  • 7/29/2019 One Inspection Lot for All GR Per Day

    1/13

    Generated by Jive on 2013-01-16+01:00

    1

    one inspection lot for all GR per day.

    manoj jadhav 56 posts since Apr 12, 2008

    one inspection lot for all GR per day. Jul 14, 2009 7:32 AM

    Hi,

    Presently when I am doing GR for a material system generates a inspection lot per GR.But

    when I am doing GR for same material several times per day system should generate

    inspect lot once only.or if material belongs to same supplier also it should generate one lot

    for that day .how to do with dynamic modification rule?

    manoj

    Sujit Gujar5,393 posts since Mar 7, 2009

    Re: one inspection lot for all GR per day. Jul 14, 2009 8:08 AM

    Hi

    manoj

    Is your requirement is to Inspect only one lot from one supplier oryou want to cumulate all

    lots to one.

    I think first one is possible through DMR:In task list assgin DMR & in Material assignment of

    task list header assign vendor.

    but if you want to cumulate all lots to one this is not possible.

    There is one provision in QM view > inspection setup>inspection type.X : for each purchase

    order item,batch & storage Location.

    http://localhost/var/www/apps/conversion/tmp/scratch_2/people/manoj.jadhav2http://scn.sap.com/people/manoj.jadhav2http://scn.sap.com/people/sujit.gujarhttp://localhost/var/www/apps/conversion/tmp/scratch_2/people/sujit.gujarhttp://scn.sap.com/people/manoj.jadhav2http://localhost/var/www/apps/conversion/tmp/scratch_2/people/manoj.jadhav2
  • 7/29/2019 One Inspection Lot for All GR Per Day

    2/13

    one inspection lot for all GR per day.

    Generated by Jive on 2013-01-16+01:00

    2

    This will create one lot for one PO.

    Revert back

    Sujit

    manoj jadhav56 posts since Apr 12, 2008

    Re: one inspection lot for all GR per day. Jul 14, 2009 8:25 AM

    Hi sujit,

    See client needs system should generate single lot if i will do more than one GRN with same

    material.then what will be the settings in DMR?

    there should options.

    1. if same material per day-one lot

    2.if same vendor material -one lot

    Sujit Gujar5,393 posts since Mar 7, 2009

    Re: one inspection lot for all GR per day. Jul 14, 2009 8:41 AM

    hi

    1. if same material per day-one lot

    Create a DMR with Reset period 1 day.

    Two stage DMR with First stage : Inspection 1

    http://scn.sap.com/people/sujit.gujarhttp://localhost/var/www/apps/conversion/tmp/scratch_2/people/sujit.gujarhttp://scn.sap.com/people/manoj.jadhav2http://localhost/var/www/apps/conversion/tmp/scratch_2/people/manoj.jadhav2
  • 7/29/2019 One Inspection Lot for All GR Per Day

    3/13

    one inspection lot for all GR per day.

    Generated by Jive on 2013-01-16+01:00

    3

    Second stage: 99 skip reset 1 day.

    Now apply this DMR in task list Header.

    Go to QA16 and set auto UD after Every 30 mins for 01 inspection type.

    Also QCC0->Basic setting>plant level>Insp lot completion>Auto UD-->

    maintain 30 mins here for skip & auto ud

    this will create first lot every day & will come to inspection.

    from second lot all lots will come to QI but stock posting will be done by system.

    2.if same vendor material -one lot

    in QP01>material Assignment>enter vendor material combination here.

    rest of the things will remain same.

    Regards

    Sujit

    manoj jadhav56 posts since Apr 12, 2008

    Re: one inspection lot for all GR per day. Jul 14, 2009 1:05 PM

    hi,

    I did all settings as u told but still system is generating inspection lot for same vendor.system

    should generate only one lot per day for same vendor & material for first GRN only.

    Sujit Gujar5,393 posts since Mar 7, 2009

    http://localhost/var/www/apps/conversion/tmp/scratch_2/people/sujit.gujarhttp://scn.sap.com/people/sujit.gujarhttp://scn.sap.com/people/sujit.gujarhttp://localhost/var/www/apps/conversion/tmp/scratch_2/people/sujit.gujarhttp://scn.sap.com/people/manoj.jadhav2http://localhost/var/www/apps/conversion/tmp/scratch_2/people/manoj.jadhav2
  • 7/29/2019 One Inspection Lot for All GR Per Day

    4/13

    one inspection lot for all GR per day.

    Generated by Jive on 2013-01-16+01:00

    4

    Re: one inspection lot for all GR per day. Jul 14, 2009 1:20 PM

    Hi manoj

    See lot will be created for that Vendor _ material combination.Say 10 times material came in

    a day.

    Now all 10 lots will be created.but except first rest of 9 will be in SKIP status.

    these skip will be automatically removed by system after each 30mins.

    Regards

    Sujit

    manoj jadhav56 posts since Apr 12, 2008

    Re: one inspection lot for all GR per day. Jul 14, 2009 1:41 PM

    Hi Sujit,

    thanks now I am nearly came to conclusion.....my plant level settings are

    inspection lot completion tab .

    delay time for skip lot 1560

    1.waiting time hours --25

    2 waiting time min --60

    http://scn.sap.com/people/manoj.jadhav2http://localhost/var/www/apps/conversion/tmp/scratch_2/people/manoj.jadhav2
  • 7/29/2019 One Inspection Lot for All GR Per Day

    5/13

    one inspection lot for all GR per day.

    Generated by Jive on 2013-01-16+01:00

    5

    is it ok?

    Sujit Gujar5,393 posts since Mar 7, 2009

    Re: one inspection lot for all GR per day. Jul 14, 2009 3:14 PMHi

    No

    maintain following setting

    inspection lot completion tab .

    delay time for skip lot 30 min

    1.waiting time hours -- blank

    2 waiting time min --30

    Regards

    sujit

    manoj jadhav56 posts since Apr 12, 2008

    Re: one inspection lot for all GR per day. Jul 15, 2009 7:25 AM

    Hi Sujit,

    now problem is when I created first lot it is showing skip & material is directly going in

    unrestricted.I created DMR with following settings

    http://scn.sap.com/people/manoj.jadhav2http://localhost/var/www/apps/conversion/tmp/scratch_2/people/manoj.jadhav2http://scn.sap.com/people/sujit.gujarhttp://localhost/var/www/apps/conversion/tmp/scratch_2/people/sujit.gujar
  • 7/29/2019 One Inspection Lot for All GR Per Day

    6/13

    one inspection lot for all GR per day.

    Generated by Jive on 2013-01-16+01:00

    6

    1.dynamic modification-for ud

    2. validaty of quality level

    3.usage indicator-used in task list

    stage.1

    tick in skip, tick in 1st

    no of inspection--1

    max skip dur---30

    new stage--99

    rejection-1

    new inspection stage--1

    stage 99

    tick in skip only

    no of inspection-1

    max skip dur-30

    new stage-1

    rej-1

    new inspection stage-1

  • 7/29/2019 One Inspection Lot for All GR Per Day

    7/13

    one inspection lot for all GR per day.

    Generated by Jive on 2013-01-16+01:00

    7

    regards,

    manoj

    Sujit Gujar5,393 posts since Mar 7, 2009

    Re: one inspection lot for all GR per day. Jul 15, 2009 7:57 AM

    Hi

    chage the following

    stage.1

    tick in skip, tick in 1st (Remove tick of skip & tick on Start of cycle ,seviarity :4) no of

    inspection--1

    max skip dur---30 ( remove this)

    new stage--99

    rejection-1

    new inspection stage--1

    99

    tick in skip only (keep tick on skip)

    no of inspection-1 (make it 99)

    max skip dur-30 ( remove this)

    new stage-1

    http://localhost/var/www/apps/conversion/tmp/scratch_2/people/sujit.gujarhttp://scn.sap.com/people/sujit.gujarhttp://localhost/var/www/apps/conversion/tmp/scratch_2/people/sujit.gujar
  • 7/29/2019 One Inspection Lot for All GR Per Day

    8/13

    one inspection lot for all GR per day.

    Generated by Jive on 2013-01-16+01:00

    8

    rej-1

    new inspection stage-1

    this will work

    Regards'

    Sujit

    manoj jadhav56 posts since Apr 12, 2008

    Re: one inspection lot for all GR per day. Jul 16, 2009 8:28 AM

    Hi Sujit,

    I did all settings as u directed.Now when today I created new lot, in RR everything is in grey

    (disable).not able to do RR .& material automatically comming to unrest area.

    My requirement is for first lot I should do RR & UD .& rest of the lots for the day no RR &

    UD directly it should go to unrest for same material & vendor

    . Regards,

    Manoj

    manoj jadhav56 posts since Apr 12, 2008

    Re: one inspection lot for all GR per day. Jul 16, 2009 9:35 AM

    Hi Sujit,

    I created demo as u said now in Qa02 it is showing lot not inspected skip lot.is there any

    relevance of sampling scheme? I not created it .now where is the problem?

    http://scn.sap.com/people/manoj.jadhav2http://localhost/var/www/apps/conversion/tmp/scratch_2/people/manoj.jadhav2http://scn.sap.com/people/manoj.jadhav2http://localhost/var/www/apps/conversion/tmp/scratch_2/people/manoj.jadhav2
  • 7/29/2019 One Inspection Lot for All GR Per Day

    9/13

    one inspection lot for all GR per day.

    Generated by Jive on 2013-01-16+01:00

    9

    Regards,

    Manoj

    Sujit Gujar5,393 posts since Mar 7, 2009

    Re: one inspection lot for all GR per day. Jul 16, 2009 9:54 AM

    Hi

    No this is not because of Smapling scheme.

    100% problem is in QDR1(DMR)...please check it again.

    your first lot must come under inspection every day.

    or else send me the screenshots.

    Regards'

    Sujit

    Gajesh Nagesh2,154 posts since Aug 12, 2008

    Re: one inspection lot for all GR per day. Jul 16, 2009 8:31 AM

    Dear Manoj

    In DMR (QDR2) maintain reset period level as 1. What this will do is soon after 1 day system

    will bring it to the initial stage.

    http://scn.sap.com/people/gajesh.nageshhttp://localhost/var/www/apps/conversion/tmp/scratch_2/people/gajesh.nageshhttp://scn.sap.com/people/sujit.gujarhttp://localhost/var/www/apps/conversion/tmp/scratch_2/people/sujit.gujar
  • 7/29/2019 One Inspection Lot for All GR Per Day

    10/13

    one inspection lot for all GR per day.

    Generated by Jive on 2013-01-16+01:00

    10

    When an inspection lot is created, the system checks if the reset date for the quality level

    has been reached or exceeded at each sample calculation. In such a case, it resets the

    qualiy level to the initial stage of the dynamic modification rule and uses this initial stage for

    the current inspection lot.

    Regards

    gajesh

    manoj jadhav56 posts since Apr 12, 2008

    Re: one inspection lot for all GR per day. Jul 16, 2009 8:36 AM

    Hi Gajesh ,

    Reset period is already 1.

    regards

    manoj

    Gajesh Nagesh2,154 posts since Aug 12, 2008

    Re: one inspection lot for all GR per day. Jul 16, 2009 8:42 AM

    Dear Manoj

    If you have done according to Sujit then one change in the first stage

    http://scn.sap.com/people/gajesh.nageshhttp://localhost/var/www/apps/conversion/tmp/scratch_2/people/gajesh.nageshhttp://scn.sap.com/people/manoj.jadhav2http://localhost/var/www/apps/conversion/tmp/scratch_2/people/manoj.jadhav2
  • 7/29/2019 One Inspection Lot for All GR Per Day

    11/13

    one inspection lot for all GR per day.

    Generated by Jive on 2013-01-16+01:00

    11

    First Stage

    Inspection severity 004 (normal)

    Ist stage tick

    No of inspection 1

    New inspection stage 99

    Rejection 1

    New inspection stage 1

    if you skip both the stage then you will not be able to do the result recording even once

    Make sure that you create a sampling scheme with inspection severity 004

    Regards

    gajesh

    Gajesh Nagesh2,154 posts since Aug 12, 2008

    Re: one inspection lot for all GR per day. Jul 16, 2009 8:44 AM

    Dear madhav

    Sorry I have read the wrong thread. Sujit has recommended the right one . Let me test and

    come back to u with the current setting

    http://scn.sap.com/people/gajesh.nageshhttp://localhost/var/www/apps/conversion/tmp/scratch_2/people/gajesh.nagesh
  • 7/29/2019 One Inspection Lot for All GR Per Day

    12/13

    one inspection lot for all GR per day.

    Generated by Jive on 2013-01-16+01:00

    12

    Regards

    Gajesh

    manoj jadhav56 posts since Apr 12, 2008

    Re: one inspection lot for all GR per day. Jul 16, 2009 9:05 AM

    Hi Gajesh,

    QDL2 status

    in tightned tab

    next stage is -1

    &Dynamic modification history tab

    current stage is -99

    & let me clear one thing I don't have sampling scheme.

    Sujit Gujar5,393 posts since Mar 7, 2009

    Re: one inspection lot for all GR per day. Jul 16, 2009 9:23 AM

    Hi

    That means you are in skip stage.

    http://scn.sap.com/people/sujit.gujarhttp://localhost/var/www/apps/conversion/tmp/scratch_2/people/sujit.gujarhttp://scn.sap.com/people/manoj.jadhav2http://localhost/var/www/apps/conversion/tmp/scratch_2/people/manoj.jadhav2
  • 7/29/2019 One Inspection Lot for All GR Per Day

    13/13

    one inspection lot for all GR per day.

    Generated by Jive on 2013-01-16+01:00

    that is a reason system is not allowing you to do RR.(check char status must be:SKIP)

    also go to QA02-->isample->In blue color you will get message of "Lot is not inspected (skip

    lot) "

    That means you have already created one lot which was not skip(initail lot) or you have

    made initial/start to skip stage in QDR1.

    Please attach it to differnt material in testing server & check.

    I have tried cycle it's working fine.

    You can try with QA01-manual lot creation.

    Regards

    Sujit

    Gajesh Nagesh2,154 posts since Aug 12, 2008

    Re: one inspection lot for all GR per day. Jul 16, 2009 8:45 AM

    dear Madhav

    Check in QDL2 what is the inspection stage. I mean current and next inspection stage. you

    will get the current in the dynamic rule history

    Regards

    gajesh

    http://scn.sap.com/people/gajesh.nageshhttp://localhost/var/www/apps/conversion/tmp/scratch_2/people/gajesh.nagesh