ON-SHORE AND REVAMPING PROJECTS

Client:Location:Main Contractor:

VERSALISPORTO MARGHERA - ITALYROSETTI MARINO

WORK IN PROGRESS

SCOPE OF WORKDetail design, Procurement, Construction and Commissioning of Balance of Plant for 2 new steam generators, involving civil works, mechanical, electrical/instrumentation, painting and insulation activities

DESCRIPTIONPiping: 560 Tons.N. 220 Tie-insSteel Structures: 200 Tons.N. 3 PumpsN. 2 Tanks modificationsPainting: 7,600 Sqm.Insulation: 8,600 Sqm.Cables E&I: 55,000 Mt.Concrete: 2,000 Cum.

DATE OF AWARDMay 2016

READY FOR COMMISSIONINGNovember 2017

TYPE OF CONTRACTePC

BALANCE OF PLANT FOR 2 NEW STEAM GENERATORS

Client:Location:

GE ENERGYAssiut - Egypt

WORK IN PROGRESS

FUEL OIL TREATMENT PLANTS &EFFLUENT WATER TREATMENT PLANTS

SCOPE OF WORK

Design, Engineering, Procurement, Construction, Commissioning and Start-up.

TYPE OF CONTRACT AWARD DURATION

LS Turn-Key January 2015 1 year (*)

DESCRIPTION:

N. 2 modularised plants for conditioning and treatment of Heavy Fuel Oil (HFO) to make itsuitable to feed gas turbines

TECHNICAL DATA (each plant)

Treated HFO: 145 t/hTreated Effluent Water: 15 m3/h

PLANT MAIN FEATURES

Two-Stage Electrostatic Separation SystemProcess Module (Heating and Water Pumping System, Sampling System & Others)Waste Water Recovery Pit SystemSludge Recovery Pit SystemHFO Transfer Pump SystemSystem Control buildingOil/Oil Economizer SystemSteam/Oil Heat Exchanger System

(*) Plant delivered and installed. Waiting for Client’s green light for commissioning & start-up.

Owner:Location:

SONATRACH TRCHassi R’mel – Skikda, Algeria

WORK IN PROGRESS

TELECOM SYSTEM INTEGRATIONPIPELINE GK1-GK2

SCOPE OF WORKDesign, Engineering, Procurement, Construction, Commissioning and Start-up.

TYPE OF CONTRACT AWARD DURATIONLS Turn-Key October 2014 2 years

PLANT MAIN FEATURES

Integration of OTN (Open Transport Network) system along GK1/GK2 pipelines from HassiR’mel to Skikda (570 Km.)

Laying of fibre optical cable 24 brins

Refurbishment of 60 telecommunicationstation

Installation of 41 solar panels with batteries

Client:Final client:Project:

Location:Main Contractor:

SKEMA SpATENGIZCHEVROILFuture Growth Project, Wellhead Pressure Management Project (FGP/WPMP)

KAZAKHSTANRosetti Marino

WORK IN PROGRESS

LER SUBSTATIONS

DESCRIPTION110 kV Main substationWeight: 500 Tons110 kV Core substationWeight: 310 Tons

DATE OF AWARDOctober 2014

READY FOR SAIL AWAYDecember 2016

TYPE OF CONTRACTePC/Lump Sum

SCOPE OF WORKConstruction Engineering, Procurement, Fabrication, Transportation, Commissioning and Start-up Assistance.

Client:Location:Main Contractor:Fabrication site:

MELLITAH OIL & GAS B.V.Bouri Field – Offshore LibyaRosetti MarinoDP3/DP4 (On board) & Fores Engineering warehouse (Italy)

COMPLETED

SCOPE OF WORKEngineering, Procurement, Fabrication, Transportation&Delivery, Off-shore installation, Testing, Precommissioning, Commissioning & assistance to the Company during Start-up

DESCRIPTIONDecommissioning and dismantling of Gas SweeteningUnit, Procurement of bulk material (structures, piping, E&I), Construction of 3 chemicaltransfer pump skids & 4 chemicalinjection skids.Offshore revamping worksonboard two platforms,Update of the DCS/ESD/PSD systemTECHNICAL DATADismantling of Unit 22 for a total weight of 240 tons (Columns, Piping and Structures)Cables: 3000m Piping: 60t

Scaffolding more than: 3500m3Offshore works: 70.000 mhrs(SIMOPS)

DATE OF AWARDOctober 2012

PROVISIONAL ACCEPTANCENovember 2013

TYPE OF CONTRACTEPIC contract on Turn Key LumpSum basis

DP3/DP4 MODIFICATION & REVAMPING PROJECT

Client:Location:Main Contractor:Fabrication site:

SEREPTAshtart Field – Offshore TunisiaRosetti MarinoSfax-Tunisia/Ashtart Field Offshore Tunisia

COMPLETED

SCOPE OF WORKConstruction engineering, procurement, fabrication, dismantling , load-out and offshore revamping works.

DESCRIPTION• Procurement of bulk material

(structures, piping, E&I)• Prefabrication of loose and

assembled structures and piping spools

• Offshore revamping worksonboard five platforms

• Dismantling & RelocationEngineering

PRELIMINARY TECHNICAL DATAPrefabricated structures: 1.350 tonsPiping spools & supports: 195 tonsElectrical & instrumentation cables: 25 km

Offshore works: approx. 1.200.000 mhrs

DATE OF AWARDSeptember 2010

COMPLETION DATEDecember 2013

TYPE OF CONTRACTProcurement and FabricationContract at Unit/Time rates

ASHTART REVAMPING PROJECT

Owner:Client:Location:

POLIMERI EUROPAMaire TecnimontRavenna, Italy

SCOPE OF WORK EPC Contract - Engineering, Procurement, Fabrication, Transportation, Assembly and erection at site

NEW FRACTIONATION PLANT

LIGHTEST FRACTIONATION TOWERS (C-2310)Vessel assembly: verticalDiameter: 2500/5.90 mm Length: TT 80300 – Tot. 84300 mm Shell thickness: 18 to 76 mmWeight: 289 metric tons

HEAVIEST FRACTIONATION TOWERS (C-2320)Vessel Assembly: verticalDiameter: 3300 / 6910 mmLength: TT 81600 – Tot. 87900 mmShell thickness: 20 to 50 mmWeight: 276 metric tons

DATE OF AWARDMay 2010

COMPLETION AT SITEFebruary 2013

SCOPE OF WORKFabrication, Testing, Hook up and CarryOver works

WORKS LOCATIONIsland D (Hub 1) –Kashagan Field

DIRECT MANHOURS: 2,150,000

DATE AWARD May2009

COMPLETIONJune 2011

TYPE OF CONTRACTFrame agreement for hook upworks

HOOK UP WORKS – ISLAND D, KASHAGAN FIELD

Owner/Operator:Location:Main Contractor:Subcontractor:

AGIP KCO NVNorth Caspian Sea, Kazakhstan SectorAKER SOLUTIONSRosetti kazakhstan LLP

COMPLETED

Client:Location:

Stogit, ENI GroupMinerbio Gas Plant, Italy

SCOPE OF WORKNr.3 Glycol regenerationunitsCivil worksDismantling of the existingDEG plantInterconnecting pipeworks

TYPE OF CONTRACTEPC LSTK+ commissioning+ start-up assistance

YEAR2006

TEG REGENERATION PLANT

Client:Location:

PETROBELEgypt

STABILIZATION UNIT FOR EL GAMIL PLANT

PLANT MAIN FEATURES1.890 m3/dayStabilized condensate: 11 psia RVPFire heaters duty: 4,25 MW

MAIN ITEMS:• nr. 1 stabilizer column• nr. 1 fire heater • nr. 1 reboiler circulation pumps skid• nr. 1 condensate pre-heater skid• Nr. 2 fuel system inter-piping skids

CONTRACT TYPE: EPC Contract Award: September 2004Completion: April 2005

SCOPE OF WORK:Process design, Engineering, Procurement, Construction, Assistance to commissioning and start-up.

Location: Refinery of Milazzo

HYDROGEN PRODUCTION PLANT

PLANT MAIN FEATURESCapacity: 100 Nm3/h Hydrogen 99.99%Feedstock: Multifuel (methane, nafta) Oxydation agent: Air/Oxygen

MAIN PLANT UNITSFeedgas compression (Air/Methan) Gas desulphurizationFeed preheating Reaction & syngascoolingCO shift conversionHydrogen purification (PSA)Offsites

CONTRACT: EPCDate of Contract Award: April 2004Delivery: September 2005

SCOPE OF WORK: Scope of Work: Engineering, Procurement,Construction, Assistance to Commissioning

Client:Location:

SAIPEMNigeria

TEG REGENERATION UNIT – OBIAFU OBRIKON GAS PLANT

DATE OF AWARDOctober 2002

DATE OF COMPLETIONAugust 2003

CONTRACT: LSTK

SCOPE OF WORK Engineering, Procurement, Construction, Start-up Assistance

OTHER REFERENCES

ENDURA PIPERONIL

BUTOXIDE (PBO) PLANT

Client: ENDURA SPALocation: c/o Enichem Plant, Ravenna - ItalyMain Contractor: Rosetti Marino

HEAT RECOVERY STEAM

GENERATOR

Client: SARMATO ENERGIA SpALocation: PiacenzaMain Contractor: Rosetti Marino

2nd STAGE GAS PHASE

REACTORS

Client: TECNIMONT Location: IranMain Contractor: Rosetti Marino

OTHER REFERENCES

SEPARATORS

FOR

TEMSAH NW II PLATFORMClient: PETROBEL Location: EGYPTMain Contractor: RosettiMarino

SEPARATRS

FOR

KASHAGAN DEVELOPMENT PJ.

SEPARATORS

FOR

KASHAGAN DEVELOPMENT PJ.

Client: Agip KCOLocation: KazakhstanMain Contractor: J.V. Rosetti Marino-SICES

SLUG CATCHERS

FOR

SHAH DENIZ PJ.

Client: BP GROUPLocation: AZERBAIJANMain Contractor: Rosetti Marino

OTHER REFERENCES

SEPARATORS

FOR

TEMSAH NW II PLATFORM

Client: CONOCOPHILLIPSLocation: UKMain Contractor: RosettiMarino

SEPARATRS

FOR

KASHAGAN DEVELOPMENT PJ.

SEPARATORS

FOR

KASHAGAN DEVELOPMENT PJ.

Client: GEIE SAIPEM-BOUYGUES OFFSHORELocation: ALGERIAMain Contractor: Rosetti MarinoSLUG CATCHERS

FOR

SHAH DENIZ PJ.

Client: PETROJETLocation: EGYPTMain Contractor: Rosetti Marino

SEPARATORS FOR PORT FOUAD ACCELERATION

(LNG GAS SUPPLY) PJ.

SEPARATORS

FOR

ROD DEVELOPMENT PJ.

SEPARATORS

FOR

BRITANNIA SATELLITE PJ.