MAIN OFFICE and PLANT 500 West Eldorado Street Decatur, Illinois 62522 www.muellercompany.com Copyright 1978 - MUELLER Co. Form 8895 - Rev. 8/11 - 500 Printed in U.S.A. 1. Read and follow instructions carefully. Proper training and periodic review regarding the use of this equipment is essential to prevent possible serious injury and/or property damage. The instructions contained herein were developed for using this equipment on fittings of Mueller manufacturer only, and may not be applicable for any other use. 2. Do not exceed the pressure ratings of any components or equipment. Exceeding the rated pressure may result in serious injury and/or property damage. 3. Safety goggles and other appropriate protective gear should be used. Failure to do so could result in serious injury. 4. Pressure test, check for and repair leaks in all fittings and components each time one is installed or any joint or connection is broken. Failure to find and repair a leak from any source in the fittings, by-pass lines or equipment could result in an explosion and subsequent serious injury and/or property damage. 5. Do not use any power operator in reverse direction with Automatic Feed engaged in an attempt to return machine boring bar to retracted position as this will cause internal damage to machine. 6. MUELLER ® Drilling Machines and Equipment have been carefully designed and engineered to work together as a unit. The use of equipment manufactured by someone other than MUELLER Co. may cause excessive wear or a malfunction of the MUELLER machines. All warranties, expressed or implied, for MUELLER Drilling Machines are rendered null and void if the machines are used with shell cutters or equipment manufactured by someone other than MUELLER Co. ! WARNING ! CL-12 DRILLING MACHINE Operating Instructions for

Upload: vukien

Post on 26-Mar-2018

227 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: Operating Instructions for - · PDF filecutting cast iron, cement-lined cast iron, asbestos-cement reinforced concrete and steel pipe. ... it replaces shell cutter, cutter hub and

MAIN OFFICE and PLANT500 West Eldorado StreetDecatur, Illinois 62522www.muellercompany.com

Copyright 1978 - MUELLER Co. Form 8895 - Rev. 8/11 - 500 Printed in U.S.A.

1. Read and follow instructions carefully. Proper training and periodic review regarding the use of this equipment is essential to prevent possible serious injuryand/or property damage. The instructions contained herein were developed for using this equipment on fittings of Mueller manufacturer only, and may not beapplicable for any other use.

2. Do not exceed the pressure ratings of any components or equipment. Exceeding the rated pressure may result in serious injury and/or property damage.3. Safety goggles and other appropriate protective gear should be used. Failure to do so could result in serious injury.4. Pressure test, check for and repair leaks in all fittings and components each time one is installed or any joint or connection is broken. Failure to find and

repair a leak from any source in the fittings, by-pass lines or equipment could result in an explosion and subsequent serious injury and/or property damage.5. Do not use any power operator in reverse direction with Automatic Feed engaged in an attempt to return machine boring bar to retracted position as this will

cause internal damage to machine.6. MUELLER® Drilling Machines and Equipment have been carefully designed and engineered to work together as a unit. The use of equipment manufactured

by someone other than MUELLER Co. may cause excessive wear or a malfunction of the MUELLER machines.All warranties, expressed or implied, for MUELLER Drilling Machines are rendered null and void if the machines are used with shell cutters orequipment manufactured by someone other than MUELLER Co.

! WARNING !

CL-12 DRILLINGMACHINE

Operating

Instructions for

Page 2: Operating Instructions for - · PDF filecutting cast iron, cement-lined cast iron, asbestos-cement reinforced concrete and steel pipe. ... it replaces shell cutter, cutter hub and

Page

Maintenance

Instructions ...........................................................3

General Specifications.........................................4-5

Drilling Equipment for

Tapping Sleeves and Valves

And Power Unit..................................................6-8

Instructions for Installing

and Operating CL-12

Drilling Machine ...............................................9-13

CL-12 Drilling Machine

Travel Chart....................................................14-20

Special Instructions .........................................21-22

2www.muellercompany.com

INDEXCL-12

DrillingMachine

Page 3: Operating Instructions for - · PDF filecutting cast iron, cement-lined cast iron, asbestos-cement reinforced concrete and steel pipe. ... it replaces shell cutter, cutter hub and

3

LUBRICATIONDrain and replace lubricant (gear oil) after the first 10hours of operation and after each 50 hours ofoperation thereafter.

Keep the front gear case and rear gear case properlyfilled with gear oil. This level may be checked byremoving oil plugs on gear cases while machine islying on level surface. Drive spindle and indicatorswould be on top during this check. Oil level should beeven with gear case oil lug threads.

CL-12 Machine requires four pints (4 lbs.) of gear oil infront gear case and four pints in rear gear case.

Mueller Part No. 89347 gear oil is used. This gear oilneeds no thinning in cold weather.

PACKINGBoring bar packing on machines is a “V” or chevrontype packing, which is automatically adjusted by aspring. There is no take up. When packings leak, theyshould be replaced with new ones. Packings are goodfor water, gas, or petroleum products.

To replace Boring bar packing, see Special Instructionson page 20.

Packing leakage may be determined by observing twosmall drain holes in sides of machine behind frontflange. These vents prevent pressure from enteringinto the gear case.

All oil seals in CL-12 Machines are “o” ring seals, whichare non-adjustable. If leakage occurs, new “o” rings arerequired.

CUTTING EQUIPMENTSharpen cutters and point drills by touching them upwith an oilstone before each cut. Front edge of cuttertips should be lightly honed.

If cutters are very dull or show excessive wear, returnto MUELLER CO. for reconditioning.CAUTION: Keeping cutters sharp assures maxi-mum efficiency in cutting operations. Whencutters are dull they not only make cutting moredifficult, but place an additional strain on thetips which can cause tip breakage.

When not in use keep cutters in a wooden container.NOTE: Be careful not to drop cutter and damage

cutter tips.) If necessary to set cutter on tips, placeupon wood rather than brick, concrete or metal.

Cutters used with CL-12 Machines are tungstencarbide tipped for making lateral connectionsthrough tapping valves.

Tungsten carbide tipped cutters are designed forcutting cast iron, cement-lined cast iron, asbestos-cement reinforced concrete and steel pipe.

A cutter which has been used on cast iron or steelpipe can be used on cement-lined, asbestos-cementor reinforced concrete pipe without resharpening.

A cutter which has been used on abrasive materialscannot be used on metal pipe without resharpening.

Steel cutter hubs are used with CL-12 Machines.

All pilot drills are threaded into the cutter hub withthread sizes arranged to prevent wrong use of drillsand cutters. Drills are provided with wrench flatspermitting removal of pilot without removing cutter.All pilot drills have spring loaded detents to retaincoupon cut by shell cutter. These detents areremovable for cleaning or replacement.

Always check detents before using to be sure they areoperating correctly.

AFTER USEDirt and excess grease should be cleaned frommachine after use. Boring bar should be given a lightcoat of oil of prevent rust, and this should be donewith boring bar slightly extended. Oiled bar will pulllubrication into packings as bar is retracted.

Cutters, drills, hubs, etc. should be lightly oiled after uuse to prevent rusting.

STORAGEWhen not is use the CL-12 Machine should be keptin wooden chest during period of being transportedto jobs or stored.

CL-12 DRILLING MACHINEMaintenance Instructions

Page 4: Operating Instructions for - · PDF filecutting cast iron, cement-lined cast iron, asbestos-cement reinforced concrete and steel pipe. ... it replaces shell cutter, cutter hub and

EQUIPMENT FURNISHED WITH EACH MACHINERatchet HandleScrew Driver3 – Double Open End Wrenches3 – Allen Screw Wrenches8 – 5/8” x 3” Bolts and Nuts - Machine to Adapter8 – 11/16” D-Type Washers - Machine to AdapterGasket – Machine to AdapterCutting Grease

CAPACITY AND USEThe CL-12 Machine may be hand operated by means ofa ratchet handle or power operated by either the H614Air Power Operator or H607 Hydraulic Power Operator.

When used with tapping valves it will make cuts up to111/2" diameter, under pressure, for lateral connections.

The CL-12 Machine is equipped with an Automatic Feedfeature. The amount of travel required can be set ininches and tenths of an inch. The Automatic Feed willdisengage automatically when the pre-set amount oftravel is completed.

CAUTION: Do not use any power operator inreverse direction with Automatic Feed engaged in

4

CL-12 DRILLING MACHINEGeneral Specifications

an attempt to return machine boring bar toretracted position as this will cause internaldamage to machine.

NOTICE: Under certain circumstances some machinesmay retract the boring bar after the Automatic Feeddisengages and the power operator is allowed tocontinue running in the forward direction. This willnot cause damage to the machine or power operator.

This machine has an automatic over travel protectiondevice which automatically disengages tool feed whenmaximum 25" travel of machine is reached. Damage tothe machine is prevented even if the Automatic Feed isincorrectly set for travel beyond the maximum travel ofthe machine.

The CL-12 Machine also has a full-time automatic feedtravel indicator. This indicator subtracts as the cut ismade and indicates at all times the amount of travelremaining in automatic feed.

The CL-12 Machine is also equipped with a full-timeautomatic tool position (or boring bar) travelindicator. The position of the shell cutter and pilot drillin relation to its rearmost or fully retracted position isindicated at all times. This indicator adds as the toolsadvance and subtracts as they are retracted.

LIFTING YOKE PIVOT PIN

PIVOT THUMB SCREW

CRANK HANDLELIFTING YOKE

RATCHET HANDLE

BOLT ANDWING NUT

LATCH

BOLT ANDWING NUT

LATCH

Page 5: Operating Instructions for - · PDF filecutting cast iron, cement-lined cast iron, asbestos-cement reinforced concrete and steel pipe. ... it replaces shell cutter, cutter hub and

CL-12 DRILLING MACHINEGeneral Specifications

WORKING PRESSURE AND TEMPERATURE250 psi – Maximum working pressure at 100° F.500° F – Maximum temperature rating at 150 psi.

LENGTH OF TRAVEL25” is adequate for all sizes of Mueller TappingSleeves and Valves. The CL-12 Machine can be set toautomatic feed for any 12” of this travel.

EQUIPMENT TO BE SELECTEDSee Mueller Water Products Catalog for equipmentrequired for use with Mueller Tapping Sleeves andValves to make lateral connections.

MACHINE WEIGHT CHART

CL-12

Machine & EquipmentShipped in Strong 400 lbs.Wooden Chest

Machine Only 260 lbs.

AUTOMATIC FEEDENGAGEMENT

KNOB

CRANK HANDLE

AUTOMATIC FEEDSET KNOB

AUTOMATIC FEEDTRAVEL INDICATOR

AUTOMATIC TOOLPOSITION INDICATOR

5

Page 6: Operating Instructions for - · PDF filecutting cast iron, cement-lined cast iron, asbestos-cement reinforced concrete and steel pipe. ... it replaces shell cutter, cutter hub and

CL-12 DRILLING MACHINEDrilling Equipment for Tapping Sleeves and Valves & Power Unit

SHELLCUTTER

DRILL FLANGEAQUAGRIPADAPTER

PILOT DRILL

NUT, BOLT AND WASHER

HUBENDADAPTERGASKET

HUBENDADAPTER

MECHANICALJOINT“O” RINGADAPTERGASKET

MECHANICALJOINTADAPTER

CUTTERHUB

THE FOLLOWING EQUIPMENT IS USED FORMAKING LATERAL CONNECTIONS TO MAINSBY DRILLING THROUGH TAPPING SLEEVESAND VALVES.

SHELL CUTTER – According to size of valve to beused.

CUTTER HUB – According to size of shell cutter

PILOT DRILL – According to size of shell cutter

DRILL – When used with 2” and 21/4” tapping valveit replaces shell cutter, cutter hub and pilot drill.

ADAPTER – According to size and type of tappingvalve to be used. (These Adapters are for a workingpressure of 200 psi at 100° F.)

6

IMPORTANT: For H614, maintain pressure of 90 psi. Werecommend the use of a gage at the throttle to determinethe actual pressure OF AIR AT THE AIR MOTOR.

H-614 MUELLER AIR MOTOR AND H607HYDRAULIC POWER OPERATOR

Page 7: Operating Instructions for - · PDF filecutting cast iron, cement-lined cast iron, asbestos-cement reinforced concrete and steel pipe. ... it replaces shell cutter, cutter hub and

To disengage these knobs—-push them in ortowards the gear case.

To engage these Knobs —pull them out or awayfrom the gear case.

3. Disengage automatic feed by pushing in onAutomatic Feed Engagement Knob on rear ofmachine, FIGURE 2. this knob has squared endand is indicated by a name or panel on rear ofmachine.

4. Remove crank handle from its position on thecombination shaft and pipe plug located belowand alongside Automatic Feed travel and Toolposition Indicates. FIGURE 3. Attach crank handleto center squared shaft and rotate clockwise toadvanced boring bar. FIGURE 4. Boring barshould be advanced enough to expose hubretaining screw hole beyond face of the machineadapter.

5. Attach proper drilling equipment to the boring bar.a. 2” size. Remove retaining screw from boring

bar adapter. Insert boring bar adapter intosocket in the boring bar. Align holes in boringbar adapter and boring bar. Replace retainingscrew by inserting it through in boring bar andin boring bar adapter tapped hole. Tightensecurely with screw driver. Screw solid drill intoboring bar adapter. Wrench flats on drill maybe used to tighten drill into boring baradapter.

b. 21/2” size. Remove retaining screw from cutterarbor. Insert cutter arbor into socket in theboring bar. Align the holes in cutter arbor andboring bar. Replace retaining screw byinserting it through hole in boring bar and intocutter arbor tapped hole. Tighten securely withwrench.

7

CL-12 DRILLING MACHINEInstallation and Operating Instructions

1. Inspect cutter and pilot drill to make sure thatthey are sharp. If cutter is dull it should besharpened as described in maintenanceinstructions. Check pilot drill detents before eachoperation to make sure they will movecompletely to the submerged position.

2. Bolt proper size of adapter to front a machine.FIGURE 1. Check to be sure machine to adaptergasket is in good condition and in place. (Allgaskets should be periodically replaced)

NOTE: On the rear case of the CL-12 Machineyou will see two Knurled Knobs.One is markedAutomatic Feed Set. This knob is used to setthe amount of travel required automatic feedto complete the cut. See instructions 13.

The other Knurled Knob is the Automatic FeedEngagement Knob which is used to place themachine in automatic feed. See instruction 3 innext column.

FIGURE 3

FIGURE 1

FIGURE 2

AUTOMATIC FEEDTRAVEL INDICATOR

AUTOMATIC TOOLPOSITION INDICATOR

Page 8: Operating Instructions for - · PDF filecutting cast iron, cement-lined cast iron, asbestos-cement reinforced concrete and steel pipe. ... it replaces shell cutter, cutter hub and

c. 31/2” size and larger. Remove hub retainingbolt and lock washer from cutter hub. Slidecutter hub from boring bar. Align the holes inthe cutter hub and the boring bar. Replace thehub retaining bolt and lock washer byinserting it through hole and hub, boring barand into cutter hub tapped hole. Tightensecurely with wrench. FIGURE 5.

NOTE: If cutter hub is E-Z Release type (51/2“size and larger), tighten allen head cap screwsso that the backing ring is rigid with the cutterhub. FIGURE 6. This must be done before shellcutter is attached to hub.

Lubricate cutter hub treads with cup grease andattach shell cutter threading it onto hub handtight.* FIGURE 7. Lubricate pilot drill threadedshank end and screw it securely into cutter hub.Wrench flats are provided on pilot drill.* FIGURE8. Check detents on pilot drill to be sure they areoperating correctly.

6. Coat solid drill or shell cutter and pilot drillthoroughly with MUELLER cutting grease (88366).When drilling or cutting A-C or concrete pipe, donot use cutting grease.

7. Open valve completely and measure the exactsize of opening and size of cutter to make surethe entire opening is clear and unobstructed andthe cutter will pass freely.

NOTE: Diameter of boring bar is 2” which willpass through 2” tapping valves but may notpass through other 2” valves.

8. Retract boring bar to its rearmost position byrotating feed crank handle counter-clock-wise.FIGURE 10. Tool position Indicator, FIGURE 3,

*Place the front lifting yoke over the square drivespindle to prevent rotation of boring bar whenattaching tools. FIGURE 9.

8

CL-12 DRILLING MACHINEInstallation and Operating Instructions

will read 000 when tools are fully retracted.Measure the distance the pilot drill extendsbeyond or behind the face of the machineadapter flange. FIGURE 11. This information willbe used later for check purposes in instructionNo. 11. Also measure the distance from gatevalve outlet flange to gate valve gate to be surepilot drill or cutter will not interfere withoperation of valve.

FIGURE 4

FIGURE 5

FIGURE 6

FIGURE 7

Page 9: Operating Instructions for - · PDF filecutting cast iron, cement-lined cast iron, asbestos-cement reinforced concrete and steel pipe. ... it replaces shell cutter, cutter hub and

9

9. Place the machine (with adapter and drillingequipment assembled) in drilling position. forhorizontal use, support the assembly by blockingup under the machine or valve.

For hand operation the driving spindle should beon the left side of the machine when facing themain. For power operation the driving spindleshould be at a right angle to the main.

CL-12 DRILLING MACHINEInstallation and Operating Instructions

FIGURE 8

FIGURE 9

FIGURE 10

FIGURE 11

Check to be sure that adapter gasket is in goodcondition and in place. FIGURE 12.

Place machine and adapter against valve,allowing cutter and pilot drill to extend into theend of the valve. FIGURE 12. Install bolt and nutsand tighten evenly to valve.

10. Test set up for pressure tightness with water.

11. Lay a scale or rule alongside the tapping sleeveand valve and measure the machine adapter topipe distance. FIGURE 13. This distance, plus orminus the amount the pilot drill extends or isbehind the face of the machine adapter flange,isthe approximate distance the pilot drill shouldtravel to reach the main.

12. Rotate feed crank handle clockwise to advancethe boring bar until the pilot drill contacts themain.

Tool Position Indicator (see FIGURE 3) shouldnow read the approximate amount that wascomputed in instruction 11.

CAUTION: If Tool Position Indicator doesnot read approximately the same as thecomputed amount, it indicates that thepilot drill has encountered an obstructionand is not contacting the main.

13. Check to be sure Automatic Feed Set Knob isdisengaged. (Push in on knob to disengage.) TurnAutomatic Feed Set Knob counter-clockwise toset the desired amount of Automatic feed onAutomatic Feed Travel Indicator. FIGURE 15. Pullout on Automatic Feed Set Knob to engage theautomatic Feed Travel Indicator after correctamount has been set. See Travel Charts on page16, 17, 18 and 19.

Page 10: Operating Instructions for - · PDF filecutting cast iron, cement-lined cast iron, asbestos-cement reinforced concrete and steel pipe. ... it replaces shell cutter, cutter hub and

CL-12 DRILLING MACHINEInstallation and Operating Instructions

10

While cut is being made, the amount set on theautomatic Feed Travel Indicator, see FIGURE 3,will subtract until the completion of the cut. It willthen register 000.

NOTE: It is always necessary to pre-set for someamount of feed to permit machine to auto-matically advance the boring bar, otherwise itwill not feed.

To replace or reset either Indicator, see SpecialInstructions on page 20.

14. Pull out on Automatic Feed Engagement Knoband rotate feed crank counter-clockwise untildive key engages. FIGURE 16. This can be feltwhen crank handle ceases to freely rotate, Thisrotation releases the tension between pilot drilland main and does not change the pre-setdisengagement point.

15A. When hand operating the CL-12 Machine –Loosen the pivot thumb screw. This permits thepivot pin to be removed so that the front liftingyoke may be removed.

Attach ratchet handle to drive spindle and set theclockwise rotation. Always operate the machineaccording to instructions with one man only onratchet and using automatic feed to assurecorrect drilling and tapping rate.

FIGURE 12

FIGURE 13

FIGURE 14

Page 11: Operating Instructions for - · PDF filecutting cast iron, cement-lined cast iron, asbestos-cement reinforced concrete and steel pipe. ... it replaces shell cutter, cutter hub and

11

CL-12 DRILLING MACHINEInstallation and Operating Instructions

If cut becomes too difficult for one man, do notforce machine as this may damage cutter ormachine. Follow one of the methods listed ininstruction 23.

Hand operated CL-12 Machine should have aboring bar advance of about .015” per minute, ifoperator can maintain 5 RPM on input spindle.This rate would require about 60 minutes toadvance one inch. Smaller cuts permit higherinput speed and cutting times will be reducedaccordingly.

15B. When power operating the CL-12 Machine withthe Mueller H-614 Air Power Operator or H607Hydraulic Power Operator

Loosen the pivot thumb screw, this permits thepivot pin to be removed so that the front liftingyoke may be removed and the operator may beattached to the holder pivot on the front gearcase of the CL-12 Machine. Position the operator

and replace pivot pin. Tighten the pivot thumbscrew and latch the operator in position with thebolt and wing nut latch provided on gear case toprevent movement.

Open operator throttle fully.

Important: Maintain 90 psi air pressure for theH614 Air Power Operator and 1500 psig for theH607 Hydraulic Power Operator. These presuresshould be measured at the operator with gauge.

When power operating the CL-12 Machine, theboring bar in automatic feed should advanceabout .187 per minute or require 5+ minutes toadvance an inch.

If cutting becomes difficult and stalling occursfollow on the the methods listed in instruction 23.

16. Continue cutting operation until automatic feeddisengages. If for some reason the presetautomatic feed was set for more than the travelremaining in machine, feed will be automaticallydisengaged when boring bar travel limit isreached. When cut is completed, both theAutomatic Feed Set Knob and Automatic FeedEngagement Knob will be in the forward ordisengaged positions. FIGURE 19.

If the pre-set automatic feed was not disengagedwhen cutting is completed for some reason, asafety device is built in to prevent damage to thismechanism.

17. Check to see if cut is completed by attempting toadvance boring bar by hand advance. Rotatecrank clockwise. See FIGURE 4. If boring baradvances easily, cut is completed.

18. Rotate crank handle counter-clockwise to returnboring bar to rearmost position. See FIGURE 10.

FIGURE 15

FIGURE 16

Page 12: Operating Instructions for - · PDF filecutting cast iron, cement-lined cast iron, asbestos-cement reinforced concrete and steel pipe. ... it replaces shell cutter, cutter hub and

CL-12 DRILLING MACHINEInstallation and Operating Instructions

12

FIGURE 17

FIGURE 18

In both FIGURE 17 and FIGURE 18 the older style H-601 air motor with holder attached is shown. It has beenreplaced by the H-601 Model 2 air motor, which requires the same holder, and is installed on the machine ina similar manner as the motor/holder assembly shown in the photograph.

Page 13: Operating Instructions for - · PDF filecutting cast iron, cement-lined cast iron, asbestos-cement reinforced concrete and steel pipe. ... it replaces shell cutter, cutter hub and

CL-12 DRILLING MACHINEInstallation and Operating Instructions

13

19. Close valve securely.

20. Remove the power operator with its holder fromthe machine pivot.

21. Unbolt adapter from valve and remove adapter,cutting equipment, and drilling machine as aunit.

22. Advance boring bar by rotating feed crankclockwise until cuter hub retaining screw isexposed. Remove retaining screw and removecutter hub, pilot drill, and cut-out section of pipeor coupon.*

If pilot or cutter is to be removed hub, leave hubon boring bar until pilot drill is loosened andcutter is loosened from hub.*

To remove the shell cutter from the E-Z ReleaseCutter Hub, loosen allen head cap screws inbacking ring. Shell Cutter may then be easilytaken off.*

Coupon may be slipped over pilot drill detentsand out of cutter or pilot may be removed fromhub to remove coupon.*

*Replace the front lifting yoke and place the frontlifting yoke over the square drive spindle to preventrotation of boring bar when removing tools. SeeFIGURE 9.

23. If cutting operation becomes difficult, follow oneto these methods.a. If cutter has difficulty in cutting, becomes dull

or should stall after the cut is started it isprobably due to scale on the main or excessivehardness of pipe.

b. Mark down the settings on both the AutomaticFeed Travel Indicator and the tool PositionIndicator, This is for reference whenreassembling the set up.

c. Push in on both Automatic Feed Set Knob andAutomatic Feed Engagement Knob – this willdisengage the Automatic Feed Travel Indicatorand will also disengage the automatic feed.

FIGURE 19

Page 14: Operating Instructions for - · PDF filecutting cast iron, cement-lined cast iron, asbestos-cement reinforced concrete and steel pipe. ... it replaces shell cutter, cutter hub and

CL-12 DRILLING MACHINETravel Chart

14

3” 2” 1.5 1.6 1.6 1.7 1.4 1.5 1.8 1.821/2” 2.5 2.6 2.6 2.7 2.4 2.6 2.8 2.8

4” 2” 1.4 1.5 1.5 1.4 1.5 1.5 1.6 1.4 1.3 1.4 1.7 1.921/2” 2.3 2.4 2.4 2.3 2.4 2.4 2.5 2.3 2.2 2.4 2.6 2.831/2” 2.9 3.0 3.0 2.9 3.0 3.0 3.1 2.9 2.8 3.0 3.2 3.4

6” 2” 1.4 1.4 1.4 1.4 1.4 1.5 1.5 1.4 1.3 1.4 1.7 2.021/2” 2.2 2.3 2.3 2.2 2.3 2.3 2.4 2.2 2.1 2.3 2.5 2.831/2” 2.5 2.6 2.6 2.5 2.6 2.6 2.7 2.5 2.4 2.6 2.8 3.151/2” 4.0 4.1 4.1 4.0 4.1 4.1 4.2 3.9 3.9 4.3 4.5 4.9

8” 2” 1.4 1.4 1.4 1.4 1.4 1.5 1.6 1.4 1.3 1.5 1.7 2.121/2” 2.2 2.2 2.2 2.2 2.2 2.3 2.4 2.2 2.1 2.3 2.5 2.931/2” 2.4 2.4 2.4 2.4 2.4 2.5 2.6 2.4 2.3 2.5 2.8 3.151/2” 3.3 3.4 3.4 3.3 3.4 3.5 3.6 3.4 3.3 3.5 3.8 4.271/2” 4.9 5.0 5.0 4.9 5.0 5.2 5.2 4.9 5.0 5.7 5.6 6.4

10” 2” 1.4 1.5 1.4 1.4 1.4 1.5 1.6 1.4 1.3 1.5 1.9 2.221/2” 2.2 2.3 2.2 2.2 2.2 2.3 2.4 2.2 2.1 2.3 2.7 3.031/2” 2.3 2.4 2.4 2.3 2.4 2.4 2.3 2.2 2.5 2.5 2.9 3.151/2” 3.1 3.2 3.2 3.1 3.2 3.3 3.4 3.2 3.1 3.3 3.7 4.071/2” 4.1 4.3 4.2 4.1 4.2 4.3 4.4 4.2 4.1 4.5 4.7 5.191/2” 5.9 6.1 6.0 5.9 6.0 6.2 6.3 5.9 6.0 7.0 6.6 7.5

12” 2” 1.4 1.5 1.4 1.4 1.4 1.5 1.7 1.4 1.3 1.6 2.0 2.321/2” 2.2 2.3 2.2 2.2 2.2 2.3 2.4 2.2 2.1 2.4 2.8 3.131/2” 2.3 2.4 2.4 2.3 2.4 2.4 2.6 2.3 2.2 2.5 2.9 3.251/2” 3.0 3.1 3.1 3.0 3.1 3.2 3.3 3.0 3.0 3.3 3.6 4.071/2” 3.8 4.0 3.9 3.8 3.9 4.0 4.1 3.9 3.8 4.2 4.5 4.991/2” 4.9 5.1 5.0 4.9 5.0 5.2 5.3 5.0 4.9 5.4 5.6 6.1

111/2” 6.5 6.8 6.7 6.5 6.7 7.0 7.0 6.6 6.8 8.1* 7.4 8.6

14” 2” 1.4 1.5 1.6 1.7 1.4 1.3 1.7 2.2 2.521/2” 2.2 2.3 2.3 2.5 2.2 2.1 2.4 2.9 3.331/2” 2.3 2.4 2.4 2.6 2.3 2.2 2.6 3.0 3.551/2” 2.9 3.1 3.1 3.3 3.0 2.9 3.3 3.7 4.171/2” 3.6 3.7 3.8 4.0 3.7 3.7 4.1 4.4 4.891/2” 4.5 4.6 4.7 4.9 4.5 4.7 5.1 5.3 5.8

111/2” 5.3 5.5 5.7 5.8 5.4 5.8 6.6 6.3 6.8

NominalSize

of Pipeto beCut

AsbestosCement

PipeClass:

150 200

OutsideDiameter

ofCutter

ASA A21 6-1953ASA A21 8-1953AWWA C106-53AWWA C108-53Class 150

ASA A21 2-1953AWWA C102-53

Class 150ASA A21 3-1953

Class 10

ASA A21 7-1953ASA A21 9-1953

Class 10

AGAOld

Standard

AWWA1908

Standard

Class B

STEEL PIPECAST IRON PIPE

TRAVEL REQUIRED TO COMPLETE A CUT FOR LATERAL CONNECTION WITH POINT OF PILOT DRILL(OR SOLID DRILL) CONTACTING MAIN

NOTE: All dimensions are in inches and tenths of an inch and are the travels required to complete the cutsplus 1/4” of over travel unless otherwise noted.

*These dimensions are based on the shell cutter advancing to the center of the main.

AWWA1908

Standard

Class D

Federal SpecWW-P-421

Class 150Schedule

40Schedule

80

Page 15: Operating Instructions for - · PDF filecutting cast iron, cement-lined cast iron, asbestos-cement reinforced concrete and steel pipe. ... it replaces shell cutter, cutter hub and

TRAVEL REQUIRED TO COMPLETE A CUT FOR LATERAL CONNECTION WITH POINT OF PILOT DRILL(OR SOLID DRILL) CONTACTING MAIN

CL-12 DRILLING MACHINETravel Chart

16” 2” 1.4 1.6 1.5 1.4 1.5 1.6 1.8 1.5 1.4 1.7 2.3 2.721/2” 2.2 2.3 2.2 2.2 2.3 2.4 2.6 2.3 2.2 2.5 3.0 3.531/2” 2.3 2.4 2.3 2.3 2.4 2.5 2.6 2.3 2.3 2.6 3.1 3.651/2” 2.9 3.0 2.9 2.8 3.0 3.1 3.3 2.9 2.9 3.3 3.7 4.271/2” 3.5 3.6 3.6 3.5 3.6 3.7 3.9 3.6 3.6 4.0 4.4 4.991/2” 4.2 4.4 4.3 4.2 4.4 4.4 4.6 4.3 4.4 4.8 5.1 5.7

111/2” 4.8 5.0 5.0 4.9 5.0 5.1 5.3 4.9 5.2 5.7 5.8 6.4

18” 2” 1.5 1.7 1.6 1.8 1.5 1.4 1.8 2.421/2” 2.2 2.4 2.4 2.6 2.3 2.2 2.6 3.231/2” 2.3 2.5 2.5 2.7 2.4 2.3 2.7 3.251/2” 2.9 3.1 3.1 3.3 2.9 2.9 3.3 3.871/2” 3.4 3.7 3.6 3.8 3.5 3.5 3.9 4.491/2” 4.1 4.3 4.3 4.5 4.1 4.2 4.7 5.1

111/2” 4.5 4.8 4.8 5.0 4.6 4.8 5.3 5.6

20” 2” 1.5 1.7 1.5 1.4 1.6 1.7 1.9 1.6 1.5 1.9 2.521/2” 2.3 2.5 2.3 2.2 2.3 2.4 2.7 2.3 2.2 2.7 3.331/2” 2.3 2.5 2.4 2.3 2.4 2.5 2.7 2.4 2.3 2.8 3.451/2” 2.9 3.1 2.9 2.8 2.9 3.1 3.3 2.9 2.9 3.3 3.971/2” 3.4 3.6 3.4 3.3 3.5 3.6 3.8 3.4 3.4 3.9 4.491/2” 4.0 4.2 4.0 3.9 4.1 4.2 4.4 4.0 4.1 4.6 5.0

111/2” 4.4 4.6 4.4 4.3 4.5 4.6 4.8 4.4 4.6 5.1 5.5

24” 2” 1.6 1.8 1.6 1.5 1.6 1.8 2.0 1.6 1.6 2.1 2.821/2” 2.4 2.6 2.4 2.3 2.4 2.5 2.8 2.4 2.3 2.9 3.631/2” 2.4 2.6 2.4 2.3 2.4 2.6 2.9 2.4 2.4 2.9 3.651/2” 2.9 3.1 2.9 2.8 3.0 3.1 3.3 2.9 2.9 3.4 4.171/2” 3.4 3.6 3.4 3.3 3.4 3.6 3.8 3.4 3.4 4.0 4.691/2” 3.9 4.1 3.9 3.8 3.9 4.1 4.3 3.9 3.9 4.5 5.1

111/2” 4.1 4.4 4.2 4.1 4.2 4.4 4.6 4.2 4.3 4.9 5.4

30” 2” 1.7 2.0 1.7 1.6 1.7 1.9 2.2 3.321/2” 2.5 2.7 2.5 2.3 2.5 2.6 3.0 4.031/2” 2.5 2.8 2.5 2.4 2.5 2.7 3.0 4.151/2” 3.0 3.2 3.0 2.9 3.0 3.2 3.5 4.571/2” 3.4 3.6 3.4 3.3 3.4 3.6 3.9 5.091/2” 3.8 4.1 3.8 4.7 3.8 4.0 4.3 5.4

111/2” 4.0 4.2 4.0 3.9 4.0 4.2 4.5 5.6

36” 2” 1.8 2.1 1.8 1.7 1.8 2.0 2.4 3.821/2” 2.5 2.8 2.6 2.4 2.6 2.8 3.2 4.531/2” 2.6 2.9 2.6 2.5 2.6 2.8 3.2 4.651/2” 3.0 3.3 3.1 2.9 3.0 3.2 3.7 5.071/2” 3.4 3.7 3.4 3.3 3.4 3.6 4.0 5.491/2” 3.8 4.0 3.8 3.6 3.8 4.0 4.4 5.8

111/2” 3.9 4.2 3.9 3.7 3.9 4.1 4.5 5.9

NominalSize

of Pipeto beCut

AsbestosCement

PipeClass:

150 200

OutsideDiameter

ofCutter

ASA A21 6-1953ASA A21 8-1953AWWA C106-53AWWA C108-53Class 150

ASA A21 2-1953AWWA C102-53

Class 150ASA A21 3-1953

Class 10

ASA A21 7-1953ASA A21 9-1953

Class 10

AGAOld

Standard

AWWA1908

Standard

Class B

STEEL PIPECAST IRON PIPE

NOTE: All dimensions are in inches and tenths of an inch and are the travels required to complete the cutsplus 1/4” of over travel unless otherwise noted.

AWWA1908

Standard

Class D

Federal SpecWW-P-421

Class 150Schedule

40Schedule

80

15

Page 16: Operating Instructions for - · PDF filecutting cast iron, cement-lined cast iron, asbestos-cement reinforced concrete and steel pipe. ... it replaces shell cutter, cutter hub and

TRAVEL REQUIRED TO COMPLETE A CUT FOR LATERAL CONNECTION WITH POINT OF PILOT DRILL(OR SOLID DRILL) CONTACTING MAIN

CL-12 DRILLING MACHINETravel Chart

42” 2” 1.9 2.2 1.9 1.8 1.9 2.1 2.621/2” 2.6 3.0 2.7 2.5 2.7 2.9 3.431/2” 2.7 3.0 2.7 2.5 2.7 2.9 3.451/2” 3.1 3.4 3.1 3.0 3.1 3.3 3.871/2” 3.4 3.7 3.5 3.3 3.5 3.7 4.291/2” 3.8 4.1 3.8 3.6 3.8 4.0 4.5

111/2” 3.8 4.1 3.9 3.7 3.9 4.1 4.6

48” 2” 2.0 2.3 2.0 1.8 2.1 2.3 2.821/2” 2.7 3.1 2.8 2.6 2.9 3.0 3.631/2” 2.8 3.1 2.8 2.6 2.9 3.0 3.651/2” 3.2 3.5 3.2 3.0 3.3 3.5 4.071/2” 3.5 3.8 3.5 3.3 3.6 3.8 4.391/2” 3.8 4.1 3.8 3.6 3.9 4.1 4.6

111/2” 3.8 4.2 3.9 3.7 4.0 4.1 4.7

54” 2” 2.5 2.4 3.121/2” 3.2 3.1 3.831/2” 3.2 3.2 3.851/2” 3.6 3.6 4.271/2” 4.0 3.9 4.691/2” 4.2 4.2 4.8

111/2” 4.2 4.2 4.9

60” 2” 2.7 2.5 3.221/2” 3.5 3.3 4.031/2” 3.5 3.3 4.051/2” 3.9 3.7 4.471/2” 4.2 4.0 4.791/2” 4.5 4.2 4.9

111/2” 4.4 4.2 4.9

72” 2” 2.821/2” 3.531/2” 3.651/2” 3.971/2” 4.291/2” 4.5

111/2” 4.4

84” 2” 3.121/2” 3.831/2” 3.851/2” 4.271/2” 4.591/2” 4.7

111/2” 4.6

NominalSize

of Pipeto beCut

AsbestosCement

PipeClass:

150 200

OutsideDiameter

ofCutter

ASA A21 6-1953ASA A21 8-1953AWWA C106-53AWWA C108-53Class 150

ASA A21 2-1953AWWA C102-53

Class 150ASA A21 3-1953

Class 10

ASA A21 7-1953ASA A21 9-1953

Class 10

AGAOld

Standard

AWWA1908

Standard

Class B

STEEL PIPECAST IRON PIPE

NOTE: All dimensions are in inches and tenths of an inch and are the travels required to complete the cutsplus 1/4” of over travel unless otherwise noted.

AWWA1908

Standard

Class D

Federal SpecWW-P-421

Class 150Schedule

40Schedule

80

16

Page 17: Operating Instructions for - · PDF filecutting cast iron, cement-lined cast iron, asbestos-cement reinforced concrete and steel pipe. ... it replaces shell cutter, cutter hub and

CL-12 DRILLING MACHINETravel Chart

Page 18: Operating Instructions for - · PDF filecutting cast iron, cement-lined cast iron, asbestos-cement reinforced concrete and steel pipe. ... it replaces shell cutter, cutter hub and

CL-12 DRILLING MACHINETravel Chart

18

Page 19: Operating Instructions for - · PDF filecutting cast iron, cement-lined cast iron, asbestos-cement reinforced concrete and steel pipe. ... it replaces shell cutter, cutter hub and

CL-12 DRILLING MACHINETravel Chart

19

Page 20: Operating Instructions for - · PDF filecutting cast iron, cement-lined cast iron, asbestos-cement reinforced concrete and steel pipe. ... it replaces shell cutter, cutter hub and

CL-12 DRILLING MACHINETravel Chart

Page 21: Operating Instructions for - · PDF filecutting cast iron, cement-lined cast iron, asbestos-cement reinforced concrete and steel pipe. ... it replaces shell cutter, cutter hub and

TO REPLACE BORING BAR PACKING1. Remove the Four Gland Cap Screws from the

Brass Gland.

2. Inset the Gland Cap Screws into the alternatetapped holes in the Brass Gland and screw themin all the way. This should be done evenly,tightening each cap screw a little at a time. Thiswill cause the Gland to move forward evenly outof the flange recess until the Gland Seal isexposed.

3. Rotate Crank Handle clockwise and advance theBoring Bar approximately 6 or 8 inches. This willusually cause the Gland, Packing Spring PackingFollower, 3 Packing Rings and Concave Followerto move forward into an exposed position.

4. Remove the Gland from the Boring Bar.

5. Punch out the two Rollpins which retain the entirepacking assembly,

CAUTION: Place the gland assembly in a viseto retain the Concave Packing Followerbefore punching out the Rollpins. Since thepacking is spring loaded, these parts will flyout when the pins are removed if they arenot properly retained.

6. Remove Concave Follower, 3 Packing Rings,Convex Follower, and Packing Spring from thegland and clean the packing cavity.

7. Remove the Boring Bar Wiper Ring and the GlandSeal and replace, if necessary.

8. Replace Packing Spring, Convex Packing Follower,3 Packing Rings, and Concave Packing Followerinto Gland. Make sure the Rollpin holes in theConcave Packing Follower align with the holes inthe Gland during his assembly.

NOTE: Make sure the new packing rings areinstalled with facing the pressure or front end ofthe machine.

9. Retain the assembled gland in a vise whileinserting the two Rollpins in the gland to retainConcave Packing Follower.

10. Remove any “burrs” or “nicks” from the BoringBar Drive Lugs. Lubricate the boring bar and theinside of the packing rings with a light film of oil.

11. Remove the Four Gland Cap Screws from thetapped holes in the gland.

12. Carefully slide the Gland Assembly onto thelubricated Boring Bar and slide into place. Insertthe Gland Cap Screws through the drilled holesand tighten Gland Cap Screws securely.

CL-12 DRILLING MACHINESpecial Instructions

21

FLANGE

GLAND CAP SCREWS

GLANDGLAND

GLANDSEAL

PACKING SPRING

ROLLPINS

CONCAVEFOLLOWER

PACKINGRINGS

PACKING FOLLOWER

BORING BARWIPER RING

BORING BAR

Page 22: Operating Instructions for - · PDF filecutting cast iron, cement-lined cast iron, asbestos-cement reinforced concrete and steel pipe. ... it replaces shell cutter, cutter hub and

TO REPLACE OR RESET AUTOMATIC FEEDTRAVEL INDICATOR (Gray Finish)

1. Rotate crank handle counter-clockwise to retractboring bar to its rearmost position.

2. Remove Brass Indicator Cover.

3. Loosen set screw in Coupling Indicator Sleeve.

4. Remove screws which hold Automatic Feed Travelindicator to body of the machine.

5. Remove Automatic Feed Travel Indicator.

6. With the Automatic Feed Travel Indicator set at000, place the shaft of the indicator into theCoupling Indicator Sleeve, and replace screwswhich hold the Automatic Feed Travel Indicator tothe body of the machine.

7. Rotate the Automatic Feed Set Knob counter-clockwise and pull out on it to place the machinein Automatic Feed. If the shaft fails to stay out,rotate the knob some more and pull out again.

8. Rotate the Crank Handle clockwise until theAutomatic Feed Shaft moves forward. This will bethe zero point of the Automatic Feed.

9. Tighten the Set Screw in Coupling Indicator Sleeveagainst the shaft of the Automatic Feed TravelIndicator.

10. Set Automatic Feed Travel Indicator for someamount above 005 (five tenths advance inAutomatic Feed is usually the minimum settingand rotate crank handle clockwise untilautomatic feed disengages.)

11. If Automatic Feed Travel Indicator does not readexactly 000 after disengaging, reset it to 000 asfollows:a. Pull the Knurled Coupler Movable Collar toward

the rear of machine(This collar will moveapproximately 1/8”)

b. Hold it in this position until the KnurledCoupling Indicator Sleeve is turned the requiredamount to obtain the 000 setting on theAutomatic Feed Travel Indicator.

c. Then release the Knurled Coupler MovableCollar so that the drive pin in it engages thenearest hole in the Coupling Indicator Sleeve.

12. Replace Brass Indicator Cover.

TO REPLACE AND RESET AUTOMATIC TOOLPOSITION INDICATOR (Black Finish)

1. Rotate crank handle counter-clockwise toretract boring bar to its rearmost position.

2. Remove Brass Indicator Cover.

3. Remove screws which hold Automatic ToolPosition Indicator to body of machine.

4. Remove Automatic Tool Position Indicator.

5. With the Automatic Tool position Indicator set at000, place the shaft of the Automatic ToolPosition Indicator into the end of the IndicatorShaft.

6. Make sure the notch in the Automatic ToolPosition Indicator Shaft engages the pin in theIndicator Shaft.

7. Replace screws which hold Automatic ToolPosition Indicator to body of the machine.

8. Replace Brass Indicator Cover.

CL-12 DRILLING MACHINESpecial Instructions

22

DRIVE PINAUTOMATIC FEED TRAVEL

INDICATOR

SETSCREW

COUPLING INDICATOR SLEEVE COUPLER MOVABLECOLLAR

INDICATOR SHAFT

PIN

AUTOMATIC TOOLPOSITION INDICATOR