Open House #1 Summary Report
Date of Meeting:
April 2, 2008
Prepared by:
4601 DTC Boulevard, Suite 700 Denver, CO 80237
303-221-7275
![Page 2: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/2.jpg)
INTRODUCTION
This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the open house was to introduce the study team, identify the study’s purpose, process, and schedule, and provide information about the methods and benefits of access management. Members of the project team, including representatives from the Colorado Department of Transportation, Mesa County, and PBS&J, were on hand to address the public’s questions and concerns. The open house format allowed people to come and go at their convenience and provided opportunities for people to speak with project team members one-on-one. Assistance for people with disabilities was offered upon request. Project information was presented through a combination of display boards, roll plots, brochures, and a DVD video. Attendees began the open house by registering at a sign-in table, where a staff member collected their contact information. Display boards were placed around the room, covering various aspects of the study. A large study area map displaying current US 6 access points was on display in the center of the room. Attendees were able to use Post-it notes to provide comments on both the boards and the map. A video presentation providing an overview of access management was played throughout the evening. Tables were available for attendees to sit and complete their comment forms and enjoy refreshments. The meeting date, time, and location were as follows: Date: April 2, 2008 Time: 5-8 p.m. Location: Clifton Elementary School 3276 F Road There were 44 people in attendance. The sign-in sheets are attached to this report as Appendix A.
Page 1
![Page 3: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/3.jpg)
INFORMATION PRESENTED The following materials were available at the open house and are attached to this report as Appendix B:
Handouts
1. Comment Form 2. Brochure: Benefits of Access Management (Federal Highway Administration)
DVD Video
Access Management Overview (Federal Highway Administration, May 1997) Note: This is not available in the appendix.
Display Materials
1. Boards (Q. 12) 2. Existing Conditions Map
PUBLIC NOTIFICATION Several communication tools were utilized to notify the public of the open house; examples are attached to this report as Appendix C :
Post Card – The post card served as an invitation to attend the open house. The post card was mailed to residents, property owners, and businesses within the study area. The mailing list contained 398 addresses.
Web site – The project Web site (www.dot.state.co.us/us6clifton/) provided the date, time, and location of the open house and also provided an overview of the study.
Print Advertisements – Open house print advertisements were published as follows: Daily Sentinel: 3/20/08; 4/2/08
Press Release – A press release was developed and distributed to media outlets throughout the corridor.
COMMENTS RECEIVED Comments were provided at the open house on comment forms and directly onto the existing conditions map. The complete comment forms are attached as Appendix D. A summary of the comments received is found on the following page.
Page 2
![Page 4: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/4.jpg)
Category Comment Front Street needs to be reconnected to I-70 B. Add access lanes on both sides for businesses and make through traffic travel through the middle of the street. A rear access from Peach Tree shopping center would help. Limit number of access points and install stoplights at remaining access points. Single access from north and south Clifton equals one stop light between I-70 B and 33 Road. Pedestrian-friendly would be a good thing. Currently it is difficult to walk across the street because of traffic. Elimination of some access points would be a good thing. Install turning lane for traffic exiting I-70 B to the frontage road (near F 1/2 Road). Consider collector/distributor-type section for SH 6 from I-70 B to 33 Road. Provide E 3/4 Road access back to US 6. Provide access to US 6 from side streets during peak travel times.
Access
Look at size and layout of school parking lot. Need light on Lois Street Signals Light needed at post office Traffic too congested through study area. Widening road to four lanes with a turning lane would relieve a lot of traffic. Needs to be more traffic-friendly Traffic
A lot of traffic most of the day Police patrol would bring down amount of speeding. If you make it four lanes it would become a raceway, just like 32. Route some traffic north on 32 or 33 and west on F 1/2 to an improved intersection by the Budweiser facility. Route some traffic to Front Street under 32 Road to I-70 B. Do not allow business parking on US 6 in study area. Move the post office. Open House format too loose; need more structure, such as a formal presentation. Also need to send out post card sooner. CDOT property that has access to E 3/4 (east of 33 Road) needs consideration; suggest deleting this road. Consider construction timing’s impact to businesses, especially seasonal businesses. Make Grand Ave. a downtown/streetscape project. Improve west to north right turn at US6/I-70 B.
Misc.
Speed limit on I-70 B between I-70 and US 6 too high. Timeline When will funding be identified? How can we fast-track this project?
Wider roads would be safer for children and other pedestrians, need median for pedestrian refuge and street lighting. Also need safe turns on/off US 6. Consider safety of moving bus drop off. Safety
Consider safety at Front/1st Street.
![Page 5: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/5.jpg)
NEXT STEPS The project Web site will continue to provide the display boards and existing conditions map. The project team will consider questions and comments provided by the public during the open house. The next public open house will be held in summer 2008.
![Page 6: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/6.jpg)
Appendix A: Sign-in Sheets
![Page 7: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/7.jpg)
![Page 8: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/8.jpg)
![Page 9: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/9.jpg)
![Page 10: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/10.jpg)
Appendix B: Information Presented
![Page 11: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/11.jpg)
US 6 - Clifton Access Management Plan
Public Open House #1 Comment Form Wednesday, April 2, 2008 · 5:00-8:00 P.M.
Clifton Elementary School
Name
Address
Phone/E-mail
1. What are your overall thoughts about access to/from US 6 between the I-70 Business Loop and the railroad
viaduct east of 33 Road?
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
2. Do you own property with direct access to US 6? Yes No
If yes, please provide the property address(es) (if different than above): ________________________________
_________________________________________________________________________________________
3. Where do you access US 6? ______________________________________________________________
_________________________________________________________________________________________
4. How often do you drive the US 6 corridor? (circle one) Daily Weekly Monthly Rarely This was my 1st time
5. How did you hear about this meeting? __________________________________________________________
6. Please tell us how we can improve the information presented and the best way to keep you informed. _______
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
OVER
![Page 12: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/12.jpg)
US 6 - Clifton Access Management Plan
Public Open House #1 Comment Form Wednesday, April 2, 2008 · 5:00-8:00 P.M.
Clifton Elementary School
Additional comments: _________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
For more information, contact: US 6 Access Management Plan
c/o David Sprague Consultant Project Manager
PBS&J 4601 DTC Blvd., Ste. 700
Denver, CO 80237 800-497-5529
Please place in comment box or mail to address above.
THANK YOU FOR YOUR PARTICIPATION
![Page 13: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/13.jpg)
AC
CE
SS
SP
AC
ING
Sig
nal S
pacin
gIncreasing the distance betw
een traffic signals improves the
flow of traffic on m
ajor arterials, reduces congestion, andim
proves air quality for heavily traveled corridors. The appro-priate
spacing betw
een signals
for a
particular corridor
depends greatly upon the speed and flow of traffic, but any-
thing greater
than tw
o signals
per m
ile has
a significant
impact on congestion and safety.
A m
ajor synthesis of research on access managem
ent foundthat each additional signal over tw
o per mile (i.e., a one-half
mile signal spacing) increased travel tim
e by over six percent.[4
] A study of an intersection in C
incinnati where a signal w
asadded found a 2
0 percent increase in peak travel tim
es. [11]
A dem
onstration project in Colorado revealed that half m
ile signal spacing and raised medi-
ans on a five-mile roadw
ay segment reduced total hours of vehicle travel by 4
2 percent and
total hours of delay by 59 percent, com
pared to quarter mile signal spacing. [1
]Im
proved speeds and travel times translate directly into envi-
ronmental benefits. A
n ongoing study in Texas found that aten m
ile four-lane arterial with one-half m
ile signal spacingreduced
fuel consum
ption by
24
0,0
00
gallons
fromincreased speed and 3
35,0
00 gallons from
reduced delay,com
pared to quarter mile signal spacing. [1
4]
Increasing the distance between signals also reduces the
incidence of crashes. A review
of crash data from seven
states demonstrated that the crash rate increased substantially w
ith additional signalsper m
ile. [4] This is partly related to access spacing, w
hich is presented next.
Drive
way S
pacin
gAppropriate drivew
ay spacing presents another major access issue. Large num
bers ofdrivew
ays increase the potential conflicts on the road. Fewer drivew
ays spaced furtherapart allow
for more orderly m
erging of traffic and present fewer challenges to drivers.
The congestion impacts of reduced drivew
ays are fairly clear. It is impossible for a
major arterial or highw
ay to maintain free flow
speeds with num
erous access pointsthat
add slow
m
oving vehicles.
A
research synthesis found that roadway
speeds w
ere reduced
an average
of2.5
miles per hour for every 1
0 access
points per mile, up to a m
aximum
of a10 m
iles per
hour reduction
(at 40
access points per mile). [4
] With high-
er numbers of access points, conges-
tion will increase significantly.
An
overabundance of
driveways
alsoincreases the rate of car crashes. A
nexam
ination of
crash data
in seven
states indicated
found a
strong linear
relationship betw
een the
number
ofcrashes and the num
ber of driveways.
Rural
areas had
a sim
ilar, but
lessstrong relationship. [4
,7]
ME
DIA
N T
RE
ATM
EN
TS
Media
ns
Median treatm
ents for roadways rep-
resent one
of the
most
effectivem
eans to regulate access, but arealso the m
ost controversial. The two
major
median
treatments
includetw
o-way left turn lanes (TW
LTL) andraised m
edians.
The safety
benefits of
median
improvem
ents have been the subjectof num
erous studies and syntheses.Studies of both particular corridors
and comparative research on differ-
ent types of median treatm
ents indi-cate
the significant
safety benefits
from
access m
anagement
tech-niques. A
ccording to an analysis of crash data in seven states, raised medians reduce
crashes by over 40 percent in urban areas and over 6
0 percent in rural areas. [4
]
A study of corridors in several cities in Iow
a found that two-w
ay left-turn lanes reducedcrashes by as m
uch as 70
percent, improved level of service by one full grade in
some areas, and increased lane capacity by as m
uch as 36
percent. [5]
Raised m
edians also provide extra protection for pedestrians. A study of m
edian treat-m
ents in Georgia found that raised m
edians reduced pedestrian-involved crashes by 45
percent and fatalities by 78 percent, com
pared to two-w
ay left-turn lanes. [12]
TU
RN
ING
LA
NE
S
Left T
urn
sExclusive turning lanes for vehicles rem
ove stopped vehicles fromthrough traffic. Left-turn lanes at intersections substantially reducerear-end crashes. A
major synthesis of research on left-turn lanes
demonstrated that exclusive turn lanes reduce crashes betw
een 18
to 77 percent (5
0 percent average) and reduce rear-end collisions
between 6
0 and 8
8 percent. [4
]
Left-turn lanes also substantially increase the capacity of many roadw
ays. A shared left-
turn and through lane has about 40 to 6
0 percent the capacity of a standard through
lane. [4]. A
synthesis of research on this topic found a 25 percent increase in capacity,
on average, for roadways that added a left-turn lane. [1
3]
Indire
ct T
urn
sSom
e of the biggest issues with m
anaging access come at intersections w
here vehiclesm
ust cross traffic. Som
e states and cities have adopted indirect turns to reduce theseconflicts. In N
ew Jersey, the jug-handle left turn requires a right turn onto a feeder
street, followed by a left onto a cross street. D
etroit hasextensively used an indirect U
-turn that requires a U-turn
past an intersection, followed by a right turn instead of a
regular left turn.
Like dedicated
left-turnlanes, indirect turns reducecrashes,
improve
conges-tion,
and add
capacity.Crashes decline by 2
0 per-
cent on
average, and
35
percent if the indirect turnintersection
is signalized.
Capacity
typically show
s a
15 to 2
0 percent gain. [4
]
Rig
ht T
urn
sR
ight-turn lanes typically have a less substantial impact on
crashes and
roadway
capacity than
other types
of turn
strategies, because
there are
fewer
limitations
on right
turns. Though there are fewer studies of these im
pacts,there is a clear relationship betw
een the number of vehicles
attempting a right turn in a through traffic lane and its delay
to through traffic. This relationship is exponential – eachadditional car that m
ust wait for a right turn w
ill increase thedelay m
ore than the previous car. At intersections w
ith substantial right-turn move-
ments, a dedicated right-turn lane segregates these cars from
through traffic andincreases the capacity of the road.
Roundabouts
Roundabouts represent a potential solution for inter-
sections with m
any conflict points. Though not appro-priate for all situations, roundabouts reduce vehiclem
ovements across traffic. O
nly a few studies have
examined the safety benefits of roundabouts. O
nestudy of four intersections that w
ere replaced with
roundabouts in
Maryland
found a
drop in
crashesbetw
een 18 and 2
9 percent and a reduction in injury
crashes between 6
3 and 8
8 percent. The cost of
crashes at these locations – one measure of severity
– was also reduced by 6
8 percent. O
verall crasheson roundabouts w
ere more m
inor than those at leftturn locations. [9
] Another study of roundabouts in
several locations
found a
51 percent
reduction in
crashes, including a 73 percent reduction in injury
crashes and a 32 percent reduction in property-dam
age-only crashes for single-lane round-abouts. M
ulti-lane roundabouts only experienced a 29 percent reduction in crashes. [6
]
RE
LA
TE
DTE
CH
NIQ
UE
SA
ccess
managem
ent
inclu
des
more
techniques than can be discussed in asingle
brochure. Som
e of
these tech-
niq
ues
are
new
er
and
have
been
researched som
ewhat
less.
Frontageroads
have been
the subject
of som
edebate in the literature, but there is noclear indication of their benefits. O
thertech
niques,
such
as th
e relation
ship
between
highway
interchange spacing
and local
traffic, are
new
topics that
require more research.
Many cities and states develop access
managem
ent
pro
gra
ms
to
dea
l w
ithexisting issues of congestion and safety.A
n active access managem
ent program,
however, w
ould need to include changesto local land use policies that encouragethe rational developm
ent of major roads.
In newly developing areas, land use and
zoning controls that limit the num
ber ofaccess points and leave space for m
edi-an
improvem
ents can
save m
oney and
effort as these areas develop.
Busin
ess C
oncern
sInstalling raised m
edians often raises serious concerns by the business comm
unitythat local businesses that depend upon pass-by traffic (especially gas stations andfast-food restaurants [1
0]) w
ill be adversely affected by medians. Though there are
few studies of the actual im
pacts of medians on business sales, there are several sur-
veys of business owner opinions. S
urveys conducted in mul-
tiple corridors in Texas, Iowa, and Florida dem
onstrate thatthe vast m
ajority of business owners believe there have been
no declines in sales, with som
e believing there are actuallyim
provements in business sales. [2
,5,8
] One study in Texas
indicated that corridors with access control im
provements
experienced an 18
percent increase in property values afterconstruction. [2
]
![Page 14: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/14.jpg)
CIT
ATIO
NS
[1]
Colorado D
epartment of H
ighways, 1
98
5, Final R
eport of the Colorado A
ccess Control
Dem
onstration Project, C
olorado.
[2]
Eisele,W
. E.,
and W
. E.
Frawley,
19
99
, A
M
ethodology for
Determ
ining Econom
icIm
pacts of Raised M
edians: Data A
nalysis on Additional C
ase Studies, R
esearch Report
39
04
-3,
TexasTransportation Institute, C
ollegeStation,
Texas, October.
[3]
Frawley,
W. E., and W
. E. Eisele, 19
98
, A M
ethodology to Determ
ine Economic Im
pactsof
Raised
Medians
on A
djacent B
usinesses, 1
99
8 N
ational Conference
on A
ccessM
anagement.
[4]
Gluck,
J., H
. S.
Levinson, and
V. Stover,
19
99
, Im
pacts of
Access
Managem
entTechniques, N
CH
RP R
eport 42
0, Transportation R
esearch Board.
[5]
Iowa
Departm
ent of
Transportation, 1
99
7,
Access
Managem
ent R
esearch and
Aw
areness Program
: Phase II R
eport.
[6]
Jacquemart,
G.,
19
98
, Synthesis
of H
ighway
Practice
26
4:
M
odern R
oundaboutPractice in the U
nited States, N
ational Cooperative H
ighway R
esearch Program
, N
ational Academ
y Press, W
ashington, D.C
.
[7]
Lall, B. K
., D. H
untington, and A. Eghtedari, 1
99
6, A
ccess Managem
ent and TrafficSafety, P
aper presented at the Second A
nnual Access M
anagement C
onference.
[8]
Long, G, C
.T. Gan, and B
.S. M
orrison. "Impacts of S
elected Median and A
ccess D
esign Features." Florida Departm
ent of Transportation Report,
TransportationR
esearch Center, U
niversity of Florida, May 1
99
3.
[9]
Meyers, E. J., 1
99
9, A
ccident Reduction w
ith Roundabouts, P
aper presented at the6
9th A
nnual ITE Meeting, Las Vegas, N
evada.
[10
]N
euwirth, R
. M., G
. E. Weisbrod, and S
. D. D
ecker. 19
93
, Methodology for Evaluation
Economic Im
pacts of Restricting Left Turns, P
aper presented at the First Annual A
ccessM
anagement C
onference.
[11
]Pant, P. D
., M.D
., S. U
la, and Y. Liu, 19
98
, Methodology for A
ssessing the Effectivenessof A
ccess Managem
ent Techniques, Final Report, prepared for the O
hio Departm
ent ofTransportation.
[12
]Parsonson, P. S
., M. G
. Waters III, and J. S
. Fincher, 20
00
, Georgia S
tudy Confirm
s theContinuing S
afety Advantage of R
aised Medians O
ver Two-W
ay Left-Turn Lanes, present-ed at the Fourth N
ational Conference on A
ccess Managem
ent, Portland, O
regon.
[13
]S/
KTransportation C
onsultants, Inc., 20
00
, National H
ighway Institute C
ourse Num
ber1
33
07
8: A
ccess Managem
ent, Location, and Design, A
pril.
[14
]Texas
Transportation Institute, In Progress, A
n Evaluation of Strategies for Im
provingTransportation M
obility and Energy Efficiency in Urban A
reas, Texas A&
M U
niversity,Project 6
00
11
.
FO
R M
OR
E IN
FO
RM
ATIO
N
http://
ww
w.accessm
anagement.gov
FHW
A D
ocument N
umber FH
WA-O
P-0
3-0
66
WH
AT IS
AC
CE
SS
M
AN
AG
EM
EN
T?
Access m
anagement is a set of techniques that state and local gov-
ernments can use to control access to highw
ays, major arterials, and
other roadways. A
ccess managem
ent includes several techniquesthat are designed to increase the capacity of these roads, m
anagecongestion, and reduce crashes.
�Increasing spacing betw
een signals and interchanges;�
Drivew
ay location, spacing, and design;�
Use of exclusive turning lanes;
�M
edian treatments, including tw
o-way left turn lanes (TW
LTL) thatallow
turn movem
ents in multiple directions from
a center laneand raised m
edians that prevent movem
ents across a roadway;
�U
se of service and frontage roads; and�
Land use policies that limit right-of-w
ay access to highways.
State, regional, and local governm
ents across the United S
tatesuse access m
anagement policies to preserve the functionality of
their roadw
ay system
s. This
is often
done by
designating an
appropriate level of access control for each of a variety of facili-ties. Local residential roads are allow
ed full access, while m
ajorhighw
ays and freeways allow
very little. In between are a series
of road types that require standards to help ensure the free flowof traffic and m
inimize crashes, w
hile still allowing access to m
ajorbusinesses and other land uses along a road,
PU
RP
OS
E O
F T
HE
BR
OC
HU
RE
This brochure serves as a guide to the major benefits of several
access managem
ent techniques in use across the United S
tates. Thepurpose of this brochure is to provide a com
prehensive and succinctexam
ination of the benefits of access managem
ent and address major
concerns that are often raised about access managem
ent.The
benefits usually
identified w
ith access
managem
ent include
improved m
ovement of through traffic, reduced crashes, and few
ervehicle conflicts. M
ost major concerns about access m
anagement
relate to
potential reductions
in revenue
to local
businesses that
depend on pass-by traffic.This brochure does not describe the precise strategies that trans-portation departm
ents should follow to im
plement an access m
an-agem
ent program, but rather provides an introduction to the key
concepts. The brochure may also be a useful tool to distribute at
public meetings for both general access m
anagement plans and
specific applications of access managem
ent techniques.This brochure describes the relevant benefits and issues w
ith threekey sets of access m
anagement techniques:
1.
Access spacing, including spacing betw
een signalized intersectionsand distance betw
een driveways;
2.
Turning lanes, including dedicated left- and right-turn lanes, asw
ell as indirect left turns and U-turns, and roundabouts; and
3.
Median treatm
ents, including two-w
ay left-turn lanes and raisedm
edians.
![Page 15: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/15.jpg)
WELCOMEto the
US 6–CliftonAccess Management Plan
Open House
At tonight’s meeting you can:
Meet the study team
Find out the study’s purpose, process, and schedule
Learn about the methods and benefits of access management
Study team members wearing name badges can answer your questions and listen to your comments.
Please take a moment to complete a comment form before you leave.
Thank YouThank YouWe Appreciate Your ParticipationWe Appreciate Your Participation
Please sign in.Please sign in.
![Page 16: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/16.jpg)
What is an access management plan?Any intersection or driveway along a roadway is called an access point. The purpose of an access management plan is to determine what access points will be allowed, where they will be located, and what kinds of traffic movements will be allowed at each one.
What are the goals of the access management plan?
Provide appropriate level of access to properties adjacent to the highway
Provide for the safe and efficient flow of traffic
Who is conducting the study?
CDOT and Mesa County
Overview
![Page 17: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/17.jpg)
OverviewWhy does US 6 need an access management plan?
US 6 is an important resource for the communities of Clifton, Palisade, and Grand Junction
Traffic volumes on US 6 are projected to significantly increase in the future
Current and Future Traffic Volumes
US 6 Segment Daily Traffic Volume (2008)
Daily Traffic Volume (2035) % Increase
I-70 B to 2nd Street 18,000 49,000 170%
2nd Street to 33 Road 12,500 39,000 210%
East of 33 Road 9,060 19,000 110%
2008 Daily Traffi c Volume Source: CDOT2035 Daily Traffi c Volume Source: Mesa County
One of the best ways to keep US 6 safe and efficient is to manage the location and design of access points
![Page 18: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/18.jpg)
The study area is from the I-70 Business Loop to the railroad viaduct east of 33 Road, a distance of just under one mile.
33 R
d
33¾
Rd
34 R
d
Front St
F Rd F Rd
G Rd
E½ RdE½ Rd
F½ Rd
E Rd
E¼ Rd
6
6
141
Project AreaProject Area
Study Area Map
![Page 19: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/19.jpg)
Highway Characteristics:
Classified as an urban arterial
Designed to accommodate moderate speeds and moderate to high traffic volumes
Service to through traffic movements has priority over providing direct access to properties
Note: Preferred spacing between full movement intersections is 1/2 mile
Access Conditions:
Study area contains 44 access points
No accesses currently have turning restrictions of any kind
Access points are 32% roads (public streets and alleys) and 68% driveways
US 6 Existing Conditions
![Page 20: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/20.jpg)
Without an access management plan residents, property owners, and businesses could experience:
Greater number of crashes involving vehicles and/or pedestrians
Increased traffic congestion, resulting in higher levels of pollution and more delays
A loss of visual appeal along the roadway
A difficult driving experience due to driveway clutter
Customers doing business on a highway with a better driving experience
Why Have an Access Management Plan?
![Page 21: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/21.jpg)
Right-in, Right-out
Only right turns are allowed
Traffic median prevents left turns and straight movements – these movements must be completed at another intersection
3/4 Movement
Right-in, right-out and left-in are allowed
Traffic median prevents left-out and straight movements – these movements must be completed at another intersection
Full Movement
All movements in all directions are allowed
Types of Access
![Page 22: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/22.jpg)
Access Management Methods
Access Elimination Access to local properties through secondary roadwaysConsolidate number of access locations where vehicles may enter or exit highwayReduce the number of conflict points
Access Conversion with Median Treatment Eliminate some or all turning movements
Reduce the number of conflicts between left turning vehicles and through vehicles on the highway
Access Relocation Align opposite approaches
Create a more familiar intersection design
Access Consolidation Consolidate adjacent access points into one locationThe number of conflict points are reduced
Before After
Before After
Before After
Before After
Location of potential future traffi c signals will be established as part of the Access Management Plan
![Page 23: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/23.jpg)
Conduct the study
Propose improvements based on study findings and public input
Accept the final plan
Prepare an Intergovernmental Agreement between CDOT and Mesa County
Specify how elements of the plan can be changed in the future, if necessary
Sign the Intergovernmental Agreement and adopt the plan
Present to the Colorado Transportation Commission and get approval from the CDOT Chief Engineer so the plan becomes law
Continuing coordination between CDOT and the communities in the corridor to ensure proper implementation of the plan in the future
Access Management Plan Process
![Page 24: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/24.jpg)
Access Management Plan is a long range vision for US 6
Implementation of the plan will occur in phases or incrementally over time based on:
Traffic needs
Safety needs
Available funding
Redevelopment
There are currently no planned state or federal projects or identified funding for improvements to US 6 that would change access in the near future
Plan Implementation
![Page 25: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/25.jpg)
OJ F M A M J J A S2008
Access ManagementAnalysis
DataCollection
Traffic Analysis
Final Traffic Study and Access Management Plan
Start IntergovernmentalAgreement Process
Final PublicOpen House
Initial Public Open HouseApril 2, 2008
Project Initiation
2nd Public Open House
Agency Presentation
AgencyPresentation
Final Report
Study Timeline
![Page 26: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/26.jpg)
Complete a comment form
Attend future public meetings and workshops
Contact the study team:
US 6-Clifton Access Management Planc/o David Sprague
Consultant Project ManagerPBS&J
4601 DTC Blvd., Ste. 700Denver, CO 80237
800-497-5529
Visit the study Web site: www.dot.state.co.us/us6clifton/
Stay Involved
![Page 27: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/27.jpg)
����
�� ������
������ ���� ���� ��
����������������
���������� ��
����
����
������
����
������ ��
������
F R
D
33 RD
FR
ON
T ST
LOIS ST
F 1/4 R
D
E 3/4 R
D
US
HW
Y 6
I70 BUSINESS LP
2ND ST
3RD ST
4TH ST
5TH ST
PRIC
E DITC
H R
D
I70B FRONTAG
E RD
GR
AN
D A
VE
OR
SO
N A
VE
F 3 /10 R
D
L AU
RE
L L N S H
IGH
LAN
D D
R
LOM
BARDY LN
LAURA AVE
HOLLAND ST
SMALLWOOD DR
LIVVY CT
1ST ST
32 4/10 RD
32 5/8 RD
32 1/2 RD
LOR
EN
E D
R
COLONY RD
MIDDLERIDGE DR
HE
LTO
N D
R
FRONTAGE RD
GA
RD
NE
R A
VE
WINDES ST
PE
AC
H S
T
OLGA ST
HIGHLAND DR
DE
NN
IS A
VE
S G
OO
D H
OP
E C
IR
VIL LA
SU
R D
R
ST
EV
EN
AV
E
N G
OO
D H
OP
E C
IR
GLOBE WILLOW DR
CA
STA
NE
DA
DR
PA
TT
ER
SO
N R
D
32 3/4 RD
E GOOD HOPE CIR
GLO
BE
WIL LO
W C
T
W GOOD HOPE CIR
W W
ILLOW
CT
CA
RD
EN
AS
DR
SMALLWOOD LN
SALEM CT
FRO
NT S
T
F 1/4 R
D
I70 BUSINESS LP
HOLLAND ST
1ST ST
FRONTAGE RD
I70 BUSINESS LP
32 1/2 RD
PE
AC
H S
T
98
7
6
543
2
1
4443
4241
4039
3837
3635
3433
3231
3029
282726
2524
2322
2120
1918
1716
1514
1311
1012
0250
500750
1,000125
Feet�
Access M
anag
emen
t Plan
Existin
g A
ccess Lo
cation
s
1:1,800 Scale 1 inch =
150 feet
Leg
end
��F
ull Movem
ent, Drivew
ay
��F
ull Movem
ent, Public R
oad
Full M
ovement "T
", Drivew
ay
Full M
ovement "T
", Public R
oadP
roperty LinesS
ignalized Intersection
![Page 28: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/28.jpg)
Appendix C: Public Notification
![Page 29: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/29.jpg)
You’re invited to an Open House for the US 6-Clifton Access Management PlanYour involvement will help us develop a successful Access Management Plan. At this upcoming Open House you can:
• Meet the study team
• Find out the study’s purpose, process, and schedule
• Learn about the methods and benefits of access management
Public input is welcomed and encouraged.
Learn more at www.dot.state.co.us/us6clifton or contact:
Zane Znamenacek, P.E. Operations and Permit EngineerColorado Department of Transportation, Region 3222 South 6th St., Rm. 100Grand Junction, CO 81501970-683-6278
Please join us at our open house:
Wednesday April 2, 2008Anytime from
5:00 – 8:00 p.m.Clifton
Elementary School 3276 F Road
![Page 30: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/30.jpg)
We are studying your Access to US 6 in Clifton!
Open House Wednesday April 2, 2008 Anytime from 5-8pm Clifton Elementary School
Reasonable accommodations provided upon request for people with disabilities. Contact Ryan Adams at 800-497-5529.
![Page 31: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/31.jpg)
������������� ���������������������
���������������� ���� ���� �������������� � ��������������������������
�������������� �� �������������� �������� ����������� ���������������������������� �����
�������������������������������� ��� ������������ ��������������� ����� ����� ������ ���
!�� �"���� ��#��� �������"�������������������� ���� �������� ������� ������������������
�� ����� ��������������"����$���������� �%���
���������&����� ���'������(������� ������"����������� ����)�� ����������������������
��� �������������"� ���� ���� ���������������#���������� ��������������������
������ ���'��� ������������ �����!�� � ����������������!���������������� � ������"�
�����*�����������������������!�� � ��������������+��,��� ���'�#���-��� �����������
� ������ ��������������. ������(�������� ����
*������� �"��������������� ������������������� �������������� �� �!����� �� ���
������� ���!����������������� ���� �� ��������� ������� �� �����"����������!����
/�������� �������� ����������� ���������"����������� ���� ����� ��������
0�����#����"���� ���������������� ������������ �� ����"� ������,��� ���������� ������
�����������
Main
Project Overview
Study Area
Project Partners
Public Involvement
Press Room
FAQs
Contact Us
�
1�2334����������.��� �� ����������� � ����
5���� �� �5��. ��6���5�
Page 1 of 1CDOT Project:: US 6 - Clifton Access Management Plan
4/8/2008http://www.dot.state.co.us/us6clifton/
![Page 32: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/32.jpg)
You are invited to the US 6-Clifton Access Management Plan
Open HouseAn Access Management Plan for US Highway 6 from the I-70 Business Loop to the railroad viaduct east of 33 Road is being prepared by the Colorado Department of Transportation and Mesa County. The plan will assess all existing and proposed intersections and driveways along the highway and, if appropriate, make recommendations for changes.
At the open house you’ll meet the study team, find out the study’s purpose, process, and schedule, and learn about the methods and benefits of access management.
Learn more at www.dot.state.co.us/us6clifton/ or contact:Zane Znamenacek, P.E., Operations and Permit Engineer
Colorado Department of Transportation, Region 3 [email protected] • 970-683-6278
Reasonable accommodations will be provided upon request for people with disabilities. If you require specific accommodations contact Ryan Adams at 1-800-497-5529.
Open HouseWednesday April 2, 2008
Anytime from 5:00 – 8:00 p.m.
Clifton Elementary School 3276 F Road
©Google - Map data ©2008 NAVTEQ™
![Page 33: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/33.jpg)
News From The Colorado Department Of Transportation
www.dot.state.co.us
March 19, 2008
Contact: Nancy Shanks, CDOT Public Relations Manager, (970) 385-1428
PUBLIC INVITED TO US 6-CLIFTON ACCESS MANAGEMENT PLAN OPEN HOUSE
We’re Studying Your Access to US 6!
MESA COUNTY – The Colorado Department of Transportation (CDOT) and Mesa County are inviting residents to an open house regarding the Access Management Plan being developed for US Highway 6, from the I-70 Business Loop to the railroad viaduct just east of 33 Road. The open house will be held Wednesday, April 2, 2008 at Clifton Elementary School, located at 3276 F Road in Clifton. People can attend anytime between 5:00 p.m. and 8:00 p.m. Representatives from CDOT, Mesa County, and their consultant, PBS&J, will be available to address questions or concerns about the plan. The US 6-Clifton Access Management Plan will assess all existing and proposed intersections and driveways along the highway and, if appropriate, make recommendations for changes. Informational boards explaining the plan’s goals and objectives, and overall access management concepts, will be on display at the meeting. Additional information is available on the project Web site: http://www.dot.state.co.us/US6Clifton/ Reasonable accommodations will be provided for persons with disabilities. Please call Ryan Adams at PBS&J, (800) 497-5529, if you require such assistance.
###
![Page 34: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/34.jpg)
Appendix D: Comments Received
![Page 35: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/35.jpg)
![Page 36: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/36.jpg)
![Page 37: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/37.jpg)
![Page 38: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/38.jpg)
![Page 39: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/39.jpg)
![Page 40: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/40.jpg)
![Page 41: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/41.jpg)
![Page 42: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/42.jpg)
![Page 43: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/43.jpg)
![Page 44: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/44.jpg)
![Page 45: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/45.jpg)
![Page 46: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/46.jpg)
![Page 47: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/47.jpg)
![Page 48: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/48.jpg)
![Page 49: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/49.jpg)
![Page 50: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/50.jpg)
![Page 51: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/51.jpg)
![Page 52: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/52.jpg)
![Page 53: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/53.jpg)
![Page 54: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/54.jpg)
![Page 55: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/55.jpg)
![Page 56: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/56.jpg)
![Page 57: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/57.jpg)
![Page 58: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/58.jpg)
![Page 59: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/59.jpg)
![Page 60: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/60.jpg)
![Page 61: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/61.jpg)
![Page 62: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the](https://reader033.vdocument.in/reader033/viewer/2022051920/600cfcb124c13053b123306a/html5/thumbnails/62.jpg)