open house: bathurst station consultation
DESCRIPTION
Station design is one of the most exciting -- and most critical -- components of The Crosstown construction. There are a number of major considerations for station design, including: accessibility for people with disabilities, development potential, integration with surrounding communities, and minimizing construction impacts. Visit www.thecrosstown.ca for more information about The Crosstown.TRANSCRIPT
![Page 1: Open House: Bathurst Station Consultation](https://reader036.vdocument.in/reader036/viewer/2022070313/55497f85b4c905c26a8b46e2/html5/thumbnails/1.jpg)
Bathurst Station Preliminary Design
04/11/23
Bathurst Station Preliminary Design
Online ConsultationNovember 28 –
December 12
![Page 2: Open House: Bathurst Station Consultation](https://reader036.vdocument.in/reader036/viewer/2022070313/55497f85b4c905c26a8b46e2/html5/thumbnails/2.jpg)
Bathurst Station Preliminary Design
04/11/23
• Welcome to our first online consultation• Purpose:
– Provide a brief Crosstown update– Share our station design philosophy– Present the preliminary design for Bathurst
Station– Most importantly: get your input on the
preliminary design, early in the process
![Page 3: Open House: Bathurst Station Consultation](https://reader036.vdocument.in/reader036/viewer/2022070313/55497f85b4c905c26a8b46e2/html5/thumbnails/3.jpg)
Bathurst Station Preliminary Design
04/11/23Bathurst Station - Preliminary Design
Overview3
* Final number and location of stations subject to review
![Page 4: Open House: Bathurst Station Consultation](https://reader036.vdocument.in/reader036/viewer/2022070313/55497f85b4c905c26a8b46e2/html5/thumbnails/4.jpg)
Bathurst Station Preliminary Design
4
• Integrate with surrounding neighbourhood
• Safe and enjoyable user experience
• Full accessibility
• Preserve space for future re-development
• Enhance the local “sense of place”
• Long-term sustainability
• Reduce Construction Footprint & Impacts
• Reduce Costs
Design Philosophy
Compatible scale
04/11/23 4Bathurst Station - Preliminary Design
Overview
Accessibility for all users
![Page 5: Open House: Bathurst Station Consultation](https://reader036.vdocument.in/reader036/viewer/2022070313/55497f85b4c905c26a8b46e2/html5/thumbnails/5.jpg)
Bathurst Station Preliminary DesignBathurst Station Preliminary Design
04/11/23Bathurst Station - Preliminary Design
Overview5
![Page 6: Open House: Bathurst Station Consultation](https://reader036.vdocument.in/reader036/viewer/2022070313/55497f85b4c905c26a8b46e2/html5/thumbnails/6.jpg)
Bathurst Station Preliminary Design
• Any architectural finish can contain integrated artwork, including:
• walls• floors• ceilings• glazing
Integrated Artwork
04/11/23 6Bathurst Station - Preliminary Design
Overview
![Page 7: Open House: Bathurst Station Consultation](https://reader036.vdocument.in/reader036/viewer/2022070313/55497f85b4c905c26a8b46e2/html5/thumbnails/7.jpg)
Bathurst Station Preliminary Design
Traction Power Substations What and Why?
• Required to provide power to the station system • Every two kilometres, at stations• Many different configurations• Above ground, surface, below-ground• Guidelines to integrate substations
04/11/23 7Bathurst Station - Preliminary Design
Overview
![Page 8: Open House: Bathurst Station Consultation](https://reader036.vdocument.in/reader036/viewer/2022070313/55497f85b4c905c26a8b46e2/html5/thumbnails/8.jpg)
Bathurst Station Preliminary Design
8
Presentation Part 2: Bathurst Station
04/11/23 8Bathurst Station - Preliminary Design
Overview
![Page 9: Open House: Bathurst Station Consultation](https://reader036.vdocument.in/reader036/viewer/2022070313/55497f85b4c905c26a8b46e2/html5/thumbnails/9.jpg)
Bathurst Station Preliminary DesignBathurst Station Preliminary Design
Local ContextPopulation Density within a 10 minute walk to Bathurst Station
04/11/23 Bathurst Station - Preliminary Design Overview
9
![Page 10: Open House: Bathurst Station Consultation](https://reader036.vdocument.in/reader036/viewer/2022070313/55497f85b4c905c26a8b46e2/html5/thumbnails/10.jpg)
Bathurst Station Preliminary Design
04/11/23Bathurst Station - Preliminary Design
Overview10
Bathurst Station – EA (2010) (add property numbers)
![Page 11: Open House: Bathurst Station Consultation](https://reader036.vdocument.in/reader036/viewer/2022070313/55497f85b4c905c26a8b46e2/html5/thumbnails/11.jpg)
Bathurst Station Preliminary Design
04/11/23Bathurst Station - Preliminary Design
Overview11
Potential Future Secondary Entrance
Generic Rendering Only Architecture Concept TBD
![Page 12: Open House: Bathurst Station Consultation](https://reader036.vdocument.in/reader036/viewer/2022070313/55497f85b4c905c26a8b46e2/html5/thumbnails/12.jpg)
Bathurst Station Preliminary Design
04/11/23 12Bathurst Station - Preliminary Design
Overview
NORTH/EAST CORNER OF BATHURST AND EGLINTON
![Page 13: Open House: Bathurst Station Consultation](https://reader036.vdocument.in/reader036/viewer/2022070313/55497f85b4c905c26a8b46e2/html5/thumbnails/13.jpg)
Bathurst Station Preliminary DesignBathurst Station Preliminary Design
04/11/23 13Bathurst Station - Preliminary Design Overview
NORTH/EAST CORNER OF BATHURST AND EGLINTON
![Page 14: Open House: Bathurst Station Consultation](https://reader036.vdocument.in/reader036/viewer/2022070313/55497f85b4c905c26a8b46e2/html5/thumbnails/14.jpg)
Bathurst Station Preliminary Design
04/11/23 14Bathurst Station - Preliminary Design
Overview
Rear Laneway
![Page 15: Open House: Bathurst Station Consultation](https://reader036.vdocument.in/reader036/viewer/2022070313/55497f85b4c905c26a8b46e2/html5/thumbnails/15.jpg)
Bathurst Station Preliminary DesignBathurst Station Preliminary Design
04/11/23 15Bathurst Station - Preliminary Design Overview
PROPERTY LINE
NEW SETBACK
GREEN BARRIER
• Setbacks TBD
![Page 16: Open House: Bathurst Station Consultation](https://reader036.vdocument.in/reader036/viewer/2022070313/55497f85b4c905c26a8b46e2/html5/thumbnails/16.jpg)
Bathurst Station Preliminary DesignBathurst Station Preliminary Design
04/11/23 16Bathurst Station - Preliminary Design Overview
![Page 17: Open House: Bathurst Station Consultation](https://reader036.vdocument.in/reader036/viewer/2022070313/55497f85b4c905c26a8b46e2/html5/thumbnails/17.jpg)
Bathurst Station Preliminary DesignBathurst Station Preliminary Design
04/11/23 Bathurst Station - Preliminary Design Overview
17
![Page 18: Open House: Bathurst Station Consultation](https://reader036.vdocument.in/reader036/viewer/2022070313/55497f85b4c905c26a8b46e2/html5/thumbnails/18.jpg)
Bathurst Station Preliminary DesignBathurst Station Preliminary Design
04/11/23 18Bathurst Station - Preliminary Design Overview
Architectural Concept: Preliminary Representation•subject to change
![Page 19: Open House: Bathurst Station Consultation](https://reader036.vdocument.in/reader036/viewer/2022070313/55497f85b4c905c26a8b46e2/html5/thumbnails/19.jpg)
Bathurst Station Preliminary DesignBathurst Station Preliminary Design
04/11/23 19Bathurst Station - Preliminary Design Overview
Preliminary Representation•subject to change
![Page 20: Open House: Bathurst Station Consultation](https://reader036.vdocument.in/reader036/viewer/2022070313/55497f85b4c905c26a8b46e2/html5/thumbnails/20.jpg)
Bathurst Station Preliminary DesignBathurst Station Preliminary Design
04/11/23Bathurst Station - Preliminary Design
Overview20
![Page 21: Open House: Bathurst Station Consultation](https://reader036.vdocument.in/reader036/viewer/2022070313/55497f85b4c905c26a8b46e2/html5/thumbnails/21.jpg)
Bathurst Station Preliminary DesignBathurst Station Preliminary Design
04/11/23Bathurst Station - Preliminary Design
Overview21
![Page 22: Open House: Bathurst Station Consultation](https://reader036.vdocument.in/reader036/viewer/2022070313/55497f85b4c905c26a8b46e2/html5/thumbnails/22.jpg)
Bathurst Station Preliminary Design
Architectural Design Approach
• Excellence in architectural/urban design treatments
• Cost effective and maintainable structures
• Standard station box configurations
• Creative use of materials, color, textures, artwork, light
• Brand identification with graphics• Use standard elements whenever
possible
04/11/23 22Bathurst Station - Preliminary Design
Overview