online training resource - commissioning of 8400 stateline and highline inverter drives
TRANSCRIPT
![Page 1: Online training resource - Commissioning of 8400 StateLine and HighLine inverter drives](https://reader037.vdocument.in/reader037/viewer/2022100216/58f0f8c11a28abe0718b45dd/html5/thumbnails/1.jpg)
Commissioning of 8400 StateLine & HighLine Inverter Drives
8400 StateLine 8400 HighLine
Introduction
1. Creating a project
Section 1: Creating an engineering project
2. Creating a defined baseline
Section 2: Load Lenze settings
3. Configuring a motor
Section 3a: Configuring a Lenze motor
Section 3b: Configuring a third-party motor
4. Commissioning of the applications
Section 4a: Actuating drive "speed"
Section 4b: "Switch-off positioning"
Section 4c: "Table positioning"
Further topics
Section 5: Changing the terminal assignment
Lenze UK: +44 1234 753200
www.lenze.com