O p e n M D C 1 . 0M o d u l a r D a t a C e n t e r O p t i m i z e d f o r O C P h a r d w a r e
Roberto Söderhäll/CBDO/Swedish Modules
Data Center
Facility
The Pro jec ta S u b p r o j e c t w i t h i n t h e D C F P r o j e c t
Launched at the OCP Summit in San Jose March 2018
The Ma in Ob jec t i vesOptimize the design for best maintainability
Optimized the design for best scalability
Energy efficient power & cooling design
Minimum Viable Product regarding robustness
The Modu le Des ignAll in One 12 Racks Scalable Module from 30 Racks
The Opt imized des ign fo rMa in tenance
“All Equipment maintained from the front side of
the racks”
Guide l ines fo r the Ma in tenance ob jec t i ve- All maintenance in cold aisle in front of the racks
- In-row Coolers maintainable from the cold aisle
- Cold aisle is best climate zone for technicians
The Opt imized des ign fo rSca lab i l i t y
Guide l ines fo r the Sca lab i l i t y ob jec t i ve- Scalable with minimum effort of site assembly
- Scalable with minimum impact of the energy efficiency
- Scalable with minimum impact of redundancy
- Cost and time efficient deployment on site
The Opt imized des ign fo rEnergy E f f i c iency
“Hot aisle Containment for best efficiency”
Guide l ines fo r the Energy E f f i c iency ob jec t i ve- Airflow management system with Hot aisle
containment
- Flexible cooling system Chilled Water or DX
- Maintain efficiency when scaling out
T h e G u i d e l i n e s f o r a M i n i m u m V i a b l e P r o d u c t r e g a r d i n g R o b u s t n e s s
G u i d e l i n e s f o r t h e M V P r e g a r d i n g R o b u s t n e s s- Fire protection 60 min fire proof shell
- Burglary protection steel in walls and ceiling
- Alarms fire and intruder alarms
- Applicable Standards ASHRAE, BICSI - Best practise
- DCIM TCP/IP compatible interface
The road to a success fu l Open Innovat ion P ro jec t• Ask the end users to participate
• Involved the top players in the Industry
• Be humble
The OCP Pro jec t P rocess
Our Miss ion i s to bu i ld the i n f ras t ruc tu re fo r the D ig i ta l Soc ie t yMaintainability - Cost- and Energy Efficiency
Openness – Scalability