LEVEL 1 ORIENTATION Process Systems Engineering
Overview10 April 2006
LEVEL 1 ORIENTATION Process Systems Engineering
Overview10 April 2006
Level 1 O
rien
tati
on
Level 1 O
rien
tati
on
Bechtel Confidential– 2 –
Process Systems Overview – ObjectivesProcess Systems Overview – Objectives
This module will provide a high level review of the roles of the Process Systems Engineers, the discipline’s organization, processes, procedures, major deliverables, and tools in the OG&C GBU.
When completed, you will have a framework in which to fit the Process Systems activities, work processes, and interfaces.
Level 1 O
rien
tati
on
Level 1 O
rien
tati
on
Bechtel Confidential– 3 –
Process Systems Overview – ContentsProcess Systems Overview – Contents Process Systems Organization
Process Systems Responsibilities
Process Systems Deliverables
Process Systems Deliverables/Requirements
Purpose/Use of P&IDs
P&ID Development Responsibilities
Development of Other Process Systems Engineering Deliverables
Level 1 O
rien
tati
on
Level 1 O
rien
tati
on
Bechtel Confidential– 4 –
Process Systems Overview – OrganizationProcess Systems Overview – Organization The Process Systems group on a project is
headed by the Process Systems Engineering Group Supervisor (EGS)
The Process Systems EGS is supported on a project by the Process Systems Engineers
Level 1 O
rien
tati
on
Level 1 O
rien
tati
on
Bechtel Confidential– 5 –
Process Systems Overview – ResponsibilitiesProcess Systems Overview – Responsibilities
The responsibilities of the Process Systems Engineering Group Supervisor’s are:
Overall design coordination
Know overall design status
Identify problems in execution of design
Budget and schedule design work
Lead other Process Systems Engineers
Responsible for completion of all deliverables
Level 1 O
rien
tati
on
Level 1 O
rien
tati
on
Bechtel Confidential– 6 –
Process Systems Overview – ResponsibilitiesProcess Systems Overview – Responsibilities
The responsibilities of the Process Systems Engineer are:
Produce assigned deliverables
Participate in HAZOP Reviews
Coordinate with other engineering disciplines
Usually responsible for several systems or units
3D Model driving and coordination
Level 1 O
rien
tati
on
Level 1 O
rien
tati
on
Bechtel Confidential– 7 –
Process Systems Overview – DeliverablesProcess Systems Overview – Deliverables P&IDs
Line Designation Tables (LDTs)
Project-specific Specifications (i.e., PSV)
PSV Summary List
Equipment List
Specialty Item List
Hydraulic Calculations
Tie-in List (if required)
Level 1 O
rien
tati
on
Level 1 O
rien
tati
on
Bechtel Confidential– 8 –
Process Systems Engineering Deliverables/ Requirements
PFDs – Process Systems provides CADD support only, in support of Process Engineering
Design Pressure and Temperature Guide (DPDT) – the DPDT guide will be an overlay of the PFDs and will be Issued for Use by Process Systems with input/review by Process
Material Selection Guides (MSGs) – the MSG guide will be an overlay of the PFDs and will be issued for approval/design by MET with CADD support by Process Systems
Level 1 O
rien
tati
on
Level 1 O
rien
tati
on
Bechtel Confidential– 9 –
Process Systems Engineering Deliverables/ Requirements
P&IDs – to be Issued for Review (IFR), Approval (IFA), HAZOP (IFH), Design (IFD) and Construction (IFC) using project approved CADD format
LDTs – to be issued along with P&IDs
Equipment List – will be developed by Process Systems with input from Process and Mechanical
Pump and Compressor Calculations –hydraulic calculations will be performed for all rotating equipment
Level 1 O
rien
tati
on
Level 1 O
rien
tati
on
Bechtel Confidential– 10 –
Process Systems Engineering Deliverables/ Requirements
Hold Lists, DCNs and Management of Change (MOC) – MOC will be implemented after P&IDs are issued for HAZOP; revision lists will be issued with P&IDs after the HAZOP is complete; hold Lists and DCNs will be issued after Issued for Design (IFD)
Specialty and tie-in lists
PSV Summary
Model Driving/Coordination – provide a model driver for model reviews and coordinate models comments
Level 1 O
rien
tati
on
Level 1 O
rien
tati
on
Bechtel Confidential– 11 –
Types of P&IDsTypes of P&IDs
Process P&IDs
Utilities P&IDs
Auxiliary P&IDs
Level 1 O
rien
tati
on
Level 1 O
rien
tati
on
Bechtel Confidential– 12 –
Purpose / Use of P&IDsPurpose / Use of P&IDs
The most essential document on the project
Defines the scope of work
Transmits essential information to design groups
Used for planning by construction, startup and operations
Used to prepare preliminary piping and special material take-offs
Used to develop preliminary plot plan
Used to provide the design basis for model work
Level 1 O
rien
tati
on
Level 1 O
rien
tati
on
Bechtel Confidential– 13 –
Purpose / Use of P&IDs (Cont’d)Purpose / Use of P&IDs (Cont’d)
Used to control changes to the scope of work
Used to help maintain basic job documents
— Line Designation Tables
— Instrument Index
— Insulation and heat tracing requirements
— Piping material classes
Level 1 O
rien
tati
on
Level 1 O
rien
tati
on
Bechtel Confidential– 14 –
Purpose / Use of P&IDs (Cont’d)Purpose / Use of P&IDs (Cont’d)
Used for constructability reviews
Used with equipment list to make engineering work hour estimates
Provide basis for the client’s operator training and maintenance planning
Level 1 O
rien
tati
on
Level 1 O
rien
tati
on
Bechtel Confidential– 15 –
P&ID Development ResponsibilitiesP&ID Development ResponsibilitiesProject Engineering Manager PEM ensures that all P&ID guidelines are
followed
Area Project Engineer Verify schedule for issuing P&IDs is consistent
with project requirements Ensures specific requirements are in place for:
— Sparing philosophy
— Winterization
— Insulation/tracing
— Drainage systems.
Level 1 O
rien
tati
on
Level 1 O
rien
tati
on
Bechtel Confidential– 16 –
P&ID Development Responsibilities (Cont’d)
P&ID Development Responsibilities (Cont’d)
Process Engineering
Provides process design information
— Issues and updates PFDs
— Issues stream data and properties
— Issues initial pump requirements
Provides process design information for equipment
— Vessel design sketches
— Tray data sheets
— Fired heater process data
Level 1 O
rien
tati
on
Level 1 O
rien
tati
on
Bechtel Confidential– 17 –
P&ID Development Responsibilities (Cont’d)
P&ID Development Responsibilities (Cont’d)
Process Engineering (Cont’d)
Provides process design information for equipment (Cont’d)
— Compressor process data sheets
— Heat exchangers process data sheets
Provides relief valve selection basis including size estimate
Prepares utility balances
Level 1 O
rien
tati
on
Level 1 O
rien
tati
on
Bechtel Confidential– 18 –
P&ID Development Responsibilities (Cont’d)
P&ID Development Responsibilities (Cont’d)
Process Systems Engineers
Prepare all P&ID drawings
Perform pipe size calculations
— Select line sizes
— Provide control valve and flow element sizing data to control systems
— Assign Line Numbers
— Prepare LDTs
Identify and number all specialty items
Level 1 O
rien
tati
on
Level 1 O
rien
tati
on
Bechtel Confidential– 19 –
P&ID Development Responsibilities (Cont’d)
P&ID Development Responsibilities (Cont’d)
Process Systems Engineers (Cont’d)
Verify the accuracy of mechanical data sheets and specifications based on the P&ID
Coordinate information between P&IDs of systems and related areas of plant
Ensure system design is suitable for upset conditions
Ensure all applicable environmental and safety codes and practices are followed
Ensure that P&IDs meet maintenance and safety needs
Level 1 O
rien
tati
on
Level 1 O
rien
tati
on
Bechtel Confidential– 20 –
P&ID Development Responsibilities (Cont’d)
P&ID Development Responsibilities (Cont’d)
Process Systems Engineers (Cont’d)
Make all P&ID issues (IFR, IFA, IFH, IFD, IFC)
— Prepare and issue revision lists (after IFH issue)
Maintain the up-to-date master markup
Conduct P&ID review meeting of client P&ID comments after IFA issue
Conduct 3D Model Reviews
Level 1 O
rien
tati
on
Level 1 O
rien
tati
on
Bechtel Confidential– 21 –
P&ID Development Responsibilities (Cont’d)
P&ID Development Responsibilities (Cont’d)
Control Systems Engineering
Works with Process Systems in the representation of control systems on the P&ID
Reviews Control Philosophy and ensures conformance to project requirements
Issues uniform criteria for application of control systems and instrumentation
Ensures proper instrumentation numbering and symbology on the P&IDs
Level 1 O
rien
tati
on
Level 1 O
rien
tati
on
Bechtel Confidential– 22 –
P&ID Development Responsibilities (Cont’d)
P&ID Development Responsibilities (Cont’d)
Control Systems Engineering (Cont’d)
Prepares functional control diagrams
Regularly updates master markup
— Reviews changes in instrumentation that will impact other disciplines with Process Systems and the affected disciplines
Ensures accurate representation of instrumentation supplied with vendor packages
Identifies control systems packages including utility requirements
Level 1 O
rien
tati
on
Level 1 O
rien
tati
on
Bechtel Confidential– 23 –
P&ID Development Responsibilities (Cont’d)
P&ID Development Responsibilities (Cont’d)
Plant Design and Piping
Issues piping material classification specifications
Provides configuration of the piping on the P&IDs
Updates the project master markup
Advises Process Systems of equipment layout changes that affect the P&IDs
Level 1 O
rien
tati
on
Level 1 O
rien
tati
on
Bechtel Confidential– 24 –
P&ID Development Responsibilities (Cont’d)
P&ID Development Responsibilities (Cont’d)
Mechanical Engineering
Provides preliminary estimate of number of exchanger shells and air cooler exchanger sections
Coordinate any changes to mechanical equipment that affects the P&IDs
Provides equipment data summary with utility requirements
Provides preliminary vendor data obtained from successful equipment vendor’s quotation
Level 1 O
rien
tati
on
Level 1 O
rien
tati
on
Bechtel Confidential– 25 –
Development of Other Process Systems DeliverablesDevelopment of Other Process Systems DeliverablesHydraulic Calculations Line Designation Tables (LDT)
— Line Designation Tables provide a listing of all process and utility lines, includes velocity and delta P per km specifications for normally flowing lines
— Includes the upset and design pressure/temperature (at IFH issue)
— Line Designation tables contain pertinent design information for each line to determine wall thickness, insulation, stress analysis, supports
Pump and Compressor Hydraulic Calculations— Determine preliminary system requirements— Determine preliminary power requirements
Level 1 O
rien
tati
on
Level 1 O
rien
tati
on
Bechtel Confidential– 26 –
Development of Other Process Systems Deliverables (Cont’d)
Development of Other Process Systems Deliverables (Cont’d)
Pump and Compressor Hydraulic Calculations IFQ Phase ─ Level 1
— Level 1 uses preliminary information for pump calculations, Equipment Dp, Estimated Dp for Control Valves, Plot Plan and equipment layout for line loss estimates
IFP Phase ─ Level 2— Level 2 uses quoted pump curves, quoted pump
NPSH (adjust skirt height), quoted equipment Dp, Calculated control valve CV, Piping drawings for line loss calculations
VP Phase ─ Level 3— Level 3 uses final pump curves, pump NPSH,
equipment DP, Control Valve CV, Isometrics
Level 1 O
rien
tati
on
Level 1 O
rien
tati
on
Bechtel Confidential– 27 –
Process Systems Overview – SummaryProcess Systems Overview – Summary
This module provided a high level review of the roles of the Process Systems Engineers, the discipline’s organization, processes, procedures, major deliverables, and tools in the OG&C GBU
Now you have a framework in which to fit the Process Systems activities, work processes, and interfaces