Project No. 160042 PID 93376 STA-SR 43-17.24 Federal Type: MINOR WIDENING Completion Date: 9/28/2018 Award Amount: $14,340,250.25 Contract Awarded To: CENTRAL-ALLIED ENTERPRISES INC Letting Date: 3/1/2016 Engineer's Estimate: $14,392,000.00 Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director CENTRAL-ALLIED ENTERPRISES INC 1243 RAFF RD S W CANTON, OH 44710 Stark Bidder 1 Bid $14,340,250.25 S E T INC 235 EAST WATER ST LOWELLVILLE, OH 44436 Mahoning Bidder 2 Bid $15,135,133.03 KARVO COMPANIES INC 4524 HUDSON DR STOW, OH 44224-1702 Bidder 3 Bid $15,624,710.95 NORTHSTAR ASPHALT INC P O BOX 2646 NORTH CANTON, OH 44720 Stark Bidder 4 Bid $17,158,880.33 MOUNTAINEER CONTRACTORS INC ROUTE 26 SOUTH KINGWOOD, WV 26537 Bidder 5 Bid $19,046,967.09 160042 - Page 1

Upload: phamdat

Post on 06-Jul-2019

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Project No. 160042

PID 93376

STA-SR 43-17.24

Federal

Type: MINOR WIDENING

Completion Date: 9/28/2018

Award Amount: $14,340,250.25

Contract Awarded To: CENTRAL-ALLIED ENTERPRISES INC

Letting Date: 3/1/2016

Engineer's Estimate: $14,392,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jerry Wray, Director

CENTRAL-ALLIED ENTERPRISES INC

1243 RAFF RD S W

CANTON, OH 44710

Stark

Bidder 1

Bid $14,340,250.25

S E T INC

235 EAST WATER ST

LOWELLVILLE, OH 44436

Mahoning

Bidder 2

Bid $15,135,133.03

KARVO COMPANIES INC

4524 HUDSON DR

STOW, OH 44224-1702

Bidder 3

Bid $15,624,710.95

NORTHSTAR ASPHALT INC

P O BOX 2646

NORTH CANTON, OH 44720

Stark

Bidder 4

Bid $17,158,880.33

MOUNTAINEER CONTRACTORS INC

ROUTE 26 SOUTH

KINGWOOD, WV 26537

Bidder 5

Bid $19,046,967.09

160042 - Page 1

Page 2: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)

Awd $545,000.00$545,000.00

2 $30,926.37$30,926.37

3 $23,500.00$23,500.00

4 $120,000.00$120,000.00

5 $90,000.00$90,000.00

Ref #2 202E20010 HEADWALL REMOVED, (3 EACH)

Awd $2,550.00$850.00

2 $1,539.21$513.07

3 $825.00$275.00

4 $2,340.00$780.00

5 $1,500.00$500.00

Ref #3 202E23000 PAVEMENT REMOVED, (3977 SY)

Awd $27,839.00$7.00

2 $30,026.35$7.55

3 $67,609.00$17.00

4 $33,804.50$8.50

5 $7,954.00$2.00

Ref #4 202E23010 PAVEMENT REMOVED, ASPHALT, (25284 SY)

Awd $126,420.00$5.00

2 $124,650.12$4.93

3 $170,667.00$6.75

4 $192,158.40$7.60

5 $50,568.00$2.00

Ref #5 202E30000 WALK REMOVED, (6383 SF)

Awd $6,383.00$1.00

2 $10,787.27$1.69

3 $6,383.00$1.00

4 $12,766.00$2.00

5 $6,383.00$1.00

Ref #6 202E30800 TRAFFIC ISLAND REMOVED, (51 SY)

Awd $714.00$14.00

2 $673.20$13.20

3 $497.25$9.75

4 $1,530.00$30.00

5 $2,040.00$40.00

Ref #7 202E32000 CURB REMOVED, (1747 FT)

Awd $8,298.25$4.75

2 $8,368.13$4.79

3 $8,735.00$5.00

4 $10,482.00$6.00

5 $14,849.50$8.50

Ref #8 202E32500 CURB AND GUTTER REMOVED, (1652 FT)

Awd $9,912.00$6.00

2 $9,878.96$5.98

3 $8,260.00$5.00

4 $11,564.00$7.00

5 $18,172.00$11.00

160042 - Page 2

Page 3: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #9 202E35100 PIPE REMOVED, 24" AND UNDER, (5547 FT)

Awd $55,470.00$10.00

2 $108,443.85$19.55

3 $86,477.73$15.59

4 $85,423.80$15.40

5 $110,940.00$20.00

Ref #10 202E35200 PIPE REMOVED, OVER 24", (624 FT)

Awd $14,976.00$24.00

2 $17,209.92$27.58

3 $14,976.00$24.00

4 $14,976.00$24.00

5 $15,600.00$25.00

Ref #11 202E58000 MANHOLE REMOVED, (8 EACH)

Awd $5,600.00$700.00

2 $6,862.00$857.75

3 $1,600.00$200.00

4 $4,800.00$600.00

5 $20,000.00$2,500.00

Ref #12 202E58300 CATCH BASIN OR INLET REMOVED, (60 EACH)

Awd $16,800.00$280.00

2 $27,691.20$461.52

3 $15,900.00$265.00

4 $30,000.00$500.00

5 $66,000.00$1,100.00

Ref #13 202E58500 CATCH BASIN ABANDONED, (1 EACH)

Awd $1,200.00$1,200.00

2 $751.18$751.18

3 $230.00$230.00

4 $500.00$500.00

5 $2,250.00$2,250.00

Ref #14 202E58700 MANHOLE ABANDONED, (2 EACH)

Awd $2,670.00$1,335.00

2 $1,780.14$890.07

3 $800.00$400.00

4 $1,000.00$500.00

5 $4,500.00$2,250.00

Ref #15 202E75610 VALVE BOX REMOVED, (4 EACH)

Awd $400.00$100.00

2 $854.96$213.74

3 $300.00$75.00

4 $400.00$100.00

5 $400.00$100.00

Ref #16 203E10000 EXCAVATION, (43851 CY)

Awd $620,491.65$14.15

2 $811,682.01$18.51

3 $570,063.00$13.00

4 $933,149.28$21.28

5 $526,212.00$12.00

160042 - Page 3

Page 4: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #17 203E20000 EMBANKMENT, (9348 CY)

Awd $84,132.00$9.00

2 $69,829.56$7.47

3 $149,568.00$16.00

4 $182,286.00$19.50

5 $28,044.00$3.00

Ref #18 204E10000 SUBGRADE COMPACTION, (72225 SY)

Awd $65,002.50$0.90

2 $109,059.75$1.51

3 $72,225.00$1.00

4 $108,337.50$1.50

5 $36,112.50$0.50

Ref #19 204E13000 EXCAVATION OF SUBGRADE, (25904 CY)

Awd $129,520.00$5.00

2 $345,041.28$13.32

3 $279,763.20$10.80

4 $518,080.00$20.00

5 $310,848.00$12.00

Ref #20 204E30010 GRANULAR MATERIAL, TYPE B, (25904 CY)

Awd $284,944.00$11.00

2 $1,162,312.48$44.87

3 $777,120.00$30.00

4 $1,269,296.00$49.00

5 $1,165,680.00$45.00

Ref #21 607E35001 FENCE REMOVED AND REBUILT, AS PER PLAN, (67 FT)

Awd $1,809.00$27.00

2 $1,790.91$26.73

3 $1,809.00$27.00

4 $1,809.00$27.00

5 $3,350.00$50.00

Ref #22 607E98000 FENCE, MISC.:8'X8' POLYVINYL CHLORIDE (PVC) FENCE, (190 FT)

Awd $4,940.00$26.00

2 $13,896.60$73.14

3 $13,300.00$70.00

4 $13,186.00$69.40

5 $3,800.00$20.00

Ref #23 608E10000 4" CONCRETE WALK, (33847 SF)

Awd $111,695.10$3.30

2 $129,972.48$3.84

3 $135,388.00$4.00

4 $194,620.25$5.75

5 $220,005.50$6.50

Ref #24 608E52010 CURB RAMP, TYPE A1, (602 SF)

Awd $10,836.00$18.00

2 $9,192.54$15.27

3 $5,418.00$9.00

4 $9,632.00$16.00

5 $16,254.00$27.00

160042 - Page 4

Page 5: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #25 608E52040 CURB RAMP, TYPE B2, (696 SF)

Awd $8,352.00$12.00

2 $10,655.76$15.31

3 $5,220.00$7.50

4 $11,136.00$16.00

5 $18,792.00$27.00

Ref #26 608E52044 CURB RAMP, TYPE B3, (1385 SF)

Awd $28,392.50$20.50

2 $21,245.90$15.34

3 $13,157.50$9.50

4 $22,160.00$16.00

5 $37,395.00$27.00

Ref #27 608E52060 CURB RAMP, TYPE C2, (205 SF)

Awd $2,460.00$12.00

2 $3,111.90$15.18

3 $1,537.50$7.50

4 $3,280.00$16.00

5 $5,535.00$27.00

Ref #28 608E53020 DETECTABLE WARNING, (14 SF)

Awd $1,120.00$80.00

2 $580.58$41.47

3 $546.00$39.00

4 $1,400.00$100.00

5 $1,400.00$100.00

Ref #29 690E12020 SPECIAL - GEOGRID, (79303 SY)

Awd $111,024.20$1.40

2 $185,569.02$2.34

3 $83,268.15$1.05

4 $138,780.25$1.75

5 $158,606.00$2.00

Ref #30 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE, (67 EACH)

Awd $13,400.00$200.00

2 $11,010.11$164.33

3 $9,045.00$135.00

4 $9,045.00$135.00

5 $30,150.00$450.00

Ref #31 690E65016 SPECIAL - WORK INVOLVING PETROLEUM CONTAMINATED SO, (100 TON)

Awd $5,500.00$55.00

2 $3,908.00$39.08

3 $5,000.00$50.00

4 $7,500.00$75.00

5 $10,000.00$100.00

Ref #32 690E65020 SPECIAL - WORK INVOLVING WATER, (1000 GAL)

Awd $2,500.00$2.50

2 $840.00$0.84

3 $1,500.00$1.50

4 $15,000.00$15.00

5 $5,000.00$5.00

160042 - Page 5

Page 6: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #33 690E65024 SPECIAL - WORK INVOLVING REGULATED WATER, (1000 GAL)

Awd $2,500.00$2.50

2 $1,310.00$1.31

3 $1,750.00$1.75

4 $20,000.00$20.00

5 $5,000.00$5.00

Ref #34 690E98000 SPECIAL - MISC.:GROUND WATER MONITORING WELL ADJUS, (2 EACH)

Awd $510.00$255.00

2 $2,015.04$1,007.52

3 $250.00$125.00

4 $400.00$200.00

5 $1,000.00$500.00

Ref #35 863E00100 GEOGRID, TYPE P1, (4154 SY)

Awd $20,562.30$4.95

2 $13,791.28$3.32

3 $12,005.06$2.89

4 $14,539.00$3.50

5 $27,001.00$6.50

Ref #36 863E00600 GEOGRID, TYPE S1, (893 SY)

Awd $4,420.35$4.95

2 $2,991.55$3.35

3 $2,366.45$2.65

4 $3,572.00$4.00

5 $8,037.00$9.00

Ref #37 863E00800 REINFORCED EMBANKMENT, (5583 CY)

Awd $61,133.85$10.95

2 $83,019.21$14.87

3 $61,413.00$11.00

4 $156,324.00$28.00

5 $307,065.00$55.00

Section 1 - ROADWAY - Totals

Awd $2,399,477.70

2 $3,373,268.82

3 $2,608,472.84

4 $4,155,276.98

5 $3,336,443.50

Ref #38 601E11000 RIPRAP USING 6" REINFORCED CONCRETE SLAB, (21 SY)

Awd $5,460.00$260.00

2 $1,391.88$66.28

3 $4,725.00$225.00

4 $1,050.00$50.00

5 $7,350.00$350.00

Ref #39 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1, (4 SY)

Awd $1,080.00$270.00

2 $565.32$141.33

3 $540.00$135.00

4 $1,000.00$250.00

5 $2,400.00$600.00

160042 - Page 6

Page 7: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #40 601E32000 ROCK CHANNEL PROTECTION, TYPE A WITH FILTER, (3 CY)

Awd $1,455.00$485.00

2 $394.92$131.64

3 $600.00$200.00

4 $375.00$125.00

5 $1,800.00$600.00

Ref #41 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER, (5 CY)

Awd $1,650.00$330.00

2 $573.95$114.79

3 $1,050.00$210.00

4 $750.00$150.00

5 $2,250.00$450.00

Ref #42 659E00100 SOIL ANALYSIS TEST, (2 EACH)

Awd $250.00$125.00

2 $159.82$79.91

3 $400.00$200.00

4 $100.00$50.00

5 $150.00$75.00

Ref #43 659E00300 TOPSOIL, (5088 CY)

Awd $106,848.00$21.00

2 $118,957.44$23.38

3 $152,640.00$30.00

4 $127,200.00$25.00

5 $178,080.00$35.00

Ref #44 659E00500 SEEDING AND MULCHING, CLASS 1, (45835 SY)

Awd $34,376.25$0.75

2 $32,542.85$0.71

3 $31,167.80$0.68

4 $55,002.00$1.20

5 $35,751.30$0.78

Ref #45 659E14000 REPAIR SEEDING AND MULCHING, (2292 SY)

Awd $1,077.24$0.47

2 $962.64$0.42

3 $2,292.00$1.00

4 $916.80$0.40

5 $1,306.44$0.57

Ref #46 659E15000 INTER-SEEDING, (2292 SY)

Awd $1,077.24$0.47

2 $252.12$0.11

3 $2,292.00$1.00

4 $229.20$0.10

5 $1,306.44$0.57

Ref #47 659E20000 COMMERCIAL FERTILIZER, (6.39 TON)

Awd $5,751.00$900.00

2 $1,346.95$210.79

3 $4,473.00$700.00

4 $1,278.00$200.00

5 $4,157.08$650.56

160042 - Page 7

Page 8: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #48 659E31000 LIME, (9.47 ACRE)

Awd $4,166.80$440.00

2 $998.14$105.40

3 $9.47$1.00

4 $947.00$100.00

5 $1,455.25$153.67

Ref #49 659E35000 WATER, (254 MGAL)

Awd $2,298.70$9.05

2 $266.70$1.05

3 $7,620.00$30.00

4 $254.00$1.00

5 $254.00$1.00

Ref #50 659E40000 MOWING, (103 MSF)

Awd $2,302.05$22.35

2 $325.48$3.16

3 $309.00$3.00

4 $10,300.00$100.00

5 $257.50$2.50

Ref #51 670E00710 DITCH EROSION PROTECTION MAT, TYPE A, (648 SY)

Awd $2,268.00$3.50

2 $1,535.76$2.37

3 $1,944.00$3.00

4 $1,458.00$2.25

5 $959.04$1.48

Ref #52 832E15000 STORM WATER POLLUTION PREVENTION PLAN, (LUMP SUM)

Awd $5,500.00$5,500.00

2 $28,502.14$28,502.14

3 $30,000.00$30,000.00

4 $20,000.00$20,000.00

5 $30,000.00$30,000.00

Ref #53 832E30000 EROSION CONTROL, (170000 EACH)

Awd $170,000.00$1.00

2 $170,000.00$1.00

3 $170,000.00$1.00

4 $170,000.00$1.00

5 $170,000.00$1.00

Section 2 - EROSION CONTROL - Totals

Awd $345,560.28

2 $358,776.11

3 $410,062.27

4 $390,860.00

5 $437,477.05

Ref #54 602E20000 CONCRETE MASONRY, (14.9 CY)

Awd $6,854.00$460.00

2 $13,261.15$890.01

3 $14,006.00$940.00

4 $15,212.90$1,021.00

5 $27,416.00$1,840.00

160042 - Page 8

Page 9: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #55 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS, (50 FT)

Awd $125.00$2.50

2 $590.00$11.80

3 $675.00$13.50

4 $485.00$9.70

5 $400.00$8.00

Ref #56 605E14020 6" BASE PIPE UNDERDRAINS WITH FABRIC WRAP, 707.31, (27323 FT)

Awd $218,584.00$8.00

2 $216,671.39$7.93

3 $271,863.85$9.95

4 $239,076.25$8.75

5 $191,261.00$7.00

Ref #57 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS, (1470 FT)

Awd $19,110.00$13.00

2 $22,138.20$15.06

3 $20,580.00$14.00

4 $16,464.00$11.20

5 $26,460.00$18.00

Ref #58 611E00900 6" CONDUIT, TYPE B, (300 FT)

Awd $1,125.00$3.75

2 $9,027.00$30.09

3 $13,500.00$45.00

4 $4,875.00$16.25

5 $9,000.00$30.00

Ref #59 611E01100 6" CONDUIT, TYPE C, (250 FT)

Awd $1,125.00$4.50

2 $7,577.50$30.31

3 $6,500.00$26.00

4 $3,700.00$14.80

5 $7,500.00$30.00

Ref #60 611E01100 6" CONDUIT, TYPE C, 707.45, (6 FT)

Awd $282.00$47.00

2 $192.42$32.07

3 $720.00$120.00

4 $115.20$19.20

5 $360.00$60.00

Ref #61 611E01400 6" CONDUIT, TYPE E, (100 FT)

Awd $1,125.00$11.25

2 $2,574.00$25.74

3 $1,700.00$17.00

4 $1,480.00$14.80

5 $3,000.00$30.00

Ref #62 611E01500 6" CONDUIT, TYPE F, (80 FT)

Awd $1,120.00$14.00

2 $2,059.20$25.74

3 $1,600.00$20.00

4 $1,184.00$14.80

5 $2,800.00$35.00

160042 - Page 9

Page 10: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #63 611E01800 8" CONDUIT, TYPE B, (100 FT)

Awd $700.00$7.00

2 $3,188.00$31.88

3 $5,500.00$55.00

4 $2,970.00$29.70

5 $3,500.00$35.00

Ref #64 611E02000 8" CONDUIT, TYPE C, (100 FT)

Awd $700.00$7.00

2 $3,188.00$31.88

3 $2,700.00$27.00

4 $2,860.00$28.60

5 $3,500.00$35.00

Ref #65 611E02000 8" CONDUIT, TYPE C, 707.45, (18 FT)

Awd $864.00$48.00

2 $651.06$36.17

3 $1,350.00$75.00

4 $514.80$28.60

5 $720.00$40.00

Ref #66 611E03100 10" CONDUIT, TYPE B, 707.45, (5 FT)

Awd $335.00$67.00

2 $231.85$46.37

3 $900.00$180.00

4 $286.00$57.20

5 $375.00$75.00

Ref #67 611E04400 12" CONDUIT, TYPE B, (5071 FT)

Awd $212,982.00$42.00

2 $394,523.80$77.80

3 $542,597.00$107.00

4 $394,523.80$77.80

5 $456,390.00$90.00

Ref #68 611E04400 12" CONDUIT, TYPE B, 706.02, (20 FT)

Awd $1,520.00$76.00

2 $1,510.40$75.52

3 $2,440.00$122.00

4 $1,556.00$77.80

5 $5,000.00$250.00

Ref #69 611E04400 12" CONDUIT, TYPE B, 707.21, (17 FT)

Awd $654.50$38.50

2 $1,348.61$79.33

3 $3,094.00$182.00

4 $1,326.00$78.00

5 $2,550.00$150.00

Ref #70 611E04400 12" CONDUIT, TYPE B, 707.33, (22 FT)

Awd $916.30$41.65

2 $1,366.20$62.10

3 $2,464.00$112.00

4 $1,711.60$77.80

5 $4,730.00$215.00

160042 - Page 10

Page 11: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #71 611E04400 12" CONDUIT, TYPE B, 707.45, (8 FT)

Awd $712.00$89.00

2 $569.12$71.14

3 $1,016.00$127.00

4 $622.40$77.80

5 $1,600.00$200.00

Ref #72 611E04600 12" CONDUIT, TYPE C, (719 FT)

Awd $21,570.00$30.00

2 $40,350.28$56.12

3 $59,677.00$83.00

4 $54,931.60$76.40

5 $43,140.00$60.00

Ref #73 611E04600 12" CONDUIT, TYPE C, 707.33, (20 FT)

Awd $670.00$33.50

2 $1,122.20$56.11

3 $2,160.00$108.00

4 $1,528.00$76.40

5 $3,500.00$175.00

Ref #74 611E04600 12" CONDUIT, TYPE C, 707.45, (5 FT)

Awd $550.00$110.00

2 $418.95$83.79

3 $950.00$190.00

4 $382.00$76.40

5 $1,250.00$250.00

Ref #75 611E04600 12" CONDUIT, TYPE C, 707.01, (5 FT)

Awd $755.00$151.00

2 $395.05$79.01

3 $950.00$190.00

4 $382.00$76.40

5 $1,250.00$250.00

Ref #76 611E05900 15" CONDUIT, TYPE B, (3466 FT)

Awd $138,640.00$40.00

2 $211,010.08$60.88

3 $381,260.00$110.00

4 $275,893.60$79.60

5 $311,940.00$90.00

Ref #77 611E05900 15" CONDUIT, TYPE B, 707.33, (21 FT)

Awd $1,050.00$50.00

2 $1,281.84$61.04

3 $2,520.00$120.00

4 $1,671.60$79.60

5 $4,200.00$200.00

Ref #78 611E06100 15" CONDUIT, TYPE C, (221 FT)

Awd $11,050.00$50.00

2 $13,284.31$60.11

3 $20,774.00$94.00

4 $17,193.80$77.80

5 $20,995.00$95.00

160042 - Page 11

Page 12: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #79 611E06100 15" CONDUIT, TYPE C, 706.02, (20 FT)

Awd $1,300.00$65.00

2 $1,526.40$76.32

3 $2,360.00$118.00

4 $1,556.00$77.80

5 $4,500.00$225.00

Ref #80 611E06100 15" CONDUIT, TYPE C, 707.33, (11 FT)

Awd $715.00$65.00

2 $661.54$60.14

3 $1,276.00$116.00

4 $855.80$77.80

5 $1,650.00$150.00

Ref #81 611E07400 18" CONDUIT, TYPE B, (982 FT)

Awd $49,100.00$50.00

2 $73,286.66$74.63

3 $112,930.00$115.00

4 $88,576.40$90.20

5 $83,470.00$85.00

Ref #82 611E07400 18" CONDUIT, TYPE B, 706.02, (17 FT)

Awd $1,275.00$75.00

2 $1,691.67$99.51

3 $2,584.00$152.00

4 $1,533.40$90.20

5 $4,250.00$250.00

Ref #83 611E07600 18" CONDUIT, TYPE C, 707.33, (9 FT)

Awd $810.00$90.00

2 $558.99$62.11

3 $1,287.00$143.00

4 $799.20$88.80

5 $2,250.00$250.00

Ref #84 611E08900 21" CONDUIT, TYPE B, (1646 FT)

Awd $98,760.00$60.00

2 $170,097.64$103.34

3 $228,794.00$139.00

4 $151,761.20$92.20

5 $189,290.00$115.00

Ref #85 611E08900 21" CONDUIT, TYPE B, 706.02, (38 FT)

Awd $2,660.00$70.00

2 $3,486.12$91.74

3 $5,472.00$144.00

4 $3,503.60$92.20

5 $7,600.00$200.00

Ref #86 611E09100 21" CONDUIT, TYPE C, 706.02, (12 FT)

Awd $600.00$50.00

2 $1,079.88$89.99

3 $1,596.00$133.00

4 $1,071.60$89.30

5 $2,100.00$175.00

160042 - Page 12

Page 13: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #87 611E10400 24" CONDUIT, TYPE B, (517 FT)

Awd $33,605.00$65.00

2 $42,249.24$81.72

3 $72,897.00$141.00

4 $47,667.40$92.20

5 $64,625.00$125.00

Ref #88 611E10400 24" CONDUIT, TYPE B, 707.33, (8 FT)

Awd $840.00$105.00

2 $705.36$88.17

3 $1,288.00$161.00

4 $737.60$92.20

5 $2,400.00$300.00

Ref #89 611E10600 24" CONDUIT, TYPE C, (101 FT)

Awd $5,555.00$55.00

2 $7,066.97$69.97

3 $14,948.00$148.00

4 $9,281.90$91.90

5 $12,625.00$125.00

Ref #90 611E10600 24" CONDUIT, TYPE C, 707.33, (5 FT)

Awd $700.00$140.00

2 $321.70$64.34

3 $855.00$171.00

4 $459.50$91.90

5 $2,000.00$400.00

Ref #91 611E11900 27" CONDUIT, TYPE B, (618 FT)

Awd $43,260.00$70.00

2 $61,701.12$99.84

3 $98,262.00$159.00

4 $79,474.80$128.60

5 $92,700.00$150.00

Ref #92 611E13400 30" CONDUIT, TYPE B, (79 FT)

Awd $6,715.00$85.00

2 $9,265.12$117.28

3 $14,378.00$182.00

4 $10,159.40$128.60

5 $11,850.00$150.00

Ref #93 611E13400 30" CONDUIT, TYPE B, 706.02, (10 FT)

Awd $1,400.00$140.00

2 $1,921.10$192.11

3 $2,100.00$210.00

4 $1,286.00$128.60

5 $3,000.00$300.00

Ref #94 611E13600 30" CONDUIT, TYPE C, 707.33, (25 FT)

Awd $2,250.00$90.00

2 $2,592.75$103.71

3 $4,450.00$178.00

4 $3,155.00$126.20

5 $4,375.00$175.00

160042 - Page 13

Page 14: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #95 611E16400 36" CONDUIT, TYPE B, (425 FT)

Awd $38,250.00$90.00

2 $50,188.25$118.09

3 $89,250.00$210.00

4 $63,495.00$149.40

5 $85,000.00$200.00

Ref #96 611E16400 36" CONDUIT, TYPE B, 707.33, (30 FT)

Awd $3,000.00$100.00

2 $3,372.60$112.42

3 $6,210.00$207.00

4 $4,482.00$149.40

5 $9,000.00$300.00

Ref #97 611E16600 36" CONDUIT, TYPE C, (289 FT)

Awd $20,230.00$70.00

2 $27,882.72$96.48

3 $54,910.00$190.00

4 $42,280.70$146.30

5 $46,240.00$160.00

Ref #98 611E16600 36" CONDUIT, TYPE C, 707.33, (41 FT)

Awd $2,870.00$70.00

2 $3,955.27$96.47

3 $8,323.00$203.00

4 $5,998.30$146.30

5 $11,275.00$275.00

Ref #99 611E22400 54" CONDUIT, TYPE B, (78 FT)

Awd $20,280.00$260.00

2 $15,385.50$197.25

3 $28,470.00$365.00

4 $17,058.60$218.70

5 $31,200.00$400.00

Ref #100 611E22400 54" CONDUIT, TYPE B, 707.33, (10 FT)

Awd $3,650.00$365.00

2 $2,008.40$200.84

3 $4,300.00$430.00

4 $2,187.00$218.70

5 $4,000.00$400.00

Ref #101 611E98150 CATCH BASIN, NO. 3, (21 EACH)

Awd $68,250.00$3,250.00

2 $80,256.96$3,821.76

3 $73,500.00$3,500.00

4 $86,583.00$4,123.00

5 $73,500.00$3,500.00

Ref #102 611E98151 CATCH BASIN, NO. 3, AS PER PLAN, (5 EACH)

Awd $20,000.00$4,000.00

2 $24,814.05$4,962.81

3 $23,000.00$4,600.00

4 $25,605.00$5,121.00

5 $20,000.00$4,000.00

160042 - Page 14

Page 15: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #103 611E98180 CATCH BASIN, NO. 3A, (83 EACH)

Awd $207,500.00$2,500.00

2 $220,862.17$2,660.99

3 $174,300.00$2,100.00

4 $249,664.00$3,008.00

5 $228,250.00$2,750.00

Ref #104 611E98181 CATCH BASIN, NO. 3A, AS PER PLAN, (17 EACH)

Awd $47,600.00$2,800.00

2 $66,922.54$3,936.62

3 $47,600.00$2,800.00

4 $67,779.00$3,987.00

5 $55,250.00$3,250.00

Ref #105 611E98450 CATCH BASIN, NO. 2-2A, (3 EACH)

Awd $6,000.00$2,000.00

2 $3,637.80$1,212.60

3 $4,200.00$1,400.00

4 $6,969.00$2,323.00

5 $6,750.00$2,250.00

Ref #106 611E98470 CATCH BASIN, NO. 2-2B, (8 EACH)

Awd $16,000.00$2,000.00

2 $11,239.76$1,404.97

3 $10,400.00$1,300.00

4 $18,144.00$2,268.00

5 $18,000.00$2,250.00

Ref #107 611E98510 CATCH BASIN, NO. 2-3, (2 EACH)

Awd $7,000.00$3,500.00

2 $4,081.78$2,040.89

3 $2,800.00$1,400.00

4 $5,944.00$2,972.00

5 $4,500.00$2,250.00

Ref #108 611E98540 CATCH BASIN, NO. 2-4, (3 EACH)

Awd $11,250.00$3,750.00

2 $8,023.41$2,674.47

3 $7,200.00$2,400.00

4 $10,632.00$3,544.00

5 $10,200.00$3,400.00

Ref #109 611E98630 CATCH BASIN ADJUSTED TO GRADE, (2 EACH)

Awd $1,000.00$500.00

2 $784.68$392.34

3 $1,200.00$600.00

4 $866.00$433.00

5 $3,700.00$1,850.00

Ref #110 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE, (2 EACH)

Awd $2,400.00$1,200.00

2 $1,984.58$992.29

3 $1,350.00$675.00

4 $1,784.00$892.00

5 $5,300.00$2,650.00

160042 - Page 15

Page 16: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #111 611E98840 INLET, NO. 2-A-6, (1 EACH)

Awd $2,800.00$2,800.00

2 $4,294.62$4,294.62

3 $3,800.00$3,800.00

4 $4,407.00$4,407.00

5 $4,500.00$4,500.00

Ref #112 611E99574 MANHOLE, NO. 3, (30 EACH)

Awd $105,000.00$3,500.00

2 $104,591.70$3,486.39

3 $78,000.00$2,600.00

4 $140,280.00$4,676.00

5 $156,000.00$5,200.00

Ref #113 611E99582 MANHOLE, NO. 3 WITH 90" BASE I.D. AND 8" WEIR, (1 EACH)

Awd $10,000.00$10,000.00

2 $5,449.92$5,449.92

3 $4,900.00$4,900.00

4 $19,798.00$19,798.00

5 $14,500.00$14,500.00

Ref #114 611E99584 MANHOLE, NO. 3 WITH 96" BASE I.D. AND 9" WEIR, (1 EACH)

Awd $10,000.00$10,000.00

2 $6,977.10$6,977.10

3 $6,700.00$6,700.00

4 $22,387.00$22,387.00

5 $18,000.00$18,000.00

Ref #115 611E99586 MANHOLE, NO. 3 W/108" BASE I.D. & 12" WEIR, (1 EACH)

Awd $15,000.00$15,000.00

2 $9,817.46$9,817.46

3 $6,800.00$6,800.00

4 $26,543.00$26,543.00

5 $20,000.00$20,000.00

Ref #116 611E99660 MANHOLE RECONSTRUCTED TO GRADE, (2 EACH)

Awd $2,200.00$1,100.00

2 $2,186.34$1,093.17

3 $1,340.00$670.00

4 $2,870.00$1,435.00

5 $5,000.00$2,500.00

Ref #117 611E99690 MANHOLE, MISC.: CONCRETE TOP, (1 EACH)

Awd $1,300.00$1,300.00

2 $1,458.47$1,458.47

3 $875.00$875.00

4 $904.00$904.00

5 $2,500.00$2,500.00

Ref #118 611E99710 PRECAST REINFORCED CONCRETE OUTLET, (2 EACH)

Awd $2,230.00$1,115.00

2 $691.00$345.50

3 $550.00$275.00

4 $440.00$220.00

5 $600.00$300.00

160042 - Page 16

Page 17: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #119 611E99720 INSPECTION WELL, (2 EACH)

Awd $500.00$250.00

2 $1,511.20$755.60

3 $700.00$350.00

4 $818.00$409.00

5 $9,000.00$4,500.00

Ref #120 638E06706 22" STEEL PIPE ENCASEMENT, OPEN CUT, WITH 1/2" WAL, (16 FT)

Awd $1,463.20$91.45

2 $3,779.04$236.19

3 $2,016.00$126.00

4 $2,112.00$132.00

5 $5,600.00$350.00

Ref #121 895E10020 MANUFACTURED WATER QUALITY STRUCTURE, TYPE 2, (1 EACH)

Awd $38,000.00$38,000.00

2 $26,043.07$26,043.07

3 $19,600.00$19,600.00

4 $26,468.00$26,468.00

5 $25,000.00$25,000.00

Ref #122 895E10030 MANUFACTURED WATER QUALITY STRUCTURE, TYPE 3, (1 EACH)

Awd $40,000.00$40,000.00

2 $29,535.54$29,535.54

3 $23,800.00$23,800.00

4 $29,089.00$29,089.00

5 $30,000.00$30,000.00

Ref #123 895E10040 MANUFACTURED WATER QUALITY STRUCTURE, TYPE 4, (1 EACH)

Awd $55,000.00$55,000.00

2 $43,364.48$43,364.48

3 $36,355.00$36,355.00

4 $43,778.00$43,778.00

5 $35,000.00$35,000.00

Section 3 - DRAINAGE - Totals

Awd $1,651,437.00

2 $2,091,843.28

3 $2,649,422.85

4 $2,372,189.95

5 $2,559,387.00

Ref #124 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (39333 SY)

Awd $78,666.00$2.00

2 $82,992.63$2.11

3 $94,399.20$2.40

4 $82,599.30$2.10

5 $78,666.00$2.00

Ref #125 302E46000 ASPHALT CONCRETE BASE, PG64-22, (11679 CY)

Awd $1,109,505.00$95.00

2 $1,267,872.24$108.56

3 $1,273,011.00$109.00

4 $1,202,937.00$103.00

5 $1,751,850.00$150.00

160042 - Page 17

Page 18: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #126 304E20000 AGGREGATE BASE, (641 CY)

Awd $57,690.00$90.00

2 $44,446.94$69.34

3 $28,845.00$45.00

4 $31,409.00$49.00

5 $32,050.00$50.00

Ref #127 304E20001 AGGREGATE BASE, AS PER PLAN, (18479 CY)

Awd $739,160.00$40.00

2 $875,904.60$47.40

3 $739,160.00$40.00

4 $905,471.00$49.00

5 $923,950.00$50.00

Ref #128 407E10000 TACK COAT, (56 GAL)

Awd $103.60$1.85

2 $118.16$2.11

3 $100.80$1.80

4 $106.40$1.90

5 $168.00$3.00

Ref #129 407E20500 SPECIAL - TACK COAT, TRACKLESS TACK, (7109 GAL)

Awd $21,327.00$3.00

2 $22,464.44$3.16

3 $17,772.50$2.50

4 $24,881.50$3.50

5 $28,436.00$4.00

Ref #130 407E20510 SPECIAL - TACK COAT, TRACKLESS TACK FOR INTERMEDIA, (3814 GAL)

Awd $11,442.00$3.00

2 $12,052.24$3.16

3 $9,535.00$2.50

4 $13,349.00$3.50

5 $15,256.00$4.00

Ref #131 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (22 CY)

Awd $9,196.00$418.00

2 $4,985.20$226.60

3 $4,532.00$206.00

4 $4,730.00$215.00

5 $3,740.00$170.00

Ref #132 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS, (3255 CY)

Awd $439,425.00$135.00

2 $411,692.40$126.48

3 $507,780.00$156.00

4 $390,600.00$120.00

5 $553,350.00$170.00

Ref #133 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (448, (4557 CY)

Awd $501,270.00$110.00

2 $528,338.58$115.94

3 $546,840.00$120.00

4 $501,270.00$110.00

5 $729,120.00$160.00

160042 - Page 18

Page 19: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #134 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), (D, (97 CY)

Awd $28,130.00$290.00

2 $24,024.96$247.68

3 $25,705.00$265.00

4 $22,795.00$235.00

5 $21,825.00$225.00

Ref #135 441E50600 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (448, (62 CY)

Awd $21,700.00$350.00

2 $12,415.50$200.25

3 $13,020.00$210.00

4 $11,780.00$190.00

5 $12,400.00$200.00

Ref #136 451E20000 REINFORCED CONCRETE PAVEMENT, MISC.:DECORATIVE CON, (433 SY)

Awd $95,260.00$220.00

2 $83,058.06$191.82

3 $84,868.00$196.00

4 $77,940.00$180.00

5 $90,930.00$210.00

Ref #137 451E20000 REINFORCED CONCRETE PAVEMENT, MISC.:CONCRETE HEADE, (220 SY)

Awd $88,000.00$400.00

2 $69,561.80$316.19

3 $66,000.00$300.00

4 $61,600.00$280.00

5 $71,500.00$325.00

Ref #138 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1, (3047 SY)

Awd $97,504.00$32.00

2 $139,369.78$45.74

3 $121,880.00$40.00

4 $152,350.00$50.00

5 $198,055.00$65.00

Ref #139 452E10050 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS, (500 SY)

Awd $25,000.00$50.00

2 $25,505.00$51.01

3 $23,000.00$46.00

4 $27,000.00$54.00

5 $32,500.00$65.00

Ref #140 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1, (2260 SY)

Awd $97,180.00$43.00

2 $121,475.00$53.75

3 $115,260.00$51.00

4 $122,040.00$54.00

5 $169,500.00$75.00

Ref #141 452E12050 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS, (500 SY)

Awd $28,000.00$56.00

2 $29,510.00$59.02

3 $28,000.00$56.00

4 $35,000.00$70.00

5 $40,000.00$80.00

160042 - Page 19

Page 20: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #142 609E12000 COMBINATION CURB AND GUTTER, TYPE 2, (27902 FT)

Awd $697,550.00$25.00

2 $561,946.28$20.14

3 $558,040.00$20.00

4 $502,236.00$18.00

5 $669,648.00$24.00

Ref #143 609E26000 CURB, TYPE 6, (2946 FT)

Awd $81,015.00$27.50

2 $62,425.74$21.19

3 $41,244.00$14.00

4 $51,555.00$17.50

5 $70,704.00$24.00

Ref #144 609E54000 6" CONCRETE TRAFFIC ISLAND, (57 SY)

Awd $8,265.00$145.00

2 $4,256.19$74.67

3 $13,110.00$230.00

4 $4,845.00$85.00

5 $7,125.00$125.00

Section 4 - PAVEMENT - Totals

Awd $4,235,388.60

2 $4,384,415.74

3 $4,312,102.50

4 $4,226,494.20

5 $5,500,773.00

Ref #145 638E01205 8" WATER MAIN DUCTILE IRON PIPE ANSI CLASS 53, PUS, (8 FT)

Awd $1,680.00$210.00

2 $1,913.20$239.15

3 $1,880.00$235.00

4 $747.20$93.40

5 $4,000.00$500.00

Ref #146 638E02401 12" WATERMAIN DUCTILE IRON PIPE ANSI CLASS 52, PUS, (1546 FT)

Awd $77,300.00$50.00

2 $167,926.52$108.62

3 $278,280.00$180.00

4 $197,733.40$127.90

5 $231,900.00$150.00

Ref #147 638E04901 1" COPPER SERVICE BRANCH, AS PER PLAN, (384 FT)

Awd $7,680.00$20.00

2 $18,063.36$47.04

3 $23,040.00$60.00

4 $11,328.00$29.50

5 $32,640.00$85.00

Ref #148 638E05101 2" COPPER SERVICE BRANCH, AS PER PLAN, (100 FT)

Awd $2,000.00$20.00

2 $5,770.00$57.70

3 $10,500.00$105.00

4 $4,280.00$42.80

5 $9,000.00$90.00

160042 - Page 20

Page 21: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #149 638E07311 24" STEEL PIPE ENCASEMENT, BORED OR JACKED, AS PER, (50 FT)

Awd $9,450.00$189.00

2 $21,507.00$430.14

3 $5,750.00$115.00

4 $16,735.00$334.70

5 $25,000.00$500.00

Ref #150 638E07491 8" GATE VALVE, AS PER PLAN, (1 EACH)

Awd $1,415.00$1,415.00

2 $1,592.19$1,592.19

3 $1,600.00$1,600.00

4 $2,454.00$2,454.00

5 $2,750.00$2,750.00

Ref #151 638E08101 12" GATE VALVE AND VALVE BOX, AS PER PLAN, (2 EACH)

Awd $5,360.00$2,680.00

2 $5,810.28$2,905.14

3 $5,800.00$2,900.00

4 $7,518.00$3,759.00

5 $9,500.00$4,750.00

Ref #152 638E08206 20" BUTTERFLY VALVE AND VALVE BOX, (1 EACH)

Awd $7,655.00$7,655.00

2 $5,941.69$5,941.69

3 $6,000.00$6,000.00

4 $7,652.00$7,652.00

5 $7,500.00$7,500.00

Ref #153 638E09801 12" X 12" TAPPING SLEEVE, VALVE AND VALVE BOX, AS , (3 EACH)

Awd $43,500.00$14,500.00

2 $15,884.19$5,294.73

3 $25,500.00$8,500.00

4 $21,972.00$7,324.00

5 $22,500.00$7,500.00

Ref #154 638E10201 6" FIRE HYDRANT, AS PER PLAN, (1 EACH)

Awd $13,000.00$13,000.00

2 $13,990.10$13,990.10

3 $6,000.00$6,000.00

4 $14,332.00$14,332.00

5 $8,500.00$8,500.00

Ref #155 638E10201 6" FIRE HYDRANT, AS PER PLAN1, (1 EACH)

Awd $6,000.00$6,000.00

2 $6,243.63$6,243.63

3 $6,000.00$6,000.00

4 $6,587.00$6,587.00

5 $8,500.00$8,500.00

Ref #156 638E10301 FIRE HYDRANT EXTENDED AND ADJUSTED TO GRADE, AS PE, (4 EACH)

Awd $5,000.00$1,250.00

2 $5,247.04$1,311.76

3 $4,200.00$1,050.00

4 $10,628.00$2,657.00

5 $9,000.00$2,250.00

160042 - Page 21

Page 22: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #157 638E10301 FIRE HYDRANT EXTENDED AND ADJUSTED TO GRADE, AS PE, (4 EACH)

Awd $5,000.00$1,250.00

2 $5,634.00$1,408.50

3 $4,200.00$1,050.00

4 $10,628.00$2,657.00

5 $9,000.00$2,250.00

Ref #158 638E10480 FIRE HYDRANT REMOVED, (2 EACH)

Awd $700.00$350.00

2 $1,399.70$699.85

3 $1,600.00$800.00

4 $1,012.00$506.00

5 $1,000.00$500.00

Ref #159 638E10800 VALVE BOX ADJUSTED TO GRADE, (69 EACH)

Awd $2,760.00$40.00

2 $17,132.01$248.29

3 $10,005.00$145.00

4 $11,316.00$164.00

5 $6,900.00$100.00

Ref #160 638E98000 WATER WORK, MISC.:24" BUTTERFLY VALVE AND VALVE BO, (1 EACH)

Awd $15,000.00$15,000.00

2 $7,655.45$7,655.45

3 $8,500.00$8,500.00

4 $10,332.00$10,332.00

5 $10,000.00$10,000.00

Ref #161 638E98000 WATER WORK, MISC.:SERVICE STOP, (30 EACH)

Awd $6,750.00$225.00

2 $20,539.50$684.65

3 $21,000.00$700.00

4 $19,620.00$654.00

5 $15,000.00$500.00

Ref #162 638E98600 WATER WORK, MISC.:20" WATER MAIN DUCTILE IRON PIPE, (697 FT)

Awd $139,400.00$200.00

2 $225,458.59$323.47

3 $181,220.00$260.00

4 $162,331.30$232.90

5 $174,250.00$250.00

Ref #163 638E98600 WATER WORK, MISC.:24" WATER MAIN DUCTILE IRON PIPE, (287 FT)

Awd $114,800.00$400.00

2 $175,747.32$612.36

3 $129,150.00$450.00

4 $77,116.90$268.70

5 $129,150.00$450.00

Ref #164 638E98600 WATER WORK, MISC.:1" PLASTIC SERVICE BRANCH, DRISC, (207 FT)

Awd $8,694.00$42.00

2 $19,722.96$95.28

3 $17,388.00$84.00

4 $5,547.60$26.80

5 $20,700.00$100.00

160042 - Page 22

Page 23: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Section 5 - WATER WORK - Totals

Awd $473,144.00

2 $743,178.73

3 $747,613.00

4 $599,870.40

5 $736,790.00

Ref #165 611E00100 4" CONDUIT, TYPE B, 707.45, (33 FT)

Awd $363.00$11.00

2 $1,397.55$42.35

3 $2,112.00$64.00

4 $1,412.40$42.80

5 $1,155.00$35.00

Ref #166 611E00900 6" CONDUIT, TYPE B, (100 FT)

Awd $355.00$3.55

2 $3,930.00$39.30

3 $10,000.00$100.00

4 $4,740.00$47.40

5 $4,000.00$40.00

Ref #167 611E01100 6" CONDUIT, TYPE C, (200 FT)

Awd $360.00$1.80

2 $7,860.00$39.30

3 $20,000.00$100.00

4 $9,040.00$45.20

5 $8,000.00$40.00

Ref #168 611E01100 6" CONDUIT, TYPE C, 707.45, (100 FT)

Awd $7,400.00$74.00

2 $4,046.00$40.46

3 $10,000.00$100.00

4 $4,520.00$45.20

5 $4,000.00$40.00

Ref #169 611E01800 8" CONDUIT, TYPE B, (100 FT)

Awd $1,000.00$10.00

2 $7,524.00$75.24

3 $31,500.00$315.00

4 $6,790.00$67.90

5 $4,500.00$45.00

Ref #170 611E01800 8" CONDUIT, TYPE B, 707.45, (418 FT)

Awd $40,964.00$98.00

2 $52,417.20$125.40

3 $41,800.00$100.00

4 $28,382.20$67.90

5 $18,810.00$45.00

Ref #171 611E02000 8" CONDUIT, TYPE C, (200 FT)

Awd $1,450.00$7.25

2 $13,722.00$68.61

3 $20,000.00$100.00

4 $12,860.00$64.30

5 $9,000.00$45.00

160042 - Page 23

Page 24: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #172 611E97200 CONDUIT, MISC.:6" PVC SANITARY CLEANOUT, (1 EACH)

Awd $535.00$535.00

2 $230.56$230.56

3 $1,300.00$1,300.00

4 $723.00$723.00

5 $40.00$40.00

Ref #173 611E99574 MANHOLE, NO. 3, (4 EACH)

Awd $12,100.00$3,025.00

2 $15,662.56$3,915.64

3 $13,200.00$3,300.00

4 $23,928.00$5,982.00

5 $19,000.00$4,750.00

Ref #174 611E99654 MANHOLE ADJUSTED TO GRADE, (29 EACH)

Awd $6,235.00$215.00

2 $17,342.87$598.03

3 $16,675.00$575.00

4 $14,413.00$497.00

5 $14,500.00$500.00

Ref #175 611E99660 MANHOLE RECONSTRUCTED TO GRADE, (11 EACH)

Awd $9,020.00$820.00

2 $19,440.74$1,767.34

3 $30,800.00$2,800.00

4 $16,753.00$1,523.00

5 $16,500.00$1,500.00

Ref #176 611E99661 MANHOLE RECONSTRUCTED TO GRADE, AS PER PLAN, (3 EACH)

Awd $2,610.00$870.00

2 $10,541.46$3,513.82

3 $8,400.00$2,800.00

4 $6,972.00$2,324.00

5 $4,500.00$1,500.00

Section 6 - SANITARY SEWER - Totals

Awd $82,392.00

2 $154,114.94

3 $205,787.00

4 $130,533.60

5 $104,005.00

Ref #177 620E70000 DELINEATOR, MISC.:FLEXIBLE POST, 720.03, AS PER PL, (11 EACH)

Awd $1,430.00$130.00

2 $579.70$52.70

3 $550.00$50.00

4 $550.00$50.00

5 $935.00$85.00

Ref #178 625E14001 LIGHT POLE FOUNDATION, 24" X 6' DEEP, AS PER PLAN, (11 EACH)

Awd $7,150.00$650.00

2 $11,531.08$1,048.28

3 $13,662.00$1,242.00

4 $13,662.00$1,242.00

5 $12,100.00$1,100.00

160042 - Page 24

Page 25: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #179 625E25400 CONDUIT, 2", 725.04, (853 FT)

Awd $10,236.00$12.00

2 $7,549.05$8.85

3 $12,283.20$14.40

4 $12,283.20$14.40

5 $10,236.00$12.00

Ref #180 625E25500 CONDUIT, 3", 725.04, (318 FT)

Awd $7,314.00$23.00

2 $4,827.24$15.18

3 $8,490.60$26.70

4 $8,490.60$26.70

5 $5,724.00$18.00

Ref #181 625E27501 LUMINAIRE, UNDERPASS, AS PER PLAN, 26 WATT, LED, 1, (6 EACH)

Awd $7,800.00$1,300.00

2 $2,064.60$344.10

3 $7,524.00$1,254.00

4 $7,524.00$1,254.00

5 $5,400.00$900.00

Ref #182 625E29000 TRENCH, (903 FT)

Awd $6,772.50$7.50

2 $6,230.70$6.90

3 $5,092.92$5.64

4 $5,092.92$5.64

5 $9,030.00$10.00

Ref #183 625E29400 TRENCH IN PAVED AREA, (268 FT)

Awd $4,422.00$16.50

2 $21,820.56$81.42

3 $12,542.40$46.80

4 $12,542.40$46.80

5 $8,040.00$30.00

Ref #184 625E30700 PULL BOX, 725.08, 18", (1 EACH)

Awd $600.00$600.00

2 $473.81$473.81

3 $696.00$696.00

4 $696.00$696.00

5 $670.00$670.00

Ref #185 625E30706 PULL BOX, 725.08, 24", (4 EACH)

Awd $2,200.00$550.00

2 $2,667.36$666.84

3 $3,480.00$870.00

4 $3,480.00$870.00

5 $3,300.00$825.00

Ref #186 625E32000 GROUND ROD, (11 EACH)

Awd $2,475.00$225.00

2 $1,657.92$150.72

3 $1,452.00$132.00

4 $1,452.00$132.00

5 $2,585.00$235.00

160042 - Page 25

Page 26: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #187 625E34001 POWER SERVICE, AS PER PLAN, (1 EACH)

Awd $2,500.00$2,500.00

2 $11,626.22$11,626.22

3 $3,528.00$3,528.00

4 $3,528.00$3,528.00

5 $6,900.00$6,900.00

Ref #188 625E36000 PLASTIC CAUTION TAPE, (1171 FT)

Awd $292.75$0.25

2 $573.79$0.49

3 $339.59$0.29

4 $339.59$0.29

5 $234.20$0.20

Ref #189 625E37101 SERVICE TO UNDERPASS LIGHTING, AS PER PLAN, (1 EACH)

Awd $7,000.00$7,000.00

2 $2,854.68$2,854.68

3 $3,906.00$3,906.00

4 $3,906.00$3,906.00

5 $9,200.00$9,200.00

Section 7 - LIGHTING - Totals

Awd $60,192.25

2 $74,456.71

3 $73,546.71

4 $73,546.71

5 $74,354.20

Ref #190 625E32000 GROUND ROD, (14 EACH)

Awd $6,510.00$465.00

2 $2,649.22$189.23

3 $3,430.00$245.00

4 $3,430.00$245.00

5 $3,570.00$255.00

Ref #191 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (628.5 FT)

Awd $5,342.25$8.50

2 $5,298.26$8.43

3 $5,028.00$8.00

4 $5,028.00$8.00

5 $5,342.25$8.50

Ref #192 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (367 FT)

Awd $3,303.00$9.00

2 $3,482.83$9.49

3 $3,303.00$9.00

4 $3,303.00$9.00

5 $3,303.00$9.00

Ref #193 630E08510 STREET NAME SIGN SUPPORT, NO. 2 POST, (13.2 FT)

Awd $132.00$10.00

2 $135.70$10.28

3 $128.70$9.75

4 $128.70$9.75

5 $132.00$10.00

160042 - Page 26

Page 27: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #194 630E08520 STREET NAME SIGN SUPPORT, NO. 3 POST, (151.5 FT)

Awd $1,590.75$10.50

2 $1,628.63$10.75

3 $1,545.30$10.20

4 $1,545.30$10.20

5 $1,590.75$10.50

Ref #195 630E08600 SIGN POST REFLECTOR, (18 EACH)

Awd $585.00$32.50

2 $664.02$36.89

3 $630.00$35.00

4 $630.00$35.00

5 $585.00$32.50

Ref #196 630E75400 SPAN WIRE SIGN SUPPORT, TYPE TC-17.10, DESIGN 4, (7 EACH)

Awd $57,750.00$8,250.00

2 $40,960.15$5,851.45

3 $45,710.00$6,530.00

4 $42,742.00$6,106.00

5 $57,750.00$8,250.00

Ref #197 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED, (15 EACH)

Awd $1,500.00$100.00

2 $3,082.80$205.52

3 $2,925.00$195.00

4 $2,925.00$195.00

5 $1,500.00$100.00

Ref #198 630E80100 SIGN, FLAT SHEET, (640 SF)

Awd $9,600.00$15.00

2 $14,675.20$22.93

3 $13,920.00$21.75

4 $13,920.00$21.75

5 $9,600.00$15.00

Ref #199 630E80500 SIGN, DOUBLE FACED, STREET NAME, (12 EACH)

Awd $1,800.00$150.00

2 $1,833.84$152.82

3 $1,740.00$145.00

4 $1,740.00$145.00

5 $1,800.00$150.00

Ref #200 630E80600 SIGN, DOUBLE FACED, MILE MARKER, (2 EACH)

Awd $65.00$32.50

2 $411.04$205.52

3 $390.00$195.00

4 $390.00$195.00

5 $65.00$32.50

Ref #201 630E84520 SPAN WIRE SIGN SUPPORT FOUNDATION, (14 EACH)

Awd $35,000.00$2,500.00

2 $35,781.90$2,555.85

3 $33,950.00$2,425.00

4 $33,950.00$2,425.00

5 $35,000.00$2,500.00

160042 - Page 27

Page 28: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #202 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (106 EACH)

Awd $1,590.00$15.00

2 $1,869.84$17.64

3 $1,060.00$10.00

4 $1,060.00$10.00

5 $1,590.00$15.00

Ref #203 630E85000 REMOVAL OF GROUND MOUNTED SIGN AND STORAGE, (5 EACH)

Awd $125.00$25.00

2 $88.20$17.64

3 $75.00$15.00

4 $75.00$15.00

5 $125.00$25.00

Ref #204 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (14 EACH)

Awd $1,400.00$100.00

2 $664.02$47.43

3 $630.00$45.00

4 $630.00$45.00

5 $1,400.00$100.00

Ref #205 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (91 EACH)

Awd $1,365.00$15.00

2 $3,690.96$40.56

3 $1,365.00$15.00

4 $1,365.00$15.00

5 $1,365.00$15.00

Ref #206 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL, (4 EACH)

Awd $700.00$175.00

2 $779.92$194.98

3 $740.00$185.00

4 $740.00$185.00

5 $700.00$175.00

Ref #207 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL, (6 EACH)

Awd $90.00$15.00

2 $324.96$54.16

3 $180.00$30.00

4 $180.00$30.00

5 $90.00$15.00

Ref #208 630E89704 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL, TYP, (1 EACH)

Awd $1,000.00$1,000.00

2 $1,212.05$1,212.05

3 $1,150.00$1,150.00

4 $1,150.00$1,150.00

5 $1,000.00$1,000.00

Ref #209 646E10000 EDGE LINE, 4", (0.71 MILE)

Awd $1,838.19$2,589.00

2 $1,676.22$2,360.87

3 $1,590.40$2,240.00

4 $1,838.19$2,589.00

5 $1,775.00$2,500.00

160042 - Page 28

Page 29: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #210 646E10100 LANE LINE, 4", (4.75 MILE)

Awd $8,516.75$1,793.00

2 $7,809.86$1,644.18

3 $7,410.00$1,560.00

4 $8,516.75$1,793.00

5 $5,700.00$1,200.00

Ref #211 646E10200 CENTER LINE, (6.02 MILE)

Awd $19,360.32$3,216.00

2 $24,395.87$4,052.47

3 $23,146.90$3,845.00

4 $19,360.32$3,216.00

5 $16,555.00$2,750.00

Ref #212 646E10300 CHANNELIZING LINE, 8", (6734 FT)

Awd $10,235.68$1.52

2 $9,629.62$1.43

3 $9,090.90$1.35

4 $10,235.68$1.52

5 $10,101.00$1.50

Ref #213 646E10400 STOP LINE, (611 FT)

Awd $6,110.00$10.00

2 $5,798.39$9.49

3 $5,499.00$9.00

4 $6,110.00$10.00

5 $7,332.00$12.00

Ref #214 646E10500 CROSSWALK LINE, (1666 FT)

Awd $7,830.20$4.70

2 $8,779.82$5.27

3 $8,330.00$5.00

4 $7,830.20$4.70

5 $9,579.50$5.75

Ref #215 646E10800 ISLAND MARKING, (10 SF)

Awd $50.00$5.00

2 $42.20$4.22

3 $40.00$4.00

4 $50.00$5.00

5 $60.00$6.00

Ref #216 646E20100 SCHOOL SYMBOL MARKING, 72", (1 EACH)

Awd $583.00$583.00

2 $526.98$526.98

3 $500.00$500.00

4 $583.00$583.00

5 $600.00$600.00

Ref #217 646E20300 LANE ARROW, (170 EACH)

Awd $22,950.00$135.00

2 $22,395.80$131.74

3 $21,250.00$125.00

4 $22,950.00$135.00

5 $25,500.00$150.00

160042 - Page 29

Page 30: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #218 646E50000 REMOVAL OF PAVEMENT MARKING, (5 EACH)

Awd $3,500.00$700.00

2 $790.45$158.09

3 $750.00$150.00

4 $700.00$140.00

5 $2,060.00$412.00

Ref #219 646E50100 REMOVAL OF PAVEMENT MARKING, (315 FT)

Awd $1,786.05$5.67

2 $897.75$2.85

3 $850.50$2.70

4 $1,786.05$5.67

5 $5,906.25$18.75

Section 8 - TRAFFIC CONTROL - Totals

Awd $212,208.19

2 $201,976.50

3 $196,357.70

4 $194,892.19

5 $211,676.75

Ref #220 625E25400 CONDUIT, 2", 725.04, (1320 FT)

Awd $6,600.00$5.00

2 $13,556.40$10.27

3 $17,820.00$13.50

4 $17,820.00$13.50

5 $15,840.00$12.00

Ref #221 625E25500 CONDUIT, 3", 725.04, (168 FT)

Awd $2,184.00$13.00

2 $2,642.64$15.73

3 $5,241.60$31.20

4 $5,241.60$31.20

5 $3,024.00$18.00

Ref #222 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, (297 FT)

Awd $15,444.00$52.00

2 $10,053.45$33.85

3 $11,360.25$38.25

4 $11,440.44$38.52

5 $10,692.00$36.00

Ref #223 625E29000 TRENCH, (1452 FT)

Awd $4,646.40$3.20

2 $10,018.80$6.90

3 $3,920.40$2.70

4 $3,920.40$2.70

5 $14,520.00$10.00

Ref #224 625E30700 PULL BOX, 725.08, 18", (16 EACH)

Awd $8,000.00$500.00

2 $7,580.96$473.81

3 $10,656.00$666.00

4 $10,656.00$666.00

5 $10,720.00$670.00

160042 - Page 30

Page 31: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #225 625E30706 PULL BOX, 725.08, 24", (2 EACH)

Awd $1,100.00$550.00

2 $1,232.32$616.16

3 $1,740.00$870.00

4 $1,740.00$870.00

5 $1,650.00$825.00

Ref #226 625E31411 PULL BOX, 725.06, 13"X24", AS PER PLAN, (4 EACH)

Awd $1,600.00$400.00

2 $1,556.16$389.04

3 $2,064.00$516.00

4 $2,064.00$516.00

5 $2,800.00$700.00

Ref #227 625E31421 PULL BOX, 725.06, 17"X30", AS PER PLAN, (1 EACH)

Awd $450.00$450.00

2 $708.74$708.74

3 $576.00$576.00

4 $576.00$576.00

5 $900.00$900.00

Ref #228 625E32000 GROUND ROD, (19 EACH)

Awd $2,850.00$150.00

2 $2,863.49$150.71

3 $2,223.00$117.00

4 $2,223.00$117.00

5 $4,465.00$235.00

Ref #229 625E36000 PLASTIC CAUTION TAPE, (1444 FT)

Awd $361.00$0.25

2 $707.56$0.49

3 $418.76$0.29

4 $418.76$0.29

5 $288.80$0.20

Ref #230 632E05007 VEHICULAR SIGNAL HEAD, (LED), BLACK, 3-SECTION, 12, (11 EACH)

Awd $8,800.00$800.00

2 $7,858.95$714.45

3 $9,490.80$862.80

4 $9,490.80$862.80

5 $9,900.00$900.00

Ref #231 632E05087 VEHICULAR SIGNAL HEAD, (LED), BLACK, 5-SECTION, 12, (15 EACH)

Awd $19,500.00$1,300.00

2 $17,350.80$1,156.72

3 $20,772.00$1,384.80

4 $20,772.00$1,384.80

5 $19,500.00$1,300.00

Ref #232 632E20731 PEDESTRIAN SIGNAL HEAD (LED) , (COUNTDOWN), TYPE D, (8 EACH)

Awd $4,000.00$500.00

2 $3,494.24$436.78

3 $4,080.00$510.00

4 $4,080.00$510.00

5 $4,920.00$615.00

160042 - Page 31

Page 32: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #233 632E20731 PEDESTRIAN SIGNAL HEAD (LED) , (COUNTDOWN), TYPE D, (2 EACH)

Awd $870.00$435.00

2 $915.02$457.51

3 $984.00$492.00

4 $984.00$492.00

5 $1,200.00$600.00

Ref #234 632E25000 COVERING OF VEHICULAR SIGNAL HEAD, (26 EACH)

Awd $1,040.00$40.00

2 $1,150.50$44.25

3 $483.60$18.60

4 $483.60$18.60

5 $1,430.00$55.00

Ref #235 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD, (10 EACH)

Awd $550.00$55.00

2 $253.40$25.34

3 $186.00$18.60

4 $186.00$18.60

5 $450.00$45.00

Ref #236 632E26000 PEDESTRIAN PUSHBUTTON, (10 EACH)

Awd $1,500.00$150.00

2 $1,760.30$176.03

3 $2,400.00$240.00

4 $2,400.00$240.00

5 $1,150.00$115.00

Ref #237 632E26001 PEDESTRIAN PUSHBUTTON, AS PER PLAN, (2 EACH)

Awd $430.00$215.00

2 $352.06$176.03

3 $614.40$307.20

4 $614.40$307.20

5 $350.00$175.00

Ref #238 632E26500 DETECTOR LOOP, (24 EACH)

Awd $23,880.00$995.00

2 $31,947.84$1,331.16

3 $33,696.00$1,404.00

4 $33,696.00$1,404.00

5 $16,200.00$675.00

Ref #239 632E27200 LOOP DETECTOR TIE IN, (3 EACH)

Awd $228.00$76.00

2 $397.68$132.56

3 $1,261.08$420.36

4 $1,261.08$420.36

5 $300.00$100.00

Ref #240 632E30400 MESSENGER WIRE, 7 STRAND, 1/2" DIAMETER WITH ACCES, (749 FT)

Awd $4,494.00$6.00

2 $6,553.75$8.75

3 $10,785.60$14.40

4 $10,785.60$14.40

5 $12,358.50$16.50

160042 - Page 32

Page 33: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #241 632E30600 TETHER WIRE, WITH ACCESSORIES, (749 FT)

Awd $6,741.00$9.00

2 $4,149.46$5.54

3 $14,830.20$19.80

4 $14,830.20$19.80

5 $12,358.50$16.50

Ref #242 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG, (5606 FT)

Awd $9,249.90$1.65

2 $14,015.00$2.50

3 $28,590.60$5.10

4 $28,590.60$5.10

5 $13,174.10$2.35

Ref #243 632E64000 STRAIN POLE FOUNDATION, (8 EACH)

Awd $16,000.00$2,000.00

2 $30,594.88$3,824.36

3 $13,440.00$1,680.00

4 $13,440.00$1,680.00

5 $30,800.00$3,850.00

Ref #244 632E64011 SIGNAL SUPPORT FOUNDATION, AS PER PLAN, (4 EACH)

Awd $8,000.00$2,000.00

2 $15,547.16$3,886.79

3 $9,096.00$2,274.00

4 $9,096.00$2,274.00

5 $18,400.00$4,600.00

Ref #245 632E64020 PEDESTAL FOUNDATION, (5 EACH)

Awd $4,000.00$800.00

2 $2,972.40$594.48

3 $3,030.00$606.00

4 $3,030.00$606.00

5 $3,750.00$750.00

Ref #246 632E65200 LOOP DETECTOR LEAD-IN CABLE, (6408 FT)

Awd $7,689.60$1.20

2 $10,316.88$1.61

3 $10,509.12$1.64

4 $10,509.12$1.64

5 $5,126.40$0.80

Ref #247 632E66101 POWER CABLE, 1 CONDUCTOR, NO. 10 AWG, AS PER PLAN, (77 FT)

Awd $107.80$1.40

2 $137.06$1.78

3 $243.32$3.16

4 $243.32$3.16

5 $38.50$0.50

Ref #248 632E68300 POWER CABLE, 3 CONDUCTOR, NO. 6 AWG, (120 FT)

Awd $336.00$2.80

2 $495.60$4.13

3 $619.20$5.16

4 $619.20$5.16

5 $120.00$1.00

160042 - Page 33

Page 34: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #249 632E70001 POWER SERVICE, AS PER PLAN, (2 EACH)

Awd $1,840.00$920.00

2 $4,687.56$2,343.78

3 $4,632.00$2,316.00

4 $4,632.00$2,316.00

5 $3,200.00$1,600.00

Ref #250 632E70001 POWER SERVICE, AS PER PLAN No. 1, (1 EACH)

Awd $685.00$685.00

2 $2,343.75$2,343.75

3 $3,696.00$3,696.00

4 $3,696.00$3,696.00

5 $1,600.00$1,600.00

Ref #251 632E70400 CONDUIT RISER, 2" DIAMETER, (2 EACH)

Awd $630.00$315.00

2 $1,314.34$657.17

3 $1,212.00$606.00

4 $1,212.00$606.00

5 $730.00$365.00

Ref #252 632E80502 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 11, (1 EACH)

Awd $6,000.00$6,000.00

2 $7,162.39$7,162.39

3 $6,282.00$6,282.00

4 $6,281.79$6,281.79

5 $5,550.00$5,550.00

Ref #253 632E80602 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 12, (2 EACH)

Awd $16,000.00$8,000.00

2 $17,572.62$8,786.31

3 $15,078.00$7,539.00

4 $15,077.76$7,538.88

5 $13,500.00$6,750.00

Ref #254 632E80620 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 13, (1 EACH)

Awd $8,250.00$8,250.00

2 $9,871.24$9,871.24

3 $8,400.00$8,400.00

4 $8,378.04$8,378.04

5 $7,600.00$7,600.00

Ref #255 632E83100 STRAIN POLE, TYPE TC-81.10, DESIGN 11, (8 EACH)

Awd $46,000.00$5,750.00

2 $54,558.40$6,819.80

3 $44,200.00$5,525.00

4 $44,195.52$5,524.44

5 $32,000.00$4,000.00

Ref #256 632E89600 PEDESTAL, 8', (5 EACH)

Awd $2,250.00$450.00

2 $2,009.70$401.94

3 $2,655.00$531.00

4 $2,654.25$530.85

5 $2,000.00$400.00

160042 - Page 34

Page 35: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #257 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA, (2 EACH)

Awd $5,860.00$2,930.00

2 $5,158.52$2,579.26

3 $6,580.00$3,290.00

4 $6,576.00$3,288.00

5 $2,500.00$1,250.00

Ref #258 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA, (1 EACH)

Awd $2,930.00$2,930.00

2 $4,432.36$4,432.36

3 $3,288.00$3,288.00

4 $3,288.00$3,288.00

5 $1,600.00$1,600.00

Ref #259 632E90400 SIGNALIZATION, MISC.:FOUNDATION TEST HOLE, (12 EACH)

Awd $1,500.00$125.00

2 $4,338.72$361.56

3 $2,376.00$198.00

4 $2,376.00$198.00

5 $1,020.00$85.00

Ref #260 633E01581 CONTROLLER UNIT, TYPE TS2/A2, WITH CABINET, TYPE T, (2 EACH)

Awd $30,000.00$15,000.00

2 $34,314.16$17,157.08

3 $25,494.00$12,747.00

4 $25,494.00$12,747.00

5 $26,500.00$13,250.00

Ref #261 633E01581 CONTROLLER UNIT, TYPE TS2/A2, WITH CABINET, TYPE T, (1 EACH)

Awd $16,000.00$16,000.00

2 $18,452.07$18,452.07

3 $13,760.00$13,760.00

4 $13,758.96$13,758.96

5 $14,100.00$14,100.00

Ref #262 633E67000 CABINET RISER, (6 EACH)

Awd $2,700.00$450.00

2 $2,952.42$492.07

3 $3,204.00$534.00

4 $3,204.00$534.00

5 $2,100.00$350.00

Ref #263 633E67101 CABINET FOUNDATION, AS PER PLAN, (3 EACH)

Awd $3,600.00$1,200.00

2 $3,845.91$1,281.97

3 $3,546.00$1,182.00

4 $3,546.00$1,182.00

5 $8,400.00$2,800.00

Ref #264 633E67200 CONTROLLER WORK PAD, (3 EACH)

Awd $450.00$150.00

2 $1,150.17$383.39

3 $1,818.00$606.00

4 $1,818.00$606.00

5 $1,050.00$350.00

160042 - Page 35

Page 36: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #265 633E67301 PREEMPTION, AS PER PLAN, (1 EACH)

Awd $3,050.00$3,050.00

2 $3,017.43$3,017.43

3 $3,041.00$3,041.00

4 $3,041.00$3,041.00

5 $2,400.00$2,400.00

Ref #266 633E67311 PREEMPTION RECEIVING UNIT, AS PER PLAN, (4 EACH)

Awd $2,200.00$550.00

2 $2,194.24$548.56

3 $2,592.00$648.00

4 $2,592.00$648.00

5 $2,720.00$680.00

Ref #267 633E67321 PREEMPTION DETECTOR CABLE, AS PER PLAN, (870 FT)

Awd $957.00$1.10

2 $1,035.30$1.19

3 $2,088.00$2.40

4 $2,088.00$2.40

5 $2,175.00$2.50

Ref #268 633E74001 UNINTERRUPTIBLE POWER SUPPLY (UPS), AS PER PLAN, (3 EACH)

Awd $15,000.00$5,000.00

2 $16,189.92$5,396.64

3 $14,115.00$4,705.00

4 $14,110.20$4,703.40

5 $16,050.00$5,350.00

Ref #269 633E99000 CONTROLLER ITEM, MISC.:CONTROLLER MODIFICATIONS, (1 EACH)

Awd $1,250.00$1,250.00

2 $2,375.95$2,375.95

3 $1,236.00$1,236.00

4 $1,236.00$1,236.00

5 $1,150.00$1,150.00

Ref #270 815E30000 SPREAD SPECTRUM RADIO, (1 EACH)

Awd $3,500.00$3,500.00

2 $2,950.10$2,950.10

3 $2,235.00$2,235.00

4 $2,230.05$2,230.05

5 $2,450.00$2,450.00

Ref #271 816E30001 VIDEO DETECTION SYSTEM, AS PER PLAN, (1 EACH)

Awd $20,000.00$20,000.00

2 $21,269.62$21,269.62

3 $16,535.00$16,535.00

4 $16,532.25$16,532.25

5 $21,000.00$21,000.00

Section 9 - TRAFFIC SIGNALS - Totals

Awd $351,303.70

2 $424,380.39

3 $409,194.93

4 $409,229.94

5 $387,820.80

160042 - Page 36

Page 37: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #272 661E40081 DECIDUOUS TREE, 2" CALIPER, AS PER PLAN, (18 EACH)

Awd $9,288.00$516.00

2 $9,789.12$543.84

3 $9,288.00$516.00

4 $11,700.00$650.00

5 $7,905.24$439.18

Section 10 - LANDSCAPING - Totals

Awd $9,288.00

2 $9,789.12

3 $9,288.00

4 $11,700.00

5 $7,905.24

Ref #273 410E13000 TRAFFIC COMPACTED SURFACE, TYPE C, (1250 CY)

Awd $40,000.00$32.00

2 $67,537.50$54.03

3 $62,500.00$50.00

4 $43,750.00$35.00

5 $75,000.00$60.00

Ref #274 608E21200 TEMPORARY ASPHALT CONCRETE WALK, (2215 SF)

Awd $6,645.00$3.00

2 $10,432.65$4.71

3 $3,322.50$1.50

4 $5,759.00$2.60

5 $44,300.00$20.00

Ref #275 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (200 HOUR)

Awd $13,000.00$65.00

2 $13,318.00$66.59

3 $14,000.00$70.00

4 $13,000.00$65.00

5 $7,900.00$39.50

Ref #276 614E11500 WORKSITE TRAFFIC SUPERVISOR, (26 MNTH)

Awd $156,000.00$6,000.00

2 $57,235.88$2,201.38

3 $26,000.00$1,000.00

4 $208,000.00$8,000.00

5 $260,000.00$10,000.00

Ref #277 614E12350 WORK ZONE IMPACT ATTENUATOR, (7 EACH)

Awd $12,600.00$1,800.00

2 $13,279.91$1,897.13

3 $12,600.00$1,800.00

4 $14,560.00$2,080.00

5 $20,300.00$2,900.00

Ref #278 614E12420 DETOUR SIGNING, (LUMP SUM)

Awd $45,000.00$45,000.00

2 $28,019.52$28,019.52

3 $25,000.00$25,000.00

4 $26,585.00$26,585.00

5 $20,375.00$20,375.00

160042 - Page 37

Page 38: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #279 614E12460 WORK ZONE MARKING SIGN, (16 EACH)

Awd $1,680.00$105.00

2 $2,023.68$126.48

3 $1,680.00$105.00

4 $1,920.00$120.00

5 $1,600.00$100.00

Ref #280 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (800 CY)

Awd $108,000.00$135.00

2 $174,384.00$217.98

3 $176,000.00$220.00

4 $216,000.00$270.00

5 $160,000.00$200.00

Ref #281 614E13300 BARRIER REFLECTOR, TYPE B, (37 EACH)

Awd $222.00$6.00

2 $214.60$5.80

3 $222.00$6.00

4 $203.50$5.50

5 $462.50$12.50

Ref #282 614E13350 OBJECT MARKER, ONE WAY, (37 EACH)

Awd $407.00$11.00

2 $292.67$7.91

3 $407.00$11.00

4 $277.50$7.50

5 $462.50$12.50

Ref #283 614E18010 MAINTAINING TRAFFIC, MISC.:3" PARTIAL DEPTH PAVEME, (650 SF)

Awd $5,850.00$9.00

2 $12,330.50$18.97

3 $14,300.00$22.00

4 $6,500.00$10.00

5 $5,200.00$8.00

Ref #284 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (24 SNMT)

Awd $25,200.00$1,050.00

2 $24,030.24$1,001.26

3 $25,200.00$1,050.00

4 $22,800.00$950.00

5 $21,600.00$900.00

Ref #285 614E20000 WORK ZONE LANE LINE, CLASS I, (0.04 MILE)

Awd $19.00$475.00

2 $4.91$122.75

3 $11.00$275.00

4 $4.66$116.50

5 $800.00$20,000.00

Ref #286 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT, (12.28 MILE)

Awd $11,666.00$950.00

2 $12,036.61$980.18

3 $6,569.80$535.00

4 $11,420.40$930.00

5 $21,797.00$1,775.00

160042 - Page 38

Page 39: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #287 614E22100 WORK ZONE EDGE LINE, CLASS I, 642 PAINT, (14.5 MILE)

Awd $6,887.50$475.00

2 $7,106.31$490.09

3 $5,582.50$385.00

4 $6,742.50$465.00

5 $21,387.50$1,475.00

Ref #288 614E22350 WORK ZONE EDGE LINE, CLASS III, 642 PAINT, (0.5 MILE)

Awd $130.00$260.00

2 $1,051.85$2,103.70

3 $1,000.00$2,000.00

4 $998.00$1,996.00

5 $925.00$1,850.00

Ref #289 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 642 PAINT, (3756 FT)

Awd $751.20$0.20

2 $3,155.04$0.84

3 $2,065.80$0.55

4 $3,004.80$0.80

5 $2,629.20$0.70

Ref #290 614E24200 WORK ZONE DOTTED LINE, CLASS I, 642 PAINT, (661 FT)

Awd $33.05$0.05

2 $1,394.71$2.11

3 $330.50$0.50

4 $1,322.00$2.00

5 $1,222.85$1.85

Ref #291 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT, (580 FT)

Awd $174.00$0.30

2 $3,543.80$6.11

3 $1,450.00$2.50

4 $3,364.00$5.80

5 $4,495.00$7.75

Ref #292 614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT, (66 EACH)

Awd $1,320.00$20.00

2 $4,521.66$68.51

3 $2,970.00$45.00

4 $4,290.00$65.00

5 $8,250.00$125.00

Ref #293 615E10000 ROADS FOR MAINTAINING TRAFFIC, (LUMP SUM)

Awd $360,000.00$360,000.00

2 $174,232.20$174,232.20

3 $85,000.00$85,000.00

4 $275,000.00$275,000.00

5 $8,000.00$8,000.00

Ref #294 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, (18029 SY)

Awd $567,913.50$31.50

2 $684,020.26$37.94

3 $783,360.05$43.45

4 $730,174.50$40.50

5 $811,305.00$45.00

160042 - Page 39

Page 40: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #295 616E10000 WATER, (25.3 MGAL)

Awd $246.68$9.75

2 $938.88$37.11

3 $253.00$10.00

4 $253.00$10.00

5 $2,530.00$100.00

Ref #296 622E41010 PORTABLE BARRIER, 50", (1790 FT)

Awd $62,650.00$35.00

2 $37,733.20$21.08

3 $48,330.00$27.00

4 $51,283.50$28.65

5 $134,250.00$75.00

Ref #297 632E26501 DETECTOR LOOP, AS PER PLAN, (23 EACH)

Awd $1,150.00$50.00

2 $38,462.21$1,672.27

3 $32,292.00$1,404.00

4 $32,292.00$1,404.00

5 $15,525.00$675.00

Section 11 - MAINTENANCE OF TRAFFIC - Totals

Awd $1,427,544.93

2 $1,371,300.79

3 $1,330,446.15

4 $1,679,504.36

5 $1,650,316.55

Ref #298 503E21100 UNCLASSIFIED EXCAVATION, (1251 CY)

Awd $112,590.00$90.00

2 $35,378.28$28.28

3 $81,315.00$65.00

4 $78,813.00$63.00

5 $76,311.00$61.00

Ref #299 509E10000 EPOXY COATED REINFORCING STEEL, (11687 LB)

Awd $17,530.50$1.50

2 $18,582.33$1.59

3 $17,530.50$1.50

4 $17,530.50$1.50

5 $23,374.00$2.00

Ref #300 511E46212 CLASS QC1 CONCRETE WITH QC/QA, (174 CY)

Awd $84,390.00$485.00

2 $110,034.12$632.38

3 $78,300.00$450.00

4 $78,300.00$450.00

5 $130,500.00$750.00

Ref #301 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (149 SY)

Awd $4,768.00$32.00

2 $4,711.38$31.62

3 $4,768.00$32.00

4 $4,768.00$32.00

5 $2,533.00$17.00

160042 - Page 40

Page 41: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #302 512E33000 TYPE 2 WATERPROOFING, (5 SY)

Awd $100.00$20.00

2 $263.50$52.70

3 $100.00$20.00

4 $100.00$20.00

5 $1,075.00$215.00

Ref #303 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (13 SF)

Awd $130.00$10.00

2 $179.66$13.82

3 $130.00$10.00

4 $130.00$10.00

5 $208.00$16.00

Ref #304 517E76300 RAILING, MISC.:DETAILS AS PER PLAN, (275 FT)

Awd $60,500.00$220.00

2 $85,211.50$309.86

3 $103,125.00$375.00

4 $60,500.00$220.00

5 $118,250.00$430.00

Ref #305 518E21200 POROUS BACKFILL WITH FILTER FABRIC, (88 CY)

Awd $5,280.00$60.00

2 $6,452.16$73.32

3 $5,280.00$60.00

4 $5,280.00$60.00

5 $14,520.00$165.00

Ref #306 610E50010 SPECIAL - RETAINING WALL, MISC.:MODULAR BLOCK WALL, (2780 SF)

Awd $139,000.00$50.00

2 $76,366.60$27.47

3 $97,300.00$35.00

4 $97,300.00$35.00

5 $100,080.00$36.00

Section 12 - RETAINING WALLS - Totals

Awd $424,288.50

2 $337,179.53

3 $387,848.50

4 $342,721.50

5 $466,851.00

Ref #307 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN, (LUMP SUM)

Awd $165,000.00$165,000.00

2 $56,913.82$56,913.82

3 $110,000.00$110,000.00

4 $103,000.00$103,000.00

5 $558,700.00$558,700.00

Ref #308 503E21100 UNCLASSIFIED EXCAVATION, (348 CY)

Awd $10,440.00$30.00

2 $11,898.12$34.19

3 $15,660.00$45.00

4 $15,660.00$45.00

5 $25,056.00$72.00

160042 - Page 41

Page 42: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #309 507E00400 STEEL PILES, MISC.:W18X119 FURNISHED, (825 FT)

Awd $82,500.00$100.00

2 $26,086.50$31.62

3 $66,000.00$80.00

4 $66,000.00$80.00

5 $75,900.00$92.00

Ref #310 509E10000 EPOXY COATED REINFORCING STEEL, (9199 LB)

Awd $13,798.50$1.50

2 $14,626.41$1.59

3 $13,798.50$1.50

4 $13,798.50$1.50

5 $17,478.10$1.90

Ref #311 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (159 EACH)

Awd $3,180.00$20.00

2 $4,189.65$26.35

3 $3,180.00$20.00

4 $3,180.00$20.00

5 $7,314.00$46.00

Ref #312 511E46212 CLASS QC1 CONCRETE WITH QC/QA, (123 CY)

Awd $64,575.00$525.00

2 $77,782.74$632.38

3 $59,040.00$480.00

4 $59,040.00$480.00

5 $137,760.00$1,120.00

Ref #313 511E81300 CONCRETE, MISC.:MOCKUP PANEL, (1 EACH)

Awd $3,000.00$3,000.00

2 $5,269.80$5,269.80

3 $3,000.00$3,000.00

4 $3,000.00$3,000.00

5 $4,000.00$4,000.00

Ref #314 512E10001 SEALING OF CONCRETE SURFACES, AS PER PLAN (PERMANE, (293 SY)

Awd $8,204.00$28.00

2 $9,419.95$32.15

3 $8,204.00$28.00

4 $8,204.00$28.00

5 $6,446.00$22.00

Ref #315 512E33000 TYPE 2 WATERPROOFING, (551 SY)

Awd $8,265.00$15.00

2 $10,452.47$18.97

3 $8,265.00$15.00

4 $8,265.00$15.00

5 $17,081.00$31.00

Ref #316 512E75500 SPECIAL - SEALING, MISC.:STAINING OF CONCRETE SURF, (293 SY)

Awd $18,459.00$63.00

2 $6,176.44$21.08

3 $18,459.00$63.00

4 $18,459.00$63.00

5 $18,459.00$63.00

160042 - Page 42

Page 43: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #317 513E20000 WELDED STUD SHEAR CONNECTORS, (434 EACH)

Awd $3,038.00$7.00

2 $1,371.44$3.16

3 $3,038.00$7.00

4 $3,038.00$7.00

5 $2,604.00$6.00

Ref #318 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (101 SF)

Awd $505.00$5.00

2 $1,395.82$13.82

3 $505.00$5.00

4 $505.00$5.00

5 $656.50$6.50

Ref #319 516E13900 2" PREFORMED EXPANSION JOINT FILLER, (16 SF)

Awd $160.00$10.00

2 $337.28$21.08

3 $160.00$10.00

4 $160.00$10.00

5 $272.00$17.00

Ref #320 517E76300 RAILING, MISC.:DETAILS AS PER PLAN, (244 FT)

Awd $53,680.00$220.00

2 $75,864.48$310.92

3 $87,840.00$360.00

4 $53,680.00$220.00

5 $95,160.00$390.00

Ref #321 518E21200 POROUS BACKFILL WITH FILTER FABRIC, (24 CY)

Awd $1,920.00$80.00

2 $1,256.40$52.35

3 $1,920.00$80.00

4 $1,920.00$80.00

5 $5,160.00$215.00

Ref #322 524E94603 DRILLED SHAFTS, 30" DIAMETER, ABOVE BEDROCK, AS PE, (399 FT)

Awd $95,760.00$240.00

2 $77,797.02$194.98

3 $95,760.00$240.00

4 $95,760.00$240.00

5 $109,725.00$275.00

Ref #323 524E94603 DRILLED SHAFTS, 30" DIAMETER, ABOVE BEDROCK, AS PE, (218 FT)

Awd $28,340.00$130.00

2 $21,828.34$100.13

3 $28,340.00$130.00

4 $28,340.00$130.00

5 $64,310.00$295.00

Ref #324 530E13000 SPECIAL - FORM LINER, (1863 SF)

Awd $18,630.00$10.00

2 $51,493.32$27.64

3 $18,630.00$10.00

4 $18,630.00$10.00

5 $22,356.00$12.00

160042 - Page 43

Page 44: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #325 610E50010 SPECIAL - RETAINING WALL, MISC.:TIMBER LAGGING, (1155 SF)

Awd $9,240.00$8.00

2 $45,576.30$39.46

3 $9,240.00$8.00

4 $9,240.00$8.00

5 $26,565.00$23.00

Ref #326 610E50010 SPECIAL - RETAINING WALL, MISC.:GEOCOMPOSITE DRAIN, (1050 SF)

Awd $5,250.00$5.00

2 $5,533.50$5.27

3 $5,250.00$5.00

4 $5,250.00$5.00

5 $2,940.00$2.80

Ref #327 610E50010 SPECIAL - RETAINING WALL, MISC.:PRECAST PANELS, (1283 SF)

Awd $76,980.00$60.00

2 $72,232.90$56.30

3 $74,414.00$58.00

4 $74,414.00$58.00

5 $69,282.00$54.00

Ref #328 611E96454 16'X9' CONDUIT, TYPE A, 706.05, (119 FT)

Awd $345,100.00$2,900.00

2 $125,990.06$1,058.74

3 $277,865.00$2,335.00

4 $277,865.00$2,335.00

5 $414,120.00$3,480.00

Section 13 - STRUCTURE 20 FOOT SPAN AND OVER (7601395 - Totals

Awd $1,016,024.50

2 $703,492.76

3 $908,568.50

4 $867,408.50

5 $1,681,344.60

Ref #329 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $125,000.00$125,000.00

2 $107,828.67$107,828.67

3 $145,000.00$145,000.00

4 $120,000.00$120,000.00

5 $130,000.00$130,000.00

Ref #330 108E10000 SPECIAL - CPM PROGRESS SCHEDULE, (LUMP SUM)

Awd $75,000.00$75,000.00

2 $13,318.76$13,318.76

3 $13,500.00$13,500.00

4 $8,000.00$8,000.00

5 $5,000.00$5,000.00

Ref #331 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $750,000.00$750,000.00

2 $387,655.18$387,655.18

3 $625,000.00$625,000.00

4 $800,000.00$800,000.00

5 $400,000.00$400,000.00

160042 - Page 44

Page 45: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #332 619E16020 FIELD OFFICE, TYPE C, (30 MNTH)

Awd $72,000.60$2,400.02

2 $67,130.40$2,237.68

3 $52,500.00$1,750.00

4 $48,000.00$1,600.00

5 $90,000.00$3,000.00

Ref #333 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)

Awd $180,000.00$180,000.00

2 $105,395.97$105,395.97

3 $65,000.00$65,000.00

4 $128,652.00$128,652.00

5 $200,000.00$200,000.00

Ref #334 624E10000 MOBILIZATION, (LUMP SUM)

Awd $450,000.00$450,000.00

2 $225,630.63$225,630.63

3 $475,000.00$475,000.00

4 $600,000.00$600,000.00

5 $1,066,822.40$1,066,822.40

Section 14 - INCIDENTALS - Totals

Awd $1,652,000.60

2 $906,959.61

3 $1,376,000.00

4 $1,704,652.00

5 $1,891,822.40

160042 - Page 45

Page 46: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Project No. 160066

PID 99868

SHE-IR 75-5.27

Federal

Type: SIGNALIZATION

Completion Date: 9/16/2016

Award Amount: $152,600.00

Contract Awarded To: PERRAM ELECTRIC INC

Letting Date: 3/1/2016

Engineer's Estimate: $215,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jerry Wray, Director

PERRAM ELECTRIC INC

6882 RIDGE RD

WADSWORTH, OH 44281

Medina

Bidder 1

Bid $152,600.00

MILLER CABLE COMPANY

210 S BROADWAY ST P O BOX 68

GREEN SPRINGS, OH 44836

Seneca

Bidder 2

Bid $155,000.00

GREENWICH ELECTRIC INC

1050 LAFAYETTE RD

MEDINA, OH 44256-3549

Bidder 3

Bid $156,300.33

CAPITAL ELECTRIC LINE BUILDERS INC

4400 NW MATTOX RD

RIVERSIDE, MO 64150

Bidder 4

Bid $157,329.60

J RANCK ELECTRIC INC

1993 GOVER PARKWAY

MT PLEASANT, MI 48858

Bidder 5

Bid $166,317.90

SECURITY FENCE GROUP INC

4260 DANE ST

CINCINNATI, OH 45223

Hamilton

Bidder 6

Bid $174,961.25

COMPLETE GENERAL CONSTRUCTION COMPANY

1221 EAST FIFTH AVE

COLUMBUS, OH 43219

Franklin

Bidder 7

Bid $180,267.25

160066 - Page 46

Page 47: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)

Awd $650.00$650.00

2 $900.00$900.00

3 $600.00$600.00

4 $290.70$290.70

5 $500.00$500.00

6 $575.00$575.00

7 $2,000.00$2,000.00

Ref #2 202E30000 WALK REMOVED, (265 SF)

Awd $1,656.25$6.25

2 $1,656.25$6.25

3 $1,749.00$6.60

4 $604.20$2.28

5 $1,987.50$7.50

6 $609.50$2.30

7 $795.00$3.00

Ref #3 202E32500 CURB AND GUTTER REMOVED, (43 FT)

Awd $946.00$22.00

2 $946.00$22.00

3 $993.30$23.10

4 $392.16$9.12

5 $860.00$20.00

6 $395.60$9.20

7 $430.00$10.00

Ref #4 203E20000 EMBANKMENT, (35 CY)

Awd $1,820.00$52.00

2 $1,820.00$52.00

3 $1,925.00$55.00

4 $399.00$11.40

5 $1,050.00$30.00

6 $1,006.25$28.75

7 $1,050.00$30.00

Ref #5 608E10001 4" CONCRETE WALK, AS PER PLAN, (118 SF)

Awd $1,829.00$15.50

2 $1,829.00$15.50

3 $1,917.50$16.25

4 $941.64$7.98

5 $2,596.00$22.00

6 $949.90$8.05

7 $1,416.00$12.00

Ref #6 608E52001 CURB RAMP, AS PER PLAN, (125 SF)

Awd $1,937.50$15.50

2 $1,937.50$15.50

3 $2,031.25$16.25

4 $2,850.00$22.80

5 $4,375.00$35.00

6 $2,875.00$23.00

7 $1,656.25$13.25

160066 - Page 47

Page 48: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Section 1 - Roadway - Totals

Awd $8,838.75

2 $9,088.75

3 $9,216.05

4 $5,477.70

5 $11,368.50

6 $6,411.25

7 $7,347.25

Ref #7 659E10000 SEEDING AND MULCHING, (625 SY)

Awd $1,093.75$1.75

2 $1,250.00$2.00

3 $1,156.25$1.85

4 $712.50$1.14

5 $1,875.00$3.00

6 $3,437.50$5.50

7 $3,125.00$5.00

Ref #8 832E30000 EROSION CONTROL, (1000 EACH)

Awd $1,000.00$1.00

2 $1,000.00$1.00

3 $1,000.00$1.00

4 $1,000.00$1.00

5 $1,000.00$1.00

6 $1,000.00$1.00

7 $1,000.00$1.00

Section 2 - Erosion Control - Totals

Awd $2,093.75

2 $2,250.00

3 $2,156.25

4 $1,712.50

5 $2,875.00

6 $4,437.50

7 $4,125.00

Ref #9 411E10000 STABILIZED CRUSHED AGGREGATE, (4 CY)

Awd $280.00$70.00

2 $340.00$85.00

3 $294.00$73.50

4 $342.00$85.50

5 $520.00$130.00

6 $345.00$86.25

7 $400.00$100.00

Ref #10 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN, (43 FT)

Awd $1,505.00$35.00

2 $1,806.00$42.00

3 $1,580.25$36.75

4 $1,470.60$34.20

5 $1,505.00$35.00

6 $1,483.50$34.50

7 $2,795.00$65.00

160066 - Page 48

Page 49: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Section 3 - Pavement - Totals

Awd $1,785.00

2 $2,146.00

3 $1,874.25

4 $1,812.60

5 $2,025.00

6 $1,828.50

7 $3,195.00

Ref #11 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (37.5 FT)

Awd $570.00$15.20

2 $450.00$12.00

3 $354.38$9.45

4 $384.75$10.26

5 $318.75$8.50

6 $371.25$9.90

7 $750.00$20.00

Ref #12 630E08004 ONE WAY SUPPORT, NO. 3 POST, (15 FT)

Awd $197.25$13.15

2 $222.00$14.80

3 $189.00$12.60

4 $205.20$13.68

5 $108.75$7.25

6 $198.00$13.20

7 $375.00$25.00

Ref #13 630E08600 SIGN POST REFLECTOR, (1 EACH)

Awd $115.00$115.00

2 $45.00$45.00

3 $37.00$37.00

4 $39.90$39.90

5 $100.00$100.00

6 $38.50$38.50

7 $100.00$100.00

Ref #14 630E79100 SIGN HANGER ASSEMBLY, MAST ARM, (1 EACH)

Awd $255.00$255.00

2 $375.00$375.00

3 $283.00$283.00

4 $307.80$307.80

5 $215.00$215.00

6 $297.00$297.00

7 $1,000.00$1,000.00

Ref #15 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED, (1 EACH)

Awd $100.00$100.00

2 $150.00$150.00

3 $115.00$115.00

4 $125.40$125.40

5 $125.00$125.00

6 $121.00$121.00

7 $150.00$150.00

160066 - Page 49

Page 50: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #16 630E80100 SIGN, FLAT SHEET, (33.5 SF)

Awd $725.28$21.65

2 $1,273.00$38.00

3 $562.80$16.80

4 $611.04$18.24

5 $1,005.00$30.00

6 $589.60$17.60

7 $1,005.00$30.00

Ref #17 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (1 EACH)

Awd $10.00$10.00

2 $15.00$15.00

3 $15.00$15.00

4 $17.10$17.10

5 $50.00$50.00

6 $16.50$16.50

7 $20.00$20.00

Ref #18 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (2 EACH)

Awd $162.50$81.25

2 $110.00$55.00

3 $130.00$65.00

4 $136.80$68.40

5 $300.00$150.00

6 $132.00$66.00

7 $200.00$100.00

Ref #19 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (1 EACH)

Awd $40.00$40.00

2 $15.00$15.00

3 $21.00$21.00

4 $22.80$22.80

5 $60.00$60.00

6 $22.00$22.00

7 $20.00$20.00

Ref #20 646E10200 CENTER LINE, (0.07 MILE)

Awd $1,603.00$22,900.00

2 $1,225.00$17,500.00

3 $1,682.80$24,040.00

4 $1,827.02$26,100.29

5 $3,570.00$51,000.00

6 $1,762.95$25,185.00

7 $1,225.00$17,500.00

Ref #21 646E10300 CHANNELIZING LINE, 8", (216 FT)

Awd $1,090.80$5.05

2 $756.00$3.50

3 $1,144.80$5.30

4 $1,244.16$5.76

5 $810.00$3.75

6 $1,198.80$5.55

7 $864.00$4.00

160066 - Page 50

Page 51: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #22 646E10400 STOP LINE, (98 FT)

Awd $1,269.10$12.95

2 $1,372.00$14.00

3 $1,332.80$13.60

4 $1,446.48$14.76

5 $1,568.00$16.00

6 $1,396.50$14.25

7 $1,470.00$15.00

Ref #23 646E10500 CROSSWALK LINE, (242 FT)

Awd $2,202.20$9.10

2 $1,633.50$6.75

3 $2,311.10$9.55

4 $2,509.54$10.37

5 $1,839.20$7.60

6 $2,420.00$10.00

7 $2,420.00$10.00

Ref #24 646E10800 ISLAND MARKING, (52 SF)

Awd $431.60$8.30

2 $260.00$5.00

3 $452.40$8.70

4 $491.92$9.46

5 $561.60$10.80

6 $475.80$9.15

7 $312.00$6.00

Ref #25 646E20300 LANE ARROW, (3 EACH)

Awd $750.00$250.00

2 $750.00$250.00

3 $789.00$263.00

4 $855.00$285.00

5 $882.00$294.00

6 $825.00$275.00

7 $1,050.00$350.00

Ref #26 646E50000 REMOVAL OF PAVEMENT MARKING, (3 EACH)

Awd $600.00$200.00

2 $1,110.00$370.00

3 $630.00$210.00

4 $684.00$228.00

5 $438.00$146.00

6 $660.00$220.00

7 $1,200.00$400.00

Ref #27 646E50100 REMOVAL OF PAVEMENT MARKING, (742 FT)

Awd $1,632.40$2.20

2 $7,420.00$10.00

3 $1,743.70$2.35

4 $1,862.42$2.51

5 $3,190.60$4.30

6 $1,817.90$2.45

7 $11,130.00$15.00

160066 - Page 51

Page 52: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #28 646E50200 REMOVAL OF PAVEMENT MARKING, (52 SF)

Awd $221.00$4.25

2 $390.00$7.50

3 $228.80$4.40

4 $249.08$4.79

5 $286.00$5.50

6 $241.80$4.65

7 $520.00$10.00

Section 4 - Traffic Control - Totals

Awd $11,975.13

2 $17,571.50

3 $12,022.58

4 $13,020.41

5 $15,427.90

6 $12,584.60

7 $23,811.00

Ref #29 625E25408 CONDUIT, 2", 725.051, (178 FT)

Awd $1,290.50$7.25

2 $1,246.00$7.00

3 $1,032.40$5.80

4 $1,927.74$10.83

5 $534.00$3.00

6 $943.40$5.30

7 $712.00$4.00

Ref #30 625E25504 CONDUIT, 3", 725.051, (11 FT)

Awd $338.25$30.75

2 $88.00$8.00

3 $92.40$8.40

4 $125.40$11.40

5 $44.00$4.00

6 $217.25$19.75

7 $71.50$6.50

Ref #31 625E25909 CONDUIT, JACKED OR DRILLED, 725.052, AS PER PLAN2", (365 FT)

Awd $8,723.50$23.90

2 $10,220.00$28.00

3 $9,033.75$24.75

4 $10,818.60$29.64

5 $5,475.00$15.00

6 $12,994.00$35.60

7 $9,125.00$25.00

Ref #32 625E29000 TRENCH, (189 FT)

Awd $2,079.00$11.00

2 $1,890.00$10.00

3 $1,606.50$8.50

4 $2,370.06$12.54

5 $1,134.00$6.00

6 $1,483.65$7.85

7 $1,890.00$10.00

160066 - Page 52

Page 53: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #33 625E30700 PULL BOX, 725.08, 18", (6 EACH)

Awd $5,970.00$995.00

2 $3,900.00$650.00

3 $4,590.00$765.00

4 $3,762.00$627.00

5 $6,000.00$1,000.00

6 $4,308.00$718.00

7 $4,500.00$750.00

Ref #34 625E30706 PULL BOX, 725.08, 24", (1 EACH)

Awd $1,165.00$1,165.00

2 $850.00$850.00

3 $915.00$915.00

4 $712.50$712.50

5 $1,100.00$1,100.00

6 $843.00$843.00

7 $900.00$900.00

Ref #35 625E32000 GROUND ROD, (7 EACH)

Awd $1,435.00$205.00

2 $1,645.00$235.00

3 $1,225.00$175.00

4 $1,316.70$188.10

5 $1,225.00$175.00

6 $1,155.00$165.00

7 $1,400.00$200.00

Ref #36 632E04911 VEHICULAR SIGNAL HEAD, (LED) BLACK, 3-SECTION, 12", (5 EACH)

Awd $3,375.00$675.00

2 $4,500.00$900.00

3 $3,345.00$669.00

4 $4,275.00$855.00

5 $4,375.00$875.00

6 $4,165.00$833.00

7 $4,250.00$850.00

Ref #37 632E04921 VEHICULAR SIGNAL HEAD, (LED) BLACK, 5-SECTION, 12", (1 EACH)

Awd $1,150.00$1,150.00

2 $1,150.00$1,150.00

3 $1,165.00$1,165.00

4 $1,333.80$1,333.80

5 $1,375.00$1,375.00

6 $1,310.00$1,310.00

7 $1,300.00$1,300.00

Ref #38 632E20731 PEDESTRIAN SIGNAL HEAD (LED) , (COUNTDOWN), TYPE D, (4 EACH)

Awd $1,580.00$395.00

2 $2,200.00$550.00

3 $1,740.00$435.00

4 $2,280.00$570.00

5 $2,300.00$575.00

6 $2,344.00$586.00

7 $2,000.00$500.00

160066 - Page 53

Page 54: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #39 632E25000 COVERING OF VEHICULAR SIGNAL HEAD, (6 EACH)

Awd $60.00$10.00

2 $300.00$50.00

3 $90.00$15.00

4 $6.84$1.14

5 $900.00$150.00

6 $76.50$12.75

7 $180.00$30.00

Ref #40 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD, (4 EACH)

Awd $20.00$5.00

2 $80.00$20.00

3 $40.00$10.00

4 $4.56$1.14

5 $600.00$150.00

6 $51.00$12.75

7 $120.00$30.00

Ref #41 632E26000 PEDESTRIAN PUSHBUTTON, (4 EACH)

Awd $860.00$215.00

2 $800.00$200.00

3 $740.00$185.00

4 $752.40$188.10

5 $1,200.00$300.00

6 $828.00$207.00

7 $1,200.00$300.00

Ref #42 632E26500 DETECTOR LOOP, (5 EACH)

Awd $5,450.00$1,090.00

2 $4,250.00$850.00

3 $5,825.00$1,165.00

4 $7,096.50$1,419.30

5 $6,000.00$1,200.00

6 $6,275.00$1,255.00

7 $8,000.00$1,600.00

Ref #43 632E40300 SIGNAL CABLE, 3 CONDUCTOR, NO. 14 AWG, (554 FT)

Awd $886.40$1.60

2 $1,329.60$2.40

3 $886.40$1.60

4 $1,163.40$2.10

5 $831.00$1.50

6 $1,052.60$1.90

7 $1,108.00$2.00

Ref #44 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG, (570 FT)

Awd $969.00$1.70

2 $1,482.00$2.60

3 $1,026.00$1.80

4 $1,311.00$2.30

5 $883.50$1.55

6 $1,305.30$2.29

7 $1,425.00$2.50

160066 - Page 54

Page 55: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #45 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG, (610 FT)

Awd $1,037.00$1.70

2 $1,708.00$2.80

3 $1,250.50$2.05

4 $1,531.10$2.51

5 $1,220.00$2.00

6 $1,647.00$2.70

7 $1,677.50$2.75

Ref #46 632E64010 SIGNAL SUPPORT FOUNDATION, (2 EACH)

Awd $9,450.00$4,725.00

2 $11,700.00$5,850.00

3 $8,500.00$4,250.00

4 $6,840.00$3,420.00

5 $7,800.00$3,900.00

6 $7,272.00$3,636.00

7 $10,000.00$5,000.00

Ref #47 632E64020 PEDESTAL FOUNDATION, (4 EACH)

Awd $3,240.00$810.00

2 $2,000.00$500.00

3 $3,200.00$800.00

4 $3,648.00$912.00

5 $2,500.00$625.00

6 $4,328.00$1,082.00

7 $5,000.00$1,250.00

Ref #48 632E65200 LOOP DETECTOR LEAD-IN CABLE, (445 FT)

Awd $689.75$1.55

2 $890.00$2.00

3 $645.25$1.45

4 $912.25$2.05

5 $667.50$1.50

6 $872.20$1.96

7 $890.00$2.00

Ref #49 632E68200 POWER CABLE, 2 CONDUCTOR, NO. 6 AWG, (160 FT)

Awd $432.00$2.70

2 $160.00$1.00

3 $512.00$3.20

4 $547.20$3.42

5 $520.00$3.25

6 $504.00$3.15

7 $640.00$4.00

Ref #50 632E69500 SERVICE CABLE, 2 CONDUCTOR, NO. 6 AWG, (50 FT)

Awd $252.50$5.05

2 $50.00$1.00

3 $160.00$3.20

4 $171.00$3.42

5 $162.50$3.25

6 $157.50$3.15

7 $200.00$4.00

160066 - Page 55

Page 56: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #51 632E70001 POWER SERVICE, AS PER PLAN, (1 EACH)

Awd $1,210.00$1,210.00

2 $1,800.00$1,800.00

3 $1,750.00$1,750.00

4 $1,824.00$1,824.00

5 $2,100.00$2,100.00

6 $2,120.00$2,120.00

7 $1,500.00$1,500.00

Ref #52 632E70400 CONDUIT RISER, 2" DIAMETER, (1 EACH)

Awd $605.00$605.00

2 $500.00$500.00

3 $425.00$425.00

4 $399.00$399.00

5 $500.00$500.00

6 $791.00$791.00

7 $500.00$500.00

Ref #53 632E75172 SIGNAL SUPPORT, TYPE TC-12.30 DESIGN 6 POLE, WITH , (1 EACH)

Awd $10,860.00$10,860.00

2 $11,000.00$11,000.00

3 $11,834.00$11,834.00

4 $12,631.20$12,631.20

5 $14,000.00$14,000.00

6 $13,074.00$13,074.00

7 $12,500.00$12,500.00

Ref #54 632E80620 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 13, (1 EACH)

Awd $9,625.00$9,625.00

2 $8,000.00$8,000.00

3 $8,871.00$8,871.00

4 $10,009.20$10,009.20

5 $10,000.00$10,000.00

6 $10,208.00$10,208.00

7 $9,000.00$9,000.00

Ref #55 632E89900 PEDESTAL, 8', TRANSFORMER BASE, (4 EACH)

Awd $3,220.00$805.00

2 $2,000.00$500.00

3 $1,780.00$445.00

4 $2,052.00$513.00

5 $2,800.00$700.00

6 $2,776.00$694.00

7 $3,200.00$800.00

Ref #56 633E01551 CONTROLLER UNIT, TYPE TS2/A2, WITH CABINET, TYPE T, (1 EACH)

Awd $16,315.00$16,315.00

2 $14,700.00$14,700.00

3 $16,865.00$16,865.00

4 $20,132.40$20,132.40

5 $15,000.00$15,000.00

6 $19,150.00$19,150.00

7 $22,000.00$22,000.00

160066 - Page 56

Page 57: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #57 633E67000 CABINET RISER, (1 EACH)

Awd $325.00$325.00

2 $550.00$550.00

3 $400.00$400.00

4 $442.32$442.32

5 $475.00$475.00

6 $472.00$472.00

7 $1,000.00$1,000.00

Ref #58 633E67101 CABINET FOUNDATION, AS PER PLAN, (1 EACH)

Awd $1,725.00$1,725.00

2 $2,760.00$2,760.00

3 $1,450.00$1,450.00

4 $1,653.00$1,653.00

5 $1,600.00$1,600.00

6 $1,370.00$1,370.00

7 $3,000.00$3,000.00

Ref #59 633E67201 CONTROLLER WORK PAD, AS PER PLAN, (1 EACH)

Awd $100.00$100.00

2 $100.00$100.00

3 $450.00$450.00

4 $513.00$513.00

5 $1,600.00$1,600.00

6 $618.00$618.00

7 $1,500.00$1,500.00

Ref #60 633E69000 ADVANCE/DILEMMA ZONE DETECTION RADARITEM 633E69200, (2 EACH)

Awd $12,670.00$6,335.00

2 $13,400.00$6,700.00

3 $13,600.00$6,800.00

4 $14,706.00$7,353.00

5 $14,000.00$7,000.00

6 $14,662.00$7,331.00

7 $14,000.00$7,000.00

Ref #61 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS , (1 EACH)

Awd $4,500.00$4,500.00

2 $3,850.00$3,850.00

3 $4,386.00$4,386.00

4 $5,164.20$5,164.20

5 $5,000.00$5,000.00

6 $4,901.00$4,901.00

7 $5,000.00$5,000.00

Section 5 - Traffic Signals - Totals

Awd $111,607.90

2 $111,098.60

3 $109,431.20

4 $122,432.37

5 $113,921.50

6 $124,274.40

7 $129,789.00

160066 - Page 57

Page 58: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #62 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $2,659.47$2,659.47

2 $1,408.15$1,408.15

3 $4,600.00$4,600.00

4 $1,069.32$1,069.32

5 $1,500.00$1,500.00

6 $5,200.00$5,200.00

7 $2,000.00$2,000.00

Ref #63 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $9,540.00$9,540.00

2 $6,142.00$6,142.00

3 $6,500.00$6,500.00

4 $6,993.90$6,993.90

5 $6,700.00$6,700.00

6 $13,675.00$13,675.00

7 $3,000.00$3,000.00

Ref #64 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)

Awd $100.00$100.00

2 $1,295.00$1,295.00

3 $3,500.00$3,500.00

4 $2,986.80$2,986.80

5 $2,500.00$2,500.00

6 $4,000.00$4,000.00

7 $3,000.00$3,000.00

Ref #65 624E10000 MOBILIZATION, (LUMP SUM)

Awd $4,000.00$4,000.00

2 $4,000.00$4,000.00

3 $7,000.00$7,000.00

4 $1,824.00$1,824.00

5 $10,000.00$10,000.00

6 $2,550.00$2,550.00

7 $4,000.00$4,000.00

Section 6 - INCIDENTALS - Totals

Awd $16,299.47

2 $12,845.15

3 $21,600.00

4 $12,874.02

5 $20,700.00

6 $25,425.00

7 $12,000.00

160066 - Page 58

Page 59: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Project No. 160083

PID 93079

HAM-IR 74-14.70 (PART 1 AND PART 2)

Federal

Type: BRIDGE REPLACEMENT (1 BRIDGE)

Completion Date: 8/15/2017

Award Amount: $8,203,065.01

Contract Awarded To: SUNESIS CONSTRUCTION CO

Letting Date: 3/1/2016

Engineer's Estimate: $7,795,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jerry Wray, Director

SUNESIS CONSTRUCTION CO

2610 CRESCENTVILLE RD

WEST CHESTER, OH 45069

Butler

Bidder 1

Bid $8,203,065.01

JOHN R JURGENSEN COMPANY

11641 MOSTELLER RD

CINCINNATI, OH 45241

Hamilton

Bidder 2

Bid $8,447,449.27

EAGLE BRIDGE CO

800 S VAN DEMARK RD

SIDNEY, OH 45365

Shelby

Bidder 3

Bid $8,447,962.68

GREAT LAKES CONSTRUCTION CO

2608 GREAT LAKES WAY

HINCKLEY, OH 44233

Medina

Bidder 4

Bid $8,596,126.99

COMPLETE GENERAL CONSTRUCTION COMPANY

1221 EAST FIFTH AVE

COLUMBUS, OH 43219

Franklin

Bidder 5

Bid $9,133,314.82

KOKOSING CONSTRUCTION COMPANY INC

886 MC KINLEY AVE

COLUMBUS, OH 43222

Franklin

Bidder 6

Bid $9,335,975.07

160083 - Page 59

Page 60: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)

Awd $6,917.00$6,917.00

2 $27,500.00$27,500.00

3 $7,500.00$7,500.00

4 $22,000.00$22,000.00

5 $100,000.00$100,000.00

6 $10,000.00$10,000.00

Ref #2 202E23010 PAVEMENT REMOVED, ASPHALT, (5765 SY)

Awd $23,578.85$4.09

2 $20,869.30$3.62

3 $34,590.00$6.00

4 $20,523.40$3.56

5 $57,650.00$10.00

6 $16,372.60$2.84

Ref #3 202E23900 CONCRETE BASE REMOVED, (5151 SY)

Awd $49,449.60$9.60

2 $54,806.64$10.64

3 $51,510.00$10.00

4 $41,208.00$8.00

5 $77,265.00$15.00

6 $46,359.00$9.00

Ref #4 202E30000 WALK REMOVED, (5704 SF)

Awd $5,875.12$1.03

2 $11,750.24$2.06

3 $7,130.00$1.25

4 $10,495.36$1.84

5 $11,122.80$1.95

6 $14,260.00$2.50

Ref #5 202E30600 CONCRETE MEDIAN REMOVED, (294 SY)

Awd $3,772.02$12.83

2 $9,801.96$33.34

3 $7,938.00$27.00

4 $2,822.40$9.60

5 $7,350.00$25.00

6 $9,996.00$34.00

Ref #6 202E32000 CURB REMOVED, (2119 FT)

Awd $10,234.77$4.83

2 $17,333.42$8.18

3 $5,297.50$2.50

4 $6,992.70$3.30

5 $13,243.75$6.25

6 $3,602.30$1.70

Ref #7 202E32700 GUTTER REMOVED, (20 SY)

Awd $124.00$6.20

2 $160.80$8.04

3 $210.00$10.50

4 $216.00$10.80

5 $300.00$15.00

6 $300.00$15.00

160083 - Page 60

Page 61: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #8 202E35100 PIPE REMOVED, 24" AND UNDER, (46 FT)

Awd $289.80$6.30

2 $3,178.60$69.10

3 $414.00$9.00

4 $1,426.00$31.00

5 $598.00$13.00

6 $920.00$20.00

Ref #9 202E38000 GUARDRAIL REMOVED, (8451 FT)

Awd $12,676.50$1.50

2 $18,592.20$2.20

3 $18,676.71$2.21

4 $12,676.50$1.50

5 $18,592.20$2.20

6 $18,930.24$2.24

Ref #10 202E42206 ANCHOR ASSEMBLY REMOVED, (23 EACH)

Awd $4,025.00$175.00

2 $3,450.00$150.00

3 $3,458.05$150.35

4 $4,025.00$175.00

5 $3,450.00$150.00

6 $3,508.42$152.54

Ref #11 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED, (4 EACH)

Awd $340.00$85.00

2 $700.00$175.00

3 $701.60$175.40

4 $340.00$85.00

5 $700.00$175.00

6 $711.88$177.97

Ref #12 202E47800 IMPACT ATTENUATOR REMOVED, (2 EACH)

Awd $700.00$350.00

2 $550.00$275.00

3 $551.28$275.64

4 $700.00$350.00

5 $550.00$275.00

6 $559.32$279.66

Ref #13 202E58100 CATCH BASIN REMOVED, (7 EACH)

Awd $2,602.46$371.78

2 $11,737.53$1,676.79

3 $1,575.00$225.00

4 $3,290.00$470.00

5 $2,800.00$400.00

6 $3,500.00$500.00

Ref #14 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, (62 FT)

Awd $471.20$7.60

2 $4,052.32$65.36

3 $930.00$15.00

4 $824.60$13.30

5 $1,550.00$25.00

6 $1,178.00$19.00

160083 - Page 61

Page 62: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #15 203E10000 EXCAVATION, (1433 CY)

Awd $26,668.13$18.61

2 $39,794.41$27.77

3 $28,660.00$20.00

4 $37,258.00$26.00

5 $64,485.00$45.00

6 $24,361.00$17.00

Ref #16 203E20000 EMBANKMENT, (1758 CY)

Awd $35,845.62$20.39

2 $17,949.18$10.21

3 $17,580.00$10.00

4 $24,612.00$14.00

5 $22,854.00$13.00

6 $33,402.00$19.00

Ref #17 203E20001 EMBANKMENT, AS PER PLAN, (1279 CY)

Awd $50,980.94$39.86

2 $34,673.69$27.11

3 $25,580.00$20.00

4 $51,160.00$40.00

5 $25,580.00$20.00

6 $70,345.00$55.00

Ref #18 204E10000 SUBGRADE COMPACTION, (6985 SY)

Awd $16,554.45$2.37

2 $15,087.60$2.16

3 $17,462.50$2.50

4 $19,558.00$2.80

5 $13,970.00$2.00

6 $17,462.50$2.50

Ref #19 204E13000 EXCAVATION OF SUBGRADE, (2003 CY)

Awd $55,483.10$27.70

2 $33,890.76$16.92

3 $36,054.00$18.00

4 $34,051.00$17.00

5 $44,066.00$22.00

6 $36,054.00$18.00

Ref #20 204E30020 GRANULAR MATERIAL, TYPE C, (2661 CY)

Awd $156,839.34$58.94

2 $117,562.98$44.18

3 $133,050.00$50.00

4 $61,203.00$23.00

5 $111,762.00$42.00

6 $141,033.00$53.00

Ref #21 204E45000 PROOF ROLLING, (3 HOUR)

Awd $1,013.13$337.71

2 $558.54$186.18

3 $450.00$150.00

4 $900.00$300.00

5 $600.00$200.00

6 $600.00$200.00

160083 - Page 62

Page 63: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #22 204E50000 GEOTEXTILE FABRIC, (5784 SY)

Awd $4,222.32$0.73

2 $15,558.96$2.69

3 $8,676.00$1.50

4 $5,784.00$1.00

5 $14,460.00$2.50

6 $9,832.80$1.70

Ref #23 606E15050 GUARDRAIL, TYPE MGS, (7462.5 FT)

Awd $100,743.75$13.50

2 $101,490.00$13.60

3 $101,713.88$13.63

4 $100,743.75$13.50

5 $101,490.00$13.60

6 $103,206.38$13.83

Ref #24 606E26050 ANCHOR ASSEMBLY, MGS TYPE B, (4 EACH)

Awd $6,100.00$1,525.00

2 $6,600.00$1,650.00

3 $6,615.20$1,653.80

4 $6,100.00$1,525.00

5 $6,600.00$1,650.00

6 $6,711.88$1,677.97

Ref #25 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, (9 EACH)

Awd $16,425.00$1,825.00

2 $17,415.00$1,935.00

3 $17,455.05$1,939.45

4 $16,425.00$1,825.00

5 $17,415.00$1,935.00

6 $17,710.11$1,967.79

Ref #26 606E26550 ANCHOR ASSEMBLY, MGS TYPE T, (9 EACH)

Awd $6,750.00$750.00

2 $7,200.00$800.00

3 $7,216.56$801.84

4 $6,750.00$750.00

5 $7,200.00$800.00

6 $7,322.04$813.56

Ref #27 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, (7 EACH)

Awd $11,900.00$1,700.00

2 $11,165.00$1,595.00

3 $11,190.69$1,598.67

4 $11,900.00$1,700.00

5 $11,165.00$1,595.00

6 $11,354.21$1,622.03

Ref #28 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2, (2 EACH)

Awd $700.00$350.00

2 $300.00$150.00

3 $300.70$150.35

4 $700.00$350.00

5 $300.00$150.00

6 $305.08$152.54

160083 - Page 63

Page 64: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #29 606E60033 IMPACT ATTENUATOR, TYPE 3, AS PER PLAN, (2 EACH)

Awd $48,000.00$24,000.00

2 $56,273.40$28,136.70

3 $52,000.00$26,000.00

4 $48,000.00$24,000.00

5 $50,500.00$25,250.00

6 $51,355.86$25,677.93

Ref #30 608E10000 4" CONCRETE WALK, (5642 SF)

Awd $27,984.32$4.96

2 $27,194.44$4.82

3 $31,031.00$5.50

4 $28,774.20$5.10

5 $31,031.00$5.50

6 $39,494.00$7.00

Ref #31 608E52000 CURB RAMP, (503 SF)

Awd $6,991.70$13.90

2 $9,033.88$17.96

3 $7,042.00$14.00

4 $10,060.00$20.00

5 $9,054.00$18.00

6 $8,048.00$16.00

Ref #32 622E10061 CONCRETE BARRIER, SINGLE SLOPE, TYPE B, AS PER PLA, (160 FT)

Awd $36,800.00$230.00

2 $46,657.60$291.61

3 $40,000.00$250.00

4 $31,200.00$195.00

5 $47,200.00$295.00

6 $38,400.00$240.00

Ref #33 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D, (208 FT)

Awd $30,160.00$145.00

2 $30,160.00$145.00

3 $36,400.00$175.00

4 $37,440.00$180.00

5 $33,280.00$160.00

6 $36,400.00$175.00

Ref #34 622E24841 CONCRETE BARRIER END SECTION, TYPE B, AS PER PLAN, (2 EACH)

Awd $14,900.00$7,450.00

2 $17,642.22$8,821.11

3 $15,000.00$7,500.00

4 $16,200.00$8,100.00

5 $13,600.00$6,800.00

6 $13,000.00$6,500.00

Ref #35 622E25000 CONCRETE BARRIER END SECTION, TYPE D, (5 EACH)

Awd $15,499.50$3,099.90

2 $15,000.00$3,000.00

3 $17,500.00$3,500.00

4 $20,000.00$4,000.00

5 $16,000.00$3,200.00

6 $14,000.00$2,800.00

160083 - Page 64

Page 65: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #36 622E25050 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE , (5 EACH)

Awd $15,499.50$3,099.90

2 $21,476.10$4,295.22

3 $16,250.00$3,250.00

4 $18,017.00$3,603.40

5 $18,000.00$3,600.00

6 $17,500.00$3,500.00

Ref #37 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER, (LUMP SUM)

Awd $5,700.00$5,700.00

2 $17,710.30$17,710.30

3 $30,000.00$30,000.00

4 $24,320.00$24,320.00

5 $40,000.00$40,000.00

6 $35,000.00$35,000.00

Ref #410 680E12500 SPECIAL - SNOW FENCE - TREE PROTECTION, (1500 FT)

Awd $6,810.00$4.54

2 $10,200.00$6.80

3 $6,000.00$4.00

4 $7,500.00$5.00

5 $9,750.00$6.50

6 $11,250.00$7.50

Section 1 - ROADWAY (PART 1) - Totals

Awd $819,627.12

2 $855,077.07

3 $803,709.72

4 $746,195.91

5 $1,005,533.75

6 $874,345.62

Ref #38 659E00100 SOIL ANALYSIS TEST, (2 EACH)

Awd $120.00$60.00

2 $600.00$300.00

3 $400.00$200.00

4 $160.00$80.00

5 $120.00$60.00

6 $120.00$60.00

Ref #39 659E00300 TOPSOIL, (546 CY)

Awd $27,867.84$51.04

2 $19,033.56$34.86

3 $5,460.00$10.00

4 $17,472.00$32.00

5 $13,650.00$25.00

6 $8,190.00$15.00

Ref #40 659E10000 SEEDING AND MULCHING, (4593 SY)

Awd $5,557.53$1.21

2 $3,123.24$0.68

3 $11,482.50$2.50

4 $3,123.24$0.68

5 $4,041.84$0.88

6 $4,041.84$0.88

160083 - Page 65

Page 66: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #41 659E14000 REPAIR SEEDING AND MULCHING, (230 SY)

Awd $156.40$0.68

2 $156.40$0.68

3 $115.00$0.50

4 $156.40$0.68

5 $202.40$0.88

6 $202.40$0.88

Ref #42 659E20000 COMMERCIAL FERTILIZER, (0.62 TON)

Awd $372.00$600.00

2 $310.00$500.00

3 $465.00$750.00

4 $372.00$600.00

5 $372.00$600.00

6 $372.00$600.00

Ref #43 659E31000 LIME, (0.95 ACRE)

Awd $47.50$50.00

2 $47.50$50.00

3 $9.50$10.00

4 $47.50$50.00

5 $28.50$30.00

6 $28.50$30.00

Ref #44 659E35000 WATER, (25 MGAL)

Awd $25.00$1.00

2 $875.00$35.00

3 $500.00$20.00

4 $25.00$1.00

5 $25.00$1.00

6 $25.00$1.00

Ref #45 670E00700 DITCH EROSION PROTECTION, (221 SY)

Awd $592.28$2.68

2 $592.28$2.68

3 $442.00$2.00

4 $592.28$2.68

5 $442.00$2.00

6 $442.00$2.00

Ref #46 832E15000 STORM WATER POLLUTION PREVENTION PLAN, (LUMP SUM)

Awd $13,055.00$13,055.00

2 $9,405.00$9,405.00

3 $20,000.00$20,000.00

4 $4,300.00$4,300.00

5 $15,000.00$15,000.00

6 $18,370.00$18,370.00

Ref #47 832E30000 EROSION CONTROL, (60000 EACH)

Awd $60,000.00$1.00

2 $60,000.00$1.00

3 $60,000.00$1.00

4 $60,000.00$1.00

5 $60,000.00$1.00

6 $60,000.00$1.00

160083 - Page 66

Page 67: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Section 2 - EROSION CONTROL (PART 1) - Totals

Awd $107,793.55

2 $94,142.98

3 $98,874.00

4 $86,248.42

5 $93,881.74

6 $91,791.74

Ref #48 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1, (1 SY)

Awd $143.16$143.16

2 $394.26$394.26

3 $150.00$150.00

4 $190.00$190.00

5 $120.00$120.00

6 $450.00$450.00

Ref #49 605E05200 4" UNCLASSIFIED PIPE UNDERDRAINS, (148 FT)

Awd $1,571.76$10.62

2 $6,947.12$46.94

3 $1,184.00$8.00

4 $1,450.40$9.80

5 $1,776.00$12.00

6 $2,220.00$15.00

Ref #50 605E06000 4" BASE PIPE UNDERDRAINS, (2162 FT)

Awd $11,458.60$5.30

2 $31,262.52$14.46

3 $17,296.00$8.00

4 $20,755.20$9.60

5 $21,620.00$10.00

6 $19,458.00$9.00

Ref #51 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET, (155 FT)

Awd $4,980.15$32.13

2 $4,383.40$28.28

3 $2,325.00$15.00

4 $2,759.00$17.80

5 $1,705.00$11.00

6 $2,945.00$19.00

Ref #52 611E01500 6" CONDUIT, TYPE F, (50 FT)

Awd $1,187.00$23.74

2 $1,328.00$26.56

3 $200.00$4.00

4 $1,000.00$20.00

5 $1,019.00$20.38

6 $1,350.00$27.00

Ref #53 611E05900 15" CONDUIT, TYPE B, (18 FT)

Awd $2,231.64$123.98

2 $7,664.22$425.79

3 $2,700.00$150.00

4 $2,949.30$163.85

5 $3,240.00$180.00

6 $3,960.00$220.00

160083 - Page 67

Page 68: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #54 611E06100 15" CONDUIT, TYPE C, (30 FT)

Awd $4,010.10$133.67

2 $6,515.70$217.19

3 $6,000.00$200.00

4 $4,140.00$138.00

5 $5,250.00$175.00

6 $5,700.00$190.00

Ref #55 611E98150 CATCH BASIN, NO. 3, (2 EACH)

Awd $6,269.66$3,134.83

2 $4,628.58$2,314.29

3 $6,500.00$3,250.00

4 $6,000.00$3,000.00

5 $6,400.00$3,200.00

6 $8,000.00$4,000.00

Ref #56 611E98180 CATCH BASIN, NO. 3A, (3 EACH)

Awd $6,472.32$2,157.44

2 $5,476.56$1,825.52

3 $7,500.00$2,500.00

4 $7,200.00$2,400.00

5 $7,800.00$2,600.00

6 $9,900.00$3,300.00

Ref #57 611E98370 CATCH BASIN, NO. 6, (1 EACH)

Awd $2,118.91$2,118.91

2 $1,590.65$1,590.65

3 $2,100.00$2,100.00

4 $2,600.00$2,600.00

5 $2,400.00$2,400.00

6 $3,350.00$3,350.00

Ref #58 611E99574 MANHOLE, NO. 3, (1 EACH)

Awd $2,859.75$2,859.75

2 $2,493.62$2,493.62

3 $2,750.00$2,750.00

4 $2,500.00$2,500.00

5 $3,600.00$3,600.00

6 $2,800.00$2,800.00

Ref #59 611E99710 PRECAST REINFORCED CONCRETE OUTLET, (1 EACH)

Awd $254.82$254.82

2 $308.90$308.90

3 $300.00$300.00

4 $300.00$300.00

5 $250.00$250.00

6 $350.00$350.00

Section 3 - DRAINAGE (PART 1) - Totals

Awd $43,557.87

2 $72,993.53

3 $49,005.00

4 $51,843.90

5 $55,180.00

6 $60,483.00

160083 - Page 68

Page 69: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #60 252E01001 FULL DEPTH RIGID PAVEMENT REMOVAL AND FLEXIBLE REP, (800 SY)

Awd $82,936.00$103.67

2 $95,488.00$119.36

3 $83,128.00$103.91

4 $82,936.00$103.67

5 $82,936.00$103.67

6 $96,000.00$120.00

Ref #61 252E01500 FULL DEPTH PAVEMENT SAWING, (2400 FT)

Awd $4,200.00$1.75

2 $9,600.00$4.00

3 $4,560.00$1.90

4 $4,032.00$1.68

5 $8,400.00$3.50

6 $3,240.00$1.35

Ref #62 253E01000 PAVEMENT REPAIR, (850 SY)

Awd $47,302.50$55.65

2 $61,633.50$72.51

3 $47,413.00$55.78

4 $47,302.50$55.65

5 $47,302.50$55.65

6 $52,700.00$62.00

Ref #63 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (78382 SY)

Awd $97,193.68$1.24

2 $140,303.78$1.79

3 $123,059.74$1.57

4 $123,059.74$1.57

5 $123,059.74$1.57

6 $126,978.84$1.62

Ref #64 301E46000 ASPHALT CONCRETE BASE, PG64-22, (1728 CY)

Awd $216,380.16$125.22

2 $246,481.92$142.64

3 $216,881.28$125.51

4 $216,380.16$125.22

5 $216,380.16$125.22

6 $223,776.00$129.50

Ref #65 304E20000 AGGREGATE BASE, (1143 CY)

Awd $63,607.95$55.65

2 $84,513.42$73.94

3 $62,865.00$55.00

4 $80,010.00$70.00

5 $68,580.00$60.00

6 $80,010.00$70.00

Ref #66 407E10000 TACK COAT, (5880 GAL)

Awd $14,700.00$2.50

2 $14,700.00$2.50

3 $14,758.80$2.51

4 $14,700.00$2.50

5 $14,700.00$2.50

6 $15,229.20$2.59

160083 - Page 69

Page 70: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #67 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (3381 GAL)

Awd $8,452.50$2.50

2 $8,452.50$2.50

3 $8,486.31$2.51

4 $8,452.50$2.50

5 $8,452.50$2.50

6 $8,756.79$2.59

Ref #68 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5MM, TYPE A (4, (3521 CY)

Awd $616,738.36$175.16

2 $557,832.03$158.43

3 $618,146.76$175.56

4 $616,738.36$175.16

5 $616,738.36$175.16

6 $637,793.94$181.14

Ref #69 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19MM, TYPE A, (4110 CY)

Awd $514,736.40$125.24

2 $590,524.80$143.68

3 $515,928.30$125.53

4 $514,736.40$125.24

5 $514,736.40$125.24

6 $532,327.20$129.52

Ref #70 451E20000 REINFORCED CONCRETE PAVEMENT, MISC.: 4" ENHANCED C, (337 SY)

Awd $40,146.81$119.13

2 $37,744.00$112.00

3 $45,495.00$135.00

4 $28,645.00$85.00

5 $48,191.00$143.00

6 $40,440.00$120.00

Ref #71 609E26000 CURB, TYPE 6, (1976 FT)

Awd $32,149.52$16.27

2 $27,170.00$13.75

3 $35,568.00$18.00

4 $43,472.00$22.00

5 $55,328.00$28.00

6 $49,400.00$25.00

Ref #73 617E10100 COMPACTED AGGREGATE, (232 CY)

Awd $47,321.04$203.97

2 $16,757.36$72.23

3 $12,799.44$55.17

4 $12,769.28$55.04

5 $12,769.28$55.04

6 $13,205.44$56.92

Ref #74 618E40100 RUMBLE STRIPS, (ASPHALT CONCRETE), (18472 FT)

Awd $12,930.40$0.70

2 $12,745.68$0.69

3 $13,854.00$0.75

4 $10,159.60$0.55

5 $9,236.00$0.50

6 $7,942.96$0.43

160083 - Page 70

Page 71: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Section 4 - PAVEMENT (PART 1) - Totals

Awd $1,798,795.32

2 $1,903,946.99

3 $1,802,943.63

4 $1,803,393.54

5 $1,826,809.94

6 $1,887,800.37

Ref #75 638E10800 VALVE BOX ADJUSTED TO GRADE, (1 EACH)

Awd $202.66$202.66

2 $455.94$455.94

3 $150.00$150.00

4 $140.00$140.00

5 $200.00$200.00

6 $1,200.00$1,200.00

Section 5 - WATER WORK (PART 1) - Totals

Awd $202.66

2 $455.94

3 $150.00

4 $140.00

5 $200.00

6 $1,200.00

Ref #76 625E00450 CONNECTION, FUSED PULL APART, (8 EACH)

Awd $640.00$80.00

2 $640.00$80.00

3 $835.12$104.39

4 $640.00$80.00

5 $800.00$100.00

6 $653.60$81.70

Ref #77 625E00460 CONNECTION, UNFUSED PULL APART, (8 EACH)

Awd $576.00$72.00

2 $576.00$72.00

3 $881.20$110.15

4 $576.00$72.00

5 $800.00$100.00

6 $588.24$73.53

Ref #78 625E00480 CONNECTION, UNFUSED PERMANENT, (32 EACH)

Awd $2,304.00$72.00

2 $2,304.00$72.00

3 $3,672.32$114.76

4 $2,304.00$72.00

5 $3,680.00$115.00

6 $2,352.96$73.53

Ref #79 625E10481 LIGHT POLE, DECORATIVE, AS PER PLAN, (6 EACH)

Awd $20,700.00$3,450.00

2 $20,700.00$3,450.00

3 $21,198.66$3,533.11

4 $20,700.00$3,450.00

5 $24,000.00$4,000.00

6 $21,139.92$3,523.32

160083 - Page 71

Page 72: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #80 625E10611 LIGHT POLE ANCHOR U-BOLTS, AS PER PLAN, (24 EACH)

Awd $1,080.00$45.00

2 $1,080.00$45.00

3 $1,804.08$75.17

4 $1,080.00$45.00

5 $3,600.00$150.00

6 $1,103.04$45.96

Ref #81 625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP, (2 EACH)

Awd $2,530.00$1,265.00

2 $2,530.00$1,265.00

3 $4,019.22$2,009.61

4 $2,530.00$1,265.00

5 $5,200.00$2,600.00

6 $2,583.78$1,291.89

Ref #82 625E23200 NO. 4 AWG 5000 VOLT DISTRIBUTION CABLE, (3426 FT)

Awd $8,565.00$2.50

2 $8,565.00$2.50

3 $11,682.66$3.41

4 $8,565.00$2.50

5 $7,708.50$2.25

6 $8,736.30$2.55

Ref #83 625E23400 NO. 10 AWG POLE AND BRACKET CABLE, (312 FT)

Awd $312.00$1.00

2 $312.00$1.00

3 $614.64$1.97

4 $312.00$1.00

5 $390.00$1.25

6 $318.24$1.02

Ref #84 625E24100 1-1/2" DUCT CABLE WITH TWO NO. 4 AWG 5000 VOLT CAB, (430 FT)

Awd $3,655.00$8.50

2 $3,655.00$8.50

3 $3,706.60$8.62

4 $3,655.00$8.50

5 $3,010.00$7.00

6 $3,732.40$8.68

Ref #85 625E25400 CONDUIT, 2", 725.04, (770 FT)

Awd $14,014.00$18.20

2 $14,014.00$18.20

3 $8,816.50$11.45

4 $14,014.00$18.20

5 $9,432.50$12.25

6 $14,314.30$18.59

Ref #86 625E25500 CONDUIT, 3", 725.04, (99 FT)

Awd $1,386.00$14.00

2 $1,386.00$14.00

3 $1,622.61$16.39

4 $1,386.00$14.00

5 $1,485.00$15.00

6 $1,415.70$14.30

160083 - Page 72

Page 73: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #87 625E27401 LUMINAIRE, POST TOP, AS PER PLAN, (6 EACH)

Awd $6,060.00$1,010.00

2 $6,060.00$1,010.00

3 $5,135.82$855.97

4 $6,060.00$1,010.00

5 $5,100.00$850.00

6 $6,188.82$1,031.47

Ref #88 625E29002 TRENCH, 24" DEEP, (431 FT)

Awd $4,741.00$11.00

2 $4,741.00$11.00

3 $3,435.07$7.97

4 $4,741.00$11.00

5 $2,586.00$6.00

6 $4,840.13$11.23

Ref #89 625E29901 JUNCTION BOX, AS PER PLAN, (4 EACH)

Awd $10,000.00$2,500.00

2 $10,000.00$2,500.00

3 $7,757.80$1,939.45

4 $10,000.00$2,500.00

5 $6,400.00$1,600.00

6 $10,212.52$2,553.13

Ref #90 625E30700 PULL BOX, 725.08, 18", (6 EACH)

Awd $5,040.00$840.00

2 $5,040.00$840.00

3 $4,329.96$721.66

4 $5,040.00$840.00

5 $4,350.00$725.00

6 $5,147.10$857.85

Ref #91 625E32000 GROUND ROD, (2 EACH)

Awd $370.00$185.00

2 $370.00$185.00

3 $334.78$167.39

4 $370.00$185.00

5 $400.00$200.00

6 $377.86$188.93

Ref #92 625E33000 STRUCTURE GROUNDING SYSTEM, (1 EACH)

Awd $4,250.00$4,250.00

2 $4,250.00$4,250.00

3 $11,077.42$11,077.42

4 $4,250.00$4,250.00

5 $4,000.00$4,000.00

6 $4,340.32$4,340.32

Ref #93 625E34000 POWER SERVICE, (2 EACH)

Awd $9,720.00$4,860.00

2 $9,720.00$4,860.00

3 $9,938.82$4,969.41

4 $9,720.00$4,860.00

5 $13,000.00$6,500.00

6 $9,926.58$4,963.29

160083 - Page 73

Page 74: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #94 625E36000 PLASTIC CAUTION TAPE, (431 FT)

Awd $21.55$0.05

2 $21.55$0.05

3 $60.34$0.14

4 $21.55$0.05

5 $107.75$0.25

6 $21.55$0.05

Ref #95 625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING, (LUMP SUM)

Awd $4,100.00$4,100.00

2 $4,100.00$4,100.00

3 $20,928.02$20,928.02

4 $4,100.00$4,100.00

5 $12,500.00$12,500.00

6 $4,187.14$4,187.14

Ref #96 625E40010 SPECIAL - REPLACEMENT OF EXISTING LIGHTING UNIT, (1 EACH)

Awd $3,600.00$3,600.00

2 $3,600.00$3,600.00

3 $2,318.32$2,318.32

4 $3,600.00$3,600.00

5 $750.00$750.00

6 $3,676.51$3,676.51

Ref #97 625E75400 LIGHT POLE REMOVED, (2 EACH)

Awd $1,020.00$510.00

2 $1,020.00$510.00

3 $845.94$422.97

4 $1,020.00$510.00

5 $800.00$400.00

6 $1,041.68$520.84

Ref #98 625E75506 LUMINAIRE REMOVED, (2 EACH)

Awd $160.00$80.00

2 $160.00$80.00

3 $124.30$62.15

4 $160.00$80.00

5 $100.00$50.00

6 $163.40$81.70

Ref #99 625E75510 POWER SERVICE REMOVED, (1 EACH)

Awd $700.00$700.00

2 $700.00$700.00

3 $846.94$846.94

4 $700.00$700.00

5 $1,000.00$1,000.00

6 $714.88$714.88

Ref #100 625E75801 DISCONNECT CIRCUIT, AS PER PLAN, (2 EACH)

Awd $1,900.00$950.00

2 $1,900.00$950.00

3 $2,034.68$1,017.34

4 $1,900.00$950.00

5 $200.00$100.00

6 $1,940.38$970.19

160083 - Page 74

Page 75: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #101 632E70600 CONDUIT RISER, 3" DIAMETER, (2 EACH)

Awd $1,040.00$520.00

2 $1,040.00$520.00

3 $1,828.20$914.10

4 $1,040.00$520.00

5 $1,300.00$650.00

6 $1,062.10$531.05

Ref #401 625E35000 REERECT EXISTING LIGHT POLE, (2 EACH)

Awd $1,280.00$640.00

2 $1,280.00$640.00

3 $851.96$425.98

4 $1,280.00$640.00

5 $800.00$400.00

6 $1,307.20$653.60

Section 6 - LIGHTING (PART 1) - Totals

Awd $109,764.55

2 $109,764.55

3 $130,701.98

4 $109,764.55

5 $113,499.75

6 $112,086.65

Ref #102 621E00100 RPM, (431 EACH)

Awd $7,477.85$17.35

2 $7,477.85$17.35

3 $7,495.09$17.39

4 $10,076.78$23.38

5 $7,477.85$17.35

6 $7,551.12$17.52

Ref #103 621E54000 RAISED PAVEMENT MARKER REMOVED, (453 EACH)

Awd $4,865.22$10.74

2 $9,082.65$20.05

3 $3,171.00$7.00

4 $3,759.90$8.30

5 $4,955.82$10.94

6 $4,385.04$9.68

Ref #104 626E00100 BARRIER REFLECTOR, (105 EACH)

Awd $840.00$8.00

2 $735.00$7.00

3 $737.10$7.02

4 $682.50$6.50

5 $735.00$7.00

6 $747.60$7.12

Ref #105 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (226 FT)

Awd $1,921.00$8.50

2 $1,864.50$8.25

3 $1,869.02$8.27

4 $1,921.00$8.50

5 $1,864.50$8.25

6 $1,887.10$8.35

160083 - Page 75

Page 76: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #106 630E04100 GROUND MOUNTED SUPPORT, NO. 4 POST, (34 FT)

Awd $391.00$11.50

2 $374.00$11.00

3 $375.02$11.03

4 $391.00$11.50

5 $374.00$11.00

6 $378.76$11.14

Ref #107 630E07600 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X12, (34.5 FT)

Awd $621.00$18.00

2 $707.25$20.50

3 $708.98$20.55

4 $621.00$18.00

5 $707.25$20.50

6 $716.22$20.76

Ref #108 630E08600 SIGN POST REFLECTOR, (9 EACH)

Awd $292.50$32.50

2 $360.00$40.00

3 $360.81$40.09

4 $292.50$32.50

5 $360.00$40.00

6 $364.59$40.51

Ref #109 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION, (2 EACH)

Awd $600.00$300.00

2 $710.00$355.00

3 $711.64$355.82

4 $600.00$300.00

5 $670.00$335.00

6 $719.00$359.50

Ref #110 630E20400 OVERHEAD SIGN SUPPORT, TYPE TC-12.30, DESIGN 4, (1 EACH)

Awd $8,200.00$8,200.00

2 $8,310.00$8,310.00

3 $8,329.11$8,329.11

4 $8,200.00$8,200.00

5 $8,310.00$8,310.00

6 $8,415.19$8,415.19

Ref #111 630E21000 OVERHEAD SIGN SUPPORT, TYPE TC-12.30, DESIGN 10, (2 EACH)

Awd $2,900.00$1,450.00

2 $30,270.00$15,135.00

3 $30,339.62$15,169.81

4 $29,000.00$14,500.00

5 $30,270.00$15,135.00

6 $30,653.16$15,326.58

Ref #112 630E75000 SIGN ATTACHMENT ASSEMBLY, (5 EACH)

Awd $50.00$10.00

2 $500.00$100.00

3 $501.15$100.23

4 $50.00$10.00

5 $500.00$100.00

6 $506.35$101.27

160083 - Page 76

Page 77: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #113 630E79000 SIGN HANGER ASSEMBLY, SPAN WIRE, (5 EACH)

Awd $1,500.00$300.00

2 $1,175.00$235.00

3 $1,177.70$235.54

4 $1,500.00$300.00

5 $1,175.00$235.00

6 $1,189.85$237.97

Ref #114 630E80100 SIGN, FLAT SHEET, (255.2 SF)

Awd $3,828.00$15.00

2 $4,593.60$18.00

3 $4,603.81$18.04

4 $3,828.00$15.00

5 $4,593.60$18.00

6 $4,652.30$18.23

Ref #115 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET, (65 SF)

Awd $1,040.00$16.00

2 $1,235.00$19.00

3 $1,237.60$19.04

4 $1,040.00$16.00

5 $1,235.00$19.00

6 $1,250.60$19.24

Ref #116 630E80224 SIGN, OVERHEAD EXTRUSHEET, (301 SF)

Awd $4,816.00$16.00

2 $6,020.00$20.00

3 $6,035.05$20.05

4 $4,816.00$16.00

5 $6,020.00$20.00

6 $6,095.25$20.25

Ref #117 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION, (2 EACH)

Awd $1,700.00$850.00

2 $2,050.00$1,025.00

3 $2,054.72$1,027.36

4 $1,700.00$850.00

5 $2,050.00$1,025.00

6 $2,075.96$1,037.98

Ref #118 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION, (3 EACH)

Awd $12,000.00$4,000.00

2 $10,800.00$3,600.00

3 $10,824.84$3,608.28

4 $12,000.00$4,000.00

5 $10,800.00$3,600.00

6 $10,936.71$3,645.57

Ref #119 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (27 EACH)

Awd $405.00$15.00

2 $405.00$15.00

3 $405.81$15.03

4 $405.00$15.00

5 $405.00$15.00

6 $410.13$15.19

160083 - Page 77

Page 78: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #120 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (2 EACH)

Awd $200.00$100.00

2 $120.00$60.00

3 $120.28$60.14

4 $200.00$100.00

5 $120.00$60.00

6 $121.52$60.76

Ref #121 630E85400 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND DISPOSAL, (2 EACH)

Awd $400.00$200.00

2 $350.00$175.00

3 $350.82$175.41

4 $400.00$200.00

5 $350.00$175.00

6 $354.44$177.22

Ref #122 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (22 EACH)

Awd $330.00$15.00

2 $1,210.00$55.00

3 $1,212.86$55.13

4 $330.00$15.00

5 $1,210.00$55.00

6 $1,225.40$55.70

Ref #123 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT, (2 EACH)

Awd $250.00$125.00

2 $300.00$150.00

3 $300.70$150.35

4 $250.00$125.00

5 $300.00$150.00

6 $303.80$151.90

Ref #124 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT , (4 EACH)

Awd $1,000.00$250.00

2 $400.00$100.00

3 $400.92$100.23

4 $1,000.00$250.00

5 $400.00$100.00

6 $405.08$101.27

Ref #125 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL, (4 EACH)

Awd $800.00$200.00

2 $2,200.00$550.00

3 $2,205.08$551.27

4 $1,000.00$250.00

5 $2,200.00$550.00

6 $2,227.84$556.96

Ref #126 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL, (2 EACH)

Awd $30.00$15.00

2 $60.00$30.00

3 $60.14$30.07

4 $30.00$15.00

5 $60.00$30.00

6 $60.76$30.38

160083 - Page 78

Page 79: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #127 630E88100 REMOVAL OF OVERHEAD SIGN SUPPORT AND STORAGE, TYPE, (1 EACH)

Awd $1,250.00$1,250.00

2 $900.00$900.00

3 $902.07$902.07

4 $1,250.00$1,250.00

5 $900.00$900.00

6 $911.39$911.39

Ref #128 630E89706 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL, TYP, (2 EACH)

Awd $2,000.00$1,000.00

2 $1,500.00$750.00

3 $1,503.46$751.73

4 $2,000.00$1,000.00

5 $1,500.00$750.00

6 $1,519.00$759.50

Ref #129 630E97700 SIGNING, MISC.: REMOVAL OF OVERHEAD SIGN SUPPORT F, (3 EACH)

Awd $1,500.00$500.00

2 $1,890.00$630.00

3 $3,006.90$1,002.30

4 $750.00$250.00

5 $1,890.00$630.00

6 $4,500.00$1,500.00

Ref #130 644E00100 EDGE LINE, 4", (0.3 MILE)

Awd $600.00$2,000.00

2 $600.00$2,000.00

3 $601.38$2,004.60

4 $600.00$2,000.00

5 $600.00$2,000.00

6 $629.12$2,097.07

Ref #131 644E00104 EDGE LINE, 6", (6.62 MILE)

Awd $17,112.70$2,585.00

2 $17,112.70$2,585.00

3 $17,152.09$2,590.95

4 $17,112.70$2,585.00

5 $17,112.70$2,585.00

6 $17,943.31$2,710.47

Ref #132 644E00200 LANE LINE, 4", (0.65 MILE)

Awd $568.75$875.00

2 $568.75$875.00

3 $570.06$877.02

4 $568.75$875.00

5 $568.75$875.00

6 $596.36$917.48

Ref #133 644E00204 LANE LINE, 6", (2.03 MILE)

Awd $2,963.80$1,460.00

2 $2,963.80$1,460.00

3 $2,970.62$1,463.36

4 $2,963.80$1,460.00

5 $2,963.80$1,460.00

6 $3,107.65$1,530.86

160083 - Page 79

Page 80: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #134 644E00300 CENTER LINE, (0.38 MILE)

Awd $1,425.00$3,750.00

2 $1,425.00$3,750.00

3 $1,428.28$3,758.63

4 $1,425.00$3,750.00

5 $1,425.00$3,750.00

6 $1,494.17$3,932.03

Ref #135 644E00400 CHANNELIZING LINE, 8", (984 FT)

Awd $1,180.80$1.20

2 $1,180.80$1.20

3 $1,180.80$1.20

4 $1,180.80$1.20

5 $1,180.80$1.20

6 $1,239.84$1.26

Ref #136 644E00404 CHANNELIZING LINE, 12", (4173 FT)

Awd $5,216.25$1.25

2 $5,216.25$1.25

3 $5,216.25$1.25

4 $5,216.25$1.25

5 $5,216.25$1.25

6 $5,466.63$1.31

Ref #137 644E00500 STOP LINE, (198 FT)

Awd $999.90$5.05

2 $999.90$5.05

3 $1,001.88$5.06

4 $999.90$5.05

5 $999.90$5.05

6 $1,049.40$5.30

Ref #138 644E00600 CROSSWALK LINE, (301 FT)

Awd $918.05$3.05

2 $918.05$3.05

3 $921.06$3.06

4 $918.05$3.05

5 $918.05$3.05

6 $963.20$3.20

Ref #139 644E00700 TRANSVERSE/DIAGONAL LINE, (224 FT)

Awd $1,120.00$5.00

2 $1,120.00$5.00

3 $1,122.24$5.01

4 $1,120.00$5.00

5 $1,120.00$5.00

6 $1,173.76$5.24

Ref #140 644E01100 SCHOOL SYMBOL MARKING, 72", (2 EACH)

Awd $1,000.00$500.00

2 $1,000.00$500.00

3 $1,002.30$501.15

4 $1,000.00$500.00

5 $1,000.00$500.00

6 $1,048.54$524.27

160083 - Page 80

Page 81: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #141 644E01300 LANE ARROW, (25 EACH)

Awd $2,125.00$85.00

2 $2,125.00$85.00

3 $2,130.00$85.20

4 $2,125.00$85.00

5 $2,125.00$85.00

6 $2,228.25$89.13

Ref #142 644E01514 DOTTED LINE, 8", (3136 FT)

Awd $3,449.60$1.10

2 $3,449.60$1.10

3 $3,449.60$1.10

4 $3,449.60$1.10

5 $3,449.60$1.10

6 $3,606.40$1.15

Ref #143 646E10000 EDGE LINE, 4", (0.11 MILE)

Awd $1,339.80$12,180.00

2 $1,339.80$12,180.00

3 $1,342.88$12,208.00

4 $1,339.80$12,180.00

5 $1,339.80$12,180.00

6 $2,039.35$18,539.55

Ref #144 646E10100 LANE LINE, 4", (0.11 MILE)

Awd $1,265.00$11,500.00

2 $1,265.00$11,500.00

3 $1,267.91$11,526.45

4 $1,265.00$11,500.00

5 $1,265.00$11,500.00

6 $1,925.50$17,504.55

Ref #145 646E10200 CENTER LINE, (0.05 MILE)

Awd $689.25$13,785.00

2 $689.25$13,785.00

3 $690.84$13,816.80

4 $689.25$13,785.00

5 $689.25$13,785.00

6 $1,049.13$20,982.60

Ref #146 646E10300 CHANNELIZING LINE, 8", (281 FT)

Awd $702.50$2.50

2 $702.50$2.50

3 $705.31$2.51

4 $702.50$2.50

5 $702.50$2.50

6 $1,070.61$3.81

Ref #147 646E20300 LANE ARROW, (2 EACH)

Awd $600.00$300.00

2 $600.00$300.00

3 $601.38$300.69

4 $600.00$300.00

5 $600.00$300.00

6 $913.28$456.64

160083 - Page 81

Page 82: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #402 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED, (5 EACH)

Awd $900.00$180.00

2 $500.00$100.00

3 $1,177.70$235.54

4 $500.00$100.00

5 $500.00$100.00

6 $1,189.85$237.97

Section 7 - TRAFFIC CONTROL (PART 1) - Totals

Awd $105,383.97

2 $139,376.25

3 $135,533.88

4 $131,870.08

5 $135,209.42

6 $143,298.51

Ref #148 625E25400 CONDUIT, 2", 725.04, (344 FT)

Awd $344.00$1.00

2 $344.00$1.00

3 $3,188.88$9.27

4 $344.00$1.00

5 $4,472.00$13.00

6 $354.32$1.03

Ref #149 625E25500 CONDUIT, 3", 725.04, (12 FT)

Awd $240.00$20.00

2 $240.00$20.00

3 $205.68$17.14

4 $240.00$20.00

5 $312.00$26.00

6 $247.32$20.61

Ref #150 625E29000 TRENCH, (350 FT)

Awd $350.00$1.00

2 $350.00$1.00

3 $2,789.50$7.97

4 $350.00$1.00

5 $2,800.00$8.00

6 $360.50$1.03

Ref #152 625E30706 PULL BOX, 725.08, 24", (1 EACH)

Awd $925.00$925.00

2 $925.00$925.00

3 $845.94$845.94

4 $925.00$925.00

5 $1,100.00$1,100.00

6 $953.32$953.32

Ref #153 625E31510 PULL BOX REMOVED, (3 EACH)

Awd $300.00$100.00

2 $300.00$100.00

3 $655.50$218.50

4 $300.00$100.00

5 $675.00$225.00

6 $309.18$103.06

160083 - Page 82

Page 83: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #154 625E32000 GROUND ROD, (6 EACH)

Awd $1,110.00$185.00

2 $1,110.00$185.00

3 $1,004.28$167.38

4 $1,110.00$185.00

5 $1,200.00$200.00

6 $1,143.96$190.66

Ref #155 625E36000 PLASTIC CAUTION TAPE, (350 FT)

Awd $17.50$0.05

2 $17.50$0.05

3 $49.00$0.14

4 $17.50$0.05

5 $87.50$0.25

6 $17.50$0.05

Ref #156 632E04911 VEHICULAR SIGNAL HEAD, (LED) BLACK, 3-SECTION, 12", (6 EACH)

Awd $4,590.00$765.00

2 $4,590.00$765.00

3 $5,153.82$858.97

4 $4,590.00$765.00

5 $4,650.00$775.00

6 $4,730.52$788.42

Ref #157 632E20731 PEDESTRIAN SIGNAL HEAD (LED) , (COUNTDOWN), TYPE D, (2 EACH)

Awd $1,110.00$555.00

2 $1,110.00$555.00

3 $1,391.20$695.60

4 $1,110.00$555.00

5 $950.00$475.00

6 $1,143.98$571.99

Ref #158 632E25000 COVERING OF VEHICULAR SIGNAL HEAD, (6 EACH)

Awd $30.00$5.00

2 $30.00$5.00

3 $77.28$12.88

4 $30.00$5.00

5 $150.00$25.00

6 $30.90$5.15

Ref #159 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD, (2 EACH)

Awd $10.00$5.00

2 $10.00$5.00

3 $25.76$12.88

4 $10.00$5.00

5 $50.00$25.00

6 $10.32$5.16

Ref #160 632E26500 DETECTOR LOOP, (10 EACH)

Awd $10,000.00$1,000.00

2 $10,000.00$1,000.00

3 $11,145.60$1,114.56

4 $10,000.00$1,000.00

5 $15,000.00$1,500.00

6 $10,306.10$1,030.61

160083 - Page 83

Page 84: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #161 632E27200 LOOP DETECTOR TIE IN, (10 EACH)

Awd $650.00$65.00

2 $650.00$65.00

3 $1,563.60$156.36

4 $650.00$65.00

5 $1,000.00$100.00

6 $669.90$66.99

Ref #162 632E30200 MESSENGER WIRE, 7 STRAND, 3/8" DIAMETER WITH ACCES, (356 FT)

Awd $1,441.80$4.05

2 $1,441.80$4.05

3 $3,574.24$10.04

4 $1,441.80$4.05

5 $4,984.00$14.00

6 $1,484.52$4.17

Ref #163 632E30600 TETHER WIRE, WITH ACCESSORIES, (356 FT)

Awd $1,441.80$4.05

2 $1,441.80$4.05

3 $5,065.88$14.23

4 $1,441.80$4.05

5 $5,696.00$16.00

6 $1,484.52$4.17

Ref #164 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG, (791 FT)

Awd $1,858.85$2.35

2 $1,858.85$2.35

3 $2,064.51$2.61

4 $1,858.85$2.35

5 $1,977.50$2.50

6 $1,914.22$2.42

Ref #165 632E64000 STRAIN POLE FOUNDATION, (4 EACH)

Awd $15,880.00$3,970.00

2 $15,880.00$3,970.00

3 $12,135.84$3,033.96

4 $15,880.00$3,970.00

5 $20,000.00$5,000.00

6 $16,366.16$4,091.54

Ref #166 632E64020 PEDESTAL FOUNDATION, (1 EACH)

Awd $645.00$645.00

2 $645.00$645.00

3 $962.21$962.21

4 $645.00$645.00

5 $1,500.00$1,500.00

6 $664.75$664.75

Ref #167 632E68300 POWER CABLE, 3 CONDUCTOR, NO. 6 AWG, (58 FT)

Awd $234.90$4.05

2 $234.90$4.05

3 $206.48$3.56

4 $234.90$4.05

5 $261.00$4.50

6 $241.86$4.17

160083 - Page 84

Page 85: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #168 632E70000 POWER SERVICE, (1 EACH)

Awd $1,250.00$1,250.00

2 $1,250.00$1,250.00

3 $2,330.35$2,330.35

4 $1,250.00$1,250.00

5 $1,500.00$1,500.00

6 $1,288.27$1,288.27

Ref #169 632E83000 STRAIN POLE, TYPE TC-81.10, DESIGN 10, (3 EACH)

Awd $18,435.00$6,145.00

2 $18,435.00$6,145.00

3 $16,543.95$5,514.65

4 $18,435.00$6,145.00

5 $18,000.00$6,000.00

6 $18,999.36$6,333.12

Ref #170 632E83001 STRAIN POLE, TYPE TC-81.10, DESIGN 10, AS PER PLAN, (1 EACH)

Awd $6,145.00$6,145.00

2 $6,145.00$6,145.00

3 $5,619.90$5,619.90

4 $6,145.00$6,145.00

5 $6,500.00$6,500.00

6 $6,333.12$6,333.12

Ref #171 632E89900 PEDESTAL, 8', TRANSFORMER BASE, (1 EACH)

Awd $350.00$350.00

2 $350.00$350.00

3 $599.38$599.38

4 $350.00$350.00

5 $625.00$625.00

6 $360.71$360.71

Ref #172 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA, (1 EACH)

Awd $2,750.00$2,750.00

2 $2,750.00$2,750.00

3 $3,373.74$3,373.74

4 $2,750.00$2,750.00

5 $3,000.00$3,000.00

6 $2,834.19$2,834.19

Ref #173 633E01661 CONTROLLER UNIT, TYPE 2070E, WITH CABINET, TYPE 33, (1 EACH)

Awd $8,950.00$8,950.00

2 $8,950.00$8,950.00

3 $10,660.46$10,660.46

4 $8,950.00$8,950.00

5 $12,000.00$12,000.00

6 $9,223.99$9,223.99

Ref #174 633E67000 CABINET RISER, (1 EACH)

Awd $185.00$185.00

2 $185.00$185.00

3 $313.72$313.72

4 $185.00$185.00

5 $500.00$500.00

6 $190.66$190.66

160083 - Page 85

Page 86: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #175 633E67101 CABINET FOUNDATION, AS PER PLAN, (1 EACH)

Awd $1,525.00$1,525.00

2 $1,525.00$1,525.00

3 $1,386.18$1,386.18

4 $1,525.00$1,525.00

5 $3,000.00$3,000.00

6 $1,571.69$1,571.69

Ref #176 633E67201 CONTROLLER WORK PAD, AS PER PLAN, (1 EACH)

Awd $825.00$825.00

2 $825.00$825.00

3 $1,017.33$1,017.33

4 $825.00$825.00

5 $1,500.00$1,500.00

6 $850.26$850.26

Ref #177 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS , (1 EACH)

Awd $4,600.00$4,600.00

2 $4,600.00$4,600.00

3 $5,449.51$5,449.51

4 $4,600.00$4,600.00

5 $5,000.00$5,000.00

6 $4,740.82$4,740.82

Ref #178 809E69101 STOP-BAR RADAR DETECTION, AS PER PLAN, (1 EACH)

Awd $5,650.00$5,650.00

2 $5,650.00$5,650.00

3 $6,405.70$6,405.70

4 $5,650.00$5,650.00

5 $8,200.00$8,200.00

6 $5,822.96$5,822.96

Ref #403 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG, (710 FT)

Awd $1,633.00$2.30

2 $1,633.00$2.30

3 $1,640.10$2.31

4 $1,633.00$2.30

5 $1,952.50$2.75

6 $1,682.70$2.37

Ref #404 632E65200 LOOP DETECTOR LEAD-IN CABLE, (1059 FT)

Awd $1,853.25$1.75

2 $1,853.25$1.75

3 $2,340.39$2.21

4 $1,853.25$1.75

5 $2,912.25$2.75

6 $1,906.20$1.80

Section 8 - TRAFFIC SIGNALS (PART 1) - Totals

Awd $95,330.10

2 $95,330.10

3 $109,785.91

4 $95,330.10

5 $131,554.75

6 $98,238.78

160083 - Page 86

Page 87: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #179 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B, (50 CY)

Awd $4,214.50$84.29

2 $4,200.50$84.01

3 $2,842.00$56.84

4 $2,135.50$42.71

5 $2,700.00$54.00

6 $5,000.00$100.00

Ref #180 611E98651 CATCH BASIN FRAME AND GRATE, AS PER PLAN, (1 EACH)

Awd $1,767.96$1,767.96

2 $1,051.38$1,051.38

3 $809.52$809.52

4 $1,286.62$1,286.62

5 $2,200.00$2,200.00

6 $2,200.00$2,200.00

Ref #181 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (1000 HOUR)

Awd $53,000.00$53.00

2 $87,660.00$87.66

3 $67,210.00$67.21

4 $50,000.00$50.00

5 $75,000.00$75.00

6 $75,000.00$75.00

Ref #182 614E11630 INCREASED BARRIER DELINEATION, (688 FT)

Awd $1,376.00$2.00

2 $10,547.04$15.33

3 $1,265.92$1.84

4 $1,376.00$2.00

5 $2,752.00$4.00

6 $1,382.88$2.01

Ref #183 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL), (2 EACH)

Awd $3,500.00$1,750.00

2 $6,833.10$3,416.55

3 $3,500.00$1,750.00

4 $3,500.00$1,750.00

5 $4,090.00$2,045.00

6 $3,517.06$1,758.53

Ref #184 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL), (8 EACH)

Awd $14,400.00$1,800.00

2 $19,240.72$2,405.09

3 $14,400.00$1,800.00

4 $14,400.00$1,800.00

5 $16,360.00$2,045.00

6 $14,068.24$1,758.53

Ref #185 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (110 CY)

Awd $32,897.70$299.07

2 $24,753.30$225.03

3 $27,500.00$250.00

4 $17,323.90$157.49

5 $33,000.00$300.00

6 $21,450.00$195.00

160083 - Page 87

Page 88: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #186 614E13100 BARRIER REFLECTOR, (112 EACH)

Awd $672.00$6.00

2 $2,019.36$18.03

3 $672.00$6.00

4 $672.00$6.00

5 $672.00$6.00

6 $675.36$6.03

Ref #187 614E13350 OBJECT MARKER, ONE WAY, (128 EACH)

Awd $1,408.00$11.00

2 $2,136.32$16.69

3 $1,408.00$11.00

4 $1,408.00$11.00

5 $1,536.00$12.00

6 $1,414.40$11.05

Ref #189 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (12 SNMT)

Awd $10,800.00$900.00

2 $11,924.64$993.72

3 $15,000.00$1,250.00

4 $10,800.00$900.00

5 $9,600.00$800.00

6 $9,600.00$800.00

Ref #190 614E20200 WORK ZONE LANE LINE, CLASS I, 740.06, TYPE I, (0.26 MILE)

Awd $910.00$3,500.00

2 $1,429.84$5,499.38

3 $912.09$3,508.04

4 $910.00$3,500.00

5 $910.00$3,500.00

6 $1,036.54$3,986.69

Ref #191 614E20550 WORK ZONE LANE LINE, CLASS III, 642 PAINT, (2.79 MILE)

Awd $627.75$225.00

2 $5,679.13$2,035.53

3 $629.20$225.52

4 $627.75$225.00

5 $627.75$225.00

6 $715.05$256.29

Ref #192 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I, (0.54 MILE)

Awd $5,940.00$11,000.00

2 $7,378.21$13,663.35

3 $5,953.66$11,025.30

4 $5,940.00$11,000.00

5 $5,940.00$11,000.00

6 $6,765.98$12,529.59

Ref #193 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (0.43 MILE)

Awd $208.55$485.00

2 $1,243.82$2,892.60

3 $209.03$486.12

4 $208.55$485.00

5 $208.55$485.00

6 $237.55$552.44

160083 - Page 88

Page 89: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #194 614E22200 WORK ZONE EDGE LINE, CLASS I, 740.06, TYPE I, (1.61 MILE)

Awd $9,775.92$6,072.00

2 $13,972.96$8,678.86

3 $9,798.40$6,085.96

4 $9,775.92$6,072.00

5 $9,775.92$6,072.00

6 $11,135.31$6,916.34

Ref #195 614E22350 WORK ZONE EDGE LINE, CLASS III, 642 PAINT, (7.03 MILE)

Awd $2,390.20$340.00

2 $5,976.84$850.19

3 $2,395.68$340.78

4 $2,390.20$340.00

5 $2,390.20$340.00

6 $2,722.58$387.28

Ref #196 614E23400 WORK ZONE CHANNELIZING LINE, CLASS I, 740.06, TYPE, (1673 FT)

Awd $3,346.00$2.00

2 $7,461.58$4.46

3 $3,346.00$2.00

4 $3,346.00$2.00

5 $3,346.00$2.00

6 $3,814.44$2.28

Ref #197 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 642 PAINT, (5438 FT)

Awd $2,990.90$0.55

2 $12,126.74$2.23

3 $2,990.90$0.55

4 $2,990.90$0.55

5 $2,990.90$0.55

6 $3,425.94$0.63

Ref #198 614E24400 WORK ZONE DOTTED LINE, CLASS I, 740.06, TYPE I, (700 FT)

Awd $1,225.00$1.75

2 $1,750.00$2.50

3 $1,225.00$1.75

4 $1,225.00$1.75

5 $1,225.00$1.75

6 $1,393.00$1.99

Ref #199 614E24610 WORK ZONE DOTTED LINE, CLASS III, 642 PAINT, (3136 FT)

Awd $1,568.00$0.50

2 $1,223.04$0.39

3 $1,568.00$0.50

4 $1,568.00$0.50

5 $1,568.00$0.50

6 $1,787.52$0.57

Ref #200 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I, (109 FT)

Awd $872.00$8.00

2 $1,062.75$9.75

3 $874.18$8.02

4 $872.00$8.00

5 $872.00$8.00

6 $992.99$9.11

160083 - Page 89

Page 90: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #201 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT, (198 FT)

Awd $495.00$2.50

2 $1,601.82$8.09

3 $496.98$2.51

4 $495.00$2.50

5 $495.00$2.50

6 $564.30$2.85

Ref #203 614E27620 WORK ZONE CROSSWALK LINE, CLASS III, 642 PAINT, (301 FT)

Awd $602.00$2.00

2 $2,040.78$6.78

3 $602.00$2.00

4 $602.00$2.00

5 $602.00$2.00

6 $686.28$2.28

Ref #204 614E30400 WORK ZONE ARROW, CLASS I, 740.06, TYPE I, (4 EACH)

Awd $700.00$175.00

2 $1,297.68$324.42

3 $701.60$175.40

4 $700.00$175.00

5 $700.00$175.00

6 $797.36$199.34

Ref #205 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT, (27 EACH)

Awd $1,485.00$55.00

2 $5,608.71$207.73

3 $1,488.51$55.13

4 $1,485.00$55.00

5 $1,485.00$55.00

6 $1,691.55$62.65

Ref #206 614E31700 WORK ZONE SCHOOL SYMBOL MARKING, 72", CLASS I, (3 EACH)

Awd $600.00$200.00

2 $692.58$230.86

3 $601.38$200.46

4 $600.00$200.00

5 $600.00$200.00

6 $455.61$151.87

Ref #207 614E31740 WORK ZONE SCHOOL SYMBOL MARKING, 72", CLASS III, 6, (2 EACH)

Awd $500.00$250.00

2 $461.74$230.87

3 $501.16$250.58

4 $500.00$250.00

5 $500.00$250.00

6 $569.54$284.77

Ref #208 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, (1296 SY)

Awd $112,402.08$86.73

2 $76,373.28$58.93

3 $58,320.00$45.00

4 $90,720.00$70.00

5 $53,123.04$40.99

6 $54,937.44$42.39

160083 - Page 90

Page 91: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #209 616E10000 WATER, (19 MGAL)

Awd $164.73$8.67

2 $1,687.96$88.84

3 $190.00$10.00

4 $1,009.66$53.14

5 $1,235.00$65.00

6 $2,280.00$120.00

Ref #210 622E41000 PORTABLE BARRIER, 32", (4890 FT)

Awd $62,543.10$12.79

2 $85,379.40$17.46

3 $61,271.70$12.53

4 $61,125.00$12.50

5 $63,570.00$13.00

6 $61,418.40$12.56

Ref #212 622E41020 PORTABLE BARRIER, 32", BRIDGE MOUNTED, (620 FT)

Awd $11,005.00$17.75

2 $10,490.40$16.92

3 $9,634.80$15.54

4 $12,245.00$19.75

5 $9,920.00$16.00

6 $9,951.00$16.05

Ref #405 614E25400 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS I, 740.0, (480 FT)

Awd $2,640.00$5.50

2 $3,787.20$7.89

3 $2,644.80$5.51

4 $2,640.00$5.50

5 $2,640.00$5.50

6 $3,004.80$6.26

Ref #406 615E10000 ROADS FOR MAINTAINING TRAFFIC, (LUMP SUM)

Awd $7,240.63$7,240.63

2 $27,791.04$27,791.04

3 $65,000.00$65,000.00

4 $40,000.00$40,000.00

5 $80,000.00$80,000.00

6 $75,000.00$75,000.00

Ref #407 622E41021 PORTABLE BARRIER, 32", BRIDGE MOUNTED, AS PER PLAN, (290 FT)

Awd $20,735.00$71.50

2 $43,714.60$150.74

3 $21,750.00$75.00

4 $22,040.00$76.00

5 $27,550.00$95.00

6 $4,654.50$16.05

Ref #409 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (18 CY)

Awd $5,422.68$301.26

2 $6,750.00$375.00

3 $6,750.00$375.00

4 $5,040.00$280.00

5 $5,400.00$300.00

6 $5,400.00$300.00

160083 - Page 91

Page 92: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Section 9 - MAINTENANCE OF TRAFFIC (PART 1) - Totals

Awd $380,425.70

2 $497,348.46

3 $394,462.51

4 $371,958.00

5 $425,584.36

6 $389,745.62

Ref #213 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)

Awd $423,838.52$423,838.52

2 $400,000.00$400,000.00

3 $400,000.00$400,000.00

4 $700,000.00$700,000.00

5 $480,000.00$480,000.00

6 $375,000.00$375,000.00

Ref #214 202E22900 APPROACH SLAB REMOVED, (317 SY)

Awd $8,907.70$28.10

2 $11,095.00$35.00

3 $11,095.00$35.00

4 $11,095.00$35.00

5 $15,216.00$48.00

6 $12,680.00$40.00

Ref #215 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN, (LUMP SUM)

Awd $66,029.05$66,029.05

2 $40,000.00$40,000.00

3 $40,000.00$40,000.00

4 $100,000.00$100,000.00

5 $75,000.00$75,000.00

6 $205,000.00$205,000.00

Ref #216 503E21330 UNCLASSIFIED EXCAVATION INCLUDING ROCK AND/OR SHAL, (LUMP SUM)

Awd $34,659.07$34,659.07

2 $180,000.00$180,000.00

3 $180,000.00$180,000.00

4 $120,000.00$120,000.00

5 $165,000.00$165,000.00

6 $250,000.00$250,000.00

Ref #217 504E11101 STEEL SHEET PILING LEFT IN PLACE, AS PER PLAN, (60 SF)

Awd $3,475.80$57.93

2 $3,000.00$50.00

3 $3,000.00$50.00

4 $4,800.00$80.00

5 $3,300.00$55.00

6 $8,400.00$140.00

Ref #218 509E10000 EPOXY COATED REINFORCING STEEL, (306874 LB)

Awd $316,080.22$1.03

2 $306,874.00$1.00

3 $306,874.00$1.00

4 $306,874.00$1.00

5 $291,530.30$0.95

6 $374,386.28$1.22

160083 - Page 92

Page 93: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #219 511E21535 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, AS , (703 CY)

Awd $661,579.24$941.08

2 $544,825.00$775.00

3 $544,825.00$775.00

4 $590,520.00$840.00

5 $562,400.00$800.00

6 $667,850.00$950.00

Ref #220 511E33500 SEMI-INTEGRAL DIAPHRAGM GUIDE, (2 EACH)

Awd $11,100.78$5,550.39

2 $15,000.00$7,500.00

3 $15,000.00$7,500.00

4 $7,800.00$3,900.00

5 $7,600.00$3,800.00

6 $10,400.00$5,200.00

Ref #221 511E41013 CLASS QC1 CONCRETE WITH QC/QA, PIER ABOVE FOOTINGS, (78 CY)

Awd $91,143.00$1,168.50

2 $74,100.00$950.00

3 $74,100.00$950.00

4 $70,200.00$900.00

5 $74,100.00$950.00

6 $66,300.00$850.00

Ref #222 511E44113 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT NOT INCLUD, (687 CY)

Awd $523,061.19$761.37

2 $446,550.00$650.00

3 $446,550.00$650.00

4 $377,850.00$550.00

5 $625,170.00$910.00

6 $401,895.00$585.00

Ref #223 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING, (203 CY)

Awd $114,835.07$565.69

2 $66,990.00$330.00

3 $66,990.00$330.00

4 $91,350.00$450.00

5 $91,350.00$450.00

6 $111,650.00$550.00

Ref #224 511E51513 CLASS QC2 CONCRETE WITH QC/QA, SIDEWALK, AS PER PL, (98 CY)

Awd $37,129.26$378.87

2 $36,750.00$375.00

3 $36,750.00$375.00

4 $34,300.00$350.00

5 $49,000.00$500.00

6 $49,000.00$500.00

Ref #225 511E53012 CLASS QC2 CONCRETE, MISC.: MOMENT SLAB, (30 CY)

Awd $15,021.30$500.71

2 $17,250.00$575.00

3 $17,250.00$575.00

4 $19,200.00$640.00

5 $20,100.00$670.00

6 $15,000.00$500.00

160083 - Page 93

Page 94: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #226 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY), (577 SY)

Awd $3,265.82$5.66

2 $4,904.50$8.50

3 $4,904.50$8.50

4 $5,770.00$10.00

5 $4,904.50$8.50

6 $7,333.67$12.71

Ref #227 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (2055 SY)

Awd $50,902.35$24.77

2 $36,990.00$18.00

3 $36,990.00$18.00

4 $30,825.00$15.00

5 $41,100.00$20.00

6 $52,217.55$25.41

Ref #228 512E33000 TYPE 2 WATERPROOFING, (22 SY)

Awd $600.82$27.31

2 $660.00$30.00

3 $660.00$30.00

4 $704.00$32.00

5 $440.00$20.00

6 $660.00$30.00

Ref #229 515E15110 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M, (10 EACH)

Awd $430,396.70$43,039.67

2 $400,000.00$40,000.00

3 $400,000.00$40,000.00

4 $364,000.00$36,400.00

5 $365,000.00$36,500.00

6 $535,000.00$53,500.00

Ref #230 515E15110 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M, (10 EACH)

Awd $430,396.70$43,039.67

2 $400,000.00$40,000.00

3 $400,000.00$40,000.00

4 $364,000.00$36,400.00

5 $365,000.00$36,500.00

6 $535,000.00$53,500.00

Ref #231 515E20000 INTERMEDIATE DIAPHRAGMS, (54 EACH)

Awd $79,159.14$1,465.91

2 $67,500.00$1,250.00

3 $67,500.00$1,250.00

4 $59,400.00$1,100.00

5 $59,400.00$1,100.00

6 $86,400.00$1,600.00

Ref #232 516E10010 ARMORLESS PREFORMED JOINT SEAL, (166 FT)

Awd $6,543.72$39.42

2 $6,640.00$40.00

3 $6,640.00$40.00

4 $10,790.00$65.00

5 $7,470.00$45.00

6 $7,470.00$45.00

160083 - Page 94

Page 95: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #233 516E13900 2" PREFORMED EXPANSION JOINT FILLER, (427 SF)

Awd $1,968.47$4.61

2 $4,270.00$10.00

3 $4,270.00$10.00

4 $4,884.88$11.44

5 $4,270.00$10.00

6 $3,843.00$9.00

Ref #234 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL, (206 FT)

Awd $6,680.58$32.43

2 $6,180.00$30.00

3 $6,180.00$30.00

4 $7,630.24$37.04

5 $5,562.00$27.00

6 $5,356.00$26.00

Ref #235 516E44201 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (10 EACH)

Awd $18,960.80$1,896.08

2 $15,000.00$1,500.00

3 $15,000.00$1,500.00

4 $13,650.00$1,365.00

5 $23,000.00$2,300.00

6 $18,000.00$1,800.00

Ref #236 516E44201 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (10 EACH)

Awd $21,251.70$2,125.17

2 $17,500.00$1,750.00

3 $17,500.00$1,750.00

4 $15,350.00$1,535.00

5 $23,000.00$2,300.00

6 $20,000.00$2,000.00

Ref #237 516E44301 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (20 EACH)

Awd $56,416.60$2,820.83

2 $50,000.00$2,500.00

3 $50,000.00$2,500.00

4 $42,000.00$2,100.00

5 $28,200.00$1,410.00

6 $56,000.00$2,800.00

Ref #238 517E74501 RAILING, CONCRETE, AS PER PLAN, (608 FT)

Awd $107,518.72$176.84

2 $127,680.00$210.00

3 $127,680.00$210.00

4 $106,400.00$175.00

5 $182,400.00$300.00

6 $145,920.00$240.00

Ref #239 518E21200 POROUS BACKFILL WITH FILTER FABRIC, (397 CY)

Awd $20,921.90$52.70

2 $29,775.00$75.00

3 $29,775.00$75.00

4 $23,820.00$60.00

5 $26,996.00$68.00

6 $25,805.00$65.00

160083 - Page 95

Page 96: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #240 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE, (292 FT)

Awd $610.28$2.09

2 $3,504.00$12.00

3 $3,504.00$12.00

4 $2,920.00$10.00

5 $2,044.00$7.00

6 $2,044.00$7.00

Ref #241 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (54 FT)

Awd $661.50$12.25

2 $1,188.00$22.00

3 $1,188.00$22.00

4 $1,620.00$30.00

5 $1,080.00$20.00

6 $1,404.00$26.00

Ref #242 524E94902 DRILLED SHAFTS, 48" DIAMETER, ABOVE BEDROCK, (44 FT)

Awd $7,585.60$172.40

2 $9,240.00$210.00

3 $9,240.00$210.00

4 $6,600.00$150.00

5 $15,400.00$350.00

6 $23,100.00$525.00

Ref #243 524E94904 DRILLED SHAFTS, 48" DIAMETER, INTO BEDROCK, (320 FT)

Awd $163,808.00$511.90

2 $160,000.00$500.00

3 $160,000.00$500.00

4 $172,800.00$540.00

5 $198,400.00$620.00

6 $232,000.00$725.00

Ref #244 524E94906 DRILLED SHAFTS, 54" DIAMETER, ABOVE BEDROCK, (20 FT)

Awd $4,347.00$217.35

2 $6,000.00$300.00

3 $6,000.00$300.00

4 $3,800.00$190.00

5 $10,000.00$500.00

6 $12,000.00$600.00

Ref #245 524E94908 DRILLED SHAFTS, 54" DIAMETER, INTO BEDROCK, (50 FT)

Awd $17,139.00$342.78

2 $38,750.00$775.00

3 $38,750.00$775.00

4 $27,250.00$545.00

5 $37,500.00$750.00

6 $40,000.00$800.00

Ref #246 526E30011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1, (552 SY)

Awd $134,682.48$243.99

2 $151,800.00$275.00

3 $151,800.00$275.00

4 $154,560.00$280.00

5 $182,160.00$330.00

6 $143,520.00$260.00

160083 - Page 96

Page 97: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #247 526E90031 TYPE C INSTALLATION, AS PER PLAN, (166 FT)

Awd $24,958.10$150.35

2 $41,500.00$250.00

3 $41,500.00$250.00

4 $36,520.00$220.00

5 $18,260.00$110.00

6 $36,520.00$220.00

Ref #248 530E01300 SPECIAL - STRUCTURE, MISC.: DECORATIVE VANDEL PROT, (430 FT)

Awd $238,650.00$555.00

2 $191,350.00$445.00

3 $240,800.00$560.00

4 $238,650.00$555.00

5 $201,455.00$468.50

6 $199,950.00$465.00

Ref #400 202E35700 ASBESTOS PIPE REMOVED, (1917 FT)

Awd $22,754.79$11.87

2 $1,917.00$1.00

3 $1,917.00$1.00

4 $22,869.81$11.93

5 $47,925.00$25.00

6 $14,377.50$7.50

Ref #408 510E10001 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, AS , (616 EACH)

Awd $8,322.16$13.51

2 $8,008.00$13.00

3 $8,008.00$13.00

4 $11,088.00$18.00

5 $6,776.00$11.00

6 $9,240.00$15.00

Section 10 - STRUCTURE 20 FOOT SPAN AND OVER (HAM-74- - Totals

Awd $4,165,363.13

2 $3,922,790.50

3 $3,972,240.50

4 $4,161,890.93

5 $4,317,508.80

6 $4,760,722.00

Ref #249 AA1 530E00400 SPECIAL - STRUCTURE, MISC.: BRONZE PLAQUES, (2 EACH)

Awd $21,041.00$10,520.50

2 $24,500.00$12,250.00

3 $24,500.00$12,250.00

4 $21,170.00$10,585.00

5 $28,000.00$14,000.00

6 $22,000.00$11,000.00

Ref #250 AA2 690E98400 SPECIAL - MISC.: BRONZE PLAQUES (NON-PERFORM), (LUMP SUM)

Awd $0.01$0.01

2 $0.01$0.01

3 $0.01$0.01

4 $0.01$0.01

5 $0.01$0.01

6 $0.01$0.01

160083 - Page 97

Page 98: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Section 11 - STRUCTURE 20 FOOT SPAN AND OVER (HAM-74- - Totals

Awd $21,041.01

2 $24,500.01

3 $24,500.01

4 $21,170.01

5 $28,000.01

6 $22,000.01

Ref #251 201E11000 CLEARING AND GRUBBING, (LUMP SUM)

Awd $71,550.00$71,550.00

2 $4,895.93$4,895.93

3 $15,000.00$15,000.00

4 $53,400.00$53,400.00

5 $45,000.00$45,000.00

6 $45,000.00$45,000.00

Ref #252 202E20010 HEADWALL REMOVED, (1 EACH)

Awd $247.86$247.86

2 $652.13$652.13

3 $150.00$150.00

4 $115.00$115.00

5 $600.00$600.00

6 $210.00$210.00

Ref #253 202E23000 PAVEMENT REMOVED, (460 SY)

Awd $7,516.40$16.34

2 $8,500.80$18.48

3 $8,280.00$18.00

4 $9,200.00$20.00

5 $9,200.00$20.00

6 $9,200.00$20.00

Ref #254 202E35100 PIPE REMOVED, 24" AND UNDER, (104 FT)

Awd $1,158.56$11.14

2 $2,488.72$23.93

3 $832.00$8.00

4 $1,144.00$11.00

5 $1,560.00$15.00

6 $2,184.00$21.00

Ref #255 202E38000 GUARDRAIL REMOVED, (489 FT)

Awd $733.50$1.50

2 $1,075.80$2.20

3 $1,080.69$2.21

4 $1,662.60$3.40

5 $1,075.80$2.20

6 $1,095.36$2.24

Ref #256 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T, (1 EACH)

Awd $243.40$243.40

2 $200.00$200.00

3 $200.46$200.46

4 $85.00$85.00

5 $200.00$200.00

6 $203.39$203.39

160083 - Page 98

Page 99: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #257 203E10000 EXCAVATION, (2716 CY)

Awd $11,868.92$4.37

2 $32,836.44$12.09

3 $54,320.00$20.00

4 $40,740.00$15.00

5 $43,456.00$16.00

6 $19,012.00$7.00

Ref #258 203E20000 EMBANKMENT, (3109 CY)

Awd $43,650.36$14.04

2 $20,426.13$6.57

3 $62,180.00$20.00

4 $24,872.00$8.00

5 $37,308.00$12.00

6 $46,635.00$15.00

Ref #259 204E10000 SUBGRADE COMPACTION, (506 SY)

Awd $880.44$1.74

2 $1,467.40$2.90

3 $1,518.00$3.00

4 $1,518.00$3.00

5 $1,771.00$3.50

6 $1,518.00$3.00

Ref #260 204E13000 EXCAVATION OF SUBGRADE, (197 CY)

Awd $5,628.29$28.57

2 $4,928.94$25.02

3 $4,728.00$24.00

4 $13,790.00$70.00

5 $4,925.00$25.00

6 $1,379.00$7.00

Ref #261 204E30020 GRANULAR MATERIAL, TYPE C, (197 CY)

Awd $11,780.60$59.80

2 $9,300.37$47.21

3 $10,835.00$55.00

4 $6,895.00$35.00

5 $8,865.00$45.00

6 $9,850.00$50.00

Ref #262 204E45000 PROOF ROLLING, (1 HOUR)

Awd $337.72$337.72

2 $186.17$186.17

3 $250.00$250.00

4 $300.00$300.00

5 $250.00$250.00

6 $200.00$200.00

Ref #263 204E50000 GEOTEXTILE FABRIC, (506 SY)

Awd $399.74$0.79

2 $1,361.14$2.69

3 $759.00$1.50

4 $1,619.20$3.20

5 $1,265.00$2.50

6 $885.50$1.75

160083 - Page 99

Page 100: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #264 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS, (487.5 FT)

Awd $6,825.00$14.00

2 $8,019.38$16.45

3 $8,038.88$16.49

4 $6,825.00$14.00

5 $8,019.38$16.45

6 $8,155.88$16.73

Ref #265 606E26550 ANCHOR ASSEMBLY, MGS TYPE T, (1 EACH)

Awd $750.00$750.00

2 $800.00$800.00

3 $801.84$801.84

4 $750.00$750.00

5 $800.00$800.00

6 $813.56$813.56

Ref #266 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER, (LUMP SUM)

Awd $6,150.00$6,150.00

2 $17,710.30$17,710.30

3 $7,500.00$7,500.00

4 $24,400.00$24,400.00

5 $27,500.00$27,500.00

6 $5,000.00$5,000.00

Section 12 - ROADWAY (PART 2) - Totals

Awd $169,720.79

2 $114,849.65

3 $176,473.87

4 $187,315.80

5 $191,795.18

6 $151,341.69

Ref #267 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1, (4 SY)

Awd $328.08$82.02

2 $433.16$108.29

3 $600.00$150.00

4 $1,000.00$250.00

5 $480.00$120.00

6 $800.00$200.00

Ref #268 601E21060 TIED CONCRETE BLOCK MAT, TYPE 2, (150 SY)

Awd $8,637.00$57.58

2 $13,629.00$90.86

3 $7,500.00$50.00

4 $13,500.00$90.00

5 $12,000.00$80.00

6 $9,000.00$60.00

Ref #269 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER, (7 CY)

Awd $570.15$81.45

2 $1,865.85$266.55

3 $630.00$90.00

4 $2,100.00$300.00

5 $735.00$105.00

6 $1,190.00$170.00

160083 - Page 100

Page 101: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #270 659E00300 TOPSOIL, (240 CY)

Awd $12,004.80$50.02

2 $8,366.40$34.86

3 $2,400.00$10.00

4 $6,960.00$29.00

5 $6,000.00$25.00

6 $2,880.00$12.00

Ref #271 659E10000 SEEDING AND MULCHING, (2158 SY)

Awd $2,589.60$1.20

2 $1,467.44$0.68

3 $4,855.50$2.25

4 $1,467.44$0.68

5 $1,899.04$0.88

6 $1,899.04$0.88

Ref #272 659E14000 REPAIR SEEDING AND MULCHING, (108 SY)

Awd $73.44$0.68

2 $73.44$0.68

3 $54.00$0.50

4 $73.44$0.68

5 $95.04$0.88

6 $95.04$0.88

Ref #273 659E20000 COMMERCIAL FERTILIZER, (0.3 TON)

Awd $180.00$600.00

2 $180.00$600.00

3 $225.00$750.00

4 $180.00$600.00

5 $180.00$600.00

6 $180.00$600.00

Ref #274 659E31000 LIME, (0.45 ACRE)

Awd $22.50$50.00

2 $22.50$50.00

3 $4.50$10.00

4 $22.50$50.00

5 $6.08$13.51

6 $13.50$30.00

Ref #275 659E35000 WATER, (6 MGAL)

Awd $6.00$1.00

2 $210.00$35.00

3 $60.00$10.00

4 $6.00$1.00

5 $6.00$1.00

6 $6.00$1.00

Ref #276 832E30000 EROSION CONTROL, (7500 EACH)

Awd $7,500.00$1.00

2 $7,500.00$1.00

3 $7,500.00$1.00

4 $7,500.00$1.00

5 $7,500.00$1.00

6 $7,500.00$1.00

160083 - Page 101

Page 102: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Section 13 - EROSION CONTROL (PART 2) - Totals

Awd $31,911.57

2 $33,747.79

3 $23,829.00

4 $32,809.38

5 $28,901.16

6 $23,563.58

Ref #277 602E20000 CONCRETE MASONRY, (0.3 CY)

Awd $788.79$2,629.30

2 $417.44$1,391.47

3 $450.00$1,500.00

4 $480.00$1,600.00

5 $1,440.00$4,800.00

6 $450.00$1,500.00

Ref #278 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS, (440 FT)

Awd $2,767.60$6.29

2 $6,754.00$15.35

3 $3,960.00$9.00

4 $4,400.00$10.00

5 $5,720.00$13.00

6 $4,400.00$10.00

Ref #279 611E01500 6" CONDUIT, TYPE F, (200 FT)

Awd $1,656.00$8.28

2 $5,312.00$26.56

3 $5,000.00$25.00

4 $4,000.00$20.00

5 $2,600.00$13.00

6 $5,000.00$25.00

Ref #280 611E06700 15" CONDUIT, TYPE F, 707.05 TYPE C OR 707.21, (102 FT)

Awd $7,354.20$72.10

2 $11,318.94$110.97

3 $7,650.00$75.00

4 $12,750.00$125.00

5 $11,220.00$110.00

6 $7,140.00$70.00

Ref #281 611E99710 PRECAST REINFORCED CONCRETE OUTLET, (2 EACH)

Awd $551.12$275.56

2 $617.78$308.89

3 $600.00$300.00

4 $600.00$300.00

5 $500.00$250.00

6 $600.00$300.00

Section 14 - DRAINAGE (PART 2) - Totals

Awd $13,117.71

2 $24,420.16

3 $17,660.00

4 $22,230.00

5 $21,480.00

6 $17,590.00

160083 - Page 102

Page 103: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #282 301E46000 ASPHALT CONCRETE BASE, PG64-22, (77 CY)

Awd $11,221.21$145.73

2 $12,688.83$164.79

3 $11,247.39$146.07

4 $11,221.21$145.73

5 $11,221.21$145.73

6 $11,604.67$150.71

Ref #283 304E20000 AGGREGATE BASE, (137 CY)

Awd $8,611.82$62.86

2 $8,873.49$64.77

3 $8,220.00$60.00

4 $13,700.00$100.00

5 $10,960.00$80.00

6 $6,850.00$50.00

Ref #284 407E10000 TACK COAT, (34 GAL)

Awd $85.00$2.50

2 $85.00$2.50

3 $85.34$2.51

4 $85.00$2.50

5 $85.00$2.50

6 $88.06$2.59

Ref #285 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (18 GAL)

Awd $45.00$2.50

2 $45.00$2.50

3 $45.18$2.51

4 $45.00$2.50

5 $45.00$2.50

6 $46.62$2.59

Ref #286 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5MM, TYPE A (4, (19 CY)

Awd $5,105.30$268.70

2 $5,336.15$280.85

3 $5,117.08$269.32

4 $5,105.30$268.70

5 $5,105.30$268.70

6 $5,279.72$277.88

Ref #287 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19MM, TYPE A, (22 CY)

Awd $3,940.64$179.12

2 $4,740.78$215.49

3 $3,949.66$179.53

4 $3,940.64$179.12

5 $3,940.64$179.12

6 $4,075.28$185.24

Ref #288 609E24511 CURB, TYPE 4-C, AS PER PLAN, (227 FT)

Awd $8,871.16$39.08

2 $6,696.50$29.50

3 $6,810.00$30.00

4 $6,810.00$30.00

5 $5,402.60$23.80

6 $7,945.00$35.00

160083 - Page 103

Page 104: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Section 15 - PAVEMENT (PART 2) - Totals

Awd $37,880.13

2 $38,465.75

3 $35,474.65

4 $40,907.15

5 $36,759.75

6 $35,889.35

Ref #289 625E00450 CONNECTION, FUSED PULL APART, (4 EACH)

Awd $320.00$80.00

2 $320.00$80.00

3 $459.04$114.76

4 $320.00$80.00

5 $400.00$100.00

6 $326.80$81.70

Ref #290 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 5000 VOLT C, (226 FT)

Awd $1,921.00$8.50

2 $1,921.00$8.50

3 $2,298.42$10.17

4 $1,921.00$8.50

5 $3,164.00$14.00

6 $1,961.68$8.68

Ref #291 625E29002 TRENCH, 24" DEEP, (216 FT)

Awd $2,376.00$11.00

2 $2,376.00$11.00

3 $2,576.88$11.93

4 $2,376.00$11.00

5 $1,296.00$6.00

6 $2,425.68$11.23

Ref #292 625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING, (LUMP SUM)

Awd $2,250.00$2,250.00

2 $2,250.00$2,250.00

3 $2,726.26$2,726.26

4 $2,250.00$2,250.00

5 $650.00$650.00

6 $2,297.82$2,297.82

Ref #293 625E75801 DISCONNECT CIRCUIT, AS PER PLAN, (2 EACH)

Awd $1,000.00$500.00

2 $1,000.00$500.00

3 $6,745.48$3,372.74

4 $1,000.00$500.00

5 $600.00$300.00

6 $1,021.26$510.63

Section 16 - LIGHTING (PART 2) - Totals

Awd $7,867.00

2 $7,867.00

3 $14,806.08

4 $7,867.00

5 $6,110.00

6 $8,033.24

160083 - Page 104

Page 105: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #294 620E00500 DELINEATOR, POST MOUNTED, (12 EACH)

Awd $504.00$42.00

2 $1,056.00$88.00

3 $1,058.40$88.20

4 $504.00$42.00

5 $1,056.00$88.00

6 $1,069.32$89.11

Ref #295 621E00100 RPM, (10 EACH)

Awd $1,327.00$132.70

2 $173.50$17.35

3 $1,330.10$133.01

4 $233.80$23.38

5 $1,327.00$132.70

6 $175.20$17.52

Ref #296 621E54000 RAISED PAVEMENT MARKER REMOVED, (6 EACH)

Awd $121.62$20.27

2 $120.30$20.05

3 $42.00$7.00

4 $165.96$27.66

5 $60.00$10.00

6 $90.00$15.00

Ref #297 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (41 FT)

Awd $348.50$8.50

2 $338.25$8.25

3 $339.07$8.27

4 $348.50$8.50

5 $338.25$8.25

6 $342.35$8.35

Ref #298 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (2 EACH)

Awd $150.00$75.00

2 $120.00$60.00

3 $120.28$60.14

4 $150.00$75.00

5 $120.00$60.00

6 $121.52$60.76

Ref #299 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (3 EACH)

Awd $45.00$15.00

2 $150.00$50.00

3 $150.36$50.12

4 $45.00$15.00

5 $150.00$50.00

6 $151.89$50.63

Ref #300 644E00104 EDGE LINE, 6", (0.09 MILE)

Awd $1,043.10$11,590.00

2 $1,043.10$11,590.00

3 $1,045.50$11,616.67

4 $1,043.10$11,590.00

5 $1,043.10$11,590.00

6 $1,093.73$12,152.56

160083 - Page 105

Page 106: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #301 644E00404 CHANNELIZING LINE, 12", (350 FT)

Awd $1,032.50$2.95

2 $1,032.50$2.95

3 $1,036.00$2.96

4 $1,032.50$2.95

5 $1,032.50$2.95

6 $1,081.50$3.09

Ref #302 644E01300 LANE ARROW, (3 EACH)

Awd $450.00$150.00

2 $450.00$150.00

3 $451.05$150.35

4 $450.00$150.00

5 $450.00$150.00

6 $471.84$157.28

Section 17 - TRAFFIC CONTROL (PART 2) - Totals

Awd $5,021.72

2 $4,483.65

3 $5,572.76

4 $3,972.86

5 $5,576.85

6 $4,597.35

Ref #303 614E11630 INCREASED BARRIER DELINEATION, (600 FT)

Awd $1,200.00$2.00

2 $4,464.00$7.44

3 $1,200.00$2.00

4 $1,200.00$2.00

5 $2,400.00$4.00

6 $1,206.00$2.01

Ref #304 614E12350 WORK ZONE IMPACT ATTENUATOR, (1 EACH)

Awd $1,800.00$1,800.00

2 $3,416.56$3,416.56

3 $1,800.00$1,800.00

4 $1,800.00$1,800.00

5 $2,045.00$2,045.00

6 $1,758.53$1,758.53

Ref #305 614E13200 BARRIER REFLECTOR, TYPE A, (11 EACH)

Awd $88.00$8.00

2 $133.32$12.12

3 $88.00$8.00

4 $88.00$8.00

5 $66.00$6.00

6 $88.44$8.04

Ref #306 614E13300 BARRIER REFLECTOR, TYPE B, (13 EACH)

Awd $78.00$6.00

2 $157.56$12.12

3 $78.00$6.00

4 $78.00$6.00

5 $65.00$5.00

6 $78.39$6.03

160083 - Page 106

Page 107: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #307 614E13350 OBJECT MARKER, ONE WAY, (24 EACH)

Awd $264.00$11.00

2 $400.56$16.69

3 $264.00$11.00

4 $264.00$11.00

5 $264.00$11.00

6 $265.20$11.05

Ref #308 614E22200 WORK ZONE EDGE LINE, CLASS I, 740.06, TYPE I, (0.13 MILE)

Awd $789.36$6,072.00

2 $1,128.28$8,679.08

3 $791.18$6,086.00

4 $789.36$6,072.00

5 $789.36$6,072.00

6 $1,170.00$9,000.00

Ref #309 622E41000 PORTABLE BARRIER, 32", (600 FT)

Awd $11,358.00$18.93

2 $18,192.00$30.32

3 $7,518.00$12.53

4 $13,200.00$22.00

5 $9,600.00$16.00

6 $7,536.00$12.56

Section 18 - MAINTENANCE OF TRAFFIC (PART 2) - Totals

Awd $15,577.36

2 $27,892.28

3 $11,739.18

4 $17,419.36

5 $15,229.36

6 $12,102.56

Ref #310 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $41,606.54$41,606.54

2 $23,474.58$23,474.58

3 $85,000.00$85,000.00

4 $70,000.00$70,000.00

5 $50,000.00$50,000.00

6 $42,000.00$42,000.00

Ref #311 108E10000 SPECIAL - CPM PROGRESS SCHEDULE(PART 1 AND PART 2), (LUMP SUM)

Awd $1,877.53$1,877.53

2 $11,889.68$11,889.68

3 $10,000.00$10,000.00

4 $260.00$260.00

5 $7,500.00$7,500.00

6 $5,000.00$5,000.00

Ref #312 614E11000 MAINTAINING TRAFFIC(PART 1 AND PART 2), (LUMP SUM)

Awd $122,794.93$122,794.93

2 $209,053.47$209,053.47

3 $320,000.00$320,000.00

4 $369,710.00$369,710.00

5 $340,000.00$340,000.00

6 $356,145.00$356,145.00

160083 - Page 107

Page 108: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #313 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING(PART 1 AN, (LUMP SUM)

Awd $12,245.00$12,245.00

2 $60,078.88$60,078.88

3 $50,000.00$50,000.00

4 $85,000.00$85,000.00

5 $125,000.00$125,000.00

6 $60,000.00$60,000.00

Ref #314 624E10000 MOBILIZATION(PART 1 AND PART 2), (LUMP SUM)

Awd $117,200.75$117,200.75

2 $200,000.00$200,000.00

3 $200,000.00$200,000.00

4 $200,000.00$200,000.00

5 $200,000.00$200,000.00

6 $200,000.00$200,000.00

Section 19 - INCIDENTALS - Totals

Awd $295,724.75

2 $504,496.61

3 $665,000.00

4 $724,970.00

5 $722,500.00

6 $663,145.00

160083 - Page 108

Page 109: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Project No. 160102

PID 80599

BEL-IR 70-14.24

Federal

Type: MAJOR WIDENING

Completion Date: 9/30/2017

Award Amount: $19,520,051.33

Contract Awarded To: SHELLY & SANDS INC

Letting Date: 3/1/2016

Engineer's Estimate: $19,454,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jerry Wray, Director

SHELLY & SANDS INC

1515 HARMON AVE

COLUMBUS, OH 43223

Franklin

Bidder 1

Bid $19,520,051.33

BEAVER EXCAVATING COMPANY

P O BOX 6059

CANTON, OH 44706

Stark

Bidder 2

Bid $20,236,209.67

TRITON CONSTRUCTION INC

P O BOX 1360

SAINT ALBANS, WV 25177

Bidder 3

Bid $21,673,000.00

KOKOSING CONSTRUCTION COMPANY INC

886 MC KINLEY AVE

COLUMBUS, OH 43222

Franklin

Bidder 4

Bid $23,300,567.71

160102 - Page 109

Page 110: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #1 202E20010 HEADWALL REMOVED, (10 EACH)

Awd $4,000.00$400.00

2 $2,500.00$250.00

3 $2,130.00$213.00

4 $15,000.00$1,500.00

Ref #2 202E23000 PAVEMENT REMOVED, (19683 SY)

Awd $182,067.75$9.25

2 $290,324.25$14.75

3 $141,717.60$7.20

4 $137,781.00$7.00

Ref #3 202E23010 PAVEMENT REMOVED, ASPHALT, (14761 SY)

Awd $103,327.00$7.00

2 $88,566.00$6.00

3 $92,994.30$6.30

4 $59,044.00$4.00

Ref #4 202E30000 WALK REMOVED, (291 SF)

Awd $291.00$1.00

2 $2,182.50$7.50

3 $407.40$1.40

4 $698.40$2.40

Ref #5 202E30700 CONCRETE BARRIER REMOVED, (98 FT)

Awd $1,568.00$16.00

2 $5,390.00$55.00

3 $2,744.00$28.00

4 $1,862.00$19.00

Ref #6 202E32000 CURB REMOVED, (808 FT)

Awd $1,616.00$2.00

2 $3,878.40$4.80

3 $2,424.00$3.00

4 $3,232.00$4.00

Ref #7 202E32600 GUTTER REMOVED, (1106 FT)

Awd $4,424.00$4.00

2 $7,565.04$6.84

3 $3,981.60$3.60

4 $8,295.00$7.50

Ref #8 202E35100 PIPE REMOVED, 24" AND UNDER, (2365 FT)

Awd $35,475.00$15.00

2 $26,015.00$11.00

3 $42,570.00$18.00

4 $59,125.00$25.00

Ref #9 202E35200 PIPE REMOVED, OVER 24", (193 FT)

Awd $3,088.00$16.00

2 $4,246.00$22.00

3 $3,474.00$18.00

4 $5,211.00$27.00

Ref #10 202E38000 GUARDRAIL REMOVED, (5979 FT)

Awd $11,958.00$2.00

2 $8,370.60$1.40

3 $8,370.60$1.40

4 $8,370.60$1.40

160102 - Page 110

Page 111: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #11 202E38800 GUARD POST REMOVED, (3 EACH)

Awd $150.00$50.00

2 $180.00$60.00

3 $15.00$5.00

4 $15.00$5.00

Ref #12 202E52990 SPECIAL - PARKING BLOCK REMOVED, (2 EACH)

Awd $300.00$150.00

2 $68.00$34.00

3 $70.00$35.00

4 $313.16$156.58

Ref #13 202E58100 CATCH BASIN REMOVED, (25 EACH)

Awd $5,000.00$200.00

2 $5,000.00$200.00

3 $6,100.00$244.00

4 $8,750.00$350.00

Ref #14 202E58200 INLET REMOVED, (1 EACH)

Awd $400.00$400.00

2 $200.00$200.00

3 $244.00$244.00

4 $650.00$650.00

Ref #15 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, (201 FT)

Awd $4,020.00$20.00

2 $6,030.00$30.00

3 $10,452.00$52.00

4 $6,432.00$32.00

Ref #16 202E75000 FENCE REMOVED, (3633 FT)

Awd $5,449.50$1.50

2 $10,172.40$2.80

3 $5,449.50$1.50

4 $5,449.50$1.50

Ref #17 202E75250 GATE REMOVED, (1 EACH)

Awd $145.00$145.00

2 $115.00$115.00

3 $145.00$145.00

4 $145.00$145.00

Ref #18 202E98000 REMOVAL MISC.: CONSTRUCTION AND DEMOLITION (C&D) D, (LUMP SUM)

Awd $3,750.00$3,750.00

2 $4,460.00$4,460.00

3 $8,500.00$8,500.00

4 $5,300.00$5,300.00

Ref #19 202E98100 REMOVAL MISC.: ROCK CHANNEL PROTECTION, (1 EACH)

Awd $750.00$750.00

2 $1,000.00$1,000.00

3 $250.00$250.00

4 $700.00$700.00

Ref #20 202E98100 REMOVAL MISC.: CONCRETE STEPS AND STEEL RAILING, (1 EACH)

Awd $285.00$285.00

2 $600.00$600.00

3 $1,750.00$1,750.00

4 $1,100.00$1,100.00

160102 - Page 111

Page 112: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #21 202E98100 REMOVAL MISC.: PAPERBOX REMOVED AND RESET, (4 EACH)

Awd $680.00$170.00

2 $112.00$28.00

3 $108.00$27.00

4 $280.00$70.00

Ref #22 202E98100 REMOVAL MISC.: BRICK PILLAR, (2 EACH)

Awd $190.00$95.00

2 $220.00$110.00

3 $400.00$200.00

4 $320.00$160.00

Ref #23 202E98700 ABANDON MISC.:12" CONDUIT, (28 FT)

Awd $896.00$32.00

2 $56.00$2.00

3 $812.00$29.00

4 $672.00$24.00

Ref #24 203E10000 EXCAVATION, (42539 CY)

Awd $233,964.50$5.50

2 $510,468.00$12.00

3 $180,790.75$4.25

4 $467,929.00$11.00

Ref #25 203E10001 EXCAVATION, AS PER PLAN, (3560 CY)

Awd $48,060.00$13.50

2 $74,760.00$21.00

3 $28,480.00$8.00

4 $74,760.00$21.00

Ref #26 203E20000 EMBANKMENT, (96241 CY)

Awd $673,687.00$7.00

2 $644,814.70$6.70

3 $769,928.00$8.00

4 $769,928.00$8.00

Ref #27 203E65000 SPECIAL - SETTLEMENT PLATFORM, (7 EACH)

Awd $6,300.00$900.00

2 $6,125.00$875.00

3 $4,550.00$650.00

4 $4,340.00$620.00

Ref #28 204E10000 SUBGRADE COMPACTION, (63264 SY)

Awd $107,548.80$1.70

2 $75,916.80$1.20

3 $145,507.20$2.30

4 $126,528.00$2.00

Ref #29 204E13000 EXCAVATION OF SUBGRADE, (19259 CY)

Awd $231,108.00$12.00

2 $192,590.00$10.00

3 $192,590.00$10.00

4 $269,626.00$14.00

Ref #30 204E30010 GRANULAR MATERIAL, TYPE B, (19259 CY)

Awd $866,655.00$45.00

2 $674,065.00$35.00

3 $1,213,317.00$63.00

4 $866,655.00$45.00

160102 - Page 112

Page 113: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #31 204E45000 PROOF ROLLING, (37 HOUR)

Awd $12,950.00$350.00

2 $12,210.00$330.00

3 $6,290.00$170.00

4 $9,990.00$270.00

Ref #32 204E50000 GEOTEXTILE FABRIC, (44204 SY)

Awd $48,624.40$1.10

2 $39,783.60$0.90

3 $53,044.80$1.20

4 $44,204.00$1.00

Ref #33 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA, (2 MILE)

Awd $13,000.00$6,500.00

2 $5,940.00$2,970.00

3 $10,400.00$5,200.00

4 $2,200.00$1,100.00

Ref #34 606E15050 GUARDRAIL, TYPE MGS, (4525 FT)

Awd $58,825.00$13.00

2 $58,825.00$13.00

3 $58,825.00$13.00

4 $58,825.00$13.00

Ref #35 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS, (987.5 FT)

Awd $14,615.00$14.80

2 $14,615.00$14.80

3 $14,615.00$14.80

4 $14,615.00$14.80

Ref #36 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING, (75 FT)

Awd $1,590.00$21.20

2 $1,590.00$21.20

3 $1,590.00$21.20

4 $1,590.00$21.20

Ref #37 606E26050 ANCHOR ASSEMBLY, MGS TYPE B, (2 EACH)

Awd $3,190.00$1,595.00

2 $3,190.00$1,595.00

3 $3,190.00$1,595.00

4 $3,190.00$1,595.00

Ref #38 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, (9 EACH)

Awd $16,065.00$1,785.00

2 $16,065.00$1,785.00

3 $16,065.00$1,785.00

4 $16,065.00$1,785.00

Ref #39 606E26550 ANCHOR ASSEMBLY, MGS TYPE T, (18 EACH)

Awd $13,410.00$745.00

2 $13,410.00$745.00

3 $13,410.00$745.00

4 $13,410.00$745.00

Ref #40 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, (13 EACH)

Awd $25,155.00$1,935.00

2 $25,155.00$1,935.00

3 $25,155.00$1,935.00

4 $25,155.00$1,935.00

160102 - Page 113

Page 114: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #41 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2, (4 EACH)

Awd $1,500.00$375.00

2 $1,500.00$375.00

3 $1,500.00$375.00

4 $1,500.00$375.00

Ref #42 607E15000 FENCE, TYPE 47, (1900 FT)

Awd $12,920.00$6.80

2 $12,920.00$6.80

3 $12,920.00$6.80

4 $12,920.00$6.80

Ref #43 607E23000 FENCE, TYPE CLT, (1171 FT)

Awd $16,979.50$14.50

2 $16,628.20$14.20

3 $16,628.20$14.20

4 $16,628.20$14.20

Ref #44 607E50901 GATE, TYPE CL, AS PER PLAN, (1 EACH)

Awd $1,825.00$1,825.00

2 $1,825.00$1,825.00

3 $1,825.00$1,825.00

4 $1,825.00$1,825.00

Ref #45 607E70000 FENCELINE SEEDING AND MULCHING, (3071 FT)

Awd $921.30$0.30

2 $1,474.08$0.48

3 $1,474.08$0.48

4 $1,474.08$0.48

Ref #46 607E98000 FENCE, MISC.: WOOD FENCE, (1100 FT)

Awd $33,825.00$30.75

2 $33,660.00$30.60

3 $33,660.00$30.60

4 $33,660.00$30.60

Ref #47 608E10000 4" CONCRETE WALK, (131 SF)

Awd $720.50$5.50

2 $917.00$7.00

3 $1,113.50$8.50

4 $1,310.00$10.00

Ref #48 608E52020 CURB RAMP, TYPE A2, (186 SF)

Awd $1,860.00$10.00

2 $2,046.00$11.00

3 $2,938.80$15.80

4 $2,232.00$12.00

Ref #49 622E24000 CONCRETE BARRIER, TYPE D, (466 FT)

Awd $44,270.00$95.00

2 $46,600.00$100.00

3 $48,930.00$105.00

4 $47,998.00$103.00

Ref #50 622E25000 CONCRETE BARRIER END SECTION, TYPE D, (5 EACH)

Awd $17,500.00$3,500.00

2 $18,000.00$3,600.00

3 $12,000.00$2,400.00

4 $13,250.00$2,650.00

160102 - Page 114

Page 115: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #51 622E25050 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE , (3 EACH)

Awd $9,000.00$3,000.00

2 $9,300.00$3,100.00

3 $6,150.00$2,050.00

4 $8,340.00$2,780.00

Ref #52 623E38500 MONUMENT ASSEMBLY, (32 EACH)

Awd $30,400.00$950.00

2 $28,800.00$900.00

3 $30,880.00$965.00

4 $25,600.00$800.00

Ref #53 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE, (11 EACH)

Awd $1,650.00$150.00

2 $1,100.00$100.00

3 $4,950.00$450.00

4 $1,265.00$115.00

Ref #54 690E50500 SPECIAL - CONCRETE PARKING BLOCK, (7 EACH)

Awd $1,575.00$225.00

2 $700.00$100.00

3 $1,330.00$190.00

4 $805.00$115.00

Ref #500 201E11000 CLEARING AND GRUBBING, (LUMP SUM)

Awd $100,000.00$100,000.00

2 $100,000.00$100,000.00

3 $200,000.00$200,000.00

4 $200,000.00$200,000.00

Ref #503 203E10001 EXCAVATION, AS PER PLAN(BIORETENTION CELL), (1400 CY)

Awd $9,100.00$6.50

2 $16,800.00$12.00

3 $15,400.00$11.00

4 $21,000.00$15.00

Ref #504 203E20001 EMBANKMENT, AS PER PLAN(BIORETENTION CELL), (1400 CY)

Awd $98,000.00$70.00

2 $112,000.00$80.00

3 $84,000.00$60.00

4 $86,800.00$62.00

Section 1 - ROADWAY - Totals

Awd $3,126,624.25

2 $3,241,044.57

3 $3,548,556.33

4 $3,574,362.94

Ref #55 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1, (50 SY)

Awd $10,000.00$200.00

2 $5,896.50$117.93

3 $6,750.00$135.00

4 $4,000.00$80.00

Ref #56 601E21060 TIED CONCRETE BLOCK MAT, TYPE 2, (139 SY)

Awd $8,062.00$58.00

2 $11,954.00$86.00

3 $7,297.50$52.50

4 $4,170.00$30.00

160102 - Page 115

Page 116: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #57 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER, (23 CY)

Awd $2,185.00$95.00

2 $2,300.00$100.00

3 $3,105.00$135.00

4 $3,680.00$160.00

Ref #58 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER, (111 CY)

Awd $14,430.00$130.00

2 $12,765.00$115.00

3 $14,985.00$135.00

4 $19,980.00$180.00

Ref #59 601E37500 PAVED GUTTER, TYPE 1-2, (419 FT)

Awd $27,235.00$65.00

2 $17,179.00$41.00

3 $33,520.00$80.00

4 $29,330.00$70.00

Ref #60 659E00100 SOIL ANALYSIS TEST, (4 EACH)

Awd $200.00$50.00

2 $200.00$50.00

3 $200.00$50.00

4 $200.00$50.00

Ref #61 659E00300 TOPSOIL, (8651 CY)

Awd $129,765.00$15.00

2 $43,255.00$5.00

3 $389,295.00$45.00

4 $181,671.00$21.00

Ref #62 659E10000 SEEDING AND MULCHING, (78563 SY)

Awd $35,353.35$0.45

2 $35,353.35$0.45

3 $35,353.35$0.45

4 $35,353.35$0.45

Ref #63 659E14000 REPAIR SEEDING AND MULCHING, (3823 SY)

Awd $955.75$0.25

2 $955.75$0.25

3 $955.75$0.25

4 $955.75$0.25

Ref #64 659E15000 INTER-SEEDING, (3823 SY)

Awd $955.75$0.25

2 $955.75$0.25

3 $955.75$0.25

4 $955.75$0.25

Ref #65 659E20000 COMMERCIAL FERTILIZER, (17.4 TON)

Awd $9,570.00$550.00

2 $9,570.00$550.00

3 $9,570.00$550.00

4 $9,625.85$553.21

Ref #66 659E31000 LIME, (16.11 ACRE)

Awd $2,255.40$140.00

2 $2,255.40$140.00

3 $2,255.40$140.00

4 $2,268.61$140.82

160102 - Page 116

Page 117: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #67 659E35000 WATER, (438 MGAL)

Awd $438.00$1.00

2 $438.00$1.00

3 $438.00$1.00

4 $442.38$1.01

Ref #68 659E40000 MOWING, (173 MSF)

Awd $1,557.00$9.00

2 $1,557.00$9.00

3 $1,557.00$9.00

4 $1,565.65$9.05

Ref #69 660E30000 SODDING UNSTAKED, (1476 SY)

Awd $8,118.00$5.50

2 $8,088.48$5.48

3 $8,088.48$5.48

4 $8,132.76$5.51

Ref #70 670E00700 DITCH EROSION PROTECTION, (3602 SY)

Awd $2,701.50$0.75

2 $2,701.50$0.75

3 $2,701.50$0.75

4 $2,701.50$0.75

Ref #71 832E15000 STORM WATER POLLUTION PREVENTION PLAN, (LUMP SUM)

Awd $30,000.00$30,000.00

2 $32,000.00$32,000.00

3 $48,650.00$48,650.00

4 $7,330.00$7,330.00

Ref #72 832E30000 EROSION CONTROL, (600000 EACH)

Awd $600,000.00$1.00

2 $600,000.00$1.00

3 $600,000.00$1.00

4 $600,000.00$1.00

Ref #73 836E10000 SEEDING AND EROSION CONTROL WITH TURF REINFORCING , (3058 SY)

Awd $9,174.00$3.00

2 $9,174.00$3.00

3 $9,174.00$3.00

4 $9,235.16$3.02

Ref #74 836E10020 SEEDING AND EROSION CONTROL WITH TURF REINFORCING , (453 SY)

Awd $1,472.25$3.25

2 $1,522.08$3.36

3 $1,522.08$3.36

4 $1,531.14$3.38

Section 2 - EROSION CONTROL - Totals

Awd $894,428.00

2 $798,120.81

3 $1,176,373.81

4 $923,128.90

Ref #75 602E20000 CONCRETE MASONRY, (63.6 CY)

Awd $92,220.00$1,450.00

2 $63,600.00$1,000.00

3 $66,144.00$1,040.00

4 $57,240.00$900.00

160102 - Page 117

Page 118: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #76 605E11110 6" SHALLOW PIPE UNDERDRAINS WITH FABRIC WRAP, (9303 FT)

Awd $93,030.00$10.00

2 $111,636.00$12.00

3 $117,217.80$12.60

4 $148,848.00$16.00

Ref #77 605E13410 6" UNCLASSIFIED PIPE UNDERDRAINS WITH FABRIC WRAP, (1057 FT)

Awd $10,570.00$10.00

2 $17,969.00$17.00

3 $24,311.00$23.00

4 $16,912.00$16.00

Ref #78 605E14020 6" BASE PIPE UNDERDRAINS WITH FABRIC WRAP, (23188 FT)

Awd $231,880.00$10.00

2 $185,504.00$8.00

3 $222,604.80$9.60

4 $278,256.00$12.00

Ref #79 605E98300 UNDERDRAINS, MISC.: PIPE CLEANOUT, (4 EACH)

Awd $4,800.00$1,200.00

2 $2,600.00$650.00

3 $700.00$175.00

4 $2,400.00$600.00

Ref #80 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS, (1911 FT)

Awd $38,220.00$20.00

2 $28,665.00$15.00

3 $39,175.50$20.50

4 $44,908.50$23.50

Ref #81 611E04400 12" CONDUIT, TYPE B, (1187 FT)

Awd $83,090.00$70.00

2 $53,415.00$45.00

3 $83,090.00$70.00

4 $136,505.00$115.00

Ref #82 611E04600 12" CONDUIT, TYPE C, (684 FT)

Awd $41,040.00$60.00

2 $27,360.00$40.00

3 $39,672.00$58.00

4 $58,140.00$85.00

Ref #83 611E04900 12" CONDUIT, TYPE D, (185 FT)

Awd $11,100.00$60.00

2 $7,215.00$39.00

3 $12,348.75$66.75

4 $11,100.00$60.00

Ref #84 611E04900 12" CONDUIT, TYPE D, 706.02, (30 FT)

Awd $1,800.00$60.00

2 $2,160.00$72.00

3 $2,010.00$67.00

4 $2,100.00$70.00

Ref #85 611E05100 12" CONDUIT, TYPE E, (100 FT)

Awd $4,200.00$42.00

2 $1,500.00$15.00

3 $6,400.00$64.00

4 $3,100.00$31.00

160102 - Page 118

Page 119: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #86 611E05200 12" CONDUIT, TYPE F, (172 FT)

Awd $8,256.00$48.00

2 $6,880.00$40.00

3 $9,632.00$56.00

4 $10,320.00$60.00

Ref #87 611E05201 12" CONDUIT, TYPE F, AS PER PLAN, (58 FT)

Awd $3,306.00$57.00

2 $4,350.00$75.00

3 $5,916.00$102.00

4 $6,206.00$107.00

Ref #88 611E05900 15" CONDUIT, TYPE B, (547 FT)

Awd $44,854.00$82.00

2 $27,350.00$50.00

3 $49,230.00$90.00

4 $73,845.00$135.00

Ref #89 611E06100 15" CONDUIT, TYPE C, (128 FT)

Awd $9,600.00$75.00

2 $7,168.00$56.00

3 $10,688.00$83.50

4 $12,032.00$94.00

Ref #90 611E06101 15" CONDUIT, TYPE C, AS PER PLAN, (134 FT)

Awd $10,720.00$80.00

2 $8,040.00$60.00

3 $11,591.00$86.50

4 $12,998.00$97.00

Ref #91 611E06700 15" CONDUIT, TYPE F, (38 FT)

Awd $1,824.00$48.00

2 $2,508.00$66.00

3 $2,622.00$69.00

4 $4,180.00$110.00

Ref #92 611E07400 18" CONDUIT, TYPE B, (202 FT)

Awd $17,776.00$88.00

2 $11,514.00$57.00

3 $20,604.00$102.00

4 $29,290.00$145.00

Ref #93 611E07600 18" CONDUIT, TYPE C, (59 FT)

Awd $4,897.00$83.00

2 $4,012.00$68.00

3 $7,375.00$125.00

4 $7,670.00$130.00

Ref #94 611E07601 18" CONDUIT, TYPE C, AS PER PLAN, (127 FT)

Awd $10,160.00$80.00

2 $8,255.00$65.00

3 $13,970.00$110.00

4 $14,478.00$114.00

Ref #95 611E08900 21" CONDUIT, TYPE B, (210 FT)

Awd $21,000.00$100.00

2 $16,800.00$80.00

3 $21,210.00$101.00

4 $34,440.00$164.00

160102 - Page 119

Page 120: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #96 611E09100 21" CONDUIT, TYPE C, (37 FT)

Awd $2,960.00$80.00

2 $3,700.00$100.00

3 $2,405.00$65.00

4 $4,995.00$135.00

Ref #97 611E09400 21" CONDUIT, TYPE D, (85 FT)

Awd $6,460.00$76.00

2 $4,250.00$50.00

3 $8,500.00$100.00

4 $6,290.00$74.00

Ref #98 611E10200 24" CONDUIT, TYPE A, (75 FT)

Awd $9,375.00$125.00

2 $6,000.00$80.00

3 $5,625.00$75.00

4 $10,875.00$145.00

Ref #99 611E10400 24" CONDUIT, TYPE B, (67 FT)

Awd $6,700.00$100.00

2 $6,030.00$90.00

3 $7,772.00$116.00

4 $13,400.00$200.00

Ref #100 611E10600 24" CONDUIT, TYPE C, (151 FT)

Awd $12,080.00$80.00

2 $13,590.00$90.00

3 $23,405.00$155.00

4 $20,083.00$133.00

Ref #101 611E10601 24" CONDUIT, TYPE C, AS PER PLAN, (85 FT)

Awd $8,330.00$98.00

2 $8,925.00$105.00

3 $13,175.00$155.00

4 $14,025.00$165.00

Ref #102 611E10900 24" CONDUIT, TYPE D, (81 FT)

Awd $6,318.00$78.00

2 $4,860.00$60.00

3 $6,480.00$80.00

4 $6,723.00$83.00

Ref #103 611E11700 27" CONDUIT, TYPE A, 706.02, (49 FT)

Awd $6,125.00$125.00

2 $6,370.00$130.00

3 $6,860.00$140.00

4 $8,869.00$181.00

Ref #104 611E13200 30" CONDUIT, TYPE A, 706.02, (14 FT)

Awd $2,520.00$180.00

2 $2,240.00$160.00

3 $1,610.00$115.00

4 $3,360.00$240.00

Ref #105 611E13200 30" CONDUIT, TYPE A, 707.01, (21 FT)

Awd $2,772.00$132.00

2 $3,360.00$160.00

3 $2,415.00$115.00

4 $4,935.00$235.00

160102 - Page 120

Page 121: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #106 611E16900 36" CONDUIT, TYPE D, (53 FT)

Awd $6,625.00$125.00

2 $5,830.00$110.00

3 $6,519.00$123.00

4 $6,890.00$130.00

Ref #107 611E19200 42" CONDUIT, TYPE A, (123 FT)

Awd $17,220.00$140.00

2 $16,605.00$135.00

3 $16,974.00$138.00

4 $22,878.00$186.00

Ref #108 611E19400 42" CONDUIT, TYPE B, (391 FT)

Awd $74,290.00$190.00

2 $50,830.00$130.00

3 $76,245.00$195.00

4 $103,615.00$265.00

Ref #109 611E19600 42" CONDUIT, TYPE C, (78 FT)

Awd $11,700.00$150.00

2 $10,920.00$140.00

3 $21,840.00$280.00

4 $16,692.00$214.00

Ref #110 611E20700 48" CONDUIT, TYPE A, (82 FT)

Awd $13,940.00$170.00

2 $13,120.00$160.00

3 $15,580.00$190.00

4 $18,860.00$230.00

Ref #111 611E21100 48" CONDUIT, TYPE C, (5 FT)

Awd $1,750.00$350.00

2 $2,375.00$475.00

3 $1,600.00$320.00

4 $2,350.00$470.00

Ref #112 611E22200 54" CONDUIT, TYPE A, (179 FT)

Awd $34,010.00$190.00

2 $38,485.00$215.00

3 $38,485.00$215.00

4 $62,650.00$350.00

Ref #113 611E22600 54" CONDUIT, TYPE C, (76 FT)

Awd $15,200.00$200.00

2 $15,580.00$205.00

3 $29,640.00$390.00

4 $22,192.00$292.00

Ref #114 611E24000 60" CONDUIT, TYPE C, (5 FT)

Awd $3,175.00$635.00

2 $2,950.00$590.00

3 $2,200.00$440.00

4 $3,000.00$600.00

Ref #115 611E98150 CATCH BASIN, NO. 3, (5 EACH)

Awd $12,500.00$2,500.00

2 $12,600.00$2,520.00

3 $13,250.00$2,650.00

4 $22,500.00$4,500.00

160102 - Page 121

Page 122: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #116 611E98180 CATCH BASIN, NO. 3A, (33 EACH)

Awd $64,350.00$1,950.00

2 $62,700.00$1,900.00

3 $82,500.00$2,500.00

4 $165,000.00$5,000.00

Ref #117 611E98230 CATCH BASIN, NO. 4, (5 EACH)

Awd $16,250.00$3,250.00

2 $17,000.00$3,400.00

3 $18,500.00$3,700.00

4 $27,500.00$5,500.00

Ref #118 611E98301 CATCH BASIN, NO. 5, AS PER PLAN, (6 EACH)

Awd $25,200.00$4,200.00

2 $18,150.00$3,025.00

3 $19,200.00$3,200.00

4 $34,800.00$5,800.00

Ref #119 611E98341 CATCH BASIN, NO. 5A, (1 EACH)

Awd $3,200.00$3,200.00

2 $4,010.00$4,010.00

3 $3,700.00$3,700.00

4 $6,500.00$6,500.00

Ref #120 611E98410 CATCH BASIN, NO. 8, (2 EACH)

Awd $5,400.00$2,700.00

2 $6,050.00$3,025.00

3 $6,400.00$3,200.00

4 $9,400.00$4,700.00

Ref #121 611E98450 CATCH BASIN, NO. 2-2A, (1 EACH)

Awd $1,850.00$1,850.00

2 $1,150.00$1,150.00

3 $2,050.00$2,050.00

4 $1,950.00$1,950.00

Ref #122 611E98470 CATCH BASIN, NO. 2-2B, (7 EACH)

Awd $12,600.00$1,800.00

2 $7,945.00$1,135.00

3 $24,500.00$3,500.00

4 $16,100.00$2,300.00

Ref #123 611E98510 CATCH BASIN, NO. 2-3, (1 EACH)

Awd $2,000.00$2,000.00

2 $1,680.00$1,680.00

3 $2,800.00$2,800.00

4 $3,000.00$3,000.00

Ref #124 611E98540 CATCH BASIN, NO. 2-4, (2 EACH)

Awd $4,400.00$2,200.00

2 $4,030.00$2,015.00

3 $5,200.00$2,600.00

4 $7,200.00$3,600.00

Ref #125 611E98600 CATCH BASIN, NO. 2-6, (1 EACH)

Awd $3,850.00$3,850.00

2 $5,000.00$5,000.00

3 $5,000.00$5,000.00

4 $7,000.00$7,000.00

160102 - Page 122

Page 123: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #126 611E98630 CATCH BASIN ADJUSTED TO GRADE, (1 EACH)

Awd $750.00$750.00

2 $500.00$500.00

3 $950.00$950.00

4 $1,100.00$1,100.00

Ref #127 611E99574 MANHOLE, NO. 3, (6 EACH)

Awd $23,100.00$3,850.00

2 $15,960.00$2,660.00

3 $19,800.00$3,300.00

4 $28,200.00$4,700.00

Ref #128 611E99575 MANHOLE, NO. 3, AS PER PLAN, (2 EACH)

Awd $8,000.00$4,000.00

2 $5,670.00$2,835.00

3 $7,800.00$3,900.00

4 $8,600.00$4,300.00

Ref #129 611E99660 MANHOLE RECONSTRUCTED TO GRADE, (1 EACH)

Awd $1,200.00$1,200.00

2 $1,200.00$1,200.00

3 $1,350.00$1,350.00

4 $1,200.00$1,200.00

Ref #130 611E99710 PRECAST REINFORCED CONCRETE OUTLET, (25 EACH)

Awd $7,500.00$300.00

2 $5,750.00$230.00

3 $5,125.00$205.00

4 $8,125.00$325.00

Ref #131 611E99820 SPECIAL - MISCELLANEOUS METAL, (500 LB)

Awd $500.00$1.00

2 $1,000.00$2.00

3 $2,000.00$4.00

4 $1,500.00$3.00

Section 3 - DRAINAGE - Totals

Awd $1,178,543.00

2 $984,916.00

3 $1,273,966.85

4 $1,667,325.50

Ref #132 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (50208 SY)

Awd $90,374.40$1.80

2 $90,374.40$1.80

3 $101,420.16$2.02

4 $91,378.56$1.82

Ref #133 301E46000 ASPHALT CONCRETE BASE, PG64-22, (3525 CY)

Awd $474,112.50$134.50

2 $474,112.50$134.50

3 $474,112.50$134.50

4 $480,351.75$136.27

Ref #134 304E20000 AGGREGATE BASE, (9472 CY)

Awd $700,928.00$74.00

2 $710,400.00$75.00

3 $691,456.00$73.00

4 $928,256.00$98.00

160102 - Page 123

Page 124: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #135 305E13010 9" CONCRETE BASE, CLASS QC1, (2391 SY)

Awd $131,505.00$55.00

2 $131,505.00$55.00

3 $164,979.00$69.00

4 $167,370.00$70.00

Ref #136 407E10000 TACK COAT, (3767 GAL)

Awd $7,345.65$1.95

2 $7,345.65$1.95

3 $7,345.65$1.95

4 $7,458.66$1.98

Ref #137 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (1894 GAL)

Awd $3,693.30$1.95

2 $3,693.30$1.95

3 $3,693.30$1.95

4 $3,750.12$1.98

Ref #138 408E10000 PRIME COAT, (1368 GAL)

Awd $4,104.00$3.00

2 $4,104.00$3.00

3 $4,104.00$3.00

4 $4,158.72$3.04

Ref #139 409E30000 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT, (1167 FT)

Awd $8,752.50$7.50

2 $4,668.00$4.00

3 $8,752.50$7.50

4 $3,057.54$2.62

Ref #140 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS, (2210 CY)

Awd $342,550.00$155.00

2 $342,550.00$155.00

3 $342,550.00$155.00

4 $347,036.30$157.03

Ref #141 441E10200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (446, (1948 CY)

Awd $272,720.00$140.00

2 $272,720.00$140.00

3 $272,720.00$140.00

4 $276,304.32$141.84

Ref #142 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (448, (88 CY)

Awd $12,320.00$140.00

2 $12,320.00$140.00

3 $12,320.00$140.00

4 $12,481.92$141.84

Ref #143 441E50401 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), (D, (118 CY)

Awd $26,550.00$225.00

2 $26,550.00$225.00

3 $26,550.00$225.00

4 $26,898.10$227.95

Ref #144 441E50600 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (448, (164 CY)

Awd $36,900.00$225.00

2 $36,900.00$225.00

3 $36,900.00$225.00

4 $37,383.80$227.95

160102 - Page 124

Page 125: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #145 442E10051 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE B (, (1641 CY)

Awd $259,278.00$158.00

2 $259,278.00$158.00

3 $259,278.00$158.00

4 $262,674.87$160.07

Ref #146 442E10150 ASPHALT CONCRETE INTERMEDIATE COURSE, 19MM, TYPE B, (166 CY)

Awd $31,540.00$190.00

2 $31,540.00$190.00

3 $31,540.00$190.00

4 $31,953.34$192.49

Ref #147 442E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19MM, TYPE , (379 CY)

Awd $72,010.00$190.00

2 $72,010.00$190.00

3 $72,010.00$190.00

4 $72,953.71$192.49

Ref #148 451E30000 SPECIAL - PRESSURE RELIEF JOINT, TYPE A, (392 FT)

Awd $98,000.00$250.00

2 $58,800.00$150.00

3 $88,200.00$225.00

4 $58,878.40$150.20

Ref #149 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1, (6935 SY)

Awd $381,425.00$55.00

2 $381,425.00$55.00

3 $381,425.00$55.00

4 $436,905.00$63.00

Ref #150 452E15010 12" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1, (6162 SY)

Awd $431,340.00$70.00

2 $431,340.00$70.00

3 $449,826.00$73.00

4 $548,418.00$89.00

Ref #151 609E24510 CURB, TYPE 4-C, (1234 FT)

Awd $27,148.00$22.00

2 $27,148.00$22.00

3 $29,616.00$24.00

4 $29,616.00$24.00

Ref #152 609E26000 CURB, TYPE 6, (10393 FT)

Awd $176,681.00$17.00

2 $196,219.84$18.88

3 $184,475.75$17.75

4 $228,646.00$22.00

Ref #153 609E54000 6" CONCRETE TRAFFIC ISLAND, (587 SY)

Awd $29,350.00$50.00

2 $29,350.00$50.00

3 $62,809.00$107.00

4 $53,417.00$91.00

Ref #154 618E40600 RUMBLE STRIPS, (ASPHALT CONCRETE), (3.49 MILE)

Awd $4,711.50$1,350.00

2 $6,190.56$1,773.80

3 $6,107.50$1,750.00

4 $4,690.56$1,344.00

160102 - Page 125

Page 126: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Section 4 - PAVEMENT - Totals

Awd $3,623,338.85

2 $3,610,544.25

3 $3,712,190.36

4 $4,114,038.67

Ref #155 202E35100 PIPE REMOVED, 24" AND UNDER, (49 FT)

Awd $980.00$20.00

2 $980.00$20.00

3 $1,911.00$39.00

4 $735.00$15.00

Ref #156 202E75600 METER VAULT REMOVED, (2 EACH)

Awd $1,000.00$500.00

2 $500.00$250.00

3 $350.00$175.00

4 $1,060.00$530.00

Ref #157 202E75610 VALVE BOX REMOVED, (24 EACH)

Awd $2,400.00$100.00

2 $2,880.00$120.00

3 $1,536.00$64.00

4 $4,944.00$206.00

Ref #158 638E01141 6" WATER MAIN POLYVINYL CHLORIDE PIPE AND FITTINGS, (1753 FT)

Awd $175,300.00$100.00

2 $96,415.00$55.00

3 $112,192.00$64.00

4 $149,005.00$85.00

Ref #159 638E01711 8" WATER MAIN POLYVINYL CHLORIDE PIPE AND FITTINGS, (2785 FT)

Awd $270,145.00$97.00

2 $161,530.00$58.00

3 $178,240.00$64.00

4 $272,930.00$98.00

Ref #160 638E02751 12" WATER MAIN, POLYVINYL CHLORIDE PIPE AND FITTIN, (96 FT)

Awd $11,232.00$117.00

2 $12,000.00$125.00

3 $12,192.00$127.00

4 $15,552.00$162.00

Ref #161 638E04900 1" COPPER SERVICE BRANCH, (131 FT)

Awd $5,371.00$41.00

2 $8,384.00$64.00

3 $3,799.00$29.00

4 $15,851.00$121.00

Ref #162 638E05100 2" COPPER SERVICE BRANCH, (493 FT)

Awd $41,412.00$84.00

2 $26,129.00$53.00

3 $32,538.00$66.00

4 $38,454.00$78.00

Ref #163 638E06704 20" STEEL PIPE ENCASEMENT, OPEN CUT, (70 FT)

Awd $14,210.00$203.00

2 $9,100.00$130.00

3 $8,750.00$125.00

4 $15,190.00$217.00

160102 - Page 126

Page 127: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #164 638E07000 10" STEEL PIPE ENCASEMENT, BORED OR JACKED, (120 FT)

Awd $20,520.00$171.00

2 $28,200.00$235.00

3 $13,440.00$112.00

4 $32,760.00$273.00

Ref #165 638E07100 12" STEEL PIPE ENCASEMENT, BORED OR JACKED, (251 FT)

Awd $43,423.00$173.00

2 $72,790.00$290.00

3 $32,379.00$129.00

4 $77,559.00$309.00

Ref #166 638E07300 16" STEEL PIPE ENCASEMENT, BORED OR JACKED, (200 FT)

Awd $38,400.00$192.00

2 $61,000.00$305.00

3 $32,000.00$160.00

4 $60,000.00$300.00

Ref #167 638E07691 2" GATE VALVE AND VALVE BOX, AS PER PLAN, (9 EACH)

Awd $6,840.00$760.00

2 $4,905.00$545.00

3 $9,270.00$1,030.00

4 $6,543.00$727.00

Ref #168 638E07801 6" GATE VALVE AND VALVE BOX, AS PER PLAN, (10 EACH)

Awd $12,850.00$1,285.00

2 $10,000.00$1,000.00

3 $16,750.00$1,675.00

4 $16,270.00$1,627.00

Ref #169 638E07901 8" GATE VALVE AND VALVE BOX, AS PER PLAN, (8 EACH)

Awd $13,424.00$1,678.00

2 $11,600.00$1,450.00

3 $18,800.00$2,350.00

4 $16,088.00$2,011.00

Ref #170 638E09300 6" X 6" TAPPING SLEEVE, VALVE AND VALVE BOX, (2 EACH)

Awd $3,700.00$1,850.00

2 $5,860.00$2,930.00

3 $8,600.00$4,300.00

4 $8,200.00$4,100.00

Ref #171 638E09710 12" X 8" TAPPING SLEEVE, VALVE AND VALVE BOX, (1 EACH)

Awd $2,700.00$2,700.00

2 $4,140.00$4,140.00

3 $15,000.00$15,000.00

4 $6,050.00$6,050.00

Ref #172 638E10200 6" FIRE HYDRANT, (6 EACH)

Awd $21,600.00$3,600.00

2 $18,690.00$3,115.00

3 $4,500.00$750.00

4 $27,984.00$4,664.00

Ref #173 638E10700 FIRE HYDRANT REMOVED AND DISPOSED OF, (6 EACH)

Awd $3,000.00$500.00

2 $1,470.00$245.00

3 $2,400.00$400.00

4 $3,300.00$550.00

160102 - Page 127

Page 128: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #174 638E11201 METER, SETTING, STOP AND CHAMBER, AS PER PLAN, (2 EACH)

Awd $7,200.00$3,600.00

2 $7,300.00$3,650.00

3 $2,340.00$1,170.00

4 $8,644.00$4,322.00

Ref #175 638E11296 3/4" AIR RELEASE VALVE, (1 EACH)

Awd $1,254.00$1,254.00

2 $935.00$935.00

3 $900.00$900.00

4 $1,041.00$1,041.00

Ref #176 638E11300 1" AIR RELEASE VALVE, (5 EACH)

Awd $7,500.00$1,500.00

2 $5,400.00$1,080.00

3 $4,130.00$826.00

4 $6,250.00$1,250.00

Ref #177 638E98600 WATER WORK, MISC.: EXTEND EXISTING CASING PIPE, (9 FT)

Awd $6,570.00$730.00

2 $2,673.00$297.00

3 $9,315.00$1,035.00

4 $2,880.00$320.00

Section 5 - WATER WORK - Totals

Awd $711,031.00

2 $552,881.00

3 $521,332.00

4 $787,290.00

Ref #178 202E35100 PIPE REMOVED, 24" AND UNDER, (82 FT)

Awd $820.00$10.00

2 $1,148.00$14.00

3 $3,198.00$39.00

4 $656.00$8.00

Ref #179 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, (162 FT)

Awd $5,994.00$37.00

2 $5,184.00$32.00

3 $8,910.00$55.00

4 $1,134.00$7.00

Ref #180 611E01800 8" CONDUIT, TYPE B, FOR SANITARY, (100 FT)

Awd $5,000.00$50.00

2 $3,100.00$31.00

3 $8,775.00$87.75

4 $9,000.00$90.00

Ref #181 611E02000 8" CONDUIT, TYPE C, FOR SANITARY, (100 FT)

Awd $4,000.00$40.00

2 $3,100.00$31.00

3 $8,100.00$81.00

4 $7,600.00$76.00

Ref #182 611E04401 12" CONDUIT, TYPE B, AS PER PLAN, (197 FT)

Awd $14,972.00$76.00

2 $15,760.00$80.00

3 $13,199.00$67.00

4 $18,912.00$96.00

160102 - Page 128

Page 129: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #183 611E99574 MANHOLE, NO. 3, (1 EACH)

Awd $5,000.00$5,000.00

2 $2,716.00$2,716.00

3 $15,300.00$15,300.00

4 $3,680.00$3,680.00

Ref #184 611E99660 MANHOLE RECONSTRUCTED TO GRADE, (1 EACH)

Awd $750.00$750.00

2 $1,880.00$1,880.00

3 $1,510.00$1,510.00

4 $1,350.00$1,350.00

Ref #185 638E00451 4" WATER MAIN POLYVINYL CHLORIDE PIPE AND FITTINGS, (652 FT)

Awd $22,820.00$35.00

2 $32,600.00$50.00

3 $39,120.00$60.00

4 $38,468.00$59.00

Ref #186 638E00991 6" WATER MAIN POLYVINYL CHLORIDE PIPE AND FITTINGS, (86 FT)

Awd $6,880.00$80.00

2 $11,610.00$135.00

3 $7,052.00$82.00

4 $8,600.00$100.00

Ref #187 638E06400 10" STEEL PIPE ENCASEMENT, OPEN CUT, (157 FT)

Awd $17,270.00$110.00

2 $12,246.00$78.00

3 $11,775.00$75.00

4 $23,550.00$150.00

Ref #188 638E06700 16" STEEL PIPE ENCASEMENT, OPEN CUT, (180 FT)

Awd $36,000.00$200.00

2 $16,560.00$92.00

3 $18,000.00$100.00

4 $30,600.00$170.00

Ref #189 638E06704 20" STEEL PIPE ENCASEMENT, OPEN CUT, (103 FT)

Awd $27,810.00$270.00

2 $10,300.00$100.00

3 $14,420.00$140.00

4 $21,321.00$207.00

Ref #190 638E07100 12" STEEL PIPE ENCASEMENT, BORED OR JACKED, (60 FT)

Awd $13,680.00$228.00

2 $17,400.00$290.00

3 $8,700.00$145.00

4 $16,800.00$280.00

Ref #191 638E07300 16" STEEL PIPE ENCASEMENT, BORED OR JACKED, (46 FT)

Awd $11,178.00$243.00

2 $16,100.00$350.00

3 $10,948.00$238.00

4 $15,410.00$335.00

Ref #192 638E98600 WATER WORK, MISC.: 8" WATER MAIN POLYVINYL CHLORID, (404 FT)

Awd $47,268.00$117.00

2 $33,532.00$83.00

3 $29,896.00$74.00

4 $40,400.00$100.00

160102 - Page 129

Page 130: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Section 6 - SANITARY SEWER - Totals

Awd $219,442.00

2 $183,236.00

3 $198,903.00

4 $237,481.00

Ref #193 611E00400 4" CONDUIT, TYPE E, (440 FT)

Awd $1,320.00$3.00

2 $704.00$1.60

3 $704.00$1.60

4 $708.40$1.61

Ref #194 625E00450 CONNECTION, FUSED PULL APART, (50 EACH)

Awd $4,250.00$85.00

2 $4,250.00$85.00

3 $4,250.00$85.00

4 $4,272.00$85.44

Ref #195 625E00480 CONNECTION, UNFUSED PERMANENT, (40 EACH)

Awd $3,400.00$85.00

2 $3,400.00$85.00

3 $3,400.00$85.00

4 $3,417.60$85.44

Ref #196 625E10490 LIGHT POLE, CONVENTIONAL, DESIGN AT10B30, (1 EACH)

Awd $2,100.00$2,100.00

2 $1,800.00$1,800.00

3 $1,800.00$1,800.00

4 $1,809.25$1,809.25

Ref #197 625E10490 LIGHT POLE, CONVENTIONAL, DESIGN AT18B30, (1 EACH)

Awd $2,300.00$2,300.00

2 $2,050.00$2,050.00

3 $2,050.00$2,050.00

4 $2,060.54$2,060.54

Ref #198 625E10490 LIGHT POLE, CONVENTIONAL, DESIGN AT20B30, (6 EACH)

Awd $14,400.00$2,400.00

2 $13,500.00$2,250.00

3 $13,500.00$2,250.00

4 $13,569.42$2,261.57

Ref #199 625E14000 LIGHT POLE FOUNDATION, 24" X 6' DEEP, (8 EACH)

Awd $6,800.00$850.00

2 $10,800.00$1,350.00

3 $10,800.00$1,350.00

4 $10,855.52$1,356.94

Ref #200 625E23200 NO. 4 AWG 5000 VOLT DISTRIBUTION CABLE, (5322 FT)

Awd $13,305.00$2.50

2 $13,305.00$2.50

3 $13,305.00$2.50

4 $13,358.22$2.51

Ref #201 625E23400 NO. 10 AWG POLE AND BRACKET CABLE, (1785 FT)

Awd $1,785.00$1.00

2 $892.50$0.50

3 $892.50$0.50

4 $892.50$0.50

160102 - Page 130

Page 131: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #202 625E24100 1-1/2" DUCT CABLE WITH TWO NO. 4 AWG 5000 VOLT CAB, (2248 FT)

Awd $10,116.00$4.50

2 $8,992.00$4.00

3 $8,992.00$4.00

4 $9,036.96$4.02

Ref #203 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 5000 VOLT C, (5288 FT)

Awd $26,440.00$5.00

2 $26,440.00$5.00

3 $26,440.00$5.00

4 $26,598.64$5.03

Ref #204 625E25400 CONDUIT, 2", 725.04, (350 FT)

Awd $3,500.00$10.00

2 $3,500.00$10.00

3 $3,500.00$10.00

4 $3,517.50$10.05

Ref #205 625E25500 CONDUIT, 3", 725.04, (1037 FT)

Awd $15,555.00$15.00

2 $14,518.00$14.00

3 $14,518.00$14.00

4 $14,590.59$14.07

Ref #206 625E25902 CONDUIT, JACKED OR DRILLED, 725.04,3", (274 FT)

Awd $9,590.00$35.00

2 $9,864.00$36.00

3 $9,864.00$36.00

4 $9,916.06$36.19

Ref #207 625E26251 LUMINAIRE, CONVENTIONAL, AS PER PLAN, 150W, (2 EACH)

Awd $700.00$350.00

2 $500.00$250.00

3 $500.00$250.00

4 $502.58$251.29

Ref #208 625E26251 LUMINAIRE, CONVENTIONAL, AS PER PLAN, 200W, (8 EACH)

Awd $2,800.00$350.00

2 $2,040.00$255.00

3 $2,040.00$255.00

4 $2,050.48$256.31

Ref #209 625E26251 LUMINAIRE, CONVENTIONAL, AS PER PLAN, 400W, (6 EACH)

Awd $2,100.00$350.00

2 $1,560.00$260.00

3 $1,560.00$260.00

4 $1,568.04$261.34

Ref #210 625E29000 TRENCH, (665 FT)

Awd $3,990.00$6.00

2 $6,650.00$10.00

3 $6,650.00$10.00

4 $6,683.25$10.05

Ref #211 625E29600 TRENCH IN PAVED AREA, TYPE B, (585 FT)

Awd $20,475.00$35.00

2 $15,210.00$26.00

3 $15,210.00$26.00

4 $15,286.05$26.13

160102 - Page 131

Page 132: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #212 625E30700 PULL BOX, 725.08, 18", (20 EACH)

Awd $17,000.00$850.00

2 $13,000.00$650.00

3 $13,000.00$650.00

4 $13,066.80$653.34

Ref #213 625E30706 PULL BOX, 725.08, 24", (2 EACH)

Awd $1,800.00$900.00

2 $1,600.00$800.00

3 $1,600.00$800.00

4 $1,608.22$804.11

Ref #214 625E31510 PULL BOX REMOVED, (4 EACH)

Awd $800.00$200.00

2 $280.00$70.00

3 $280.00$70.00

4 $281.44$70.36

Ref #215 625E32000 GROUND ROD, (16 EACH)

Awd $2,800.00$175.00

2 $3,760.00$235.00

3 $3,760.00$235.00

4 $3,779.36$236.21

Ref #216 625E34001 POWER SERVICE, AS PER PLAN, (1 EACH)

Awd $6,000.00$6,000.00

2 $6,600.00$6,600.00

3 $6,600.00$6,600.00

4 $6,633.93$6,633.93

Ref #217 625E36000 PLASTIC CAUTION TAPE, (1250 FT)

Awd $625.00$0.50

2 $1,000.00$0.80

3 $1,000.00$0.80

4 $1,000.00$0.80

Ref #218 625E40004 SPECIAL - MAINTAIN EXISTING LIGHTING, (1 EACH)

Awd $5,000.00$5,000.00

2 $17,525.00$17,525.00

3 $17,525.00$17,525.00

4 $17,615.08$17,615.08

Ref #219 625E40010 SPECIAL - REPLACEMENT OF EXISTING LIGHTING UNIT, (1 EACH)

Awd $500.00$500.00

2 $175.00$175.00

3 $175.00$175.00

4 $175.90$175.90

Ref #220 625E75506 LUMINAIRE REMOVED, (8 EACH)

Awd $200.00$25.00

2 $400.00$50.00

3 $400.00$50.00

4 $402.08$50.26

Ref #221 625E75520 LUMINAIRE SUPPORT REMOVED, (9 EACH)

Awd $1,350.00$150.00

2 $1,350.00$150.00

3 $1,350.00$150.00

4 $1,356.93$150.77

160102 - Page 132

Page 133: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #222 625E75522 LUMINAIRE SUPPORT FOUNDATION REMOVED, (8 EACH)

Awd $1,600.00$200.00

2 $480.00$60.00

3 $480.00$60.00

4 $482.48$60.31

Ref #223 625E75801 DISCONNECT CIRCUIT, AS PER PLAN, (4 EACH)

Awd $1,012.00$253.00

2 $940.00$235.00

3 $940.00$235.00

4 $944.84$236.21

Section 7 - LIGHTING - Totals

Awd $183,613.00

2 $187,085.50

3 $187,085.50

4 $188,040.66

Ref #224 611E99700 GAS VALVE BOX ADJUSTED TO GRADE, (1 EACH)

Awd $600.00$600.00

2 $110.00$110.00

3 $450.14$450.14

4 $312.59$312.59

Section 8 - OTHER UTILITIES - Totals

Awd $600.00

2 $110.00

3 $450.14

4 $312.59

Ref #225 621E00100 RPM, (478 EACH)

Awd $10,277.00$21.50

2 $12,428.00$26.00

3 $10,277.00$21.50

4 $10,277.00$21.50

Ref #226 621E54000 RAISED PAVEMENT MARKER REMOVED, (115 EACH)

Awd $2,300.00$20.00

2 $1,725.00$15.00

3 $517.50$4.50

4 $2,050.45$17.83

Ref #227 625E10490 LIGHT POLE, CONVENTIONAL, AT-16, (2 EACH)

Awd $3,800.00$1,900.00

2 $2,800.00$1,400.00

3 $2,800.00$1,400.00

4 $2,814.40$1,407.20

Ref #228 625E14000 LIGHT POLE FOUNDATION, 24" X 6' DEEP, (2 EACH)

Awd $1,600.00$800.00

2 $2,500.00$1,250.00

3 $2,500.00$1,250.00

4 $2,512.86$1,256.43

160102 - Page 133

Page 134: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #229 625E25400 CONDUIT, 2", 725.04, (595 FT)

Awd $5,950.00$10.00

2 $5,950.00$10.00

3 $5,950.00$10.00

4 $5,979.75$10.05

Ref #230 625E25500 CONDUIT, 3", 725.04, (53 FT)

Awd $795.00$15.00

2 $742.00$14.00

3 $742.00$14.00

4 $745.71$14.07

Ref #231 625E29000 TRENCH, (595 FT)

Awd $2,975.00$5.00

2 $5,950.00$10.00

3 $5,950.00$10.00

4 $5,979.75$10.05

Ref #232 625E29600 TRENCH IN PAVED AREA, TYPE B, (53 FT)

Awd $1,855.00$35.00

2 $1,378.00$26.00

3 $1,378.00$26.00

4 $1,384.89$26.13

Ref #233 625E30700 PULL BOX, 725.08, 18", (6 EACH)

Awd $5,100.00$850.00

2 $3,900.00$650.00

3 $3,900.00$650.00

4 $3,920.04$653.34

Ref #234 625E31510 PULL BOX REMOVED, (5 EACH)

Awd $1,000.00$200.00

2 $350.00$70.00

3 $350.00$70.00

4 $351.80$70.36

Ref #235 625E32000 GROUND ROD, (2 EACH)

Awd $350.00$175.00

2 $470.00$235.00

3 $470.00$235.00

4 $472.42$236.21

Ref #236 625E75800 DISCONNECT CIRCUIT, (1 EACH)

Awd $200.00$200.00

2 $235.00$235.00

3 $235.00$235.00

4 $236.21$236.21

Ref #237 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (130 FT)

Awd $910.00$7.00

2 $910.00$7.00

3 $910.00$7.00

4 $910.00$7.00

Ref #238 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (1663 FT)

Awd $13,304.00$8.00

2 $13,304.00$8.00

3 $13,304.00$8.00

4 $13,304.00$8.00

160102 - Page 134

Page 135: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #239 630E06400 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, S4X7.7, (224 FT)

Awd $3,584.00$16.00

2 $3,584.00$16.00

3 $3,584.00$16.00

4 $3,584.00$16.00

Ref #240 630E06500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W6X9, (195 FT)

Awd $3,510.00$18.00

2 $3,510.00$18.00

3 $3,510.00$18.00

4 $3,510.00$18.00

Ref #241 630E07600 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X12, (215 FT)

Awd $4,257.00$19.80

2 $4,257.00$19.80

3 $4,257.00$19.80

4 $4,257.00$19.80

Ref #242 630E08004 ONE WAY SUPPORT, NO. 3 POST, (88 FT)

Awd $836.00$9.50

2 $836.00$9.50

3 $836.00$9.50

4 $836.00$9.50

Ref #243 630E08600 SIGN POST REFLECTOR, (22 EACH)

Awd $770.00$35.00

2 $770.00$35.00

3 $770.00$35.00

4 $770.00$35.00

Ref #244 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION, (26 EACH)

Awd $6,370.00$245.00

2 $6,370.00$245.00

3 $6,370.00$245.00

4 $6,370.00$245.00

Ref #245 630E80100 SIGN, FLAT SHEET, (849 SF)

Awd $9,339.00$11.00

2 $9,339.00$11.00

3 $9,339.00$11.00

4 $9,339.00$11.00

Ref #246 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET, (678 SF)

Awd $10,170.00$15.00

2 $10,170.00$15.00

3 $10,170.00$15.00

4 $10,170.00$15.00

Ref #247 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION, (38 EACH)

Awd $24,130.00$635.00

2 $24,130.00$635.00

3 $24,130.00$635.00

4 $24,130.00$635.00

Ref #248 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (199 EACH)

Awd $1,990.00$10.00

2 $1,990.00$10.00

3 $1,990.00$10.00

4 $1,990.00$10.00

160102 - Page 135

Page 136: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #249 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (1 EACH)

Awd $45.00$45.00

2 $45.00$45.00

3 $45.00$45.00

4 $45.00$45.00

Ref #250 630E85400 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND DISPOSAL, (4 EACH)

Awd $320.00$80.00

2 $320.00$80.00

3 $320.00$80.00

4 $320.00$80.00

Ref #251 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (102 EACH)

Awd $1,020.00$10.00

2 $1,020.00$10.00

3 $1,020.00$10.00

4 $1,020.00$10.00

Ref #252 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT , (32 EACH)

Awd $4,640.00$145.00

2 $4,640.00$145.00

3 $4,640.00$145.00

4 $4,640.00$145.00

Ref #253 631E93000 SCHOOL SPEED LIMIT SIGN ASSEMBLY, 24" X 48", (2 EACH)

Awd $2,494.00$1,247.00

2 $4,988.00$2,494.00

3 $2,494.00$1,247.00

4 $2,500.00$1,250.00

Ref #254 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG, (728 FT)

Awd $1,820.00$2.50

2 $1,601.60$2.20

3 $1,601.60$2.20

4 $1,608.88$2.21

Ref #255 642E00490 STOP LINE, 24" WHITE, (398 FT)

Awd $995.00$2.50

2 $1,651.70$4.15

3 $2,328.30$5.85

4 $2,328.30$5.85

Ref #256 642E00690 TRANSVERSE/DIAGONAL LINE, 24" YELLOW, (1993 FT)

Awd $4,484.25$2.25

2 $3,786.70$1.90

3 $3,986.00$2.00

4 $3,986.00$2.00

Ref #257 642E01108 SCHOOL SYMBOL MARKING, 96", (2 EACH)

Awd $600.00$300.00

2 $550.00$275.00

3 $370.00$185.00

4 $370.00$185.00

Ref #258 642E01190 PARKING LOT STALL MARKING, (342 FT)

Awd $171.00$0.50

2 $1,197.00$3.50

3 $649.80$1.90

4 $649.80$1.90

160102 - Page 136

Page 137: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #259 642E01290 LANE ARROW, (53 EACH)

Awd $2,279.00$43.00

2 $2,279.00$43.00

3 $4,902.50$92.50

4 $4,902.50$92.50

Ref #260 642E01600 BIKE LANE SYMBOL MARKING, (35 EACH)

Awd $1,925.00$55.00

2 $1,575.00$45.00

3 $6,125.00$175.00

4 $6,125.00$175.00

Ref #261 642E30020 REMOVAL OF PAVEMENT MARKING, (17 EACH)

Awd $3,400.00$200.00

2 $1,394.00$82.00

3 $1,394.00$82.00

4 $2,601.00$153.00

Ref #262 646E10000 EDGE LINE, 4", (4.41 MILE)

Awd $7,474.95$1,695.00

2 $14,508.90$3,290.00

3 $14,508.90$3,290.00

4 $10,656.06$2,416.34

Ref #263 646E10010 EDGE LINE, 6", (3.42 MILE)

Awd $8,464.50$2,475.00

2 $12,654.00$3,700.00

3 $12,654.00$3,700.00

4 $12,066.72$3,528.28

Ref #264 646E10110 LANE LINE, 6", (1.42 MILE)

Awd $2,548.90$1,795.00

2 $3,919.20$2,760.00

3 $3,947.60$2,780.00

4 $3,633.62$2,558.89

Ref #265 646E10200 CENTER LINE, (3.02 MILE)

Awd $12,321.60$4,080.00

2 $12,412.20$4,110.00

3 $12,412.20$4,110.00

4 $17,565.26$5,816.31

Ref #266 646E10300 CHANNELIZING LINE, 8", (2501 FT)

Awd $3,751.50$1.50

2 $4,401.76$1.76

3 $4,401.76$1.76

4 $5,352.14$2.14

Ref #267 646E10310 CHANNELIZING LINE, 12", (3409 FT)

Awd $6,818.00$2.00

2 $6,954.36$2.04

3 $6,954.36$2.04

4 $9,715.65$2.85

Ref #268 646E20504 DOTTED LINE, 6", (655 FT)

Awd $917.00$1.40

2 $1,074.20$1.64

3 $1,074.20$1.64

4 $1,310.00$2.00

160102 - Page 137

Page 138: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Section 9 - TRAFFIC CONTROL - Totals

Awd $181,861.70

2 $198,570.62

3 $200,068.72

4 $207,291.21

Ref #269 625E25600 CONDUIT, 4", 725.04, (72 FT)

Awd $2,880.00$40.00

2 $2,304.00$32.00

3 $2,304.00$32.00

4 $2,313.36$32.13

Ref #270 625E29000 TRENCH, (72 FT)

Awd $504.00$7.00

2 $720.00$10.00

3 $720.00$10.00

4 $722.88$10.04

Ref #271 625E30706 PULL BOX, 725.08, 24", (3 EACH)

Awd $2,700.00$900.00

2 $2,400.00$800.00

3 $2,400.00$800.00

4 $2,410.02$803.34

Ref #272 625E32000 GROUND ROD, (15 EACH)

Awd $2,625.00$175.00

2 $3,525.00$235.00

3 $3,525.00$235.00

4 $3,539.70$235.98

Ref #273 632E05007 VEHICULAR SIGNAL HEAD, (LED), BLACK, 3-SECTION, 12, (15 EACH)

Awd $12,750.00$850.00

2 $13,500.00$900.00

3 $13,500.00$900.00

4 $13,556.40$903.76

Ref #274 632E05087 VEHICULAR SIGNAL HEAD, (LED), BLACK, 5-SECTION, 12, (7 EACH)

Awd $10,500.00$1,500.00

2 $9,100.00$1,300.00

3 $9,100.00$1,300.00

4 $9,138.01$1,305.43

Ref #275 632E25000 COVERING OF VEHICULAR SIGNAL HEAD, (22 EACH)

Awd $550.00$25.00

2 $1,210.00$55.00

3 $1,210.00$55.00

4 $1,215.06$55.23

Ref #276 632E30200 MESSENGER WIRE, 7 STRAND, 3/8" DIAMETER WITH ACCES, (1036 FT)

Awd $9,324.00$9.00

2 $16,576.00$16.00

3 $16,576.00$16.00

4 $16,648.52$16.07

Ref #277 632E30600 TETHER WIRE, WITH ACCESSORIES, (1036 FT)

Awd $15,540.00$15.00

2 $16,576.00$16.00

3 $16,576.00$16.00

4 $16,648.52$16.07

160102 - Page 138

Page 139: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #278 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG, (1734 FT)

Awd $5,202.00$3.00

2 $4,161.60$2.40

3 $4,161.60$2.40

4 $4,178.94$2.41

Ref #279 632E40900 SIGNAL CABLE, 9 CONDUCTOR, NO. 14 AWG, (4070 FT)

Awd $14,245.00$3.50

2 $10,582.00$2.60

3 $10,582.00$2.60

4 $10,622.70$2.61

Ref #280 632E64000 STRAIN POLE FOUNDATION, (12 EACH)

Awd $42,000.00$3,500.00

2 $37,200.00$3,100.00

3 $37,200.00$3,100.00

4 $37,355.28$3,112.94

Ref #281 632E68200 POWER CABLE, 2 CONDUCTOR, NO. 6 AWG, (96 FT)

Awd $480.00$5.00

2 $76.80$0.80

3 $76.80$0.80

4 $76.80$0.80

Ref #282 632E68300 POWER CABLE, 3 CONDUCTOR, NO. 6 AWG, (79 FT)

Awd $474.00$6.00

2 $118.50$1.50

3 $118.50$1.50

4 $119.29$1.51

Ref #283 632E69800 SERVICE CABLE, 3 CONDUCTOR, NO. 6 AWG, (404 FT)

Awd $2,424.00$6.00

2 $404.00$1.00

3 $404.00$1.00

4 $404.00$1.00

Ref #284 632E70001 POWER SERVICE, AS PER PLAN, (3 EACH)

Awd $5,400.00$1,800.00

2 $5,700.00$1,900.00

3 $5,700.00$1,900.00

4 $5,723.79$1,907.93

Ref #285 632E85200 COMBINATION STRAIN POLE, TYPE TC-81.10, DESIGN 12, (12 EACH)

Awd $108,000.00$9,000.00

2 $97,200.00$8,100.00

3 $97,200.00$8,100.00

4 $97,605.72$8,133.81

Ref #286 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA, (3 EACH)

Awd $6,000.00$2,000.00

2 $2,550.00$850.00

3 $2,550.00$850.00

4 $2,560.65$853.55

Ref #287 633E01683 CONTROLLER UNIT, TYPE 2070E, WITH CABINET, TYPE 33, (3 EACH)

Awd $42,000.00$14,000.00

2 $45,000.00$15,000.00

3 $45,000.00$15,000.00

4 $45,187.83$15,062.61

160102 - Page 139

Page 140: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #288 633E67000 CABINET RISER, (3 EACH)

Awd $1,800.00$600.00

2 $1,800.00$600.00

3 $1,800.00$600.00

4 $1,807.50$602.50

Ref #289 633E67101 CABINET FOUNDATION, AS PER PLAN, (3 EACH)

Awd $4,500.00$1,500.00

2 $7,350.00$2,450.00

3 $7,350.00$2,450.00

4 $7,380.69$2,460.23

Ref #290 633E67201 CONTROLLER WORK PAD, AS PER PLAN, (3 EACH)

Awd $1,050.00$350.00

2 $525.00$175.00

3 $525.00$175.00

4 $527.19$175.73

Ref #291 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS , (3 EACH)

Awd $15,000.00$5,000.00

2 $13,800.00$4,600.00

3 $13,800.00$4,600.00

4 $13,857.60$4,619.20

Ref #292 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN, (8 EACH)

Awd $56,000.00$7,000.00

2 $60,000.00$7,500.00

3 $60,000.00$7,500.00

4 $60,250.48$7,531.31

Ref #293 809E69101 STOP-BAR RADAR DETECTION, AS PER PLAN, (9 EACH)

Awd $54,000.00$6,000.00

2 $58,500.00$6,500.00

3 $58,500.00$6,500.00

4 $58,744.17$6,527.13

Section 10 - TRAFFIC SIGNALS - Totals

Awd $415,948.00

2 $410,878.90

3 $410,878.90

4 $412,595.10

Ref #294 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (624 HOUR)

Awd $42,432.00$68.00

2 $42,432.00$68.00

3 $42,432.00$68.00

4 $43,680.00$70.00

Ref #295 614E11500 WORKSITE TRAFFIC SUPERVISOR, (18 MNTH)

Awd $75,600.00$4,200.00

2 $75,600.00$4,200.00

3 $75,600.00$4,200.00

4 $75,340.62$4,185.59

Ref #296 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL), (73 EACH)

Awd $126,655.00$1,735.00

2 $126,655.00$1,735.00

3 $113,150.00$1,550.00

4 $153,300.00$2,100.00

160102 - Page 140

Page 141: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #297 614E12410 SPEED ZONE AHEAD SYMBOL SIGN, (8 EACH)

Awd $800.00$100.00

2 $800.00$100.00

3 $800.00$100.00

4 $800.00$100.00

Ref #298 614E12420 DETOUR SIGNING, (LUMP SUM)

Awd $18,275.00$18,275.00

2 $18,275.00$18,275.00

3 $18,275.00$18,275.00

4 $23,100.00$23,100.00

Ref #299 614E12470 WORK ZONE SPEED LIMIT SIGN, (16 EACH)

Awd $1,600.00$100.00

2 $1,600.00$100.00

3 $1,600.00$100.00

4 $1,594.56$99.66

Ref #300 614E12484 WORK ZONE INCREASED PENALTIES SIGN, (8 EACH)

Awd $800.00$100.00

2 $800.00$100.00

3 $800.00$100.00

4 $797.28$99.66

Ref #301 614E12756 WORK ZONE CROSSOVER LIGHTING SYSTEM, (2 EACH)

Awd $60,000.00$30,000.00

2 $59,400.00$29,700.00

3 $59,400.00$29,700.00

4 $59,705.34$29,852.67

Ref #302 614E12800 WORK ZONE RAISED PAVEMENT MARKER, (2430 EACH)

Awd $15,187.50$6.25

2 $11,542.50$4.75

3 $11,542.50$4.75

4 $17,010.00$7.00

Ref #303 614E13100 BARRIER REFLECTOR, (611 EACH)

Awd $3,635.45$5.95

2 $3,666.00$6.00

3 $3,635.45$5.95

4 $3,623.23$5.93

Ref #304 614E13200 BARRIER REFLECTOR, TYPE A, (42 EACH)

Awd $441.00$10.50

2 $504.00$12.00

3 $840.00$20.00

4 $336.00$8.00

Ref #305 614E13350 OBJECT MARKER, ONE WAY, (474 EACH)

Awd $4,029.00$8.50

2 $4,740.00$10.00

3 $4,029.00$8.50

4 $4,014.78$8.47

Ref #306 614E20100 WORK ZONE LANE LINE, CLASS I, 642 PAINT, (0.17 MILE)

Awd $170.00$1,000.00

2 $170.00$1,000.00

3 $170.00$1,000.00

4 $205.87$1,211.00

160102 - Page 141

Page 142: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #307 614E20550 WORK ZONE LANE LINE, CLASS III, 642 PAINT, (1.42 MILE)

Awd $667.40$470.00

2 $667.40$470.00

3 $667.40$470.00

4 $808.22$569.17

Ref #308 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT, (2.78 MILE)

Awd $2,363.00$850.00

2 $2,363.00$850.00

3 $2,363.00$850.00

4 $2,861.59$1,029.35

Ref #309 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (3.02 MILE)

Awd $2,114.00$700.00

2 $2,114.00$700.00

3 $2,114.00$700.00

4 $2,560.05$847.70

Ref #310 614E22100 WORK ZONE EDGE LINE, CLASS I, 642 PAINT, (17.53 MILE)

Awd $11,131.55$635.00

2 $11,131.55$635.00

3 $11,131.55$635.00

4 $13,480.22$768.98

Ref #311 614E22350 WORK ZONE EDGE LINE, CLASS III, 642 PAINT, (7.83 MILE)

Awd $4,189.05$535.00

2 $4,189.05$535.00

3 $4,189.05$535.00

4 $5,072.90$647.88

Ref #312 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 642 PAINT, (15277 FT)

Awd $6,416.34$0.42

2 $6,416.34$0.42

3 $6,416.34$0.42

4 $7,791.27$0.51

Ref #313 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 642 PAINT, (5910 FT)

Awd $2,245.80$0.38

2 $2,245.80$0.38

3 $2,245.80$0.38

4 $2,718.60$0.46

Ref #314 614E24200 WORK ZONE DOTTED LINE, CLASS I, 642 PAINT, (648 FT)

Awd $324.00$0.50

2 $324.00$0.50

3 $324.00$0.50

4 $395.28$0.61

Ref #315 614E24610 WORK ZONE DOTTED LINE, CLASS III, 642 PAINT, (655 FT)

Awd $327.50$0.50

2 $327.50$0.50

3 $327.50$0.50

4 $399.55$0.61

Ref #316 614E25200 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS I, 642 P, (150 FT)

Awd $225.00$1.50

2 $225.00$1.50

3 $225.00$1.50

4 $273.00$1.82

160102 - Page 142

Page 143: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #317 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT, (253 FT)

Awd $632.50$2.50

2 $632.50$2.50

3 $632.50$2.50

4 $766.59$3.03

Ref #318 615E10000 ROADS FOR MAINTAINING TRAFFIC, (LUMP SUM)

Awd $240,000.00$240,000.00

2 $500,000.00$500,000.00

3 $303,745.20$303,745.20

4 $250,000.00$250,000.00

Ref #319 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, (12694 SY)

Awd $476,025.00$37.50

2 $634,700.00$50.00

3 $476,025.00$37.50

4 $825,110.00$65.00

Ref #320 615E35001 PAVEMENT FOR MAINTAINING TRAFFIC, AS PER PLAN, (9202 SY)

Awd $156,434.00$17.00

2 $184,040.00$20.00

3 $197,382.90$21.45

4 $158,458.44$17.22

Ref #321 616E10000 WATER, (540 MGAL)

Awd $21,600.00$40.00

2 $21,600.00$40.00

3 $35,100.00$65.00

4 $25,920.00$48.00

Ref #322 622E41000 PORTABLE BARRIER, 32", (21520 FT)

Awd $182,920.00$8.50

2 $236,720.00$11.00

3 $215,200.00$10.00

4 $258,240.00$12.00

Ref #323 622E41020 PORTABLE BARRIER, 32", BRIDGE MOUNTED, (880 FT)

Awd $16,720.00$19.00

2 $15,840.00$18.00

3 $11,440.00$13.00

4 $14,960.00$17.00

Ref #324 622E80000 GLARE SCREEN, (3740 FT)

Awd $13,090.00$3.50

2 $11,220.00$3.00

3 $22,440.00$6.00

4 $26,180.00$7.00

Section 11 - MAINTENANCE OF TRAFFIC - Totals

Awd $1,487,050.09

2 $1,980,940.64

3 $1,624,243.19

4 $1,979,503.39

Ref #325 690E65016 SPECIAL - WORK INVOLVING PETROLEUM CONTAMINATED SO, (10 TON)

Awd $1,900.00$190.00

2 $1,500.00$150.00

3 $3,500.00$350.00

4 $3,000.00$300.00

160102 - Page 143

Page 144: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #326 690E65024 SPECIAL - WORK INVOLVING REGULATED WATER, (5000 GAL)

Awd $3,500.00$0.70

2 $15,000.00$3.00

3 $35,000.00$7.00

4 $10,000.00$2.00

Section 12 - ENVIRONMENTAL / REMEDIATION - Totals

Awd $5,400.00

2 $16,500.00

3 $38,500.00

4 $13,000.00

Ref #327 503E21100 UNCLASSIFIED EXCAVATION, (36 CY)

Awd $2,340.00$65.00

2 $1,692.00$47.00

3 $2,124.00$59.00

4 $3,420.00$95.00

Ref #328 509E10000 EPOXY COATED REINFORCING STEEL, (2737 LB)

Awd $4,105.50$1.50

2 $2,737.00$1.00

3 $3,284.40$1.20

4 $3,010.70$1.10

Ref #329 511E46510 CLASS QC1 CONCRETE, FOOTING, (18 CY)

Awd $29,700.00$1,650.00

2 $7,380.00$410.00

3 $15,120.00$840.00

4 $12,060.00$670.00

Ref #330 511E46610 CLASS QC1 CONCRETE, HEADWALL, (14 CY)

Awd $32,200.00$2,300.00

2 $6,720.00$480.00

3 $19,320.00$1,380.00

4 $23,100.00$1,650.00

Ref #331 512E10000 SEALING OF CONCRETE SURFACES, (31 SY)

Awd $434.00$14.00

2 $434.00$14.00

3 $837.00$27.00

4 $1,318.12$42.52

Ref #332 518E21200 POROUS BACKFILL WITH FILTER FABRIC, (11 CY)

Awd $1,298.00$118.00

2 $770.00$70.00

3 $1,375.00$125.00

4 $1,111.00$101.00

Section 13 - MISCELLANEOUS STRUCTURE - Totals

Awd $70,077.50

2 $19,733.00

3 $42,060.40

4 $44,019.82

160102 - Page 144

Page 145: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #334 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)

Awd $35,000.00$35,000.00

2 $100.00$100.00

3 $1,000.00$1,000.00

4 $1.00$1.00

Ref #335 509E10000 EPOXY COATED REINFORCING STEEL, (58388 LB)

Awd $58,388.00$1.00

2 $58,388.00$1.00

3 $64,226.80$1.10

4 $64,226.80$1.10

Ref #336 511E34013 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, AS , (383 CY)

Awd $121,794.00$318.00

2 $130,220.00$340.00

3 $174,265.00$455.00

4 $172,350.00$450.00

Ref #337 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (1745 SY)

Awd $33,155.00$19.00

2 $31,410.00$18.00

3 $52,350.00$30.00

4 $37,098.70$21.26

Ref #338 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (1212 SF)

Awd $3,030.00$2.50

2 $6,060.00$5.00

3 $1,999.80$1.65

4 $7,272.00$6.00

Ref #339 517E70001 RAILING (TWIN STEEL TUBE), AS PER PLAN, (246 FT)

Awd $23,554.50$95.75

2 $20,418.00$83.00

3 $24,600.00$100.00

4 $22,140.00$90.00

Ref #340 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1, (4 SY)

Awd $880.00$220.00

2 $376.00$94.00

3 $536.00$134.00

4 $452.00$113.00

Ref #341 611E99710 PRECAST REINFORCED CONCRETE OUTLET, (2 EACH)

Awd $826.00$413.00

2 $600.00$300.00

3 $496.00$248.00

4 $540.00$270.00

Ref #342 840E20001 MECHANICALLY STABILIZED EARTH WALL, AS PER PLAN, (11224 SF)

Awd $187,777.52$16.73

2 $258,152.00$23.00

3 $224,480.00$20.00

4 $269,376.00$24.00

Ref #343 840E21000 WALL EXCAVATION, (1165 CY)

Awd $15,145.00$13.00

2 $16,310.00$14.00

3 $17,475.00$15.00

4 $34,950.00$30.00

160102 - Page 145

Page 146: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #344 840E22001 FOUNDATION PREPARATION, AS PER PLAN, (1314 SY)

Awd $77,526.00$59.00

2 $107,748.00$82.00

3 $131,400.00$100.00

4 $122,202.00$93.00

Ref #345 840E23000 SELECT GRANULAR BACKFILL, (6129 CY)

Awd $484,191.00$79.00

2 $232,902.00$38.00

3 $520,965.00$85.00

4 $410,643.00$67.00

Ref #346 840E25010 6" DRAINAGE PIPE, PERFORATED, (1294 FT)

Awd $3,882.00$3.00

2 $9,058.00$7.00

3 $2,588.00$2.00

4 $10,352.00$8.00

Ref #347 840E25020 6" DRAINAGE PIPE, NON-PERFORATED, (25 FT)

Awd $600.00$24.00

2 $325.00$13.00

3 $437.50$17.50

4 $500.00$20.00

Ref #348 840E26001 CONCRETE COPING, AS PER PLAN, (606 FT)

Awd $60,600.00$100.00

2 $50,904.00$84.00

3 $64,236.00$106.00

4 $87,870.00$145.00

Ref #349 840E27000 ON-SITE ASSISTANCE, (5 DAY)

Awd $1,000.00$200.00

2 $2,500.00$500.00

3 $2,500.00$500.00

4 $2,500.00$500.00

Ref #505 840E28000 SGB INSPECTION AND COMPACTION TESTING, (LUMP SUM)

Awd $31,000.00$31,000.00

2 $10,000.00$10,000.00

3 $17,000.00$17,000.00

4 $10,416.00$10,416.00

Section 14 - RETAINING WALLS (MSE WALLS NO. 3 & 4) - Totals

Awd $1,138,349.02

2 $935,471.00

3 $1,300,555.10

4 $1,252,889.50

Ref #350 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)

Awd $2,000.00$2,000.00

2 $100.00$100.00

3 $1,000.00$1,000.00

4 $1.00$1.00

Ref #351 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN, (LUMP SUM)

Awd $25,000.00$25,000.00

2 $21,000.00$21,000.00

3 $46,500.00$46,500.00

4 $55,000.00$55,000.00

160102 - Page 146

Page 147: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #352 509E10000 EPOXY COATED REINFORCING STEEL, (18914 LB)

Awd $20,805.40$1.10

2 $18,914.00$1.00

3 $23,642.50$1.25

4 $20,805.40$1.10

Ref #353 511E71100 CONCRETE, MISC.: SOIL NAIL WALL PERMANENT CIP FACI, (98 CY)

Awd $81,340.00$830.00

2 $196,000.00$2,000.00

3 $112,700.00$1,150.00

4 $174,244.00$1,778.00

Ref #354 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (359 SY)

Awd $6,462.00$18.00

2 $6,462.00$18.00

3 $9,693.00$27.00

4 $9,542.22$26.58

Ref #355 518E21200 POROUS BACKFILL WITH FILTER FABRIC, (10 CY)

Awd $590.00$59.00

2 $600.00$60.00

3 $1,300.00$130.00

4 $1,700.00$170.00

Ref #356 518E39800 4" PERFORATED CORRUGATED PLASTIC PIPE, (308 FT)

Awd $2,772.00$9.00

2 $3,080.00$10.00

3 $2,279.20$7.40

4 $1,848.00$6.00

Ref #357 518E39900 4" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (35 FT)

Awd $630.00$18.00

2 $350.00$10.00

3 $735.00$21.00

4 $420.00$12.00

Ref #358 601E34200 ROCK CHANNEL PROTECTION, TYPE C WITHOUT FILTER, (10 CY)

Awd $720.00$72.00

2 $800.00$80.00

3 $1,370.00$137.00

4 $1,120.00$112.00

Ref #359 610E50000 SPECIAL - RETAINING WALL, MISC.: 10' LONG SOIL NAI, (14 EACH)

Awd $17,360.00$1,240.00

2 $5,180.00$370.00

3 $5,446.00$389.00

4 $5,528.88$394.92

Ref #360 610E50000 SPECIAL - RETAINING WALL, MISC.: 15' LONG SOIL NAI, (1 EACH)

Awd $1,600.00$1,600.00

2 $545.00$545.00

3 $582.00$582.00

4 $590.86$590.86

Ref #361 610E50000 SPECIAL - RETAINING WALL, MISC.: 20' LONG SOIL NAI, (11 EACH)

Awd $18,975.00$1,725.00

2 $6,681.62$607.42

3 $8,558.00$778.00

4 $8,688.35$789.85

160102 - Page 147

Page 148: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #362 610E50000 SPECIAL - RETAINING WALL, MISC.: 25' LONG SOIL NAI, (42 EACH)

Awd $75,180.00$1,790.00

2 $31,031.28$738.84

3 $40,782.00$971.00

4 $41,403.18$985.79

Ref #363 610E50000 SPECIAL - RETAINING WALL, MISC.: 27' LONG SOIL NAI, (3 EACH)

Awd $5,715.00$1,905.00

2 $2,460.00$820.00

3 $3,147.00$1,049.00

4 $3,194.91$1,064.97

Ref #364 610E50000 SPECIAL - RETAINING WALL, MISC.: 30' LONG SOIL NAI, (87 EACH)

Awd $150,510.00$1,730.00

2 $76,560.00$880.00

3 $101,355.00$1,165.00

4 $102,898.38$1,182.74

Ref #365 610E50000 SPECIAL - RETAINING WALL, MISC.: PROOF TESTS, (7 EACH)

Awd $4,130.00$590.00

2 $1,715.00$245.00

3 $2,100.00$300.00

4 $2,131.99$304.57

Ref #366 610E50000 SPECIAL - RETAINING WALL, MISC.: VERIFICATION TEST, (4 EACH)

Awd $13,500.00$3,375.00

2 $11,100.00$2,775.00

3 $12,775.00$3,193.75

4 $12,969.56$3,242.39

Ref #367 610E50010 SPECIAL - RETAINING WALL, MISC.: SHOTCRETE CONSTRU, (3390 SF)

Awd $123,735.00$36.50

2 $88,140.00$26.00

3 $96,954.00$28.60

4 $115,463.40$34.06

Section 15 - RETAINING WALLS (SOIL NAIL WALL NO. 5) - Totals

Awd $551,024.40

2 $470,718.90

3 $470,918.70

4 $557,550.13

Ref #368 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN, (LUMP SUM)

Awd $120,000.00$120,000.00

2 $150,000.00$150,000.00

3 $150,000.00$150,000.00

4 $175,000.00$175,000.00

Ref #369 202E22900 APPROACH SLAB REMOVED, (167 SY)

Awd $5,010.00$30.00

2 $6,012.00$36.00

3 $3,006.00$18.00

4 $5,010.00$30.00

Ref #370 202E23500 WEARING COURSE REMOVED, (870 SY)

Awd $870.00$1.00

2 $7,830.00$9.00

3 $7,830.00$9.00

4 $13,050.00$15.00

160102 - Page 148

Page 149: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #371 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN, (LUMP SUM)

Awd $80,000.00$80,000.00

2 $18,000.00$18,000.00

3 $1,000.00$1,000.00

4 $1.00$1.00

Ref #372 503E21100 UNCLASSIFIED EXCAVATION, (838 CY)

Awd $20,950.00$25.00

2 $323,468.00$386.00

3 $30,587.00$36.50

4 $108,940.00$130.00

Ref #373 503E31101 ROCK EXCAVATION, AS PER PLAN, (1564 CY)

Awd $39,100.00$25.00

2 $67,252.00$43.00

3 $64,906.00$41.50

4 $109,480.00$70.00

Ref #374 509E10000 EPOXY COATED REINFORCING STEEL, (299409 LB)

Awd $239,527.20$0.80

2 $299,409.00$1.00

3 $374,261.25$1.25

4 $299,409.00$1.00

Ref #375 511E33500 SEMI-INTEGRAL DIAPHRAGM GUIDE, (2 EACH)

Awd $9,000.00$4,500.00

2 $8,000.00$4,000.00

3 $4,000.00$2,000.00

4 $10,000.00$5,000.00

Ref #376 511E34447 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK, AS PER, (395 CY)

Awd $225,150.00$570.00

2 $262,675.00$665.00

3 $276,500.00$700.00

4 $335,750.00$850.00

Ref #377 511E41512 CLASS QC1 CONCRETE WITH QC/QA, PIER ABOVE FOOTINGS, (66 CY)

Awd $52,800.00$800.00

2 $50,688.00$768.00

3 $56,760.00$860.00

4 $56,760.00$860.00

Ref #378 511E44113 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT NOT INCLUD, (701 CY)

Awd $252,360.00$360.00

2 $455,650.00$650.00

3 $378,540.00$540.00

4 $473,175.00$675.00

Ref #379 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING, (752 CY)

Awd $176,720.00$235.00

2 $188,000.00$250.00

3 $263,200.00$350.00

4 $263,200.00$350.00

Ref #380 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (1410 SY)

Awd $29,610.00$21.00

2 $28,200.00$20.00

3 $38,070.00$27.00

4 $29,976.60$21.26

160102 - Page 149

Page 150: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #381 512E33000 TYPE 2 WATERPROOFING, (22 SY)

Awd $594.00$27.00

2 $660.00$30.00

3 $1,078.00$49.00

4 $594.00$27.00

Ref #382 513E10280 STRUCTURAL STEEL MEMBERS, LEVEL 4, (340416 LB)

Awd $510,624.00$1.50

2 $582,111.36$1.71

3 $476,582.40$1.40

4 $510,624.00$1.50

Ref #383 513E20000 WELDED STUD SHEAR CONNECTORS, (6321 EACH)

Awd $18,963.00$3.00

2 $17,698.80$2.80

3 $29,076.60$4.60

4 $20,543.25$3.25

Ref #384 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (11 SF)

Awd $55.00$5.00

2 $71.50$6.50

3 $18.15$1.65

4 $80.30$7.30

Ref #385 516E13900 2" PREFORMED EXPANSION JOINT FILLER, (526 SF)

Awd $2,630.00$5.00

2 $4,734.00$9.00

3 $8,416.00$16.00

4 $4,208.00$8.00

Ref #386 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL, (248 FT)

Awd $6,696.00$27.00

2 $6,944.00$28.00

3 $9,424.00$38.00

4 $5,456.00$22.00

Ref #387 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (14 EACH)

Awd $14,000.00$1,000.00

2 $14,700.00$1,050.00

3 $16,660.00$1,190.00

4 $13,300.00$950.00

Ref #388 516E44201 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (7 EACH)

Awd $7,000.00$1,000.00

2 $7,350.00$1,050.00

3 $8,330.00$1,190.00

4 $6,825.00$975.00

Ref #389 517E75120 RAILING (CONCRETE PARAPET WITH TWIN STEEL TUBE RAI, (272 FT)

Awd $73,440.00$270.00

2 $48,960.00$180.00

3 $87,040.00$320.00

4 $59,840.00$220.00

Ref #390 517E75121 RAILING (CONCRETE PARAPET WITH TWIN STEEL TUBE RAI, (269 FT)

Awd $67,788.00$252.00

2 $66,712.00$248.00

3 $44,923.00$167.00

4 $82,045.00$305.00

160102 - Page 150

Page 151: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #391 518E21200 POROUS BACKFILL WITH FILTER FABRIC, (448 CY)

Awd $26,432.00$59.00

2 $30,016.00$67.00

3 $38,080.00$85.00

4 $33,600.00$75.00

Ref #392 518E39900 4" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (105 FT)

Awd $315.00$3.00

2 $1,680.00$16.00

3 $2,362.50$22.50

4 $4,725.00$45.00

Ref #393 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE, (365 FT)

Awd $1,095.00$3.00

2 $4,380.00$12.00

3 $730.00$2.00

4 $1,825.00$5.00

Ref #394 526E30000 REINFORCED CONCRETE APPROACH SLABS (T=17"), (430 SY)

Awd $94,600.00$220.00

2 $101,050.00$235.00

3 $104,060.00$242.00

4 $86,000.00$200.00

Ref #395 607E39910 VANDAL PROTECTION FENCE, 8' STRAIGHT, COATED FABRI, (490 FT)

Awd $44,100.00$90.00

2 $30,086.00$61.40

3 $32,830.00$67.00

4 $49,000.00$100.00

Ref #396 690E98400 SPECIAL - MISC.: TEMPORARY WIRE FACED MSE WALL, (LUMP SUM)

Awd $35,000.00$35,000.00

2 $40,000.00$40,000.00

3 $125,000.00$125,000.00

4 $140,000.00$140,000.00

Section 16 - STRUCTURE 20 FOOT SPAN AND OVER (BEL-331 - Totals

Awd $2,154,429.20

2 $2,822,337.66

3 $2,633,270.90

4 $2,898,417.15

Ref #397 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)

Awd $156,400.00$156,400.00

2 $150,000.00$150,000.00

3 $200,000.00$200,000.00

4 $162,000.00$162,000.00

Ref #398 202E22900 APPROACH SLAB REMOVED, (133 SY)

Awd $3,724.00$28.00

2 $4,655.00$35.00

3 $3,990.00$30.00

4 $7,049.00$53.00

Ref #399 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN, (LUMP SUM)

Awd $6,000.00$6,000.00

2 $2,000.00$2,000.00

3 $18,000.00$18,000.00

4 $38,000.00$38,000.00

160102 - Page 151

Page 152: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #400 503E21300 UNCLASSIFIED EXCAVATION, (LUMP SUM)

Awd $7,000.00$7,000.00

2 $7,000.00$7,000.00

3 $25,000.00$25,000.00

4 $80,000.00$80,000.00

Ref #401 509E10000 EPOXY COATED REINFORCING STEEL, (111118 LB)

Awd $104,450.92$0.94

2 $122,229.80$1.10

3 $166,677.00$1.50

4 $122,229.80$1.10

Ref #402 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (320 LB)

Awd $320.00$1.00

2 $320.00$1.00

3 $800.00$2.50

4 $640.00$2.00

Ref #403 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (166 EACH)

Awd $4,814.00$29.00

2 $3,652.00$22.00

3 $3,320.00$20.00

4 $2,656.00$16.00

Ref #404 511E34412 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, (72 CY)

Awd $41,400.00$575.00

2 $35,280.00$490.00

3 $43,200.00$600.00

4 $37,800.00$525.00

Ref #405 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK, (275 CY)

Awd $217,250.00$790.00

2 $204,875.00$745.00

3 $217,250.00$790.00

4 $254,375.00$925.00

Ref #406 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE, (72 CY)

Awd $28,224.00$392.00

2 $60,480.00$840.00

3 $29,787.12$413.71

4 $47,160.00$655.00

Ref #407 511E41010 CLASS QC1 CONCRETE, PIER ABOVE FOOTINGS, (54 CY)

Awd $48,600.00$900.00

2 $43,740.00$810.00

3 $55,350.00$1,025.00

4 $54,000.00$1,000.00

Ref #408 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING, (50 CY)

Awd $30,000.00$600.00

2 $31,500.00$630.00

3 $45,000.00$900.00

4 $55,000.00$1,100.00

Ref #409 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (1067 SY)

Awd $21,340.00$20.00

2 $21,340.00$20.00

3 $32,010.00$30.00

4 $22,684.42$21.26

160102 - Page 152

Page 153: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #410 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (90 SY)

Awd $3,330.00$37.00

2 $1,980.00$22.00

3 $2,160.00$24.00

4 $1,620.00$18.00

Ref #411 512E33000 TYPE 2 WATERPROOFING, (4 SY)

Awd $208.00$52.00

2 $144.00$36.00

3 $184.00$46.00

4 $136.00$34.00

Ref #412 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (173 SY)

Awd $4,498.00$26.00

2 $4,325.00$25.00

3 $1,730.00$10.00

4 $4,598.34$26.58

Ref #413 513E10260 STRUCTURAL STEEL MEMBERS, LEVEL 3, (278233 LB)

Awd $389,526.20$1.40

2 $353,355.91$1.27

3 $306,056.30$1.10

4 $389,526.20$1.40

Ref #414 513E20000 WELDED STUD SHEAR CONNECTORS, (4088 EACH)

Awd $12,264.00$3.00

2 $11,446.40$2.80

3 $18,804.80$4.60

4 $17,782.80$4.35

Ref #415 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (17 SF)

Awd $68.00$4.00

2 $136.00$8.00

3 $28.05$1.65

4 $102.00$6.00

Ref #416 516E13900 2" PREFORMED EXPANSION JOINT FILLER, (457 SF)

Awd $2,285.00$5.00

2 $4,113.00$9.00

3 $7,197.75$15.75

4 $3,130.45$6.85

Ref #417 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL, (150 FT)

Awd $4,350.00$29.00

2 $4,200.00$28.00

3 $5,700.00$38.00

4 $4,500.00$30.00

Ref #418 516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (4 EACH)

Awd $4,000.00$1,000.00

2 $4,400.00$1,100.00

3 $4,760.00$1,190.00

4 $6,800.00$1,700.00

Ref #419 516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (8 EACH)

Awd $8,000.00$1,000.00

2 $8,800.00$1,100.00

3 $9,520.00$1,190.00

4 $12,800.00$1,600.00

160102 - Page 153

Page 154: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #420 516E44200 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (12 EACH)

Awd $12,000.00$1,000.00

2 $13,200.00$1,100.00

3 $14,280.00$1,190.00

4 $14,580.00$1,215.00

Ref #421 518E21201 POROUS BACKFILL WITH FILTER FABRIC, AS PER PLAN, (89 CY)

Awd $6,319.00$71.00

2 $7,654.00$86.00

3 $8,633.00$97.00

4 $9,790.00$110.00

Ref #422 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE, (24 FT)

Awd $72.00$3.00

2 $360.00$15.00

3 $60.00$2.50

4 $348.00$14.50

Ref #423 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (40 FT)

Awd $160.00$4.00

2 $640.00$16.00

3 $1,280.00$32.00

4 $2,120.00$53.00

Ref #424 519E11100 PATCHING CONCRETE STRUCTURE, (117 SF)

Awd $11,700.00$100.00

2 $15,795.00$135.00

3 $14,625.00$125.00

4 $11,700.00$100.00

Ref #425 526E25001 REINFORCED CONCRETE APPROACH SLABS (T=15"), AS PER, (248 SY)

Awd $49,600.00$200.00

2 $66,960.00$270.00

3 $64,480.00$260.00

4 $57,040.00$230.00

Ref #426 601E20000 CRUSHED AGGREGATE SLOPE PROTECTION, (803 SY)

Awd $13,651.00$17.00

2 $26,499.00$33.00

3 $28,908.00$36.00

4 $29,711.00$37.00

Ref #501 607E39901 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI, (400 FT)

Awd $36,000.00$90.00

2 $22,880.00$57.20

3 $26,800.00$67.00

4 $36,000.00$90.00

Section 17 - STRUCTURE 20 FOOT SPAN AND OVER (BEL-70- - Totals

Awd $1,227,554.12

2 $1,233,960.11

3 $1,355,591.02

4 $1,485,879.01

Ref #427 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)

Awd $83,000.00$83,000.00

2 $200,000.00$200,000.00

3 $200,000.00$200,000.00

4 $162,000.00$162,000.00

160102 - Page 154

Page 155: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #428 202E22900 APPROACH SLAB REMOVED, (133 SY)

Awd $3,724.00$28.00

2 $4,655.00$35.00

3 $3,990.00$30.00

4 $7,049.00$53.00

Ref #429 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN, (LUMP SUM)

Awd $10,000.00$10,000.00

2 $2,000.00$2,000.00

3 $18,000.00$18,000.00

4 $38,000.00$38,000.00

Ref #430 503E21300 UNCLASSIFIED EXCAVATION, (LUMP SUM)

Awd $10,000.00$10,000.00

2 $7,000.00$7,000.00

3 $27,750.00$27,750.00

4 $80,000.00$80,000.00

Ref #431 509E10000 EPOXY COATED REINFORCING STEEL, (111194 LB)

Awd $111,194.00$1.00

2 $122,313.40$1.10

3 $166,791.00$1.50

4 $122,313.40$1.10

Ref #432 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (321 LB)

Awd $321.00$1.00

2 $321.00$1.00

3 $802.50$2.50

4 $642.00$2.00

Ref #433 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (166 EACH)

Awd $4,814.00$29.00

2 $3,652.00$22.00

3 $3,320.00$20.00

4 $2,656.00$16.00

Ref #434 511E34412 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, (72 CY)

Awd $41,400.00$575.00

2 $36,000.00$500.00

3 $43,200.00$600.00

4 $37,800.00$525.00

Ref #435 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK, (276 CY)

Awd $213,900.00$775.00

2 $202,860.00$735.00

3 $218,040.00$790.00

4 $255,300.00$925.00

Ref #436 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE, (72 CY)

Awd $28,080.00$390.00

2 $59,760.00$830.00

3 $28,800.00$400.00

4 $47,160.00$655.00

Ref #437 511E41010 CLASS QC1 CONCRETE, PIER ABOVE FOOTINGS, (56 CY)

Awd $50,400.00$900.00

2 $44,240.00$790.00

3 $59,920.00$1,070.00

4 $55,720.00$995.00

160102 - Page 155

Page 156: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #438 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING, (51 CY)

Awd $30,600.00$600.00

2 $31,620.00$620.00

3 $47,175.00$925.00

4 $56,100.00$1,100.00

Ref #439 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (1117 SY)

Awd $22,340.00$20.00

2 $22,340.00$20.00

3 $33,510.00$30.00

4 $23,747.42$21.26

Ref #440 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (90 SY)

Awd $3,330.00$37.00

2 $1,980.00$22.00

3 $2,160.00$24.00

4 $1,620.00$18.00

Ref #441 512E33000 TYPE 2 WATERPROOFING, (4 SY)

Awd $208.00$52.00

2 $144.00$36.00

3 $184.00$46.00

4 $136.00$34.00

Ref #442 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (225 SY)

Awd $5,850.00$26.00

2 $5,625.00$25.00

3 $2,250.00$10.00

4 $5,980.50$26.58

Ref #443 513E10260 STRUCTURAL STEEL MEMBERS, LEVEL 3, (278233 LB)

Awd $389,526.20$1.40

2 $353,355.91$1.27

3 $306,056.30$1.10

4 $389,526.20$1.40

Ref #444 513E20000 WELDED STUD SHEAR CONNECTORS, (4088 EACH)

Awd $12,264.00$3.00

2 $11,446.40$2.80

3 $18,804.80$4.60

4 $14,103.60$3.45

Ref #445 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (17 SF)

Awd $68.00$4.00

2 $136.00$8.00

3 $28.05$1.65

4 $85.00$5.00

Ref #446 516E13900 2" PREFORMED EXPANSION JOINT FILLER, (457 SF)

Awd $2,285.00$5.00

2 $4,113.00$9.00

3 $7,220.60$15.80

4 $2,742.00$6.00

Ref #447 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL, (150 FT)

Awd $4,050.00$27.00

2 $4,200.00$28.00

3 $5,700.00$38.00

4 $4,500.00$30.00

160102 - Page 156

Page 157: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #448 516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (4 EACH)

Awd $4,400.00$1,100.00

2 $4,400.00$1,100.00

3 $4,760.00$1,190.00

4 $6,800.00$1,700.00

Ref #449 516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (8 EACH)

Awd $8,800.00$1,100.00

2 $8,800.00$1,100.00

3 $9,520.00$1,190.00

4 $12,800.00$1,600.00

Ref #450 516E44200 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (12 EACH)

Awd $13,200.00$1,100.00

2 $13,200.00$1,100.00

3 $14,280.00$1,190.00

4 $14,640.00$1,220.00

Ref #451 518E21201 POROUS BACKFILL WITH FILTER FABRIC, AS PER PLAN, (90 CY)

Awd $6,300.00$70.00

2 $7,650.00$85.00

3 $8,550.00$95.00

4 $10,170.00$113.00

Ref #452 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE, (24 FT)

Awd $72.00$3.00

2 $360.00$15.00

3 $60.00$2.50

4 $360.00$15.00

Ref #453 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (40 FT)

Awd $160.00$4.00

2 $640.00$16.00

3 $1,280.00$32.00

4 $2,120.00$53.00

Ref #454 519E11100 PATCHING CONCRETE STRUCTURE, (46 SF)

Awd $6,900.00$150.00

2 $6,210.00$135.00

3 $5,750.00$125.00

4 $5,060.00$110.00

Ref #455 526E25001 REINFORCED CONCRETE APPROACH SLABS (T=15"), AS PER, (248 SY)

Awd $49,600.00$200.00

2 $66,960.00$270.00

3 $68,200.00$275.00

4 $54,560.00$220.00

Ref #456 601E20000 CRUSHED AGGREGATE SLOPE PROTECTION, (803 SY)

Awd $13,651.00$17.00

2 $26,499.00$33.00

3 $28,908.00$36.00

4 $29,711.00$37.00

Ref #502 607E39901 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI, (400 FT)

Awd $34,800.00$87.00

2 $22,880.00$57.20

3 $26,800.00$67.00

4 $36,000.00$90.00

160102 - Page 157

Page 158: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Section 18 - STRUCTURE 20 FOOT SPAN AND OVER (BEL-70- - Totals

Awd $1,165,237.20

2 $1,275,360.71

3 $1,361,810.25

4 $1,479,402.12

Ref #457 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $85,000.00$85,000.00

2 $60,000.00$60,000.00

3 $99,357.00$99,357.00

4 $100,000.00$100,000.00

Ref #458 108E10000 SPECIAL - CPM PROGRESS SCHEDULE, (LUMP SUM)

Awd $9,000.00$9,000.00

2 $9,000.00$9,000.00

3 $5,000.00$5,000.00

4 $5,000.00$5,000.00

Ref #459 614E11001 MAINTAINING TRAFFIC, AS PER PLAN, (LUMP SUM)

Awd $512,000.00$512,000.00

2 $250,000.00$250,000.00

3 $428,188.40$428,188.40

4 $363,040.00$363,040.00

Ref #460 619E16020 FIELD OFFICE, TYPE C, (18 MNTH)

Awd $54,000.00$3,000.00

2 $64,800.00$3,600.00

3 $54,000.00$3,000.00

4 $70,000.02$3,888.89

Ref #461 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)

Awd $125,500.00$125,500.00

2 $130,000.00$130,000.00

3 $229,699.43$229,699.43

4 $140,000.00$140,000.00

Ref #462 624E10000 MOBILIZATION, (LUMP SUM)

Awd $400,000.00$400,000.00

2 $800,000.00$800,000.00

3 $800,000.00$800,000.00

4 $800,000.00$800,000.00

Section 19 - INCIDENTALS - Totals

Awd $1,185,500.00

2 $1,313,800.00

3 $1,616,244.83

4 $1,478,040.02

160102 - Page 158

Page 159: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Project No. 160103

PID 88718

ADA-SR 247-8.82 Culvert Rehab.

Federal

Type: CULVERT REPLACEMENT

Completion Date: 8/31/2016

Award Amount: $189,013.00

Contract Awarded To: FOILL INC

Letting Date: 3/1/2016

Engineer's Estimate: $186,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jerry Wray, Director

FOILL INC

201 E NORTH ST

WAVERLY, OH 45690

Pike

Bidder 1

Bid $189,013.00

BUDS INC

6260 NEWARK RD

NASHPORT, OH 43830

Muskingum

Bidder 2

Bid $198,535.05

TURN-KEY TUNNELING INC

1247 STIMMEL RD

COLUMBUS, OH 43223

Franklin

Bidder 3

Bid $236,137.55

SUNESIS CONSTRUCTION CO

2610 CRESCENTVILLE RD

WEST CHESTER, OH 45069

Butler

Bidder 4

Bid $258,573.87

MIDWEST MOLE INC

6814 W 350 N

GREENFIELD, IN 46140

Bidder 5

Bid $305,395.00

160103 - Page 159

Page 160: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)

Awd $2,574.00$2,574.00

2 $8,500.00$8,500.00

3 $4,500.00$4,500.00

4 $4,547.16$4,547.16

5 $1,500.00$1,500.00

Ref #2 202E32600 GUTTER REMOVED, (26 FT)

Awd $319.02$12.27

2 $780.00$30.00

3 $390.00$15.00

4 $179.14$6.89

5 $1,040.00$40.00

Ref #3 202E38000 GUARDRAIL REMOVED, (550 FT)

Awd $726.00$1.32

2 $825.00$1.50

3 $2,200.00$4.00

4 $825.00$1.50

5 $2,200.00$4.00

Ref #4 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A, (4 EACH)

Awd $816.00$204.00

2 $1,000.00$250.00

3 $1,400.00$350.00

4 $938.36$234.59

5 $5,600.00$1,400.00

Ref #5 203E10000 EXCAVATION, (12 CY)

Awd $1,446.00$120.50

2 $420.00$35.00

3 $600.00$50.00

4 $157.08$13.09

5 $2,160.00$180.00

Ref #6 203E20000 EMBANKMENT, (231 CY)

Awd $9,702.00$42.00

2 $11,550.00$50.00

3 $11,550.00$50.00

4 $13,104.63$56.73

5 $35,805.00$155.00

Ref #7 606E15050 GUARDRAIL, TYPE MGS, (437.5 FT)

Awd $8,990.63$20.55

2 $5,687.50$13.00

3 $8,312.50$19.00

4 $5,687.50$13.00

5 $7,875.00$18.00

Ref #8 606E17360 GUARDRAIL, TYPE MGS, LONG-SPAN, (43.75 FT)

Awd $1,006.25$23.00

2 $743.75$17.00

3 $1,268.75$29.00

4 $743.75$17.00

5 $1,225.00$28.00

160103 - Page 160

Page 161: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #9 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, (4 EACH)

Awd $8,008.00$2,002.00

2 $7,200.00$1,800.00

3 $9,920.00$2,480.00

4 $7,200.00$1,800.00

5 $9,600.00$2,400.00

Section 1 - ROADWAY - Totals

Awd $33,587.90

2 $36,706.25

3 $40,141.25

4 $33,382.62

5 $67,005.00

Ref #10 601E32110 ROCK CHANNEL PROTECTION, TYPE B WITH AGGREGATE FIL, (27 CY)

Awd $3,772.17$139.71

2 $2,970.00$110.00

3 $5,400.00$200.00

4 $2,493.45$92.35

5 $6,750.00$250.00

Ref #11 601E37500 PAVED GUTTER, TYPE 1-2, (26 FT)

Awd $2,578.42$99.17

2 $1,950.00$75.00

3 $5,200.00$200.00

4 $1,808.82$69.57

5 $6,500.00$250.00

Ref #12 659E10000 SEEDING AND MULCHING, (1352 SY)

Awd $4,164.16$3.08

2 $2,704.00$2.00

3 $3,042.00$2.25

4 $3,123.12$2.31

5 $4,056.00$3.00

Ref #13 659E14000 REPAIR SEEDING AND MULCHING, (68 SY)

Awd $52.36$0.77

2 $34.00$0.50

3 $102.00$1.50

4 $68.00$1.00

5 $204.00$3.00

Ref #14 659E20000 COMMERCIAL FERTILIZER, (0.18 TON)

Awd $84.15$467.50

2 $119.70$665.00

3 $144.00$800.00

4 $135.00$750.00

5 $180.00$1,000.00

Ref #15 659E31000 LIME, (0.28 ACRE)

Awd $30.80$110.00

2 $44.80$160.00

3 $70.00$250.00

4 $56.00$200.00

5 $14.00$50.00

160103 - Page 161

Page 162: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #16 659E35000 WATER, (7.3 MGAL)

Awd $81.03$11.10

2 $7.30$1.00

3 $7.30$1.00

4 $7.30$1.00

5 $73.00$10.00

Ref #17 832E30000 EROSION CONTROL, (861 EACH)

Awd $861.00$1.00

2 $861.00$1.00

3 $861.00$1.00

4 $861.00$1.00

5 $861.00$1.00

Section 2 - EROSION CONTROL - Totals

Awd $11,624.09

2 $8,690.80

3 $14,826.30

4 $8,552.69

5 $18,638.00

Ref #18 626E00100 BARRIER REFLECTOR, (14 EACH)

Awd $77.00$5.50

2 $98.00$7.00

3 $154.00$11.00

4 $112.00$8.00

5 $140.00$10.00

Section 3 - TRAFFIC CONTROL - Totals

Awd $77.00

2 $98.00

3 $154.00

4 $112.00

5 $140.00

Ref #19 616E10000 WATER, (1 MGAL)

Awd $11.10$11.10

2 $10.00$10.00

3 $1.00$1.00

4 $80.40$80.40

5 $15.00$15.00

Section 4 - MAINTENANCE OF TRAFFIC - Totals

Awd $11.10

2 $10.00

3 $1.00

4 $80.40

5 $15.00

160103 - Page 162

Page 163: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #20 202E70130 SPECIAL - PIPE CLEANOUT OVER 48", (67 FT)

Awd $6,138.54$91.62

2 $2,680.00$40.00

3 $5,025.00$75.00

4 $2,969.44$44.32

5 $8,710.00$130.00

Ref #21 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)

Awd $7,304.00$7,304.00

2 $8,000.00$8,000.00

3 $8,500.00$8,500.00

4 $15,564.45$15,564.45

5 $23,000.00$23,000.00

Ref #22 837E10001 LINER PIPE, AS PER PLAN (10'-8" SPAN X 6'-8" RISE , (67 FT)

Awd $89,099.95$1,329.85

2 $100,500.00$1,500.00

3 $130,650.00$1,950.00

4 $129,660.41$1,935.23

5 $132,124.00$1,972.00

Ref #23 837E20000 BACKFILL FOR LINER PIPE, (29 CY)

Awd $8,245.57$284.33

2 $13,050.00$450.00

3 $4,640.00$160.00

4 $26,997.26$930.94

5 $18,763.00$647.00

Section 5 - STRUCTURE UNDER 20 FOOT SPAN (BRIDGE NO. - Totals

Awd $110,788.06

2 $124,230.00

3 $148,815.00

4 $175,191.56

5 $182,597.00

Ref #24 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $2,986.00$2,986.00

2 $2,500.00$2,500.00

3 $5,000.00$5,000.00

4 $2,094.47$2,094.47

5 $5,500.00$5,500.00

Ref #25 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $14,408.85$14,408.85

2 $6,500.00$6,500.00

3 $3,500.00$3,500.00

4 $12,083.50$12,083.50

5 $12,500.00$12,500.00

Ref #26 619E16000 FIELD OFFICE, TYPE A, (2 MNTH)

Awd $5,280.00$2,640.00

2 $1,300.00$650.00

3 $1,800.00$900.00

4 $4,562.78$2,281.39

5 $4,000.00$2,000.00

160103 - Page 163

Page 164: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #27 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)

Awd $2,750.00$2,750.00

2 $2,500.00$2,500.00

3 $2,900.00$2,900.00

4 $1,250.00$1,250.00

5 $5,000.00$5,000.00

Ref #28 624E10000 MOBILIZATION, (LUMP SUM)

Awd $7,500.00$7,500.00

2 $16,000.00$16,000.00

3 $19,000.00$19,000.00

4 $21,263.85$21,263.85

5 $10,000.00$10,000.00

Section 6 - INCIDENTALS - Totals

Awd $32,924.85

2 $28,800.00

3 $32,200.00

4 $41,254.60

5 $37,000.00

160103 - Page 164

Page 165: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Project No. 160104

PID 96264

ALL-SRTS Spencerville

Federal

Type: MISCELLANEOUS

Completion Date: 8/15/2016

Award Amount: $98,637.21

Contract Awarded To: SMITH PAVING & EXCAVATING INC

Letting Date: 3/1/2016

Engineer's Estimate: $135,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jerry Wray, Director

SMITH PAVING & EXCAVATING INC

4426 N OLD STATE RD

NORWALK, OH 44857

Huron

Bidder 1

Bid $98,637.21

160104 - Page 165

Page 166: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)

Awd $1,000.00$1,000.00

Ref #2 202E20010 HEADWALL REMOVED, (1 EACH)

Awd $650.00$650.00

Ref #3 202E23000 PAVEMENT REMOVED, (44 SY)

Awd $1,012.00$23.00

Ref #4 202E30000 WALK REMOVED, (37 SF)

Awd $74.00$2.00

Ref #5 202E35100 PIPE REMOVED, 24" AND UNDER, (20 FT)

Awd $280.00$14.00

Ref #6 202E58100 CATCH BASIN REMOVED, (1 EACH)

Awd $350.00$350.00

Ref #7 202E75000 FENCE REMOVED, (34 FT)

Awd $340.00$10.00

Ref #8 203E10000 EXCAVATION, (105 CY)

Awd $2,520.00$24.00

Ref #9 203E20000 EMBANKMENT, (28 CY)

Awd $1,176.00$42.00

Ref #10 204E10000 SUBGRADE COMPACTION, (742 SY)

Awd $1,187.20$1.60

Ref #11 607E98000 FENCE, MISC.:WOOD FENCE, (60 FT)

Awd $3,570.00$59.50

Section 1 - ROADWAY - Totals

Awd $12,159.20

Ref #12 659E00300 TOPSOIL, (46 CY)

Awd $1,932.00$42.00

Ref #13 659E00500 SEEDING AND MULCHING, CLASS 1, (419 SY)

Awd $942.75$2.25

Ref #14 832E30000 EROSION CONTROL, (7267 EACH)

Awd $7,267.00$1.00

Section 2 - EROSION CONTROL - Totals

Awd $10,141.75

Ref #15 602E20000 CONCRETE MASONRY, (9 CY)

Awd $7,200.00$800.00

Ref #16 611E01100 6" CONDUIT, TYPE C, (50 FT)

Awd $925.00$18.50

Ref #17 611E01100 6" CONDUIT, TYPE C, FOR DRAINAGE CONNECTION, (25 FT)

Awd $400.00$16.00

Ref #18 611E04401 12" CONDUIT, TYPE B, AS PER PLAN, (45 FT)

Awd $1,710.00$38.00

Ref #19 611E04601 12" CONDUIT, TYPE C, AS PER PLAN, (59 FT)

Awd $1,770.00$30.00

160104 - Page 166

Page 167: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #20 611E19200 42" CONDUIT, TYPE A, (25 FT)

Awd $3,300.00$132.00

Ref #21 611E98470 CATCH BASIN, NO. 2-2B, (4 EACH)

Awd $5,200.00$1,300.00

Ref #22 611E99574 MANHOLE, NO. 3, (1 EACH)

Awd $2,600.00$2,600.00

Ref #23 611E99574 MANHOLE, NO. 3 WITH 72" BASE I.D., (1 EACH)

Awd $4,200.00$4,200.00

Section 3 - DRAINAGE - Totals

Awd $27,305.00

Ref #24 411E10000 STABILIZED CRUSHED AGGREGATE, (24 CY)

Awd $1,248.00$52.00

Ref #25 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1, (84 SY)

Awd $3,780.00$45.00

Ref #26 608E10000 4" CONCRETE WALK, (4837 SF)

Awd $21,766.50$4.50

Ref #27 608E13000 6" CONCRETE WALK, (1363 SF)

Awd $7,155.75$5.25

Ref #28 608E53020 DETECTABLE WARNING, (56 SF)

Awd $2,016.00$36.00

Section 4 - PAVEMENT - Totals

Awd $35,966.25

Ref #29 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (26 FT)

Awd $377.00$14.50

Ref #30 630E08600 SIGN POST REFLECTOR, (2 EACH)

Awd $150.00$75.00

Ref #31 630E80100 SIGN, FLAT SHEET, (12.5 SF)

Awd $343.75$27.50

Ref #32 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (3 EACH)

Awd $120.00$40.00

Ref #33 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (2 EACH)

Awd $190.00$95.00

Ref #34 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (3 EACH)

Awd $135.00$45.00

Ref #35 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT, (1 EACH)

Awd $175.00$175.00

Ref #36 643E00600 CROSSWALK LINE, (121 FT)

Awd $3,274.26$27.06

Section 5 - TRAFFIC CONTROL - Totals

Awd $4,765.01

160104 - Page 167

Page 168: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #37 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $1,000.00$1,000.00

Ref #38 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $2,500.00$2,500.00

Ref #39 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)

Awd $2,300.00$2,300.00

Ref #40 624E10000 MOBILIZATION, (LUMP SUM)

Awd $2,500.00$2,500.00

Section 6 - INCIDENTALS - Totals

Awd $8,300.00

160104 - Page 168

Page 169: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Project No. 160105

PID 77719

ATH-US 50-4.99

Federal

Type: FOUR LANE RESURFACING

Completion Date: 8/1/2016

Award Amount: $1,626,121.00

Contract Awarded To: NUKO PAVING INC

Letting Date: 3/1/2016

Engineer's Estimate: $2,023,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jerry Wray, Director

NUKO PAVING INC

1 ACY AVE SUITE C

JACKSON, OH 45640

Jackson

Bidder 1

Bid $1,626,121.00

SHELLY & SANDS INC

1515 HARMON AVE

COLUMBUS, OH 43223

Franklin

Bidder 2

Bid $2,008,594.80

160105 - Page 169

Page 170: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #1 253E02000 PAVEMENT REPAIR, (750 CY)

Awd $127,500.00$170.00

2 $225,000.00$300.00

Ref #2 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (187803 SY)

Awd $169,022.70$0.90

2 $262,924.20$1.40

Ref #3 254E01600 PATCHING PLANED SURFACE, (50 SY)

Awd $500.00$10.00

2 $500.00$10.00

Ref #4 255E10010 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT,, (320 SY)

Awd $48,000.00$150.00

2 $56,000.00$175.00

Ref #5 255E20000 FULL DEPTH PAVEMENT SAWING, (1320 FT)

Awd $5,280.00$4.00

2 $2,772.00$2.10

Ref #6 407E10000 TACK COAT, (13891 GAL)

Awd $26,392.90$1.90

2 $29,171.10$2.10

Ref #7 442E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19MM, TYPE , (36 CY)

Awd $10,080.00$280.00

2 $9,900.00$275.00

Ref #8 617E10100 COMPACTED AGGREGATE, (37 CY)

Awd $2,960.00$80.00

2 $3,330.00$90.00

Ref #9 618E40600 RUMBLE STRIPS, (ASPHALT CONCRETE), (16.76 MILE)

Awd $8,380.00$500.00

2 $12,570.00$750.00

Ref #10 806E00100 ASPHALT CONCRETE SURFACE COURSE, 12.5MM, TYPE A, (8259 CY)

Awd $999,339.00$121.00

2 $1,156,260.00$140.00

Section 1 - PAVEMENT - Totals

Awd $1,397,454.60

2 $1,758,427.30

Ref #11 621E10020 RPM, LOW PROFILE WHITE/RED, (587 EACH)

Awd $10,712.75$18.25

2 $12,327.00$21.00

Ref #12 621E54000 RAISED PAVEMENT MARKER REMOVED, (587 EACH)

Awd $5,283.00$9.00

2 $1,761.00$3.00

Ref #13 644E00104 EDGE LINE, 6", (16.76 MILE)

Awd $48,469.92$2,892.00

2 $43,576.00$2,600.00

Ref #14 644E00204 LANE LINE, 6", (8.38 MILE)

Awd $11,245.96$1,342.00

2 $11,103.50$1,325.00

160105 - Page 170

Page 171: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #15 644E00404 CHANNELIZING LINE, 12", (6175 FT)

Awd $7,718.75$1.25

2 $9,262.50$1.50

Ref #16 644E00500 STOP LINE, (327 FT)

Awd $981.00$3.00

2 $1,798.50$5.50

Ref #17 644E00720 CHEVRON MARKING, (296 FT)

Awd $814.00$2.75

2 $1,776.00$6.00

Ref #18 644E00900 ISLAND MARKING, (164 SF)

Awd $492.00$3.00

2 $451.00$2.75

Ref #19 644E01200 PARKING LOT STALL MARKING, (1060 FT)

Awd $1,590.00$1.50

2 $2,915.00$2.75

Ref #20 644E01300 LANE ARROW, (16 EACH)

Awd $1,600.00$100.00

2 $1,440.00$90.00

Ref #21 644E01600 HANDICAP SYMBOL MARKING, (2 EACH)

Awd $200.00$100.00

2 $250.00$125.00

Section 2 - TRAFFIC CONTROL - Totals

Awd $89,107.38

2 $86,660.50

Ref #22 614E12410 SPEED ZONE AHEAD SYMBOL SIGN, (4 EACH)

Awd $400.00$100.00

2 $380.00$95.00

Ref #23 614E12470 WORK ZONE SPEED LIMIT SIGN, (32 EACH)

Awd $3,200.00$100.00

2 $3,040.00$95.00

Ref #24 614E12490 RESUME LEGAL SPEED SIGN, (4 EACH)

Awd $400.00$100.00

2 $380.00$95.00

Ref #25 614E18400 PORTABLE CHANGEABLE MESSAGE SIGN, (45 DAY)

Awd $3,825.00$85.00

2 $1,575.00$35.00

Ref #26 614E22100 WORK ZONE EDGE LINE, CLASS I, 642 PAINT, (16.76 MILE)

Awd $13,973.65$833.75

2 $10,056.00$600.00

Ref #27 614E22200 WORK ZONE EDGE LINE, CLASS I, 740.06, TYPE I, (0.48 MILE)

Awd $3,206.02$6,679.21

2 $2,400.00$5,000.00

Ref #28 614E22350 WORK ZONE EDGE LINE, CLASS III, 642 PAINT, (16.76 MILE)

Awd $13,973.65$833.75

2 $6,704.00$400.00

160105 - Page 171

Page 172: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #29 614E24400 WORK ZONE DOTTED LINE, CLASS I, 740.06, TYPE I, (1472 FT)

Awd $1,869.44$1.27

2 $1,472.00$1.00

Section 3 - MAINTENANCE OF TRAFFIC - Totals

Awd $40,847.76

2 $26,007.00

Ref #30 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $28,711.26$28,711.26

2 $7,250.00$7,250.00

Ref #31 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $40,000.00$40,000.00

2 $87,500.00$87,500.00

Ref #32 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P, (LUMP SUM)

Awd $5,000.00$5,000.00

2 $2,750.00$2,750.00

Ref #33 624E10000 MOBILIZATION, (LUMP SUM)

Awd $25,000.00$25,000.00

2 $40,000.00$40,000.00

Section 4 - INCIDENTALS - Totals

Awd $98,711.26

2 $137,500.00

160105 - Page 172

Page 173: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Project No. 160106

PID 100350

AUG-SR 65-0.00/7.32

Federal

Type: TWO LANE RESURFACING

Completion Date: 7/30/2016

Award Amount: $389,957.90

Contract Awarded To: STRAWSER CONSTRUCTION INC

Letting Date: 3/1/2016

Engineer's Estimate: $614,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jerry Wray, Director

STRAWSER CONSTRUCTION INC

1392 DUBLIN RD

COLUMBUS, OH 43215

Franklin

Bidder 1

Bid $389,957.90

NY-MAC ENTERPRISES INC

3415 S CREYTS RD

LANSING, MI 48917

Bidder 2

Bid $415,537.15

AMERICAN PAVEMENTS INC

7475 MONTGOMERY DR

PLAIN CITY, OH 43064

Madison

Bidder 3

Bid $421,349.10

PAVEMENT MAINTENANCE SYSTEMS LLC

384 INDUSTRIAL PARK DR

IMLAY CITY, MI 48444

Bidder 4

Bid $538,859.68

160106 - Page 173

Page 174: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #1 202E30000 WALK REMOVED, (207.5 SF)

Awd $3,216.25$15.50

2 $1,691.13$8.15

3 $3,112.50$15.00

4 $830.00$4.00

Ref #2 202E30000 WALK REMOVED, ASPHALT, (14 SF)

Awd $217.00$15.50

2 $114.10$8.15

3 $210.00$15.00

4 $210.00$15.00

Ref #3 608E10000 4" CONCRETE WALK, (264 SF)

Awd $2,669.04$10.11

2 $4,752.00$18.00

3 $2,640.00$10.00

4 $2,640.00$10.00

Ref #4 608E52010 CURB RAMP, TYPE A1, (201 SF)

Awd $2,456.22$12.22

2 $3,618.00$18.00

3 $2,412.00$12.00

4 $4,824.00$24.00

Ref #5 608E53020 DETECTABLE WARNING, (32 SF)

Awd $1,326.08$41.44

2 $960.00$30.00

3 $1,280.00$40.00

4 $1,152.00$36.00

Section 1 - ROADWAY - Totals

Awd $9,884.59

2 $11,135.23

3 $9,654.50

4 $9,656.00

Ref #6 253E01001 PAVEMENT REPAIR, AS PER PLAN, (175 SY)

Awd $16,098.25$91.99

2 $26,250.00$150.00

3 $15,750.00$90.00

4 $24,500.00$140.00

Ref #7 421E10011 MICROSURFACING, SURFACE COURSE, AS PER PLAN, (185358 SY)

Awd $279,890.58$1.51

2 $257,647.62$1.39

3 $296,572.80$1.60

4 $363,301.68$1.96

Section 2 - PAVEMENT - Totals

Awd $295,988.83

2 $283,897.62

3 $312,322.80

4 $387,801.68

160106 - Page 174

Page 175: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #8 621E00100 RPM, (890 EACH)

Awd $17,791.10$19.99

2 $16,020.00$18.00

3 $16,020.00$18.00

4 $17,088.00$19.20

Ref #9 621E54000 RAISED PAVEMENT MARKER REMOVED, (890 EACH)

Awd $9,309.40$10.46

2 $4,450.00$5.00

3 $10,680.00$12.00

4 $20,025.00$22.50

Ref #10 642E00090 EDGE LINE, 4", (22.62 MILE)

Awd $10,179.00$450.00

2 $9,161.10$405.00

3 $9,161.10$405.00

4 $9,048.00$400.00

Ref #11 642E00290 CENTER LINE, (11.31 MILE)

Awd $6,107.40$540.00

2 $4,976.40$440.00

3 $4,976.40$440.00

4 $6,559.80$580.00

Ref #12 644E00500 STOP LINE, (73 FT)

Awd $511.00$7.00

2 $605.90$8.30

3 $605.90$8.30

4 $438.00$6.00

Ref #13 644E00600 CROSSWALK LINE, (181 FT)

Awd $602.73$3.33

2 $1,140.30$6.30

3 $1,140.30$6.30

4 $543.00$3.00

Section 3 - TRAFFIC CONTROL - Totals

Awd $44,500.63

2 $36,353.70

3 $42,583.70

4 $53,701.80

Ref #14 614E12460 WORK ZONE MARKING SIGN, (100 EACH)

Awd $9,000.00$90.00

2 $10,500.00$105.00

3 $10,500.00$105.00

4 $11,000.00$110.00

Ref #15 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT, (11.31 MILE)

Awd $10,280.79$909.00

2 $4,919.85$435.00

3 $4,919.85$435.00

4 $9,274.20$820.00

Ref #16 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT, (73 FT)

Awd $162.06$2.22

2 $1,843.25$25.25

3 $1,843.25$25.25

4 $365.00$5.00

160106 - Page 175

Page 176: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Section 4 - MAINTENANCE OF TRAFFIC - Totals

Awd $19,442.85

2 $17,263.10

3 $17,263.10

4 $20,639.20

Ref #17 516E31000 JOINT SEALER, (450 FT)

Awd $2,475.00$5.50

2 $4,387.50$9.75

3 $6,525.00$14.50

4 $8,550.00$19.00

Section 5 - STRUCTURE REPAIR (AUG-65-1319) - Totals

Awd $2,475.00

2 $4,387.50

3 $6,525.00

4 $8,550.00

Ref #18 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $1,555.00$1,555.00

2 $7,500.00$7,500.00

3 $2,000.00$2,000.00

4 $5,210.00$5,210.00

Ref #19 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $7,058.00$7,058.00

2 $25,000.00$25,000.00

3 $10,000.00$10,000.00

4 $20,491.00$20,491.00

Ref #20 624E10000 MOBILIZATION, (LUMP SUM)

Awd $9,053.00$9,053.00

2 $30,000.00$30,000.00

3 $21,000.00$21,000.00

4 $32,810.00$32,810.00

Section 6 - INCIDENTALS - Totals

Awd $17,666.00

2 $62,500.00

3 $33,000.00

4 $58,511.00

160106 - Page 176

Page 177: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Project No. 160107

PID 100098

CUY-East 93rd Street

Federal

Type: FOUR LANE RESURFACING

Completion Date: 9/30/2016

Award Amount: $1,582,190.30

Contract Awarded To: PERK COMPANY INC

Letting Date: 3/1/2016

Engineer's Estimate: $1,665,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jerry Wray, Director

PERK COMPANY INC

8100 GRAND AVE SUITE 300

CLEVELAND, OH 44104-3110

Bidder 1

Bid $1,582,190.30

TERRACE CONSTRUCTION CO INC

3965 PEARL RD

CLEVELAND, OH 44109

Cuyahoga

Bidder 2

Bid $1,640,503.81

CATTS CONSTRUCTION INC

21223 AURORA RD

WARRENSVILLE HTS, OH 44146

Cuyahoga

Bidder 3

Bid $1,699,960.51

KARVO COMPANIES INC

4524 HUDSON DR

STOW, OH 44224-1702

Bidder 4

Bid $1,763,455.83

VANDRA BROTHERS CONSTRUCTION INC

24629 BROADWAY AVE

OAKWOOD VILLAGE, OH 44146

Cuyahoga

Bidder 5

Bid $1,779,819.55

C A AGRESTA CONSTRUCTION CO

4186 GREENVALE RD

CLEVELAND, OH 44121

Cuyahoga

Bidder 6

Bid $1,894,403.80

PARELLA-PANNUNZIO INC

720 NORTH MERIDIAN RD

YOUNGSTOWN, OH 44509

Mahoning

Bidder 7

Bid $2,133,685.55

160107 - Page 177

Page 178: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)

Awd $51,000.00$51,000.00

2 $1,191.00$1,191.00

3 $2,100.00$2,100.00

4 $500.00$500.00

5 $10,000.00$10,000.00

6 $2,000.00$2,000.00

7 $500.00$500.00

Ref #2 202E58101 CATCH BASIN REMOVED, AS PER PLAN, (5 EACH)

Awd $500.00$100.00

2 $1,885.00$377.00

3 $2,075.00$415.00

4 $2,900.00$580.00

5 $2,500.00$500.00

6 $3,000.00$600.00

7 $8,405.00$1,681.00

Ref #3 204E10000 SUBGRADE COMPACTION, (244 SY)

Awd $976.00$4.00

2 $390.40$1.60

3 $305.00$1.25

4 $366.00$1.50

5 $488.00$2.00

6 $244.00$1.00

7 $488.00$2.00

Ref #4 209E60200 LINEAR GRADING, (62 STA)

Awd $3,100.00$50.00

2 $9,176.00$148.00

3 $6,200.00$100.00

4 $5,580.00$90.00

5 $12,400.00$200.00

6 $10,850.00$175.00

7 $19,654.00$317.00

Ref #5 608E13001 6" CONCRETE WALK, AS PER PLAN, (35965 SF)

Awd $230,176.00$6.40

2 $248,158.50$6.90

3 $278,728.75$7.75

4 $213,991.75$5.95

5 $278,728.75$7.75

6 $323,685.00$9.00

7 $296,711.25$8.25

Ref #6 608E52001 CURB RAMP, AS PER PLAN, (2535 SF)

Awd $63,375.00$25.00

2 $47,531.25$18.75

3 $30,420.00$12.00

4 $44,996.25$17.75

5 $55,770.00$22.00

6 $50,700.00$20.00

7 $43,602.00$17.20

160107 - Page 178

Page 179: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #7 608E53011 TRUNCATED DOMES, AS PER PLAN, (24 SF)

Awd $3,600.00$150.00

2 $1,728.00$72.00

3 $4,800.00$200.00

4 $552.00$23.00

5 $2,400.00$100.00

6 $1,200.00$50.00

7 $840.00$35.00

Ref #8 623E38501 MONUMENT ASSEMBLY, AS PER PLAN, (3 EACH)

Awd $2,250.00$750.00

2 $2,436.00$812.00

3 $1,950.00$650.00

4 $2,925.00$975.00

5 $3,300.00$1,100.00

6 $1,950.00$650.00

7 $2,640.00$880.00

Ref #9 623E39501 MONUMENT BOX ADJUSTED TO GRADE, AS PER PLAN, (21 EACH)

Awd $15,750.00$750.00

2 $9,618.00$458.00

3 $9,030.00$430.00

4 $4,200.00$200.00

5 $15,750.00$750.00

6 $12,600.00$600.00

7 $15,582.00$742.00

Ref #10 623E40900 MONUMENT, MISC.: MONUMENT REFERENCING, (6 EACH)

Awd $600.00$100.00

2 $1,464.00$244.00

3 $900.00$150.00

4 $900.00$150.00

5 $1,500.00$250.00

6 $600.00$100.00

7 $4,560.00$760.00

Ref #11 625E75501 LIGHT POLE FOUNDATION REMOVED, AS PER PLAN, (23 EACH)

Awd $4,600.00$200.00

2 $1,932.00$84.00

3 $3,910.00$170.00

4 $8,510.00$370.00

5 $8,050.00$350.00

6 $11,500.00$500.00

7 $6,900.00$300.00

Section 1 - ROADWAY - Totals

Awd $375,927.00

2 $325,510.15

3 $340,418.75

4 $285,421.00

5 $390,886.75

6 $418,329.00

7 $399,882.25

160107 - Page 179

Page 180: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #12 659E10000 SEEDING AND MULCHING, (725 SY)

Awd $7,250.00$10.00

2 $3,335.00$4.60

3 $7,250.00$10.00

4 $3,117.50$4.30

5 $2,175.00$3.00

6 $10,875.00$15.00

7 $2,102.50$2.90

Ref #13 832E30001 EROSION CONTROL, AS PER PLAN, (7500 EACH)

Awd $7,500.00$1.00

2 $7,500.00$1.00

3 $7,500.00$1.00

4 $7,500.00$1.00

5 $7,500.00$1.00

6 $7,500.00$1.00

7 $7,500.00$1.00

Section 2 - EROSION CONTROL - Totals

Awd $14,750.00

2 $10,835.00

3 $14,750.00

4 $10,617.50

5 $9,675.00

6 $18,375.00

7 $9,602.50

Ref #14 605E14000 6" BASE PIPE UNDERDRAINS, (4054 FT)

Awd $44,594.00$11.00

2 $38,513.00$9.50

3 $40,540.00$10.00

4 $48,648.00$12.00

5 $60,810.00$15.00

6 $48,648.00$12.00

7 $64,255.90$15.85

Ref #15 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS, (480 FT)

Awd $5,280.00$11.00

2 $6,240.00$13.00

3 $4,800.00$10.00

4 $4,800.00$10.00

5 $12,000.00$25.00

6 $5,760.00$12.00

7 $8,640.00$18.00

Ref #16 611E04400 12" CONDUIT, TYPE B, (60 FT)

Awd $1,200.00$20.00

2 $9,120.00$152.00

3 $5,400.00$90.00

4 $6,300.00$105.00

5 $14,760.00$246.00

6 $6,000.00$100.00

7 $14,430.00$240.50

160107 - Page 180

Page 181: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #17 611E98101 CATCH BASIN, CITY OF CLEVELAND NO. 1, AS PER PLAN, (5 EACH)

Awd $6,500.00$1,300.00

2 $20,585.00$4,117.00

3 $12,500.00$2,500.00

4 $22,500.00$4,500.00

5 $20,000.00$4,000.00

6 $15,000.00$3,000.00

7 $24,400.00$4,880.00

Ref #18 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN, (35 EACH)

Awd $26,250.00$750.00

2 $29,085.00$831.00

3 $18,375.00$525.00

4 $34,125.00$975.00

5 $28,000.00$800.00

6 $28,000.00$800.00

7 $44,450.00$1,270.00

Ref #19 611E98635 CATCH BASIN RECONSTRUCTED TO GRADE, AS PER PLAN, (12 EACH)

Awd $13,200.00$1,100.00

2 $11,052.00$921.00

3 $13,800.00$1,150.00

4 $12,600.00$1,050.00

5 $13,200.00$1,100.00

6 $10,800.00$900.00

7 $21,360.00$1,780.00

Ref #20 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN, (28 EACH)

Awd $21,000.00$750.00

2 $22,708.00$811.00

3 $14,700.00$525.00

4 $25,200.00$900.00

5 $21,000.00$750.00

6 $22,400.00$800.00

7 $28,560.00$1,020.00

Ref #21 611E99661 MANHOLE RECONSTRUCTED TO GRADE, AS PER PLAN, (6 EACH)

Awd $4,800.00$800.00

2 $5,526.00$921.00

3 $6,600.00$1,100.00

4 $6,600.00$1,100.00

5 $6,000.00$1,000.00

6 $5,400.00$900.00

7 $11,040.00$1,840.00

Ref #22 611E99820 SPECIAL - MISCELLANEOUS METAL, (20000 LB)

Awd $60,000.00$3.00

2 $24,000.00$1.20

3 $23,000.00$1.15

4 $20,000.00$1.00

5 $30,000.00$1.50

6 $20,000.00$1.00

7 $39,000.00$1.95

160107 - Page 181

Page 182: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #23 613E41250 LOW STRENGTH MORTAR BACKFILL (TYPE 1), (100 CY)

Awd $4,000.00$40.00

2 $3,725.00$37.25

3 $5,000.00$50.00

4 $14,500.00$145.00

5 $5,500.00$55.00

6 $7,500.00$75.00

7 $6,900.00$69.00

Section 3 - DRAINAGE - Totals

Awd $186,824.00

2 $170,554.00

3 $144,715.00

4 $195,273.00

5 $211,270.00

6 $169,508.00

7 $263,035.90

Ref #24 251E01001 PARTIAL DEPTH PAVEMENT REPAIR, AS PER PLAN, (1500 SY)

Awd $45,000.00$30.00

2 $48,375.00$32.25

3 $38,475.00$25.65

4 $67,500.00$45.00

5 $43,500.00$29.00

6 $37,500.00$25.00

7 $37,500.00$25.00

Ref #25 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, (19524 SY)

Awd $24,405.00$1.25

2 $72,238.80$3.70

3 $68,334.00$3.50

4 $48,810.00$2.50

5 $58,572.00$3.00

6 $78,096.00$4.00

7 $58,572.00$3.00

Ref #26 255E10161 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT,, (2000 SY)

Awd $90,000.00$45.00

2 $208,000.00$104.00

3 $184,000.00$92.00

4 $210,000.00$105.00

5 $180,000.00$90.00

6 $180,000.00$90.00

7 $222,000.00$111.00

Ref #27 304E20001 AGGREGATE BASE, AS PER PLAN, (41 CY)

Awd $2,870.00$70.00

2 $2,829.00$69.00

3 $2,890.50$70.50

4 $2,870.00$70.00

5 $2,050.00$50.00

6 $2,460.00$60.00

7 $2,952.00$72.00

160107 - Page 182

Page 183: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #28 407E10000 TACK COAT (0.10 GAL/SY), (1966 GAL)

Awd $3,932.00$2.00

2 $5,052.62$2.57

3 $4,521.80$2.30

4 $3,440.50$1.75

5 $3,932.00$2.00

6 $3,932.00$2.00

7 $3,932.00$2.00

Ref #29 407E14000 TACK COAT FOR INTERMEDIATE COURSE (0.075 GAL/SY), (1482 GAL)

Awd $2,964.00$2.00

2 $3,808.74$2.57

3 $3,408.60$2.30

4 $2,593.50$1.75

5 $2,964.00$2.00

6 $2,964.00$2.00

7 $2,964.00$2.00

Ref #30 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS, (650 CY)

Awd $110,500.00$170.00

2 $131,300.00$202.00

3 $113,750.00$175.00

4 $113,100.00$174.00

5 $102,050.00$157.00

6 $100,750.00$155.00

7 $100,750.00$155.00

Ref #31 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS, (49 CY)

Awd $15,680.00$320.00

2 $14,651.00$299.00

3 $20,580.00$420.00

4 $14,700.00$300.00

5 $11,270.00$230.00

6 $17,640.00$360.00

7 $17,640.00$360.00

Ref #32 441E50201 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, (448, (202 CY)

Awd $23,230.00$115.00

2 $42,016.00$208.00

3 $30,603.00$151.50

4 $33,734.00$167.00

5 $32,320.00$160.00

6 $26,260.00$130.00

7 $26,260.00$130.00

Ref #33 441E50301 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (448, (900 CY)

Awd $121,500.00$135.00

2 $131,400.00$146.00

3 $144,000.00$160.00

4 $123,300.00$137.00

5 $103,500.00$115.00

6 $112,500.00$125.00

7 $112,500.00$125.00

160107 - Page 183

Page 184: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #34 451E20000 REINFORCED CONCRETE PAVEMENT, MISC.:10" REINFORCED, (244 SY)

Awd $24,400.00$100.00

2 $22,936.00$94.00

3 $20,740.00$85.00

4 $24,400.00$100.00

5 $28,060.00$115.00

6 $36,600.00$150.00

7 $28,279.60$115.90

Ref #35 451E98000 REINFORCED CONCRETE PAVEMENT, MISC.:BUS PAD COMPLE, (134 SY)

Awd $16,750.00$125.00

2 $13,266.00$99.00

3 $12,998.00$97.00

4 $17,152.00$128.00

5 $18,090.00$135.00

6 $18,760.00$140.00

7 $18,760.00$140.00

Ref #36 452E12051 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS, , (1330 SY)

Awd $106,400.00$80.00

2 $98,420.00$74.00

3 $124,355.00$93.50

4 $99,750.00$75.00

5 $115,710.00$87.00

6 $99,750.00$75.00

7 $110,390.00$83.00

Ref #37 609E14001 CURB, TYPE 2-A, AS PER PLAN, (204 FT)

Awd $1,428.00$7.00

2 $734.40$3.60

3 $1,632.00$8.00

4 $3,672.00$18.00

5 $3,060.00$15.00

6 $2,040.00$10.00

7 $1,632.00$8.00

Ref #38 609E26001 CURB, TYPE 6, AS PER PLAN, (4855 FT)

Awd $121,860.50$25.10

2 $77,680.00$16.00

3 $100,741.25$20.75

4 $106,810.00$22.00

5 $97,100.00$20.00

6 $77,680.00$16.00

7 $138,367.50$28.50

Ref #39 690E98700 SPECIAL - MISC.: CONCRETE MIX DESIGN FOR CLASS QC , (25 CY)

Awd $2,500.00$100.00

2 $240.00$9.60

3 $575.00$23.00

4 $145.00$5.80

5 $500.00$20.00

6 $5,000.00$200.00

7 $625.00$25.00

160107 - Page 184

Page 185: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Section 4 - PAVEMENT - Totals

Awd $713,419.50

2 $872,947.56

3 $871,604.15

4 $871,977.00

5 $802,678.00

6 $801,932.00

7 $883,124.10

Ref #40 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN, (74 EACH)

Awd $44,400.00$600.00

2 $22,940.00$310.00

3 $33,300.00$450.00

4 $37,000.00$500.00

5 $48,100.00$650.00

6 $33,300.00$450.00

7 $49,580.00$670.00

Ref #41 638E10901 SERVICE BOX ADJUSTED TO GRADE, AS PER PLAN, (12 EACH)

Awd $1,200.00$100.00

2 $1,848.00$154.00

3 $1,320.00$110.00

4 $5,400.00$450.00

5 $1,800.00$150.00

6 $1,800.00$150.00

7 $2,700.00$225.00

Ref #42 638E98000 WATER WORK, MISC.: WATER MANHOLE ADJUSTED TO GRADE, (8 EACH)

Awd $3,200.00$400.00

2 $6,840.00$855.00

3 $4,000.00$500.00

4 $21,600.00$2,700.00

5 $7,200.00$900.00

6 $8,000.00$1,000.00

7 $5,800.00$725.00

Ref #43 638E98000 WATER WORK, MISC.: WATER MANHOLE RECONSTRUCTED TO , (3 EACH)

Awd $3,000.00$1,000.00

2 $1,167.00$389.00

3 $3,150.00$1,050.00

4 $6,600.00$2,200.00

5 $3,300.00$1,100.00

6 $4,800.00$1,600.00

7 $600.00$200.00

Ref #44 638E98000 WATER WORK, MISC.: WATER METER ADJUSTED TO GRADE, , (18 EACH)

Awd $7,200.00$400.00

2 $3,870.00$215.00

3 $9,000.00$500.00

4 $34,200.00$1,900.00

5 $9,000.00$500.00

6 $7,200.00$400.00

7 $19,116.00$1,062.00

160107 - Page 185

Page 186: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Section 5 - WATER WORK - Totals

Awd $59,000.00

2 $36,665.00

3 $50,770.00

4 $104,800.00

5 $69,400.00

6 $55,100.00

7 $77,796.00

Ref #45 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (287 FT)

Awd $1,435.00$5.00

2 $1,722.00$6.00

3 $2,339.05$8.15

4 $1,965.95$6.85

5 $1,435.00$5.00

6 $1,435.00$5.00

7 $1,435.00$5.00

Ref #46 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (292.1 FT)

Awd $1,752.60$6.00

2 $2,103.12$7.20

3 $2,716.53$9.30

4 $2,482.85$8.50

5 $1,752.60$6.00

6 $1,752.60$6.00

7 $1,752.60$6.00

Ref #47 630E08510 STREET NAME SIGN SUPPORT, NO. 2 POST, (75.6 FT)

Awd $529.20$7.00

2 $635.04$8.40

3 $642.60$8.50

4 $756.00$10.00

5 $529.20$7.00

6 $529.20$7.00

7 $529.20$7.00

Ref #48 630E08520 STREET NAME SIGN SUPPORT, NO. 3 POST, (147 FT)

Awd $1,176.00$8.00

2 $1,411.20$9.60

3 $1,411.20$9.60

4 $1,837.50$12.50

5 $1,176.00$8.00

6 $1,176.00$8.00

7 $1,176.00$8.00

Ref #49 630E08600 SIGN POST REFLECTOR, (11 EACH)

Awd $495.00$45.00

2 $594.00$54.00

3 $423.50$38.50

4 $247.50$22.50

5 $495.00$45.00

6 $495.00$45.00

7 $495.00$45.00

160107 - Page 186

Page 187: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #50 630E80100 SIGN, FLAT SHEET, (270.8 SF)

Awd $4,062.00$15.00

2 $4,874.40$18.00

3 $4,414.04$16.30

4 $4,562.98$16.85

5 $4,062.00$15.00

6 $4,062.00$15.00

7 $4,062.00$15.00

Ref #51 630E80510 SIGN, STREET NAME, (60 EACH)

Awd $5,700.00$95.00

2 $6,840.00$114.00

3 $4,545.00$75.75

4 $4,110.00$68.50

5 $5,700.00$95.00

6 $5,700.00$95.00

7 $5,700.00$95.00

Ref #52 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (27 EACH)

Awd $540.00$20.00

2 $648.00$24.00

3 $378.00$14.00

4 $405.00$15.00

5 $540.00$20.00

6 $540.00$20.00

7 $540.00$20.00

Ref #53 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (17 EACH)

Awd $340.00$20.00

2 $408.00$24.00

3 $595.00$35.00

4 $170.00$10.00

5 $340.00$20.00

6 $340.00$20.00

7 $340.00$20.00

Ref #54 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL, (80 EACH)

Awd $1,200.00$15.00

2 $1,440.00$18.00

3 $1,356.00$16.95

4 $1,000.00$12.50

5 $1,200.00$15.00

6 $1,200.00$15.00

7 $1,200.00$15.00

Ref #55 630E87520 REMOVAL OF POLE MOUNTED SIGN AND REERECTION, (2 EACH)

Awd $150.00$75.00

2 $180.00$90.00

3 $258.00$129.00

4 $100.00$50.00

5 $150.00$75.00

6 $150.00$75.00

7 $150.00$75.00

160107 - Page 187

Page 188: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #56 632E26501 DETECTOR LOOP, AS PER PLAN, (15 EACH)

Awd $14,250.00$950.00

2 $13,635.00$909.00

3 $16,650.00$1,110.00

4 $14,625.00$975.00

5 $14,250.00$950.00

6 $14,250.00$950.00

7 $14,250.00$950.00

Ref #57 644E00200 LANE LINE, 4", (1.13 MILE)

Awd $1,695.00$1,500.00

2 $1,698.39$1,503.00

3 $1,975.24$1,748.00

4 $1,412.50$1,250.00

5 $1,695.00$1,500.00

6 $1,695.00$1,500.00

7 $1,695.00$1,500.00

Ref #58 644E00300 CENTER LINE, (0.6 MILE)

Awd $3,240.00$5,400.00

2 $3,246.00$5,410.00

3 $3,775.80$6,293.00

4 $2,700.00$4,500.00

5 $3,240.00$5,400.00

6 $3,240.00$5,400.00

7 $3,240.00$5,400.00

Ref #59 644E00400 CHANNELIZING LINE, 8", (137 FT)

Awd $171.25$1.25

2 $157.55$1.15

3 $198.65$1.45

4 $130.15$0.95

5 $171.25$1.25

6 $171.25$1.25

7 $171.25$1.25

Ref #60 644E00500 STOP LINE, (335 FT)

Awd $2,010.00$6.00

2 $2,278.00$6.80

3 $2,345.00$7.00

4 $1,892.75$5.65

5 $2,010.00$6.00

6 $2,010.00$6.00

7 $2,010.00$6.00

Ref #61 644E00600 CROSSWALK LINE, (1291 FT)

Awd $3,550.25$2.75

2 $3,098.40$2.40

3 $4,131.20$3.20

4 $2,582.00$2.00

5 $3,550.25$2.75

6 $3,550.25$2.75

7 $3,550.25$2.75

160107 - Page 188

Page 189: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #62 644E00700 TRANSVERSE/DIAGONAL LINE, (57 FT)

Awd $313.50$5.50

2 $342.00$6.00

3 $364.80$6.40

4 $282.15$4.95

5 $313.50$5.50

6 $313.50$5.50

7 $313.50$5.50

Ref #63 644E01300 LANE ARROW, (2 EACH)

Awd $250.00$125.00

2 $204.00$102.00

3 $291.40$145.70

4 $170.00$85.00

5 $250.00$125.00

6 $250.00$125.00

7 $250.00$125.00

Ref #64 644E19000 SHARED LANE MARKING, (24 EACH)

Awd $7,200.00$300.00

2 $4,320.00$180.00

3 $8,391.60$349.65

4 $3,600.00$150.00

5 $7,200.00$300.00

6 $7,200.00$300.00

7 $7,200.00$300.00

Section 6 - TRAFFIC CONTROL - Totals

Awd $50,059.80

2 $49,835.10

3 $57,202.61

4 $45,032.33

5 $50,059.80

6 $50,059.80

7 $50,059.80

Ref #65 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B, (60 CY)

Awd $6,000.00$100.00

2 $915.00$15.25

3 $2,400.00$40.00

4 $1,200.00$20.00

5 $2,400.00$40.00

6 $3,000.00$50.00

7 $4,320.00$72.00

Ref #66 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (200 HOUR)

Awd $14,000.00$70.00

2 $9,600.00$48.00

3 $15,150.00$75.75

4 $15,000.00$75.00

5 $12,000.00$60.00

6 $13,000.00$65.00

7 $13,000.00$65.00

160107 - Page 189

Page 190: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #67 614E11130 LAW ENFORCEMENT OFFICER FOR ASSISTANCE, (40 HOUR)

Awd $2,600.00$65.00

2 $1,640.00$41.00

3 $2,200.00$55.00

4 $2,200.00$55.00

5 $1,800.00$45.00

6 $2,000.00$50.00

7 $2,000.00$50.00

Ref #68 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (120 CY)

Awd $12,000.00$100.00

2 $9,480.00$79.00

3 $15,000.00$125.00

4 $26,400.00$220.00

5 $12,000.00$100.00

6 $12,000.00$100.00

7 $23,400.00$195.00

Ref #69 616E10000 WATER, (60 MGAL)

Awd $60.00$1.00

2 $144.00$2.40

3 $3,600.00$60.00

4 $60.00$1.00

5 $600.00$10.00

6 $600.00$10.00

7 $60.00$1.00

Ref #70 616E20000 CALCIUM CHLORIDE, (25 TON)

Awd $2,500.00$100.00

2 $300.00$12.00

3 $13,750.00$550.00

4 $25.00$1.00

5 $2,500.00$100.00

6 $500.00$20.00

7 $250.00$10.00

Section 7 - MAINTENANCE OF TRAFFIC - Totals

Awd $37,160.00

2 $22,079.00

3 $52,100.00

4 $44,885.00

5 $31,300.00

6 $31,100.00

7 $43,030.00

Ref #71 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $12,000.00$12,000.00

2 $9,760.00$9,760.00

3 $20,000.00$20,000.00

4 $18,000.00$18,000.00

5 $15,000.00$15,000.00

6 $35,000.00$35,000.00

7 $27,500.00$27,500.00

160107 - Page 190

Page 191: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #72 614E11001 MAINTAINING TRAFFIC, AS PER PLAN, (LUMP SUM)

Awd $42,050.00$42,050.00

2 $23,500.00$23,500.00

3 $78,000.00$78,000.00

4 $100,000.00$100,000.00

5 $101,350.00$101,350.00

6 $188,000.00$188,000.00

7 $121,000.00$121,000.00

Ref #73 619E16011 FIELD OFFICE, TYPE B, AS PER PLAN, (9 MNTH)

Awd $22,500.00$2,500.00

2 $10,818.00$1,202.00

3 $14,400.00$1,600.00

4 $15,750.00$1,750.00

5 $16,200.00$1,800.00

6 $27,000.00$3,000.00

7 $16,200.00$1,800.00

Ref #74 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P, (LUMP SUM)

Awd $5,000.00$5,000.00

2 $3,000.00$3,000.00

3 $6,000.00$6,000.00

4 $4,200.00$4,200.00

5 $28,000.00$28,000.00

6 $10,000.00$10,000.00

7 $13,455.00$13,455.00

Ref #75 624E10000 MOBILIZATION, (LUMP SUM)

Awd $63,500.00$63,500.00

2 $105,000.00$105,000.00

3 $50,000.00$50,000.00

4 $67,500.00$67,500.00

5 $54,000.00$54,000.00

6 $90,000.00$90,000.00

7 $229,000.00$229,000.00

Section 8 - INCIDENTALS - Totals

Awd $145,050.00

2 $152,078.00

3 $168,400.00

4 $205,450.00

5 $214,550.00

6 $350,000.00

7 $407,155.00

160107 - Page 191

Page 192: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Project No. 160108

PID 97676

CUY-IR 271-10.87 Safety

Federal

Type: INTERCHANGE

Completion Date: 10/15/2017

Award Amount: $2,631,010.37

Contract Awarded To: BURTON SCOT CONTRACTORS LLC

Letting Date: 3/1/2016

Engineer's Estimate: $2,376,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jerry Wray, Director

BURTON SCOT CONTRACTORS LLC

11330 KINSMAN RD

NEWBURY, OH 44065

Geauga

Bidder 1

Bid $2,631,010.37

KARVO COMPANIES INC

4524 HUDSON DR

STOW, OH 44224-1702

Bidder 2

Bid $2,711,566.89

PERK COMPANY INC

8100 GRAND AVE SUITE 300

CLEVELAND, OH 44104-3110

Bidder 3

Bid $2,761,731.20

GREAT LAKES CONSTRUCTION CO

2608 GREAT LAKES WAY

HINCKLEY, OH 44233

Medina

Bidder 4

Bid $2,881,405.99

160108 - Page 192

Page 193: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)

Awd $30,000.00$30,000.00

2 $24,000.00$24,000.00

3 $500.00$500.00

4 $50,000.00$50,000.00

Ref #2 202E23000 PAVEMENT REMOVED, (1933 SY)

Awd $48,325.00$25.00

2 $26,578.75$13.75

3 $43,492.50$22.50

4 $38,660.00$20.00

Ref #3 202E23500 WEARING COURSE REMOVED, (10932 SY)

Awd $60,126.00$5.50

2 $37,715.40$3.45

3 $24,597.00$2.25

4 $43,728.00$4.00

Ref #4 202E30000 WALK REMOVED, (5700 SF)

Awd $28,500.00$5.00

2 $1,254.00$0.22

3 $14,250.00$2.50

4 $17,100.00$3.00

Ref #5 202E32000 CURB REMOVED, (3073 FT)

Awd $15,365.00$5.00

2 $921.90$0.30

3 $21,511.00$7.00

4 $6,146.00$2.00

Ref #6 202E35100 PIPE REMOVED, 24" AND UNDER, (556 FT)

Awd $16,680.00$30.00

2 $34,472.00$62.00

3 $20,016.00$36.00

4 $19,460.00$35.00

Ref #7 202E35200 PIPE REMOVED, OVER 24", (13 FT)

Awd $3,250.00$250.00

2 $598.00$46.00

3 $650.00$50.00

4 $455.00$35.00

Ref #8 202E38000 GUARDRAIL REMOVED, (267 FT)

Awd $400.50$1.50

2 $400.50$1.50

3 $400.50$1.50

4 $2,136.00$8.00

Ref #9 202E58000 MANHOLE REMOVED, (2 EACH)

Awd $1,500.00$750.00

2 $1,180.00$590.00

3 $3,000.00$1,500.00

4 $1,400.00$700.00

Ref #10 202E58100 CATCH BASIN REMOVED, (10 EACH)

Awd $7,500.00$750.00

2 $7,000.00$700.00

3 $5,000.00$500.00

4 $5,500.00$550.00

160108 - Page 193

Page 194: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #11 202E58501 CATCH BASIN ABANDONED, AS PER PLAN, (9 EACH)

Awd $6,750.00$750.00

2 $22,500.00$2,500.00

3 $4,500.00$500.00

4 $18,000.00$2,000.00

Ref #12 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, (101 FT)

Awd $4,040.00$40.00

2 $1,792.75$17.75

3 $1,515.00$15.00

4 $1,515.00$15.00

Ref #13 202E75261 VANDAL PROTECTION FENCE REMOVED, AS PER PLAN, (39 FT)

Awd $390.00$10.00

2 $975.00$25.00

3 $975.00$25.00

4 $1,287.00$33.00

Ref #14 202E98300 REMOVAL MISC.: CONCRETE APRON, (441 SY)

Awd $8,820.00$20.00

2 $4,410.00$10.00

3 $7,276.50$16.50

4 $5,733.00$13.00

Ref #15 202E98500 REMOVAL MISC.: RETAINING WALL, (17 CY)

Awd $1,700.00$100.00

2 $6,800.00$400.00

3 $3,757.00$221.00

4 $2,550.00$150.00

Ref #16 203E10000 EXCAVATION, (2890 CY)

Awd $72,250.00$25.00

2 $95,370.00$33.00

3 $81,064.50$28.05

4 $106,930.00$37.00

Ref #17 203E20000 EMBANKMENT, (754 CY)

Awd $15,080.00$20.00

2 $13,949.00$18.50

3 $19,604.00$26.00

4 $15,080.00$20.00

Ref #18 203E98500 ROADWAY, MISC.: REMOVABLE CURB, (LUMP SUM)

Awd $3,000.00$3,000.00

2 $475.00$475.00

3 $3,500.00$3,500.00

4 $700.00$700.00

Ref #19 204E10000 SUBGRADE COMPACTION, (5719 SY)

Awd $17,157.00$3.00

2 $7,148.75$1.25

3 $11,438.00$2.00

4 $17,157.00$3.00

Ref #20 204E13000 EXCAVATION OF SUBGRADE, (1752 CY)

Awd $52,560.00$30.00

2 $52,560.00$30.00

3 $36,792.00$21.00

4 $63,072.00$36.00

160108 - Page 194

Page 195: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #21 204E30010 GRANULAR MATERIAL, TYPE B, (1752 CY)

Awd $78,840.00$45.00

2 $84,096.00$48.00

3 $101,616.00$58.00

4 $96,360.00$55.00

Ref #22 204E45000 PROOF ROLLING, (3 HOUR)

Awd $450.00$150.00

2 $450.00$150.00

3 $300.00$100.00

4 $750.00$250.00

Ref #23 204E50001 GEOTEXTILE FABRIC, AS PER PLAN, (5255 SY)

Awd $7,882.50$1.50

2 $6,306.00$1.20

3 $10,510.00$2.00

4 $7,882.50$1.50

Ref #24 606E15050 GUARDRAIL, TYPE MGS, (475 FT)

Awd $7,220.00$15.20

2 $7,220.00$15.20

3 $7,220.00$15.20

4 $7,220.00$15.20

Ref #25 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS, (62.5 FT)

Awd $1,175.00$18.80

2 $1,175.00$18.80

3 $1,175.00$18.80

4 $1,175.00$18.80

Ref #26 606E15551 GUARDRAIL, BARRIER DESIGN, TYPE MGS, AS PER PLAN, (125 FT)

Awd $3,150.00$25.20

2 $3,150.00$25.20

3 $3,150.00$25.20

4 $3,150.00$25.20

Ref #27 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, (2 EACH)

Awd $3,700.00$1,850.00

2 $3,700.00$1,850.00

3 $3,700.00$1,850.00

4 $3,700.00$1,850.00

Ref #28 606E26550 ANCHOR ASSEMBLY, MGS TYPE T, (3 EACH)

Awd $2,235.00$745.00

2 $2,235.00$745.00

3 $2,235.00$745.00

4 $2,235.00$745.00

Ref #29 608E11000 4-1/2" CONCRETE WALK, (5378 SF)

Awd $37,646.00$7.00

2 $37,646.00$7.00

3 $36,301.50$6.75

4 $32,268.00$6.00

Ref #30 608E52011 CURB RAMP, TYPE A1, AS PER PLAN, (212 SF)

Awd $3,180.00$15.00

2 $4,452.00$21.00

3 $6,042.00$28.50

4 $5,300.00$25.00

160108 - Page 195

Page 196: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #31 608E52021 CURB RAMP, TYPE A2, AS PER PLAN, (289 SF)

Awd $4,335.00$15.00

2 $5,780.00$20.00

3 $8,236.50$28.50

4 $7,225.00$25.00

Ref #32 608E52031 CURB RAMP, TYPE B1, AS PER PLAN, (128 SF)

Awd $1,920.00$15.00

2 $2,496.00$19.50

3 $3,648.00$28.50

4 $3,200.00$25.00

Ref #33 608E52041 CURB RAMP, TYPE B2, APP, (168 SF)

Awd $2,520.00$15.00

2 $2,940.00$17.50

3 $4,788.00$28.50

4 $4,200.00$25.00

Ref #34 608E52045 CURB RAMP, TYPE B3, AS PER PLAN, (74 SF)

Awd $1,110.00$15.00

2 $1,221.00$16.50

3 $2,109.00$28.50

4 $1,850.00$25.00

Ref #35 608E52061 CURB RAMP, TYPE C2, AS PER PLAN, (155 SF)

Awd $2,325.00$15.00

2 $2,441.25$15.75

3 $4,417.50$28.50

4 $3,875.00$25.00

Ref #36 623E40000 MONUMENT ASSEMBLY REMOVED AND RESET, (1 EACH)

Awd $1,000.00$1,000.00

2 $800.00$800.00

3 $850.00$850.00

4 $300.00$300.00

Section 1 - ROADWAY - Totals

Awd $552,082.00

2 $506,209.30

3 $500,137.50

4 $597,299.50

Ref #37 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1, (6 SY)

Awd $1,200.00$200.00

2 $1,200.00$200.00

3 $1,500.00$250.00

4 $1,800.00$300.00

Ref #38 659E00100 SOIL ANALYSIS TEST, (2 EACH)

Awd $100.00$50.00

2 $100.00$50.00

3 $100.00$50.00

4 $100.00$50.00

Ref #39 659E00300 TOPSOIL, (553 CY)

Awd $14,765.10$26.70

2 $14,931.00$27.00

3 $22,673.00$41.00

4 $16,590.00$30.00

160108 - Page 196

Page 197: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #40 659E10000 SEEDING AND MULCHING, (4792 SY)

Awd $3,594.00$0.75

2 $3,594.00$0.75

3 $26,356.00$5.50

4 $3,594.00$0.75

Ref #41 659E14000 REPAIR SEEDING AND MULCHING, (240 SY)

Awd $360.00$1.50

2 $360.00$1.50

3 $600.00$2.50

4 $360.00$1.50

Ref #42 659E15000 INTER-SEEDING, (240 SY)

Awd $2.40$0.01

2 $60.00$0.25

3 $600.00$2.50

4 $2.40$0.01

Ref #43 659E20000 COMMERCIAL FERTILIZER, (0.67 TON)

Awd $469.00$700.00

2 $469.00$700.00

3 $569.50$850.00

4 $469.00$700.00

Ref #44 659E31000 LIME, (0.99 ACRE)

Awd $0.99$1.00

2 $0.99$1.00

3 $742.50$750.00

4 $0.01$0.01

Ref #45 659E35000 WATER, (27 MGAL)

Awd $2.70$0.10

2 $27.00$1.00

3 $1,080.00$40.00

4 $0.27$0.01

Ref #46 659E40000 MOWING, (11 MSF)

Awd $1.10$0.10

2 $11.00$1.00

3 $110.00$10.00

4 $0.11$0.01

Ref #47 670E00700 DITCH EROSION PROTECTION, (186 SY)

Awd $465.00$2.50

2 $465.00$2.50

3 $2,464.50$13.25

4 $465.00$2.50

Ref #48 832E15000 STORM WATER POLLUTION PREVENTION PLAN, (LUMP SUM)

Awd $5,000.00$5,000.00

2 $16,000.00$16,000.00

3 $2,850.00$2,850.00

4 $10,000.00$10,000.00

Ref #49 832E30000 EROSION CONTROL, (29000 EACH)

Awd $29,000.00$1.00

2 $29,000.00$1.00

3 $29,000.00$1.00

4 $29,000.00$1.00

160108 - Page 197

Page 198: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Section 2 - EROSION CONTROL - Totals

Awd $54,960.29

2 $66,217.99

3 $88,645.50

4 $62,380.79

Ref #50 602E20000 CONCRETE MASONRY, (0.21 CY)

Awd $420.00$2,000.00

2 $729.75$3,475.00

3 $420.00$2,000.00

4 $672.00$3,200.00

Ref #51 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS, (100 FT)

Awd $2,500.00$25.00

2 $1,500.00$15.00

3 $1,800.00$18.00

4 $1,500.00$15.00

Ref #52 605E14020 6" BASE PIPE UNDERDRAINS WITH FABRIC WRAP, (3510 FT)

Awd $52,650.00$15.00

2 $47,385.00$13.50

3 $63,180.00$18.00

4 $45,630.00$13.00

Ref #53 611E00406 4" CONDUIT, TYPE F, (100 FT)

Awd $2,000.00$20.00

2 $2,000.00$20.00

3 $1,800.00$18.00

4 $2,000.00$20.00

Ref #54 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS, (469 FT)

Awd $16,415.00$35.00

2 $10,318.00$22.00

3 $8,442.00$18.00

4 $13,132.00$28.00

Ref #55 611E04400 12" CONDUIT, TYPE B, (381 FT)

Awd $43,815.00$115.00

2 $44,958.00$118.00

3 $59,055.00$155.00

4 $60,960.00$160.00

Ref #56 611E04400 12" CONDUIT, TYPE B, 706.02, (168 FT)

Awd $21,840.00$130.00

2 $20,496.00$122.00

3 $26,040.00$155.00

4 $20,160.00$120.00

Ref #57 611E04600 12" CONDUIT, TYPE C, (198 FT)

Awd $20,790.00$105.00

2 $18,414.00$93.00

3 $30,690.00$155.00

4 $19,800.00$100.00

Ref #58 611E05900 15" CONDUIT, TYPE B, (50 FT)

Awd $7,000.00$140.00

2 $5,750.00$115.00

3 $8,500.00$170.00

4 $8,250.00$165.00

160108 - Page 198

Page 199: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #59 611E06100 15" CONDUIT, TYPE C, (34 FT)

Awd $3,910.00$115.00

2 $3,400.00$100.00

3 $5,780.00$170.00

4 $4,590.00$135.00

Ref #60 611E07400 18" CONDUIT, TYPE B, (30 FT)

Awd $6,000.00$200.00

2 $4,500.00$150.00

3 $7,500.00$250.00

4 $4,800.00$160.00

Ref #61 611E16400 36" CONDUIT, TYPE B, (15 FT)

Awd $4,500.00$300.00

2 $5,625.00$375.00

3 $5,475.00$365.00

4 $5,475.00$365.00

Ref #62 611E98210 CATCH BASIN, CUYAHOGA COUNTY NO. 3C, (14 EACH)

Awd $56,000.00$4,000.00

2 $41,650.00$2,975.00

3 $44,870.00$3,205.00

4 $36,400.00$2,600.00

Ref #63 611E98220 CATCH BASIN, CUYAHOGA COUNTY TWIN 3C, (2 EACH)

Awd $12,000.00$6,000.00

2 $12,350.00$6,175.00

3 $9,340.00$4,670.00

4 $11,000.00$5,500.00

Ref #64 611E98221 CATCH BASIN, CUYAHOGA COUNTY TWIN 3C, AS PER PLAN, (1 EACH)

Awd $6,000.00$6,000.00

2 $6,200.00$6,200.00

3 $4,400.00$4,400.00

4 $5,500.00$5,500.00

Ref #65 611E98410 CATCH BASIN, NO. 8, (1 EACH)

Awd $5,000.00$5,000.00

2 $3,100.00$3,100.00

3 $4,180.00$4,180.00

4 $3,800.00$3,800.00

Ref #66 611E98840 INLET, NO. 2-A-6, (5 EACH)

Awd $32,500.00$6,500.00

2 $23,000.00$4,600.00

3 $26,450.00$5,290.00

4 $22,500.00$4,500.00

Ref #67 611E98850 INLET, NO. 2-A-8, (3 EACH)

Awd $21,000.00$7,000.00

2 $14,100.00$4,700.00

3 $16,275.00$5,425.00

4 $14,400.00$4,800.00

Ref #68 611E99574 MANHOLE, NO. 3, (2 EACH)

Awd $8,000.00$4,000.00

2 $7,000.00$3,500.00

3 $8,590.00$4,295.00

4 $6,000.00$3,000.00

160108 - Page 199

Page 200: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #69 611E99654 MANHOLE ADJUSTED TO GRADE, (4 EACH)

Awd $4,000.00$1,000.00

2 $2,800.00$700.00

3 $3,400.00$850.00

4 $2,800.00$700.00

Ref #70 611E99660 MANHOLE RECONSTRUCTED TO GRADE, (4 EACH)

Awd $7,000.00$1,750.00

2 $4,600.00$1,150.00

3 $3,800.00$950.00

4 $8,800.00$2,200.00

Ref #71 611E99710 PRECAST REINFORCED CONCRETE OUTLET, (3 EACH)

Awd $750.00$250.00

2 $687.21$229.07

3 $750.00$250.00

4 $900.00$300.00

Ref #72 611E99820 SPECIAL - MISCELLANEOUS METAL, (1980 LB)

Awd $5,940.00$3.00

2 $2,970.00$1.50

3 $1,980.00$1.00

4 $1,980.00$1.00

Section 3 - DRAINAGE - Totals

Awd $340,030.00

2 $283,532.96

3 $342,717.00

4 $301,049.00

Ref #73 251E01000 PARTIAL DEPTH PAVEMENT REPAIR, (300 SY)

Awd $21,000.00$70.00

2 $26,700.00$89.00

3 $15,000.00$50.00

4 $15,000.00$50.00

Ref #74 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (3035 SY)

Awd $30,350.00$10.00

2 $10,319.00$3.40

3 $30,350.00$10.00

4 $30,350.00$10.00

Ref #75 304E20000 AGGREGATE BASE, (889 CY)

Awd $53,340.00$60.00

2 $66,675.00$75.00

3 $56,007.00$63.00

4 $71,120.00$80.00

Ref #76 305E13000 9" CONCRETE BASE, (3263 SY)

Awd $221,884.00$68.00

2 $221,884.00$68.00

3 $277,355.00$85.00

4 $277,355.00$85.00

Ref #77 407E10000 TACK COAT, (228 GAL)

Awd $456.00$2.00

2 $399.00$1.75

3 $456.00$2.00

4 $456.00$2.00

160108 - Page 200

Page 201: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #78 407E13900 TACK COAT, 702.13, (819 GAL)

Awd $1,638.00$2.00

2 $1,433.25$1.75

3 $1,638.00$2.00

4 $1,638.00$2.00

Ref #79 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (561 GAL)

Awd $1,122.00$2.00

2 $981.75$1.75

3 $1,122.00$2.00

4 $1,122.00$2.00

Ref #80 409E30000 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT, (1979 FT)

Awd $3,958.00$2.00

2 $9,895.00$5.00

3 $2,968.50$1.50

4 $2,968.50$1.50

Ref #81 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS, (591 CY)

Awd $130,020.00$220.00

2 $115,245.00$195.00

3 $118,200.00$200.00

4 $118,200.00$200.00

Ref #82 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (448, (834 CY)

Awd $133,440.00$160.00

2 $131,772.00$158.00

3 $125,100.00$150.00

4 $125,100.00$150.00

Ref #83 451E32000 SPECIAL - PRESSURE RELIEF JOINT, TYPE C, (8 FT)

Awd $800.00$100.00

2 $920.00$115.00

3 $1,400.00$175.00

4 $800.00$100.00

Ref #84 452E10050 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS, (298 SY)

Awd $19,370.00$65.00

2 $14,900.00$50.00

3 $25,330.00$85.00

4 $25,330.00$85.00

Ref #85 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1, (11 SY)

Awd $1,100.00$100.00

2 $1,089.00$99.00

3 $2,200.00$200.00

4 $1,925.00$175.00

Ref #86 452E13010 9" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1, (1711 SY)

Awd $116,348.00$68.00

2 $108,648.50$63.50

3 $145,435.00$85.00

4 $153,990.00$90.00

Ref #87 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN, (376 FT)

Awd $16,920.00$45.00

2 $10,904.00$29.00

3 $15,040.00$40.00

4 $15,792.00$42.00

160108 - Page 201

Page 202: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #88 609E14000 CURB, TYPE 2-A, (1140 FT)

Awd $11,400.00$10.00

2 $7,980.00$7.00

3 $11,400.00$10.00

4 $10,260.00$9.00

Ref #89 609E16000 CURB, TYPE 2-B, (1207 FT)

Awd $12,070.00$10.00

2 $8,449.00$7.00

3 $13,277.00$11.00

4 $19,312.00$16.00

Ref #90 609E50000 4" CONCRETE TRAFFIC ISLAND, (33 SY)

Awd $2,145.00$65.00

2 $6,105.00$185.00

3 $4,950.00$150.00

4 $2,145.00$65.00

Ref #91 875E10000 LONGITUDINAL JOINT ADHESIVE, (1383 LB)

Awd $8,298.00$6.00

2 $3,042.60$2.20

3 $6,915.00$5.00

4 $6,915.00$5.00

Section 4 - PAVEMENT - Totals

Awd $785,659.00

2 $747,342.10

3 $854,143.50

4 $879,778.50

Ref #92 638E02501 12" WATER MAIN DUCTILE IRON PIPE ANSI CLASS 52, ME, (5 FT)

Awd $10,000.00$2,000.00

2 $4,700.00$940.00

3 $3,375.00$675.00

4 $5,500.00$1,100.00

Ref #93 638E10701 FIRE HYDRANT REMOVED AND DISPOSED OF, AS PER PLAN, (1 EACH)

Awd $2,000.00$2,000.00

2 $685.00$685.00

3 $400.00$400.00

4 $500.00$500.00

Ref #94 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN, (8 EACH)

Awd $4,000.00$500.00

2 $1,320.00$165.00

3 $6,800.00$850.00

4 $1,200.00$150.00

Ref #95 638E20102 SPECIAL - 6" WATER MAIN DUCTILE IRON PIPE WITH PUS, (40 FT)

Awd $10,000.00$250.00

2 $3,920.00$98.00

3 $4,400.00$110.00

4 $8,000.00$200.00

Ref #96 638E24600 SPECIAL - FURNISHING AND SETTING 6" HYDRANT, COMPL, (1 EACH)

Awd $7,500.00$7,500.00

2 $4,800.00$4,800.00

3 $5,250.00$5,250.00

4 $5,000.00$5,000.00

160108 - Page 202

Page 203: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #97 638E24700 SPECIAL - EXTEND AND ADJUST HYDRANT TO GRADE, TYPE, (1 EACH)

Awd $5,000.00$5,000.00

2 $4,150.00$4,150.00

3 $9,500.00$9,500.00

4 $1,200.00$1,200.00

Ref #98 638E29406 SPECIAL - EXTEND 3/4" WATER SERVICE CONNECTION, CO, (2 EACH)

Awd $7,000.00$3,500.00

2 $2,200.00$1,100.00

3 $7,000.00$3,500.00

4 $3,400.00$1,700.00

Section 5 - WATER WORK - Totals

Awd $45,500.00

2 $21,775.00

3 $36,725.00

4 $24,800.00

Ref #99 620E00500 DELINEATOR, POST MOUNTED, (16 EACH)

Awd $560.00$35.00

2 $560.00$35.00

3 $560.00$35.00

4 $560.00$35.00

Ref #100 620E31200 REMOVAL OF DELINEATOR, (13 EACH)

Awd $65.00$5.00

2 $65.00$5.00

3 $65.00$5.00

4 $65.00$5.00

Ref #101 621E00100 RPM, (79 EACH)

Awd $4,187.00$53.00

2 $3,950.00$50.00

3 $5,135.00$65.00

4 $3,950.00$50.00

Ref #102 625E32000 GROUND ROD, (4 EACH)

Awd $432.00$108.00

2 $940.00$235.00

3 $940.00$235.00

4 $940.00$235.00

Ref #103 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (182 FT)

Awd $910.00$5.00

2 $1,456.00$8.00

3 $910.00$5.00

4 $910.00$5.00

Ref #104 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (246 FT)

Awd $1,476.00$6.00

2 $2,214.00$9.00

3 $1,476.00$6.00

4 $1,476.00$6.00

Ref #105 630E04100 GROUND MOUNTED SUPPORT, NO. 4 POST, (64 FT)

Awd $512.00$8.00

2 $640.00$10.00

3 $512.00$8.00

4 $512.00$8.00

160108 - Page 203

Page 204: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #106 630E06400 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, S4X7.7, (173 FT)

Awd $2,422.00$14.00

2 $3,114.00$18.00

3 $2,422.00$14.00

4 $2,422.00$14.00

Ref #107 630E07000 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W8X18, (43 FT)

Awd $1,634.00$38.00

2 $1,161.00$27.00

3 $1,634.00$38.00

4 $1,634.00$38.00

Ref #108 630E08004 ONE WAY SUPPORT, NO. 3 POST, (120 FT)

Awd $840.00$7.00

2 $1,200.00$10.00

3 $840.00$7.00

4 $840.00$7.00

Ref #109 630E08520 STREET NAME SIGN SUPPORT, NO. 3 POST, (13 FT)

Awd $91.00$7.00

2 $156.00$12.00

3 $91.00$7.00

4 $91.00$7.00

Ref #110 630E08600 SIGN POST REFLECTOR, (13 EACH)

Awd $585.00$45.00

2 $455.00$35.00

3 $585.00$45.00

4 $585.00$45.00

Ref #111 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION, (12 EACH)

Awd $4,500.00$375.00

2 $3,540.00$295.00

3 $4,500.00$375.00

4 $4,500.00$375.00

Ref #112 630E11202 OVERHEAD SIGN SUPPORT, TYPE TC-16.21, DESIGN 12, (1 EACH)

Awd $8,800.00$8,800.00

2 $9,650.00$9,650.00

3 $8,800.00$8,800.00

4 $8,800.00$8,800.00

Ref #113 630E11206 OVERHEAD SIGN SUPPORT, TYPE TC-16.21, DESIGN 13, (1 EACH)

Awd $8,900.00$8,900.00

2 $10,600.00$10,600.00

3 $8,900.00$8,900.00

4 $8,900.00$8,900.00

Ref #114 630E20400 OVERHEAD SIGN SUPPORT, TYPE TC-12.30, DESIGN 4, (1 EACH)

Awd $9,100.00$9,100.00

2 $10,125.00$10,125.00

3 $9,100.00$9,100.00

4 $9,100.00$9,100.00

Ref #115 630E20600 OVERHEAD SIGN SUPPORT, TYPE TC-12.30, DESIGN 6, (1 EACH)

Awd $11,300.00$11,300.00

2 $10,775.00$10,775.00

3 $11,300.00$11,300.00

4 $11,300.00$11,300.00

160108 - Page 204

Page 205: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #116 630E75000 SIGN ATTACHMENT ASSEMBLY, (2 EACH)

Awd $1,020.00$510.00

2 $1,150.00$575.00

3 $1,020.00$510.00

4 $1,020.00$510.00

Ref #117 630E79100 SIGN HANGER ASSEMBLY, MAST ARM, (4 EACH)

Awd $820.00$205.00

2 $980.00$245.00

3 $820.00$205.00

4 $820.00$205.00

Ref #118 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED, (2 EACH)

Awd $110.00$55.00

2 $250.00$125.00

3 $110.00$55.00

4 $110.00$55.00

Ref #119 630E80100 SIGN, FLAT SHEET, (474 SF)

Awd $5,688.00$12.00

2 $5,688.00$12.00

3 $5,688.00$12.00

4 $5,688.00$12.00

Ref #120 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET, (240 SF)

Awd $3,600.00$15.00

2 $3,600.00$15.00

3 $3,600.00$15.00

4 $3,600.00$15.00

Ref #121 630E80224 SIGN, OVERHEAD EXTRUSHEET, (276 SF)

Awd $4,968.00$18.00

2 $4,416.00$16.00

3 $4,968.00$18.00

4 $4,968.00$18.00

Ref #122 630E80500 SIGN, DOUBLE FACED, STREET NAME, (2 EACH)

Awd $250.00$125.00

2 $170.00$85.00

3 $250.00$125.00

4 $250.00$125.00

Ref #123 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION, (12 EACH)

Awd $9,000.00$750.00

2 $9,420.00$785.00

3 $9,000.00$750.00

4 $9,000.00$750.00

Ref #124 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION, (4 EACH)

Awd $14,000.00$3,500.00

2 $13,500.00$3,375.00

3 $14,000.00$3,500.00

4 $14,000.00$3,500.00

Ref #125 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (49 EACH)

Awd $1,225.00$25.00

2 $490.00$10.00

3 $1,225.00$25.00

4 $1,225.00$25.00

160108 - Page 205

Page 206: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #126 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (2 EACH)

Awd $130.00$65.00

2 $80.00$40.00

3 $130.00$65.00

4 $130.00$65.00

Ref #127 630E85400 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND DISPOSAL, (1 EACH)

Awd $60.00$60.00

2 $30.00$30.00

3 $60.00$60.00

4 $60.00$60.00

Ref #128 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (44 EACH)

Awd $1,100.00$25.00

2 $440.00$10.00

3 $1,100.00$25.00

4 $1,100.00$25.00

Ref #129 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT , (7 EACH)

Awd $525.00$75.00

2 $1,365.00$195.00

3 $525.00$75.00

4 $525.00$75.00

Ref #130 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL, (10 EACH)

Awd $500.00$50.00

2 $1,600.00$160.00

3 $500.00$50.00

4 $500.00$50.00

Ref #131 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL, (1 EACH)

Awd $15.00$15.00

2 $30.00$30.00

3 $15.00$15.00

4 $15.00$15.00

Ref #132 630E89704 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL, TYP, (1 EACH)

Awd $1,100.00$1,100.00

2 $825.00$825.00

3 $1,100.00$1,100.00

4 $1,100.00$1,100.00

Ref #133 630E89706 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL, TYP, (1 EACH)

Awd $1,100.00$1,100.00

2 $1,150.00$1,150.00

3 $1,100.00$1,100.00

4 $1,100.00$1,100.00

Ref #134 646E10010 EDGE LINE, 6", (0.58 MILE)

Awd $1,699.40$2,930.00

2 $2,900.00$5,000.00

3 $1,972.00$3,400.00

4 $1,699.40$2,930.00

Ref #135 646E10100 LANE LINE, 4", (0.5 MILE)

Awd $1,125.00$2,250.00

2 $887.50$1,775.00

3 $900.00$1,800.00

4 $1,125.00$2,250.00

160108 - Page 206

Page 207: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #136 646E10200 CENTER LINE, (0.69 MILE)

Awd $3,129.15$4,535.00

2 $3,105.00$4,500.00

3 $4,002.00$5,800.00

4 $3,129.15$4,535.00

Ref #137 646E10300 CHANNELIZING LINE, 8", (3472 FT)

Awd $4,687.20$1.35

2 $5,208.00$1.50

3 $6,249.60$1.80

4 $4,687.20$1.35

Ref #138 646E10310 CHANNELIZING LINE, 12", (933 FT)

Awd $1,399.50$1.50

2 $1,866.00$2.00

3 $2,332.50$2.50

4 $1,399.50$1.50

Ref #139 646E10400 STOP LINE, (431 FT)

Awd $3,879.00$9.00

2 $5,172.00$12.00

3 $4,741.00$11.00

4 $3,879.00$9.00

Ref #140 646E10500 CROSSWALK LINE, (859 FT)

Awd $4,724.50$5.50

2 $4,939.25$5.75

3 $4,295.00$5.00

4 $4,724.50$5.50

Ref #141 646E10600 TRANSVERSE/DIAGONAL LINE, (415 FT)

Awd $3,008.75$7.25

2 $3,112.50$7.50

3 $2,905.00$7.00

4 $3,008.75$7.25

Ref #142 646E10620 CHEVRON MARKING, (26 FT)

Awd $188.50$7.25

2 $260.00$10.00

3 $182.00$7.00

4 $188.50$7.25

Ref #143 646E20300 LANE ARROW, (73 EACH)

Awd $10,950.00$150.00

2 $12,775.00$175.00

3 $9,125.00$125.00

4 $10,950.00$150.00

Ref #144 646E20410 WORD ON PAVEMENT, 96", (1 EACH)

Awd $200.00$200.00

2 $200.00$200.00

3 $175.00$175.00

4 $200.00$200.00

Ref #145 646E20502 DOTTED LINE, 4", (1348 FT)

Awd $1,752.40$1.30

2 $4,044.00$3.00

3 $4,044.00$3.00

4 $1,752.40$1.30

160108 - Page 207

Page 208: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #146 646E50000 REMOVAL OF PAVEMENT MARKING, (2 EACH)

Awd $500.00$250.00

2 $900.00$450.00

3 $400.00$200.00

4 $500.00$250.00

Ref #147 646E50100 REMOVAL OF PAVEMENT MARKING, (2027 FT)

Awd $2,027.00$1.00

2 $14,594.40$7.20

3 $4,054.00$2.00

4 $2,027.00$1.00

Section 6 - TRAFFIC CONTROL - Totals

Awd $140,795.40

2 $165,748.65

3 $148,358.10

4 $141,066.40

Ref #148 625E25408 CONDUIT, 2", 725.051, (253 FT)

Awd $4,306.06$17.02

2 $2,024.00$8.00

3 $2,024.00$8.00

4 $2,024.00$8.00

Ref #149 625E25504 CONDUIT, 3", 725.051, (356 FT)

Awd $6,336.80$17.80

2 $3,560.00$10.00

3 $3,560.00$10.00

4 $3,560.00$10.00

Ref #150 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 3", (751 FT)

Awd $31,091.40$41.40

2 $27,036.00$36.00

3 $27,036.00$36.00

4 $27,036.00$36.00

Ref #151 625E29000 TRENCH, (565 FT)

Awd $3,785.50$6.70

2 $4,520.00$8.00

3 $4,520.00$8.00

4 $4,520.00$8.00

Ref #152 625E30706 PULL BOX, 725.08, 24", (13 EACH)

Awd $10,894.00$838.00

2 $10,595.00$815.00

3 $10,595.00$815.00

4 $10,595.00$815.00

Ref #153 625E32000 GROUND ROD, (25 EACH)

Awd $2,700.00$108.00

2 $5,875.00$235.00

3 $5,875.00$235.00

4 $5,875.00$235.00

Ref #154 625E36000 PLASTIC CAUTION TAPE, (565 FT)

Awd $113.00$0.20

2 $282.50$0.50

3 $282.50$0.50

4 $282.50$0.50

160108 - Page 208

Page 209: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #155 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (48 FT)

Awd $240.00$5.00

2 $384.00$8.00

3 $240.00$5.00

4 $240.00$5.00

Ref #156 630E79100 SIGN HANGER ASSEMBLY, MAST ARM, (18 EACH)

Awd $3,690.00$205.00

2 $4,410.00$245.00

3 $3,690.00$205.00

4 $3,690.00$205.00

Ref #157 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED, (9 EACH)

Awd $405.00$45.00

2 $1,125.00$125.00

3 $405.00$45.00

4 $405.00$45.00

Ref #158 630E80100 SIGN, FLAT SHEET, (82 SF)

Awd $1,148.00$14.00

2 $984.00$12.00

3 $1,148.00$14.00

4 $1,148.00$14.00

Ref #159 630E80510 SIGN, STREET NAME, (6 EACH)

Awd $750.00$125.00

2 $1,650.00$275.00

3 $750.00$125.00

4 $750.00$125.00

Ref #160 632E04911 VEHICULAR SIGNAL HEAD, (LED) BLACK, 3-SECTION, 12", (28 EACH)

Awd $22,400.00$800.00

2 $27,440.00$980.00

3 $27,440.00$980.00

4 $27,440.00$980.00

Ref #161 632E04921 VEHICULAR SIGNAL HEAD, (LED) BLACK, 5-SECTION, 12", (3 EACH)

Awd $4,000.80$1,333.60

2 $4,425.00$1,475.00

3 $4,425.00$1,475.00

4 $4,425.00$1,475.00

Ref #162 632E04925 VEHICULAR SIGNAL HEAD, (LED) BLACK, 4-SECTION, 12", (1 EACH)

Awd $1,158.00$1,158.00

2 $1,300.00$1,300.00

3 $1,300.00$1,300.00

4 $1,300.00$1,300.00

Ref #163 632E20731 PEDESTRIAN SIGNAL HEAD (LED) , (COUNTDOWN), TYPE D, (10 EACH)

Awd $4,516.00$451.60

2 $5,800.00$580.00

3 $5,800.00$580.00

4 $5,800.00$580.00

Ref #164 632E25000 COVERING OF VEHICULAR SIGNAL HEAD, (32 EACH)

Awd $768.00$24.00

2 $1,760.00$55.00

3 $1,760.00$55.00

4 $1,760.00$55.00

160108 - Page 209

Page 210: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #165 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD, (10 EACH)

Awd $240.00$24.00

2 $400.00$40.00

3 $400.00$40.00

4 $400.00$40.00

Ref #166 632E26000 PEDESTRIAN PUSHBUTTON, (10 EACH)

Awd $2,320.00$232.00

2 $1,400.00$140.00

3 $1,400.00$140.00

4 $1,400.00$140.00

Ref #167 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG, (1758 FT)

Awd $3,973.08$2.26

2 $4,043.40$2.30

3 $4,043.40$2.30

4 $4,043.40$2.30

Ref #168 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG, (4791 FT)

Awd $12,073.32$2.52

2 $11,977.50$2.50

3 $11,977.50$2.50

4 $11,977.50$2.50

Ref #169 632E62830 INTERCONNECT, MISC.: REMOVAL OF INTERCONNECT CABLE, (LUMP SUM)

Awd $6,400.00$6,400.00

2 $2,250.00$2,250.00

3 $2,250.00$2,250.00

4 $2,250.00$2,250.00

Ref #170 632E64011 SIGNAL SUPPORT FOUNDATION, AS PER PLAN, (9 EACH)

Awd $18,180.00$2,020.00

2 $34,200.00$3,800.00

3 $34,200.00$3,800.00

4 $34,200.00$3,800.00

Ref #171 632E64021 PEDESTAL FOUNDATION, AS PER PLAN, (10 EACH)

Awd $5,900.00$590.00

2 $7,000.00$700.00

3 $7,000.00$700.00

4 $7,000.00$700.00

Ref #172 632E68300 POWER CABLE, 3 CONDUCTOR, NO. 6 AWG, (234 FT)

Awd $1,216.80$5.20

2 $690.30$2.95

3 $690.30$2.95

4 $690.30$2.95

Ref #173 632E69800 SERVICE CABLE, 3 CONDUCTOR, NO. 6 AWG, (134 FT)

Awd $696.80$5.20

2 $395.30$2.95

3 $395.30$2.95

4 $395.30$2.95

Ref #174 632E70001 POWER SERVICE, AS PER PLAN, (3 EACH)

Awd $7,200.00$2,400.00

2 $2,625.00$875.00

3 $2,625.00$875.00

4 $2,625.00$875.00

160108 - Page 210

Page 211: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #175 632E75042 SIGNAL SUPPORT, TYPE TC-81.21 DESIGN 4 POLE, WITH , (1 EACH)

Awd $6,932.20$6,932.20

2 $6,000.00$6,000.00

3 $6,000.00$6,000.00

4 $6,000.00$6,000.00

Ref #176 632E77231 SIGNAL SUPPORT, MECHANICAL DAMPER FOR TC-81.21 MAS, (4 EACH)

Awd $2,156.80$539.20

2 $2,200.00$550.00

3 $2,200.00$550.00

4 $2,200.00$550.00

Ref #177 632E80402 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 4, (1 EACH)

Awd $5,444.64$5,444.64

2 $4,650.00$4,650.00

3 $4,650.00$4,650.00

4 $4,650.00$4,650.00

Ref #178 632E80620 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 13, (5 EACH)

Awd $43,510.40$8,702.08

2 $40,500.00$8,100.00

3 $40,500.00$8,100.00

4 $40,500.00$8,100.00

Ref #179 632E80628 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 14, (2 EACH)

Awd $20,676.88$10,338.44

2 $19,100.00$9,550.00

3 $19,100.00$9,550.00

4 $19,100.00$9,550.00

Ref #180 632E89900 PEDESTAL, 8', TRANSFORMER BASE, (10 EACH)

Awd $5,940.00$594.00

2 $7,500.00$750.00

3 $7,500.00$750.00

4 $7,500.00$750.00

Ref #181 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA, (3 EACH)

Awd $11,904.00$3,968.00

2 $8,250.00$2,750.00

3 $8,250.00$2,750.00

4 $8,250.00$2,750.00

Ref #182 633E01661 CONTROLLER UNIT, TYPE 2070E, WITH CABINET, TYPE 33, (3 EACH)

Awd $29,324.40$9,774.80

2 $32,550.00$10,850.00

3 $32,550.00$10,850.00

4 $32,550.00$10,850.00

Ref #183 633E39001 CONTROLLER, MASTER, TRAFFIC RESPONSIVE, AS PER PLA, (1 EACH)

Awd $5,735.50$5,735.50

2 $2,641.00$2,641.00

3 $2,641.00$2,641.00

4 $2,641.00$2,641.00

Ref #184 633E67100 CABINET FOUNDATION, (3 EACH)

Awd $3,450.00$1,150.00

2 $6,900.00$2,300.00

3 $6,900.00$2,300.00

4 $6,900.00$2,300.00

160108 - Page 211

Page 212: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #185 633E67200 CONTROLLER WORK PAD, (3 EACH)

Awd $1,770.00$590.00

2 $1,350.00$450.00

3 $1,350.00$450.00

4 $1,350.00$450.00

Ref #186 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS , (3 EACH)

Awd $11,083.50$3,694.50

2 $12,000.00$4,000.00

3 $12,000.00$4,000.00

4 $12,000.00$4,000.00

Ref #187 633E99000 CONTROLLER ITEM, MISC.: REUSE OF EMERGENCY VEHICLE, (3 EACH)

Awd $15,300.00$5,100.00

2 $6,750.00$2,250.00

3 $6,750.00$2,250.00

4 $6,750.00$2,250.00

Ref #188 805E00101 GLOBAL POSITIONING SYSTEM CLOCK ASSEMBLY, AS PER , (4 EACH)

Awd $2,896.00$724.00

2 $2,920.00$730.00

3 $2,920.00$730.00

4 $2,920.00$730.00

Ref #189 809E69100 STOP-BAR RADAR DETECTION, (10 EACH)

Awd $57,180.00$5,718.00

2 $62,650.00$6,265.00

3 $62,650.00$6,265.00

4 $62,650.00$6,265.00

Section 7 - TRAFFIC SIGNALS - Totals

Awd $379,806.88

2 $384,113.00

3 $381,793.00

4 $381,793.00

Ref #190 661E40081 DECIDUOUS TREE, 2" CALIPER, AS PER PLAN, (9 EACH)

Awd $5,670.00$630.00

2 $5,670.00$630.00

3 $7,650.00$850.00

4 $5,670.00$630.00

Section 8 - LANDSCAPING - Totals

Awd $5,670.00

2 $5,670.00

3 $7,650.00

4 $5,670.00

Ref #191 608E21200 TEMPORARY ASPHALT CONCRETE WALK, (126 SF)

Awd $3,150.00$25.00

2 $1,044.54$8.29

3 $1,260.00$10.00

4 $630.00$5.00

160108 - Page 212

Page 213: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #192 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (100 HOUR)

Awd $6,500.00$65.00

2 $7,500.00$75.00

3 $7,500.00$75.00

4 $7,000.00$70.00

Ref #193 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL), (2 EACH)

Awd $7,200.00$3,600.00

2 $4,600.00$2,300.00

3 $5,150.00$2,575.00

4 $4,280.00$2,140.00

Ref #194 614E12420 DETOUR SIGNING, (LUMP SUM)

Awd $1,775.00$1,775.00

2 $3,000.00$3,000.00

3 $5,650.00$5,650.00

4 $1,775.00$1,775.00

Ref #195 614E13300 BARRIER REFLECTOR, TYPE B, (17 EACH)

Awd $102.00$6.00

2 $85.00$5.00

3 $136.00$8.00

4 $136.00$8.00

Ref #196 614E13350 OBJECT MARKER, ONE WAY, (17 EACH)

Awd $187.00$11.00

2 $123.25$7.25

3 $255.00$15.00

4 $255.00$15.00

Ref #197 614E20100 WORK ZONE LANE LINE, CLASS I, 642 PAINT, (0.11 MILE)

Awd $20.35$185.00

2 $33.00$300.00

3 $121.00$1,100.00

4 $20.35$185.00

Ref #198 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT, (0.43 MILE)

Awd $191.35$445.00

2 $378.40$880.00

3 $1,075.00$2,500.00

4 $191.35$445.00

Ref #199 614E22100 WORK ZONE EDGE LINE, CLASS I, 642 PAINT, (1.28 MILE)

Awd $384.00$300.00

2 $844.80$660.00

3 $2,304.00$1,800.00

4 $384.00$300.00

Ref #200 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 642 PAINT, (4522 FT)

Awd $2,487.10$0.55

2 $2,713.20$0.60

3 $3,843.70$0.85

4 $2,487.10$0.55

Ref #201 614E24200 WORK ZONE DOTTED LINE, CLASS I, 642 PAINT, (745 FT)

Awd $372.50$0.50

2 $1,341.00$1.80

3 $2,235.00$3.00

4 $372.50$0.50

160108 - Page 213

Page 214: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #202 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT, (262 FT)

Awd $655.00$2.50

2 $655.00$2.50

3 $917.00$3.50

4 $655.00$2.50

Ref #203 614E27200 WORK ZONE CROSSWALK LINE, CLASS I, 642 PAINT, (584 FT)

Awd $1,168.00$2.00

2 $1,635.20$2.80

3 $1,080.40$1.85

4 $1,168.00$2.00

Ref #204 614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT, (60 EACH)

Awd $2,700.00$45.00

2 $2,700.00$45.00

3 $3,300.00$55.00

4 $2,700.00$45.00

Ref #205 622E41000 PORTABLE BARRIER, 32", (620 FT)

Awd $31,000.00$50.00

2 $22,940.00$37.00

3 $18,600.00$30.00

4 $12,400.00$20.00

Section 9 - MAINTENANCE OF TRAFFIC - Totals

Awd $57,892.30

2 $49,593.39

3 $53,427.10

4 $34,454.30

Ref #206 517E70001 RAILING (TWIN STEEL TUBE), AS PER PLAN, (39 FT)

Awd $4,114.50$105.50

2 $4,114.50$105.50

3 $4,114.50$105.50

4 $4,114.50$105.50

Section 10 - MISCELLANEOUS STRUCTURE - Totals

Awd $4,114.50

2 $4,114.50

3 $4,114.50

4 $4,114.50

Ref #207 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $15,000.00$15,000.00

2 $35,000.00$35,000.00

3 $20,000.00$20,000.00

4 $35,000.00$35,000.00

Ref #208 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $150,000.00$150,000.00

2 $236,000.00$236,000.00

3 $164,205.00$164,205.00

4 $228,000.00$228,000.00

160108 - Page 214

Page 215: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #209 619E16011 FIELD OFFICE, TYPE B, AS PER PLAN, (13 MNTH)

Awd $19,500.00$1,500.00

2 $22,750.00$1,750.00

3 $41,600.00$3,200.00

4 $26,000.00$2,000.00

Ref #210 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)

Awd $30,000.00$30,000.00

2 $23,500.00$23,500.00

3 $15,000.00$15,000.00

4 $60,000.00$60,000.00

Ref #211 624E10000 MOBILIZATION, (LUMP SUM)

Awd $50,000.00$50,000.00

2 $160,000.00$160,000.00

3 $103,215.00$103,215.00

4 $100,000.00$100,000.00

Section 11 - INCIDENTALS - Totals

Awd $264,500.00

2 $477,250.00

3 $344,020.00

4 $449,000.00

160108 - Page 215

Page 216: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Project No. 160109

PID 97245

CUY-IR 90-25.97 Ped

Federal

Type: BRIDGE REPLACEMENT (1 BRIDGE)

Completion Date: 10/31/2016

Award Amount: $3,168,720.50

Contract Awarded To: J D WILLIAMSON CONSTRUCTION CO INC

Letting Date: 3/1/2016

Engineer's Estimate: $3,165,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jerry Wray, Director

J D WILLIAMSON CONSTRUCTION CO INC

441 GENEVA AVE, PO BOX 113

TALLMADGE, OH 44278

Summit

Bidder 1

Bid $3,168,720.50

UNION INDUSTRIAL CONTRACTORS INC

1800 EAST 21ST STREET

ASHTABULA, OH 44004

Ashtabula

Bidder 2

Bid $3,377,157.33

RUHLIN COMPANY

P O BOX 190

SHARON CENTER, OH 44274

Medina

Bidder 3

Bid $3,461,668.26

GREAT LAKES CONSTRUCTION CO

2608 GREAT LAKES WAY

HINCKLEY, OH 44233

Medina

Bidder 4

Bid $3,711,550.31

160109 - Page 216

Page 217: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)

Awd $10,000.00$10,000.00

2 $10,000.00$10,000.00

3 $10,500.00$10,500.00

4 $25,000.00$25,000.00

Ref #2 202E23000 PAVEMENT REMOVED, (44 SY)

Awd $572.00$13.00

2 $2,200.00$50.00

3 $924.00$21.00

4 $4,400.00$100.00

Ref #3 202E30000 WALK REMOVED, (553 SF)

Awd $967.75$1.75

2 $2,765.00$5.00

3 $1,106.00$2.00

4 $1,659.00$3.00

Ref #4 202E30700 CONCRETE BARRIER REMOVED, (22 FT)

Awd $803.00$36.50

2 $1,870.00$85.00

3 $616.00$28.00

4 $3,300.00$150.00

Ref #5 202E38200 GUARDRAIL REMOVED FOR REUSE, (25 FT)

Awd $112.50$4.50

2 $250.00$10.00

3 $105.00$4.20

4 $125.00$5.00

Ref #6 202E98100 REMOVAL MISC.: BOLLARDS, (6 EACH)

Awd $135.00$22.50

2 $600.00$100.00

3 $600.00$100.00

4 $300.00$50.00

Ref #7 203E10000 EXCAVATION, (7 CY)

Awd $91.00$13.00

2 $1,050.00$150.00

3 $245.00$35.00

4 $1,050.00$150.00

Ref #8 203E20000 EMBANKMENT, (959 CY)

Awd $17,022.25$17.75

2 $19,180.00$20.00

3 $23,975.00$25.00

4 $17,262.00$18.00

Ref #9 606E16000 GUARDRAIL REBUILT, (25 FT)

Awd $500.00$20.00

2 $625.00$25.00

3 $500.00$20.00

4 $500.00$20.00

Ref #10 608E13000 6" CONCRETE WALK, (6285 SF)

Awd $28,282.50$4.50

2 $43,995.00$7.00

3 $34,567.50$5.50

4 $40,852.50$6.50

160109 - Page 217

Page 218: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #11 608E40000 CONCRETE STEPS, TYPE A, (130 FT)

Awd $11,765.00$90.50

2 $22,750.00$175.00

3 $5,200.00$40.00

4 $19,500.00$150.00

Ref #12 609E14001 CURB, TYPE 2-A, AS PER PLAN A, (80 FT)

Awd $4,960.00$62.00

2 $6,000.00$75.00

3 $7,200.00$90.00

4 $14,400.00$180.00

Ref #13 609E14001 CURB, TYPE 2-A, AS PER PLAN B, (576 FT)

Awd $6,912.00$12.00

2 $11,520.00$20.00

3 $10,368.00$18.00

4 $8,640.00$15.00

Ref #14 622E23300 CONCRETE BARRIER, TYPE A, (22 FT)

Awd $2,750.00$125.00

2 $5,500.00$250.00

3 $8,800.00$400.00

4 $8,800.00$400.00

Section 1 - ROADWAY - Totals

Awd $84,873.00

2 $128,305.00

3 $104,706.50

4 $145,788.50

Ref #15 601E20011 CRUSHED AGGREGATE SLOPE PROTECTION, AS PER PLAN, (348 CY)

Awd $24,012.00$69.00

2 $43,500.00$125.00

3 $41,760.00$120.00

4 $41,760.00$120.00

Ref #16 659E00300 TOPSOIL, (20 CY)

Awd $1,700.00$85.00

2 $1,000.00$50.00

3 $1,600.00$80.00

4 $1,600.00$80.00

Ref #17 659E10000 SEEDING AND MULCHING, (177 SY)

Awd $398.25$2.25

2 $531.00$3.00

3 $354.00$2.00

4 $354.00$2.00

Ref #18 659E14000 REPAIR SEEDING AND MULCHING, (9 SY)

Awd $29.25$3.25

2 $36.00$4.00

3 $27.00$3.00

4 $27.00$3.00

Ref #19 659E20000 COMMERCIAL FERTILIZER, (0.03 TON)

Awd $16.50$550.00

2 $15.00$500.00

3 $15.00$500.00

4 $15.00$500.00

160109 - Page 218

Page 219: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #20 659E31000 LIME, (0.04 ACRE)

Awd $3.00$75.00

2 $4.00$100.00

3 $0.40$10.00

4 $0.80$20.00

Ref #21 659E35000 WATER, (1 MGAL)

Awd $50.00$50.00

2 $1.00$1.00

3 $50.00$50.00

4 $50.00$50.00

Ref #22 832E30000 EROSION CONTROL, (1674 EACH)

Awd $1,674.00$1.00

2 $1,674.00$1.00

3 $1,674.00$1.00

4 $1,674.00$1.00

Section 2 - EROSION CONTROL - Totals

Awd $27,883.00

2 $46,761.00

3 $45,480.40

4 $45,480.80

Ref #23 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS, (20 FT)

Awd $260.00$13.00

2 $1,000.00$50.00

3 $360.00$18.00

4 $700.00$35.00

Ref #24 611E04600 12" CONDUIT, TYPE C, (47 FT)

Awd $1,880.00$40.00

2 $4,700.00$100.00

3 $5,170.00$110.00

4 $5,875.00$125.00

Ref #25 611E98391 CATCH BASIN, NO. 7, AS PER PLAN, (1 EACH)

Awd $1,100.00$1,100.00

2 $4,000.00$4,000.00

3 $2,800.00$2,800.00

4 $2,000.00$2,000.00

Ref #26 611E99574 MANHOLE, NO. 3, (1 EACH)

Awd $2,100.00$2,100.00

2 $7,000.00$7,000.00

3 $2,300.00$2,300.00

4 $3,000.00$3,000.00

Section 3 - DRAINAGE - Totals

Awd $5,340.00

2 $16,700.00

3 $10,630.00

4 $11,575.00

160109 - Page 219

Page 220: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #27 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (1810 SY)

Awd $12,670.00$7.00

2 $11,765.00$6.50

3 $11,765.00$6.50

4 $11,765.00$6.50

Ref #28 302E46000 ASPHALT CONCRETE BASE, PG64-22, (18 CY)

Awd $6,147.00$341.50

2 $5,850.00$325.00

3 $5,850.00$325.00

4 $5,850.00$325.00

Ref #29 304E20000 AGGREGATE BASE, (9 CY)

Awd $468.00$52.00

2 $1,800.00$200.00

3 $1,260.00$140.00

4 $1,800.00$200.00

Ref #30 407E10000 TACK COAT, (137 GAL)

Awd $890.50$6.50

2 $822.00$6.00

3 $822.00$6.00

4 $822.00$6.00

Ref #31 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (3 GAL)

Awd $19.50$6.50

2 $18.00$6.00

3 $18.00$6.00

4 $18.00$6.00

Ref #32 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (82 CY)

Awd $21,730.00$265.00

2 $20,500.00$250.00

3 $20,500.00$250.00

4 $20,500.00$250.00

Ref #33 618E40100 RUMBLE STRIPS, (ASPHALT CONCRETE), (5425 FT)

Awd $4,882.50$0.90

2 $5,425.00$1.00

3 $6,510.00$1.20

4 $7,595.00$1.40

Section 4 - PAVEMENT - Totals

Awd $46,807.50

2 $46,180.00

3 $46,725.00

4 $48,350.00

Ref #34 625E98200 LIGHTING, MISC.: LIGHTING REMOVED, (LUMP SUM)

Awd $6,000.00$6,000.00

2 $5,000.00$5,000.00

3 $2,500.00$2,500.00

4 $5,400.00$5,400.00

160109 - Page 220

Page 221: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Section 5 - LIGHTING - Totals

Awd $6,000.00

2 $5,000.00

3 $2,500.00

4 $5,400.00

Ref #35 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (80 HOUR)

Awd $5,600.00$70.00

2 $6,400.00$80.00

3 $6,400.00$80.00

4 $5,600.00$70.00

Ref #36 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL), (3 EACH)

Awd $5,700.00$1,900.00

2 $6,000.00$2,000.00

3 $5,400.00$1,800.00

4 $6,900.00$2,300.00

Ref #37 614E12800 WORK ZONE RAISED PAVEMENT MARKER, (1049 EACH)

Awd $9,441.00$9.00

2 $6,294.00$6.00

3 $8,916.50$8.50

4 $6,294.00$6.00

Ref #38 614E13100 BARRIER REFLECTOR, (12 EACH)

Awd $78.00$6.50

2 $120.00$10.00

3 $72.00$6.00

4 $60.00$5.00

Ref #39 614E13350 OBJECT MARKER, ONE WAY, (12 EACH)

Awd $138.00$11.50

2 $120.00$10.00

3 $132.00$11.00

4 $84.00$7.00

Ref #40 614E20000 WORK ZONE LANE LINE, CLASS I, (1.37 MILE)

Awd $527.45$385.00

2 $315.10$230.00

3 $500.05$365.00

4 $315.10$230.00

Ref #41 614E22000 WORK ZONE EDGE LINE, CLASS I, (2.1 MILE)

Awd $1,060.50$505.00

2 $1,921.50$915.00

3 $1,008.00$480.00

4 $1,921.50$915.00

Ref #42 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, (13155 FT)

Awd $3,288.75$0.25

2 $7,235.25$0.55

3 $3,288.75$0.25

4 $7,235.25$0.55

Ref #43 622E41000 PORTABLE BARRIER, 32", (522 FT)

Awd $6,264.00$12.00

2 $15,660.00$30.00

3 $10,440.00$20.00

4 $15,660.00$30.00

160109 - Page 221

Page 222: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Section 6 - MAINTENANCE OF TRAFFIC - Totals

Awd $32,097.70

2 $44,065.85

3 $36,157.30

4 $44,069.85

Ref #44 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN, (LUMP SUM)

Awd $95,000.00$95,000.00

2 $100,000.00$100,000.00

3 $45,000.00$45,000.00

4 $141,000.00$141,000.00

Ref #45 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)

Awd $15,000.00$15,000.00

2 $30,000.00$30,000.00

3 $17,000.00$17,000.00

4 $10,000.00$10,000.00

Ref #46 503E21100 UNCLASSIFIED EXCAVATION, (346 CY)

Awd $17,300.00$50.00

2 $25,950.00$75.00

3 $17,300.00$50.00

4 $17,300.00$50.00

Ref #47 509E10000 EPOXY COATED REINFORCING STEEL, (257794 LB)

Awd $244,904.30$0.95

2 $237,170.48$0.92

3 $244,904.30$0.95

4 $283,573.40$1.10

Ref #48 511E31613 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, AS , (216 CY)

Awd $99,360.00$460.00

2 $108,000.00$500.00

3 $155,520.00$720.00

4 $162,000.00$750.00

Ref #49 511E42013 CLASS QC1 CONCRETE WITH QC/QA, PIER ABOVE FOOTINGS, (268 CY)

Awd $218,420.00$815.00

2 $187,600.00$700.00

3 $241,200.00$900.00

4 $375,200.00$1,400.00

Ref #50 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING , (55 CY)

Awd $24,750.00$450.00

2 $45,375.00$825.00

3 $31,350.00$570.00

4 $49,500.00$900.00

Ref #51 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING, (83 CY)

Awd $29,050.00$350.00

2 $43,575.00$525.00

3 $41,500.00$500.00

4 $49,800.00$600.00

Ref #52 511E53014 CLASS QC3 CONCRETE, MISC.: SUPERSTRUCTURE WITH QC/, (312 CY)

Awd $234,000.00$750.00

2 $202,800.00$650.00

3 $268,320.00$860.00

4 $240,240.00$770.00

160109 - Page 222

Page 223: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #53 511E81300 CONCRETE, MISC.: MOCKUP, MOLDED RANDOM BRICK PATTE, (3 EACH)

Awd $3,300.00$1,100.00

2 $4,500.00$1,500.00

3 $6,000.00$2,000.00

4 $4,500.00$1,500.00

Ref #54 512E10001 SEALING OF CONCRETE SURFACES, AS PER PLAN, (587 SY)

Awd $9,392.00$16.00

2 $20,545.00$35.00

3 $8,805.00$15.00

4 $8,805.00$15.00

Ref #55 512E10101 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), AS , (1857 SY)

Awd $30,640.50$16.50

2 $74,280.00$40.00

3 $22,284.00$12.00

4 $59,424.00$32.00

Ref #56 515E12091 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM, (20 EACH)

Awd $443,500.00$22,175.00

2 $460,000.00$23,000.00

3 $500,000.00$25,000.00

4 $440,000.00$22,000.00

Ref #57 516E10900 ELASTOMERIC COMPRESSION SEAL, (32 FT)

Awd $1,840.00$57.50

2 $3,200.00$100.00

3 $960.00$30.00

4 $1,920.00$60.00

Ref #58 516E11211 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S, (31 FT)

Awd $18,755.00$605.00

2 $23,250.00$750.00

3 $11,780.00$380.00

4 $15,500.00$500.00

Ref #59 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (226 SF)

Awd $1,130.00$5.00

2 $1,130.00$5.00

3 $1,356.00$6.00

4 $2,938.00$13.00

Ref #60 516E41100 1/8" PREFORMED BEARING PAD, (120 EACH)

Awd $3,000.00$25.00

2 $4,200.00$35.00

3 $2,400.00$20.00

4 $8,400.00$70.00

Ref #61 516E43200 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY (, (28 EACH)

Awd $14,840.00$530.00

2 $16,800.00$600.00

3 $25,200.00$900.00

4 $16,800.00$600.00

Ref #62 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (32 EACH)

Awd $11,680.00$365.00

2 $17,600.00$550.00

3 $16,000.00$500.00

4 $12,800.00$400.00

160109 - Page 223

Page 224: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #63 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (48 EACH)

Awd $18,000.00$375.00

2 $26,400.00$550.00

3 $24,000.00$500.00

4 $19,200.00$400.00

Ref #64 518E21200 POROUS BACKFILL WITH FILTER FABRIC, (30 CY)

Awd $2,340.00$78.00

2 $3,750.00$125.00

3 $2,700.00$90.00

4 $3,600.00$120.00

Ref #65 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE, (55 FT)

Awd $825.00$15.00

2 $1,650.00$30.00

3 $825.00$15.00

4 $825.00$15.00

Ref #66 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (34 FT)

Awd $510.00$15.00

2 $1,530.00$45.00

3 $510.00$15.00

4 $1,020.00$30.00

Ref #67 518E51201 PIPE DOWNSPOUT, INCLUDING SPECIALS, AS PER PLAN, (60 FT)

Awd $3,300.00$55.00

2 $2,700.00$45.00

3 $3,000.00$50.00

4 $12,000.00$200.00

Ref #68 524E94604 DRILLED SHAFTS, 30" DIAMETER, INTO BEDROCK, (42 FT)

Awd $9,450.00$225.00

2 $11,130.00$265.00

3 $12,180.00$290.00

4 $14,280.00$340.00

Ref #69 524E94702 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, (110 FT)

Awd $19,800.00$180.00

2 $24,750.00$225.00

3 $31,900.00$290.00

4 $30,800.00$280.00

Ref #70 524E94804 DRILLED SHAFTS, 42" DIAMETER, INTO BEDROCK, (131 FT)

Awd $39,300.00$300.00

2 $44,540.00$340.00

3 $57,640.00$440.00

4 $58,950.00$450.00

Ref #71 524E94902 DRILLED SHAFTS, 48" DIAMETER, ABOVE BEDROCK, (185 FT)

Awd $40,700.00$220.00

2 $48,100.00$260.00

3 $81,400.00$440.00

4 $77,700.00$420.00

Ref #72 524E94904 DRILLED SHAFTS, 48" DIAMETER, INTO BEDROCK, (46 FT)

Awd $16,790.00$365.00

2 $18,400.00$400.00

3 $24,380.00$530.00

4 $26,220.00$570.00

160109 - Page 224

Page 225: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #73 524E94906 DRILLED SHAFTS, 54" DIAMETER, ABOVE BEDROCK, (47 FT)

Awd $11,280.00$240.00

2 $12,925.00$275.00

3 $24,910.00$530.00

4 $24,440.00$520.00

Ref #74 524E94908 DRILLED SHAFTS, 54" DIAMETER, INTO BEDROCK, (33 FT)

Awd $16,665.00$505.00

2 $18,150.00$550.00

3 $19,800.00$600.00

4 $19,800.00$600.00

Ref #75 524E94914 DRILLED SHAFTS, 60" DIAMETER, ABOVE BEDROCK, (18 FT)

Awd $4,860.00$270.00

2 $5,400.00$300.00

3 $10,440.00$580.00

4 $10,800.00$600.00

Ref #76 607E98000 FENCE, MISC.:OFF BRIDGE, (1386 FT)

Awd $471,240.00$340.00

2 $436,590.00$315.00

3 $436,590.00$315.00

4 $436,590.00$315.00

Ref #77 607E98000 FENCE, MISC.:ON BRIDGE, (808 FT)

Awd $432,280.00$535.00

2 $404,000.00$500.00

3 $404,000.00$500.00

4 $404,000.00$500.00

Ref #78 839E30100 TRENCH DRAIN WITH PEDESTRIAN GRATE, (35 FT)

Awd $4,725.00$135.00

2 $2,625.00$75.00

3 $7,000.00$200.00

4 $10,500.00$300.00

Ref #79 840E20000 MECHANICALLY STABILIZED EARTH WALL, (775 SF)

Awd $32,550.00$42.00

2 $31,000.00$40.00

3 $31,000.00$40.00

4 $29,450.00$38.00

Ref #80 840E21000 WALL EXCAVATION, (238 CY)

Awd $7,140.00$30.00

2 $3,570.00$15.00

3 $7,616.00$32.00

4 $4,760.00$20.00

Ref #81 840E22000 FOUNDATION PREPARATION, (109 SY)

Awd $2,670.50$24.50

2 $4,905.00$45.00

3 $3,488.00$32.00

4 $3,815.00$35.00

Ref #82 840E23001 SELECT GRANULAR BACKFILL, AS PER PLAN, (326 CY)

Awd $15,159.00$46.50

2 $21,190.00$65.00

3 $22,820.00$70.00

4 $22,820.00$70.00

160109 - Page 225

Page 226: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #83 840E25010 6" DRAINAGE PIPE, PERFORATED, (168 FT)

Awd $2,352.00$14.00

2 $1,680.00$10.00

3 $1,680.00$10.00

4 $1,680.00$10.00

Ref #84 840E25020 6" DRAINAGE PIPE, NON-PERFORATED, (19 FT)

Awd $266.00$14.00

2 $285.00$15.00

3 $1,425.00$75.00

4 $950.00$50.00

Ref #85 840E26000 CONCRETE COPING, (80 FT)

Awd $10,000.00$125.00

2 $10,000.00$125.00

3 $8,800.00$110.00

4 $14,400.00$180.00

Ref #86 840E26050 AESTHETIC SURFACE TREATMENT, (775 SF)

Awd $9,300.00$12.00

2 $15,500.00$20.00

3 $3,875.00$5.00

4 $14,725.00$19.00

Ref #87 840E27000 ON-SITE ASSISTANCE, (5 DAY)

Awd $1,075.00$215.00

2 $2,500.00$500.00

3 $2,250.00$450.00

4 $2,000.00$400.00

Ref #88 840E28000 SGB INSPECTION AND COMPACTION TESTING, (LUMP SUM)

Awd $950.00$950.00

2 $5,000.00$5,000.00

3 $1,500.00$1,500.00

4 $2,000.00$2,000.00

Section 7 - STRUCTURE 20 FOOT SPAN AND OVER (CUY-90- - Totals

Awd $2,689,389.30

2 $2,764,245.48

3 $2,882,608.30

4 $3,147,025.40

Ref #89 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $30,000.00$30,000.00

2 $30,000.00$30,000.00

3 $29,800.00$29,800.00

4 $50,000.00$50,000.00

Ref #90 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $95,000.00$95,000.00

2 $140,000.00$140,000.00

3 $136,200.00$136,200.00

4 $50,000.00$50,000.00

Ref #91 619E16010 FIELD OFFICE, TYPE B, (7 MNTH)

Awd $13,300.00$1,900.00

2 $10,500.00$1,500.00

3 $21,000.00$3,000.00

4 $14,000.00$2,000.00

160109 - Page 226

Page 227: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #92 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)

Awd $17,000.00$17,000.00

2 $25,000.00$25,000.00

3 $26,000.00$26,000.00

4 $30,000.00$30,000.00

Ref #93 624E10000 MOBILIZATION, (LUMP SUM)

Awd $100,000.00$100,000.00

2 $100,000.00$100,000.00

3 $100,000.00$100,000.00

4 $100,000.00$100,000.00

Section 8 - INCIDENTALS - Totals

Awd $255,300.00

2 $305,500.00

3 $313,000.00

4 $244,000.00

Ref #100 646E10010 EDGE LINE, 6", (2.1 MILE)

Awd $9,450.00$4,500.00

2 $8,820.00$4,200.00

3 $8,643.60$4,116.00

4 $8,643.60$4,116.00

Ref #101 646E10110 LANE LINE, 6", (3.86 MILE)

Awd $11,580.00$3,000.00

2 $11,580.00$3,000.00

3 $11,217.16$2,906.00

4 $11,217.16$2,906.00

Section 9 - TRAFFIC CONTROL - Totals

Awd $21,030.00

2 $20,400.00

3 $19,860.76

4 $19,860.76

160109 - Page 227

Page 228: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Project No. 160110

PID 99435

CUY-SR 82-03.54 Safety

Federal

Type: INTERSECTION

Completion Date: 10/31/2016

Award Amount: $1,027,719.15

Contract Awarded To: BURTON SCOT CONTRACTORS LLC

Letting Date: 3/1/2016

Engineer's Estimate: $919,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jerry Wray, Director

BURTON SCOT CONTRACTORS LLC

11330 KINSMAN RD

NEWBURY, OH 44065

Geauga

Bidder 1

Bid $1,027,719.15

S E T INC

235 EAST WATER ST

LOWELLVILLE, OH 44436

Mahoning

Bidder 2

Bid $1,074,345.75

CHAGRIN VALLEY PAVING INC

17290 MUNN RD

CHAGRIN FALLS, OH 44023

Geauga

Bidder 3

Bid $1,079,120.30

GREAT LAKES CONSTRUCTION CO

2608 GREAT LAKES WAY

HINCKLEY, OH 44233

Medina

Bidder 4

Bid $1,124,039.27

PERK COMPANY INC

8100 GRAND AVE SUITE 300

CLEVELAND, OH 44104-3110

Bidder 5

Bid $1,220,154.50

LOCKHART CONCRETE CO

800 W WATERLOO RD

AKRON, OH 44314

Summit

Bidder 6

Bid $1,647,604.24

160110 - Page 228

Page 229: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)

Awd $10,000.00$10,000.00

2 $11,794.62$11,794.62

3 $100.00$100.00

4 $30,000.00$30,000.00

5 $8,660.00$8,660.00

6 $4,500.00$4,500.00

Ref #2 202E23000 PAVEMENT REMOVED, (3891 SY)

Awd $58,365.00$15.00

2 $29,221.41$7.51

3 $42,801.00$11.00

4 $62,256.00$16.00

5 $79,765.50$20.50

6 $19,455.00$5.00

Ref #3 202E30000 WALK REMOVED, (1957 SF)

Awd $4,892.50$2.50

2 $4,246.69$2.17

3 $1,957.00$1.00

4 $3,914.00$2.00

5 $3,229.05$1.65

6 $195.70$0.10

Ref #4 202E30500 CONCRETE MEDIAN REMOVED, (220 FT)

Awd $3,300.00$15.00

2 $2,853.40$12.97

3 $3,300.00$15.00

4 $1,540.00$7.00

5 $3,740.00$17.00

6 $2,200.00$10.00

Ref #5 202E30600 CONCRETE MEDIAN REMOVED, (20 SY)

Awd $1,000.00$50.00

2 $715.60$35.78

3 $300.00$15.00

4 $400.00$20.00

5 $600.00$30.00

6 $200.00$10.00

Ref #6 202E32000 CURB REMOVED, (493 FT)

Awd $2,465.00$5.00

2 $2,519.23$5.11

3 $3,944.00$8.00

4 $986.00$2.00

5 $2,711.50$5.50

6 $493.00$1.00

Ref #7 202E38000 GUARDRAIL REMOVED, (170 FT)

Awd $255.00$1.50

2 $596.70$3.51

3 $255.00$1.50

4 $255.00$1.50

5 $1,402.50$8.25

6 $340.00$2.00

160110 - Page 229

Page 230: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #8 202E98100 REMOVAL MISC.: CATCH BASIN FRAME AND GRATE, AS PER, (1 EACH)

Awd $500.00$500.00

2 $949.04$949.04

3 $350.00$350.00

4 $300.00$300.00

5 $670.00$670.00

6 $100.00$100.00

Ref #9 203E10000 EXCAVATION, (3666 CY)

Awd $91,650.00$25.00

2 $79,442.22$21.67

3 $91,650.00$25.00

4 $117,312.00$32.00

5 $83,401.50$22.75

6 $54,990.00$15.00

Ref #10 203E20000 EMBANKMENT, (36 CY)

Awd $900.00$25.00

2 $372.96$10.36

3 $900.00$25.00

4 $360.00$10.00

5 $1,465.20$40.70

6 $540.00$15.00

Ref #11 204E10000 SUBGRADE COMPACTION, (6310 SY)

Awd $9,465.00$1.50

2 $7,382.70$1.17

3 $4,732.50$0.75

4 $18,930.00$3.00

5 $11,358.00$1.80

6 $6,310.00$1.00

Ref #12 204E45000 PROOF ROLLING, (4 HOUR)

Awd $600.00$150.00

2 $564.84$141.21

3 $600.00$150.00

4 $1,200.00$300.00

5 $1,552.00$388.00

6 $400.00$100.00

Ref #13 606E15050 GUARDRAIL, TYPE MGS, (325 FT)

Awd $5,070.00$15.60

2 $6,470.75$19.91

3 $5,070.00$15.60

4 $5,525.00$17.00

5 $5,525.00$17.00

6 $4,940.00$15.20

Ref #14 606E26000 ANCHOR ASSEMBLY, TYPE B, (1 EACH)

Awd $1,585.00$1,585.00

2 $1,873.69$1,873.69

3 $1,585.00$1,585.00

4 $1,600.00$1,600.00

5 $1,600.00$1,600.00

6 $975.00$975.00

160110 - Page 230

Page 231: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #15 606E26550 ANCHOR ASSEMBLY, MGS TYPE T, (1 EACH)

Awd $745.00$745.00

2 $936.85$936.85

3 $745.00$745.00

4 $800.00$800.00

5 $800.00$800.00

6 $750.00$750.00

Ref #16 606E60028 IMPACT ATTENUATOR, TYPE 2 (BIDIRECTIONAL), 35MPH, , (2 EACH)

Awd $26,320.00$13,160.00

2 $27,519.90$13,759.95

3 $26,320.00$13,160.00

4 $23,500.00$11,750.00

5 $32,332.00$16,166.00

6 $4,600.00$2,300.00

Ref #17 608E10000 4" CONCRETE WALK, (1603 SF)

Awd $8,015.00$5.00

2 $11,156.88$6.96

3 $16,030.00$10.00

4 $12,824.00$8.00

5 $11,942.35$7.45

6 $11,221.00$7.00

Ref #18 608E52030 CURB RAMP, TYPE B1, (228 SF)

Awd $2,245.80$9.85

2 $2,982.24$13.08

3 $4,560.00$20.00

4 $2,280.00$10.00

5 $2,006.40$8.80

6 $2,736.00$12.00

Ref #19 608E52060 CURB RAMP, TYPE C2, (86 SF)

Awd $847.10$9.85

2 $1,345.04$15.64

3 $2,150.00$25.00

4 $1,290.00$15.00

5 $2,021.00$23.50

6 $1,032.00$12.00

Ref #20 622E10060 CONCRETE BARRIER, SINGLE SLOPE, TYPE B, (240 FT)

Awd $16,680.00$69.50

2 $19,533.60$81.39

3 $48,000.00$200.00

4 $36,000.00$150.00

5 $18,696.00$77.90

6 $7,680.00$32.00

Ref #21 622E24840 CONCRETE BARRIER END SECTION, TYPE B, (2 EACH)

Awd $13,500.00$6,750.00

2 $15,809.30$7,904.65

3 $10,000.00$5,000.00

4 $10,000.00$5,000.00

5 $14,250.00$7,125.00

6 $4,000.00$2,000.00

160110 - Page 231

Page 232: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Section 1 - ROADWAY - Totals

Awd $258,400.40

2 $228,287.66

3 $265,349.50

4 $331,272.00

5 $287,728.00

6 $127,657.70

Ref #22 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1, (2 SY)

Awd $600.00$300.00

2 $433.88$216.94

3 $200.00$100.00

4 $500.00$250.00

5 $576.00$288.00

6 $200.00$100.00

Ref #23 601E21060 TIED CONCRETE BLOCK MAT, TYPE 2, (5 SY)

Awd $1,500.00$300.00

2 $569.00$113.80

3 $1,000.00$200.00

4 $600.00$120.00

5 $1,440.00$288.00

6 $525.00$105.00

Ref #24 659E00100 SOIL ANALYSIS TEST, (2 EACH)

Awd $100.00$50.00

2 $133.84$66.92

3 $200.00$100.00

4 $120.00$60.00

5 $1,000.00$500.00

6 $4.00$2.00

Ref #25 659E00300 TOPSOIL, (635 CY)

Awd $12,065.00$19.00

2 $13,906.50$21.90

3 $25,400.00$40.00

4 $9,525.00$15.00

5 $22,860.00$36.00

6 $12,700.00$20.00

Ref #26 659E10000 SEEDING AND MULCHING, (5104 SY)

Awd $3,317.60$0.65

2 $3,879.04$0.76

3 $6,380.00$1.25

4 $4,491.52$0.88

5 $7,656.00$1.50

6 $5,104.00$1.00

Ref #27 659E14000 REPAIR SEEDING AND MULCHING, (255 SY)

Awd $255.00$1.00

2 $298.35$1.17

3 $102.00$0.40

4 $224.40$0.88

5 $510.00$2.00

6 $255.00$1.00

160110 - Page 232

Page 233: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #28 659E15000 INTER-SEEDING, (255 SY)

Awd $2.55$0.01

2 $298.35$1.17

3 $25.50$0.10

4 $140.25$0.55

5 $510.00$2.00

6 $255.00$1.00

Ref #29 659E20000 COMMERCIAL FERTILIZER, (1.15 TON)

Awd $690.00$600.00

2 $808.04$702.64

3 $287.50$250.00

4 $690.00$600.00

5 $747.50$650.00

6 $1,150.00$1,000.00

Ref #30 659E31000 LIME, (1.05 ACRE)

Awd $0.53$0.50

2 $1.23$1.17

3 $105.00$100.00

4 $31.50$30.00

5 $682.50$650.00

6 $1,050.00$1,000.00

Ref #31 659E35000 WATER, (29 MGAL)

Awd $2.90$0.10

2 $33.93$1.17

3 $145.00$5.00

4 $29.00$1.00

5 $580.00$20.00

6 $1,450.00$50.00

Ref #32 670E00700 DITCH EROSION PROTECTION, (952 SY)

Awd $1,904.00$2.00

2 $2,227.68$2.34

3 $2,380.00$2.50

4 $1,713.60$1.80

5 $2,380.00$2.50

6 $3,808.00$4.00

Ref #33 832E15000 STORM WATER POLLUTION PREVENTION PLAN, (LUMP SUM)

Awd $5,000.00$5,000.00

2 $5,735.06$5,735.06

3 $1,025.00$1,025.00

4 $10,000.00$10,000.00

5 $3,900.00$3,900.00

6 $2,000.00$2,000.00

Ref #34 832E30000 EROSION CONTROL, (20529 EACH)

Awd $20,529.00$1.00

2 $20,529.00$1.00

3 $20,529.00$1.00

4 $20,529.00$1.00

5 $20,529.00$1.00

6 $20,529.00$1.00

160110 - Page 233

Page 234: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Section 2 - EROSION CONTROL - Totals

Awd $45,966.58

2 $48,853.90

3 $57,779.00

4 $48,594.27

5 $63,371.00

6 $49,030.00

Ref #35 605E11110 6" SHALLOW PIPE UNDERDRAINS WITH FABRIC WRAP, (1293 FT)

Awd $25,860.00$20.00

2 $19,563.09$15.13

3 $15,516.00$12.00

4 $19,395.00$15.00

5 $26,183.25$20.25

6 $10,344.00$8.00

Ref #36 605E13410 6" UNCLASSIFIED PIPE UNDERDRAINS WITH FABRIC WRAP, (35 FT)

Awd $875.00$25.00

2 $730.80$20.88

3 $420.00$12.00

4 $525.00$15.00

5 $708.75$20.25

6 $280.00$8.00

Ref #37 605E14020 6" BASE PIPE UNDERDRAINS WITH FABRIC WRAP, (1345 FT)

Awd $20,175.00$15.00

2 $14,364.60$10.68

3 $16,140.00$12.00

4 $17,485.00$13.00

5 $21,520.00$16.00

6 $9,415.00$7.00

Ref #38 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS, (84 FT)

Awd $3,360.00$40.00

2 $1,591.80$18.95

3 $2,100.00$25.00

4 $1,680.00$20.00

5 $1,701.00$20.25

6 $840.00$10.00

Ref #39 611E98651 CATCH BASIN FRAME AND GRATE, AS PER PLAN, (1 EACH)

Awd $750.00$750.00

2 $837.71$837.71

3 $3,000.00$3,000.00

4 $800.00$800.00

5 $725.00$725.00

6 $500.00$500.00

Ref #40 611E99710 PRECAST REINFORCED CONCRETE OUTLET, (2 EACH)

Awd $1,000.00$500.00

2 $666.36$333.18

3 $2,000.00$1,000.00

4 $600.00$300.00

5 $1,070.00$535.00

6 $400.00$200.00

160110 - Page 234

Page 235: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Section 3 - DRAINAGE - Totals

Awd $52,020.00

2 $37,754.36

3 $39,176.00

4 $40,485.00

5 $51,908.00

6 $21,779.00

Ref #41 302E46000 ASPHALT CONCRETE BASE, PG64-22, (1542 CY)

Awd $178,872.00$116.00

2 $196,836.30$127.65

3 $154,200.00$100.00

4 $168,078.00$109.00

5 $178,872.00$116.00

6 $231,300.00$150.00

Ref #42 304E20000 AGGREGATE BASE, (1052 CY)

Awd $52,600.00$50.00

2 $57,491.80$54.65

3 $46,288.00$44.00

4 $68,380.00$65.00

5 $65,960.40$62.70

6 $42,080.00$40.00

Ref #43 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (239 GAL)

Awd $478.00$2.00

2 $700.27$2.93

3 $478.00$2.00

4 $597.50$2.50

5 $597.50$2.50

6 $1,195.00$5.00

Ref #44 442E20001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A (, (249 CY)

Awd $53,535.00$215.00

2 $65,900.34$264.66

3 $42,330.00$170.00

4 $56,274.00$226.00

5 $53,535.00$215.00

6 $43,575.00$175.00

Ref #45 442E20201 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE , (291 CY)

Awd $58,200.00$200.00

2 $56,227.02$193.22

3 $49,470.00$170.00

4 $48,015.00$165.00

5 $58,200.00$200.00

6 $58,200.00$200.00

Ref #46 609E12000 COMBINATION CURB AND GUTTER, TYPE 2, (153 FT)

Awd $4,222.80$27.60

2 $4,946.49$32.33

3 $11,475.00$75.00

4 $7,650.00$50.00

5 $6,716.70$43.90

6 $4,590.00$30.00

160110 - Page 235

Page 236: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #47 609E16000 CURB, TYPE 2-B, (217 FT)

Awd $3,615.22$16.66

2 $4,845.61$22.33

3 $10,850.00$50.00

4 $6,510.00$30.00

5 $3,537.10$16.30

6 $2,170.00$10.00

Ref #48 609E54000 6" CONCRETE TRAFFIC ISLAND, (7 SY)

Awd $669.90$95.70

2 $897.40$128.20

3 $1,750.00$250.00

4 $1,050.00$150.00

5 $2,590.00$370.00

6 $525.00$75.00

Ref #49 875E10000 LONGITUDINAL JOINT ADHESIVE, (970 LB)

Awd $5,820.00$6.00

2 $2,269.80$2.34

3 $1,940.00$2.00

4 $1,940.00$2.00

5 $1,940.00$2.00

6 $9,700.00$10.00

Section 4 - PAVEMENT - Totals

Awd $358,012.92

2 $390,115.03

3 $318,781.00

4 $358,494.50

5 $371,948.70

6 $393,335.00

Ref #50 625E00480 CONNECTION, UNFUSED PERMANENT, (12 EACH)

Awd $1,500.00$125.00

2 $884.64$73.72

3 $1,500.00$125.00

4 $1,500.00$125.00

5 $1,500.00$125.00

6 $1,512.00$126.00

Ref #51 625E23200 NO. 4 AWG 5000 VOLT DISTRIBUTION CABLE, (2037 FT)

Awd $7,129.50$3.50

2 $8,412.81$4.13

3 $7,129.50$3.50

4 $7,129.50$3.50

5 $7,129.50$3.50

6 $717,024.00$352.00

Ref #52 625E25500 CONDUIT, 3", 725.04, (639 FT)

Awd $9,585.00$15.00

2 $8,728.74$13.66

3 $9,585.00$15.00

4 $9,585.00$15.00

5 $9,585.00$15.00

6 $10,863.00$17.00

160110 - Page 236

Page 237: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #53 625E29000 TRENCH, (639 FT)

Awd $4,473.00$7.00

2 $2,798.82$4.38

3 $4,473.00$7.00

4 $4,473.00$7.00

5 $4,473.00$7.00

6 $5,751.00$9.00

Ref #54 625E30700 PULL BOX, 725.08, 18", (4 EACH)

Awd $2,400.00$600.00

2 $1,907.08$476.77

3 $2,400.00$600.00

4 $2,400.00$600.00

5 $2,400.00$600.00

6 $2,408.00$602.00

Ref #55 625E31510 PULL BOX REMOVED, (6 EACH)

Awd $1,200.00$200.00

2 $530.58$88.43

3 $1,200.00$200.00

4 $1,200.00$200.00

5 $1,200.00$200.00

6 $1,212.00$202.00

Ref #56 625E36000 PLASTIC CAUTION TAPE, (639 FT)

Awd $319.50$0.50

2 $223.65$0.35

3 $319.50$0.50

4 $319.50$0.50

5 $319.50$0.50

6 $639.00$1.00

Ref #57 625E75500 LIGHT POLE FOUNDATION REMOVED, (1 EACH)

Awd $200.00$200.00

2 $645.64$645.64

3 $200.00$200.00

4 $200.00$200.00

5 $200.00$200.00

6 $201.00$201.00

Ref #58 625E75550 DISTRIBUTION CABLE REMOVED, (1047 FT)

Awd $523.50$0.50

2 $4,627.74$4.42

3 $523.50$0.50

4 $523.50$0.50

5 $523.50$0.50

6 $1,047.00$1.00

Ref #59 625E75800 DISCONNECT CIRCUIT, (3 EACH)

Awd $945.00$315.00

2 $366.57$122.19

3 $945.00$315.00

4 $945.00$315.00

5 $945.00$315.00

6 $951.00$317.00

160110 - Page 237

Page 238: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Section 5 - LIGHTING - Totals

Awd $28,275.50

2 $29,126.27

3 $28,275.50

4 $28,275.50

5 $28,275.50

6 $741,608.00

Ref #60 620E00500 DELINEATOR, POST MOUNTED, (42 EACH)

Awd $1,344.00$32.00

2 $2,090.34$49.77

3 $1,344.00$32.00

4 $1,344.00$32.00

5 $1,344.00$32.00

6 $1,428.00$34.00

Ref #61 620E31200 REMOVAL OF DELINEATOR, (45 EACH)

Awd $225.00$5.00

2 $263.70$5.86

3 $225.00$5.00

4 $225.00$5.00

5 $225.00$5.00

6 $315.00$7.00

Ref #62 621E00100 RPM, (31 EACH)

Awd $4,316.75$139.25

2 $3,267.40$105.40

3 $3,565.00$115.00

4 $2,790.00$90.00

5 $1,085.00$35.00

6 $12,400.00$400.00

Ref #63 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (113 FT)

Awd $678.00$6.00

2 $959.37$8.49

3 $678.00$6.00

4 $678.00$6.00

5 $678.00$6.00

6 $791.00$7.00

Ref #64 630E08600 SIGN POST REFLECTOR, (4 EACH)

Awd $180.00$45.00

2 $149.88$37.47

3 $180.00$45.00

4 $180.00$45.00

5 $180.00$45.00

6 $188.00$47.00

Ref #65 630E80100 SIGN, FLAT SHEET, (61 SF)

Awd $854.00$14.00

2 $999.79$16.39

3 $854.00$14.00

4 $854.00$14.00

5 $854.00$14.00

6 $915.00$15.00

160110 - Page 238

Page 239: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #66 630E80400 SIGN, PERMANENT OVERLAY, (29 SF)

Awd $725.00$25.00

2 $636.84$21.96

3 $725.00$25.00

4 $725.00$25.00

5 $725.00$25.00

6 $783.00$27.00

Ref #67 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (3 EACH)

Awd $75.00$25.00

2 $42.15$14.05

3 $75.00$25.00

4 $75.00$25.00

5 $75.00$25.00

6 $81.00$27.00

Ref #68 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (3 EACH)

Awd $90.00$30.00

2 $63.24$21.08

3 $90.00$30.00

4 $90.00$30.00

5 $90.00$30.00

6 $96.00$32.00

Ref #69 630E97700 SIGNING, MISC.: SOLAR POWERED RECTANGULAR RAPID FL, (2 EACH)

Awd $15,000.00$7,500.00

2 $12,550.94$6,275.47

3 $15,000.00$7,500.00

4 $15,000.00$7,500.00

5 $15,000.00$7,500.00

6 $15,010.00$7,505.00

Ref #70 632E64020 PEDESTAL FOUNDATION, (2 EACH)

Awd $1,200.00$600.00

2 $1,651.82$825.91

3 $1,200.00$600.00

4 $1,200.00$600.00

5 $1,200.00$600.00

6 $1,200.00$600.00

Ref #71 646E10010 EDGE LINE, 6", (0.54 MILE)

Awd $2,106.00$3,900.00

2 $5,605.98$10,381.44

3 $2,106.00$3,900.00

4 $2,106.00$3,900.00

5 $2,106.00$3,900.00

6 $2,107.08$3,902.00

Ref #72 646E10100 LANE LINE, 4", (0.15 MILE)

Awd $315.00$2,100.00

2 $1,437.77$9,585.13

3 $315.00$2,100.00

4 $315.00$2,100.00

5 $315.00$2,100.00

6 $315.30$2,102.00

160110 - Page 239

Page 240: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #73 646E10110 LANE LINE, 6", (0.14 MILE)

Awd $350.00$2,500.00

2 $1,716.54$12,261.00

3 $350.00$2,500.00

4 $350.00$2,500.00

5 $350.00$2,500.00

6 $350.70$2,505.00

Ref #74 646E10300 CHANNELIZING LINE, 8", (1441 FT)

Awd $2,593.80$1.80

2 $2,536.16$1.76

3 $2,593.80$1.80

4 $2,593.80$1.80

5 $2,593.80$1.80

6 $4,034.80$2.80

Ref #75 646E10500 CROSSWALK LINE, (72 FT)

Awd $360.00$5.00

2 $547.92$7.61

3 $360.00$5.00

4 $360.00$5.00

5 $360.00$5.00

6 $504.00$7.00

Ref #76 646E10600 TRANSVERSE/DIAGONAL LINE, (59 FT)

Awd $413.00$7.00

2 $518.02$8.78

3 $413.00$7.00

4 $413.00$7.00

5 $413.00$7.00

6 $531.00$9.00

Ref #77 646E20300 LANE ARROW, (10 EACH)

Awd $1,550.00$155.00

2 $1,756.60$175.66

3 $1,550.00$155.00

4 $1,550.00$155.00

5 $1,550.00$155.00

6 $1,570.00$157.00

Ref #78 646E20350 LANE REDUCTION ARROW, (2 EACH)

Awd $550.00$275.00

2 $585.52$292.76

3 $550.00$275.00

4 $550.00$275.00

5 $550.00$275.00

6 $558.00$279.00

Ref #79 646E20410 WORD ON PAVEMENT, 96", (1 EACH)

Awd $185.00$185.00

2 $263.49$263.49

3 $185.00$185.00

4 $185.00$185.00

5 $185.00$185.00

6 $187.00$187.00

160110 - Page 240

Page 241: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #80 646E20504 DOTTED LINE, 6", (400 FT)

Awd $1,200.00$3.00

2 $656.00$1.64

3 $1,200.00$3.00

4 $1,200.00$3.00

5 $1,200.00$3.00

6 $2,000.00$5.00

Ref #81 646E20800 YIELD LINE, (26 FT)

Awd $312.00$12.00

2 $456.82$17.57

3 $312.00$12.00

4 $312.00$12.00

5 $312.00$12.00

6 $364.00$14.00

Ref #82 646E50000 REMOVAL OF PAVEMENT MARKING, (4 EACH)

Awd $2,000.00$500.00

2 $1,639.48$409.87

3 $2,000.00$500.00

4 $16.00$4.00

5 $2,000.00$500.00

6 $2,008.00$502.00

Section 6 - TRAFFIC CONTROL - Totals

Awd $36,622.55

2 $40,395.77

3 $35,870.80

4 $33,111.80

5 $33,390.80

6 $47,736.88

Ref #83 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (50 HOUR)

Awd $3,250.00$65.00

2 $3,346.00$66.92

3 $3,750.00$75.00

4 $3,500.00$70.00

5 $3,250.00$65.00

6 $2,500.00$50.00

Ref #84 614E12200 SPECIAL - WORK ZONE GUARDRAIL, (275 FT)

Awd $4,180.00$15.20

2 $5,475.25$19.91

3 $4,180.00$15.20

4 $4,675.00$17.00

5 $4,675.00$17.00

6 $5,087.50$18.50

Ref #85 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL), (4 EACH)

Awd $9,200.00$2,300.00

2 $8,431.64$2,107.91

3 $9,200.00$2,300.00

4 $8,000.00$2,000.00

5 $9,200.00$2,300.00

6 $9,200.00$2,300.00

160110 - Page 241

Page 242: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #86 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (25 CY)

Awd $6,250.00$250.00

2 $4,927.25$197.09

3 $3,750.00$150.00

4 $7,500.00$300.00

5 $8,000.00$320.00

6 $5,000.00$200.00

Ref #87 614E13300 BARRIER REFLECTOR, TYPE B, (74 EACH)

Awd $370.00$5.00

2 $520.22$7.03

3 $370.00$5.00

4 $444.00$6.00

5 $370.00$5.00

6 $444.00$6.00

Ref #88 614E13350 OBJECT MARKER, ONE WAY, (74 EACH)

Awd $518.00$7.00

2 $953.12$12.88

3 $888.00$12.00

4 $814.00$11.00

5 $518.00$7.00

6 $666.00$9.00

Ref #89 614E22100 WORK ZONE EDGE LINE, CLASS I, 642 PAINT, (1.83 MILE)

Awd $3,184.20$1,740.00

2 $3,268.14$1,785.87

3 $8,875.50$4,850.00

4 $3,184.20$1,740.00

5 $8,875.50$4,850.00

6 $8,879.16$4,852.00

Ref #90 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 642 PAINT, (780 FT)

Awd $624.00$0.80

2 $507.00$0.65

3 $1,755.00$2.25

4 $624.00$0.80

5 $1,755.00$2.25

6 $3,315.00$4.25

Ref #91 614E25200 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS I, 642 P, (66 FT)

Awd $165.00$2.50

2 $173.58$2.63

3 $330.00$5.00

4 $165.00$2.50

5 $330.00$5.00

6 $462.00$7.00

Ref #92 615E10000 ROADS FOR MAINTAINING TRAFFIC, (LUMP SUM)

Awd $10,000.00$10,000.00

2 $2,296.43$2,296.43

3 $100.00$100.00

4 $25,000.00$25,000.00

5 $27,000.00$27,000.00

6 $5,794.00$5,794.00

160110 - Page 242

Page 243: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #93 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, (344 SY)

Awd $22,360.00$65.00

2 $26,023.60$75.65

3 $20,640.00$60.00

4 $22,360.00$65.00

5 $30,444.00$88.50

6 $13,760.00$40.00

Ref #94 615E20001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER , (185 SY)

Awd $24,050.00$130.00

2 $13,939.75$75.35

3 $11,100.00$60.00

4 $18,500.00$100.00

5 $23,125.00$125.00

6 $7,400.00$40.00

Ref #95 622E41000 PORTABLE BARRIER, 32", (3670 FT)

Awd $95,420.00$26.00

2 $75,198.30$20.49

3 $73,400.00$20.00

4 $44,040.00$12.00

5 $110,100.00$30.00

6 $91,750.00$25.00

Ref #96 622E41050 PORTABLE BARRIER, "Y" CONNECTOR, (1 EACH)

Awd $3,000.00$3,000.00

2 $1,873.69$1,873.69

3 $2,700.00$2,700.00

4 $1,500.00$1,500.00

5 $2,000.00$2,000.00

6 $2,000.00$2,000.00

Ref #97 630E97800 SIGNING, MISC.: ADDITIONAL SIGNS, GROUND MOUNTED, , (300 SF)

Awd $4,350.00$14.50

2 $351.00$1.17

3 $3,900.00$13.00

4 $7,500.00$25.00

5 $4,500.00$15.00

6 $4,200.00$14.00

Section 7 - MAINTENANCE OF TRAFFIC - Totals

Awd $186,921.20

2 $147,284.97

3 $144,938.50

4 $147,806.20

5 $234,142.50

6 $160,457.66

Ref #98 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $5,000.00$5,000.00

2 $9,660.00$9,660.00

3 $9,000.00$9,000.00

4 $10,000.00$10,000.00

5 $5,000.00$5,000.00

6 $25,000.00$25,000.00

160110 - Page 243

Page 244: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #99 108E30000 SPECIAL - CPM PROGRESS SCHEDULE SHORT DURATION PRO, (LUMP SUM)

Awd $2,500.00$2,500.00

2 $2,007.61$2,007.61

3 $500.00$500.00

4 $1,000.00$1,000.00

5 $5,000.00$5,000.00

6 $5,000.00$5,000.00

Ref #100 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $20,000.00$20,000.00

2 $21,435.74$21,435.74

3 $90,450.00$90,450.00

4 $54,000.00$54,000.00

5 $44,400.00$44,400.00

6 $27,000.00$27,000.00

Ref #101 619E16011 FIELD OFFICE, TYPE B, AS PER PLAN, (6 MNTH)

Awd $9,000.00$1,500.00

2 $11,115.48$1,852.58

3 $9,000.00$1,500.00

4 $6,000.00$1,000.00

5 $13,710.00$2,285.00

6 $3,000.00$500.00

Ref #102 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)

Awd $10,000.00$10,000.00

2 $12,881.65$12,881.65

3 $5,000.00$5,000.00

4 $25,000.00$25,000.00

5 $11,000.00$11,000.00

6 $29,000.00$29,000.00

Ref #103 624E10000 MOBILIZATION, (LUMP SUM)

Awd $15,000.00$15,000.00

2 $95,427.31$95,427.31

3 $75,000.00$75,000.00

4 $40,000.00$40,000.00

5 $70,280.00$70,280.00

6 $17,000.00$17,000.00

Section 8 - INCIDENTALS - Totals

Awd $61,500.00

2 $152,527.79

3 $188,950.00

4 $136,000.00

5 $149,390.00

6 $106,000.00

160110 - Page 244

Page 245: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Project No. 160111

PID 100159

CUY-Warren Road

Federal

Type: FOUR LANE RESURFACING

Completion Date: 10/14/2016

Award Amount: $1,230,677.50

Contract Awarded To: SHELLY COMPANY

Letting Date: 3/1/2016

Engineer's Estimate: $1,412,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jerry Wray, Director

SHELLY COMPANY

80 PARK DR BOX 266

THORNVILLE, OH 43076

Perry

Bidder 1

Bid $1,230,677.50

CHAGRIN VALLEY PAVING INC

17290 MUNN RD

CHAGRIN FALLS, OH 44023

Geauga

Bidder 2

Bid $1,243,774.25

CATTS CONSTRUCTION INC

21223 AURORA RD

WARRENSVILLE HTS, OH 44146

Cuyahoga

Bidder 3

Bid $1,299,150.40

BARBICAS CONSTRUCTION COMPANY INC

124 DARROW RD

AKRON, OH 44305

Summit

Bidder 4

Bid $1,390,900.50

BURTON SCOT CONTRACTORS LLC

11330 KINSMAN RD

NEWBURY, OH 44065

Geauga

Bidder 5

Bid $1,402,276.85

KARVO COMPANIES INC

4524 HUDSON DR

STOW, OH 44224-1702

Bidder 6

Bid $1,431,592.15

160111 - Page 245

Page 246: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)

Awd $5,000.00$5,000.00

2 $100.00$100.00

3 $1,165.00$1,165.00

4 $700.00$700.00

5 $12,500.00$12,500.00

6 $500.00$500.00

Ref #2 202E23000 PAVEMENT REMOVED, (24 SY)

Awd $600.00$25.00

2 $600.00$25.00

3 $480.00$20.00

4 $720.00$30.00

5 $1,440.00$60.00

6 $708.00$29.50

Ref #3 202E30600 CONCRETE MEDIAN REMOVED, (100 SY)

Awd $1,500.00$15.00

2 $2,500.00$25.00

3 $2,000.00$20.00

4 $1,000.00$10.00

5 $2,000.00$20.00

6 $2,800.00$28.00

Ref #4 202E30701 CONCRETE BARRIER REMOVED, AS PER PLAN, (193 FT)

Awd $2,895.00$15.00

2 $1,930.00$10.00

3 $3,860.00$20.00

4 $5,790.00$30.00

5 $2,895.00$15.00

6 $5,597.00$29.00

Ref #5 202E38000 GUARDRAIL REMOVED, (25 FT)

Awd $125.00$5.00

2 $80.00$3.20

3 $91.25$3.65

4 $80.00$3.20

5 $125.00$5.00

6 $80.00$3.20

Ref #6 202E98400 REMOVAL MISC.: INTEGRAL CURB AND WALK REMOVED, (500 SF)

Awd $1,750.00$3.50

2 $1,000.00$2.00

3 $1,375.00$2.75

4 $1,000.00$2.00

5 $1,750.00$3.50

6 $2,475.00$4.95

Ref #7 606E15050 GUARDRAIL, TYPE MGS, (112.5 FT)

Awd $2,812.50$25.00

2 $3,195.00$28.40

3 $3,656.25$32.50

4 $3,195.00$28.40

5 $2,812.50$25.00

6 $3,195.00$28.40

160111 - Page 246

Page 247: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #8 606E26050 ANCHOR ASSEMBLY, MGS TYPE B, (1 EACH)

Awd $1,750.00$1,750.00

2 $1,745.00$1,745.00

3 $2,000.00$2,000.00

4 $1,745.00$1,745.00

5 $1,750.00$1,750.00

6 $1,745.00$1,745.00

Ref #9 606E26500 ANCHOR ASSEMBLY, TYPE T, (3 EACH)

Awd $2,550.00$850.00

2 $2,355.00$785.00

3 $2,700.00$900.00

4 $2,355.00$785.00

5 $2,550.00$850.00

6 $2,355.00$785.00

Ref #10 608E10001 4" CONCRETE WALK, AS PER PLAN, (3000 SF)

Awd $21,000.00$7.00

2 $21,000.00$7.00

3 $22,500.00$7.50

4 $24,000.00$8.00

5 $22,950.00$7.65

6 $20,850.00$6.95

Ref #11 608E13001 6" CONCRETE WALK, AS PER PLAN, (500 SF)

Awd $4,000.00$8.00

2 $4,000.00$8.00

3 $4,125.00$8.25

4 $4,250.00$8.50

5 $4,175.00$8.35

6 $4,725.00$9.45

Ref #12 608E52001 CURB RAMP, AS PER PLAN, (3451 SF)

Awd $110,432.00$32.00

2 $51,765.00$15.00

3 $53,490.50$15.50

4 $51,765.00$15.00

5 $54,353.25$15.75

6 $39,686.50$11.50

Ref #13 608E53021 DETECTABLE WARNING, AS PER PLAN, (200 SF)

Awd $30,000.00$150.00

2 $6,000.00$30.00

3 $5,000.00$25.00

4 $40,000.00$200.00

5 $7,200.00$36.00

6 $4,600.00$23.00

Ref #14 623E38501 MONUMENT ASSEMBLY, AS PER PLAN, (2 EACH)

Awd $1,600.00$800.00

2 $1,000.00$500.00

3 $900.00$450.00

4 $1,200.00$600.00

5 $1,400.00$700.00

6 $2,000.00$1,000.00

160111 - Page 247

Page 248: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #15 623E39501 MONUMENT BOX ADJUSTED TO GRADE, AS PER PLAN, (28 EACH)

Awd $16,800.00$600.00

2 $12,600.00$450.00

3 $12,600.00$450.00

4 $19,600.00$700.00

5 $12,600.00$450.00

6 $5,600.00$200.00

Ref #16 623E40900 MONUMENT, MISC.: MONUMENT REFERENCING, (25 EACH)

Awd $3,000.00$120.00

2 $2,500.00$100.00

3 $4,000.00$160.00

4 $1,250.00$50.00

5 $4,125.00$165.00

6 $4,000.00$160.00

Section 1 - ROADWAY - Totals

Awd $205,814.50

2 $112,370.00

3 $119,943.00

4 $158,650.00

5 $134,625.75

6 $100,916.50

Ref #17 832E30001 EROSION CONTROL, AS PER PLAN, (10000 EACH)

Awd $10,000.00$1.00

2 $10,000.00$1.00

3 $10,000.00$1.00

4 $10,000.00$1.00

5 $10,000.00$1.00

6 $10,000.00$1.00

Section 2 - EROSION CONTROL - Totals

Awd $10,000.00

2 $10,000.00

3 $10,000.00

4 $10,000.00

5 $10,000.00

6 $10,000.00

Ref #18 605E05210 4" UNCLASSIFIED PIPE UNDERDRAIN WITH FABRIC WRAP, (500 FT)

Awd $5,000.00$10.00

2 $5,000.00$10.00

3 $5,000.00$10.00

4 $2,000.00$4.00

5 $6,500.00$13.00

6 $4,125.00$8.25

Ref #19 605E13410 6" UNCLASSIFIED PIPE UNDERDRAINS WITH FABRIC WRAP, (1500 FT)

Awd $15,000.00$10.00

2 $15,000.00$10.00

3 $13,500.00$9.00

4 $7,050.00$4.70

5 $19,500.00$13.00

6 $13,050.00$8.70

160111 - Page 248

Page 249: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #20 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN, (33 EACH)

Awd $28,050.00$850.00

2 $28,050.00$850.00

3 $18,150.00$550.00

4 $23,100.00$700.00

5 $16,500.00$500.00

6 $31,350.00$950.00

Ref #21 611E98635 CATCH BASIN RECONSTRUCTED TO GRADE, AS PER PLAN, (10 EACH)

Awd $11,000.00$1,100.00

2 $12,000.00$1,200.00

3 $11,000.00$1,100.00

4 $9,500.00$950.00

5 $12,000.00$1,200.00

6 $12,000.00$1,200.00

Ref #22 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN, (49 EACH)

Awd $22,050.00$450.00

2 $34,300.00$700.00

3 $26,950.00$550.00

4 $24,500.00$500.00

5 $29,400.00$600.00

6 $47,775.00$975.00

Ref #23 611E99661 MANHOLE RECONSTRUCTED TO GRADE, AS PER PLAN, (10 EACH)

Awd $7,500.00$750.00

2 $11,000.00$1,100.00

3 $10,000.00$1,000.00

4 $8,000.00$800.00

5 $12,000.00$1,200.00

6 $13,500.00$1,350.00

Ref #24 611E99820 SPECIAL - MISCELLANEOUS METAL, (20000 LB)

Awd $20,000.00$1.00

2 $22,000.00$1.10

3 $23,000.00$1.15

4 $28,000.00$1.40

5 $29,000.00$1.45

6 $20,000.00$1.00

Section 3 - DRAINAGE - Totals

Awd $108,600.00

2 $127,350.00

3 $107,600.00

4 $102,150.00

5 $124,900.00

6 $141,800.00

Ref #25 251E01001 PARTIAL DEPTH PAVEMENT REPAIR, AS PER PLAN, (4000 SY)

Awd $52,520.00$13.13

2 $120,000.00$30.00

3 $110,000.00$27.50

4 $104,000.00$26.00

5 $120,000.00$30.00

6 $156,000.00$39.00

160111 - Page 249

Page 250: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #26 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, (19939 SY)

Awd $59,817.00$3.00

2 $34,893.25$1.75

3 $57,823.10$2.90

4 $99,695.00$5.00

5 $67,792.60$3.40

6 $41,871.90$2.10

Ref #27 254E01600 PATCHING PLANED SURFACE, (800 SY)

Awd $800.00$1.00

2 $800.00$1.00

3 $1,840.00$2.30

4 $2,200.00$2.75

5 $1,600.00$2.00

6 $800.00$1.00

Ref #28 255E10161 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT,, (2000 SY)

Awd $90,000.00$45.00

2 $190,000.00$95.00

3 $157,000.00$78.50

4 $144,000.00$72.00

5 $194,000.00$97.00

6 $198,000.00$99.00

Ref #29 255E20001 FULL DEPTH PAVEMENT SAWING, AS PER PLAN, (310 FT)

Awd $1,705.00$5.50

2 $930.00$3.00

3 $465.00$1.50

4 $3,100.00$10.00

5 $1,472.50$4.75

6 $558.00$1.80

Ref #30 407E10000 TACK COAT, (1498 GAL)

Awd $2,996.00$2.00

2 $2,996.00$2.00

3 $3,445.40$2.30

4 $3,745.00$2.50

5 $2,996.00$2.00

6 $2,621.50$1.75

Ref #31 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (1995 GAL)

Awd $3,990.00$2.00

2 $3,990.00$2.00

3 $4,588.50$2.30

4 $4,987.50$2.50

5 $3,990.00$2.00

6 $3,491.25$1.75

Ref #32 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS, (694 CY)

Awd $117,980.00$170.00

2 $107,570.00$155.00

3 $130,159.70$187.55

4 $152,680.00$220.00

5 $145,740.00$210.00

6 $127,696.00$184.00

160111 - Page 250

Page 251: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #33 441E50201 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, (448, (225 CY)

Awd $34,875.00$155.00

2 $30,375.00$135.00

3 $31,050.00$138.00

4 $33,750.00$150.00

5 $36,000.00$160.00

6 $35,325.00$157.00

Ref #34 441E50301 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (448, (971 CY)

Awd $150,505.00$155.00

2 $111,665.00$115.00

3 $140,795.00$145.00

4 $165,070.00$170.00

5 $160,215.00$165.00

6 $133,027.00$137.00

Ref #35 452E10051 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS, , (200 SY)

Awd $15,600.00$78.00

2 $13,000.00$65.00

3 $14,400.00$72.00

4 $13,200.00$66.00

5 $14,400.00$72.00

6 $13,000.00$65.00

Ref #36 452E12051 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS, , (500 SY)

Awd $40,500.00$81.00

2 $37,500.00$75.00

3 $42,000.00$84.00

4 $35,000.00$70.00

5 $43,500.00$87.00

6 $36,500.00$73.00

Ref #37 609E26001 CURB, TYPE 6, AS PER PLAN, (1719 FT)

Awd $10,314.00$6.00

2 $68,760.00$40.00

3 $37,818.00$22.00

4 $51,570.00$30.00

5 $61,884.00$36.00

6 $51,570.00$30.00

Ref #38 690E98700 SPECIAL - MISC.: CONCRETE MIX DESIGN FOR CLASS QC , (100 CY)

Awd $2,500.00$25.00

2 $2,000.00$20.00

3 $2,300.00$23.00

4 $2,000.00$20.00

5 $2,400.00$24.00

6 $500.00$5.00

Section 4 - PAVEMENT - Totals

Awd $584,102.00

2 $724,479.25

3 $733,684.70

4 $814,997.50

5 $855,990.10

6 $800,960.65

160111 - Page 251

Page 252: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #39 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN, (5 EACH)

Awd $2,250.00$450.00

2 $3,500.00$700.00

3 $2,750.00$550.00

4 $2,500.00$500.00

5 $3,000.00$600.00

6 $8,500.00$1,700.00

Ref #40 611E99661 MANHOLE RECONSTRUCTED TO GRADE, AS PER PLAN, (7 EACH)

Awd $5,250.00$750.00

2 $7,700.00$1,100.00

3 $7,700.00$1,100.00

4 $5,950.00$850.00

5 $8,400.00$1,200.00

6 $14,000.00$2,000.00

Ref #41 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN, (55 EACH)

Awd $33,000.00$600.00

2 $24,750.00$450.00

3 $24,750.00$450.00

4 $19,250.00$350.00

5 $23,375.00$425.00

6 $33,000.00$600.00

Ref #42 638E10901 SERVICE BOX ADJUSTED TO GRADE, AS PER PLAN, (5 EACH)

Awd $2,000.00$400.00

2 $1,000.00$200.00

3 $550.00$110.00

4 $1,000.00$200.00

5 $2,500.00$500.00

6 $2,500.00$500.00

Section 5 - WATER WORK - Totals

Awd $42,500.00

2 $36,950.00

3 $35,750.00

4 $28,700.00

5 $37,275.00

6 $58,000.00

Ref #43 632E26501 DETECTOR LOOP, AS PER PLAN, (10 EACH)

Awd $10,000.00$1,000.00

2 $9,000.00$900.00

3 $10,500.00$1,050.00

4 $9,000.00$900.00

5 $9,000.00$900.00

6 $9,000.00$900.00

Ref #44 644E00200 LANE LINE, 4", (1.52 MILE)

Awd $2,280.00$1,500.00

2 $2,280.00$1,500.00

3 $2,660.00$1,750.00

4 $2,280.00$1,500.00

5 $2,280.00$1,500.00

6 $2,280.00$1,500.00

160111 - Page 252

Page 253: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #45 644E00300 CENTER LINE, (0.85 MILE)

Awd $4,930.00$5,800.00

2 $4,930.00$5,800.00

3 $5,746.00$6,760.00

4 $4,930.00$5,800.00

5 $4,930.00$5,800.00

6 $4,930.00$5,800.00

Ref #46 644E00400 CHANNELIZING LINE, 8", (800 FT)

Awd $840.00$1.05

2 $840.00$1.05

3 $960.00$1.20

4 $840.00$1.05

5 $840.00$1.05

6 $840.00$1.05

Ref #47 644E00500 STOP LINE, (460 FT)

Awd $2,760.00$6.00

2 $2,760.00$6.00

3 $3,220.00$7.00

4 $2,760.00$6.00

5 $2,760.00$6.00

6 $2,760.00$6.00

Ref #48 644E00600 CROSSWALK LINE, (2000 FT)

Awd $6,000.00$3.00

2 $6,000.00$3.00

3 $6,900.00$3.45

4 $6,000.00$3.00

5 $6,000.00$3.00

6 $6,000.00$3.00

Ref #49 644E01300 LANE ARROW, (6 EACH)

Awd $750.00$125.00

2 $750.00$125.00

3 $874.20$145.70

4 $750.00$125.00

5 $750.00$125.00

6 $750.00$125.00

Ref #50 644E01500 DOTTED LINE, 4", (300 FT)

Awd $600.00$2.00

2 $600.00$2.00

3 $690.00$2.30

4 $600.00$2.00

5 $600.00$2.00

6 $600.00$2.00

Ref #51 646E10100 LANE LINE, 4", (0.05 MILE)

Awd $375.00$7,500.00

2 $375.00$7,500.00

3 $437.05$8,741.00

4 $375.00$7,500.00

5 $375.00$7,500.00

6 $375.00$7,500.00

160111 - Page 253

Page 254: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #52 646E10300 CHANNELIZING LINE, 8", (200 FT)

Awd $500.00$2.50

2 $500.00$2.50

3 $580.00$2.90

4 $500.00$2.50

5 $500.00$2.50

6 $500.00$2.50

Ref #53 646E10400 STOP LINE, (40 FT)

Awd $520.00$13.00

2 $520.00$13.00

3 $600.00$15.00

4 $520.00$13.00

5 $520.00$13.00

6 $520.00$13.00

Ref #54 646E10500 CROSSWALK LINE, (70 FT)

Awd $420.00$6.00

2 $420.00$6.00

3 $490.00$7.00

4 $420.00$6.00

5 $420.00$6.00

6 $420.00$6.00

Ref #55 646E20300 LANE ARROW, (9 EACH)

Awd $1,575.00$175.00

2 $1,575.00$175.00

3 $1,836.00$204.00

4 $1,575.00$175.00

5 $1,575.00$175.00

6 $1,575.00$175.00

Section 6 - TRAFFIC CONTROL - Totals

Awd $31,550.00

2 $30,550.00

3 $35,493.25

4 $30,550.00

5 $30,550.00

6 $30,550.00

Ref #56 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B, (75 CY)

Awd $375.00$5.00

2 $750.00$10.00

3 $2,512.50$33.50

4 $7,675.50$102.34

5 $3,750.00$50.00

6 $1,350.00$18.00

Ref #57 410E13000 TRAFFIC COMPACTED SURFACE, TYPE C, (100 CY)

Awd $500.00$5.00

2 $1,000.00$10.00

3 $3,350.00$33.50

4 $11,400.00$114.00

5 $5,400.00$54.00

6 $4,000.00$40.00

160111 - Page 254

Page 255: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #58 614E11111 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (100 HOUR)

Awd $7,500.00$75.00

2 $6,000.00$60.00

3 $7,000.00$70.00

4 $6,500.00$65.00

5 $6,000.00$60.00

6 $7,500.00$75.00

Ref #59 614E11130 LAW ENFORCEMENT OFFICER FOR ASSISTANCE, (100 HOUR)

Awd $6,500.00$65.00

2 $4,500.00$45.00

3 $7,000.00$70.00

4 $6,500.00$65.00

5 $4,100.00$41.00

6 $5,500.00$55.00

Ref #60 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (150 CY)

Awd $15,000.00$100.00

2 $15,000.00$100.00

3 $18,750.00$125.00

4 $21,000.00$140.00

5 $26,250.00$175.00

6 $34,500.00$230.00

Ref #61 614E22100 WORK ZONE EDGE LINE, CLASS I, 642 PAINT, (3.6 MILE)

Awd $2,466.00$685.00

2 $2,880.00$800.00

3 $3,355.20$932.00

4 $2,880.00$800.00

5 $2,466.00$685.00

6 $2,880.00$800.00

Ref #62 614E22200 WORK ZONE EDGE LINE, CLASS I, 740.06, TYPE I, (0.25 MILE)

Awd $1,000.00$4,000.00

2 $1,625.00$6,500.00

3 $1,893.75$7,575.00

4 $1,625.00$6,500.00

5 $1,000.00$4,000.00

6 $1,625.00$6,500.00

Ref #63 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT, (100 FT)

Awd $300.00$3.00

2 $300.00$3.00

3 $345.00$3.45

4 $300.00$3.00

5 $300.00$3.00

6 $300.00$3.00

Ref #64 614E27200 WORK ZONE CROSSWALK LINE, CLASS I, 642 PAINT, (1000 FT)

Awd $2,000.00$2.00

2 $1,750.00$1.75

3 $2,000.00$2.00

4 $1,750.00$1.75

5 $2,000.00$2.00

6 $1,750.00$1.75

160111 - Page 255

Page 256: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #65 616E10000 WATER, (30 MGAL)

Awd $300.00$10.00

2 $150.00$5.00

3 $9,450.00$315.00

4 $349.80$11.66

5 $1,500.00$50.00

6 $150.00$5.00

Ref #66 616E20000 CALCIUM CHLORIDE, (6 TON)

Awd $1,500.00$250.00

2 $120.00$20.00

3 $3,000.00$500.00

4 $1,398.90$233.15

5 $600.00$100.00

6 $60.00$10.00

Ref #67 630E83000 COVERING OF SIGN, (20 SF)

Awd $170.00$8.50

2 $150.00$7.50

3 $198.00$9.90

4 $223.80$11.19

5 $170.00$8.50

6 $200.00$10.00

Section 7 - MAINTENANCE OF TRAFFIC - Totals

Awd $37,611.00

2 $34,225.00

3 $58,854.45

4 $61,603.00

5 $53,536.00

6 $59,815.00

Ref #68 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $8,000.00$8,000.00

2 $9,500.00$9,500.00

3 $22,000.00$22,000.00

4 $20,000.00$20,000.00

5 $12,000.00$12,000.00

6 $15,000.00$15,000.00

Ref #69 614E11001 MAINTAINING TRAFFIC, AS PER PLAN, (LUMP SUM)

Awd $135,000.00$135,000.00

2 $99,000.00$99,000.00

3 $103,325.00$103,325.00

4 $110,000.00$110,000.00

5 $88,400.00$88,400.00

6 $155,000.00$155,000.00

Ref #70 619E16011 FIELD OFFICE, TYPE B, AS PER PLAN, (5 MNTH)

Awd $15,000.00$3,000.00

2 $3,750.00$750.00

3 $7,500.00$1,500.00

4 $3,750.00$750.00

5 $7,500.00$1,500.00

6 $8,750.00$1,750.00

160111 - Page 256

Page 257: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #71 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P, (LUMP SUM)

Awd $7,500.00$7,500.00

2 $500.00$500.00

3 $10,000.00$10,000.00

4 $500.00$500.00

5 $7,500.00$7,500.00

6 $800.00$800.00

Ref #72 624E10000 MOBILIZATION, (LUMP SUM)

Awd $45,000.00$45,000.00

2 $55,100.00$55,100.00

3 $55,000.00$55,000.00

4 $50,000.00$50,000.00

5 $40,000.00$40,000.00

6 $50,000.00$50,000.00

Section 8 - INCIDENTALS - Totals

Awd $210,500.00

2 $167,850.00

3 $197,825.00

4 $184,250.00

5 $155,400.00

6 $229,550.00

160111 - Page 257

Page 258: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Project No. 160112

PID 93568

AUG-BH FY 16

Federal

Type: BRIDGE REPAIR

Completion Date: 9/30/2016

Award Amount: $622,112.51

Contract Awarded To: BCC OHIO INC

Letting Date: 3/1/2016

Engineer's Estimate: $773,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jerry Wray, Director

BCC OHIO INC

P O BOX 229

NEW LONDON, OH 44851

Huron

Bidder 1

Bid $622,112.51

160112 - Page 258

Page 259: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)

Awd $1,368.00$1,368.00

Ref #2 202E23500 WEARING COURSE REMOVED, (198 SY)

Awd $5,472.72$27.64

Ref #3 202E38603 BRIDGE RAILING REMOVED FOR REUSE, AS PER PLAN, (531.5 FT)

Awd $12,054.42$22.68

Section 1 - ROADWAY - Totals

Awd $18,895.14

Ref #4 601E34100 ROCK CHANNEL PROTECTION, TYPE B WITHOUT FILTER, (233 CY)

Awd $23,591.25$101.25

Ref #5 659E10000 SEEDING AND MULCHING, (1400 SY)

Awd $3,598.00$2.57

Ref #6 659E20000 COMMERCIAL FERTILIZER, (0.13 TON)

Awd $68.25$525.00

Ref #7 659E35000 WATER, (7.5 MGAL)

Awd $15.75$2.10

Ref #8 832E30000 EROSION CONTROL, (3800 EACH)

Awd $3,800.00$1.00

Section 2 - EROSION CONTROL - Totals

Awd $31,073.25

Ref #9 407E10000 TACK COAT, (27 GAL)

Awd $63.99$2.37

Ref #10 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (15 CY)

Awd $10,161.00$677.40

Section 3 - PAVEMENT - Totals

Awd $10,224.99

Ref #11 614E12420 DETOUR SIGNING, (LUMP SUM)

Awd $7,131.00$7,131.00

Section 4 - MAINTENANCE OF TRAFFIC - Totals

Awd $7,131.00

Ref #12 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)

Awd $8,943.00$8,943.00

Ref #13 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)

Awd $855.00$855.00

Ref #14 507E71200 SPECIAL - PILE ENCASEMENT, (135 FT)

Awd $24,803.55$183.73

Ref #15 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (453 LB)

Awd $557.19$1.23

160112 - Page 259

Page 260: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #16 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (40 LB)

Awd $51.20$1.28

Ref #17 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (136 EACH)

Awd $2,613.92$19.22

Ref #18 511E50210 CLASS QC1 CONCRETE, SUBSTRUCTURE, (2 CY)

Awd $2,122.50$1,061.25

Ref #19 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (42 SY)

Awd $1,031.94$24.57

Ref #20 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER, (36 SF)

Awd $258.12$7.17

Ref #21 844E10001 CONCRETE PATCHING WITH GALVANIC ANODE PROTECTION, , (240 SF)

Awd $14,272.80$59.47

Section 5 - STRUCTURE 20 FOOT SPAN AND OVER (AUG-29- - Totals

Awd $55,509.22

Ref #22 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)

Awd $855.00$855.00

Ref #23 507E71200 SPECIAL - PILE ENCASEMENT, (84 FT)

Awd $14,386.68$171.27

Ref #24 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (177 LB)

Awd $228.33$1.29

Ref #25 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (20 LB)

Awd $24.60$1.23

Ref #26 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (50 EACH)

Awd $961.50$19.23

Ref #27 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (40 SY)

Awd $982.40$24.56

Ref #28 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER, (18 SF)

Awd $163.44$9.08

Ref #29 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (7 SF)

Awd $1,003.52$143.36

Ref #30 844E10001 CONCRETE PATCHING WITH GALVANIC ANODE PROTECTION, , (101 SF)

Awd $7,002.33$69.33

Section 6 - STRUCTURE 20 FOOT SPAN AND OVER (AUG-197 - Totals

Awd $25,607.80

Ref #31 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)

Awd $15,040.50$15,040.50

Ref #32 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (2743 LB)

Awd $3,373.89$1.23

Ref #33 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (40 LB)

Awd $49.60$1.24

Ref #34 511E34444 CLASS QC2 CONCRETE, BRIDGE DECK, (26 CY)

Awd $25,504.44$980.94

160112 - Page 260

Page 261: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #35 511E81300 CONCRETE, MISC.: EMBEDDED GALVANIC ANODE (EGA), (152 EACH)

Awd $6,767.04$44.52

Ref #36 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (49 SY)

Awd $1,263.22$25.78

Ref #37 512E33010 TYPE 3 WATERPROOFING, (79 SY)

Awd $3,046.24$38.56

Ref #38 517E72710 RAILING (DEEP BEAM BRIDGE RETROFIT RAILING), (250 FT)

Awd $23,940.00$95.76

Ref #39 517E76302 RAILING, MISC.: TYPE B ANCHORS, (152 EACH)

Awd $7,709.44$50.72

Ref #40 518E22300 SPECIAL - STEEL DRIP STRIP, (295 FT)

Awd $3,011.95$10.21

Ref #41 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (5 SF)

Awd $667.50$133.50

Ref #42 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM, (4.8 CF)

Awd $2,176.51$453.44

Section 7 - STRUCTURE 20 FOOT SPAN AND OVER (DAR-47- - Totals

Awd $92,550.33

Ref #43 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)

Awd $8,266.50$8,266.50

Ref #44 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)

Awd $3,477.00$3,477.00

Ref #45 507E71200 SPECIAL - PILE ENCASEMENT, (120 FT)

Awd $16,482.00$137.35

Ref #46 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (3355 LB)

Awd $4,126.65$1.23

Ref #47 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (40 LB)

Awd $51.20$1.28

Ref #48 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (98 EACH)

Awd $1,885.52$19.24

Ref #49 511E34444 CLASS QC2 CONCRETE, BRIDGE DECK, (14 CY)

Awd $13,721.96$980.14

Ref #50 511E50210 CLASS QC1 CONCRETE, SUBSTRUCTURE, (1 CY)

Awd $2,058.00$2,058.00

Ref #51 511E81300 CONCRETE, MISC.: EMBEDDED GALVANIC ANODE (EGA), (98 EACH)

Awd $4,363.94$44.53

Ref #52 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (80 SY)

Awd $1,964.80$24.56

Ref #53 512E33010 TYPE 3 WATERPROOFING, (49 SY)

Awd $2,122.68$43.32

Ref #54 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER, (22 SF)

Awd $220.44$10.02

Ref #55 517E72710 RAILING (DEEP BEAM BRIDGE RETROFIT RAILING), (162.5 FT)

Awd $15,561.00$95.76

160112 - Page 261

Page 262: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #56 517E76302 RAILING, MISC.: TYPE B ANCHORS, (96 EACH)

Awd $4,889.28$50.93

Ref #57 518E22300 SPECIAL - STEEL DRIP STRIP, (182 FT)

Awd $1,860.04$10.22

Ref #58 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (2 SF)

Awd $412.50$206.25

Ref #59 844E10001 CONCRETE PATCHING WITH GALVANIC ANODE PROTECTION, , (95 SF)

Awd $7,562.95$79.61

Ref #60 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM, (4 CF)

Awd $2,026.52$506.63

Section 8 - STRUCTURE 20 FOOT SPAN AND OVER (DAR-49- - Totals

Awd $91,052.98

Ref #61 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)

Awd $855.00$855.00

Ref #62 507E71200 SPECIAL - PILE ENCASEMENT, (126 FT)

Awd $17,335.08$137.58

Section 9 - STRUCTURE 20 FOOT SPAN AND OVER (DAR-118 - Totals

Awd $18,190.08

Ref #63 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)

Awd $855.00$855.00

Ref #64 507E71200 SPECIAL - PILE ENCASEMENT, (98 FT)

Awd $15,966.16$162.92

Ref #65 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (2 SF)

Awd $412.50$206.25

Section 10 - STRUCTURE 20 FOOT SPAN AND OVER (LOG-33- - Totals

Awd $17,233.66

Ref #66 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)

Awd $855.00$855.00

Ref #67 507E71200 SPECIAL - PILE ENCASEMENT, (98 FT)

Awd $15,966.16$162.92

Ref #68 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (5 SF)

Awd $717.00$143.40

Section 11 - STRUCTURE 20 FOOT SPAN AND OVER (LOG-33- - Totals

Awd $17,538.16

Ref #69 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)

Awd $855.00$855.00

Ref #70 507E71200 SPECIAL - PILE ENCASEMENT, (119 FT)

Awd $17,264.52$145.08

160112 - Page 262

Page 263: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Section 12 - STRUCTURE 20 FOOT SPAN AND OVER (LOG-33- - Totals

Awd $18,119.52

Ref #71 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)

Awd $855.00$855.00

Ref #72 507E71200 SPECIAL - PILE ENCASEMENT, (126 FT)

Awd $18,036.90$143.15

Section 13 - STRUCTURE 20 FOOT SPAN AND OVER (LOG-33- - Totals

Awd $18,891.90

Ref #73 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)

Awd $855.00$855.00

Ref #74 507E71200 SPECIAL - PILE ENCASEMENT, (78 FT)

Awd $14,497.86$185.87

Section 14 - STRUCTURE 20 FOOT SPAN AND OVER (LOG-274 - Totals

Awd $15,352.86

Ref #75 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)

Awd $10,489.50$10,489.50

Ref #76 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)

Awd $855.00$855.00

Ref #77 507E71200 SPECIAL - PILE ENCASEMENT, (112 FT)

Awd $18,378.08$164.09

Ref #78 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (3996 LB)

Awd $4,915.08$1.23

Ref #79 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (20 LB)

Awd $24.60$1.23

Ref #80 511E34444 CLASS QC2 CONCRETE, BRIDGE DECK, (18 CY)

Awd $17,062.56$947.92

Ref #81 511E81300 CONCRETE, MISC.: EMBEDDED GALVANIC ANODE (EGA), (90 EACH)

Awd $4,006.80$44.52

Ref #82 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (50 SY)

Awd $1,228.00$24.56

Ref #83 512E33010 TYPE 3 WATERPROOFING, (44 SY)

Awd $1,909.60$43.40

Ref #84 517E72710 RAILING (DEEP BEAM BRIDGE RETROFIT RAILING), (118.75 FT)

Awd $11,371.50$95.76

Ref #85 517E76302 RAILING, MISC.: TYPE B ANCHORS, (72 EACH)

Awd $3,666.96$50.93

Ref #86 518E22300 SPECIAL - STEEL DRIP STRIP, (139 FT)

Awd $1,419.19$10.21

Ref #87 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM, (4 CF)

Awd $1,966.52$491.63

160112 - Page 263

Page 264: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Section 15 - STRUCTURE 20 FOOT SPAN AND OVER (LOG-508 - Totals

Awd $77,293.39

Ref #88 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)

Awd $855.00$855.00

Ref #89 507E71200 SPECIAL - PILE ENCASEMENT, (84 FT)

Awd $14,635.32$174.23

Section 16 - STRUCTURE 20 FOOT SPAN AND OVER (LOG-720 - Totals

Awd $15,490.32

Ref #90 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)

Awd $855.00$855.00

Ref #91 507E71200 SPECIAL - PILE ENCASEMENT, (78 FT)

Awd $14,459.64$185.38

Ref #92 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (162 LB)

Awd $197.64$1.22

Ref #93 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (20 LB)

Awd $25.60$1.28

Ref #94 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (48 EACH)

Awd $922.56$19.22

Ref #95 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (71 SY)

Awd $1,743.05$24.55

Ref #96 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER, (18 SF)

Awd $160.56$8.92

Ref #97 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (8 SF)

Awd $1,146.00$143.25

Ref #98 844E10001 CONCRETE PATCHING WITH GALVANIC ANODE PROTECTION, , (88 SF)

Awd $6,438.08$73.16

Section 17 - STRUCTURE 20 FOOT SPAN AND OVER (MER-197 - Totals

Awd $25,948.13

Ref #99 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)

Awd $855.00$855.00

Ref #100 507E71200 SPECIAL - PILE ENCASEMENT, (108 FT)

Awd $16,584.48$153.56

Section 18 - STRUCTURE 20 FOOT SPAN AND OVER (MER-707 - Totals

Awd $17,439.48

Ref #101 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $7,680.00$7,680.00

Ref #102 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $22,572.00$22,572.00

160112 - Page 264

Page 265: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #103 624E10000 MOBILIZATION, (LUMP SUM)

Awd $18,318.30$18,318.30

Section 19 - INCIDENTALS - Totals

Awd $48,570.30

160112 - Page 265

Page 266: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Project No. 160115

PID 85997

FRA-SR 317-13.48

Federal

Type: FOUR LANE RESURFACING

Completion Date: 9/1/2016

Award Amount: $313,448.15

Contract Awarded To: SHELLY & SANDS INC

Letting Date: 3/1/2016

Engineer's Estimate: $334,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jerry Wray, Director

SHELLY & SANDS INC

1515 HARMON AVE

COLUMBUS, OH 43223

Franklin

Bidder 1

Bid $313,448.15

SHELLY COMPANY

80 PARK DR BOX 266

THORNVILLE, OH 43076

Perry

Bidder 2

Bid $398,932.00

KOKOSING CONSTRUCTION COMPANY INC

886 MC KINLEY AVE

COLUMBUS, OH 43222

Franklin

Bidder 3

Bid $431,556.00

160115 - Page 266

Page 267: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #1 832E30000 EROSION CONTROL, (1000 EACH)

Awd $1,000.00$1.00

2 $1,000.00$1.00

3 $1,000.00$1.00

Section 1 - EROSION CONTROL - Totals

Awd $1,000.00

2 $1,000.00

3 $1,000.00

Ref #2 611E98630 CATCH BASIN ADJUSTED TO GRADE, (5 EACH)

Awd $3,500.00$700.00

2 $2,750.00$550.00

3 $2,275.00$455.00

Ref #3 611E99654 MANHOLE ADJUSTED TO GRADE, (5 EACH)

Awd $425.00$85.00

2 $2,750.00$550.00

3 $1,150.00$230.00

Section 2 - DRAINAGE - Totals

Awd $3,925.00

2 $5,500.00

3 $3,425.00

Ref #4 251E01001 PARTIAL DEPTH PAVEMENT REPAIR, AS PER PLAN, (500 SY)

Awd $17,000.00$34.00

2 $18,250.00$36.50

3 $18,500.00$37.00

Ref #5 253E02000 PAVEMENT REPAIR, (100 CY)

Awd $19,500.00$195.00

2 $35,500.00$355.00

3 $35,700.00$357.00

Ref #6 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (28755 SY)

Awd $46,008.00$1.60

2 $53,196.75$1.85

3 $58,947.75$2.05

Ref #7 407E20500 SPECIAL - TACK COAT, TRACKLESS TACK, (2162 GAL)

Awd $8,107.50$3.75

2 $7,999.40$3.70

3 $7,999.40$3.70

Ref #8 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5MM, TYPE A (4, (1204 CY)

Awd $145,684.00$121.00

2 $184,212.00$153.00

3 $214,312.00$178.00

Section 3 - PAVEMENT - Totals

Awd $236,299.50

2 $299,158.15

3 $335,459.15

160115 - Page 267

Page 268: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #9 638E10800 VALVE BOX ADJUSTED TO GRADE, (5 EACH)

Awd $300.00$60.00

2 $1,250.00$250.00

3 $800.00$160.00

Section 4 - WATER WORK - Totals

Awd $300.00

2 $1,250.00

3 $800.00

Ref #10 644E00204 LANE LINE, 6", (1.53 MILE)

Awd $2,065.50$1,350.00

2 $1,950.75$1,275.00

3 $1,950.75$1,275.00

Ref #11 644E00300 CENTER LINE, (1.47 MILE)

Awd $6,174.00$4,200.00

2 $5,880.00$4,000.00

3 $5,880.00$4,000.00

Ref #12 644E00404 CHANNELIZING LINE, 12", (1198 FT)

Awd $2,036.60$1.70

2 $1,976.70$1.65

3 $1,976.70$1.65

Ref #13 644E00500 STOP LINE, (180 FT)

Awd $1,080.00$6.00

2 $1,080.00$6.00

3 $1,080.00$6.00

Ref #14 644E00600 CROSSWALK LINE, (1381 FT)

Awd $4,004.90$2.90

2 $3,797.75$2.75

3 $3,797.75$2.75

Ref #15 644E01300 LANE ARROW, (19 EACH)

Awd $1,748.00$92.00

2 $1,672.00$88.00

3 $1,672.00$88.00

Ref #16 644E01400 WORD ON PAVEMENT, 72", (6 EACH)

Awd $840.00$140.00

2 $810.00$135.00

3 $810.00$135.00

Ref #17 644E30000 REMOVAL OF PAVEMENT MARKING, (625 FT)

Awd $1,250.00$2.00

2 $1,250.00$2.00

3 $1,250.00$2.00

Section 5 - TRAFFIC CONTROL - Totals

Awd $19,199.00

2 $18,417.20

3 $18,417.20

160115 - Page 268

Page 269: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #18 632E26500 DETECTOR LOOP, (15 EACH)

Awd $15,000.00$1,000.00

2 $19,500.00$1,300.00

3 $14,250.00$950.00

Ref #19 632E27200 LOOP DETECTOR TIE IN, (15 EACH)

Awd $1,125.00$75.00

2 $1,500.00$100.00

3 $1,500.00$100.00

Section 6 - TRAFFIC SIGNALS - Totals

Awd $16,125.00

2 $21,000.00

3 $15,750.00

Ref #20 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (80 HOUR)

Awd $6,000.00$75.00

2 $5,600.00$70.00

3 $5,600.00$70.00

Ref #21 614E20550 WORK ZONE LANE LINE, CLASS III, 642 PAINT, (1.53 MILE)

Awd $1,285.20$840.00

2 $1,224.00$800.00

3 $1,224.00$800.00

Ref #22 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (1.47 MILE)

Awd $2,322.60$1,580.00

2 $2,205.00$1,500.00

3 $2,205.00$1,500.00

Ref #23 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 642 PAINT, (1198 FT)

Awd $599.00$0.50

2 $658.90$0.55

3 $658.90$0.55

Ref #24 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT, (180 FT)

Awd $468.00$2.60

2 $450.00$2.50

3 $450.00$2.50

Ref #25 614E27620 WORK ZONE CROSSWALK LINE, CLASS III, 642 PAINT, (1381 FT)

Awd $2,554.85$1.85

2 $2,416.75$1.75

3 $2,416.75$1.75

Ref #26 616E10000 WATER, (2 MGAL)

Awd $1,000.00$500.00

2 $2.00$1.00

3 $50.00$25.00

Section 7 - MAINTENANCE OF TRAFFIC - Totals

Awd $14,229.65

2 $12,556.65

3 $12,604.65

160115 - Page 269

Page 270: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #27 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $1,770.00$1,770.00

2 $1,550.00$1,550.00

3 $1,200.00$1,200.00

Ref #28 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $10,000.00$10,000.00

2 $25,000.00$25,000.00

3 $31,600.00$31,600.00

Ref #29 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P, (LUMP SUM)

Awd $600.00$600.00

2 $3,500.00$3,500.00

3 $1,300.00$1,300.00

Ref #30 624E10000 MOBILIZATION, (LUMP SUM)

Awd $10,000.00$10,000.00

2 $10,000.00$10,000.00

3 $10,000.00$10,000.00

Section 8 - INCIDENTALS - Totals

Awd $22,370.00

2 $40,050.00

3 $44,100.00

160115 - Page 270

Page 271: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Project No. 160116

PID 84301

GEA-SR 322-00.00

Federal

Type: TWO LANE RESURFACING

Completion Date: 10/31/2016

Award Amount: $1,974,964.56

Contract Awarded To: KOKOSING CONSTRUCTION COMPANY INC

Letting Date: 3/1/2016

Engineer's Estimate: $2,158,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jerry Wray, Director

KOKOSING CONSTRUCTION COMPANY INC

886 MC KINLEY AVE

COLUMBUS, OH 43222

Franklin

Bidder 1

Bid $1,974,964.56

RONYAK PAVING INC

14376 N CHESHIRE ST

BURTON, OH 44021

Geauga

Bidder 2

Bid $1,996,465.27

KARVO COMPANIES INC

4524 HUDSON DR

STOW, OH 44224-1702

Bidder 3

Bid $2,009,403.00

CHAGRIN VALLEY PAVING INC

17290 MUNN RD

CHAGRIN FALLS, OH 44023

Geauga

Bidder 4

Bid $2,029,455.05

BURTON SCOT CONTRACTORS LLC

11330 KINSMAN RD

NEWBURY, OH 44065

Geauga

Bidder 5

Bid $2,074,894.81

BARBICAS CONSTRUCTION COMPANY INC

124 DARROW RD

AKRON, OH 44305

Summit

Bidder 6

Bid $2,368,376.04

160116 - Page 271

Page 272: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)

Awd $1,400.00$1,400.00

2 $2,500.00$2,500.00

3 $1,200.00$1,200.00

4 $2,500.00$2,500.00

5 $15,500.00$15,500.00

6 $1,500.00$1,500.00

Ref #2 202E20010 HEADWALL REMOVED, (4 EACH)

Awd $2,800.00$700.00

2 $800.00$200.00

3 $2,160.00$540.00

4 $800.00$200.00

5 $1,000.00$250.00

6 $5,780.00$1,445.00

Ref #3 202E30000 WALK REMOVED, (331 SF)

Awd $1,158.50$3.50

2 $1,655.00$5.00

3 $1,075.75$3.25

4 $1,655.00$5.00

5 $496.50$1.50

6 $910.25$2.75

Ref #4 202E32000 CURB REMOVED, (6811 FT)

Awd $6,811.00$1.00

2 $27,244.00$4.00

3 $8,513.75$1.25

4 $27,244.00$4.00

5 $6,811.00$1.00

6 $13,622.00$2.00

Ref #5 202E35101 PIPE REMOVED, 24" AND UNDER, AS PER PLAN, (806 FT)

Awd $12,090.00$15.00

2 $4,836.00$6.00

3 $14,105.00$17.50

4 $4,836.00$6.00

5 $12,090.00$15.00

6 $12,887.94$15.99

Ref #6 202E35201 PIPE REMOVED, OVER 24", AS PER PLAN, (99 FT)

Awd $9,900.00$100.00

2 $495.00$5.00

3 $5,742.00$58.00

4 $495.00$5.00

5 $9,900.00$100.00

6 $8,390.25$84.75

Ref #7 202E38001 GUARDRAIL REMOVED, AS PER PLAN, (3778 FT)

Awd $5,667.00$1.50

2 $5,667.00$1.50

3 $5,667.00$1.50

4 $5,667.00$1.50

5 $5,667.00$1.50

6 $5,667.00$1.50

160116 - Page 272

Page 273: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #8 203E10000 EXCAVATION, (49 CY)

Awd $2,205.00$45.00

2 $1,862.00$38.00

3 $2,303.00$47.00

4 $1,862.00$38.00

5 $2,450.00$50.00

6 $2,560.74$52.26

Ref #9 203E20000 EMBANKMENT, (6 CY)

Awd $480.00$80.00

2 $360.00$60.00

3 $312.00$52.00

4 $360.00$60.00

5 $360.00$60.00

6 $320.10$53.35

Ref #10 204E10000 SUBGRADE COMPACTION, (140 SY)

Awd $455.00$3.25

2 $3,360.00$24.00

3 $280.00$2.00

4 $3,360.00$24.00

5 $700.00$5.00

6 $326.20$2.33

Ref #11 209E15001 RESHAPING UNDER GUARDRAIL, AS PER PLAN, (45 STA)

Awd $6,930.00$154.00

2 $6,930.00$154.00

3 $6,930.00$154.00

4 $6,930.00$154.00

5 $16,200.00$360.00

6 $6,930.00$154.00

Ref #12 209E70000 BORROW, (115 CY)

Awd $5,520.00$48.00

2 $5,520.00$48.00

3 $5,520.00$48.00

4 $5,002.50$43.50

5 $3,450.00$30.00

6 $5,520.00$48.00

Ref #13 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA, (8.14 MILE)

Awd $3,337.40$410.00

2 $7,460.39$916.51

3 $10,582.00$1,300.00

4 $6,512.00$800.00

5 $12,210.00$1,500.00

6 $21,745.52$2,671.44

Ref #14 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS, (3087.5 FT)

Awd $45,695.00$14.80

2 $45,695.00$14.80

3 $45,695.00$14.80

4 $45,695.00$14.80

5 $45,695.00$14.80

6 $45,695.00$14.80

160116 - Page 273

Page 274: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #15 606E17360 GUARDRAIL, TYPE MGS, LONG-SPAN, (150 FT)

Awd $2,940.00$19.60

2 $2,940.00$19.60

3 $2,940.00$19.60

4 $2,940.00$19.60

5 $2,940.00$19.60

6 $2,940.00$19.60

Ref #16 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, (18 EACH)

Awd $32,040.00$1,780.00

2 $32,040.00$1,780.00

3 $32,040.00$1,780.00

4 $32,040.00$1,780.00

5 $32,040.00$1,780.00

6 $32,040.00$1,780.00

Ref #17 606E26550 ANCHOR ASSEMBLY, MGS TYPE T, (13 EACH)

Awd $9,555.00$735.00

2 $9,555.00$735.00

3 $9,555.00$735.00

4 $9,555.00$735.00

5 $9,555.00$735.00

6 $9,555.00$735.00

Ref #18 608E52071 CURB RAMP, TYPE D, AS PER PLAN, (354 SF)

Awd $3,894.00$11.00

2 $4,071.00$11.50

3 $4,602.00$13.00

4 $4,071.00$11.50

5 $7,788.00$22.00

6 $4,194.90$11.85

Ref #19 623E39501 MONUMENT BOX ADJUSTED TO GRADE, AS PER PLAN, (5 EACH)

Awd $2,625.00$525.00

2 $2,000.00$400.00

3 $2,150.00$430.00

4 $2,500.00$500.00

5 $3,750.00$750.00

6 $2,175.00$435.00

Ref #20 623E39600 MONUMENT BOX RECONSTRUCTED TO GRADE, (1 EACH)

Awd $725.00$725.00

2 $600.00$600.00

3 $430.00$430.00

4 $700.00$700.00

5 $1,500.00$1,500.00

6 $529.00$529.00

Section 1 - ROADWAY - Totals

Awd $156,227.90

2 $165,590.39

3 $161,802.50

4 $164,724.50

5 $190,102.50

6 $183,288.90

160116 - Page 274

Page 275: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #21 601E32004 ROCK CHANNEL PROTECTION, TYPE A WITH FABRIC FILTER, (16 CY)

Awd $2,400.00$150.00

2 $2,240.00$140.00

3 $2,320.00$145.00

4 $2,240.00$140.00

5 $2,400.00$150.00

6 $3,870.24$241.89

Ref #22 659E00300 TOPSOIL, (35 CY)

Awd $1,680.00$48.00

2 $3,220.00$92.00

3 $1,487.50$42.50

4 $3,500.00$100.00

5 $3,500.00$100.00

6 $2,705.15$77.29

Ref #23 659E10000 SEEDING AND MULCHING, (315 SY)

Awd $3,150.00$10.00

2 $567.00$1.80

3 $787.50$2.50

4 $1,575.00$5.00

5 $567.00$1.80

6 $1,729.35$5.49

Ref #24 659E20000 COMMERCIAL FERTILIZER, (0.04 TON)

Awd $32.00$800.00

2 $24.00$600.00

3 $20.00$500.00

4 $4.00$100.00

5 $24.00$600.00

6 $165.00$4,125.00

Ref #25 659E31000 LIME, (0.07 ACRE)

Awd $8.75$125.00

2 $0.07$1.00

3 $35.00$500.00

4 $7.00$100.00

5 $0.70$10.00

6 $493.15$7,045.00

Ref #26 659E35000 WATER, (2 MGAL)

Awd $30.00$15.00

2 $2.00$1.00

3 $2.00$1.00

4 $50.00$25.00

5 $1.00$0.50

6 $1,150.00$575.00

Ref #27 659E98700 SEEDING, MISC.:SEEDING AND MULCHING, (LUMP SUM)

Awd $500.00$500.00

2 $1,000.00$1,000.00

3 $1,400.00$1,400.00

4 $500.00$500.00

5 $10,000.00$10,000.00

6 $1,997.77$1,997.77

160116 - Page 275

Page 276: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #28 832E30000 EROSION CONTROL, (5000 EACH)

Awd $5,000.00$1.00

2 $5,000.00$1.00

3 $5,000.00$1.00

4 $5,000.00$1.00

5 $5,000.00$1.00

6 $5,000.00$1.00

Section 2 - EROSION CONTROL - Totals

Awd $12,800.75

2 $12,053.07

3 $11,052.00

4 $12,876.00

5 $21,492.70

6 $17,110.66

Ref #29 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)

Awd $5,200.00$5,200.00

2 $4,500.00$4,500.00

3 $2,200.00$2,200.00

4 $4,500.00$4,500.00

5 $5,200.00$5,200.00

6 $13,685.00$13,685.00

Ref #30 602E20000 CONCRETE MASONRY, (3.3 CY)

Awd $6,600.00$2,000.00

2 $3,333.00$1,010.00

3 $6,270.00$1,900.00

4 $3,333.00$1,010.00

5 $6,600.00$2,000.00

6 $6,431.70$1,949.00

Ref #31 611E04401 12" CONDUIT, TYPE B, AS PER PLAN, (772 FT)

Awd $77,200.00$100.00

2 $52,496.00$68.00

3 $62,532.00$81.00

4 $52,496.00$68.00

5 $77,200.00$100.00

6 $35,782.20$46.35

Ref #32 611E04601 12" CONDUIT, TYPE C, AS PER PLAN, (100 FT)

Awd $7,000.00$70.00

2 $6,100.00$61.00

3 $6,100.00$61.00

4 $6,100.00$61.00

5 $7,000.00$70.00

6 $4,565.00$45.65

Ref #33 611E53300 53" X 83" CONDUIT, TYPE A, 706.04, (57 FT)

Awd $45,600.00$800.00

2 $38,247.00$671.00

3 $45,600.00$800.00

4 $38,247.00$671.00

5 $45,600.00$800.00

6 $62,643.00$1,099.00

160116 - Page 276

Page 277: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #34 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN, (9 EACH)

Awd $5,400.00$600.00

2 $3,600.00$400.00

3 $7,065.00$785.00

4 $4,500.00$500.00

5 $7,200.00$800.00

6 $6,255.00$695.00

Ref #35 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE, (3 EACH)

Awd $2,175.00$725.00

2 $4,200.00$1,400.00

3 $3,000.00$1,000.00

4 $4,500.00$1,500.00

5 $4,500.00$1,500.00

6 $3,477.00$1,159.00

Ref #36 611E98635 CATCH BASIN RECONSTRUCTED TO GRADE, AS PER PLAN, (26 EACH)

Awd $26,000.00$1,000.00

2 $39,000.00$1,500.00

3 $40,300.00$1,550.00

4 $41,600.00$1,600.00

5 $26,000.00$1,000.00

6 $31,590.00$1,215.00

Ref #37 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN, (12 EACH)

Awd $7,500.00$625.00

2 $4,800.00$400.00

3 $7,860.00$655.00

4 $6,000.00$500.00

5 $9,600.00$800.00

6 $5,100.00$425.00

Ref #38 611E99660 MANHOLE RECONSTRUCTED TO GRADE, (3 EACH)

Awd $2,475.00$825.00

2 $4,800.00$1,600.00

3 $3,300.00$1,100.00

4 $5,100.00$1,700.00

5 $4,500.00$1,500.00

6 $3,717.00$1,239.00

Ref #39 611E99820 SPECIAL - MISCELLANEOUS METAL, (10000 LB)

Awd $12,000.00$1.20

2 $22,500.00$2.25

3 $10,000.00$1.00

4 $22,500.00$2.25

5 $20,000.00$2.00

6 $13,500.00$1.35

Ref #40 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN, (2 EACH)

Awd $1,100.00$550.00

2 $1,000.00$500.00

3 $800.00$400.00

4 $1,200.00$600.00

5 $1,600.00$800.00

6 $670.00$335.00

160116 - Page 277

Page 278: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Section 3 - DRAINAGE - Totals

Awd $198,250.00

2 $184,576.00

3 $195,027.00

4 $190,076.00

5 $215,000.00

6 $187,415.90

Ref #41 251E01000 PARTIAL DEPTH PAVEMENT REPAIR, (1500 SY)

Awd $60,000.00$40.00

2 $37,500.00$25.00

3 $80,250.00$53.50

4 $34,500.00$23.00

5 $60,000.00$40.00

6 $33,000.00$22.00

Ref #42 253E02001 PAVEMENT REPAIR, AS PER PLAN, (440 CY)

Awd $79,200.00$180.00

2 $86,680.00$197.00

3 $65,120.00$148.00

4 $87,120.00$198.00

5 $132,000.00$300.00

6 $79,200.00$180.00

Ref #43 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, (4780 SY)

Awd $9,560.00$2.00

2 $9,560.00$2.00

3 $7,887.00$1.65

4 $9,082.00$1.90

5 $19,120.00$4.00

6 $23,900.00$5.00

Ref #44 254E01010 PAVEMENT PLANING, PORTLAND CEMENT CONCRETE, (624 SY)

Awd $4,524.00$7.25

2 $3,744.00$6.00

3 $3,369.60$5.40

4 $3,744.00$6.00

5 $6,240.00$10.00

6 $5,304.00$8.50

Ref #46 301E46000 ASPHALT CONCRETE BASE, PG64-22, (42 CY)

Awd $24,150.00$575.00

2 $29,400.00$700.00

3 $6,720.00$160.00

4 $8,400.00$200.00

5 $8,400.00$200.00

6 $9,240.00$220.00

Ref #47 304E20000 AGGREGATE BASE, (71 CY)

Awd $4,970.00$70.00

2 $2,840.00$40.00

3 $7,313.00$103.00

4 $4,650.50$65.50

5 $4,970.00$70.00

6 $4,615.00$65.00

160116 - Page 278

Page 279: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #48 407E20500 SPECIAL - TACK COAT, TRACKLESS TACK, (8080 GAL)

Awd $18,180.00$2.25

2 $24,240.00$3.00

3 $16,160.00$2.00

4 $16,160.00$2.00

5 $26,260.00$3.25

6 $32,320.00$4.00

Ref #49 407E20510 SPECIAL - TACK COAT, TRACKLESS TACK FOR INTERMEDIA, (3930 GAL)

Awd $8,842.50$2.25

2 $11,790.00$3.00

3 $7,860.00$2.00

4 $7,860.00$2.00

5 $12,772.50$3.25

6 $15,720.00$4.00

Ref #50 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS, (4038 CY)

Awd $573,396.00$142.00

2 $565,320.00$140.00

3 $569,358.00$141.00

4 $565,320.00$140.00

5 $565,320.00$140.00

6 $605,700.00$150.00

Ref #51 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS, (157 CY)

Awd $43,960.00$280.00

2 $46,315.00$295.00

3 $38,465.00$245.00

4 $30,615.00$195.00

5 $31,400.00$200.00

6 $39,250.00$250.00

Ref #52 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, (448, (2727 CY)

Awd $319,059.00$117.00

2 $299,970.00$110.00

3 $321,786.00$118.00

4 $299,970.00$110.00

5 $327,240.00$120.00

6 $436,320.00$160.00

Ref #53 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), (D, (77 CY)

Awd $23,100.00$300.00

2 $26,950.00$350.00

3 $15,400.00$200.00

4 $15,015.00$195.00

5 $18,480.00$240.00

6 $22,660.33$294.29

Ref #54 441E50701 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, (448, (138 CY)

Awd $28,980.00$210.00

2 $34,500.00$250.00

3 $24,150.00$175.00

4 $22,770.00$165.00

5 $35,880.00$260.00

6 $24,840.00$180.00

160116 - Page 279

Page 280: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #55 609E10000 ASPHALT CONCRETE CURB, TYPE 1, (6756 FT)

Awd $33,780.00$5.00

2 $29,388.60$4.35

3 $30,402.00$4.50

4 $33,780.00$5.00

5 $33,780.00$5.00

6 $43,914.00$6.50

Ref #56 617E10101 COMPACTED AGGREGATE, AS PER PLAN, (551 CY)

Awd $19,285.00$35.00

2 $22,040.00$40.00

3 $16,530.00$30.00

4 $11,020.00$20.00

5 $27,550.00$50.00

6 $49,590.00$90.00

Ref #57 618E40600 RUMBLE STRIPS, (ASPHALT CONCRETE), (1.28 MILE)

Awd $3,296.00$2,575.00

2 $3,296.00$2,575.00

3 $3,296.00$2,575.00

4 $3,296.00$2,575.00

5 $4,352.00$3,400.00

6 $7,680.00$6,000.00

Ref #58 875E10000 LONGITUDINAL JOINT ADHESIVE, (6426 LB)

Awd $5,140.80$0.80

2 $16,065.00$2.50

3 $8,353.80$1.30

4 $12,852.00$2.00

5 $14,458.50$2.25

6 $16,065.00$2.50

Ref #200 252E01001 FULL DEPTH RIGID PAVEMENT REMOVAL AND FLEXIBLE REP, (33 SY)

Awd $5,445.00$165.00

2 $3,960.00$120.00

3 $4,224.00$128.00

4 $2,475.00$75.00

5 $4,950.00$150.00

6 $3,630.00$110.00

Ref #201 252E01500 FULL DEPTH PAVEMENT SAWING, (407 FT)

Awd $1,017.50$2.50

2 $3,052.50$7.50

3 $1,221.00$3.00

4 $2,035.00$5.00

5 $1,526.25$3.75

6 $814.00$2.00

Ref #202 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 3, (3765 SY)

Awd $15,060.00$4.00

2 $28,990.50$7.70

3 $18,260.25$4.85

4 $12,801.00$3.40

5 $6,588.75$1.75

6 $11,295.00$3.00

160116 - Page 280

Page 281: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Section 4 - PAVEMENT - Totals

Awd $1,280,945.80

2 $1,285,601.60

3 $1,246,125.65

4 $1,183,465.50

5 $1,341,288.00

6 $1,465,057.33

Ref #59 620E00500 DELINEATOR, POST MOUNTED, (18 EACH)

Awd $900.00$50.00

2 $720.00$40.00

3 $900.00$50.00

4 $900.00$50.00

5 $900.00$50.00

6 $1,584.00$88.00

Ref #60 621E00100 RPM, (575 EACH)

Awd $12,155.50$21.14

2 $12,500.50$21.74

3 $12,500.50$21.74

4 $12,500.50$21.74

5 $12,569.50$21.86

6 $12,500.50$21.74

Ref #61 621E54000 RAISED PAVEMENT MARKER REMOVED, (250 EACH)

Awd $1,687.50$6.75

2 $1,902.50$7.61

3 $500.00$2.00

4 $250.00$1.00

5 $1,250.00$5.00

6 $2,500.00$10.00

Ref #62 626E00100 BARRIER REFLECTOR, (60 EACH)

Awd $378.00$6.30

2 $378.00$6.30

3 $378.00$6.30

4 $378.00$6.30

5 $378.00$6.30

6 $378.00$6.30

Ref #63 632E26501 DETECTOR LOOP, AS PER PLAN, (20 EACH)

Awd $20,000.00$1,000.00

2 $24,000.00$1,200.00

3 $19,000.00$950.00

4 $23,100.00$1,155.00

5 $23,100.00$1,155.00

6 $24,000.00$1,200.00

Ref #64 646E10000 EDGE LINE, 4", (9.75 MILE)

Awd $19,266.00$1,976.00

2 $19,266.00$1,976.00

3 $18,378.75$1,885.00

4 $18,378.75$1,885.00

5 $19,266.00$1,976.00

6 $23,400.00$2,400.00

160116 - Page 281

Page 282: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #65 646E10100 LANE LINE, 4", (1.07 MILE)

Awd $1,418.82$1,326.00

2 $1,418.82$1,326.00

3 $995.10$930.00

4 $995.10$930.00

5 $1,418.82$1,326.00

6 $1,605.00$1,500.00

Ref #66 646E10200 CENTER LINE, (5.84 MILE)

Awd $16,854.24$2,886.00

2 $16,854.24$2,886.00

3 $15,884.80$2,720.00

4 $15,884.80$2,720.00

5 $16,854.24$2,886.00

6 $28,032.00$4,800.00

Ref #67 646E10300 CHANNELIZING LINE, 8", (1425 FT)

Awd $2,080.50$1.46

2 $2,080.50$1.46

3 $1,781.25$1.25

4 $1,781.25$1.25

5 $2,080.50$1.46

6 $2,422.50$1.70

Ref #68 646E10400 STOP LINE, (856 FT)

Awd $8,132.00$9.50

2 $8,132.00$9.50

3 $9,073.60$10.60

4 $9,073.60$10.60

5 $8,132.00$9.50

6 $9,416.00$11.00

Ref #69 646E10500 CROSSWALK LINE, (410 FT)

Awd $1,927.00$4.70

2 $1,927.00$4.70

3 $2,041.80$4.98

4 $2,009.00$4.90

5 $1,927.00$4.70

6 $2,050.00$5.00

Ref #70 646E10600 TRANSVERSE/DIAGONAL LINE, (1440 FT)

Awd $8,064.00$5.60

2 $8,064.00$5.60

3 $7,992.00$5.55

4 $7,992.00$5.55

5 $8,064.00$5.60

6 $10,080.00$7.00

Ref #71 646E10800 ISLAND MARKING, (185 SF)

Awd $925.00$5.00

2 $925.00$5.00

3 $851.00$4.60

4 $851.00$4.60

5 $925.00$5.00

6 $555.00$3.00

160116 - Page 282

Page 283: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #72 646E20300 LANE ARROW, (16 EACH)

Awd $2,352.00$147.00

2 $2,352.00$147.00

3 $2,240.00$140.00

4 $2,240.00$140.00

5 $2,352.00$147.00

6 $2,320.00$145.00

Ref #73 646E20350 LANE REDUCTION ARROW, (2 EACH)

Awd $952.00$476.00

2 $952.00$476.00

3 $1,650.00$825.00

4 $1,650.00$825.00

5 $952.00$476.00

6 $450.00$225.00

Ref #74 646E20502 DOTTED LINE, 4", (830 FT)

Awd $1,328.00$1.60

2 $1,328.00$1.60

3 $954.50$1.15

4 $954.50$1.15

5 $1,328.00$1.60

6 $2,490.00$3.00

Ref #75 690E98400 SPECIAL - MISC.:INVENTORY EXISTING PAVEMENT MARKIN, (LUMP SUM)

Awd $350.00$350.00

2 $350.00$350.00

3 $750.00$750.00

4 $750.00$750.00

5 $350.00$350.00

6 $750.00$750.00

Section 5 - TRAFFIC CONTROL - Totals

Awd $98,770.56

2 $103,150.56

3 $95,871.30

4 $99,688.50

5 $101,847.06

6 $124,533.00

Ref #76 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (200 HOUR)

Awd $13,000.00$65.00

2 $9,000.00$45.00

3 $13,000.00$65.00

4 $12,000.00$60.00

5 $13,000.00$65.00

6 $13,800.00$69.00

Ref #77 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL), (4 EACH)

Awd $7,800.00$1,950.00

2 $7,860.00$1,965.00

3 $7,800.00$1,950.00

4 $7,800.00$1,950.00

5 $7,800.00$1,950.00

6 $8,000.00$2,000.00

160116 - Page 283

Page 284: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #78 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (100 CY)

Awd $10,000.00$100.00

2 $12,500.00$125.00

3 $8,000.00$80.00

4 $9,000.00$90.00

5 $20,000.00$200.00

6 $15,000.00$150.00

Ref #79 614E13302 BARRIER REFLECTOR, TYPE B2, (6 EACH)

Awd $30.00$5.00

2 $54.00$9.00

3 $30.00$5.00

4 $30.00$5.00

5 $30.00$5.00

6 $90.00$15.00

Ref #80 614E13360 OBJECT MARKER, TWO WAY, (6 EACH)

Awd $72.00$12.00

2 $75.00$12.50

3 $72.00$12.00

4 $72.00$12.00

5 $72.00$12.00

6 $120.00$20.00

Ref #81 614E18401 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (180 DAY)

Awd $5,400.00$30.00

2 $5,400.00$30.00

3 $5,400.00$30.00

4 $5,400.00$30.00

5 $5,400.00$30.00

6 $6,300.00$35.00

Ref #82 614E20100 WORK ZONE LANE LINE, CLASS I, 642 PAINT, (2.14 MILE)

Awd $1,284.00$600.00

2 $834.60$390.00

3 $1,284.00$600.00

4 $1,284.00$600.00

5 $1,284.00$600.00

6 $1,070.00$500.00

Ref #83 614E20550 WORK ZONE LANE LINE, CLASS III, 642 PAINT, (1.07 MILE)

Awd $642.00$600.00

2 $395.90$370.00

3 $642.00$600.00

4 $642.00$600.00

5 $642.00$600.00

6 $535.00$500.00

Ref #84 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT, (12.06 MILE)

Awd $10,854.00$900.00

2 $10,371.60$860.00

3 $10,854.00$900.00

4 $10,854.00$900.00

5 $10,854.00$900.00

6 $9,648.00$800.00

160116 - Page 284

Page 285: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #85 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (5.84 MILE)

Awd $4,642.80$795.00

2 $4,175.60$715.00

3 $4,642.80$795.00

4 $4,642.80$795.00

5 $4,642.80$795.00

6 $4,672.00$800.00

Ref #86 614E22100 WORK ZONE EDGE LINE, CLASS I, 642 PAINT, (19.75 MILE)

Awd $8,393.75$425.00

2 $10,467.50$530.00

3 $8,393.75$425.00

4 $8,393.75$425.00

5 $8,393.75$425.00

6 $11,850.00$600.00

Ref #87 614E22350 WORK ZONE EDGE LINE, CLASS III, 642 PAINT, (9.75 MILE)

Awd $3,412.50$350.00

2 $4,046.25$415.00

3 $3,412.50$350.00

4 $3,412.50$350.00

5 $3,412.50$350.00

6 $5,850.00$600.00

Ref #88 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 642 PAINT, (2850 FT)

Awd $1,425.00$0.50

2 $1,966.50$0.69

3 $1,425.00$0.50

4 $1,425.00$0.50

5 $1,425.00$0.50

6 $2,137.50$0.75

Ref #89 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 642 PAINT, (1425 FT)

Awd $712.50$0.50

2 $826.50$0.58

3 $712.50$0.50

4 $712.50$0.50

5 $712.50$0.50

6 $1,068.75$0.75

Ref #90 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT, (1760 FT)

Awd $4,400.00$2.50

2 $5,280.00$3.00

3 $4,400.00$2.50

4 $4,400.00$2.50

5 $4,400.00$2.50

6 $5,280.00$3.00

Ref #91 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT, (856 FT)

Awd $1,926.00$2.25

2 $2,311.20$2.70

3 $1,926.00$2.25

4 $1,926.00$2.25

5 $1,926.00$2.25

6 $2,568.00$3.00

160116 - Page 285

Page 286: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #92 614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT, (32 EACH)

Awd $1,280.00$40.00

2 $1,056.00$33.00

3 $1,280.00$40.00

4 $1,280.00$40.00

5 $1,280.00$40.00

6 $1,600.00$50.00

Ref #93 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT, (16 EACH)

Awd $640.00$40.00

2 $480.00$30.00

3 $640.00$40.00

4 $640.00$40.00

5 $640.00$40.00

6 $800.00$50.00

Ref #94 622E41000 PORTABLE BARRIER, 32", (220 FT)

Awd $4,840.00$22.00

2 $6,672.60$30.33

3 $3,960.00$18.00

4 $9,020.00$41.00

5 $11,000.00$50.00

6 $8,800.00$40.00

Ref #95 622E41020 PORTABLE BARRIER, 32", BRIDGE MOUNTED, (60 FT)

Awd $3,600.00$60.00

2 $2,270.40$37.84

3 $1,500.00$25.00

4 $3,240.00$54.00

5 $3,600.00$60.00

6 $3,381.00$56.35

Ref #96 630E97800 SIGNING, MISC.:ADDITIONAL SIGNS, GROUND MOUNTED, A, (300 SF)

Awd $4,950.00$16.50

2 $4,950.00$16.50

3 $4,950.00$16.50

4 $4,950.00$16.50

5 $4,950.00$16.50

6 $6,000.00$20.00

Section 6 - MAINTENANCE OF TRAFFIC - Totals

Awd $89,304.55

2 $90,993.65

3 $84,324.55

4 $91,124.55

5 $105,464.55

6 $108,570.25

Ref #97 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $8,000.00$8,000.00

2 $15,500.00$15,500.00

3 $32,000.00$32,000.00

4 $15,000.00$15,000.00

5 $12,500.00$12,500.00

6 $75,000.00$75,000.00

160116 - Page 286

Page 287: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #98 108E30000 SPECIAL - CPM PROGRESS SCHEDULE SHORT DURATION PRO, (LUMP SUM)

Awd $750.00$750.00

2 $1,000.00$1,000.00

3 $3,700.00$3,700.00

4 $500.00$500.00

5 $2,500.00$2,500.00

6 $500.00$500.00

Ref #99 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $80,000.00$80,000.00

2 $95,000.00$95,000.00

3 $106,000.00$106,000.00

4 $175,000.00$175,000.00

5 $53,500.00$53,500.00

6 $100,000.00$100,000.00

Ref #100 619E16011 FIELD OFFICE, TYPE B, AS PER PLAN, (6 MNTH)

Awd $6,000.00$1,000.00

2 $9,000.00$1,500.00

3 $10,500.00$1,750.00

4 $9,000.00$1,500.00

5 $7,200.00$1,200.00

6 $5,400.00$900.00

Ref #101 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)

Awd $3,915.00$3,915.00

2 $9,000.00$9,000.00

3 $5,000.00$5,000.00

4 $2,500.00$2,500.00

5 $4,000.00$4,000.00

6 $1,500.00$1,500.00

Ref #102 624E10000 MOBILIZATION, (LUMP SUM)

Awd $40,000.00$40,000.00

2 $25,000.00$25,000.00

3 $58,000.00$58,000.00

4 $85,500.00$85,500.00

5 $20,000.00$20,000.00

6 $100,000.00$100,000.00

Section 7 - INCIDENTALS - Totals

Awd $138,665.00

2 $154,500.00

3 $215,200.00

4 $287,500.00

5 $99,700.00

6 $282,400.00

160116 - Page 287

Page 288: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Project No. 160117

PID 92556

HAM-US 127-10.07

Federal

Type: INTERSECTION

Completion Date: 8/15/2016

Award Amount: $229,798.39

Contract Awarded To: BARRETT PAVING MATERIALS INC

Letting Date: 3/1/2016

Engineer's Estimate: $272,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jerry Wray, Director

BARRETT PAVING MATERIALS INC

3751 COMMERCE DR

MIDDLETOWN, OH 45005

Warren

Bidder 1

Bid $229,798.39

PRUS CONSTRUCTION COMPANY

5325 WOOSTER RD

CINCINNATI, OH 45226

Hamilton

Bidder 2

Bid $247,380.66

JOHN R JURGENSEN COMPANY

11641 MOSTELLER RD

CINCINNATI, OH 45241

Hamilton

Bidder 3

Bid $268,526.50

160117 - Page 288

Page 289: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)

Awd $5,000.00$5,000.00

2 $3,200.00$3,200.00

3 $3,481.87$3,481.87

Ref #2 202E23000 PAVEMENT REMOVED, (165 SY)

Awd $2,475.00$15.00

2 $3,960.00$24.00

3 $3,582.15$21.71

Ref #3 202E30000 WALK REMOVED, (1668 SF)

Awd $1,668.00$1.00

2 $4,170.00$2.50

3 $4,486.92$2.69

Ref #4 202E30800 TRAFFIC ISLAND REMOVED, (6 SY)

Awd $60.00$10.00

2 $180.00$30.00

3 $388.50$64.75

Ref #5 202E32000 CURB REMOVED, (404 FT)

Awd $4,040.00$10.00

2 $3,232.00$8.00

3 $3,139.08$7.77

Ref #6 202E58500 CATCH BASIN ABANDONED, (2 EACH)

Awd $400.00$200.00

2 $650.00$325.00

3 $3,168.26$1,584.13

Ref #7 202E75000 FENCE REMOVED, (18 FT)

Awd $90.00$5.00

2 $450.00$25.00

3 $189.54$10.53

Ref #8 203E10000 EXCAVATION, (335 CY)

Awd $16,750.00$50.00

2 $13,400.00$40.00

3 $15,286.05$45.63

Ref #9 203E20000 EMBANKMENT, (23 CY)

Awd $2,300.00$100.00

2 $690.00$30.00

3 $589.49$25.63

Ref #10 204E10000 SUBGRADE COMPACTION, (551 SY)

Awd $2,755.00$5.00

2 $1,377.50$2.50

3 $1,102.00$2.00

Ref #11 204E13000 EXCAVATION OF SUBGRADE, (184 CY)

Awd $3,680.00$20.00

2 $6,440.00$35.00

3 $8,042.64$43.71

Ref #12 204E30020 GRANULAR MATERIAL, TYPE C, (184 CY)

Awd $7,360.00$40.00

2 $11,408.00$62.00

3 $10,846.80$58.95

160117 - Page 289

Page 290: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #13 204E45000 PROOF ROLLING, (1 HOUR)

Awd $750.00$750.00

2 $150.00$150.00

3 $186.15$186.15

Ref #14 204E50000 GEOTEXTILE FABRIC, (551 SY)

Awd $1,928.50$3.50

2 $1,267.30$2.30

3 $1,421.58$2.58

Ref #15 608E10000 4" CONCRETE WALK, (1532 SF)

Awd $6,128.00$4.00

2 $10,724.00$7.00

3 $10,815.92$7.06

Ref #16 608E52020 CURB RAMP, TYPE A2, (192 SF)

Awd $2,419.20$12.60

2 $2,112.00$11.00

3 $3,216.00$16.75

Ref #17 608E53020 DETECTABLE WARNING, (44 SF)

Awd $1,848.00$42.00

2 $1,100.00$25.00

3 $1,980.00$45.00

Ref #18 690E65010 SPECIAL - WORK INVOLVING SOLID WASTE, (429 TON)

Awd $4,290.00$10.00

2 $12,870.00$30.00

3 $19,305.00$45.00

Ref #19 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER, (LUMP SUM)

Awd $2,500.00$2,500.00

2 $4,000.00$4,000.00

3 $898.35$898.35

Section 1 - ROADWAY - Totals

Awd $66,441.70

2 $81,380.80

3 $92,126.30

Ref #20 659E00100 SOIL ANALYSIS TEST, (2 EACH)

Awd $600.00$300.00

2 $600.00$300.00

3 $600.00$300.00

Ref #21 659E00300 TOPSOIL, (17 CY)

Awd $850.00$50.00

2 $1,105.00$65.00

3 $1,404.71$82.63

Ref #22 659E10000 SEEDING AND MULCHING, (153 SY)

Awd $1,530.00$10.00

2 $612.00$4.00

3 $459.00$3.00

Ref #23 659E14000 REPAIR SEEDING AND MULCHING, (8 SY)

Awd $8.00$1.00

2 $40.00$5.00

3 $16.00$2.00

160117 - Page 290

Page 291: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #24 659E15000 INTER-SEEDING, (8 SY)

Awd $0.08$0.01

2 $40.00$5.00

3 $16.00$2.00

Ref #25 659E20000 COMMERCIAL FERTILIZER, (0.1 TON)

Awd $75.00$750.00

2 $300.00$3,000.00

3 $250.00$2,500.00

Ref #26 659E31000 LIME, (0.1 ACRE)

Awd $20.00$200.00

2 $100.00$1,000.00

3 $250.00$2,500.00

Ref #27 659E35000 WATER, (1 MGAL)

Awd $1.00$1.00

2 $1.00$1.00

3 $100.00$100.00

Ref #28 832E30000 EROSION CONTROL, (1000 EACH)

Awd $1,000.00$1.00

2 $1,000.00$1.00

3 $1,000.00$1.00

Section 2 - EROSION CONTROL - Totals

Awd $4,084.08

2 $3,798.00

3 $4,095.71

Ref #29 605E06000 4" BASE PIPE UNDERDRAINS, (385 FT)

Awd $5,775.00$15.00

2 $8,470.00$22.00

3 $4,285.05$11.13

Ref #30 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET, (16 FT)

Awd $560.00$35.00

2 $480.00$30.00

3 $934.08$58.38

Ref #31 611E04401 12" CONDUIT, TYPE B, AS PER PLAN, (34 FT)

Awd $6,120.00$180.00

2 $6,800.00$200.00

3 $5,518.54$162.31

Ref #32 611E98180 CATCH BASIN, NO. 3A, (2 EACH)

Awd $5,800.00$2,900.00

2 $5,200.00$2,600.00

3 $4,409.06$2,204.53

Ref #33 611E99654 MANHOLE ADJUSTED TO GRADE, (1 EACH)

Awd $650.00$650.00

2 $675.00$675.00

3 $911.87$911.87

160117 - Page 291

Page 292: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Section 3 - DRAINAGE - Totals

Awd $18,905.00

2 $21,625.00

3 $16,058.60

Ref #34 301E46000 ASPHALT CONCRETE BASE, PG64-22, (98 CY)

Awd $19,600.00$200.00

2 $19,600.00$200.00

3 $21,095.48$215.26

Ref #35 304E20000 AGGREGATE BASE, (107 CY)

Awd $9,630.00$90.00

2 $7,704.00$72.00

3 $9,302.58$86.94

Ref #36 407E10000 TACK COAT, (33 GAL)

Awd $66.00$2.00

2 $165.00$5.00

3 $82.50$2.50

Ref #37 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (18 GAL)

Awd $36.00$2.00

2 $90.00$5.00

3 $45.00$2.50

Ref #38 442E20001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A (, (40 CY)

Awd $15,000.00$375.00

2 $12,800.00$320.00

3 $14,164.40$354.11

Ref #39 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1, (123 SY)

Awd $6,580.50$53.50

2 $11,070.00$90.00

3 $8,425.50$68.50

Ref #40 609E26000 CURB, TYPE 6, (475 FT)

Awd $8,478.75$17.85

2 $9,500.00$20.00

3 $9,381.25$19.75

Ref #41 609E54000 6" CONCRETE TRAFFIC ISLAND, (6 SY)

Awd $660.00$110.00

2 $900.00$150.00

3 $1,440.00$240.00

Section 4 - PAVEMENT - Totals

Awd $60,051.25

2 $61,829.00

3 $63,936.71

Ref #42 509E25000 REINFORCING STEEL, (238 LB)

Awd $238.00$1.00

2 $476.00$2.00

3 $618.80$2.60

160117 - Page 292

Page 293: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #43 602E10000 BRICK MASONRY, (1 CY)

Awd $150.00$150.00

2 $250.00$250.00

3 $1,095.31$1,095.31

Ref #44 638E11500 SHEETING AND BRACING ORDERED LEFT IN PLACE, (1 MBF)

Awd $10.00$10.00

2 $100.00$100.00

3 $741.75$741.75

Ref #45 638E80600 SPECIAL - FURNISHING AND LAYING 6" DUCTILE IRON PI, (6 FT)

Awd $1,800.00$300.00

2 $1,800.00$300.00

3 $2,740.20$456.70

Ref #46 638E80900 SPECIAL - FURNISHING AND LAYING 12" DUCTILE IRON P, (36 FT)

Awd $10,800.00$300.00

2 $12,240.00$340.00

3 $12,830.04$356.39

Ref #47 638E84502 SPECIAL - CONCRETE, CLASS QC-MISC. (CIN. 1110) THR, (2 CY)

Awd $300.00$150.00

2 $500.00$250.00

3 $421.48$210.74

Ref #48 638E85900 SPECIAL - RELOCATING EXISTING FIRE HYDRANT (CIN. 1, (1 EACH)

Awd $3,500.00$3,500.00

2 $1,800.00$1,800.00

3 $1,289.45$1,289.45

Ref #49 638E86300 SPECIAL - FURNISHING AND INSTALLING VALVE BOX, COM, (1 EACH)

Awd $2,500.00$2,500.00

2 $700.00$700.00

3 $2,555.64$2,555.64

Ref #50 638E86700 SPECIAL - REMOVING EXISTING VALVE BOX (CIN. 1122), (1 EACH)

Awd $100.00$100.00

2 $125.00$125.00

3 $189.52$189.52

Ref #51 638E88800 SPECIAL - RESETTING EXISTING CURB AND ROADWAY BOX , (3 EACH)

Awd $750.00$250.00

2 $675.00$225.00

3 $1,137.24$379.08

Ref #52 638E90300 SPECIAL - REMOVING CURB AND ROADWAY BOX (CIN. 1138, (1 EACH)

Awd $100.00$100.00

2 $75.00$75.00

3 $777.02$777.02

Section 5 - WATER WORK - Totals

Awd $20,248.00

2 $18,741.00

3 $24,396.45

Ref #53 625E75400 LIGHT POLE REMOVED, (2 EACH)

Awd $1,050.00$525.00

2 $1,150.00$575.00

3 $1,050.00$525.00

160117 - Page 293

Page 294: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #54 625E75500 LIGHT POLE FOUNDATION REMOVED, (2 EACH)

Awd $1,500.00$750.00

2 $500.00$250.00

3 $1,435.20$717.60

Ref #55 625E75506 LUMINAIRE REMOVED, (2 EACH)

Awd $520.00$260.00

2 $600.00$300.00

3 $520.00$260.00

Section 6 - LIGHTING - Totals

Awd $3,070.00

2 $2,250.00

3 $3,005.20

Ref #56 621E00100 RPM, (28 EACH)

Awd $1,835.40$65.55

2 $1,835.40$65.55

3 $1,835.40$65.55

Ref #57 621E54000 RAISED PAVEMENT MARKER REMOVED, (17 EACH)

Awd $170.00$10.00

2 $595.00$35.00

3 $401.03$23.59

Ref #58 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (39 FT)

Awd $526.50$13.50

2 $585.00$15.00

3 $351.00$9.00

Ref #59 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (1 EACH)

Awd $45.00$45.00

2 $50.00$50.00

3 $15.00$15.00

Ref #60 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (3 EACH)

Awd $285.00$95.00

2 $300.00$100.00

3 $150.00$50.00

Ref #61 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (4 EACH)

Awd $200.00$50.00

2 $240.00$60.00

3 $80.00$20.00

Ref #62 644E00200 LANE LINE, 4", (0.13 MILE)

Awd $843.96$6,492.00

2 $843.96$6,492.00

3 $843.96$6,492.00

Ref #63 644E00300 CENTER LINE, (0.08 MILE)

Awd $749.60$9,370.00

2 $749.60$9,370.00

3 $749.60$9,370.00

Ref #64 644E00400 CHANNELIZING LINE, 8", (145 FT)

Awd $319.00$2.20

2 $319.00$2.20

3 $319.00$2.20

160117 - Page 294

Page 295: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #65 644E00700 TRANSVERSE/DIAGONAL LINE, (42 FT)

Awd $233.10$5.55

2 $233.10$5.55

3 $233.10$5.55

Ref #66 644E01300 LANE ARROW, (3 EACH)

Awd $450.00$150.00

2 $450.00$150.00

3 $450.00$150.00

Ref #67 644E30000 REMOVAL OF PAVEMENT MARKING, (1192 FT)

Awd $1,370.80$1.15

2 $1,370.80$1.15

3 $1,370.80$1.15

Ref #68 644E30020 REMOVAL OF PAVEMENT MARKING, (1 EACH)

Awd $485.00$485.00

2 $485.00$485.00

3 $485.00$485.00

Section 7 - TRAFFIC CONTROL - Totals

Awd $7,513.36

2 $8,056.86

3 $7,283.89

Ref #69 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (30 HOUR)

Awd $1,800.00$60.00

2 $2,700.00$90.00

3 $2,326.20$77.54

Section 8 - MAINTENANCE OF TRAFFIC - Totals

Awd $1,800.00

2 $2,700.00

3 $2,326.20

Ref #70 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $2,185.00$2,185.00

2 $4,500.00$4,500.00

3 $951.15$951.15

Ref #71 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $33,000.00$33,000.00

2 $28,500.00$28,500.00

3 $25,077.70$25,077.70

Ref #72 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)

Awd $2,500.00$2,500.00

2 $4,000.00$4,000.00

3 $9,268.59$9,268.59

Ref #73 624E10000 MOBILIZATION, (LUMP SUM)

Awd $10,000.00$10,000.00

2 $10,000.00$10,000.00

3 $20,000.00$20,000.00

160117 - Page 295

Page 296: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Section 9 - INCIDENTALS - Totals

Awd $47,685.00

2 $47,000.00

3 $55,297.44

160117 - Page 296

Page 297: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Project No. 160118

PID 100473

HOL-US 62-5.66

Federal

Type: PREVENTIVE MAINTENANCE

Completion Date: 8/31/2016

Award Amount: $211,864.76

Contract Awarded To: NY-MAC ENTERPRISES INC

Letting Date: 3/1/2016

Engineer's Estimate: $278,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jerry Wray, Director

NY-MAC ENTERPRISES INC

3415 S CREYTS RD

LANSING, MI 48917

Bidder 1

Bid $211,864.76

AMERICAN PAVEMENTS INC

7475 MONTGOMERY DR

PLAIN CITY, OH 43064

Madison

Bidder 2

Bid $222,190.07

STRAWSER CONSTRUCTION INC

1392 DUBLIN RD

COLUMBUS, OH 43215

Franklin

Bidder 3

Bid $250,939.93

PAVEMENT MAINTENANCE SYSTEMS LLC

384 INDUSTRIAL PARK DR

IMLAY CITY, MI 48444

Bidder 4

Bid $253,911.07

160118 - Page 297

Page 298: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #1 832E30000 EROSION CONTROL, (1000 EACH)

Awd $1,000.00$1.00

2 $1,000.00$1.00

3 $1,000.00$1.00

4 $1,000.00$1.00

Section 1 - EROSION CONTROL - Totals

Awd $1,000.00

2 $1,000.00

3 $1,000.00

4 $1,000.00

Ref #2 421E10011 MICROSURFACING, SURFACE COURSE, AS PER PLAN, (65069 SY)

Awd $117,124.20$1.80

2 $150,960.08$2.32

3 $157,466.98$2.42

4 $150,309.39$2.31

Ref #3 423E00220 CRACK SEALING, TYPE II OR TYPE III, (65069 SY)

Awd $35,137.26$0.54

2 $26,678.29$0.41

3 $33,185.19$0.51

4 $33,835.88$0.52

Section 2 - PAVEMENT - Totals

Awd $152,261.46

2 $177,638.37

3 $190,652.17

4 $184,145.27

Ref #4 621E00100 RPM, (559 EACH)

Awd $11,180.00$20.00

2 $11,180.00$20.00

3 $11,739.00$21.00

4 $11,180.00$20.00

Ref #5 621E54000 RAISED PAVEMENT MARKER REMOVED, (559 EACH)

Awd $2,795.00$5.00

2 $7,043.40$12.60

3 $8,071.96$14.44

4 $12,577.50$22.50

Ref #6 642E00090 EDGE LINE, 4", (8.44 MILE)

Awd $3,587.00$425.00

2 $3,587.00$425.00

3 $3,713.60$440.00

4 $3,587.00$425.00

Ref #7 642E00290 CENTER LINE, (4.22 MILE)

Awd $2,110.00$500.00

2 $2,110.00$500.00

3 $2,321.00$550.00

4 $2,110.00$500.00

160118 - Page 298

Page 299: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Section 3 - TRAFFIC CONTROL - Totals

Awd $19,672.00

2 $23,920.40

3 $25,845.56

4 $29,454.50

Ref #8 614E12460 WORK ZONE MARKING SIGN, (38 EACH)

Awd $2,470.00$65.00

2 $2,470.00$65.00

3 $2,660.00$70.00

4 $2,470.00$65.00

Ref #9 614E21500 WORK ZONE CENTER LINE, CLASS II, 642 PAINT, (4.22 MILE)

Awd $1,751.30$415.00

2 $1,751.30$415.00

3 $844.00$200.00

4 $1,751.30$415.00

Ref #10 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (4.22 MILE)

Awd $2,110.00$500.00

2 $2,110.00$500.00

3 $886.20$210.00

4 $2,110.00$500.00

Section 4 - MAINTENANCE OF TRAFFIC - Totals

Awd $6,331.30

2 $6,331.30

3 $4,390.20

4 $6,331.30

Ref #11 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $1,000.00$1,000.00

2 $1,500.00$1,500.00

3 $1,000.00$1,000.00

4 $3,110.00$3,110.00

Ref #12 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $6,900.00$6,900.00

2 $5,100.00$5,100.00

3 $7,770.00$7,770.00

4 $11,220.00$11,220.00

Ref #13 624E10000 MOBILIZATION, (LUMP SUM)

Awd $24,700.00$24,700.00

2 $6,700.00$6,700.00

3 $20,282.00$20,282.00

4 $18,650.00$18,650.00

Section 5 - INCIDENTALS - Totals

Awd $32,600.00

2 $13,300.00

3 $29,052.00

4 $32,980.00

160118 - Page 299

Page 300: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Project No. 160119

PID 94139

MAH-46/62/224 Various

Federal

Type: TWO LANE RESURFACING

Completion Date: 8/15/2016

Award Amount: $783,689.03

Contract Awarded To: SHELLY & SANDS INC

Letting Date: 3/1/2016

Engineer's Estimate: $950,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jerry Wray, Director

SHELLY & SANDS INC

1515 HARMON AVE

COLUMBUS, OH 43223

Franklin

Bidder 1

Bid $783,689.03

KARVO COMPANIES INC

4524 HUDSON DR

STOW, OH 44224-1702

Bidder 2

Bid $824,270.25

SHELLY COMPANY

80 PARK DR BOX 266

THORNVILLE, OH 43076

Perry

Bidder 3

Bid $870,628.65

CHAGRIN VALLEY PAVING INC

17290 MUNN RD

CHAGRIN FALLS, OH 44023

Geauga

Bidder 4

Bid $896,641.80

R T VERNAL PAVING & EXCAVATING INC

11299 SOUTH AVE EXTENSION PO BOX 519

NORTH LIMA, OH 44452-0519

Bidder 5

Bid $908,849.18

BARBICAS CONSTRUCTION COMPANY INC

124 DARROW RD

AKRON, OH 44305

Summit

Bidder 6

Bid $947,844.15

160119 - Page 300

Page 301: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #1 202E23501 WEARING COURSE REMOVED, AS PER PLAN, (2110 SY)

Awd $5,275.00$2.50

2 $3,692.50$1.75

3 $8,862.00$4.20

4 $8,440.00$4.00

5 $2,848.50$1.35

6 $9,495.00$4.50

Ref #2 203E10000 EXCAVATION, (91 CY)

Awd $910.00$10.00

2 $1,820.00$20.00

3 $1,365.00$15.00

4 $910.00$10.00

5 $3,640.00$40.00

6 $1,365.00$15.00

Ref #3 209E72001 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA, (97 STA)

Awd $4,850.00$50.00

2 $3,298.00$34.00

3 $4,850.00$50.00

4 $2,425.00$25.00

5 $8,730.00$90.00

6 $4,365.00$45.00

Ref #4 608E10001 4" CONCRETE WALK, AS PER PLAN, (500 SF)

Awd $4,875.00$9.75

2 $1,750.00$3.50

3 $7,500.00$15.00

4 $7,500.00$15.00

5 $5,255.00$10.51

6 $7,500.00$15.00

Ref #5 608E52111 CURB RAMP, TYPE A1, AS PER PLAN, (19 EACH)

Awd $6,840.00$360.00

2 $26,125.00$1,375.00

3 $18,050.00$950.00

4 $18,050.00$950.00

5 $7,315.00$385.00

6 $18,050.00$950.00

Ref #6 608E52171 CURB RAMP, TYPE D, AS PER PLAN, (1 EACH)

Awd $475.00$475.00

2 $1,350.00$1,350.00

3 $950.00$950.00

4 $950.00$950.00

5 $495.00$495.00

6 $950.00$950.00

Ref #7 623E39500 MONUMENT BOX ADJUSTED TO GRADE, (2 EACH)

Awd $150.00$75.00

2 $850.00$425.00

3 $1,800.00$900.00

4 $1,000.00$500.00

5 $600.00$300.00

6 $1,000.00$500.00

160119 - Page 301

Page 302: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #8 690E98400 SPECIAL - MISC.:PRECONSTRUCTION VIDEO TAPING, (LUMP SUM)

Awd $900.00$900.00

2 $1,500.00$1,500.00

3 $1,000.00$1,000.00

4 $2,500.00$2,500.00

5 $3,500.00$3,500.00

6 $1,000.00$1,000.00

Section 1 - ROADWAY - Totals

Awd $24,275.00

2 $40,385.50

3 $44,377.00

4 $41,775.00

5 $32,383.50

6 $43,725.00

Ref #9 832E30000 EROSION CONTROL, (600 EACH)

Awd $600.00$1.00

2 $600.00$1.00

3 $600.00$1.00

4 $600.00$1.00

5 $600.00$1.00

6 $600.00$1.00

Section 2 - EROSION CONTROL - Totals

Awd $600.00

2 $600.00

3 $600.00

4 $600.00

5 $600.00

6 $600.00

Ref #10 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN, (32 EACH)

Awd $12,800.00$400.00

2 $16,000.00$500.00

3 $20,800.00$650.00

4 $32,000.00$1,000.00

5 $16,000.00$500.00

6 $16,896.00$528.00

Ref #11 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN, (23 EACH)

Awd $9,200.00$400.00

2 $11,500.00$500.00

3 $15,525.00$675.00

4 $18,400.00$800.00

5 $11,500.00$500.00

6 $10,350.00$450.00

160119 - Page 302

Page 303: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Section 3 - DRAINAGE - Totals

Awd $22,000.00

2 $27,500.00

3 $36,325.00

4 $50,400.00

5 $27,500.00

6 $27,246.00

Ref #12 251E01000 PARTIAL DEPTH PAVEMENT REPAIR, (547 SY)

Awd $24,615.00$45.00

2 $19,418.50$35.50

3 $32,820.00$60.00

4 $16,410.00$30.00

5 $27,350.00$50.00

6 $14,222.00$26.00

Ref #13 252E01500 FULL DEPTH PAVEMENT SAWING, (1960 FT)

Awd $19.60$0.01

2 $196.00$0.10

3 $3,920.00$2.00

4 $3,920.00$2.00

5 $3,920.00$2.00

6 $3,626.00$1.85

Ref #14 253E01000 PAVEMENT REPAIR, (547 SY)

Awd $38,290.00$70.00

2 $27,350.00$50.00

3 $34,187.50$62.50

4 $41,025.00$75.00

5 $51,418.00$94.00

6 $41,025.00$75.00

Ref #15 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, (52567 SY)

Awd $73,593.80$1.40

2 $52,567.00$1.00

3 $55,195.35$1.05

4 $73,593.80$1.40

5 $70,965.45$1.35

6 $105,134.00$2.00

Ref #16 304E20001 AGGREGATE BASE, AS PER PLAN, (91 CY)

Awd $2,730.00$30.00

2 $3,640.00$40.00

3 $2,730.00$30.00

4 $3,185.00$35.00

5 $10,010.00$110.00

6 $3,640.00$40.00

Ref #17 407E20000 SPECIAL - TACK COAT, TRACKLESS TACK, INTERMEDIATE , (2187 GAL)

Awd $7,654.50$3.50

2 $5,467.50$2.50

3 $6,232.95$2.85

4 $4,374.00$2.00

5 $13,122.00$6.00

6 $8,748.00$4.00

160119 - Page 303

Page 304: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #18 407E20100 SPECIAL - TACK COAT, TRACKLESS TACK, SURFACE COURS, (5467 GAL)

Awd $19,134.50$3.50

2 $13,667.50$2.50

3 $15,580.95$2.85

4 $10,934.00$2.00

5 $32,802.00$6.00

6 $21,868.00$4.00

Ref #19 424E12001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B, AS P, (1166 CY)

Awd $192,390.00$165.00

2 $193,556.00$166.00

3 $191,807.00$164.50

4 $186,560.00$160.00

5 $209,880.00$180.00

6 $233,200.00$200.00

Ref #20 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, (448, (1919 CY)

Awd $201,495.00$105.00

2 $226,442.00$118.00

3 $214,640.15$111.85

4 $230,280.00$120.00

5 $253,308.00$132.00

6 $268,660.00$140.00

Ref #21 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), (D, (12 CY)

Awd $2,700.00$225.00

2 $4,200.00$350.00

3 $9,600.00$800.00

4 $3,600.00$300.00

5 $2,400.00$200.00

6 $3,600.00$300.00

Ref #22 617E10101 COMPACTED AGGREGATE, AS PER PLAN, (236 CY)

Awd $11,800.00$50.00

2 $7,788.00$33.00

3 $15,340.00$65.00

4 $5,900.00$25.00

5 $14,160.00$60.00

6 $12,980.00$55.00

Section 4 - PAVEMENT - Totals

Awd $574,422.40

2 $554,292.50

3 $582,053.90

4 $579,781.80

5 $689,335.45

6 $716,703.00

Ref #23 638E10800 VALVE BOX ADJUSTED TO GRADE, (3 EACH)

Awd $150.00$50.00

2 $1,200.00$400.00

3 $3,000.00$1,000.00

4 $1,500.00$500.00

5 $300.00$100.00

6 $1,200.00$400.00

160119 - Page 304

Page 305: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Section 5 - WATER WORK - Totals

Awd $150.00

2 $1,200.00

3 $3,000.00

4 $1,500.00

5 $300.00

6 $1,200.00

Ref #24 621E00100 RPM, (25 EACH)

Awd $2,500.00$100.00

2 $2,461.25$98.45

3 $2,461.25$98.45

4 $2,461.25$98.45

5 $2,750.00$110.00

6 $2,461.25$98.45

Ref #25 621E54000 RAISED PAVEMENT MARKER REMOVED, (25 EACH)

Awd $175.00$7.00

2 $50.00$2.00

3 $125.00$5.00

4 $25.00$1.00

5 $250.00$10.00

6 $250.00$10.00

Ref #26 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (450.1 FT)

Awd $2,813.13$6.25

2 $2,700.60$6.00

3 $3,375.75$7.50

4 $2,700.60$6.00

5 $2,970.66$6.60

6 $2,250.50$5.00

Ref #27 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (1159.6 FT)

Awd $8,697.00$7.50

2 $8,407.10$7.25

3 $9,856.60$8.50

4 $8,407.10$7.25

5 $9,253.61$7.98

6 $6,957.60$6.00

Ref #28 630E08520 STREET NAME SIGN SUPPORT, NO. 3 POST, (120 FT)

Awd $1,020.00$8.50

2 $990.00$8.25

3 $1,186.80$9.89

4 $990.00$8.25

5 $1,089.60$9.08

6 $840.00$7.00

Ref #29 630E08600 SIGN POST REFLECTOR, (15 EACH)

Awd $315.00$21.00

2 $300.00$20.00

3 $525.00$35.00

4 $300.00$20.00

5 $330.00$22.00

6 $675.00$45.00

160119 - Page 305

Page 306: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #30 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED, (2 EACH)

Awd $132.00$66.00

2 $130.00$65.00

3 $290.00$145.00

4 $130.00$65.00

5 $143.00$71.50

6 $110.00$55.00

Ref #31 630E80100 SIGN, FLAT SHEET, (777.9 SF)

Awd $11,668.50$15.00

2 $11,279.55$14.50

3 $8,945.85$11.50

4 $11,279.55$14.50

5 $12,407.51$15.95

6 $9,334.80$12.00

Ref #32 630E80501 SIGN, DOUBLE FACED, STREET NAME, AS PER PLAN, (20 EACH)

Awd $1,520.00$76.00

2 $1,500.00$75.00

3 $1,900.00$95.00

4 $1,500.00$75.00

5 $1,650.00$82.50

6 $2,500.00$125.00

Ref #33 630E85001 REMOVAL OF GROUND MOUNTED SIGN AND STORAGE, AS PER, (186 EACH)

Awd $2,883.00$15.50

2 $2,790.00$15.00

3 $2,790.00$15.00

4 $2,790.00$15.00

5 $3,069.00$16.50

6 $3,720.00$20.00

Ref #34 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (10 EACH)

Awd $155.00$15.50

2 $150.00$15.00

3 $350.00$35.00

4 $150.00$15.00

5 $165.00$16.50

6 $550.00$55.00

Ref #35 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (115 EACH)

Awd $1,207.50$10.50

2 $1,150.00$10.00

3 $1,150.00$10.00

4 $1,150.00$10.00

5 $1,265.00$11.00

6 $2,875.00$25.00

Ref #36 630E87511 REMOVAL OF POLE MOUNTED SIGN AND STORAGE, AS PER P, (12 EACH)

Awd $186.00$15.50

2 $180.00$15.00

3 $180.00$15.00

4 $180.00$15.00

5 $198.00$16.50

6 $240.00$20.00

160119 - Page 306

Page 307: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #37 642E00090 EDGE LINE, 4", (4.85 MILE)

Awd $1,503.50$310.00

2 $2,328.00$480.00

3 $1,455.00$300.00

4 $1,455.00$300.00

5 $2,560.80$528.00

6 $2,910.00$600.00

Ref #38 642E00290 CENTER LINE, (3.4 MILE)

Awd $1,530.00$450.00

2 $3,009.00$885.00

3 $1,513.00$445.00

4 $1,513.00$445.00

5 $3,309.90$973.50

6 $3,060.00$900.00

Ref #39 642E00390 CHANNELIZING LINE, 8", (1475 FT)

Awd $811.25$0.55

2 $958.75$0.65

3 $811.25$0.55

4 $811.25$0.55

5 $1,062.00$0.72

6 $1,180.00$0.80

Ref #40 642E00490 STOP LINE, (140 FT)

Awd $364.00$2.60

2 $392.00$2.80

3 $350.00$2.50

4 $350.00$2.50

5 $431.20$3.08

6 $434.00$3.10

Ref #41 642E00590 CROSSWALK LINE, (940 FT)

Awd $1,880.00$2.00

2 $1,880.00$2.00

3 $1,880.00$2.00

4 $1,880.00$2.00

5 $2,068.00$2.20

6 $1,692.00$1.80

Ref #42 642E00690 TRANSVERSE/DIAGONAL LINE, (1455 FT)

Awd $3,273.75$2.25

2 $4,001.25$2.75

3 $3,273.75$2.25

4 $3,273.75$2.25

5 $4,408.65$3.03

6 $2,910.00$2.00

Ref #43 642E00910 ISLAND MARKING, (75 SF)

Awd $150.00$2.00

2 $206.25$2.75

3 $150.00$2.00

4 $150.00$2.00

5 $227.25$3.03

6 $150.00$2.00

160119 - Page 307

Page 308: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #44 642E01090 SCHOOL SYMBOL MARKING, 72", (2 EACH)

Awd $520.00$260.00

2 $210.00$105.00

3 $500.00$250.00

4 $500.00$250.00

5 $231.00$115.50

6 $750.00$375.00

Ref #45 642E01290 LANE ARROW, (19 EACH)

Awd $1,064.00$56.00

2 $807.50$42.50

3 $1,045.00$55.00

4 $1,045.00$55.00

5 $888.25$46.75

6 $1,045.00$55.00

Section 6 - TRAFFIC CONTROL - Totals

Awd $44,368.63

2 $45,881.25

3 $44,114.25

4 $43,041.50

5 $50,728.43

6 $46,895.15

Ref #46 632E26501 DETECTOR LOOP, AS PER PLAN, (4 EACH)

Awd $3,900.00$975.00

2 $3,800.00$950.00

3 $3,800.00$950.00

4 $6,000.00$1,500.00

5 $6,000.00$1,500.00

6 $6,000.00$1,500.00

Section 7 - TRAFFIC SIGNALS - Totals

Awd $3,900.00

2 $3,800.00

3 $3,800.00

4 $6,000.00

5 $6,000.00

6 $6,000.00

Ref #47 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (120 HOUR)

Awd $7,800.00$65.00

2 $7,800.00$65.00

3 $9,000.00$75.00

4 $7,200.00$60.00

5 $7,800.00$65.00

6 $8,280.00$69.00

Ref #48 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (20 CY)

Awd $2,500.00$125.00

2 $3,400.00$170.00

3 $2,500.00$125.00

4 $1,800.00$90.00

5 $4,000.00$200.00

6 $3,000.00$150.00

160119 - Page 308

Page 309: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #49 614E21000 WORK ZONE CENTER LINE, CLASS I, (6.8 MILE)

Awd $3,060.00$450.00

2 $6,120.00$900.00

3 $3,026.00$445.00

4 $3,026.00$445.00

5 $6,732.00$990.00

6 $5,440.00$800.00

Ref #50 614E22000 WORK ZONE EDGE LINE, CLASS I, (9.7 MILE)

Awd $3,007.00$310.00

2 $3,395.00$350.00

3 $2,910.00$300.00

4 $2,910.00$300.00

5 $5,228.30$539.00

6 $5,820.00$600.00

Ref #51 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, (2950 FT)

Awd $1,180.00$0.40

2 $1,475.00$0.50

3 $1,180.00$0.40

4 $1,180.00$0.40

5 $1,475.00$0.50

6 $2,360.00$0.80

Ref #52 614E25000 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS I, (2910 FT)

Awd $5,238.00$1.80

2 $2,910.00$1.00

3 $5,092.50$1.75

4 $5,092.50$1.75

5 $8,002.50$2.75

6 $4,365.00$1.50

Ref #53 614E26000 WORK ZONE STOP LINE, CLASS I, (280 FT)

Awd $560.00$2.00

2 $700.00$2.50

3 $560.00$2.00

4 $560.00$2.00

5 $770.00$2.75

6 $560.00$2.00

Ref #54 614E27000 WORK ZONE CROSSWALK LINE, CLASS I, (1880 FT)

Awd $2,820.00$1.50

2 $3,760.00$2.00

3 $2,820.00$1.50

4 $2,820.00$1.50

5 $4,136.00$2.20

6 $2,350.00$1.25

Ref #55 614E30000 WORK ZONE ARROW, CLASS I, (38 EACH)

Awd $1,368.00$36.00

2 $950.00$25.00

3 $1,330.00$35.00

4 $1,330.00$35.00

5 $1,672.00$44.00

6 $1,900.00$50.00

160119 - Page 309

Page 310: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #56 614E31700 WORK ZONE SCHOOL SYMBOL MARKING, 72", CLASS I, (4 EACH)

Awd $840.00$210.00

2 $300.00$75.00

3 $800.00$200.00

4 $800.00$200.00

5 $506.00$126.50

6 $1,200.00$300.00

Ref #57 614E32700 WORK ZONE ISLAND MARKING, CLASS I, (150 SF)

Awd $225.00$1.50

2 $300.00$2.00

3 $225.00$1.50

4 $225.00$1.50

5 $330.00$2.20

6 $150.00$1.00

Ref #58 616E10000 WATER, (1 MGAL)

Awd $100.00$100.00

2 $1.00$1.00

3 $5.00$5.00

4 $100.00$100.00

5 $100.00$100.00

6 $50.00$50.00

Section 8 - MAINTENANCE OF TRAFFIC - Totals

Awd $28,698.00

2 $31,111.00

3 $29,448.50

4 $27,043.50

5 $40,751.80

6 $35,475.00

Ref #59 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $2,800.00$2,800.00

2 $8,000.00$8,000.00

3 $3,500.00$3,500.00

4 $7,000.00$7,000.00

5 $6,500.00$6,500.00

6 $10,000.00$10,000.00

Ref #60 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $61,000.00$61,000.00

2 $65,000.00$65,000.00

3 $100,000.00$100,000.00

4 $75,000.00$75,000.00

5 $42,250.00$42,250.00

6 $35,000.00$35,000.00

Ref #61 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)

Awd $1,475.00$1,475.00

2 $1,500.00$1,500.00

3 $3,410.00$3,410.00

4 $500.00$500.00

5 $2,500.00$2,500.00

6 $5,000.00$5,000.00

160119 - Page 310

Page 311: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #62 624E10000 MOBILIZATION, (LUMP SUM)

Awd $20,000.00$20,000.00

2 $45,000.00$45,000.00

3 $20,000.00$20,000.00

4 $64,000.00$64,000.00

5 $10,000.00$10,000.00

6 $20,000.00$20,000.00

Section 9 - INCIDENTALS - Totals

Awd $85,275.00

2 $119,500.00

3 $126,910.00

4 $146,500.00

5 $61,250.00

6 $70,000.00

160119 - Page 311

Page 312: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Project No. 160120

PID 100360

MER-SR 118/SR 703-3.91/6.48

Federal

Type: TWO LANE RESURFACING

Completion Date: 7/30/2016

Award Amount: $2,225,125.97

Contract Awarded To: SHELLY COMPANY

Letting Date: 3/1/2016

Engineer's Estimate: $2,025,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jerry Wray, Director

SHELLY COMPANY

80 PARK DR BOX 266

THORNVILLE, OH 43076

Perry

Bidder 1

Bid $2,225,125.97

160120 - Page 312

Page 313: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #1 202E23500 WEARING COURSE REMOVED, (3569 SY)

Awd $23,198.50$6.50

Ref #2 202E30000 WALK REMOVED, (2035.5 SF)

Awd $4,885.20$2.40

Ref #3 202E32001 CURB REMOVED, AS PER PLAN, (290 FT)

Awd $2,900.00$10.00

Ref #4 202E32501 CURB AND GUTTER REMOVED, AS PER PLAN, (26.5 FT)

Awd $265.00$10.00

Ref #5 608E10000 4" CONCRETE WALK, (423.4 SF)

Awd $3,366.03$7.95

Ref #6 608E52011 CURB RAMP, TYPE A1, AS PER PLAN, (89.5 SF)

Awd $895.00$10.00

Ref #7 608E52031 CURB RAMP, TYPE B1, AS PER PLAN, (201 SF)

Awd $2,010.00$10.00

Ref #8 608E52041 CURB RAMP, TYPE B2, APP, (548 SF)

Awd $5,480.00$10.00

Ref #9 608E52044 CURB RAMP, TYPE B3, (120.5 SF)

Awd $1,205.00$10.00

Ref #10 608E52061 CURB RAMP, TYPE C2, AS PER PLAN, (1341 SF)

Awd $13,410.00$10.00

Ref #11 623E39500 MONUMENT BOX ADJUSTED TO GRADE, (3 EACH)

Awd $750.00$250.00

Section 1 - ROADWAY - Totals

Awd $58,364.73

Ref #12 253E01001 PAVEMENT REPAIR, AS PER PLAN, (3000 SY)

Awd $150,000.00$50.00

Ref #13 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (41983 SY)

Awd $56,677.05$1.35

Ref #14 254E01601 PATCHING PLANED SURFACE, AS PER PLAN, (50 SY)

Awd $600.00$12.00

Ref #15 301E46001 ASPHALT CONCRETE BASE, PG64-22, AS PER PLAN, (10 CY)

Awd $2,600.00$260.00

Ref #16 407E10000 TACK COAT, (12198 GAL)

Awd $28,665.30$2.35

Ref #17 407E20500 SPECIAL - TACK COAT, TRACKLESS TACK, (10867 GAL)

Awd $25,537.45$2.35

Ref #18 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (6966 CY)

Awd $1,017,036.00$146.00

Ref #19 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, (448, (4175 CY)

Awd $555,275.00$133.00

Ref #20 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN, (104.75 FT)

Awd $2,723.50$26.00

Ref #21 609E26001 CURB, TYPE 6, AS PER PLAN, (12.25 FT)

Awd $306.25$25.00

160120 - Page 313

Page 314: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #22 617E10100 COMPACTED AGGREGATE, (998 CY)

Awd $44,910.00$45.00

Ref #23 618E41000 EDGE LINE, RUMBLE STRIPE (ASPHALT CONCRETE), (13.88 MILE)

Awd $15,962.00$1,150.00

Ref #24 618E43000 CENTER LINE, RUMBLE STRIPE (ASPHALT CONCRETE), (2.79 MILE)

Awd $3,208.50$1,150.00

Section 2 - PAVEMENT - Totals

Awd $1,903,501.05

Ref #25 638E10800 VALVE BOX ADJUSTED TO GRADE, (27 EACH)

Awd $6,075.00$225.00

Section 3 - WATER WORK - Totals

Awd $6,075.00

Ref #26 611E99654 MANHOLE ADJUSTED TO GRADE, (8 EACH)

Awd $6,200.00$775.00

Section 4 - SANITARY SEWER - Totals

Awd $6,200.00

Ref #27 621E00100 RPM, (529 EACH)

Awd $9,680.70$18.30

Ref #28 621E54000 RAISED PAVEMENT MARKER REMOVED, (543 EACH)

Awd $3,801.00$7.00

Ref #29 630E08520 STREET NAME SIGN SUPPORT, NO. 3 POST, (15 FT)

Awd $300.00$20.00

Ref #30 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (2 EACH)

Awd $150.00$75.00

Ref #31 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (1 EACH)

Awd $20.00$20.00

Ref #32 642E00090 EDGE LINE, 4", (18.38 MILE)

Awd $8,050.44$438.00

Ref #33 642E00290 CENTER LINE, (9.35 MILE)

Awd $4,908.75$525.00

Ref #34 644E00400 CHANNELIZING LINE, 8", (230 FT)

Awd $276.00$1.20

Ref #35 644E00500 STOP LINE, (287 FT)

Awd $1,707.65$5.95

Ref #36 644E00600 CROSSWALK LINE, (708 FT)

Awd $1,876.20$2.65

Ref #37 644E00700 TRANSVERSE/DIAGONAL LINE, (632 FT)

Awd $3,570.80$5.65

Ref #38 644E01100 SCHOOL SYMBOL MARKING, 72", (2 EACH)

Awd $400.00$200.00

160120 - Page 314

Page 315: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #39 644E01300 LANE ARROW, (4 EACH)

Awd $340.00$85.00

Ref #40 647E20902 BIKE LANE SYMBOL MARKING, TYPE A125, (12 EACH)

Awd $2,100.00$175.00

Ref #41 690E50350 SPECIAL - MAILBOX REMOVED AND RESET, (2 EACH)

Awd $550.00$275.00

Section 5 - TRAFFIC CONTROL - Totals

Awd $37,731.54

Ref #42 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (40 HOUR)

Awd $2,400.00$60.00

Ref #43 614E12460 WORK ZONE MARKING SIGN, (90 EACH)

Awd $7,920.00$88.00

Ref #44 614E21400 WORK ZONE CENTER LINE, CLASS II, (19.93 MILE)

Awd $9,666.05$485.00

Ref #45 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT, (56 FT)

Awd $131.60$2.35

Section 6 - MAINTENANCE OF TRAFFIC - Totals

Awd $20,117.65

Ref #46 516E31011 2" DEEP JOINT SEALER, AS PER PLAN, (112 FT)

Awd $3,136.00$28.00

Section 7 - STRUCTURE REPAIR (MER-118-0722) - Totals

Awd $3,136.00

Ref #47 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $10,000.00$10,000.00

Ref #48 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $100,000.00$100,000.00

Ref #49 624E10000 MOBILIZATION, (LUMP SUM)

Awd $80,000.00$80,000.00

Section 8 - INCIDENTALS - Totals

Awd $190,000.00

160120 - Page 315

Page 316: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Project No. 160121

PID 93176

MOT-SR 741-5.52

Federal

Type: BRIDGE REPLACEMENT (1 BRIDGE)

Completion Date: 9/30/2016

Award Amount: $449,552.50

Contract Awarded To: W G STANG LLC

Letting Date: 3/1/2016

Engineer's Estimate: $403,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jerry Wray, Director

W G STANG LLC

2403 JACKSONBURG RD

HAMILTON, OH 45011

Butler

Bidder 1

Bid $449,552.50

SUNESIS CONSTRUCTION CO

2610 CRESCENTVILLE RD

WEST CHESTER, OH 45069

Butler

Bidder 2

Bid $486,596.15

BRUMBAUGH CONSTRUCTION INC

P O BOX 309

ARCANUM, OH 45304

Darke

Bidder 3

Bid $487,848.00

JOHN R JURGENSEN COMPANY

11641 MOSTELLER RD

CINCINNATI, OH 45241

Hamilton

Bidder 4

Bid $499,625.56

COMPLETE GENERAL CONSTRUCTION COMPANY

1221 EAST FIFTH AVE

COLUMBUS, OH 43219

Franklin

Bidder 5

Bid $508,610.42

160121 - Page 316

Page 317: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)

Awd $2,500.00$2,500.00

2 $3,500.00$3,500.00

3 $2,500.00$2,500.00

4 $758.03$758.03

5 $5,000.00$5,000.00

Ref #2 202E23010 PAVEMENT REMOVED, ASPHALT, (275 SY)

Awd $1,375.00$5.00

2 $3,880.25$14.11

3 $1,650.00$6.00

4 $1,493.25$5.43

5 $4,675.00$17.00

Ref #3 202E23500 WEARING COURSE REMOVED, (379 SY)

Awd $1,895.00$5.00

2 $2,675.74$7.06

3 $2,274.00$6.00

4 $2,611.31$6.89

5 $7,580.00$20.00

Ref #4 202E32500 CURB AND GUTTER REMOVED, (65 FT)

Awd $650.00$10.00

2 $332.15$5.11

3 $520.00$8.00

4 $762.45$11.73

5 $975.00$15.00

Ref #5 202E35100 PIPE REMOVED, 24" AND UNDER, (18 FT)

Awd $180.00$10.00

2 $183.42$10.19

3 $144.00$8.00

4 $303.12$16.84

5 $900.00$50.00

Ref #6 202E35101 PIPE REMOVED, 24" AND UNDER, AS PER PLAN, (7 FT)

Awd $70.00$10.00

2 $337.12$48.16

3 $140.00$20.00

4 $362.25$51.75

5 $1,400.00$200.00

Ref #7 202E38000 GUARDRAIL REMOVED, (254 FT)

Awd $1,270.00$5.00

2 $820.42$3.23

3 $2,032.00$8.00

4 $1,125.22$4.43

5 $1,333.50$5.25

Ref #8 204E10000 SUBGRADE COMPACTION, (429 SY)

Awd $858.00$2.00

2 $1,089.66$2.54

3 $858.00$2.00

4 $1,068.21$2.49

5 $2,574.00$6.00

160121 - Page 317

Page 318: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #9 606E15050 GUARDRAIL, TYPE MGS, (62.5 FT)

Awd $1,562.50$25.00

2 $1,093.75$17.50

3 $1,250.00$20.00

4 $1,462.50$23.40

5 $1,462.50$23.40

Ref #10 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING, (100 FT)

Awd $7,500.00$75.00

2 $5,000.00$50.00

3 $9,500.00$95.00

4 $6,940.00$69.40

5 $6,940.00$69.40

Ref #11 606E25550 ANCHOR ASSEMBLY, MGS TYPE A, (1 EACH)

Awd $1,500.00$1,500.00

2 $1,200.00$1,200.00

3 $1,500.00$1,500.00

4 $1,300.00$1,300.00

5 $1,300.00$1,300.00

Ref #12 606E26050 ANCHOR ASSEMBLY, MGS TYPE B, (1 EACH)

Awd $2,000.00$2,000.00

2 $1,600.00$1,600.00

3 $2,100.00$2,100.00

4 $1,750.00$1,750.00

5 $1,750.00$1,750.00

Ref #13 606E26550 ANCHOR ASSEMBLY, MGS TYPE T, (2 EACH)

Awd $2,000.00$1,000.00

2 $1,600.00$800.00

3 $1,800.00$900.00

4 $1,630.00$815.00

5 $1,630.00$815.00

Ref #14 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE, (1 EACH)

Awd $125.00$125.00

2 $136.97$136.97

3 $300.00$300.00

4 $225.00$225.00

5 $225.00$225.00

Section 1 - ROADWAY - Totals

Awd $23,485.50

2 $23,449.48

3 $26,568.00

4 $21,791.34

5 $37,745.00

Ref #15 659E20000 COMMERCIAL FERTILIZER, (0.01 TON)

Awd $5.00$500.00

2 $54.29$5,429.00

3 $6.00$600.00

4 $7.50$750.00

5 $7.50$750.00

160121 - Page 318

Page 319: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #16 659E35000 WATER, (1 MGAL)

Awd $10.00$10.00

2 $33.72$33.72

3 $5.00$5.00

4 $1.00$1.00

5 $1.00$1.00

Ref #17 660E20000 SODDING REINFORCED, (17 SY)

Awd $1,275.00$75.00

2 $536.69$31.57

3 $425.00$25.00

4 $1,700.00$100.00

5 $1,700.00$100.00

Ref #18 832E30000 EROSION CONTROL, (4000 EACH)

Awd $4,000.00$1.00

2 $4,000.00$1.00

3 $4,000.00$1.00

4 $4,000.00$1.00

5 $4,000.00$1.00

Section 2 - EROSION CONTROL - Totals

Awd $5,290.00

2 $4,624.70

3 $4,436.00

4 $5,708.50

5 $5,708.50

Ref #19 611E04400 12" CONDUIT, TYPE B, (20 FT)

Awd $600.00$30.00

2 $744.20$37.21

3 $800.00$40.00

4 $735.00$36.75

5 $100.00$5.00

Ref #20 611E05900 15" CONDUIT, TYPE B, (38 FT)

Awd $1,330.00$35.00

2 $2,186.52$57.54

3 $1,900.00$50.00

4 $1,508.60$39.70

5 $1,900.00$50.00

Section 3 - DRAINAGE - Totals

Awd $1,930.00

2 $2,930.72

3 $2,700.00

4 $2,243.60

5 $2,000.00

Ref #21 301E46000 ASPHALT CONCRETE BASE, PG64-22, (169 CY)

Awd $29,575.00$175.00

2 $23,322.00$138.00

3 $29,575.00$175.00

4 $30,938.83$183.07

5 $27,040.00$160.00

160121 - Page 319

Page 320: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #22 304E20000 AGGREGATE BASE, (72 CY)

Awd $3,600.00$50.00

2 $4,876.56$67.73

3 $3,600.00$50.00

4 $10,649.52$147.91

5 $6,840.00$95.00

Ref #23 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (27 GAL)

Awd $54.00$2.00

2 $189.00$7.00

3 $54.00$2.00

4 $67.50$2.50

5 $54.00$2.00

Ref #24 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (55 CY)

Awd $15,125.00$275.00

2 $15,290.00$278.00

3 $17,325.00$315.00

4 $14,268.10$259.42

5 $13,750.00$250.00

Ref #25 609E12000 COMBINATION CURB AND GUTTER, TYPE 2, (45 FT)

Awd $2,250.00$50.00

2 $2,038.05$45.29

3 $2,700.00$60.00

4 $2,052.00$45.60

5 $2,250.00$50.00

Ref #26 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN, (25 FT)

Awd $1,250.00$50.00

2 $1,060.00$42.40

3 $1,500.00$60.00

4 $1,241.75$49.67

5 $1,625.00$65.00

Section 4 - PAVEMENT - Totals

Awd $51,854.00

2 $46,775.61

3 $54,754.00

4 $59,217.70

5 $51,559.00

Ref #27 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (37 FT)

Awd $444.00$12.00

2 $333.00$9.00

3 $444.00$12.00

4 $536.50$14.50

5 $536.50$14.50

Ref #28 630E08600 SIGN POST REFLECTOR, (3 EACH)

Awd $90.00$30.00

2 $105.00$35.00

3 $90.00$30.00

4 $135.00$45.00

5 $135.00$45.00

160121 - Page 320

Page 321: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #29 630E80100 SIGN, FLAT SHEET, (14.3 SF)

Awd $286.00$20.00

2 $228.80$16.00

3 $228.80$16.00

4 $500.50$35.00

5 $500.50$35.00

Ref #30 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (3 EACH)

Awd $75.00$25.00

2 $45.00$15.00

3 $60.00$20.00

4 $75.00$25.00

5 $75.00$25.00

Ref #31 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (3 EACH)

Awd $75.00$25.00

2 $60.00$20.00

3 $60.00$20.00

4 $75.00$25.00

5 $75.00$25.00

Ref #32 644E00200 LANE LINE, 4", (0.02 MILE)

Awd $500.00$25,000.00

2 $331.20$16,560.00

3 $370.00$18,500.00

4 $331.20$16,560.00

5 $486.32$24,316.00

Ref #33 644E00300 CENTER LINE, (0.02 MILE)

Awd $1,000.00$50,000.00

2 $388.80$19,440.00

3 $420.00$21,000.00

4 $388.80$19,440.00

5 $973.00$48,650.00

Ref #34 644E00500 STOP LINE, (28 FT)

Awd $560.00$20.00

2 $280.00$10.00

3 $336.00$12.00

4 $280.00$10.00

5 $420.00$15.00

Section 5 - TRAFFIC CONTROL - Totals

Awd $3,030.00

2 $1,771.80

3 $2,008.80

4 $2,322.00

5 $3,201.32

Ref #35 614E12346 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL) 24", (1 EACH)

Awd $2,500.00$2,500.00

2 $1,800.00$1,800.00

3 $2,000.00$2,000.00

4 $2,922.60$2,922.60

5 $2,000.00$2,000.00

160121 - Page 321

Page 322: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #36 614E12420 DETOUR SIGNING, (LUMP SUM)

Awd $10,000.00$10,000.00

2 $5,757.98$5,757.98

3 $10,000.00$10,000.00

4 $7,695.00$7,695.00

5 $6,000.00$6,000.00

Ref #37 614E13302 BARRIER REFLECTOR, TYPE B2, (8 EACH)

Awd $80.00$10.00

2 $64.00$8.00

3 $80.00$10.00

4 $160.00$20.00

5 $80.00$10.00

Ref #38 614E13350 OBJECT MARKER, ONE WAY, (10 EACH)

Awd $500.00$50.00

2 $110.00$11.00

3 $120.00$12.00

4 $160.20$16.02

5 $100.00$10.00

Ref #39 614E22200 WORK ZONE EDGE LINE, CLASS I, 740.06, TYPE I, (0.1 MILE)

Awd $500.00$5,000.00

2 $607.20$6,072.00

3 $1,600.00$16,000.00

4 $933.90$9,339.00

5 $2,500.00$25,000.00

Ref #40 615E10000 ROADS FOR MAINTAINING TRAFFIC, (LUMP SUM)

Awd $2,500.00$2,500.00

2 $1,007.21$1,007.21

3 $2,000.00$2,000.00

4 $747.25$747.25

5 $3,000.00$3,000.00

Ref #41 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, (6 SY)

Awd $900.00$150.00

2 $1,101.48$183.58

3 $3,300.00$550.00

4 $2,232.90$372.15

5 $3,000.00$500.00

Ref #42 616E10000 WATER, (3 MGAL)

Awd $30.00$10.00

2 $37.74$12.58

3 $15.00$5.00

4 $252.06$84.02

5 $150.00$50.00

Ref #43 622E41000 PORTABLE BARRIER, 32", (323 FT)

Awd $9,690.00$30.00

2 $6,682.87$20.69

3 $6,460.00$20.00

4 $20,604.17$63.79

5 $8,075.00$25.00

160121 - Page 322

Page 323: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Section 6 - MAINTENANCE OF TRAFFIC - Totals

Awd $26,700.00

2 $17,168.48

3 $25,575.00

4 $35,708.08

5 $24,905.00

Ref #44 202E11002 STRUCTURE REMOVED, OVER 20 FOOT SPAN, (LUMP SUM)

Awd $20,000.00$20,000.00

2 $44,899.93$44,899.93

3 $25,000.00$25,000.00

4 $16,529.10$16,529.10

5 $28,000.00$28,000.00

Ref #45 202E22900 APPROACH SLAB REMOVED, (160 SY)

Awd $1,600.00$10.00

2 $2,552.00$15.95

3 $3,200.00$20.00

4 $5,763.20$36.02

5 $8,000.00$50.00

Ref #46 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)

Awd $500.00$500.00

2 $11,725.10$11,725.10

3 $5,500.00$5,500.00

4 $10,034.48$10,034.48

5 $12,000.00$12,000.00

Ref #47 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN, (LUMP SUM)

Awd $10,000.00$10,000.00

2 $37,013.79$37,013.79

3 $7,500.00$7,500.00

4 $28,799.99$28,799.99

5 $32,000.00$32,000.00

Ref #48 509E10000 EPOXY COATED REINFORCING STEEL, (5430 LB)

Awd $5,430.00$1.00

2 $7,602.00$1.40

3 $5,430.00$1.00

4 $8,145.00$1.50

5 $9,502.50$1.75

Ref #49 511E46010 CLASS QC1 CONCRETE, (13 CY)

Awd $13,000.00$1,000.00

2 $16,606.33$1,277.41

3 $5,850.00$450.00

4 $12,636.78$972.06

5 $13,000.00$1,000.00

Ref #50 511E46510 CLASS QC1 CONCRETE, FOOTING, (35 CY)

Awd $17,500.00$500.00

2 $18,553.85$530.11

3 $15,750.00$450.00

4 $36,129.10$1,032.26

5 $17,500.00$500.00

160121 - Page 323

Page 324: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #51 511E47011 CLASS QC1 CONCRETE, CULVERT, AS PER PLAN, (4 CY)

Awd $4,000.00$1,000.00

2 $2,300.20$575.05

3 $1,500.00$375.00

4 $7,027.20$1,756.80

5 $5,800.00$1,450.00

Ref #52 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (53 SY)

Awd $2,120.00$40.00

2 $1,515.27$28.59

3 $1,590.00$30.00

4 $1,855.00$35.00

5 $1,855.00$35.00

Ref #53 512E33000 TYPE 2 WATERPROOFING, (174 SY)

Awd $3,480.00$20.00

2 $2,923.20$16.80

3 $4,002.00$23.00

4 $3,480.00$20.00

5 $3,480.00$20.00

Ref #54 512E33010 TYPE 3 WATERPROOFING, (245 SY)

Awd $7,350.00$30.00

2 $6,935.95$28.31

3 $7,350.00$30.00

4 $6,360.20$25.96

5 $6,125.00$25.00

Ref #55 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (35 SF)

Awd $175.00$5.00

2 $128.80$3.68

3 $52.50$1.50

4 $234.15$6.69

5 $317.10$9.06

Ref #56 518E21200 POROUS BACKFILL WITH FILTER FABRIC, (12 CY)

Awd $900.00$75.00

2 $1,273.08$106.09

3 $900.00$75.00

4 $1,972.44$164.37

5 $1,380.00$115.00

Ref #57 518E22300 SPECIAL - STEEL DRIP STRIP, (44 FT)

Awd $528.00$12.00

2 $744.48$16.92

3 $748.00$17.00

4 $866.36$19.69

5 $572.00$13.00

Ref #58 601E32004 ROCK CHANNEL PROTECTION, TYPE A WITH FABRIC FILTER, (28 CY)

Awd $2,520.00$90.00

2 $2,228.52$79.59

3 $1,680.00$60.00

4 $3,826.76$136.67

5 $3,080.00$110.00

160121 - Page 324

Page 325: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #59 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH FABRIC FILTER, (24 CY)

Awd $2,160.00$90.00

2 $1,937.28$80.72

3 $1,320.00$55.00

4 $3,495.84$145.66

5 $2,880.00$120.00

Ref #60 611E96489 20' X 5' CONDUIT, TYPE A, 706.05, AS PER PLAN, DES, (105 FT)

Awd $147,000.00$1,400.00

2 $139,319.25$1,326.85

3 $176,400.00$1,680.00

4 $135,045.75$1,286.15

5 $126,000.00$1,200.00

Section 7 - STRUCTURE 20 FOOT SPAN AND OVER (MOT-741 - Totals

Awd $238,263.00

2 $298,259.03

3 $263,772.50

4 $282,201.35

5 $271,491.60

Ref #61 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $5,000.00$5,000.00

2 $3,941.04$3,941.04

3 $10,000.00$10,000.00

4 $410.00$410.00

5 $5,000.00$5,000.00

Ref #62 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $5,000.00$5,000.00

2 $1,431.02$1,431.02

3 $4,000.00$4,000.00

4 $8,988.05$8,988.05

5 $4,000.00$4,000.00

Ref #63 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)

Awd $3,000.00$3,000.00

2 $2,100.00$2,100.00

3 $4,000.00$4,000.00

4 $8,512.92$8,512.92

5 $2,000.00$2,000.00

Ref #64 624E10000 MOBILIZATION, (LUMP SUM)

Awd $5,000.00$5,000.00

2 $16,644.27$16,644.27

3 $9,033.70$9,033.70

4 $5,022.02$5,022.02

5 $20,000.00$20,000.00

Section 8 - INCIDENTALS - Totals

Awd $18,000.00

2 $24,116.33

3 $27,033.70

4 $22,932.99

5 $31,000.00

160121 - Page 325

Page 326: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #65 614E15000 SPECIAL - CALENDAR DAYS OF CONTRACT TIME FOR OPENI, (4500 DLR)

Awd $81,000.00$18.00

2 $67,500.00$15.00

3 $81,000.00$18.00

4 $67,500.00$15.00

5 $81,000.00$18.00

Section 9 - PART B - Totals

Awd $81,000.00

2 $67,500.00

3 $81,000.00

4 $67,500.00

5 $81,000.00

160121 - Page 326

Page 327: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Project No. 160122

PID 101678

MRW-US 42-0.00

Federal

Type: PREVENTIVE MAINTENANCE

Completion Date: 8/31/2016

Award Amount: $1,820,096.46

Contract Awarded To: SHELLY & SANDS INC

Letting Date: 3/1/2016

Engineer's Estimate: $1,800,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jerry Wray, Director

SHELLY & SANDS INC

1515 HARMON AVE

COLUMBUS, OH 43223

Franklin

Bidder 1

Bid $1,820,096.46

KOKOSING CONSTRUCTION COMPANY INC

886 MC KINLEY AVE

COLUMBUS, OH 43222

Franklin

Bidder 2

Bid $1,974,028.74

160122 - Page 327

Page 328: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #1 202E38001 GUARDRAIL REMOVED, AS PER PLAN, (4062.5 FT)

Awd $4,875.00$1.20

2 $4,875.00$1.20

Ref #2 202E42001 ANCHOR ASSEMBLY REMOVED, TYPE A, AS PER PLAN, (42 EACH)

Awd $7,770.00$185.00

2 $7,770.00$185.00

Ref #3 203E20001 EMBANKMENT, AS PER PLAN, (176 CY)

Awd $8,580.00$48.75

2 $8,580.00$48.75

Ref #4 209E10000 DITCH CLEANOUT, (275 FT)

Awd $2,200.00$8.00

2 $2,337.50$8.50

Ref #5 209E60500 LINEAR GRADING, (23.33 MILE)

Awd $27,412.75$1,175.00

2 $27,996.00$1,200.00

Ref #6 606E15050 GUARDRAIL, TYPE MGS, (5225 FT)

Awd $66,880.00$12.80

2 $66,880.00$12.80

Ref #7 606E26050 ANCHOR ASSEMBLY, MGS TYPE B, (3 EACH)

Awd $4,695.00$1,565.00

2 $4,695.00$1,565.00

Ref #8 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, (35 EACH)

Awd $58,800.00$1,680.00

2 $62,300.00$1,780.00

Ref #9 606E27820 ANCHOR ASSEMBLY, MGS TYPE T, (4 EACH)

Awd $2,940.00$735.00

2 $2,940.00$735.00

Ref #10 606E35000 BRIDGE TERMINAL ASSEMBLY, TYPE 1, (4 EACH)

Awd $7,380.00$1,845.00

2 $7,380.00$1,845.00

Ref #11 606E35141 BRIDGE TERMINAL ASSEMBLY, TYPE 4, AS PER PLAN, (4 EACH)

Awd $2,700.00$675.00

2 $2,700.00$675.00

Ref #12 606E98000 GUARDRAIL, MISC.:ALTERNATIVE GUARDRAIL REPLACEMENT, (125 FT)

Awd $2,650.00$21.20

2 $2,650.00$21.20

Ref #13 623E39500 MONUMENT BOX ADJUSTED TO GRADE, (7 EACH)

Awd $8,750.00$1,250.00

2 $2,100.00$300.00

Section 1 - ROADWAY - Totals

Awd $205,632.75

2 $203,203.50

Ref #14 659E00300 TOPSOIL, (422 CY)

Awd $10,550.00$25.00

2 $12,660.00$30.00

160122 - Page 328

Page 329: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #15 659E10000 SEEDING AND MULCHING, (3751 SY)

Awd $5,063.85$1.35

2 $5,063.85$1.35

Ref #16 659E14000 REPAIR SEEDING AND MULCHING, (188 SY)

Awd $75.20$0.40

2 $75.20$0.40

Ref #17 659E15000 INTER-SEEDING, (188 SY)

Awd $18.80$0.10

2 $18.80$0.10

Ref #18 659E20000 COMMERCIAL FERTILIZER, (0.51 TON)

Awd $226.95$445.00

2 $226.95$445.00

Ref #19 659E31000 LIME, (0.78 ACRE)

Awd $70.20$90.00

2 $70.20$90.00

Ref #20 659E35000 WATER, (20 MGAL)

Awd $20.00$1.00

2 $20.00$1.00

Ref #21 832E30000 EROSION CONTROL, (1000 EACH)

Awd $1,000.00$1.00

2 $1,000.00$1.00

Section 2 - EROSION CONTROL - Totals

Awd $17,025.00

2 $19,135.00

Ref #22 605E31100 AGGREGATE DRAINS, (20 FT)

Awd $800.00$40.00

2 $600.00$30.00

Ref #23 611E99654 MANHOLE ADJUSTED TO GRADE, (4 EACH)

Awd $2,200.00$550.00

2 $1,200.00$300.00

Section 3 - DRAINAGE - Totals

Awd $3,000.00

2 $1,800.00

Ref #24 251E01001 PARTIAL DEPTH PAVEMENT REPAIR, AS PER PLANTYPE A, (1800 SY)

Awd $73,800.00$41.00

2 $59,400.00$33.00

Ref #25 251E01001 PARTIAL DEPTH PAVEMENT REPAIR, AS PER PLANTYPE B, (600 SY)

Awd $17,400.00$29.00

2 $8,850.00$14.75

Ref #26 251E01001 PARTIAL DEPTH PAVEMENT REPAIR, AS PER PLANTYPE C, (140 SY)

Awd $12,600.00$90.00

2 $9,660.00$69.00

Ref #27 253E01001 PAVEMENT REPAIR, AS PER PLAN, (200 SY)

Awd $16,000.00$80.00

2 $19,200.00$96.00

160122 - Page 329

Page 330: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #28 255E10501 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT,, (100 SY)

Awd $15,000.00$150.00

2 $30,000.00$300.00

Ref #29 255E20000 FULL DEPTH PAVEMENT SAWING, (90 FT)

Awd $450.00$5.00

2 $1,147.50$12.75

Ref #30 407E10000 TACK COAT, (15525 GAL)

Awd $30,273.75$1.95

2 $27,168.75$1.75

Ref #31 409E30001 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT, (240 FT)

Awd $3,139.20$13.08

2 $3,240.00$13.50

Ref #32 423E98200 CRACK SEALING, MISC.:TYPE II OR TYPE III, (60 FT)

Awd $699.00$11.65

2 $480.00$8.00

Ref #33 424E12000 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B, (5598 CY)

Awd $867,690.00$155.00

2 $1,086,012.00$194.00

Ref #34 617E10100 COMPACTED AGGREGATE, (448 CY)

Awd $26,880.00$60.00

2 $37,184.00$83.00

Ref #35 617E25000 WATER, (4 MGAL)

Awd $40.00$10.00

2 $8.00$2.00

Ref #36 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A, (19322 SY)

Awd $57,966.00$3.00

2 $52,169.40$2.70

Section 4 - PAVEMENT - Totals

Awd $1,121,937.95

2 $1,334,519.65

Ref #37 621E00100 RPM, (888.782 EACH)

Awd $16,842.42$18.95

2 $16,664.66$18.75

Ref #38 621E54000 RAISED PAVEMENT MARKER REMOVED, (888.782 EACH)

Awd $7,999.04$9.00

2 $7,999.04$9.00

Ref #39 626E00100 BARRIER REFLECTOR, (153 EACH)

Awd $918.00$6.00

2 $918.00$6.00

Ref #40 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (112 FT)

Awd $840.00$7.50

2 $952.00$8.50

Ref #41 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (160 FT)

Awd $1,360.00$8.50

2 $1,520.00$9.50

160122 - Page 330

Page 331: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #42 630E80100 SIGN, FLAT SHEET, (132 SF)

Awd $1,980.00$15.00

2 $2,244.00$17.00

Ref #43 642E00090 EDGE LINE, 4", (24.561 MILE)

Awd $10,438.43$425.00

2 $10,438.43$425.00

Ref #44 642E00290 CENTER LINE, (12.73 MILE)

Awd $6,365.00$500.00

2 $6,365.00$500.00

Ref #45 644E00500 STOP LINE, (685 FT)

Awd $3,767.50$5.50

2 $3,767.50$5.50

Ref #46 644E00600 CROSSWALK LINE, (1321 FT)

Awd $2,642.00$2.00

2 $2,642.00$2.00

Ref #47 644E01000 RAILROAD SYMBOL MARKING, (2 EACH)

Awd $450.00$225.00

2 $450.00$225.00

Ref #48 644E01110 SCHOOL SYMBOL MARKING, 96", (2 EACH)

Awd $330.00$165.00

2 $330.00$165.00

Section 5 - TRAFFIC CONTROL - Totals

Awd $53,932.39

2 $54,290.63

Ref #49 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (40 HOUR)

Awd $2,400.00$60.00

2 $2,400.00$60.00

Ref #50 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL), (4 EACH)

Awd $6,578.88$1,644.72

2 $6,578.88$1,644.72

Ref #51 614E12460 WORK ZONE MARKING SIGN, (84 EACH)

Awd $14,700.00$175.00

2 $6,720.00$80.00

Ref #52 614E13100 BARRIER REFLECTOR, (16 EACH)

Awd $258.08$16.13

2 $258.08$16.13

Ref #53 614E13360 OBJECT MARKER, TWO WAY, (16 EACH)

Awd $258.08$16.13

2 $258.08$16.13

Ref #54 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (13.62 MILE)

Awd $9,193.50$675.00

2 $8,648.70$635.00

Ref #55 614E22200 WORK ZONE EDGE LINE, CLASS I, 740.06, TYPE I, (0.28 MILE)

Awd $2,287.50$8,169.64

2 $2,287.60$8,170.00

160122 - Page 331

Page 332: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #56 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I, (20 FT)

Awd $301.60$15.08

2 $301.60$15.08

Ref #57 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT, (1259 FT)

Awd $3,147.50$2.50

2 $1,699.65$1.35

Ref #58 614E27620 WORK ZONE CROSSWALK LINE, CLASS III, 642 PAINT, (2630 FT)

Awd $5,260.00$2.00

2 $1,315.00$0.50

Ref #59 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, (380 SY)

Awd $27,667.80$72.81

2 $27,667.80$72.81

Ref #60 622E41000 PORTABLE BARRIER, 32", (660 FT)

Awd $8,712.00$13.20

2 $8,712.00$13.20

Section 6 - MAINTENANCE OF TRAFFIC - Totals

Awd $80,764.94

2 $66,847.39

Ref #61 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)

Awd $14,793.00$14,793.00

2 $14,793.00$14,793.00

Ref #62 202E23500 WEARING COURSE REMOVED, (254 SY)

Awd $5,598.16$22.04

2 $5,598.16$22.04

Ref #63 202E38500 BRIDGE RAILING REMOVED, (150 FT)

Awd $600.00$4.00

2 $600.00$4.00

Ref #64 407E10000 TACK COAT, (26 GAL)

Awd $50.70$1.95

2 $45.50$1.75

Ref #65 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (25 CY)

Awd $12,500.00$500.00

2 $13,500.00$540.00

Ref #66 509E10000 EPOXY COATED REINFORCING STEEL, (20 LB)

Awd $384.00$19.20

2 $384.00$19.20

Ref #67 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (50 LB)

Awd $58.50$1.17

2 $58.50$1.17

Ref #68 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (8 EACH)

Awd $169.52$21.19

2 $169.52$21.19

Ref #69 511E31610 CLASS QC2 CONCRETE, SUPERSTRUCTURE, (1 CY)

Awd $2,595.00$2,595.00

2 $2,595.00$2,595.00

160122 - Page 332

Page 333: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #70 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (31 SY)

Awd $749.58$24.18

2 $1,395.00$45.00

Ref #71 512E33010 TYPE 3 WATERPROOFING, (254 SY)

Awd $7,724.14$30.41

2 $7,239.00$28.50

Ref #72 515E10030 PRESTRESSED CONCRETE NON-COMPOSITE BOX BEAM BRIDGE, (4 EACH)

Awd $49,927.64$12,481.91

2 $49,927.64$12,481.91

Ref #73 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (24 SF)

Awd $90.00$3.75

2 $90.00$3.75

Ref #74 516E31200 SPECIAL - SAWING AND SEALING BITUMINOUS CONCRETE J, (64 FT)

Awd $1,216.64$19.01

2 $1,216.64$19.01

Ref #75 516E41100 1/8" PREFORMED BEARING PAD, (16 EACH)

Awd $373.44$23.34

2 $373.44$23.34

Ref #76 516E43100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY (, (16 EACH)

Awd $1,645.44$102.84

2 $1,645.44$102.84

Ref #77 517E70001 RAILING (TWIN STEEL TUBE), AS PER PLAN, (152 FT)

Awd $17,632.00$116.00

2 $17,632.00$116.00

Ref #78 518E22300 SPECIAL - STEEL DRIP STRIP, (179 FT)

Awd $1,782.84$9.96

2 $2,237.50$12.50

Section 7 - STRUCTURE 20 FOOT SPAN AND OVER (MRW-42- - Totals

Awd $117,890.60

2 $119,500.34

Ref #79 202E30000 WALK REMOVED, (165 SF)

Awd $727.65$4.41

2 $727.65$4.41

Ref #80 202E32000 CURB REMOVED, (31 FT)

Awd $193.44$6.24

2 $193.44$6.24

Ref #81 509E10000 EPOXY COATED REINFORCING STEEL, (44 LB)

Awd $392.92$8.93

2 $392.92$8.93

Ref #82 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (21 EACH)

Awd $403.41$19.21

2 $403.41$19.21

Ref #83 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (640 SY)

Awd $6,265.60$9.79

2 $5,600.00$8.75

160122 - Page 333

Page 334: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #84 526E98200 APPROACH SLABS, MISC.:CURB, (20 FT)

Awd $886.60$44.33

2 $886.60$44.33

Ref #85 530E00200 SPECIAL - STRUCTURE, MISC.:BRIDGE POWER WASHING, (LUMP SUM)

Awd $1,026.00$1,026.00

2 $3,000.00$3,000.00

Ref #86 530E00400 SPECIAL - STRUCTURE, MISC.:CLEANING STEEL EXPANSIO, (2 EACH)

Awd $684.00$342.00

2 $1,000.00$500.00

Ref #87 608E10000 4" CONCRETE WALK, (165 SF)

Awd $1,163.25$7.05

2 $1,163.25$7.05

Ref #88 609E26000 CURB, TYPE 6, (31 FT)

Awd $765.08$24.68

2 $765.08$24.68

Ref #89 613E41201 LOW STRENGTH MORTAR BACKFILL, AS PER PLAN, (0.5 CY)

Awd $288.00$576.00

2 $288.00$576.00

Section 8 - STRUCTURE 20 FOOT SPAN AND OVER (MRW-42- - Totals

Awd $12,795.95

2 $14,420.35

Ref #90 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM, (39 CF)

Awd $12,574.38$322.42

2 $12,574.38$322.42

Section 9 - STRUCTURE 20 FOOT SPAN AND OVER (MRW-42- - Totals

Awd $12,574.38

2 $12,574.38

Ref #91 517E72710 RAILING (DEEP BEAM BRIDGE RETROFIT RAILING), (50 FT)

Awd $4,475.00$89.50

2 $4,475.00$89.50

Ref #92 613E41201 LOW STRENGTH MORTAR BACKFILL, AS PER PLAN, (0.5 CY)

Awd $622.50$1,245.00

2 $622.50$1,245.00

Section 10 - STRUCTURE 20 FOOT SPAN AND OVER (MRW-42- - Totals

Awd $5,097.50

2 $5,097.50

Ref #93 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $8,500.00$8,500.00

2 $10,000.00$10,000.00

Ref #94 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $131,200.00$131,200.00

2 $85,540.00$85,540.00

160122 - Page 334

Page 335: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #95 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P, (LUMP SUM)

Awd $8,545.00$8,545.00

2 $2,600.00$2,600.00

Ref #96 624E10000 MOBILIZATION, (LUMP SUM)

Awd $40,000.00$40,000.00

2 $40,000.00$40,000.00

Ref #100 100E00300 SPECIAL - PREMIUM ON RAILROADS' PROTECTIVE PUBLIC , (LUMP SUM)

Awd $1,200.00$1,200.00

2 $4,500.00$4,500.00

Section 11 - INCIDENTALS - Totals

Awd $189,445.00

2 $142,640.00

160122 - Page 335

Page 336: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Project No. 160123

PID 93150

PER-SR 13-17.49 (PART 1 PART 2)

Federal

Type: TWO LANE RESURFACING

Completion Date: 10/15/2016

Award Amount: $2,089,954.47

Contract Awarded To: SHELLY COMPANY

Letting Date: 3/1/2016

Engineer's Estimate: $1,740,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jerry Wray, Director

SHELLY COMPANY

80 PARK DR BOX 266

THORNVILLE, OH 43076

Perry

Bidder 1

Bid $2,089,954.47

160123 - Page 336

Page 337: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #1 202E23500 WEARING COURSE REMOVED, (3448 SY)

Awd $43,100.00$12.50

Ref #2 202E30000 WALK REMOVED, (915 SF)

Awd $3,843.00$4.20

Ref #3 202E32000 CURB REMOVED, (158 FT)

Awd $2,370.00$15.00

Ref #4 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA, (1.58 MILE)

Awd $2,370.00$1,500.00

Ref #5 608E10000 4" CONCRETE WALK, (691 SF)

Awd $7,911.95$11.45

Ref #6 653E10001 TOPSOIL FURNISHED AND PLACED, AS PER PLAN, (5 CY)

Awd $2,375.00$475.00

Ref #7 690E98000 SPECIAL - MISC.:CURB RAMP, TYPE A2, (2 EACH)

Awd $800.00$400.00

Ref #8 690E98200 SPECIAL - MISC.:DETECTABLE WARNING, (200 SF)

Awd $6,400.00$32.00

Section 1 - ROADWAY (PART 1) - Totals

Awd $69,169.95

Ref #9 659E00500 SEEDING AND MULCHING, CLASS 1, (200 SY)

Awd $1,100.00$5.50

Ref #10 659E14000 REPAIR SEEDING AND MULCHING, (10 SY)

Awd $6.00$0.60

Ref #11 659E15000 INTER-SEEDING, (10 SY)

Awd $6.00$0.60

Ref #12 659E20000 COMMERCIAL FERTILIZER, (0.03 TON)

Awd $18.00$600.00

Ref #13 659E31000 LIME, (0.04 ACRE)

Awd $6.40$160.00

Ref #14 659E35000 WATER, (2 MGAL)

Awd $2.00$1.00

Section 2 - EROSION CONTROL (PART 1) - Totals

Awd $1,138.40

Ref #15 611E98630 CATCH BASIN ADJUSTED TO GRADE, (20 EACH)

Awd $13,000.00$650.00

Ref #16 611E99654 MANHOLE ADJUSTED TO GRADE, (8 EACH)

Awd $5,200.00$650.00

Section 3 - DRAINAGE (PART 1) - Totals

Awd $18,200.00

Ref #17 253E02000 PAVEMENT REPAIR, (100 CY)

Awd $25,000.00$250.00

160123 - Page 337

Page 338: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #18 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (40560 SY)

Awd $81,120.00$2.00

Ref #19 304E20000 AGGREGATE BASE, (3 CY)

Awd $750.00$250.00

Ref #20 407E20500 SPECIAL - TACK COAT, TRACKLESS TACK, (3266 GAL)

Awd $12,084.20$3.70

Ref #21 407E20510 SPECIAL - TACK COAT, TRACKLESS TACK FOR INTERMEDIA, (2044 GAL)

Awd $7,562.80$3.70

Ref #22 408E10001 PRIME COAT, AS PER PLAN, (742 GAL)

Awd $2,411.50$3.25

Ref #23 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (113 CY)

Awd $41,245.00$365.00

Ref #24 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (1462 CY)

Awd $233,920.00$160.00

Ref #25 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (448, (2003 CY)

Awd $260,390.00$130.00

Ref #26 609E26000 CURB, TYPE 6, (181 FT)

Awd $4,525.00$25.00

Ref #27 617E10101 COMPACTED AGGREGATE, AS PER PLAN, (52 CY)

Awd $8,112.00$156.00

Ref #28 617E20000 SHOULDER PREPARATION, (1854 SY)

Awd $741.60$0.40

Section 4 - PAVEMENT (PART 1) - Totals

Awd $677,862.10

Ref #29 638E10800 VALVE BOX ADJUSTED TO GRADE, (4 EACH)

Awd $1,000.00$250.00

Section 5 - WATER WORK (PART 1) - Totals

Awd $1,000.00

Ref #30 621E00100 RPM, (115 EACH)

Awd $3,162.50$27.50

Ref #31 621E54000 RAISED PAVEMENT MARKER REMOVED, (115 EACH)

Awd $575.00$5.00

Ref #32 644E00400 CHANNELIZING LINE, 8", (375 FT)

Awd $600.00$1.60

Ref #33 644E00500 STOP LINE, (690 FT)

Awd $3,760.50$5.45

Ref #34 644E00600 CROSSWALK LINE, (2593 FT)

Awd $7,260.40$2.80

Ref #35 644E01000 RAILROAD SYMBOL MARKING, (1 EACH)

Awd $545.00$545.00

Ref #36 644E01201 PARKING LOT STALL MARKING, AS PER PLAN, (2800 FT)

Awd $4,480.00$1.60

160123 - Page 338

Page 339: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #37 644E01300 LANE ARROW, (9 EACH)

Awd $702.00$78.00

Ref #38 644E01400 WORD ON PAVEMENT, 72", (4 EACH)

Awd $392.00$98.00

Ref #39 644E01601 HANDICAP SYMBOL MARKING, AS PER PLAN, (7 EACH)

Awd $1,036.00$148.00

Ref #40 648E00100 EDGE LINE, 4", (1.58 MILE)

Awd $1,548.40$980.00

Ref #41 648E00200 LANE LINE, 4", (0.03 MILE)

Awd $18.45$615.00

Ref #42 648E00300 CENTER LINE, (2.35 MILE)

Awd $3,771.75$1,605.00

Ref #200 632E26501 DETECTOR LOOP, AS PER PLAN, (8 EACH)

Awd $13,600.00$1,700.00

Section 6 - TRAFFIC CONTROL (PART 1) - Totals

Awd $41,452.00

Ref #43 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (250 HOUR)

Awd $17,500.00$70.00

Ref #44 614E12460 WORK ZONE MARKING SIGN, (8 EACH)

Awd $800.00$100.00

Ref #45 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (6 CY)

Awd $900.00$150.00

Ref #46 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (12 SNMT)

Awd $11,040.00$920.00

Ref #47 614E21400 WORK ZONE CENTER LINE, CLASS II, (2.18 MILE)

Awd $763.00$350.00

Ref #48 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (2.18 MILE)

Awd $2,398.00$1,100.00

Section 7 - MAINTENANCE OF TRAFFIC (PART 1) - Totals

Awd $33,401.00

Ref #49 201E11000 CLEARING AND GRUBBING, (LUMP SUM)

Awd $5,000.00$5,000.00

Ref #50 202E23500 WEARING COURSE REMOVED, (120 SY)

Awd $1,200.00$10.00

Ref #51 202E30000 WALK REMOVED, (705 SF)

Awd $2,291.25$3.25

Ref #52 202E32000 CURB REMOVED, (151 FT)

Awd $1,359.00$9.00

Ref #53 203E10000 EXCAVATION, (68 CY)

Awd $2,720.00$40.00

Ref #54 203E20000 EMBANKMENT, (12 CY)

Awd $420.00$35.00

160123 - Page 339

Page 340: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #55 204E10000 SUBGRADE COMPACTION, (147 SY)

Awd $735.00$5.00

Ref #56 608E10000 4" CONCRETE WALK, (563 SF)

Awd $4,504.00$8.00

Ref #57 608E52044 CURB RAMP, TYPE B3, (201 SF)

Awd $6,432.00$32.00

Ref #58 690E65016 SPECIAL - WORK INVOLVING PETROLEUM CONTAMINATED SO, (5 TON)

Awd $2,500.00$500.00

Section 8 - ROADWAY (PART 2) - Totals

Awd $27,161.25

Ref #59 601E20010 CRUSHED AGGREGATE SLOPE PROTECTION, (2 CY)

Awd $420.00$210.00

Ref #60 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH FABRIC FILTER, (265 CY)

Awd $19,345.00$73.00

Ref #61 616E10000 WATER, (0.2 MGAL)

Awd $1.00$5.00

Ref #62 659E00500 SEEDING AND MULCHING, CLASS 1, (422 SY)

Awd $1,202.70$2.85

Ref #63 659E20000 COMMERCIAL FERTILIZER, (0.06 TON)

Awd $38.10$635.00

Ref #64 659E31000 LIME, (0.09 ACRE)

Awd $13.41$149.00

Ref #65 659E35000 WATER, (2.3 MGAL)

Awd $2.30$1.00

Ref #66 832E30000 EROSION CONTROL, (2000 EACH)

Awd $2,000.00$1.00

Section 9 - EROSION CONTROL (PART 2) - Totals

Awd $23,022.51

Ref #67 611E98630 CATCH BASIN ADJUSTED TO GRADE, (3 EACH)

Awd $1,950.00$650.00

Ref #68 611E98635 CATCH BASIN RECONSTRUCTED TO GRADE, AS PER PLAN, (1 EACH)

Awd $1,600.00$1,600.00

Ref #69 611E98644 CATCH BASIN GRATE, (8 EACH)

Awd $1,200.00$150.00

Section 10 - DRAINAGE (PART 2) - Totals

Awd $4,750.00

Ref #70 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (1804 SY)

Awd $11,275.00$6.25

Ref #71 255E20000 FULL DEPTH PAVEMENT SAWING, (77 FT)

Awd $385.00$5.00

160123 - Page 340

Page 341: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #72 301E46000 ASPHALT CONCRETE BASE, PG64-22, (20 CY)

Awd $6,500.00$325.00

Ref #73 304E20000 AGGREGATE BASE, (25 CY)

Awd $2,250.00$90.00

Ref #74 407E20500 SPECIAL - TACK COAT, TRACKLESS TACK, (145 GAL)

Awd $536.50$3.70

Ref #75 407E20510 SPECIAL - TACK COAT, TRACKLESS TACK FOR INTERMEDIA, (77 GAL)

Awd $284.90$3.70

Ref #76 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (94 CY)

Awd $15,040.00$160.00

Ref #77 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (448, (67 CY)

Awd $13,400.00$200.00

Ref #78 609E26000 CURB, TYPE 6, (154 FT)

Awd $4,928.00$32.00

Ref #79 690E12050 SPECIAL - REINFORCED MESH FOR TRANSVERSE AND/OR LO, (42 SY)

Awd $2,604.00$62.00

Section 11 - PAVEMENT (PART 2) - Totals

Awd $57,203.40

Ref #80 644E00500 STOP LINE, (20 FT)

Awd $109.00$5.45

Ref #81 644E01000 RAILROAD SYMBOL MARKING, (1 EACH)

Awd $545.00$545.00

Ref #82 644E01300 LANE ARROW, (4 EACH)

Awd $312.00$78.00

Ref #83 648E00200 LANE LINE, 4", (0.06 MILE)

Awd $36.90$615.00

Ref #84 648E00300 CENTER LINE, (0.16 MILE)

Awd $256.80$1,605.00

Section 12 - TRAFFIC CONTROL (PART 2) - Totals

Awd $1,259.70

Ref #85 632E90400 SIGNALIZATION, MISC.:MICROWAVE DETECTOR, (1 EACH)

Awd $6,000.00$6,000.00

Section 13 - TRAFFIC SIGNALS (PART 2) - Totals

Awd $6,000.00

Ref #86 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL), (7 EACH)

Awd $16,800.00$2,400.00

Ref #87 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (10 CY)

Awd $1,500.00$150.00

Ref #88 614E13100 BARRIER REFLECTOR, (15 EACH)

Awd $105.00$7.00

160123 - Page 341

Page 342: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #89 614E13360 OBJECT MARKER, TWO WAY, (15 EACH)

Awd $180.00$12.00

Ref #90 622E41000 PORTABLE BARRIER, 32", (490 FT)

Awd $7,350.00$15.00

Ref #91 622E41020 PORTABLE BARRIER, 32", BRIDGE MOUNTED, (260 FT)

Awd $4,160.00$16.00

Ref #92 873E22000 WORK ZONE EDGE LINE, CLASS I, (0.17 MILE)

Awd $1,870.00$11,000.00

Ref #93 873E25000 WORK ZONE STOP LINE, CLASS I, (34 FT)

Awd $816.00$24.00

Section 14 - MAINTENANCE OF TRAFFIC (PART 2) - Totals

Awd $32,781.00

Ref #94 202E11301 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN (SUBST, (101 CY)

Awd $45,450.00$450.00

Ref #95 202E11301 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN (SUPER, (270 CY)

Awd $47,250.00$175.00

Ref #96 202E22900 APPROACH SLAB REMOVED, (124 SY)

Awd $4,712.00$38.00

Ref #97 202E38500 BRIDGE RAILING REMOVED, (177 FT)

Awd $2,655.00$15.00

Ref #98 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)

Awd $50,000.00$50,000.00

Ref #99 503E21300 UNCLASSIFIED EXCAVATION, (LUMP SUM)

Awd $20,000.00$20,000.00

Ref #100 509E10000 EPOXY COATED REINFORCING STEEL, (84692 LB)

Awd $82,998.16$0.98

Ref #101 511E32213 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, AS , (320 CY)

Awd $272,000.00$850.00

Ref #102 511E34451 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE, (28 CY)

Awd $30,800.00$1,100.00

Ref #103 511E43262 CLASS QC2 CONCRETE WITH QC/QA, PIER CAP, (24 CY)

Awd $36,000.00$1,500.00

Ref #104 511E45710 CLASS QC1 CONCRETE, ABUTMENT, (75 CY)

Awd $52,500.00$700.00

Ref #105 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY), (278 SY)

Awd $3,336.00$12.00

Ref #106 512E75010 SPECIAL - SEALING, MISC.:CONCRETE STAINING, (2372 SF)

Awd $10,674.00$4.50

Ref #107 516E13201 1/2" PREFORMED EXPANSION JOINT FILLER, AS PER PLAN, (86 SF)

Awd $860.00$10.00

Ref #108 516E13601 1" PREFORMED EXPANSION JOINT FILLER, AS PER PLAN, (123 SF)

Awd $1,599.00$13.00

Ref #109 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL, (144 FT)

Awd $4,752.00$33.00

160123 - Page 342

Page 343: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #110 516E14600 STRUCTURAL JOINT OR JOINT SEALER, MISC.:ANGLE STEE, (77 FT)

Awd $27,720.00$360.00

Ref #111 516E31011 2" DEEP JOINT SEALER, AS PER PLAN, (106 FT)

Awd $2,968.00$28.00

Ref #112 518E12500 SCUPPER, MISC.:STEEL TUBE SCUPPERS INCLUDING ATTAC, (2 EACH)

Awd $1,900.00$950.00

Ref #113 518E21200 POROUS BACKFILL WITH FILTER FABRIC, (73 CY)

Awd $6,059.00$83.00

Ref #114 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE, (130 FT)

Awd $910.00$7.00

Ref #115 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (38 FT)

Awd $570.00$15.00

Ref #116 524E94401 DRILLED SHAFTS, 18" DIAMETER, AS PER PLAN, (159 FT)

Awd $30,210.00$190.00

Ref #117 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER, (112 FT)

Awd $33,600.00$300.00

Ref #118 526E10011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1, (167 SY)

Awd $53,440.00$320.00

Ref #119 530E00600 SPECIAL - STRUCTURE, MISC.:AESTHETIC TREATMENT (CO, (1829 SF)

Awd $18,290.00$10.00

Section 15 - STRUCTURE 20 FOOT SPAN AND OVER (PER-13- - Totals

Awd $841,253.16

Ref #120 100E00300 SPECIAL - PREMIUM ON RAILROADS' PROTECTIVE PUBLIC , (LUMP SUM)

Awd $5,300.00$5,300.00

Ref #121 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $15,000.00$15,000.00

Ref #122 614E11000 MAINTAINING TRAFFIC(PART 1 AND PART 2), (LUMP SUM)

Awd $125,000.00$125,000.00

Ref #123 619E16000 FIELD OFFICE, TYPE A(PART 1 AND PART 2), (4 MNTH)

Awd $6,000.00$1,500.00

Ref #124 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING(PART 1 AN, (LUMP SUM)

Awd $10,000.00$10,000.00

Ref #125 624E10000 MOBILIZATION(PART 1 AND PART 2), (LUMP SUM)

Awd $93,000.00$93,000.00

Section 16 - INCIDENTALS - Totals

Awd $254,300.00

160123 - Page 343

Page 344: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Project No. 160124

PID 92454

PIC-SR 762-0.19

Federal

Type: CULVERT REPLACEMENT

Completion Date: 10/1/2016

Award Amount: $265,668.03

Contract Awarded To: SHELLY & SANDS INC

Letting Date: 3/1/2016

Engineer's Estimate: $306,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jerry Wray, Director

SHELLY & SANDS INC

1515 HARMON AVE

COLUMBUS, OH 43223

Franklin

Bidder 1

Bid $265,668.03

COMPLETE GENERAL CONSTRUCTION COMPANY

1221 EAST FIFTH AVE

COLUMBUS, OH 43219

Franklin

Bidder 2

Bid $287,419.30

BUDS INC

6260 NEWARK RD

NASHPORT, OH 43830

Muskingum

Bidder 3

Bid $311,835.44

MASSANA CONSTRUCTION INC

937 HIGH ST SUITE 201

WORTHINGTON, OH 43085

Franklin

Bidder 4

Bid $321,469.26

FOILL INC

201 E NORTH ST

WAVERLY, OH 45690

Pike

Bidder 5

Bid $361,300.00

FIELDS EXCAVATING INC

177 TWP RD 191

KITTS HILL, OH 45645

Lawrence

Bidder 6

Bid $406,195.00

160124 - Page 344

Page 345: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)

Awd $3,000.00$3,000.00

2 $5,000.00$5,000.00

3 $4,000.00$4,000.00

4 $12,301.00$12,301.00

5 $5,148.00$5,148.00

6 $4,000.00$4,000.00

Ref #2 202E20010 HEADWALL REMOVED, (2 EACH)

Awd $3,000.00$1,500.00

2 $2,400.00$1,200.00

3 $1,500.00$750.00

4 $322.00$161.00

5 $2,574.00$1,287.00

6 $3,000.00$1,500.00

Ref #3 202E32800 CONCRETE SLOPE PROTECTION REMOVED, (38 SY)

Awd $513.00$13.50

2 $494.00$13.00

3 $684.00$18.00

4 $912.00$24.00

5 $1,022.96$26.92

6 $1,140.00$30.00

Ref #4 202E38000 GUARDRAIL REMOVED, (70 FT)

Awd $350.00$5.00

2 $350.00$5.00

3 $210.00$3.00

4 $420.00$6.00

5 $154.00$2.20

6 $350.00$5.00

Ref #5 203E10000 EXCAVATION, (219 CY)

Awd $4,380.00$20.00

2 $3,285.00$15.00

3 $5,037.00$23.00

4 $8,103.00$37.00

5 $21,129.12$96.48

6 $8,760.00$40.00

Ref #6 203E20000 EMBANKMENT, (290 CY)

Awd $4,640.00$16.00

2 $1,450.00$5.00

3 $4,350.00$15.00

4 $7,685.00$26.50

5 $21,874.70$75.43

6 $10,150.00$35.00

Ref #7 204E10000 SUBGRADE COMPACTION, (335 SY)

Awd $1,842.50$5.50

2 $1,172.50$3.50

3 $670.00$2.00

4 $1,172.50$3.50

5 $1,035.15$3.09

6 $1,340.00$4.00

160124 - Page 345

Page 346: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #8 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (440 SY)

Awd $6,160.00$14.00

2 $5,280.00$12.00

3 $5,720.00$13.00

4 $6,820.00$15.50

5 $7,158.80$16.27

6 $12,320.00$28.00

Ref #9 411E10000 STABILIZED CRUSHED AGGREGATE, (10 CY)

Awd $1,600.00$160.00

2 $800.00$80.00

3 $1,000.00$100.00

4 $752.50$75.25

5 $930.00$93.00

6 $500.00$50.00

Ref #10 605E31100 AGGREGATE DRAINS, (50 FT)

Awd $950.00$19.00

2 $500.00$10.00

3 $700.00$14.00

4 $775.00$15.50

5 $825.00$16.50

6 $1,250.00$25.00

Ref #11 606E13000 GUARDRAIL, TYPE 5 H=27", (70 FT)

Awd $1,568.00$22.40

2 $1,568.00$22.40

3 $2,100.00$30.00

4 $2,292.50$32.75

5 $3,850.00$55.00

6 $2,800.00$40.00

Ref #12 626E00100 BARRIER REFLECTOR, (4 EACH)

Awd $52.00$13.00

2 $52.00$13.00

3 $30.00$7.50

4 $76.00$19.00

5 $33.00$8.25

6 $40.00$10.00

Section 1 - ROADWAY - Totals

Awd $28,055.50

2 $22,351.50

3 $26,001.00

4 $41,631.50

5 $65,734.73

6 $45,650.00

Ref #13 601E11000 RIPRAP USING 6" REINFORCED CONCRETE SLAB, (38 SY)

Awd $9,500.00$250.00

2 $3,800.00$100.00

3 $4,314.14$113.53

4 $7,296.00$192.00

5 $3,429.88$90.26

6 $6,840.00$180.00

160124 - Page 346

Page 347: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #14 601E32004 ROCK CHANNEL PROTECTION, TYPE A WITH FABRIC FILTER, (62 CY)

Awd $8,990.00$145.00

2 $5,890.00$95.00

3 $6,820.00$110.00

4 $3,534.00$57.00

5 $5,593.64$90.22

6 $5,580.00$90.00

Ref #15 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER, (10 CY)

Awd $1,650.00$165.00

2 $900.00$90.00

3 $1,100.00$110.00

4 $945.00$94.50

5 $871.00$87.10

6 $900.00$90.00

Ref #16 659E10000 SEEDING AND MULCHING, (244 SY)

Awd $976.00$4.00

2 $2,440.00$10.00

3 $976.00$4.00

4 $854.00$3.50

5 $2,618.12$10.73

6 $732.00$3.00

Ref #17 659E20000 COMMERCIAL FERTILIZER, (0.04 TON)

Awd $22.00$550.00

2 $30.00$750.00

3 $22.00$550.00

4 $29.15$728.75

5 $31.24$781.00

6 $40.00$1,000.00

Ref #18 659E35000 WATER, (1.3 MGAL)

Awd $1.30$1.00

2 $1.30$1.00

3 $1.30$1.00

4 $37.70$29.00

5 $2.86$2.20

6 $13.00$10.00

Ref #19 832E30000 EROSION CONTROL, (10000 EACH)

Awd $10,000.00$1.00

2 $10,000.00$1.00

3 $10,000.00$1.00

4 $10,000.00$1.00

5 $10,000.00$1.00

6 $10,000.00$1.00

Section 2 - EROSION CONTROL - Totals

Awd $31,139.30

2 $23,061.30

3 $23,233.44

4 $22,695.85

5 $22,546.74

6 $24,105.00

160124 - Page 347

Page 348: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #20 602E20000 CONCRETE MASONRY, (8.1 CY)

Awd $12,960.00$1,600.00

2 $11,340.00$1,400.00

3 $8,910.00$1,100.00

4 $13,002.53$1,605.25

5 $15,581.57$1,923.65

6 $13,770.00$1,700.00

Ref #21 611E01400 6" CONDUIT, TYPE E, (25 FT)

Awd $375.00$15.00

2 $250.00$10.00

3 $250.00$10.00

4 $812.50$32.50

5 $1,135.75$45.43

6 $1,250.00$50.00

Ref #22 611E01500 6" CONDUIT, TYPE F, (25 FT)

Awd $375.00$15.00

2 $250.00$10.00

3 $250.00$10.00

4 $918.75$36.75

5 $1,135.75$45.43

6 $1,250.00$50.00

Ref #23 611E28000 84" CONDUIT, TYPE A706.02, (168 FT)

Awd $93,240.00$555.00

2 $137,760.00$820.00

3 $164,640.00$980.00

4 $123,900.00$737.50

5 $150,029.04$893.03

6 $184,800.00$1,100.00

Section 3 - DRAINAGE - Totals

Awd $106,950.00

2 $149,600.00

3 $174,050.00

4 $138,633.78

5 $167,882.11

6 $201,070.00

Ref #24 301E46000 ASPHALT CONCRETE BASE, PG64-22, (55 CY)

Awd $11,000.00$200.00

2 $12,100.00$220.00

3 $12,100.00$220.00

4 $20,047.50$364.50

5 $16,856.40$306.48

6 $27,500.00$500.00

Ref #25 304E20000 AGGREGATE BASE, (56 CY)

Awd $3,640.00$65.00

2 $3,080.00$55.00

3 $4,760.00$85.00

4 $3,374.00$60.25

5 $2,957.36$52.81

6 $2,240.00$40.00

160124 - Page 348

Page 349: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #26 407E10000 TACK COAT, (45 GAL)

Awd $90.00$2.00

2 $90.00$2.00

3 $90.00$2.00

4 $135.00$3.00

5 $173.25$3.85

6 $225.00$5.00

Ref #27 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (76 GAL)

Awd $152.00$2.00

2 $152.00$2.00

3 $152.00$2.00

4 $228.00$3.00

5 $292.60$3.85

6 $380.00$5.00

Ref #28 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (31 CY)

Awd $7,750.00$250.00

2 $11,315.00$365.00

3 $9,300.00$300.00

4 $15,810.00$510.00

5 $10,387.48$335.08

6 $15,500.00$500.00

Section 4 - PAVEMENT - Totals

Awd $22,632.00

2 $26,737.00

3 $26,402.00

4 $39,594.50

5 $30,667.09

6 $45,845.00

Ref #29 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (15 FT)

Awd $171.00$11.40

2 $171.00$11.40

3 $105.00$7.00

4 $247.50$16.50

5 $181.50$12.10

6 $225.00$15.00

Ref #30 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (30 FT)

Awd $390.00$13.00

2 $390.00$13.00

3 $450.00$15.00

4 $570.00$19.00

5 $445.50$14.85

6 $600.00$20.00

Ref #31 630E08510 STREET NAME SIGN SUPPORT, NO. 2 POST, (5 FT)

Awd $80.00$16.00

2 $80.00$16.00

3 $35.00$7.00

4 $115.00$23.00

5 $71.50$14.30

6 $100.00$20.00

160124 - Page 349

Page 350: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #32 630E08520 STREET NAME SIGN SUPPORT, NO. 3 POST, (10 FT)

Awd $175.00$17.50

2 $175.00$17.50

3 $150.00$15.00

4 $255.00$25.50

5 $176.00$17.60

6 $200.00$20.00

Ref #33 630E08600 SIGN POST REFLECTOR, (1 EACH)

Awd $65.00$65.00

2 $65.00$65.00

3 $40.00$40.00

4 $94.75$94.75

5 $44.00$44.00

6 $50.00$50.00

Ref #34 630E80100 SIGN, FLAT SHEET, (9 SF)

Awd $243.00$27.00

2 $243.00$27.00

3 $225.00$25.00

4 $355.50$39.50

5 $346.50$38.50

6 $405.00$45.00

Ref #35 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (1 EACH)

Awd $25.00$25.00

2 $25.00$25.00

3 $20.00$20.00

4 $36.50$36.50

5 $11.00$11.00

6 $15.00$15.00

Ref #36 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (4 EACH)

Awd $200.00$50.00

2 $200.00$50.00

3 $300.00$75.00

4 $292.00$73.00

5 $198.00$49.50

6 $240.00$60.00

Ref #37 642E00090 EDGE LINE, 4", (0.3 MILE)

Awd $583.50$1,945.00

2 $583.50$1,945.00

3 $174.30$581.00

4 $1,093.13$3,643.77

5 $642.00$2,140.00

6 $300.00$1,000.00

Ref #38 642E00290 CENTER LINE, (0.2 MILE)

Awd $778.00$3,890.00

2 $778.00$3,890.00

3 $219.00$1,095.00

4 $728.75$3,643.75

5 $851.80$4,259.00

6 $300.00$1,500.00

160124 - Page 350

Page 351: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #39 642E00490 STOP LINE, (54 FT)

Awd $135.00$2.50

2 $135.00$2.50

3 $164.70$3.05

4 $405.00$7.50

5 $148.50$2.75

6 $270.00$5.00

Section 5 - TRAFFIC CONTROL - Totals

Awd $2,845.50

2 $2,845.50

3 $1,883.00

4 $4,193.13

5 $3,116.30

6 $2,705.00

Ref #40 661E40060 DECIDUOUS TREE, 1-1/2" CALIPER RED MAPLE(ACER RUBR, (6 EACH)

Awd $2,400.00$400.00

2 $3,000.00$500.00

3 $2,400.00$400.00

4 $1,312.50$218.75

5 $1,704.00$284.00

6 $3,600.00$600.00

Ref #41 661E40060 DECIDUOUS TREE, 1-1/2" CALIPER RIVER BIRCH (BETULA, (7 EACH)

Awd $2,800.00$400.00

2 $3,500.00$500.00

3 $2,730.00$390.00

4 $1,785.00$255.00

5 $1,925.00$275.00

6 $4,200.00$600.00

Section 6 - LANDSCAPING - Totals

Awd $5,200.00

2 $6,500.00

3 $5,130.00

4 $3,097.50

5 $3,629.00

6 $7,800.00

Ref #42 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (40 HOUR)

Awd $2,880.00$72.00

2 $3,000.00$75.00

3 $2,600.00$65.00

4 $2,400.00$60.00

5 $2,600.00$65.00

6 $4,000.00$100.00

Ref #43 614E11300 SPECIAL - WORK ZONE TRAFFIC SIGNAL, (1 EACH)

Awd $20,095.73$20,095.73

2 $18,000.00$18,000.00

3 $6,000.00$6,000.00

4 $15,000.00$15,000.00

5 $18,840.00$18,840.00

6 $30,000.00$30,000.00

160124 - Page 351

Page 352: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #44 614E12420 DETOUR SIGNING, (LUMP SUM)

Awd $6,500.00$6,500.00

2 $6,000.00$6,000.00

3 $2,300.00$2,300.00

4 $8,016.00$8,016.00

5 $2,810.00$2,810.00

6 $6,000.00$6,000.00

Ref #45 622E41020 PORTABLE BARRIER, 32", BRIDGE MOUNTED, (92 FT)

Awd $2,530.00$27.50

2 $2,300.00$25.00

3 $1,472.00$16.00

4 $6,072.00$66.00

5 $4,048.00$44.00

6 $5,980.00$65.00

Ref #46 626E00100 BARRIER REFLECTOR, (4 EACH)

Awd $80.00$20.00

2 $24.00$6.00

3 $64.00$16.00

4 $76.00$19.00

5 $33.00$8.25

6 $40.00$10.00

Section 7 - MAINTENANCE OF TRAFFIC - Totals

Awd $32,085.73

2 $29,324.00

3 $12,436.00

4 $31,564.00

5 $28,331.00

6 $46,020.00

Ref #47 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)

Awd $15,000.00$15,000.00

2 $8,000.00$8,000.00

3 $10,000.00$10,000.00

4 $7,500.00$7,500.00

5 $11,115.00$11,115.00

6 $2,500.00$2,500.00

Section 8 - MISCELLANEOUS STRUCTURE - Totals

Awd $15,000.00

2 $8,000.00

3 $10,000.00

4 $7,500.00

5 $11,115.00

6 $2,500.00

Ref #48 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $2,260.00$2,260.00

2 $3,000.00$3,000.00

3 $3,200.00$3,200.00

4 $6,559.00$6,559.00

5 $5,500.00$5,500.00

6 $10,000.00$10,000.00

160124 - Page 352

Page 353: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #49 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $3,500.00$3,500.00

2 $2,000.00$2,000.00

3 $6,000.00$6,000.00

4 $5,000.00$5,000.00

5 $9,207.00$9,207.00

6 $5,000.00$5,000.00

Ref #50 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)

Awd $6,000.00$6,000.00

2 $4,000.00$4,000.00

3 $3,500.00$3,500.00

4 $5,500.00$5,500.00

5 $2,750.00$2,750.00

6 $3,500.00$3,500.00

Ref #51 624E10000 MOBILIZATION, (LUMP SUM)

Awd $10,000.00$10,000.00

2 $10,000.00$10,000.00

3 $20,000.00$20,000.00

4 $15,500.00$15,500.00

5 $10,821.03$10,821.03

6 $12,000.00$12,000.00

Section 9 - INCIDENTALS - Totals

Awd $21,760.00

2 $19,000.00

3 $32,700.00

4 $32,559.00

5 $28,278.03

6 $30,500.00

160124 - Page 353

Page 354: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Project No. 160125

PID 92408

SUM-IR 271-10.22 Slide

Federal

Type: SLIDE REPAIR

Completion Date: 10/15/2016

Award Amount: $1,865,634.80

Contract Awarded To: SHELLY & SANDS INC

Letting Date: 3/1/2016

Engineer's Estimate: $2,062,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jerry Wray, Director

SHELLY & SANDS INC

1515 HARMON AVE

COLUMBUS, OH 43223

Franklin

Bidder 1

Bid $1,865,634.80

FECHKO EXCAVATING INC

865 W LIBERTY ST 120

MEDINA, OH 44256

Medina

Bidder 2

Bid $2,130,242.22

S E T INC

235 EAST WATER ST

LOWELLVILLE, OH 44436

Mahoning

Bidder 3

Bid $2,155,299.99

RUHLIN COMPANY

P O BOX 190

SHARON CENTER, OH 44274

Medina

Bidder 4

Bid $2,195,788.21

GREAT LAKES CONSTRUCTION CO

2608 GREAT LAKES WAY

HINCKLEY, OH 44233

Medina

Bidder 5

Bid $2,220,225.82

INDEPENDENCE EXCAVATING INC

5720 SCHAAF RD

INDEPENDENCE, OH 44131

Cuyahoga

Bidder 6

Bid $2,246,275.05

BURTON SCOT CONTRACTORS LLC

11330 KINSMAN RD

NEWBURY, OH 44065

Geauga

Bidder 7

Bid $2,505,463.44

ECLIPSE CO LLC

11554 EAST WASHINGTON ST

CHAGRIN FALLS, OH 44023

Geauga

Bidder 8

Bid $2,599,653.92

LOCKHART CONCRETE CO

800 W WATERLOO RD

AKRON, OH 44314

Summit

Bidder 9

Bid $2,796,500.00

MARK HAYNES CONSTRUCTION INC

3130 ST RT 18 E

NORWALK, OH 44857

Huron

Bidder 10

Bid $3,512,286.00

160125 - Page 354

Page 355: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #1 202E38000 GUARDRAIL REMOVED, (925 FT)

Awd $1,295.00$1.40

2 $4,458.50$4.82

3 $1,341.25$1.45

4 $1,258.00$1.36

5 $1,850.00$2.00

6 $1,295.00$1.40

7 $1,258.00$1.36

8 $1,387.50$1.50

9 $1,850.00$2.00

10 $2,775.00$3.00

Ref #2 202E75000 FENCE REMOVED, (486 FT)

Awd $899.10$1.85

2 $1,467.72$3.02

3 $933.12$1.92

4 $874.80$1.80

5 $874.80$1.80

6 $874.80$1.80

7 $874.80$1.80

8 $972.00$2.00

9 $2,430.00$5.00

10 $1,458.00$3.00

Ref #3 203E10000 EXCAVATION, (20537 CY)

Awd $266,981.00$13.00

2 $244,801.04$11.92

3 $261,641.38$12.74

4 $242,336.60$11.80

5 $410,740.00$20.00

6 $277,249.50$13.50

7 $410,740.00$20.00

8 $585,304.50$28.50

9 $410,740.00$20.00

10 $533,962.00$26.00

Ref #4 203E20000 EMBANKMENT, (13145 CY)

Awd $78,870.00$6.00

2 $29,707.70$2.26

3 $89,386.00$6.80

4 $236,610.00$18.00

5 $92,015.00$7.00

6 $85,442.50$6.50

7 $131,450.00$10.00

8 $105,160.00$8.00

9 $262,900.00$20.00

10 $368,060.00$28.00

Ref #5 203E35141 GRANULAR MATERIAL, TYPE E, AS PER PLAN, 1, (557 CY)

Awd $25,065.00$45.00

2 $43,212.06$77.58

3 $41,329.40$74.20

4 $33,977.00$61.00

5 $55,700.00$100.00

6 $25,622.00$46.00

7 $44,560.00$80.00

8 $41,218.00$74.00

9 $30,635.00$55.00

10 $27,850.00$50.00

160125 - Page 355

Page 356: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #6 203E35141 GRANULAR MATERIAL, TYPE E, AS PER PLAN, 2, (216 CY)

Awd $15,120.00$70.00

2 $16,014.24$74.14

3 $15,091.92$69.87

4 $12,960.00$60.00

5 $21,600.00$100.00

6 $9,720.00$45.00

7 $21,600.00$100.00

8 $12,312.00$57.00

9 $11,880.00$55.00

10 $10,800.00$50.00

Ref #7 204E10000 SUBGRADE COMPACTION, (921 SY)

Awd $1,611.75$1.75

2 $2,891.94$3.14

3 $1,768.32$1.92

4 $2,763.00$3.00

5 $3,684.00$4.00

6 $2,763.00$3.00

7 $1,842.00$2.00

8 $1,842.00$2.00

9 $921.00$1.00

10 $3,684.00$4.00

Ref #8 204E50100 GEOTEXTILE FABRIC, 712.09, TYPE A, (3985 SY)

Awd $6,376.00$1.60

2 $8,408.35$2.11

3 $5,539.15$1.39

4 $5,977.50$1.50

5 $4,981.25$1.25

6 $2,988.75$0.75

7 $7,970.00$2.00

8 $1,992.50$0.50

9 $15,940.00$4.00

10 $5,977.50$1.50

Ref #9 209E60201 LINEAR GRADING, AS PER PLAN, (7 STA)

Awd $2,450.00$350.00

2 $17,341.80$2,477.40

3 $5,197.08$742.44

4 $4,375.00$625.00

5 $2,800.00$400.00

6 $6,300.00$900.00

7 $3,500.00$500.00

8 $9,450.00$1,350.00

9 $7,000.00$1,000.00

10 $17,500.00$2,500.00

Ref #10 606E15050 GUARDRAIL, TYPE MGS, (600 FT)

Awd $9,600.00$16.00

2 $9,300.00$15.50

3 $9,744.00$16.24

4 $9,120.00$15.20

5 $9,120.00$15.20

6 $9,000.00$15.00

7 $9,120.00$15.20

8 $9,600.00$16.00

9 $9,120.00$15.20

10 $12,000.00$20.00

160125 - Page 356

Page 357: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #11 607E15000 FENCE, TYPE 47, (486 FT)

Awd $7,776.00$16.00

2 $8,505.00$17.50

3 $4,777.38$9.83

4 $4,471.20$9.20

5 $4,471.20$9.20

6 $4,374.00$9.00

7 $4,471.20$9.20

8 $4,860.00$10.00

9 $17,982.00$37.00

10 $12,150.00$25.00

Ref #12 622E41010 PORTABLE BARRIER, 50", (710 FT)

Awd $12,780.00$18.00

2 $44,978.50$63.35

3 $15,186.90$21.39

4 $17,040.00$24.00

5 $15,620.00$22.00

6 $24,850.00$35.00

7 $49,700.00$70.00

8 $28,400.00$40.00

9 $28,400.00$40.00

10 $34,080.00$48.00

Ref #13 863E00200 GEOGRID, TYPE P2, (3350 SY)

Awd $5,695.00$1.70

2 $14,606.00$4.36

3 $11,457.00$3.42

4 $11,557.50$3.45

5 $8,375.00$2.50

6 $8,375.00$2.50

7 $8,375.00$2.50

8 $10,050.00$3.00

9 $16,750.00$5.00

10 $20,100.00$6.00

Ref #14 863E00600 GEOGRID, TYPE S1, (2523 SY)

Awd $3,784.50$1.50

2 $10,344.30$4.10

3 $8,048.37$3.19

4 $8,452.05$3.35

5 $3,784.50$1.50

6 $5,550.60$2.20

7 $6,307.50$2.50

8 $6,307.50$2.50

9 $12,615.00$5.00

10 $12,615.00$5.00

Ref #15 863E00800 REINFORCED EMBANKMENT, (3156 CY)

Awd $157,800.00$50.00

2 $38,661.00$12.25

3 $40,523.04$12.84

4 $63,120.00$20.00

5 $94,680.00$30.00

6 $183,048.00$58.00

7 $157,800.00$50.00

8 $227,232.00$72.00

9 $18,936.00$6.00

10 $362,940.00$115.00

160125 - Page 357

Page 358: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #100 201E11000 CLEARING AND GRUBBING, (LUMP SUM)

Awd $6,500.00$6,500.00

2 $7,129.48$7,129.48

3 $2,991.15$2,991.15

4 $107,000.00$107,000.00

5 $60,000.00$60,000.00

6 $58,700.00$58,700.00

7 $50,000.00$50,000.00

8 $42,500.00$42,500.00

9 $97,000.00$97,000.00

10 $4,500.00$4,500.00

Section 1 - ROADWAY - Totals

Awd $602,603.35

2 $501,827.63

3 $514,955.46

4 $761,892.65

5 $790,295.75

6 $706,153.15

7 $909,568.50

8 $1,088,588.00

9 $945,099.00

10 $1,430,451.50

Ref #16 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1, (459 SY)

Awd $13,770.00$30.00

2 $21,132.36$46.04

3 $43,435.17$94.63

4 $64,260.00$140.00

5 $27,540.00$60.00

6 $27,540.00$60.00

7 $22,950.00$50.00

8 $22,032.00$48.00

9 $22,950.00$50.00

10 $25,245.00$55.00

Ref #17 601E34001 ROCK CHANNEL PROTECTION, TYPE A WITHOUT FILTER, AS, (1138 CY)

Awd $79,660.00$70.00

2 $168,469.52$148.04

3 $95,182.32$83.64

4 $125,180.00$110.00

5 $101,623.40$89.30

6 $113,800.00$100.00

7 $182,080.00$160.00

8 $125,180.00$110.00

9 $91,040.00$80.00

10 $119,490.00$105.00

160125 - Page 358

Page 359: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #18 659E00300 TOPSOIL, (1178 CY)

Awd $5,890.00$5.00

2 $14,748.56$12.52

3 $20,426.52$17.34

4 $16,492.00$14.00

5 $21,204.00$18.00

6 $11,780.00$10.00

7 $17,670.00$15.00

8 $11,780.00$10.00

9 $35,340.00$30.00

10 $44,764.00$38.00

Ref #19 659E10000 SEEDING AND MULCHING, (1789 SY)

Awd $2,504.60$1.40

2 $3,631.67$2.03

3 $2,576.16$1.44

4 $2,415.15$1.35

5 $948.17$0.53

6 $4,204.15$2.35

7 $948.17$0.53

8 $2,683.50$1.50

9 $5,367.00$3.00

10 $5,367.00$3.00

Ref #20 659E20000 COMMERCIAL FERTILIZER, (1.43 TON)

Awd $500.50$350.00

2 $5,589.46$3,908.71

3 $534.66$373.89

4 $500.50$350.00

5 $858.00$600.00

6 $500.50$350.00

7 $858.00$600.00

8 $536.25$375.00

9 $1,430.00$1,000.00

10 $3,575.00$2,500.00

Ref #21 659E31000 LIME, (2.19 ACRE)

Awd $251.85$115.00

2 $4,199.87$1,917.75

3 $257.35$117.51

4 $240.90$110.00

5 $109.50$50.00

6 $240.90$110.00

7 $1.10$0.50

8 $251.85$115.00

9 $2,190.00$1,000.00

10 $1,752.00$800.00

Ref #22 659E35000 WATER, (57 MGAL)

Awd $57.00$1.00

2 $12,640.89$221.77

3 $60.99$1.07

4 $57.00$1.00

5 $57.00$1.00

6 $57.00$1.00

7 $0.57$0.01

8 $59.85$1.05

9 $5,700.00$100.00

10 $2,850.00$50.00

160125 - Page 359

Page 360: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #23 671E15040 EROSION CONTROL MAT, TYPE E, (8821 SY)

Awd $22,052.50$2.50

2 $15,877.80$1.80

3 $23,111.02$2.62

4 $21,611.45$2.45

5 $20,641.14$2.34

6 $15,436.75$1.75

7 $22,052.50$2.50

8 $22,934.60$2.60

9 $35,284.00$4.00

10 $30,873.50$3.50

Ref #24 832E15000 STORM WATER POLLUTION PREVENTION PLAN, (LUMP SUM)

Awd $10,000.00$10,000.00

2 $3,670.00$3,670.00

3 $7,971.96$7,971.96

4 $8,758.00$8,758.00

5 $6,000.00$6,000.00

6 $8,000.00$8,000.00

7 $5,000.00$5,000.00

8 $11,500.00$11,500.00

9 $2,000.00$2,000.00

10 $6,500.00$6,500.00

Ref #25 832E30000 EROSION CONTROL, (50000 EACH)

Awd $50,000.00$1.00

2 $50,000.00$1.00

3 $50,000.00$1.00

4 $50,000.00$1.00

5 $50,000.00$1.00

6 $50,000.00$1.00

7 $50,000.00$1.00

8 $50,000.00$1.00

9 $50,000.00$1.00

10 $50,000.00$1.00

Section 2 - EROSION CONTROL - Totals

Awd $184,686.45

2 $299,960.13

3 $243,556.15

4 $289,515.00

5 $228,981.21

6 $231,559.30

7 $301,560.34

8 $246,958.05

9 $251,301.00

10 $290,416.50

160125 - Page 360

Page 361: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #26 605E11110 6" SHALLOW PIPE UNDERDRAINS WITH FABRIC WRAP, (602 FT)

Awd $7,826.00$13.00

2 $9,872.80$16.40

3 $8,367.80$13.90

4 $8,428.00$14.00

5 $9,030.00$15.00

6 $12,040.00$20.00

7 $15,050.00$25.00

8 $5,418.00$9.00

9 $7,224.00$12.00

10 $10,836.00$18.00

Ref #27 605E14020 6" BASE PIPE UNDERDRAINS WITH FABRIC WRAP, (598 FT)

Awd $6,578.00$11.00

2 $6,972.68$11.66

3 $6,805.24$11.38

4 $6,578.00$11.00

5 $7,475.00$12.50

6 $11,960.00$20.00

7 $8,970.00$15.00

8 $5,142.80$8.60

9 $5,980.00$10.00

10 $10,764.00$18.00

Ref #28 611E01500 6" CONDUIT, TYPE F, (186 FT)

Awd $2,976.00$16.00

2 $2,715.60$14.60

3 $3,364.74$18.09

4 $5,022.00$27.00

5 $4,650.00$25.00

6 $6,510.00$35.00

7 $4,650.00$25.00

8 $2,596.56$13.96

9 $2,046.00$11.00

10 $3,720.00$20.00

Ref #29 611E02600 8" CONDUIT, TYPE F, (27 FT)

Awd $1,620.00$60.00

2 $694.71$25.73

3 $716.31$26.53

4 $918.00$34.00

5 $675.00$25.00

6 $1,080.00$40.00

7 $675.00$25.00

8 $540.00$20.00

9 $324.00$12.00

10 $1,485.00$55.00

Ref #30 611E02600 8" CONDUIT, TYPE F, 707.41 (PERFORATED), (267 FT)

Awd $2,670.00$10.00

2 $2,864.91$10.73

3 $6,725.73$25.19

4 $2,269.50$8.50

5 $2,670.00$10.00

6 $8,277.00$31.00

7 $2,670.00$10.00

8 $1,596.66$5.98

9 $3,204.00$12.00

10 $8,010.00$30.00

160125 - Page 361

Page 362: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #31 611E99710 PRECAST REINFORCED CONCRETE OUTLET, (2 EACH)

Awd $800.00$400.00

2 $1,168.06$584.03

3 $674.66$337.33

4 $750.00$375.00

5 $600.00$300.00

6 $630.00$315.00

7 $800.00$400.00

8 $640.00$320.00

9 $600.00$300.00

10 $1,100.00$550.00

Section 3 - DRAINAGE - Totals

Awd $22,470.00

2 $24,288.76

3 $26,654.48

4 $23,965.50

5 $25,100.00

6 $40,497.00

7 $32,815.00

8 $15,934.02

9 $19,378.00

10 $35,915.00

Ref #32 301E46000 ASPHALT CONCRETE BASE, PG64-22, (211 CY)

Awd $26,375.00$125.00

2 $29,329.00$139.00

3 $31,331.39$148.49

4 $30,806.00$146.00

5 $30,806.00$146.00

6 $31,228.00$148.00

7 $33,760.00$160.00

8 $32,072.00$152.00

9 $42,200.00$200.00

10 $34,815.00$165.00

Ref #33 304E20001 AGGREGATE BASE, AS PER PLAN, (149 CY)

Awd $8,940.00$60.00

2 $9,731.19$65.31

3 $9,756.52$65.48

4 $8,344.00$56.00

5 $11,175.00$75.00

6 $14,900.00$100.00

7 $8,940.00$60.00

8 $8,046.00$54.00

9 $8,940.00$60.00

10 $7,152.00$48.00

160125 - Page 362

Page 363: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #34 407E20510 SPECIAL - TACK COAT, TRACKLESS TACK FOR INTERMEDIA, (66 GAL)

Awd $231.00$3.50

2 $277.20$4.20

3 $295.68$4.48

4 $660.00$10.00

5 $660.00$10.00

6 $660.00$10.00

7 $660.00$10.00

8 $297.00$4.50

9 $660.00$10.00

10 $264.00$4.00

Ref #35 441E50701 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, (448, (57 CY)

Awd $16,815.00$295.00

2 $16,644.00$292.00

3 $17,780.01$311.93

4 $14,250.00$250.00

5 $14,250.00$250.00

6 $14,478.00$254.00

7 $12,540.00$220.00

8 $10,473.75$183.75

9 $17,100.00$300.00

10 $14,649.00$257.00

Ref #36 442E20051 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE B (, (69 CY)

Awd $14,835.00$215.00

2 $20,976.00$304.00

3 $22,407.75$324.75

4 $17,595.00$255.00

5 $17,595.00$255.00

6 $17,871.00$259.00

7 $17,250.00$250.00

8 $19,182.00$278.00

9 $22,425.00$325.00

10 $19,872.00$288.00

Ref #37 618E40100 RUMBLE STRIPS, (ASPHALT CONCRETE), (2394 FT)

Awd $2,394.00$1.00

2 $5,625.90$2.35

3 $6,008.94$2.51

4 $4,548.60$1.90

5 $4,548.60$1.90

6 $4,548.60$1.90

7 $4,548.60$1.90

8 $7,301.70$3.05

9 $4,548.60$1.90

10 $67,032.00$28.00

160125 - Page 363

Page 364: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Section 4 - PAVEMENT - Totals

Awd $69,590.00

2 $82,583.29

3 $87,580.29

4 $76,203.60

5 $79,034.60

6 $83,685.60

7 $77,698.60

8 $77,372.45

9 $95,873.60

10 $143,784.00

Ref #38 511E71100 CONCRETE, MISC.: PERMANENT SOIL NAIL WALL CIP FACI, (232 CY)

Awd $185,600.00$800.00

2 $382,800.00$1,650.00

3 $309,796.56$1,335.33

4 $215,760.00$930.00

5 $324,800.00$1,400.00

6 $266,800.00$1,150.00

7 $278,400.00$1,200.00

8 $324,800.00$1,400.00

9 $23,200.00$100.00

10 $464,000.00$2,000.00

Ref #39 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (1114 SY)

Awd $16,710.00$15.00

2 $22,280.00$20.00

3 $23,806.18$21.37

4 $17,824.00$16.00

5 $15,863.36$14.24

6 $22,280.00$20.00

7 $44,560.00$40.00

8 $35,091.00$31.50

9 $7,241.00$6.50

10 $27,850.00$25.00

Ref #40 518E62200 STRUCTURE DRAINAGE, MISC.:PVC PIPE WRAPPED WITH GE, (119 EACH)

Awd $2,380.00$20.00

2 $4,165.00$35.00

3 $4,449.41$37.39

4 $2,975.00$25.00

5 $4,165.00$35.00

6 $4,284.00$36.00

7 $16,660.00$140.00

8 $5,712.00$48.00

9 $12,078.50$101.50

10 $5,355.00$45.00

160125 - Page 364

Page 365: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #41 520E11101 PNEUMATICALLY PLACED MORTAR, AS PER PLAN, (9356 SF)

Awd $126,306.00$13.50

2 $196,476.00$21.00

3 $209,855.08$22.43

4 $255,512.36$27.31

5 $224,544.00$24.00

6 $187,120.00$20.00

7 $159,052.00$17.00

8 $201,154.00$21.50

9 $288,164.80$30.80

10 $245,595.00$26.25

Ref #42 610E50000 SPECIAL - RETAINING WALL, MISC.:PERMANENT SOIL NAI, (480 EACH)

Awd $408,000.00$850.00

2 $352,800.00$735.00

3 $376,886.40$785.18

4 $236,640.00$493.00

5 $242,400.00$505.00

6 $350,400.00$730.00

7 $480,000.00$1,000.00

8 $251,040.00$523.00

9 $475,200.00$990.00

10 $441,600.00$920.00

Ref #43 610E50000 SPECIAL - RETAINING WALL, MISC.:SOIL NAIL PROOF TE, (24 EACH)

Awd $12,600.00$525.00

2 $16,680.00$695.00

3 $17,818.80$742.45

4 $7,440.00$310.00

5 $7,440.00$310.00

6 $16,560.00$690.00

7 $12,000.00$500.00

8 $7,896.00$329.00

9 $6,177.12$257.38

10 $20,880.00$870.00

Ref #44 610E50000 SPECIAL - RETAINING WALL, MISC.:SOIL NAIL VERIFICA, (4 EACH)

Awd $30,000.00$7,500.00

2 $16,602.00$4,150.50

3 $17,733.24$4,433.31

4 $19,064.00$4,766.00

5 $19,064.00$4,766.00

6 $16,000.00$4,000.00

7 $8,000.00$2,000.00

8 $20,200.00$5,050.00

9 $39,600.00$9,900.00

10 $20,800.00$5,200.00

Ref #45 610E50010 SPECIAL - RETAINING WALL, MISC.:GEOCOMPOSITE WALL , (7616 SF)

Awd $15,232.00$2.00

2 $38,080.00$5.00

3 $40,669.44$5.34

4 $15,232.00$2.00

5 $15,232.00$2.00

6 $38,080.00$5.00

7 $22,848.00$3.00

8 $15,993.60$2.10

9 $25,132.80$3.30

10 $49,504.00$6.50

160125 - Page 365

Page 366: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #46 626E00100 BARRIER REFLECTOR, (7 EACH)

Awd $70.00$10.00

2 $77.00$11.00

3 $43.05$6.15

4 $42.00$6.00

5 $42.00$6.00

6 $42.00$6.00

7 $42.00$6.00

8 $42.00$6.00

9 $42.00$6.00

10 $280.00$40.00

Ref #47 644E00104 EDGE LINE, 6", (0.24 MILE)

Awd $1,440.00$6,000.00

2 $2,202.00$9,175.00

3 $2,352.32$9,801.33

4 $1,364.40$5,685.00

5 $2,202.00$9,175.00

6 $2,280.00$9,500.00

7 $2,280.00$9,500.00

8 $2,316.00$9,650.00

9 $3,600.00$15,000.00

10 $3,600.00$15,000.00

Ref #48 644E00204 LANE LINE, 6", (0.12 MILE)

Awd $576.00$4,800.00

2 $275.40$2,295.00

3 $294.20$2,451.67

4 $547.20$4,560.00

5 $275.40$2,295.00

6 $900.00$7,500.00

7 $900.00$7,500.00

8 $288.00$2,400.00

9 $1,140.00$9,500.00

10 $1,440.00$12,000.00

Section 5 - TRAFFIC CONTROL - Totals

Awd $798,914.00

2 $1,032,437.40

3 $1,003,704.68

4 $772,400.96

5 $856,027.76

6 $904,746.00

7 $1,024,742.00

8 $864,532.60

9 $881,576.22

10 $1,280,904.00

160125 - Page 366

Page 367: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #49 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (20 HOUR)

Awd $1,200.00$60.00

2 $1,200.00$60.00

3 $1,336.60$66.83

4 $1,300.00$65.00

5 $1,400.00$70.00

6 $1,200.00$60.00

7 $1,300.00$65.00

8 $1,470.00$73.50

9 $1,000.00$50.00

10 $1,700.00$85.00

Ref #50 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL), (1 EACH)

Awd $1,800.00$1,800.00

2 $3,481.47$3,481.47

3 $3,280.22$3,280.22

4 $1,800.00$1,800.00

5 $2,075.00$2,075.00

6 $2,300.00$2,300.00

7 $3,000.00$3,000.00

8 $2,415.00$2,415.00

9 $2,300.00$2,300.00

10 $6,800.00$6,800.00

Ref #51 614E12460 WORK ZONE MARKING SIGN, (30 EACH)

Awd $3,000.00$100.00

2 $5,250.00$175.00

3 $3,044.70$101.49

4 $2,850.00$95.00

5 $3,450.00$115.00

6 $5,250.00$175.00

7 $2,850.00$95.00

8 $5,520.00$184.00

9 $5,250.00$175.00

10 $7,500.00$250.00

Ref #52 614E13100 BARRIER REFLECTOR, (6 EACH)

Awd $60.00$10.00

2 $34.50$5.75

3 $36.90$6.15

4 $36.00$6.00

5 $60.00$10.00

6 $36.00$6.00

7 $54.00$9.00

8 $36.30$6.05

9 $34.50$5.75

10 $240.00$40.00

Ref #53 614E13350 OBJECT MARKER, ONE WAY, (6 EACH)

Awd $96.00$16.00

2 $46.50$7.75

3 $49.68$8.28

4 $66.00$11.00

5 $60.00$10.00

6 $48.00$8.00

7 $75.00$12.50

8 $48.00$8.00

9 $46.50$7.75

10 $270.00$45.00

160125 - Page 367

Page 368: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #54 614E20550 WORK ZONE LANE LINE, CLASS III, 642 PAINT, (0.3 MILE)

Awd $120.00$400.00

2 $136.50$455.00

3 $145.82$486.07

4 $115.50$385.00

5 $136.50$455.00

6 $2,250.00$7,500.00

7 $2,250.00$7,500.00

8 $142.50$475.00

9 $136.50$455.00

10 $450.00$1,500.00

Ref #55 614E22350 WORK ZONE EDGE LINE, CLASS III, 642 PAINT, (0.8 MILE)

Awd $420.00$525.00

2 $1,452.00$1,815.00

3 $1,551.13$1,938.91

4 $400.00$500.00

5 $1,452.00$1,815.00

6 $7,600.00$9,500.00

7 $7,600.00$9,500.00

8 $1,520.00$1,900.00

9 $1,452.00$1,815.00

10 $2,000.00$2,500.00

Ref #56 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 642 PAINT, (1080 FT)

Awd $540.00$0.50

2 $648.00$0.60

3 $691.20$0.64

4 $594.00$0.55

5 $648.00$0.60

6 $5,400.00$5.00

7 $5,400.00$5.00

8 $702.00$0.65

9 $648.00$0.60

10 $1,620.00$1.50

Ref #57 615E10000 ROADS FOR MAINTAINING TRAFFIC, (LUMP SUM)

Awd $15,000.00$15,000.00

2 $5,033.83$5,033.83

3 $3,740.43$3,740.43

4 $39,000.00$39,000.00

5 $15,000.00$15,000.00

6 $11,000.00$11,000.00

7 $5,000.00$5,000.00

8 $14,000.00$14,000.00

9 $24,000.00$24,000.00

10 $65,000.00$65,000.00

Ref #58 615E35001 PAVEMENT FOR MAINTAINING TRAFFIC, AS PER PLAN, (791 SY)

Awd $27,685.00$35.00

2 $51,834.23$65.53

3 $52,514.49$66.39

4 $30,849.00$39.00

5 $43,505.00$55.00

6 $39,550.00$50.00

7 $39,550.00$50.00

8 $51,415.00$65.00

9 $18,588.50$23.50

10 $67,235.00$85.00

160125 - Page 368

Page 369: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Section 6 - MAINTENANCE OF TRAFFIC - Totals

Awd $49,921.00

2 $69,117.03

3 $66,391.17

4 $77,010.50

5 $67,786.50

6 $74,634.00

7 $67,079.00

8 $77,268.80

9 $53,456.00

10 $152,815.00

Ref #59 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $10,450.00$10,450.00

2 $21,864.24$21,864.24

3 $22,051.50$22,051.50

4 $20,000.00$20,000.00

5 $25,000.00$25,000.00

6 $18,000.00$18,000.00

7 $20,000.00$20,000.00

8 $45,000.00$45,000.00

9 $75,000.00$75,000.00

10 $35,000.00$35,000.00

Ref #60 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $36,000.00$36,000.00

2 $25,500.00$25,500.00

3 $17,270.09$17,270.09

4 $33,000.00$33,000.00

5 $20,000.00$20,000.00

6 $52,600.00$52,600.00

7 $10,000.00$10,000.00

8 $58,000.00$58,000.00

9 $197,000.00$197,000.00

10 $18,000.00$18,000.00

Ref #61 619E16010 FIELD OFFICE, TYPE B, (8 MNTH)

Awd $16,000.00$2,000.00

2 $31,596.96$3,949.62

3 $11,673.92$1,459.24

4 $20,800.00$2,600.00

5 $8,000.00$1,000.00

6 $14,400.00$1,800.00

7 $12,000.00$1,500.00

8 $12,000.00$1,500.00

9 $4,000.00$500.00

10 $12,000.00$1,500.00

160125 - Page 369

Page 370: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #62 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)

Awd $35,000.00$35,000.00

2 $14,366.78$14,366.78

3 $21,217.43$21,217.43

4 $21,000.00$21,000.00

5 $20,000.00$20,000.00

6 $20,000.00$20,000.00

7 $30,000.00$30,000.00

8 $14,000.00$14,000.00

9 $97,000.00$97,000.00

10 $28,000.00$28,000.00

Ref #63 624E10000 MOBILIZATION, (LUMP SUM)

Awd $40,000.00$40,000.00

2 $26,700.00$26,700.00

3 $140,244.82$140,244.82

4 $100,000.00$100,000.00

5 $100,000.00$100,000.00

6 $100,000.00$100,000.00

7 $20,000.00$20,000.00

8 $100,000.00$100,000.00

9 $176,816.18$176,816.18

10 $85,000.00$85,000.00

Section 7 - INCIDENTALS - Totals

Awd $137,450.00

2 $120,027.98

3 $212,457.76

4 $194,800.00

5 $173,000.00

6 $205,000.00

7 $92,000.00

8 $229,000.00

9 $549,816.18

10 $178,000.00

160125 - Page 370

Page 371: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Project No. 160126

PID 87058

TUS-US 250-21.320

Federal

Type: TWO LANE RESURFACING

Completion Date: 8/15/2016

Award Amount: $250,268.85

Contract Awarded To: SMITH PAVING & EXCAVATING INC

Letting Date: 3/1/2016

Engineer's Estimate: $338,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jerry Wray, Director

SMITH PAVING & EXCAVATING INC

4426 N OLD STATE RD

NORWALK, OH 44857

Huron

Bidder 1

Bid $250,268.85

SHELLY & SANDS INC

1515 HARMON AVE

COLUMBUS, OH 43223

Franklin

Bidder 2

Bid $268,025.55

CENTRAL-ALLIED ENTERPRISES INC

1243 RAFF RD S W

CANTON, OH 44710

Stark

Bidder 3

Bid $298,629.95

KARVO COMPANIES INC

4524 HUDSON DR

STOW, OH 44224-1702

Bidder 4

Bid $329,005.11

PARELLA-PANNUNZIO INC

720 NORTH MERIDIAN RD

YOUNGSTOWN, OH 44509

Mahoning

Bidder 5

Bid $337,964.35

STANLEY MILLER CONSTRUCTION COMPANY

2250 HOWENSTINE DR SE

EAST SPARTA, OH 44626

Stark

Bidder 6

Bid $576,770.23

160126 - Page 371

Page 372: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #1 832E30000 EROSION CONTROL, (1000 EACH)

Awd $1,000.00$1.00

2 $1,000.00$1.00

3 $1,000.00$1.00

4 $1,000.00$1.00

5 $1,000.00$1.00

6 $1,000.00$1.00

Section 1 - EROSION CONTROL - Totals

Awd $1,000.00

2 $1,000.00

3 $1,000.00

4 $1,000.00

5 $1,000.00

6 $1,000.00

Ref #2 255E10160 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT,, (715 SY)

Awd $86,872.50$121.50

2 $96,525.00$135.00

3 $85,800.00$120.00

4 $132,990.00$186.00

5 $125,125.00$175.00

6 $250,250.00$350.00

Ref #3 255E10161 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT,, (262 SY)

Awd $34,846.00$133.00

2 $41,920.00$160.00

3 $35,370.00$135.00

4 $50,304.00$192.00

5 $55,020.00$210.00

6 $144,624.00$552.00

Ref #4 255E20000 FULL DEPTH PAVEMENT SAWING, (5184 FT)

Awd $11,664.00$2.25

2 $12,441.60$2.40

3 $11,664.00$2.25

4 $10,368.00$2.00

5 $10,368.00$2.00

6 $18,144.00$3.50

Section 2 - PAVEMENT - Totals

Awd $133,382.50

2 $150,886.60

3 $132,834.00

4 $193,662.00

5 $190,513.00

6 $413,018.00

Ref #5 621E00100 RPM, (48 EACH)

Awd $2,604.00$54.25

2 $2,544.00$53.00

3 $3,312.00$69.00

4 $3,312.00$69.00

5 $2,400.00$50.00

6 $2,688.00$56.00

160126 - Page 372

Page 373: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #6 621E00300 RPM REFLECTOR, (115 EACH)

Awd $5,031.25$43.75

2 $4,025.00$35.00

3 $1,115.50$9.70

4 $1,115.50$9.70

5 $3,795.00$33.00

6 $4,255.00$37.00

Ref #7 621E90000 RPM, MISC.: REPLACEMENT OF RAISED PAVEMENT MARKERS, (25 EACH)

Awd $1,468.75$58.75

2 $793.75$31.75

3 $1,725.00$69.00

4 $3,063.75$122.55

5 $750.00$30.00

6 $3,325.00$133.00

Ref #8 632E26500 DETECTOR LOOP, (14 EACH)

Awd $20,650.00$1,475.00

2 $15,400.00$1,100.00

3 $13,300.00$950.00

4 $13,300.00$950.00

5 $14,504.00$1,036.00

6 $22,946.00$1,639.00

Ref #9 632E65200 LOOP DETECTOR LEAD-IN CABLE, (140 FT)

Awd $70.00$0.50

2 $161.00$1.15

3 $140.00$1.00

4 $140.00$1.00

5 $140.00$1.00

6 $84.00$0.60

Ref #10 646E10010 EDGE LINE, 6", (0.84 MILE)

Awd $2,725.80$3,245.00

2 $2,898.00$3,450.00

3 $5,539.80$6,595.00

4 $4,014.36$4,779.00

5 $2,725.80$3,245.00

6 $6,157.20$7,330.00

Ref #11 646E10110 LANE LINE, 6", (0.3 MILE)

Awd $768.00$2,560.00

2 $813.00$2,710.00

3 $1,635.90$5,453.00

4 $1,002.00$3,340.00

5 $768.00$2,560.00

6 $1,817.40$6,058.00

Ref #12 646E10310 CHANNELIZING LINE, 12", (3045 FT)

Awd $4,567.50$1.50

2 $4,872.00$1.60

3 $8,130.15$2.67

4 $5,785.50$1.90

5 $4,567.50$1.50

6 $9,135.00$3.00

160126 - Page 373

Page 374: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #13 646E10400 STOP LINE, (219 FT)

Awd $2,135.25$9.75

2 $2,255.70$10.30

3 $2,847.00$13.00

4 $2,628.00$12.00

5 $2,135.25$9.75

6 $3,164.55$14.45

Ref #14 646E10600 TRANSVERSE/DIAGONAL LINE, (16 FT)

Awd $116.00$7.25

2 $124.00$7.75

3 $160.00$10.00

4 $192.00$12.00

5 $116.00$7.25

6 $177.92$11.12

Ref #15 646E10601 TRANSVERSE/DIAGONAL LINE, AS PER PLAN, (358 FT)

Awd $4,475.00$12.50

2 $4,743.50$13.25

3 $6,444.00$18.00

4 $9,809.20$27.40

5 $4,475.00$12.50

6 $7,160.00$20.00

Ref #16 646E10800 ISLAND MARKING, (156 SF)

Awd $702.00$4.50

2 $741.00$4.75

3 $1,209.00$7.75

4 $780.00$5.00

5 $702.00$4.50

6 $1,343.16$8.61

Ref #17 646E20300 LANE ARROW, (44 EACH)

Awd $6,600.00$150.00

2 $7,040.00$160.00

3 $8,140.00$185.00

4 $6,600.00$150.00

5 $6,600.00$150.00

6 $9,064.00$206.00

Ref #18 646E20504 DOTTED LINE, 6", (552 FT)

Awd $772.80$1.40

2 $828.00$1.50

3 $2,097.60$3.80

4 $1,600.80$2.90

5 $772.80$1.40

6 $2,346.00$4.25

Section 3 - TRAFFIC CONTROL - Totals

Awd $52,686.35

2 $47,238.95

3 $55,795.95

4 $53,343.11

5 $44,451.35

6 $73,663.23

160126 - Page 374

Page 375: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #19 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (400 HOUR)

Awd $27,200.00$68.00

2 $28,800.00$72.00

3 $10,000.00$25.00

4 $16,000.00$40.00

5 $28,000.00$70.00

6 $30,400.00$76.00

Section 4 - MAINTENANCE OF TRAFFIC - Totals

Awd $27,200.00

2 $28,800.00

3 $10,000.00

4 $16,000.00

5 $28,000.00

6 $30,400.00

Ref #20 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $3,000.00$3,000.00

2 $1,600.00$1,600.00

3 $9,000.00$9,000.00

4 $9,000.00$9,000.00

5 $4,000.00$4,000.00

6 $8,966.00$8,966.00

Ref #21 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $18,000.00$18,000.00

2 $28,500.00$28,500.00

3 $45,000.00$45,000.00

4 $42,000.00$42,000.00

5 $30,000.00$30,000.00

6 $21,056.00$21,056.00

Ref #22 624E10000 MOBILIZATION, (LUMP SUM)

Awd $15,000.00$15,000.00

2 $10,000.00$10,000.00

3 $45,000.00$45,000.00

4 $14,000.00$14,000.00

5 $40,000.00$40,000.00

6 $28,667.00$28,667.00

Section 5 - INCIDENTALS - Totals

Awd $36,000.00

2 $40,100.00

3 $99,000.00

4 $65,000.00

5 $74,000.00

6 $58,689.00

160126 - Page 375

Page 376: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Project No. 160127

PID 94668

WAY-SR 83-15.86

Federal

Type: INTERSECTION

Completion Date: 8/31/2016

Award Amount: $2,048,202.04

Contract Awarded To: SHELLY & SANDS INC

Letting Date: 3/1/2016

Engineer's Estimate: $1,986,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jerry Wray, Director

SHELLY & SANDS INC

1515 HARMON AVE

COLUMBUS, OH 43223

Franklin

Bidder 1

Bid $2,048,202.04

S E T INC

235 EAST WATER ST

LOWELLVILLE, OH 44436

Mahoning

Bidder 2

Bid $2,048,638.01

LOCKHART CONCRETE CO

800 W WATERLOO RD

AKRON, OH 44314

Summit

Bidder 3

Bid $2,119,378.35

CENTRAL-ALLIED ENTERPRISES INC

1243 RAFF RD S W

CANTON, OH 44710

Stark

Bidder 4

Bid $2,270,163.26

WENGER EXCAVATING INC

P O BOX 499 26 NORTH COCHRAN STREET

DALTON, OH 44618

Wayne

Bidder 5

Bid $2,383,374.62

MARK HAYNES CONSTRUCTION INC

3130 ST RT 18 E

NORWALK, OH 44857

Huron

Bidder 6

Bid $2,540,490.25

160127 - Page 376

Page 377: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)

Awd $7,500.00$7,500.00

2 $15,398.35$15,398.35

3 $19,000.00$19,000.00

4 $20,000.00$20,000.00

5 $12,624.00$12,624.00

6 $4,500.00$4,500.00

Ref #2 202E23000 PAVEMENT REMOVED, (1955 SY)

Awd $7,038.00$3.60

2 $7,839.55$4.01

3 $19,550.00$10.00

4 $13,685.00$7.00

5 $17,595.00$9.00

6 $19,550.00$10.00

Ref #3 202E23010 PAVEMENT REMOVED, ASPHALT, (7613 SY)

Awd $27,406.80$3.60

2 $30,528.13$4.01

3 $76,130.00$10.00

4 $53,291.00$7.00

5 $38,065.00$5.00

6 $76,130.00$10.00

Ref #4 202E35100 PIPE REMOVED, 24" AND UNDER, (1055 FT)

Awd $21,100.00$20.00

2 $9,843.15$9.33

3 $5,275.00$5.00

4 $10,444.50$9.90

5 $9,284.00$8.80

6 $10,550.00$10.00

Ref #5 202E35200 PIPE REMOVED, OVER 24", (89 FT)

Awd $1,780.00$20.00

2 $1,587.76$17.84

3 $890.00$10.00

4 $1,869.00$21.00

5 $1,886.80$21.20

6 $1,335.00$15.00

Ref #6 202E58000 MANHOLE REMOVED, (1 EACH)

Awd $350.00$350.00

2 $782.61$782.61

3 $100.00$100.00

4 $250.00$250.00

5 $602.00$602.00

6 $350.00$350.00

Ref #7 202E58100 CATCH BASIN REMOVED, (6 EACH)

Awd $1,500.00$250.00

2 $2,761.50$460.25

3 $300.00$50.00

4 $1,500.00$250.00

5 $2,526.00$421.00

6 $1,500.00$250.00

160127 - Page 377

Page 378: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #8 202E75000 FENCE REMOVED, (60 FT)

Awd $480.00$8.00

2 $361.80$6.03

3 $600.00$10.00

4 $180.00$3.00

5 $360.00$6.00

6 $600.00$10.00

Ref #9 203E10000 EXCAVATION, (15927 CY)

Awd $171,374.52$10.76

2 $104,799.66$6.58

3 $238,905.00$15.00

4 $183,160.50$11.50

5 $251,646.60$15.80

6 $286,686.00$18.00

Ref #10 203E20000 EMBANKMENT, (13169 CY)

Awd $65,845.00$5.00

2 $101,401.30$7.70

3 $131,690.00$10.00

4 $121,154.80$9.20

5 $165,929.40$12.60

6 $250,211.00$19.00

Ref #11 204E10000 SUBGRADE COMPACTION, (18005 SY)

Awd $36,010.00$2.00

2 $29,888.30$1.66

3 $18,005.00$1.00

4 $14,404.00$0.80

5 $36,010.00$2.00

6 $18,005.00$1.00

Ref #12 204E13000 EXCAVATION OF SUBGRADE, (2097 CY)

Awd $31,455.00$15.00

2 $42,338.43$20.19

3 $31,455.00$15.00

4 $32,188.95$15.35

5 $13,001.40$6.20

6 $46,134.00$22.00

Ref #13 204E20000 EMBANKMENT, (2097 CY)

Awd $20,970.00$10.00

2 $32,398.65$15.45

3 $20,970.00$10.00

4 $19,187.55$9.15

5 $38,165.40$18.20

6 $50,328.00$24.00

Ref #14 204E45000 PROOF ROLLING, (6 HOUR)

Awd $3,000.00$500.00

2 $926.04$154.34

3 $600.00$100.00

4 $600.00$100.00

5 $1,344.00$224.00

6 $1,500.00$250.00

160127 - Page 378

Page 379: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #15 623E38500 MONUMENT ASSEMBLY, (7 EACH)

Awd $11,200.00$1,600.00

2 $7,508.27$1,072.61

3 $3,500.00$500.00

4 $6,440.00$920.00

5 $6,356.00$908.00

6 $8,400.00$1,200.00

Ref #16 623E40520 RIGHT-OF-WAY MONUMENT, (12 EACH)

Awd $7,200.00$600.00

2 $2,673.84$222.82

3 $4,800.00$400.00

4 $8,400.00$700.00

5 $1,800.00$150.00

6 $9,600.00$800.00

Ref #17 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE, (3 EACH)

Awd $345.00$115.00

2 $539.70$179.90

3 $975.00$325.00

4 $345.00$115.00

5 $606.00$202.00

6 $450.00$150.00

Ref #18 690E50200 SPECIAL - MAILBOX SUPPORT SYSTEM, DOUBLE, (1 EACH)

Awd $120.00$120.00

2 $277.80$277.80

3 $325.00$325.00

4 $120.00$120.00

5 $268.00$268.00

6 $200.00$200.00

Ref #19 690E50300 SPECIAL - MAILBOX SUPPORT SYSTEM, MULTIPLE, (1 EACH)

Awd $120.00$120.00

2 $277.80$277.80

3 $445.00$445.00

4 $120.00$120.00

5 $411.00$411.00

6 $250.00$250.00

Section 1 - ROADWAY - Totals

Awd $414,794.32

2 $392,132.64

3 $573,515.00

4 $487,340.30

5 $598,480.60

6 $786,279.00

Ref #20 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER, (5 CY)

Awd $750.00$150.00

2 $667.55$133.51

3 $500.00$100.00

4 $900.00$180.00

5 $600.00$120.00

6 $800.00$160.00

160127 - Page 379

Page 380: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #21 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH FABRIC FILTER, (7 CY)

Awd $1,218.00$174.00

2 $887.67$126.81

3 $700.00$100.00

4 $1,218.00$174.00

5 $854.00$122.00

6 $1,260.00$180.00

Ref #22 659E00100 SOIL ANALYSIS TEST, (2 EACH)

Awd $200.00$100.00

2 $134.34$67.17

3 $120.00$60.00

4 $400.00$200.00

5 $350.00$175.00

6 $100.00$50.00

Ref #23 659E00300 TOPSOIL, (555 CY)

Awd $13,875.00$25.00

2 $12,654.00$22.80

3 $13,875.00$25.00

4 $10,545.00$19.00

5 $5,661.00$10.20

6 $17,760.00$32.00

Ref #24 659E00510 SEEDING AND MULCHING, CLASS 2, (26352 SY)

Awd $18,182.88$0.69

2 $17,392.32$0.66

3 $25,034.40$0.95

4 $22,926.24$0.87

5 $31,622.40$1.20

6 $39,528.00$1.50

Ref #25 659E14000 REPAIR SEEDING AND MULCHING, (1318 SY)

Awd $724.90$0.55

2 $527.20$0.40

3 $527.20$0.40

4 $527.20$0.40

5 $527.20$0.40

6 $1,977.00$1.50

Ref #26 659E15000 INTER-SEEDING, (1318 SY)

Awd $724.90$0.55

2 $79.08$0.06

3 $131.80$0.10

4 $131.80$0.10

5 $527.20$0.40

6 $1,318.00$1.00

Ref #27 659E20000 COMMERCIAL FERTILIZER, (3.68 TON)

Awd $2,410.40$655.00

2 $2,254.96$612.76

3 $1,232.80$335.00

4 $1,232.80$335.00

5 $2,252.16$612.00

6 $3,128.00$850.00

160127 - Page 380

Page 381: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #28 659E31000 LIME, (5.44 ACRE)

Awd $816.00$150.00

2 $848.53$155.98

3 $544.00$100.00

4 $2,959.36$544.00

5 $1,327.36$244.00

6 $1,360.00$250.00

Ref #29 659E35000 WATER, (146 MGAL)

Awd $146.00$1.00

2 $162.06$1.11

3 $146.00$1.00

4 $146.00$1.00

5 $876.00$6.00

6 $1,460.00$10.00

Ref #30 670E00700 DITCH EROSION PROTECTION, (2743 SY)

Awd $3,511.04$1.28

2 $4,580.81$1.67

3 $7,817.55$2.85

4 $6,446.05$2.35

5 $5,486.00$2.00

6 $10,972.00$4.00

Ref #31 832E15000 STORM WATER POLLUTION PREVENTION PLAN, (LUMP SUM)

Awd $7,500.00$7,500.00

2 $6,092.18$6,092.18

3 $1,500.00$1,500.00

4 $4,000.00$4,000.00

5 $3,446.00$3,446.00

6 $6,500.00$6,500.00

Ref #32 832E30000 EROSION CONTROL, (58000 EACH)

Awd $58,000.00$1.00

2 $58,000.00$1.00

3 $58,000.00$1.00

4 $58,000.00$1.00

5 $58,000.00$1.00

6 $58,000.00$1.00

Ref #33 836E10000 SEEDING AND EROSION CONTROL WITH TURF REINFORCING , (85 SY)

Awd $522.75$6.15

2 $710.60$8.36

3 $1,020.00$12.00

4 $522.75$6.15

5 $1,232.50$14.50

6 $1,020.00$12.00

Section 2 - EROSION CONTROL - Totals

Awd $108,581.87

2 $104,991.30

3 $111,148.75

4 $109,955.20

5 $112,761.82

6 $145,183.00

160127 - Page 381

Page 382: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #34 602E20000 CONCRETE MASONRY, (2.2 CY)

Awd $4,400.00$2,000.00

2 $3,647.05$1,657.75

3 $1,320.00$600.00

4 $2,420.00$1,100.00

5 $1,931.60$878.00

6 $4,070.00$1,850.00

Ref #35 605E31100 AGGREGATE DRAINS, (1000 FT)

Awd $13,000.00$13.00

2 $12,640.00$12.64

3 $12,500.00$12.50

4 $17,000.00$17.00

5 $4,600.00$4.60

6 $7,000.00$7.00

Ref #36 611E00100 4" CONDUIT, TYPE B, (100 FT)

Awd $1,800.00$18.00

2 $1,727.00$17.27

3 $1,000.00$10.00

4 $900.00$9.00

5 $920.00$9.20

6 $1,500.00$15.00

Ref #37 611E00200 4" CONDUIT, TYPE C, (100 FT)

Awd $1,800.00$18.00

2 $1,295.00$12.95

3 $1,000.00$10.00

4 $900.00$9.00

5 $890.00$8.90

6 $1,200.00$12.00

Ref #38 611E00400 4" CONDUIT, TYPE E, (100 FT)

Awd $1,800.00$18.00

2 $1,295.00$12.95

3 $1,000.00$10.00

4 $900.00$9.00

5 $890.00$8.90

6 $1,000.00$10.00

Ref #39 611E00406 4" CONDUIT, TYPE F, (100 FT)

Awd $1,800.00$18.00

2 $1,295.00$12.95

3 $1,000.00$10.00

4 $900.00$9.00

5 $890.00$8.90

6 $1,000.00$10.00

Ref #40 611E00900 6" CONDUIT, TYPE B, (100 FT)

Awd $2,200.00$22.00

2 $1,340.00$13.40

3 $1,200.00$12.00

4 $1,000.00$10.00

5 $1,480.00$14.80

6 $1,700.00$17.00

160127 - Page 382

Page 383: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #41 611E01400 6" CONDUIT, TYPE E, (200 FT)

Awd $4,400.00$22.00

2 $2,628.00$13.14

3 $2,400.00$12.00

4 $2,000.00$10.00

5 $2,840.00$14.20

6 $2,800.00$14.00

Ref #42 611E01500 6" CONDUIT, TYPE F, (100 FT)

Awd $2,200.00$22.00

2 $1,212.00$12.12

3 $1,200.00$12.00

4 $1,000.00$10.00

5 $1,420.00$14.20

6 $1,400.00$14.00

Ref #43 611E04400 12" CONDUIT, TYPE B, (187 FT)

Awd $15,147.00$81.00

2 $13,129.27$70.21

3 $9,350.00$50.00

4 $11,033.00$59.00

5 $12,379.40$66.20

6 $6,545.00$35.00

Ref #44 611E04600 12" CONDUIT, TYPE C, (238 FT)

Awd $16,660.00$70.00

2 $11,362.12$47.74

3 $11,900.00$50.00

4 $9,520.00$40.00

5 $15,303.40$64.30

6 $7,616.00$32.00

Ref #45 611E04900 12" CONDUIT, TYPE D, (356 FT)

Awd $21,360.00$60.00

2 $15,478.88$43.48

3 $17,800.00$50.00

4 $21,360.00$60.00

5 $22,890.80$64.30

6 $11,392.00$32.00

Ref #46 611E05700 15" CONDUIT, TYPE A, (78 FT)

Awd $6,630.00$85.00

2 $7,690.80$98.60

3 $5,070.00$65.00

4 $4,992.00$64.00

5 $5,717.40$73.30

6 $3,510.00$45.00

Ref #47 611E05900 15" CONDUIT, TYPE B, (78 FT)

Awd $6,630.00$85.00

2 $6,697.08$85.86

3 $5,070.00$65.00

4 $4,212.00$54.00

5 $5,522.40$70.80

6 $3,510.00$45.00

160127 - Page 383

Page 384: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #48 611E07600 18" CONDUIT, TYPE C, (80 FT)

Awd $6,800.00$85.00

2 $4,586.40$57.33

3 $6,000.00$75.00

4 $3,840.00$48.00

5 $6,352.00$79.40

6 $4,400.00$55.00

Ref #49 611E10400 24" CONDUIT, TYPE B, (70 FT)

Awd $7,700.00$110.00

2 $6,626.20$94.66

3 $7,000.00$100.00

4 $6,160.00$88.00

5 $6,692.00$95.60

6 $5,250.00$75.00

Ref #50 611E10600 24" CONDUIT, TYPE C, (37 FT)

Awd $3,700.00$100.00

2 $2,891.55$78.15

3 $3,700.00$100.00

4 $2,479.00$67.00

5 $3,355.90$90.70

6 $2,590.00$70.00

Ref #51 611E16600 36" CONDUIT, TYPE C, (76 FT)

Awd $11,400.00$150.00

2 $10,957.68$144.18

3 $10,260.00$135.00

4 $5,472.00$72.00

5 $7,888.80$103.80

6 $6,840.00$90.00

Ref #52 611E98150 CATCH BASIN, NO. 3, (8 EACH)

Awd $26,000.00$3,250.00

2 $25,949.36$3,243.67

3 $16,000.00$2,000.00

4 $24,160.00$3,020.00

5 $36,944.00$4,618.00

6 $14,400.00$1,800.00

Ref #53 611E98470 CATCH BASIN, NO. 2-2B, (4 EACH)

Awd $8,000.00$2,000.00

2 $6,094.20$1,523.55

3 $2,800.00$700.00

4 $6,200.00$1,550.00

5 $7,916.00$1,979.00

6 $5,000.00$1,250.00

Ref #54 611E98540 CATCH BASIN, NO. 2-4, (1 EACH)

Awd $2,700.00$2,700.00

2 $2,444.16$2,444.16

3 $2,000.00$2,000.00

4 $1,400.00$1,400.00

5 $2,974.00$2,974.00

6 $2,100.00$2,100.00

160127 - Page 384

Page 385: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #55 611E99574 MANHOLE, NO. 3, (2 EACH)

Awd $6,400.00$3,200.00

2 $7,317.86$3,658.93

3 $6,000.00$3,000.00

4 $4,300.00$2,150.00

5 $6,928.00$3,464.00

6 $5,500.00$2,750.00

Section 3 - DRAINAGE - Totals

Awd $172,527.00

2 $148,304.61

3 $125,570.00

4 $132,148.00

5 $156,725.70

6 $100,323.00

Ref #56 301E46000 ASPHALT CONCRETE BASE, PG64-22, (3545 CY)

Awd $407,675.00$115.00

2 $454,185.40$128.12

3 $432,490.00$122.00

4 $379,315.00$107.00

5 $406,257.00$114.60

6 $496,300.00$140.00

Ref #57 301E48000 ASPHALT CONCRETE BASE, PG64-22 (DRIVEWAYS), (10 CY)

Awd $2,950.00$295.00

2 $1,281.20$128.12

3 $2,950.00$295.00

4 $2,000.00$200.00

5 $3,680.00$368.00

6 $3,450.00$345.00

Ref #58 304E20000 AGGREGATE BASE, (2828 CY)

Awd $200,788.00$71.00

2 $160,460.72$56.74

3 $113,120.00$40.00

4 $86,254.00$30.50

5 $135,744.00$48.00

6 $127,260.00$45.00

Ref #59 407E10000 TACK COAT, (1053 GAL)

Awd $2,106.00$2.00

2 $2,348.19$2.23

3 $3,159.00$3.00

4 $1,948.05$1.85

5 $2,316.60$2.20

6 $4,212.00$4.00

Ref #60 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (558 GAL)

Awd $1,116.00$2.00

2 $1,244.34$2.23

3 $1,674.00$3.00

4 $1,032.30$1.85

5 $1,227.60$2.20

6 $2,232.00$4.00

160127 - Page 385

Page 386: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #61 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4, (484 CY)

Awd $82,280.00$170.00

2 $78,190.20$161.55

3 $80,828.00$167.00

4 $70,180.00$145.00

5 $85,184.00$176.00

6 $95,348.00$197.00

Ref #62 442E10510 ASPHALT CONCRETE SURFACE COURSE, 9.5MM, TYPE A (44, (3 CY)

Awd $2,274.00$758.00

2 $484.65$161.55

3 $990.00$330.00

4 $1,770.00$590.00

5 $1,254.00$418.00

6 $1,125.00$375.00

Ref #63 442E20201 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE , (678 CY)

Awd $94,920.00$140.00

2 $123,877.38$182.71

3 $89,496.00$132.00

4 $96,954.00$143.00

5 $78,919.20$116.40

6 $101,700.00$150.00

Ref #64 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1, (605 SY)

Awd $31,460.00$52.00

2 $27,769.50$45.90

3 $30,250.00$50.00

4 $37,510.00$62.00

5 $36,421.00$60.20

6 $43,560.00$72.00

Ref #65 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1, (236 SY)

Awd $12,980.00$55.00

2 $12,751.08$54.03

3 $14,160.00$60.00

4 $16,992.00$72.00

5 $18,124.80$76.80

6 $18,880.00$80.00

Ref #66 452E19200 NON-REINFORCED CONCRETE PAVEMENT, MISC.: 8" TRUCK , (404 SY)

Awd $35,552.00$88.00

2 $41,410.00$102.50

3 $26,260.00$65.00

4 $58,580.00$145.00

5 $49,045.60$121.40

6 $58,580.00$145.00

Ref #67 452E19200 NON-REINFORCED CONCRETE PAVEMENT, MISC.: 8" TRUCK , (1094 SY)

Awd $92,990.00$85.00

2 $120,055.56$109.74

3 $76,580.00$70.00

4 $158,630.00$145.00

5 $133,030.40$121.60

6 $169,570.00$155.00

160127 - Page 386

Page 387: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #68 609E24511 CURB, TYPE 4-C, AS PER PLAN, (971 FT)

Awd $29,130.00$30.00

2 $18,070.31$18.61

3 $9,710.00$10.00

4 $44,666.00$46.00

5 $36,315.40$37.40

6 $23,304.00$24.00

Ref #69 609E26000 CURB, TYPE 6, (4668 FT)

Awd $79,356.00$17.00

2 $55,129.08$11.81

3 $56,016.00$12.00

4 $104,796.60$22.45

5 $98,494.80$21.10

6 $74,688.00$16.00

Ref #70 617E10100 COMPACTED AGGREGATE, (55 CY)

Awd $3,300.00$60.00

2 $4,610.65$83.83

3 $2,200.00$40.00

4 $4,840.00$88.00

5 $2,898.50$52.70

6 $7,975.00$145.00

Section 4 - PAVEMENT - Totals

Awd $1,078,877.00

2 $1,101,868.26

3 $939,883.00

4 $1,065,467.95

5 $1,088,912.90

6 $1,228,184.00

Ref #71 611E00400 4" CONDUIT, TYPE E, (100 FT)

Awd $180.00$1.80

2 $666.00$6.66

3 $2,750.00$27.50

4 $1,500.00$15.00

5 $500.00$5.00

6 $1,200.00$12.00

Ref #72 625E00450 CONNECTION, FUSED PULL APART, (16 EACH)

Awd $1,280.00$80.00

2 $1,100.80$68.80

3 $2,192.00$137.00

4 $1,280.00$80.00

5 $1,792.00$112.00

6 $5,600.00$350.00

Ref #73 625E00481 CONNECTION, UNFUSED PERMANENT, AS PER PLAN, (6 EACH)

Awd $510.00$85.00

2 $411.48$68.58

3 $756.00$126.00

4 $420.00$70.00

5 $672.00$112.00

6 $1,950.00$325.00

160127 - Page 387

Page 388: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #74 625E10490 LIGHT POLE, CONVENTIONAL: (AT10B20), (3 EACH)

Awd $4,350.00$1,450.00

2 $4,372.29$1,457.43

3 $7,650.00$2,550.00

4 $5,250.00$1,750.00

5 $6,372.00$2,124.00

6 $1,350.00$450.00

Ref #75 625E10490 LIGHT POLE, CONVENTIONAL: (AT10B35), (5 EACH)

Awd $8,125.00$1,625.00

2 $8,926.05$1,785.21

3 $14,000.00$2,800.00

4 $10,000.00$2,000.00

5 $13,275.00$2,655.00

6 $2,250.00$450.00

Ref #76 625E14500 LIGHT POLE FOUNDATION, 24 in. x 6 ft Deep, (8 EACH)

Awd $10,400.00$1,300.00

2 $6,383.76$797.97

3 $9,680.00$1,210.00

4 $7,200.00$900.00

5 $10,496.00$1,312.00

6 $2,800.00$350.00

Ref #78 625E23200 NO. 4 AWG 5000 VOLT DISTRIBUTION CABLE, (2004 FT)

Awd $7,014.00$3.50

2 $7,234.44$3.61

3 $7,515.00$3.75

4 $4,709.40$2.35

5 $6,813.60$3.40

6 $12,024.00$6.00

Ref #79 625E23400 NO. 10 AWG POLE AND BRACKET CABLE, (580 FT)

Awd $1,160.00$2.00

2 $939.60$1.62

3 $1,044.00$1.80

4 $899.00$1.55

5 $1,160.00$2.00

6 $2,610.00$4.50

Ref #80 625E25400 CONDUIT, 2", 725.04, (291 FT)

Awd $4,074.00$14.00

2 $2,231.97$7.67

3 $2,560.80$8.80

4 $2,124.30$7.30

5 $5,529.00$19.00

6 $2,619.00$9.00

Ref #81 625E25500 CONDUIT, 3", 725.04, (360 FT)

Awd $6,480.00$18.00

2 $4,600.80$12.78

3 $5,148.00$14.30

4 $4,950.00$13.75

5 $9,720.00$27.00

6 $3,600.00$10.00

160127 - Page 388

Page 389: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #82 625E26251 LUMINAIRE, CONVENTIONAL, AS PER PLAN: (70 Watt, Ty, (8 EACH)

Awd $1,800.00$225.00

2 $2,335.84$291.98

3 $4,200.00$525.00

4 $2,240.00$280.00

5 $3,568.00$446.00

6 $2,400.00$300.00

Ref #83 625E29000 TRENCH, (651 FT)

Awd $4,882.50$7.50

2 $3,124.80$4.80

3 $5,012.70$7.70

4 $2,213.40$3.40

5 $4,557.00$7.00

6 $2,604.00$4.00

Ref #84 625E30701 PULL BOX, 725.08, 18", AS PER PLAN, (6 EACH)

Awd $3,900.00$650.00

2 $3,243.78$540.63

3 $1,710.00$285.00

4 $3,840.00$640.00

5 $4,560.00$760.00

6 $2,400.00$400.00

Ref #85 625E30707 PULL BOX, 725.08, 24", AS PER PLAN, (1 EACH)

Awd $865.00$865.00

2 $697.03$697.03

3 $375.00$375.00

4 $715.00$715.00

5 $1,121.00$1,121.00

6 $600.00$600.00

Ref #86 625E32000 GROUND ROD, (8 EACH)

Awd $1,880.00$235.00

2 $1,023.28$127.91

3 $1,360.00$170.00

4 $2,120.00$265.00

5 $1,200.00$150.00

6 $640.00$80.00

Ref #87 625E34001 POWER SERVICE, AS PER PLAN, (1 EACH)

Awd $6,300.00$6,300.00

2 $4,756.52$4,756.52

3 $3,200.00$3,200.00

4 $7,500.00$7,500.00

5 $3,778.00$3,778.00

6 $3,500.00$3,500.00

Ref #88 625E36000 PLASTIC CAUTION TAPE, (638 FT)

Awd $159.50$0.25

2 $287.10$0.45

3 $478.50$0.75

4 $63.80$0.10

5 $638.00$1.00

6 $319.00$0.50

160127 - Page 389

Page 390: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Section 5 - LIGHTING - Totals

Awd $63,360.00

2 $52,335.54

3 $69,632.00

4 $57,024.90

5 $75,751.60

6 $48,466.00

Ref #89 621E00100 RPM, (77 EACH)

Awd $2,810.50$36.50

2 $2,967.58$38.54

3 $2,814.35$36.55

4 $2,849.00$37.00

5 $4,004.00$52.00

6 $5,005.00$65.00

Ref #90 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (635 FT)

Awd $5,397.50$8.50

2 $6,013.45$9.47

3 $5,334.00$8.40

4 $6,286.50$9.90

5 $6,350.00$10.00

6 $9,525.00$15.00

Ref #91 630E06501 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W6X9, AS P, (28 FT)

Awd $5,180.00$185.00

2 $5,771.08$206.11

3 $6,025.60$215.20

4 $7,280.00$260.00

5 $952.00$34.00

6 $7,000.00$250.00

Ref #92 630E08600 SIGN POST REFLECTOR, (8 EACH)

Awd $280.00$35.00

2 $311.92$38.99

3 $360.00$45.00

4 $400.00$50.00

5 $240.00$30.00

6 $400.00$50.00

Ref #93 630E80100 SIGN, FLAT SHEET, (286.9 SF)

Awd $4,016.60$14.00

2 $4,475.64$15.60

3 $4,590.40$16.00

4 $5,207.24$18.15

5 $8,033.20$28.00

6 $7,172.50$25.00

Ref #94 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (27 EACH)

Awd $405.00$15.00

2 $451.17$16.71

3 $270.00$10.00

4 $594.00$22.00

5 $2,160.00$80.00

6 $1,080.00$40.00

160127 - Page 390

Page 391: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #95 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (1 EACH)

Awd $85.00$85.00

2 $94.70$94.70

3 $45.00$45.00

4 $45.00$45.00

5 $80.00$80.00

6 $150.00$150.00

Ref #96 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (21 EACH)

Awd $315.00$15.00

2 $350.91$16.71

3 $210.00$10.00

4 $462.00$22.00

5 $1,680.00$80.00

6 $840.00$40.00

Ref #97 630E97700 SIGNING, MISC.: SCHOOL SPEED LIMIT SIGN ASSEMBLY, , (2 EACH)

Awd $5,700.00$2,850.00

2 $3,618.56$1,809.28

3 $1,650.00$825.00

4 $4,000.00$2,000.00

5 $2,886.00$1,443.00

6 $400.00$200.00

Ref #98 631E97700 SIGN LIGHTING MISC.: LED FLOOD LIGHT, (2 EACH)

Awd $2,140.00$1,070.00

2 $715.48$357.74

3 $4,000.00$2,000.00

4 $2,400.00$1,200.00

5 $2,338.00$1,169.00

6 $3,000.00$1,500.00

Ref #99 631E97700 SIGN LIGHTING MISC.: STANCHION MOUNT TENON, (2 EACH)

Awd $1,000.00$500.00

2 $744.06$372.03

3 $3,500.00$1,750.00

4 $1,400.00$700.00

5 $870.00$435.00

6 $3,000.00$1,500.00

Ref #100 644E00100 EDGE LINE, 4", (1.81 MILE)

Awd $4,525.00$2,500.00

2 $5,041.34$2,785.27

3 $4,525.00$2,500.00

4 $6,438.17$3,557.00

5 $14,299.00$7,900.00

6 $5,656.25$3,125.00

Ref #101 644E00300 CENTER LINE, (0.57 MILE)

Awd $2,850.00$5,000.00

2 $3,175.21$5,570.54

3 $2,850.00$5,000.00

4 $3,420.00$6,000.00

5 $4,503.00$7,900.00

6 $3,562.50$6,250.00

160127 - Page 391

Page 392: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #102 644E01100 SCHOOL SYMBOL MARKING, 72", (2 EACH)

Awd $400.00$200.00

2 $445.64$222.82

3 $400.00$200.00

4 $1,054.00$527.00

5 $648.00$324.00

6 $500.00$250.00

Ref #103 644E01510 DOTTED LINE, 6", (123 FT)

Awd $215.25$1.75

2 $239.85$1.95

3 $215.25$1.75

4 $246.00$2.00

5 $836.40$6.80

6 $369.00$3.00

Ref #104 644E20800 YIELD LINE, (64 FT)

Awd $320.00$5.00

2 $356.48$5.57

3 $320.00$5.00

4 $1,600.00$25.00

5 $358.40$5.60

6 $640.00$10.00

Section 6 - TRAFFIC CONTROL - Totals

Awd $35,639.85

2 $34,773.07

3 $37,109.60

4 $43,681.91

5 $50,238.00

6 $48,300.25

Ref #105 204E50000 GEOTEXTILE FABRIC, (780 SY)

Awd $1,560.00$2.00

2 $1,560.00$2.00

3 $3,120.00$4.00

4 $2,067.00$2.65

5 $1,560.00$2.00

6 $2,340.00$3.00

Ref #106 657E10001 RIPRAP FOR TREE PROTECTION, AS PER PLAN, (780 SY)

Awd $17,160.00$22.00

2 $17,573.40$22.53

3 $7,800.00$10.00

4 $33,540.00$43.00

5 $10,920.00$14.00

6 $31,200.00$40.00

Ref #107 661E19000 DECIDUOUS SHRUB, 12" HEIGHT: RHUS AROMATICA, 3 GAL, (28 EACH)

Awd $1,652.00$59.00

2 $1,871.80$66.85

3 $2,800.00$100.00

4 $1,428.00$51.00

5 $1,400.00$50.00

6 $3,500.00$125.00

160127 - Page 392

Page 393: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #108 661E50040 EVERGREEN TREE, 2' HEIGHT: PINUS MUGO, 5 GAL, (3 EACH)

Awd $225.00$75.00

2 $835.59$278.53

3 $600.00$200.00

4 $360.00$120.00

5 $1,254.00$418.00

6 $1,050.00$350.00

Section 7 - LANDSCAPING - Totals

Awd $20,597.00

2 $21,840.79

3 $14,320.00

4 $37,395.00

5 $15,134.00

6 $38,090.00

Ref #109 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B, (50 CY)

Awd $5,005.00$100.10

2 $3,406.00$68.12

3 $2,000.00$40.00

4 $4,000.00$80.00

5 $2,400.00$48.00

6 $4,500.00$90.00

Ref #110 614E12420 DETOUR SIGNING, (LUMP SUM)

Awd $8,300.00$8,300.00

2 $6,517.54$6,517.54

3 $5,850.00$5,850.00

4 $10,000.00$10,000.00

5 $11,428.00$11,428.00

6 $7,315.00$7,315.00

Ref #111 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (12 SNMT)

Awd $10,800.00$900.00

2 $10,695.48$891.29

3 $9,600.00$800.00

4 $132,000.00$11,000.00

5 $10,200.00$850.00

6 $14,400.00$1,200.00

Ref #112 616E10000 WATER, (115 MGAL)

Awd $920.00$8.00

2 $2,877.30$25.02

3 $5,750.00$50.00

4 $1,150.00$10.00

5 $690.00$6.00

6 $1,150.00$10.00

Section 8 - MAINTENANCE OF TRAFFIC - Totals

Awd $25,025.00

2 $23,496.32

3 $23,200.00

4 $147,150.00

5 $24,718.00

6 $27,365.00

160127 - Page 393

Page 394: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #113 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $15,000.00$15,000.00

2 $18,500.00$18,500.00

3 $59,000.00$59,000.00

4 $30,000.00$30,000.00

5 $59,882.00$59,882.00

6 $25,000.00$25,000.00

Ref #114 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $10,000.00$10,000.00

2 $10,245.16$10,245.16

3 $50,000.00$50,000.00

4 $50,000.00$50,000.00

5 $39,774.00$39,774.00

6 $4,500.00$4,500.00

Ref #115 619E16010 FIELD OFFICE, TYPE B, (4 MNTH)

Awd $12,800.00$3,200.00

2 $8,738.64$2,184.66

3 $2,000.00$500.00

4 $8,000.00$2,000.00

5 $9,372.00$2,343.00

6 $4,800.00$1,200.00

Ref #116 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)

Awd $51,000.00$51,000.00

2 $33,980.33$33,980.33

3 $79,000.00$79,000.00

4 $50,000.00$50,000.00

5 $18,982.00$18,982.00

6 $34,000.00$34,000.00

Ref #117 624E10000 MOBILIZATION, (LUMP SUM)

Awd $40,000.00$40,000.00

2 $97,431.35$97,431.35

3 $35,000.00$35,000.00

4 $52,000.00$52,000.00

5 $132,642.00$132,642.00

6 $50,000.00$50,000.00

Section 9 - INCIDENTALS - Totals

Awd $128,800.00

2 $168,895.48

3 $225,000.00

4 $190,000.00

5 $260,652.00

6 $118,300.00

160127 - Page 394

Page 395: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Project No. 160128

PID 99703

D04-PM FY2016 (East)

Non-Federal

Type: PAVEMENT MARKING

Completion Date: 6/30/2016

Award Amount: $1,124,958.59

Contract Awarded To: DURA MARK INC

Letting Date: 3/1/2016

Engineer's Estimate: $1,094,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jerry Wray, Director

DURA MARK INC

2940 PROGRESS PARK DR

STOW, OH 44224

Summit

Bidder 1

Bid $1,124,958.59

A & A SAFETY INC

1126 FERRIS RD

AMELIA, OH 45102

Clermont

Bidder 2

Bid $1,210,721.30

AERO-MARK INC

10423 DANNER DR

STREETSBORO, OH 44241

Portage

Bidder 3

Bid $1,213,141.50

OGLESBY CONSTRUCTION INC

1600 TOLEDO RD

NORWALK, OH 44857

Huron

Bidder 4

Bid $1,246,632.56

160128 - Page 395

Page 396: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #1 832E30000 EROSION CONTROL, (1000 EACH)

Awd $1,000.00$1.00

2 $1,000.00$1.00

3 $1,000.00$1.00

4 $1,000.00$1.00

Section 1 - EROSION CONTROL - Totals

Awd $1,000.00

2 $1,000.00

3 $1,000.00

4 $1,000.00

Ref #2 642E00100 EDGE LINE, 4", TYPE 1, (1283.63 MILE)

Awd $462,106.80$360.00

2 $462,106.80$360.00

3 $500,615.70$390.00

4 $494,197.55$385.00

Ref #3 642E00104 EDGE LINE, 6", TYPE 1, (326.44 MILE)

Awd $163,220.00$500.00

2 $159,955.60$490.00

3 $171,381.00$525.00

4 $171,381.00$525.00

Ref #4 642E00200 LANE LINE, 4", TYPE 1, (158.95 MILE)

Awd $27,816.25$175.00

2 $27,021.50$170.00

3 $31,790.00$200.00

4 $32,584.75$205.00

Ref #5 642E00204 LANE LINE, 6", TYPE 1, (176.3 MILE)

Awd $35,260.00$200.00

2 $35,260.00$200.00

3 $38,786.00$220.00

4 $38,786.00$220.00

Ref #6 642E00300 CENTER LINE, TYPE 1, (593.32 MILE)

Awd $264,027.40$445.00

2 $296,660.00$500.00

3 $252,161.00$425.00

4 $284,793.60$480.00

Ref #7 642E00400 CHANNELIZING LINE, 8", TYPE 1, (160638 FT)

Awd $44,978.64$0.28

2 $48,191.40$0.30

3 $51,404.16$0.32

4 $51,404.16$0.32

Ref #8 642E00500 STOP LINE, TYPE 1, (13431 FT)

Awd $24,847.35$1.85

2 $23,504.25$1.75

3 $29,951.13$2.23

4 $29,548.20$2.20

Ref #9 642E00600 CROSSWALK LINE, TYPE 1, (6288 FT)

Awd $6,288.00$1.00

2 $4,716.00$0.75

3 $10,815.36$1.72

4 $8,174.40$1.30

160128 - Page 396

Page 397: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #10 642E00700 TRANSVERSE/DIAGONAL LINE, TYPE 1, (32353 FT)

Awd $29,117.70$0.90

2 $32,353.00$1.00

3 $41,735.37$1.29

4 $38,823.60$1.20

Ref #11 642E00900 ISLAND MARKING, TYPE 1, (4563 SF)

Awd $2,965.95$0.65

2 $3,422.25$0.75

3 $3,239.73$0.71

4 $5,019.30$1.10

Ref #12 642E01000 RAILROAD SYMBOL MARKING, TYPE 1, (45 EACH)

Awd $6,750.00$150.00

2 $6,750.00$150.00

3 $9,405.00$209.00

4 $7,875.00$175.00

Ref #13 642E01110 SCHOOL SYMBOL MARKING, 96", TYPE 1, (51 EACH)

Awd $7,650.00$150.00

2 $7,650.00$150.00

3 $10,659.00$209.00

4 $8,925.00$175.00

Ref #14 642E01200 PARKING LOT STALL MARKING, TYPE 1, (667 FT)

Awd $333.50$0.50

2 $333.50$0.50

3 $1,667.50$2.50

4 $667.00$1.00

Ref #15 642E01300 LANE ARROW, TYPE 1, (985 EACH)

Awd $27,580.00$28.00

2 $39,400.00$40.00

3 $39,400.00$40.00

4 $47,280.00$48.00

Ref #16 642E01410 WORD ON PAVEMENT, 96", TYPE 1, (97 EACH)

Awd $2,910.00$30.00

2 $4,850.00$50.00

3 $4,850.00$50.00

4 $6,305.00$65.00

Ref #17 642E01500 DOTTED LINE, 4", TYPE 1, (5672 FT)

Awd $5,672.00$1.00

2 $5,672.00$1.00

3 $2,836.00$0.50

4 $5,672.00$1.00

Ref #18 642E01702 HANDICAP SYMBOL MARKING, TYPE 1, (3 EACH)

Awd $135.00$45.00

2 $165.00$55.00

3 $210.00$70.00

4 $150.00$50.00

Ref #19 642E30000 REMOVAL OF PAVEMENT MARKING, (500 FT)

Awd $750.00$1.50

2 $750.00$1.50

3 $450.00$0.90

4 $750.00$1.50

160128 - Page 397

Page 398: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #20 642E30010 REMOVAL OF PAVEMENT MARKING, (100 SF)

Awd $300.00$3.00

2 $435.00$4.35

3 $200.00$2.00

4 $400.00$4.00

Ref #21 642E30020 REMOVAL OF PAVEMENT MARKING, (25 EACH)

Awd $1,250.00$50.00

2 $750.00$30.00

3 $250.00$10.00

4 $1,625.00$65.00

Section 2 - TRAFFIC CONTROL - Totals

Awd $1,113,958.59

2 $1,159,946.30

3 $1,201,806.95

4 $1,234,361.56

Ref #22 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $8,000.00$8,000.00

2 $7,775.00$7,775.00

3 $6,134.00$6,134.00

4 $8,000.00$8,000.00

Ref #23 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $750.00$750.00

2 $11,000.00$11,000.00

3 $2,100.00$2,100.00

4 $2,270.00$2,270.00

Ref #24 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)

Awd $500.00$500.00

2 $1,000.00$1,000.00

3 $0.55$0.55

4 $1.00$1.00

Ref #25 624E10000 MOBILIZATION, (LUMP SUM)

Awd $750.00$750.00

2 $30,000.00$30,000.00

3 $2,100.00$2,100.00

4 $1,000.00$1,000.00

Section 3 - INCIDENTALS - Totals

Awd $10,000.00

2 $49,775.00

3 $10,334.55

4 $11,271.00

160128 - Page 398

Page 399: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Project No. 160129

PID 99013

AUG-FDPM FY16

Non-Federal

Type: PAVEMENT MARKING

Completion Date: 8/31/2016

Award Amount: $1,921,181.71

Contract Awarded To: DURA MARK INC

Letting Date: 3/1/2016

Engineer's Estimate: $1,892,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jerry Wray, Director

DURA MARK INC

2940 PROGRESS PARK DR

STOW, OH 44224

Summit

Bidder 1

Bid $1,921,181.71

OGLESBY CONSTRUCTION INC

1600 TOLEDO RD

NORWALK, OH 44857

Huron

Bidder 2

Bid $1,983,894.14

A & A SAFETY INC

1126 FERRIS RD

AMELIA, OH 45102

Clermont

Bidder 3

Bid $2,168,927.40

AERO-MARK INC

10423 DANNER DR

STREETSBORO, OH 44241

Portage

Bidder 4

Bid $2,311,000.00

160129 - Page 399

Page 400: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #2 642E00104 EDGE LINE, 6", TYPE 1, (3017.28 MILE)

Awd $1,484,501.76$492.00

2 $1,529,760.96$507.00

3 $1,644,417.60$545.00

4 $1,743,987.84$578.00

Ref #3 642E00300 CENTER LINE, TYPE 1, (1223.71 MILE)

Awd $422,179.95$345.00

2 $438,088.18$358.00

3 $465,009.80$380.00

4 $523,747.88$428.00

Section 1 - TRAFFIC CONTROL - Totals

Awd $1,906,681.71

2 $1,967,849.14

3 $2,109,427.40

4 $2,267,735.72

Ref #4 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $12,500.00$12,500.00

2 $12,045.00$12,045.00

3 $9,000.00$9,000.00

4 $12,000.00$12,000.00

Ref #5 614E11001 MAINTAINING TRAFFIC, AS PER PLAN, (LUMP SUM)

Awd $1,000.00$1,000.00

2 $2,000.00$2,000.00

3 $10,500.00$10,500.00

4 $8,000.00$8,000.00

Ref #6 624E10000 MOBILIZATION, (LUMP SUM)

Awd $1,000.00$1,000.00

2 $2,000.00$2,000.00

3 $40,000.00$40,000.00

4 $23,264.28$23,264.28

Section 2 - INCIDENTALS - Totals

Awd $14,500.00

2 $16,045.00

3 $59,500.00

4 $43,264.28

160129 - Page 400

Page 401: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Project No. 161020

PID 97359

D03-MOW FY2016 (A)

Non-Federal

Type: MOWING

Completion Date: 11/15/2016

Award Amount: $382,788.00

Contract Awarded To: LINKEL COMPANY

Letting Date: 3/1/2016

Engineer's Estimate: $284,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jerry Wray, Director

LINKEL COMPANY

1081 MORRIS RD

BATESVILLE, IN 47006

Bidder 1

Bid $382,788.00

BRYPAN LLC

14303 BRUSHY FORK RD SE

NEWARK, OH 43056

Licking

Bidder 2

Bid $419,764.00

161020 - Page 401

Page 402: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #1 692E10100 SPECIAL - FIRST MOWING, (1260 ACRE)

Awd $60,480.00$48.00

2 $81,900.00$65.00

Ref #2 692E20100 SPECIAL - SECOND MOWING, (1260 ACRE)

Awd $60,480.00$48.00

2 $75,600.00$60.00

Ref #3 692E30100 SPECIAL - THIRD MOWING, (1260 ACRE)

Awd $60,480.00$48.00

2 $56,700.00$45.00

Ref #4 692E30270 SPECIAL - FOURTH MOWING, (1260 ACRE)

Awd $60,480.00$48.00

2 $50,400.00$40.00

Ref #5 692E30400 SPECIAL - MOWBACK, (1572 ACRE)

Awd $29,868.00$19.00

2 $58,164.00$37.00

Section 1 - ROADWAY - Totals

Awd $271,788.00

2 $322,764.00

Ref #6 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $31,000.00$31,000.00

2 $37,000.00$37,000.00

Ref #7 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $40,000.00$40,000.00

2 $20,000.00$20,000.00

Ref #8 624E10000 MOBILIZATION, (LUMP SUM)

Awd $40,000.00$40,000.00

2 $40,000.00$40,000.00

Section 2 - INCIDENTALS - Totals

Awd $111,000.00

2 $97,000.00

161020 - Page 402

Page 403: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Project No. 161022

PID 102022

D04-MOW FY 2016 (East)

Non-Federal

Type: MOWING

Completion Date: 10/31/2016

Award Amount: $653,568.00

Contract Awarded To: BRYPAN LLC

Letting Date: 3/1/2016

Engineer's Estimate: $560,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jerry Wray, Director

BRYPAN LLC

14303 BRUSHY FORK RD SE

NEWARK, OH 43056

Licking

Bidder 1

Bid $653,568.00

161022 - Page 403

Page 404: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #1 692E10000 SPECIAL - FIRST MOWING, (192.32 MILE)

Awd $115,392.00$600.00

Ref #2 692E20000 SPECIAL - SECOND MOWING, (192.32 MILE)

Awd $115,392.00$600.00

Ref #3 692E30000 SPECIAL - THIRD MOWING, (192.32 MILE)

Awd $115,392.00$600.00

Ref #4 692E30250 SPECIAL - FOURTH MOWING, (192.32 MILE)

Awd $115,392.00$600.00

Section 1 - ROADWAY - Totals

Awd $461,568.00

Ref #5 832E30000 EROSION CONTROL, (2000 EACH)

Awd $2,000.00$1.00

Section 2 - EROSION CONTROL - Totals

Awd $2,000.00

Ref #6 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $58,000.00$58,000.00

Ref #7 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $52,000.00$52,000.00

Ref #8 624E10000 MOBILIZATION, (LUMP SUM)

Awd $80,000.00$80,000.00

Section 3 - INCIDENTALS - Totals

Awd $190,000.00

161022 - Page 404

Page 405: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Project No. 161025

PID 92425

D01-HS-FY16

Non-Federal

Type: HERBICIDAL SPRAYING

Completion Date: 10/1/2016

Award Amount: $212,652.00

Contract Awarded To: NATURCHEM INC

Letting Date: 3/1/2016

Engineer's Estimate: $306,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jerry Wray, Director

NATURCHEM INC

155 PETRO RD

KINGSTON SPRINGS, TN 37082-8971

Bidder 1

Bid $212,652.00

BIG TREES INC

27201 ROYALTON RD SUITE 1

COLUMBIA STATION, OH 44028

Lorain

Bidder 2

Bid $255,616.00

DEANGELO BROTHERS LLC

100 NORTH CONAHAN DR

HAZLETON, PA 18201

Bidder 3

Bid $284,444.37

FIRST KLASS LAWN CARE

1441 EAST MAIN ST

OTTAWA, OH 45875

Putnam

Bidder 4

Bid $302,955.00

DALTONS INC

936 LITTLE EAGLE DRIVE

WARSAW, IN 46580

Bidder 5

Bid $321,273.00

161025 - Page 405

Page 406: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #1 691E10000 SPECIAL - HERBICIDAL SPRAYING, WEED AND BRUSH CONT, (3251 ACRE)

Awd $87,777.00$27.00

2 $120,287.00$37.00

3 $124,344.25$38.25

4 $113,785.00$35.00

5 $97,530.00$30.00

Ref #2 691E10100 SPECIAL - HERBICIDAL SPRAYING, WEED AND BRUSH CONT, (2457 ACRE)

Awd $98,280.00$40.00

2 $90,909.00$37.00

3 $93,975.34$38.25

4 $147,420.00$60.00

5 $147,420.00$60.00

Ref #3 691E41000 SPECIAL - HERBICIDAL SPRAYING, (286 MILE)

Awd $23,595.00$82.50

2 $34,320.00$120.00

3 $61,124.78$213.72

4 $35,750.00$125.00

5 $64,350.00$225.00

Section 1 - ROADWAY - Totals

Awd $209,652.00

2 $245,516.00

3 $279,444.37

4 $296,955.00

5 $309,300.00

Ref #4 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $1,000.00$1,000.00

2 $3,000.00$3,000.00

3 $4,000.00$4,000.00

4 $3,000.00$3,000.00

5 $5,000.00$5,000.00

Ref #5 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $1,000.00$1,000.00

2 $4,500.00$4,500.00

3 $500.00$500.00

4 $1,500.00$1,500.00

5 $6,000.00$6,000.00

Ref #6 624E10000 MOBILIZATION, (LUMP SUM)

Awd $1,000.00$1,000.00

2 $2,600.00$2,600.00

3 $500.00$500.00

4 $1,500.00$1,500.00

5 $973.00$973.00

Section 2 - INCIDENTALS - Totals

Awd $3,000.00

2 $10,100.00

3 $5,000.00

4 $6,000.00

5 $11,973.00

161025 - Page 406

Page 407: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Project No. 161026

PID 97040

D11-HS-FY2016A

Non-Federal

Type: HERBICIDAL SPRAYING

Completion Date: 9/30/2016

Award Amount: $118,000.00

Contract Awarded To: MERCIER'S INC

Letting Date: 3/1/2016

Engineer's Estimate: $166,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jerry Wray, Director

MERCIER'S INC

7442 SHIPLEY AVENUE

HARMANS, MD 21077

Bidder 1

Bid $118,000.00

NATURCHEM INC

155 PETRO RD

KINGSTON SPRINGS, TN 37082-8971

Bidder 2

Bid $118,780.00

DEANGELO BROTHERS LLC

100 NORTH CONAHAN DR

HAZLETON, PA 18201

Bidder 3

Bid $184,660.00

161026 - Page 407

Page 408: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #1 832E30000 EROSION CONTROL, (1000 EACH)

Awd $1,000.00$1.00

2 $1,000.00$1.00

3 $1,000.00$1.00

Section 1 - EROSION CONTROL - Totals

Awd $1,000.00

2 $1,000.00

3 $1,000.00

Ref #2 691E41000 SPECIAL - HERBICIDAL SPRAYING, (430 MILE)

Awd $43,000.00$100.00

2 $43,860.00$102.00

3 $55,900.00$130.00

Ref #3 691E41900 SPECIAL - HERBICIDAL SPRAYING, GUARDRAIL, (430 MILE)

Awd $43,000.00$100.00

2 $43,860.00$102.00

3 $72,240.00$168.00

Ref #4 691E60300 SPECIAL - HERBICIDAL SPRAYING, MISC.: ROCKWALL AND, (280 MILE)

Awd $28,000.00$100.00

2 $28,560.00$102.00

3 $51,520.00$184.00

Section 2 - LANDSCAPING - Totals

Awd $114,000.00

2 $116,280.00

3 $179,660.00

Ref #5 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $2,000.00$2,000.00

2 $500.00$500.00

3 $3,000.00$3,000.00

Ref #6 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $500.00$500.00

2 $500.00$500.00

3 $500.00$500.00

Ref #7 624E10000 MOBILIZATION, (LUMP SUM)

Awd $500.00$500.00

2 $500.00$500.00

3 $500.00$500.00

Section 3 - INCIDENTALS - Totals

Awd $3,000.00

2 $1,500.00

3 $4,000.00

161026 - Page 408

Page 409: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Project No. 161027

PID 100437

JAC-US 35-Various

Non-Federal

Type: BRIDGE REPAIR

Completion Date: 6/30/2016

Award Amount: $208,398.80

Contract Awarded To: A & A PAINTING LLC

Letting Date: 3/1/2016

Engineer's Estimate: $317,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jerry Wray, Director

A & A PAINTING LLC

74 CREED CIRCLE

CAMPBELL, OH 44405

Mahoning

Bidder 1

Bid $208,398.80

T & A CONSTRUCTION INC

8954 BROADVIEW RD

BROADVIEW HTS, OH 44147

Cuyahoga

Bidder 2

Bid $291,925.70

ALAN STONE CO INC

1324 ELLIS RUN RD

CUTLER, OH 45724

Washington

Bidder 3

Bid $302,846.00

DOT CONSTRUCTION CORP

535 NORTH BROAD ST STE 5

CANFIELD, OH 44406

Mahoning

Bidder 4

Bid $369,888.60

INFRASTRUCTURE UNLIMITED INC

144 FOGGINTOWN RD

BREWSTER, NY 10509

Bidder 5

Bid $478,742.00

161027 - Page 409

Page 410: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #1 832E30000 EROSION CONTROL, (1000 EACH)

Awd $1,000.00$1.00

2 $1,000.00$1.00

3 $1,000.00$1.00

4 $1,000.00$1.00

5 $1,000.00$1.00

Section 1 - EROSION CONTROL - Totals

Awd $1,000.00

2 $1,000.00

3 $1,000.00

4 $1,000.00

5 $1,000.00

Ref #2 642E00094 EDGE LINE, 6", (1.8 MILE)

Awd $3,600.00$2,000.00

2 $7,191.00$3,995.00

3 $3,060.00$1,700.00

4 $3,612.60$2,007.00

5 $9,000.00$5,000.00

Ref #3 642E00194 LANE LINE, 6", (0.9 MILE)

Awd $1,800.00$2,000.00

2 $891.00$990.00

3 $1,800.00$2,000.00

4 $1,206.00$1,340.00

5 $5,400.00$6,000.00

Section 2 - TRAFFIC CONTROL - Totals

Awd $5,400.00

2 $8,082.00

3 $4,860.00

4 $4,818.60

5 $14,400.00

Ref #4 512E10301 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, AS , (1954 SY)

Awd $35,172.00$18.00

2 $45,430.50$23.25

3 $35,172.00$18.00

4 $48,850.00$25.00

5 $54,712.00$28.00

Ref #5 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (19542 SY)

Awd $105,526.80$5.40

2 $168,061.20$8.60

3 $136,794.00$7.00

4 $195,420.00$10.00

5 $195,420.00$10.00

Ref #6 516E01301 ELASTOMERIC STRIP SEAL WITHOUT STEEL EXTRUSIONS, A, (308 FT)

Awd $30,800.00$100.00

2 $36,652.00$119.00

3 $20,020.00$65.00

4 $30,800.00$100.00

5 $36,960.00$120.00

161027 - Page 410

Page 411: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #7 519E12300 SPECIAL - PATCHING CONCRETE BRIDGE DECK - TYPE B, (30 SY)

Awd $13,500.00$450.00

2 $14,700.00$490.00

3 $15,000.00$500.00

4 $15,000.00$500.00

5 $11,250.00$375.00

Section 3 - STRUCTURE 20 FOOT SPAN AND OVER - Totals

Awd $184,998.80

2 $264,843.70

3 $206,986.00

4 $290,070.00

5 $298,342.00

Ref #8 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $4,000.00$4,000.00

2 $5,500.00$5,500.00

3 $2,000.00$2,000.00

4 $4,000.00$4,000.00

5 $20,000.00$20,000.00

Ref #9 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $10,000.00$10,000.00

2 $7,500.00$7,500.00

3 $75,000.00$75,000.00

4 $50,000.00$50,000.00

5 $80,000.00$80,000.00

Ref #10 624E10000 MOBILIZATION, (LUMP SUM)

Awd $3,000.00$3,000.00

2 $5,000.00$5,000.00

3 $13,000.00$13,000.00

4 $20,000.00$20,000.00

5 $65,000.00$65,000.00

Section 4 - INCIDENTALS - Totals

Awd $17,000.00

2 $18,000.00

3 $90,000.00

4 $74,000.00

5 $165,000.00

161027 - Page 411

Page 412: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Project No. 164001

PID 93265

FAI-SR 664-4.65

Federal

Type: BRIDGE REPAIR

Completion Date: 10/31/2016

Award Amount: $609,281.31

Contract Awarded To: BCC OHIO INC

Letting Date: 3/1/2016

Engineer's Estimate: $563,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jerry Wray, Director

BCC OHIO INC

P O BOX 229

NEW LONDON, OH 44851

Huron

Bidder 1

Bid $609,281.31

BUDS INC

6260 NEWARK RD

NASHPORT, OH 43830

Muskingum

Bidder 2

Bid $682,963.18

RIETSCHLIN CONSTRUCTION INC

4240 BAKER RD

CRESTLINE, OH 44827

Crawford

Bidder 3

Bid $723,982.00

FOLLOW THE RIVER DESIGNS LLC

4330 E HOOPPOLE RIDGE RD

MC CONNELSVILLE, OH 43756

Morgan

Bidder 4

Bid $744,674.91

164001 - Page 412

Page 413: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)

Awd $427.50$427.50

2 $5,000.00$5,000.00

3 $6,500.00$6,500.00

4 $3,500.00$3,500.00

Ref #2 202E23500 WEARING COURSE REMOVED, (112 SY)

Awd $2,880.64$25.72

2 $2,800.00$25.00

3 $2,352.00$21.00

4 $3,360.00$30.00

Ref #3 202E38000 GUARDRAIL REMOVED, (176 FT)

Awd $278.08$1.58

2 $528.00$3.00

3 $792.00$4.50

4 $352.00$2.00

Ref #4 203E10000 EXCAVATION, (64 CY)

Awd $600.32$9.38

2 $2,880.00$45.00

3 $5,376.00$84.00

4 $4,437.76$69.34

Ref #5 203E20000 EMBANKMENT, (105 CY)

Awd $2,823.45$26.89

2 $3,675.00$35.00

3 $2,415.00$23.00

4 $6,242.25$59.45

Ref #6 204E10000 SUBGRADE COMPACTION, (524 SY)

Awd $896.04$1.71

2 $1,310.00$2.50

3 $2,096.00$4.00

4 $2,358.00$4.50

Ref #7 606E13000 GUARDRAIL, TYPE 5, (175 FT)

Awd $3,087.00$17.64

2 $2,441.25$13.95

3 $2,712.50$15.50

4 $2,441.25$13.95

Ref #8 606E26500 ANCHOR ASSEMBLY, TYPE T, (4 EACH)

Awd $3,087.00$771.75

2 $2,380.00$595.00

3 $2,700.00$675.00

4 $2,380.00$595.00

Ref #9 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4, (4 EACH)

Awd $2,709.00$677.25

2 $2,400.00$600.00

3 $2,700.00$675.00

4 $2,400.00$600.00

Ref #10 606E50000 SPECIAL - RESHAPING BERM, (710 FT)

Awd $972.70$1.37

2 $3,550.00$5.00

3 $1,065.00$1.50

4 $3,408.00$4.80

164001 - Page 413

Page 414: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Section 1 - ROADWAY - Totals

Awd $17,761.73

2 $26,964.25

3 $28,708.50

4 $30,879.26

Ref #11 601E20010 CRUSHED AGGREGATE SLOPE PROTECTION, (3 CY)

Awd $378.00$126.00

2 $600.00$200.00

3 $840.00$280.00

4 $255.96$85.32

Ref #12 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH FABRIC FILTER, (70 CY)

Awd $7,834.40$111.92

2 $5,950.00$85.00

3 $7,910.00$113.00

4 $5,548.90$79.27

Ref #13 616E10000 WATER, (0.4 MGAL)

Awd $5.25$13.12

2 $0.40$1.00

3 $6.00$15.00

4 $24.00$60.00

Ref #14 659E00500 SEEDING AND MULCHING, CLASS 1, (511 SY)

Awd $2,948.47$5.77

2 $1,277.50$2.50

3 $3,066.00$6.00

4 $1,533.00$3.00

Ref #15 659E20000 COMMERCIAL FERTILIZER, (0.07 TON)

Awd $37.49$535.57

2 $46.20$660.00

3 $49.00$700.00

4 $38.50$550.00

Ref #16 659E31000 LIME, (0.11 ACRE)

Awd $11.55$105.00

2 $16.28$148.00

3 $11.00$100.00

4 $15.40$140.00

Ref #17 659E35000 WATER, (2.8 MGAL)

Awd $2.94$1.05

2 $2.80$1.00

3 $56.00$20.00

4 $2.80$1.00

Ref #18 832E30000 EROSION CONTROL, (1500 EACH)

Awd $1,500.00$1.00

2 $1,500.00$1.00

3 $1,500.00$1.00

4 $1,500.00$1.00

164001 - Page 414

Page 415: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Section 2 - EROSION CONTROL - Totals

Awd $12,718.10

2 $9,393.18

3 $13,438.00

4 $8,918.56

Ref #19 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (1198 SY)

Awd $9,020.94$7.53

2 $8,386.00$7.00

3 $7,188.00$6.00

4 $8,985.00$7.50

Ref #20 255E20000 FULL DEPTH PAVEMENT SAWING, (478 FT)

Awd $2,103.20$4.40

2 $2,390.00$5.00

3 $1,195.00$2.50

4 $478.00$1.00

Ref #21 301E46000 ASPHALT CONCRETE BASE, PG64-22, (128 CY)

Awd $29,568.00$231.00

2 $30,080.00$235.00

3 $31,744.00$248.00

4 $35,200.00$275.00

Ref #22 304E20000 AGGREGATE BASE, (88 CY)

Awd $8,748.08$99.41

2 $9,680.00$110.00

3 $7,568.00$86.00

4 $5,740.24$65.23

Ref #23 407E10000 TACK COAT, (90 GAL)

Awd $189.00$2.10

2 $180.00$2.00

3 $202.50$2.25

4 $180.00$2.00

Ref #24 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (48 GAL)

Awd $100.80$2.10

2 $96.00$2.00

3 $108.00$2.25

4 $96.00$2.00

Ref #25 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (43 CY)

Awd $10,610.25$246.75

2 $10,320.00$240.00

3 $11,373.50$264.50

4 $10,965.00$255.00

Ref #26 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (448, (59 CY)

Awd $12,699.75$215.25

2 $12,980.00$220.00

3 $13,599.50$230.50

4 $13,452.00$228.00

164001 - Page 415

Page 416: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Section 3 - PAVEMENT - Totals

Awd $73,040.02

2 $74,112.00

3 $72,978.50

4 $75,096.24

Ref #27 621E54000 RAISED PAVEMENT MARKER REMOVED, (11 EACH)

Awd $85.47$7.77

2 $110.00$10.00

3 $550.00$50.00

4 $55.00$5.00

Ref #28 626E00100 BARRIER REFLECTOR, (8 EACH)

Awd $48.32$6.04

2 $80.00$10.00

3 $88.00$11.00

4 $80.00$10.00

Ref #29 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (46 FT)

Awd $603.98$13.13

2 $460.00$10.00

3 $506.00$11.00

4 $460.00$10.00

Ref #30 630E80100 SIGN, FLAT SHEET, (12 SF)

Awd $378.00$31.50

2 $246.00$20.50

3 $276.00$23.00

4 $246.00$20.50

Ref #31 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (1 EACH)

Awd $47.25$47.25

2 $40.00$40.00

3 $45.00$45.00

4 $40.00$40.00

Ref #32 648E00100 EDGE LINE, 4", (0.19 MILE)

Awd $2,007.60$10,566.32

2 $1,805.00$9,500.00

3 $1,748.00$9,200.00

4 $3,515.00$18,500.00

Ref #33 648E00300 CENTER LINE, (0.1 MILE)

Awd $2,113.65$21,136.50

2 $950.00$9,500.00

3 $1,120.00$11,200.00

4 $1,850.00$18,500.00

Section 4 - TRAFFIC CONTROL - Totals

Awd $5,284.27

2 $3,691.00

3 $4,333.00

4 $6,246.00

164001 - Page 416

Page 417: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #34 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL), (8 EACH)

Awd $13,156.48$1,644.56

2 $16,800.00$2,100.00

3 $16,200.00$2,025.00

4 $16,000.00$2,000.00

Ref #35 614E13100 BARRIER REFLECTOR, (35 EACH)

Awd $550.55$15.73

2 $280.00$8.00

3 $315.00$9.00

4 $455.00$13.00

Ref #36 614E13360 OBJECT MARKER, TWO WAY, (22 EACH)

Awd $482.90$21.95

2 $176.00$8.00

3 $319.00$14.50

4 $352.00$16.00

Ref #37 622E41000 PORTABLE BARRIER, 32", (360 FT)

Awd $6,134.40$17.04

2 $5,760.00$16.00

3 $9,900.00$27.50

4 $4,680.00$13.00

Ref #38 622E41020 PORTABLE BARRIER, 32", BRIDGE MOUNTED, (420 FT)

Awd $7,236.60$17.23

2 $6,720.00$16.00

3 $12,180.00$29.00

4 $9,240.00$22.00

Ref #39 632E90400 SIGNALIZATION, MISC.:MICROWAVE DETECTOR, (2 EACH)

Awd $26,775.00$13,387.50

2 $1,000.00$500.00

3 $2,800.00$1,400.00

4 $1,000.00$500.00

Ref #40 642E30000 REMOVAL OF PAVEMENT MARKING, (445 FT)

Awd $1,735.50$3.90

2 $2,603.25$5.85

3 $2,447.50$5.50

4 $445.00$1.00

Ref #41 873E21000 WORK ZONE CENTER LINE, CLASS I, (0.19 MILE)

Awd $2,009.70$10,577.37

2 $950.00$5,000.00

3 $2,831.00$14,900.00

4 $2,540.30$13,370.00

Ref #42 873E22000 WORK ZONE EDGE LINE, CLASS I, (0.39 MILE)

Awd $2,008.65$5,150.38

2 $1,872.00$4,800.00

3 $3,549.00$9,100.00

4 $3,045.90$7,810.00

Ref #43 873E25000 WORK ZONE STOP LINE, CLASS I, (48 FT)

Awd $252.00$5.25

2 $144.00$3.00

3 $1,920.00$40.00

4 $208.80$4.35

164001 - Page 417

Page 418: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Section 5 - MAINTENANCE OF TRAFFIC - Totals

Awd $60,341.78

2 $36,305.25

3 $52,461.50

4 $37,967.00

Ref #44 202E11301 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN, (44 CY)

Awd $40,879.52$929.08

2 $77,000.00$1,750.00

3 $39,160.00$890.00

4 $44,000.00$1,000.00

Ref #45 202E22900 APPROACH SLAB REMOVED, (111 SY)

Awd $5,391.27$48.57

2 $7,659.00$69.00

3 $5,328.00$48.00

4 $3,663.00$33.00

Ref #46 202E98200 REMOVAL MISC.:PILE ENCASEMENT, (95 FT)

Awd $3,385.80$35.64

2 $18,050.00$190.00

3 $7,600.00$80.00

4 $3,663.20$38.56

Ref #47 202E98200 REMOVAL MISC.:STEEL DRIP STRIP, (284 FT)

Awd $533.92$1.88

2 $1,420.00$5.00

3 $5,041.00$17.75

4 $2,272.00$8.00

Ref #48 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)

Awd $3,337.50$3,337.50

2 $20,000.00$20,000.00

3 $29,750.00$29,750.00

4 $28,500.00$28,500.00

Ref #49 503E21300 UNCLASSIFIED EXCAVATION, (LUMP SUM)

Awd $4,530.00$4,530.00

2 $7,500.00$7,500.00

3 $25,800.00$25,800.00

4 $15,000.00$15,000.00

Ref #50 507E71200 SPECIAL - PILE ENCASEMENT, (239 FT)

Awd $34,136.37$142.83

2 $39,435.00$165.00

3 $34,655.00$145.00

4 $42,384.26$177.34

Ref #51 509E10000 EPOXY COATED REINFORCING STEEL, (7686 LB)

Awd $9,300.06$1.21

2 $15,372.00$2.00

3 $11,529.00$1.50

4 $11,529.00$1.50

Ref #52 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (144 EACH)

Awd $2,767.68$19.22

2 $2,304.00$16.00

3 $3,312.00$23.00

4 $3,888.00$27.00

164001 - Page 418

Page 419: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #53 511E34410 CLASS QC2 CONCRETE, SUPERSTRUCTURE, (42 CY)

Awd $52,563.00$1,251.50

2 $44,100.00$1,050.00

3 $46,200.00$1,100.00

4 $67,200.00$1,600.00

Ref #54 511E45710 CLASS QC1 CONCRETE, ABUTMENT, (12 CY)

Awd $14,985.00$1,248.75

2 $12,000.00$1,000.00

3 $13,200.00$1,100.00

4 $9,120.00$760.00

Ref #55 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY), (128 SY)

Awd $1,807.36$14.12

2 $2,560.00$20.00

3 $1,728.00$13.50

4 $2,048.00$16.00

Ref #56 516E13201 1/2" PREFORMED EXPANSION JOINT FILLER, AS PER PLAN, (179 SF)

Awd $980.92$5.48

2 $1,790.00$10.00

3 $2,595.50$14.50

4 $2,148.00$12.00

Ref #57 516E13601 1" PREFORMED EXPANSION JOINT FILLER, AS PER PLAN, (45 SF)

Awd $508.50$11.30

2 $180.00$4.00

3 $1,170.00$26.00

4 $900.00$20.00

Ref #58 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL, (89 FT)

Awd $12,535.65$140.85

2 $5,340.00$60.00

3 $2,714.50$30.50

4 $2,670.00$30.00

Ref #59 516E31011 2" DEEP JOINT SEALER, AS PER PLAN, (77 FT)

Awd $1,403.71$18.23

2 $1,540.00$20.00

3 $2,233.00$29.00

4 $770.00$10.00

Ref #60 516E42000 ELASTOMERIC BEARING PAD, MISC.: (1-1/2" x 8" x 38', (2 EACH)

Awd $51,486.00$25,743.00

2 $12,000.00$6,000.00

3 $4,800.00$2,400.00

4 $26,000.00$13,000.00

Ref #61 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A, (LUMP SUM)

Awd $9,300.00$9,300.00

2 $25,000.00$25,000.00

3 $20,399.00$20,399.00

4 $50,000.00$50,000.00

Ref #62 517E75601 DEEP BEAM BRIDGE RETROFIT RAILING, AS PER PLAN, (300 FT)

Awd $29,799.00$99.33

2 $21,000.00$70.00

3 $23,700.00$79.00

4 $21,900.00$73.00

164001 - Page 419

Page 420: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #63 518E21200 POROUS BACKFILL WITH FILTER FABRIC, (36 CY)

Awd $3,593.88$99.83

2 $4,680.00$130.00

3 $4,176.00$116.00

4 $3,960.00$110.00

Ref #64 518E22300 SPECIAL - STEEL DRIP STRIP, (350 FT)

Awd $3,724.00$10.64

2 $2,887.50$8.25

3 $5,250.00$15.00

4 $4,200.00$12.00

Ref #65 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE, (85 FT)

Awd $696.15$8.19

2 $680.00$8.00

3 $1,190.00$14.00

4 $595.00$7.00

Ref #66 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (100 FT)

Awd $756.00$7.56

2 $800.00$8.00

3 $1,800.00$18.00

4 $800.00$8.00

Ref #67 519E11100 PATCHING CONCRETE STRUCTURE, (2 SF)

Awd $492.00$246.00

2 $500.00$250.00

3 $2,200.00$1,100.00

4 $360.00$180.00

Ref #68 526E10001 REINFORCED CONCRETE APPROACH SLABS (T=12"), AS PER, (120 SY)

Awd $32,298.00$269.15

2 $33,000.00$275.00

3 $26,640.00$222.00

4 $32,400.00$270.00

Ref #69 690E12050 SPECIAL - REINFORCED MESH FOR TRANSVERSE AND/OR LO, (43 SY)

Awd $2,264.81$52.67

2 $1,720.00$40.00

3 $3,225.00$75.00

4 $4,128.00$96.00

Ref #70 847E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (2" THICK), (585 SY)

Awd $37,340.55$63.83

2 $56,160.00$96.00

3 $49,432.50$84.50

4 $76,050.00$130.00

Ref #71 847E20200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE , (30 CY)

Awd $6,525.00$217.50

2 $9,000.00$300.00

3 $5,250.00$175.00

4 $5,700.00$190.00

Ref #72 847E30000 TEST SLAB, (LUMP SUM)

Awd $823.50$823.50

2 $1,200.00$1,200.00

3 $2,200.00$2,200.00

4 $500.00$500.00

164001 - Page 420

Page 421: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #73 847E30400 EXISTING CONCRETE OVERLAY REMOVED ( 1 3/4" THICK), (544 SY)

Awd $6,201.60$11.40

2 $21,760.00$40.00

3 $41,344.00$76.00

4 $16,320.00$30.00

Ref #74 847E50000 HAND CHIPPING, (26 SY)

Awd $3,355.56$129.06

2 $4,160.00$160.00

3 $3,640.00$140.00

4 $5,200.00$200.00

Section 6 - STRUCTURE 20 FOOT SPAN AND OVER (BRIDGE - Totals

Awd $377,702.31

2 $450,797.50

3 $427,262.50

4 $487,868.46

Ref #75 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $7,522.00$7,522.00

2 $6,500.00$6,500.00

3 $7,100.00$7,100.00

4 $20,699.39$20,699.39

Ref #76 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $16,091.25$16,091.25

2 $44,000.00$44,000.00

3 $42,200.00$42,200.00

4 $40,000.00$40,000.00

Ref #77 619E16000 FIELD OFFICE, TYPE A, (4 MNTH)

Awd $6,951.00$1,737.75

2 $7,200.00$1,800.00

3 $7,200.00$1,800.00

4 $8,800.00$2,200.00

Ref #78 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)

Awd $2,745.00$2,745.00

2 $4,000.00$4,000.00

3 $2,300.00$2,300.00

4 $8,200.00$8,200.00

Ref #79 624E10000 MOBILIZATION, (LUMP SUM)

Awd $29,123.85$29,123.85

2 $20,000.00$20,000.00

3 $66,000.00$66,000.00

4 $20,000.00$20,000.00

Section 7 - INCIDENTALS - Totals

Awd $62,433.10

2 $81,700.00

3 $124,800.00

4 $97,699.39

164001 - Page 421

Page 422: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Project No. 168001

PID 101873

LOR-IR 90-10.78

Non-Federal

Type: SPOT PATCHING

Completion Date: 6/15/2016

Award Amount: $422,279.65

Contract Awarded To: BURTON SCOT CONTRACTORS LLC

Letting Date: 3/1/2016

Engineer's Estimate: $389,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jerry Wray, Director

BURTON SCOT CONTRACTORS LLC

11330 KINSMAN RD

NEWBURY, OH 44065

Geauga

Bidder 1

Bid $422,279.65

CHAGRIN VALLEY PAVING INC

17290 MUNN RD

CHAGRIN FALLS, OH 44023

Geauga

Bidder 2

Bid $479,237.00

KARVO COMPANIES INC

4524 HUDSON DR

STOW, OH 44224-1702

Bidder 3

Bid $492,443.75

KOKOSING CONSTRUCTION COMPANY INC

886 MC KINLEY AVE

COLUMBUS, OH 43222

Franklin

Bidder 4

Bid $568,615.25

ERIE BLACKTOP INC

4507 TIFFIN AVE

SANDUSKY, OH 44870

Erie

Bidder 5

Bid $626,697.65

168001 - Page 422

Page 423: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #1 251E01010 PARTIAL DEPTH PAVEMENT REPAIR, (230 CY)

Awd $100,050.00$435.00

2 $138,000.00$600.00

3 $106,950.00$465.00

4 $207,000.00$900.00

5 $198,950.00$865.00

Ref #2 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (13693 SY)

Awd $45,186.90$3.30

2 $54,772.00$4.00

3 $51,348.75$3.75

4 $54,772.00$4.00

5 $51,348.75$3.75

Ref #3 407E20100 SPECIAL - TACK COAT, TRACKLESS TACK, SURFACE COURS, (1095 GAL)

Awd $3,558.75$3.25

2 $2,190.00$2.00

3 $1,642.50$1.50

4 $4,106.25$3.75

5 $2,299.50$2.10

Ref #4 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5MM, TYPE A (4, (571 CY)

Awd $159,880.00$280.00

2 $114,200.00$200.00

3 $142,750.00$250.00

4 $171,300.00$300.00

5 $139,895.00$245.00

Ref #5 618E40100 RUMBLE STRIPS, (ASPHALT CONCRETE), (10560 FT)

Awd $11,616.00$1.10

2 $7,392.00$0.70

3 $7,392.00$0.70

4 $4,224.00$0.40

5 $12,144.00$1.15

Section 1 - PAVEMENT - Totals

Awd $320,291.65

2 $316,554.00

3 $310,083.25

4 $441,402.25

5 $404,637.25

Ref #6 621E00100 RPM, (450 EACH)

Awd $9,990.00$22.20

2 $9,540.00$21.20

3 $11,452.50$25.45

4 $13,275.00$29.50

5 $10,125.00$22.50

Ref #7 621E54000 RAISED PAVEMENT MARKER REMOVED, (450 EACH)

Awd $2,250.00$5.00

2 $450.00$1.00

3 $675.00$1.50

4 $1,350.00$3.00

5 $4,500.00$10.00

168001 - Page 423

Page 424: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #8 644E00104 EDGE LINE, 6", (2 MILE)

Awd $7,700.00$3,850.00

2 $4,990.00$2,495.00

3 $4,990.00$2,495.00

4 $4,990.00$2,495.00

5 $8,100.00$4,050.00

Ref #9 644E00204 LANE LINE, 6", (7 MILE)

Awd $11,550.00$1,650.00

2 $9,590.00$1,370.00

3 $9,590.00$1,370.00

4 $9,590.00$1,370.00

5 $12,145.00$1,735.00

Ref #10 644E00404 CHANNELIZING LINE, 12", (1280 FT)

Awd $2,560.00$2.00

2 $2,560.00$2.00

3 $2,560.00$2.00

4 $2,560.00$2.00

5 $2,688.00$2.10

Ref #11 644E00700 TRANSVERSE/DIAGONAL LINE, (336 FT)

Awd $2,688.00$8.00

2 $1,848.00$5.50

3 $1,848.00$5.50

4 $1,848.00$5.50

5 $2,822.40$8.40

Section 2 - TRAFFIC CONTROL - Totals

Awd $36,738.00

2 $28,978.00

3 $31,115.50

4 $33,613.00

5 $40,380.40

Ref #12 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (160 HOUR)

Awd $9,600.00$60.00

2 $9,600.00$60.00

3 $10,400.00$65.00

4 $11,200.00$70.00

5 $10,880.00$68.00

Ref #13 614E11500 WORKSITE TRAFFIC SUPERVISOR, (2 MNTH)

Awd $10,000.00$5,000.00

2 $1,000.00$500.00

3 $250.00$125.00

4 $6,000.00$3,000.00

5 $10,000.00$5,000.00

Ref #14 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (4 SNMT)

Awd $3,800.00$950.00

2 $3,800.00$950.00

3 $800.00$200.00

4 $3,800.00$950.00

5 $4,000.00$1,000.00

168001 - Page 424

Page 425: Ohio Department of Transportation Official Bid Tabulation Jerry … · 2 $7.47 $69,829.56 3 $16.00 $149,568.00 4 $19.50 $182,286.00 5 $3.00 $28,044.00 Ref #18 204E10000 SUBGRADE COMPACTION,

Ref #15 614E20550 WORK ZONE LANE LINE, CLASS III, 642 PAINT, (7 MILE)

Awd $6,650.00$950.00

2 $6,825.00$975.00

3 $6,825.00$975.00

4 $6,650.00$950.00

5 $7,000.00$1,000.00

Ref #16 614E22350 WORK ZONE EDGE LINE, CLASS III, 642 PAINT, (2 MILE)

Awd $1,700.00$850.00

2 $2,170.00$1,085.00

3 $2,170.00$1,085.00

4 $1,700.00$850.00

5 $1,800.00$900.00

Section 3 - MAINTENANCE OF TRAFFIC - Totals

Awd $31,750.00

2 $23,395.00

3 $20,445.00

4 $29,350.00

5 $33,680.00

Ref #17 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $4,550.00$4,550.00

2 $4,500.00$4,500.00

3 $15,000.00$15,000.00

4 $3,500.00$3,500.00

5 $2,500.00$2,500.00

Ref #18 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $13,700.00$13,700.00

2 $65,310.00$65,310.00

3 $75,000.00$75,000.00

4 $38,250.00$38,250.00

5 $120,000.00$120,000.00

Ref #19 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)

Awd $5,250.00$5,250.00

2 $500.00$500.00

3 $800.00$800.00

4 $2,500.00$2,500.00

5 $5,500.00$5,500.00

Ref #20 624E10000 MOBILIZATION, (LUMP SUM)

Awd $10,000.00$10,000.00

2 $40,000.00$40,000.00

3 $40,000.00$40,000.00

4 $20,000.00$20,000.00

5 $20,000.00$20,000.00

Section 4 - INCIDENTALS - Totals

Awd $33,500.00

2 $110,310.00

3 $130,800.00

4 $64,250.00

5 $148,000.00

168001 - Page 425