oim presentation rev tt nov 2010 vsersion

44
TRELLEBORG OFFSHORE INTEGRATED MOORING PRESENTATION Tom Toth Manager - Business Development & Offshore Tom.Toth@trelleborg .com

Upload: tomtoth

Post on 20-Aug-2015

923 views

Category:

Business


1 download

TRANSCRIPT

Page 1: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG OFFSHORE INTEGRATED MOORING PRESENTATION

Tom TothManager - Business Development & [email protected]

Page 2: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

TRELLEBORG AB – Corporate Overview

2

Sales by Region

Asia

Total sales ~ US$ 3.5 Billion*

Employing ~ 20,000 people*

Present in 40 countries worldwide

Manufacturing in ~100 plants

Globally, among largest non-tire rubber players

* Incl recent acquisitions, proforma

Europe

Americas

Page 3: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

TRELLEBORG AB – Business Areas

3

Trelleborg Sealing Solutions

Trelleborg Automotive

Trelleborg Engineered

Systems

Trelleborg Wheel Systems

Trelleborg MarineSystems

(Business Unit)

Trelleborg Marine Systems – Docking & Mooring, Trellex, Fentek, Seaward

Page 4: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

4 August 25, 2010

Trelleborg Marine Systems | Docking & Mooring

Page 5: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

5 October 2, 2008

PRESENTATION FOCUS

Ship to Ship Integrated Mooring & Berthing

Transfer of crude FPSO & LNG for FSRU applications

Tandem Mooring & Offloading

Conventional stern Tandem Offloading for FPSO

Mooring Systems with integrated Hose & Reel package

Spread Mooring

Shallow water, long chain, multi leg mooring systems for FPSO

Page 6: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

6

OFFSHORE INTEGRATED MOORING

History Harbour Marine Engineering was established in 1972 Focus on onshore and offshore mooring equipment (since 1980) Acquired by Trelleborg in 2006 name changed to

Trelleborg Marine Systems

Capabilities Key strength is our in-house, mechanical and instrumentation

engineering design to provide standard as well as custom mooring berthing and offloading solutions.

Over 60 FPSO ship sets of tandem mooring equipment supplied since 1980

Largest supplier of integrated mooring berthing systems for on shore LNG facilities

First to develop the integrated STS solution now installed on the first of the FSRU vessels

Page 7: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

Ship to Ship Mooring

7

Page 8: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

SHIP TO SHIP MOORING & BERTHING•QRH with capstan, load monitoring and high security remote release systems

•RTK GPS Approach & Berthing

• Portable Workstations - Carry On Board

•Environmental - Met Ocean

•Fenders & deployment systems

•Fairleads & Chocks

•Rope reelers augmentation to LNGC mooring

• Class Approval DNV, ABS, RINA & Lloyds

8

Page 9: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

STS - GOLAR FREEZE & GOLAR FROST

9

Golar Freeze for Dubai LNG

Golar Frost for Livorno LNG

Golar Khannur West Java LNG

FSRU of 287m long volume 125,000 cubic meters of LNG• STS Quick Release Hooks• Load Monitoring • Remote Release• RTK Berthing Aid• RINA Class Approval – FSRU Frost• DNV Class Approval - FSRU

Freeze

Page 10: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

STS - TI AFRICA & TI ASIA

10

ULCC largest double hulled vessels of 380m long 440,000 DWT

• STS Quick Release Hooks• Load Monitoring • Remote Release• RTK Berthing Aid• Fender Deployment System• Tandem Mooring• Lloyds Register Class

approval

TI AFRICA

TI ASIA

Page 11: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

STS Mooring Hooks during commissioning 2009

11

Commissioning – Ti Africa Golar Freeze

Page 12: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

STS – QUICK RELEASE HOOKS

12

Features for STS

• Fully enclosed capstan• Compact footprint circular base• Electric Release Zone 1

ATEX approved• Security over inadvertent release

& Release Command signals• IP 66 enclosures• Marinised hook release • Stainless Steel load cells

Page 13: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

Instrumentation & Integration

13

Page 14: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

INTEGRATED CCR SERVER & WORKSTATIONS

•Mooring line tension display

•Mooring set up & alarm level configuration

•Mooring tension warnings

•Approach & Berthing speed, distance & position display

•Met Ocean Wind Wave Current

•Telemetry Communications of Mooring, Berthing & Met Ocean to Secondary Vessel

•Integrated Data Logging

14

Page 15: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

15

Integration concept for STS originated from onshore LNG mooring & berthing

Page 16: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

Berthing & Approach Systems

16

Page 17: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

GPS Based Technology

Satellite Navigation Systems - DGPS & RTK technology

• Monitors the relative closing speed & distance between two vessels for STS or Tandem Mooring applications.

•Provides Primary & Secondary vessels with berthing data with integrated feed from Met Ocean sensors.

•Primary vessel fitted with the fixed system. Secondary vessel is supplied with the portable carry on board unit.

17

Bridge Unit STS or tandem

Navigation Berthing

Page 18: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

18

Information can be displayed over a wireless network or telemetry between vessels to:

• Carry On Board Workstations

• Fixed workstations integrated with load monitoring emergency release & ship to

• Large Main Display Board installed on board the Primary vessel i.e. FSRU or FPSO

Page 19: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

19

Fenders – Pneumatic or Foam

Fender Deployment Systems

for STS

Page 20: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

FENDERS – PNEUMATIC & FOAM

20

Pneumatic Fenders• Up to 4.5m diameter & 12 m long• Complete with Tyre & Chain net• Rigging in chain, wire or synthetic rope

Foam Fenders • Up to 3.8m diameter & 6 m Long• Do not require Chain net• Virtually unsinkable• Closed cell foam & 28mm polyurethane

skin

Page 21: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

FENDER DEPLOYMENT - DAVITS

Fender deployment davits are designed to store the fender either on deck or outboard over the side of the vessel.

•Hydraulic or Electric operation

•Lift capacity to 15t

•API or IEC design

•High dynamic FOS for open sea deployment applications such as FLNG

21

6 Fender Deployment FPSO - Ti Africa ULCC

Out board fender storage proposed for Livorno FLNG

Page 22: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

Tandem Mooring & Offloading Systems

22

Page 23: Oim presentation  rev tt nov 2010 vsersion

23

TANDEM MOORING SOLUTIONS

Shuttle tanker Tandem Mooring Winches

With Emergency Quick Release to full load

Load Monitoring Local & CCR with Load History recording

GPS approach monitoring

Load alarm options deck or CCR load alarm stations

Page 24: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

24

FPSO TANDEM MOORING

Hawser hook with load monitoring and remote release Hawser reeler (vertical or horizontal) with hawser Trelleborg hose and hose reeler Certified by classification society (i.e.. DNV, ABS, Rina, Lloyds)

Page 25: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

25

Quick Release Hawser Hooks

• Class Certified

• OCIMF compliant

• SWL 250t or 400t

Page 26: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

26

Page 27: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

27

I have called it the “LIMP- D- HOOK” or LDH.

Page 28: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

28

Page 29: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

21inch 150m integral buoyancy hawser with 76mm dia. chafe chains

400t Quick Release

Load Monitoring Remote Release

29

Vertical Tandem Mooring Winch – Tupi FPSO

Page 30: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

30

Page 31: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

Offloading Hose

& Hose Reel Systems

31

Page 32: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

Trelleborg Offloading Hoses

32

• Dual & Double carcass manufactured by Trelleborg

• API 17K certified

• Unique flexibility & recess flange design allows for a compact reeler drum.

Page 33: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

33

IMO & OCIMF compliant design

Stores up to 340m of 20inch hose

Capacity 35t pull

Spooling system & fairlead to reduce abrasion to hose

Page 34: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

Spread Mooring

34

Page 35: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

35

Bow Spread Mooring

Page 36: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

Equipment List

Chain stoppers with or without quick release to suit chain up to 127 mm diameter with:

Load Monitoring System Load Alarm Stations Local and remote display at CCR

Chain Tensioners - Using winch or jack Hazardous Area Compliant Class Approved Fixed or transferable within a stopper group.

Chain Fairleads & Chutes Fixed & Sheave type Swivelling Chain to 127mm

36

Page 37: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

Q

37

10 Point Spread Mooring

Chain - 1200 metres 105mm U3

Load Monitoring to 800t

Releasable 0 to 600t

MBL > 1200t

Chain Size 76mm

Load Monitoring to 250t

Releasable 0 to 250t

MBL > 580t

Page 38: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

38

10 Point Spread Mooring System

• Chain 89mm• SWL 300t• Load Monitoring• MBL > 800t

FPSO East Fortune

Page 39: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

Other Products & Services

39

Page 40: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

40

CommissioningTraining Maintenance

Page 41: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

41

Retrofit Load Monitoring

Bow Bitt with Load Cell 400t SWL

CALM Buoy LMS Retrofit

Page 42: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

FAIRLEADSCHOCKS

• Roller fairleads• Chocks • Chain Fairleads• OCIMF compliant• Class certified

42

10 Roller Fairlead - Livorno FSRU

300t Closed Fairlead Aquila FPSO

Page 43: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

Mooring & Tensioning Winches

43

Page 44: Oim presentation  rev tt nov 2010 vsersion

TRELLEBORG GROUP

44

www.trelleborg.com

Questions?