office ofthe secretary manila · pdf fileoffice ofthe secretary manila ~?/3 ~ptjj8 /[)_~-~ir...
TRANSCRIPT
t·
Republic of the PhilippinesDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE SECRETARYManila
~?/3 ~ptJJ8
/[) _~-~Ir
OGT 232015
DEPARTMENT ORDER )
163 ~NO. )Series of 201~V. )f.N
SUBJECT: Standard Forms of Program ofWorks (POW), Approved Budget forthe Contract (ABC) and Detailed UnitPrice Analysis (DUPA)
In order to have a uniform format and consistency in the preparation of Program of Works(POW), Approved Budget for the Contract (ABC) and Detailed Unit Price Analysis (DUPA) forinfrastructure projects in the Department, all DPWH Implementing Offices are herebydirected to use the POW/ABC Template and corresponding procedures in preparing andprocessing of the above-mentioned documents.
Henceforth, the adoption of POW/ABC/DUPAStandard Forms for projects costing Php200.00Million and above shall take effect starting January 2016. The use of the standard forms forprojects below Php200.00 Million shall be adopted on later dates to be specified.
Prior to its implementation, all concerned Implementing Offices shall undertake preparatoryactivities such as trainings and workshops that will be conducted by the resource speakersfrom the Bureau of Construction and Information Management Service (IMS).
The templates can be downloaded from the DPWHIntranet Website.
This Order shall take effect immediately.
5.2 WRO/RCA
Department of Public Works and HighwaysOffice of the Secreta ry
1111111111111111111111111111111111111WIN5W01854
•Project
Project 10
LocationStation LimitsAppropriationSource of Fund
( A ) • (IMPLEMENTING OFFICE)
PROGRAM OF WORK/BUDGET COST
Net Length
Target Start DateTotal Project DurationNo. of Pre-determinedUnworkable Days
(a) Road(b) Bridge(c) Others
FORM POW·2015-01·00
DESCRIPTION OF WORKS TO BE DONE QUANTITYAS SUBMITTED AS EVALUATED
UNIT% TOTAL TOTAL DIRECT COST % TOTAL TOTAL DIRECT COST
Part A: Facilities for the Engineer
B: Other General Requirements
C: Earthworks
D: Subbase and Base Course (PLS. SEE FORM POW-2015-01C-OO)
E: Surface CoursesF: Bridge Construction
G: Drainage and Slope Protection Structures
H: Miscellaneous StructuresI: Provisional SumJ: Daywork
Total
(PLS. SEE FORM POW-2015-01B-OO)
EQUIPMENT:DESCRIPTION REQUIRED
BREAKDOWN OF EXPENDITURES:AS SUBMITTED AS EVALUATED
1. labor2. Materials3. Rental of Equipment4. Provisional Sum / Daywork5. OCM and Profit6. Value Added Tax7. EAO. %8. RROW Acquisition9. Physical Reserved (Contingency)10.TOTAl ESTIMATEDCOST
AS SUBMITTED AS EVALUATEDA. Total Direct CostB. OCM and ProfitC. Value Added TaxD. Total Construction CostE. Eng'g & Administrative Overhead, %
F. RROW AcquisitionG. Physical Reserved (Contingency)
H. TOTAL ESTIMATEDCOST
Preparation and Submission:
Prepared by:
Name & SignaturePosition Title
Planning/Const. Section/Division/Consultant
Checked/Submitted by:
Name & SignaturePosition Title
Planning/Const. Section/Division/UPMO
Evaluation:
Reviewed as to Unit Cost:
Name & SignaturePosition Title
Planning/Construction DivisionlBOC
Approval: (based on the Delegated Authority)
Recommending Approval:
Name & SignaturePosition Title
Approved :
Name & SignaturePosition Title
QTYITEMNO. DESCRIPTION UNIT TOTAL UNITCOST (DIRECT+INDIRECT)
!'AlIi'~:" >' ;':'~{,", ALUATED
•
TOTAL OF PART A
..'PARTB, .. " ···•.•·O~".·,-." ,
TOTAL OF PART B
TOTAL OF PART C
'PAaltL ....:-'.:': ..;(Qitt:"''':..
TOTAL OF PART D
(PROJECT NAME)(lOCATION)
ITEMIZED BREAKDOWNDIRECTCOST TOTAL UNITCOST
FORM POW-2015-01A·OI
% DIRECTCOST
AS EVALUATED',;. J• .';.".:'.' •
. ,,, ·.·C'·.;·
..
': .' ''',.'' ..,
TOTAL OF PART E
• [Autogenerated Code)
•ITEM NO. DESCRIPTION
TOTAL OF PART F
QTYUNIT
(PROJECT NAME)(LOCATION)
TOTAL
ITEMIZED BREAKDOWN
DIRECT COST
UNIT COST
TOTAL UNIT COST
(DIRECT +INDIRECT)
FORM POW-2015-01A-OC
% DIRECT COST
PARTG
PARTH .•
(Autogenerated Code]
TOTAL OF PART G
TOTAL OF PART H
TOTAL OF PART J
GRAND TOTAL
• (Name of Project)(Location)
FORM POW·2015-01B.lJO .MINIMUM EQUIPMENT REQUIREMENT
No. Equipment Description Number ofEquipment Description Capacity Number ofCapacity Equipment No.
Equipment1 312 323 334 345 356 367 378 389 3910 4011 4112 4213 4314 . 4415 4516 4617 4718 4819 4920 5021 5122 5223 5324 5425 5526 5627 5728 5829 5930 60
SUB· TOTAL SUB·TOTALTOTAL ...
[Autogenerated Code]
• (NAME OF PROJECT)
(Location)
FORM POW·2015-01C..oO
'. ' .
TOTAL COST
.•....',' I •.•. "",' .••..•.•••.•.
5% VAT
.' '»:.8 .'" :.'.,
"~ .•~~.f~~trJ~r~-;'~,."<i
AS EVALUATED
AS SUBMITTED
AS EVALUATED
AS SUBMITTED
AS EVALUATED
AS SUBMITTED
AS EVALUATED
AS SUBMITTED
AS EVALUATED
AS SUBMITTED
DETAILED BREAKDOWN OF COMPONENT COST FOR EACH ITEM
~~LW'"h,:~~~~;r_%TOT"-"::AS EVALUAlED
AS SUBMITTED
AS EVALUATED
AS SUBMITTED
AS EVALUATED
AS SUBMITTED
AS EVALUATED
AS SUBMITTED
AS EVALUATED
AS SUBMITTED
ASEVALJ ~ ~~~LiC.~· •••.;.,
AS SUBMITTED
AS EVALUATED
AS SUBMITTED
AS EVALUATED
AS SUBMITTEDAS EVALUATED
AS SUBMITTEDAS EVALUATED
AS SUBIIITTEll
AS EVALUATED
AS SUBMITTED
AS EVALUATED
AS SUBMITTED
AS EVALUATED
AS SUBMITTED
AS EVALUAlED
AS SUBMITTED
AS EVALUATED
AS SUBMITTED
DESCRIPTION
TOTAL OF PART A
TOTAL OF PART D
TOTAL OF PART C
.SUB,~~ ".'
TOTAL OF PART B
. '<'" .
PART A
PART Il
PARTC
ITEM NO.
[Autogenerated Code)
• (NAME OF PROJECT)
(Location)
FORM POW·2015-01C.oO
TOTAL COST5% VAT
AS EVAlUATED
AS SUBMITTED
AS EVAlUATED
AS SUBMITTED
AS EVAlUATED
AS SUBMITTED
AS EVALUATED
AS SUBMITTED
DESCRIPTION
TOTAL OF PART F
;/'>. '~'Et~$~~"\.b~fi"~~~~~~··.~;~: '-c..'",",""AS EVAlUATED
AS SUBMITTEDAS EVAlUATED
AS SUBMITTED
AS EVAlUATED
AS SUBMITTED
TOTAL OF PART E AS EVALUATEDAS SUBMITTED
PART'F
ITEM NO.
PAlttIL."" '.
pART a ..' ....
PARTI .' '7.'
PARTJ '.'
TOTAL OF PART G
TOTAL OF PART H
...' "Ro..V1TOTAL OF PART I
';1).
TOTAL OF PART J
GRAND TOTAL
..~.",~..~~~.. , "AS EVAlUATED
AS SUBMITTED
AS EVAlUATED
AS SUBMITTED
AS EVAlUATED
AS SUBMITTED
AS EVALUATED
AS SUBMITTED
~ ..""".R!;_"AS EVALUATED -..;,(<14!'.,",_ ',..""t ;"":'~~1:i,:..",·, r'}o;-"
AS SUBMITTED
AS EVALUATED
AS SUBMITTED
AS EVALUATED
AS SUBMITTEDAS EVALUATED
AS SUBMITTED
c· ~:!::~~~~"~ I T~
~ "~iJ~AS EVALUATED ~}~
AS SUBMITTED
AS EVALUATEDAS SUBMITTED
I
." " ,:.).:
.......... ;.,...• ,
" (Autogenerated Code]
•(IMPLEMENTING OFFICE)
(NAME OF PROJECT)(Location)
FORM ABC·2015-02·00
--------------.------- ..---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
SUMMARY OF APPROVED BUDGET FOR THE CONTRACTContract Duration:
ITEM NO. DESCRIPTION TOTAL MARK·UPTOTAL INDIRECT COST TOTAL COSTESTIMATED DIRECT COST VAT
% VALUEAS EV ALUA TEDPART A FACILITIES FOR THE ENGINEERAS SUBMITTED
AS EVALUA TEDPART B OTHER GENERAL REQUIREMENTSAS SUBMITTED
AS EVALUA TEDPART C EARTHWORKSAS SUBMITTED
AS EVALUATEDPART D SUBBASE AND BASE COURSEAS SUBMITTED
AS EVALUATEDPART E SURFACE COURSEAS SUBMITTED
AS EV ALUA TEDPART F BRIDGE CONSTRUCTIONAS SUBMITTED
AS EVALUATEDPART G DRAINAGE AND SLOPE PROTECTION STRUCTURESAS SUBMITTED
AS EV ALUA TEDPART H MISCELLANEOUS STRUCTURESAS SUBMITTED
AS EVALUA TEDPART I PROVISIONAL SUMAS SUBMITTED
AS EVALUA TEDPART J DAYWORKAS SUBMITTED
AS EVALUATEDTOTALAS SUBMITTED
Preparation and Submission:
Prepared by:
Name & SignaturePosition Title
Planning/Const. SectionlDivision/Consultant
Checked/Submitted by:
Name & SignaturePosition Title
Planning/Const. Section/Division/UPMO
Evaluation:
Evaluated by:
Name & SignaturePosition Title
Planning/Constnuction Division/BOC
Approval: (based on the Delegated Authority)
Recommending Approval:
Name & SignaturePosition Title
Approved:
Name & SignaturePosition Title
•(IMPLEMENTING OFFICE)
(NAME OF PROJECT)(location)
FORM ABC·2015-02A·OO
----.._---------~-..._-_._._---_._._-_._------------_.-------.-----.-.---------.--.---------------------------------------.--------------------------------APPROVED BUDGET FOR THE CONTRACT
Contract Duration :
ITEM NO. DESCRIPTION ESTIMATED DIRECT TOTAL MARK..lJP TOTAL INDIRECTUNIT COSTQUANTITY UNIT VAT TOTAL COSTCOST % VALUE COST
PART A FACILITIES FOR THE ENGINEER
AS EVALUATED
AS SUBMITTED
AS EVALUATED
AS SUBMITTED
AS EVALUATED
AS SUBMITTED
AS EVALUATEDTOTAL OF PART A
AS SUBMITTED
PART B OTHER GENERAL REQUIREMENTS
AS EVALUATED
AS SUBMITTED
AS EVALUATED
AS SUBMITTED
AS EVALUATED
AS SUBMITTED
AS EVAlUATEDTOTAL OF PART B
AS SUBMITTED
PART C EARTHWORKS
AS EVALUATED
AS SUBMITTED
AS EVALUATED
AS SUBMITTED
AS EVALUATED
AS SUBMITTED
AS EVAlUATEDTOTAL OF PART C
AS SUBMITTED
Preparation and Submission:
Prepared by:
Name & SignaturePosition Title
Planning/Canst. SeclionlDivision/ConsuRanl
[Autogenerated Code)
CheckedlSubmilted by:
Name & SignaturePOlltlon Title
Planning/Const. SectionlDivisionlUPMO
Evaluation:
Reviewed as 10Unn Cost:
Name & SignaturePosition Title
Planning/Construction DivisionlBOC
•(IMPLEMENTING OFFICE)
(NAME OF PROJECT)(location)
FORM ABC·2015-02A-OO
----..-------------------------------------------------------.----.-------.---.-----------------------------------------------------------------------------APPROVED BUDGET FOR THE CONTRACT
Contract Duration :
ITEM NO. DESCRIPTION ESTIMATED DIRECT TOTAL MARK·UP TOTAL INDIRECT TOTAL COST UNIT COSTQUANTITY UNIT VATCOST % VALUE COST
PART D SUBBASE AND BASE COURSE
AS EVALUATED
AS SUBMITTED
AS EVALUATED
AS SUBMITTED
AS EVALUATED
AS SUBMlmD
AS EVALUATEDTOTAL OF PART D
AS SUBMITTED
PART E SURFACE COURSES
AS EVALUATED
AS SUBMITTED
AS EVALUATED
AS SUBMITTED
AS EVALUATED
AS SUBMITTED
AS EVALUATEDTOTAL OF PART E
AS SUBMITTED
PART F BRIDGE CONSTRUCTION
AS EVAlUATED
AS SUBMITTED
AS EVALUATED
AS SUBMITTED
AS EVALUATED
AS SUBMITTED
AS EVALUATEDTOTAL OF PART F
AS SUBMITTED
Preparation and Submission:
Preparedby:
Name & SignaturePosition Title
PlanninglConst. SectionlDivisionlConsullant
[Autogenerated Code)
Checked/Submittedby:
Name & SignaturePosition Title
Planning/Const. SectionlDivisionlUPMO
Evaluation:
Reviewedas to Unit Cost
Name & SignaturePosition Title
Planning/Construction DivisionlBOC
•(IMPLEMENTING OFFICE)
(NAME OF PROJECT)(Location)
APPROVED BUDGET FOR THE CONTRACTContract Duration :
FORM ABC·2015-02A-ClO
ITEM NO. DESCRIPTION QUANTITY ESTIMATED DIRECT TOTAL MARK-UP TOTAL INDIRECT TOTAL COST UNIT COSTUNIT VATCOST % VALUE COST
PART G DRAINAGE AND SLOPE PROTECTION STRUCTURES
AS EVALUATED
AS SUBMITTED
AS EVALUATED
AS SUBMiTTED
AS EVALUATED
AS SUBMiTTED
AS EVALUATEDTOTAL OF PART G
AS SUBMITTED
PART H MISCELLANEOUS STRUCTURES
AS EVALUATED
AS SUBMITTED
AS EVALUATED
AS SUBMITTED
AS EVALUATED
AS SUBMITTED
AS EVALUATEDTOTAL OF PART H
AS SUBMITTED
PART I PROVISIONAL SUM
AS EVAlUATED
AS SUBMITTED
PART J DAYWORK
AS EVAlUATED
AS SUBMITTED
AS EVALUATEDGRAND TOTAL
AS SUBMITTED
Preparation and Submission:
Prepared by:
Name & SignaturePosition Title
Planning/Const. SectionlDivision/Consultanl
•. {Auto~enerated Code]
CheckedlSubmilted by:
Name & SignaturePosition Title
Planning/Const. SectionlDivisionlUPMO
Evaluation:
Reviewed as to Unit Cost:
Name & SignaturePosition Title
Planning/Construction DivisionlBOC
Item No.1 Description
Unit of MeasurementOutput per hour· As SubmittedOutput per hour· As Evaluated
(NAME OF PROJECT)(Location)
DETAILED UNIT PRICE ANALYSIS (DUPA)
nc::vl.;)lC"\..I G.;) VI lI.'UU:: 011\..1 IU111C"J
FORM.POW·2015·01D-ll0
• Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)
A.1 Labor
Sub· Total for A.1 • As SubmittedA.2 Labor
Sub· Total for A.2. As Evaluated
Name and Capacity No. of Unlt/s No. of Hour/s Hourly Rate Amount (PhP)
B.1 Equipment
Sub· Total for B.1 • As SubmittedB.2 Equipment
Sub· Total for B.2· As EvaluatedC.1 Total (A.1 + B.1)· As SubmittedC.2 Total (A.2 + B.2)· As Evaluated0.1 Output per hour· As Submitted0.2 Output per hour· As EvaluatedE.1 Direct Unit Cost (C.1 + 0.1). As SubmittedE.2 Direct Unit Cost (C.2+ 0.2) • As Evaluated .
Name and Specification Unit Quantity Unit Cost Amount (PhP)
F.1 Materials
Sub· Total for F.1 • As SubmittedF.2 Materials
Sub· Total for F.2 • As EvaluatedG.1 Direct Unit Cost (E.1 + F.1)·As SubmittedG.2 Direct Unit Cost (E.2 + F.2) • As EvaluatedH.1 Overhead, Contingencies & Miscellaneous (OCM)• As Submitted 12% 19%/7% 16%ofG.1H.2 Overhead, Contingencies & Miscellaneous (OCM). As Evaluated 12% 19%17%/6%ofG.21.1 Contractor's Profit (CP) • As Submitted 10%/8%ofG.11.2 Contractor's profit (CP) • As Evaluated 10%/8% ofG.2J.1 Value Added Tax (VAT)· As Submitted 5% of (G.1+ H.1 + 1.1)J.2 Value Added Tax (VAT) • As Evaluated 5% of (G.2+ H.2+ 1.2)K.1 Total Unit Cost· As Submitted (G.1+ H.1+ 1.1+ J.1)K.2 Total Unit Cost· As Evaluated (G.2+ H.2+ 1.2+ J.2)
Prepared by:
Name & SignaturePosition Title
Implementing Ollice/Consultant
(Autogenerated Code]
CheckedlRevlewed by:
Name& SignaturePosition Title
Reviewing Office
[Page No.]