operation data
DESCRIPTION
Diagram Flow MassTRANSCRIPT
-
WE OBSERVED THIS DATA FROM LAST 3 MONTH AGO, STILL RUNNING OUR PLANT ALSO THIS DATA FOLLLOWING UNTIL .
BWRO Transfer Pump running continously 45 minutes and stopped 15 minutes due to maintain of levels RO Tank high condition and Pure Tank Low condition.
Pure transfer pump also runnig contionusly 45 minutes and stopped 15 minutes due to maintain of tank level Pure Tank (low and high). Yesterday ( 17-Oct-2015),
24 hrs = 15.5 hrs (Pure Tr.P) + 6 hrs(Fresh Water) + 2.5 hrs (MMF Backwash) + 0.5 hrs (RO Flushing)
DM water production = 92 M3, (means pure pump running 11.5 hrs, but taking total time 15.5 hrs because 15.5 x 0.75 = 11.5)
Remaining hour of day 6 hrs this is goes to direct to fresh tank.
MMF Backwash, every shift should be given one time due to input water is more different compare to begining. Fresh Tank Before Level (17-Oct-2015)
At 6.00 am = 0.35 mtr = 64.5 m3
From 17 Oct. 2015 at 6.00 am to 18 Oct.2015 at 6.00 am (Fresh Water Production 6 hours) = 54 m3
64.5 + 54 = 118.5 m3 (but, day consumption 63 m3), So Total Tank Capacity Total Day Consumption = Current Tank Level.
118.5 63 = 55.5 (0.35 mtr) on 18 Oct.2015 at 06.00 am.
According to one day tank level from 0.35 mtr to 0.35 mtr. DM Tank Before Level (17-Oct-2015)
At 6.00 am = 0.35 mtr = 19 m3
From 17 Oct. 2015 at 6.00 am to 18 Oct.2015 at 6.00 am (DM Water Production 11.5 hours) = 92 m3
19 + 92 = 111 m3 (but, day consumption 97 m3), So Total Tank Capacity Total Day Consumption = Current Tank Level.
111 97 = 14 (0.25 mtr) on 18 Oct.2015 at 06.00 am.
According to one day tank level from 0.35 mtr to 0.25 mtr.
RO
TANK 10 M3
PURE TANK
10 M3
Mix Bed
DM TANK 200 M3
SWRO
30 m3/ H
9 M3
11 M3
BWRO Transfer
Pump
BWRO
3 m3/ H Pure Tank
Transfer Pump
8 M3 8 M3 8 M3
FRESH TANK
572 M3
To Drain Tank
To ACW
To Service Toilets and Guest House
NOTE :
If both SWRO Pump Running
in operation we able to achive
compactable tank level and
supply to 2 units Boiler and
ACW also.