Page 1: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the

Open House #1 Summary Report

Date of Meeting:

April 2, 2008

Prepared by:

4601 DTC Boulevard, Suite 700 Denver, CO 80237

303-221-7275

Page 2: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the

INTRODUCTION

This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the open house was to introduce the study team, identify the study’s purpose, process, and schedule, and provide information about the methods and benefits of access management. Members of the project team, including representatives from the Colorado Department of Transportation, Mesa County, and PBS&J, were on hand to address the public’s questions and concerns. The open house format allowed people to come and go at their convenience and provided opportunities for people to speak with project team members one-on-one. Assistance for people with disabilities was offered upon request. Project information was presented through a combination of display boards, roll plots, brochures, and a DVD video. Attendees began the open house by registering at a sign-in table, where a staff member collected their contact information. Display boards were placed around the room, covering various aspects of the study. A large study area map displaying current US 6 access points was on display in the center of the room. Attendees were able to use Post-it notes to provide comments on both the boards and the map. A video presentation providing an overview of access management was played throughout the evening. Tables were available for attendees to sit and complete their comment forms and enjoy refreshments. The meeting date, time, and location were as follows: Date: April 2, 2008 Time: 5-8 p.m. Location: Clifton Elementary School 3276 F Road There were 44 people in attendance. The sign-in sheets are attached to this report as Appendix A.

Page 1

Page 3: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the

INFORMATION PRESENTED The following materials were available at the open house and are attached to this report as Appendix B:

Handouts

1. Comment Form 2. Brochure: Benefits of Access Management (Federal Highway Administration)

DVD Video

Access Management Overview (Federal Highway Administration, May 1997) Note: This is not available in the appendix.

Display Materials

1. Boards (Q. 12) 2. Existing Conditions Map

PUBLIC NOTIFICATION Several communication tools were utilized to notify the public of the open house; examples are attached to this report as Appendix C :

Post Card – The post card served as an invitation to attend the open house. The post card was mailed to residents, property owners, and businesses within the study area. The mailing list contained 398 addresses.

Web site – The project Web site (www.dot.state.co.us/us6clifton/) provided the date, time, and location of the open house and also provided an overview of the study.

Print Advertisements – Open house print advertisements were published as follows: Daily Sentinel: 3/20/08; 4/2/08

Press Release – A press release was developed and distributed to media outlets throughout the corridor.

COMMENTS RECEIVED Comments were provided at the open house on comment forms and directly onto the existing conditions map. The complete comment forms are attached as Appendix D. A summary of the comments received is found on the following page.

Page 2

Page 4: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the

Category Comment Front Street needs to be reconnected to I-70 B. Add access lanes on both sides for businesses and make through traffic travel through the middle of the street. A rear access from Peach Tree shopping center would help. Limit number of access points and install stoplights at remaining access points. Single access from north and south Clifton equals one stop light between I-70 B and 33 Road. Pedestrian-friendly would be a good thing. Currently it is difficult to walk across the street because of traffic. Elimination of some access points would be a good thing. Install turning lane for traffic exiting I-70 B to the frontage road (near F 1/2 Road). Consider collector/distributor-type section for SH 6 from I-70 B to 33 Road. Provide E 3/4 Road access back to US 6. Provide access to US 6 from side streets during peak travel times.

Access

Look at size and layout of school parking lot. Need light on Lois Street Signals Light needed at post office Traffic too congested through study area. Widening road to four lanes with a turning lane would relieve a lot of traffic. Needs to be more traffic-friendly Traffic

A lot of traffic most of the day Police patrol would bring down amount of speeding. If you make it four lanes it would become a raceway, just like 32. Route some traffic north on 32 or 33 and west on F 1/2 to an improved intersection by the Budweiser facility. Route some traffic to Front Street under 32 Road to I-70 B. Do not allow business parking on US 6 in study area. Move the post office. Open House format too loose; need more structure, such as a formal presentation. Also need to send out post card sooner. CDOT property that has access to E 3/4 (east of 33 Road) needs consideration; suggest deleting this road. Consider construction timing’s impact to businesses, especially seasonal businesses. Make Grand Ave. a downtown/streetscape project. Improve west to north right turn at US6/I-70 B.

Misc.

Speed limit on I-70 B between I-70 and US 6 too high. Timeline When will funding be identified? How can we fast-track this project?

Wider roads would be safer for children and other pedestrians, need median for pedestrian refuge and street lighting. Also need safe turns on/off US 6. Consider safety of moving bus drop off. Safety

Consider safety at Front/1st Street.

Page 5: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the

NEXT STEPS The project Web site will continue to provide the display boards and existing conditions map. The project team will consider questions and comments provided by the public during the open house. The next public open house will be held in summer 2008.

Page 6: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the

Appendix A: Sign-in Sheets

Page 7: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the
Page 8: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the
Page 9: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the
Page 10: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the

Appendix B: Information Presented

Page 11: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the

US 6 - Clifton Access Management Plan

Public Open House #1 Comment Form Wednesday, April 2, 2008 · 5:00-8:00 P.M.

Clifton Elementary School

Name

Address

Phone/E-mail

1. What are your overall thoughts about access to/from US 6 between the I-70 Business Loop and the railroad

viaduct east of 33 Road?

________________________________________________________________________________________

________________________________________________________________________________________

________________________________________________________________________________________

________________________________________________________________________________________

________________________________________________________________________________________

________________________________________________________________________________________

________________________________________________________________________________________

2. Do you own property with direct access to US 6? Yes No

If yes, please provide the property address(es) (if different than above): ________________________________

_________________________________________________________________________________________

3. Where do you access US 6? ______________________________________________________________

_________________________________________________________________________________________

4. How often do you drive the US 6 corridor? (circle one) Daily Weekly Monthly Rarely This was my 1st time

5. How did you hear about this meeting? __________________________________________________________

6. Please tell us how we can improve the information presented and the best way to keep you informed. _______

__________________________________________________________________________________________

__________________________________________________________________________________________

__________________________________________________________________________________________

OVER

Page 12: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the

US 6 - Clifton Access Management Plan

Public Open House #1 Comment Form Wednesday, April 2, 2008 · 5:00-8:00 P.M.

Clifton Elementary School

Additional comments: _________________________________________________________________________

__________________________________________________________________________________________

__________________________________________________________________________________________

__________________________________________________________________________________________

__________________________________________________________________________________________

___________________________________________________________________________________________

___________________________________________________________________________________________

___________________________________________________________________________________________

___________________________________________________________________________________________

For more information, contact: US 6 Access Management Plan

c/o David Sprague Consultant Project Manager

PBS&J 4601 DTC Blvd., Ste. 700

Denver, CO 80237 800-497-5529

Please place in comment box or mail to address above.

THANK YOU FOR YOUR PARTICIPATION

Page 13: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the

AC

CE

SS

SP

AC

ING

Sig

nal S

pacin

gIncreasing the distance betw

een traffic signals improves the

flow of traffic on m

ajor arterials, reduces congestion, andim

proves air quality for heavily traveled corridors. The appro-priate

spacing betw

een signals

for a

particular corridor

depends greatly upon the speed and flow of traffic, but any-

thing greater

than tw

o signals

per m

ile has

a significant

impact on congestion and safety.

A m

ajor synthesis of research on access managem

ent foundthat each additional signal over tw

o per mile (i.e., a one-half

mile signal spacing) increased travel tim

e by over six percent.[4

] A study of an intersection in C

incinnati where a signal w

asadded found a 2

0 percent increase in peak travel tim

es. [11]

A dem

onstration project in Colorado revealed that half m

ile signal spacing and raised medi-

ans on a five-mile roadw

ay segment reduced total hours of vehicle travel by 4

2 percent and

total hours of delay by 59 percent, com

pared to quarter mile signal spacing. [1

]Im

proved speeds and travel times translate directly into envi-

ronmental benefits. A

n ongoing study in Texas found that aten m

ile four-lane arterial with one-half m

ile signal spacingreduced

fuel consum

ption by

24

0,0

00

gallons

fromincreased speed and 3

35,0

00 gallons from

reduced delay,com

pared to quarter mile signal spacing. [1

4]

Increasing the distance between signals also reduces the

incidence of crashes. A review

of crash data from seven

states demonstrated that the crash rate increased substantially w

ith additional signalsper m

ile. [4] This is partly related to access spacing, w

hich is presented next.

Drive

way S

pacin

gAppropriate drivew

ay spacing presents another major access issue. Large num

bers ofdrivew

ays increase the potential conflicts on the road. Fewer drivew

ays spaced furtherapart allow

for more orderly m

erging of traffic and present fewer challenges to drivers.

The congestion impacts of reduced drivew

ays are fairly clear. It is impossible for a

major arterial or highw

ay to maintain free flow

speeds with num

erous access pointsthat

add slow

m

oving vehicles.

A

research synthesis found that roadway

speeds w

ere reduced

an average

of2.5

miles per hour for every 1

0 access

points per mile, up to a m

aximum

of a10 m

iles per

hour reduction

(at 40

access points per mile). [4

] With high-

er numbers of access points, conges-

tion will increase significantly.

An

overabundance of

driveways

alsoincreases the rate of car crashes. A

nexam

ination of

crash data

in seven

states indicated

found a

strong linear

relationship betw

een the

number

ofcrashes and the num

ber of driveways.

Rural

areas had

a sim

ilar, but

lessstrong relationship. [4

,7]

ME

DIA

N T

RE

ATM

EN

TS

Media

ns

Median treatm

ents for roadways rep-

resent one

of the

most

effectivem

eans to regulate access, but arealso the m

ost controversial. The two

major

median

treatments

includetw

o-way left turn lanes (TW

LTL) andraised m

edians.

The safety

benefits of

median

improvem

ents have been the subjectof num

erous studies and syntheses.Studies of both particular corridors

and comparative research on differ-

ent types of median treatm

ents indi-cate

the significant

safety benefits

from

access m

anagement

tech-niques. A

ccording to an analysis of crash data in seven states, raised medians reduce

crashes by over 40 percent in urban areas and over 6

0 percent in rural areas. [4

]

A study of corridors in several cities in Iow

a found that two-w

ay left-turn lanes reducedcrashes by as m

uch as 70

percent, improved level of service by one full grade in

some areas, and increased lane capacity by as m

uch as 36

percent. [5]

Raised m

edians also provide extra protection for pedestrians. A study of m

edian treat-m

ents in Georgia found that raised m

edians reduced pedestrian-involved crashes by 45

percent and fatalities by 78 percent, com

pared to two-w

ay left-turn lanes. [12]

TU

RN

ING

LA

NE

S

Left T

urn

sExclusive turning lanes for vehicles rem

ove stopped vehicles fromthrough traffic. Left-turn lanes at intersections substantially reducerear-end crashes. A

major synthesis of research on left-turn lanes

demonstrated that exclusive turn lanes reduce crashes betw

een 18

to 77 percent (5

0 percent average) and reduce rear-end collisions

between 6

0 and 8

8 percent. [4

]

Left-turn lanes also substantially increase the capacity of many roadw

ays. A shared left-

turn and through lane has about 40 to 6

0 percent the capacity of a standard through

lane. [4]. A

synthesis of research on this topic found a 25 percent increase in capacity,

on average, for roadways that added a left-turn lane. [1

3]

Indire

ct T

urn

sSom

e of the biggest issues with m

anaging access come at intersections w

here vehiclesm

ust cross traffic. Som

e states and cities have adopted indirect turns to reduce theseconflicts. In N

ew Jersey, the jug-handle left turn requires a right turn onto a feeder

street, followed by a left onto a cross street. D

etroit hasextensively used an indirect U

-turn that requires a U-turn

past an intersection, followed by a right turn instead of a

regular left turn.

Like dedicated

left-turnlanes, indirect turns reducecrashes,

improve

conges-tion,

and add

capacity.Crashes decline by 2

0 per-

cent on

average, and

35

percent if the indirect turnintersection

is signalized.

Capacity

typically show

s a

15 to 2

0 percent gain. [4

]

Rig

ht T

urn

sR

ight-turn lanes typically have a less substantial impact on

crashes and

roadway

capacity than

other types

of turn

strategies, because

there are

fewer

limitations

on right

turns. Though there are fewer studies of these im

pacts,there is a clear relationship betw

een the number of vehicles

attempting a right turn in a through traffic lane and its delay

to through traffic. This relationship is exponential – eachadditional car that m

ust wait for a right turn w

ill increase thedelay m

ore than the previous car. At intersections w

ith substantial right-turn move-

ments, a dedicated right-turn lane segregates these cars from

through traffic andincreases the capacity of the road.

Roundabouts

Roundabouts represent a potential solution for inter-

sections with m

any conflict points. Though not appro-priate for all situations, roundabouts reduce vehiclem

ovements across traffic. O

nly a few studies have

examined the safety benefits of roundabouts. O

nestudy of four intersections that w

ere replaced with

roundabouts in

Maryland

found a

drop in

crashesbetw

een 18 and 2

9 percent and a reduction in injury

crashes between 6

3 and 8

8 percent. The cost of

crashes at these locations – one measure of severity

– was also reduced by 6

8 percent. O

verall crasheson roundabouts w

ere more m

inor than those at leftturn locations. [9

] Another study of roundabouts in

several locations

found a

51 percent

reduction in

crashes, including a 73 percent reduction in injury

crashes and a 32 percent reduction in property-dam

age-only crashes for single-lane round-abouts. M

ulti-lane roundabouts only experienced a 29 percent reduction in crashes. [6

]

RE

LA

TE

DTE

CH

NIQ

UE

SA

ccess

managem

ent

inclu

des

more

techniques than can be discussed in asingle

brochure. Som

e of

these tech-

niq

ues

are

new

er

and

have

been

researched som

ewhat

less.

Frontageroads

have been

the subject

of som

edebate in the literature, but there is noclear indication of their benefits. O

thertech

niques,

such

as th

e relation

ship

between

highway

interchange spacing

and local

traffic, are

new

topics that

require more research.

Many cities and states develop access

managem

ent

pro

gra

ms

to

dea

l w

ithexisting issues of congestion and safety.A

n active access managem

ent program,

however, w

ould need to include changesto local land use policies that encouragethe rational developm

ent of major roads.

In newly developing areas, land use and

zoning controls that limit the num

ber ofaccess points and leave space for m

edi-an

improvem

ents can

save m

oney and

effort as these areas develop.

Busin

ess C

oncern

sInstalling raised m

edians often raises serious concerns by the business comm

unitythat local businesses that depend upon pass-by traffic (especially gas stations andfast-food restaurants [1

0]) w

ill be adversely affected by medians. Though there are

few studies of the actual im

pacts of medians on business sales, there are several sur-

veys of business owner opinions. S

urveys conducted in mul-

tiple corridors in Texas, Iowa, and Florida dem

onstrate thatthe vast m

ajority of business owners believe there have been

no declines in sales, with som

e believing there are actuallyim

provements in business sales. [2

,5,8

] One study in Texas

indicated that corridors with access control im

provements

experienced an 18

percent increase in property values afterconstruction. [2

]

Page 14: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the

CIT

ATIO

NS

[1]

Colorado D

epartment of H

ighways, 1

98

5, Final R

eport of the Colorado A

ccess Control

Dem

onstration Project, C

olorado.

[2]

Eisele,W

. E.,

and W

. E.

Frawley,

19

99

, A

M

ethodology for

Determ

ining Econom

icIm

pacts of Raised M

edians: Data A

nalysis on Additional C

ase Studies, R

esearch Report

39

04

-3,

TexasTransportation Institute, C

ollegeStation,

Texas, October.

[3]

Frawley,

W. E., and W

. E. Eisele, 19

98

, A M

ethodology to Determ

ine Economic Im

pactsof

Raised

Medians

on A

djacent B

usinesses, 1

99

8 N

ational Conference

on A

ccessM

anagement.

[4]

Gluck,

J., H

. S.

Levinson, and

V. Stover,

19

99

, Im

pacts of

Access

Managem

entTechniques, N

CH

RP R

eport 42

0, Transportation R

esearch Board.

[5]

Iowa

Departm

ent of

Transportation, 1

99

7,

Access

Managem

ent R

esearch and

Aw

areness Program

: Phase II R

eport.

[6]

Jacquemart,

G.,

19

98

, Synthesis

of H

ighway

Practice

26

4:

M

odern R

oundaboutPractice in the U

nited States, N

ational Cooperative H

ighway R

esearch Program

, N

ational Academ

y Press, W

ashington, D.C

.

[7]

Lall, B. K

., D. H

untington, and A. Eghtedari, 1

99

6, A

ccess Managem

ent and TrafficSafety, P

aper presented at the Second A

nnual Access M

anagement C

onference.

[8]

Long, G, C

.T. Gan, and B

.S. M

orrison. "Impacts of S

elected Median and A

ccess D

esign Features." Florida Departm

ent of Transportation Report,

TransportationR

esearch Center, U

niversity of Florida, May 1

99

3.

[9]

Meyers, E. J., 1

99

9, A

ccident Reduction w

ith Roundabouts, P

aper presented at the6

9th A

nnual ITE Meeting, Las Vegas, N

evada.

[10

]N

euwirth, R

. M., G

. E. Weisbrod, and S

. D. D

ecker. 19

93

, Methodology for Evaluation

Economic Im

pacts of Restricting Left Turns, P

aper presented at the First Annual A

ccessM

anagement C

onference.

[11

]Pant, P. D

., M.D

., S. U

la, and Y. Liu, 19

98

, Methodology for A

ssessing the Effectivenessof A

ccess Managem

ent Techniques, Final Report, prepared for the O

hio Departm

ent ofTransportation.

[12

]Parsonson, P. S

., M. G

. Waters III, and J. S

. Fincher, 20

00

, Georgia S

tudy Confirm

s theContinuing S

afety Advantage of R

aised Medians O

ver Two-W

ay Left-Turn Lanes, present-ed at the Fourth N

ational Conference on A

ccess Managem

ent, Portland, O

regon.

[13

]S/

KTransportation C

onsultants, Inc., 20

00

, National H

ighway Institute C

ourse Num

ber1

33

07

8: A

ccess Managem

ent, Location, and Design, A

pril.

[14

]Texas

Transportation Institute, In Progress, A

n Evaluation of Strategies for Im

provingTransportation M

obility and Energy Efficiency in Urban A

reas, Texas A&

M U

niversity,Project 6

00

11

.

FO

R M

OR

E IN

FO

RM

ATIO

N

http://

ww

w.accessm

anagement.gov

FHW

A D

ocument N

umber FH

WA-O

P-0

3-0

66

WH

AT IS

AC

CE

SS

M

AN

AG

EM

EN

T?

Access m

anagement is a set of techniques that state and local gov-

ernments can use to control access to highw

ays, major arterials, and

other roadways. A

ccess managem

ent includes several techniquesthat are designed to increase the capacity of these roads, m

anagecongestion, and reduce crashes.

�Increasing spacing betw

een signals and interchanges;�

Drivew

ay location, spacing, and design;�

Use of exclusive turning lanes;

�M

edian treatments, including tw

o-way left turn lanes (TW

LTL) thatallow

turn movem

ents in multiple directions from

a center laneand raised m

edians that prevent movem

ents across a roadway;

�U

se of service and frontage roads; and�

Land use policies that limit right-of-w

ay access to highways.

State, regional, and local governm

ents across the United S

tatesuse access m

anagement policies to preserve the functionality of

their roadw

ay system

s. This

is often

done by

designating an

appropriate level of access control for each of a variety of facili-ties. Local residential roads are allow

ed full access, while m

ajorhighw

ays and freeways allow

very little. In between are a series

of road types that require standards to help ensure the free flowof traffic and m

inimize crashes, w

hile still allowing access to m

ajorbusinesses and other land uses along a road,

PU

RP

OS

E O

F T

HE

BR

OC

HU

RE

This brochure serves as a guide to the major benefits of several

access managem

ent techniques in use across the United S

tates. Thepurpose of this brochure is to provide a com

prehensive and succinctexam

ination of the benefits of access managem

ent and address major

concerns that are often raised about access managem

ent.The

benefits usually

identified w

ith access

managem

ent include

improved m

ovement of through traffic, reduced crashes, and few

ervehicle conflicts. M

ost major concerns about access m

anagement

relate to

potential reductions

in revenue

to local

businesses that

depend on pass-by traffic.This brochure does not describe the precise strategies that trans-portation departm

ents should follow to im

plement an access m

an-agem

ent program, but rather provides an introduction to the key

concepts. The brochure may also be a useful tool to distribute at

public meetings for both general access m

anagement plans and

specific applications of access managem

ent techniques.This brochure describes the relevant benefits and issues w

ith threekey sets of access m

anagement techniques:

1.

Access spacing, including spacing betw

een signalized intersectionsand distance betw

een driveways;

2.

Turning lanes, including dedicated left- and right-turn lanes, asw

ell as indirect left turns and U-turns, and roundabouts; and

3.

Median treatm

ents, including two-w

ay left-turn lanes and raisedm

edians.

Page 15: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the

WELCOMEto the

US 6–CliftonAccess Management Plan

Open House

At tonight’s meeting you can:

Meet the study team

Find out the study’s purpose, process, and schedule

Learn about the methods and benefits of access management

Study team members wearing name badges can answer your questions and listen to your comments.

Please take a moment to complete a comment form before you leave.

Thank YouThank YouWe Appreciate Your ParticipationWe Appreciate Your Participation

Please sign in.Please sign in.

Page 16: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the

What is an access management plan?Any intersection or driveway along a roadway is called an access point. The purpose of an access management plan is to determine what access points will be allowed, where they will be located, and what kinds of traffic movements will be allowed at each one.

What are the goals of the access management plan?

Provide appropriate level of access to properties adjacent to the highway

Provide for the safe and efficient flow of traffic

Who is conducting the study?

CDOT and Mesa County

Overview

Page 17: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the

OverviewWhy does US 6 need an access management plan?

US 6 is an important resource for the communities of Clifton, Palisade, and Grand Junction

Traffic volumes on US 6 are projected to significantly increase in the future

Current and Future Traffic Volumes

US 6 Segment Daily Traffic Volume (2008)

Daily Traffic Volume (2035) % Increase

I-70 B to 2nd Street 18,000 49,000 170%

2nd Street to 33 Road 12,500 39,000 210%

East of 33 Road 9,060 19,000 110%

2008 Daily Traffi c Volume Source: CDOT2035 Daily Traffi c Volume Source: Mesa County

One of the best ways to keep US 6 safe and efficient is to manage the location and design of access points

Page 18: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the

The study area is from the I-70 Business Loop to the railroad viaduct east of 33 Road, a distance of just under one mile.

33 R

d

33¾

Rd

34 R

d

Front St

F Rd F Rd

G Rd

E½ RdE½ Rd

F½ Rd

E Rd

E¼ Rd

6

6

141

Project AreaProject Area

Study Area Map

Page 19: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the

Highway Characteristics:

Classified as an urban arterial

Designed to accommodate moderate speeds and moderate to high traffic volumes

Service to through traffic movements has priority over providing direct access to properties

Note: Preferred spacing between full movement intersections is 1/2 mile

Access Conditions:

Study area contains 44 access points

No accesses currently have turning restrictions of any kind

Access points are 32% roads (public streets and alleys) and 68% driveways

US 6 Existing Conditions

Page 20: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the

Without an access management plan residents, property owners, and businesses could experience:

Greater number of crashes involving vehicles and/or pedestrians

Increased traffic congestion, resulting in higher levels of pollution and more delays

A loss of visual appeal along the roadway

A difficult driving experience due to driveway clutter

Customers doing business on a highway with a better driving experience

Why Have an Access Management Plan?

Page 21: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the

Right-in, Right-out

Only right turns are allowed

Traffic median prevents left turns and straight movements – these movements must be completed at another intersection

3/4 Movement

Right-in, right-out and left-in are allowed

Traffic median prevents left-out and straight movements – these movements must be completed at another intersection

Full Movement

All movements in all directions are allowed

Types of Access

Page 22: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the

Access Management Methods

Access Elimination Access to local properties through secondary roadwaysConsolidate number of access locations where vehicles may enter or exit highwayReduce the number of conflict points

Access Conversion with Median Treatment Eliminate some or all turning movements

Reduce the number of conflicts between left turning vehicles and through vehicles on the highway

Access Relocation Align opposite approaches

Create a more familiar intersection design

Access Consolidation Consolidate adjacent access points into one locationThe number of conflict points are reduced

Before After

Before After

Before After

Before After

Location of potential future traffi c signals will be established as part of the Access Management Plan

Page 23: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the

Conduct the study

Propose improvements based on study findings and public input

Accept the final plan

Prepare an Intergovernmental Agreement between CDOT and Mesa County

Specify how elements of the plan can be changed in the future, if necessary

Sign the Intergovernmental Agreement and adopt the plan

Present to the Colorado Transportation Commission and get approval from the CDOT Chief Engineer so the plan becomes law

Continuing coordination between CDOT and the communities in the corridor to ensure proper implementation of the plan in the future

Access Management Plan Process

Page 24: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the

Access Management Plan is a long range vision for US 6

Implementation of the plan will occur in phases or incrementally over time based on:

Traffic needs

Safety needs

Available funding

Redevelopment

There are currently no planned state or federal projects or identified funding for improvements to US 6 that would change access in the near future

Plan Implementation

Page 25: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the

OJ F M A M J J A S2008

Access ManagementAnalysis

DataCollection

Traffic Analysis

Final Traffic Study and Access Management Plan

Start IntergovernmentalAgreement Process

Final PublicOpen House

Initial Public Open HouseApril 2, 2008

Project Initiation

2nd Public Open House

Agency Presentation

AgencyPresentation

Final Report

Study Timeline

Page 26: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the

Complete a comment form

Attend future public meetings and workshops

Contact the study team:

US 6-Clifton Access Management Planc/o David Sprague

Consultant Project ManagerPBS&J

4601 DTC Blvd., Ste. 700Denver, CO 80237

800-497-5529

Visit the study Web site: www.dot.state.co.us/us6clifton/

Stay Involved

Page 27: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the

����

�� ������

������ ���� ���� ��

����������������

���������� ��

����

����

������

����

������ ��

������

F R

D

33 RD

FR

ON

T ST

LOIS ST

F 1/4 R

D

E 3/4 R

D

US

HW

Y 6

I70 BUSINESS LP

2ND ST

3RD ST

4TH ST

5TH ST

PRIC

E DITC

H R

D

I70B FRONTAG

E RD

GR

AN

D A

VE

OR

SO

N A

VE

F 3 /10 R

D

L AU

RE

L L N S H

IGH

LAN

D D

R

LOM

BARDY LN

LAURA AVE

HOLLAND ST

SMALLWOOD DR

LIVVY CT

1ST ST

32 4/10 RD

32 5/8 RD

32 1/2 RD

LOR

EN

E D

R

COLONY RD

MIDDLERIDGE DR

HE

LTO

N D

R

FRONTAGE RD

GA

RD

NE

R A

VE

WINDES ST

PE

AC

H S

T

OLGA ST

HIGHLAND DR

DE

NN

IS A

VE

S G

OO

D H

OP

E C

IR

VIL LA

SU

R D

R

ST

EV

EN

AV

E

N G

OO

D H

OP

E C

IR

GLOBE WILLOW DR

CA

STA

NE

DA

DR

PA

TT

ER

SO

N R

D

32 3/4 RD

E GOOD HOPE CIR

GLO

BE

WIL LO

W C

T

W GOOD HOPE CIR

W W

ILLOW

CT

CA

RD

EN

AS

DR

SMALLWOOD LN

SALEM CT

FRO

NT S

T

F 1/4 R

D

I70 BUSINESS LP

HOLLAND ST

1ST ST

FRONTAGE RD

I70 BUSINESS LP

32 1/2 RD

PE

AC

H S

T

98

7

6

543

2

1

4443

4241

4039

3837

3635

3433

3231

3029

282726

2524

2322

2120

1918

1716

1514

1311

1012

0250

500750

1,000125

Feet�

Access M

anag

emen

t Plan

Existin

g A

ccess Lo

cation

s

1:1,800 Scale 1 inch =

150 feet

Leg

end

��F

ull Movem

ent, Drivew

ay

��F

ull Movem

ent, Public R

oad

Full M

ovement "T

", Drivew

ay

Full M

ovement "T

", Public R

oadP

roperty LinesS

ignalized Intersection

Page 28: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the

Appendix C: Public Notification

Page 29: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the

You’re invited to an Open House for the US 6-Clifton Access Management PlanYour involvement will help us develop a successful Access Management Plan. At this upcoming Open House you can:

• Meet the study team

• Find out the study’s purpose, process, and schedule

• Learn about the methods and benefits of access management

Public input is welcomed and encouraged.

Learn more at www.dot.state.co.us/us6clifton or contact:

Zane Znamenacek, P.E. Operations and Permit EngineerColorado Department of Transportation, Region 3222 South 6th St., Rm. 100Grand Junction, CO 81501970-683-6278

Please join us at our open house:

Wednesday April 2, 2008Anytime from

5:00 – 8:00 p.m.Clifton

Elementary School 3276 F Road

Page 30: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the

We are studying your Access to US 6 in Clifton!

Open House Wednesday April 2, 2008 Anytime from 5-8pm Clifton Elementary School

Reasonable accommodations provided upon request for people with disabilities. Contact Ryan Adams at 800-497-5529.

Page 31: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the

������������� ���������������������

���������������� ���� ���� �������������� � ��������������������������

�������������� �� �������������� �������� ����������� ���������������������������� �����

�������������������������������� ��� ������������ ��������������� ����� ����� ������ ���

!�� �"���� ��#��� �������"�������������������� ���� �������� ������� ������������������

�� ����� ��������������"����$���������� �%���

���������&����� ���'������(������� ������"����������� ����)�� ����������������������

��� �������������"� ���� ���� ���������������#���������� ��������������������

������ ���'��� ������������ �����!�� � ����������������!���������������� � ������"�

�����*�����������������������!�� � ��������������+��,��� ���'�#���-��� �����������

� ������ ��������������. ������(�������� ����

*������� �"��������������� ������������������� �������������� �� �!����� �� ���

������� ���!����������������� ���� �� ��������� ������� �� �����"����������!����

/�������� �������� ����������� ���������"����������� ���� ����� ��������

0�����#����"���� ���������������� ������������ �� ����"� ������,��� ���������� ������

�����������

Main

Project Overview

Study Area

Project Partners

Public Involvement

Press Room

FAQs

Contact Us

1�2334����������.��� �� ����������� � ����

5���� �� �5��. ��6���5�

Page 1 of 1CDOT Project:: US 6 - Clifton Access Management Plan

4/8/2008http://www.dot.state.co.us/us6clifton/

Page 32: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the

You are invited to the US 6-Clifton Access Management Plan

Open HouseAn Access Management Plan for US Highway 6 from the I-70 Business Loop to the railroad viaduct east of 33 Road is being prepared by the Colorado Department of Transportation and Mesa County. The plan will assess all existing and proposed intersections and driveways along the highway and, if appropriate, make recommendations for changes.

At the open house you’ll meet the study team, find out the study’s purpose, process, and schedule, and learn about the methods and benefits of access management.

Learn more at www.dot.state.co.us/us6clifton/ or contact:Zane Znamenacek, P.E., Operations and Permit Engineer

Colorado Department of Transportation, Region 3 [email protected] • 970-683-6278

Reasonable accommodations will be provided upon request for people with disabilities. If you require specific accommodations contact Ryan Adams at 1-800-497-5529.

Open HouseWednesday April 2, 2008

Anytime from 5:00 – 8:00 p.m.

Clifton Elementary School 3276 F Road

©Google - Map data ©2008 NAVTEQ™

Page 33: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the

News From The Colorado Department Of Transportation

www.dot.state.co.us

March 19, 2008

Contact: Nancy Shanks, CDOT Public Relations Manager, (970) 385-1428

PUBLIC INVITED TO US 6-CLIFTON ACCESS MANAGEMENT PLAN OPEN HOUSE

We’re Studying Your Access to US 6!

MESA COUNTY – The Colorado Department of Transportation (CDOT) and Mesa County are inviting residents to an open house regarding the Access Management Plan being developed for US Highway 6, from the I-70 Business Loop to the railroad viaduct just east of 33 Road. The open house will be held Wednesday, April 2, 2008 at Clifton Elementary School, located at 3276 F Road in Clifton. People can attend anytime between 5:00 p.m. and 8:00 p.m. Representatives from CDOT, Mesa County, and their consultant, PBS&J, will be available to address questions or concerns about the plan. The US 6-Clifton Access Management Plan will assess all existing and proposed intersections and driveways along the highway and, if appropriate, make recommendations for changes. Informational boards explaining the plan’s goals and objectives, and overall access management concepts, will be on display at the meeting. Additional information is available on the project Web site: http://www.dot.state.co.us/US6Clifton/ Reasonable accommodations will be provided for persons with disabilities. Please call Ryan Adams at PBS&J, (800) 497-5529, if you require such assistance.

###

Page 34: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the

Appendix D: Comments Received

Page 35: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the
Page 36: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the
Page 37: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the
Page 38: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the
Page 39: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the
Page 40: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the
Page 41: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the
Page 42: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the
Page 43: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the
Page 44: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the
Page 45: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the
Page 46: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the
Page 47: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the
Page 48: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the
Page 49: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the
Page 50: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the
Page 51: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the
Page 52: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the
Page 53: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the
Page 54: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the
Page 55: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the
Page 56: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the
Page 57: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the
Page 58: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the
Page 59: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the
Page 60: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the
Page 61: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the
Page 62: Open House #1 Summary Report · This report contains a summary of public involvement efforts associated with the US 6 - Clifton Access Management Plan Open House. The purpose of the