1. Call To Order
2. Roll Call of Members
3. Chairman's Comments
4. Public Hearing to Recommend Approval or Denial to the ParishCouncil to Consider the following:
(A) Zoning Review ID PZ-1171.17 Lot 1 1.706 Acre Tract andFormer Lottie Henderson Road Right of Way Containing 1.706Acre for C.A.P./ Ritter MaherLocated on the west side of LA Highway 73 approximately 400´north of Longwood Avenue to amend the Ascension Parish ZoningMap from Mixed Use 2 (MU2) and Medium Intensity Residential(RM) to Small Planned Unit Development (SPUD)
5. Adjourn
Description: Zoning Review ID PZ-1171.17 Lot 1 1.706 Acre Tract and FormerLottie Henderson Road Right of Way Containing 1.706 Acre for C.A.P./Ritter MaherLocated on the west side of LA Highway 73 approximately 400´ north ofLongwood Avenue to amend the Ascension Parish Zoning Map from MixedUse 2 (MU2) and Medium Intensity Residential (RM) to Small Planned UnitDevelopment (SPUD)
ATTACHMENTS:Description Upload Date TypeFinal Review Letter 1/4/2017 Cover MemoInformation Sheet 1/4/2017 Cover MemoLandscape Plan 1/4/2017 Cover MemoSurvey 1/4/2017 Cover Memo
WWW.CSRSONL INE .COM
CSRS, INC.
6767 Perkins Road, Suite 200 Baton Rouge, Louisiana 70808
Phone. (225) 769-0546
Fax. (225) 767-0060
January 4, 2016
Mr. Jerome Fournier
Ascension Parish Planning Commission
P.O. Box 1659
Gonzales, La 70707
RE: C.A.P. SPUD
Development Plan Review
Mr. Fournier:
As the Engineering Review Agency for the Ascension Parish Planning Commission, we have reviewed the
Development Plan, Drainage Impact Study, and Traffic Impact Study submitted for the above referenced
development for compliance with the Ascension Parish Subdivision Regulations and the Ascension Parish
Development Code. Shown below are the comments made to the Consulting Engineer for the project as a
result of our review of their submittals, as well as a description of their correction or response made to our
comments (shown in bold print).
Preliminary Plat
1. The Northern property line abuts a residential zoning/use and is therefore required to have a buffer
yard with 7 Class ‘A’ trees or equivalent. The buffer yard needs to be labeled as such along the
northern and western property lines and the label stating a buffer yard is not required needs to be
removed. Consultant appears to have addressed buffer yard requirements, however, this will be
further reviewed during the building permit review process.
2. Label trees as Class ‘A’ Trees on Landscape Plan. This has been added to the development plan.
3. Trees along relocated bayou should be shown in islands adjacent to driveway as DPW will not want
trees too close along the edge of the relocated waterway. Also, it looks like there will be catch basins
near the currently shown tree locations. Consultant added labels to indicate existing characteristics.
4. Parking lot tree count appears to be 10 and not the required 12.
5. Label fence on the Landscape Plan. This has been added to the development plan.
6. Show anticipated trail section on Landscape Plan. Ensure the trail material is noted. This has been
added to the development plan.
7. Parking spaces are required to be a minimum of 200 sq. ft. except where they are adjacent to outer
perimeter or interior landscaped areas. In these areas the depth may be reduced by two feet making
WWW.CSRSONL INE .COM
the minimum required area of each parking spot 180 sq. ft. This has been updated on the
development plan.
8. ‘Toward’ is misspelled under ‘PROJECT DESCRIPTION’ on Sheet. A 1.0. This has been corrected on the
development plan.
9. Applicant shall coordinate with Ascension Parish Utilities Department on final location of Sewer
Treatment Plant. The plant should also have perimeter fence. This has been added to the
development plan.
10. Show all existing and proposed drainage servitudes. Ensure any servitudes that are to be revoked are
labeled as such. This has been added to the development plan.
11. Depict and note the proposed drainage servitude of Bayou Goudine. Ensure adequate widths are
provided from the top banks of the ditch per Section 17-4045 of the Ascension Parish Subdivision
Regulations. In addition, it appears that a portion of the parking lot will fall within the drainage
servitude. A Hold Harmless agreement will be required from DPW to allow parking within the drainage
servitude after a detailed design is completed. This has been added to the development plan. The
consultant stated a Hold Harmless agreement will be submitted upon design approval.
12. Note the existing land characteristics on the survey map. This has been added to the development
plan.
13. The SPUD Development Checklist requires an aerial photograph to a scale of 1” = 200’ taken within 2
years of the application. Please include this within the plans. This has been added to the development
plan.
14. Provide a note stating, “There are no existing curves on public streets within one-fourth (1/4) mile of
the proposed entrance.” This has been added to the development plan.
15. Depict the two proposed 5’x7’ box culverts under the SPUD entrance on sheet A 1.0. This has been
added to the development plan.
16. Note that this site is subject to traffic impact fees and confirm whether or not this site is subject to
sewer development fees. Coordinate with Carl Ladmirault from Ascension Parish to determine sewer
development fee requirements. This has been added to the development plan.
17. Under ‘Buffer yard Requirements’ on the landscaping plan, add line for 422’ north property line
calculating required number of Class ‘A’ trees (7). This has been added to the development plan.
18. Label the 55’ drainage servitude of Bayou Goudine with arrows pointing to the specific lines. This has
been added to the development plan.
WWW.CSRSONL INE .COM
19. Label or otherwise more clearly delineate the top bank lines of Bayou Goudine. This has been added
to the development plan.
20. Provide arrows pointing to the 25’ front building line. This has been added to the development plan.
21. The parking space count seems to be incorrect. Please recount and revise circled numbers and update
parking total note as necessary. This has been updated on the development plan.
22. The most recent submission did not include the previous version of the ‘Boundary and Topo Survey’
map, and a comment response suggested this was revised to the ‘Area to be Rezoned’ map. The
‘General Notes’ section on the previous survey map needs to be included with the submittal as it
contained required information per the Ascension Parish SPUD Development Plan Checklist. Please
confirm whether the ‘Boundary and Topo Survey’ map is to be a separate document or if this has been
revised and replaced with the ‘Area to be Rezoned’ map. If it is intended to replace the previous survey
map, the ‘General Notes’ section needs to be re-added. This has been updated on the development
plan.
Drainage Study
1. The HEC-RAS models show Longwood Avenue is overtopped at ~16.5’. The topographic survey
suggests this roadway is higher than this elevation. Provide evidence from the Longwood HOA or DPW
showing this road gets overtopped with water in 10-year events, otherwise extend the HEC-RAS
models to show water is contained within the banks of the Bayou and adjust road elevations to more
accurately reflect the survey map elevations. Additionally, if the roadway is not overtopped during a
10-year event, add ineffective areas to the upstream and downstream areas around the two 5’x7’ box
culverts. Consultant noted Longwood Avenue elevation as 18.5’ and revised HEC-RAS model
accordingly.
2. Label station numbers on the HEC-RAS model graphs. This has been added to the DIS.
3. The existing and proposed conditions show offsite water from Longwood Subdivision to the North
drains across this property. Although this is a conceptual design, only one inlet is shown along the
northern property line which may be inadequate. This design will need to be further reviewed when
more detailed plans are submitted. Consultant acknowledged the design will be further reviewed
when detailed construction plans are submitted.
4. Both pre and post HEC-RAS models show Lottie Henderson Rd. at a lower elevation than is suggested
by the survey map. Revise the deck/roadway height to more accurately reflect the survey map
elevations and extend the HEC-RAS models to show water is contained within the banks of the Bayou.
In addition, update the Pond Pack model as necessary. Resubmit an electronic copy of the revised HEC-
RAS model for our review. Consultant revised roadway height and updated DIS accordingly.
Traffic Study
No Comments
WWW.CSRSONL INE .COM
Drainage Impact Study Summary:
Consulting Engineer: Jeff Cook, P.E., Louisiana Land Engineering, LLC
Date of Study: December 2016
Size of Development: 3.6 acres
Existing Land Use: Existing single family house & undeveloped grassy lot
Receiving Basin: Bayou Goudine
FEMA Flood Zone: X & A
100-year Flood Elevation: 18.0 ft
Offsite Drainage Area: 160 acres upstream
Fill Mitigation: Fill mitigation is being addressed with the proposed pond.
Storm Water Mitigation: Retention pond proposed
The Drainage Impact Study substantially conforms to the requirements of the Drainage Impact Study Policy
included in the Subdivision Regulations. The Engineering Review Agency has performed a review of the input
parameters and results of the submitted drainage calculations for compliance with the Subdivision Regulations
and generally accepted practices for storm water hydrologic design. The Engineering Review Agency has not
performed a detailed numerical check of the analysis submitted. Upon approval of the preliminary plat, the
applicant can proceed with final drainage design in accordance with the concepts submitted in the impact
study.
Traffic Impact Study Summary:
Consulting Engineer: Sheelagh Brin Ferlito, P.E., PTOE, Vectura Consulting Services, LLC
Date of Study: December 2016
Date of Movement Counts: December 1, 2016
Number of Proposed Lots: 2 Buildings - 18,316 sq. ft. Health/Fitness, 2,500 sq. ft. gross Medical-Dental
Peak Hour A.M. Trips: 32
Peak Hour P.M. Trips: 74
Study Threshold Level: 1
Conclusion: No roadway improvements are recommended by the consultant.
Sight Distance Evaluation: Sight distance was evaluated at the current condition and concluded that sight
distance will cause no traffic operational problems for this proposed
development.
The following intersections were studied with the following conclusions:
LA 73 at Site Drive #1 (Right In/Right Out): The eastbound approach is anticipated to operate at a level of
service (LOS) of B during both AM and PM peak periods. A right-turn lane was not warranted during the AM or
PM peak hours. No roadway improvements are recommended by the consultant.
LA 73 at Site Drive #2 (Full Access - Longwood Avenue Connection): The southbound and eastbound
approaches are anticipated to operate at a level of service (LOS) of A during both AM and PM peak periods. No
roadway improvements are recommended by the consultant.
Longwood Avenue at LA 73: The level of services for the exit left turn from Longwood Ave. onto LA 73 remains
at a C for the AM peak hour and goes from an E to and F for the PM peak hour. The level of services for the exit
WWW.CSRSONL INE .COM
right turn from Longwood Ave. onto LA 73 remains at a B for both the AM and PM peak hours. The level of
services for the La 73 left turn onto Longwood Avenue remains at an A for both the AM and PM peak hours.
No roadway improvements are recommended by the consultant.
The following items should be considered by the Planning Commission in their analysis of the case and
addressed in the final motion:
• No Comments
Should you have any questions or comments, please do not hesitate to contact me at (225) 769-0546.
Sincerely,
Engineer Review Agency for the Ascension Parish Planning Commission
Shaun Sherrow, P.E.
CC: Blayne McCrae, AIA, Ritter Maher Architects