operation analysis
DESCRIPTION
Operation Analysis. INSY 3021 Auburn University Spring 2007. Questioning Attitude. Why is this operation necessary? What can be done to make the job safer? Who can best perform the operation? When is the best time to schedule this maintenance? How can the task be improved?. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Operation Analysis](https://reader035.vdocument.in/reader035/viewer/2022062421/56812a56550346895d8dae16/html5/thumbnails/1.jpg)
Operation Analysis
INSY 3021
Auburn UniversitySpring 2007
![Page 2: Operation Analysis](https://reader035.vdocument.in/reader035/viewer/2022062421/56812a56550346895d8dae16/html5/thumbnails/2.jpg)
Questioning Attitude Why is this operation necessary? What can be done to make the job
safer? Who can best perform the
operation? When is the best time to schedule
this maintenance? How can the task be improved?
![Page 3: Operation Analysis](https://reader035.vdocument.in/reader035/viewer/2022062421/56812a56550346895d8dae16/html5/thumbnails/3.jpg)
Operation Purpose Try to eliminate or combine an operation
prior to improving it! Some operations exist because the
previous work was unacceptable, necessitating “touch-up” work supposedly accomplished by the first operation.
Can an outside supplier perform the operation more economically?
![Page 4: Operation Analysis](https://reader035.vdocument.in/reader035/viewer/2022062421/56812a56550346895d8dae16/html5/thumbnails/4.jpg)
Questioning Attitude
![Page 5: Operation Analysis](https://reader035.vdocument.in/reader035/viewer/2022062421/56812a56550346895d8dae16/html5/thumbnails/5.jpg)
Part Design Review every design for possible
improvements. Simplify design to reduce # of parts. Make joining, machining, and
assembly easier. Design for manufacturing.
![Page 6: Operation Analysis](https://reader035.vdocument.in/reader035/viewer/2022062421/56812a56550346895d8dae16/html5/thumbnails/6.jpg)
Tolerances and Specifications Designers may overcompensate with
very tight tolerances (high production cost and time consuming) because they are not aware of the capabilities of the manufacturing dept.
![Page 7: Operation Analysis](https://reader035.vdocument.in/reader035/viewer/2022062421/56812a56550346895d8dae16/html5/thumbnails/7.jpg)
Cost vs. Machining Tolerance
![Page 8: Operation Analysis](https://reader035.vdocument.in/reader035/viewer/2022062421/56812a56550346895d8dae16/html5/thumbnails/8.jpg)
Find a less expensive material Find materials that are easier to process Use materials more economically Use salvage materials Use supplies and tools more economically Standardize materials Negotiate best prices from vendors
Materials
![Page 9: Operation Analysis](https://reader035.vdocument.in/reader035/viewer/2022062421/56812a56550346895d8dae16/html5/thumbnails/9.jpg)
Manufacturing Sequence and Process Rearrange operations Mechanize manual operations
(ergonomically designed tools) Use of robots Operate mechanical facilities more
effectively Manufacture near the net shape
(eliminates material removal)
![Page 10: Operation Analysis](https://reader035.vdocument.in/reader035/viewer/2022062421/56812a56550346895d8dae16/html5/thumbnails/10.jpg)
Setup Reduction (SMED) and Tools Tooling amount based on production
quantity, recorders, labor, time limits and capital.
Perform setup work while the machine is running
Use efficient clamping devices Eliminate large adjustments Use templates or block gages Maintain records of difficult setups
![Page 11: Operation Analysis](https://reader035.vdocument.in/reader035/viewer/2022062421/56812a56550346895d8dae16/html5/thumbnails/11.jpg)
Machine Efficiency Use multiple cutting tools to use
available power Use most efficient tooling Energy efficient motors
![Page 12: Operation Analysis](https://reader035.vdocument.in/reader035/viewer/2022062421/56812a56550346895d8dae16/html5/thumbnails/12.jpg)
![Page 13: Operation Analysis](https://reader035.vdocument.in/reader035/viewer/2022062421/56812a56550346895d8dae16/html5/thumbnails/13.jpg)
Material Handling (MH) Depending on the part, 30%-50% of the
cost is due to MH Reduce time spent picking up the
material Use mechanized equipment Make better use of existing handling
facilities Handle material with the greater care Use bar-coding where applicable
![Page 14: Operation Analysis](https://reader035.vdocument.in/reader035/viewer/2022062421/56812a56550346895d8dae16/html5/thumbnails/14.jpg)
Plant Layout Layout types (product or straight
line & process or functional) Travel charts Muther’s Systematic Layout Plan
(SLP)
![Page 15: Operation Analysis](https://reader035.vdocument.in/reader035/viewer/2022062421/56812a56550346895d8dae16/html5/thumbnails/15.jpg)
Travel Chart
![Page 16: Operation Analysis](https://reader035.vdocument.in/reader035/viewer/2022062421/56812a56550346895d8dae16/html5/thumbnails/16.jpg)
![Page 17: Operation Analysis](https://reader035.vdocument.in/reader035/viewer/2022062421/56812a56550346895d8dae16/html5/thumbnails/17.jpg)
![Page 18: Operation Analysis](https://reader035.vdocument.in/reader035/viewer/2022062421/56812a56550346895d8dae16/html5/thumbnails/18.jpg)
![Page 19: Operation Analysis](https://reader035.vdocument.in/reader035/viewer/2022062421/56812a56550346895d8dae16/html5/thumbnails/19.jpg)
![Page 20: Operation Analysis](https://reader035.vdocument.in/reader035/viewer/2022062421/56812a56550346895d8dae16/html5/thumbnails/20.jpg)
Work Design Manual work and principles of
motion economy Ergonomic principles of workplace
and tool design Working and environmental
conditions
![Page 21: Operation Analysis](https://reader035.vdocument.in/reader035/viewer/2022062421/56812a56550346895d8dae16/html5/thumbnails/21.jpg)