COMPANY PROFILEV.2020 ENG Rev0

INTRODUCTION

BOUCHAMAOUI A&R INDUSTRIES

(BI) is an international recognized

construction company covering a large

spectrum of activities in North Africa..

Based in Tunisia, BI provides a full Procurement, Fabrication and

Construction services mainly to Oil & Gas Industry, Industrial Plants and also

to HV Electrical Power Installation.

PRODUCTS & SERVICES

High Voltage Overhead Towers &

Underground Electric Lines.

Pipeline Construction.

Oil & Gas Installations (Production and

treatment facilities )

LNG Multiproduct Storage facilities

BI Quality and HSE Management System is certified in accordance with

standards for all of its activities and projects :

INTEGRATED MANAGEMENT SYSTEM

Quality Management System

ISO 9001 : 2015

Environmental Management System

ISO 14001: 2015

Health and Safety Management System

OHSAS 18001 : 2007

HUMAN RESOURCES

Bouchamaoui Industries employs specialists in the fields of:

Project Management

Engineering & Design

Quality & Safety Management

Finance & Cost control.

Human Resources

Procurement

Construction

Therefore, the Company provides a complete and efficient range of services

for all types of industry and in any location.

DÉSIGNATION OF MACHINE NUMBER

Sidebooms CAT 583 8

Sidebooms CAT 561 10

Excavators from 22 to 45 T 25

Cold Bending Machines (4’’- 42’’) 4

Automatic Welding Trucks (20 “ 42’’) 3

Horizontal Directional Drilling 1

Auger boring Machines (6’’ - 42’’) 2

Backhoes 10

Front wheel loaders (2 - 3.5 m3) 4

Bulldozers D7 & D8 2

Cranes (25 T, 2 x 45 T, 70 T, 80 T) 5

BI possesses an extensive range of equipment which allows the company to

undertake all types of works such as:

EQUIPMENT & FACILITIES

DÉSIGNATION OF MACHINE NUMBER

Low bed trailers from 30 T to 70 T 4

Trucks 6 x 4 & 6 x 6 10

Trucks 10 T 1

Trucks 3.5 T 3

Pick ups 4 x 2 & 4 x 4 80

Minibuses 4

Diesel Welding Generators 20

Electric Welding Machines 120

Electric Generators 35 KV- 650 KV 16

Concrete Batching 45 m3/h 1

EQUIPMENT & FACILITIES

During more than half a century of experience, BI has successfully completed

numerous projects with major Clients such as :

MAJOR CLIENTS

REFERENCES & ACHIEVEMENTS

PROJECT

370 Km 24”

Gas Pipeline

Nawara– Gabes

Client

ETAP

OMV

Location

Nawara - Gabes

Completion Date

2019

Project Overview

Gas Pipeline EPC project (In JV With MS Italy) for

the interconnection of Nawara CPF to the GTP

Gabes the projet include :

Western Gas Pipeline from Nawara to Gabès GTP

(370 Km 24”)

2 pig stations (launchers & receivers).

12 block valve stations.

Control and Telecommunications Systems

Photovoltaic system Installation

Pipeline Construction

Click Here For Video Presentation

PROJECT

50 Km 12”

Gas Pipeline

Tataouine

Client

STEG

Location

Tataouine

Completion Date

In Progress

Pipeline Construction

Project Overview

Gas Pipeline Construction for the supply

of natural gas in Tataouine, the projet

include :

• 50 Km PPL construction of 12 Inch

• Pig stations & valve stations.

• Mechanical Works , Electrical Works,

Civil Works…

• PHOTOVOLTAIC system Installation

• FOC Installation

PROJECT

57 Km 20”

16 Km 24”

Gas Pipeline

Tunis - Beja

Client

STEG

Location

Tunis - Beja

Completion Date

In Progress

Pipeline Construction

Project Overview

Gas Pipeline Construction (EPC

project) between Tunis and Beja, the

projet include :

• 57 Km PPL construction of 20 Inch

• 16 Km PPL construction of 24 Inch

• Pig stations & valve stations.

• Mechanical Works / Electrical

Works, Civil Works…

• FOC Installation

• SCADA system Installation

Mornaguia – Mjez Elbeb 16 km 24 Inch

Mjez Elbeb - Béja 57 km 20 Inch

PROJECT

95 Km 20”

75 Km 8”

Gas Pipeline

Feriana – Gafsa

Client

STEG

Location

Coal mines in

Gafsa valley

Completion Date

2016

Project Overview

Gas Pipeline EPC project for the

interconnection of Coal mines in the

Gafsa valley the projet include :

• 95 Km of 20”

• 75 Km of 8”

• Pig stations & valve stations.

• Facility & metering system.

Pipeline Construction

PROJECT

155 Km 12”

Gas Pipeline

Gabés – Djerba -

Zarzis

Client

STEG

Location

Gabés – Djerba -

Zarzis

Completion Date

2016

Project Overview

150 Km of 12” Pipeline from Gabés

to Zarziz

Construction , Testing &

commissioning of 155 Km of 12''

pipeline from Gabés to Zarzis

including:

2 pig stations (launchers &

receivers).

5 block valve stations.

Facility & metering system.

Pipeline Construction

Pipeline Construction

PROJECT

8” Pipeline from

Hannibal Gas Plant

TRAPSA terminal

Client

BG TUNISIA

Location

Hannibal Gas Plant-

TRAPSA Terminal

Completion Date

2006

Project Overview

Engineering, Procurement,

Construction , Testing &

commissioning of 8'' pipeline from

Hannibal Gas Plant – TRAPSA

Terminal.

58 Km of 8’’ condensate

pipeline and associated works

from Hannibal plant (sfax) to

Trapsa Terminal(Skhira).

2 pig stations (launchers

&receives).

33 block valve stations block

valve stations.

Facility & metering system.

PROJECT

LPG & Gas

Pipeline

Client

BG TUNISIA

Location

Sfax/Gabes

Completion Date

2009

Project Overview

Hasdrubal Project : 260 Km of

6’’ LPG Pipeline From hanibal

Gas plant to Gabes

20 Km of 18’’ Multiphase and

Gas Pipelines From hanibal

Gas plant to Ben Sahloul

PROJECT

Gas Pipeline

Client

ENI

Location

Oued Zar

Completion Date

2008

Project Overview

Engineering, procurement and construction of 4 Km

6 "

Pipeline Interconnection from Djebel Grouz to

pipeline 10" STEG

10 Km of 12" Flowline Construction From Oued Zar

to Trapsa

9 Km of 12" Pipeline Construction From Oued Zar

to Trapsa

Pipeline Construction

PROJECT

Gas Pipeline

Client

ENI

Location

El Borma

Completion Date

2007

Project Overview

13km of 8 " Pipeline

Construction Oued Zar El

Borma including EPC manifold

& related piping HP at Oued

Zar.

Pipeline Construction

PROJECT

Pipelines Gaz

Client

PERENCO

Location

Oum Chiah -

Gabes

Completion Date

2006

Project Overview

Project Engineering, procurement

and construction

Loop 10 ’’ Gaz Pipeline from OUM

CHIAH

Gaz to LPG Gaz plant LL

PROJECT

Gas pipelines

interconnection

Client

STEG

Location

Tunis &

Suburbains

Completion Date

2000-2004

Project Overview

Gas pipeline looping:

10 Km of 20" diam pipeline and

related civil works at El Mourouj.

12 Km of 8" diam pipeline and

related civil works at Jbel El

Oust.

5 Km of 4'' diam pipeline and

related civil works in Denden city.

4 Km of 12" diam pipeline and

related civil works from La

Goulette to Radés, including 500

m of horizontal drilling.

13 Km of 20” diameter , 11.2

mm thick pipe+ fiber optic cable

.

5 km of 16 “ diameter , 9.2 mm

thick pipe .

PROJECT

LPG

Recovery

system

Client

STEG

Location

El Borma –

Gabes

Completion Date

1985

Project Overview

300 Km of 6” pipeline transporting

L.P.G from El Borma production

field to the fractionating plant in

Gabes .

50 Km of 6” flow lines .

The construction of the pipeline

included in field coating, pipe

laying through rocky mountains and

major rivers, special points,

installation of pig launchers &

receivers and cathodic protection

etc.

Pipeline Construction

PROJECT

EL Franig/ Baguel

Development-

Pipeline project

Client

CMS

NOMECO

Location

Douz

( South Tunisia)

Completion Date

1998

Project Overview

Designed to transport gas and condensate

from two distant fields in the Tunisian desert,

this project was completed in six months. .

Activities included Survey & right of way,

pipe transport & stinting, welding & NDT,

coating, lowering-in and backfilling,

installation of pig scrapers, block valves

hydro-testing, tie-in to existing lines and

pre-commissioning.

Two main segments were included in this

pipeline:

116 km of 10” FBE coated pipe from El

franig wellhead to the CPF.

39.5 Km of 6” FBE coated pipe from

Bagel wellhead to junction point .

PROJECT

LNG Storage

Facilities

CLIENT

SNDP

LOCATION

Gabés

COMPLETION

DATE

2016

Project Overview

Engineering, Procurement, &

Construction of 6 LNG storage

spheres 4000 m3 each including :

Civil work

Mechanical work

Electrical &

Instrumentation

Control System

Fire fighting system

Storage Tanks and Spheres

Click Here For Video Presentation

PROJECT

Réalisation de 11

bacs et réservoirs

en acier.

CLIENT

TIFERT

LOCATION

Skhira –Tunisia

COMPLETION

DATE

2010

Storage Tanks and Spheres

Project Overview

Construction of 11 sulfuric and

phosphoric acid storage tanks for the new

TIFERT production plant in Skhira.

The project includes :

Engineering

Procurement

Prefabrication & Manufacturing

Commissioning

PROJECT

LPG Storage

Terminal

CLIENT

SNDP

LOCATION

Rades –Tunisia

COMPLETION

DATE

2009

Storage Tanks and Spheres

Project Overview

Engineering, Procurement, &

Construction of 4 LNG storage

spheres 4000 m3 each including :

Civil work

Mechanical work

Electrical &

Instrumentation Works

Control System

Fire Fighting system

PROJECT

Multi Product

Storage Tanks

CLIENT

SEPT

LOCATION

Skhira Terminal –

Sfax

COMPLETION

DATE

2004

Storage Tanks and Spheres

Project Overview

Engineering, procurement and

construction of 12 multi product storage

tanks with floating roofs (120 000 m3)

including:

Piping and mechanical works .

Electrical & instrumentation works .

Civil works

DCS & metering system .

Complete fire fighting system .

LOCATION

Southern

Tunisia

PROJECT

Oil Storage

Tanks

Construction

CLIENT

PIONEER

COMPLETION

DATE

2009

Project Overview

Engineering, procurement and

construction. of Two 30.000

BBL Crude Oil Storage Tanks

For The WAHA

The project includes :

Civil works

Mechanical works

Electrical & Instrumentation

Works

Fire Fighting system

Storage Tanks and Spheres

PROJECT

Tank Farm

Client

MINISTRY OF

OIL(IRAK)

Location

El Basra

Terminal -Irak

Completion Date

2002

Project Overview

Design, engineering, procurement and

construction of a tank farm.

The work included :

4 crude oil storage tanks with

floating roofs and a capacity of

58 000 m3 each.

A complete fire fighting system.

All interconnecting piping an

mechanical works.

All electrical & instrumentation

works .

Storage Tanks and Spheres

PROJECT

Sidi Kilani

Oil field

Client

CTKP

Location

Kairouan,

Tunisia

Completion Date

2003

Project Overview

Engineering, Procurement and

installation:

30 000 bbls crude oil tank

A complete fire fighting

system.

A 7 km of fiber glass

pipeline.

A 5 km of 6” pipeline

including tieins & hook –

ups.

Central Processing Facility

PROJECT

Nawara

Development-

project

Client

ETAP

OMV

Location

Nawara Field

Project Overview

Engineering, procurement, construction,

of Central Processing Facility (In JV

With MS Germany) including Gas &

condensate pipelines interconnection and

related facilities, It included:

Central processing facilities PLANT

with utilities : (The capacity of the

CPF will match the export capacity

of 2.7 MSCMD)

Nine (9) Flowlines with methanol

distribution lines and FOC in trench

line (89 Km of 6”)

Nawara Accommodation Camp

Fiscal metering for gas and

condensate products

Completion Date

In Progress

Central Processing Facility

PROJECT

EL Franig/ Baguel

Development-

project

Client

CMS

NOMECO

Location

Oum Chiah

( South Tunisia)

Project Overview

Engineering, procurement, construction,

commissioning & start-up of El Franig/

Baguel / Central Processing Facility

including Gas & condensate pipelines

interconnection and related facilities, It

included:

Civil work

Mechanical work.

Firefighting system

Transfer pumps

Elec./Instrumentation

116 km of 10” FBE coated pipe from

El franig wellhead to the CPF.

39.5 Km of 6” FBE coated pipe from

Bagel wellhead to junction point .

4 pig launchers & receivers stations

8 Section valve stations

Central Processing Facility

PROJECT

EZZAOUIA Oil

Field Development

Client

MARATHON

OIL LTD

Location

ZARZIS

Project Overview

Construction of Central Production

Facility including :

* Civil works,buildings, piping, tanks,

electrical and instrumentation &

control.

Construction of Storage and loading

terminal including civil works,

buildings, piping,tanks (main tank with

220 000 bbl capacity),

* Installation of cathodic protection

system .

* Installation of heat tracing system .

Project Overview

High Voltage tower installation

including civil work, tower

erection and cable stringing of :

• 83 Km of 150 KV Single

Circuit Line

HIGH VOLTAGE TOWER TRANSMISSION LINES

CLIENT

STEG-JYOTI

LOCATION

MDHILA -

TOZEUR

COMPLETION DATE

2012

PROJECT

HIGH VOLTAGE

TOWER

CLIENT

STEG - JYOTI

Project Overview

High Voltage tower installation

including civil work, tower

erection and cable stringing of:

• 127 Km of 225 KV

• 274 Km of 150 KV

• 375 Km of 90 KV

PROJECT

HIGH VOLTAGE

TOWER

COMPLETION DATE

2008

HIGH VOLTAGE TOWER TRANSMISSION LINES

Client

STEG -KEC

Project Overview

High Voltage tower installation

including civil work, tower

erection and cable stringing of:

• 220 Km of 400 KV

• 70 Km of 225 KV

• 150 Km of 150 KV

PROJECT

HIGH VOLTAGE

TOWER

COMPLETION DATE

2006

HIGH VOLTAGE TOWER TRANSMISSION LINES

Project Overview

Construction of 225/400 KV Over

head Power Transmission Line

Interconnection between Tunisia &

Libya

• 334 Km of 400/225 KV Over head.

CLIENT

STEG

LOCATION

SFAX -

MEDENINE

COMPLETION DATE

2001

PROJECT

HIGH VOLTAGE

TOWER

HIGH VOLTAGE TOWER TRANSMISSION LINES

Project Overview

133 km 225 KV burried cable

including all Civil works

3 km of Horizontal drilling

under channels (1 x 1000 m)

(8 x 150-450m)

* Cable laying and

connection

CLIENT

STEG/

PIRELLI-NEXANS

LOCATION

TUNIS & BIZERTE

COMPLETION DATE

2006

PROJECT

HIGH VOLTAGE

UNDERGROUND CABLES

Project Overview

• 4,7 Km of 225 KV

(Goulette/Mnihla)

• 27 km of HV underground

cable laying

CLIENT

STEG/

NEXANS-PRYSMIAN

LOCATION

TUNIS-GOULETTE -

MNIHLA

COMPLETION DATE

2009 & 2011

PROJECT

HIGH VOLTAGE

UNDERGROUND CABLES

HIGH VOLTAGE TOWER TRANSMISSION LINES

PROFILCOMPANY INFORMATION

Company Name BOUCHAMAOUI A&R INDUSTRIES

Capital : 19 327 400 TND

Date : 05 Juin 1995

Type : Limited Company

Trade Register N° : 102566V

Head Office: 55, Rue 8600, Z.I. Charguia I – Tunis Aéroport – 2035 Tunis

Tel/Fax/Website +216 71 206 850 /+216 71 206 855 / www.bouchamaoui.net