XceIEnergy Suppementa Reports 2010 2014 Financial Performance Team FPT Operating and Maintenance Expense Reports This section contains explanations for significant differences between the NSPM Companys year end actual and budget business area departmental operating and maintenance expenses for the previous five years The purpose of these schedules is to provide the reports that were reviewed and used each month by the executives of Xcel Energy Financial Council to govern the companies operating and maintenance expenditures Together these reports indicate the Companys historical actual versus budget performance and provide explanations for variances The FPT schedules provided in Section are those referenced by Company witness Gregory Robinson within his direct testimony discussion regarding the accuracy of the Companys budgets to its actual cost These reports are consistent with the values shown in Table Total NSPM Company Actual vs Budget OM within his testimony The total operating and maintenance amounts summarized on the FPT reports include NSPM Company electric gas and non-utility expenditures Therefore they do not match the total operating and maintenance expenses identified on the NSPM Companys five historical electric utility operating and maintenance expense schedules included in Section NSPM Electric Utility OM Expense

Upload: others

Post on 01-Feb-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

  • XceIEnergy

    Suppementa Reports

    2010 2014 Financial Performance Team FPT Operating and Maintenance ExpenseReports

    This section contains explanations for significant differences between the NSPM

    Companys year end actual and budget business area departmental operating and

    maintenance expenses for the previous five years The purpose of these schedules is to

    provide the reports that were reviewed and used each month by the executives of Xcel

    Energy Financial Council to govern the companies operating and maintenance

    expenditures Together these reports indicate the Companys historical actual versus

    budget performance and provide explanations for variances

    The FPT schedules provided in Section are those referenced by Company witness

    Gregory Robinson within his direct testimony discussion regarding the accuracy of the

    Companys budgets to its actual cost These reports are consistent with the values

    shown in Table Total NSPM Company Actual vs Budget OM within his testimony

    The total operating and maintenance amounts summarized on the FPT reports include

    NSPM Company electric gas and non-utility expenditures Therefore they do not match

    the total operating and maintenance expenses identified on the NSPM Companys fivehistorical electric utility operating and maintenance expense schedules included in

    Section NSPM Electric Utility OM Expense

  • FPT Report

    OM Actual

    vs Budget

    Northern States Power

    Co Minnesota Company

    December 2010

    Attachment

    OM thousands

    of

    Energy Supply

    C/H

    Nuclear Generation

    Nuclear Amortization Other

    Talent Tech Customers

    Distribution

    Transmission

    Reg Resource Planning

    Corporate Other

    Corporate Services

    Financial Operations

    General Counsel

    Chief Executive Officer

    Benefits

    Total

    YE 2010

    Actuals

    YE Budget Difference

    162080 167460 5380270316 264809 5507

    19759 18818

    941

    142086 154407 12321143903 150857 6954

    39385 34669 4717

    10037 10097

    60

    36851 35261 1590

    35569 36750 118136358 36464

    107

    10096 8762 1333

    12601 12925

    323

    118959 102660 16299

    1038000 $1033940 4061

    Year

    End Deviation

    Energy Supply

    C/H

    Management Initiatives

    GM

    MN Plants

    Management Initiatives Peaking Plants

    Management Initiatives Service Orgs

    Management Initiatives Sherco

    Ui overhaul turbine work move

    to 2012

    Management Initiatives Sherco

    U2 overhaul move from 2009

    Target Adjustment Total Round Management Initiatives

    Management Initiatives

    GM MN Plants

    Management Initiatives Hydro

    Management Initiatives Peaking Plants Granite City

    Management Initiatives Service Orgs

    Target Adjustment Total Round Management Initiatives

    3155

    49

    685

    510075001489

    2175

    25

    325

    204

    2729

    Management Initiatives

    GM

    MN Plants

    Management Initiatives Service Orgs

    Target Adjustment Total Round Management Initiatives

    TargetAdjustment Phase -Accelerations from 2011/12

    Target Adjustment Phase

    2- 2010 additional spend

    Accelerations into 2009

    Peaking move from 2009

    333

    774

    1107

    567

    1456

    1486

    540

    Page

    of

    14

  • OM thousands

    of

    FPT Report

    OM Actual

    vs Budget

    Northern States Power

    Co Minnesota Company

    December 2010

    Energy Supply

    C/H

    Nuclear Generation

    Nuclear Amortization Other

    Talent Tech Customers

    Distribution

    Transmission

    Reg Resource Planning

    Corporate Other

    Corporate Services

    Financial Operations

    General Counsel

    Chief Executive Officer

    Benefits

    TotalY

    E Actuals

    YE Budget Difference

    162080 167460 5380270316 264809 5507

    19759 18818

    941

    142086 154407 12321143903 150857 6954

    39385 34669 4717

    10037 10097

    60

    36851 35261 1590

    35569 36750 118136358 36464

    107

    10096 8762 1333

    12601 12925

    323

    118959 102660 16299

    1.038.000 $1033940 4.061

    GM

    MN overrun

    due

    to Nuclear plant overhaul support

    GM

    MN Sales/use

    tax rebate credit

    MN Craft labor increase

    in

    support

    of non-ES departments

    Net Service

    Org reductions

    due

    to

    productivity challenge

    Peaking-Anson gas line integrity project

    not budgeted

    Peaking-Anson

    U4

    Cl overhaul moved

    to 2012 $700k

    U2

    Cl moved

    to 2013 $390kPeaking-Blue Lake

    U8 unplanned outage

    and compressor grinding overhaul

    Peaking-Grand Meadow inspections materials underrun

    Peaking-Granite City

    UI

    gen inspection

    in forecast only

    see above under

    Mls

    Peaking-Inver Hills

    U2

    major inspection overhaul moved

    to 2011

    Peaking-MN Valley

    dam removal

    and stop

    log grout repairs project delayed

    Peaking-Nobles base cost increase primarily

    due

    to land lease payments earlier start-up

    Peaking-reduce full-time benefit employees

    at Anson

    AS King-mercury sorbent reduction

    due

    to

    timing

    of project completion rider

    AS

    King Spring overhaul

    gas recirc

    fan repairs discovery work

    AS King reclassification

    of

    ash landfill capital project

    to

    OM

    AS King -lime silo repairs payment applied

    to

    revenue

    High Bridge reduction

    in

    outage work scopeService Orgs additional cost savingsSherco

    U3

    mercury sorbent underrun

    due

    to results

    of fuel

    sys optimization testing

    Sherco-Ul overhaul work scope change timing airheater gearbox repairs

    Sherco-U2 overhaul discovery work

    Sherco-U3 forced outage tube leak repairs

    Sherco-U3 audit findings settlement

    CM less than anticipated

    Other

    Year

    End Deviation

    317

    990

    103

    260

    430

    1090

    180

    259

    150

    650

    60

    950

    200

    1052

    200

    358

    730

    500

    10002150

    700

    2500

    1600

    19

    863

    55

    Total Energy Supply

    C/H 5380

    Attachment

    Page

    of

    14

  • FPT Report

    OM Actual

    vs Budget

    Northern States Power

    Co Minnesota Company

    December 2010

    Attachment

    OM thousands

    of

    $1

    Energy Supply

    C/H

    Nuclear Generation

    Nuclear Amortization Other

    Talent Tech Customers

    Distribution

    Transmission

    Reg Resource Planning

    Corporate Other

    Corporate Services

    Financial Operations

    General Counsel

    Chief Executive Officer

    Benefits

    Total

    YE 2010

    YE Actuals

    YE Budget Difference

    162080

    270316

    19759

    142086

    143903

    39385

    10037

    36851

    35569

    36358

    10096

    12601

    118959

    167460

    264809

    18818

    154407

    150857

    34669

    10097

    35261

    36750

    36464

    8762

    12925

    102660

    53805507

    941

    1232169544717

    60

    1590

    1181

    107

    1333

    323

    16299

    1.038.000 51.033.940 4.061

    Nuclear Generation

    MONTICELLOTarget Adjustment Management Initiatives Round

    Target Adjustment Management Initiatives Round

    Target Adjustment Additional Mgmt Initiatives

    Target Adjustment Phase Accelerations from 2011

    Target Adjustment Phase Approved new projects

    Target Adjustment

    IT move

    to

    Corp

    and

    HR

    security moved

    to Nuclear

    Non-Outage

    Accelerations into 2009

    Forecast change commitment

    Forecast sensitivity

    Labor Nuclear Labor Pool

    Adj

    Plant shutdown to repair

    15 feedwater heater tube leaks

    Security-force

    on force drill comp measures other contractor expense snow removal

    Other

    Total Non-Outage

    Outage

    Outage Prep Timing

    Total OutageTotal Monticello

    Year

    End Deviation

    1534

    202

    400

    400

    175

    750

    426

    805

    1062

    89

    2100

    325

    59

    85

    85

    Page

    of

    14

  • Energy Supply

    C/H

    Nuclear Generation

    Nuclear Amortization Other

    Talent Tech Customers

    Distribution

    Transmission

    Reg Resource Planning

    Corporate Other

    Corporate Services

    Financial Operations

    General Counsel

    Chief Executive Officer

    Benefits

    Total

    PRAIRIE ISLAND

    Target Adjustment Management Initiatives Round

    Target Adjustment Management Initiatives Round

    Target Adjustment Additional Mgmt Initiatives

    Target Adjustment Phase Accelerations from 2011

    Target Adjustment Phase Approved

    new projects

    Target Adjustment

    IT

    move

    to

    Corp

    and

    HR

    security moved

    to Nuclear

    Non-Outage

    Accelerations into 2009

    Initiatives

    to fund Outage over-run

    Initiatives-Dewolif

    and income taxes

    Instrument

    Air Project Write-down forecasted

    at Corp level

    Labor

    PTO Carryover savings

    EP fees less than budget

    and 2009 sales

    tax

    true-up

    Planning Project budget transferred

    to

    outage

    Planning budget transferred

    to 2011 outage

    Planning budget transferred

    to 2012 outageTurbine building flood project moved

    to

    capital

    Other Misc

    Total Non-Outage

    Outage

    2009 Outage expense Credit from Siemens

    for work

    not performed

    to

    spec2009 Outage expense Westinghouse

    for work

    not performed

    tospec

    2010 Outage Forecast Sensitivity Turbine Contract

    2010 Outage Planning Project budget transferred

    to

    outage

    2010 Planned Refueling Outage CM-fuel cavity leakageto

    capital

    2011 Planning budget transferred

    to

    outage

    2012 Planning budget transferred

    to

    outage

    Total OutageTotal Prairie Island

    YE 2010

    YE Actuals

    YE Budget Difference

    162080 167460 5380270316 264809 5507

    19759 18818

    941

    142086 154407 12321143903 150857 6954

    39385 34669 4717

    10037 10097

    60

    36851 35261 1590

    35569 36750 118136358 36464

    107

    10096 8762 1333

    12601 12925

    323

    118959 102660 16299

    1038000 $1033940 4061

    Year

    End Deviation

    1580

    406

    1151

    700

    1540

    821

    177

    771

    200

    7519

    228

    397

    720

    167

    133

    900

    945

    3319

    950

    264

    2900

    72

    02

    87

    16

    71

    33

    2993

    6312

    FPT Report

    OM Actual vs Budget Attachment

    Northern States Power

    Co Minnesota Company

    December 2010

    OM thousands

    of

    Page

    of

    14

  • OM thousands

    of

    $1

    FPT Report

    OM Actual vs Budget

    Northern States Power

    Co Minnesota Company

    December 2010

    Energy Supply

    C/H

    Nuclear Generation

    Nuclear Amortization Other

    Talent Tech Customers

    Distribution

    Transmission

    Reg Resource Planning

    Corporate Other

    Corporate Services

    Financial Operations

    General Counsel

    Chief Executive Officer

    Benefits

    Total

    YE 2010

    YE Actuals

    YE Budget Difference

    162080 167460 5380270316 264809 5507

    19759 18818

    941

    142086 154407 12321143903 150857 6954

    39385 34669 4717

    10037 10097

    60

    36851 35261 1590

    35569 36750 118136358 36464

    107

    10096 8762 1333

    12601 12925

    323

    118959 102660 16299

    1038000 $1033940 4061

    NUCLEAR SUPPORTTarget Adjustment Management Initiatives Round

    Target Adjustment Management Initiatives Round

    Target Adjustment Additional Mgmt Initiatives

    Target Adjustment Phase Accelerations from 2011

    Target Adjustment

    HR

    security moved

    to Nuclear

    Forecast sensitivity

    Accelerations into 2009

    YE reduction

    of labor consulting

    and employee expenses CM-timing

    of moving expenses

    Total Nuclear SupportOther

    Total Nuclear Generation

    Nuclear Outage Cost Deferral

    and Amortization

    Year

    End Deviation

    505

    304

    444

    105

    994

    115

    68

    613

    720

    5507

    Lower deferral

    due

    to reversal

    of December

    P1 Unit

    R26 accruals

    Monticello

    R25 costs lower than budget

    YTD

    P1 Unit

    R27 costs higher than budget

    YTD

    P1 Unit 2R26/27 costs higher than budget

    YTD

    Total Outage Cost Deferrals

    Monticello

    R24 amortization lower than budget

    due

    to lower costs

    P1 Unit

    R26 amortization higher than budget

    due

    to

    higher costs

    P1 Unit 2R26 amortization higher than budget

    du

    e

    to

    higher costs

    Total Outage Cost Amortizations

    Other

    Total Nuclear Outage Cost Deferral

    an

    d Amortization

    1215

    495

    410

    40912791

    491

    3154

    1072

    3735

    94

    1

    Attachment

    Page

    of

    14

  • FPT Report

    OM Actual vs Budget

    Northern States Power

    Co Minnesota Company

    December 2010

    Attachment

    OM thousands

    of

    Energy Supply

    C/H

    Nuclear Generation

    Nuclear Amortization Other

    Talent Tech Customers

    Distribution

    Transmission

    Reg Resource Planning

    Corporate Other

    Corporate Services

    Financial Operations

    General Counsel

    Chief Executive Officer

    Benefits

    Total

    YE 2010

    YE Actuals

    YE Budoet Difference

    162080 167460 5380270316 264809 5507

    19759 18818

    941

    142086 154407 12321143903 150857 6954

    39385 34669 4717

    10037 10097

    60

    36851 35261 1590

    35569 36750 118136358 36464

    107

    10096 8762 1333

    12601 12925

    323

    118959 102660 16299

    1.038.000 S1.033.940 4061

    TTC

    Management Initiatives Round

    Human ResourcesCustomer Care

    Business Systems

    Marketing

    Total Management Initiatives Round

    Year

    End Deviation

    121

    156

    608

    215

    1100

    Management Initiatives Round

    Human ResourcesCustomer Care

    Business Systems

    Marketing

    Bad Debt

    Total Management Initiatives Round

    Accelerations

    Human ResourcesBusiness Systems

    Marketing

    Total Accelerations

    Incremental Projects

    Business Systems

    Total Incremental Projects

    79

    88

    204

    19

    12881678

    70

    441

    20

    53112

    12

    Page

    of

    14

  • FPT Report

    OM Actual

    vs Budget

    Northern States Power

    Co Minnesota Company

    December 2010

    OM thousands

    of

    Energy Supply

    C/H

    Nuclear Generation

    Nuclear Amortization Other

    Talent Tech Customers

    Distribution

    Transmission

    Reg Resource Planning

    Corporate Other

    Corporate Services

    Financial Operations

    General Counsel

    Chief Executive Officer

    Benefits

    Total

    YE 2010

    Actuals

    YE Budget Difference

    162080 167460 5380270316 264809 5507

    19759 18818

    941

    142086 154407 12321143903 150857 6954

    39385 34669 4717

    10037 10097

    60

    36851 35261 1590

    35569 36750 118136358 36464

    107

    10096 8762 1333

    12601 12925

    323

    118959 102660 16299

    1038000 $1033940 4061

    Bad Debt unfavorable

    due

    to reserve change offset

    by

    net write offs

    for

    the current month

    and favorable

    for

    YE

    BS Favorable software maintenance

    due

    to

    prepaid correction from prior month change

    in

    timing

    of

    the prepaid NACR invoice

    change

    in run rate

    due

    to amortization

    of many contracts over service period

    and other favorable variances

    in various categories

    BS Budget transfer

    of Nuclear

    BS Direct charge

    vs allocations

    for Network Radio

    FMF

    partially offset

    by

    09

    FMF that

    was

    paid

    in 2010

    and Network Radio infrastructure

    BS Virtualization

    of servers

    as well

    as contract change on per server costs

    and re-negotiated Disaster Recovery contract with

    IBM

    BS Accenture expense recognition associated with

    new contracfiADM

    BS Higher contract labor/consulting/online information primarily driven

    by

    PW

    C

    IT

    Assessmentand

    ION

    Calpine Integration

    BS Consulting fees

    due

    to PWC

    CC Favorable

    due

    to

    managed under

    run driven

    by December vacations

    and lower postage

    HR Favorable

    due

    to

    managed under

    run

    in

    consulting/screening

    and labor

    for

    YE

    HR Transfer

    of Nuclear Screening

    Marketing Favorable

    due

    to

    managed under

    run

    and

    net other lower

    Other

    Total

    TTC

    Year End Deviation

    65651074

    1765

    1200

    1262

    544

    866

    213

    254

    18821187

    290

    240

    10086

    12321

    Attachment

    Page

    of

    14

  • FPT Report

    OM

    Actual

    vs Budget Attachment

    Northern States Power

    Co Minnesota Company

    December 2010

    OM thousands

    of

    Energy Supply

    C/H

    Nuclear Generation

    Nuclear Amortization Other

    Talent Tech Customers

    Distribution

    Transmission

    Reg Resource Planning

    Corporate Other

    Corporate Services

    Financial Operations

    General Counsel

    Chief Executive Officer

    Benefits

    Total

    Distribution

    Sewer mitigation incremental costs moved

    to deferred account

    Vegetation Management achieved additional reductions

    put

    in

    place

    in Nov/Dec

    Additional reduction efforts

    for advertising dues

    and sponsorships

    Increased overtime

    due

    to

    reliability efforts

    Material reduction efforts

    and commodity price savings beyond management initiatives

    Labor attrition impacts partially offset

    by favorable labor savings

    due

    to

    delayed hires

    and

    PTO

    Increased overtime

    due

    to

    significant storm events

    Increased Integrity Management Project efforts

    due

    to

    project plan changes

    Reductions efforts

    in contract outside vendor costs

    for projects

    on hold

    Reductions efforts

    in

    contact labor beyond management initiatives

    to

    help offset overruns

    due

    to other impacts

    Increased gas

    and elect utility costs

    as facilities moves costs

    out

    to

    the business areas

    Achieved Management Initiatives

    Low

    Achieved Management Initiatives MediumAchieved Management Initiatives Sustainable

    Achieved Management Initiatives Other

    Achieved 2009 Accelerations savings which included materials

    and

    Veg Mgmt

    2011 Accelerations into 2010 achieved

    for Outdoor lighting pole painting

    and capacitor controls purchase

    OM

    Additions $546K

    out

    of

    the $700K was spent

    on Qwest effort

    due

    to additional reductions

    to be achieved

    Vegetation Management L1DAR

    Other

    Total Distribution

    Actuals

    YE Budget Difference

    162080 167460 5380270316 264809 5507

    19759 18818

    941

    142086 154407 12321143903 150857 6954

    39385 34669 4717

    10037 10097

    60

    36851 35261 1590

    35569 36750 118136358 36464

    107

    10096 8762 1333

    12601 12925

    323

    118959 102660 16299

    1.038.000 51.033.940 4.061

    Year

    End Deviation

    500

    202

    131

    15611000

    1263

    288

    343

    400

    149

    15181520

    579

    3500

    818

    400

    546

    210

    6954

    Page

    of

    14

  • FPT Report

    OM Actual

    vs Budget Attachment

    Northern States Power

    Co Minnesota Company

    December 2010

    OM thousands

    of

    Energy Supply

    C/H

    Nuclear Generation

    Nuclear Amortization Other

    Talent Tech Customers

    Distribution

    Transmission

    Reg Resource Planning

    Corporate Other

    Corporate Services

    Financial Operations

    General Counsel

    Chief Executive Officer

    Benefits

    Total

    Transmission

    Substation labor driven

    by overtime

    to

    support maintenance

    and emergency work

    Substation consulting services

    to

    support increased compliance workload

    Substation contract vendor supporting increased transformer maintenance versus budgeted work plan

    Substation materials

    for maintenance work

    Substation employee

    exp mileage meals

    and safety equipment performing maintenance

    and emergency work floods 2010

    Substation equipment rental

    to

    support additional compliance workload

    Substation credits

    for Energy Supply work performed under

    in

    current

    mo

    and

    in excess

    of planned

    YTD

    Non-Substation labor driven

    by overtime

    in

    field operations

    YTD $256K performing line maintenance

    Non-Substation productive labor

    and labor loading non-productive

    are less than planned YTD$-492 plus impact

    of

    attrition

    YT

    D $414K

    on

    the business areas budgets

    Other compensation-welfare fund more than planned

    in

    field operations

    Contract labor less than planned

    for business operations

    and

    the vice president organization

    Timing

    of requested Consulting studies

    Contract outside vendor decreased

    in

    Field Operations

    due

    to maintenance work performed

    by internal resources

    Timing

    of partner invoicing CapX

    OM

    Materials increased

    in

    Field Operations

    due

    to avian protection woodpecker hole filler

    $1

    02K

    and line maintenance work

    Employee expenses reduced against planned spend

    as business areas reduced travel

    Transportation fleet expense variance

    to

    historic spend budget splits

    Regulatory fees timing

    vs historic spend budget splits

    Electric utility association dues land rights fees

    and transmission fees less than planned

    Other

    Total Transmission

    YE 2010

    Actuals

    YE Budget Difference

    162080 167460 5380270316 264809 5507

    19759 18818

    941

    142086 154407 12321143903 150857 6954

    39385 34669 4717

    10037 10097

    60

    36851 35261 1590

    35569 36750 118136358 36464

    107

    10096 8762 1333

    12601 12925

    323

    118959 102660 16299

    1.038.000 51.033.940 4.061

    Year

    End Deviation

    1061

    187

    3586

    34

    585

    189

    522

    256

    78

    214

    177

    335

    394

    160

    545

    112

    163

    136

    280

    97

    4717

    Page

    of

    14

  • OM thousands

    of

    FPT Report

    OM Actual

    vs Budget

    Northern States Power

    Co Minnesota Company

    December 2010

    Energy Supply

    C/H

    Nuclear Generation

    Nuclear Amortization Other

    Talent Tech Customers

    Distribution

    Transmission

    Reg Resource Planning

    Corporate Other

    Corporate Services

    Financial Operations

    General Counsel

    Chief Executive Officer

    Benefits

    Total

    Actuals

    YE Budget Difference

    162080 167460 5380270316 264809 5507

    19759 18818

    941

    142086 154407 12321143903 150857 6954

    39385 34669 4717

    10037 10097

    60

    36851 35261 1590

    35569 36750 118136358 36464

    107

    10096 8762 1333

    12601 12925

    323

    118959 102660 16299

    1038000 $1033940 4061

    Regulatory Resource Planning

    Management Initiatives

    Additional reductions

    in

    consulting recognition office supplies

    and employee expenses

    Write

    off expenses

    for

    MN Rate Case costs

    in excess

    of authorized

    Other

    Total Regulatory Resource Planning

    Corporate Other

    Year

    End Deviation

    101

    495

    530

    60

    Transmission Interchange Expense

    First

    Set Credit variance

    due

    to

    change

    in

    meter/transformer purchases

    Company

    use credit

    Net

    BM

    O accrual

    for unreconciled transactions

    in concur

    Service Company Permanent

    Tax Differences

    Denver audit settlement

    Shared asset annual true up

    for PeopleSoft

    and

    CR

    S

    Other

    Total Corporate Other

    479

    377

    419

    537

    2009

    139

    74

    106

    1590

    Attachment

    Page

    10

    of

    14

  • OM thousands

    of

    FPT Report

    OM Actual vs Budget

    Northern States Power

    Co Minnesota Company

    December 2010

    Energy Supply

    C/H

    Nuclear Generation

    Nuclear Amortization Other

    Talent Tech Customers

    Distribution

    Transmission

    Reg Resource Planning

    Corporate Other

    Corporate Services

    Financial Operations

    General Counsel

    Chief Executive Officer

    Benefits

    Total

    YE 2010

    Actuals

    YE Budaet Difference

    162080 167460 5380270316 264809 5507

    19759 18818

    941

    142086 154407 12321143903 150857 6954

    39385 34669 4717

    10037 10097

    60

    36851 35261 1590

    35569 36750 118136358 36464

    107

    10096 8762 1333

    12601 12925

    323

    118959 102660 16299

    1038000 $1033940 4061

    Corporate Services

    Management Initiatives Excluding Property Services

    Management Initiatives Property Services

    Total Management Initiatives

    Reductions above mgmt initiative

    for Consulting Equipment Maint Brand Sponsorship Director Fees

    Reduced proxy statement facility solicitation

    and transfer share expenses

    in Shareholder Relations

    Reduced materials director fees

    and shareholder relations

    Rents shared asset annual true-up

    Rents 1800 Larimer change

    in

    possession

    of floors

    and addition

    of taxes

    and tenant operating

    and maintenance expenses

    Rents reduced contract labor

    to

    keep 2010 expense flat

    to 2009 actuals

    Rents

    ES

    G chemical labs moved

    to MDC

    Rents transfer from Business Systems

    for

    copier lease/use

    Rents change

    in the labor allocation

    Rents maintenance spending increased

    to

    complete projects

    in

    2010 snow removal expense

    due

    to several storms

    and copier lease payment made later than budgeted

    due

    to invoicing issues withth

    e vendorOther

    Year

    End Deviation

    237

    89

    326

    Attachment

    551

    323

    813

    651

    165

    12

    18

    115

    398

    33

    855

    Total Corporate Services 1181

    Page

    11

    of

    14

  • FPT Report

    OM Actual

    vs Budget

    Northern States Power

    Co Minnesota Company

    December 2010

    OM thousands

    of

    Energy Supply

    C/H

    Nuclear Generation

    Nuclear Amortization Other

    Talent Tech Customers

    Distribution

    Transmission

    Reg Resource Planning

    Corporate Other

    Corporate Services

    Financial Operations

    General Counsel

    Chief Executive Officer

    Benefits

    Total

    YE 2010

    Actuals

    YE Budget Difference

    162080 167460 5380270316 264809 5507

    19759 18818

    941

    142086 154407 12321143903 150857 6954

    39385 34669 4717

    10037 10097

    60

    36851 35261 1590

    35569 36750 118136358 36464

    107

    10096 8762 1333

    12601 12925

    323

    118959 102660 16299

    1038000 $1033940 4061

    Financial Operations

    Management Initiatives

    Labor savings above management initiatives including workforce plan reductions with timing

    of

    PTO

    also impacting December

    Severances

    Credits

    for loss control engineers labor

    and expenses reimbursed

    by captive insurance

    Contract labor reductions above management initiatives

    Other consulting including

    an NSPM electric project

    Legal consulting supporting

    the

    tax department

    Reductions

    and OpCo allocation adjustments

    to Controller accounting consulting including

    tax support

    and

    DT

    audits above management initiatives

    for year-end

    Employee expense savings above management initiatives

    Risk Management legal settlements

    Property insurance including increase

    for loss control

    and

    for

    the Nobles Wind Farm

    General liability insurance

    due

    to

    high losses

    Auto liability/physical damage insurance reductions

    due

    to loss history

    Directors

    and Officers/Fiduciary insurance

    Other insurance

    due

    to delay

    in the purchase

    of Cyber Risk insurance until 2011

    Nuclear property insurance

    due

    to

    completion

    of shall recommendations

    for reductions

    Nuclear liability insurance primarily

    due

    to Price-Anderson

    Act which requires

    the purchase

    of as much insurance

    as

    the market will beer

    2009 nuclear liability Industry Credit Rating Plan ICRP distribution larger than anticipatedReduced Nuclear Electric Insurance Limited distribution compared

    to

    year-end budget

    Unclaimed propertyOn-line information services

    Other

    Total Financial Operations

    Year

    End Deviation

    180

    461

    177

    77

    149

    185

    57

    374

    363

    180

    73

    1027

    62

    36

    113

    71

    126

    140

    504

    88

    12

    22

    25

    107

    Attachment

    Page

    12

    of

    14

  • OM thousands

    of

    FPT Report

    OM Actual

    vs Budget

    Northern States Power

    Co Minnesota Company

    December 2010

    Energy Supply

    C/H

    Nuclear Generation

    Nuclear Amortization Other

    Talent Tech Customers

    Distribution

    Transmission

    Reg Resource Planning

    Corporate Other

    Corporate Services

    Financial Operations

    General Counsel

    Chief Executive Officer

    Benefits

    Total

    YE 2010

    YE Actuals

    YE Budget Difference

    162080 167460 5380270316 264809 5507

    19759 18818

    941

    142086 154407 12321143903 150857 6954

    39385 34669 4717

    10037 10097

    60

    36851 35261 1590

    35569 36750 118136358 36464

    107

    10096 8762 1333

    12601 12925

    323

    118959 102660 16299

    1038000 $1033940 4061

    General Counsel

    Management initiatives

    Increases

    to outside legal

    due

    to 2010 sensitivities

    Labor decrease

    due

    to

    delays

    in

    hiring

    Legal invoices relating

    to DOE Monticello Rates

    and

    Regulatory Matters

    Nuclear Contract Reviews Areva

    U.S Xcel Energy

    EP

    A matter

    Other

    Total General Counsel

    Chief Executive Officer

    Management Initiatives

    New

    CO

    O organization

    No budget

    Labor shift between op

    cos

    primarily

    in

    Safety organization

    as well

    as fewer pseudos than attrition rate

    Shift

    in

    contract

    LT

    security expense between legal entities

    Reductions

    in

    consulting primarily

    in CEO

    and Federal State Affairs above management initiatives

    Reductions

    in

    employee expense primarily

    in

    Safety above management initiatives

    Year

    End Deviation

    28

    1161

    735

    976

    41

    1333

    Reduction

    in

    Safety advertising

    due

    to lower fulfillment orders

    44

    Reduction

    in Civic Political Chamber

    of Commerce dues

    and

    MU

    I dues as expenses paid

    in 2009

    Other

    Total Chief Executive Officer

    Attachment

    428

    331

    486

    202

    123

    69

    145

    129

    323

    Page

    13

    of

    14

  • FPT Report

    OM Actual vs Budget Attachment

    Northern States Power

    Co Minnesota Company

    December 2010

    OM thousands

    of

    Energy Supply

    C/H

    Nuclear Generation

    Nuclear Amortization Other

    Talent Tech Customers

    Distribution

    Transmission

    Reg Resource Planning

    Corporate Other

    Corporate Services

    Financial Operations

    General Counsel

    Chief Executive Officer

    Benefits

    Total

    Benefits

    Higher qualified pension costs

    Higher nonqualified pension costs

    FAS

    88 settlement expense

    Higher 401K match costs

    Prior year 401K match true-up recorded

    in

    2010

    Higher retirement

    and compensation consulting costs

    Higher active healthcare costs Lower compared

    to forecast mainly

    due

    to claims adjustment

    Lower

    FAS

    106 retiree medical costs

    Higher

    FAS

    112 long-term disability costs

    Higher workers compensation costs mainly

    due

    to

    higher

    FAS

    112 estimates

    Higher workers compensation costs

    due

    to the SMMPA billing adjustment

    in

    August

    for 2003 through August

    YTD 2010

    Higher annual incentive costs

    due

    to

    updated

    KP

    I

    and performance assumptions

    Prior year annual incentive true-up recorded

    in March

    Lower performance share plan costs

    due

    to the true-up recorded from

    the 2007 cycle payout

    Higher performance share plan costs

    Higher restricted stock unit costs mainly

    due

    to acceleration

    of

    vesting periods offset

    by employee adjustments

    Prior year

    NM

    C long-term incentive true-up recorded

    in March

    Lower

    NM

    C

    long-term incentive costs

    due

    to

    employee adjustmentsElimination

    of

    the

    perquisite benefit program

    Changes

    in

    splits

    to OM other

    Total Benefits

    YE Actuals

    YE Budget Difference

    162080 167460 5380270316 264809 5507

    19759 18818

    941

    142086 154407 12321143903 150857 6954

    39385 34669 4717

    10037 10097

    60

    36851 35261 1590

    35569 36750 118136358 36464

    107

    10096 8762 1333

    12601 12925

    323

    118959 102660 16299

    1038000 $1033940 4061

    Year

    End Deviation

    5515

    320

    665

    310

    160

    385

    359

    2400

    65

    1000

    1046

    8630

    255

    95

    1374

    78

    84

    19

    184

    739

    16299

    Page

    14

    of

    14

  • FPT Report

    OM Actual

    vs Budget Attachment

    Northern States Power

    Co Minnesota Company

    December 2011

    OM thousands

    of

    YE 2011

    YE

    Actuals

    YE Budget Difference

    EnergySupply 151000 155311 4311Distribution Utility 139562 138076 1485

    Transmission

    and

    Op Srvcs 37658 37659

    Operations Services 8971 9167

    196

    Nuclear Generation

    Bus Area 310126 299838 10288

    Nuclear Amortz Other 8187 6198 1989Corporate Services 176313 182492 6180Financial Operations 38657 37747

    909

    Group President 28185 29362 1177General Counsel 6637 9455 2817Public Policy/External Affairs 11374 11430

    56

    Strategy Planning 3245 3202

    43

    Chief Executive Officer 1714 1791

    77

    Corporate Other 41493 40802

    691

    Benefits Loadings 118051 120120 2069Total 1064797 1070254 5457

    Year

    End Deviation

    Energy Supply

    C/H

    Target Adjustment

    GM

    MN projects moved from 2011 into 2010

    975

    Target Adjustment Merricourt Wind project cancelled 1524Accelerations Round Black

    Dog component refurbishment 1755

    Accelerations Round Black

    Dog

    Red Wing Sherco projects

    267

    Accelerations Round King Sherco Wilmarth projects

    923

    Accelerations Round

    VC

    P Sherco Wilmarth projects

    760

    Environmental Permit

    Fee increase

    all plants

    500

    AS King spring overhaul discovery work 1000

    AS King fall outage misc projects under

    run

    200

    Black

    Dog Unit repowering

    31

    6B

    projects transfer capital

    to OM

    1200Black

    Dog Unit

    gas turbine exhaust crack repairs 1574

    Black

    Dog component refurbishment acceleration round 1-costs less than expected $300k will

    be

    spent

    in

    2012 1355

    GM

    MN Peaking plants reduction

    of misc maintenance projects 2750

    GM

    MN Sales

    tax rebate filing

    600

    GM

    MN FERC security contract

    not required

    700

    Grand Meadow Nobles Wind-gearbox repair

    to

    capital 210k mobilization

    fee paid

    in

    2010 misc projects savings 1629Nuclear plant overhaul support

    800

    Angus Anson materials returned

    to

    inventory less

    run time misc projects under

    run

    500

    Angus Anson gas line testing Blue Lake inventory write-off

    not budgeted

    210

    Riverside boundary properties emergent environmental project 2638Sherco Unit

    AS King mercury sorbent under

    run 5000

    Sherco Unit chemicals under

    run

    due

    to turbine failure unit

    not running

    750

    Sherco Unit turbine/generator failure

    617

    Sherco Unit turbine/generator failure-move

    OM

    to insurance receivables account

    61

    7

    Sherco slow moving inventory write-off 1000SMMPA credit more credit

    du

    e

    to Sherco Unit overhaul work scope

    70

    0

    Engineering Construction timing reduction

    of miscellaneous projects

    316

    Other

    61

    Total Energy Supply

    C/H 4311

    Page

    of

    12

  • FPT Report

    OM Actual

    vs Budget Attachment

    Northern States Power

    Co Minnesota Company

    December 2011

    OM thousands

    of

    YE 2011

    YE Actuals

    YE

    Budaet Difference

    EnergySupply 151000 155311 4311Distribution Utility 139562 138076 1485

    Transmission

    and

    Op Srvcs 37658 37659

    Operations Services 8971 9167

    196

    Nuclear Generation

    Bus Area 310126 299838 10288

    Nuclear Amortz Other 8187 6198 1989Corporate Services 176313 182492 6180Financial Operations 38657 37747

    909

    Group President 28185 29362 1177General Counsel 6637 9455 2817Public Policy/External Affairs 11374 11430

    56

    Strategy Planning 3245 3202

    43

    Chief Executive Officer 1714 1791

    77

    Corporate Other 41493 40802

    691

    Benefits Loadings 118051 120120 2069Total 1064797 1070254 5457

    Year

    End Deviation

    Distribution

    Accelerated

    St Light pole painting

    in 2011 from 2012 250

    Accelerated fall arrest equipment

    in

    2011 from 2012 100

    Accelerated capacitor control material

    in

    2011 from 2012 115

    Accelerated

    gas materials

    in

    2011 from 2012 142

    Accelerated

    Ice Shields/Meter Guards from 2011 into 2012 279

    Under run

    in contract outside vendor costs

    for sewer efforts budgeted

    but deferred 3001

    Timing

    of

    PTO usage

    at year

    end

    699

    Re-negotiation

    on vendor pricing

    as well

    as capitalization policy change

    for

    IMP

    409

    Transportation impacts

    due

    to increased fleet cost such

    as fuel materials

    etc 1085

    Non Commodity

    Bad Debt higher than forecast

    and budget

    56

    Over run

    in

    overtime

    and premium time

    due

    to

    significant storm events

    and Minot flood 1900

    Damage Prevention Zayo/ACS locates

    608

    Vegetation Management

    St Paul Agreement payment

    500

    Gas Association dues higher than planned

    due

    to sewer mitigation efforts

    203

    Mutual

    Aid

    287

    Other

    69

    Total Distribution 1485

    Page

    of

    12

  • FPT Report

    OM Actual

    vs Budget Attachment

    Northern States Power

    Co Minnesota Company

    December 2011

    OM thousands

    of

    YE2OI1

    YE Actuals

    YE

    Budget Difference

    EnergySupply 151000 155311 4311Distribution Utility 139562 138076 1485

    Transmission

    and

    Op Srvcs 37658 37659

    Operations Services 8971 9167

    196

    Nuclear Generation

    Bus Area 310126 299838 10288

    Nuclear Amortz Other 8187 6198 1989Corporate Services 176313 182492 6180Financial Operations 38657 37747

    909

    Group President 28185 29362 1177General Counsel 6637 9455 2817Public Policy/External Affairs 11374 11430

    56

    Strategy Planning 3245 3202

    43

    Chief Executive Officer 1714 1791

    77

    Corporate Other 41493 40802

    691

    Benefits Loadings 118051 120120 2069Total 1064797 1070254 5457

    Year

    End Deviation

    Transmission

    Acceleration Round 30

    Headcount Realignment Initiative between OPCos

    544

    Substation Transformer

    and Mobile Repairs partially offset

    by

    PTO

    525

    Substation Construction costs associated with Cass County

    Sub

    56

    Work

    for Energy Supply

    is

    greater than anticipated

    10

    IHS subscription allocated from

    ES 41

    Substation flood work Preparation

    for upcoming season

    442

    Subst2tinn emergent work that

    is

    accelerating maintenance cost

    119

    Substation

    OM work

    in

    support

    of Capital

    634

    Substation 500kv outage

    60

    Substation non relay work

    171

    System Operations received credit

    in

    labor

    for Capital treatment

    for switching

    31

    Engineering Studies less than anticipated Revenue forecast also adjusted 1237Transmission Business Operations

    is

    delayed

    in

    hiring consultants

    and employees

    215

    due

    to

    qualifications

    of applicants

    Substation

    is

    working higher concentration

    of capital work

    75

    The GIST2 computer support project

    had

    OM

    charge inadvertently charged

    to

    the

    capital project

    110

    Other

    97

    Total Transmission

    Operations Services

    Other

    196

    Total Operations Services

    196

    Page

    of

    12

  • FPT Report

    OM Actual vs Budget Attachment

    Northern States Power

    Co Minnesota Company

    December 2011

    OM thousands

    of

    YE 2011

    YE Actuals

    YE Budget Difference

    EnergySupply 151000 155311 4311Distribution Utility 139552 135075 1455

    Transmission

    and

    Op Srvcs 37658 37659

    Operations Services 8971 9167

    196

    Nuclear Generation

    Bus Area 310126 299838 10288

    Nuclear Amortz Other 8187 6198 1989Corporate Services 176313 182492 6180Financial Operations 38657 37747

    909

    Group President 28185 29362 1177General Counsel 6637 9455 2817Public Policy/External Affairs 11374 11430

    56

    Strategy Planning 3245 3202

    43

    Chief Executive Officer 1714 1791

    77

    Corporate Other 41493 40802

    691

    Benefits Loadings 118051 120120 2069Total 1064797 1070254 5457

    Year

    End Deviation

    Nuclear Generation

    MONTICELLONon-Outage

    Round

    2- Approved accelerations from 2012

    to 2011

    427

    ESRV forced outage June

    370

    INPO fees

    330

    Low turbine

    oil system pressure forced outage 2500

    Lump sum

    in

    lieu

    of incentive

    60

    Site employee expenses

    300

    Other

    15

    Total 2742

    Outage

    RFO

    25

    refueling outage duration ended

    16

    days compared

    to

    budget 1419

    RFO

    26

    refueling outage timing

    585

    Other

    101

    Total 1903

    Total Monticello 4645

    Page

    of

    12

  • FPT Report

    OM

    Actual

    vs Budget Attachment

    Northern States Power

    Co Minnesota Company

    December 2011

    OM thousands

    of

    YE2O11

    YE Actuals

    YE Budciet Difference

    EnergySupply 151000 155311 4311Distnbution utility 139562 138076 1485

    Transmission

    and

    Op Srvcs 37658 37659

    Operations Services 8971 9167

    196

    Nuclear Generation

    Bus Area 310126 299838 10288

    Nuclear Amortz Other 8187 6198 1989Corporate Services 176313 182492 6180Financial Operations 38657 37747

    909

    Group President 28185 29362 1177General Counsel 6637 9455 2817Public Policy/External Affairs 11374 11430

    56

    Strategy Planning 3245 3202

    43

    Chief Executive Officer 1714 1791

    77

    Corporate Other 41493 40802

    691

    Benefits Loadings 118051 120120 2069Total 1064797 1070254 5457

    Year

    End Deviation

    PRAIRIE ISLAND

    Non-OutageRound

    2- Approved accelerations from 2012

    to 2011 1516

    Round 3-Approved accelerations from 2012

    to 2011 Reactor Coolant Pump Seal work 2150Round 3-Approved accelerations from 2012

    to 2011 Reactor Coolant Pump Seal work

    43

    Base Labor Open Headcount

    44 Contract increases

    for Maint Engineering

    484

    Base Labor Engineering Contract settlement target adjustment

    790

    Forecast reduction

    for Bechtel transition costs transferred

    to Nuclear Projects 2000Engineering

    CD

    R Initiative 1200

    NR

    C Fees Rate changes 1233Projects transfer Baffle Bolt

    to

    Outage-PRG

    875

    Rad Waste cost increase 700

    RC

    P Forced outage costs above budgeted pull-forward amount 1355

    RC

    P Forced outage initiative

    to

    offset

    RC

    P forced outage overage

    PR

    G project reductions 1355Initiatives

    to

    offset increased outage costs walk-downs

    for 2012-

    PR

    G project reductions

    498

    Spent fuel heat exchanger capital costs moved

    to OM deemed

    to be design

    258

    NR

    C White finding Contract Support

    50

    U2 incore flux tilit Westinghouse

    93

    OM

    Projects-PRG

    261

    R27 outage underage transferred

    to base

    for

    Rad Waste

    and

    to

    support$2M transfer

    for Bechtel 1033

    ER

    O Contract Support 1100Other

    328

    Total 3254Outage

    2012 outage 1R28 Increased planning cost compared

    to

    budget

    2012 outage 2R27 increased costs 2011 walk downs pre-outage expense

    49

    1

    2012 2R27 Transferring baffle bolt project from base

    to

    outage

    for 2012

    91

    0

    R27 underage

    du

    e

    to

    in-processing synergies weekend management 1686Other

    54

    Total

    33

    2

    Total Prairie Island 2922

    Page

    of

    12

  • FPT Report

    OM Actual

    vs Budget Attachment

    Northern States Power

    Co Minnesota Company

    December 2011

    OM thousands

    of

    YE 2011

    YE Actuals

    YE Budget Difference

    Energy Supply 151000 155311 4311Distribution Utility 139562 138076 1485

    Transmission

    and

    Op Srvcs 37658 37659

    Operations Services 8971 9167

    196

    Nuclear Generation

    Bus Area 310126 299838 10288

    Nuclear Amortz Other 8187 6198 1989Corporate Services 176313 182492 6180Financial Operations 38657 37747

    909

    Group President 28185 29362 1177General Counsel 6637 9455 2817Public Policy/External Affairs 11374 11430

    56

    Strategy Planning 3245 3202

    43

    Chief Executive Officer 1714 1791

    77

    Corporate Other 41493 40802

    691

    Benefits Loadings 118051 120120 2069Total 1064797 1070254 5457

    Year

    End Deviation

    NUCLEAR SUPPORTCorp Supply Chain will

    be

    paying

    the

    US

    A dues

    for 2011

    167

    Transfer

    of

    Regulatory personnel

    to assist with Monti

    EP

    U project

    60

    Bechtel transition costs recorded

    in

    Nuclear Projects area/not

    at site 2542

    Transfer

    of Fuel Group from

    ES

    to Nuclear October reorganization

    130

    EP Rulemaking lower costs

    due

    to December contractor furlough

    190

    Labor savings-CM

    YTD labor increases

    337

    Employee expense savings

    175

    Other

    184

    Total Nuclear Support 2721

    Total Nuclear Generation 10288

    Page

    of

    12

  • FPT Report

    OM Actual

    vs Budget Attachment

    Northern States Power

    Co Minnesota Company

    December 2011

    OM thousands

    of

    $1

    YE 2011

    YE Actuals

    YE

    Budget Difference

    EnergySupply 151000 155311 4311Distribution Utility 139562 138076 1485Transmission

    and

    Op Srvcs 37658 37659

    Operations Services 8971 9167

    196

    Nuclear Generation

    Bus Area 310126 299838 10288

    Nuclear Amortz Other 8187 6198 1989Corporate Services 176313 182492 6180Financial Operations 38657 37747

    909

    Group President 28185 29362 1177General Counsel 6637 9455 2817Public Policy/External Affairs 11374 11430

    56

    Strategy Planning 3245 3202

    43

    Chief Executive Officer 1714 1791

    77

    Corporate Other 41493 40802

    691

    Benefits Loadings 118051 120120 2069Total 1064797 1070254 5457

    Year

    End Deviation

    Nuclear Outage Cost Deferral

    and Amortization

    P1 Unit

    R27 actual outage costs were lower vs budget

    YTD

    NG

    1676

    P1 Unit 2R27

    YE forecasted costs were higher than budget

    YTD

    NG 1366

    P1 Unit

    R28 actual outage costs were higher vs budget

    YTD

    NG

    MT RFO25-201 actual outage costs were higher than

    YTD budget Monticello Nuclear 1419

    MT RFO26-201 actual costs were higher than December

    YTD

    budget Monticello Nuclear

    248

    RFO26

    was moved back

    to 2013 from 2012

    MT outage

    25 actual deferred outage costs were higher than

    YTD budget Energy Supply Travelers

    680

    MT outage

    25 actual deferred outage costs were higher than

    YTD budget Marquette Plaza Nuclear Travelers

    83

    MT outage

    25 actual deferred outage costs were higher than

    iTO budget Prairie Island Nuclear Travelers

    408

    MT outage

    25 actual deferred outage costs were higher than

    iTO budget Corp Business Systems Travelers

    24

    Total Outage Cost Deferrals 2559

    P11 Unit

    R27 amortization

    is lower than

    YTD budget

    due

    to decreased outage costs

    544

    P1 Unit 2R26 amortization was lower because

    of reclass from outage

    OM costs

    to

    capital-$477K

    558

    MT

    R25 amortization

    is

    higher than

    YTD budget

    due

    to increased deferred outage costs 1665Total Outage Cost Amortizations

    563

    Other

    Total Nuclear Outage Cost Deferral

    and Amortization 1989

    Page

    of

    12

  • FPT Report

    OM

    Actual

    vs Budget Attachment

    Northern States Power

    Co Minnesota Company

    December 2011

    OM thousands

    of

    YE 2011

    YE Actuals

    YE Budget Difference

    EnergySupply 151000 155311 4311Distribution Utility 139562 138076 1485

    Transmission

    and

    Op Srvcs 37658 37659

    Operations Services 8971 9167

    196

    Nuclear Generation

    Bus Area 310126 299838 10288

    Nuclear Amortz Other 8187 6198 1989Corporate Services 176313 182492 6180Financial Operations 38657 37747

    909

    Group President 28185 29362 1177General Counsel 6637 9455 2817Public Policy/External Affairs 11374 11430

    56

    Strategy Planning 3245 3202

    43

    Chief Executive Officer 1714 1791

    77

    Corporate Other 41493 40802

    691

    Benefits Loadings 118051 120120 2069Total 1064797 1070254 5457

    Year

    End Deviation

    Corporate Services

    Accelerations

    Human Resources Round 73

    Business Systems Round 75

    Business Systems Round

    98

    Customer Care Round 95

    Safety Round

    95

    Safety Round 49

    Bad Debt favorable

    due

    to lower write-offs and/or reserve change 3507

    Business Systems

    IT shared asset depreciation allocation 1833Favorable software maintenance

    due

    to

    change

    in

    projects

    in the pipeline 2150

    Tax contingencies

    and settlements budgeted

    in Dec

    act

    in

    previous months 381

    Server storage

    and maintenance increase

    due

    to

    system demands

    399

    Mainframe upgrade 163

    Help Desk incurred fees

    for termination

    of

    the

    IBM

    and Dell transition fees

    120

    Software license purchases were favorable

    as management reviewed application inventory

    and based requirements

    on business needs 194

    Management initiatives

    to

    control employee travel

    and related expenses

    145

    Contract labor/consulting

    on

    pie project capital work

    and Critical Information Protection compliance 2400

    Lower demand

    for Hardware/software purchases

    508

    Page

    of

    12

  • FPT Report

    OM Actual

    vs Budget Attachment

    Northern States Power

    Co Minnesota Company

    December 2011

    OM thousands

    of

    YE 2011

    YE Actuals

    YE Budget Difference

    EnergySupply 151000 155311 4311Distribution Utility 139562 136076 1465

    Transmission

    and

    Op Srvcs 37658 37659

    Operations Services 8971 9167

    196

    Nuclear Generation

    Bus Area 310126 299838 10288

    Nuclear Amortz Other 8187 6198 1989Corporate Services 176313 182492 6180Financial Operations 38657 37747

    909

    Group President 28185 29362 1177General Counsel 6637 9455 2817Public Policy/External Affairs 11374 11430

    56

    Strategy Planning 3245 3202

    43

    Chief Executive Officer 1714 1791

    77

    Corporate Other 41493 40802

    691

    BenefltsLoadings 118051 120120 2069Total 1064797 1070254 5457

    Year

    End Deviation

    Business Services

    1800 Larimer occupancy

    and

    tax cost reduction

    277

    Shared Asset change

    in

    asset values reduction

    for

    XE

    S head count

    was removed

    IT

    network assets moved

    to Business 1218Systems

    and addition

    of aircraft hangars

    Shared Asset annual true-up

    34

    Minot Flood Restoration

    230

    Facilities Charge

    Out Process primarily

    due

    to

    budget adjustment

    not including

    ES

    G Lookout Center

    and Amarillo Tower

    738

    Aircraft Maintenance

    due

    to increased flights

    and hours 243

    CA

    O

    Customer Care

    Favorable

    YE

    in Misc

    OM Credits

    due

    to Cellnet delays

    and

    in

    Postage

    due

    to OAM savings offset with unfavorable

    in labor

    209

    due

    to Cellnet delays

    and

    in

    Materials

    due

    to

    timing

    of supplies

    in

    Meter Reading

    Safety

    Labor increase primarily related

    to additional safety positions

    as well

    380

    as wage increases

    Reduced Safety employee expenses

    130

    Reduced contact labor as responsibilities shifted

    in house

    102

    Other

    Total Corporate Services 6180

    Page

    of

    12

  • FPT Report

    OM Actual vs Budget ttachment

    Northern States Power

    Co Minnesota Company

    December 2011

    OM thousands

    of

    YE 2011

    YE Actuals

    YE Budget Difference

    EnergySupply 151000 155311 4311Distribution Utility 139562 138076 1485

    Transmission

    and

    Op Srvcs 37658 37659

    Operations Services 8971 9167

    196

    Nuclear Generation

    Bus Area 310126 299838 10288

    Nuclear Amortz Other 8187 6198 1989Corporate Services 176313 182492 6180Financial Operations 38657 37747

    909

    Group President 28185 29362 1177General Counsel 6637 9455 2817Public Policy/External Affairs 11374 11430

    56

    Strategy Planning 3245 3202

    43

    Chief Executive Officer 1714 1791

    77

    Corporate Other 41493 40802

    691

    Benefits Loadings 118051 120120 2069Total 1064797 1070254 5457

    Year

    End Deviation

    Financial OperationsACCELERATION Round Cancellation

    fee Bloomberg online information contract

    10

    Consulting primarily

    for

    legal

    and

    accounting

    tax

    support

    DT

    audits

    and

    the December transfer

    of work

    for

    234

    the

    CFM upgrade

    to

    capital

    General liability insurance operating company shifts based

    on 3-year loss history

    as well

    as policy increase 1823

    Excess liability insurance

    for adjustment

    to amortization schedule

    to

    align accruals

    to the timing

    of policy renewal

    144

    Excess liability insurance policy renewals less than anticipated

    350

    Auto insurance operating company shifts based

    on 3-year loss history

    as well

    as policy increase

    167

    Nuclear interruption insurance

    217

    Nuclear liability insurance including

    $1 93K ICRP refund related

    to the Nuclear Management Company

    333

    Other

    101

    Total Financial Operations

    909

    Group President

    Round Accelerations Marketing

    32

    Round Accelerations Marketing

    75

    Regulatory payments based

    on

    new monthly accrual process

    886

    Write

    off expenses

    for

    MN Rate Case costs

    in

    excess

    of authorized 1055

    Fewer customer program promotions

    for community outreach activities Energy Efficiency baskets

    for CRM5

    951

    Timing

    of

    and shifts

    to

    consulting costs between Operating Companies within Regulatory

    224

    Shifts

    in

    labor between Operating Companies

    275

    Lower spending

    in Homesmart advertising

    297

    Other

    154

    Total Group President 1177

    Page

    10

    of

    12

  • FPT Report

    OM

    Actual

    vs Budget Attachment

    Northern States Power

    Co Minnesota Company

    December 2011

    OM thousands

    of

    YE 2011

    YE Actuals

    YE Budget Difference

    Energy Supply 151000 155311 4311Distribution UtIlity 139562 136076 1485

    Transmission

    and

    Op Srvcs 37658 37659

    Operations Services 8971 9167

    196

    Nuclear Generation

    Bus Area 310126 299838 10288

    Nuclear Amortz Other 8187 6198 1989Corporate Services 176313 182492 6180Financial Operations 38657 37747

    909

    Group President 28185 29362 1177General Counsel 6637 9455 2817Public Policy/External Affairs 11374 11430

    56

    Strategy Planning 3245 3202

    43

    Chief Executive Officer 1714 1791

    77

    Corporate Other 41493 40802

    691

    Benefits Loadings 118051 120120 2069Total 1064797 1070254 5457

    Year

    End Deviation

    General Counsel

    Increase

    in

    Outside Legal costs

    due

    to Merricourt Wind Project moving from capital

    to

    expense

    643

    DO

    E Settlement 3314Other

    146

    Total General Counsel 2817

    Public Policy/External Affairs

    Round Accelerations

    Other

    60

    Total Public Policy/External Affairs

    56

    Strategy Planning

    Other

    43

    Total Strategy Planning

    43

    Chief Executive Officer

    Increase

    in

    community sponsorship

    and donation expenses within Chairman Environmental Fund

    Other

    77

    Total Chief Executive Officer

    77

    Corporate Other

    Transmission Interchange Expense variance 2676

    Company use credit variance

    426

    Permanent

    Tax Difference

    240

    Cannon Falls

    AFB Project Refund 1571

    Shared Assets annual true-up

    44

    8

    Other

    19

    7

    Total Corporate Other

    69

    1

    Page

    11

    of

    12

  • FPT Report

    OM Actual

    vs Budget Attachment

    Northern States Power

    Co Minnesota Company

    December2011

    OM thousands

    of

    YE2O11

    YE Actuals

    YE Budget Difference

    Energy Supply 151000 155311 4311Distribution Utility 139562 138076 1485

    Transmission

    and

    Op Srvcs 37658 37659

    Operations Services 8971 9167

    196

    Nuclear Generation

    Bus Area 310126 299838 10288

    Nuclear Amortz Other 8187 6198 1989Corporate Services 176313 182492 6180Financial Operations 38657 37747

    909

    Group President 28185 29362 1177General Counsel 6637 9455 2817Public Policy/External Affairs 11374 11430

    56

    Strategy Planning 3245 3202

    43

    Chief Executive Officer 1714 1791

    77

    Corporate Other 41493 40802

    691

    Benefits Loadings 118051 120120 2069Total 1064797 1070254 5457

    Year

    End Deviation

    Benefits

    Lower qualified pension expense

    310

    Higher nonqualified pension expense

    125

    Higher 401k match costs based

    on fourth quarter calculations

    260

    401K match true-up

    for 2010 plan payout

    30

    Lower nuclear employer retirement contribution costs based

    on fourth quarter calculations

    45

    Nuclear employer retirement contribution true-up

    for 2010 plan

    due

    to

    payout

    75

    Higher retirement related consulting costs

    60

    Lower retiree medical costs mainly

    due

    to improved asset performance

    and updated medical trend assumptions

    700

    Higher

    FAS

    112 long-term disability costs

    285

    Lower

    HR Service Center costs

    due

    to transfer

    of some employees

    to HR removal

    of labor loadings from process allocation

    400

    Lower

    HW

    due

    to

    recognition

    and Years

    of Contribution costs

    now being recorded

    in 721850 instead

    of

    the labor loading account

    320

    Lower active healthcare

    due

    to

    recording write-offs

    of

    the 2010 IBNR liability

    430

    Lower active healthcare mainly

    due

    to lower claims levels 4975Lower active healthcare

    due

    to

    plan design changes largely

    due

    to the increased deductible 1330Lower active healthcare

    due

    to removal

    of

    the north bargaining

    HS

    A contribution 1600Lower active healthcare

    due

    to headcount adjustment

    to lower than expected levelsof full time benefit employees

    800

    Lower workers compensation

    due

    to lower

    FAS

    112 work comp

    exp offset

    by higher insurance premiums

    360

    Higher annual incentive costs

    due

    to

    forecasting above budgeted payout levels offset

    by plan design changes 3537

    Annual incentive true-up

    due

    to payout

    of 2010 plan

    in

    March

    450

    Higher performance share plan costs based

    on Dec30 rankings

    and stock price 1569

    Higher performance share plan costs

    due

    to

    the true-up recorded from

    the 2008 cycle payout

    82

    Lower restricted stock unit costs

    due

    to 2008 units budgeted

    to vest

    at

    end

    of 2011

    but vested

    at

    end

    of 2010

    715

    Lower restricted stock unit costs

    due

    to 2009 unit employee adjustments partially offset

    by

    the addition

    of phase-ins

    205

    Higher restricted stock unit costs primarily

    du

    e

    to acceleration

    of

    the 2010 units from 2013

    to 2011 2100

    Higher restricted stock unit costs mainly

    du

    e

    to projected payout

    of

    the 2011 RSUs at 150% vs 100% 1847

    Spot

    On Award forecasted costs

    wa

    s

    no

    t known during budget create

    22

    3

    Lower

    NM

    C long-term incentive

    du

    e

    to

    this plan vesting

    at

    the

    en

    d

    of 2010

    110

    Corporate Recognition

    an

    d Years

    of Contribution program

    now recorded

    in OM account

    vs insurance labor loadings

    50

    0

    Changes

    in

    splits

    to OM labor load budget/forecast process timing other

    13

    8

    Total Benefits 2069

    Page

    12

    of

    12

  • FPT Report

    OM Actual

    vs Budget Attachment

    Northern States Power Co Minnesota Company

    OM thousands

    of December 2012

    YE 2012

    December December December

    Company

    Bus Area

    Act

    YE

    Bud

    YE

    YE

    Var

    10 Northerr States Power

    MN Energy Supply

    148

    284 156187 7903Distnbution Operations 118176 115520 1655

    Gas Systems

    20

    482

    19

    222 1260Transmisson

    40

    102 39159

    943

    Operations Services 7665 8074

    409

    Nuclear Generaton

    Bus Area 330295 316656 13639

    Nuclear Amortz Other

    29

    507 13655

    15

    852

    Corporate Services 178644 177193

    451

    Firiancia Operations

    41

    700 41913

    212

    Group President 28795 29135

    340

    General Counsel 11689 9832

    857

    Public Policy/External Affa

    is 15625 11680 945

    Strategy Planning

    Chief Executive Officer 1163

    822

    659

    Corporate Other 44330

    44

    165

    164

    Benefits Loadings

    136

    040

    131

    534 4505

    10 Northern States PowerMN Total 1093483 1089438 4045

    Page

    of

    14

  • FPT Report

    OM Actual vs Budget Attachment

    Northern States Power

    Co Minnesota Company

    OM

    thousands

    of December 2012

    Energy Supply Year

    End Deytattun

    Electric

    Management lnitatwes 6423Management Initiatives January

    405

    Management Initiatives March 986

    Management Initiatives June 1758Exempt Merit

    Ad ustment 274

    Accelerations from 2013 into 2012 1148Capitalization potcy review team findinga 2234Capita ization potcy review team findinga scope reduced

    280

    ES storekeepers moved

    to

    the warehouse clearing account

    447

    Sates

    tax rebates

    599

    Emergent reliability maintenance projects

    at

    the

    RD

    F plants Black

    Dog

    and

    High Bridge

    870

    Forecaat reductio is

    at Riverside

    and

    High Bridge primarily

    due

    to labor vacancies

    and cancelled

    OM

    prOjects

    660

    King reclamation write-off 2400Nobles operations contract savings

    due

    to new vendor 125

    Riverside acceleration from 2013 into 2012 cancelled

    due to leadtime concerns

    500

    Service organizations reduction

    in

    plant studies vacancies labor

    to

    capital projects

    ES

    VP

    consulting coats 1714Turbine Parts Exchange Program

    165

    Other

    174

    Sub-total Electnc 8009

    Gas

    Other

    Sub-total

    Gas

    Other

    Other

    104

    Sub-total Other 104

    Other

    Page

    of

    14

  • FPT Report

    OM Actua vs Budget Attachment

    Northern States Power

    Co Minnesota Company

    OM thousands

    of December 2012

    Distribution Operations Year

    End Deviation

    Electnc

    Management Initiatives 4260Management Initiatives January

    400

    Management Initiatives March 3410ManagementAddbacks Sept /Oct Certury Lirk

    and Osmose Pole Programs

    650

    Exempt Merit Adjustment

    100

    Storm Escalated Operations

    394

    Vegetation Management

    650

    Non commodity

    bad debt

    312

    Prior Year

    LRT Impacts

    040

    Minot Flood

    327

    Capital/OM reclass

    for storms

    330

    Hurricane Sandy Mutual

    Aid

    AE

    P

    and LIPA

    841

    MutualAid-AEP 220

    Dell Rapids

    294

    Increased costs

    for Underground Fault Repair

    179

    Cable Injectons

    212

    Obsolete material inventory wrte

    off

    165

    Various other

    25

    Other

    Sub4otal Electnc 2679

    Gas

    Contract Outside Vendor timing

    of

    IMP spend

    485

    Gas

    Uti

    ity Association Dues

    387

    ncreased consulting costs meter

    rig managemert

    168

    Hurricane Sandy Mutual

    Aid National Grid

    143

    Sewer Mitigation nor-deferrable costs

    157

    Non-commodity

    Bad debt

    190

    Gas Safety Deferral

    OM

    to Deferred

    906

    Obsolete material inveitory write

    off

    56

    Other

    19

    Sub-total

    Gas 1046

    Other

    Other

    22

    Sub-total Other

    22

    Other

    Page

    of

    14

  • FPT Report

    OM Actual vs Budget Attachment

    Northern States Power

    Co Minnesota Company

    OM

    thousands

    of December 2012

    Gac Systeme Year

    End Deviation

    Electnc

    Management Initiatives275

    Management Addbacks Sept

    Oct Damage Prevention Locates

    285

    Exempt Ment Adjustment

    10

    Labor favorable pnnianly

    due

    to organizationa realignment

    161

    Lower Electric Damage Prevention Locates than budgeted/forecasted 58

    Controlled Employee Expenses

    and

    Transportation costs

    66

    Various 48

    Other

    Sub4otal Electric

    58

    Gas

    Management Initiatives 207

    Management Initiatives JanuaryManagement Initiatives March 95

    Management Initiatives June

    Management Addbacks Sept

    Oct Damage Prevention Locates

    315

    Exempt Merit Adjustment

    13

    Mutual

    Aid

    for Hurricane Sandy

    188

    Increased spend

    for corrosion testing

    220

    Gas Association Dues 61

    Wescott unexpected repairs

    08

    Wescott

    LPG tank painting

    iso

    Gas Damage Prevention Locates 215

    Various other

    62

    Other

    Sub-total

    Gas

    13i1

    Othet

    Other

    Sub-total Other

    Other

    Page

    of 14

  • FPT Report

    OM Actua vs Budget Attachment

    Northern States Power

    Co Mmnesota Company

    OM thousands

    of December 2012

    Transmission Year

    End Deviation

    Electnc

    Management Initiatives 407Management Initiatives January

    203

    Management Initiatives March

    714

    Management Initiatives June 354

    Management Actions Sept

    Oct Cancelled

    St Cloud Loop project

    620

    Management Actions Sept

    Oct Increased maintenance plan

    to address vibration galloping conductor issues

    in

    SW Minnesota

    700

    Management Actions. Sept

    Oct Substation pressures

    for

    OM in

    support

    of

    capital ARCM Thyristors transformer leak rape 470

    Exempt Merit Adjustment

    12

    Field Operations increased focus

    on maintenance workplan

    in

    Q4 vibration galloping conductor issues

    in SW

    Minnesota

    784

    MR

    O Settlement Transm ssion portion

    173

    Materal Reserve adjustment

    136

    Substations increased preventive maintenance portfolio ARCM focus in 04 582

    Po tion

    of

    City

    of Fargo project

    had overruns that are

    not recoverable

    286

    Cancelled Border Wind G904 project moving

    to

    OM 728

    Work performed on

    GR

    E assets initially assigned

    to

    capital work order moved

    to OM 100% revenue offset received 100

    Operating company

    al ocation adjustment

    of initial

    OM in support

    of

    capital additions

    for Substation Operations

    600

    Budgeted Transniesion Facility Studies

    not realized

    due in

    part

    to new MISO rules

    and

    uncertainty

    of PICa 509

    Other 188

    Sub-total Electric

    899

    Gas

    Other 40

    Sub-total

    Gas

    40

    Other

    Other

    Sub-total Other

    Other

    PageS

    of

    14

  • FPT Report

    OM Actual vs Budget AttachmentNorthern States Power

    Co Minnesota Company

    OM thousands

    of December 2012

    Operatrons Servroes Year

    End Deviabon

    Electnc

    Management tmtietlves 767

    Management Initiatives January

    667

    Management Initiatives March 50

    Exempt Merit Adjustrrent

    50

    Increased Environmental hazardous waste disposal

    and

    hauhng costs

    due

    to the

    closing

    of

    the Chestnut process center

    544

    Sr

    VP

    Ops consulting under-run budgeted doflsrs real gned

    to Distnbution

    107

    Increased costsEnvironmental Fees

    and Permits

    for

    the year

    69

    Environmental Utility Association Dues lower than anticipated

    EE

    l Supplemental funding

    not required

    96

    Fuels Employee expenses lower than anticipated fewer scheduled tnps

    11

    Higher Environments Online Information Services costs

    18

    Environmental employee expenses higher than anticipated more scheduled trips

    42

    Budoet acliustment spread

    to other cost categones

    28

    Other____________

    Sub-total Eectnc 323

    Gas Coal Compliance consulting cost under

    run

    26

    Other

    60

    Sub-total

    Gas

    86

    Other

    Sub-total Other

    Other

    Page

    of

    14

  • FP

    I Report

    OM Actual vs Budget Attachment

    Northern States Power

    Co Minnesota Company

    OM thousands

    of December 2012

    Nuclear Year

    End Deviation

    Elcctnc

    Outage Explanations

    MT 2013

    RFO Accelerations 1813

    P1 tJ2R27

    YE vanance

    due

    to

    29

    day extension

    and delay charges 2050U1R26 YE due to 25 day outage extension 6660

    P1 U2R28 Baffle bolts moved from 2R27 outage 758

    Outage Subtotal 11281

    Non Outage Explanations

    Me

    it

    reduction total Nuclear

    902

    Monticello-Management Initiatives January

    181

    Monticello-Management Initiatives-March

    842

    Monticello-Management Initiatives June

    627

    Monticello-Management Actions September

    573

    MT

    YE

    due

    to

    Craft labor augmentatior

    394

    MT Fees

    YE FEMA

    NR

    C

    198

    MT Contract Services

    YE prudency review credit

    ard

    IT

    Cyber Security

    270

    MT CRIB costs transfe

    red from capital

    712

    MT

    ood mitigation materials

    831

    P1 Management Init atives-January 950

    P1 Management Init atives-March 2220

    P1 Management Initiatives-June 005

    P1 Management Actions-September

    P1 Spent Fuel Heat Exchanger capital write down estimate

    141

    P1 Radiation waste disposal

    750

    P1 Intake screen repair

    220

    P1 Obsolete parts

    153

    P1

    NR

    C Fukushima Response activities

    255

    P1 rate contract changes

    not known during budget creation

    311

    P1-01

    02 Diesel Forced Outage

    911

    P1-Backlog initiative

    533

    P1 Sales

    tax adjustment

    183

    Page

    of

    14

  • EP

    T Report

    OM Actual

    vs Budget Attachment

    Northern States Power

    Co Minnesota Company

    OM thousands

    of December 2012

    Nuclear Year

    End Deviatron

    Secucty Feadcunt ojrtrn

    NR

    C fees

    due

    to reactor

    fee reduction 1050

    Labor

    YE

    PTO carryover

    $1 Craft labor

    aug

    SM 974

    MP Management lnitativesJanuary

    190

    MP Management lnitiativesMarch 526

    MP Management Actions September labor adjustment 947

    MP Sales

    tax adjustment

    MP Timing

    of consulting

    136

    MP

    MRO Settlement penalty

    78

    WebEOC Software 90

    Non outage Subtotal 1522

    Other 824

    Sub4otal Electrro 13627Ttac

    Other 12

    Sub4otal

    Gas

    12

    ot Nualear

    Nuclear Outage Cost Deferral

    and Amortization

    Electr

    Outage Cost Deferral

    P1 Urit 2012 outage 1R28 actual costs were higher than budget as additional costs were added 6761

    P1

    Unit 2012 outage 2R27 actual costs were higher thar budget because

    of refue outage timing mitigating action

    to reduce 2989contractors

    and

    the month extension

    of

    the 2R27 outage

    MT outage RF026 actual outage costs were higher than budget as additional costs were added 1812

    Outage Cost Deferral Subtotal 11562Outage Cost Amortization

    There was no amortization

    in

    Decerrber 2012

    for

    the

    P1 Unit 2010 outage 1R27

    The unit

    was expected

    to

    corre back online 8951

    from

    the 2012 outage 1R28

    in December2012

    but

    did

    not come back online until aruary 2013

    The

    budget

    had this

    unit

    com

    ng back online ir November 2012

    P1

    Unit 22012 outage 2R27 amortization

    is

    lower than budget

    due

    to

    the

    two month outage extension

    and 1395movog

    $1

    7M of

    OM

    for baffle bolt project

    to P1

    Un 2013 outage 2R28

    Outage Cost Amortizabon Subtotal 4290Other

    Subtotal Electric 158521

    PageS

    of

    14

  • FPT Report

    OM Actual vs Budget Attachment

    Northern States Power

    Co Minnesota Company

    OM thousands

    of December2012

    Shared Services Consolidated Year

    End Deviation

    Corporate Services

    Merit Reductions457

    Merit Reinstatement

    137

    Bad Debt

    Management initiatives January

    580

    Management initial yes June

    357

    Bad Debt change

    due

    to net writeoffs/reserve change

    and revenues

    987

    Business ServIces

    Management Initiatives January

    731

    Management Initiatives March

    446

    Management Addbacks Sept

    Oct Additions spending granted

    for Property Services

    800

    Additional spending granted

    for Property Services Funded within Corporate Services organization

    108

    Change

    in

    the labor allocation pnmsnly resulting from work

    on

    the PSC0 electric rate case

    and Energy Supply

    300

    decrease

    in

    the facilities allocation

    of expense from

    the addition

    of new Supply Chain business units resulting

    151

    iii iiiuie fauiliies uusts alluuated

    to Othoi iloaiiiiis

    Inn is uffwt

    by au uuuuroase

    iii uusts alluuatod

    to f4SPM

    and NSPW

    due

    primarily

    to rate case work PSC0 experienced

    net decrease from updating

    the facilities

    allocations

    as labor

    in 1800 Larimer shifted

    to

    the North Facilities allocations are based on labor

    and

    are updated quarterly

    Aviation refurbishment costs

    to be reimbursed

    by

    BO

    A

    196

    Business Systems

    Management initiatives January

    906

    Management initiatives March

    403

    IBM contract reductions 2208

    Incremental

    OM required

    for preliminary capital

    pro ecta 1265

    Additional mobile date terminals Safety Cameras Security Card Readers Performance monitors

    and

    PB

    X switches 1055

    Also

    in sourcing Critical Information Protection function

    and move from leased

    to

    private infrastructure

    Shared Asset Calculation 4473

    Updated digital ocators

    in

    April

    and other allocation changes

    in 2012 5692Budget System Upgrade

    Windows redesign

    for Nulcear

    103

    Software compliance license

    not forecasted

    165

    Network inventory wnte

    oft

    652

    Wr

    te off

    of

    nd predictor project

    173

    Critical Information Protection fines

    87

    BM True

    Up Entry

    69

    Page

    of 14