    Overhead Line Design Manual Section 1

    Aerial Bundled Conductor (ABC) Low Voltage Mains and Services

    Asset Management

  • Overhead Line Design Manual Section 1 LV ABC v1.2 Page 2

  • OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 3

    Aug

    ust 2

    012

    Table of Contents 1 Scope ................................................................................................................................5

    2 References.......................................................................................................................6

    3 Definitions........................................................................................................................7

    4 Introduction .....................................................................................................................9

    5 Design Information....................................................................................................... 10

    5.1 GeneralPractice ....................................................................................................10 5.2 Riskassessment.....................................................................................................10 5.3 Earthing................................................................................................................. 10

    5.4 DesignData ...........................................................................................................10 6 Construction Information ............................................................................................ 12

    6.1 GeneralPractice ....................................................................................................12 6.1.1 Supports................................................................................................................................. 12

    6.2 Clearances.............................................................................................................12

    6.2.1 General ................................................................................................................................... 12 6.2.2 Tree Clearances ................................................................................................................... 13

    6.3 LowVoltageSupports............................................................................................ 13 6.4 Augering................................................................................................................ 13

    6.5 Foundations .......................................................................................................... 13

    6.6 Stays...................................................................................................................... 14

    6.7 GeneralbackfillingandCompaction .....................................................................14 6.8 InLineConnections ............................................................................................... 15 6.9 ConnectionstotheBundle ....................................................................................15

    6.9.1 General ................................................................................................................................... 15 6.9.2 Limit on Number of Connections to the Bundle .......................................................... 15 6.9.3 Disconnections from the bundle ..................................................................................... 15

    6.10 Openpoints...........................................................................................................15 6.10.1 General ................................................................................................................................. 15

    6.11 AppendixAGADrawingsandMaterialsMains .................................................16 6.12 AppendixBGADrawingsandMaterialsServices .............................................37 6.13 AppendixCGADrawingsandMaterialsPoleMountedEquipment..................48 6.14 AppendixDGADrawingsandMaterialsEarthing.............................................57

  • Overhead Line Design Manual Section 1 LV ABC v1.2 Page 4

    Overhead Line Design Manual 6.15 AppendixEReferenceListofallMaterialsforthisspecification .........................61 6.16 AppendixFDesignDataforConductorABC,4x120mm2....................................66 6.17 AppendixGDesignDataforConductor,ABC,4x95mm2 ....................................71 6.18 AppendixHDesignDataforConductor,ABC,2x95mm2 ....................................76 6.19 AppendixIDesignDataforConductor,ABC,4x35mm2 .....................................81 6.20 AppendixJDesignDataforConductor,ABC,2x35mm2 .....................................86 6.21 AppendixKServiceSpans ................................................................................... 91 6.22 AppendixLUnstayedSupports ..........................................................................93 6.23 AppendixMStaybaseandangleconversiontable .............................................95 6.24 Fulllistoftables ....................................................................................................96 6.25 Fulllistoffigures ................................................................................................... 98

    Revision Record Issue Date Prepared by Details 1.0 26/08/2010 Andy Horstead New document 1.1 11/03/2011 John Lowe Document rebranded 1.2 17/08/2012 Lee Strachan Reviewed for Publication on G81 Website

  • OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 5

    Overhead Line Design Manual

    Aug

    ust 2

    012

    1 Scope This specification details the design and construction requirements for all new types of Low Voltage (LV) Aerial Bundled Conductor (ABC) lines and services, operating in the range up to and including 1kV. LV ABC structures can be considered as one of three distinct types for design and construction purposes:

    1. LV ABC distribution networks supported on wood poles.

    2. LV ABC service connections (excludes terminations within property).

    3. LV ABC pole-mounted equipment.

    ABC conductors comprising the following number of cores and cross-sectional areas are used in the above lines:

    4. Conductor, ABC, 2x35mm2.

    5. Conductor, ABC, 2x95mm2.

    6. Conductor, ABC, 4x35mm2.

    7. Conductor, ABC, 4x95mm2.

    8. Conductor, ABC, 4x120mm2.

    These conductors are specified in more detail in EAS 00-0001and BS 7870-5.

  • Overhead Line Design Manual Section 1 LV ABC v1.2 Page 6

    Mar

    ch 2

    011

    Overhead Line Design Manual

    2 References

    The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies.

    Standard Number Standard Description

    BS 1990 Wood pole for overhead lines (power and telecommunications lines)

    BS EN ISO 9001 Quality Management Systems Requirements

    BS EN ISO 14001 Environmental Management Systems Specification with guidance for use

    UKPN EDS-06 0016 LV Networks Earthing Design

    ENA TS 43-12 Insulated Aerial Bundled Conductors erection requirements of low voltage overhead distribution systems

    ENA TS 43-13 Aerial Bundled Conductors (ABC) insulated with cross-linked polyethylene for low voltage overhead distribution systems

    ENA TS 43-14 Conductor fittings and associated apparatus for use with LV aerial bundled conductors

    BS 7870-5 Low Voltage Aerial Bundled Conductors

    UKPN EM 01 Overhead line Construction Manual 2010

    UKPN EDS 09-0019 Safety signs and labelling of equipment

    UKPN EAS 00-0001 UK Power Networks' Materials List (Overhead Lines)

  • OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 7

    Overhead Line Design Manual

    Aug

    ust 2

    012

    3 Definitions

    ABC Aerial Bundled Conductor

    CNE Combined Neutral Earth

    UKPN UK Power Networks

    UK Power Networks DMS UK Power Networks Document Management System

    EDS Engineering Design Standard

    ENA TS Energy Networks Association Technical Specification

    FoS Factor of Safety

    GA General Arrangement

    JC,s Job Cards

    IPC Insulation Piercing Connector

    Manufacturer An organisation supplying equipment for use on networks owned by UK Power Networks

    NI Not Illustrated (i.e. item numbers on Figures).

    PME Protective Multiple Earthing

    SJI Specific Job Instructions

    XLPE Cross-linked Polyethylene

  • Overhead Line Design Manual Section 1 LV ABC v1.2 Page 8

    Mar

    ch 2

    011

    Overhead Line Design Manual

  • OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 9

    Overhead Line Design Manual

    Aug

    ust 2

    012

    4 Introduction

    The body of this specification covers general design and construction requirements. How to construct and maintain ABC is detailed in a separate manual known as the Overhead Line Construction Manual. Appendix A to Appendix C of this document comprises General Arrangement (GA) drawings with associated lists of materials for LV ABC structures as follows:

    1. Appendix A comprises GAs for LV ABC distribution networks supported on wood poles. (Note that inside and outside angles are not as defined in ENA TS 43-12.)

    2. Appendix B comprises GAs for LV ABC service connections, followed by a GA summarising ABC and CNE service spans

    3. Appendix C comprises GAs for LV ABC pole-mounted equipment.

    Each list of materials identifies the components included in the associated GA and which supplementary items are needed to complete that structure. Variations within each GA for different conductors are covered by different columns in the associated list of materials. Note that the lists of materials for the connections and plant shown in Appendix B and Appendix C do not include the materials for the associated GA structure; many combinations are possible and it is not practical to cover every possible structure/connection variation here. (Refer to Appendix A for approved GA structures and materials.)

    Appendix E Reference List of all Materials for this specification comprises a reference list of all materials used within this specification.

    Appendixes F to M are tables of design data for this specification: one Appendix for each ABC type.

    This specification fits into the overall design and construction process as outlined by the following process summary:

    (a) Carry out a risk assessment.

    (b) Generate a proposal taking into account the risk assessment.

    (c) Generate a proposal for a new line.

    (d) Choose a proposed route and a line survey carried out.

    (e) Plot pole positions, heights, clearances, and develop a line profile. (Note that the development of a line profile will require some data and parameters from Appendix F and subsequent Appendices.)

    (f) Compile a list of materials using the GAs and supplementary items identified in this specification (Appendix A, Appendix B, Appendix C and appropriate ES and/or ENA TS). The GAs and supplementary items shall be selected and used in accordance with the design and construction information given below and the data given in subsequent Appendices.

  • Overhead Line Design Manual Section 1 LV ABC v1.2 Page 10

    Mar

    ch 2

    011

    Overhead Line Design Manual Appendix M provides a table to give distances in metres from pole base to stay base dependant on pole size. This has been provided to support the minimum angle of stay column provided in Appendix F to J.

    5 Design Information

    5.1 General Practice Lines shall be designed using the GAs and supplementary items from Appendix A, Appendix B, Appendix C and the data from Appendix F to M, etc. The following information shall be taken into account during the design process.

    5.2 Risk assessment

    A risk assessment shall be carried out at the commencement of the design work to identify the site specific safety hazards. The design shall incorporate mitigation measures to control the risks, identified in the risk assessment, associated with the construction, operation and maintenance of the proposed overhead line and its suitability compared with an underground cable solution.

    5.3 Earthing System earthing shall meet the requirements of the current UK Power Networks LV Network Earthing Design Manual EDS 06 0016 .

    To provide a PME network the connection from the neutral of the bundle to the earth electrode(s) shall be installed and connected in accordance with the drawings given in Appendix D. (The PME connections are split across two drawings, because all pole mounted equipment GAs incorporate connections from bundle neutral to neutral/earth as mandatory requirements.)

    5.4 Design Data Each set of design data (Appendix F to M) contains all the information necessary for the conductor bundle specified, with the exception of poles supporting electrical plant. Design parameters used to construct the tables of design data are given for reference. Note that the basic span for this design is 50m. If ABC is to be installed onto an existing pole it is then assumed that the pole depth will be 1500 mm. The maximum wind loading span shall then be limited to the figures supplied in Table 6 and Table 12 (Appendix F and G). If an existing pole has to be changed due to decay or clearance problems then refer to tables for planting depth for new build.

    For poles supporting electrical plant, strut loadings need to be re-calculated as necessary. (Note that 1000kg additional weight can be approximated to 1000kgf additional loading for this purpose.)

    Data in Appendix F to J, etc, are based on the minimum pole diameters included in BS 1990. In practice, if it is found that strut loadings exceed the values given in Appendix F to J, etc, the minimum pole top diameter needs to be re-calculated. Maximum service spans shall be in accordance with Figure 15: Concentric Service Spans and Figure 16: ABC Service Spans.

  • OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 11

    Overhead Line Design Manual

    Aug

    ust 2

    012

  • Overhead Line Design Manual Section 1 LV ABC v1.2 Page 12

    Mar

    ch 2

    011

    Overhead Line Design Manual

    6 Construction Information

    6.1 General Practice Construction practices shall be in accordance with the UK Power Networks Overhead Line Construction Manual. For reference, ABC phases and neutral shall be identified by the number of ribs on the insulation as follows:

    Phase L1: 1 rib. Phase L2: 2 ribs. Phase L3: 3 ribs. Neutral: fully ribbed. (Note that this applies

    whenever ABC is used; e.g. when neutral is run down the pole for connection to the neutral/earth connection.)

    6.1.1 Supports All fittings supporting the ABC system shall provide an insulating barrier rated at 1000V between the core insulation and the mechanical attachment. The ABC shall be attached in such a manner that it cannot make contact with any metalwork or stays.

    The maximum pole height for a service or service line shall be 9 metres.

    Weak links will be used on all poles except for the following:

    1. Terminal poles

    2. Section poles or

    3. Either side of a road crossing.

    6.2 Clearances

    6.2.1 General Clearances from external objects and structures (e.g. buildings, trees and roads) shall comply with ENA TS 43-12 In-line construction clearances shall comply with those specified in the specific job instructions detailed in the Overhead Line Construction Manual.

    In addition to the above, the following rules shall be followed:

    1. Wherever possible, ABC conductors shall not pass directly over buildings and roofs.

    2. Wherever it is necessary to over sail a building or roof, the relevant span shall not contain any in-line connections.

    3. Where ABC is attached to a building which has a thatched roof, the attachment shall be a minimum of 0.5m from the thatched roof.

    4. Once terminated, ABC shall be converted to concentric cable or insulated and sheathed (mechanically protected) cable within 0.5m of the point of attachment to a

  • OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 13

    Overhead Line Design Manual

    Aug

    ust 2

    012

    building. Service cable lead-ins into the building shall be installed in accordance with the Overhead Line Construction Manual.

    6.2.2 Tree Clearances Where an ABC system is erected through trees, the following points shall be considered:

    1. For additional information regarding overhead line clearances, refer to ENA TS 43-12.

    2. Risks of the ABC being abraded by trees.

    3. Sag variations and conductor swing due to the effects of the wind.

    4. The effect of wind and snow loading on trees or branches bearing onto the ABC.

    5. The danger of trees providing climbing access.

    6. The amount of tree cutting required for ABC compared with conventional open wire systems can be significantly reduced. However, the XLPE insulation is susceptible to abrasion and shall not be allowed to come into contact with tree trunks, mature branches or heavy outer growth, under any circumstances.

    7. Clearances through trees shall take account of maximum and minimum conductor sags, conductor swing and the anticipated tree growth rate and cutting periods.

    6.3 Low Voltage Supports

    All supports shall be fitted with a Safety Sign (Danger of Death) in accordance with UK Power Networks EDS 09-0019.

    6.4 Augering Augering the pole hole is the preferred method when the ground is suitable.

    After pole erection, the remaining hole shall be backfilled with suitable material based on soil condition. If there is a risk of movement due to poor soil conditions then a suitable cement mixture shall be used.

    6.5 Foundations Un-stayed angle poles shall be installed 0.5m deeper than the planting depth given in the Appendices to this specification. (Care shall be taken when planning un-stayed angle poles, particularly near walls.)

  • Overhead Line Design Manual Section 1 LV ABC v1.2 Page 14

    Mar

    ch 2

    011

    Overhead Line Design Manual

    6.6 Stays Only the following types of stay are suitable for lines designed to this specification:

    Load-lock anchors (Light)

    Screw-in (Heavy)

    Concrete blocks: Light 500 x 300 x 90mm

    Heavy 640 x 430 x 140mm

    Refer to tables for staying arrangements.

    Heavy duty stay plates are useful for structures of restricted height: the overall distance between the fixing at the top of the pole and the stay insulator is less than that of an equivalent pole-top make-off.

    The distance of the stay-base from the pole-base are given in Appendix F J using angles in degrees from 0o to 45o measured between the pole and stay. This information is then supported by a further table 42 provided in Appendix M which gives the spread in metres between the stay and the pole at ground level.

    6.7 General back-filling and Compaction All holes shall be backfilled with the excavated material but consideration should be given to soil condition. It may be necessary to import suitable material which can be mixed with a cement based compound for reinstatement around the pole.

  • OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 15

    Overhead Line Design Manual

    Aug

    ust 2

    012

    Any poles erected in the highway (excluding grass verges) shall be backfilled with suitable material with reference to NRSWA requirements.

    6.8 In-Line Connections Compression fittings shall be used for all tension and in line non-tension connections. (Under no circumstances shall IPCs) be used to make in-line connections.)

    6.9 Connections to the Bundle

    6.9.1 General Only ABC to ABC connections to the conductor bundle are permitted.

    Table 1 Number of IPCs required for Mains and service connections

    Scenario Phase Neutral

    120mm Mains or Service 1 double bolt IPC 2 double bolt IPCs

    95mm Mains or Service 1 single bolt IPC 2 single bolt IPCs

    35mm Mains or Service 1 single bolt IPC 2 single bolt IPCs

    6.9.1.1 Service Connections For single phase and three phase connections to 95mm2 ABC and below, one single-bolt IPC shall be used on each phase conductor and two single-bolt IPCs shall be used on the neutral/earth conductor. For single phase and three phase connections to 120mm2 ABC, one double-bolt IPC shall be used on each phase conductor and two double-bolt IPCs shall be used on the neutral/earth conductor (as illustrated in the appropriate GAs).

    6.9.1.2 Mains Connections For all mains connections to 95mm2 and below, one single-bolt IPC shall be used on each phase conductor and two single-bolt IPCs shall be used on the neutral/earth conductor

    For all mains connections to 120mm2, one, double-bolt IPC shall be used on each phase conductor and two, double-bolt IPCs shall be used on the neutral/earth conductor (as illustrated in the appropriate GAs).

    6.9.2 Limit on Number of Connections to the Bundle Only two single phase or two three phase connection to the bundle is permitted at any pole position. If this number of connections is to be exceeded then a distribution box is to be provided.

    6.9.3 Disconnections from the bundle IPCs shall not be removed from the bundle.

    Disconnections shall be made on the ABC tail. Refer to the appropriate SJI in the Overhead Lines Construction Manual for method of disconnection.

    6.10 Open points

    6.10.1 General The following method is adopted when creating or replacing an open point.

    1. Fuse Links see Figure 18

  • Overhead Line Design Manual Section 1 LV ABC v1.2 Page 16

    Mar

    ch 2

    011

    Overhead Line Design Manual

    6.11 Appendix A GA Drawings and Materials - Mains Table 2: List of GA Drawings and Materials - Mains

    Figure Drawing Title

    Figure 1: ABC General Drawing Arrangement

    Figure 2: ABC Stay Arrangement, Make-Off (No Auxiliary Pole-Mounted Equipment)

    Figure 3: ABC Stay Arrangement, Make-Off (Restricted Height or Auxiliary Pole-Mounted Equipment)

    Figure 4: ABC Stay Arrangement, Stay Plate (Restricted Height, Auxiliary Pole-Mounted Equipment or Live Line Working)

    Figure 5: ABC Intermediate GA (Inside Angle up to 60o Line Deviation)

    Figure 6: ABC Intermediate GA (Outside Angle up to 30o Line Deviation)

    Figure 7: ABC Angle Section GA (up to 20o Line Deviation)

    Figure 8: ABC Angle Section GA (20o to 90o Line Deviation)

    Figure 9: ABC Terminal GA

    Figure 10: ABC Tee-off Intermediate GA

  • OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 17

    Overhead Line Design Manual

    Aug

    ust 2

    012

  • Overhead Line Design Manual Section 1 LV ABC v1.2 Page 18

    Mar

    ch 2

    011

    Overhead Line Design Manual

    Figure 1: ABC General Drawing Arrangement

  • OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 19

    Overhead Line Design Manual

    Aug

    ust 2

    012

    Figure 2: ABC Stay Arrangement, Make-Off (No Auxiliary Pole-Mounted Equipment)

  • Overhead Line Design Manual Section 1 LV ABC v1.2 Page 20

    Mar

    ch 2

    011

    Overhead Line Design Manual

    Ref No Component (Manufacturers references are available in UKPN EAS 00-0001)

    Stores No

    1 Pole-top make-off, 7/3.25mm 08237U or 08244Y

    2 Guy grip dead-end, 7/3.25mm 09532A or 08233F or 08245J

    3 Insulator, stay, LV, ENA TS type 1, 110kN MFL 08911W

    4 Stay wire, 7/3.25mm, 1150 grade 08316A or 13816S

    5 Steelwork, thimble, stay, type 1 09924P

    6 & 7 Anchor, stay, load lock 0944D and/or 0944T

    - Staples, wire [NI] ** TBA

    - Stay marker [NI] *** 13818M

    1 Pole-top make-off, 7/4.00mm 08237U or 08244Y

    2 Guy grip dead-end, 7/4.00mm 09354U, 09532A, 08233F or 08245J

    3 Insulator, stay, LV, ENA TS type 1, 110kN MFL 08911W

    4 Stay wire, 7/4.00mm, 1150 grade 08315Q or 13817C

    5 Steelwork, thimble, stay, type 1 09924P

    6 & 7*

    Anchor, stay rod, type 2 Concrete stay block, 640 x 430 x 140

    09735S 09447X

    6 & 7* Anchor, stay, screw-in, 8", single helix 08719K

    6 & 7* Anchor, stay, screw-in, 10", single helix 08720F

    6 & 7* Anchor, stay, screw-in, 10", twin helix 08725E

    6 & 7* Anchor, stay, screw-in, 12", single helix 08721Q

    6 & 7* Anchor, stay, screw-in, 14", single helix 08730P

    - Staples, wire [NI] ** TBA

    - Stay marker [NI] *** 13818M

  • OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 21

    Overhead Line Design Manual

    Aug

    ust 2

    012

    Figure 3: ABC Stay Arrangement, Make-Off (Restricted Height or Auxiliary Pole-Mounted Equipment)

  • Overhead Line Design Manual Section 1 LV ABC v1.2 Page 22

    Mar

    ch 2

    011

    Overhead Line Design Manual

    Ref No

    Component (Manufacturers references are available in UKPN EAS 00-0001)

    Stores No

    1 Pole-top make-off, 7/3.25mm 08237U or 08244Y

    2 Stay wire splice, 7/3.25mm 09356P

    3 Stay wire, 7/3.25mm, 1150 grade 08316A or 13816S

    4 Guy grip dead-end, 7/3.25mm 09532A or 08233F or08245J

    5 Insulator, stay, LV, ENA TS type 1, 110kN MFL 08910M

    6 Steelwork, thimble, stay, type 1 09924P

    7 & 8 Anchor, stay, load lock 0944D and/or 0944T

    - Staples, wire [NI] ** TBA

    - Stay marker [NI] *** 13818M

    1 Pole-top make-off, 7/4.00mm 08237U or 08244Y

    2 Stay wire splice, 7/4.00mm 09357Y

    3 Stay wire, 7/4.00mm, 1150 grade 08315Q or 13817C

    4 Guy grip dead-end, 7/4.00mm 09354U, 09532A, 08233F or 08245J

    5 Insulator, stay, LV, ENA TS type 1, 110kN MFL 08911W

    6 Steelwork, thimble, stay, type 1 09924P

    7 & 8*

    Anchor, stay rod, type 2 Concrete stay block, 640 x 430 x 140

    09735S 09447X

    7 & 8* Anchor, stay, screw-in, 8", single helix 08719K

    7 & 8* Anchor, stay, screw-in, 10", single helix 08720F

    7 & 8* Anchor, stay, screw-in, 10", twin helix 08725E

    7 & 8* Anchor, stay, screw-in, 12", single helix 08721Q

    7 & 8* Anchor, stay, screw-in, 14", single helix 08730P

    - Staples, wire [NI] ** TBA

    - Stay marker [NI] *** 13818M

  • OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 23

    Overhead Line Design Manual

    Aug

    ust 2

    012

    Figure 4: ABC Stay Arrangement, Stay Plate (Restricted Height, Auxiliary Pole-Mounted Equipment or Live Line Working)

  • Overhead Line Design Manual Section 1 LV ABC v1.2 Page 24

    Mar

    ch 2

    011

    Overhead Line Design Manual

    Ref No

    Component (Manufacturers references are available in UKPN EAS 00-0001)

    Stores No

    1 Steelwork, stay plate, heavy duty TBA

    - Bolt, M20, length 260mm, c/w hex full nut [NI] 13370X

    - Washer, square curved, M20 [NI] 13803U

    2 Guy grip dead-end, 7/3.25mm 09532A or 08233F or08245J

    3 Steelwork, thimble, stay, type 1 09924P

    4 Stay wire, 7/3.25mm, 1150 grade 08316A or 13816S

    5 Insulator, stay, LV, ENA TS type 1, 110kN MFL 08910M

    6 & 7 Anchor, stay, load lock 0944D and/or 0944T

    - Stay marker [NI] ** 13818M

    1 Steelwork, stay plate, heavy duty TBA

    - Bolt, M20, length 260mm, c/w hex full nut [NI] 13370X

    - Washer, square curved, M20 [NI] 13803U

    2 Guy grip dead-end, 7/4.00mm 09354U, 09532A, 08233F or 08245J

    3 Steelwork, thimble, stay, type 1 09924P

    4 Stay wire, 7/4.00mm, 1150 grade 08315Q or 13817C

    5 Insulator, stay, LV, ENA TS type 1, 110kN MFL 08911W

    6 & 7*

    Anchor, stay rod, type 2 Concrete stay block, 640 x 430 x 140

    09735S 09447X

    6 & 7* Anchor, stay, screw-in, 8", single helix 08719K

    6 & 7* Anchor, stay, screw-in, 10", single helix 08720F

    6 & 7* Anchor, stay, screw-in, 10", twin helix 08725E

    6 & 7* Anchor, stay, screw-in, 12", single helix 08721Q

    6 & 7* Anchor, stay, screw-in, 14", single helix 08730P

    - Stay marker [NI] ** 13818M

  • OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 25

    Overhead Line Design Manual

    Aug

    ust 2

    012

    Figure 5: ABC Intermediate GA (Inside Angle up to 60o Line Deviation)

    Alternativearrangementshowingweaklink

  • Overhead Line Design Manual Section 1 LV ABC v1.2 Page 26

    Mar

    ch 2

    011

    Overhead Line Design Manual

    Materials for Figure 5: ABC Intermediate GA (Inside Angle up to 60o Line Deviation)

    Conductor

    ABC, 2x35mm2

    ABC, 2x95mm

    ABC, 4x35mm2

    ABC, 4x95mm2

    ABC, 4x120mm2

    Ref no

    Component (Manufacturers references are available in UKPN EAS 00-0001)

    Stores No

    1 Nut, M20, open-ended hook, ABC 09375W or 08365J

    1 1 1 1 1

    2 Conductor fitting, clamp, suspension, ABC, 2/4x35mm2 08372N - - 1 - 1

    2 Conductor fitting, clamp, suspension, ABC, 2x95mm2 08369X - - - 1 -

    2 Conductor fitting, clamp, suspension, ABC, 4x95mm2 08374H - 1 - - -

    2 Conductor fitting, clamp, suspension, ABC, 4x120mm2 08367D 1 - - - -

    3 Washer, square curved, M20 08302C 1 1 1 1 1

    4 Bolt, M20 * 1 1 1 1 1

    5 Wood pole * 1 1 1 1 1

    Notice, danger of death [NI] 20010P 1 1 1 1 1

    Supplementary components needed to complete the structure

    6 Stay * As required

    ACD [NI] 08136C As required

    7 Conductor fitting, clamp, weak link suspension, ABC [NI] 09385F ** As required

    Notices [NI] * As required

    * Select from specification identified in previous column. ** The adjacent drawing is for Illustration purposes to show position for the weak link if required as per 6.1.1Supports

    7

  • OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 27

    Overhead Line Design Manual

    Aug

    ust 2

    012

    Figure 6: ABC Intermediate GA (Outside Angle up to 30o Line Deviation)

    Alternativearrangementshowingweaklink

  • Overhead Line Design Manual Section 1 LV ABC v1.2 Page 28

    Mar

    ch 2

    011

    Overhead Line Design Manual

    Materials for Figure 6: ABC Intermediate GA (Outside Angle up to 30o Line Deviation)

    Conductor

    ABC, 2x35mm2

    ABC, 2x95mm2

    ABC, 4x35mm2

    ABC, 4x95mm2

    ABC, 4x120mm2

    Ref No

    Component (Manufacturers references are available in UKPN EAS 00-0001)

    Stores No

    1 Steelwork, hook outrigger, pole, ABC 09376G 1 1 1 1 1

    2 Conductor fitting, clamp, suspension, ABC, 2/4x35mm2 08865W - - 1 - 1

    2 Conductor fitting, clamp, suspension, ABC, 2x95mm2 08866G - - - 1 -

    2 Conductor fitting, clamp, suspension, ABC, 4x95mm2 08867R - 1 - - -

    2 Conductor fitting, clamp, suspension, ABC, 4x120mm2 08868B 1 - - - -

    3 Washer, square curved, M20 08302C 1 1 1 1 1

    4 Bolt, M20, 320mm 09372S 1 1 1 1 1

    5 Wood pole * 1 1 1 1 1

    Notice, danger of death [NI] 20010P 1 1 1 1 1

    Supplementary components needed to complete the structure 6 Stay * As required

    ACD [NI] 08136C As required

    7 Conductor fitting, clamp, weak link suspension, ABC [NI] 09385F ** As required

    Notices [NI] e.g pole number * As required

    * Select from specification identified in previous column. ** The adjacent drawing is for Illustration purposes to show position for the weak link if required as per 6.1.1Supports

    7

  • OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 29

    Overhead Line Design Manual

    Aug

    ust 2

    012

    Figure 7: ABC Angle Section GA (up to 20o Line Deviation)

  • Overhead Line Design Manual Section 1 LV ABC v1.2 Page 30

    Mar

    ch 2

    011

    Overhead Line Design Manual

    Materials for Figure 7: ABC Angle Section GA (up to 20o Line Deviation)

    Conductor

    ABC, 2x35mm2

    ABC, 2x95mm2

    ABC, 4x35mm2

    ABC, 4x95mm2

    ABC, 4x120mm2

    Ref No

    Component (Manufacturers references are available in UKPN EAS 00-0001)

    Stores No

    1 Conductor fitting, clamp, anchor, 2x35mm2 08857H - - - - 2

    1 Conductor fitting, clamp, anchor, 2x95mm2 08858S - - - 2 -

    1 Conductor fitting, clamp, anchor, 4x35mm2 08859C - - 2 - -

    1 Conductor fitting, clamp, anchor, 4x95mm2 08860X - 2 - - -

    1 Conductor fitting, clamp, anchor, 4x120mm2 08861H 2 - - - -

    2 Bolt, eye, M20, 300mm 08052X 1 1 1 1 1 3

    Conductor fitting, compression non tension, ABC, 35mm2

    08740X - - 4 - 2

    3

    Conductor fitting, compression non tension, ABC, 95mm2

    08743C - 4 - 2 -

    3

    Conductor fitting, compression non tension, ABC, 120mm2

    08744M 4 - - - -

    4 Washer, square curved, M20 08302C 2 2 2 2 2

    5 Nut, eye, M20 08057W 1 1 1 1 1

    6 Wood pole * 1 1 1 1 1

    Notice, danger of death (wood poles) [NI] 20010P 1 1 1 1 1

    Supplementary components needed to complete the structure 7 Stay * As required

    8 Cleat, stand-off, plastic, ABC TBA As required

    ACD [NI] * As required

    Notices [NI] e.g pole number * As required

    * Select from specification identified in previous column.

  • OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 31

    Overhead Line Design Manual

    Aug

    ust 2

    012

    Figure 8: ABC Angle Section GA (20o to 90o Line Deviation)

  • Overhead Line Design Manual Section 1 LV ABC v1.2 Page 32

    Mar

    ch 2

    011

    Overhead Line Design Manual

    Materials for Figure 8: ABC Angle Section GA (20o to 90o Line Deviation)

    Conductor

    ABC, 2x35mm2

    ABC, 2x95mm2

    ABC, 4x35mm2

    ABC, 4x95mm2

    ABC, 4x120mm2

    Ref No

    Component (Manufacturers references are available in UKPN EAS 00-0001)

    Stores No

    1 Conductor fitting, clamp, anchor, 2x35mm2 08857H - - - - 2

    1 Conductor fitting, clamp, anchor, 2x95mm2 08858S - - - 2 -

    1 Conductor fitting, clamp, anchor, 4x35mm2 08859C - - 2 - -

    1 Conductor fitting, clamp, anchor, 4x95mm2 08860X - 2 - - -

    1 Conductor fitting, clamp, anchor, 4x120mm2 08861H 2 - - - -

    2 Bolt, eye, M20, 300mm 08052X 2 2 2 2 2

    3 Washer, square curved, M20 08302C 2 2 2 2 2

    4 Wood pole * 1 1 1 1 1

    Notice, danger of death (wood poles) [NI] 20010P 1 1 1 1 1

    Supplementary components needed to complete the structure 5 Stay * As required

    ACD [NI] * As required

    Notices [NI] e.g pole number * As required

    * Select from specification identified in previous column.

  • OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 33

    Overhead Line Design Manual

    Aug

    ust 2

    012

    Figure 9: ABC Terminal GA

  • Overhead Line Design Manual Section 1 LV ABC v1.2 Page 34

    Mar

    ch 2

    011

    Overhead Line Design Manual

    Materials for Figure 9: ABC Terminal GA

    Conductor

    ABC, 2x35mm2

    ABC, 2x95mm2

    ABC, 4x35mm2

    ABC, 4x95mm2

    ABC, 4x120mm2

    Ref No

    Component (Manufacturers references are available in UKPN EAS 00-0001)

    Stores No

    1 Conductor fitting, clamp, anchor, 2x35mm2 08857H - - - - 2

    1 Conductor fitting, clamp, anchor, 2x95mm2 08858S - - - 2 -

    1 Conductor fitting, clamp, anchor, 4x35mm2 08859C - - 2 - -

    1 Conductor fitting, clamp, anchor, 4x95mm2 08860X - 2 - - -

    1 Conductor fitting, clamp, anchor, 4x120mm2 08861H 2 - - - -

    2 Bolt, eye, M20, 300mm 08052X 1 1 1 1 1

    3 Conductor fitting, cap, end, ABC 08881A 4 4 4 2 2

    4 Washer, square curved, M20 08302C 2 2 2 2 2

    5 Wood pole * 1 1 1 1 1

    Notice, danger of death (wood poles) [NI] 20010P 1 1 1 1 1

    Supplementary components needed to complete the structure 6 Stay * As required

    ACD [NI] * As required

    Notices [NI] e.g pole number * As required

    * Select from specification identified in previous column.

  • OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 35

    Overhead Line Design Manual

    Aug

    ust 2

    012

    Figure 10: ABC Tee-off Intermediate GA

    Note This drawing illustrates connections for a 120mm2 ABC. For connections of 95mm2 and below refer to the material lists.

  • Overhead Line Design Manual Section 1 LV ABC v1.2 Page 36

    Mar

    ch 2

    011

    Overhead Line Design Manual

    Materials for Figure 10: ABC Tee-off Intermediate GA Conductor ABC, 2x35mm2 ABC, 2x95mm2 ABC, 4x35mm2 ABC, 4x95mm2 ABC, 4x120mm2

    Ref No

    Component (Manufacturers references are available in UKPN EAS 00-0001)

    Stores No

    1 Conductor fitting, clamp, suspension, ABC, 2/4x35mm2 08865W - - 1 - 1 1 Conductor fitting, clamp, suspension, ABC, 2x95mm2 08866G - - - 1 - 1 Conductor fitting, clamp, suspension, ABC, 4x95mm2 08867R - 1 - - - 1 Conductor fitting, clamp, suspension, ABC, 4x120mm2 08868B 1 - - - - 2 Nut, M20, open-ended hook, ABC 09375W 1 1 1 1 1

    3 Conductor fitting, insulating piercing connector, ABC, 35mm2

    ABC, 35mm2, single bolt 08845E - - 5 - 3

    3 Conductor fitting, insulating piercing connector, ABC, 95mm2

    ABC, 95mm2, single bolt 08846P - 5 - 3 -

    3 Conductor fitting, insulating piercing connector, ABC, 120mm2

    ABC, 120mm2,double bolt 08848J 5 - - - -

    4 Conductor fitting, clamp, anchor, 2x35mm2 08857H - - - - 2

    4 Conductor fitting, clamp, anchor, 2x95mm2 08858S - - - 2 -

    4 Conductor fitting, clamp, anchor, 4x35mm2 08859C - - 2 - -

    4 Conductor fitting, clamp, anchor, 4x95mm2 08860X - 2 - - -

    4 Conductor fitting, clamp, anchor, 4x120mm2 08861H 2 - - - -

    5 Bolt, eye, M20, 300mm 08052X 1 1 1 1 1 6 Washer, square curved, M20 08302C 1 1 1 1 1 7 Wood pole * 1 1 1 1 1 Notice, danger of death (wood poles) [NI] 20010P 1 1 1 1 1

    Supplementary components needed to complete the structure 8 Stay * As required

    ACD [NI] * As required Cable tie [NI] TBA As required Cleat, stand-off, plastic, ABC [NI] TBA As required Notices [NI] e.g pole number * As required

    * Select from specification identified in previous column.

  • OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 37

    Overhead Line Design Manual

    Aug

    ust 2

    012

    6.12 Appendix B GA Drawings and Materials Services Table 3: List of GA Drawings and Materials Services

    Figure Drawing Title

    Figure 11: ABC Service Connection (Three Phase) GA

    Figure 12: Concentric Service Connection GA

    Figure 13: Insulated Open Wire Service Connection GA

    Figure 14: Street Lighting Service Connection GA

    Figure 15: Concentric Service Spans

    Figure 16: ABC Service Spans

  • Overhead Line Design Manual Section 1 LV ABC v1.2 Page 38

    Mar

    ch 2

    011

    Overhead Line Design Manual

  • OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 39

    Overhead Line Design Manual

    Aug

    ust 2

    012

    Figure 11: ABC Service Connection (Three Phase) GA

    Note This drawing illustrates connections for 95mm2 ABC and below. For connections of 120mm2 and below refer to the material lists.

  • Overhead Line Design Manual Section 1 LV ABC v1.2 Page 40

    Mar

    ch 2

    011

    Overhead Line Design Manual

    Materials for Figure 11: ABC Service Connection (Three Phase) GA

    Conductor

    ABC, 4x35mm2

    ABC, 4x95mm2

    ABC, 4x120mm2

    Ref No

    Component (Manufacturers references are available in UKPN EAS 00-0001)

    Stores No

    1 Conductor fitting, cap, end, ABC 08881A 4 4 4

    2 Conductor fitting, insulating piercing connector, ABC, 35mm2 ABC,

    35mm2, single bolt 08845E - - 5

    2 Conductor fitting, insulating piercing connector, ABC, 95mm2 ABC,

    35mm2, single bolt 08847Y - 5 -

    2 Conductor fitting, insulating piercing connector, ABC, 120mm2 ABC,

    35mm2, double bolt 08848J 5 - -

    3 Steelwork, hook bolt, pole, ABC 09372S 1 1 1

    4 Conductor fitting, clamp, anchor, 4x35mm2 08859C - - 1

    4 Conductor fitting, clamp, anchor, 4x95mm2 08860X - 1 -

    4 Conductor fitting, clamp, anchor, 4x120mm2 08861H 1 - -

    Supplementary components needed to complete the structure

    5 Cleat, stand-off, plastic, ABC TBA As required

    6 Cable tie TBA As required

  • OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 41

    Overhead Line Design Manual

    Aug

    ust 2

    012

    Figure 12: Concentric Service Connection GA (3ph service cable shown)

    Note This drawing illustrates connections for 95mm2 ABC and below. For connections of 120mm2 refer to the material lists.

  • Overhead Line Design Manual Section 1 LV ABC v1.2 Page 42

    Mar

    ch 2

    011

    Overhead Line Design Manual

    Materials for Figure 12: Concentric Service Connection GA single phase

    Conductor

    CNE, 1-phase, 35mm2

    Ref No

    Component (Manufacturers references are available in UKPN EAS 00-0001)

    Stores No

    1 Conductor fitting, cap, end, ABC 08885P 2

    2 Conductor fitting, insulating piercing connector, ABC, 35mm2 ABC, 35mm2,

    single bolt 08845E 3**

    2 Conductor fitting, insulating piercing connector, ABC, 95mm2 ABC, 35mm2,

    single bolt 08847Y 3**

    2 Conductor fitting, insulating piercing connector, ABC, 120mm2 ABC, 35mm2,

    double bolt 08848J 3**

    3 Conductor fitting, non-tension, ABC tailed out fitting to match CNE * 2

    4 Cable termination, break-out kit, 2-core 02805T 02806D 1

    5 Cable, CNE, 1-phase * L*

    6 Conductor fitting, helical dead end, CNE, 1-phase * 1

    7 Insulator, coach screw, service 08927P 1

    Conductor

    CNE, 3-phase, 35mm2

    Ref No

    Component Stores No

    1 Conductor fitting, cap, end, ABC 08885P 4

    2 Conductor fitting, insulating piercing connector, ABC, 35mm2 ABC, 35mm2,

    single bolt 08845E 5**

    2 Conductor fitting, insulating piercing connector, ABC, 95mm2 ABC, 35mm2,

    single bolt 08847Y 5**

    2 Conductor fitting, insulating piercing connector, ABC, 120mm2 ABC, 35mm2,

    double bolt TBA 5**

    3 Conductor fitting, non-tension, ABC tailed out fitting to match CNE * 4

    4 Cable termination, break-out kit, 4-core 02805T 02806D 1

    5 Cable, CNE, 3-phase 05177J L*

    6 Conductor fitting, helical dead end, CNE, 3-phase 08243P 1

    7 Insulator, coach screw, service 08927P 1

    Supplementary components needed to complete the structure for 3ph and single 1ph services

    8 Cleat, stand-off, plastic, ABC TBA As reqd

    9 Cable tie TBA As reqd

    L* Length as required. * Select from specification identified in previous column. ** Select to fit ABC.

  • OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 43

    Overhead Line Design Manual

    Aug

    ust 2

    012

    Figure 13: Insulated Open Wire Service Connection GA

    Note This drawing illustrates connections for 95mm2 ABC and below. For connections of 120mm2 refer to the material lists.

  • Overhead Line Design Manual Section 1 LV ABC v1.2 Page 44

    Mar

    ch 2

    011

    Overhead Line Design Manual

    Materials for Figure 13: Insulated Open Wire Service Connection GA

    Conductor

    Insulated open-wire

    Ref No

    Component (Manufacturers references are available in UKPN EAS 00-0001)

    Stores No

    1 Conductor, ABC, 2x35mm2 06200R L*

    1 Conductor, ABC, 2x95mm2 06202L L*

    1 Conductor, ABC, 4x35mm2 06205Q L*

    1 Conductor, ABC, 4x95mm2 06207K L*

    1 Conductor, ABC, 4x120mm2 06208U L*

    2 Conductor fitting, insulating piercing connector, ABC, 35mm2 ABC, 35mm2,

    single bolt 08845E **

    2 Conductor fitting, insulating piercing connector, ABC, 95mm2 ABC, 35mm2,

    single bolt 08847Y **

    2 Conductor fitting, insulating piercing connector, ABC, 95mm2 ABC, 95mm2,

    single bolt 08846P **

    2 Conductor fitting, insulating piercing connector, ABC, 120mm2 ABC, 35mm2,

    double bolt 08848J **

    2 Conductor fitting, insulating piercing connector, ABC, 120mm2 ABC, 95mm2,

    double bolt 08848J **

    2 Conductor fitting, insulating piercing connector, ABC, 120mm2 ABC, 120mm2,

    double bolt 08848J **

    3 Conductor fitting, cap, end, ABC 08881A 4

    4 Conductor fitting, non-tension, ABC, 35mm2 tail 400mm long transformed

    insulated wire * ***

    4 Conductor fitting, non-tension, ABC, 95mm2 tail 400mm long transformed

    insulated wire * ***

    4 Conductor fitting, non-tension, ABC, 120mm2 tail 400mm long transformed

    insulated wire * ***

    5 Insulator, coach screw, service 08927P 4

    6 Conductor fitting, helical dead end * 4

    Supplementary components needed to complete the structure

    7 Cleat, stand-off, plastic, ABC TBA As reqd

    8 Cable tie TBA As reqd

    L* Length as required. * Select to fit insulated wire from specification identified in previous column. ** Select to fit ABC (5 required for three phase; 3 required for single phase). *** Select to fit ABC and insulated wire from specification identified in previous column (4 required for three phase; 2 required for single phase).

  • OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 45

    Overhead Line Design Manual

    Aug

    ust 2

    012

    Figure 14: Street Lighting Service Connection GA

    Note This drawing illustrates connections for 95mm2 ABC and below. For connections of 120mm2 refer to the material lists.

    Lamp, control gear and tails are the property of the local Street Lighting Authority

  • Overhead Line Design Manual Section 1 LV ABC v1.2 Page 46

    Mar

    ch 2

    011

    Overhead Line Design Manual

    Materials for Figure 14: Street Lighting Service Connection GA

    Conductor

    ABC, all

    Ref No

    Component (Manufacturers references are available in UKPN EAS 00-0001)

    Stores No

    1 Conductor fitting, cap, end, ABC 08881A 2

    2 Conductor fitting, insulating piercing connector, ABC, 35mm2 ABC, 35mm2,

    single bolt 08845E *

    2 Conductor fitting, insulating piercing connector, ABC, 95mm2 ABC, 35mm2,

    single bolt 08847Y *

    2 Conductor fitting, insulating piercing connector, ABC, 120mm2 ABC, 35mm2,

    double bolt 08848J *

    3 Conductor, ABC, 2x35mm2 06200R L*

    4 Conductor fitting, compression non tension, ABC, 35mm2 Al 16mm2 08765P

    08757A 2

    5 Cable termination, break-out kit, 2-core 02805T 1

    6 Cable, Concentric, 1-phase, 4mm2 or 16mm2 TBA L*

    7 Service box cut-out (diamond) 08361U 1

    7 Cut-Out Street Lighting PME 25 Amp 12000K 1

    Supplementary components needed to complete the structure

    8 Cleat, stand-off, plastic, ABC TBA As reqd

    9 Local Authority Street Light Tails TBA As reqd

    L* Length as required. * Select to fit ABC.

  • OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 47

    Overhead Line Design Manual

    Aug

    ust 2

    012

    Figure 15: Concentric Service Spans

    Figure 16: ABC Service Spans

    Table 11.1 Service Clearances

    Location Minimum Clearance (m)

    Along the line of hedgerows, fences and boundary walls etc.

    4.0

    Domestic driveways with an access width of 2.5 m or less which is defined by gateposts, hedges or other fixed features.

    4.3

    Between buildings where there is no vehicular access. 3.5

    Normal Ground 3.5

  • Overhead Line Design Manual Section 1 LV ABC v1.2 Page 48

    Mar

    ch 2

    011

    Overhead Line Design Manual

    6.13 Appendix C GA Drawings and Materials Pole Mounted Equipment Table 4: List of GA Drawings and Materials Pole Mounted Equipment

    Figure Drawing Title

    Figure 17: ABC to Two Distribution Boxes

    Figure 18: ABC to ABC via Fuses GA

    Figure 19: ABC Intermediate with Cable Termination and LV Fuses GA

    Figure 20: ABC Terminal with Cable Termination and LV Fuses GA

  • OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 49

    Overhead Line Design Manual

    Aug

    ust 2

    012

    Figure 17: ABC to Two Distribution Boxes

    Note This drawing illustrates connections for 120mm2 ABC. For connections of 95mm2 and below refer to the material lists.

    Please ensure that ABC droppers (Ref No 3) are adequately cleated to the pole as above drawing is for illustration purposes only.

  • Overhead Line Design Manual Section 1 LV ABC v1.2 Page 50

    Mar

    ch 2

    011

    Overhead Line Design Manual

    Materials for Figure 17: ABC to Two Distribution Boxes Conductor ABC, 4x95mm2

    Ref No Component (Manufacturers references are available in UKPN EAS 00-0001)

    Stores No

    1 Conductor fitting, cap, end, ABC 08881A 8

    2 Conductor fitting, insulating piercing connector, ABC, 95mm2 ABC,

    95mm2, single bolt 08846P 8

    2 Conductor fitting, insulating piercing connector, ABC, 120mm2 ABC,

    95mm2, double bolt 08848J 8

    3 Conductor, ABC, 4x50mm2 or 95mm2 (line to distribution box) 06207K L* 4 Conductor, ABC, 4x50mm2 or 95mm2 (line to distribution box) 06207K L* 5 Distribution box, overhead, 3-phase 08360K 2

    Supplementary components needed to complete the structure Cable tie [NI] TBA As

    reqd Cleat, stand-off, plastic, ABC [NI] TBA As

    reqd L* Length as required.

  • OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 51

    Overhead Line Design Manual

    Aug

    ust 2

    012

    Figure 18: ABC to ABC via Fuses GA

    Note This drawing illustrates connections for 120mm2 ABC. For connections of 95mm2 and below refer to the material lists.

    Please ensure that ABC droppers (Ref No 3) are adequately cleated to the pole as above drawing is for illustration purposes only.

  • Overhead Line Design Manual Section 1 LV ABC v1.2 Page 52

    Mar

    ch 2

    011

    Overhead Line Design Manual

    Materials for Figure 18: ABC to ABC via Fuses GA Conductor ABC, 4x35mm2 ABC, 4x95mm2 ABC, 4x120mm2

    Ref No

    Component (Manufacturers references are available in UKPN EAS 00-0001)

    Stores No

    1 Conductor fitting, insulating piercing connector, ABC, 35mm2 ABC,

    35mm2, single bolt 08845E - - 2

    1 Conductor fitting, insulating piercing connector, ABC, 95mm2 ABC,

    95mm2, single bolt 08846P - 2 -

    1 Conductor fitting, insulating piercing connector, ABC, 120mm2 ABC,

    120mm2, double bolt 08848J 2 - -

    2 Conductor fitting, compression full tension, ABC, 35mm2 08740X - - 1

    2 Conductor fitting, compression full tension, ABC, 95mm2 08743C - 1 -

    2 Conductor fitting, compression full tension, ABC, 120mm2 08744M 1 - -

    3 Fuse unit, pole mounted, LV ABC 12050D 3 3 3

    4 Conductor fitting, compression non tension, ABC, 35mm2 Cu, 16mm2 08765P - - 1

    4 Conductor fitting, compression non tension, ABC, 95mm2 Cu, 16mm2 TBA - 1 -

    4 Conductor fitting, compression non tension, ABC, 120mm2 Cu, 16mm2 TBA 1 - -

    Earthing components * * 1 1 1

    Supplementary components needed to complete the structure Cable tie [NI] TBA As required Cleat, stand-off, plastic, ABC [NI] TBA As required

  • OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 53

    Overhead Line Design Manual

    Aug

    ust 2

    012

    Figure 19: ABC Intermediate with Cable Termination and LV Fuses GA

    Note This drawing illustrates connections for 120mm2 ABC. For connections of 95mm2 and below refer to the material lists.

    Please ensure that ABC droppers (Ref No 3) are adequately cleated to the pole as above drawing is for illustration purposes only.

  • Overhead Line Design Manual Section 1 LV ABC v1.2 Page 54

    Mar

    ch 2

    011

    Overhead Line Design Manual

    Materials for Figure 19: ABC Intermediate with Cable Termination and LV Fuses GA

    Conductor ABC, 2x95mm2

    ABC, 4x95mm2

    ABC, 4x120mm2

    Ref No

    Component (Manufacturers references are available in UKPN EAS 00-0001)

    Stores No

    1 Conductor fitting, insulating piercing connector, ABC, 95mm2 ABC,

    95mm2, single bolt 08846P - 5 5

    1 Conductor fitting, insulating piercing connector, ABC, 120mm2 ABC,

    95mm2, double bolt TBA 7 - -

    2 Conductor fitting, cap, end, ABC 08881A 5 5 3

    3 Conductor, ABC, 2x95mm2 (main to fuse) 06202L - - L*

    3 Conductor, ABC, 4x95mm2 (main to fuse) 06207K - L* -

    3 Conductor, ABC, 4x120mm2 (main to fuse) 06208U L* - -

    4 Cable guard, LV ABC 08172X 1 1 1

    5 Conductor fitting, compression non tension, ABC, 95mm2 Cu, 16mm2 TBA 1 1 1

    6 Conductor fitting, compression full tension, ABC, 95mm2 08743C - 1 1

    6 Conductor fitting, compression full tension, ABC, 120mm2 ABC, 95mm2 TBA 1 - -

    7 Fuse unit, pole mounted, LV ABC 12050D 3 3 1

    Earthing components ** ** 1 1 1

    Supplementary components needed to complete the structure Cable tie [NI] TBA TBA As required

    Cleat, stand-off, plastic, ABC [NI] TBA TBA As required

    L* Length as required. * Select from specification identified in previous column. ** Refer to Figure 22.

  • OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 55

    Overhead Line Design Manual

    Aug

    ust 2

    012

    Figure 20: ABC Terminal with Cable Termination and LV Fuses GA

    Note This drawing illustrates connections for 120mm2 ABC. For connections of 95mm2 and below refer to the material lists. Please ensure that ABC droppers are adequately cleated to the pole as above drawing is for illustration purposes only.

  • Overhead Line Design Manual Section 1 LV ABC v1.2 Page 56

    Mar

    ch 2

    011

    Overhead Line Design Manual

    Materials for Figure 20: ABC Terminal with Cable Termination and LV Fuses GA Conductor ABC, 2x95mm2 ABC, 4x95mm2 ABC, 4x120mm2

    Ref No

    Component (Manufacturers references are available in UKPN EAS 00-0001)

    Stores No

    1 Fuse unit, pole mounted, LV ABC 12050D 3 3 1

    2 Cable guard, LV ABC 08172X 1 1 1

    3 Conductor fitting, compression non tension, ABC, 95mm2 Cu, 16mm2 TBA 1 1 1

    4 Conductor fitting, compression full tension, ABC, 95mm2 08743C - 1 1

    4 Conductor fitting, compression full tension, ABC, 120mm2 ABC, 95mm2 TBA 1 - -

    5 Conductor fitting, insulating piercing connector, ABC, 95mm2 ABC,

    95mm2 single bolt 08846P - 2 2

    5 Conductor fitting, insulating piercing connector, ABC, 120mm2 ABC,

    95mm2, double bolt 088485 2 - -

    6 Conductor fitting, cap, end, ABC 08881A 1 1 1

    Earthing components ** ** 1 1 1

    Supplementary components needed to complete the structure Cable tie [NI] TBA As required Cleat, stand-off, plastic, ABC [NI] TBA As required

    * Select from specification identified in previous column. ** Refer to Figure 22.

  • OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 57

    Overhead Line Design Manual

    Aug

    ust 2

    012

    6.14 Appendix D GA Drawings and Materials Earthing Table 5: List of GA Drawings and Materials Earthing

    Figure Drawing Title

    Figure 21: ABC Earthing ABC Bundle to Neutral/Earth Bracket

    Figure 22: ABC Earthing Neutral/Earth Bracket to Earth Electrodes

  • Overhead Line Design Manual Section 1 LV ABC v1.2 Page 58

    Mar

    ch 2

    011

    Overhead Line Design Manual

    Figure 21: ABC Earthing ABC Bundle to Neutral/Earth Bracket

    Materials for Figure 21: ABC Earthing ABC Bundle to Neutral/Earth Bracket Conductor ABC, 2x35mm2 ABC, 2x95mm2 ABC, 4x35mm2 ABC, 4x95mm2 ABC, 4x120mm2

    Ref No

    Component (Manufacturers references are available in UKPN EAS 00-0001)

    Stores No

    1 Conductor fitting, cap, end, ABC 08881A 1 1 1 1 1

    2 Conductor fitting, insulating piercing connector, ABC, 35mm2

    ABC, 35mm2, single bolt 08845E - - 2 - 2

    2 Conductor fitting, insulating piercing connector, ABC, 95mm2

    ABC, 35mm2, single bolt 08847Y - 2 - 2 -

    2 Conductor fitting, insulating piercing connector, ABC, 120mm2

    ABC, 35mm2, double bolt 08848J 2 - - - -

    3 Conductor fitting, non-tension, ABC, 35mm2 tail 400mm long

    transformed Cu, bare, 16mm2 08765P 1 1 1 1 1

    4 Cable, Cu, 16mm2, green/yellow insulated earth wire 05280G L* L* L* L* L* Earthing components * * 1 1 1 1 1

    * Refer to Figure 22.

  • OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 59

    Overhead Line Design Manual

    Aug

    ust 2

    012

    Figure 22: ABC Earthing Neutral/Earth Bracket to Earth Electrodes

  • Overhead Line Design Manual Section 1 LV ABC v1.2 Page 60

    Mar

    ch 2

    011

    Overhead Line Design Manual

    Materials for Figure 22: ABC Earthing Neutral/Earth Bracket to Earth Electrodes ABC, all

    Ref No

    Component (Manufacturers references are available in UKPN EAS 00-0001)

    Stores No

    1 Cable, Cu, 16mm2, green/yellow insulated earth wire 05280G 6m 2 Cable guard 08172X 1

    3 Earth electrode 02463T As reqd

    4 Cable, Cu, 16mm2, bare earth wire TBA As

    reqd

    Supplementary components needed to complete the structure Earth electrode, coupling ** 02467K As

    reqd

    Earth electrode, clamp ** 02466A As reqd

    Earth electrode, extension ** TBA As reqd

    L* Length as required. * Select from specification identified in previous column. ** For use with earth electrode as required.

  • OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 61

    Overhead Line Design Manual

    Aug

    ust 2

    012

    6.15 Appendix E Reference List of all Materials for this specification

    Reference List of all Materials for this specification (supplementary components are included at the end of this list)

    Component (Manufacturers references are available in UKPN EAS 00-0001)

    Stores No

    GA Figure Ref

    Bolt, eye, M20, 300mm 08052X Figure 7, Figure 8, Figure 9 & Figure 10

    Bolt, M20, lengths as required TBA Figure 4, Figure 5, & Figure 6

    Cable, CNE, 1-phase Various Figure 12

    Cable, CNE, 3-phase Various Figure 12

    Cable, Concentric, 1-phase, 4mm2 or 16mm2 TBA Figure 14

    Cable, Cu, 16mm2, bare earth wire TBA Figure 21

    Cable, Cu, 16mm2, green/yellow insulated earth wire 05280G Figure 21 & Figure 22

    Cable guard 08172X Figure 19, Figure 20 & Figure 22

    Cable termination, break-out kit, 2-core 02805T 02806D

    Figure 12 Figure 14

    Cable termination, break-out kit, 4-core 02805T 02806D

    Figure 12

    Conductor, ABC, 2x35mm2 06200R Figure 13 Figure 14

    Conductor, ABC, 2x95mm2 06202L Figure 13 Figure 19

    Conductor, ABC, 4x35mm2 06205Q Figure 13

    Conductor, ABC, 4x95mm2 06207K Figure 13, Figure 17 & Figure 19

    Conductor, ABC, 4x120mm2 06208U Figure 13 & Figure 19

    Conductor fitting, cap, end, ABC 08881A Figure 9, Figure 11, Figure 13, Figure 14, Figure 17 Figure 19, Figure 20 & Figure 21

    Conductor fitting, cap, end, ABC 08885P Figure 12

    Conductor fitting, clamp, anchor, 2x35mm2 08857H Figure 7, Figure 8, Figure 9 & Figure 10

    Conductor fitting, clamp, anchor, 2x95mm2 08858S Figure 7, Figure 8, Figure 9 & Figure 10

    Conductor fitting, clamp, anchor, 4x35mm2 08859C Figure 7, Figure 8, Figure 9 & Figure 10

    Conductor fitting, clamp, anchor, 4x95mm2 08860X Figure 7, Figure 8, Figure 9 & Figure 10

    Conductor fitting, clamp, anchor, 4x120mm2 08861H Figure 7, Figure 8, Figure 9 & Figure 10

    Conductor fitting, clamp, suspension, ABC, 2/4x35mm2 08372N Figure 4

    Conductor fitting, clamp, suspension, ABC, 2/4x35mm2 08865W Figure 6 & Figure 10

    Conductor fitting, clamp, suspension, ABC, 2x95mm2 08369X Figure 5

    Conductor fitting, clamp, suspension, ABC, 2x95mm2 08866G

    Figure 6 & Figure 10

  • Overhead Line Design Manual Section 1 LV ABC v1.2 Page 62

    Mar

    ch 2

    011

    Overhead Line Design Manual

    Reference List of all Materials for this specification (supplementary components are included at the end of this list)

    Component (Manufacturers references are available in UKPN EAS 00-0001)

    Stores No

    GA Figure Ref

    Conductor fitting, clamp, suspension, ABC, 4x95mm2 08374H Figure 5

    Conductor fitting, clamp, suspension, ABC, 4x95mm2 08867R Figure 6 & Figure 10

    Conductor fitting, clamp, suspension, ABC, 4x120mm2 08367D Figure 5

    Conductor fitting, clamp, suspension, ABC, 4x120mm2 08868B

    Figure 6 & Figure 10

    Conductor fitting, compression full tension, ABC, 35mm2 08740X Figure 7 & Figure 18

    Conductor fitting, compression full tension, ABC, 95mm2 08743C Figure 7, Figure 18, Figure 19 & Figure 20

    Conductor fitting, compression full tension, ABC, 120mm2 08744M Figure 7 & Figure 18

    Conductor fitting, compression full tension, ABC, 120mm2 ABC, 95mm2 TBA Figure 7 & Figure 18

    Conductor fitting, compression non tension, ABC, 35mm2 08740X Figure 7 & Figure 18

    Conductor fitting, compression non tension, ABC, 35mm2 Al, 16mm2

    08765P 08757A

    Figure 14, Figure 18 & Figure 21

    Conductor fitting, compression non tension, ABC, 35mm2 Cu, 16mm2 08765p Figure 14, Figure 18 & Figure 21

    Conductor fitting, compression non tension, ABC, 95mm2 08743C

    Conductor fitting, compression non tension, ABC, 95mm2 Cu, 16mm2 TBA Figure 14 Figure 16 to Figure 18 to Figure 22

    Conductor fitting, compression non tension, ABC, 120mm2 08744M Figure 3

    Conductor fitting, compression non tension, ABC, 120mm2 Cu, 16mm2 TBA Figure 16 to Figure 18

    Conductor fitting, compression non tension, Cu, 16mm2 TBA Figure 23

    Conductor fitting, helical dead end TBA Figure 10

    Conductor fitting, helical dead end, CNE, 1-phase Various Figure 9

    Conductor fitting, helical dead end, CNE, 3-phase Various Figure 9

    Conductor fitting, insulating piercing connector, ABC, 35mm2 ABC, 35mm2, single bolt

    08845E Figure 6 to 11 Figure 17 Figure 18 Figure 23

    Conductor fitting, insulating piercing connector, ABC, 95mm2 ABC, 35mm2, single bolt

    08847Y Figure 8 to Figure 11 Figure 23

    Conductor fitting, insulating piercing connector, ABC, 95mm2 ABC, 95mm2, single bolt

    08846P Figure 6 Figure 7 Figure 10 Figure 14 to Figure 22

    Conductor fitting, insulating piercing connector, ABC, 120mm2 ABC, 35mm2, double bolt

    08848J Figure 8 to Figure 11 Figure 23

  • OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 63

    Overhead Line Design Manual

    Aug

    ust 2

    012

    Reference List of all Materials for this specification (supplementary components are included at the end of this list)

    Component (Manufacturers references are available in UKPN EAS 00-0001)

    Stores No

    GA Figure Ref

    Conductor fitting, insulating piercing connector, ABC, 120mm2 ABC, 95mm2, double bolt

    08848J Figure 10 Figure 14 Figure 15 Figure 19 to Figure 22

    Conductor fitting, insulating piercing connector, ABC, 120mm2 ABC, 120mm2, double bolt

    08848J Figure 6 Figure 7 Figure 10 Figure 16 to Figure 18

    Conductor fitting, non-tension, ABC tailed out fitting to match CNE TBA Figure 9

    Conductor fitting, non-tension, ABC, 35mm2 tail 400mm long transformed Cu, bare, 16mm2

    08765P Figure 23

    Conductor fitting, non-tension, ABC, 35mm2 tail 400mm long transformed insulated wire

    TBA Figure 10

    Conductor fitting, non-tension, ABC, 95mm2 tail 400mm long transformed insulated wire

    TBA Figure 10

    Conductor fitting, non-tension, ABC, 95mm2 tail 400mm long transformed Cu 70mm2

    087715 Figure 16

    Conductor fitting, non-tension, ABC, 120mm2 tail 400mm long transformed insulated wire

    TBA Figure 10

    Conductor fitting, non-tension, ABC, 120mm2 tail 400mm long transformed Cu 100mm2

    TBA Figure 16

    Conductor fitting, non-tension, ABC tailed out fitting to match CNE Various Figure 9

    Distribution box, overhead, 3-phase 08360K Figure 14 Figure 15

    Earth electrode TBA Figure 24

    Earth electrode, coupling TBA Figure 24

    Earth electrode, clamp TBA Figure 24

    Fuse unit, pole mounted, LV ABC 12050D Figure 17 Figure 21 Figure 22

    Insulator, coach screw, service 08927P Figure 9 Figure 10

    Notice, danger of death 20010P Figure 5 to Figure 10

    Nut, eye, M20 08057W Figure 3 Figure 7

    Nut, M20, open-ended hook, ABC 09375W Figure 1 Figure 6

    Steelwork, hook bolt, pole, ABC 09372S Figure 8

    Steelwork, hook outrigger, pole, ABC 09376G Figure 2

    Washer, square curved, M20 08302C Figure 1 to Figure 7

  • Overhead Line Design Manual Section 1 LV ABC v1.2 Page 64

    Mar

    ch 2

    011

    Overhead Line Design Manual

    Reference List of all Materials for this specification (supplementary components are included at the end of this list)

    Component (Manufacturers references are available in UKPN EAS 00-0001)

    Stores No

    GA Figure Ref

    Wood pole Various Figure 1 to Figure 7

    Supplementary components to be used as required

    Anti-climbing device (ACD) Various Figure 1 to Figure 7

    Cable tie TBA As required

    Cleat, stand-off, plastic, ABC TBA Figure 3 Figure 6 to Figure 11 Figure 14 to Figure 22

    Conductor fitting, clamp, weak link suspension, ABC 09385F Figure 5 Figure 6

    Notices Various Figure 1 to Figure 7

    Stays

    Anchor, stay rod, type 2 Concrete stay block, 640 x 430 x 140 09735S Figure 2 to Figure 4

    Anchor, stay, screw-in, 8", single helix (Various sizes) 08719K Figure 2 to Figure 4

    Anchor, stay, load lock 0944D and/or 0944T

    Figure 2 to Figure 4

    Bolt, M20, length 260mm, c/w hex full nut 13370X Figure 4

    Guy grip dead-end, 7/3.25mm 09532A or 08233F or 08245J

    Figure 2 to Figure 4

    Guy grip dead-end, 7/4.00mm 09354U, 09532A, 08233F or 08245J

    Figure 2 to Figure 4

    Insulator, stay, LV, ENA TS type 1, 110kN MFL 08911W Figure 2 to Figure 4

    Pole-top make-off, 7/3.25mm 08237U or 08244Y

    Figure 2 to Figure 4

    Pole-top make-off, 7/4.00mm 08237U or 08244Y

    Figure 2 to Figure 4

    Stay wire, 7/3.25mm, 1150 grade 08316A or 13816S

    Figure 2 to Figure 4

    Steelwork, thimble, stay, type 1 09924P Figure 2 to Figure 4

    Staples, wire Figure 2 to Figure 4

    Stay marker 13818M Figure 2 to Figure 4

    Steelwork, stay plate, heavy duty TBA Figure 4

  • OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 65

    Overhead Line Design Manual

    Aug

    ust 2

    012

  • Overhead Line Design Manual Section 1 LV ABC v1.2 Page 66

    Mar

    ch 2

    011

    Overhead Line Design Manual

    6.16 Appendix F Design Data for Conductor ABC, 4 x 120mm2 Table 6: Conductor ABC, 4 x 120mm2: Design Data Summary

    Recommended Span = 50m. A maximum span of 90m is allowed. A FoS value of 2.5 is used on stays, wind-span, foundation and single pole strut loading capabilities.

    In Line Structures Existing

    Drawing No

    Support Type Support Class Support Size

    Max Span

    Based on medium

    9m 87m

    10m 78m

    11m 69m

    12m 62m

    Refer to Figure 5 to Figure 7

    Intermediate or Section Medium Medium Medium Stout

    12m Any

    90m 83m 90m 90m

    13m 55m

    Angle Structures

    Min Stay Angle

    Heavy Light

    Drawing No

    Support Type Support Class

    Support Size

    Max Line Deviation

    Ref to 6.6 Stays

    Max Span

    Intermediate Angle

    Medium Stout

    Any

  • OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 67

    Overhead Line Design Manual

    Aug

    ust 2

    012

    Table 7: Conductor ABC, 4 x 120mm2: Design Sag/Tension

    120 mm 4 core LV ABC 380N/mm wind 4.75mm radial ice EDS limit (1000/2.62) x conductor mass at 10C basic span 50m

    Design Sag (m) for Span Length (m) Temp (C)

    Tension (kgf)

    10 20 30 40 50 60 70 80 90

    -5.6 793.9 0.03 0.10 0.23 0.40 0.63 0.91 1.23 1.61 2.04

    0 714.2 0.03 0.11 0.25 0.45 0.70 1.01 1.37 1.79 2.27

    5 657.4 0.03 0.12 0.27 0.49 0.76 1.10 1.49 1.95 2.46

    10 610.7 0.03 0.13 0.29 0.52 0.82 1.18 1.60 2.10 2.65

    15 571.7 0.03 0.14 0.31 0.56 0.87 1.26 1.71 2.24 2.83

    20 538.7 0.04 0.15 0.33 0.59 0.93 1.34 1.82 2.38 3.01

    25 510.4 0.04 0.16 0.35 0.63 0.98 1.41 1.92 2.51 3.17

    30 485.9 0.04 0.16 0.37 0.66 1.03 1.48 2.02 2.63 3.33

    35 464.4 0.04 0.17 0.39 0.69 1.08 1.55 2.11 2.76 3.49

    40 445.3 0.04 0.18 0.40 0.72 1.12 1.62 2.20 2.87 3.64

    45 428.3 0.05 0.19 0.42 0.75 1.17 1.68 2.29 2.99 3.78

    50 413.1 0.05 0.19 0.44 0.77 1.21 1.74 2.37 3.10 3.92

    55 399.3 0.05 0.20 0.45 0.80 1.25 1.80 2.45 3.21 4.06

    60 386.7 0.05 0.21 0.47 0.83 1.29 1.86 2.53 3.31 4.19

    65 375.2 0.05 0.21 0.48 0.85 1.33 1.92 2.61 3.41 4.32

    70 364.7 0.05 0.22 0.49 0.88 1.37 1.97 2.69 3.51 4.44

    75 354.9 0.06 0.23 0.51 0.90 1.41 2.03 2.76 3.61 4.56

    80 345.9 0.06 0.23 0.52 0.93 1.45 2.08 2.83 3.70 4.68

  • Overhead Line Design Manual Section 1 LV ABC v1.2 Page 68

    Mar

    ch 2

    011

    Overhead Line Design Manual Table 8: Conductor, ABC, 4 x 120mm2: Pole Data (Ground Good/Average)

    Length (m)

    Grade Top dia (mm)

    Dia 1.5m from butt (mm)

    Planting depth (mm)

    Single pole strut strength (kgf)

    Maximum wind load span (m)

    9 Medium 150 220 1800 7308 112

    10 Medium 150 230 1800 6077 101

    11 Medium 150 240 1800 5201 92

    12 Medium 150 250 1800 4550 83

    13 Medium 160 260 2400 5000 139

    14 Medium 160 275 2400 4624 150

    9 Stout 190 275 1800 18368 140

    10 Stout 190 285 1800 15030 125

    11 Stout 190 295 1800 12662 112

    12 Stout 190 305 1800 10915 101

    13 Stout 195 320 2400 11227 266

    14 Stout 195 335 2400 10192 252

    Table 9: Conductor, ABC, 4 x 120mm2: Single Pole Stay Capability

    Maximum angle of line deviation for stated stay type and angle of stay slope

    Angle of stay slope

    Grade 1150

    1 x 7/3.25

    Grade 1150

    2 x 7/3.25

    Grade 1150

    1 x 7/4.00

    Grade 1150

    2 x 7/4.00

    20 27 63 51 90

    25 37 90 68 90

    30 47 90 86 90

    35 56 90 90 90

    40 66 90 90 90

    45 75 90 90 90

  • OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 69

    Overhead Line Design Manual

    Aug

    ust 2

    012

    Table 10: Conductor, ABC, 4 x 120mm2: Single Pole Strut Loading (Level Conditions)

    Strut load in pole with one or two stays (kgf)

    Line Angle (Degrees)

    Stay Angle (Degrees)

    20 25 30 35 40 45

    Level Conditions

    0 2439 2031 1752 1547 1387 1257

    5 3240 2657 2257 1963 1735 1549

    10 4037 3279 2760 2378 2080 1839

    15 4829 3897 3259 2789 2424 2127

    20 5614 4509 3754 3197 2764 2413

    25 6390 5116 4243 3601 3101 2696

    30 7157 5714 4727 3999 3434 2975

    35 7912 6303 5203 4392 3761 3250

    40 8655 6883 5671 4778 4083 3520

    45 9383 7451 6130 5156 4399 3785

    50 10096 8008 6579 5527 4708 4044

    55 10792 8551 7018 5889 5010 4297

    60 11469 9080 7445 6241 5304 4544

    65 12127 9593 7860 6583 5589 4784

    70 12764 10090 8262 6914 5866 5015

    75 13379 10571 8649 7234 6133 5239

    80 13971 11033 9022 7541 6389 5455

    85 14539 11476 9380 7836 6636 5661

    90 15081 11899 9722 8118 6871 5859

  • Overhead Line Design Manual Section 1 LV ABC v1.2 Page 70

    Mar

    ch 2

    011

    Overhead Line Design Manual Table 11: Conductor, ABC, 4 x 120mm2: Single Pole Strut Loading (1:10 Downpull

    Conditions)

    Strut load in pole with one or two stays (kgf)

    Line Angle (Degrees)

    Stay Angle (Degrees)

    20 25 30 35 40 45

    Downpull 1:10

    0 3105 2697 2418 2213 2053 1924

    5 3906 3323 2924 2629 2401 2215

    10 4703 3945 3426 3044 2746 2505

    15 5495 4563 3925 3455 3090 2793

    20 6280 5176 4420 3863 3430 3079

    25 7057 5782 4910 4267 3767 3362

    30 7823 6380 5393 4665 4100 3641

    35 8578 6970 5869 5058 4427 3916

    40 9321 7549 6337 5444 4749 4186

    45 10049 8117 6796 5823 5065 4451

    50 10762 8674 7245 6193 5374 4710

    55 11458 9217 7684 6555 5676 4964

    60 12135 9746 8111 6907 5970 5210

    65 12793 10259 8526 7249 6255 5450

    70 13430 10757 8928 7580 6532 5682

    75 14045 11237 9315 7900 6799 5905

    80 14637 11699 9689 8207 7055 6121

    85 15205 12142 10046 8503 7302 6327

    90 15747 12565 10388 8784 7537 6525

  • OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 71

    Overhead Line Design Manual

    Aug

    ust 2

    012

    6.17 Appendix G Design Data for Conductor, ABC, 4 x 95mm2 Table 12: Conductor, ABC, 4 x 95mm2: Design Data Summary

    Recommended Span = 50m. A maximum span of 90m is allowed. A FOS value of 2.5 is used on stays, wind span, foundation and single pole strut loading capabilities.

    In Line Structures Existing

    Drawing No

    Support Type Support Class

    Support Size

    Max Span

    Based on medium

    9m 87m

    10m 78m

    11m 69m

    12m 62m

    Refer to Figure 5 to Figure 7

    Intermediate or Section Medium Medium Medium Stout

    12m Any

    90m 88m 90m 90m

    13m 55m

    Angle Structures

    Min Stay Angle Max Span

    Heavy Light

    Drawing No

    Support Type Support Class

    Support Size

    Max Line Deviation

    Ref to 6.6 Stays

    Intermediate Angle

    Medium Stout

    Any

  • Overhead Line Design Manual Section 1 LV ABC v1.2 Page 72

    Mar

    ch 2

    011

    Overhead Line Design Manual Table 13: Conductor, ABC, 4 x 95mm2: Design Sag/Tension

    95 mm 4 core LV ABC 380N/mm wind 4.75mm radial ice EDS limit (1000/2.62) x conductor mass at 10C basic span 50m

    Design Sag (m) for Span Length (m) Temp (C)

    Tension (kgf)

    10 20 30 40 50 60 70 80 90

    -5.6 644.1 0.03 0.10 0.23 0.40 0.63 0.91 1.24 1.61 2.04

    0 579.8 0.03 0.11 0.25 0.45 0.70 1.01 1.37 1.79 2.27

    5 534.0 0.03 0.12 0.27 0.49 0.76 1.10 1.49 1.95 2.47

    10 496.2 0.03 0.13 0.29 0.52 0.82 1.18 1.60 2.10 2.65

    15 464.6 0.03 0.14 0.31 0.56 0.87 1.26 1.71 2.24 2.83

    20 437.9 0.04 0.15 0.33 0.59 0.93 1.34 1.82 2.38 3.01

    25 414.9 0.04 0.16 0.35 0.63 0.98 1.41 1.92 2.51 3.17

    30 395.0 0.04 0.16 0.37 0.66 1.03 1.48 2.02 2.63 3.33

    35 377.5 0.04 0.17 0.39 0.69 1.08 1.55 2.11 2.75 3.49

    40 362.0 0.04 0.18 0.40 0.72 1.12 1.62 2.20 2.87 3.64

    45 348.2 0.05 0.19 0.42 0.75 1.17 1.68 2.29 2.99 3.78

    50 335.8 0.05 0.19 0.44 0.77 1.21 1.74 2.37 3.10 3.92

    55 324.6 0.05 0.20 0.45 0.80 1.25 1.80 2.45 3.20 4.06

    60 314.4 0.05 0.21 0.47 0.83 1.29 1.86 2.53 3.31 4.19

    65 305.0 0.05 0.21 0.48 0.85 1.33 1.92 2.61 3.41 4.32

    70 296.5 0.05 0.22 0.49 0.88 1.37 1.97 2.69 3.51 4.44

    75 288.5 0.06 0.23 0.51 0.90 1.41 2.03 2.76 3.60 4.56

    80 281.2 0.06 0.23 0.52 0.92 1.44 2.08 2.83 3.70 4.68

  • OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 73

    Overhead Line Design Manual

    Aug

    ust 2

    012

    Table 14: Conductor, ABC, 4 x 95mm2: Pole Data (Ground Good/Average)

    Length (m)

    Grade Top dia (mm)

    Dia 1.5m from butt (mm)

    Planting depth (mm)

    Single pole strut strength (kgf)

    Maximum wind load span (m)

    9 Medium 150 220 1800 7308 119

    10 Medium 150 230 1800 6077 107

    11 Medium 150 240 1800 5201 97

    12 Medium 150 250 1800 4550 88

    13 Medium 160 260 2400 5000 148

    14 Medium 160 275 2400 4624 159

    9 Stout 190 275 1800 18368 148

    10 Stout 190 285 1800 15030 133

    11 Stout 190 295 1800 12662 119

    12 Stout 190 305 1800 10915 107

    13 Stout 195 320 2400 11227 282

    14 Stout 195 335 2400 10192 268

    Table 15: Conductor, ABC, 4 x 95mm2: Single Pole Stay Capability

    Maximum angle of line deviation for stated stay type and angle of stay slope

    Angle of stay slope

    Grade 1150

    1x7/3.25

    Grade 1150

    2 x 7/3.25

    Grade 1150

    1x7/4.00

    Grade 1150

    2x7/4.00

    20 32 76 61 90

    25 44 90 82 90

    30 56 90 90 90

    35 68 90 90 90

    40 80 90 90 90

    45 90 90 90 90

  • Overhead Line Design Manual Section 1 LV ABC v1.2 Page 74

    Mar

    ch 2

    011

    Overhead Line Design Manual Table 16: Conductor, ABC, 4 x 95mm2: Single Pole Strut Loading (Level Conditions)

    Strut load in pole with one or two stays (kgf)

    Line Angle (Degrees)

    Stay Angle (Degrees)

    20 25 30 35 40 45

    Level Conditions

    0 2280 1888 1620 1422 1269 1144

    5 2969 2426 2054 1781 1568 1395

    10 3655 2961 2487 2137 1865 1645

    15 4336 3493 2916 2491 2161 1892

    20 5011 4020 3342 2842 2453 2138

    25 5678 4541 3762 3189 2743 2381

    30 6337 5055 4178 3531 3029 2621

    35 6986 5561 4587 3869 3310 2857

    40 7624 6059 4989 4200 3587 3089

    45 8249 6547 5383 4525 3858 3317

    50 8861 7024 5768 4843 4123 3539

    55 9457 7490 6145 5153 4382 3756

    60 10038 7944 6511 5455 4634 3968

    65 10602 8384 6867 5748 4879 4173

    70 11148 8810 7211 6032 5115 4372

    75 11675 9221 7543 6306 5344 4564

    80 12182 9617 7862 6569 5564 4748

    85 12668 9996 8168 6822 5774 4925

    90 13131 10358 8461 7063 5976 5094

  • OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 75

    Overhead Line Design Manual

    Aug

    ust 2

    012

    Table 17: Conductor, ABC, 4 x 95mm2: Single Pole Strut Loading (1:10 Downpull Conditions)

    Strut load in pole with one or two stays (kgf)

    Line Angle (Degrees)

    Stay Angle (Degrees)

    20 25 30 35 40 45

    Downpull 1:10

    0 2853 2461 2193 1996 1842 1717

    5 3543 2999 2628 2354 2141 1968

    10 4228 3535 3060 2710 2439 2218

    15 4909 4066 3489 3064 2734 2466

    20 5584 4593 3915 3415 3027 2711

    25 6252 5114 4336 3762 3316 2954

    30 6911 5628 4751 4105 3602 3194

    35 7559 6135 5160 4442 3883 3430

    40 8197 6632 5562 4773 4160 3662

    45 8822 7120 5956 5098 4431 3890

    50 9434 7598 6342 5416 4696 4112

    55 10031 8064 6718 5727 4955 4330

    60 10612 8517 7084 6029 5207 4541

    65 11176 8957 7440 6322 5452 4746

    70 11722 9383 7784 6606 5689 4945

    75 12249 9795 8116 6879 5917 5137

    80 12755 10190 8436 7143 6137 5321

    85 13241 10569 8742 7395 6348 5498

    90 13705 10931 9034 7636 6549 5667

  • Overhead Line Design Manual Section 1 LV ABC v1.2 Page 76

    Mar

    ch 2

    011

    Overhead Line Design Manual

    6.18 Appendix H Design Data for Conductor, ABC, 2 x 95mm2 Table 18: Conductor, ABC, 2 x 95mm2: Design Data Summary

    Recommended Span = 50m. A maximum span of 90m is allowed. A FOS value of 2.5 is used on stays, windspan, foundation and single pole strut loading capabilities.

    In Line Structures

    Drawing No

    Support Type Support Class Support Size Max Span

    Refer to Figure 5 to Figure 7

    Intermediate or Section

    Medium Stout

    Any Any

    90m 90m

    Angle Structures

    Min Stay Angle

    Heavy Light

    Drawing No

    Support Type Support Class

    Support Size

    Max Line Deviation

    Ref to 6.6 Stays

    Max Span

    Intermediate Angle

    Medium Stout

    Any Any

    30o

    30o 1 x 20o

    1 x 20o 1 x 20o

    1 x 20o 90m 90m

    Intermediate Heavy Angle

    Medium Stout

    Any Any

    60o

    60o 1 x 25o

    1 x 20o 1 x 25o

    1 x 20o 90m 90m

    Refer to Figure 5 to Figure 8

    Section Angle Medium Stout Medium Stout

    Any Any Any

  • OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 77

    Overhead Line Design Manual

    Aug

    ust 2

    012

    Table 19: Conductor, ABC, 2 x 95mm2: Design Sag/Tension

    95 mm 2 core LV ABC 380N/mm wind 4.75mm radial ice EDS limit (1000/3.86) x conductor mass at 10C basic span 50m

    Design Sag (m) for Span Length (m) Temp (C)

    Tension (kgf)

    10 20 30 40 50 60 70 80 90

    -5.6 190.5 0.04 0.17 0.38 0.68 1.07 1.54 2.09 2.73 3.45

    0 181.7 0.04 0.18 0.40 0.72 1.12 1.61 2.19 2.86 3.62

    5 174.7 0.05 0.19 0.42 0.74 1.16 1.67 2.28 2.98 3.77

    10 168.4 0.05 0.19 0.43 0.77 1.21 1.74 2.36 3.09 3.91

    15 162.8 0.05 0.20 0.45 0.80 1.25 1.80 2.45 3.19 4.04

    20 157.6 0.05 0.21 0.46 0.82 1.29 1.86 2.53 3.30 4.18

    25 152.9 0.05 0.21 0.48 0.85 1.33 1.91 2.60 3.40 4.30

    30 148.6 0.05 0.22 0.49 0.87 1.37 1.97 2.68 3.50 4.43

    35 144.6 0.06 0.22 0.51 0.90 1.40 2.02 2.75 3.60 4.55

    40 140.9 0.06 0.23 0.52 0.92 1.44 2.08 2.82 3.69 4.67

    45 137.5 0.06 0.24 0.53 0.95 1.48 2.13 2.90 3.78 4.79

    50 134.3 0.06 0.24 0.54 0.97 1.51 2.18 2.96 3.87 4.90

    55 131.3 0.06 0.25 0.56 0.99 1.55 2.23 3.03 3.96 5.01

    60 128.5 0.06 0.25 0.57 1.01 1.58 2.28 3.10 4.05 5.12

    65 125.9 0.06 0.26 0.58 1.03 1.61 2.32 3.16 4.13 5.23

    70 123.4 0.07 0.26 0.59 1.05 1.65 2.37 3.23 4.21 5.33

    75 121.1 0.07 0.27 0.60 1.07 1.68 2.42 3.29 4.30 5.44

    80 118.9 0.07 0.27 0.62 1.09 1.71 2.46 3.35 4.38 5.54

  • Overhead Line Design Manual Section 1 LV ABC v1.2 Page 78

    Mar

    ch 2

    011

    Overhead Line Design Manual Table 20: Conductor, ABC, 2 x 95mm2: Pole Data (Ground Good/Average)

    Length (m)

    Grade Top dia (mm)

    Dia 1.5m from butt (mm)

    Planting depth (mm)

    Single pole strut strength (kgf)

    Maximum wind load span (m)

    9 Medium 150 220 1800 7308 171

    10 Medium 150 230 1800 6077 154

    11 Medium 150 240 1800 5201 140

    12 Medium 150 250 1800 4550 127

    13 Medium 160 260 2400 5000 206

    14 Medium 160 275 2400 4624 196

    9 Stout 190 275 1800 18368 213

    10 Stout 190 285 1800 15030 190

    11 Stout 190 295 1800 12662 171

    12 Stout 190 305 1800 10915 154

    13 Stout 195 320 2400 11227 254

    14 Stout 195 335 2400 10192 239

    Table 21: Conductor, ABC, 2 x 95mm2: Single Pole Stay Capability

    Maximum angle of line deviation for stated stay type and angle of stay slope

    Angle of stay slope

    Grade 1150

    1x7/3.25

    Grade 1150

    2 x 7/3.25

    Grade 1150

    1x7/4.00

    Grade 1150

    2x7/4.00

    20 89 90 90 90

    25 90 90 90 90

    30 90 90 90 90

    35 90 90 90 90

    40 90 90 90 90

    45 90 90 90 90

  • OHL Design Manual - Section 1 - Aerial Bundled Conductor (ABC) Low Voltage Mains And Services LS BH PW Page 79

    Overhead Line Design Manual

    Aug

    ust 2

    012

    Table 22: Conductor, ABC, 2 x 95mm2: Single Pole Strut Loading (Level Conditions)

    Strut load in pole with one or two stays (kgf)

    Line Angle (Degrees)

    Stay Angle (Degrees)

    20 25 30 35 40 45

    Level Conditions

    0 1687 1372 1157 999 876 776

    5 1998 1615 1354 1161 1011 889

    10 2307 1857 1549 1322 1145 1002

    15 2614 2096 1742 1481 1278 1113

    20 2917 2333 1933 1639 1410 1224

    25 3216 2566 2122 1794 1539 1333

    30 3511 2797 2308 1947 1667 1440

    35 3801 3023 2490 2098 1793 1545

    40 4086 3245 2670 2246 1916 1649

    45 4364 3462 2845 2391 2037 1750

    50 4635 3674 3016 2532 2155 1849

    55 4900 3880 3183 2669 2269 1945

    60 5156 4081 3345 2803 2381 2039

    65 5405 4275 3501 2932 2489 2129

    70 5645 4462 3653 3056 2593 2216

    75 5876 4642 3798 3176 2693 2300

    80 6097 4815 3938 3291 2789 2381

    85 6308 4980 4071 3401 2880 2458

    90 6509 5137 4198 3506 2968 2531

  • Overhead Line Design Manual Section 1 LV ABC v1.2 Page 80

    Mar

    ch 2

    011

    Overhead Line Design Manual Table 23: Conductor, ABC, 2 x 95mm2: Single Pole Strut Loading (1:10 Downpull

    Conditions)

    Strut load in pole with one or two stays (kgf)

    Line Angle (Degrees)

    Stay Angle (Degrees)

    20 25 30 35 40 45

    D