LEGEND : PM SM Primary Meter Secondary Meter Single Valve New Pipeline Existing Line DURI CPS NBS MINAS CRUDE OIL FROM PUNGUT GS CRUDE OIL FROM TANDUN GS CRUDE OIL FROM INTAN GS CRUDE OIL FROM GS 5 CRUDE OIL FROM GS 4 CRUDE OIL FROM BOB - CPP EAST CRUDE OIL FROM GS 1 CRUDE OIL FROM GS 6 CRUDE OIL FROM GS 3 PM PM SM SM SM SM SM SM 20" #150 PM PIG RECEIVER PIG LAUNCHER PIG RECEIVER PIG LAUNCHER CRUDE OIL FROM GS 2 CRUDE OIL TO DURI TANK FARM - New pipeline will be buried. - New pipeline will be equiped with cathodic protection and leak detection. CRUDE OIL FROM LIBO GS CRUDE OIL FROM KOTA BATAK GS PM PM V-6101 V-6102 V-7101 V-7102 SM 1. New tie-in line NOTES: Note 1 Note 1 20" #150 Pipeline Segmen 1 Pipeline Segmen 2 GENERAL NOTES: PIG LAUNCHER V-8101 PIG RECEIVER V-8102 KOTABATAK Note 1 Note 2 2. Existing Primary Meter at NBS Note 3 3. Partial pipeline repair and replace from Libo to Mindal 4. Existing pig launcher from Libo 5. Existing pig receiver at Mindal Note 4 Note 5 MINDAL SBB Valve with MOV SBB Valve Note 6 6. SBB Valve at River Crossing PIPELINE ISOLATION SYSYTEMS SCHEMATIC DIAGRAM APPENDIX D

Upload: nofrialdie

Post on 09-Dec-2015

213 views

Category:

Documents


2 download

DESCRIPTION

TFH

TRANSCRIPT

Page 1: Oil

LEGEND :

PMSM

Prim

ary Meter

Secondary M

eter

Single V

alve

New

Pipeline

Existing Line

DURI CPSNBS

MINAS

CRUDE OIL FROM

PUNGUT GS

CRUDE OIL FROM

TANDUN GS

CRUDE OIL FROM

INTAN GS

CRUDE OIL FROM

GS 5

CRUDE OIL FROM

GS 4

CRUDE OIL FROM

BOB - CPP EAST

CRUDE OIL FROM

GS 1

CRUDE OIL FROM

GS 6

CRUDE OIL FROM

GS 3

PM

PM

SMSM SMSMSMSM

20" #150

PM

PIG

RE

CE

IVE

RP

IG LA

UN

CH

ER

PIG

RE

CE

IVE

RP

IG LA

UN

CH

ER

CRUDE OIL FROM

GS 2

CRUDE OIL TODURI TANK FARM

- New pipeline will be buried.- New pipeline will be equiped with cathodic protection and leak detection.

CRUDE OIL FROM

LIBO GS

CRUDE OIL FROM

KOTA BATAK GS

PMPM

V-6101 V-6102

V-7101 V-7102

SM

1. New tie-in line

NOTES:

Note 1

Note 1

20" #150

Pipeline Segmen 1

Pipeline Segmen 2

GENERAL NOTES:

PIG

LAU

NC

HE

R

V-8101

PIG RECEIVER

V-8102

KOTABATAK

Note 1

Note 2

2. Existing Primary M

eter at NBS

Note 3

3. Partial pipeline repair and replace from Libo to M

indal4. Existing pig launcher from

Libo5. Existing pig receiver at M

indal

Note 4

Note 5

MINDAL

SB

B V

alve with M

OV

SB

B V

alve

Note 6

6. SBB Valve at River Crossing

PIPELINE ISOLATION SYSYTEMS

SCHEMATIC DIAGRAM

APPENDIX D