Offshore Wind Supply Chain Overview 13 Oct 2020 Global Offshore Wind Summit - Taiwan Fu-Ching Chen Deputy Chief of Industrial Research Section Metal Industrial Research & Development Centre

Upload: others

Post on 07-Feb-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

  • Offshore Wind Supply Chain Overview

    13 Oct 2020

    Global Offshore Wind Summit - Taiwan

    Fu-Ching ChenDeputy Chief of Industrial Research Section

    Metal Industrial Research & Development Centre

  • 1Copyright©2020 MIRDC All rights Reserved

    Agenda

    01

    02

    03

    Conclusion

    Offshore Wind Industry Policy

    04

    05

    Promoting Industry Clusters

    Industry Development Status

    Supply Chain Considerations for Zonal Development

  • 2Copyright©2020 MIRDC All rights Reserved

    Offshore Wind in TaiwanI. Offshore Wind Industry Policy (1/9)

    Offshore Wind Power Demonstration Incentive Program (DIP)

    DIP results announcedTGC, Swancor,

    Taipower awarded incentives

    Demo turbines installed by 2015• >3MW turbines, 2 per project• Incentives: max. of 50% of upfront installation costs per kWh based on the year’s OFW FiT rates, no higher than 50% of total turbine installation costs

    Demo wind farms completed by 2020• Total capacity: 100-200MW• Incentive max.: 250Mn NTD

    2012

    2013

    2014Green Energy Industry

    Upgrading PlanFoster domestic market with policy

    tools• Target capacity by 2020: 320 MW• by 2030: 3GW

    Infrastructure developmentTechnology R&DShort-term: offshore wind; mid-term:

    service sector; long-term: manufacturing industry

    2015

    Directions for Allocating Installed Capacity of Offshore Wind Potential Zones • Results of Selection and Auction rounds announced

    2017

    36 potential wind farm sites

    announced

    2018

    4-year Wind Power Promotion Plan•Target capacity by 2020: 976 MW/ by 2025: 5.7GW

    Formosa 1 demo turbines began operations

    2019

    2026-2035 target: 10GWFormosa 1 project began operations

    2020

    Green & renewable energy listed as a national Core Strategic Industry

  • 3Copyright©2020 MIRDC All rights Reserved

    Energy Security, Green Economy, Sustainable Environment

    Grow Energy Independence

    Diversify Energy Mix

    Enhance Energy Security

    Vision Boost Local Demand & Employment

    Innovate for Global Market

    Innovative Green Economy

    Save Energy & Cut Carbon

    Environmental Protection

    Environmental Sustainability

    TargetPolicy

    Measure

    Thousand Wind Turbines Project Office, MOEA One-stop shop, review process tracking, application barrier-free

    Wind Energy Zonal Development4-year Wind Energy Development

    PlanOffice of Energy and Carbon Reduction, Executive Yuan

    cross-agency coordination

    Coexist with

    FisheriesIndustry

    ParkBetter

    RegulationDesignated

    HarborInstallation

    Fleets

    Grid Connection Substation

    Spatialco-opetition

    OffshoreOnshoreWind FarmLocation

    FeederConnection

    Cumulative capacity by 2025: 6.7 GW Annual Energy Production 24.5 B kWh

    Annual Carbon Reduction 13. 58M tons

    Investment total NT$ 1.06 T

    Building Onshore experience for Offshore

    2020 Target: 814 MW2025 Target: 1,200 MW

    Onshore2020 Target: 976 MW2025 Target: 5,738 MW

    Offshore

    Public Communi-

    cation

    Source:Thousand Wind Turbines Office

    Executive Yuan Approved 4-year Wind Energy Development PlanI. Offshore Wind Industry Policy (2/9)

  • 4Copyright©2020 MIRDC All rights Reserved

    Phase 1

    Phase 2

    Phase3

    2017: 2 demo sets at Formosa 12019: 60 sets (120MW in total) at Formosa2020: 21 sets (109.2MW in total) at Taipower

    Turbine components-Swancor, Fortune, Powercom, Walsin

    Foundation- Ming Rong Yuan

    Provide subsidies to accumulate experience Guide supplier engagement

    Demo Incentives

    Potential Sites

    2021-2024: wind farm selection (3.8GW in total)2025: wind farm auction (1.7GW in total)

    South-North foundation cluster

    (SDMS, Century)Taichung Port turbine cluster

    (SGRE、MVOW)

    Announce sites for application Facilitate industry cluster

    Zonal Dev.

    2026-2035: release 1GW/year (10GW in totalTwo-phase selection: first qualification

    assessment, then price comparison

    Build the industry led by the government Further industry dev. Continue the energy of potential

    site suppliersOptimize investment environmentBecome Asia-Pacific offshore

    wind power hub

    Offshore wind power is both an energy policy and a industry policy

    I. Offshore Wind Industry Policy (3/9)

    Source:BOE, IDB

  • 5Copyright©2020 MIRDC All rights Reserved

    I. Offshore Wind Industry Policy (4/9)

    In selection stage, the selected developers with completion due in 2021-2025 commit to submitting a specific industrial relevance program and supporting material.

    Developers to submit the above two documents according to year of grid connection. IDB issues an Opinion Letter to help improve developer program before it is reviewed by BOE.

    Capacity awarded originally:3GW (in practice: 3.098GW)

    Criteria: technical & financial capability Commitments Required: Specific industrial relevance program:

    by 2018/11/15 for 2021-2022 completion, 2019/11/15 for 2023-2025 completion

    Best available techniques & strategy to minimize environmental impact

    Power Development Fund used for environmental protection & CSR projects

    Capacity awarded originally: 0.5GW (in practice: 0.738GW)Criteria: technical (60%) & financial capability (40%)Submit supporting material according to establishment permit application requirements, progress strictly reviewed

    Capacity awarded originally: 2GW (in practice: 1.664GW)

    2-Stage review processQualification: a score >60 in the

    selection processProposals with lower FIT rates

    are selectedGrid connection capacity for 2021-2025 awarded, with flexible requirements

    1. Selection 2. Auction Total Installed Capacity by 2025: 5.5 GW

    Grid Connectionby 2020

    Completion & Connection during 2021-2025

    The commitments of “Guidelines for Allocating Installed Capacity of Offshore Wind Potential Zones.”

    Source:BOE

  • 6Copyright©2020 MIRDC All rights Reserved

    (1) Build infrastructure for the industry to develop upon: plan offshore wind power zones to facilitate investment and form clusters.

    (2) Facilitate the dev. of supply chain: Attract international manufacturers to Taiwan via market incentives; encourage international and local suppliers to form partnerships in turbine manufacturing, foundation and vessel manufacturing, etc.; create a supply chain for the industry.

    Strategies

    Goal

    Turbine sub

    systems

    Maritimesupply chain

    Approaches Industry dev.

    environment

    Investment

    Wind farm

    application

    Facilitate international collaboration

    Create a supply chain for the industry

    Build infrastructure for the industry to develop upon

    Plan industry zones to facilitate industry clusters

    Attract international vendors to invest & build factories in Taiwan

    Strengthen matching mechanism

    Facilitate international collaboration

    Facilitate the dev. of key subsystems & components

    Facilitate cases of local wind farm application

    Help expanding Asia-Pacific markets and enter international supply chains

    Jan. 18, 2018: Announcement of Taiwan’s Offshore Wind Industry PolicyPromote the dev. of Taiwan’s offshore wind power industry, build the supply chain, and compete in Asia-Pacific markets

    I. Offshore Wind Industry Policy (5/9)

    Source:IDB

  • 7Copyright©2020 MIRDC All rights Reserved

    76 consulting meetings convened during Sep 20 to Dec 15 in 2017 (in total 50 wind farm developers, system suppliers, local component suppliers and industry associations), to measure technical gaps and investment willingness for further assessment and planning

    Industrial development items and timeline formulated based on technical maturity level among local suppliers and planning practices of international suppliers.

    Clear List of Items and Timeline for Industrial Development

    I. Offshore Wind Industry Policy (6/9)

    Foundation (IDB)

    Foundation

    Electrical Components

    (IDB)

    Onshore electrical components (transformer, switchgear, distribution panel)

    Submarine cable

    Wind Turbine (IDB)

    Tower Nacelle assembly, transformer, distribution panel, UPS, canopy & spinner, cable, hub casting, fastener

    Gearbox, generator, PCS, blade and resin, nacelle housing, nacelle bedframe casting

    Marine Engineering

    (BOE)

    Construction and supervision of surveying, cable laying, exploration, etc. Vessel and machine planning and design and safety management

    Ship-building: vessels for survey, supply, arrangement, transportation, cable laying

    Construction and supervision of tower, foundation, etc. Vessel and machine planning and design and safety management

    Ship-building: vessels for installation & transportation

    Construction and supervision of turbines, vessel and machine planning and design, safety management

    Preparation(2021-2022) (incl. preparation phase items) (incl. preparation phase & Phase I items)

    Phase I (2023) Phase II (2024-2025)

    Source:IDB

  • 8Copyright©2020 MIRDC All rights Reserved

    ROC-flag vessels owned by a company or entity formed pursuant to ROClaws are preferred.

    If the vessel used is owned by a legally formed international joint venture(IJV), the domestic company should own more than half of the shares in theIJV; the IJV should also own more than half of the shared of the said vessel.

    If using foreign flag vessels proves necessary, a non-capacity letter frommarine engineering trade associations, as well as a “ROC crew training plan”are required. Maritime and Port Bureau’s (MPB) Operation Directions forForeign Flag Ships Applying to Stay in Any Harbor or Port Other Than ThoseAnnounced as International Ports by the ROC should be followed.

    MOEA planned to formulate a mechanism for reviewing the degree ofindustrial relevance of OFW vessels.

    Domestic suppliers preferred in marine engineering projects

    Applicant Vessel

    Arriving in TW

    Consultation Meeting

    Review Meeting

    Decision by Competent Authority

    (MPB)

    I. Offshore Wind Industry Policy (7/9)

  • 9Copyright©2020 MIRDC All rights Reserved

    4 Drivers for Building OFW Supply Chain in Taiwan

    •OFW Industrial Relevance Program building supply chain Setting up factory via sole

    proprietorship/ JV Tech transfer, OEM Supply chain partners

    •OFW engineering and key component inspection & certification program

    •O&M inspection and servicing technologies program

    •Taichung Harbor: OFW Industrial ParkTurbine component production, nacelle assemblyPre-assembly portO&M base

    •Foundation clusters at Taipei Harbor & SindaHarbor (Kaohsiung)

    •Offshore Wind Master Program Course

    •Welder TrainingGov: technology upgrading for OFW

    foundation industryEducation: Fortune Institute of

    Technology, NKUSTIndustry: CSBC Academy, Century-

    Bladt welding school• Maritime talent developmentMIRDC Maritime Talent Devt. &

    Accreditation Center (Kaohsiung)TIWTC (Taichung)NKUST (Wind Industry Training

    Base)

    •National Financing Guarantee Scheme10Bn-NTD in size, with 100Bn

    financing guarantee resourcesApplication to open by end of

    2020Wind farm developer: max loan

    for local goods & service procurement: 30Bn NTD, max guarantee period: 20y (per company).Domestic equipment & service

    provider: max loan: 2Bn NTD; for export purpose: 500Mn NTD, max guarantee period: 5y

    Supply Chain

    I. Offshore Wind Industry Policy (8/9)

  • 10Copyright©2020 MIRDC All rights Reserved

    Offshore Wind Regulations in TaiwanAnnouncement Date Agency Regulation Description

    2019.9.23 BSMIGuidelines for Project Certification and Review of Wind Farms

    Demonstration offshore wind farms should apply for project certification and review within 6 months after obtaining establishment permits

    2020.1 MOL Health and Safety Guidelines for Offshore Wind Farms

    Employers shall formulate a safety and health management plan and implement accordingly, in order to ensure worker health and safety on offshore wind farms.

    2020.8.24 BOECOVID-19 Prevention and Control Guidelines for Offshore Wind (Revised 3.0)

    Epidemic prevention and control measures targeting personnel working in offshore wind, covering personnel entry and exit, work shifts, and foreign vessels operating in Taiwan

    2020.9.10 MOL

    Announcement to approve Personnel Working for the Construction, Operation and Maintenance of Offshore Wind Farms or Onshore Wind Farms as the Type of Workers Specified in Article 84-1 of Labor Standards Act (LSA)

    Due to poor weather conditions and safety risks, offshore wind workers at times cannot carry out operations as scheduled, or avoid working at height or solving failures. When Articles 30, 32, 36, 37 and 49 of LSA apply in relevant situations, such personnel should be approved as the Type of Workers Specified in Article 84-1 of LSA and granted flexibility in work arrangement.

    I. Offshore Wind Industry Policy (9/9)

  • 11Copyright©2020 MIRDC All rights Reserved

    圖例

    國際商港 輔助港

    國內商港 工業專用港

    特種貨物裝卸及其他特殊設施

    (商港法第十三條)

    交通船碼頭

    Legend

    International Commercial Port

    Supporting PortDomestic Commercial PortIndustrial Harbor

    Special Cargo Stevedoring & Other Special Facility (Commercial Port Law)

    Transfer Vessel HarborTaiwan Strait GuantangHarbor

    Keelung Port

    Shenao Harbor

    Heping Harbor

    Suao Harbor

    Hualien Harbor

    Fugang

    Taiwan

    Nanliao

    Kaiyuan

    Penghu Harbor

    Taichung Port

    Mailiao Harbor

    BudaiHarbor

    Yongan Harbor

    Bozhi Harbor

    Donggang

    OffshoreOil-unloading Buoy

    Wangan

    Pacific Ocean

    Taipei PortFoundation Production Base

    Anping Harbor

    Kaohsiung HarborXiao Liuqiu

    Qimei

    Penghu

    Bashi Channel

    Singda HarborFoundation Production

    Base

    Changhua Fishing Port Offshore Wind O&M Base

    Taichung PortWind Turbine Component Manufacturing, O&M base

    Taipei Harbor

    Industry Cluster Allocation

    Source:MIRDC

    II. Promoting Industry Clusters (1/4)

  • 12Copyright©2020 MIRDC All rights Reserved

    Offshore Wind Component Industry Cluster at Taichung PortWharf No. 106, completed on April 17th of this year will soon be put into service receiving

    wind turbine parts and materials and shipping out assembled turbine components ready for installation.

    Wharf No. 5A and 5B completed on June 10th of this year.Wharf No. 36 will be completed by the end of this year.

    CS Wind-Chin FongTower Plant

    Source: TIPC

    II. Promoting Industry Clusters (2/5)

    MVOWNacelle Assembly

    Plant

  • 13Copyright©2020 MIRDC All rights Reserved

    #106 Wharf

    YGG 20.5haHub casting,

    bedframe casting fabrication factory

    Chung Chia

    Power(6ha)

    •Wharf length: 450m;•load-bearing structural width: 33m•Operating water depth: -16.3m• Uniformly distributed load (UDL)

    capacities : 40mt/m2 over a 187.7m-long section, 10mt/m2 over a 237.5m-long section, and 3mt/m2 over a 24.8m-long section

    Southern Fill Area 36ha

    (reserved for offshore wind)

    Tien-Li21.1haBlade

    factorySGRE

    SGRE3ha

    Nacelle Assembly Facility

    Century Huaxin30.1haPP、TPTower factory

    可供租用(9.4公頃)

    For rent

    (4.3ha)

    Land return of coal ash pond by 2024

    For Rent(11.2ha)

    For Rent(7.7 ha)

    Offshore Wind Component Industry Cluster at Taichung Port

    Source:TIPC, YGG, SGRE, Century Huaxin, Tien-Li

    II. Promoting Industry Clusters (3/4)

  • 14Copyright©2020 MIRDC All rights Reserved

    1. Building O&M base and wharf Feb 2019: TIPC announced guidelines for berth management for Taichung’s OFW O&M Base. Ørsted already

    inked 20-year wharf lease with TIPC. July 2020: CIP signed contracts with Reiju Construction and CECI Engineering Consultants to build an O&M

    center for its Changfang/Xidao project, to invest in 210Mn NTD, completion due in Oct 2021. Aug 2020: Phase I construction of O&M base at Changhua Fishing Port commenced, set to provide 44 berths

    when completed. Sep 2020: Ørsted held groundbreaking ceremony fir its O&M base, operation begins 2022.

    2. Building O&M Team Turbine manufacturer: turbine O&M; local suppliers (SWE, Star Energy, TOWSC, Vestech): BoP system

    O&M (technology transfer by Netherland’s ECN)

    Changhua Fishing Port and Taichung Harbor as O&M base

    Taichung

    Note: BOP (Balance of Plant) refers to power plant operations, excluding marine engineering, covering project management, seacable engineering, onshore power engineering and data monitoring system.

    Changhua Ørsted, Hai LongCIP, China Steel

    II. Promoting Industry Clusters (4/4)

  • 15Copyright©2020 MIRDC All rights Reserved

    Formosa @Miaoli • Capacity: 128MW (32 turbines)• Distance to shore: 2-6 km; water depth: 15-35 m• 106/4/28-2 demo turbines (8MW) began commercial operation-

    collaboration with local specialists including CSBC (port logistics), Woen Jinn Harbor Engineering (cable laying), Fortune Electrics (onshore cables & substation), CECI (engineering consulting) and Unitech (EIA technical consulting)

    • 106/12/12-power purchase agreement signed with Taipower• Demo wind farm(120MW)-grid connection completed late Dec

    2019Fuhai (TGC) @Chunghua

    • Capacity: 120MW (30 turbines)• Distance to shore: 8-12 km; water depth: 20-45 m• Unsuccessful negotiations with fisheries, EIA approval denied• 107/1/17-review committee denied request of extension of time• 108/3/20-EIA approval obtained

    Taipower @Chunghua• Capacity: 110(109.2)MW (21 Hitachi 5.2MW turbines)• Distance to shore: 7-9 km; water depth: 15-26 m• 21 foundations supplied by South Korean SamKang M&T• 107/2/13 contract awarded to Hitachi and JDN• In accordance with the government's new regulations on

    epidemic prevention and the time of the application process, and strive to complete installation this year

    Source: BOE, Taipower

    Taipei City

    New Taipei City

    Taoyuan City

    Hsinchu CountyMiaoli

    County

    Taichung City

    Changhua County

    Yunlin County

    Nantou County

    Hualien County

    YilanCounty

    Hsinchu City

    Phase I Demonstration Incentive ProgramIII. Industry Development Status(1/4)

  • 16Copyright©2020 MIRDC All rights Reserved

    Offshore Wind Farm Cap COD

    Turbine Supplier

    FoundationSupplier

    PPSupplier

    SubstationSupplier

    Formosa I 128 2017 SGRE 4MW EEW - Fortune2019 SGRE 6MW EEW

    Formosa II 378 2020 SGRE 8MWSembcorp Marine Saipem

    EEW Korea Fortune

    YunNeng I 360 2020 SGRE 8MW Steelwind - GEYunNeng II 348 2021

    FHI - GETBD CWP - TBDLi Wei 350

    Greater Changhua Southeast

    605.2

    2021 SGRE 8MWSDMS

    SamkangHyundai

    CSBCFHICentury Iron

    Star EnergyGreater Changhua Southwest I)

    294.8

    (Greater Changhua Southwest II

    337.1

    2025 TBD TBD TBD TBDGreater Changhua Northwest

    582.9

    ChangFang I 100 2021MVOW 9.5MW CWP CICTCI

    TECOChangFang II 452 2023Xidao 48 2024

    ZhongNeng 300 2024 MVOW 9.5MW SDMS SDMS TECO

    TPC Phase 1 110 2020 Hitachi 5.2 MW SamkangEdgenMurry MRY

    CHEM

    TPC Phase 2 300 2024 MVOW9.5MW TBD CI CTCI

    Hai Long I 300 2024 SGRE 14MW TBD TBD TBDHaiLong II 232 2025 TBD TBD TBD TBDHaiLong III 512

    2

    45

    6

    3

    16 1711 14 15

    ZhongNeng #29300 MW

    Liwei #2350 MW

    Greater Changhua 1 15 605.2 MW

    YunNeng@Yunlin708 MW

    Hailong II #19532 MW

    ChangFang #27552 MW

    Taipower #26300 MW

    Formosa II #5-6378 MW

    Xidao@Changhua48 MW

    Hailong III #18512 MW

    Greater Changhua 2a#14 631.9 MW

    Greater Changhua 3#12 582.9 MW

    Phase II Potential ZonesIII. Industry Development Status(2/4)

  • 17Copyright©2020 MIRDC All rights Reserved

    Strategic alliances around 4 major systems: a national team composed ofWind Team (led by CSC) and Marine Team (led by CSBC), forming strategicalliances in wind turbine, foundation, power facility and marine engineering

    Key manufacturing hub in Asia-Pacific: attract international developers,turbine manufacturers to set up APAC operating HQs or office in Taiwan

    Component Local Supply Chain

    Turbine system

    Foundation

    On shore Substation

    Marine engineering

    >15 local suppliers became suppliers of 2 global leading turbine manufacturers SGRE(Germany) and MVOW(Denmark) to set up nacelle assembly facilities outside Europe

    for the first time

    >29 local suppliers joined supply chain system, forming 2 major industrial clusters Taipei Port: Century Wind [joint venture b/n Century Steel and Bladt(Denmark)] Xingda Port (Kaohsiung): Sing Da Marine Structure [CSC-Nervión(Spain) partnership]

    >10 local suppliers joined supply chain system EPC for onshore transmission & distribution: Taiwan Cogen[Star Energy], TECO, GE Taiwan Electrical component: Fortune Electric-transformer; Fortune Electric, Chung-Hsin Electric-switch and

    switchgear

    >35 local suppliers joined supply chain system Foundation and turbine installation projects led by CSBC-DEME Wind

    [CSBC+GeoSea(Belgium)], Boskalis Hwa Chi Offshore Wind [Hwa Chi +Boskalis(Netherlands)], Fugro IOVTEC[IOVTEC+Fugro (Netherlands)], TMHI(HungHua)+JDN(Belgium)

    International Cooperation to Build Supply ChainIII. Industry Development Status(3/4)

  • 18Copyright©2020 MIRDC All rights Reserved

    Taiwan’s offshore wind industry clusters

    NorthCentral

    South

    New TaipeiCentury Wind PowerWalsinTaoyuanFortuneTecoAllis

    TaichungSGRETien LiChinfong/CSWindYeong GuanChanghua Tai-Shing APEXYunlin FHINantou Swancor

    KaohsiungSDMSChina SteelCSSCCSMCLianglianChung MaoHengchangJinchingSteelguard

    ShianghongYinzhangShengcunBore YuanCTCICSACFermoWanchi

    JingchiCSBCCSBC

    Coating SolutionsJong ShynAtech

    Century Crown

    TainanRong ShengBoltunTaya

    Turbine components

    FoundationOnshore substation facilitiesMaritime engineering vessels

    Chung-HsinShihlinCentury SteelDelta

    Yilan Lungteh

    East

    PingtungBing TsenMing Rong

    Yuan

    ChiayiFemco

    Source:MIRDC

    III. Industry Development Status(4/4)

  • 19Copyright©2020 MIRDC All rights Reserved

    Economic Growth

    Post-glocalization Era

    Changing DemographicsQuality Life

    OFW industry becoming new driver of Taiwan’s economyTotal target capacity of Asian

    countries by 2030 reaches 90GW, TW suppliers gearing up for Asia market, boosting export volume

    Tech Advancement

    Sustainability

    Offshore Wind

    Turbine capacity reaching 12-15MW, leading to different standardized subsystem modulesMega-size marine engineering vesselsFloating foundations

    European companies moving production base to AsiaO&M demand to follow: routine

    monitoring, predictive diagnostics etc.

    O&M base key to ensure smooth turbine operation and stable supply of green energyFoster OFW industry clusters,

    cultivate green- and white-collarskilled workers

    Develop more energy-efficient, eco-friendly OFW products with higher performanceDevelop recyclable materials, reusable OFW

    products after decommissioning

    Ageing population and low birth rate shrink labor force, smart manufacturing solutions required to boost productivity Innovative technology employed

    to pass on skills and knowledge

    01

    02

    05

    06

    03

    04

    Wind turbines are growing bigger and more modular with different subsystems, making smart and flexible manufacturing a necessity.

    European companies moving production base to Asia; local and timely supply and O&M services become key to market success.

    Trends in Offshore Wind to 2030

    IV. Supply Chain Considerations for Zonal Development (1/3)

  • 20Copyright©2020 MIRDC All rights Reserved

    Country Japan Belgium DenmarkDate Aug 26 2020 Sep 8 2020 Sep 29 2020

    Name

    aiwan-Japan Offshore Wind Power Smart

    O&M and Innovative Technology Hybird

    Networking Meeting

    Taiwan-Belgium Offshore Wind Power Smart O&M and

    Innovative Technology Hybrid Meeting

    Taiwan-Denmark Offshore Wind Industry International

    Hybrid Networking Meeting

    Local Participants 70 117 150

    Foreign Companies

    JERA Energy Taiwan, The Nippon Corrosion Engineering, Stella Technology, Japan Inspection, and British Engineering Services

    MARLINKS, SARENS, CDWE, TRACTEBEL

    CIP,MVOW, KK Wind Solutions, Nordisk SvejseKontrol A/S、Peak Wind、Comtec Int、SeasightDavits, NIRAS

    Knowledge Exchange and Business Networking for Offshore Wind Industry

    IV. Supply Chain Considerations for Zonal Development (2/3)

  • 21Copyright©2020 MIRDC All rights Reserved

    2026-2030 5GW Q3 2018 2031-2035 5GW

    Proposed Mechanism for Zonal Development in Taiwan’s OFW

    Policy Announcem

    entEligibility

    Review

    Process

    Capacity

    Allocation

    2026-20272GW

    2028-20303GW

    2022Q2 2024Q2Selection Capacity

    Grid connection

    EIA approval obtained (conditional) Approval given on initial evaluation by EIA

    review committee Financial position Developer’s self-owned capital to account for >5% of total

    investment

    Technical capacity: development, project design, O&M planning

    Financial capacity: financial strength, capital, equity planning

    IRP commitment: to comply with IDB’s IRP policy for Zonal Development

    Max. Capacity per Project: max. capacity of 500MW in each phase per project

    Max. Capacity per Developer: max. capacity of 2GW per Developer for 2026-2030 period

    Eligibility Review Pricing Evaluation Auction elegibility: development,

    project design Bid price ceiling: max. price limits on

    developer bids Auction order: lowest bids first

    Dependent uponWind farm development

    during 2020-2025Developer selection

    mechanism for 2026-2030

    Global OFW technology trends

    IV. Supply Chain Considerations for Zonal Development (3/3)

  • 22Copyright©2020 MIRDC All rights Reserved

    V. Conclusion

    From US-China trade disputes to COVID-19 pandemic, theglobal trade and investment landscape will be reshaped by therestructuring of global chains, build-up of new regional chains,and distributed manufacturing.

    For governments worldwide, supporting local businesses andindustries has become priority. President Tsai has announcednew “Six Core Strategic Industries,” one of which being greenand renewable energy, which covers offshore wind.

    After a series of meetings with industry stakeholders, themajority would like to see current localization efforts continuetheir way into Zonal Development.

    Taiwan remains keen to work with global OFW leaders duringZonal Development, leveraging experience and expertise fromboth sides to drive energy transition in Taiwan and togethermake successful entry into Asian market.

  • T h a n k y o u f o r y o u r a t t e n t i o n !