Client:Location:Main Contractor:
VERSALISPORTO MARGHERA - ITALYROSETTI MARINO
WORK IN PROGRESS
SCOPE OF WORKDetail design, Procurement, Construction and Commissioning of Balance of Plant for 2 new steam generators, involving civil works, mechanical, electrical/instrumentation, painting and insulation activities
DESCRIPTIONPiping: 560 Tons.N. 220 Tie-insSteel Structures: 200 Tons.N. 3 PumpsN. 2 Tanks modificationsPainting: 7,600 Sqm.Insulation: 8,600 Sqm.Cables E&I: 55,000 Mt.Concrete: 2,000 Cum.
DATE OF AWARDMay 2016
READY FOR COMMISSIONINGNovember 2017
TYPE OF CONTRACTePC
BALANCE OF PLANT FOR 2 NEW STEAM GENERATORS
Client:Location:
GE ENERGYAssiut - Egypt
WORK IN PROGRESS
FUEL OIL TREATMENT PLANTS &EFFLUENT WATER TREATMENT PLANTS
SCOPE OF WORK
Design, Engineering, Procurement, Construction, Commissioning and Start-up.
TYPE OF CONTRACT AWARD DURATION
LS Turn-Key January 2015 1 year (*)
DESCRIPTION:
N. 2 modularised plants for conditioning and treatment of Heavy Fuel Oil (HFO) to make itsuitable to feed gas turbines
TECHNICAL DATA (each plant)
Treated HFO: 145 t/hTreated Effluent Water: 15 m3/h
PLANT MAIN FEATURES
Two-Stage Electrostatic Separation SystemProcess Module (Heating and Water Pumping System, Sampling System & Others)Waste Water Recovery Pit SystemSludge Recovery Pit SystemHFO Transfer Pump SystemSystem Control buildingOil/Oil Economizer SystemSteam/Oil Heat Exchanger System
(*) Plant delivered and installed. Waiting for Client’s green light for commissioning & start-up.
Owner:Location:
SONATRACH TRCHassi R’mel – Skikda, Algeria
WORK IN PROGRESS
TELECOM SYSTEM INTEGRATIONPIPELINE GK1-GK2
SCOPE OF WORKDesign, Engineering, Procurement, Construction, Commissioning and Start-up.
TYPE OF CONTRACT AWARD DURATIONLS Turn-Key October 2014 2 years
PLANT MAIN FEATURES
Integration of OTN (Open Transport Network) system along GK1/GK2 pipelines from HassiR’mel to Skikda (570 Km.)
Laying of fibre optical cable 24 brins
Refurbishment of 60 telecommunicationstation
Installation of 41 solar panels with batteries
Client:Final client:Project:
Location:Main Contractor:
SKEMA SpATENGIZCHEVROILFuture Growth Project, Wellhead Pressure Management Project (FGP/WPMP)
KAZAKHSTANRosetti Marino
WORK IN PROGRESS
LER SUBSTATIONS
DESCRIPTION110 kV Main substationWeight: 500 Tons110 kV Core substationWeight: 310 Tons
DATE OF AWARDOctober 2014
READY FOR SAIL AWAYDecember 2016
TYPE OF CONTRACTePC/Lump Sum
SCOPE OF WORKConstruction Engineering, Procurement, Fabrication, Transportation, Commissioning and Start-up Assistance.
Client:Location:Main Contractor:Fabrication site:
MELLITAH OIL & GAS B.V.Bouri Field – Offshore LibyaRosetti MarinoDP3/DP4 (On board) & Fores Engineering warehouse (Italy)
COMPLETED
SCOPE OF WORKEngineering, Procurement, Fabrication, Transportation&Delivery, Off-shore installation, Testing, Precommissioning, Commissioning & assistance to the Company during Start-up
DESCRIPTIONDecommissioning and dismantling of Gas SweeteningUnit, Procurement of bulk material (structures, piping, E&I), Construction of 3 chemicaltransfer pump skids & 4 chemicalinjection skids.Offshore revamping worksonboard two platforms,Update of the DCS/ESD/PSD systemTECHNICAL DATADismantling of Unit 22 for a total weight of 240 tons (Columns, Piping and Structures)Cables: 3000m Piping: 60t
Scaffolding more than: 3500m3Offshore works: 70.000 mhrs(SIMOPS)
DATE OF AWARDOctober 2012
PROVISIONAL ACCEPTANCENovember 2013
TYPE OF CONTRACTEPIC contract on Turn Key LumpSum basis
DP3/DP4 MODIFICATION & REVAMPING PROJECT
Client:Location:Main Contractor:Fabrication site:
SEREPTAshtart Field – Offshore TunisiaRosetti MarinoSfax-Tunisia/Ashtart Field Offshore Tunisia
COMPLETED
SCOPE OF WORKConstruction engineering, procurement, fabrication, dismantling , load-out and offshore revamping works.
DESCRIPTION• Procurement of bulk material
(structures, piping, E&I)• Prefabrication of loose and
assembled structures and piping spools
• Offshore revamping worksonboard five platforms
• Dismantling & RelocationEngineering
PRELIMINARY TECHNICAL DATAPrefabricated structures: 1.350 tonsPiping spools & supports: 195 tonsElectrical & instrumentation cables: 25 km
Offshore works: approx. 1.200.000 mhrs
DATE OF AWARDSeptember 2010
COMPLETION DATEDecember 2013
TYPE OF CONTRACTProcurement and FabricationContract at Unit/Time rates
ASHTART REVAMPING PROJECT
Owner:Client:Location:
POLIMERI EUROPAMaire TecnimontRavenna, Italy
SCOPE OF WORK EPC Contract - Engineering, Procurement, Fabrication, Transportation, Assembly and erection at site
NEW FRACTIONATION PLANT
LIGHTEST FRACTIONATION TOWERS (C-2310)Vessel assembly: verticalDiameter: 2500/5.90 mm Length: TT 80300 – Tot. 84300 mm Shell thickness: 18 to 76 mmWeight: 289 metric tons
HEAVIEST FRACTIONATION TOWERS (C-2320)Vessel Assembly: verticalDiameter: 3300 / 6910 mmLength: TT 81600 – Tot. 87900 mmShell thickness: 20 to 50 mmWeight: 276 metric tons
DATE OF AWARDMay 2010
COMPLETION AT SITEFebruary 2013
SCOPE OF WORKFabrication, Testing, Hook up and CarryOver works
WORKS LOCATIONIsland D (Hub 1) –Kashagan Field
DIRECT MANHOURS: 2,150,000
DATE AWARD May2009
COMPLETIONJune 2011
TYPE OF CONTRACTFrame agreement for hook upworks
HOOK UP WORKS – ISLAND D, KASHAGAN FIELD
Owner/Operator:Location:Main Contractor:Subcontractor:
AGIP KCO NVNorth Caspian Sea, Kazakhstan SectorAKER SOLUTIONSRosetti kazakhstan LLP
COMPLETED
Client:Location:
Stogit, ENI GroupMinerbio Gas Plant, Italy
SCOPE OF WORKNr.3 Glycol regenerationunitsCivil worksDismantling of the existingDEG plantInterconnecting pipeworks
TYPE OF CONTRACTEPC LSTK+ commissioning+ start-up assistance
YEAR2006
TEG REGENERATION PLANT
Client:Location:
PETROBELEgypt
STABILIZATION UNIT FOR EL GAMIL PLANT
PLANT MAIN FEATURES1.890 m3/dayStabilized condensate: 11 psia RVPFire heaters duty: 4,25 MW
MAIN ITEMS:• nr. 1 stabilizer column• nr. 1 fire heater • nr. 1 reboiler circulation pumps skid• nr. 1 condensate pre-heater skid• Nr. 2 fuel system inter-piping skids
CONTRACT TYPE: EPC Contract Award: September 2004Completion: April 2005
SCOPE OF WORK:Process design, Engineering, Procurement, Construction, Assistance to commissioning and start-up.
Location: Refinery of Milazzo
HYDROGEN PRODUCTION PLANT
PLANT MAIN FEATURESCapacity: 100 Nm3/h Hydrogen 99.99%Feedstock: Multifuel (methane, nafta) Oxydation agent: Air/Oxygen
MAIN PLANT UNITSFeedgas compression (Air/Methan) Gas desulphurizationFeed preheating Reaction & syngascoolingCO shift conversionHydrogen purification (PSA)Offsites
CONTRACT: EPCDate of Contract Award: April 2004Delivery: September 2005
SCOPE OF WORK: Scope of Work: Engineering, Procurement,Construction, Assistance to Commissioning
Client:Location:
SAIPEMNigeria
TEG REGENERATION UNIT – OBIAFU OBRIKON GAS PLANT
DATE OF AWARDOctober 2002
DATE OF COMPLETIONAugust 2003
CONTRACT: LSTK
SCOPE OF WORK Engineering, Procurement, Construction, Start-up Assistance
OTHER REFERENCES
ENDURA PIPERONIL
BUTOXIDE (PBO) PLANT
Client: ENDURA SPALocation: c/o Enichem Plant, Ravenna - ItalyMain Contractor: Rosetti Marino
HEAT RECOVERY STEAM
GENERATOR
Client: SARMATO ENERGIA SpALocation: PiacenzaMain Contractor: Rosetti Marino
2nd STAGE GAS PHASE
REACTORS
Client: TECNIMONT Location: IranMain Contractor: Rosetti Marino
OTHER REFERENCES
SEPARATORS
FOR
TEMSAH NW II PLATFORMClient: PETROBEL Location: EGYPTMain Contractor: RosettiMarino
SEPARATRS
FOR
KASHAGAN DEVELOPMENT PJ.
SEPARATORS
FOR
KASHAGAN DEVELOPMENT PJ.
Client: Agip KCOLocation: KazakhstanMain Contractor: J.V. Rosetti Marino-SICES
SLUG CATCHERS
FOR
SHAH DENIZ PJ.
Client: BP GROUPLocation: AZERBAIJANMain Contractor: Rosetti Marino
OTHER REFERENCES
SEPARATORS
FOR
TEMSAH NW II PLATFORM
Client: CONOCOPHILLIPSLocation: UKMain Contractor: RosettiMarino
SEPARATRS
FOR
KASHAGAN DEVELOPMENT PJ.
SEPARATORS
FOR
KASHAGAN DEVELOPMENT PJ.
Client: GEIE SAIPEM-BOUYGUES OFFSHORELocation: ALGERIAMain Contractor: Rosetti MarinoSLUG CATCHERS
FOR
SHAH DENIZ PJ.
Client: PETROJETLocation: EGYPTMain Contractor: Rosetti Marino
SEPARATORS FOR PORT FOUAD ACCELERATION
(LNG GAS SUPPLY) PJ.
SEPARATORS
FOR
ROD DEVELOPMENT PJ.
SEPARATORS
FOR
BRITANNIA SATELLITE PJ.