one inspection lot for all GR per day.
manoj jadhav 56 posts since Apr 12, 2008
one inspection lot for all GR per day. Jul 14, 2009 7:32 AM
Hi,
Presently when I am doing GR for a material system generates a inspection lot per GR.But
when I am doing GR for same material several times per day system should generate
inspect lot once only.or if material belongs to same supplier also it should generate one lot
for that day .how to do with dynamic modification rule?
manoj
Sujit Gujar5,393 posts since Mar 7, 2009
Re: one inspection lot for all GR per day. Jul 14, 2009 8:08 AM
Hi
manoj
Is your requirement is to Inspect only one lot from one supplier oryou want to cumulate all
lots to one.
I think first one is possible through DMR:In task list assgin DMR & in Material assignment of
task list header assign vendor.
but if you want to cumulate all lots to one this is not possible.
There is one provision in QM view > inspection setup>inspection type.X : for each purchase
order item,batch & storage Location.
http://localhost/var/www/apps/conversion/tmp/scratch_2/people/manoj.jadhav2http://scn.sap.com/people/manoj.jadhav2http://scn.sap.com/people/sujit.gujarhttp://localhost/var/www/apps/conversion/tmp/scratch_2/people/sujit.gujarhttp://scn.sap.com/people/manoj.jadhav2http://localhost/var/www/apps/conversion/tmp/scratch_2/people/manoj.jadhav2 -
7/29/2019 One Inspection Lot for All GR Per Day
2/13
one inspection lot for all GR per day.
Generated by Jive on 2013-01-16+01:00
2
This will create one lot for one PO.
Revert back
Sujit
manoj jadhav56 posts since Apr 12, 2008
Re: one inspection lot for all GR per day. Jul 14, 2009 8:25 AM
Hi sujit,
See client needs system should generate single lot if i will do more than one GRN with same
material.then what will be the settings in DMR?
there should options.
1. if same material per day-one lot
2.if same vendor material -one lot
Sujit Gujar5,393 posts since Mar 7, 2009
Re: one inspection lot for all GR per day. Jul 14, 2009 8:41 AM
hi
1. if same material per day-one lot
Create a DMR with Reset period 1 day.
Two stage DMR with First stage : Inspection 1
http://scn.sap.com/people/sujit.gujarhttp://localhost/var/www/apps/conversion/tmp/scratch_2/people/sujit.gujarhttp://scn.sap.com/people/manoj.jadhav2http://localhost/var/www/apps/conversion/tmp/scratch_2/people/manoj.jadhav2 -
7/29/2019 One Inspection Lot for All GR Per Day
3/13
one inspection lot for all GR per day.
Generated by Jive on 2013-01-16+01:00
3
Second stage: 99 skip reset 1 day.
Now apply this DMR in task list Header.
Go to QA16 and set auto UD after Every 30 mins for 01 inspection type.
Also QCC0->Basic setting>plant level>Insp lot completion>Auto UD-->
maintain 30 mins here for skip & auto ud
this will create first lot every day & will come to inspection.
from second lot all lots will come to QI but stock posting will be done by system.
2.if same vendor material -one lot
in QP01>material Assignment>enter vendor material combination here.
rest of the things will remain same.
Regards
Sujit
manoj jadhav56 posts since Apr 12, 2008
Re: one inspection lot for all GR per day. Jul 14, 2009 1:05 PM
hi,
I did all settings as u told but still system is generating inspection lot for same vendor.system
should generate only one lot per day for same vendor & material for first GRN only.
Sujit Gujar5,393 posts since Mar 7, 2009
http://localhost/var/www/apps/conversion/tmp/scratch_2/people/sujit.gujarhttp://scn.sap.com/people/sujit.gujarhttp://scn.sap.com/people/sujit.gujarhttp://localhost/var/www/apps/conversion/tmp/scratch_2/people/sujit.gujarhttp://scn.sap.com/people/manoj.jadhav2http://localhost/var/www/apps/conversion/tmp/scratch_2/people/manoj.jadhav2 -
7/29/2019 One Inspection Lot for All GR Per Day
4/13
one inspection lot for all GR per day.
Generated by Jive on 2013-01-16+01:00
4
Re: one inspection lot for all GR per day. Jul 14, 2009 1:20 PM
Hi manoj
See lot will be created for that Vendor _ material combination.Say 10 times material came in
a day.
Now all 10 lots will be created.but except first rest of 9 will be in SKIP status.
these skip will be automatically removed by system after each 30mins.
Regards
Sujit
manoj jadhav56 posts since Apr 12, 2008
Re: one inspection lot for all GR per day. Jul 14, 2009 1:41 PM
Hi Sujit,
thanks now I am nearly came to conclusion.....my plant level settings are
inspection lot completion tab .
delay time for skip lot 1560
1.waiting time hours --25
2 waiting time min --60
http://scn.sap.com/people/manoj.jadhav2http://localhost/var/www/apps/conversion/tmp/scratch_2/people/manoj.jadhav2 -
7/29/2019 One Inspection Lot for All GR Per Day
5/13
one inspection lot for all GR per day.
Generated by Jive on 2013-01-16+01:00
5
is it ok?
Sujit Gujar5,393 posts since Mar 7, 2009
Re: one inspection lot for all GR per day. Jul 14, 2009 3:14 PMHi
No
maintain following setting
inspection lot completion tab .
delay time for skip lot 30 min
1.waiting time hours -- blank
2 waiting time min --30
Regards
sujit
manoj jadhav56 posts since Apr 12, 2008
Re: one inspection lot for all GR per day. Jul 15, 2009 7:25 AM
Hi Sujit,
now problem is when I created first lot it is showing skip & material is directly going in
unrestricted.I created DMR with following settings
http://scn.sap.com/people/manoj.jadhav2http://localhost/var/www/apps/conversion/tmp/scratch_2/people/manoj.jadhav2http://scn.sap.com/people/sujit.gujarhttp://localhost/var/www/apps/conversion/tmp/scratch_2/people/sujit.gujar -
7/29/2019 One Inspection Lot for All GR Per Day
6/13
one inspection lot for all GR per day.
Generated by Jive on 2013-01-16+01:00
6
1.dynamic modification-for ud
2. validaty of quality level
3.usage indicator-used in task list
stage.1
tick in skip, tick in 1st
no of inspection--1
max skip dur---30
new stage--99
rejection-1
new inspection stage--1
stage 99
tick in skip only
no of inspection-1
max skip dur-30
new stage-1
rej-1
new inspection stage-1
-
7/29/2019 One Inspection Lot for All GR Per Day
7/13
one inspection lot for all GR per day.
Generated by Jive on 2013-01-16+01:00
7
regards,
manoj
Sujit Gujar5,393 posts since Mar 7, 2009
Re: one inspection lot for all GR per day. Jul 15, 2009 7:57 AM
Hi
chage the following
stage.1
tick in skip, tick in 1st (Remove tick of skip & tick on Start of cycle ,seviarity :4) no of
inspection--1
max skip dur---30 ( remove this)
new stage--99
rejection-1
new inspection stage--1
99
tick in skip only (keep tick on skip)
no of inspection-1 (make it 99)
max skip dur-30 ( remove this)
new stage-1
http://localhost/var/www/apps/conversion/tmp/scratch_2/people/sujit.gujarhttp://scn.sap.com/people/sujit.gujarhttp://localhost/var/www/apps/conversion/tmp/scratch_2/people/sujit.gujar -
7/29/2019 One Inspection Lot for All GR Per Day
8/13
one inspection lot for all GR per day.
Generated by Jive on 2013-01-16+01:00
8
rej-1
new inspection stage-1
this will work
Regards'
Sujit
manoj jadhav56 posts since Apr 12, 2008
Re: one inspection lot for all GR per day. Jul 16, 2009 8:28 AM
Hi Sujit,
I did all settings as u directed.Now when today I created new lot, in RR everything is in grey
(disable).not able to do RR .& material automatically comming to unrest area.
My requirement is for first lot I should do RR & UD .& rest of the lots for the day no RR &
UD directly it should go to unrest for same material & vendor
. Regards,
Manoj
manoj jadhav56 posts since Apr 12, 2008
Re: one inspection lot for all GR per day. Jul 16, 2009 9:35 AM
Hi Sujit,
I created demo as u said now in Qa02 it is showing lot not inspected skip lot.is there any
relevance of sampling scheme? I not created it .now where is the problem?
http://scn.sap.com/people/manoj.jadhav2http://localhost/var/www/apps/conversion/tmp/scratch_2/people/manoj.jadhav2http://scn.sap.com/people/manoj.jadhav2http://localhost/var/www/apps/conversion/tmp/scratch_2/people/manoj.jadhav2 -
7/29/2019 One Inspection Lot for All GR Per Day
9/13
one inspection lot for all GR per day.
Generated by Jive on 2013-01-16+01:00
9
Regards,
Manoj
Sujit Gujar5,393 posts since Mar 7, 2009
Re: one inspection lot for all GR per day. Jul 16, 2009 9:54 AM
Hi
No this is not because of Smapling scheme.
100% problem is in QDR1(DMR)...please check it again.
your first lot must come under inspection every day.
or else send me the screenshots.
Regards'
Sujit
Gajesh Nagesh2,154 posts since Aug 12, 2008
Re: one inspection lot for all GR per day. Jul 16, 2009 8:31 AM
Dear Manoj
In DMR (QDR2) maintain reset period level as 1. What this will do is soon after 1 day system
will bring it to the initial stage.
http://scn.sap.com/people/gajesh.nageshhttp://localhost/var/www/apps/conversion/tmp/scratch_2/people/gajesh.nageshhttp://scn.sap.com/people/sujit.gujarhttp://localhost/var/www/apps/conversion/tmp/scratch_2/people/sujit.gujar -
7/29/2019 One Inspection Lot for All GR Per Day
10/13
one inspection lot for all GR per day.
Generated by Jive on 2013-01-16+01:00
10
When an inspection lot is created, the system checks if the reset date for the quality level
has been reached or exceeded at each sample calculation. In such a case, it resets the
qualiy level to the initial stage of the dynamic modification rule and uses this initial stage for
the current inspection lot.
Regards
gajesh
manoj jadhav56 posts since Apr 12, 2008
Re: one inspection lot for all GR per day. Jul 16, 2009 8:36 AM
Hi Gajesh ,
Reset period is already 1.
regards
manoj
Gajesh Nagesh2,154 posts since Aug 12, 2008
Re: one inspection lot for all GR per day. Jul 16, 2009 8:42 AM
Dear Manoj
If you have done according to Sujit then one change in the first stage
http://scn.sap.com/people/gajesh.nageshhttp://localhost/var/www/apps/conversion/tmp/scratch_2/people/gajesh.nageshhttp://scn.sap.com/people/manoj.jadhav2http://localhost/var/www/apps/conversion/tmp/scratch_2/people/manoj.jadhav2 -
7/29/2019 One Inspection Lot for All GR Per Day
11/13
one inspection lot for all GR per day.
Generated by Jive on 2013-01-16+01:00
11
First Stage
Inspection severity 004 (normal)
Ist stage tick
No of inspection 1
New inspection stage 99
Rejection 1
New inspection stage 1
if you skip both the stage then you will not be able to do the result recording even once
Make sure that you create a sampling scheme with inspection severity 004
Regards
gajesh
Gajesh Nagesh2,154 posts since Aug 12, 2008
Re: one inspection lot for all GR per day. Jul 16, 2009 8:44 AM
Dear madhav
Sorry I have read the wrong thread. Sujit has recommended the right one . Let me test and
come back to u with the current setting
http://scn.sap.com/people/gajesh.nageshhttp://localhost/var/www/apps/conversion/tmp/scratch_2/people/gajesh.nagesh -
7/29/2019 One Inspection Lot for All GR Per Day
12/13
one inspection lot for all GR per day.
Generated by Jive on 2013-01-16+01:00
12
Regards
Gajesh
manoj jadhav56 posts since Apr 12, 2008
Re: one inspection lot for all GR per day. Jul 16, 2009 9:05 AM
Hi Gajesh,
QDL2 status
in tightned tab
next stage is -1
&Dynamic modification history tab
current stage is -99
& let me clear one thing I don't have sampling scheme.
Sujit Gujar5,393 posts since Mar 7, 2009
Re: one inspection lot for all GR per day. Jul 16, 2009 9:23 AM
Hi
That means you are in skip stage.
http://scn.sap.com/people/sujit.gujarhttp://localhost/var/www/apps/conversion/tmp/scratch_2/people/sujit.gujarhttp://scn.sap.com/people/manoj.jadhav2http://localhost/var/www/apps/conversion/tmp/scratch_2/people/manoj.jadhav2 -
7/29/2019 One Inspection Lot for All GR Per Day
13/13
one inspection lot for all GR per day.
Generated by Jive on 2013-01-16+01:00
that is a reason system is not allowing you to do RR.(check char status must be:SKIP)
also go to QA02-->isample->In blue color you will get message of "Lot is not inspected (skip
lot) "
That means you have already created one lot which was not skip(initail lot) or you have
made initial/start to skip stage in QDR1.
Please attach it to differnt material in testing server & check.
I have tried cycle it's working fine.
You can try with QA01-manual lot creation.
Regards
Sujit
Gajesh Nagesh2,154 posts since Aug 12, 2008
Re: one inspection lot for all GR per day. Jul 16, 2009 8:45 AM
dear Madhav
Check in QDL2 what is the inspection stage. I mean current and next inspection stage. you
will get the current in the dynamic rule history
Regards
gajesh