on the job training - presentation_dec '09
TRANSCRIPT
-
7/29/2019 On the Job Training - Presentation_Dec '09
1/12
LearningFrom
On The Job Training
Name : MAHAVADI DHANSHYAM
Dept. : ELECTRICAL & INSTRUMENTATION
(December, 2009)
-
7/29/2019 On the Job Training - Presentation_Dec '09
2/12
CONTENTS
Activities of the Department
My Role in My Department
Key Observations
Key Learning
Suggestions & Recommendations
Conclusion
-
7/29/2019 On the Job Training - Presentation_Dec '09
3/12
Activities of E&I
The E & I Department is concerned with the Electrical works in the entire plant,which include:
Providing Construction power to the entire plant using the CESU supply and various Diesel
Generators
Distributing the power to various places within the township and plant.
Electrical repair works throughout the township and the plant.
Electrical work in the R&R Colony
Airstrip Lighting for Night-landing facility.
Co-ordinating the electrical and instrumentation-related works of various departments and
taking proper actions based on their requirements
Automation of the entire plant using various Instrumentation Systems
Provision of Lighting within the township and the plant, etc..
In short, E&I is the hidden pioneer of all the works in the entire plant.
However, the most important activity of the Dept is the 400/220/33KV MSDS
which is to be commissioned early, next year.
-
7/29/2019 On the Job Training - Presentation_Dec '09
4/12
MSDS - I
Stands for Main Step Down Substation, commonly referred to as switchyard.
4
Activities:
Erection of the switchyard
Synchronisation of the power plant to the 400KV gridco substation at
Meramundali
Erection of Transmission towers from Meramundali to MSDS-I for
synchronisation
Provision and distribution of power to the varrious parts of the plant
and township
Automation of Protection Systems and SCADA
-
7/29/2019 On the Job Training - Presentation_Dec '09
5/12
5
My Role:
One of the members of the switchyard
To study the drawings and try to understand and help in implementing them at the
site
To be pre-equipped with sufficient knowledge to identify the difficulties involved in
the project work and rectify them
To supervise the electrical works like provision of construction power supply, DGmaintenance, illumination, etc.
To plan the schedule of the work and to organise to get those works within the
schedule
To coordinate with the other members of the team and arrange for an effective
plan of action
To help maintain the favourable work environment
To grab every opportunity to learn things from the experienced ones
-
7/29/2019 On the Job Training - Presentation_Dec '09
6/12
Key Observations:
6
Its easier said than done. What Ive learnt till date was one part; its implementation,the other.
An engineer is a Manager in the true sense. One needs to have good management
skills to get the work done in time.
Every work needs time and the time required is subject to variations depending upon
the situation. One needs to follow up at every point of the work to ensure proper work.
-
7/29/2019 On the Job Training - Presentation_Dec '09
7/12
Key Learnings and Achievements
7
250KVA, 6.6/0.433KV Distribution Substation set up in the switchyard to provide
construction power for the project
Earth Resistance Testing throughout the township and the plant
Understanding of layouts, Drawings, SLDs, Technical Specifications, etc. related to
the switchyard.
Material Reservations, Purchase Requisition, Service Reservation, Work Order, etc.
through SAP. Preparation of Comparatives for cables and LT Distribution Panels
Study of manuals, catalogues and specifications of various electrical equipmentsused in the township and the plant
Tried to utilise the training programmes conducted by the management (the one
like DG Maintenance, SAP, etc. to the fullest to acquire some basic knowledge
required to work efficiently and effectively.
Tried to study the entire power distribution system in the plant and township areaand to draw an SLD of the same, which was later on taken as a reference to make a
fair copy in Autocad by one of my batchmates.
-
7/29/2019 On the Job Training - Presentation_Dec '09
8/12
OUR SUBSTATION: 250KVA, 6.6/0.433KV
-
7/29/2019 On the Job Training - Presentation_Dec '09
9/12
OUR SUBSTATION: 250KVA, 6.6/0.433KV
-
7/29/2019 On the Job Training - Presentation_Dec '09
10/12
Suggestions and Recommendations:
10
Simplification of the process of work order required to ensure efficient and timely
delivery of results.
We GETs should be given access to all the drawings, various TS documents and BOQs
of various activities being undertaken in the department. This would enable smoother
work flow and coordination among all the members of the team.
There should be a common Medium of Instruction and Information Exchange
(preferably, Hindi or English) so that all the technical parameters should be properly
understood. In other words, it should be ensured that technical discussions or
meetings should never go on in regional languages.
-
7/29/2019 On the Job Training - Presentation_Dec '09
11/12
Conclusion:
11
Its been a great learning experience throughout and would hopefully provide us with
a hands on experience to perform effectively when wed be made responsible for some
particular work.
-
7/29/2019 On the Job Training - Presentation_Dec '09
12/12
12
THANK YOU