Page 1: OPEN HOUSE PUBLIC MEETING No. 2ftp.dot.state.tx.us/pub/txdot-info/sat/notices/071216-presentation.pdf · 7/12/2016  · Open House Public Meeting was held on November 12, 2015 at

Loop 337 from I-35 to Hillcrest Drive

OPEN HOUSE PUBLIC MEETING No. 2Loop 337 from I-35 to Hillcrest DriveNew Braunfels, Comal County

Page 2: OPEN HOUSE PUBLIC MEETING No. 2ftp.dot.state.tx.us/pub/txdot-info/sat/notices/071216-presentation.pdf · 7/12/2016  · Open House Public Meeting was held on November 12, 2015 at

Loop 337 from I-35 to Hillcrest Drive

Loop 337

FROM: I-35TO: Hillcrest Drive

COMAL COUNTY

OPEN HOUSE PUBLIC MEETING No. 2 NEW BRAUNFELS HIGH SCHOOL

July 12, 2016 2551 Loop 337

5:00pm – 7:00pm New Braunfels, TX 78130

Page 3: OPEN HOUSE PUBLIC MEETING No. 2ftp.dot.state.tx.us/pub/txdot-info/sat/notices/071216-presentation.pdf · 7/12/2016  · Open House Public Meeting was held on November 12, 2015 at

Loop 337 from I-35 to Hillcrest Drive

Project Location

3

Project BeginI-35

Page 4: OPEN HOUSE PUBLIC MEETING No. 2ftp.dot.state.tx.us/pub/txdot-info/sat/notices/071216-presentation.pdf · 7/12/2016  · Open House Public Meeting was held on November 12, 2015 at

Loop 337 from I-35 to Hillcrest Drive

Need and Purpose

Need– Growth along Loop 337 has resulted in the degradation of traffic

flow through the corridor• According to the Alamo Area Metropolitan Planning Organization, six

geographies in the project area rank in the top third in Comal County for projected population growth between 2010-2040.

• Large scale master development is planned along Loop 337 in the project area

• Traffic volumes on Loop 337 are expected to increase by 40-50% percent over the next 20 years.

– Increase in number of access points along the corridor without adequate turn lanes have created additional conflict points

Purpose– The purpose of the project is to facilitate traffic flow on Loop 337 in

order to accommodate the projected increase in traffic and population growth while increasing safety for the traveling public.

4

Page 5: OPEN HOUSE PUBLIC MEETING No. 2ftp.dot.state.tx.us/pub/txdot-info/sat/notices/071216-presentation.pdf · 7/12/2016  · Open House Public Meeting was held on November 12, 2015 at

Loop 337 from I-35 to Hillcrest Drive

Projected Traffic

5

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

1975

1980

1985

1990

1995

2000

2005

2010

2014

2039

Loop 337 (North of River Road) – Average Daily Traffic

*PR

OJE

CTE

D

3,28

0

3,50

0 6,20

0

7,60

0 8,90

0 13,3

00

18,5

00

13,7

00 17,9

08

*33,

500

Page 6: OPEN HOUSE PUBLIC MEETING No. 2ftp.dot.state.tx.us/pub/txdot-info/sat/notices/071216-presentation.pdf · 7/12/2016  · Open House Public Meeting was held on November 12, 2015 at

Loop 337 from I-35 to Hillcrest Drive

Projected Traffic

6

05,000

10,00015,00020,00025,00030,00035,00040,00045,00050,000

1975

1980

1985

1990

1995

2000

2005

2010

2014

2039

Loop 337 (South of SH 46 / Vicinity of San Antonio St.) – Average Daily Traffic

*PR

OJE

CTE

D

3,45

0

3,60

0 7,00

0

6,40

0 9,00

0 13,4

00

13,1

00 18,2

00

14,2

32

*43,

000

Page 7: OPEN HOUSE PUBLIC MEETING No. 2ftp.dot.state.tx.us/pub/txdot-info/sat/notices/071216-presentation.pdf · 7/12/2016  · Open House Public Meeting was held on November 12, 2015 at

Loop 337 from I-35 to Hillcrest Drive

Project Information

Upgrade the existing Loop 337 roadway from two lanes undivided to a four-lane divided facility

Sidewalks added from Rivercrest Drive to River Terrace and from River Road to SH 46

No additional ROW required

Total project length = approximately 6.7 Miles

7

Page 8: OPEN HOUSE PUBLIC MEETING No. 2ftp.dot.state.tx.us/pub/txdot-info/sat/notices/071216-presentation.pdf · 7/12/2016  · Open House Public Meeting was held on November 12, 2015 at

Loop 337 from I-35 to Hillcrest Drive

Typical Section

8

Existing Loop 337 Typical Section

8’SHLD

8’SHLD

24’2-Lanes

Two-WayOperation

1604LOOP

337LOOP

Page 9: OPEN HOUSE PUBLIC MEETING No. 2ftp.dot.state.tx.us/pub/txdot-info/sat/notices/071216-presentation.pdf · 7/12/2016  · Open House Public Meeting was held on November 12, 2015 at

Loop 337 from I-35 to Hillcrest Drive

Typical Section

9

Proposed Loop 337 Typical Section

8’SHLD

8’SHLD

24’2-LanesOne-WayOperation

1604LOOP

337LOOP

10’ SHLD

4’SHLD

24’2-LanesOne-WayOperation

5’* SDWLK

5’* ** SDWLK

*From Rivercrest to River Terrace**From River Road To SH 46

*From Rivercrest to River Terrace

Page 10: OPEN HOUSE PUBLIC MEETING No. 2ftp.dot.state.tx.us/pub/txdot-info/sat/notices/071216-presentation.pdf · 7/12/2016  · Open House Public Meeting was held on November 12, 2015 at

Loop 337 from I-35 to Hillcrest Drive

Visual of Typical 2-lane Roadway

10

Page 11: OPEN HOUSE PUBLIC MEETING No. 2ftp.dot.state.tx.us/pub/txdot-info/sat/notices/071216-presentation.pdf · 7/12/2016  · Open House Public Meeting was held on November 12, 2015 at

Loop 337 from I-35 to Hillcrest Drive

Visual of Typical 4-lane Divided Roadway

11

Page 12: OPEN HOUSE PUBLIC MEETING No. 2ftp.dot.state.tx.us/pub/txdot-info/sat/notices/071216-presentation.pdf · 7/12/2016  · Open House Public Meeting was held on November 12, 2015 at

Loop 337 from I-35 to Hillcrest Drive

Update from Open House No. 1

Open House Public Meeting was held on November 12, 2015 at New Braunfels High School– 171 people registered their attendance– 83 comments were received from comment forms, statements to the

court reporter and one letter

Changes have been made to the project based on public input from the open house and stakeholder meetings, and refinements from traffic analysis

12

Page 13: OPEN HOUSE PUBLIC MEETING No. 2ftp.dot.state.tx.us/pub/txdot-info/sat/notices/071216-presentation.pdf · 7/12/2016  · Open House Public Meeting was held on November 12, 2015 at

Loop 337 from I-35 to Hillcrest Drive

Stakeholder Meetings Since Open House No. 1

Since the November 2015 meeting, TxDOT has met with several stakeholders with an interest in the project corridor:– New Braunfels ISD (October 2015)

– Oakwood Baptist Church (January 2016)

– New Braunfels Transportation Forum at Eden Hill (February 2016)

– Oakwood Baptist Church/City of New Braunfels (May 2016)

13

Page 14: OPEN HOUSE PUBLIC MEETING No. 2ftp.dot.state.tx.us/pub/txdot-info/sat/notices/071216-presentation.pdf · 7/12/2016  · Open House Public Meeting was held on November 12, 2015 at

Loop 337 from I-35 to Hillcrest Drive

Schematic Revisions Made Since Open House No. 1

14

• Traffic analysis showed dual left-turn lanes are needed on northbound Loop 337 at Oak Run Parkway

• Also added a right-turn acceleration lane onto southbound Loop 337 from Oak Run Parkway

Dual left-turn lane added

Added right-turn acceleration lane

Page 15: OPEN HOUSE PUBLIC MEETING No. 2ftp.dot.state.tx.us/pub/txdot-info/sat/notices/071216-presentation.pdf · 7/12/2016  · Open House Public Meeting was held on November 12, 2015 at

Loop 337 from I-35 to Hillcrest Drive

Schematic Revisions Made Since Open House No. 1

15

• Traffic analysis showed a northbound acceleration lane would help vehicles merge with the Loop 337 traffic

Added a northbound acceleration lane at

Ridge Hill Dr.

Page 16: OPEN HOUSE PUBLIC MEETING No. 2ftp.dot.state.tx.us/pub/txdot-info/sat/notices/071216-presentation.pdf · 7/12/2016  · Open House Public Meeting was held on November 12, 2015 at

Loop 337 from I-35 to Hillcrest Drive

Schematic Revisions Made Since Open House No. 1

16

• To accommodate the vehicles leaving the high school, dual right-turn lanes would be provided

Dual right-turn out from New Braunfels HS

Page 17: OPEN HOUSE PUBLIC MEETING No. 2ftp.dot.state.tx.us/pub/txdot-info/sat/notices/071216-presentation.pdf · 7/12/2016  · Open House Public Meeting was held on November 12, 2015 at

Loop 337 from I-35 to Hillcrest Drive

Schematic Revisions Made Since Open House No. 1

17

• Public comments requested a dedicated right turn lane to serve California Blvd.

• Proposed plan will add a right turn lane

Right-turn lane to California Blvd. has

been added

Page 18: OPEN HOUSE PUBLIC MEETING No. 2ftp.dot.state.tx.us/pub/txdot-info/sat/notices/071216-presentation.pdf · 7/12/2016  · Open House Public Meeting was held on November 12, 2015 at

Loop 337 from I-35 to Hillcrest Drive

Schematic Revisions Made Since Open House No. 1

18

• The deceleration and acceleration lanes for the turnaround that serves California Blvd. and Oakwood Church were lengthened

Lengthened deceleration lane

Lengthened acceleration lane

Page 19: OPEN HOUSE PUBLIC MEETING No. 2ftp.dot.state.tx.us/pub/txdot-info/sat/notices/071216-presentation.pdf · 7/12/2016  · Open House Public Meeting was held on November 12, 2015 at

Loop 337 from I-35 to Hillcrest Drive

Schematic Revisions Made Since Open House No. 1

19

• The largest number of comments pointed to the need for a full intersection at Hanz Dr. rather than at River Terrace.

• Site visits to observe the traffic travel patterns confirmed the public comments, and of such the design was changed to make Hanz Dr. the full intersection.

Make Hanz Dr. the intersection, not

River Terrace

Page 20: OPEN HOUSE PUBLIC MEETING No. 2ftp.dot.state.tx.us/pub/txdot-info/sat/notices/071216-presentation.pdf · 7/12/2016  · Open House Public Meeting was held on November 12, 2015 at

Loop 337 from I-35 to Hillcrest Drive

Environmental Studies

Community Impacts: no disproportionately high or adverse effects on minority or low income populations anticipated

Traffic Noise: analysis is underway Cultural Resources: proposed project would have no effects on historic or

archeological resources Biological Resources: evaluation is underway Water Resources:

– Jurisdictional determination study has been performed– No impacts to wetlands are anticipated– Portions of the proposed project are located over the recharge and transition

zones of the Edwards Aquifer– Portions of the proposed project are located within a Federal Emergency

Management Agency (FEMA) designated 100-year floodplain

20

Page 21: OPEN HOUSE PUBLIC MEETING No. 2ftp.dot.state.tx.us/pub/txdot-info/sat/notices/071216-presentation.pdf · 7/12/2016  · Open House Public Meeting was held on November 12, 2015 at

Loop 337 from I-35 to Hillcrest Drive

Project Schedule

Current Let Date:Spring 2017

Estimated Construction Duration:3 – 3 1/2 years

Current Estimated Construction Cost:$ 45 Million

Project Funding:Alamo Area MPO, State, and Local Funds

21

Page 22: OPEN HOUSE PUBLIC MEETING No. 2ftp.dot.state.tx.us/pub/txdot-info/sat/notices/071216-presentation.pdf · 7/12/2016  · Open House Public Meeting was held on November 12, 2015 at

Loop 337 from I-35 to Hillcrest Drive

Project Funding

$8.5 million from the Alamo Area Metropolitan Planning Organization

$31.5 million from State funds

$5 million local contribution

22

Page 23: OPEN HOUSE PUBLIC MEETING No. 2ftp.dot.state.tx.us/pub/txdot-info/sat/notices/071216-presentation.pdf · 7/12/2016  · Open House Public Meeting was held on November 12, 2015 at

Loop 337 from I-35 to Hillcrest Drive

Provide Your Comments

23

Options for Commenting

1. Place comment card in comment box tonight2. Provide comments to onsite court reporter3. Fax comments to: (512) 338-2225, Attn: Emily Reed4. Mail comments to: Cox McLain Environmental Consulting, Inc.

Attn: Emily Reed6010 Balcones Drive, Suite 210Austin, Texas 78731

5. Email comments to: [email protected]

Deadline for comments: July 22, 2016

Meeting materials and project information will be posted online:• Visit txdot.gov and enter “Loop 337” in the search bar or• Visit https://goo.gl/EIQh7i

Page 24: OPEN HOUSE PUBLIC MEETING No. 2ftp.dot.state.tx.us/pub/txdot-info/sat/notices/071216-presentation.pdf · 7/12/2016  · Open House Public Meeting was held on November 12, 2015 at

Loop 337 from I-35 to Hillcrest Drive

Thank You

Thank You for YourParticipation!

24