FLOOD CONTROL PROGRAM

1

Technical Drainage Study (TDS) ReviewReview TDS for all development over 2 acres or in floodplainEnsure all properties are flood protectedEnsure local, state and federal criteriaStorm Water Quality ReviewTwo (2) week turn around time

TECHNICAL DRAINAGE STUDY REVIEW

2

Civil improvement plan reviewCivil Improvement Plan ReviewPreserve drainage corridorsEnsure TDS recommendation are reflectedEnsure Utilities are DEEPCoordinate improvements with CIP Program

Pre-application review & development review teamPre-application ReviewPart of Development Service ProcessProvides flood information earlySubmittals are electronic

Development Review Team (DRT) ReviewReview all DRT itemsEvery 4 weeksRequest TDS, Meet with, or Easements

TDS Scanning & DatabaseOver 4500 TDS scannedDatabase for CIP and Private Development ProjectsAll TDS have electronic copy nowGIS DatabaseStorm Drain InfrastructureCitizen Complaint DataCondition Assessment Data

DATA MANAGEMENT

5

The National Flood Insurance Program's (NFIP) Community Rating System (CRS)Voluntary incentive program that recognizes communities that exceed the minimum requirements.Class 5 community 25% reduction in flood insurance premiums. We are in the top 5% in the nation. Only 11 other communities have a higher Class.

FLOODPLAIN MANAGEMENT

6

Capital Improvement Programs Flood Control ProjectsReceives 42% of the -cents Sale TaxApproximately $650 million programmed for next 10-YearSpend Approximately $475 million to construct 245-mile of major storm drain facilities and 13 detention basinsReceives $2.2 million for maintenance every year.

CAPITAL IMPROVEMENT PROGRAMS

7

Please contact us at 229-5384CUSTOMER/CITIZEN FLOOD CONCERNS AND REPONSES

Peter JacksonOh-Sang KwonAlbert Sung

8

F:\#Depot\Engineering_Planning\DIVISION\INTEGRATEDPLAN\integrated plan Flood 5_13_13.mxd

Proposed Detention BasinsExisting Detention Basins

Proposed RFCD ProjectsExisting RFCD Facility

13/14

11/1212/1314/15

17/18

18/19 16/17

15/1622/23

20/21

21/22

19/20

21/22

13/14

22/23

18/19

18/19

20/21

15/16

12/13

14/15

12/13

22/23

22/23

14/15

14/1515/16

18/19

16/17

13/14

20/21

13/14

17/18

19/20

16/17

15/16

14/15

22/23

Regional Flood Control Plan

NOTE: DATES SHOWN ARE CONSTRUCTION START DATES.DESIGN TO BEGIN 1 TO 2 YEARS PRIOR TO CONSTRUCTIONSTART DATES.