On-going and Completed Projects For the period July 1, 2017 to June 30, 2020 AMOUNT DUR (C.D.) 0405 Construction & Supply 34735 Repair/Rehab. of Drainage Canal along Sorsogon-Bacon- Manito Road, Bibincahan, Sorsogon City 05/30/2017 Sorsogon 1st DEO 2.841 90 C 0.40 0.13 0.30 - - - 83.30 *83.3% Satisfactory 0405 Construction & Supply 34735 Construction of Flood Mitigation Structures (Baybay Dagat Dike) Sitio Bacolod along Bito River, San Fernando, Masbate 06/14/2016 Masbate 3rd DEO 4.653 115 O 0.382 0.24 0.15 0.022 0.04 0.05 88.40% - On-going 0405 Construction & Supply 34735 Construction / Repair / Rehabilitation of Multi-Purpose Building (Municipal Hall), Monreal, Masbate 08/19/2017 Masbate 3rd DEO 3.881 150 O 0.488 0.133 0.300 - - - 92.10 *92.10% Very Satisfactory 11-16 Construction 29646 Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems-Rehabilitation/ Improvement of Existing Dike along Marimla River, Left Bank, Sta. 0+258 to Sta. 0+630; Sta. 0+033 to Sta. 0+089.90 and Sta. 0+033 to Sta. 0+129, Bamban, Tarlac 11/21/2017 DPWH 45.616 147 C 0.50 0.13 0.30 - - - 92.90 *92.9% Very Satisfactory 121 Construction Corporation (Formerly: 121 Construction) 21686 Improvement/Concreting with Drainage System along Ballesteros Street 11/29/2014 NCR 6.684 120 O 0.355 0.240 0.150 0.030 0.035 0.033 84.30% - On-going 128 Dragon Construction And Supplies 35408 Construction of Flood Control Structure, Brgy. Kanluran, San Vicente, Camarines Norte, 2nd Legislative District 03/14/2016 Camarines Norte DEO 0.949 30 C 0.40 0.20 0.30 - - - 89.60% *89.6% Very Satisfactory 2M Construction & Enterprises Improvement/ Construction/ Concreting of Labasan - Camanga Road 05/29/2018 Zamboanga Sibugay 2nd DEO 28.649 133 O 0.39 0.24 0.15 0.03 0.07 0.05 92.10 - On-going 2M Construction & Enterprises 33331 Slope Protection (Grouted Riprap) along Isabela-Maluso Rd., Matarling Sect. at K15+190-K15+249 03/13/2013 IX 4.842 75 O 0.328 0.240 0.150 0.030 0.040 0.050 83.80 - On-going 2M Construction & Enterprises 33331 Construction of Water System Level II 03/07/2016 Zamboanga City DEO 1.945 75 C 0.43 0.15 0.30 - - - 87.50% *87.5% Satisfactory 2M Construction & Enterprises 33331 Road Widening Including Drainage along Ipil-Magdaup Wharf Road (S01143MN) (K2014+800 - K2015+297) 03/13/2018 Zamboanga Sibugay 2nd DEO 16.187 177 C 0.49 0.20 0.28 - - - 96.60 92.92% Very Satisfactory 2-R Construction & Supply 15304 Concreting of Barangay Camanggaan - Calapugan, FMR, Brgy. Camanggaan-Calapugan 03/19/2018 Pangasinan 3rd DEO 3.977 119 C 0.46 0.13 0.30 - - - 89.40 *89.40% Very Satisfactory 2-R Construction & Supply 15304 Raising of Grade of Dike Agno River Basin Flood Control Project (Phase III), Brgy. Cabalitian, Asingan, Pangasinan 11/16/2015 PANGASINA N 3RD DEO 9.167 120 O 0.391 0.24 0.15 0.03 0.05 0.05 91.10% - On-going NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF EVALUATION *IMPL. AGENCY CONTRACT STATUS WMS FINAL RATING QUALITATIVE DESCRIPTION MTL TIME FAC ESH RDR CPES VISIT RATING *1st/Final * For DPWH, only the region and PMO office are listed 31st Release Page 1 of 688

Upload: others

Post on 04-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

  • On-going and Completed Projects

    For the period July 1, 2017 to June 30, 2020

    AMOUNTDUR (C.D.)

    0405 Construction & Supply 34735Repair/Rehab. of Drainage Canal along Sorsogon-Bacon-

    Manito Road, Bibincahan, Sorsogon City05/30/2017

    Sorsogon 1st

    DEO2.841 90 C 0.40 0.13 0.30 - - - 83.30 *83.3% Satisfactory

    0405 Construction & Supply 34735

    Construction of Flood Mitigation Structures (Baybay

    Dagat Dike) Sitio Bacolod along Bito River, San

    Fernando, Masbate

    06/14/2016Masbate 3rd

    DEO4.653 115 O 0.382 0.24 0.15 0.022 0.04 0.05 88.40% - On-going

    0405 Construction & Supply 34735Construction / Repair / Rehabilitation of Multi-Purpose

    Building (Municipal Hall), Monreal, Masbate08/19/2017

    Masbate 3rd

    DEO3.881 150 O 0.488 0.133 0.300 - - - 92.10 *92.10% Very Satisfactory

    11-16 Construction 29646

    Construction/ Maintenance of Flood Mitigation

    Structures and Drainage Systems-Rehabilitation/

    Improvement of Existing Dike along Marimla River, Left

    Bank, Sta. 0+258 to Sta. 0+630; Sta. 0+033 to Sta.

    0+089.90 and Sta. 0+033 to Sta. 0+129, Bamban, Tarlac

    11/21/2017 DPWH 45.616 147 C 0.50 0.13 0.30 - - - 92.90 *92.9% Very Satisfactory

    121 Construction Corporation

    (Formerly: 121 Construction)21686

    Improvement/Concreting with Drainage System along

    Ballesteros Street11/29/2014 NCR 6.684 120 O 0.355 0.240 0.150 0.030 0.035 0.033 84.30% - On-going

    128 Dragon Construction And

    Supplies35408

    Construction of Flood Control Structure, Brgy. Kanluran,

    San Vicente, Camarines Norte, 2nd Legislative District03/14/2016

    Camarines

    Norte DEO0.949 30 C 0.40 0.20 0.30 - - - 89.60% *89.6% Very Satisfactory

    2M Construction & EnterprisesImprovement/ Construction/ Concreting of Labasan -

    Camanga Road05/29/2018

    Zamboanga

    Sibugay 2nd

    DEO

    28.649 133 O 0.39 0.24 0.15 0.03 0.07 0.05 92.10 - On-going

    2M Construction & Enterprises 33331Slope Protection (Grouted Riprap) along Isabela-Maluso

    Rd., Matarling Sect. at K15+190-K15+24903/13/2013 IX 4.842 75 O 0.328 0.240 0.150 0.030 0.040 0.050 83.80 - On-going

    2M Construction & Enterprises 33331 Construction of Water System Level II 03/07/2016Zamboanga

    City DEO1.945 75 C 0.43 0.15 0.30 - - - 87.50% *87.5% Satisfactory

    2M Construction & Enterprises 33331Road Widening Including Drainage along Ipil-Magdaup

    Wharf Road (S01143MN) (K2014+800 - K2015+297)03/13/2018

    Zamboanga

    Sibugay 2nd

    DEO

    16.187 177 C 0.49 0.20 0.28 - - - 96.60 92.92% Very Satisfactory

    2-R Construction & Supply 15304Concreting of Barangay Camanggaan - Calapugan,

    FMR, Brgy. Camanggaan-Calapugan03/19/2018

    Pangasinan

    3rd DEO3.977 119 C 0.46 0.13 0.30 - - - 89.40 *89.40% Very Satisfactory

    2-R Construction & Supply 15304

    Raising of Grade of Dike Agno River Basin Flood Control

    Project (Phase III), Brgy. Cabalitian, Asingan,

    Pangasinan

    11/16/2015PANGASINA

    N 3RD DEO9.167 120 O 0.391 0.24 0.15 0.03 0.05 0.05 91.10% - On-going

    NAME OF CONSTRUCTORLICENSE

    NO.PROJECT

    DATE OF EVALUATION

    *IMPL. AGENCY

    CONTRACT

    STATUS WMS FINAL RATINGQUALITATIVE DESCRIPTION

    MTL TIME FAC ESH RDRCPES VISIT

    RATING

    *1st/Final

    * For DPWH, only the region and PMO office are listed 31st Release Page 1 of 688

  • On-going and Completed Projects

    For the period July 1, 2017 to June 30, 2020

    AMOUNTDUR (C.D.)

    NAME OF CONSTRUCTORLICENSE

    NO.PROJECT

    DATE OF EVALUATION

    *IMPL. AGENCY

    CONTRACT

    STATUS WMS FINAL RATINGQUALITATIVE DESCRIPTION

    MTL TIME FAC ESH RDRCPES VISIT

    RATING

    2-R Construction & Supply 15304Off Carriageway Improvement at Lingayen Capitol Loop,

    K0364+(-219) to K0364+836, Lingayen, Pangasinan09/02/2016

    Pangasinan

    2nd DEO9.34 105 C 0.47 0.13 0.30 - - - 90.60% 87.36% Satisfactory

    301 Engineers 38364

    Indv. Project - Rehab./Reconst. of National Roads w/

    Slips, Slope Collapse and Landslide along Iriga City-

    Masoli Road

    11/16/2017 DPWH 5.071 132 C 0.49 0.13 0.30 - - - 92.70 *92.7% Very Satisfactory

    0405 Construction & SupplyJV-17-

    1886

    Development of Pocket Forest Park, Gardens and

    Playground09/19/19 TIEZA 23.000 195 C 0.40 0.17 0.30 - - - 86.80 92.57% Very Satisfactory

    3C'Sl Construction And Supply 36393

    Construction of One Storey Two Classroom (Toilet

    Attached) Tolosa CES, Cabadbaran City, Agusan del

    Norte

    03/14/2016 ADN DEO 1.927 90 C 0.44 0.13 0.30 - - - 87.40% *87.40% Satisfactory

    3Diamonds Construction

    Corporation35457

    Rehabilitation of San Francisco River Control (San

    Francisco-Maguiron Section)11/06/2017 DPWH 9.328 105 C 0.50 0.13 0.30 - - - 93.40 *93.40% Very Satisfactory

    3G A Construction & Supply 35033Construction of Flood Control along Cabugao River,

    Brgy. Turod - Patac03/16/2018

    Ilocos Sur 1st

    DEO9.304 140 C 0.48 0.13 0.30 - - - 91.20 *91.20% Very Satisfactory

    3K Rock Engineering

    Road Upgrading (Unpaved to Paved) based on Gravel

    Roads Strategies, Traffic Benchmark for Uprading to

    Paved Road Standards (HDM-4) Project Analysis)-

    Tertiary Roads+ Apayao- Ilocos Norte Road

    06/05/2018Apayao 1st

    DEO, CAR96.499 417 O 0.363 0.255 0.112 0.03 0.055 0.033 84.80 - On-going

    3K Rock Engineering 27908

    Road Upgrading (Gravel to Paved) Based on Gravel

    Road Strategies, Traffic Benchmark for Upgrading to

    Paved Road Standard (HDM-4 Project Analysis) Asin

    (KM 8)-Nangalisan San Pascual, Tuba, Benguet-LU

    Road, K0273+707 - K0273+728, K0273+790 -

    K0274+127, K0275+351 - K0275+613, K0275+629 -

    K0275+1014, K0275+1050 - K0275+1240, Tuba,

    Benguet

    11/17/2016Benguet 1st

    DEO33.303 196 C 0.41 0.18 0.30 - - - 88.30 86.32% Satisfactory

    3K Rock Engineering 27908

    Rehabilitation/ Reconstruction/ Upgrading of Damaged

    Paved National Roads including drainage based on

    Pavement Management System/Highway-4 Kennon KO

    238 + 880-KO 239 + 048, KO237 + 123- KO238 + 000,

    KO228 + 791-KO229+000, KO228+080-KO228+440,

    Tuba, Benguet

    11/16/2016Regional

    Office46.620 282 O 0.331 0.289 0.121 0.03 0.055 0.033 0.8590 - On-going

    *1st/Final

    * For DPWH, only the region and PMO office are listed 31st Release Page 2 of 688

  • On-going and Completed Projects

    For the period July 1, 2017 to June 30, 2020

    AMOUNTDUR (C.D.)

    NAME OF CONSTRUCTORLICENSE

    NO.PROJECT

    DATE OF EVALUATION

    *IMPL. AGENCY

    CONTRACT

    STATUS WMS FINAL RATINGQUALITATIVE DESCRIPTION

    MTL TIME FAC ESH RDRCPES VISIT

    RATING

    3K Rock Engineering 27908

    Road Upgrading (Gravel to Paved) Based on Gravel

    Road Strategies, Traffic Benchmark for Upgrading to

    Paved Road Standard (HDM-4 Project Analysis) Asin

    (Km 8) - Nangalisan San Pascual, Tuba, Benguet,

    K0273+707 to K0273+728; K0273+790 to K0274+127;

    K0275+531 to K0275+631; K0275+629 to K0275+1014;

    K0275+1050 to K0275+1240, Tuba, Benguet

    03/29/2017Benguet 1st

    DEO33.303 195 C 0.44 0.13 0.30 - - - 86.90 *86.9% Satisfactory

    3K Rock Engineering 27908

    Road Upgrading (Unpaved to Paved) Based on Gravel

    Road Strategies, Traffic Benchmark for Upgrading to

    Paved Road Standards (HDM-4 Project Analysis)

    (Intermittent Sections) of Kabugao - Pudtol - Luna -

    Cagayan Bdry. Road, K0611+917 to K0612+961,

    K0612+973 to K0613+699, K0613+723 to K0614+500,

    Apayao

    08/27/2015 CAR 75.709 221 O 0.363 0.241 0 0.03 0.061 0.033 72.80% - On-going

    3K Rock Engineering 27908

    Road Upgrading (Gravel to Paved) Based on Gravel

    Road Strategies, Traffic Benchmark for Upgrading to

    Paved Road Standard (HDM-4 Project Analysis) Asin

    Km. 8 - Naglisan - San Pascual, Tuba, Benguet-La Union

    Road, K0273+707 to K0273+728, K0273+790 to K0274+

    08/23/2016BENGUET

    1ST DEO33.303 195 O 0.339 0.24 0.15 0.02 0.051 0.05 0.8500 - On-going

    3K Rock Engineering/Rvc

    Construction (J.V.)27908

    Road Upgrading (Gravel to Concrete) of Asin -

    Nanganban - San Pascual Road K0270+594 -

    K0272+220 ; K0275+5311 - K0275+7178

    08/16/2014 CAR 91.358 237 O 0.379 0.240 0.150 0.024 0.060 0.050 90.30 - On-going

    3-L Construction 16745Concreting of Barangay Road, Barangay Salvacion, Del

    Gallego, Camarines Sur08/16/2017

    Camarines

    Sur 5th DEO1.410 40 O 0.496 0.133 0.300 - - - 92.90 - On-going

    3-L Construction 16745Concreting of Mataoroc (Zone 3- Zone 5 FMR) Barangay

    Mataoroc04/06/2018

    Camarines

    Sur 1st DEO4.723 90 C 0.49 0.15 0.30 - - - 94.50 *94.50% Very Satisfactory

    3N Construction & Supply 37872

    Cluster 5-Local Infrastructure Program-Repair/Rehab. of

    Multi-Purpose Building, Barangay Sweetland,

    Buenavista, Bohol

    03/10/2016Bohol 2nd

    DEO0.7682 75 C 0.47 0.13 0.30 - - - 90.00% *90.00% Very Satisfactory

    3Rb Construction And Supply 19541

    Cluster 6 - Network Development -

    Improvement/Widening of National Roads - Secondary

    Road along DM- Jct.-Legazpi-Sto. Domingo-Tabaco-

    Cam. Sur Bdry. Roads, Malinao, Albay and along Ligao-

    Tabaco Roads, Buang, Tabaco City, Albay 1st LD

    06/08/2017Albay 1st

    DEO92.711 190 O 0.387 0.232 0.150 0.03 0.061 0.033 89.30 - On-going

    3Rb Construction And Supply 19541

    Cluster 6- Network Development - Improvement/

    Widening of National Roads - Secondary Roads along

    DM- Junction - Legazpi - Sto. Domingo- Tabaco -

    Camarines Sur Bdry Roads, Malinao, Albay and along

    Ligao- Tabaco Roads, Buang , Tabaco City, Malinao and

    Tabaco City

    08/24/2017Albay 1st

    DEO92.771 190 O 0.369 0.295 0.150 0.022 0.037 0.033 90.60 - On-going

    *1st/Final

    * For DPWH, only the region and PMO office are listed 31st Release Page 3 of 688

  • On-going and Completed Projects

    For the period July 1, 2017 to June 30, 2020

    AMOUNTDUR (C.D.)

    NAME OF CONSTRUCTORLICENSE

    NO.PROJECT

    DATE OF EVALUATION

    *IMPL. AGENCY

    CONTRACT

    STATUS WMS FINAL RATINGQUALITATIVE DESCRIPTION

    MTL TIME FAC ESH RDRCPES VISIT

    RATING

    3Rb Construction And Supply 19541

    Construction/ Maintenance of Flood Mitigation Structures

    and Drainage Systems - Construction of Revetment

    along Pooc Creek, Barangay Balibago and Barangay

    Macabling, Sta. Rosa City, Laguna

    03/19/2017 Laguna 2nd 19.002 140 C 0.34 0.20 0.30 - - - 84.40 *84.4% Satisfactory

    3Rb Construction And Supply 19541Extension of River Control, Sta. 0+112.50 - Sta.

    0+232.50, Bongabong, Tabaco City, Albay03/13/2017

    Albay 1st

    DEO16.705 128 C 0.49 0.14 0.30 - - - 92.60 *92.6% Very Satisfactory

    3Rb Construction And Supply 19541

    Widening of National Roads Outside N1 DM Jct-Legazpi-

    Sto. Domingo-Tabaco-Camarines Sur Bdry. K0552+532-

    K0553+660, K0554+600-K0555+400, Malilipot, Albay

    and Tabaco City

    03/07/2016Albay 1st

    DEO43.1972 147 C 0.45 0.20 0.30 - - - 94.40% 94.40% Very Satisfactory

    3Rb Construction And Supply 19541 Prieto Diaz Port Development Project 08/19/2015 DOTC 8.512 124 O 0.367 0.300 0.150 0.030 0.054 0.050 95.10 - On-going

    3Rb Construction And Supply 19541Cluster 9-Construction/Rehabilitation/Improvement of

    River Control Section, Estancia, Estancia, Malinao, Albay03/07/2016

    Albay 1st

    DEO3.9755 218 C 0.48 0.13 0.30 - - - 91.30% 91.30% Very Satisfactory

    3R'S Builders And Resources 35922 Construction of Multi-Purpose Building 03/16/2016

    MISAMIS

    OCCIDENTA

    L 2ND DEO

    1.937 120 C 0.46 0.13 0.30 - - - 89.10% 89.10% Very Satisfactory

    4 A'S Construction 9446Construction of 2STY 4CL School Building at Andabuen

    National High School Benito Soliven, Isabela03/18/2017 Isabela 2nd 5.996 150 O 0.341 0.299 0.000 0.03 0.047 0.033 75.00 - On-going

    4 A'S Construction 9446

    Construction of Two (2) Storey Four (4) Classroom

    School Building at Andabuen National High School

    Benito Soliven, Isabela

    11/19/2016 Isabela 2nd 5.996 150 O 0.389 0.2 0.15 0.02 0.052 0.05 0.8610 - On-going

    4B Construction Corporation Gumain Bridges Pier 5 & 6 Protection Works 02/05/2015 BCDA 18.951 120 O 0.377 0.293 0.000 0.030 0.041 0.033 77.44 - On-going

    4B Construction Corporation Gumain Bridges Pier 5 & 6 Protection Works 11/20/2014 BCDA 18.951 120 O 0.400 0.271 0.105 0.000 0.032 0.033 84.10 - On-going

    4B Construction Corporation2014 heavy maintenance works along SCTEX lot 2 -

    Bridge revetment, slope and drainage repair works10/31/2014 BCDA 12.430 90 O 0.298 0.288 0.135 0.000 0.035 0.050 80.53 - On-going

    515 Life Construction, Corp.

    CY 2017 Basic Educational Facilities Fund, Construction

    of 2STY 6CL Bernardo Lirio Memorial National High

    School

    06/19/2018Batangas 3rd

    DEO11.598 170 C 0.48 0.14 0.30 - - - 91.70 91.70% Very Satisfactory

    525 Construction 28532Repair/ Maintenance of Flood Control Structure along

    Balagtas River, San Juan Section, Balagtas, Bulacan05/31/2017

    Bulacan 1st

    DEO18.325 150 C 0.47 0.13 0.30 - - - 90.20 *90.2% Very Satisfactory

    525 Construction 28532Construction of Flood Control Structure along Balagtas

    at Dalig, Balagtas, Bulacan08/25/2017 Bulacan 1st 4.628 90 C 0.37 0.20 0.30 - - - 86.70 *86.7% Satisfactory

    525 Construction 28532Rehabilitation of Roads Brgy. Igulot - Brgy. Binang -

    Brgy. Turo09/19/2016

    Bulacan 1st

    DEO34.143 210 O 0.312 0.3 0.15 0.03 0.042 0.05 0.8840 - On-going

    *1st/Final

    * For DPWH, only the region and PMO office are listed 31st Release Page 4 of 688

  • On-going and Completed Projects

    For the period July 1, 2017 to June 30, 2020

    AMOUNTDUR (C.D.)

    NAME OF CONSTRUCTORLICENSE

    NO.PROJECT

    DATE OF EVALUATION

    *IMPL. AGENCY

    CONTRACT

    STATUS WMS FINAL RATINGQUALITATIVE DESCRIPTION

    MTL TIME FAC ESH RDRCPES VISIT

    RATING

    525 Construction 28532

    Valenzuela-Obando-Meycauayan Flood Control Project-

    Meycauayan, Construction of River wall Protection,

    Meycauayan-Valenzuela Boundary Phase I, RS , (Sta.

    3+475.40-Sta. 3+567.00), Right Side, Meycauayan,

    Bulacan

    03/08/2016Bulacan

    Second DEO24.1599 201 O 0.40 0.21 0.15 0.03 0.06 0.05 89.50% - On-going

    525 Construction 28532

    Valenzuela-Obando-Meycauayan Flood Control Project -

    Meycauayan - Construction of Riverwall Protection,

    Meycauayan-Valenzuela Boundary Phase I, RS (Sta.

    3+475.40 - Sta. 3+567.00), Right Side

    06/07/2016 Bulacan 2nd 24.159 201 C 0.49 0.10 0.30 - - - 89.30% 89.42% Very Satisfactory

    525 Construction 28532Construction of Flood Control Structure along Angat

    River, Pulilan, Bulacan11/17/2017 DPWH 10.880 150 C 0.47 0.13 0.30 - - - 90.50 *90.5% Very Satisfactory

    5'S Construction & Supply 32404

    Local Infrastructure Program - Improvement of Multi-

    Purpose Building (Public Market) Iloilo 4th Legislative

    District , Brgy. Poblacion, Banate Iloilo

    03/09/2016Iloilo 2nd

    DEO1.969 259 C 0.46 0.13 0.30 - - - 89.00% 89% Satisfactory

    5'S Construction & Supply 32404Improvement of Multi-Purpose Building/ Barangay Hall,

    Barangay Punong Lapuz, Iloilo City03/23/2018

    Iloilo City

    DEO1.914 118 C 0.49 0.13 0.30 - - - 92.50 *92.50% Very Satisfactory

    6 Jewels Construction

    CY 2017 Basic Educational Facilities Fund (Batch 4),

    Construction of 2 units Unique Workshop (7 x 22.5) at

    Gulod Senior High School

    06/20/2018Batangas

    2nd DEO5.314 115 C 0.49 0.13 0.30 - - - 92.60 92.60% Very Satisfactory

    6 Jewels Construction 34737

    MFO 1 - National Road Network Services, Network

    Development Off-Carriageway Improvement including

    Drainage, Secondary Roads Batangas Quezon Road,

    K0134+(-664) - K0134+(-414), K0134+100 - K0134+407,

    Batangas City, Batangas

    08/25/2017Batangas

    2nd DEO5.287 45 C 0.48 0.13 0.30 - - - 91.60 *91.6% Very Satisfactory

    626 Construction & Trading, Inc. 34990Rehabilitation & Improvement of Bustos Dam and Picnic

    Grounds09/27/2018 TIEZA 7.500 90 O 0.38 0.30 0.13 0.03 0.06 0.05 95.30 - On - Going

    626 Construction & Trading, Inc. 34990 Improvement of Hot and Cold Spring Resort 10/09/2015 TIEZA 12.000 240 O 0.395 0.300 0.103 0.030 0.047 0.050 92.49 - On-going

    626 Construction & Trading, Inc. 34990 Improvement of Balungao Hot and Cold Spring Resort 05/27/2015 TIEZA 11.800 180 O 0.397 0.299 0 0.030 0.045 0.017 78.74 Ongoing

    722 Construction, Inc.(Formerly:

    722 Construction)21923

    Repair/Rehabilitation/Improvement along Baliuag-

    Candaba Road K0054+000 to K0057+00011/24/2014 III 12.104 72 O 0.295 0.240 0.150 0.030 0.037 0.033 78.50% - On-going

    739 Builders 31174

    Barbar Small River Irrigation Project, Package 9 -

    Construction of Main Canal Nagsupotan (Canalization,

    Sta. 3+000 - 5+000)

    10/26/2019 NIA 10.764 270 O 0.39 0.18 0.13 0.03 0.05 0.05 82.30 - On-going

    739 Builders 31174Barbar Small River Irrigation Project, Package 11 -

    Construction of Slope Protection Works at Diversion10/26/2019 NIA 15.134 270 O 0.31 0.24 0.13 0.03 0.05 0.05 81.00 - On-going

    739 Builders 31174Provision of Techvoc Workshop Buildings/Laboratories

    for Senior High School, Narvacan NCHS06/04/2017

    Ilocos Sur

    2nd District

    Engineering

    Office

    2.307 85 C 0.48 0.20 0.24 - - - 92.30 *92.3% Very Satisfactory

    739 Builders 31174Construction of Drainage Canal, Vigan-Sta. Catalina

    Road, K0407+405-K0408+28808/17/2017

    Ilocos Sur 1st

    DEO11.177 120 C 0.49 0.17 0.23 - - - 88.80 *88.8% Satisfactory

    *1st/Final

    * For DPWH, only the region and PMO office are listed 31st Release Page 5 of 688

  • On-going and Completed Projects

    For the period July 1, 2017 to June 30, 2020

    AMOUNTDUR (C.D.)

    NAME OF CONSTRUCTORLICENSE

    NO.PROJECT

    DATE OF EVALUATION

    *IMPL. AGENCY

    CONTRACT

    STATUS WMS FINAL RATINGQUALITATIVE DESCRIPTION

    MTL TIME FAC ESH RDRCPES VISIT

    RATING

    739 Builders 31174

    Provision of Techvoc Workshop Building/Laboratories for

    Senior High School, Narvacan National High School,

    Narvacan, Ilocos Sur

    03/18/2017Ilocos Sur

    2nd DEO2.306 115 O 0.225 0.300 0.051 0.03 0.052 0.033 69.10 - On-going

    739 Builders / Arthit Corporation31174 /

    40667

    Upgrading and Improvement of Sta. Lucia - Nagrebcan -

    Ronda Road10/09/2018

    Provincial

    Government

    of Ilocos Sur

    44.784 211 O 0.40 0.30 0.15 0.03 0.07 0.05 100.00 - On - Going

    739 Builders / Arthit Corporation

    (JV)

    31174 /

    40667 -

    SN1-SN-

    16780

    Barbar Small River Irrigation Project, Package 10 -

    Construction of Lateral D & Lateral E (Canalization Sta.

    0+008.00 to Sta. 1+490.00) L=1,481.20 l.m.

    10/26/2019 NIA 10.297 240 O 0.38 0.18 0.13 0.03 0.05 0.05 82.20 - On-going

    739 Builders / Arthit Corporation

    (JV)

    31174 /

    40667 -

    SN1-SN-

    16780

    Barbar Small River Irrigation Project, Package 12 -

    Construction of Re-Road Surfacing of Access Road at

    Sta. 0+000 - 5+179.14

    10/26/2019 NIA 10.791 240 O 0.38 0.18 0.12 0.03 0.06 0.05 81.20 - On-going

    811 Trading & Construction 21215Construction of Two (2) Storey, Four Classroom Building

    for Punong NHS, Sta. Cruz, Marinduque08/25/2017

    Marinduque

    DEO7.115 262 C 0.47 0.20 0.15 - - - 82.70 *82.7% Satisfactory

    811 Trading & Construction 21215

    Construction of 2 Storey/ 8 Classrooms at Doroteo S.

    Mendoza SR Memorial National High School, Naujan,

    Oriental Mindoro

    08/17/2017Mindoro

    Oriental DEO10.769 210 C 0.49 0.20 0.00 - - - 68.80 *68.8% Poor

    811 Trading & Construction 21215

    Construction of 2 Storey/8 Classrooms at Doroteo S.

    Mendoza, Sr., Memorial National High School, Naujan,

    Oriental Mindoro

    11/17/2016Mindoro

    Oriental DEO10.821 150 O 0.349 0.3 0.109 0.03 0.058 0.033 0.8790 - On-going

    811 Trading & Construction/ Great

    Lakes Enterprises, Joint Venture

    JV-15-

    1249

    Construction of Wawa Seawall, Calapan City, Oriental

    Mindoro08/26/2016

    Mindoro

    Oriental DEO18.576 181 O 0.382 0.2 0.3 0 0 0 0.8820 - On-going

    876 Construction 24224Paving of Shoulder with Drainage and Slope Protection,

    Calapan North Road (CNR)08/26/2016

    Mindoro

    Oriental DEO1.293 75 O 0.455 0.158 0.3 0 0 0 0.9130 - On-going

    888 Acy Enterprises 32898

    Cluster-Road Widening along Daang Maharlika

    (S00223LT), K1024+443-K1024+699, K1024+721-

    K1025+607

    11/06/2017 DPWH 33.567 240 O 0.344 0.254 0.112 0.03 0.056 0.033 82.90 - On-going

    888 Acy Enterprises 32898

    Off-Carriageway Improvement Along Jct. Taft-Oras-San

    Policarpio-Arteche Road (S00167SM) K0939+500-

    K0940+744; K0942+280-K0943+344, K0943+432-

    K0944+1087, Eastern Samar

    08/15/2017Eastern

    Samar DEO39.857 210 O 0.364 0.300 0.150 0.03 0.012 0.033 88.90 - On-going

    888 Acy Enterprises 32898

    Rehab./Major Repair of Permanent Bridges, Canlawis

    Bridge along Lilo-an-San Ricardo Road (B00368LT),

    Pintuyan, Southern Leyte

    03/30/2017Southern

    Leyte DEO19.585 247 C 0.41 0.13 0.30 - - - 84.50 *84.5% Satisfactory

    *1st/Final

    * For DPWH, only the region and PMO office are listed 31st Release Page 6 of 688

  • On-going and Completed Projects

    For the period July 1, 2017 to June 30, 2020

    AMOUNTDUR (C.D.)

    NAME OF CONSTRUCTORLICENSE

    NO.PROJECT

    DATE OF EVALUATION

    *IMPL. AGENCY

    CONTRACT

    STATUS WMS FINAL RATINGQUALITATIVE DESCRIPTION

    MTL TIME FAC ESH RDRCPES VISIT

    RATING

    888 Acy Enterprises 32898

    Rehab./Major Repair of Permanent Dinahugan Bridge

    along Bdry. So. Leyte-Maasin-Macrohon-Sogod-Daang

    Maharlika (B003011LT)

    06/26/2016Southern

    Leyte DEO19.148 202 O 0.367 0.24 0.15 0.03 0.056 0.05 89.30% - On-going

    888 Acy Enterprises 32898

    Rehab/Major Repair of Permanent Bridges, Pandan

    Bridge, Along Brdy, S. leyte-Maasin-Macrohon-Sogod-

    Daang Maharlika

    06/03/2015Southern

    Leyte DEO8.812 150 O 0.4 0.24 0.15 0.03 0.052 0.033 90.50% - On-going

    888 Acy Enterprises 32898

    Off-Carriageway Improvement along Taft - Oras - San

    Policarpio - Arteche Road, K0939+500 - K0940+744,

    K0942+280 - K0943+344, K0943+432 - K0944+490,

    K0944+672 - K0944+1087

    04/10/2018Eastern

    Samar DEO39.857 210 C 0.48 0.19 0.30 - - - 96.70 91.48% Very Satisfactory

    888 Acy Enterprises 32898Road Widening along Daang Maharlika, K1024+443-

    K1024+699.00; K1024+721-K1025+607.00004/09/2018

    Southern

    Leyte DEO33.567 240 C 0.48 0.13 0.30 - - - 91.50 *91.50% Very Satisfactory

    8G Construction And General

    Services35783

    Rehabilitation/Improvement of Farm to Market Road at

    Jandalamanon, Kilaban, Gomentoc and Candanaay,

    Ayungon, Negros Oriental

    03/11/2016

    Negros

    Oriental First

    DEO

    3.7437 50 C 0.44 0.13 0.30 0.00 0.00 0.00 86.80% 86.80% Satisfactory

    8R'S Construction 22997

    Rehabilitation/ Reconstruction/ Upgrading of Damaged

    Paved National Rd. including Drainage (Marinduque

    Circumferencial Road), K0004+000-K0004+600,

    K0005+300-K0005+486, and K0005+670-K0005+832,

    Boac-Mogpog, Marinduque

    08/27/2016Marinduque

    DEO26.202 257 O 0.347 0.259 0.15 0.03 0.025 0.033 0.8440 - On-going

    969 Construction & Supplies 35818 Barangay San Roque, Delfin Albano, Isabela 06/02/2017Isabela 1st

    DEO1.410 91 C 0.44 0.14 0.30 - - - 88.00 *88% Satisfactory

    A B Aponesto Construction, Parts &

    Supply22998

    Repair/Rehab of Agusan River Flood Control, Osmena

    Section, Compostela along Montevista – Compostela –

    New Bataan – Maragusan – Mati Bdry. Road.

    08/09/2014 XI 30.533 183 O 0.384 0.219 0.123 0.030 0.042 0.033 83.10 - On-going

    A De Guia Construction 18228Construction of River Bank Protection, Siffu Flood

    Control Project, Sittio Gabit Section, Roxas, Isabela08/28/2015

    Isabela 2nd

    DEO18.346 215 O 0.354 0.3 0.15 0.03 0.04 0.05 92.40% - On-going

    A J Taylan Construction &

    Development/Jlp Construction &

    Supply Joint Venture

    JV-14-518

    Rehabilitation/Reconstruction/Upgrading of Damaged

    Paved National Roads including Drainage Based on

    Pavement Management System/Highway Development

    and Management- 4(HDM-4), Pinili-Nueva Era Road,

    K0453+(-224)-K0454+1013, K0455+884-K0456+433,

    Pinili Road, Ilocos Norte

    08/26/2015Ilocos Sur

    2nd DEO37.519 219 O 0.355 0.209 0.15 0.03 0.051 0.05 84.50% - On-going

    A. B. Taylan Construction &

    Development / North Tech Builders

    And Construction Supply Joint

    Venture

    JV-14-115

    MFO-1 National Road Network Services: Network

    Development: Widening of National Roads (Arterial)-

    along N1, Bangag-Magapit Road, K0686+(-512) -

    K0687+980, Bangag-Magapit, Allacapan, Cagayan

    06/01/2017Regional

    Office No. II74.138 294 C 0.45 0.13 0.30 - - - 88.60 *88.6% Satisfactory

    A. C. Rivero Development

    Corporation5122 Concreting of Brgy. San Miguel - Brgy. Cantandoy FMR 09/18/2019 DA 4.722 60 O 0.37 0.30 0.15 0.03 0.04 0.05 94.40 - On-going

    *1st/Final

    * For DPWH, only the region and PMO office are listed 31st Release Page 7 of 688

  • On-going and Completed Projects

    For the period July 1, 2017 to June 30, 2020

    AMOUNTDUR (C.D.)

    NAME OF CONSTRUCTORLICENSE

    NO.PROJECT

    DATE OF EVALUATION

    *IMPL. AGENCY

    CONTRACT

    STATUS WMS FINAL RATINGQUALITATIVE DESCRIPTION

    MTL TIME FAC ESH RDRCPES VISIT

    RATING

    A. C. Rivero Development

    Corporation5122

    Replacement/ Raising of PHHC Bridge (S00130NR)

    along Bacolod Circumferential Road, Bacolod City11/16/2017 DPWH 19.600 255 O 0.391 0.240 0.150 0.03 0.04 0.05 90.10 - On-going

    A. C. Soliven Construction *

    General Merchandise19278

    Rehabilitation/ Improvement of Existing Dike along

    Lucung River, Upstream of Sta. Maria Section, Left Side,

    Sta. (-)2+050 to Sta. (-)2+132 and Sta. (-)2+200 to Sta. (-

    )2+619.60, Concepcion, Tarlac

    08/20/2017Tarlac 2nd

    DEO37.231 147 C 0.42 0.13 0.30 - - - 85.40 *85.4% Satisfactory

    A. D. Pendon Construction &

    Supply, Inc. (Formerly: A. D. P.

    Construction & Supply)

    3466

    Asset Preservation of National Roads Preventive

    Maintenance - Asset Preservation of National Roads -

    Rehabilitation/Reconstruction/Upgrading of Damaged

    Paved National Roads Including Drainage, Odiong -

    Sibalom - San Remigio - Leon Road, San Remigio, Antiq

    06/09/2016ANTIQUE

    DEO29.476 223 O 0.23 0.291 0.121 0.008 0.022 0 67.20% - On-going

    A. D. Pendon Construction &

    Supply, Inc. (Formerly: A. D. P.

    Construction & Supply)

    3466

    Rehabilitation/ Reconstruction/ Upgrading of Damaged

    Paved National Roads including Drainage, Iloilo-Capiz

    Road (Pavia Diversion), K0010+449 to K0010+824.30,

    Iloilo

    11/16/2016ILOILO 4TH

    DEO7.258 170 O 0.341 0.24 0.15 0.03 0.05 0.05 0.8610 - On-going

    A. D. Pendon Construction &

    Supply, Inc. (Formerly: A. D. P.

    Construction & Supply)

    3466Upgrading of Delgado St. K0001+(-402)-K0001+(-100),

    K0001+(-100)-K0001+080, Iloilo City09/01/2016 ILOILO DEO 22.611 22.611 O 0.275 0.3 0.05 0.03 0.058 0 0.7130 - On-going

    A. De Guia Construction 18228

    Construction/ Rehabilitation of Flood Control Projects,

    Nagassican Flood Control Projects, Sta. 0+000 to Sta.

    0+224

    08/12/2014 II 19.500 184 O 0.288 0.248 0.150 0.030 0.055 0.050 82.10 - On-going

    A. De Guia Construction 18228

    Construction of Drainage System / Protection Works

    along Daang Maharlika, Isabela 4th LD K0311+590 -

    K0314+350, San Luis - Caquilingan

    10/27/2014 II 19.403 231 O 0.347 0.300 0.150 0.030 0.029 0.033 88.90% - On-going

    A. De Guia Construction 18228Concreting of San Pablo-Salvacion Road, Barangay San

    Pablo Alicia, Isabela11/11/2017 DPWH 6.930 122 C 0.47 0.13 0.30 - - - 90.30 *90.3% Very Satisfactory

    A. De Guia Construction 18228

    Network Development - Improvement/ Widening of

    National Roads Primary Roads - Other Primary Roads

    along National Roads along Santiago - Tuguegarao

    Road, K0369+000 - K0371+000, K0373+000 -

    K0374+000, K0374+947 - K0376+000, Aurora and San

    Miguel, Isabela

    08/19/2017Isabela 2nd

    DEO91.157 251 O 0.381 0.240 0.150 0.03 0.07 0.033 90.40 - On-going

    *1st/Final

    * For DPWH, only the region and PMO office are listed 31st Release Page 8 of 688

  • On-going and Completed Projects

    For the period July 1, 2017 to June 30, 2020

    AMOUNTDUR (C.D.)

    NAME OF CONSTRUCTORLICENSE

    NO.PROJECT

    DATE OF EVALUATION

    *IMPL. AGENCY

    CONTRACT

    STATUS WMS FINAL RATINGQUALITATIVE DESCRIPTION

    MTL TIME FAC ESH RDRCPES VISIT

    RATING

    A. De Guia Construction 18228

    MFO 1 - National Road Network Services: Network

    Development: Improvement/Widening of National Roads,

    Primary Roads along N1 Daang Maharlika (LZ) -

    K0382+977-K0383+450 L/S, K0383+830-K0386+182

    L/S, K0386+291-K0387+215 L/S, K0382+977-

    K0383+450 R/S, K0383+83

    06/15/2016Regional

    Office79.349 248 O 0.393 0.24 0.15 0.03 0.047 0.05 91.00% - On-going

    A. De Guia Construction 18228

    Network Development-Improvement/Widening of

    National Roads-Primary Roads-Other Primary Roads

    along National Roads along Santiago-Tuguegarao Road,

    K0369+000-K0371+000, K0373+000-K0374+000 &

    K0374+947-K0376+000

    04/09/2018Isabela 2nd

    DEO91.157 281 C 0.36 0.20 0.30 - - - 86.30 91.40% Very Satisfactory

    A. De Guia Construction 18228

    Network Development, Improvement/Widening of

    National Roads, Santiago-Tuguegarao Road, K0342+(-

    039)-K0343+884, Oscar, Ramon

    03/20/2018Isabela 3rd

    DEO45.847 179 C 0.46 0.18 0.30 - - - 93.70 *93.70% Very Satisfactory

    A. Dela Cruz Builders Inc. 38836Construction of Multi-Purpose Building at Dona Aurora

    Elementary School, Brgy. Doña Aurora, Quezon City03/17/2018

    Quezon City

    2nd DEO14.724 250 C 0.49 0.13 0.30 - - - 92.20 *92.20% Very Satisfactory

    A. J. Lava Builders Corp. (Formerly:

    A. J. Lava Builders)22265

    Flood Management Services Construction/Maintenance

    of Flood Mitigation Structures and Drainage System

    Improvement/Riprapping of Sitio Kapatagan River

    (Downstream), Brgy. San Jose, Antipolo City, 2nd LD

    11/11/2015RIZAL 1ST

    DEO27.612 180 O 0.39 0.24 0.15 0.03 0.06 0.05 92.00% - On-going

    A. J. Taylan Construction

    Corporation2336

    Laoag River Basin Flood and Sabo Project, Concrete

    Revetment along Bongo River, Brgy. Sta Monica, Sitio 2,

    San Nicolas, Ilocos Norte

    03/09/2016

    ILOCOS

    NORTE 2ND

    DEO

    9.649 194 C 0.42 0.20 0.30 - - - 91.10% 91.10% Very Satisfactory

    A. M. Oreta and Co., Incorporated 108 Region 2-PIDP-CBIMO 09/19/2015 NIA 80.788 690 O 0.370 0.300 0.130 0.030 0.060 0.050 94.00 - On-going

    A. M. P. Construction 16574Construction of Flood Control Wall along Agbalili River,

    Altavas, Aklan08/28/2016 AKLAN DEO 34.428 34.428 O 0.388 0.3 0.003 0.03 0.058 0 0.7790 - On-going

    A. M. P. Construction 16574Construction of Flood Control Revetment Wall along

    Agbalili River, Altavas, Aklan06/11/2016 AKLAN DEO 34.428 274 O 0.385 0.3 0.104 0.023 0.055 0.033 90.00% - On-going

    A. M. P. Construction/ Forthright

    Construction Joint Venture

    JV-16-

    1612

    Construction/ Maintenance of Flood Mitigation Structures

    and Drainage System, Rehabilitation/ Improvement of

    Pampanga River Control, Brgy. Sapang Buho, Palayan

    City, Nueva Ecija

    08/23/2017Nueva Ecija

    2nd DEO39.200 161 O 0.309 0.300 0.150 0.02 0.042 0.05 87.10 - On-going

    *1st/Final

    * For DPWH, only the region and PMO office are listed 31st Release Page 9 of 688

  • On-going and Completed Projects

    For the period July 1, 2017 to June 30, 2020

    AMOUNTDUR (C.D.)

    NAME OF CONSTRUCTORLICENSE

    NO.PROJECT

    DATE OF EVALUATION

    *IMPL. AGENCY

    CONTRACT

    STATUS WMS FINAL RATINGQUALITATIVE DESCRIPTION

    MTL TIME FAC ESH RDRCPES VISIT

    RATING

    A. P. B. Construction 17055

    Network Development/ Widening of National Roads-

    Secondary Road-Abra-Ilocos Norte Road K0409+000-

    K0409+100, K0409+115-K409+178, K0409+307-

    K0409+404, K0409+531-K0409+648, K0409+748-

    K0410+139, K0410+159-K0410+360, K0410+369-

    K0410+777, K0411+050-K0411+220, K0412+122-

    K0412+499, K0413+000-K0414+354, K0414+764-

    K0415+747, K0416+175-K0416+445, K041

    11/20/2015Regional

    Office81.971 286 O 0.318 0.29 0.15 0.022 0.045 0.033 85.80% - On-going

    A. P. Consebido Construction And

    Trading33616

    Construction of Barangay Road, Barangay Dumarao,

    Sta. 00+012.70-Sta. 0+149.00, Roxas, Palawan03/10/2016

    Palawan First

    DEO1.9478 100 C 0.43 0.20 0.27 - - - 89.90% 89.90% Very Satisfactory

    A. P. D. Construction 17467

    Retrofitting/Strengthening of Disiluad Br. (B01939LZ)

    along Cordon-Aurora Boundary Road (Isabela Boundary -

    Jct. Dumabato)

    03/17/2016 Quirino 29.4724 180 C 0.49 0.13 0.30 - - - 91.90% 91.90% Very Satisfactory

    A. R. Lustre Jr. Construction 7680

    Construction of Multi-Purpose Building, Barangay Sta.

    Monica, Inagawan Sub. And San Miguel, Puerto

    Princesa City

    03/11/2016Palawan 3rd

    DEO1.9142 156 C 0.48 0.18 0.30 - - - 96.00% 96% Very Satisfactory

    A. Y. U. Engineering And

    Construction25632

    Road Concreting, Bato to Likate Road, Brgy. Bato and

    Kilate, Toril, Davao City09/02/2016

    Davao City

    2nd DEO9.800 105 C 0.48 0.13 0.30 - - - 0.9160 88.30% Satisfactory

    A.B Taylan Construction &

    Development 25273

    Netwrork Development, Improvement of National Roads

    along Manila North Road, K0508+050-K0508+125;

    K0508+140-K0508+250; K0508+329; K0508+410-

    K0509+755; K0509+760-K0510+501; K0519+000-

    K0520+200; K0521+000-K0522+500; K0522+500-

    K0523+060

    11/08/2017 DPWH 144.750 255 C 0.47 0.13 0.30 - - - 90.60 *90.6% Very Satisfactory

    A.B. Opena BuildersConcreting of Barangay Road, Purok 13,, Sanitarium

    Compound, Brgy. San Pedro 06/02/2018

    Camarines

    Sur 5th DEO1.880 60 C 0.46 0.13 0.30 - - - 89.50 89.50% Very Satisfactory

    A.B. Opeña Builders 33996Construction of Multi-Purpose Building at Colacling

    National High School11/15/2017 DPWH 0.955 60 C 0.49 0.13 0.30 - - - 92.10 *92.1% Very Satisfactory

    A.B. Opeña Builders 33996Concreting of Barangay Road at Brgy. Mabini, Del

    Gallego, Camarines Sur 06/01/2017

    Camarines

    Sur 5th DEO1.410 40 C 0.44 0.13 0.30 - - - 87.70 *87.7% Satisfactory

    A.B. Opeña Builders 33996Concreting of Barangay Road, Barangay Sta. Cruz,

    Cabusao, Camarine Sur08/16/2017

    Camarines

    Sur 5th DEO1.881 45 O 0.489 0.134 0.300 - - - 92.30 - On-going

    *1st/Final

    * For DPWH, only the region and PMO office are listed 31st Release Page 10 of 688

  • On-going and Completed Projects

    For the period July 1, 2017 to June 30, 2020

    AMOUNTDUR (C.D.)

    NAME OF CONSTRUCTORLICENSE

    NO.PROJECT

    DATE OF EVALUATION

    *IMPL. AGENCY

    CONTRACT

    STATUS WMS FINAL RATINGQUALITATIVE DESCRIPTION

    MTL TIME FAC ESH RDRCPES VISIT

    RATING

    A.B. Taylan Construction &

    Development28233

    Improvement/Widening of National Road along N1,

    Manila North Roads, K0494+396-K0495+024;

    K0496+164-K0496+423; K0496+775-K0497+444;

    K0497+834-K0498+000; K0499+200-K0500+676;

    K0500+676-K0500+698; K0500+676-K0500+756;

    K0503+380-K0506+084; K0503+380-K0506+048,

    Bacarra, Ilocos Norte

    11/16/2016Regional

    Office No. I146.250 325 O 0.49 0.133 0.3 0 0 0 0.9230 - On-going

    A.B. Taylan Construction &

    Development/ Badoc Builders &

    Supply Joint Venture

    JV-16-621Construction of Final Mitigation Structure along Badoc

    River, U/S and D/S of Badoc Bridge08/16/2017

    Ilocos Norte

    2nd DEO44.100 225 C 0.46 0.20 0.30 - - - 95.70 *92.4% Very Satisfactory

    A.B. Taylan Construction &

    Development/ Badoc Builders &

    Supply Joint Venture

    JV-15-404

    Road Upgrading (Unpaved to Paved) Based on Gravel

    Road Strategies, Traffic Benchmark for Upgrading to

    Paved Road Standards (HDM-4) along Batac-Pinili via

    Maipalig Road (S04765LZ)

    08/17/2017Regional

    Office No. I146.249 300 C 0.49 0.15 0.29 - - - 92.80 *92.8% Very Satisfactory

    A.C Rivero Development

    Corporation5122

    Upgrading of Drainage System Along El Dorado Street,

    Barangay Bosco, District II11/21/2017 DPWH 14.035 261 O 0.376 0.300 0.079 0.03 0.056 0.033 87.40 - On-going

    A.C Rivero Development

    Corporation5122

    Rehabilitation/Reconstruction of Proposed Slope

    Protection along Sta. Felomina-Bonbonon-Digkilaan-

    Rogongon Road K1526+000-K1526+200 R/S

    11/14/2017 DPWH 33.582 193 C 0.45 0.18 0.30 - - - 92.30 *92.3% Very Satisfactory

    A.C Soliven Construction & General

    Merchandise19278

    Agno River Basin & Allied Rivers Flood Control Project -

    Heightening of Villasis-Alacala Earth Dike Phase I, Agno

    River Control

    11/14/2017 DPWH 44.687 220 C 0.44 0.13 0.30 - - - 87.10 *87.1% Satisfactory

    A.C Soliven Construction & General

    Merchandise19278

    Flood Management Services: Construction/ Maintenance

    of Flood Mitigation Structures and Drainage System,

    Construction of Flood Control Facilities at Paranum

    Creek, Sta. 0+000 - Sta. 0+110 and Sta. 0+390 - Sta.

    1+170, (L/S), Brgy. Camias, Magalang, Pampanga

    06/08/2017Pampanga

    3rd DEO17.784 150 O 0.370 0.242 0.150 0.03 0.065 0.033 89.00 - On-going

    A.C Soliven Construction & General

    Merchandise19278

    Flood Management Services: Construction/ Maintenance

    of Flood Mitigation Structures and Drainage System;

    Construction of Flood Facilities at Paranum Creek,

    Barangay Camias, Sta. 0+000 to Sta. 0+110, Magalang,

    Pampanga

    08/19/2017Pampanga

    3rd DEO17.784 150 C 0.39 0.20 0.30 - - - 89.10 *89.04% Very Satisfactory

    *1st/Final

    * For DPWH, only the region and PMO office are listed 31st Release Page 11 of 688

  • On-going and Completed Projects

    For the period July 1, 2017 to June 30, 2020

    AMOUNTDUR (C.D.)

    NAME OF CONSTRUCTORLICENSE

    NO.PROJECT

    DATE OF EVALUATION

    *IMPL. AGENCY

    CONTRACT

    STATUS WMS FINAL RATINGQUALITATIVE DESCRIPTION

    MTL TIME FAC ESH RDRCPES VISIT

    RATING

    A.C Soliven Construction & General

    Merchandise19278

    Construction/Maintenance of Flood Mitigation Structure &

    Drainage Systems - Agno River Basin Flood Control

    Project-Extension/ Construction of Bank Protection of

    River Course, Brgy. Mabanogbog, Namcamaliran

    Pinmaludpod, Urdaneta City, Pangasinan

    11/25/2016Pangasinan

    3rd DEO34.299 250 O 0.4 0.3 0.15 0.03 0.035 0.025 0.9400 - On-going

    A.C Soliven Construction & General

    Merchandise19278

    Construction/Maintenance of Flood Mitigation Structures

    & Drainage Systems - Agno River Basin Flood Control

    Project - Extension/Construction of Bank Protection of

    River Course, Brgy. Mabanogbog, Nancamairan,

    Pinmalupod, Urdaneta City, Pangasinan

    03/23/2017Pangasinan

    3rd DEO34.299 250 O 0.400 0.300 0.060 0.03 0.04 - 83.00 - On-going

    A.C Soliven Construction & General

    Merchandise19278

    Construction of Bank Protection Works, Agnooo River

    Basin Flood Control Project (Phase III) Brgy. Bantog,

    Asingan, Pangasinan

    11/16/2015PANGASINA

    N 3RD DEO18.336 180 O 0.389 0.24 0.15 0.03 0.055 0.05 91.40% - On-going

    A.C Soliven Construction & General

    Merchandise19278

    Construction of Bank Protection, Agno River Basin Flood

    Control Project (Phase III), Barangay Bantog, Asingan,

    Pangasinan

    03/18/2016PANGASINA

    N 3RD DEO18.335 180 C 0.41 0.20 0.30 - - - 91.28% 91.28% Very Satisfactory

    A.C Soliven Construction & General

    Merchandise19278

    Construction/Rehabilitation of Drainage along National

    Roads, Villasis-Malassiqui-San Carlos Road, K0190+785-

    K0192+800 with Exception (B/S), Malasiqui, Pangasinan

    03/15/2016PANGASINA

    N 4TH DEO34.3 226 C 0.36 0.20 0.30 - - - 86.20% 86.20% Satisfactory

    A.C. Mojares Construction, Inc. 1771Concreting and Sidewalk Improvement of Phase 2, Scout

    Tobias St., Brgy. Laging Handa, Quezon City06/03/2014

    Quezon City

    2nd DEO10.018 207 O 0.394 0.24 0.15 0.015 0.028 0.05 87.70% - On-going

    A.C. Rivero Development

    Corporation

    Construction of Drainage Structure along Road - Bdry.

    So. Leyte - Maasin- Macrohon - Sogod - Jct. - Maharlika

    (S00194LT) K1149+000 - K1152+000

    05/29/2018Southern

    Leyte DEO48.020 330 C 0.45 0.13 0.30 - - - 88.50 88.50% Satisfactory

    A.C. Rivero Development

    Corporation

    Local Roads and Bridges - Local Roads - Local

    Infrastructure Program / Concreting og Brgy. Road,

    Batuan - San Isidro

    05/29/2018Southern

    Leyte DEO9.296 180 O 0.39 0.24 0.15 0.03 0.05 0.03 88.80 - On-going

    A.C. Rivero Development

    Corporation

    Road Upgrading (Unpaved to Paved) of Quezon-

    Aramaywan Road K)158+KO665-K158+749,

    KO158+749-KO158+849 and KO172+635-KO175+005

    06/02/2018Palawan 2nd

    DEO74.758 225 O 0.35 0.22 0.15 0.02 0.05 0.05 84.10 - On-going

    A.C. Rivero Development

    Corporation (Formerly: A.C. Rivero

    Construction)

    5122

    Rehabilitation/ Reconstruction of National Roads with

    Slips, Slope Collapse and Landslide along Tomas Oppus

    Street

    06/03/2017Southern

    Leyte DEO27.915 260 C 0.50 0.13 0.30 - - - 93.20 *93.2% Very Satisfactory

    A.C. Rivero Development

    Corporation (Formerly: A.C. Rivero

    Construction)

    5122

    CY 2016 Basic Education Facilities Fund (BEFF),

    Provision of Tech Voc. Laboratores, Batch 12, Merida

    Vocation School, Merida, Leyte

    04/01/2017Leyte 4th

    Deo2.556 90 C 0.46 0.13 0.30 - - - 89.50 *89.5% Very Satisfactory

    *1st/Final

    * For DPWH, only the region and PMO office are listed 31st Release Page 12 of 688

  • On-going and Completed Projects

    For the period July 1, 2017 to June 30, 2020

    AMOUNTDUR (C.D.)

    NAME OF CONSTRUCTORLICENSE

    NO.PROJECT

    DATE OF EVALUATION

    *IMPL. AGENCY

    CONTRACT

    STATUS WMS FINAL RATINGQUALITATIVE DESCRIPTION

    MTL TIME FAC ESH RDRCPES VISIT

    RATING

    A.C. Rivero Development

    Corporation (Formerly: A.C. Rivero

    Construction)

    5122Indv. Project - Concreting of Monte-Calvario-Igbac-

    Barangay Road, Brgy. Monte-Calvario and Igbac11/16/2017 DPWH 9.860 83 C 0.48 0.13 0.30 - - - 91.60 *91.6% Very Satisfactory

    A.C. Rivero Development

    Corporation (Formerly: A.C. Rivero

    Construction)

    5122

    Off-Carriageway Improvement including Drainage along

    Liloan-San Ricardo Road (S00218LT), K1070+685 to

    K1072+000

    11/06/2017 DPWH 45.307 270 O 0.368 0.239 0.150 0.03 0.065 0.05 90.20 - On-going

    A.C. Rivero Development

    Corporation (Formerly: A.C. Rivero

    Construction)

    5122Replacement of PHHC Bridge along Bacolod

    Circumferential Road06/06/2017 Bacolod City 34.299 330 O 0.373 0.200 0.029 0.03 0.058 0.033 72.33 - On-going

    A.C. Rivero Development

    Corporation (Formerly: A.C. Rivero

    Construction)

    5122Replacement of PHHC Bridge along Bacolod

    Circumferential Road, Bacolod City08/23/2017 Bacolod City 34.299 330 C 0.49 0.13 0.00 - - - 62.40 *68.34% Poor

    A.C. Rivero Development

    Corporation (Formerly: A.C. Rivero

    Construction)

    5122

    MFO-1: National Road Network Services Off-

    Carriageway Improvement including Drainage-

    Secondary Roads Flaring of Intersection along Carrmen-

    Patag-Bulua Road K1440+(-272) and K1441+370

    03/16/2018

    Cagayan de

    Oro City 1st

    DEO

    9.221 195 C 0.48 0.20 0.12 - - - 79.70 *79.70% Unsatisfactory

    A.C. Rivero Development

    Corporation (Formerly: A.C. Rivero

    Construction)

    5122

    Road Upgrading (Unpaved to Paved) Based on Gravel

    Road Strategies Traffic Benchmark for Upgrading to

    Paved Road Standards (HDM-4 Project Analysis) along

    Sta. Felomina-Bonbonon-Digkilaan-Rogongon Road

    03/22/2018

    Lanao del

    Norte 2nd

    DEO

    33.269 202 C 0.49 0.13 0.30 - - - 92.50 *92.50% Very Satisfactory

    A.C. Rivero Development

    Corporation (Formerly: A.C. Rivero

    Construction)

    5122Construction and Maintenance of Bridges along National

    Roads (Replacement of Weak Bridge) at Olingan Bridge03/15/2017

    Zamboanga

    del Norte 1st

    DEO

    21.622 355 C 0.46 0.20 0.15 - - - 81.00 *81% Unsatisfactory

    A.C. Rivero Development

    Corporation (Formerly: A.C. Rivero

    Construction)

    5122Upgrading/Conc. of San Juanico-Basey-Sohoton Rd.,

    K0913+721.75-K0917+915.72, w/ exceptions08/07/2012 VIII 47.065 200 O 0.357 0.240 0.150 0.030 0.040 0.033 85.00 - On-going

    A.C. Rivero Development

    Corporation (Formerly: A.C. Rivero

    Construction)

    5122Const./Completion of Subang Daku Bridge, Subang

    Daku River, San Miguel08/17/2012 VIII 42.820 220 O 0.383 0.300 0.150 0.030 0.040 0.033 93.60 - On-going

    A.C. Rivero Development

    Corporation (Formerly: A.C. Rivero

    Construction)

    5122Const./Impv't. of San Miguel-Jct. Buac Rd., Daang

    Maharlika Rd (Km1207+000 - Km1209+454.40)08/19/2012 VIII 35.731 220 O 0.349 0.289 0.150 0.030 0.045 0.033 89.60 - On-going

    A.C. Rivero Development

    Corporation (Formerly: A.C. Rivero

    Construction)

    5122Const./Completion of Maasin Flood Control along Tomas

    Oppus Street (Road ID S00222LT)06/26/2016

    Southern

    Leyte DEO25.281 180 O 0.32 0.3 0.15 0.03 0.056 0.05 90.60% - On-going

    A.C. Rivero Development

    Corporation (Formerly: A.C. Rivero

    Construction)

    5122

    Widening of Permanent Bridges from 1 Lane to 2 Lanes

    Malatgao Bridge (B00168PW) along Quezon, Punta,

    Baja Rd., Quezon, Palawan

    11/22/2016Palawan

    Second DEO18.408 220 O 0.388 0.176 0.15 0.03 0.04 0.05 0.8340 - On-going

    *1st/Final

    * For DPWH, only the region and PMO office are listed 31st Release Page 13 of 688

  • On-going and Completed Projects

    For the period July 1, 2017 to June 30, 2020

    AMOUNTDUR (C.D.)

    NAME OF CONSTRUCTORLICENSE

    NO.PROJECT

    DATE OF EVALUATION

    *IMPL. AGENCY

    CONTRACT

    STATUS WMS FINAL RATINGQUALITATIVE DESCRIPTION

    MTL TIME FAC ESH RDRCPES VISIT

    RATING

    A.C. Rivero Development

    Corporation (Formerly: A.C. Rivero

    Construction)

    5122

    Completion of Dodiongan Bridge along Sta. Felomina-

    Bonbonon-Digkilaan-Rogongon Road, Brgy. Bonbonon,

    Iligan City K01526+058-K01526+118, K01526+910-

    K01526+297

    09/03/2015

    Lanao del

    Norte 2nd

    DEO

    37.105 236 O 0.384 0.285 0.15 0.02 0.045 0.05 93.40% - On-going

    A.C. Rivero Development

    Corporation (Formerly: A.C. Rivero

    Construction)

    5122Off-Carriageway Improvement along Jct. Taft - Oras -

    San Policarpio-Arteche Road, K0950+000 - K0955+00006/29/2015

    Eastern

    Samar DEO33.355 150 O 0.297 0.3 0.15 0.03 0.04 0.033 85.00% - On-going

    A.C. Rivero Development

    Corporation (Formerly: A.C. Rivero

    Construction)

    5122

    Replacement of Permanent Weak Bridge, Ramon

    Magsaysay Bridge (B00469MN) Along Jct. Switch-Jct.

    Monte Alegre Road

    08/30/2016

    Zamboanga

    del Sur 1st

    DEO

    29.101 290 C 0.47 0.13 0.30 - - - 90% 88.07% Satisfactory

    A.C. RIVERO DEVELOPMENT

    CORPORATION (Formerly: A.C.

    Rivero Construction)

    5122

    Replacement of Permanent Weak Bridge, Ramon

    Magsaysay Bridge (B0469MN) along Jct. Switch-

    Jct.Monte Alegre Road

    08/29/2015Zamboanga

    del Sur 1st29.101 230 O 0.288 0.299 0.15 0.03 0.051 0.05 86.79% - On-going

    A.C. RIVERO DEVELOPMENT

    CORPORATION (Formerly: A.C.

    Rivero Construction)

    5122

    Construction and Maintenance of Bridges along National

    Roads - (Widening of Permanent Bridges to more than 2

    lanes), Miputak Bridge (BO1192MN) along Dipolog-

    Oroquieta National Road

    06/11/2016

    Zamboanga

    del Norte 1st

    DEO

    22.574 250 O 0.388 0.24 0.12 0.03 0.04 0.033 85.10% - On-going

    A.C. Rivero Development

    Corporation (Formerly: A.C. Rivero

    Construction)

    5122

    Construction and Maintenance of Bridges along National

    Roads (Replacement of Permanent Weak Bridge),

    Olingan Bridge (B01193MN)

    08/25/2016

    Zamboanga

    del Norte 1st

    DEO

    21.559 340 O 0.38 0.24 0.105 0.03 0.045 0.017 0.8170 - On-going

    A.C. Rivero Development

    Corporation (Formerly: A.C. Rivero

    Construction)

    5122

    Construction and Maintenance of Bridges along National

    Rd. (Replacement of Permanent Weak Bridge) at

    Olingan Bridge along Dipolog-Oroquieta National Road,

    Olingan, Dipolog City, Zamboanga del Norte

    11/16/2015

    Zamboanga

    Del Norte 1st

    DEO

    21.218 220 O 0.371 0.22 0.15 0.022 0.042 0.05 85.50% - On-going

    A.C. Rivero Development

    Corporation (Formerly: A.C. Rivero

    Construction)

    5122

    Construction/ Maintenance of Flood Control Mitigation

    Structure and Drainage, Construction of Sibugay Flood

    Control Brgy. Poblacion, Albuera, Leyte

    08/22/2017Leyte 4th

    DEO9.299 90 C 0.40 0.20 0.30 - - - 90.30 *90.3% Very Satisfactory

    A.C. Rivero Development

    Corporation / Jqd Construction And

    General Services Joint Venture

    JV-14-

    1038

    Rehabilitation/Major Repair of Permanent Weak Bridges,

    Otikon Bridge Along Daang Maharlika (B00598LT),

    Libagon, Southern Leyte

    11/16/2015Southern

    Leyte DEO31.056 195 O 0.249 0.3 0.15 0.03 0.06 0.05 83.90% - On-going

    A.C. Rivero Development

    Corporation / Jqd Construction And

    General Services Joint Venture

    0

    Rehabilitation/Major Repair of Permanent Weak Bridge,

    Otikon Bridge along Daang Maharlika, Libagon, Southern

    Leyte

    03/07/2016Southern

    Leyte31.056 195 C 0.45 0.19 0.30 - - - 88.10% 88.10% Satisfactory

    *1st/Final

    * For DPWH, only the region and PMO office are listed 31st Release Page 14 of 688

  • On-going and Completed Projects

    For the period July 1, 2017 to June 30, 2020

    AMOUNTDUR (C.D.)

    NAME OF CONSTRUCTORLICENSE

    NO.PROJECT

    DATE OF EVALUATION

    *IMPL. AGENCY

    CONTRACT

    STATUS WMS FINAL RATINGQUALITATIVE DESCRIPTION

    MTL TIME FAC ESH RDRCPES VISIT

    RATING

    A.D. Pendon Construction &

    Supply, Inc. (Formerly: Adp

    Construction & Supply

    3466

    Construction of Drainage along Mandurriao-Jaro

    Road,K0006+100-K0007+082, K0007+082, Mandurriao,

    Iloilo City

    08/24/2017Iloilo City

    DEO38.376 191 O 0.392 0.200 0.150 0.022 0.037 0.05 85.10 - On-going

    A.D. Pendon Construction &

    Supply, Inc. (Formerly: Adp

    Construction & Supply

    3466Const. of Slope Protection along Jct. Bancal-Leon-

    Antique Boundary Rd., K0031+722-K0031+89103/22/2013 VI 13.802 188 O 0.388 0.241 0.150 0.030 0.055 0.050 91.40 - On-going

    A.D. Pendon Construction &

    Supply, Inc. (Formerly: Adp

    Construction & Supply

    3466 Construction of Multi-Purpose Building 10/28/2014 VI 4.227 120 O 0.362 0.214 0.121 0.030 0.049 0.050 82.60% - On-going

    A.D. Pendon Construction &

    Supply, Inc. (Formerly: Adp

    Construction & Supply

    3466Construction/Rehab. Of Drainage System along Balasan-

    Carles Road, Brgy. Barosbos10/29/2014 VI 43.954 274 O 0.373 0.218 0.150 0.030 0.054 0.050 87.50% - On-going

    A.D. Pendon Construction &

    Supply, Inc. (Formerly: Adp

    Construction & Supply

    3466

    Road Upgrading (Gravel to Paved) along Davao-

    Sarangani Coastal Road km. 1671+600 to km.

    1673+060, Biton-Lanao Section

    08/07/2014 XI 40.082 208 O 0.014 0.300 0.000 0.030 0.014 0.000 35.80 - On-going

    A.D. Pendon Construction &

    Supply, Inc. (Formerly: Adp

    Construction & Supply

    3466

    Rd. Upgrading (Gravel to Paved) along Davao-Sarangani

    Coastal Rd., Km.1671+600-Km.1673+060, Biton-Lanao

    Sect.

    08/06/2013 XI 40.082 179 O 0.322 0.248 0.000 0.030 0.033 0.033 66.60 - On-going

    A.D. Pendon Construction &

    Supply, Inc. (Formerly: Adp

    Construction & Supply

    3466

    Malag-it Box Culvert along Iloilo East Coast-Capiz Road

    (Construction of Malag-it Bridge along Iloilo East Coast-

    Capiz Road)

    10/29/2014 VI 35.132 240 O 0.388 0.249 0.000 0.030 0.054 0.033 75.40% - On-going

    A.D. Pendon Construction &

    Supply, Inc. (Formerly: Adp

    Construction & Supply

    3466Widening of Caradio-an Bridge alog Bacolod South

    Road, Barangay Caradio-an10/23/2014 VI 24.804 273 O 0.378 0.221 0.034 0.030 0.045 0.033 74.10% - On-going

    A.D. Pendon Construction &

    Supply, Inc. (Formerly: Adp

    Construction & Supply

    3466 Impvt./Conc. of Access Road, Tubalan Port, Tubalan 06/14/2010 XI 58.261 320 O 0.338 0.300 0.000 0.030 0.040 0.033 74.10 - On-going

    A.D. Pendon Construction &

    Supply, Inc. (Formerly: Adp

    Construction & Supply

    3466

    Rehab./Reconst./Upgrading of Damaged Paved National

    Road, Roxas City Boundary-Panitan Road-Jct. Bailan

    Road, Capiz (KM.112+750-Km.122+705) with exception

    08/31/2010 VI 53.673 225 O 0.364 0.240 0.150 0.030 0.051 0.050 88.50 - On-going

    A.D. Pendon Construction &

    Supply, Inc. (Formerly: Adp

    Construction & Supply

    3466Construction of Drainage System along Iloilo East Coast

    Capiz Road06/09/2015

    Iloilo Third

    DEO44.467 252 O 0.37 0.247 0.15 0.022 0.035 0.05 87.40% - On-going

    A.D. Pendon Construction &

    Supply, Inc. (Formerly: Adp

    Construction & Supply

    3466 Widening of Sara-San Dionisio Road 06/09/2015Iloilo Third

    DEO26.054 175 O 0.344 0.252 0.15 0.022 0.035 0.05 85.30% - On-going

    *1st/Final

    * For DPWH, only the region and PMO office are listed 31st Release Page 15 of 688

  • On-going and Completed Projects

    For the period July 1, 2017 to June 30, 2020

    AMOUNTDUR (C.D.)

    NAME OF CONSTRUCTORLICENSE

    NO.PROJECT

    DATE OF EVALUATION

    *IMPL. AGENCY

    CONTRACT

    STATUS WMS FINAL RATINGQUALITATIVE DESCRIPTION

    MTL TIME FAC ESH RDRCPES VISIT

    RATING

    A.D. Pendon Construction &

    Supply, Inc. (Formerly: Adp

    Construction & Supply

    3466

    Network Development, Widening of National Road,

    Secondary Road along Roxas City, Cagay-Sibaguan

    Balijuangan-Cudian-Ijisan Road

    06/06/2015Capiz First

    DEO10.341 121 O 0.368 0.251 0.105 0.03 0.035 0.033 82.20% - On-going

    A.D.L. Constrak 26442

    Concreting of Ipil-Sagana Bridge Approaches "A" and "B"

    and Sta. Cruz Road, Brgy. Ipil and Sagan and Sta. Cruz,

    Bongabong, Oriental Mindoro

    08/24/2016Southern

    Mindoro DEO3.290 35 O 0.424 0.164 0.3 0 0 0 0.8880 - On-going

    A.D.L. Constrak 26442Rehabilitation/Reconstruction of Paclasan Seawall,

    Roxas, Oriental Mindoro03/18/2017

    Southern

    Mindoro DEO3.627 67 O 0.438 0.200 0.300 - - - 93.80 - On-going

    A.F.G Construction & Construction

    Supply17161

    Construction of Standard One (1) Unit - 2 Sty 10-CL

    School Building, Eustacio Lopez NHS, Silay City,

    Negros Occidental

    03/22/2017

    Negros

    Occidental

    1st DEO

    17.397 235 C 0.48 0.13 0.30 - - - 90.80 *87.23% Satisfactory

    A.F.G Construction & Construction

    Supply17161

    Repair/Imporvement of Multi Purpose Building, Barangay

    Kasambagan 04/12/2018

    Cebu City

    DEO2.908 75 C 0.50 0.13 0.30 - - - 93.20 *93.20% Very Satisfactory

    A.F.G Construction & Construction

    Supply17161

    Rehabilitation/Reconstruction/Upgrading of Damaged

    Paved National Road including Drainage Based on

    Pavement Management System / Highway Development

    and Management - 4 (HDM-4) (Intermittent Section)

    along Hinigaran - Isabela Road, K0058+263 -

    K0059+000

    08/27/2015

    Negros

    Occidental

    2nd

    12.674 127 O 0.358 0.239 0.15 0.03 0.05 0.033 86.00% - On-going

    A.F.G Construction & Construction

    Supply17161

    Concreting of Barangay Road, Brgy. Sta. Teresa,

    Dumalag, Capiz11/10/2017 DPWH 9.407 97 C 0.42 0.14 0.30 - - - 85.50 *85.5% Satisfactory

    A.F.G Construction & Construction

    Supply17161 Const. of Tangalan-Ibajay Rd. 03/19/2013 VI 45.834 179 O 0.387 0.259 0.150 0.024 0.030 0.033 88.30 - On-going

    A.F.G Construction & Construction

    Supply17161

    Odiong-Sibalom-San Remegio-Leon Rd. Upgrading

    (Gravel to Paved), Km. 129+328-Km. 131+27508/15/2013 VI 40.453 179 O 0.336 0.240 0.150 0.030 0.037 0.033 82.60 - On-going

    A.F.G Construction & Construction

    Supply17161

    Construction of Standard One (1) Unit - 2 Sty 10-CL

    School Building at Brgy. Eustaquio Lopez NHS, Silay

    City, Negros Occidental

    06/16/2016

    Negros

    Occidental

    First DEO

    17.396 175 O 0.304 0.3 0.15 0.03 0.023 0.05 85.70% - On-going

    A.F.G Construction & Construction

    Supply17161

    Const. of Two (2) Storey, Eight (8) Cl Sch. Bldg.,

    Leonora Salapantan NHS08/22/2013 VI 8.949 150 O 0.347 0.200 0.108 0.030 0.032 0.033 75.00 - On-going

    A.F.G Construction & Construction

    Supply17161 Replacement/Const. of Tubog Bridge, Brgy. Tubog 08/15/2012 VI 7.587 180 O 0.372 0.230 0.150 0.010 0.035 0.033 83.00 - On-going

    A.F.G Construction & Construction

    Supply17161

    Construction of 2-CL Alimanguan National High School

    Brgy. Alimanguan06/05/2015

    Palawan 1st

    DEO1.721 120 O 0.36 0.24 0.15 0.03 0.047 0.033 86.00% - On-going

    *1st/Final

    * For DPWH, only the region and PMO office are listed 31st Release Page 16 of 688

  • On-going and Completed Projects

    For the period July 1, 2017 to June 30, 2020

    AMOUNTDUR (C.D.)

    NAME OF CONSTRUCTORLICENSE

    NO.PROJECT

    DATE OF EVALUATION

    *IMPL. AGENCY

    CONTRACT

    STATUS WMS FINAL RATINGQUALITATIVE DESCRIPTION

    MTL TIME FAC ESH RDRCPES VISIT

    RATING

    A.F.G Construction & Construction

    Supply17161

    Rehabilitation/Reconstruction/Upgrading of Damaged

    Paved National Road Including Drainage Based on

    Pavement Management System/Highway Development

    and Management-4 (HDM-4) (Intermittent Section) along

    Hinigaran-Isabela Road, K0058+263 to

    K0059+000Barangay

    03/14/2016

    Negros

    Occidental

    Second DEO

    12.6742 157 C 0.45 0.13 0.30 - - - 88.40% 88.40% Satisfactory

    A.F.G Construction & Construction

    Supply17161

    Preventive Maintenance Based on Pavement

    Management System/Highway Development and

    Management -4 (HDM-4) Jct Bagonawa-La Castellana-

    Isabela Road, K0057+244 to K0072+800

    03/14/2018

    Negros

    Occidental

    2nd DEO

    46.210 221 C 0.49 0.13 0.16 - - - 78.00 *78.00% Unsatisfactory

    A.F.G. Construction And

    Construction Supply/Yurich Builders

    And Construction Supplu Joint

    Venture

    JV-15-

    1239

    Off-Carriageway Improvement including Drainage of

    Puerto Princesa North Road, K0090+000-K0090+600,

    K0091+100-K0091+350, K0095+200-K0096+246,

    K0103+600-K0103+961, K0107+600-K0107+720,

    Roxas, Palawan

    03/13/2017Palawan 1st

    DEO45.859 280 C 0.38 0.20 0.30 - - - 88.00 *89.38% Very Satisfactory

    A.H. Raga Construction 36952

    MFO1-National Road Network Services-Construction and

    Maintenance of Bridge along National Roads-

    Rehabilitation/Major Repair of Permanent Bridges-

    Zapote Br. (BO2887LZ) Manila-Cavite (NCR Bdry-Jct

    Cavite City Section), Bacoor City, Cavite

    11/28/2017 DPWH 9.593 180 C 0.50 0.13 0.30 - - - 93.30 *93.3% Very Satisfactory

    A.I.P Construction 32458

    Construction/Improvement of Access Roads leading to

    Declared Tourism Destinations; Guisset-Binga-Baloy-

    Tinongdan Road leading to Binga Dam and Mt. Ugo, Site

    for International Sky Running Event

    11/08/2017 DPWH 96.500 386 O 0.376 0.240 0.150 0.03 0.056 0.05 90.20 - On-going

    A.I.P Construction 32458

    Rehabilitation/Reconstruction/Upgrading of Damaged

    Paved National Roads including Drainage Based on

    Pavement Management System/Highway Development

    and Management-4 (HDM-4) (Intermittent Section), Lt.

    Takay Road, K0308+(-599) to K0308+000 & K0308+616

    to K0308+754, Baguio City

    09/04/2015Baguio City

    DEO13.442 104 O 0.36 0.228 0.15 0.03 0.056 0.05 87.40% - On-going

    A.I.P. Construction

    Construction/Improvement of Access Roads Leading to

    Declared Tourism Destinations: Guisset-Binga-Baloy-

    Tinongdan Road leading to Binga Dam and Mt. Ugo, Site

    for the International Sky Running Event

    05/29/2018Benguet 1st

    DEO96.500 416 C 0.37 0.20 0.30 - - - 86.50 88.90% Satisfactory

    A.J Taylan Construction

    Corporation2336

    Road Opening/Const. of Missing Links of National Road,

    Solsona-Kabugao Road, Ilocos Norte Side09/09/2009 I 48.199 300 O 0.379 0.250 0.150 0.030 0.050 0.033 89.20 - On-going

    *1st/Final

    * For DPWH, only the region and PMO office are listed 31st Release Page 17 of 688

  • On-going and Completed Projects

    For the period July 1, 2017 to June 30, 2020

    AMOUNTDUR (C.D.)

    NAME OF CONSTRUCTORLICENSE

    NO.PROJECT

    DATE OF EVALUATION

    *IMPL. AGENCY

    CONTRACT

    STATUS WMS FINAL RATINGQUALITATIVE DESCRIPTION

    MTL TIME FAC ESH RDRCPES VISIT

    RATING

    A.J Taylan Construction

    Corporation2336

    Laoag River Basin Flood and Sabo Project, Concrete

    Revetment along Bongo River Brgy. Sta. Monica, Sitio 2,

    San Nicolas, Ilocos Norte

    11/13/2015

    ILOCOS

    NORTE 2ND

    DEO

    9.650 194 O 0.38 0.24 0.15 0.03 0.055 0.05 90.50% - On-going

    A.J. Lava Builders Corp. (Formerly:

    A.J. Lava Builders)22265

    Repair & Maint. of Flood Control & Drainage Structures

    along Rofriguez-San Jose-Quezon City Rd.11/19/2012 IVA 2.449 90 O 0.337 0.300 0.150 0.030 0.025 0.033 87.50 - On-going

    A.J. Lava Builders Corp. (Formerly:

    A.J. Lava Builders)22265

    MFO2-Flood Management Services, Construction/

    Maintenance of Flood Mitigation Structure and Drainage

    Systems - Construction/ Maintenance of Flood Mitigation

    Structures Drainage Systems - Construction of Flood

    Control Structures along Montalban, Rizal

    03/12/2018Rizal 2nd

    DEO28.350 212 C 0.50 0.13 0.30 - - - 93.00 *93.00% Very Satisfactory

    A.J. Lava Builders Corp. (Formerly:

    A.J. Lava Builders)22265

    MFO-1 National Road Network Services-Asset

    Preservation of National Roads Preventive Maintenance

    Based on Pavement Management System/Highway

    Development and Management-4 (HDM-4) Cabrera -

    Antipolo Road, K0026+(-554) to K0026+000, Taytay,

    Rizal

    11/21/2017 DPWH 14.260 60 C 0.41 0.20 0.30 - - - 90.60 *90.6% Very Satisfactory

    A.J. Taylan Construction Corp/FR

    Espiritu Jr. Builders (JV)JV-14-074 Additional Priority Flood Control Project 10/21/2014 I 41.179 163 O 0.299 0.276 0.150 0.030 0.056 0.050 86.10% - On-going

    A.J. Taylan Construction

    Corporation/ J.L.P Construction And

    Supply Joint Venture

    JV-16-

    1092Improvement/Concreting of Sand Dunes Access Road 08/16/2017

    Ilocos Norte

    2nd DEO39.688 210 O 0.381 0.214 0.150 0.03 0.058 0.05 88.30 - On-going

    A.J. Taylan Construction

    Corporation/ J.Q.C. Summit

    Construction And Development

    Corporation

    JV-15-

    1238

    Construction/Maintenance of Flood Control Mitigation

    Structures and Drainage Systems, Damaged Flood

    Control Facilities/Structures under the Laoag River Basin

    and Flood Control and Sabo Project (LRBDCSP)-Batac

    City Flood Control, Quiaoit River, Eroded Bank

    Embankment

    08/16/2017Ilocos Norte

    2nd DEO14.700 396 C 0.47 0.13 0.30 - - - 89.90 *89.9% Very Satisfactory

    A.J. Taylan Construction

    Corporation/ J.Q.C. Summit

    Construction And Development

    Corporation

    JV-15-

    1238

    Construction/Maintenance of Flood Mitigation Structures

    and Drainage System, Damaged Flood Control

    Facilities/Structures under the Laoag River Basin Flood

    Control and Sabo Project (LRBDCSP) Batac City Flood

    Control, Quiaoit River, Eroded Bank Embankment, Ilocos

    Norte

    03/15/2017Ilocos Norte

    2nd DEO14.699 396 O 0.390 0.239 0.150 0.03 0.04 0.033 88.20 - On-going

    A.J. Taylan Construction

    Corporation/Zedik Builders (JV)JV-13-345

    Road Upgrading (Gravel to Paved) Based on Gravel

    Road Strategies, Traffic Benchmark for Upgrading to

    Paved Standard (HDM-4 Project Analysis) of Piniti-

    Banna (Espiritu) Road

    08/08/2014 I 28.942 236 O 0.380 0.240 0.150 0.030 0.055 0.033 88.80 - On-going

    A.J.Taylan Construction Corp./Jlp

    Construction & Supply, Joint

    Venture

    JV-16-

    1092Improvement/Concreting of Sand Dunes Access Road 03/15/2018

    Ilocos Norte

    2nd DEO39.688 236 C 0.46 0.12 0.30 - - - 88.00 89.00% Satisfactory

    *1st/Final

    * For DPWH, only the region and PMO office are listed 31st Release Page 18 of 688

  • On-going and Completed Projects

    For the period July 1, 2017 to June 30, 2020

    AMOUNTDUR (C.D.)

    NAME OF CONSTRUCTORLICENSE

    NO.PROJECT

    DATE OF EVALUATION

    *IMPL. AGENCY

    CONTRACT

    STATUS WMS FINAL RATINGQUALITATIVE DESCRIPTION

    MTL TIME FAC ESH RDRCPES VISIT

    RATING

    A.L Acharon Construction & Supply 33068

    Off-Carriageway Improvement Paving

    Shoulders/Construction along Makar-Kiamba Road

    K1667+270 to K1667+720

    11/15/2017 DPWH 13.150 150 C 0.47 0.15 0.30 - - - 91.80 *91.8% Very Satisfactory

    A.L Acharon Construction & Supply 30872Construction of the Diversion Works and Canal System

    of Libertad CIP - Phase 211/15-20/2010 NIA 16.060 202 O 0.373 0.264 0.150 0.023 0.038 0.050 89.69 - On-going

    A.L Acharon Construction & Supply 30872 Benolho CIS 10/6-10/08 NIA 3.720 90 O 0.277 0.180 0.050 0.020 0.038 0.100 66.50 - On-going

    A.L Acharon Construction & Supply 33068

    Construction of Classroom in Areas Experiencing

    Classroom Shortage - Construction of Two (2) Storey,

    Two (2) Classroom School Building, Bawing Elementary

    School Brgy. Bawing, General Santos City

    03/18/2016South

    Cotabato 2nd4.3497 120 C 0.47 0.12 0.30 0.00 0.00 0.00 88.90% 88.90% Satisfactory

    A.L Acharon Construction & Supply 33068Off-Carriageway Improvement - Paving of Shoulders/

    Construction Along Makar-Kiamba Road03/22/2018

    South

    Cotabato 2nd

    DEO

    11.019 120 C 0.48 0.13 0.30 - - - 90.90 *90.90% Very Satisfactory

    A.L. Dare Construction

    Construction/Maintenance of Flood Mitigation Structures

    and Drainage Systems- Rehabilitation/Improvement of

    Slope Protection along Pentor Balsik River (Balsik

    Section-Phase III)

    06/19/2018Bataan 1st

    DEO22.904 192 C 0.48 0.13 0.30 - - - 91.70 91.70% Very Satisfactory

    A.L. Dare Construction 11932

    Rehabilitation/ Improvement of Sepung Ilog, Sta. Lucia,

    Sta. Ana By Pass Road, Sta. 0+000 to Sta. 1+227, Sta.

    Ana, Pampanga

    11/27/2017 DPWH 25.187 135 C 0.49 0.13 0.30 - - - 92.60 *92.6% Very Satisfactory

    A.L. Dare Construction 11932

    Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rd.

    (Int. Sect.) at Candaba-San Miguel Rd., K0070+290-

    K0071+184

    07/29/2013 III 11.909 139 O 0.319 0.240 0.136 0.030 0.055 0.033 81.30 Ongoing

    A.L. Salazar Construction, Inc. 3899Drainage Improvement of Commonwealth Avenue Drive

    to Zuzuaregui, Brgy. Batasan Hills, Quezon City08/25/2015 QC 1st DEO 17.562 270 O 0.38 0.24 0.15 0.023 0.045 0.05 88.80% - On-going

    A.L. Salazar Construction, Inc. 3899Const./Widening/Upgrading/Rehab. of Access Rd. to

    Taytay-Bantulan Port (Km.210+000-Km.214+211)03/12/2013 IVB 89.312 450 O 0.364 0.300 0.030 0.030 0.055 0.033 81.20 - On-going

    A.L. Salazar Construction, Inc. 3899Const./Widening/Upgrading/Rehab. of Access Road

    (Km.210+000-Km.214+211)08/03/2012 IVB 81.362 349 O 0.332 0.240 0.150 0.030 0.045 0.050 84.70 - On-going

    A.L. Salazar Construction, Inc. 3899Drainage Improvement of Commonwealth Avenue Drive

    to Zuzuaregui, Brgy. Batasan Hills, Quezon City04/12/2016

    Quezon City

    1st DEO17.5621 270 C 0.47 0.13 0.30 - - - 89.20% 89.20% Very Satisfactory

    A.L. Salazar Construction, Inc. 3899Rehabiliation/Improvement of drainage System along C-

    3 Road11/22/2014 NCR 17.425 209 O 0.380 0.240 0.150 0.030 0.045 0.033 87.80% - On-going

    A.L.R. Construction Corporation 24110 Completion of 2-Storey 4-CL @ Landayan E/S 02/24/2010 IVA 5.030 225 O 0.354 0.300 0.150 0.015 0.018 0.033 87.00 - On-going

    A.M Oreta & Co ., Inc / Ibc

    International Builders Corporation

    (Joint Venture)

    JV-07096 Kalibo Airport Development Project 08/22/2017 DOTC 309.889 450 C 0.48 0.20 0.30 - - - 89.20% 95.00% Satisfactory

    *1st/Final

    * For DPWH, only the region and PMO office are listed 31st Release Page 19 of 688

  • On-going and Completed Projects

    For the period July 1, 2017 to June 30, 2020

    AMOUNTDUR (C.D.)

    NAME OF CONSTRUCTORLICENSE

    NO.PROJECT

    DATE OF EVALUATION

    *IMPL. AGENCY

    CONTRACT

    STATUS WMS FINAL RATINGQUALITATIVE DESCRIPTION

    MTL TIME FAC ESH RDRCPES VISIT

    RATING

    A.M Oreta & Co ., Inc / Ibc

    International Builders Corporation

    (Joint Venture)

    JV-07096 Kalibo Airport Development Project 06/17/2015 DOTC 287.056 360 O 0.381 0.300 0.150 0.020 0.044 0.033 92.80 - On-going

    A.M. Ayunan Construction 13983 Construction/Rehabilitation of Brgy Hall 11/11/2015Cotabato

    First DEO0.924 75 O 0.363 0.16 0.052 0.03 0 0.016 62.10% - On-going

    A.M. Ayunan Construction 13983Construction/Rehabilitation of Barangay Hall Barangay

    Langkong, M'lang, Cotabato03/10/2016 Cotabato 1st 0.924 75 C 0.50 0.20 0.01 - - - 64.53% 64.53% Poor

    A.M. Oreta & Co., Inc. / Camia

    Const. Development Corporation

    (Formerl

    Construction and Maintenance of Bridges along National

    Roads, Construction of New Permanent Bridges, along

    Igawe Bridge, Apayao-Ilocos Norte Road

    06/05/2018Apayao 1st

    DEO57.890 527 O 0.36 0.30 0.05 0.03 0.06 0.03 82.40 - On-going

    A.M. Oreta & Company Inc. / Labb

    Construction (JV)

    108 /

    13524 -

    SL2-SN-

    03029

    Small Reservoir Irrigation Project - Benliw SRIP -

    Construction of Benliw Earthfill Dam & Appurtenant

    Structures

    07/09/2019 NIA 367.082 941 O 0.34 0.24 0.14 0.03 0.04 0.05 83.90 - On-going

    A.M. Oreta / IBC (Joint Venture) JV-11-210Const. of Drainage System along Iloilo-Capiz Rd. (Old

    Route) Nat'l Rd. CPU Sect., Iloilo City08/06/2012 VI 42.875 240 O 0.321 0.239 0.150 0.030 0.055 0.050 84.50 - On-going

    A.M.P. ConstructionRehabilitation of Flood Control Structures along Talavera

    River06/20/2018

    Nueva Ecija

    1st DEO27.925 210 O 0.36 0.30 0.15 0.03 0.055 0.05 94.10 - On-going

    A.M.P. Construction 16574

    Improvement of Canal Service Road - Concreting of

    Canal Service / Access Road at SEE Lateral IA (Sta.

    0+000 - 0+471)

    09/28/2019 NIA 3.804 90 O 0.32 0.24 0.15 0.03 0.06 0.03 83.40 - On-going

    A.M.P. Construction 16574Repair/Maintenance of Flood Control Talavera River

    Control, Brgy. Sicsican Matanda, Talavera, Nueva Ecija06/02/2017

    Nueva Ecija

    1st DEO1.901 70 C 0.42 0.14 0.30 - - - 85.40 *85.4% Satisfactory

    A.M.P. Construction 16574Construction of Flood Control Revetment Wall along

    Agbalili River03/15/2016 Aklan DEO 34.428 244 O 0.328 0.3 0.101 0.03 0.045 0.033 83.70% - On-going

    A.M.P. Construction/ Forthright

    Construction Joint Venture

    JV-16-

    1612

    Construction/ Maintenance of Flood Mitigation Structures

    and Drainage Systems, Rehabilitation/ Improvement of

    Pampanga River Control, Brgy. Sapang Buho, Palayan

    City, Nueva Ecija

    03/15/2018Nueva Ecija

    2nd DEO39.200 161 C 0.47 0.13 0.30 - - - 90.50 88.46% Satisfactory

    A.M.P. Construction/ Forthright

    Construction Joint VentureJV-16-933

    Improvement/ Rehabilitation of Revetment along

    Talavera River Barangay Basang Hamog, Talavera,

    Nueva Ecija

    03/13/2018Nueva Ecija

    1st DEO31.723 240 C 0.41 0.14 0.30 - - - 85.40 *85.40% Satisfactory

    A.P Palacios Construction 29021 Rehab./Impvt. of Dikidit-Suguit FTMR 09/08/2009 III 4.723 150 O 0.300 0.300 0.150 0.030 0.050 0.033 86.30 - On-going

    A.P. Consebido Construction And

    Trading33616

    Construction of Two (2) Units Technical-Vocational

    Livelihood (TVL) Laboratories/Worshop Roxas National

    Comprehensive High School, Roxas, Palawan

    03/13/2017Palawan 1st

    DEO5.347 140 O 0.451 0.200 0.300 - - - 95.10 - On-going

    *1st/Final

    * For DPWH, only the region and PMO office are listed 31st Release Page 20 of 688

  • On-going and Completed Projects

    For the period July 1, 2017 to June 30, 2020

    AMOUNTDUR (C.D.)

    NAME OF CONSTRUCTORLICENSE

    NO.PROJECT

    DATE OF EVALUATION

    *IMPL. AGENCY

    CONTRACT

    STATUS WMS FINAL RATINGQUALITATIVE DESCRIPTION

    MTL TIME FAC ESH RDRCPES VISIT

    RATING

    A.P. Tagarino Engineering and

    Construction Services32730

    Mabolo Communal Irrigation System - Diversion Work

    and Embankment Protection05/10/2019 NIA 28.040 300 O 0.33 0.28 0.15 0.02 0.04 0.05 87.00 - On-going

    A.P.B. Construction 17055 Concreting of Ore West Capangdanan Road 11/09/2017 DPWH 24.500 175 C 0.41 0.13 0.30 - - - 84.00 *84% Satisfactory

    A.P.B. Construction 17055

    Improvement/Widening of National Roads along

    Pangasinan-Nueva Ecija Roa, K0180+417-K0181+745;

    K0183+129-K0184+062

    08/21/2017Pangasinan

    3rd DEO46.372 300 C 0.48 0.14 0.30 - - - 91.40 *91.4% Very Satisfactory

    A.P.B. Construction 17055

    Improvement/Upgrading of Naguilian-Bagulin Road

    Leading to Tudingan Falls and Kedlap Burial Cave, Sta.

    266+980-Sta. 271+279 with Exception, Naguilian-

    Bagulin, La Union

    03/14/2016LA UNION

    2ND DEO41.295 179 C 0.26 0.20 0.30 - - - 83.36% 83.36% Satisfactory

    A.P.B. Construction 17055

    Rehabilitation/Reconstruction of National Roads with

    Slips, Slope Collapse and Landslide: Magsaysay Ave.

    (Trinidad Rd.), K0251+996 to K0251+1024; K0252+255

    to K0252+270; K0252+350 to K0252+444, Baguio City

    09/01/2016BAGUIO

    CITY DEO19.805 177 O 0.387 0.3 0.118 0.03 0.04 0.017 0.8920 - On-going

    A.P.B. Construction 17055

    Off-Carriageway Improvement along Baguio-Bontoc

    Road, K0253+(-586) to K0253+000, K0259+450 to

    K0259+600, K0260+500 to K0262+000

    06/02/2015Benguet 1st

    DEO18.999 150 O 0.333 0.274 0.149 0.03 0.05 0.035 87.10% - On-going

    A.P.B. Construction 17055

    Improvement/Upgrading of Naguilian-Bagulin Road

    Leading to Tudingan Falls and Kedlap Burial Cave Sta.

    266+980 to Sta. 271+279, Naguilian, La Union

    08/30/2015La Union 2nd

    DEO41.295 179 O 0.335 0.287 0.15 0.023 0.037 0.05 88.20% - On-going

    A.P.B. Construction 17055Rehab./Reconst./Upgrading of Damaged Paved National

    Road, PMA cut-off Road 2 K0+000-K0+36008/18/2011 CAR 5.610 102 O 0.370 0.240 0.000 0.030 0.042 0.033 71.50 - On-going

    A.P.O. General Construction 7010

    MFO-1: National Road Network Services - Asset

    Preservation of National Roads - Rehabilitation/

    Reconstruction/ Upgrading Tertiary - Reconstruction from

    Concrete to Concrete - Mt. Province - Ifugao Road (Kiling-

    Paracelis Section), K0456+753-K0457+000, K0459+300-

    K0460+000

    11/11/2017 DPWH 28.581 250 O 0.351 0.240 0.150 0.03 0.061 0.05 88.20 - On-going

    A.P.O. General Construction 7010Construction of 4 Storey 12 Classroom School Building

    Senior High School in Aringay06/06/2017

    La Union 2nd

    District

    Engineering

    Office

    21.893 255 O 0.397 0.239 0.138 0.03 0.065 0.033 90.20 - On-going

    A.P.O. General Construction 7010

    Road Upgrading (Unpaved to Paved) based on Gravel

    Road Strategies, Traffic Benchmark for Upgrading to

    Paved Road Standard (HDM-4 Project Analysis) Junction-

    Talubin-Barlig-Natonin-Paracelis-Calaccad Road,

    K0443+054 - K0446+000

    06/03/2017

    Cordillera

    Administrativ

    e Region,

    R.O.

    97.500 455 C 0.43 0.13 0.30 - - - 86.10 *86.1% Satisfactory

    A.P.O. General Construction 7010Construction of 4 Storey 12 Classroom School Building

    Senior High School, Aringay, La Union03/18/2017

    La Union 2nd

    DEO21.481 195 O 0.285 0.300 0.112 0.03 0.041 0.033 80.10 - On-going

    *1st/Final

    * For DPWH, only the region and PMO office are listed 31st Release Page 21 of 688

  • On-going and Completed Projects

    For the period July 1, 2017 to June 30, 2020

    AMOUNTDUR (C.D.)

    NAME OF CONSTRUCTORLICENSE

    NO.PROJECT

    DATE OF EVALUATION

    *IMPL. AGENCY

    CONTRACT

    STATUS WMS FINAL RATINGQUALITATIVE DESCRIPTION

    MTL TIME FAC ESH RDRCPES VISIT

    RATING

    A.P.O. General Construction 7010

    Road Upgrading (Gravel to Paved) along Acop-

    Kapangan-Kibungan-Bakun Road, K0283+636 -

    K0283+796, K0287+621 - K0287+685, K0289+214 -

    K0289+473, K0289+549 - K0289+709, K0290+901 -

    K0291+000, K0292+016 - K0292+114, K0298+781 -

    K0299+514, K0299+531 - K0299+816

    11/20/2014 CAR 72.026 267 O 0.362 0.240 0.150 0.030 0.061 0.050 89.30% - On-going

    A.P.O. General Construction 7010

    Rd. Upgrading (gravel to concrete) along Acop-

    Kapangan-Kibungan-Bakun Rd., K0285+444-K0286+840

    V.S. (K0285+423-K0286+836 as per RBIA) &

    K0345+470-K0348+000 V.S. (K0345+500-K0348+000

    as per RBIA)

    11/21/2012 CAR 59.896 237 O 0.333 0.240 0.150 0.015 0.047 0.050 83.50 - On-going

    A.P.O. General Construction 7010

    Road Upgrading (Unpaved to Paved) Based on Gravel

    Road Strategies, Traffic Benchmark for Upgrading to

    Paved Road Standards (HDM-4 Project

    Analysis)(Intermittent Sections) along Mountain Province

    - Ifugao Road (Kiling - Paracelis Section), K0460+508 to

    K0460+868, K0467+904 to K0469+000, K0471+451 to

    K0472+061, K0473+155 to K0473+582, K0474+350 to

    K0474+368, K0477+312 to K0477+341, Paracelis,

    Mountain Province

    03/13/2016Regional

    Office57.843 248 C 0.35 0.19 0.30 - - - 87.08% 87.08% Satisfactory

    A.P.O. General Construction 7010

    Road Upgrading (Unpaved to Paved) Based on Gravel

    Road Strategies, Traffic Benchmark for Upgrading to

    Paved Road Standards (HDM-4 Project Analysis)

    (Intermittent Sections) along Mt. Province - Ifugao Road

    (Kiling - Paracelis Section), K0460+508 to K0460+868,

    K0467+904 to K0469+000, K0471+451 to K0472+061,

    K0473+155 to K0473+582, K0474+350 to K0474+368,

    K0477+312 to K0477+341, Paracelis, Mt. Province

    08/29/2015 CAR 54.883 237 O 0.367 0.246 0.15 0.03 0.051 0.05 89.40% - On-going

    A.P.O. General Construction 7010Rd. Upgrading (Gravel to Paved) Int. Sect., Acop-

    Kapangan-Kibungan-Bakun Rd., K0348+000-K0349+00008/01/2013 CAR 23.654 207 O 0.356 0.239 0.150 0.023 0.048 0.050 86.60 - On-going

    A.R. & Mark Builders 31673 Const. of Multi-Purpose Building, BUSECO Compound 10/21/2014 X 7.920 124 O 0.304 0.240 0.017 0.010 0.022 0.033 62.60% - On-going

    A.R. & Mark Builders 31673Const. of 1-Storey, 1-CL & 1-Storey, 1-CL Kinder at

    Maramag South PS, Pob.08/08/2013 X 1.448 187 O 0.393 0.235 0.120 0.030 0.023 0.033 83.40 - On-going

    A.R. Lustre Jr. ConstructionRehabilitation/ of Paved Rd - Puerto Princesa Wharf Rd -

    (S00031PW), Chainage 1180- Chainage 172205/31/2018

    Palawan 3rd

    DEO7.201 30 C 0.46 0.13 0.30 - - - 89.40 89.40% Very Satisfactory

    A.R. Lustre, Jr. Construction 7680Asphalt Overlay of Puerto Princesa South Road,

    K000+000 - K000+420, K001+420 - K002+30011/17/2017 DPWH 29.860 105 C 0.43 0.20 0.30 - - - 92.90 *92.9% Very Satisfactory

    *1st/Final

    * For DPWH, only the region and PMO office are listed 31st Release Page 22 of 688

  • On-going and Completed Projects

    For the period July 1, 2017 to June 30, 2020

    AMOUNTDUR (C.D.)

    NAME OF CONSTRUCTORLICENSE

    NO.PROJECT

    DATE OF EVALUATION

    *IMPL. AGENCY

    CONTRACT

    STATUS WMS FINAL RATINGQUALITATIVE DESCRIPTION

    MTL TIME FAC ESH RDRCPES VISIT

    RATING

    A.R. Lustre, Jr. Construction 7680

    Asphalt Overlay of Puerto Princesa South Road

    K0000+000 to K000+420, K000+420 to K002+300,

    Puerto Princesa City, Palawan

    06/05/2017 Palwan 3rd 29.884 90 O 0.385 0.298 0.150 0.03 0.037 0.033 93.30 - On-going

    A.R. Lustre, Jr. Construction 7680

    Asphalt Overlay of Puerto Princesa South Road,

    K0000+000 to K0000+420, K0000+420 to K0002+300,

    Puerto Princesa City, Palawan

    08/24/2017Palawan 3rd

    DEO29.860 105 O 0.489 0.133 0.300 - - - 92.20 - On-going

    A.R. Lustre, Jr. Construction 7680

    Rehabilitation/Reconstruction of National Roads with

    Slips, Slope Collapse and Landslide Puerto Princesa

    South Road, K0139+214 to K0139+245, K0139+292 to

    K0139+397, K0140+033 to K0140+111, K0141+807 to

    K0141+880, K0142+000 to K0142+300, Espanola,

    Palawan

    03/14/2017Palawan 2nd

    DEO47.859 266 C 0.40 0.20 0.30 - - - 90.20 *90.2% Very Satisfactory

    A.R. Lustre, Jr. Construction 7680