online training resource - commissioning of 8400 stateline and highline inverter drives

1
Commissioning of 8400 StateLine & HighLine Inverter Drives 8400 StateLine 8400 HighLine Introduction 1. Creating a project Section 1: Creating an engineering project 2. Creating a defined baseline Section 2: Load Lenze settings 3. Configuring a motor Section 3a: Configuring a Lenze motor Section 3b: Configuring a third-party motor 4. Commissioning of the applications Section 4a: Actuating drive "speed" Section 4b: "Switch-off positioning" Section 4c: "Table positioning" Further topics Section 5: Changing the terminal assignment Lenze UK: +44 1234 753200 www.lenze.com

Upload: derek-jones-lenze-uk

Post on 14-Apr-2017

47 views

Category:

Engineering


3 download

TRANSCRIPT

Page 1: Online training resource - Commissioning of 8400 StateLine and HighLine inverter drives

Commissioning of 8400 StateLine & HighLine Inverter Drives

8400 StateLine 8400 HighLine

Introduction

1. Creating a project

Section 1: Creating an engineering project

2. Creating a defined baseline

Section 2: Load Lenze settings

3. Configuring a motor

Section 3a: Configuring a Lenze motor

Section 3b: Configuring a third-party motor

4. Commissioning of the applications

Section 4a: Actuating drive "speed"

Section 4b: "Switch-off positioning"

Section 4c: "Table positioning"

Further topics

Section 5: Changing the terminal assignment

Lenze UK: +44 1234 753200

www.lenze.com