OIL & GAS
AudingIntresa has been in the engineering and building businesses for more than 30 years, providing services to the public andprivate sector alike, planning and designing structures and monitoring works, installations and services.
AudingIntraesa offers its clients its technical capacity and experience, balancing its activity and development whilst meeting incre-asingly demanding environmental regulations.
03
Introduction
04
Business areas
AudingIntraesa provides services right from the initial planning phase (identifying problems, setting objectives and analyzing viablesolutions) to the final stage of operational control of the finished infrastructures.
The Group’s strategy is based on adding value to the services provided, combined with consulting and technology, closely followingtechnical, environmental, economical, social and juridical guidelines. By doing so, AudingIntraesa achieves long-term, sustainedand practical solutions.
Team
45% 21% 26% 8%
05
Modern societies demand that multiple criteria are taken into consideration when planning and developing infrastructures and pu-blic services. AudingIntraesa’s workforce consists of 250 professionals and in 2012 the company’s total revenue was €22 million.Partnering with several international companies, AudingIntraesa possesses 3.700 collaborators throughout the world and is partof annual cumulative revenues of more than €300 million.
AudingIntraesa has a vast knowledge in assembling and managing its human resources, working in responsible fashion, easily adap-ting to the customer’s specific demands.
AudingIntraesa’s service capacity is based on its know-how, human and material resources and the flexibility to adapt to the specificdemands of each task.
Engineering and Environmental Sciences
Economic and Social Sciences
Agronomy and Forestry Engineering
Architecture and Urban Planning
Geotechnical Engineering and Sciences
Industrial Systems Engineering
Civil Engineering
Senior Qualification Medium Qualification Technicians SupportStaff
12 years average experience
35 years average age
OIL & GAS
AudingIntraesa offers a wide range of services directed towards meeting the needs of its clients, designing sustainable and adequatesolutions from a technical, economic, social and environmental point of view.
The services offered in the Oil & Gas sector combine the knowledgeand expertise of a multidisciplinary group of specialists composed ofaeronautics, industrial engineers, chemists, biologists, civil engineersand environmentalists that develop and support works in the follo-wing areas:
Process•Construction and structural design•Piping•Hydraulics•Installations and mechanical equipments•Installations and electrical equipments•Instrumentation•Environmental Impact Assessment•Occupational Health & Safety•Energy Efficiency•
This offer is supported by transverse services that strengthen andimprove the internal work, such as: geographic informationsystems, geological and hydrogeological studies and structural de-sign.
Design and Implementation•
Feasibility Studies•
Analysis of Alternatives•
Basic Design•
Detailed Engineering•
Draft Invitation to Tender•
Project Management•
Location Studies and Soil Me-•chanics
Construction Management•and Technical Assistance
As-Built Projects•
Startup•
Performance Studies•
Simulation and Modeling•Studies
Occupational Health & Safety•
Inspection and Operational•Control
Risk and Environmental Im-•pact Assessment
Legalization of Installations•
EPC (Engineering, Procure-•ment and Construction)
07
Specific Services
PROCESS ENGINEERING
Modeling and process simulation •
Sizing calculations•
Definition of equipments•
Process diagrams•
Line design•
Risk, emergency and HSE (Health, Safety and Environ-•
ment) Studies
MECHANICAL ENGINEERING
Basic design•
Invitation to tender•
Technical and legal requirements•
Comparative analysis of technical offers•
Purchase and transport specifications•
Material handling guides•
Design of static equipments•
08
HYDRAULIC ENGINEERING AND PIPING
Hydraulic design and simulations•
Piping material specifications•
Stress calculations•
Pipe stress analysis•
3D and isometric modeling•
Purchase and transport specifications•
Assembly diagrams•
09
STRUCTURAL ENGINEERING
Geometric definition•
Structural design and simulation•
Geotechnical studies and analysis•
Calculation of design loads•
ELECTRICAL ENGINEERING
Electrical and energy design•
Electrical switchboard design•
Lighting design•
Single and multi line diagrams•
Power and electrical grounding definition•
Classification of hazardous areas•
Energy efficiency analysis•
Technical specifications and data sheets•
CONTROL AND AUTOMATION ENGINEERING
Systems design and architecture•
PID diagrams•
Control and automation engineering (PLC and SCADA)•
Definition of analog and digital signs•
Control room design•
Technical specifications and data sheets•
References
EXTENSION OF AN EXTERNAL RACK CONNECTING WITH AN OFFSHORE FACILITY IN THE PROVINCE OF TARRAGONALocation: Catalonia, SpainCustomer: REPSOL PETRÓLEO
TECHNICAL DESCRIPTION
The purpose of this project was the definition of the pipelinesthat transport raw materials and finished products from LaPobla de Mafumet’s Refinery to Vila-seca, crossing the muni-cipalities of Constantí, Tarragona, La Canonja and ending on apier in Vila-seca.
This work is part of a Comprehensive Coastal Protection Planthat includes a number of improvements aimed at renewingexisting assets and minimizing the risk of potential spills on theright bank of the Francolí river, air rack and dock.The scope of the work included:
Pipeline design (8.590 m buried and 6.970 m aerial).•10’’/ 16’’ pipelines for hydrocracking residue, 16’’ for•fuel oil, 10’’ for heavy gas oil, 10’’ for gasoline, 16’’for black derivatives, 20’’ for effluents and 8’’ for re-serve. Replacement of a 16’’ fuel oil pipeline.Activity license project. Appendix no.1. Environmen-•tal license (no substantial change).Building permits.•Offprint for Administrations and services impacted by•the pipeline.Detailed engineering•Construction management.•Occupational Health & Safety coordination.•Field engineering.•As-Built projects.•
Contract Value: €554,900
11
REPLACEMENT OF REPSOL QUÍMICA’S OUTFALL IN TARRAGONALocation: Catalonia, SpainCustomer: REPSOL QUÍMICA
TECHNICAL DESCRIPTION
Descriptive report regarding the replacement of Repsol Química’s effluent pipelines (10.967 m buried and 1.652 m aerial) by newones.
The works consisted in replacing the effluent sewer, made of concrete and with a diameter of f 600 m, by a new one with a no-minal diameter of 630 mm, made of HDPE, on the buried segment, and a 24’’ carbon steel pipe in the section running along theaerial rack.The renewal of assets was made possible by this project, which also reduced the risk of leaking.
Performed works:
Administrative projects•Detailed engineering•Construction management•Occupational health & safety coordination•Field engineering•As-built projects•
Contract Value: €157,500
12
References
ADJUSTMENT OF A MAIN SUBSTATION AND SWITCHYARD FOR THE TRANSFER OF INSTALLATIONS TO ENDESA. IMPROVEMENTACTIONS, EXTERNAL RACK AND NEW BUILDINGLocation: Catalonia, SpainCustomer: REPSOL PETRÓLEO
TECHNICAL DESCRIPTION
The works, which included the project and construction management, are listed below:
TE-001: Adjustment of a main substation and switchyard for the transfer of installations to E.D.E.:
Extend the 66 kV busbar in three new streets (6 positions) and increase their capacity to 1250 A;•Replacement of 66 kV P.I. lighting to solve problems associated with luminous pollution and perform energy efficiency ac-•tions;Installation of a new 416-S-0-T-4 transformer with a nominal voltage of 66/15 kV;•Necessary adjustments performed on the 416-S-0-PLC-00 electrical PLC;•Replacement of a 15 kV switchboard by a new 416-S-0-CH-1;•Replacement of four 15 kV capacitor batteries (1,8 MVar each) by two others with a bigger reactive power;•Installation of a new PDB+FI, power supply from a 25 kV line, installation of a third line L3, equip the new P16 position,•etc.
AT-001: New building located on a dock:
Demolitions, earth movements, foundations and reinforcements, structure, interiors, installations, finishes, etc.•
T-68: Improvement actions in the marine installations and on the external rack:
Construction of a 50 m-deep shaft, lined by a 200 mm-diameter steel pipe with a manhole at surface level;•Supporting system for instruments and electrical components, adjustment of the existing light panels, 400 V power supply•cables for the control room and a 128 optical fiber network;Adjustment of the platform at the end of the sewers;•Installation of breakaway valves in mono-buoy hoses;•Replacement of load arms by others of current technology and PERC;•Replacement of Dow’s 24’’ naphtha line on the dock;•Improvement of the electrical infrastructure.•
Contract Value: €82,000
13
INSTALLATION OF NEW STAIRS TO ACCESS THE TOP OF REPSOL’S TANKS IN TARRAGONALocation: Catalonia, SpainCustomer: REPSOL PETRÓLEO
TECHNICAL DESCRIPTION
The work consisted in providing technical assistance to the project and construction as described below:
Structural design of the metal stairs;•Detailed engineering for 41 tanks and 14 spheres;•Lighting and grounding;•Construction: foundations and trenches to install the grounding system.•
Contract Value: €68,025
14
References
PREPARATORY WORK, DETAILED ENGINEERING, PROCUREMENT MANAGEMENT, DOCUMENT MANAGEMENT, LEGALIZATION,ETC. OF 28 REPSOL PROJECTS, IN TARRAGONALocation: Catalonia, SpainCustomer: REPSOL PETRÓLEO
TECHNICAL DESCRIPTION
The works were primarily based on providing technical assistance tothe projects and construction as listed below:
Divert, from PLC to TDC, all on/off, LSH/LSL-155 and•LSH/LSL-105 digital control signals;Place 611-G-36-A/B flow control valves in pumps;•Feed Wild Naphtha to 611C35 connecting upper reflux line•to tray 1;Pressure Safety Valve (PSV) 613-C-10 and 641-C-7 to flare;•Modify 24’’ pipe’s isometry to avoid the accumulation of•sulphur at the end of the collector;Modify PLC 680 A/ 680 B logic in accordance with 673•A/B/C plants;Install minimum recirculation to G-103 A/B to reduce MDEA•consumption;Relocate two 645-F-02 TSK;•Replace radioactive level switches 652 (CCR);•Change level transmitter;•Replace 652/02-NARCD sampler by one of SEPTUM type;•Open the 653-HCV-13 valve according to the 653-K-1 hydro-•gen compressor status;Replace insulation for personal protection with a perfora-•ted plate in U-654 equipments;Install safety equipment with bellows to replace the current•safety system, sealed with a 24,4 kg/cm2 pressure;Install sampling probe in condensation line;•Install a 713-G-13 pump bypass (aromatic component/ ben-•zene concentrate).
Contract Value: €54,000
15
Referencias
ENAGAS’ MAINTENANCE DEPARTMENT. SMALL SCALE INVESTMENT PROJECTSLocation: Catalonia, SpainCustomer: ENAGAS
TECHNICAL DESCRIPTION
Relocation of a P-2180A fire pump:
Comparative analysis to assess the location of a pump in five different settings. The actionareas are:
Install the pump in one of the 5 new possible locations. Construction of suppor-•ting, access and maintenance structures. Construction of a force main from thepump to the nearest fire main.Electrical connection to the nearest substation. Installation of a control panel.•Modification of the substation’s electrical switchboard to include the new bomb’selectrical consumption. Upgrade of the control system.
Installation of a filtration system in the common drain lineStudy of alternatives in order to install a filtration system in the F-200 A1/B1/C1/D1/E1,F-3501 A/B/C and F-4501 A/B common drain line.
Definition of the proposed alternatives.•Cost estimate for each alternative.•
Installation of a recycling line in the water intake system
Cost estimate of a recycling line in the common seawater force main P-3501 A/B/C pumps(seawater intake system no.4).
Assessment of the new line’s efficiency point.•Installation of a valve and collector.•Development of project documentation.•
Evaluation of the filters’ foundations when submitted to a provisional load
Verification of the filters’ foundations when submitted to loads such as pieces of equip-ment from an adjacent filter, which is common during maintenance and cleaning opera-tions.
Contract Value: €45,595
16
References
INSTALLATION OF A METAL STRUCTURE UNDERNEATH C-31B HIGHWAY’S RACK, TARRAGONALocation: Catalonia, SpainCustomer: REPSOL PETRÓLEO
TECHNICAL DESCRIPTION
Given REPSOL’s commitment towards local administrations af-fected by its activity, the company decided to create an actionplan named “Integral Coastline Protection Plan” which inclu-des a number of improvements aimed at renewing their assetsand minimize the risk of possible leaks on the right bank of theFrancolí river, aerial rack, dock and Casablanca platform.
The improvements will consist in the installation of a metalstructure underneath the rack on its passage through C-13BHighway.
The purpose was to improve the existing infrastructure. Thissystem will gather possible leaks and drain storm water wi-thout interfering with the highway’s own drainage system andclearance area.
Description of the works:
Installation of a 1 mm thick galvanized steel plate•with a 35 microns PVSDS topcoat on each side bene-ath the rack and using the existing structure;Collector and downspouts;•Hydraulic design;•Structural design.•
Contract Value: €41,370
17
CEPSA’S TERMINAL PLATFORM INSTALLATIONS. PROVINCE OF SANTA CRUZ DE TENERIFE Location: Tenerife, SpainCustomer: ALATEC
TECHNICAL DESCRIPTION
CEPSA has facilities to transfer hydrocarbons from a discharge point on a platform in Santa Cruz de Tenerife and distribute themthrough different lines according to the type of product.However, these installations had to be expanded by adding a berthing dolphin, a deck slab supported by girders connecting twodolphins, new loading arms over the deck and a new crane, also remodeling the entire pipe network on the platform and improvingexisting facilities.
The purpose of this project was:
Definition of new installations in order to improve existing facilities, expanding mechanical, electrical and fire safety ins-•tallations;Adjustment of the existing pipe network adapting it to new needs, closely following flow diagrams and improving their ca-•pacity with new loading arms.Low voltage electrical supply: electro hydraulic control center, control of the loading arms, electro-hydraulic crane and•lighting;Construction of an 8’’ diameter pipe to supply the platform’s protection system and dolphins, also supplying a manual•control system, a fire hydrant and the sprinkler network.ABC dry powder and BC chemical powder fire extinguishers. Replacement of sprinkler rings on both platform and under-•dock systems..
Contract Value: €41,000
18
References
DETAILED ENGINEERING, DRAFTING TECHNICAL DOCUMENTATION, PROCEDURES WITH OFFICIAL ORGANIZATIONS AND TECH-NICAL ASSISTANCE DURING DOW CHEMICAL’S REMODELING WORKSLocation: Catalonia, SpainCustomer: DOW CHEMICAL IBERICA
TECHNICAL DESCRIPTION
The works were as follows:
Urbanization of a land plot, currently used as a par-•king lot, by paving it and building sidewalks. The lot’stopography, slope and drainage were kept unchan-ged thus preventing its flooding. A cabin was built toserve as a security gate, provided with water, electri-city and septic tank.New access road for heavy vehicles and sidewalk for•pedestrians. The road has traffic on both directionsand a 15 m parking area. Changes were also perfor-med on the fences by installing control access gatesfor heavy vehicles. The southern area of the lot willhave a turnstile for pedestrian access control.
Both the urbanization and the construction of the road inclu-ded the following works: paving, signaling, sewerage and po-table water supply networks, public lighting, energy supplyand fire fighting systems.
Contract Value: €28,050
19
PROJECT TO IMPROVE THE MAINTENANCE OF FILTERS IN THE INFLAMMABLES WHARF IN THE PORT OF BARCELONALocation: Catalonia, SpainCustomer: ENAGAS
TECHNICAL DESCRIPTION
The project consisted in the study, technical justification and cost estimation of the adopted solutions to improve a water filtrationsystem on the inflammables wharf in the Port of Barcelona, thus improving their maintenance.
The platforms were equipped with access routes, washing areas and loading systems close to the different filtration groups.The analyzed filtration units: FIL-3501-A/B/C, FIL-200-A1/B1/C1/D1/E1, FIL-4501-A/B, FIL-2502-A-E and FIL-200-B/C/D.
The scope of the work carried out for each filter set was as follows:
Installation of easily dismantled structures and an electric hoist for each group of filters (5 hoists and 4 barges);•Installation of one or two working platforms at clamp area height on the upper or intermediate part of the filter;•Quick connection and disconnection system in each filter’s engine;•Concrete reservoir to clean the filters, with a ramp;•Installation of a service station on the cleaning area: water, air and energy supply, installation of a drain pump connected•to the collector and a hot water high pressure cleaning machine.
Contract Value: €26,750
20
References
STUDY OF ALTERNATIVES. 3RD OVOID PIPE RACK BENEATH C-31B HIGHWAY IN TARRAGONALocation: Catalonia, SpainCustomer: REPSOL PETRÓLEO
TECHNICAL DESCRIPTION
There are two ovoid pipe racks beneath C31-B highway, from Tarragona to Salou. One carries REPSOL’s PETRÓLEO pipe rack andthe other was left empty. REPSOL uses the ovoid to monitor and perform maintenance operations but its extension meant that se-curity and maintenance personnel could not access it. The purpose of this work was then to define and estimate a third rack alter-native next to the existing ones, allowing the passage of vehicles and its surveillance and monitoring.
The scope of the works was as follows:
Compilation of available plans of the area in study, from various sources, providing a reliable basis to conduct the study•and a photographic survey to facilitate the understanding of its current state;Consultation with Generalitat de Catalunya’s (The Autonomous Government of Catalonia) roads service;•Study of 5 alternatives, graphical representation and budget estimate.•
Contract Value: €24,400
21
Alternativa 1 Alternativa 2
Alternativa 3
ADMINISTRATIVE PROJECTS. “SEAWATER DESALINATION RESEARCH PILOT PLANT” IN TARRAGONALocation: Catalonia, SpainCustomer: DOW CHEMICAL IBÉRICA
TECHNICAL DESCRIPTION
As part of Dow Water Solutions’ plan to build a world reference pilot station tostudy the operation of reverse osmosis membranes, a new building and twooutdoor areas were planned: the first housing an additives deposit, semi-deta-ched with the main building, covered but with no walls; the second, away fromthe main building, housing a transformer station, with outer walls but withouta roof.
The developed works were as follows:
Activity licensing project. Activity not included in Law 3/98;•Construction licensing project•Annex – summary documentation•Annex – investigation•Annex – wastewater discharge•
Contract Value: €24,000
22
References
AMENDED PROJECT FOR TR1’S LOW DENSITY POLYETHYLENE PLANT IN TARRAGONALocation: Catalonia, SpainCustomer: DOW CHEMICAL IBÉRICA
TECHNICAL DESCRIPTION
The works carried out were as follows:
Project of a new system to dries the air used in polyethylene and polypropylene transportation into the packing lines. The•drying system will be installed on a two level galvanized steel structure; the upper level at a height of 7 m and the lowerat 4,5 m. Both can be accessed through stairs.Activity license project. Annex 1. Environmental authorization.•Construction licensing project.•Technical project. Summary report of the basic design.•
Contract Value: €23,000
23
Planta general Planta Isométrico
DETAILED ENGINEERING, TECHNICAL DOCUMENTATION, PROCEDURES WITH OFFICIAL ORGANISMS AND TECHNICAL ASSISTANCEDURING THE CONSTRUCTION OF A NEW HYDROBLASTING AREA FOR TGN SOUTHLocation: Catalonia, SpainCustomer: DOW CHEMICAL IBÉRICA
TECHNICAL DESCRIPTION
The purpose of this contract was to develop detailed engineering and tech-nical documentation to obtain the necessary construction permits for DowChemical’s new hydroblasting area, as well as to provide technical assistanceduring its construction. The scope of the works is as follows:
Design of a separation tank and water storage tank for process•water;Pavement design, slope definition and water drainage;•Development of a technical solution for the plant’s enclosure based•on a prefabricated solution;Support other areas;•Geotechnical study..•
Contract Value: €21,830.25
24
References
MODIFIED PROJECT. TARRAGONA’S “WATER SOLUBLE TRAIN” POLYOIL FACTORYLocation: Catalonia, SpainCustomer: DOW CHEMICAL IBÉRIA
TECHNICAL DESCRIPTION
The works consisted in:
Construction of an assembly line for water soluble products (Water Soluble Polyglycols & Surfactants and Performance•Fluids), on an existing area in Tarragona’s Polyoils and Polyglycols Plant. The assembly line consists of a storage tank, afilter, a pyrolysis tower, two tanks to store the finished product, an additives system and a transport container loading line.Design and construction of a new discharge tank for the R300 reactor, allowing the manufacture of finished products with•acetic acid.Construction of a concrete pavement to cover the partially excavated area where the production building will be founded;•install a wire mesh and cover it with 200 mm of HA-30 concrete with a 1% slope to allow the drainage of rainwater.Construction of a tank to retain the spills from the liquid antioxidant tanks, with a 250 mm tall wall and a 1% slope;•Structure to support equipments and pipes. Expansion of the existing rack and new ones to install new piping systems.•Two new loading stations, one double and one single. The platform is located at a height of 4 m and its roof at 7 m. Its di-•mensions are 6 m wide by 12 m long (single station) and 12 m wide by 12 m long.Activity licensing project. Annex 1. Environmental authorization.•Construction licensing project.•
Contract Value: €20,000
25
Isométrico
Planta Alzado
ADMINISTRATIVE PROJECTS. REHABILITATION OF A LOW DENSITY POLYETHYLENE INDUSTRIAL PLANT IN TARRAGONALocation: Catalonia, SpainCustomer: DOW CHEMICAL IBÉRICA
TECHNICAL DESCRIPTION
The project aimed to establish Dow’s best technology to high pressure reactors, which basically consisted in dividing the ethylenefeed to the reactor in two (50/50), and have 4 catalyst injections instead of the current 2. To add two new catalyst injections itwas necessary to build two new deposits (mixing and injection) and 3 new injection pumps. In addition, the reactor’s length hadto be increased by adding input tubes. The cooling water network had to be modified to optimize the transfer of heat.
A new telomere system was also added. The telomere is currently stored in a carbon steel deposit and a new stainless steel tankand pump injection shall be installed.
The project also included replacing the extruder’s motor, from direct to alternating current, hence requiring the construction ofa storage facility to host a drive and a transformer. The changes improved the plant’s capacity in 15%. The works consisted in:
Activity licensing project. Activity not included in Law 3/98;•Construction licensing project;•Summary annex report •Annex on waste emission•
Contract Value: €19,711
26
Situación Tren III
Planta Rehabilitación
References
CONSTRUCTION PROJECT. EL CRACKER’S NEW STEAM LINELocation: Catalonia, SpainCustomer: DOW CHEMICAL IBÉRICA
TECHNICAL DESCRIPTION
Design of a steel pipe steam line network with a diameter varying from 8’’ to 14’’, connected to the existing one through an aerialrack. The network is submitted to medium pressure and is controlled by a valve that regulates the pressure and temperature inorder to clean 14 furnaces.
This system eliminates the risk of serious safety accidents such as the contamination of the dilution steam by hydrocarbons du-ring cleaning operations.
The works consisted in the extension of the existing metal structure, laying the new steam line and connecting it with the furna-ces.
Contract Value: €11,900
27
Vista general
Línea de Vapor
Planta
TECHNICAL CONSTRUCTION PROJECT. TARRAGONA’S SOUTHWESTERN AREA INFRASTRUCTURELocation: Catalonia, SpainCustomer: DOW CHEMICAL IBÉRICA
TECHNICAL DESCRIPTION
The work consisted in the project for a new road, extension of an existingone near building N, and two branches paved with asphalt and concrete si-dewalks, completed through the installation of lighting, storm water drai-nage, wastewater treatment, water and fire water supply and a duct foroptical fiber.
Storm water is drained into the plant’s general drainage system. The waterfrom the toilets shall be treated and conducted to building N through theexisting pumping system, which is equipped with a check valve, evacuatingthem through the existing sewerage system.
The scope of the works is as follows:
Construction licensing project;•A waste from demolition and construction activities program;•Occupational Health & Safety Study;•Archeological Study.•
Contract Value: €11,500
28
Planta servicios
Planta general
Planta estado proyectos
References
CONSTRUCTION PROJECT. CRACKER AND OCTENO’S SHUT-DOWN OPERATIONS, 2012Location: Catalonia, SpainCustomer: DOW CHEMICAL IBÉRICA
TECHNICAL DESCRIPTION
The works consisted of:
Description of the works to be undertaken during Dow Chemical’s shut-down during the second quarter of 2012;•General maintenance operations, minor improvements and repairs;•Description of the works to be carried out in order to obtain a construction permit by La Pobla de Mafumet’s local autho-•rities during Cracker and Octeno’s shut-down operations 2012.
Contract Value: €6,650
29
ENVIRONMENTAL ADJUSTMENT PROJECT FOR A TRUCK DEPOT IN CONSTANTÍ. PROVINCE OF TARRAGONALocation: Catalonia, SpainCustomer: CITESA
TECHNICAL DESCRIPTION
The works consisted in:
Project for a truck base in Constantí’s industrial area;•Creation of an environmental assessment document. Appendix 2.2•
Contract Value: €2,900
30
Planta y sección oficinas
Planta general
COLOMBIACra. 35 Bis Nº60‐79BOGOTÁ DCTel: +57 (1) 8 05 36 [email protected]
UNITED ARAB EMIRATESAudingIntraesa Middle East & GulfAbu Dhabi Trade CenterSky Tower 7th floor Al Reem IslandP.O. Box 46689 ABU DHABI, United Arab EmiratesTel: +971 2 6455227Fax: +971 2 [email protected]
OIL&GASENG14
www.audingintraesa.com
MEXICOAudingMexAvda. Insurgentes Sur, 753, Piso 5º, Local 5‐DColonia Nápoles, Delegación Benito Juárez03810 MÉXICO DFTel: +52 55 5523 1910 Fax: +52 55 5523 [email protected]
DOMINICAN REPUBLICJuan Tomás Mejía y Cotes, 39EDIFICIO C&J Local 402Arroyo Hondo, Santo Domingo DNTel: +1 809 540 37 23 Fax: +1 809 540 36 [email protected]
BRAZILAuditorías e Ingenierías S.A.U DO BrasilAv. Paulista, 777, 15º andar01311‐914 Bela Vista SÃO PAULOTel: +55 11 3323 [email protected]
SPAINBarcelonaAvda. Baix Llobregat, 3‐508970 SANT JOAN DESPÍTel: +34 93 470 19 90 Fax: +34 93 473 24 [email protected]
MadridNúñez Morgado, 3, 6A28036 MADRIDTel: +34 91 314 04 47Fax: +34 91 323 04 [email protected]