Page 1: Offshore Rig Life Extension
Seng
Typewritten Text
Seng
Typewritten Text
Seng
Typewritten Text
Seng
Typewritten Text
Seng
Typewritten Text
Page 2: Offshore Rig Life Extension
Page 3: Offshore Rig Life Extension

www.lets-global.com

Page 4: Offshore Rig Life Extension

IIW Document XIII-2430r1-12

Page 5: Offshore Rig Life Extension

Specimens sprayed with artificial salt water

Specimens

Page 6: Offshore Rig Life Extension

Specimens

Page 7: Offshore Rig Life Extension

The As-welded corroded specimens exhibited a slight improved fatigue strength compared to the As-welded non corroded specimens.

Page 8: Offshore Rig Life Extension

The surface layer with detrimental residual tensile stresses may be removed by the corrosion process

and/or

Possible stress concentrations such as weld toe notches and corrosion pits are ‘softened’ by corrosion

Page 9: Offshore Rig Life Extension

The reduction of the compressive layer (induced by the Ultrasonic Peening treatment) due to corrosion is detrimental to the fatigue life improvement.

Only a improvement factor of 1.6 was observed after 7.5 years of corrosion

Page 10: Offshore Rig Life Extension

Compare real situation to drawings and/or finite element models

Page 11: Offshore Rig Life Extension
Page 12: Offshore Rig Life Extension

A bracket, which had not been taken into account in the FE model had been installed at the fatigue hot-spot after a crack repair

The original planned extent of Ultrasonic Peening:

Is this extent of treatment sufficient?

Page 13: Offshore Rig Life Extension

Just because something is written in ink does not mean it is true

Page 14: Offshore Rig Life Extension

Just because something is written in ink does not mean it is true

Page 15: Offshore Rig Life Extension
Page 16: Offshore Rig Life Extension
Page 17: Offshore Rig Life Extension
Page 18: Offshore Rig Life Extension

Visual inspection of fatigue hot-spots is strongly recommended prior to planning of work. Difficulties with access can easily be assessed on site, but can be hard to predict from a drawing and/or from a picture.

Page 19: Offshore Rig Life Extension

ASSET INTEGRITY

Is a result of optimizing the combination of:

• understanding of plant or structure criticality

• degradation mechanisms

• appropriate design

• construction

• plant operation

• maintenance

Page 20: Offshore Rig Life Extension

ASSET INTEGRITY MANAGEMENT

Actions to ensure that a critical equipment or structure is:

– designed

– constructed

– and operated

so that it remains safe and fit-for-purpose throughout its entire intended life

Page 21: Offshore Rig Life Extension

ASSET INTEGRITY ASSURANCE

is a combination of many factors of

which Risk Based Inspection

is one important component

Page 22: Offshore Rig Life Extension

Is the optimized application of appropriate inspection methodology to equipment or structures based on the risk and consequence of their failure in such a manner as to provide reliable information on condition and deterioration rates

RISK BASED INSPECTION

Page 23: Offshore Rig Life Extension

• Helps understanding the current condition • Provides information about rate of degradation when baseline data as

– design philosophy – operating conditions – maintenance regimes – other such data

are also known and linked in to the condition assessments and prediction.

Benefits of Risk Based Inspection

Page 24: Offshore Rig Life Extension

RBI is an evolution from

• prescriptive regulations

• is a method for optimizing the inspection process

• supports good Asset Integrity Management

It relies on knowledge of other factors in order to design the RBI programme and,

• to interpret the results

• to predict future condition

Page 25: Offshore Rig Life Extension

Designing a RBI System for an FPSO

• define the key stakeholder objectives

• agree on key project issues such as

– data availability

– baselines

– database selection

– database inputs and outputs.

Page 26: Offshore Rig Life Extension

RBI system depends on • complete and accurate data • at the set up stage • throughout the asset life.

• This data includes:

– Line / Vessel Lists – Material of construction – Operating temperatures and pressures – Design temperatures and pressures (if operating values not available) – Insulation / lining / cladding details – System criticality information – Basic fluid composition – Heat and Material Balance – Process System Description – Materials selection basis – Fabrication drawings, Datasheets etc – Plus many others

Page 27: Offshore Rig Life Extension

RIS

K S

cree

nin

g M

atr

ix

Page 28: Offshore Rig Life Extension

SCREENING

• Screening can be performed at any level such as a complete facility or process unit, down to multiple or individual pieces of equipment. It is recommended to do a good quality risk screening where data is readily available such as a complete process line list/vessel list.

• If data is less readily available a risk screening by system/structural component may be more appropriate.

Page 29: Offshore Rig Life Extension

Structural Integrity Life Extension for FPSO

Page 30: Offshore Rig Life Extension

a) b)

d)

c)

Page 31: Offshore Rig Life Extension

a) b)

d)

c)

Page 32: Offshore Rig Life Extension

a) b)

d)

c)

Page 33: Offshore Rig Life Extension

a) b)

d)

c)

Page 34: Offshore Rig Life Extension

a) b)

d)

c)

Page 35: Offshore Rig Life Extension

1 2 3

?

4

Possible number of people in a confined space - Alternative escape route - Escape route length - Company policy - Not a exact science….

5

Page 36: Offshore Rig Life Extension
Page 37: Offshore Rig Life Extension
Page 38: Offshore Rig Life Extension

A temporary platform is spot-welded into a bulkhead. All personnel continuously secured with Rope Access methods No extensive testing/safety measure of the platform itself is necessary before work can start. Advantages: -Quick to set up -Improves working quality Drawbacks: -Hot-work

Page 39: Offshore Rig Life Extension
Page 40: Offshore Rig Life Extension

[email protected]

LETS Global Ultrasonic Peening Procedure

Lloyd’s Approval

Page 41: Offshore Rig Life Extension

- Fatigue hot-spots found in four FPSO cargotanks - Bulkhead and bracket welds treated by UP rope access team - January 2011 to February 2012

[email protected]

Page 42: Offshore Rig Life Extension

Transverse cargo tank bracket; 6 hours required Ultrasonic Peening treated area; - 300mm on each side of bracket

Page 43: Offshore Rig Life Extension

Transverse cargo tank bracket

Page 44: Offshore Rig Life Extension

Bulkhead connection; 8 hours required

Page 45: Offshore Rig Life Extension

Scenario Fatigue hot-spot located in cargo oil tank Weld improvement method; Ultrasonic Peening

Page 46: Offshore Rig Life Extension

12m

Page 47: Offshore Rig Life Extension

-Quick to install

-Good access to fatigue hot-spot

-Equipment can rest on platform

Page 48: Offshore Rig Life Extension

Fatigue hot-spot

Page 49: Offshore Rig Life Extension

Drawings recieved from client; Planned extent of Ultrasonic Peening

Page 50: Offshore Rig Life Extension
Page 51: Offshore Rig Life Extension