on time | on target: leasing for army transportation battalion
DESCRIPTION
Manage/lead project team to develop Decision–Making Process for Improvement for new Army commercial lease. Business objectives include: Stronger, long-term Port business partner/stakeholder Incentivize Port infrastructure investment to meet our needs. Operational productivity - more capable/relevantTRANSCRIPT
TRANSPORTATION TRANSPORTATION BATTIOLIONBATTIOLION
RELO: RELO: “On Time, On Target”“On Time, On Target”
Commander’s EstimateCommander’s EstimateDecision–Making Process for ImprovementDecision–Making Process for Improvement
Battalion (BN) capability meet strategic rqmtsBattalion (BN) capability meet strategic rqmts
Ability to support WarfighterAbility to support Warfighter
Stronger, long-term Port business partner/stakeholderStronger, long-term Port business partner/stakeholder
Promote assured accessPromote assured access
Incentivize Port infrastructure investment to meet our Incentivize Port infrastructure investment to meet our needs.needs.
Fix current AT/FP shortfallsFix current AT/FP shortfalls
Operational productivity - more capable/relevantOperational productivity - more capable/relevant
Quality of LifeQuality of Life
1: Initiation 1: Initiation (Trigger Event)
2: Mission Analysis 2: Mission Analysis (Needs Interview-Prog Of Rqmts)
3: Course of Action (COA) Dev 3: Course of Action (COA) Dev (Rqmts Dev-POR)
4: COA Analysis & Wargaming 4: COA Analysis & Wargaming (Rqmts Dev-POR)
5: COA Comparison Step 5: COA Comparison Step (Present Options-POR)
6: COA Approval 6: COA Approval (Document Agreement)
7: Plan Development 7: Plan Development (Acquisition Plan) Solicitation Lease Award Design/Construction Occupancy
Planning ProcessPlanning Process
Estimated MilestonesEstimated Milestones
OCTFY11
OCTFY12
OCTFY10
Prog Of Rqmts/Prog Of Rqmts/ATFP RqmtsATFP Rqmts(DEC 09-MAR 10)(DEC 09-MAR 10)
Confirm RqmtsConfirm Rqmts(APR-JUN 10)(APR-JUN 10)
Signed DraftSigned DraftO/A (NOV 09)O/A (NOV 09)
Prep/PresentPrep/PresentOptionsOptions(JUN 10)(JUN 10)
Doc AgreementDoc Agreement(JUL 10)(JUL 10)
SolicitationSolicitationProcess (TBD)Process (TBD)(OCT 10–AUG 11)(OCT 10–AUG 11)
LeaseLeaseAward/NTPAward/NTP(OCT 11)(OCT 11)
Occupancy Occupancy (TBD)(TBD)(JUN 12)(JUN 12)
Des/ConstDes/Const(FEB 12)(FEB 12)
Sole Source JustificationApproval (NOV 09 –MAR 10)
NeedsNeedsInterview Interview RequirementsRequirements(AUG-OCT 09)(AUG-OCT 09)
BNChange
ofCommand
BN COAUpdate to
CG
2: Mission Analysis 2: Mission Analysis (Needs Interview-POR)
3: Course of Action (COA) Dev 3: Course of Action (COA) Dev (Rqmts Dev-POR)
4: COA Analysis & Wargaming 4: COA Analysis & Wargaming (Rqmts Dev-POR)
5: COA Comparison Step 5: COA Comparison Step (Present Options-POR)
Good COAs Provide Clarity of ThinkingGood COAs Provide Clarity of Thinking Suitable: accomplish mission Feasible: time, space & budget constraints Acceptable: balance costs (resources, risk, etc) Distinguishable: different from other COAs Complete: achieves desired end state
Mission/COA AnalysisMission/COA Analysis
Research current and future workplace needs/COA’sResearch current and future workplace needs/COA’s
Develop space rqmts from these COA’s that:Develop space rqmts from these COA’s that: Supports the execution of your mission Creates a place that supports how employees work Contributes to successful design of your new space
Once the lease is awarded:Once the lease is awarded: Potential “refresh” developed space rqmts for
Request for Lease Proposal Communicate findings/recommendations to lessor A/E
Mission/COA AnalysisMission/COA Analysis
COA dev: diff spacesCOA dev: diff spaces• BEFORE:BEFORE: All Cubicle All Cubicle
Workspace; No Common/ Workspace; No Common/ Spec SpaceSpec Space
AFTER:AFTER: Different Spaces Different Spaces For Various Work For Various Work Tasks/PatternsTasks/Patterns
BEFORE:BEFORE: Cubicle as Cubicle as Storage BinStorage Bin
COA dev: StorageCOA dev: Storage
AFTER:AFTER: Shared and Shared and Managed Storage AreaManaged Storage Area
BEFORE:BEFORE: Exposed Copy Exposed Copy AreaArea
COA dev: Copy AreaCOA dev: Copy Area
AFTER:AFTER: Separate Copy Separate Copy AreaArea
EstimatedEstimated site rqmt @ 2 acres site rqmt @ 2 acres
EstEst annual charge of $210K for land only annual charge of $210K for land only
EstEst design/construction cost of $5.5M for new building design/construction cost of $5.5M for new building (this is GSA placeholder for TI costs).(this is GSA placeholder for TI costs).
EstEst full amort of above figures plus int, econ full amort of above figures plus int, econ deterioration, utilities and services = $806K annual deterioration, utilities and services = $806K annual chargecharge
AddAdd GSA fee at 5% = $850K annual charges for non- GSA fee at 5% = $850K annual charges for non-cancelable 10-yr leasecancelable 10-yr lease
REAL ESTATE INTEL ($)REAL ESTATE INTEL ($)$850K annual charges for non-cancel 10-yr $850K annual charges for non-cancel 10-yr leaselease
GSA Approval of Sole Source JustificationGSA Approval of Sole Source Justification
BN concurs with estimated lease termsBN concurs with estimated lease terms
BN obtains DoD Title 10 ClearanceBN obtains DoD Title 10 Clearance
GSA Draft Occupancy Agreement, obtain GSA Draft Occupancy Agreement, obtain
BN signatureBN signature
GSA Draft Rqmts Dev SOW; use BN fundingGSA Draft Rqmts Dev SOW; use BN funding
Initiate leasing actionInitiate leasing action– Drives TimelineDrives Timeline– Sets Work in MotionSets Work in Motion
Next Steps / Action Req’dNext Steps / Action Req’d
Contact InformationContact Information Curt Cooper, Project LeaderCurt Cooper, Project Leader [email protected] (425) 221-3944(425) 221-3944