operation manual for wdm

337
1 Quick Start 1-1 ..................................................................................................... 1.1 Starting and Shutting down the T2000 1-2 ................................................... 1.1.1 Starting T2000 Computer 1-2 ............................................................... 1.1.2 Shutting down T2000 Computer 1-4 .................................................... 1.1.3 Starting T2000 Server 1-5 .................................................................... 1.1.4 Restarting T2000 Server from System Monitor 1-6 .............................. 1.1.5 Exiting T2000 Server 1-6 ..................................................................... 1.1.6 Starting T2000 Client 1-7 ..................................................................... 1.1.7 Exiting T2000 Client 1-8 ....................................................................... 1.1.8 Switching T2000 User 1-9 .................................................................... 1.2 Verifying whether License File has been Installed Correctly 1-10 .................. 1.3 Opening Online Help 1-11 .............................................................................. 1.4 Closing Online Help 1-13 ................................................................................ 1.5 System Setting 1-14 ....................................................................................... 1.5.1 Enabling Display of Needed Functions 1-14 .......................................... 1.5.2 Setting Alarm Sounds 1-15 .................................................................... 1.5.3 Setting Background 1-16 ........................................................................ 1.5.4 Setting Screen Lockout 1-17 .................................................................. 1.5.5 Changing NM User’s Password 1-18 ..................................................... 1.6 Views 1-19 ...................................................................................................... 1.6.1 Main Topology 1-19 ............................................................................... 1.6.2 Equipment Maintenance Console 1-20 .................................................. 1.6.3 Protection Network View 1-21 ................................................................ 1.6.4 Trail View 1-22 ....................................................................................... 1.6.5 DCN View 1-23 ...................................................................................... 1.6.6 Custom View 1-24 .................................................................................. 1.6.7 NE Panel 1-26 ........................................................................................ 1.7 Selecting Operation Objects from Object Tree 1-29 ....................................... 1.8 Setting Parameters in the List 1-30 ................................................................ 1.9 Operation Precautions 1-31 ............................................................................ 2 Creating Topology 2-1 ........................................................................................ 2.1 Creating NEs 2-2 .......................................................................................... 2.1.1 Searching NEs in Batch 2-2 ................................................................. 2.1.2 Manually Creating Subrack NEs 2-3 .................................................... 2.1.3 Manually Creating Optical NEs 2-5 ...................................................... 2.1.4 Deleting Subrack NE 2-7 ...................................................................... 2.1.5 Deleting Optical NE 2-8 ........................................................................ 2.1.6 Switching NE User 2-8 ......................................................................... 2.2 Creating Topology Subnet 2-10 ......................................................................

Upload: can-tho

Post on 26-Oct-2015

49 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Operation Manual for WDM

1 Quick Start 1-1.....................................................................................................

1.1 Starting and Shutting down the T2000 1-2...................................................1.1.1 Starting T2000 Computer 1-2...............................................................1.1.2 Shutting down T2000 Computer 1-4....................................................1.1.3 Starting T2000 Server 1-5....................................................................1.1.4 Restarting T2000 Server from System Monitor 1-6..............................1.1.5 Exiting T2000 Server 1-6.....................................................................1.1.6 Starting T2000 Client 1-7.....................................................................1.1.7 Exiting T2000 Client 1-8.......................................................................1.1.8 Switching T2000 User 1-9....................................................................

1.2 Verifying whether License File has been Installed Correctly 1-10..................1.3 Opening Online Help 1-11..............................................................................1.4 Closing Online Help 1-13................................................................................1.5 System Setting 1-14.......................................................................................

1.5.1 Enabling Display of Needed Functions 1-14..........................................1.5.2 Setting Alarm Sounds 1-15....................................................................1.5.3 Setting Background 1-16........................................................................1.5.4 Setting Screen Lockout 1-17..................................................................1.5.5 Changing NM User’s Password 1-18.....................................................

1.6 Views 1-19......................................................................................................1.6.1 Main Topology 1-19...............................................................................1.6.2 Equipment Maintenance Console 1-20..................................................1.6.3 Protection Network View 1-21................................................................1.6.4 Trail View 1-22.......................................................................................1.6.5 DCN View 1-23......................................................................................1.6.6 Custom View 1-24..................................................................................1.6.7 NE Panel 1-26........................................................................................

1.7 Selecting Operation Objects from Object Tree 1-29.......................................1.8 Setting Parameters in the List 1-30................................................................1.9 Operation Precautions 1-31............................................................................

2 Creating Topology 2-1........................................................................................

2.1 Creating NEs 2-2..........................................................................................2.1.1 Searching NEs in Batch 2-2.................................................................2.1.2 Manually Creating Subrack NEs 2-3....................................................2.1.3 Manually Creating Optical NEs 2-5......................................................2.1.4 Deleting Subrack NE 2-7......................................................................2.1.5 Deleting Optical NE 2-8........................................................................2.1.6 Switching NE User 2-8.........................................................................

2.2 Creating Topology Subnet 2-10......................................................................

Page 2: Operation Manual for WDM

2.3 Changing Subrack NE Attributes 2-11............................................................2.3.1 Changing Subrack NE Name and Remarks 2-11..................................2.3.2 Changing Subrack NE IP Address 2-12.................................................2.3.3 Changing Subrack NE Extended ID 2-13...............................................2.3.4 Changing Subrack NE Subnet Mask 2-14.............................................2.3.5 Changing Subrack NE Pre-configuration Attribute 2-15.........................

2.4 Creating Optical NE Attributes 2-17...............................................................2.4.1 Changing Optical NE Name and Remarks 2-17....................................2.4.2 Changing Resource Division of Optical NE 2-17...................................

2.5 Creating Links 2-19........................................................................................2.5.1 Creating NM Ethernet Line 2-19............................................................2.5.2 Creating Extended ECC 2-19.................................................................2.5.3 Creating Serial Port Line 2-20................................................................

2.6 Creating NM 2-22...........................................................................................

3 Security Management 3-1...................................................................................

3.1 Creating NE User and Assigning Authority 3-2............................................3.2 Managing NE Login 3-3................................................................................

3.2.1 Switching NE User 3-3.........................................................................3.2.2 Forcing NE User to Logout NE 3-4......................................................3.2.3 Locking NE Login 3-4...........................................................................3.2.4 Locking NE Settings 3-6.......................................................................3.2.5 Setting NE Security Parameters 3-7....................................................3.2.6 Viewing NE Log and Report 3-7...........................................................

3.3 Creating NM User 3-9...................................................................................3.3.1 Adding New Operation Set 3-9............................................................3.3.2 Adding New Equipment Set 3-10...........................................................3.3.3 Adding New NM User Group 3-11.........................................................3.3.4 Modifying Authority of NM User Group 3-11..........................................3.3.5 Creating NM User and Assign Authority 3-13........................................3.3.6 Slightly Adjusting Authority of NM User 3-14.........................................3.3.7 Modifying User Attribute 3-14.................................................................3.3.8 Enabling Remote Maintenance User 3-16.............................................

3.4 Managing T2000 Login 3-17...........................................................................3.4.1 Locking T2000 Client Screen 3-17.........................................................3.4.2 Switching NM User 3-17........................................................................3.4.3 Switching Between Single User Mode and Multi-user Mode 3-17.........3.4.4 Forcing Other Users to Exit T2000 3-18................................................3.4.5 Modifying NM User’s Password 3-19.....................................................

4 Configuring Equipment 4-1................................................................................

Page 3: Operation Manual for WDM

4.1 Viewing NE Resource 4-2............................................................................4.2 Uploading Data if NE has been Configured 4-3...........................................

4.2.1 Uploading/ Downloading NE Configuration Data 4-3...........................4.2.2 Checking Configuration Data Consistency Between NE andthe T2000 4-4................................................................................................

4.3 Duplicating NE Configuration Data 4-6.........................................................4.4 Manually Configuring NE Data 4-7...............................................................4.5 Creating Board 4-8.......................................................................................4.6 Deleting Board 4-9........................................................................................4.7 Creating Fiber 4-10.........................................................................................4.8 Viewing Unit Version 4-13..............................................................................4.9 Creating and View Physical Location Information 4-14..................................

4.9.1 Creating and Viewing Equipment Room Information 4-14.....................4.9.2 Creating and Viewing Cabinet Information 4-15....................................4.9.3 Modifying and Viewing Subrack Information 4-16..................................

4.10 Viewing NE Hardware Information 4-18.......................................................

5 Configuring Communication 5-1.......................................................................

5.1 Setting NE Communication Parameters 5-3.................................................5.2 Enabling Serial Port/Ethernet Port Access Control 5-4................................5.3 Setting DCC Rate and Allocating the Resource 5-5.....................................5.4 Setting DCC Transparent Transmission 5-6.................................................5.5 DCN Protection Management 5-7................................................................

5.5.1 Modifying the Attributes of a GNE 5-7..................................................5.5.2 Changing GNE for an NE 5-8...............................................................5.5.3 Adding Standby GNEs for an NE 5-8...................................................5.5.4 Changing an Ordinary NE into a GNE 5-9...........................................5.5.5 Changing a GNE into an Ordinary NE 5-10...........................................

6 Configuring Unit Parameters 6-1.......................................................................

6.1 Configuring Optical Transponder Unit 6-3....................................................6.2 Configuring Trans-Multiplexer 6-5................................................................6.3 Querying Multiplexer and Demultiplexer 6-7................................................6.4 Querying Optical Add/Drop Multiplexing Unit 6-9.........................................6.5 Configuring Optical Amplifier Unit 6-11..........................................................6.6 Configuring Optical Supervisory Channel Unit 6-13.......................................6.7 Configuring Spectrum Analysis Unit 6-15.......................................................6.8 Configuring Variable Optical Attenuation Unit 6-17........................................6.9 Querying Optical Equalizer Unit 6-19.............................................................6.10 Querying Automatic Optical Fiber Monitoring Unit 6-21...............................

7 Configuring Clock 7-1.........................................................................................

Page 4: Operation Manual for WDM

7.1 Configuring Board Clock Source 7-3............................................................7.1.1 Setting Priority Table for Reference Clock 7-3.....................................7.1.2 Setting SSM Protocol of Current Clock Source 7-5.............................7.1.3 Setting Restoration Parameters for Current Clock Source 7-6............7.1.4 Switching Clock Source 7-7.................................................................7.1.5 Setting External Clock Source 7-9.......................................................7.1.6 Setting Lock Status of Clock Source 7-10..............................................

7.2 Configuring Returned Clock of Optical Supervisory Channel Board 7-11......7.3 Configuring Clock Transparent Transmission 7-12........................................

7.3.1 Configuring Input Attributes of Service Clock 7-12................................7.3.2 Configuring Output Attributes of Service Clock 7-14..............................7.3.3 Configuring Working Route of Service Clock 7-15.................................

8 Configuring Overhead Interface 8-1..................................................................

8.1 Configuring Orderwire Phone 8-2.................................................................8.2 Configuring Conference Call 8-4..................................................................8.3 Configuring Auxiliary Port 8-6.......................................................................8.4 Configuring F1 Data Port 8-8........................................................................8.5 Configuring Broadcast Data Port 8-9............................................................8.6 Configuring Subnet No. for the Optical Interface 8-10....................................

9 Configuring Network Parameters 9-1................................................................

9.1 Laser Maintenance 9-2.................................................................................9.1.1 Querying Laser Performance Threshold 9-2........................................9.1.2 Switching DWDM Laser Status 9-3......................................................9.1.3 Querying Laser Spectrum Analysis Data 9-4.......................................

9.2 Optical Power Management 9-6...................................................................9.3 DWDM Overhead Byte Management 9-8.....................................................9.4 IPA Management 9-10....................................................................................

9.4.1 Creating IPA 9-10...................................................................................9.4.2 Setting Delay Time for IPA 9-12.............................................................9.4.3 Restarting IPA 9-13................................................................................9.4.4 Deleting IPA 9-14...................................................................................

9.5 ALC Management for 1600G/320GV3 9-15...................................................9.5.1 Configuring the ALC Protocol Path 9-16................................................9.5.2 Creating the ALC Link Node 9-16..........................................................9.5.3 Checking the ALC Link 9-21..................................................................9.5.4 Searching the ALC Link 9-22.................................................................9.5.5 Starting/Stopping Automatic Link Adjustment 9-23................................

9.6 ALC Management for 320G 9-25...................................................................9.6.1 Creating the ALC Link Node 9-25..........................................................

Page 5: Operation Manual for WDM

9.6.2 Checking the ALC Link 9-27..................................................................9.6.3 Search the ALC Link 9-28......................................................................9.6.4 Starting/Stopping Automatic Link Adjustment 9-28................................

9.7 Fiber Power Check 9-29.................................................................................9.8 Automatic Optical Power Equalization 9-33...................................................

9.8.1 Creating the APE Pair 9-34....................................................................9.8.2 Configuring Wavelength Monitoring Flag 9-37.......................................9.8.3 Setting Standard Power Curve 9-38......................................................9.8.4 Starting/Stopping Regulation 9-39.........................................................

9.9 Wavelength Management 9-41......................................................................9.9.1 Setting the Customized Display 9-41.....................................................9.9.2 Browsing Wavelength Trails 9-43..........................................................9.9.3 Viewing the Details about a Wavelength Trail 9-44...............................9.9.4 Managing the Wavelength Division Optical Power 9-46........................9.9.5 Viewing the Relevant Alarms of a Wavelength Trail 9-47......................9.9.6 Viewing the Wavelength Trail Performance 9-49...................................

9.10 Configuring OAMS 9-52...............................................................................9.10.1 Starting OAMS through T2000 9-52.....................................................9.10.2 Browsing Curve File 9-54.....................................................................9.10.3 Modifying Curve File 9-55....................................................................9.10.4 Setting Reference Curve 9-55..............................................................9.10.5 Test on-Demand 9-57..........................................................................9.10.6 Periodic Test 9-58................................................................................

10 Configuring Protection 10-1...............................................................................

10.1 Configuring Optical Line Protection 10-2......................................................10.2 Configuring Wavelength Protection Group 10-4...........................................10.3 Configuring 1+ 1 Optical Channel Protection 10-7.......................................10.4 Configuring 1:N Optical Channel Protection 10-9.........................................

10.4.1 Creating 1:N Optical Channel Protection 10-9.....................................10.4.2 Searching 1:N Optical Channel Protection Subnet 10-11......................10.4.3 Switching 1:N Optical Channel Protection Status 10-12........................

10.5 Configuring Clock Transparent Transmission Protection 10-15.....................

11 Configuring Alarm and Performance Monitoring Parameters 11-1................

11.1 Synchronizing NE Time 11-2........................................................................11.2 Setting Network Wide Alarm Attributes 11-3................................................

11.2.1 Creating New Alarm Attribute Template 11-3......................................11.2.2 Creating Alarm Correlation Rule 11-4..................................................11.2.3 Creating Fault Diagnosis Rule 11-4.....................................................11.2.4 Enabling the Switch of Alarm Function 11-6........................................

Page 6: Operation Manual for WDM

11.2.5 Enabling Alarm Notification to E-mail or Pager 11-7............................11.2.6 Enabling Alarm Box and Setting Parameter 11-9................................11.2.7 Setting Alarm Dump Condition 11-10.....................................................

11.3 Setting NE Alarm Attributes 11-12..................................................................11.4 Setting Board/Port Alarm Attributes 11-14.....................................................

11.4.1 Setting Alarm Severity and Auto-report status 11-14.............................11.4.2 Setting Alarm Reversion 11-15..............................................................11.4.3 Setting Alarm Suppression Status 11-16...............................................11.4.4 Setting Alarm Filter Status 11-18...........................................................11.4.5 Setting Bit Error Alarm Threshold 11-19................................................11.4.6 Setting AIS Insertion Switch 11-20.........................................................11.4.7 Setting UNEQ Insertion Switch 11-21....................................................

11.5 Setting Performance Monitoring Parameters 11-23.......................................11.5.1 Creating Performance Threshold Template 11-23.................................11.5.2 Setting Performance Threshold 11-24...................................................11.5.3 Setting Board Temperature Threshold 11-25.........................................11.5.4 Setting Performance Monitoring Object 11-26.......................................11.5.5 Setting Performance Monitoring Start/Stop Status 11-27......................11.5.6 Setting Non-Periodic Automatic Report of Performance Event 11-28...11.5.7 Resetting NE Performance Register 11-29............................................11.5.8 Setting Performance Dump Conditions 11-30........................................

12 Synchronization and Data Management 12-1...................................................

12.1 Synchronizing NE Time 12-2........................................................................12.2 Synchronizing Current Alarms from NE 12-2...............................................12.3 Backing up and Restoring T2000 Database 12-4.........................................

12.3.1 Immediately Backing up T2000 Database 12-4...................................12.3.2 Enabling Automatical T2000 Database Backup 12-4...........................12.3.3 Restoring T2000 Database 12-6..........................................................

12.4 Managing NE Database 12-8.......................................................................12.4.1 Checking the Consistency of NE Configuration Data 12-8..................12.4.2 Uploading/Downloading NE Configuration Data 12-9..........................12.4.3 Duplicating NE Configuration Data 12-9..............................................12.4.4 Initializing NE Configuration Data 12-9................................................12.4.5 Exporting ROME Text Files Periodically 12-11......................................

13 Routine Maintenance 13-1..................................................................................

13.1 Browsing Alarm 13-2....................................................................................13.1.1 Synchronizing Current Alarms from NE 13-2.......................................13.1.2 Browsing Network-Wide Current Alarms 13-2.....................................13.1.3 Browsing Current Alarms and Abnormal Event 13-4...........................

Page 7: Operation Manual for WDM

13.1.4 Browsing History Alarms 13-5..............................................................13.1.5 Browsing Alarm Statistics and Output Report 13-6..............................13.1.6 Turning off Alarm Indicator on Alarm Box 13-7....................................13.1.7 Clearing Alarms 13-8...........................................................................

13.2 Performance Monitoring 13-10.......................................................................13.2.1 Browsing Current Performance Data 13-10...........................................13.2.2 Browsing PM Threshold-crossing Record 13-11....................................13.2.3 Browsing History Performance Data 13-12............................................

13.3 Browsing Operation Log 13-14.......................................................................13.4 Checking Switching Status 13-16...................................................................

13.4.1 Checking Line Protection Switching 13-16.............................................13.4.2 Checking Wavelength Protection Switching 13-16................................13.4.3 Checking 1+1 Channel Protection Switching 13-17...............................13.4.4 Checking 1:N Channel Protection Switching 13-18...............................13.4.5 Checking Clock Transparent Transmission ProtectionSwitching 13-19.................................................................................................

13.5 Synchronization 13-21....................................................................................13.6 Backing up and Restoring T2000 Database 13-21.........................................13.7 Equipment Data Collection 13-21...................................................................13.8 Automatic Disabling of NE Function 13-23.....................................................

14 Fault Maintenance 14-1......................................................................................

14.1 Checking Optical Power 14-3.......................................................................14.2 Setting OTU Loopback 14-3.........................................................................14.3 Performing Protection Switching 14-6..........................................................

14.3.1 Performing Line Protection Switching 14-6..........................................14.3.2 Performing Wavelength Protection Switching 14-7..............................14.3.3 Performing 1+1 Channel Protection Switching 14-8............................14.3.4 Performing 1:N Channel Protection Switching 14-9.............................14.3.5 Performing Clock Transparent Transmission ProtectionSwitching 14-9.................................................................................................

14.4 Fault Diagnosis Wizard 14-11........................................................................14.4.1 Set Fault Diagnosis Rules 14-11............................................................14.4.2 Fault Diagnosis Wizard 14-12................................................................

14.5 Hard Resetting and Soft Resetting Unit 14-14...............................................14.6 Resetting NE Software 14-15.........................................................................14.7 Remote Maintenance 14-16...........................................................................14.8 Modifying Overhead Byte 14-17.....................................................................

A Obtaining and Installing License A-1................................................................

A.1 Obtaining License A-1..................................................................................A.2 Installing License A-4...................................................................................

Page 8: Operation Manual for WDM

B Abbreviations B-1...............................................................................................

Page 9: Operation Manual for WDM

Huawei Technologies Proprietary

HUAWEI

OptiX iManager T2000 Operation Manual for WDM

V100R008

Page 10: Operation Manual for WDM

Huawei Technologies Proprietary

OptiX iManager T2000 Operation Manual for WDM Manual Version T2-041666-20041118-C-1.82

Product Version V100R008

BOM 31161366

Huawei Technologies Co., Ltd. provides customers with comprehensive technical support and service. Please feel free to contact our local office or company headquarters.

Huawei Technologies Co., Ltd. Address: Administration Building, Huawei Technologies Co., Ltd., Bantian, Longgang District, Shenzhen, P. R. China Postal Code: 518129 Website: http://www.huawei.com Email: [email protected]

Page 11: Operation Manual for WDM

Huawei Technologies Proprietary

Copyright © 2004 Huawei Technologies Co., Ltd.

All Rights Reserved No part of this document may be reproduced or transmitted in any form or by any means without prior written consent of Huawei Technologies Co., Ltd. Trademarks

, HUAWEI, C&C08, EAST8000, HONET, , ViewPoint, INtess, ETS, DMC, TELLIN, InfoLink, Netkey, Quidway, SYNLOCK, Radium, M900/M1800, TELESIGHT, Quidview, Musa, Airbridge, Tellwin, Inmedia, VRP, DOPRA, iTELLIN, HUAWEIOptiX, C&C08 iNET, NETENGINE, OptiX, iSite, U-SYS, iMUSE, OpenEye, Lansway, SmartAX, infoX, TopEng are trademarks of Huawei Technologies Co., Ltd. All other trademarks and trade names mentioned in this manual are the property of their respective holders. Notice The information in this document is subject to change without notice. Every effort has been made in the preparation of this document to ensure accuracy of the contents, but all statements, information, and recommendations in this document don't constitute the warranty of any kind, express or implied.

Page 12: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM About this Manual

Huawei Technologies Proprietary

i

Summary of Updates

This section provides the update history of this manual and introduces the contents of subsequent updates.

Update History

Manual Version Notes

T2-041666-20040617-C-1.80 Initial field trial release

T2-041666-20040914-C-1.81 Second time release.

T2-041666-20041118-C-1.82 Third time release.

Updates of Contents

Updates between document versions are cumulative. Therefore, the latest document version contains all updates made to previous versions.

Updates in Manual Version 1.82

Add several ROME interface files in 12.4.5. Updates in Manual Version 1.81

Add ”12.4.5 Exporting ROME Text Files Periodically”.

Page 13: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for SDH Contents

Huawei Technologies Proprietary

i

Contents

1 Quick Start 1-1

1.1 Starting and Shutting down the T2000 1-2

1.1.1 Starting T2000 Computer 1-2

1.1.2 Shutting down T2000 Computer 1-4

1.1.3 Starting T2000 Server 1-5

1.1.4 Restarting T2000 Server from System Monitor 1-6

1.1.5 Exiting T2000 Server 1-6

1.1.6 Starting T2000 Client 1-7

1.1.7 Exiting T2000 Client 1-8

1.1.8 Switching T2000 User 1-9

1.2 Verifying whether License File has been Installed Correctly 1-10

1.3 Opening Online Help 1-11

1.4 Closing Online Help 1-13

1.5 System Setting 1-14

1.5.1 Enabling Display of Needed Functions 1-14

1.5.2 Setting Alarm Sounds 1-15

1.5.3 Setting Background 1-16

1.5.4 Setting Screen Lockout 1-17

1.5.5 Changing NM User’s Password 1-18

1.6 Views 1-19

1.6.1 Main Topology 1-19

1.6.2 Equipment Maintenance Console 1-20

1.6.3 Protection Network View 1-21

1.6.4 Trail View 1-22

1.6.5 DCN View 1-23

1.6.6 Custom View 1-24

1.6.7 NE Panel 1-26

Page 14: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for SDH Contents

Huawei Technologies Proprietary

ii

1.7 Selecting Operation Objects from Object Tree 1-29

1.8 Setting Parameters in the List 1-30

1.9 Operation Precautions 1-31

2 Creating Topology 2-1

2.1 Creating NEs 2-2

2.1.1 Searching NEs in Batch 2-2

2.1.2 Manually Creating Subrack NEs 2-3

2.1.3 Manually Creating Optical NEs 2-5

2.1.4 Deleting Subrack NE 2-7

2.1.5 Deleting Optical NE 2-8

2.1.6 Switching NE User 2-8

2.2 Creating Topology Subnet 2-10

2.3 Changing Subrack NE Attributes 2-11

2.3.1 Changing Subrack NE Name and Remarks 2-11

2.3.2 Changing Subrack NE IP Address 2-12

2.3.3 Changing Subrack NE Extended ID 2-13

2.3.4 Changing Subrack NE Subnet Mask 2-14

2.3.5 Changing Subrack NE Pre-configuration Attribute 2-15

2.4 Creating Optical NE Attributes 2-17

2.4.1 Changing Optical NE Name and Remarks 2-17

2.4.2 Changing Resource Division of Optical NE 2-17

2.5 Creating Links 2-19

2.5.1 Creating NM Ethernet Line 2-19

2.5.2 Creating Extended ECC 2-19

2.5.3 Creating Serial Port Line 2-20

2.6 Creating NM 2-22

3 Security Management 3-1

3.1 Creating NE User and Assigning Authority 3-2

3.2 Managing NE Login 3-3

3.2.1 Switching NE User 3-3

3.2.2 Forcing NE User to Logout NE 3-4

3.2.3 Locking NE Login 3-4

3.2.4 Locking NE Settings 3-6

3.2.5 Setting NE Security Parameters 3-7

3.2.6 Viewing NE Log and Report 3-7

3.3 Creating NM User 3-9

Page 15: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for SDH Contents

Huawei Technologies Proprietary

iii

3.3.1 Adding New Operation Set 3-9

3.3.2 Adding New Equipment Set 3-10

3.3.3 Adding New NM User Group 3-11

3.3.4 Modifying Authority of NM User Group 3-11

3.3.5 Creating NM User and Assign Authority 3-13

3.3.6 Slightly Adjusting Authority of NM User 3-14

3.3.7 Modifying User Attribute 3-14

3.3.8 Enabling Remote Maintenance User 3-16

3.4 Managing T2000 Login 3-17

3.4.1 Locking T2000 Client Screen 3-17

3.4.2 Switching NM User 3-17

3.4.3 Switching Between Single User Mode and Multi-user Mode 3-17

3.4.4 Forcing Other Users to Exit T2000 3-18

3.4.5 Modifying NM User’s Password 3-19

4 Configuring Equipment 4-1

4.1 Viewing NE Resource 4-2

4.2 Uploading Data if NE has been Configured 4-3

4.2.1 Uploading/Downloading NE Configuration Data 4-3

4.2.2 Checking Configuration Data Consistency Between NE and the T2000 4-4

4.3 Duplicating NE Configuration Data 4-6

4.4 Manually Configuring NE Data 4-7

4.5 Creating Board 4-8

4.6 Deleting Board 4-9

4.7 Creating Fiber 4-10

4.8 Viewing Unit Version 4-13

4.9 Creating and View Physical Location Information 4-14

4.9.1 Creating and Viewing Equipment Room Information 4-14

4.9.2 Creating and Viewing Cabinet Information 4-15

4.9.3 Modifying and Viewing Subrack Information 4-16

4.10 Viewing NE Hardware Information 4-18

5 Configuring Communication 5-1

5.1 Setting NE Communication Parameters 5-2

5.2 Enabling Serial Port/Ethernet Port Access Control 5-3

5.3 Setting DCC Rate and Allocating the Resource 5-4

5.4 Setting DCC Transparent Transmission 5-5

5.5 DCN Protection Management 5-6

Page 16: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for SDH Contents

Huawei Technologies Proprietary

iv

5.5.1 Modifying the Attributes of a GNE 5-6

5.5.2 Changing GNE for an NE 5-7

5.5.3 Adding Standby GNEs for an NE 5-7

5.5.4 Changing an Ordinary NE into a GNE 5-8

5.5.5 Changing a GNE into an Ordinary NE 5-9

6 Configuring Unit Parameters 6-1

6.1 Configuring Optical Transponder Unit 6-2

6.2 Configuring Trans-Multiplexer 6-4

6.3 Querying Multiplexer and Demultiplexer 6-6

6.4 Querying Optical Add/Drop Multiplexing Unit 6-8

6.5 Configuring Optical Amplifier Unit 6-10

6.6 Configuring Optical Supervisory Channel Unit 6-12

6.7 Configuring Spectrum Analysis Unit 6-14

6.8 Configuring Variable Optical Attenuation Unit 6-16

6.9 Querying Optical Equalizer Unit 6-18

6.10 Querying Automatic Optical Fiber Monitoring Unit 6-20

7 Configuring Clock 7-1

7.1 Configuring Board Clock Source 7-2

7.1.1 Setting Priority Table for Reference Clock 7-2

7.1.2 Setting SSM Protocol of Current Clock Source 7-4

7.1.3 Setting Restoration Parameters for Current Clock Source 7-5

7.1.4 Switching Clock Source 7-6

7.1.5 Setting External Clock Source 7-8

7.1.6 Setting Lock Status of Clock Source 7-9

7.2 Configuring Returned Clock of Optical Supervisory Channel Board 7-10

7.3 Configuring Clock Transparent Transmission 7-11

7.3.1 Configuring Input Attributes of Service Clock 7-11

7.3.2 Configuring Output Attributes of Service Clock 7-13

7.3.3 Configuring Working Route of Service Clock 7-14

8 Configuring Overhead Interface 8-1

8.1 Configuring Orderwire Phone 8-2

8.2 Configuring Conference Call 8-4

8.3 Configuring Auxiliary Port 8-6

8.4 Configuring F1 Data Port 8-8

8.5 Configuring Broadcast Data Port 8-9

8.6 Configuring Subnet No. for the Optical Interface 8-10

Page 17: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for SDH Contents

Huawei Technologies Proprietary

v

9 Configuring Network Parameters 9-1

9.1 Laser Maintenance 9-2

9.1.1 Querying Laser Performance Threshold 9-2

9.1.2 Switching DWDM Laser Status 9-3

9.1.3 Querying Laser Spectrum Analysis Data 9-4

9.2 Optical Power Management 9-6

9.3 DWDM Overhead Byte Management 9-8

9.4 IPA Management 9-10

9.4.1 Creating IPA 9-10

9.4.2 Setting Delay Time for IPA 9-12

9.4.3 Restarting IPA 9-13

9.4.4 Deleting IPA 9-14

9.5 ALC Management for 1600G/320GV3 9-15

9.5.1 Configuring the ALC Protocol Path 9-16

9.5.2 Creating the ALC Link Node 9-16

9.5.3 Checking the ALC Link 9-21

9.5.4 Searching the ALC Link 9-22

9.5.5 Starting/Stopping Automatic Link Adjustment 9-23

9.6 ALC Management for 320G 9-25

9.6.1 Creating the ALC Link Node 9-25

9.6.2 Checking the ALC Link 9-27

9.6.3 Search the ALC Link 9-28

9.6.4 Starting/Stopping Automatic Link Adjustment 9-28

9.7 Fiber Power Check 9-29

9.8 Automatic Optical Power Equalization 9-33

9.8.1 Creating the APE Pair 9-34

9.8.2 Configuring Wavelength Monitoring Flag 9-37

9.8.3 Setting Standard Power Curve 9-38

9.8.4 Starting/Stopping Regulation 9-39

9.9 Wavelength Management 9-41

9.9.1 Setting the Customized Display 9-41

9.9.2 Browsing Wavelength Trails 9-43

9.9.3 Viewing the Details about a Wavelength Trail 9-44

9.9.4 Managing the Wavelength Division Optical Power 9-46

9.9.5 Viewing the Relevant Alarms of a Wavelength Trail 9-47

9.9.6 Viewing the Wavelength Trail Performance 9-49

9.10 Configuring OAMS 9-52

Page 18: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for SDH Contents

Huawei Technologies Proprietary

vi

9.10.1 Starting OAMS through T2000 9-52

9.10.2 Browsing Curve File 9-54

9.10.3 Modifying Curve File 9-55

9.10.4 Setting Reference Curve 9-55

9.10.5 Test on-Demand 9-57

9.10.6 Periodic Test 9-58

10 Configuring Protection 10-1

10.1 Configuring Optical Line Protection 10-2

10.2 Configuring Wavelength Protection Group 10-4

10.3 Configuring 1+1 Optical Channel Protection 10-7

10.4 Configuring 1:N Optical Channel Protection 10-9

10.4.1 Creating 1:N Optical Channel Protection 10-9

10.4.2 Searching 1:N Optical Channel Protection Subnet 10-11

10.4.3 Switching 1:N Optical Channel Protection Status 10-12

10.5 Configuring Clock Transparent Transmission Protection 10-15

11 Configuring Alarm and Performance Monitoring Parameters 11-1

11.1 Synchronizing NE Time 11-2

11.2 Setting Network Wide Alarm Attributes 11-3

11.2.1 Creating New Alarm Attribute Template 11-3

11.2.2 Creating Alarm Correlation Rule 11-4

11.2.3 Creating Fault Diagnosis Rule 11-4

11.2.4 Enabling the Switch of Alarm Function 11-6

11.2.5 Enabling Alarm Notification to E-mail or Pager 11-7

11.2.6 Enabling Alarm Box and Setting Parameter 11-9

11.2.7 Setting Alarm Dump Condition 11-10

11.3 Setting NE Alarm Attributes 11-12

11.4 Setting Board/Port Alarm Attributes 11-14

11.4.1 Setting Alarm Severity and Auto-report status 11-14

11.4.2 Setting Alarm Reversion 11-15

11.4.3 Setting Alarm Suppression Status 11-16

11.4.4 Setting Alarm Filter Status 11-18

11.4.5 Setting Bit Error Alarm Threshold 11-19

11.4.6 Setting AIS Insertion Switch 11-20

11.4.7 Setting UNEQ Insertion Switch 11-21

11.5 Setting Performance Monitoring Parameters 11-23

11.5.1 Creating Performance Threshold Template 11-23

Page 19: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for SDH Contents

Huawei Technologies Proprietary

vii

11.5.2 Setting Performance Threshold 11-24

11.5.3 Setting Board Temperature Threshold 11-25

11.5.4 Setting Performance Monitoring Object 11-26

11.5.5 Setting Performance Monitoring Start/Stop Status 11-27

11.5.6 Setting Non-Periodic Automatic Report of Performance Event 11-28

11.5.7 Resetting NE Performance Register 11-29

11.5.8 Setting Performance Dump Conditions 11-30

12 Synchronization and Data Management 12-1

12.1 Synchronizing NE Time 12-2

12.2 Synchronizing Current Alarms from NE 12-2

12.3 Backing up and Restoring T2000 Database 12-4

12.3.1 Immediately Backing up T2000 Database 12-4

12.3.2 Enabling Automatical T2000 Database Backup 12-4

12.3.3 Restoring T2000 Database 12-6

12.4 Managing NE Database 12-8

12.4.1 Checking the Consistency of NE Configuration Data 12-8

12.4.2 Uploading/Downloading NE Configuration Data 12-9

12.4.3 Duplicating NE Configuration Data 12-9

12.4.4 Initializing NE Configuration Data 12-9

12.4.5 Exporting ROME Text Files Periodically 12-11

13 Routine Maintenance 13-1

13.1 Browsing Alarm 13-2

13.1.1 Synchronizing Current Alarms from NE 13-2

13.1.2 Browsing Network-Wide Current Alarms 13-2

13.1.3 Browsing Current Alarms and Abnormal Event 13-4

13.1.4 Browsing History Alarms 13-5

13.1.5 Browsing Alarm Statistics and Output Report 13-6

13.1.6 Turning off Alarm Indicator on Alarm Box 13-7

13.1.7 Clearing Alarms 13-8

13.2 Performance Monitoring 13-10

13.2.1 Browsing Current Performance Data 13-10

13.2.2 Browsing PM Threshold-crossing Record 13-11

13.2.3 Browsing History Performance Data 13-12

13.3 Browsing Operation Log 13-14

13.4 Checking Switching Status 13-16

13.4.1 Checking Line Protection Switching 13-16

Page 20: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for SDH Contents

Huawei Technologies Proprietary

viii

13.4.2 Checking Wavelength Protection Switching 13-16

13.4.3 Checking 1+1 Channel Protection Switching 13-17

13.4.4 Checking 1:N Channel Protection Switching 13-18

13.4.5 Checking Clock Transparent Transmission Protection Switching 13-19

13.5 Synchronization 13-21

13.6 Backing up and Restoring T2000 Database 13-21

13.7 Equipment Data Collection 13-21

13.8 Automatic Disabling of NE Function 13-23

14 Fault Maintenance 14-1

14.1 Checking Optical Power 14-2

14.2 Setting OTU Loopback 14-2

14.3 Performing Protection Switching 14-5

14.3.1 Performing Line Protection Switching 14-5

14.3.2 Performing Wavelength Protection Switching 14-6

14.3.3 Performing 1+1 Channel Protection Switching 14-7

14.3.4 Performing 1:N Channel Protection Switching 14-8

14.3.5 Performing Clock Transparent Transmission Protection Switching 14-8

14.4 Fault Diagnosis Wizard 14-10

14.4.1 Set Fault Diagnosis Rules 14-10

14.4.2 Fault Diagnosis Wizard 14-11

14.5 Hard Resetting and Soft Resetting Unit 14-13

14.6 Resetting NE Software 14-14

14.7 Remote Maintenance 14-15

14.8 Modifying Overhead Byte 14-16

A Obtaining and Installing License A-1

A.1 Obtaining License A-1

A.2 Installing License A-4

B Abbreviations B-1

Page 21: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for SDH Tables

Huawei Technologies Proprietary

ix

Figures

Figure 7-1 Clock numbering supported by TC1/TC2 7-11

Figure 9-1 System power when gain control is activated 9-15

Figure 9-2 System power when ALC is activated 9-15

Figure 9-3 Networking for APE function 9-33

Figure 14-1 Cross loopback diagram 14-3

Figure 14-2 RAS-based remote maintenance 14-15

Page 22: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM About this Manual

Huawei Technologies Proprietary

ii

About this Manual

Related Manuals

Manual Usage

OptiX iManager T2000 System Description

Introduces the position, functional characteristics, system architecture and networking mode of the T2000, appended with standards that the T2000 complies with, abbreviations and performance indices.

OptiX iManager T2000 Installation Manual

Introduces the installation procedure and FAQ of T2000 under the platforms of Windows2000 and Solaris 8.

OptiX iManager T2000 Operation Manual for SDH

Introduces the configuration and maintenance operations of SDH equipment in the T2000.

OptiX iManager T2000 Operation Manual for WDM

Introduces the configuration and maintenance operations of WDM equipment in the T2000.

OptiX iManager T2000 Electronic Documentation for SDH&WDM

Contains all the above manuals in CD-ROM format, readable with Acrobat Reader.

Organization

The manual has the following organization: Chapter Description

Chapter 1 Quick Start This chapter introduces some preparation operations that make the T2000 into a fine work status.

Chapter 2 Creating Topology

This chapter introduces how to create topology objects in the T2000.

Chapter 3 Security Management

This chapter introduces some security management tasks of the T2000.

Chapter 4 Configuring Equipment

This chapter introduces how to configure equipment in the T2000.

Page 23: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM About this Manual

Huawei Technologies Proprietary

iii

Chapter Description

Chapter 5 Configuring Communication

This chapter introduces basic communication configuring operations that ensures normal communication between the NEs and the T2000.

Chapter 6 Configuring Unit parameters

This chapter introduces how to configure units.

Chapter 7 Configuring Clock

This chapter includes the operations of configuring board clock and service clock.

Chapter 8 Configuring Overhead Interface

This chapter introduces how to configure overhead interface in the T2000.

Chapter 9 Configuring Network Parameters

This chapter introduces how to configure network parameters.

Chapter 10 Configuring Protection

This chapter introduces how to configure protection.

Chapter 11 Configuring Alarm and Performance Monitoring Parameters

This chapter introduces how to configuring alarm and performance monitoring parameters.

Chapter 12 Synchronization and Data Management

This chapter introduces the operations of synchronization and data management.

Chapter 13 Routine Maintenance

This chapter includes the tasks in the routine maintenance work, which should be done regularly, may be daily, weekly or monthly.

Chapter 14 Fault Maintenance

This chapter introduces basic operations of fault maintenance.

Appendix Appendix A introduces how to obtain and install the license file. Appendix B introduces the abbreviations.

Intended Audience

This manual is for: Transmission network management system operator

Conventions

The manual uses the following conventions.

Page 24: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM About this Manual

Huawei Technologies Proprietary

iv

Symbol Conventions

Symbol Description

Warning A warning notice with this symbol indicate a potentially hazardous situation in which there is a possibility of personal injury.

Caution A caution notice with this symbol indicates a risk to equipment damage or loss of data.

Important Note:

An important note notice with this symbol helps you avoid an undesirable situation or indicates important supplementary information.

Note: A note notice with this symbol indicates additional, helpful, non-critical information.

GUI Conventions

Convention Description

< > Button name are inside angle brackets. For example, click the <OK> button

[ ] Window names, menu items, data table and field names are inside square brackets. For example, pop up the [New User] window.

/ Multi-level menus are separated by forward slashes. For example, [File/Create/Folder].

Keyboard Operation

Format Description

<Key> Press the key with the key name inside angle brackets. For example, <Enter>, <Tab>, <Backspace>, or <A>.

<Key1 + Key2> Press the keys concurrently. For example, <Ctrl+Alt+A> means the three keys should be pressed concurrently.

<Key1, Key2> Press the keys in turn. For example, <Alt, A> means the two keys should be pressed in turn.

Mouse Operation

Action Description

Select Press and hold the primary mouse button (left mouse button by default).

Click Select and release the primary mouse button without moving the pointer.

Double-click Press the primary mouse button twice continuously and quickly without moving the pointer.

Page 25: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM About this Manual

Huawei Technologies Proprietary

v

Action Description

Drag Press and hold the primary mouse button and move the pointer to a certain position.

Page 26: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 1 Quick Start

Huawei Technologies Proprietary

1-1

1 Quick Start

This chapter introduces some preparation operations that make the T2000 into a fine work status. The following tasks are described:

Starting and Shutting down the T2000

Verifying whether License File has been Installed Correctly

Opening Online Help

Closing Online Help

System Setting

Views

Selecting Operation Objects from Object Tree

Setting Parameters in the List

Operation Precautions

Page 27: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 1 Quick Start

Huawei Technologies Proprietary

1-2

1.1 Starting and Shutting down the T2000

1.1.1 Starting T2000 Computer

Purpose

Use this procedure to start the computer of UNIX platform and Windows platform correctly.

The Sun workstation is different from personal computer (PC). Please start it by strictly observing the following procedure to avoid possible equipment damage or data loss.

Note:

T2000 supports both UNIX platform and Windows platform and provides the same functions under the two platforms. For the system hardware details, refer to OptiX iManager T2000 System Description.

Prerequisites

The T2000 hardware has been installed completely.

Before starting the system, check the connections of the workstation power cable, monitor power cable, and monitor data cable. Check whether the Ethernet cable of the workstation is correctly connected.

If there is external equipment such as printer or modem, check whether the printer or modem is correctly connected to the parallel interface or the serial interface of the workstation respectively. Also, check the connection of the power cable of such external equipment.

Procedure

1. On the UNIX platform Step Action 1 Turn on the power switch of the external equipment, such as the

monitor, modem, or printer.

2 Turn on the power switch of the workstation host. The Solaris boots automatically to display the Common Desktop Environment (CDE) for login.

Page 28: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 1 Quick Start

Huawei Technologies Proprietary

1-3

Step Action 3 Enter the user name and password in the login dialog box. For

example:

User: t2000 (the default is t2000)

Password: t2000 (the default is t2000)

4 The CDE starts completely.

2. On the Windows platform Step Action 1 Turn on the power switch of the external equipment, such as the

monitor, modem, or printer.

2 Turn on the power switch of the PC, and the MS Windows 2000 boots automatically for login.

3 Enter the user name and password in the login dialog box. For example:

User: t2000 (the default is t2000)

Password: t2000 (the default is t2000)

4 The MS Windows 2000 starts completely.

Page 29: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 1 Quick Start

Huawei Technologies Proprietary

1-4

1.1.2 Shutting down T2000 Computer

Purpose

Use this procedure to shut down the computer of T2000 server or T2000 client correctly.

The Sun workstation is different from PC. Please shut it down by strictly observing the following procedure to avoid possible equipment damage or data loss.

Prerequisite

Exit all running applications, including T2000 server, Sybase database, T2000 client and so on.

Procedure

1. On the UNIX platform Step Action 1 Open a terminal window and enter the following commands:

%su root Password: rootkit #sync;sync;sync;sync;sync #shutdown -y -g0 -i5

Note:

1) The "rootkit" above is the default password of super user root. If the password is already changed, enter the new password.

2) To reboot the Sun workstation, the last command is “#shutdown -y -g0 –i6”.

2 The Sun workstation will be shut down automatically.

3 Turn off the monitor and the external equipment.

Page 30: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 1 Quick Start

Huawei Technologies Proprietary

1-5

2. On the Windows platform Step Action 1 Select the [Start/Shut down] from the Windows 2000 desktop.

2 Select “Shut down” and click <OK> in the dialog box.

3 The computer will be shut down automatically.

4 Turn off the monitor and the external equipment.

1.1.3 Starting T2000 Server

Purpose

Use this procedure to start the T2000 server the first time.

Prerequisites

The T2000 server computer has been started correctly.

The T2000 license file is placed in the server directory.

Procedure

Step Action 1 Double-click the "T2000Server" icon on the desktop of the T2000

server. The System Monitor login dialog box will be displayed in a few seconds.

2 Enter password and server in the login dialog box. For example,

Password: T2000 (the default is T2000)

Server: Local

3 Wait a few minutes until the EMS server, Security server and Topo server are all in “Running” status. If they are, it means the T2000 server is started successfully.

Page 31: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 1 Quick Start

Huawei Technologies Proprietary

1-6

1.1.4 Restarting T2000 Server from System Monitor

Purpose

The procedure for restarting T2000 server is different from the one specified in “1.1.3 Starting T2000 Server” at the first time, since the System Monitor server has been started.

Prerequisites

The T2000 server has been shut down correctly.

Procedure

Step Action 1 Run the System Monitor client program.

Note:

Usually, the System Monitor client program is “C:\T2000\smclient\sysmonitor.bat” on the Windows platform, and it is “/T2000/smclient/sysmonitor.sh” on the UNIX platform.

2 Enter password and server in the login dialog box. For example,

Password: T2000 (the default is T2000)

Server: Local

3 Select [System/Start Server] in the System Monitor.

1.1.5 Exiting T2000 Server

Purpose

Use this procedure to shut down the T2000 server from the System Monitor.

Page 32: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 1 Quick Start

Huawei Technologies Proprietary

1-7

Prerequisite

None.

Procedure

Step Action 1 Start and log in to the System Monitor.

2 Select [System/Stop Server] in the System Monitor.

3 A confirmation dialog box is displayed. Click <OK>.

Wait for a moment until the EMS server, Security server and Topo server are all in “Stopped” status. If they are, it means the T2000 server is shut down successfully.

1.1.6 Starting T2000 Client

Purpose

Use this procedure to start the T2000 client correctly.

Prerequisite

The T2000 server has been started correctly.

Procedure

Step Action 1 On the computer of T2000 client, double-click the “T2000Client” icon

on the desktop.

Page 33: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 1 Quick Start

Huawei Technologies Proprietary

1-8

Step Action 2 Enter the user name, the password and the address of T2000 server in

the login dialog box. For example:

Name: Admin

Password: T2000

Server: 127.0.0.1

Note:

1) By default, the initial user name of T2000 is admin, and the password is T2000. To ensure the security of the T2000, the administrator should instantly change this password and keep the new one.

2) The administrator should create new T2000 users and assign them with certain authorities to NM staff.

3 Click <Login> to enter the main topology windows of T2000.

1.1.7 Exiting T2000 Client

Purpose

Use this procedure to exit the T2000 client only.

Prerequisite

None.

Procedure

Step Action 1 Select the [System/Exit] from the Main Menu.

A confirmation dialog box is displayed.

2 Click <OK>.

Page 34: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 1 Quick Start

Huawei Technologies Proprietary

1-9

1.1.8 Switching T2000 User

Purpose

Different users operating the T2000 client have different T2000 user names and passwords. Each one accesses the screen with his own T2000 user.

Use this procedure to switch a T2000 user.

Prerequisite

The user has logged in the T2000.

Procedure

Step Action 1 Select the [System/Change User] from the Main Menu. A confirmation

dialog box is displayed.

2 Click <OK>.

The login dialog box is displayed. If no other users want to log in the client, just leave the window there and skip steps 3 – 4.

3 If another T2000 user wants to operate on the client, enter the user name and password. For example:

Name: ABC

Password: 123

4 Click <Login>.

Page 35: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 1 Quick Start

Huawei Technologies Proprietary

1-10

1.2 Verifying whether License File has been Installed Correctly

Purpose

The functions of the T2000 are controlled by the license file. Without a license file, the T2000 can be started, but the features and management capability are limited. So, before starting the T2000, please make sure the license file has been correctly installed.

Prerequisites

The T2000 license file is placed in the sub-directory “server” of T2000 installation directory.

The T2000 server has been started correctly.

Procedure

Step Action 1 Start a T2000 client.

2 Select [Help/About] from the Main Menu.

3 Click <License Information>.

4 Check the functions and management capabilities listed in it.

Note:

1) If the functions are correct, the license works normally.

2) If not, please exit the T2000 client and server first, and then reinstall the license file. The detailed information about how to install license file is described in the “Appendix A.2 Installing License File” or the OptiX iManager T2000 Installation Manual.

Page 36: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 1 Quick Start

Huawei Technologies Proprietary

1-11

1.3 Opening Online Help

Purpose

Help is the main information resources of the T2000, which can help you to master the operation procedures and know about the interface operation guides at any time.

You can open the T2000 help in the following two ways:

From the menu of the T2000 client

From a certain function interface

Prerequisite

The T2000 has been working normally.

Procedure

Step Action 1 Select [Help/Help Topics] from the Main Menu to display the help

window.

Page 37: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 1 Quick Start

Huawei Technologies Proprietary

1-12

Step Action 2 In the operation interface of the T2000 client, press <F1> to display the

help topic for this function.

For example, press F1 in the Optical Transponder Unit functional window and the Help Topic of this function is displayed.

Page 38: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 1 Quick Start

Huawei Technologies Proprietary

1-13

1.4 Closing Online Help

Purpose

Use this procedure to close the T2000 help window.

Prerequisite

None.

Procedure

Step Action 1 Make sure that the active dialog box has been closed, because it will

lock the help window.

2 Make sure that the pop-up help window has been closed before closing the help window.

Note:

To close the pop-up window, click outside it in the help window.

3 Click of the help windows to close it.

Page 39: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 1 Quick Start

Huawei Technologies Proprietary

1-14

1.5 System Setting

1.5.1 Enabling Display of Needed Functions

Purpose

The T2000 can manage Huawei's optical transmission equipment, including the SONET equipment, DWDM equipment and SDH equipment. It can also manage the ATM service and Ethernet service. You can set whether to display them at the client as required.

Furthermore, the T2000 hides some functions that are not used frequently as advanced menus. You can set whether to display them at the client.

Prerequisite

NM user with the authority of "system operator" or above.

Procedure

Step Action 1 Select [System/System Setting] from the Main Menu.

2 Click the tab "Customize Function".

3 Select the checkbox of SDH Functions, DWDM Functions, ATM Functions, Ethernet Functions and SONET Functions. In this way, only related menu items are displayed.

Page 40: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 1 Quick Start

Huawei Technologies Proprietary

1-15

Step Action 4 If the less common functions need to be displayed in the menu, select

the “Show Advanced Menu” checkbox.

If not, skip this step.

5 Click <OK>.

6 Restart the client to validate the settings.

1.5.2 Setting Alarm Sounds

Purpose

Use this procedure to set the prompt sounds of the system for reporting different severities of alarms as well as the sounds for exception events and performance threshold-crossing events.

Prerequisites

NM user with the authority of "system operator" or above.

The client must have installed the sound playing equipment.

Procedure

Step Action 1 Select [System/System Setting] from the Main Menu.

2 Click the tab "Sound".

3 Set the voice type and duration of the event. Click <Play> to test the alarm sound settings.

Page 41: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 1 Quick Start

Huawei Technologies Proprietary

1-16

Step Action 4 If the alarm sound needs to be shut off forever on the T2000 client,

select the “Shut off Sound Forever” checkbox.

If not, skip this step.

5 Click <OK>.

1.5.3 Setting Background

Purpose

Use this procedure to set the backgrounds of the T2000 views respectively. You can select the pictures provided by the T2000 or introduce other pictures.

Prerequisite

NM user with the authority of "system operator" or above.

Procedure

Step Action 1 Select [System/System Setting] from the Main Menu and click the tab

"Set Background".

Or, right-click the view and select [Background Settings].

2 If the background pictures need to added or deleted on the T2000 client, please click <Add New Background> or <Delete Background>.

If not, skip this step.

3 Double-click the “Background” for the view to display the combo box, and select the background picture.

4 Click <OK>.

Page 42: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 1 Quick Start

Huawei Technologies Proprietary

1-17

1.5.4 Setting Screen Lockout

Purpose

Use this procedure to set whether the client of the current user is auto-locked and the delay time that the client is locked automatically.

Prerequisite

NM user with the authority of "system operator" or above.

Procedure

Step Action 1 Select [System/System Setting] from the Main Menu.

2 Click the tab "System Lockout".

3 Enter the delay time in the “Minute(s)” entry box for locking screen.

4 Click <OK>.

Note:

To lock the current client immediately, select [System/Lock NM Screen] in the Main Menu.

To unlock the screen, press <CTRL>+<ALT>+<U> and enter the login user password.

Page 43: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 1 Quick Start

Huawei Technologies Proprietary

1-18

1.5.5 Changing NM User’s Password

Purpose

Use this procedure to change the current T2000 user's password.

Prerequisite

None.

Procedure

Step Action 1 Select [System/Change Password] from the Main Menu.

2 Enter the old password.

Enter the new password and confirm it.

3 Click <OK>.

Page 44: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 1 Quick Start

Huawei Technologies Proprietary

1-19

1.6 Views

1.6.1 Main Topology

The T2000 constructs and manages topology structure of the network through the Main Topology.

The topology management includes creating topology object, creating subnet, creating fiber/cable, and searching for the existing equipments in the network.

Topologyobject tree

Toolbar

T2000Server IP

Main menu

Topology menu

Maintenancestatus

Toolbar button

CurrentT2000 user

Multi-user/Singleuser mode

Currenttopology subnet

Topology view

Date & TimeEquipment/Unitinformation

Alarm button

Filter tab

Legend tabAbnormal

event indicator

Page 45: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 1 Quick Start

Huawei Technologies Proprietary

1-20

1.6.2 Equipment Maintenance Console

The equipment maintenance console is the main operation interface of the T2000. You can open the functions of equipment configuration, management and maintenance through selecting the corresponding function node in the navigation tree.

Interface

Navigation tree Toolbar

Commondbutton

Toolbar button

Function Display boxList title

Time/Datebutton

Double-right-arrowbutton

Objecttree

Parameter setting area

Subnet/NE/Unit/Module name

Combobox

Refresh/Expand all/Collapse all

Page 46: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 1 Quick Start

Huawei Technologies Proprietary

1-21

1.6.3 Protection Network View

The protection view enables search, browse, creation, setting and management on the protection subnetwork as well as management on independent nodes and SDH NNI.

Interface

Page 47: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 1 Quick Start

Huawei Technologies Proprietary

1-22

1.6.4 Trail View

The trail view enables search, creation, configuration and maintenance management functions on network trails.

Interface

Page 48: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 1 Quick Start

Huawei Technologies Proprietary

1-23

1.6.5 DCN View

The Data Communication Network (DCN) is to implement the transmission of management information, providing the information switch between the NM (network management) and NEs (network elements).

T2000 can communicate with each NE, via the TCP/IP channel between T2000 and gateway NE and via the ECC between the gateway NE and non-gateway NE.

The communications between the NEs and the NM can be managed in a unified way through the DCN view.

Interface

NE tab Toolbar

View

DCN menu

GNE tab View legend tabView filter tab

Page 49: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 1 Quick Start

Huawei Technologies Proprietary

1-24

1.6.6 Custom View

A custom view is a topological view similar a Main Topology. Generally, in the T2000, different users have different network management ranges. A user can customize a view for the network topology and equipment under certain administration as a working interface. In a custom view window, the topology structure of a network, including the link and subnet/NE, is displayed.

Interface

Topologyview

Toolbar

T2000Server IP

Main menuCustom viewname

Maintenancestatus

Toolbar button

CurrentT2000 user

Multi-user/Singleuser mode

Currenttopology subnet

Shortcut menu

Data & Time

Alarm button

Filter tab

Legend tabAbnormal

event indicator

Page 50: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 1 Quick Start

Huawei Technologies Proprietary

1-25

Procedure

1. Create a custom view Step Action 1 Select [View/Custom View] from the Main Menu.

2 Click <Create> in the "View Management" dialog box.

3 In the "Basic Attributes" tab, enter the view name and descriptions and select the background.

4 Click the "Object Selection" tab and select the link and subnet/NE to be included in the view.

5 Click <OK> to create a custom view.

2. Open a custom view Step Action 1 Select [View/Custom View] from the Main Menu.

2 Select a custom view record in the "View Management" dialog box.

Page 51: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 1 Quick Start

Huawei Technologies Proprietary

1-26

Step Action 3 Click <Open> in the "View Management" dialog box.

The selected custom view window is displayed.

3. Modify a custom view Step Action 1 Select [View/Custom View] from the Main Menu.

2 Select a custom view record in the "View Management" dialog box.

3 Click <Modify> in the "View Management" dialog box.

4 Modify the attributes of this view and the object it includes.

5 Click <OK> to confirm the modification.

4. Delete a custom view Step Action 1 Select [View/Custom View] from the Main Menu.

2 Select a custom view record in the "View Management" dialog box.

3 Click < Delete> to remove it.

5. Set a custom view as the startup view Step Action 1 Open a custom view window.

2 Right-click in the custom view and select [Save as Home View] to set the current custom view as the default startup view.

Note:

To set Main Topology as startup view, select [Set Start View to Main Topology].

3 Restart the T2000 client to automatically enter the custom view.

1.6.7 NE Panel

The NE panel displays the visual graphic objects of physical entities such as subracks, units, and ports. The graphic objects that constitute the NE panel reflect the status changes in different colors. In the T2000, the NE panel is the major means

Page 52: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 1 Quick Start

Huawei Technologies Proprietary

1-27

of equipment configuration. It is also an important means for monitoring equipment operation status and locating fault.

Interface

Double-click the NE icon in the Main Topology view to display the NE panel.

Right-click an idle slot, and select the unit to be added.

Right-click a unit installed to display the corresponding shortcut menu.

Page 53: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 1 Quick Start

Huawei Technologies Proprietary

1-28

Page 54: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 1 Quick Start

Huawei Technologies Proprietary

1-29

1.7 Selecting Operation Objects from Object Tree

Purpose

Before any operations such as configuration and query in the Equipment Maintenance Console, you need to select operation objects such as NE, unit, port or functional module from the object tree in the lower-left pane.

The operations in the Equipment Maintenance Console are taken as an example in the following description.

Prerequisite

None.

Procedure

Step Action 1 After any function selection in the equipment maintenance console, the

operation object concerning this function will be shown in the navigation tree on the lower left part of the view.

2 Clicking before the operation object can extend the lower directory contained.

3 Clicking the check boxes before the operation objects can select or not select the objects and all the operation objects they contain. The object selected will have a before.

4 Click double-right-arrow button (red) to be added to the operation interface in the right pane. Then, operations such as query and configuration can be done there.

Page 55: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 1 Quick Start

Huawei Technologies Proprietary

1-30

1.8 Setting Parameters in the List

Purpose

The T2000 operation interface adopts the style of “tree on the left and list on the right”. All parameters are set in the list.

The operations in the Equipment Maintenance Console are taken as an example in the following description.

Prerequisite

None.

Procedure

Step Action 1 In the upper-left pane, select a functional node from the Equipment

Maintenance Console navigation tree.

2 In the lower-left pane, select the operation object from the object tree and click the double-right-arrow button (red).

3 Select one or more rows to be set in the list box.

4 Double-click the column to be set in the list to display the pull-down combo box or edit box. Select the appropriate item from the combo box or type a desired value in the edit box.

Another way is to right-click the item to be modified to select the appropriate item from the shortcut menu.

5 Click <OK>.

Page 56: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 1 Quick Start

Huawei Technologies Proprietary

1-31

1.9 Operation Precautions

It is forbidden to modify the system time of the server during the T2000 operation. Please set the system time during the T2000 installation. To modify the system time of the server, do exit from the T2000 server first and then restart it after the modification.

Do not modify the name and IP address of the computer as T2000 server randomly.

Log in the Solaris CDE as t2000 on the UNIX platform. While on the Windows platform, you must use the user name and password in the T2000 installation for login.

Make sure the data at NE side is consistent with that at the NM side. When the NE data configuration is finished and runs normally, please update the data at the NM side manually or with auto synchronization function.

Backup the T2000 database periodically to minimize the loss caused by system abnormity.

If the login user has the authority of system administrator, the operation of “Shut Down Server” can be implemented. Be cautious to execute this operation to avoid shutting down the running server by mistake.

It is recommended to query the latest data from the NE side before settings parameters.

Usually, when a dangerous operation is going to be implemented, the T2000 will give a confirmation message to remind the operator.

Page 57: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 2 Creating Topology

Huawei Technologies Proprietary

2-1

2 Creating Topology

This chapter introduces how to create topology objects in the T2000 screen. This is the first step in configuration.

The following tasks are described:

Creating NEs

Creating Topology Subnet

Changing Subrack NE Attributes

Creating Optical NE Attributes

Creating Links

Creating NM

Page 58: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 2 Creating Topology

Huawei Technologies Proprietary

2-2

2.1 Creating NEs

There are several ways to create NEs.

2.1.1 Searching NEs in Batch

Purpose

It is to search for the NE ID information of all NEs in a network and the IP addresses of the gateway NEs by specifying the IP address range of a network to be searched.

Based on the above information, you can create NEs in batch on the T2000 and display them on the Main Topology. The equipment search function of the T2000 can also be used to search for and display the information about connection between NEs, but you need to manually create these fibers/cables one by one.

Searching for and creating NEs in batch is quicker and more accurate than manually creating NEs one by one. This method applies to the situation that data has been configured on the NE side and fiber/cable connection has been established between NEs.

Prerequisite

NM user with the authority of "system maintainer" or above.

Procedure

Step Action

1 Select [Topology/Automatic Equipment Detection] from the Main Menu.

2 Click <Add Search Field>. The “Input IP” dialog box is displayed.

3 Select “Address Type” and enter the IP address. Click <OK>.

Note:

You can repeat steps 2~3 to add multiple search fields.

4 Click <Start Search>. The NEs and Links found are displayed after search.

5 Select the uncreated NE in the “NEs Found” list and click <Create NE>. The “Current NE ID is…” dialog box is displayed.

Page 59: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 2 Creating Topology

Huawei Technologies Proprietary

2-3

Step Action

6 Enter the NE user name and password. You can select the “All NEs use the same User and Password” or “Save User and Password for Re-Use” combo box when creating multiple NEs.

7 Click <OK>. The NE is created in the Main Topology.

2.1.2 Manually Creating Subrack NEs

Purpose

WDM equipment is composed of subrack NE and optical NE (ONE) on T2000. The subrack NE represents a physical subrack of WDM equipment and the ONE represents a logical equipment type, for example, OTM. The subrack NE belongs to an ONE and one ONE contains 1 – 3 subrack NEs.

There are two ways to create the ONE and the subrack NE in T2000.

You can create ONE firstly and then create subrack NEs that belong to this ONE.

You can create several subrack NEs in affiliated idle ONE first and then create an ONE to obtain subrack NEs from the idle ONE. Idle ONE is the default ONE which contains the new created subrack NEs.

Use this procedure to manually create subrack NEs one by one.

This method applies to the situation no matter whether data has been configured on the NE side or not.

Prerequisite

NM user with the authority of "system maintainer" or above.

Page 60: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 2 Creating Topology

Huawei Technologies Proprietary

2-4

Procedure

1. Creating gateway subrack NE Step Action

1 Right-click in the Main Topology and select [Create/Topology Object].

2 Select the NE type from the “Create Topology Object” dialog box and enter the attribute information of the NE. Select “IP Gateway” in Gateway Type item.

Note:

Default NE user of the T2000: root; default password: password. The NE user for creating an NE shall be at the system maintainer level at least.

You can choose the “Pre-Configuration” combo box if the data has not been configured on the NE side.

3 Click <OK>.

4 Click in the Main Topology. The icon of this NE appears in the position where you click.

2. Creating common subrack NE Step Action

1 Right-click in the Main Topology and select [Create/Topology Object].

Page 61: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 2 Creating Topology

Huawei Technologies Proprietary

2-5

Step Action

2 Select the NE type from the “Create Topology Object” dialog box and enter the attribute information of the NE.

Note:

Default NE user of the T2000: root; default password: password. The NE user for creating an NE shall be at the system maintainer level at least.

You can choose the “Pre-Configuration” combo box if the data has not been configured on the NE side.

The subrack NE created is in affiliated idle ONE.

3 Click <OK>.

4 Click in the Main Topology. The icon of this NE appears in the position where you click.

2.1.3 Manually Creating Optical NEs

Purpose

Use this procedure to manually create optical NEs (ONEs) one by one.

Prerequisite

NM user with the authority of "system maintainer" or above.

Page 62: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 2 Creating Topology

Huawei Technologies Proprietary

2-6

Procedure

Step Action

1 Right-click in the Main Topology and select [Create/Topology Object].

2 Select the optical NE type “DWDM_OTM” from the “Create Topology Object” dialog box.

Note:

You can choose the “Pre-Configuration” combo box if the data has not been configured on the NE side.

3 Click “Basic Attributes” tab and enter the attribute information of the ONE.

Note:

There are three types of optical NEs in T2000: DWDM_OTM, DWDM_OLA, and DWDM_OADM.

Page 63: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 2 Creating Topology

Huawei Technologies Proprietary

2-7

Step Action

4 Click “Divide Resource” tab and select created subrack NEs from the “Available Boards” column. Click the double-right-arrow button (red).

5 Click <OK>.

6 Click in the Main Topology. The icon of this NE appears in the position where you click.

2.1.4 Deleting Subrack NE

Purpose

Use this procedure to manually delete subrack NEs one by one on the NM side.

Prerequisite

NM user with the authority of "system maintainer" or above.

Procedure

Step Action

1 Double-click the ONE icon in the Main Topology.

Page 64: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 2 Creating Topology

Huawei Technologies Proprietary

2-8

Step Action

2 Right-click the selected subrack NE icon in the left pane and select [Delete]. The “Delete” dialog box is displayed.

3 Click <OK>. The NE icon is deleted from the Main Topology.

2.1.5 Deleting Optical NE

Purpose

Use this procedure to manually delete optical NEs one by one on the NM side.

Prerequisites

NM user with the authority of "system maintainer" or above.

Procedure

Step Action

1 Right-click the ONE icon in the Main Topology and select [Delete]. The “Delete” dialog box is displayed.

2 Click <OK>. The ONE icon is deleted from the Main Topology.

2.1.6 Switching NE User

Purpose

For NE management, you usually need to select an NE user with the corresponding

Page 65: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 2 Creating Topology

Huawei Technologies Proprietary

2-9

authority level according to the operation type. To avoid conflict due to the login to the NE from different clients using the same NE user, you often need to switch the NE user.

Prerequisites

NM user with the authority of "system maintainer" or above.

NE user has been created.

Procedure

Step Action

1 Select [System/NE Security Management/NE Login Management] from the Main Menu.

2 Select the NE with the NE user to be switched from the NE list, and click the double-right-arrow button (red).

3 Select the NE in “NE Login Management”. Click <Switch NE User>. The “Switch Current NE User” dialog box is displayed.

Note:

You can use <Ctrl> or <Shift> to select multiple NEs at one time.

4 Enter the name and password of the new NE user. Click <OK>.

5 Click <OK> in the “Operation Result” dialog box.

Page 66: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 2 Creating Topology

Huawei Technologies Proprietary

2-10

2.2 Creating Topology Subnet

Purpose

The subnet created here is a topological concept only. For the convenience of management, topology objects in the same area of a network or with similar attributes are usually arranged in one subnet for display.

Prerequisite

NM user with the authority of "system maintainer" or above.

Procedure

Step Action

1 Right-click in the Main Topology and select [Create/Subnet].

2 Select the tab “Basic Attributes” in the “Create Subnet” dialog box. Enter the attributes of the subnet.

3 Select the tab “Object Selection” and select the created NE from the column “Object Not Selected”. Click the double-right-arrow button (red).

4 Click <OK>. The icon “ ” appears on the Main Topology.

Page 67: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 2 Creating Topology

Huawei Technologies Proprietary

2-11

2.3 Changing Subrack NE Attributes

2.3.1 Changing Subrack NE Name and Remarks

Purpose

Use this procedure to change subrack NE name and remarks.

Prerequisite

NM user with the authority of "system operator" or above.

Procedure

Step Action

1 Double-click the ONE icon and the subrack NEs are displayed.

2 Right-click the selected subrack NE icon in the left pane and select [Attribute]. The “NE Attribute…” dialog box is displayed.

3 Enter the new subrack NE name and click <Apply>.

Page 68: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 2 Creating Topology

Huawei Technologies Proprietary

2-12

Step Action

4 Enter the new subrack NE remarks and click <OK>.

2.3.2 Changing Subrack NE IP Address

Purpose

Use this procedure to change subrack NE IP Address.

Caution:

Changing subrack NE IP address will not interrupt the communication between the NE and the NM.

Prerequisite

NM user with the authority of "system administrator" or above.

Procedure

Step Action

1 Select [View/Protection View] from the Main Menu.

2 Select [Communication/Communication Parameter Setting] in the DCN View.

3 Select the subrack NE and click the double-right-arrow button (red).

Page 69: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 2 Creating Topology

Huawei Technologies Proprietary

2-13

Step Action

4 Enter the new IP in the “IP” domain and click <Apply>.

2.3.3 Changing Subrack NE Extended ID

Purpose

Use this procedure to change the subrack NE Extended ID. Extended ID refers to the higher 8 bits of the NE ID that are used to identify the subnet where the NE is located, and to distinguish different network segments in the WAN.

Prerequisite

NM user with the authority of "system administrator" or above.

Procedure

Step Action

1 Select [View/Protection View] from the Main Menu.

2 Select [Communication/Communication Parameter Setting] in the DCN View.

3 Select the subrack NE and click the double-right-arrow button (red).

Page 70: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 2 Creating Topology

Huawei Technologies Proprietary

2-14

Step Action

4 Enter the new extended ID in the “Extended ID” domain and click <Apply>.

2.3.4 Changing Subrack NE Subnet Mask

Purpose

Use this procedure to change subrack NE subnet mask.

Caution:

Changing subrack NE subnet mask may interrupt the communication between an NE and the NM.

Prerequisite

NM user with the authority of "system administrator" or above.

Procedure

Step Action

1 Select [Communication/Communication Parameter Setting] in the DCN View.

Page 71: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 2 Creating Topology

Huawei Technologies Proprietary

2-15

Step Action

2 Select [Communication/Communication Parameter Setting] in the DCN View.

3 Select the subrack NE and click the double-right-arrow button (red).

4 Enter the new subnet mask in the “Subnet Mask” domain and click <Apply>.

2.3.5 Changing Subrack NE Pre-configuration Attribute

Purpose

Use this procedure to change the pre-configuration attribute of subrack NEs. Data of the pre-configuration subrack NE will not be sent to the NE side. The pre-configuration subrack NE must be changed into normal subrack NE after it runs normally.

Prerequisite

NM user with the authority of "system operator" or above.

Pre-configuration NE has been created.

Procedure

Step Action

1 Double-click the ONE icon and the subrack NEs are displayed.

Page 72: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 2 Creating Topology

Huawei Technologies Proprietary

2-16

Step Action

Right-click the subrack NE icon in the left pane and select [Attribute]. The “NE Attribute…” dialog box is displayed.

2 Set the pre-configuration attribute in the “Pre-Configuration” combo box. Click <OK>.

Page 73: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 2 Creating Topology

Huawei Technologies Proprietary

2-17

2.4 Creating Optical NE Attributes

2.4.1 Changing Optical NE Name and Remarks

Purpose

The WDM equipment is managed in form of Optical NE (ONE). There are three kinds of ONEs on T2000: DWDM_OTM, DWDM_OLA and DWDM_OADM.

Each ONE contains one to three subrack NEs. On T2000, you can create the ONE and then create its subordinate subrack NEs. Or you can create some subrack NEs in the idle ONE and then create the ONE to obtain resources from the idle ONE.

Use this procedure to change optical NE name and remarks.

Prerequisite

NM user with the authority of "system operator" or above.

Procedure

Step Action

1 Right-click the selected optical NE icon in the Main Topology and select [Attribute]. The “NE Attribute…” dialog box is displayed.

2 Enter the new optical NE name and click <Apply>.

3 Enter the new optical NE remarks and click <OK>.

2.4.2 Changing Resource Division of Optical NE

Purpose

Use this procedure to change the resource division of optical NE.

Page 74: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 2 Creating Topology

Huawei Technologies Proprietary

2-18

Prerequisite

NM user with the authority of "system operator" or above.

Procedure

Step Action

1 Right-click the selected optical NE icon in the Main Topology and select [Attribute]. The “NE Attribute…” dialog box is displayed.

2 Select “Divide Resource” tab and click the double-right-arrow button (red) to change selected subrack NEs in “Selected Board” column.

3 Click <OK>.

Page 75: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 2 Creating Topology

Huawei Technologies Proprietary

2-19

2.5 Creating Links

2.5.1 Creating NM Ethernet Line

Purpose

Use this procedure to create Ethernet line between the NM and the gateway NE.

Prerequisite

NM user with the authority of "system operator" or above.

Procedure

Step Action

1 Right-click in the Main Topology and select [Create/Topology Object].

2 Select “Ethernet Line” from the “Create Topology Object” dialog box and enter the attribute information of the Ethernet line.

3 Click <OK>. The Ethernet line icon is displayed between the NM and the gateway NE.

2.5.2 Creating Extended ECC

Purpose

In some cases, you can connect two gateway NEs without fiber connection by Ethernet line to establish an extended ECC between them. Use this procedure to create an extended ECC line.

Prerequisite

NM user with the authority of "system operator" or above.

Page 76: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 2 Creating Topology

Huawei Technologies Proprietary

2-20

Procedure

Step Action

1 Right-click in the Main Topology and select [Create/Topology Object].

2 Select “Extended ECC” from the “Create Topology Object” dialog box and enter the attribute information of the extended ECC line.

3 Click <OK>. The extended ECC icon is displayed between the two gateway NEs.

2.5.3 Creating Serial Port Line

Purpose

In some cases, the NM communicates with the gateway NE through a serial port. Use this procedure to create a serial port line.

Prerequisite

NM user with the authority of "system operator" or above.

Procedure

Step Action

1 Right-click in the Main Topology and select [Create/Topology Object].

Page 77: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 2 Creating Topology

Huawei Technologies Proprietary

2-21

Step Action

2 Select “Serial Port Line” from the “Create Topology Object” dialog box and enter the attribute information of the serial port line.

3 Click <OK>. The serial port line icon is displayed between the NM and the gateway NE.

Page 78: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 2 Creating Topology

Huawei Technologies Proprietary

2-22

2.6 Creating NM

Purpose

Use this procedure to create the NM.

Prerequisite

NM user with the authority of "system operator" or above.

Procedure

Step Action

1 Right-click in the Main Topology and select [Create/Topology Object].

2 Select “NM” from the “Create Topology Object” dialog box and enter the attribute information of the NM.

3 Click <OK>. The NM icon is displayed on the Main Topology.

Page 79: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 3 Security Management

Huawei Technologies Proprietary

3-1

3 Security Management

This chapter introduces some security management tasks of the T2000.

The following tasks are described:

Creating NE User and Assigning Authority

Managing NE Login

Creating NM User

Managing T2000 Login

Page 80: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 3 Security Management

Huawei Technologies Proprietary

3-2

3.1 Creating NE User and Assigning Authority

Purpose

Use this procedure to create NE user and assign its authority.

Prerequisite

Super NM user: admin.

Procedure

Step Action 1 Select [System/NE Security Management/NE User Management] from

the Main Menu.

2 In the lower-left pane, select the appropriate NE and click the double-right-arrow button (red).

3 Click <Add>. The “Add NE User” dialog box is displayed.

4 Enter the information of the newly created user in the “Add NE User” dialog box.

5 Click <OK> or <Apply>.

6 Repeat this procedure to create as many NE users as necessary.

Page 81: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 3 Security Management

Huawei Technologies Proprietary

3-3

3.2 Managing NE Login

3.2.1 Switching NE User

Purpose

Use this procedure to switch NE user.

Prerequisites

NM user with the authority of “system maintainer” or above.

The NE user has been created.

The NE user has been logged in.

Procedure

Step Action 1 Select [System/NE Security Management/NE Login Management] from

the Main Menu.

2 In the lower-left pane, select the appropriate NE and click the double-right-arrow button (red).

3 Click <Query> to query the current NE user.

4 Select the NE in the NE user management list and click <Switch NE User>. The “Switch Current NE User” dialog box is displayed.

5 Enter the user name and password in the “Switch Current NE User” combo box.

6 Click <OK>.

Page 82: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 3 Security Management

Huawei Technologies Proprietary

3-4

3.2.2 Forcing NE User to Logout NE

Purpose

Use this procedure to force NE user to log out NE.

Prerequisites

NM user with the authority of "system maintainer" or above.

The NE user has been created.

The NE user has been logged in.

Procedure

Step Action 1 Select [System/NE Security Management/NE Login Management] from

the Main Menu.

2 In the lower-left pane, select the appropriate NEs and click the double-right-arrow button (red).

3 Select the NE entry. Click <Logout> or right-click it and select [Logout]

4 The “Operation Result” dialog box is displayed and indicates operation succeeded.

3.2.3 Locking NE Login

Purpose

Use this procedure to lock NE login.

Prerequisites

NM user with the authority of “system maintainer” or above.

The current NE user has the highest level in all login NE users.

Procedure

Step Action 1 Select [System/NE Security Management/NE Login Lock] from the

Main Menu.

2 In the lower-left pane, select the appropriate NEs and click the double-right-arrow button (red).

3 Click <Query> to query the “Login Lock Status”.

Page 83: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 3 Security Management

Huawei Technologies Proprietary

3-5

Step Action 4 If the value of “Login Lock Status” is “Unlocked”, select it and click

<Lock Login> or right-click it and select [Lock Login].

Page 84: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 3 Security Management

Huawei Technologies Proprietary

3-6

3.2.4 Locking NE Settings

Purpose

Use this procedure to lock NE settings.

Prerequisite

NM user with the authority of “system maintainer” or above.

Procedure

Step Action 1 Select [System/NE Security Management/NE Setting Lock] from the

Main Menu.

2 In the lower-left pane, select the appropriate NE and click the double-right-arrow button (red).

3 Click <Query> to query the “Set Lock Status”.

4 If the value of “Set Lock Status” is “No”, select it and click <Lock Settings> or right-click it and select [Lock Settings]. The “Set Lock Window” dialog box is displayed.

5 Select “Permanent Locking” check box for permanent locking of the current NE settings or enter the value of “Duration (10-10000) seconds” for temporary locking. Click <OK>.

Page 85: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 3 Security Management

Huawei Technologies Proprietary

3-7

3.2.5 Setting NE Security Parameters

Purpose

Use this procedure to set and update NE security parameters.

Prerequisite

NM user with the authority of “system operator” or above.

Procedure

Step Action 1 Select [System/NE Security Management/NE Security Parameters]

from the Main Menu.

2 In the lower-left pane, select the appropriate NE and click the double-right-arrow button (red).

3 Click <Query> to query the security paramerters of current NE.

4 Modify the parameters as required.

5 Repeat this procedure to set as many security parameters of NE users as necessary.

3.2.6 Viewing NE Log and Report

Purpose

All operations to NE by all users and results of the operations are recorded in the NE security log. It provides the functions of browsing NE security log and filtering by the conditions of NE user, event name and generating time.

Use this procedure to browse NE security log.

Prerequisite

NM user with the authority of “system operator” or above.

Procedure

Step Action 1 Select [System/NE Security Management/NE Security Log] from the

Main Menu.

2 In the lower-left pane, select the appropriate NE and click the double-right-arrow button (red).

Page 86: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 3 Security Management

Huawei Technologies Proprietary

3-8

Step Action 3 Set the log fliter conditions and click <Query>.

Page 87: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 3 Security Management

Huawei Technologies Proprietary

3-9

3.3 Creating NM User

3.3.1 Adding New Operation Set

Purpose

After planning and creating an operation set, authorize a specific user group. All users in this group have the right to perform the operations in the operation set.

This management mode helps in unified assignment and management of the T2000 user authority.

Use this procedure to create operation set.

Prerequisite

Super NM user: admin.

Procedure

Step Action 1 Select [System/NM Security Management/NM User Management] from

the Main Menu.

2 Right-click the . Select [Create Operation Set].

3 Enter information of the newly created operation set in the "Create Operation Set" dialog box, and click <OK> or <Apply>.

Page 88: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 3 Security Management

Huawei Technologies Proprietary

3-10

3.3.2 Adding New Equipment Set

Purpose

After planning and creating an equipment set, authorize a specific user group to make users in the group have the right to operate the equipments in the equipment set.

This management mode helps in unified assignment and management of the T2000 user authority.

Use this procedure to create equipment set.

Prerequisite

Super NM user: admin.

Procedure

Step Action 1 Select [System/NM Security Management/NM User Management] from

the Main Menu.

2 Right-Click the . Select [Create Equipment Set].

3 Enter information of the newly created equipment set in the "Create Equipment Set" dialog box, and click <OK> or <Apply>.

Page 89: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 3 Security Management

Huawei Technologies Proprietary

3-11

3.3.3 Adding New NM User Group

Purpose

Use this procedure to create NM user group.

Prerequisite

Super NM user: admin.

Procedure

Step Action 1 Select [System/NM Security Management/NM User Management] from

the Main Menu.

2 Right-click the . Select [Create User Group].

3 Enter information of the newly created user group in the "Create User Group" dialog box, and click <OK> or <Apply>.

3.3.4 Modifying Authority of NM User Group

Purpose

Use this procedure to modify authority of an NM user group.

Prerequisite

Super NM user: admin.

Page 90: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 3 Security Management

Huawei Technologies Proprietary

3-12

Procedure

Step Action 1 Select [System/NM Security Management/NM User Management] from

the Main Menu.

2 Click the . Select the appropriate NM user group.

Note:

NM user group authority is not allowed to be modified for the four system default user groups: system administer, system maintainer, system operator, and system supervisor groups.

3 Select the tab “Authority”. Click <Add>, the “Add Authority” dialog box is displayed.

4 Add authority: Select “Type”, “Subtype”, “Operation Name” and “Operation Level”. Click <Add>. Delete authority: Select the appropriate row, click <Delete>.

Page 91: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 3 Security Management

Huawei Technologies Proprietary

3-13

3.3.5 Creating NM User and Assign Authority

Purpose

Use this procedure to create NM user and assign its authority.

Prerequisite

Super NM user: admin.

Procedure

Step Action 1 Select [System/NM Security Management/NM User Management] from

the Main Menu.

2 Right-Click the , Select [Create User].

3 Enter information of the newly created user in the "Create User" dialog box, and click <OK> or <Apply>.

Note:

Step 1 to step 3 are performed to create the NM user.

4 Click the . Select the new user in the user list.

5 Click the tab "Subjected to". Click <Add>.

Page 92: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 3 Security Management

Huawei Technologies Proprietary

3-14

Step Action 6 Select the user group in the "Add User Group" dialog box and click the

<Add>, and click <OK> to add the user into this user group.

Note:

Step 1 to step 6 are performed to assign the NM user authority.

3.3.6 Slightly Adjusting Authority of NM User

Purpose

Use this procedure to slightly adjust authority of NM user.

Prerequisite

Super NM user: admin.

Procedure

Step Action 1 Select [System/NM Security Management/NM User Management] from

the Main Menu.

2 Click the . Select the appropriate user.

3 Select the tab “Additional authority”. Click <Add>. The “Add Authority” dialog box is displayed.

4 Add authority: Select “Type”, “Subtype”, “Operation Name” and “Operation Level”. Click <Add>.

3.3.7 Modifying User Attribute

Purpose

Use this procedure to modify general user attribute.

Prerequisite

Super NM user: admin.

Page 93: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 3 Security Management

Huawei Technologies Proprietary

3-15

Procedure

Step Action 1 Select [System/NM Security Management/NM User Management] from

the Main Menu.

2 Click the . Select the appropriate user.

3 Select the tab “General”.

4 Modify the general attribute. Click <Apply>.

Page 94: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 3 Security Management

Huawei Technologies Proprietary

3-16

3.3.8 Enabling Remote Maintenance User

Purpose

Use this procedure to enable a remote maintenance user, enabling the T2000 remote maintenance terminal to access the T2000 server.

Prerequisite

Super NM user: admin.

Procedure

Step Action 1 Select [System/NM Security Management/Remote Maintenance User

Management] from the Main Menu.

2 The “Set Remote Maintenance User” dialog box is displayed. Set the value of “Disable/Enable” to “Enable”.

3 Click <OK>.

Page 95: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 3 Security Management

Huawei Technologies Proprietary

3-17

3.4 Managing T2000 Login

3.4.1 Locking T2000 Client Screen

Purpose

Use this procedure to lock T2000 client screen.

Prerequisite

None

Procedure

Step Action 1 Select [System/Lock NM Screen] from the Main Menu.

2 The “T2000 Client has been locked” dialog box is displayed.

3.4.2 Switching NM User

Refer to the “1.1.8 Switching T2000 User”.

3.4.3 Switching Between Single User Mode and Multi-user Mode

Purpose

You can switch the client login mode: single user mode and multi-user mode. In single user mode, all users currently logged in the client are forced to exit and log in again as "admin".

Use this procedure to switch between single user mode and multi-user mode.

Prerequisite

Super NM user: admin.

Page 96: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 3 Security Management

Huawei Technologies Proprietary

3-18

Procedure

Step Action 1 Select [System/Single User Mode] from the Main Menu under the

multi-user mode.

Select [System/Multi-user Mode] from the Main Menu under the single user mode.

3.4.4 Forcing Other Users to Exit T2000

Purpose

Use this procedure to force other users to exit T2000. This function is used to force a user having logged in to exit, while the single user login mode is used to force all the other users logged in to exit.

Prerequisite

Super NM user: admin.

Procedure

Step Action 1 Select [System/NM Security Management/NM User Management] from

the Main Menu.

2 Click the . Select the appropriate user.

3 Right-click and select [Force To Exit].

Page 97: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 3 Security Management

Huawei Technologies Proprietary

3-19

3.4.5 Modifying NM User’s Password

Purpose

Use this procedure to modify current NM user’s password.

Prerequisite

None

Procedure

Step Action 1 Select [System/Change Password] from the Main Menu.

2 The “Set New Password” dialog box is displayed.

3 Enter the old password and a new password respectively. Click <OK> after confirming the new password.

Page 98: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 4 Configuring Equipment

Huawei Technologies Proprietary

4-1

4 Configuring Equipment

This chapter introduces how to configure equipment in the T2000.

The following tasks are described:

Viewing NE Resource

Uploading Data if NE has been Configured

Duplicating NE Configuration Data

Manually Configuring NE Data

Creating Board

Deleting Board

Creating Fiber

Viewing Unit Version

Creating and View Physical Location Information

Viewing NE Hardware Information

Page 99: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 4 Configuring Equipment

Huawei Technologies Proprietary

4-2

4.1 Viewing NE Resource

Purpose

Use this procedure to view the resource information of an NE, including NE name, type, ID, extended ID, number of fibers, subnet belonged, gateway type and gateway attribute.

Prerequisite

NE has been configured.

Procedure

Step Action 1 Select [Configuration/Common Configuration/NE Hardware

Information] from the Main Menu. Select the tab "View NE Resources".

2 Select the NE to be viewed from the NE list, and click double-right-arrow button (red).

3 Click <Refresh> to refresh the information.

4 If you want to print the information, click <Print> to output the information displayed in the interface to a page (in the form of a list). Choose to print or save it in the network browser.

5 If you want to save the information, click <Save as> to select and save the information you need.

Page 100: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 4 Configuring Equipment

Huawei Technologies Proprietary

4-3

4.2 Uploading Data if NE has been Configured

4.2.1 Uploading/Downloading NE Configuration Data

Purpose

Use this procedure to upload (or download) configuration data during configuration or modification.

The NE configuration data in the T2000 database may be different from that on NE. If the network is expected to run as the configuration data in the T2000 database, download them to NEs. If the network and its services run normally, you can upload the data to the T2000. Check the consistency of configuration data again after uploading or downloading them.

Prerequisite

NM user with the authority of "system maintainer" or above.

Procedure

Step Action 1 Select [Configuration/Configuration Data Management/Configuration

Data Upload/Download].

Or, select [Maintenance/Configuration Data Management/NE Configuration Data Management] from the navigation tree of the Equipment Maintenance Console.

2 In the lower-left pane, select the appropriate NEs and click the double-right-arrow button (red).

3 Select one or more NEs in the NE Data List.

4 Right-click the NE and select [Upload] or [Download].

5 Click <OK> to confirm the operation.

Page 101: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 4 Configuring Equipment

Huawei Technologies Proprietary

4-4

4.2.2 Checking Configuration Data Consistency Between NE and the T2000

Purpose

Use this procedure to check whether the T2000 configuration data and the NE configuration are consistent.

The configuration data in NEs and in the T2000 database is compared in this task and a report of consistency is created. According to the report and actual reliability of configuration data, uploading or downloading configuration data is selected to implement.

This task will not change the configuration data in NEs and the T2000 database and it is recommended to run this function periodically to keep the consistency of configuration data in NEs and the T2000 server.

Prerequisite

NM user with the authority of "system maintainer" or above.

Procedure

Step Action 1 Select [Configuration/Configuration Data Management/Configuration

Data Consistency Check].

Or, select [Maintenance/Configuration Data Management/NE Configuration Data Management] from the navigation tree of the Equipment Maintenance Console.

2 In the lower-left pane, select the appropriate NEs and click the double-right-arrow button (red).

3 Select one or more NEs to check in the NE Data List.

4 Right-click the NE and select [Consistency Check].

Page 102: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 4 Configuring Equipment

Huawei Technologies Proprietary

4-5

Step Action 5 Click <OK> to confirm the consistency check.

Note:

If the check result shows the modules with the configuration data inconsistent, you should solve the problem by re-uploading or re-downloading the configuration data as required in practice.

Page 103: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 4 Configuring Equipment

Huawei Technologies Proprietary

4-6

4.3 Duplicating NE Configuration Data

Purpose

NEs can be configured in batches by copying the configuration data of other NEs. Actually, this is a fast and effective method to configure new NEs and it is commonly used.

Prerequisite

NM user with the authority of "system maintainer" or above.

Procedure

Step Action 1 Select [Configuration/Configuration Data Management/Configuration

Data Duplication].

Or, select [Maintenance/Configuration Data Management/NE Configuration Data Management] from the navigation tree of the Equipment Maintenance Console.

2 In the lower-left pane, select the configured NEs and unconfigured NEs, and then click the double-right-arrow button (red).

3 Right-click a configured NE as a template in the NE Data List and select [Copy].

4 Select one or more unconfigured NEs to be duplicated in the NE Data List. Right-click the NE and select [Paste].

5 Click <OK>.

Page 104: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 4 Configuring Equipment

Huawei Technologies Proprietary

4-7

4.4 Manually Configuring NE Data

Purpose

Use this procedure to create/delete expanded subrack and units manually.

This method applies to the situation that data has not been configured on the NM side.

Prerequisite

NM user with the authority of "system maintainer" or above.

Procedure

Step Action 1 Double-click the NE icon in the Main Topology. The “NE Configuration

Wizard” dialog box is displayed.

2 Select “Manual Configuration” and click “Next”.

3 The “Confirm” dialog box is displayed. Click <OK>. The “NE Configuration Wizard” dialog box is displayed.

4 Set the NE attributes and click <Next>. The NE panel is displayed.

5 Right-click the slot and select the unit type.

6 After all the units have been created, click <Next>. Then, click <Finish>.

Page 105: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 4 Configuring Equipment

Huawei Technologies Proprietary

4-8

4.5 Creating Board

Purpose

Use this procedure to add boards to the WDM subrack NE.

Prerequisites

Subrack NE has been configured.

NM user with the authority of "system maintainer" or above.

Procedure

Step Action 1 Double-click the optical NE in the Main Topology.

2 Click the created subrack NE in the left pane and the subrack NE panel is displayed.

3 Right-click the slot to be provisioned. Select the appropriate board type.

Note:

Within each slot the upper indicator shows the summary status. If all is okay, it is displayed in green. It will be displayed in red if any CR alarm is detected. It will be displayed in orange if any MJ alarm is detected and no CR alarm. It will be displayed in yellow if any MN alarm is detected and no CR or MJ alarm.

Page 106: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 4 Configuring Equipment

Huawei Technologies Proprietary

4-9

4.6 Deleting Board

Purpose

Use this procedure to delete boards from the NE.

Prerequisites

Subrack NE has been configured.

NM user with the authority of "system maintainer" or above.

Procedure

Step Action 1 Double-click the optical NE in the Main Topology.

2 Click the created subrack NE in the left pane and the subrack NE panel is displayed.

3 Right-click the board to be deleted. Select [Delete Board].

Note:

If there is a fiber connection, protection or IPA configuration in this board, the Operation Result dialog box is displayed and this board will not be deleted. You need to delete the protection settings and fiber connections first, and then delete the board.

Page 107: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 4 Configuring Equipment

Huawei Technologies Proprietary

4-10

4.7 Creating Fiber

Purpose

Use this procedure to create fibers between NEs or boards.

Note:

Boards connected with the fibers must have been created before creating fiber on NM.

Prerequisites

NM user with the authority of "system maintainer" or above.

Boards connected with fiber have been created.

Procedure

1. Creating internal fiber

Note:

Internal fibers include fiber connections between the subrack NEs in the optical NE and fiber connections within the subrack NE.

Step Action 1 Select from the shortcut icons of the Main Topology and the

mouse pointer will change to a “+”.

2 Click to select the source optical NE in the Main Topology.

3 Click selected source subrack NE in the left pane.

4 Click the source board in the pop-up “Select Fiber Source” dialog box and select the source port.

5 Click <OK> and the mouse pointer will change to a “+”.

6 Click to select the fiber sink optical NE in the Main Topology.

7 Click selected sink subrack NE in the left pane.

Page 108: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 4 Configuring Equipment

Huawei Technologies Proprietary

4-11

Step Action 8 Click the sink board in the pop-up “Select Fiber Sink” dialog box and

select the sink port.

9 Click <OK> and type the attribute information of the fiber cable in the pop-up “Create Fiber/Cable” dialog box.

10 Click <OK>. The internal fiber is created.

2. Creating external fiber

Note:

External fibers refer to fiber connections between optical NEs.

Step Action 1 Select from the shortcut icons of the Main Topology and the

mouse pointer will change to a “+”.

2 Click to select the source optical NE in the Main Topology.

3 Click selected source subrack NE in the left pane.

4 Click the source board (such as FIU, SCA) in the pop-up “Select Fiber Source” dialog box and select the source port.

Page 109: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 4 Configuring Equipment

Huawei Technologies Proprietary

4-12

Step Action 5 Click <OK> and the mouse pointer will change to a “+”.

6 Click to select the fiber sink optical NE in the Main Topology.

7 Click selected sink subrack NE in the left pane.

8 Click the sink board in the pop-up “Select Fiber Sink” dialog box and select the sink port.

9 Click <OK> and type the attribute information of the fiber cable in the pop-up “Create Fiber/Cable” dialog box.

10 Click <OK>. The created external fiber appears between the source and sink optical NEs on the Main Topology.

Page 110: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 4 Configuring Equipment

Huawei Technologies Proprietary

4-13

4.8 Viewing Unit Version

Purpose

Use this procedure to view the unit version information of an NE, including BIOS version, software version, and logic version.

Prerequisite

NE has been configured.

Procedure

Step Action 1 Select [Configuration/Common Configuration/Board Version

Information] from the Main Menu. Click the tab "View Version".

2 Select the NE and click double-right-arrow button (red).

3 Click <Query> to query the information from the NE side.

4 If you want to print the information, click <Print> to output the information displayed in the interface to a page (in the form of a list). Choose to print or save it in the network browser.

5 If you want to save the information, click <Save as> to select and save the information you need.

Page 111: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 4 Configuring Equipment

Huawei Technologies Proprietary

4-14

4.9 Creating and View Physical Location Information

4.9.1 Creating and Viewing Equipment Room Information

Purpose

Use this procedure to create/view the physical location information of the equipment room.

Prerequisites

NE has been configured.

NM user with the authority of "system maintainer" or above.

Procedure

Step Action 1 Select [Configuration/Common Configuration/Physical Location

Information] from the Main Menu. Select the tab “Equipment Room”.

2 Click <Query> to view the information.

3 Click <Create>, the “Create Equipment Room” dialog box is displayed.

4 Select the tab “Basic Attributes” and enter attributes of the equipment room.

5 Select the tab “Object Selection” and select the available object from the list on the left. Click the double-right-arrow button (red) and then <OK>.

Page 112: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 4 Configuring Equipment

Huawei Technologies Proprietary

4-15

Step Action 6 If you want to print the information, click <Print> to output the

information displayed in the interface to a page (in the form of a list). Choose to print or save it in the network browser.

7 If you want to save the information, click <Save as> to select and save the information you need.

8 If you want to modify or delete the information, right-click on the information and select “Modify” or “Delete”.

4.9.2 Creating and Viewing Cabinet Information

Purpose

Use this procedure to create/view the physical location information of the cabinet.

Prerequisites

NE has been configured.

NM user with the authority of "system maintainer" or above.

Procedure

Step Action 1 Select [Configuration/Common Configuration/Physical Location

Information] from the Main Menu. Select the tab “Cabinet”

2 Click <Query> to view the information.

3 Click <Create>, the “Create Cabinet” dialog box is displayed.

Page 113: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 4 Configuring Equipment

Huawei Technologies Proprietary

4-16

Step Action 4 Select the tab “Basic Attributes” and enter attributes of the cabinet.

5 Select the tab “Object Selection” and select the available object from the list on the left. Click the double-right-arrow button (red) and then <OK>.

6 If you want to print the information, click <Print> to output the information displayed in the interface to a page (in the form of a list). Choose to print or save it in the network browser.

7 If you want to save the information, click <Save as> to select and save the information you need.

8 If you want to modify or delete the information, right-click on the information and select “Modify” or “Delete”.

4.9.3 Modifying and Viewing Subrack Information

Purpose

Use this procedure to modify/view the physical location information of the subrack.

Prerequisites

NE has been configured.

NM user with the authority of "system maintainer" or above.

Page 114: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 4 Configuring Equipment

Huawei Technologies Proprietary

4-17

Procedure

Step Action 1 Select [Configuration/Common Configuration/Physical Location

Information] from the Main Menu. Select the tab “Subrack”.

2 Click <Query> to view the information.

3 Right-click on the information and select “Modify”. The “Set Subrack Attributes” dialog box is displayed.

4 Set the attributes and click <OK>.

5 If you want to print the information, click <Print> to output the information displayed in the interface to a page (in the form of a list). Choose to print or save it in the network browser.

6 If you want to save the information, click <Save as> to select and save the information you need.

Page 115: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 4 Configuring Equipment

Huawei Technologies Proprietary

4-18

4.10 Viewing NE Hardware Information

Purpose

Use this procedure to view the NE hardware information, including NE resources, unit resources, WDM subrack resources and unit resource statistics.

Prerequisite

NE has been configured.

Procedure

Step Action 1 Select [Configuration/Common Configuration/NE Hardware

Information] from the Main Menu.

2 Select the tab corresponding to the information to be viewed. Select the NE and click the double-right-arrow button (red).

3 Click <Refresh> to view the information.

4 If you want to print the information, click <Print> to output the information displayed in the interface to a page in the form of a list and choose to print or save it in the network browser.

5 If you want to save the information, click <Save as> to select and save the information you need.

Page 116: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 5 Configuring Communication

Huawei Technologies Proprietary

5-1

5 Configuring Communication

This chapter introduces basic communication configuring operations that ensures normal communication between the NEs and the T2000. The following tasks are described:

Setting NE Communication Parameters

Enabling Serial Port/Ethernet Port Access Control

Setting DCC Rate and Allocating the Resource

Setting DCC Transparent Transmission

Page 117: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 5 Configuring Communication

Huawei Technologies Proprietary

5-2

DCN Protection Management

Page 118: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 5 Configuring Communication

Huawei Technologies Proprietary

5-3

5.1 Setting NE Communication Parameters

Purpose

Use this procedure to set NE communication parameters to keep normal communication between the NEs and the T2000.

Prerequisite

NM user with the authority of “system administrator” or above.

Procedure

Step Action 1 Select [Communication/NE Communication Parameter Setting] in the

DCN View.

2 Double-click to select an operation object in the lower-left pane.

3 Click <Refresh> to refresh the communication parameters.

4 Modify the IP, Extended ID, Gateway IP or Subnet Mask as you need, and click the corresponding <Apply> to confirm the modification.

Page 119: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 5 Configuring Communication

Huawei Technologies Proprietary

5-4

5.2 Enabling Serial Port/Ethernet Port Access Control

Purpose

Use this procedure to enable the Ethernet port of an NE.

Prerequisite

NM user with the authority of “system maintainer” or above.

Procedure

Step Action 1 Select [Communication/Serial Port Ethernet Access Control] in the DCN

View.

2 Double-click to select an operation object in the lower-left pane.

3 Click <Refresh> in the “Ethernet Access Control” group box to refresh the Ethernet access status.

4 Select “Enable NM Access”.

5 Click <Apply> to confirm the settings.

Page 120: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 5 Configuring Communication

Huawei Technologies Proprietary

5-5

5.3 Setting DCC Rate and Allocating the Resource

Purpose

Use this procedure to set DCC rate and allocate the DCC resource.

DCC can be configured as D1 to D3, D7 to D9, or D4 to D12 to realize the DCC of multiple rates so that the network management requirements can be satisfied under complicated networking.

By default, the NE uses D1 to D3 as the DCC, and enables DCC communication.

Prerequisite

NM user with the authority of “system maintainer” or above.

Procedure

Step Action 1 Select [View/Equipment Maintenance Console] from the Main Menu.

2 Select [NE Communication/DCC Extended Management] in the upper-left pane.

3 Double-click to select an operation object in the lower-left pane.

4 Select “DCC Rate Configuration” tab.

5 Select a port entry and set its DCC rate as you need.

6 Select “DCC Resource Allocation” tab.

7 Select a rate entry and modify its parameters as you need.

Page 121: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 5 Configuring Communication

Huawei Technologies Proprietary

5-6

5.4 Setting DCC Transparent Transmission

Purpose

Use this procedure to set DCC transparent transmission.

In case of multi-vendor networking, Huawei's equipments support transmission of the DCC bytes of the third party's equipments, and allocating its own DCC bytes and the transparent transmission through the idle DCC bytes of the third party's equipments. There are three cases:

Huawei's equipments are in the network center, while a third party's equipments are at the edge of the network, and the third party’s network management system uses the D1 to D3 bytes. In this case, Huawei's equipments will provide three consecutive bytes between D4 and D12 for the transparent transmission of the third party's DCC bytes.

Huawei's equipments are at the edge of the network, while a third party's equipments are in the network center, and the third party’s network management system uses the D1 to D3 bytes. In this case, Huawei's equipments support transmission of network management information through three consecutive bytes between D4 and D12.

Huawei's equipments also transparently transmit other overhead bytes, for example, E1 to E2, K1 to K2, or X1 to X3, through the idle D bytes.

Prerequisite

NM user with the authority of “system maintainer” or above.

Procedure

Step Action 1 Select [View/Equipment Maintenance Console] from the Main Menu.

2 Select [NE Communication/DCC Extended Management] in the upper-left pane.

3 Double-click to select an operation object in the lower-left pane.

4 Select “DCC Transparent Transmission Management” tab.

5 Click <Add> to add a transparent transmission entry. Select source/sink port and corresponding overhead bytes.

Page 122: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 5 Configuring Communication

Huawei Technologies Proprietary

5-7

5.5 DCN Protection Management

5.5.1 Modifying the Attributes of a GNE

Purpose

Use this procedure to modify the attributes of a GNE.

Prerequisite

NM user with the authority of “system maintainer” or above.

Procedure

Step Action 1 Select [View/DCN View].

2 Select the “GNE” tab in the left pane.

3 Right-click an ordinary NE and select [Modify GNE].

4 The “Modify GNE” dialog box is displayed. Set the “GNE type” and “IP Address”.

5 Click <OK> to confirm the settings.

Page 123: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 5 Configuring Communication

Huawei Technologies Proprietary

5-8

5.5.2 Changing GNE for an NE

Purpose

When an NE is created, a GNE for it has been configured.

Use this procedure to change GNE for an NE.

Prerequisite

NM user with the authority of “system maintainer” or above.

Procedure

Step Action 1 Select [View/DCN View].

2 Select the “NE” tab in the left pane.

3 Select an NE entry, and modify the “Active GNE” attribute.

4 Click <Apply> to confirm the modification.

5.5.3 Adding Standby GNEs for an NE

Purpose

Use this procedure to add standby GNEs for an NE.

Up to three standby GNEs can be added for an NE.

Prerequisite

NM user with the authority of “system maintainer” or above.

Page 124: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 5 Configuring Communication

Huawei Technologies Proprietary

5-9

Procedure

Step Action 1 Select [View/DCN View].

2 Select the “NE” tab in the left pane.

3 Select an NE entry, add standby GNEs.

4 Click <Apply> to confirm the modification.

5.5.4 Changing an Ordinary NE into a GNE

Purpose

Use this procedure to change an ordinary NE into a GNE.

Prerequisite

NM user with the authority of “system maintainer” or above.

Procedure

Step Action 1 Select [View/DCN View].

2 Select the “NE” tab in the left pane.

3 Right-click an ordinary NE and select [Change to GNE].

Page 125: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 5 Configuring Communication

Huawei Technologies Proprietary

5-10

Step Action 4 The “Change to GNE” dialog box is displayed. Set the “GNE type” and

“IP Address”. Keep the “Port No.” untouched.

5 Click <OK> to confirm the settings.

5.5.5 Changing a GNE into an Ordinary NE

Purpose

Use this procedure to change a GNE into an ordinary NE.

Prerequisite

NM user with the authority of “system maintainer” or above.

Procedure

Step Action 1 Select [View/DCN View].

2 Select the “GNE” tab in the left pane.

3 Right-click a GNE and select [Delete GNE].

4 A “Confirm” dialog box is displayed. Click <OK> to confirm the deleting. Thus the NE changes from a GNE into an ordinary one.

Page 126: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 6 Configuring Unit Parameters

Huawei Technologies Proprietary

6-1

6 Configuring Unit Parameters

This chapter introduces how to configure units.

The following tasks are described:

Configuring Optical Transponder Unit

Configuring Trans-Multiplexer

Querying Multiplexer and Demultiplexer

Querying Optical Add/Drop Multiplexing Unit

Configuring Optical Amplifier Unit

Page 127: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 6 Configuring Unit Parameters

Huawei Technologies Proprietary

6-2

Configuring Optical Supervisory Channel Unit

Configuring Spectrum Analysis Unit

Configuring Variable Optical Attenuation Unit

Querying Optical Equalizer Unit

Querying Automatic Optical Fiber Monitoring Unit

Page 128: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 6 Configuring Unit Parameters

Huawei Technologies Proprietary

6-3

6.1 Configuring Optical Transponder Unit

Purpose

Use this procedure to configure the parameters of OTU (Optical Transponder Unit). Usually, each parameter adopts the default value. However, they need to be modified during maintenance or configuration of special functions.

Prerequisites

The OTU unit has been created.

NM user with the authority of "system maintainer" or above.

Procedure

Step Action 1 Select [Configuration/DWDM Configuration/DWDM Interface/Optical

Transponder Unit] from the Main Menu. Select "By Board/Port (Path)". Select “Path”.

Note:

You can also configure OTU interface parameters by selecting “By Function”.

2 In the lower-left pane, select the appropriate OTU unit (for example, LWF) and click the double-right-arrow button (red).

Note:

Configure different parameter items according to different types of OTUs. For example:

“Client Rate (bit/s)” shall be set for client-end interface of LWM board.

“Rate Band (M)” shall be set for client-end interface of LWX board.

3 Select “Basic Attributes” tab and select the parameter to be set or queried.

Page 129: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 6 Configuring Unit Parameters

Huawei Technologies Proprietary

6-4

Step Action 4 Right-click the parameter and select the value.

The frequently used parameters that need to be set are as follows:

Laser Status: “Enabled”. Set “Disabled” for the unused laser.

Laser Auto-shutdown: “Enabled”. Set “Disabled” for the LWF, LWFS and LWS boards.

Service Type: “SDH” or “SONET” as required

Path Using Status: “Used” for using path. “Unused” for not used path.

5 Click <Apply>. The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

6 Select “OHP Byte” and “Advance Attributes” tabs and select the right parameters. Usually use the default value. FEC Working Status is set as “Enabled”.

7 Click <Apply>. The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

8 Select “Port” from the pull-down menu and click <Query> to query the attributes of optical transponder unit.

Page 130: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 6 Configuring Unit Parameters

Huawei Technologies Proprietary

6-5

6.2 Configuring Trans-Multiplexer

Purpose

Use this procedure to configure the parameters of convergence OTU, for example, LDG, OCU, LQS, EC8. Usually, each parameter adopts the default value. However, they need to be modified during maintenance or configuration of special functions.

Prerequisites

The Trans-multiplexer has been created.

NM user with the authority of "system maintainer" or above.

Procedure

Step Action 1 Select [Configuration/DWDM Configuration/DWDM

Interface/Trans-Multiplexer] from the Main Menu. Select "By Board/Port (Path)". Select “Path”.

Note:

You can also configure trans-multiplexer interface parameters by selecting “By Function”.

2 In the lower-left pane, select the appropriate trans-multiplexer unit (for example, LDG) and click the double-right-arrow button (red).

Note:

Configure different parameter items according to different type of trans-multiplexer unit. For example:

“Auto-negotiation” shall be set for client-end interface of LDG board.

“Max. Packet Length” shall be set for client-end interface of LDG board.

“FEC Working Status” shall be set for DWDM-end interface of OCU board.

3 Click <Query> to query the attributes of the trans-multiplexer.

Page 131: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 6 Configuring Unit Parameters

Huawei Technologies Proprietary

6-6

Step Action 4 Right-click the parameter and select the value.

The frequently used parameters that need to be set are as follows:

Laser Status: “Enabled” for using laser. “Disabled” for the unused laser.

Laser Auto-shutdown: “Enabled”

Service Type: “SDH” or “SONET” as required

Path Using Status: “Used” for using path. “Unused” for not used path.

5 Click <Apply>. The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

6 Click <Query> to query the value.

7 Select “Board” from the pull-down menu and click <Query> to query the attributes of trans-multiplexer.

8 Click <Apply>. The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

9 Click <Query> to query the value.

Page 132: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 6 Configuring Unit Parameters

Huawei Technologies Proprietary

6-7

6.3 Querying Multiplexer and Demultiplexer

Purpose

Use this procedure to query parameters of multiplexer and demultiplexer, for example “Fixed Band”, “Working Band Parity” and “Working Frequency Band”.

Prerequisites

The multiplexer and demultiplexer have been created.

NM user with the authority of "system maintainer" or above.

Procedure

Step Action 1 Select [Configuration/DWDM Configuration/DWDM Interface/

Multiplexer and Demultiplexer] from the Main Menu. Select "By Board/Port (Path)".

Note:

You can also configure trans-multiplexer interface parameters by selecting “By Function”.

2 Select “Path” from the pull-down menu.

3 In the lower-left pane, select the appropriate multiplexer or demultiplexer (for example, M40) and click the double-right-arrow button (red).

4 Click <Query> to query the attributes of the multiplexer and the demultiplexer.

Page 133: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 6 Configuring Unit Parameters

Huawei Technologies Proprietary

6-8

Step Action 5 Double-click the “Optical Interface Attenuation Rate (0.1dB)”

parameter and enter the attenuation value.

Note:

This parameter only can be set for the V40 and V32 boards to adjust input optical power of each channel.

6 The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

7 Select “Board” from the pull-down menu and click <Query> to query the working frequency band of the multiplexer and the demultiplexer.

Page 134: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 6 Configuring Unit Parameters

Huawei Technologies Proprietary

6-9

6.4 Querying Optical Add/Drop Multiplexing Unit

Purpose

Use this procedure to query parameters of optical add/drop multiplexing unit, for example, “Add/Drop Wavelength (nm)/Frequency (THz)”, “Add/Drop Wave Band” and “Band Type”.

Prerequisites

The optical add/drop multiplexing unit has been created.

NM user with the authority of "system maintainer" or above.

Procedure

Step Action 1 Select [Configuration/DWDM Configuration/DWDM Interface/ Optical

Add/Drop Multiplex Unit] from the Main Menu. Select "By Board/Port (Path)".

Note:

You can also configure optical add/drop multiplexing unit interface parameters by selecting “By Function”.

2 Select “Add/Drop Wavelength” from the pull-down menu.

3 In the lower-left pane, select the appropriate optical add/drop multiplexing unit (for example, MR2) and click the double-right-arrow button (red).

4 Click <Query> to query the attributes of the optical add/drop multiplexing unit. The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

Note:

All the parameters of the optical add/drop multiplexing unit can be queried only.

5 Select “Board” from the pull-down menu and click <Query> to query the add/drop wave band of the optical add/drop multiplexing unit.

Page 135: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 6 Configuring Unit Parameters

Huawei Technologies Proprietary

6-10

Step Action 6 Select “Waveband Type” from the pull-down menu and click <Query>

to query the band type of the optical add/drop multiplexing unit.

Page 136: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 6 Configuring Unit Parameters

Huawei Technologies Proprietary

6-11

6.5 Configuring Optical Amplifier Unit

Purpose

Use this procedure to configure laser status and query optical amplifier attributes. For example:

Configure laser status

Configure/Query gain of optical amplifier unit

Query fixed band of optical amplifier unit

Query working band parity of optical amplifier unit

Query threshold of input/output power loss

Prerequisites

The optical amplifier unit has been created.

NM user with the authority of "system maintainer" or above.

Procedure

Step Action 1 Select [Configuration/DWDM Configuration/DWDM Interface/ Optical

Amplifier Unit] from the Main Menu. Select "By Board/Port (Path)".

Note:

You can also configure optical add/drop multiplexing unit interface parameters by selecting “By Function”.

2 Select “path” from the pull-down menu.

3 In the lower-left pane, select the appropriate optical amplifier unit (for example, OAU) and click the double-right-arrow button (red).

Note:

Configure different parameter items according to different type of optical amplifier unit. For example:

“Optical Interface Attenuation Rate (0.1dB)”: this parameter can be set for “TDC/RDC” port of the OAU board.

4 Click <Query> to query the optical amplifier attributes from NE side.

Page 137: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 6 Configuring Unit Parameters

Huawei Technologies Proprietary

6-12

Step Action 5 Right-click the parameter and select the value.

The frequently used parameters that need to be configured are as follows:

“Laser Status” and “Optical Interface Attenuation Rate (0.1dB)”

Note:

Usually the “Laser Status” of EDFA amplifier is set to “Enabled”. For the Raman amplifier, the “Laser Status” is set to “Disabled” for safety.

6 Click <Apply>. The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

7 Click <Query> to query the optical amplifier attributes.

Page 138: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 6 Configuring Unit Parameters

Huawei Technologies Proprietary

6-13

6.6 Configuring Optical Supervisory Channel Unit

Purpose

Use this procedure to configure laser status, returned clock and query optical supervisory channel unit attributes. For example:

Configure laser status

Configure returned clock

Configure loopback

Query wavelength of optical supervisory channel

Prerequisites

The optical supervisory channel unit has been created.

NM user with the authority of "system operator" or above.

Procedure

Step Action 1 Select [Configuration/DWDM Configuration/DWDM Interface/Optical

Supervisory Channel Unit] from the Main Menu. Select "By Board/Port (Path)".

Note:

You can also configure optical add/drop multiplexing unit interface parameters by selecting “By Function”.

2 Select “path” from the pull-down menu.

3 In the lower-left pane, select the appropriate optical supervisory channel unit (for example, TC1) and click the double-right-arrow button (red).

Note:

Configure different parameter items according to different type of optical supervisory channel unit. For example:

“Laser Auto-Shutdown”: it can be set for the SMC board of the OptiX Metro 6100.

“Clock Mode”: it can be set for the SMC board of the OptiX Metro 6100.

“Returned Clock”: it can be set for the SC1/SC2/TC1/TC2 board.

Page 139: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 6 Configuring Unit Parameters

Huawei Technologies Proprietary

6-14

Step Action 4 Right-click the parameter and select the value.

The frequently used parameter that needs to be configured is “Laser Status”.

Note:

1) “Loopback”: it can be set for SC1/SC2/TC1/TC2 board of OptiX BWS 1600G and OptiX Metro 6040. It can be set as “Inloop”, “Outloop” and “Cross loop” for equipment testing.

2) “Laser Status”: “Enabled” as default.

5 Click <Apply>. The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

6 Select “Board” from the pull-down menu and set the right parameter of “Returned Clock”. Usually use the default value.

Note:

“Returned Clock”: In a DWDM network, the processing of optical supervisory information needs to be synchronized with a network-unified clock source. So the returned clock should be configured on optical supervisory channel board as SCC tracing clock source. For the SC1/TC1 board, “West clock” is available. For the SC2/TC2 board, “West clock” and “East clock” are available.

7 Click <Apply>. The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

8 Click <Query> to query the optical amplifier attributes.

Page 140: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 6 Configuring Unit Parameters

Huawei Technologies Proprietary

6-15

6.7 Configuring Spectrum Analysis Unit

Purpose

Use this procedure to configure wavelength monitor status, monitor interval and query working band and parity. For example:

Configure wavelength monitor status

Configure monitor interval

Query working band of monitored wavelength

Query working band parity

Prerequisites

The optical spectrum analysis unit has been created.

NM user with the authority of "system operator" or above.

Procedure

Step Action 1 Select [Configuration/DWDM Configuration/DWDM Interface/Spectrum

Analysis Unit] from the Main Menu. Select "By Board/Port (Path)".

Note:

You can also configure optical add/drop multiplexing unit interface parameters by selecting “By Function”.

2 Select “Monitor Wavelength” from the pull-down menu.

3 In the lower-left pane, select the appropriate optical spectrum analysis unit (for example, MCA) and click the double-right-arrow button (red).

Page 141: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 6 Configuring Unit Parameters

Huawei Technologies Proprietary

6-16

Step Action 4 Right-click the parameter and select the value. For example, select

“Monitor” status for one channel.

5 Click <Apply>. The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

6 Select “Board” from the pull-down menu and set the right parameter of “Monitor Interval (Min.)”. Usually use the default value.

7 Click <Apply>. The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

8 Select “Path” from the pull-down menu and click <Query> to query the optical spectrum analysis unit attributes. For example “Fixed Band” and “Working Band Parity”.

Page 142: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 6 Configuring Unit Parameters

Huawei Technologies Proprietary

6-17

6.8 Configuring Variable Optical Attenuation Unit

Purpose

Use this procedure to configure and query the attributes of variable optical attenuation unit. For example:

Configure optical interface attenuation rate

Configure path using status

Configure optical port memo

Query fixed band and working band parity

Prerequisites

The variable optical attenuation unit has been created.

NM user with the authority of "system operator" or above.

Procedure

Step Action 1 Select [Configuration/DWDM Configuration/DWDM Interface/ Variable

Optical Attenuation Unit] from the Main Menu. Select "By Board/Port (Path)".

Note:

You can also configure optical add/drop multiplexing unit interface parameters by selecting “By Function”.

2 Select “Path” from the pull-down menu.

3 In the lower-left pane, select the appropriate optical spectrum analysis unit (for example, VOA) and click the double-right-arrow button (red).

Page 143: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 6 Configuring Unit Parameters

Huawei Technologies Proprietary

6-18

Step Action 4 Right-click the parameter and select the value. For example, select

“Path Using Status” value for one path and enter optical interface attenuation value.

5 Click <Apply>. The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

6 Click <Query> to query the attributes of the variable optical attenuation unit. For example, “Fixed Band” and “Working Band Parity”.

Page 144: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 6 Configuring Unit Parameters

Huawei Technologies Proprietary

6-19

6.9 Querying Optical Equalizer Unit

Purpose

Use this procedure to query the attributes of optical equalizer unit. For example:

Query fixed band of the board

Query working band parity of the board

Query insertion loss of DGE board

Prerequisites

The optical equalizer unit has been created.

NM user with the authority of "system operator" or above.

Procedure

Step Action 1 Select [Configuration/DWDM Configuration/DWDM Interface/Optical

Equalizer Unit] from the Main Menu. Select "By Board/Port (Path)".

Note:

You can also configure optical add/drop multiplexing unit interface parameters by selecting “By Function”.

2 Select “Path” from the pull-down menu.

3 In the lower-left pane, select the appropriate optical spectrum analysis unit (for example, DGE) and click the double-right-arrow button (red).

Page 145: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 6 Configuring Unit Parameters

Huawei Technologies Proprietary

6-20

Step Action 4 Click <Query> to query the attributes of the optical equalizer unit. The

“Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

Note:

All the parameters of the multiplexer and the demultiplexer can be queried only.

Page 146: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 6 Configuring Unit Parameters

Huawei Technologies Proprietary

6-21

6.10 Querying Automatic Optical Fiber Monitoring Unit

Purpose

Automatic optical fiber monitoring units contain three boards: FMU, MWA and MWF. Only interfaces of FMU board need to be configured on T2000.

Use this procedure to query working wavelength of automatic optical fiber monitoring unit FMU.

Prerequisites

The FMU board has been created.

NM user with the authority of "system operator" or above.

Procedure

Step Action 1 Select [Configuration/DWDM Configuration/DWDM Interface/Optical

Supervisory Channel Unit] from the Main Menu. Select "By Board/Port (Path)".

Note:

You can also configure optical add/drop multiplexing unit interface parameters by selecting “By Function”.

2 Select “path” from the pull-down menu.

3 In the lower-left pane, select the appropriate optical supervisory channel unit (for example, FMU) and click the double-right-arrow button (red).

Page 147: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 6 Configuring Unit Parameters

Huawei Technologies Proprietary

6-22

Step Action 4 Click <Query> to query the attributes of the FMU board. The

“Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

Page 148: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 7 Configuring Clock

Huawei Technologies Proprietary

7-1

7 Configuring Clock

This chapter includes the operations of configuring board clock and service clock. The following tasks are described:

Configuring Board Clock Source Configuring Returned Clock of Optical Supervisory Channel Board

Page 149: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 7 Configuring Clock

Huawei Technologies Proprietary

7-2

Configuring Clock Transparent Transmission

Page 150: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 7 Configuring Clock

Huawei Technologies Proprietary

7-3

7.1 Configuring Board Clock Source

7.1.1 Setting Priority Table for Reference Clock

Purpose

Use this procedure to set priority table for reference clock. The system clock source priority list is used to define the priority of the available clock source of the board, and the board always traces the available clock source currently with the highest priority. The board cannot switch to a lower-priority clock source until the higher-priority clock source degrades or a clock switching command is sent manually.

Prerequisites

Supported by the OCU, OCUS, LQS or SMC board and it has been created. NM user with the authority of "system operator" or above.

Procedure

Step Action 1 Select [Configuration/DWDM Configuration/Board Clock Source

Configuration] from the Main Menu.

2 In the lower-left pane, select the appropriate board and click the double-right-arrow button (red).

3 Select “Clock Source Attributes” tab in the right pane.

4 Right-click the blank area in the right pane and select [Add Clock Source], “Add Clock Source” dialog box is displayed.

5 Select the reference clock source and click <OK>.

Page 151: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 7 Configuring Clock

Huawei Technologies Proprietary

7-4

Step Action 6 Click or to adjust the priority.

7 Click <Set Clock List>. The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

8 Click <Query> to query the priority table for reference clock. The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

9 Set the parameters “Input Mode of External Source” for the external clock source. The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

10 Select “Basic Attributes” tab and click <Query> to query the current board clock source.

Page 152: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 7 Configuring Clock

Huawei Technologies Proprietary

7-5

7.1.2 Setting SSM Protocol of Current Clock Source

Purpose

Use this procedure to set SSM protocol of current clock source. Only the SSM protocol is set to “enable”, the clock source auto-switching is supported.

Prerequisites

Supported by the OCU, OCUS, LQS or SMC board and it has been created. Priority table for reference clock has been set. NM user with the authority of "system operator" or above.

Procedure

Step Action 1 Select [Configuration/DWDM Configuration/Board Clock Source

Configuration] from the Main Menu.

2 In the lower-left pane, select the appropriate board and click the double-right-arrow button (red).

3 Select “Basic Attributes” tab in the left pane. Double-click the parameter “SSM Protocol” to set the parameter for the current clock source and click <Apply>.

Note:

The OCU board supports three modes of SSM protocol: Disabled, Enable Extended SSM Protocol and Enable Standard SSM Protocol. The default value is “Disabled”.

4 The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

5 Click <Query> to query the value.

Page 153: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 7 Configuring Clock

Huawei Technologies Proprietary

7-6

7.1.3 Setting Restoration Parameters for Current Clock Source

Purpose

If clock source switching is revertive, a degraded clock source with higher priority can serve as the system-traced clock source again after the restoration.

Prerequisites

Supported by the OCU, OCUS, LQS or SMC board and it has been created. NM user with the authority of "system operator" or above.

Procedure

Step Action 1 Select [Configuration/DWDM Configuration/Board Clock Source

Configuration] from the Main Menu.

2 In the lower-left pane, select the appropriate board and click the double-right-arrow button (red).

3 Select “Basic Attributes” tab in the left pane.

4 Double-click the parameters to set “Revertive Mode” and “Clock Holdover Mode”, and click <Apply>.

Note:

There are two modes of clock holdover, one is holdover for 24-hour, the other is holdover forever. You can choose one of them according to requirement.

5 The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

6 Click <Query> to query the value.

Page 154: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 7 Configuring Clock

Huawei Technologies Proprietary

7-7

7.1.4 Switching Clock Source

Purpose

Use this procedure to switch currently traced source to other specified clock sources. During equipment maintenance or failure conditions, it may be necessary to force the clock source to be switched to other clock sources. A clock source can be switched only when the “Lock Status” is “Unlock”.

Prerequisites

Supported by the OCU, OCUS, LQS or SMC board and it has been created. NM user with the authority of "system operator" or above.

Procedure

Step Action 1 Select [Configuration/DWDM Configuration/Board Clock Source

Configuration] from the Main Menu.

2 In the lower-left pane, select the appropriate board and click the double-right-arrow button (red).

3 Select “Clock Source Attributes” tab in the right pane.

Page 155: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 7 Configuring Clock

Huawei Technologies Proprietary

7-8

Step Action 4 Right-click a clock source and select the switching operation.

Note:

To switch the currently traced clock source, make sure the new clock source is of good quality, exists in the corresponding priority table and is not locked. Manual switching is different from forced manual switching. Manual switching must meet these conditions: 1) The source to be manually switched to must exist in the corresponding priority table and cannot be locked. 2) When the SSM protocol is enabled, the SSM priority of the source must be the highest. 3) In addition, manual switching is only used in the case when no priority table is used and its switching priority is lower than that under any other switching conditions, such as source status change, SSM message degradation, forced switching operation and locking operation.

5 The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

6 Click <Query> to query the switching status of a clock source.

7 If you want to restore to the automatic clock source selection mode, right-click the switched clock source and select [Clear Switching].

Page 156: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 7 Configuring Clock

Huawei Technologies Proprietary

7-9

7.1.5 Setting External Clock Source

Purpose

Use this procedure to set the working mode of external clock source. Prerequisites

Supported by the OCU, OCUS, LQS or SMC board and it has been created. NM user with the authority of "system operator" or above.

Procedure

Step Action 1 Select [Configuration/DWDM Configuration/Board Clock Source

Configuration] from the Main Menu.

2 In the lower-left pane, select the appropriate board and click the double-right-arrow button (red).

3 Select “Clock Source Attributes” tab in the right pane.

4 Set the parameters “Input Mode of External” and “External Source S1 Timeslot” for the external clock source.

5 Click <Apply> and the “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

6 Click <Query> to query the value.

Page 157: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 7 Configuring Clock

Huawei Technologies Proprietary

7-10

7.1.6 Setting Lock Status of Clock Source

Purpose

Use this procedure to set the “Lock Status” of clock source. Prerequisites

Supported by the OCU, OCUS, LQS or SMC board and it has been created. NM user with the authority of "system operator" or above.

Procedure

Step Action 1 Select [Configuration/DWDM Configuration/Board Clock Source

Configuration] from the Main Menu.

2 In the lower-left pane, select the appropriate board and click the double-right-arrow button (red).

3 Select “Clock Source Attributes” tab in the right pane.

4 Right-click a clock source and select the “Lock Status” of clock source.

Note:

Clock switching can not be done when “Lock Status” of clock source is “Locked”.

5 The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

6 Click <Query> to query the value.

Page 158: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 7 Configuring Clock

Huawei Technologies Proprietary

7-11

7.2 Configuring Returned Clock of Optical Supervisory Channel Board

Purpose

In a DWDM network, the processing of optical supervisory information needs to be synchronized with a network-unified clock source, that is, a local clock of SCC of a station needs to be set as the clock source to synchronize the SCC boards of other stations in the link or ring. The available clock sources of the SCC are: clk6 in slot 6, clk8 in slot 8, local clock and none. So, the returned clock should be configured on optical supervisory channel board as SCC tracing clock source. Use this procedure to set returned clock of optical supervisory channel board. This returned clock is as the tracing clock source of SCC board.

Prerequisites

Supported by the SC1/SC2/TC1/TC2. NM user with the authority of "system operator" or above.

Procedure

Step Action 1 Select [Configuration/DWDM Configuration/DWDM Interface/Optical

Supervisory Channel Unit] from the Main Menu. Select "By Board/Port (Path)".

2 Select “board” from pull-down menu.

3 In the lower-left pane, select the appropriate optical supervisory channel unit and click the double-right-arrow button (red).

4 Double-click the parameter and select the “West Clock” or “East Clock” for “Returned Clock” item. The default is west clock.

5 Click <Apply>. The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

Page 159: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 7 Configuring Clock

Huawei Technologies Proprietary

7-12

7.3 Configuring Clock Transparent Transmission

7.3.1 Configuring Input Attributes of Service Clock

Purpose

WDM product supports transparent transmission of three channels of synchronous timing clocks at 2Mbit/s. The numbering of transparent transmission clock in T2000 is shown in the figure. The TC2 board supports two directions of clock numbering and the TC1 board only supports clock numbering in west direction.

TC1/TC2

Westwardinput clock

External input clock

1

2

3

1

2

3

1

2

3

1

2

3

1 2 3 4 5 6

321

Westwardoutputclock

Eastwardoutput clock

Eastwardinput clock

External output clock Figure 7-1 Clock numbering supported by TC1/TC2

Use this procedure to set input attributes of external synchronous timing clock.

Prerequisites

Supported by the TC1/TC2. NM user with the authority of "system operator" or above.

Procedure

Step Action 1 Select [Configuration/DWDM Configuration/DWDM Interface/Clock

Transparent Transmission Configuration] from the Main Menu.

2 In the lower-left pane, select the appropriate optical supervisory channel unit (TC1/TC2) and click the double-right-arrow button (red).

3 Select “Input Attributes” tab, and click <Query> to query the input attributes for synchronous clock.

Page 160: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 7 Configuring Clock

Huawei Technologies Proprietary

7-13

Step Action 4 Set “Input Mode” for external input synchronous clock.

Note:

Setting the clock input mode is only applicable to external clock input. Therefore, configure this item only at the start station of the clock transmission link.

5 Set “Auto-Report When S1 Byte Unavailable” for external input synchronous clock.

Note:

Setting “Auto-Report When S1 Byte Unavailable” to “Enabled” means setting the S1 byte to disabled when the system detects loss of clock. The default is “Disabled”. Generally, there is no need to set it to enable.

6 Set “Service Status” for external input synchronous clock.

Note:

This parameter is used to configure whether the system monitors the input clock. It is applicable to line input clock and external clock. Configure this parameter at each node of the clock transmission link.

7 Click <Apply>. The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

Page 161: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 7 Configuring Clock

Huawei Technologies Proprietary

7-14

Step Action 8 Click <Query> to query the “Existing Status” and “S1 Byte Received”.

7.3.2 Configuring Output Attributes of Service Clock

Purpose

Use this procedure to set output attributes of external synchronous timing clock. Prerequisites

Supported by the TC1/TC2. NM user with the authority of "system operator" or above.

Procedure

Step Action 1 Select [Configuration/DWDM Configuration/DWDM Interface/Clock

Transparent Transmission Configuration] from the Main Menu.

2 In the lower-left pane, select the appropriate optical supervisory channel unit (TC1/TC2) and click the double-right-arrow button (red).

3 Select “Output Attributes” tab, and click <Query> to query the output attributes for synchronous clock.

4 Set “Output Mode” for synchronous service clock.

Note:

This parameter is only applicable to output port of external clock. Configure it at the node with clock output.

5 Click <Apply>. The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

Page 162: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 7 Configuring Clock

Huawei Technologies Proprietary

7-15

7.3.3 Configuring Working Route of Service Clock

Purpose

Use this procedure to set working route of external synchronous timing clock. Prerequisites

Supported by the TC1/TC2. NM user with the authority of "system operator" or above.

Procedure

Step Action 1 Select [Configuration/DWDM Configuration/DWDM Interface/Clock

Transparent Transmission Configuration] from the Main Menu.

2 In the lower-left pane, select the appropriate optical supervisory channel unit (TC1/TC2) and click the double-right-arrow button (red).

3 Select “Working Route” tab.

4 Select input clock from the pull-down menu. Select output clock in the lower-left pane. Then click the double-right-arrow button. The created working routes are displayed in the lower-right pane.

5 Click <Apply>. The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

Page 163: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 8 Configuring Overhead Interface

Huawei Technologies Proprietary

8-1

8 Configuring Overhead Interface

This chapter introduces how to configure overhead interface in the T2000.

The following tasks are described:

Configuring Orderwire Phone

Configuring Conference Call

Configuring Auxiliary Port

Configuring F1 Data Port

Configuring Broadcast Data Port

Configuring Subnet No. for the Optical Interface

Page 164: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 8 Configuring Overhead Interface

Huawei Technologies Proprietary

8-2

8.1 Configuring Orderwire Phone

Purpose

Use this procedure to configure orderwire phone.

Prerequisite

The NM user with the authority of “system operator” or above.

Procedure

Step Action 1 Select [Configuration/DWDM Configuration/Overhead Interface] from

the Main Menu. Select the “General” tab.

2 Double-click to select an NE in the lower-left pane.

3 Click <Query> to query information form the NE side.

Page 165: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 8 Configuring Overhead Interface

Huawei Technologies Proprietary

8-3

Step Action 4 Set “Call Waiting Time”, “Phone 1” and orderwire port.

Note:

Call waiting time refers to an interval, when you finish dialing a number, the NE will wait during this interval and then call the number. And the value range is 1-9.

There are two dialing mode: “Pulse” and “Dual Tone”, with “Dual Tone” as default.

Three orderwires of a single station is configured as 101, 102, and 103 by default. When one of them is configured, the other two will be set to 0xffffffff automatically, indicating unavailability.

When an orderwire is configured for subnet-outgoing use, its number is set to 0xfffffffff, and cannot be used as a caller or caller nor configured with telephone number any more. Otherwise, the subnet-outgoing connection will be affected.

5 Click <Apply> to confirm the settings. The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

Page 166: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 8 Configuring Overhead Interface

Huawei Technologies Proprietary

8-4

8.2 Configuring Conference Call

Purpose

Use this procedure to configure conference call.

Prerequisite

The NM user with the authority of “system operator” or above.

Procedure

Step Action 1 Select [Configuration/DWDM Configuration/Overhead Interface] from

the Main Menu. Select the “General” tab.

2 Double-click to select an NE in the lower-left pane.

3 Click <Query> to query information form the NE side.

4 Set “Conference Call”.

Page 167: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 8 Configuring Overhead Interface

Huawei Technologies Proprietary

8-5

Step Action 5 Select the “Conference Call” tab.

6 Set conference call attributes.

Note:

There are two attribute values you can select: Able to listen and speak, able to listen but not speak.

7 Click <Apply> to confirm the settings. The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

Page 168: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 8 Configuring Overhead Interface

Huawei Technologies Proprietary

8-6

8.3 Configuring Auxiliary Port

Purpose

Use this procedure to configure auxiliary port.

Auxiliary port is mainly used for inter-network communication.

Prerequisite

The NM user with the authority of “system operator” or above.

Procedure

Step Action 1 Select [Configuration/DWDM Configuration/Overhead Interface] from

the Main Menu.

2 Double-click to select an NE in the lower-left pane. Select the “Auxiliary” tab.

3 Click <Query> to query information form the NE side.

Page 169: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 8 Configuring Overhead Interface

Huawei Technologies Proprietary

8-7

Step Action 4 Set “Subnet No. Length” and “SDH NNI Connection”.

Note:

Set the length of subnet No. according to the size of the network.

Set the communication port and phone port used for inter-network communication.

5 Click <Apply> to confirm the settings. The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

Page 170: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 8 Configuring Overhead Interface

Huawei Technologies Proprietary

8-8

8.4 Configuring F1 Data Port

Purpose

Use this procedure to configure F1 data port.

F1 data port is used for data transparent transmission.

Prerequisite

The NM user with the authority of “system operator” or above.

Procedure

Step Action 1 Select [Configuration/DWDM Configuration/Overhead Interface] from

the Main Menu.

2 Double-click to select an NE in the lower-left pane. Select the “F1 Data Port” tab.

3 Click <Query> to query information form the NE side.

4 Select two available data ports and click the double-left-arrow button.

5 Click <Apply> to confirm the settings. The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

Page 171: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 8 Configuring Overhead Interface

Huawei Technologies Proprietary

8-9

8.5 Configuring Broadcast Data Port

Purpose

Use this procedure to configure broadcast data port.

Prerequisite

The NM user with the authority of “system operator” or above.

Procedure

Step Action 1 Select [Configuration/DWDM Configuration/Overhead Interface] from

the Main Menu.

2 Double-click to select an NE in the lower-left pane. Select the “Broadcast Data Port” tab.

3 Click <Query> to query information form the NE side.

4 Select a serial port in the “Overhead Byte” pull-down list.

Set the “Working Mode” of it.

Select the broadcast data source and sink.

5 Click <Apply> to confirm the settings. The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

Page 172: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 8 Configuring Overhead Interface

Huawei Technologies Proprietary

8-10

8.6 Configuring Subnet No. for the Optical Interface

Purpose

Use this procedure to configure Subnet No. for the optical interface.

Optical port subnet number is used to divide an orderwire subnet. Every optical interface in a network is assigned an optical interface subnet number, and optical interfaces with the same number belong to the same orderwire subnet, which can communicate with one another through orderwire.

Prerequisite

The NM user with the authority of “system operator” or above.

Procedure

Step Action 1 Select [Configuration/DWDM Configuration/Overhead Interface] from

the Main Menu.

2 Double-click to select an NE in the lower-left pane. Select the “Subnet No. for the Optical Interface” tab.

3 Click <Query> to query information form the NE side.

4 Click subnet field and enter subnet No. as you need.

5 Click <Apply> to confirm the settings. The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

Page 173: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-1

9 Configuring Network Parameters

This chapter introduces how to configure network parameters. The following tasks are described:

Laser Maintenance

Optical Power Management

DWDM Overhead Byte Management

IPA Management

ALC Management for 1600G/320GV3

ALC Management for 320G

Fiber Power Check

Automatic Optical Power Equalization

Wavelength Management

Configuring OAMS

Page 174: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-2

9.1 Laser Maintenance

9.1.1 Querying Laser Performance Threshold

Purpose

Use this procedure to query laser performance threshold, for example:

Input Optical Power

Output Optical Power

Laser Bias Current

Laser Cooling Current

Prerequisites

Supported by the OptiX Metro 6100.

NM user with the authority of "system operator" or above.

Procedure

Step Action 1 Select [Maintenance/Laser Maintenance/Laser Performance Threshold]

from the Main Menu.

2 In the lower-left pane, select the appropriate board and click the double-right-arrow button (red).

3 Select “Input Optical Power” from the pull-down menu.

4 Click <Query> to query information from the NE side.

5 Select “Output Optical Power”, “Laser Bias Current”, “Laser Cooling Current” from the pull-down menu one by one.

6 Click <Query> to query information from the NE side.

Page 175: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-3

9.1.2 Switching DWDM Laser Status

Purpose

Use this procedure to set laser status for optical transponder unit.

Prerequisites

Optical transponder unit has been created.

NM user with the authority of "system operator" or above.

Procedure

Step Action 1 Select [Maintenance/Laser Maintenance/DWDM Laser Switch] from the

Main Menu. Select “By Function”.

2 In the lower-left pane, select the appropriate board and click the double-right-arrow button (red).

3 Select one optical interface to be modified and double-click the “Laser Status” to set it to “Enabled” or “Disabled”.

4 Click <Apply>. The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

Page 176: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-4

9.1.3 Querying Laser Spectrum Analysis Data

Purpose

The spectrum analyzer unit provides the built-in in-service spectrum analysis and monitoring functions for the system. It can monitor such parameters as central wavelength, power and signal-to-noise of the system's optical signal and report the result to the SCC unit and NM.

Use this procedure to query spectrum analysis data for each channel accessing the port of the MCA/MS2 board.

Prerequisites

Supported by the MCA, MS1 and MS2 boards.

Optical spectrum analysis unit has been used and configured.

NM user with the authority of "system maintainer" or above.

Procedure

Step Action 1 Select [Maintenance/Laser Maintenance/ Laser Spectrum Analysis] from

the Main Menu.

2 In the lower-left pane, select the appropriate port of optical spectrum analysis unit and click the double-right-arrow button (red).

3 Set the value in “Compensation Power”. The default is 10dBm and the range is 10dBm~20dBm.

Note:

Due to the attenuation of the “MON” port, the reported optical power and the actual optical power need to be calibrated by setting the compensation power.

Page 177: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-5

Step Action 4 Click <Query> to query optical spectrum analysis data from the NE side.

The spectrum analysis result in the form of data is displayed in the upper-right pane and the spectrum analysis results in the form of graphics and profile are displayed in the lower-right pane.

Spectrum data information contains:

“No.” indicates wavelength serial number for monitored wavelength.

“Standard Wavelength (nm)/Frequency (THz)” indicates standard wavelength complying with ITU-T recommendations.

“Central Wavelength (nm)/Frequency (THz)” indicates actual central wavelength of monitored channel signal.

“Wavelength Deviation (nm)” indicates the deviation value between standard wavelength and central wavelength.

“Optical Power (dBm)” indicates optical power of single channel signal.

“OSNR (dB)” indicates optical signal-to-noise rate of single channel signal.

5 Click <Print> to print the spectrum analysis result.

Page 178: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-6

9.2 Optical Power Management

Purpose

The DWDM system provides the optical power management function, which performs optical power management for boards with the optical power detection function. It keeps the output optical power stable and improves the overall performances of the DWDM.

The meanings of each parameter are as follows: Parameters Description

Input Optical Power (dBm) Displays the optical power value of the receiving port. Double-click this item to set the optical power of the receiving port.

Input Reference Value (dBm)

Displays the optical power reference value of the receiving port. If the optical power of the receiving port is equal or close to the reference value, it indicates the optical power of this receiving port meets the requirements. Click <Save Reference Value> or <Save Networkwide Reference Value> to set the current input optical power as the input reference value.

Input Reference Value Time The reference value time refers to the time when the T2000 performs the operations of saving the reference value.

Input Lower Threshold (dBm)

Displays the minimum value of the input optical power. If the input optical power is below the lower threshold, the system will report an optical power performance degrade alarm.

Input Upper Threshold (dBm)

Displays the maximum value of the input optical power. If the input optical power is over the upper threshold, the system will report an optical power performance threshold-crossing alarm.

Output Optical Power (dBm) Displays the optical power value of the transmitting port. Double-click this item to set the optical power of the transmitting port.

Output Reference Value (dBm)

Displays the optical power reference value of the transmitting port. If the optical power of the transmitting port is equal or close to the reference value, it indicates the optical power of this transmitting port meets the requirements. Click <Save Reference Value> or <Save Networkwide Reference Value> to set the current output optical power as the output reference value.

Output Reference Value Time

The reference value time refers to the time when the T2000 performs the operations of saving the reference value.

Page 179: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-7

Prerequisites

Boards with the optical power detection function have been created.

NM user with the authority of "system operator" or above.

Procedure

Step Action 1 Select [Maintenance/Optical Power Management] from the Main Menu.

Select “By Port”.

2 In the lower-left pane, select the appropriate board and click the double-right-arrow button (red).

3 Click <Query> to query optical power information from the NE side. The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

4 Click <Apply> to send the configurations upon completion of the setting.

5 Click <Save Reference Value>. If the currently queried and set optical power values are ideal, you can set them as the reference values through this button, which serve as the references for power offset judgment.

6 Click <Save Networkwide Reference Value> to set the current power value of the entire network as the reference value.

7 Click <Print> to print the power list or <Save as> to save the power list in a specified file.

Page 180: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-8

9.3 DWDM Overhead Byte Management

Purpose

Use this procedure to manage overhead bytes of boards.

Prerequisite

The advanced menu has been started.

The NM user with the authority of “system maintainer” or above.

Procedure

1. OCh Overhead Management-SDH Interface Step Action 1 Select [Maintenance/DWDM Overhead Byte Management/OCh Overhead

Management-SDH Interface] from the Main Menu.

2 Select one or more boards from the left lower pane and click the double-right-arrow button (red).

3 Click “Display in Text Format” or “Display in Hexadecimal” radio button to modify the display mode of overhead bytes.

4 Click <Query> to refresh the overhead bytes.

5 If you want to modify an overhead byte, double-click it. Overhead byte setting dialog box is displayed.

Page 181: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-9

Step Action 6 Modify the overhead byte as you need. Click <OK> to confirm the

modification. A prompt is displayed. Confirm it.

7 If you have modified the overhead bytes, click <Apply> to confirm the settings. Three prompts are displayed in turn. Confirm them.

2. OCh Overhead Management-OTN Interface Step Action 1 Select [Maintenance/DWDM Overhead Byte Management/OCh Overhead

Management-OTN Interface/OTU] from the Main Menu.

2 Select one or more boards from the left lower pane and click the double-right-arrow button (red).

3 Click <Query> to refresh the overhead bytes.

4 If you want to modify an overhead byte, double-click it. Overhead byte setting dialog box is displayed.

5 Modify the overhead byte as you need. Click <OK> to confirm the modification. A prompt is displayed. Confirm it.

6 If you have modified the overhead bytes, click <Apply> to confirm the settings. Three prompts are displayed in turn. Confirm them.

7 Select [Maintenance/DWDM Overhead Byte Management/OCh Overhead Management-OTN Interface/ODU] from the Main Menu.

8 Repeat step 2 – step 7 to set ODU overhead bytes.

9 Select [Maintenance/DWDM Overhead Byte Management/OCh Overhead Management-OTN Interface/OPU] from the Main Menu.

10 Repeat step 2 – step 7 to set OPU overhead bytes.

Page 182: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-10

9.4 IPA Management

WDM system provides the IPA (Intelligent Power Adjustment) function.

In case the optical power signals on one or more segments of the active optical path are lost, the system can detect the loss of optical signals on the link and instantly reduce the optical power of the amplifier to a safety level. It will reduce the optical power of all amplifiers in the regeneration section of the downstream. When the optical signals of the system are recovered, the normal working of the optical amplifier can be recovered. The loss of optical signals might be caused by broken optical fiber, equipment deterioration or connector disconnection.

Note:

In the DWDM system, the IPA function is started only when optical signals of the active optical path are lost. When this function is executed, the objects of monitoring and shut-down action are both in service path. No operation will be implemented on the optical supervisory channel. Hence the functions of all optical supervisory channels will not be affected.

This section introduces the configuration of IPA. IPA configuration contains:

Create IPA

Set Delay Time for IPA

Restart IPA

Delete IPA

9.4.1 Creating IPA

Purpose

Use this procedure to create an IPA protection group.

Prerequisites

The NM user with the authority of “system operator” or above.

Detect board and control board have been installed and configured.

Page 183: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-11

Procedure

Step Action 1 Select [Maintenance/IPA Management] from the Main Menu.

2 Double-click the selected NE in the lower-left pane and the IPA information is displayed in right pane.

3 Click <Query> to refresh the created IPA information.

4 Click <Add IPA>. The “Create IPA” dialog box is displayed. Select or set parameters for added IPA group.

Note:

1) Detect board and control board must be configured in the same subrack NE with IPA function. And the detect board and the control board cannot be the same board.

2) IPA protection group should be configured in pairs for two terminal stations of the link.

3) If there are multiple OLA stations between two OTMs, it is recommended to configure the IPA function only on two terminals. If you configure IPA on each station, upon fiber-cut, all the IPA protection will be started and it will take a long time to recover services.

Page 184: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-12

Step Action Attribute parameters for IPA group:

“Protection Group ID”: indicates protection group index, ranging from 1 to 16.

“Band”: C Band and L Band can be selected.

“Detect Board”: indicates the optical amplifier board to detect the optical power.

“Control Board”: indicates the optical amplifier board to execute laser shutdown.

“RAMAN Amplifier”: this item is optional. It is used when Raman amplifier unit is configured at the receiving end.

“Enable Flag”: indicates whether to enable the IPA function.

“Restart Mode”: manual and automatic mode can be selected for restart.

“Off Period (s)”: indicates time period for laser shutdown in auto restart mode.

“On Period (0.01s)”: indicates time period for laser on.

“Testing Period (s)”: indicates time period for IPA test.

5 Click <OK>. The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

6 You can modify the parameters of IPA protection group and click <Apply>.

“Enable Flag”, “Restart Mode”, “Off Period (s)”, “On Period (0.01s)”, “Testing Period (s)” can be modified.

7 Repeat step 2 – step 5 to create an IPA group in the other terminal NE.

9.4.2 Setting Delay Time for IPA

Purpose

Use this procedure to set start delay parameter for IPA function to prevent from alarm jitter, that is when ”R_LOS” alarm is detected by detect board, IPA function will start after waiting for a moment to prevent alarm jitter.

Prerequisites

The NM user with the authority of “system operator” or above.

The IPA has been created.

Page 185: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-13

Procedure

Step Action 1 Select [Maintenance/IPA Management] from the Main Menu.

2 Double-click the selected NE in the lower-left pane and the IPA information is displayed in the right pane.

3 Click <Query> to refresh the created IPA information.

4 Select the created IPA group. Click <Start Delay> and the “Set Delay Time” dialog box is displayed.

5 Enter the delay time and click <OK>. The default is 10ms.

The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

6 Repeat step 2 – step 5 to set delay time for the other terminal NE.

9.4.3 Restarting IPA

Purpose

Use this procedure to restart IPA function manually. There are three modes for restarting IPA: auto, manual and testing. No configuration on T2000 for auto restarting mode is needed. Manual restarting and testing modes are usually used in commissioning. Pay attention to restart IPA at two terminals when in manual restarting and testing mode.

Prerequisites

The NM user with the authority of “system operator” or above.

The IPA has been created.

“Restart Mode” should be set to “Manual” when creating IPA group.

Page 186: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-14

Procedure

Step Action 1 Select [Maintenance/IPA Management] from the Main Menu.

2 Double-click the selected NE in the lower-left pane and the IPA information is displayed in the right pane.

3 Click <Query> to refresh the created IPA information.

4 Select the created IPA group. Click <Manual Reboot> or <Start Test> to restart IPA function manually. The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

9.4.4 Deleting IPA

Purpose

Use this procedure to delete the created IPA protection group

Prerequisites

The NM user with the authority of “system operator” or above.

Detect board and control board have been installed and configured.

IPA protection group has been created.

Procedure

Step Action 1 Select [Maintenance/IPA Management] from the Main Menu.

2 Double-click the selected NE in the lower-left pane and the IPA information is displayed in the right pane.

3 Click <Query> to refresh the created IPA information.

4 Select the IPA group to be deleted. Click <Delete IPA> to delete IPA group. A prompt is displayed. Confirm it.

Page 187: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-15

9.5 ALC Management for 1600G/320GV3

In DWDM system, optical fiber aging, optical connector aging or manual factors might lead to the abnormal attenuation of transmission lines. In case the attenuation on a line segment increases, all input and output power will be reduced on all downstream amplifiers. The system OSNR will get worse. At the same time, the received optical power will also be reduced. Receiving performance will be greatly affected. The closer the attenuated segment is to the transmission end, the more influence on OSNR there will be, as shown in Figure 9-1.

If the automatic level control (ALC) function is activated, this effect can be minimized. As the attenuation on a line segment is increased, the input power on the amplifier will be reduced. But due to ALC, the output power as well as the input and output powers of other downstream amplifiers will not be changed. Hence there will be much less influence on OSNR. The optical power received by the receiver will not be changed. Figure 9-2 shows the power changes on optical line amplification regenerators in the gain control and power control modes in case of abnormal attenuation on optical fiber lines.

OAU

High line losses

Attenuated output

OAUOAU

Attenuated input

Normal output

Figure 9-1 System power when gain control is activated

OAU

High line losses

Normal input

OAUOAU

Attenuated input

Normal output

Figure 9-2 System power when ALC is activated

This section introduces the configuration of ALC for OptiX BWS 1600G and OptiX BWS 320GV3. ALC configuration contains:

Configure the ALC Protocol Channel

Create the ALC Link Node

Check the ALC Link

Search the ALC Link

Start/Stop Automatic Link Adjustment

Page 188: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-16

9.5.1 Configuring the ALC Protocol Path

Purpose

Use this procedure to create a physical channel for transmission of ALC link protocol.

Prerequisite

The NM user with the authority of “system operator” or above.

Procedure

Step Action 1 Select [Maintenance/ALC Management] from the Main Menu.

2 Select “1600G/320GV3 Protocol Path Configuration” tab in the bottom pane.

3 Select an NE from the “NE Name” list in the bottom pane, and right-click in the idle area to select “Set Protocol Channel". “Set ALC Protocol Channel” dialog box is displayed.

4 Set the West Supervisory Channel and the East Supervisory Channel for this NE.

5 Click <OK>.

9.5.2 Creating the ALC Link Node

Purpose

The units involved in the ALC function and their functions are:

Optical amplifier unit (such as OAU, OBU): detect optical power

Variable optical attenuation (such as VOA): adjust optical power

Optical spectrum analysis unit (such as MCA): detect the number of channels

Optical supervisory channel unit (such as SC1/SC2/TC1/TC2): support transmission channel for ALC protocol.

Page 189: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-17

Control and communication unit (such as SCC/SCE): support control function for ALC.

Use this procedure to create the ALC nodes along the link.

Note:

There are two working modes of ALC: wave detection mode and power reference mode.

ALC cannot be enabled if the link is not properly configured. Pay attention to the following:

The ALC link number ranges from 1 to 255. Repetition of link number is not allowed. A subrack can be configured with four links at most.

The nodes on the same link must have the same direction.

The ALC node number must start from 1, and then increase consecutively along the service direction.

An MCA node is a node configured with MCA board specially for monitoring the ALC link. An ALC link can only be monitored by one optical port of one MCA board of an MCA node, and this optical port can monitor one ALC link only.

The nodes not involved in the ALC adjustment can be configured as pass-through nodes. The pass-through node is neither the first nor the last node, and cannot be a MCA node.

When setting an ALC link in the power reference mode, pay attention to the following:

The system supports one ALC link being divided into multiple power control sections to accommodate OADM application.

The initial node or the start node of a new power control section has no corresponding power reference. To ensure the correctness of the output power at the reference node, it is required to set a standard gain and check the actual gain of the reference node. When the actual gain of the reference node changes, it is necessary to reset the standard gain.

The auto adjustment switch is set at the initial node only in the power reference mode. It is suggested to be enabled after the whole ALC line works normally.

In the power reference mode, the reference node configured must be located upstream of this node, and the initial node takes itself as the reference node. If the ALC link passes through an OADM station with service add/drop operation, it is necessary to reset a new reference node in the new power control section. You can configure it on the same ALC link, or establish a new ALC link.

Page 190: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-18

Prerequisites

The NM user with the authority of “system operator” or above.

For the number-of-channels detection mode, the MCA board has been created in the ALC link.

Optical supervisory channel unit and SCC must be installed in the same subrack NE.

Optical amplifier unit, VOA, MCA and optical supervisory channel unit must be installed in the same subrack NE in MCA node.

Procedure

1. Wave Detection Mode Step Action 1 Select [Maintenance/ALC Management] from the Main Menu.

2 Select “1600G/320GV3 Single Station Configuration” tab in the bottom pane as required in practice.

3 Select an NE from the “NE Name” list in the bottom pane, and right-click in the idle area to select “Add Node". “Add Node” dialog box is displayed.

4 Select “Wave Detection Mode” in Working Mode. Set the link number, node number, number of nodes, working mode and the corresponding parameters for this node. Click <Apply>.

Page 191: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-19

Step Action Note:

Pay attention to requirement of parameters:

1) “Monitor NE”: indicates the subrack with the ALC protocol frame transport channel. If the waveband type of the ALC link is "C-Band", the monitor NE is the current subrack. If the waveband type of the ALC link is "L-Band", as the L-band link has no protocol frame transport channel, the monitor NE is the C-band subrack related with the L-band.

2) “Working Mode”: indicates two working modes of ALC. Parameter items available in two modes are different.

3) “Variable Optical Attenuation Unit”: selects the variable optical attenuator unit. If the optical amplifier unit is OAU, selects the “5” port of OAU board.

4) “Node ID of Reference Unit”: Indicates ID of the MCA node of ALC.

5) “Node No [1,255]”: sets the node numbers of the ALC node on the ALC link. The node numbers of the nodes on the ALC link start from 1 and increase consecutively in an ascending sequence according to the traffic flow direction.

6) “Standard Output Power for Single Wavelength (dBm)”: “5” for 32-channel system, “4” for 40-channel system, “1” for 80/160-channel system.

5 ALC link node information is displayed in the bottom pane.

6 Repeat step 4 to set other nodes on the ALC link.

2. Power Reference Mode Step Action 1 Select [Maintenance/ALC Management] from the Main Menu.

2 Select “1600G/320GV3 Single Station Configuration” tab in the bottom pane as required in practice.

3 Select an NE from the “NE Name” list in the bottom pane, and right-click in the idle area to select “Add Node". “Add Node” dialog box is displayed.

Page 192: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-20

Step Action 4 Select “Power Reference Mode” in Working Mode. Set the link number,

node number, number of nodes, working mode and the corresponding parameters for this node. Click <Apply>.

Page 193: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-21

Step Action Note:

Pay attention to the requirement of parameters:

1) “Monitor NE”: indicates the subrack with the ALC protocol frame transport channel. If the waveband type of the ALC link is "C-Band", the monitor NE is the current subrack. If the waveband type of the ALC link is "L-Band", as the L-band link has no protocol frame transport channel, the monitor NE is the C-band subrack related with the L-band.

2) “Working Mode”: indicates two working mode of ALC. Parameter items available in two modes are different.

3) “Variable Optical Attenuation Unit”: selects the variable optical attenuator unit. If the optical amplifier unit is OAU, select the “5” port of OAU board.

4) “Node ID of Reference Unit”: indicates ID of the power reference node of ALC. If the Node ID is “1”, enter “1”. If the Node ID is not “1”, enter the ID number which provides power reference for this node.

5) “Reference Unit”: selects the board and port to make the reference optical power unit for downstream nodes. If there is no need to give reference to downstream nodes, select “NUll”.

6) “Node No [1,255]”: sets the node numbers of the ALC node on the ALC link. The node numbers of the nodes on the ALC link start from 1 and increase consecutively in an ascending sequence according to the traffic flow direction.

7) “Standard Output Power for Single Wavelength (dBm)”: “5” for 32-channel system, “4” for 40-channel system, “1” for 80/160-channel system.

8) “Automatic Regulation Switch”: it can be set only in the initial node of ALC link.

5 ALC link node information is displayed in the bottom pane.

6 Repeat step 4 to set other nodes on the ALC link.

9.5.3 Checking the ALC Link

Purpose

Use this procedure to check correctness of the ALC configuration.

Prerequisites

The NM user with the authority of “system operator” or above.

ALC link has been created.

Page 194: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-22

Procedure

Step Action 1 Select [Maintenance/ALC Management] from the Main Menu.

2 Select “About 1600G/320GV3 Link” tab in the bottom pane.

3 Select a link from the “Link No.” list in the bottom pane and right-click to select [Consistency Check].

4 The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

Note:

This operation aims to check the validity of existing ALC links through NM and then inform the result to the user. The check principle is the same with the configuration principle of ALC link node, see section 9.5.2.

9.5.4 Searching the ALC Link

Purpose

Use this procedure to search the complete information of the created ALC.

Prerequisites

The NM user with the authority of “system operator” or above.

ALC link has been created.

Page 195: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-23

Procedure

Step Action 1 Select [Maintenance/ALC Management] from the Main Menu.

2 Select “1600G/320GV3 Complete Link” tab in the middle pane.

3 Right-click the idle area in the middle pane. Select [Search Link]. The link information will be displayed after several seconds.

9.5.5 Starting/Stopping Automatic Link Adjustment

Purpose

Use this procedure to start or stop automatic ALC link adjustment.

Prerequisites

The NM user with the authority of “system operator” or above.

ALC link has been created.

Procedure

Step Action 1 Select [Maintenance/ALC Management] from the Main Menu.

2 Select “1600G/320GV3 Complete Link” tab in the middle pane.

Page 196: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-24

Step Action 3 Select a link from the “Link No.” list in the middle pane.

4 Click <Start Automatic Link Adjustment> to start ALC or click <Stop Automatic Link Adjustment> to stop ALC.

5 A prompt is displayed. Click <OK> to start or stop the automatic link adjustment function.

Page 197: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-25

9.6 ALC Management for 320G

Refer to section 9.5 to know about ALC principle.

This section introduces the configuration of ALC for OptiX BWS 320G. ALC configuration contains:

Create the ALC Link Node

Check the ALC Link

Search the ALC Link

Start/stop Automatic Link Adjustment

9.6.1 Creating the ALC Link Node

Purpose

Use this procedure to create the ALC nodes along the link.

The units involved in the ALC function and their functions are:

Optical amplifier unit (such as WBA): detect optical power

Variable optical attenuation (such as VOA): adjust optical power

Optical spectrum analysis unit (such as MS2): detect the number of channels

Optical supervisory channel unit (such as SC1/SC2): support transmission channel for ALC protocol.

Control and communication unit (such as SCC/SCE): support control function for ALC.

Prerequisites

The NM user with the authority of “system operator” or above.

Supported by the OptiX BWS 320G.

For the number-of-channels detection mode, the MS1/MS2 board has been created in the ALC link.

Optical supervisory channel unit and SCC must be installed in the same subrack NE.

Optical amplifier unit, VOA, MS1/MS2 and optical supervisory channel unit must be installed in the same subrack NE in MS node.

Procedure

Step Action 1 Select [Maintenance/ALC Management] from the Main Menu.

Page 198: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-26

Step Action 2 Select “320G Single Station Configuration” tab in the bottom pane as

required in practice.

3 Select an NE from the “NE Name” list in the bottom pane, and right-click in the idle area to select “Add Node". “Add Node” dialog box is displayed.

4 Set the link number, node type, optical detection board, supervisory channel and the corresponding parameters for this node. Click <Apply>.

Note:

Pay attention to the requirement of parameters:

1) “Node No [1,255]”: sets the node numbers of the ALC node on the ALC link. The node numbers of the nodes on the ALC link start from 1 and increase consecutively in an ascending sequence according to the traffic flow direction.

2) “Node Type”: common node, pass-through node and MS node can be selected.

3) “Reference Unit Node ID”: Indicates ID of the MS node of ALC.

4) “Reference Unit”: Indicates slot of the MS2 board in MS node.

5) “Upstream Supervisory Channel”: Configures the slot where the upstream supervisory channel resides and its optical port.

6) “Downstream Supervisory Channel”: Configures the slot where the downstream supervisory channel resides and its optical port.

5 ALC link node information is displayed in the bottom pane.

6 Repeat step 4 to set other nodes on the ALC link.

Page 199: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-27

Caution:

ALC cannot be enabled if the link is not properly configured. Note:

1) The ALC link number ranges from 1 to 255. Repetition of link number is not allowed. A subrack can be configured with four links at most.

2) The ALC node number must start from 1, and then increase consecutively along the service direction.

3) The nodes not involved in the ALC adjustment can be configured as pass-through nodes. The pass-through node is neither the first nor the last node, and cannot be an MS node.

9.6.2 Checking the ALC Link

Purpose

Use this procedure to check correctness of the ALC configuration.

Prerequisites

The NM user with the authority of “system operator” or above.

ALC link has been created.

Procedure

Step Action 1 Select [Maintenance/ALC Management] from the Main Menu.

2 Select “About 320G Link” tab in the bottom pane.

3 Select a link from the “Link No.” list in the bottom pane and right-click to select [Consistency Check].

4 The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

Note:

This operation aims to check the validity of existing ALC links through NM and then inform the result to the user. The check principle is the same with the configuration principle of ALC link node, see section 9.6.1.

Page 200: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-28

9.6.3 Search the ALC Link

Purpose

Use this procedure to search the complete information of the created ALC.

Prerequisites

The NM user with the authority of “system operator” or above.

ALC link has been created.

Procedure

Step Action 1 Select [Maintenance/ALC Management] from the Main Menu.

2 Select “320G Complete Link” tab in the middle pane.

3 Right-click the idle area in the middle pane. Select [Search Link]. The link information will be displayed after several seconds.

9.6.4 Starting/Stopping Automatic Link Adjustment

Purpose

Use this procedure to start or stop automatic ALC link adjustment.

Prerequisites

The NM user with the authority of “system operator” or above.

ALC link has been created.

Procedure

Step Action 1 Select [Maintenance/ALC Management] from the Main Menu.

2 Select “320G Complete Link” tab in the middle pane.

3 Select a link from the “Link No.” list in the middle pane.

4 Click <Start Automatic Link Adjustment> to start ALC or click <Stop Automatic Link Adjustment> to stop ALC.

5 A prompt is displayed. Click <OK> to start or stop the automatic link adjustment function.

Page 201: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-29

9.7 Fiber Power Check

Purpose

In the application of the OptiX Metro 6100 system, either of fiber aging, optical connector aging or human factors may cause abnormal attenuation to the line. When the line attenuation decreases, as the optical power of the receive end has redundancy, the decrease of the optical power has little effect on the receive end. However, the input optical power downstream will decrease, thus severely affecting the OSNR of the system. In the end, the downstream will receive no signal.

To avoid this situation, the fiber link detection function is added to the T2000, which can regularly detect the optical power attenuation of every line. When it finds that the attenuation change of a line exceeds the predefined threshold, an abnormal event is generated in the T2000, prompting you to adjust the attenuation value of the VOA until the line attenuation of the entire ring is restored to normal.

Use this procedure to configure the fiber power check function.

Prerequisites

Boards with the optical power detection function have been created.

NM user with the authority of "system operator" or above.

Supported by the OptiX Metro 6100.

Procedure

1. Create Check Link Step Action 1 Select [Maintenance/Fiber Power Check] from the Main Menu.

2 Right-click in the idle area in the “Check Link”. Select [Create].

Page 202: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-30

Step Action 3 Set related attributes for check link in “Create Link”.

4 Click <Apply>. The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

5 Repeat step 3 – step 4 to create other links.

2. Create Check Link Group Step Action 1 Select [Maintenance/Fiber Power Check] from the Main Menu.

2 Right-click in the idle area in the “Check Link Group”. Select [Create].

Page 203: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-31

Step Action 3 Set related attributes for check link in “Create Link Group”. Select the link

from the “Available Links” to “Selected Link”.

4 Click <Apply>. The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

5 Repeat step 3 – step 4 to create other link groups.

3. Set Timing Period Step Action 1 Select [Maintenance/Fiber Power Check] from the Main Menu.

2 Click <Query> to query fiber power check link information.

3 Select the check link or check link group in the list.

Page 204: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-32

Step Action 4 Click < Set Timing Period > to set automatic check period.

5 Click <OK>.

6 Right-click the selected check link in the “Check Link” and select [to be Checked Periodically]. The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>. The automatic check is set.

Page 205: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-33

9.8 Automatic Optical Power Equalization

The automatic power equilibrium (APE) function can automatically adjust optical power of each channel at the transmitting end, so as to optimize the OSNR at the receiving end.

The APE function is implemented by MCA, V40/V32, SC1/SC2 and SCC. Their networking is shown in Figure 9-3.

Adjustment station Monitoring station

OTU

V40

OAUMCA

SC1

Figure 9-3 Networking for APE function

The normal functioning of APE requires the coordination between the optical boards and the SCC board, and the participation of the user. As shown in Figure 9-3, for power equilibrium, each channel power at the transmitting end can be adjusted according to the per channel power measured by the MCA at the receiving end. The APE brings convenience to DWDM system test in deployment and subsequent network maintenance. The APE function mode can also be set allowing user to decide whether to adjust the optical power.

Configuration principle:

To implement the APE function, it is required that the OTM station at the transmitting end should be configured with V40/V32, and the OTM station at the receiving end should be configured with MCA. Moreover, since DWDM is a dual-fiber bidirectional system, an MCA should be configured at the both ends of a multiplexing section.

To implement the APE function, it is required to install MCA and OSC unit (SC1/SC2/TC1/TC2) in one subrack. If not, network port ETHERNET 2 of two subracks should be interconnected.

To implement the APE function, it is required to install V40/V32 and OSC unit (SC1/SC2/TC1/TC2) in one subrack. If not, network port ETHERNET 2 of two subracks should be interconnected.

This section introduces the configuration of APE for OptiX BWS 1600G and OptiX BWS 320G. APE configuration contains:

Create the APE Pair

Configure Wavelength Monitoring Flag

Set Standard Power Curve

Start/Stop Regulation

Page 206: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-34

9.8.1 Creating the APE Pair

Purpose

Use this procedure to create the APE pair along the link.

The units involved in the APE function and their functions are:

V40/V32: variable multiplexer, adjusting attenuation of each channel

MCA: detect optical power of each channels

SC1/SC2/TC1/TC2: support transmission channel for APE protocol byte.

SCC/SCE: support control function for APE.

Prerequisites

The NM user with the authority of “system operator” or above.

The MCA board and the V40/V32 board have been installed and configured.

Optical supervisory channel unit and SCC must be installed in the same subrack NE.

Procedure

Step Action 1 Select [Maintenance/Automatic Optical Power Equalization] from the Main

Menu.

2 In the lower-left pane, select the subrack NE with the MCA board and click the double-right-arrow button (red).

3 Click <Create> at the bottom. “Create APE Pair” dialog box is displayed.

Page 207: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-35

Step Action 4 Set the related attributes of the APE pair: power regulating subrack, power

monitoring unit, band type, power regulating unit, monitoring subrack and power unbalance threshold. Click <OK>.

Note:

Pay attention to the requirement of parameters:

1) “Power Monitoring Unit”: configures the slot number and optical port number of MCA board where it resides.

2) “Power Regulating Subrack/Unit”: odd wavelength subrack/unit and even wavelength subrack/unit are available. Only configure the odd wavelength subrack/unit for the OptiX BWS 320G.

3) “Monitoring Subrack of Transmit End”: selects the subrack with a supervisory channel unit at the transmitting end.

4) “Monitoring Subrack of Receive End”: selects the subrack with a supervisory channel unit at the receiving end.

5) “Power Unbalance Threshold (dB)”: The default is 1.5dB. The range is 0.5dB to 3dB.

Page 208: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-36

Step Action 5 Modify the parameters of APE pair (optional).

Select an APE pair in the APE Pair list.

Right-click to select [Modify]. Modify parameters in "Modify APE Pair" dialog box.

6 Delete the APE pair (optional).

Select an APE pair in the APE Pair list and right-click to select [Delete APE Pair].

7 Configure monitoring flag of wavelength.

Select the wavelength from the "Wavelength ID" list and right-click to set the wavelength monitoring flag.

Note:

Disable wavelength monitoring for the wavelengths added/dropped to/from the OADM.

Page 209: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-37

Step Action 8 Query the ALC protocol channel from the T2000 (optional).

Select the NE from the "NE Name" list and right-click to select [Query Protocol Path from the NM].

9 Query the ALC protocol channel from the NE (optional).

Select the NE from the "NE Name" list and right-click to select [Query Protocol Path from the NE].

10 Repeat step 3 – step 4 to create protocol channels for all nodes on the ALC link.

Note:

1) For the first node of the ALC link, the West Supervisory Channel is “Null”; for the last node of the ALC link, the East Supervisory Channel is “Null”.

2) Each node only supports one ALC protocol channel.

9.8.2 Configuring Wavelength Monitoring Flag

Purpose

Use this procedure to configure wavelength monitoring flag.

Prerequisites

The NM user with the authority of “system operator” or above.

APE pair has been created.

Procedure

Step Action 1 Select [Maintenance/Automatic Optical Power Equalization] from the Main

Menu.

2 In the lower-left pane, select the subrack NE with the MCA board and click the double-right-arrow button (red).

3 Click <Query> to query the optical power equalization information.

Page 210: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-38

Step Action 4 Select the wavelength from the "Wavelength ID" list and right-click to set

the wavelength monitoring flag. The default is “Allow”.

Note:

Disable wavelength monitoring for the wavelengths added/dropped to/from the OADM.

9.8.3 Setting Standard Power Curve

Purpose

Use this procedure to save the current optical power offset to standard curve for reference.

Prerequisites

The NM user with the authority of “system operator” or above.

APE pair has been created.

Procedure

Step Action 1 Select [Maintenance/Automatic Optical Power Equalization] from the Main

Menu.

Page 211: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-39

Step Action 2 In the lower-left pane, select the subrack NE with the MCA board and click

the double-right-arrow button (red).

3 Click <Query> to query the IPA pair information.

4 Select the APE pair from the "ID of APE Pair" list in the upper pane and right-click to select [Set Current Power Offset to Standard Value]. The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

Note:

Through MCA board, the system can learn about the spectrum accessed by each optical interface and compare the spectrum with the existing one. If there is a wavelength not being accessed, the system will report the wavelength-drop event. If there is a new wavelength, the system will report the wavelength-add event. After that, NM will prompt the user to save the APE standard power curve again.

9.8.4 Starting/Stopping Regulation

Purpose

Use this procedure to start or stop APE function.

Prerequisites

The NM user with the authority of “system operator” or above.

APE pair has been created.

Procedure

Step Action 1 Select [Maintenance/Automatic Optical Power Equalization] from the Main

Menu.

2 In the lower-left pane, select the subrack NE with the MCA board and click the double-right-arrow button (red).

3 Click <Query> to query the IPA pair information.

Page 212: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-40

Step Action 4 Click <Start Regulation > to start APE or click <Stop Regulation > to stop

APE.

Note:

When a dialog box of APE power exception is displayed on NM, the user needs to confirm it to start the APE regulation. The total time of APE regulation should be no more than three minutes. Normally one minute is enough. After the APE regulation, the system will report the APE regulation success event.

5 A prompt is displayed. Click <OK> to start or stop the automatic link adjustment function.

Page 213: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-41

9.9 Wavelength Management

This section describes the management, configuration, and maintenance of the end-to-end wavelength service. To be specific, it introduces how to:

Set the customized display;

Browse wavelength trails;

View the details about a wavelength trail;

Manage the wavelength division optical power;

View the relevant alarms of a wavelength trail;

View the wavelength trail performance.

9.9.1 Setting the Customized Display

Objective

This section introduces how to set the customized display.

Prerequisite

The NM user has the right of “system operator” or above.

Procedure

Step Action

1 Select [View/Trail View] from the main menu.

Page 214: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-42

Step Action 2 Select [Trail/Wavelength Management] in the trail view to enter the

“Wavelength Management” interface.

3 Right-click the table heading and then click [Customize Display].

Page 215: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-43

Step Action 4 The “Customize Display” interface pops up.

5 Select from the “Undisplayed” column the customized wavelength trail attributes to be displayed and click to add them to the “Displayed” column.

6 Click <OK>, and the selected attribute parameters will appear in the tabling heading in the “Wavelength Management” interface.

9.9.2 Browsing Wavelength Trails

Objective

This section introduces how to browse wavelength trails.

Prerequisite

The NM user has the right of “system operator” or above.

Internal fibers and external fibers of the optical NE have been correctly created.

Procedure

Step Action 1 Select [View/Trail View] from the main menu.

2 Select [Trail/Wavelength Management] in the trail view to enter the “Wavelength Management” interface.

3 Click <Filter>, and the “Set Trail Browse Filter Conditions” dialog box will pop up.

Page 216: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-44

Step Action 4 Set the filtering conditions and then click <Full Filter>. The wavelength

trails that meet the conditions will be displayed in the list.

Note:

“Full Filter” refreshes to display all the trails that meet the conditions. “Secondary Filter” serves to filter in the displayed trails according to the filtering conditions. “Incremental Filter” does not refresh the displayed trails, but only adds the results in respond to the new filtering to after the displayed trails.

5 Click <Save As> to save the result to the specified path on the client PC.

9.9.3 Viewing the Details about a Wavelength Trail

Objective

This section introduces how to view details about a wavelength trail.

Prerequisite

The NM user has the right of “system operator” or above.

Internal fibers and external fibers of the optical NE have been correctly created.

Procedure

Step Action 1 Select [View/Trail View] from the main menu.

2 Select [Trail/Wavelength Management] in the trail view to enter the “Wavelength Management” interface.

3 Click <Filter> in the “Wavelength Management” interface. The “Set Trail Browse Filter Conditions” interface will pop up for you to select or enter the required parameters and trail filtering conditions.

4 Click <Full Filter>, and the trails that meet the conditions will be displayed in the list.

Note:

“Full Filter” refreshes to display all the trails that meet the conditions. “Secondary Filter” serves to filter in the displayed trails according to the filtering conditions. “Incremental Filter” does not refresh the displayed trails, but only adds the results in respond to the new filtering to after the displayed trails.

Page 217: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-45

Step Action 5 Right-click a wavelength trail and select [Details].

6 Click the “Attribute” tab to view the basic attributes of the wavelength, and modify its attributes such as “Name”, “ID”, and “Remarks”.

Page 218: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-46

Step Action 7 Click the “Channel Allocation” tab to view the channel allocation information

such as name of the serving trail, source seized wavelength and sink seized wavelength.

9.9.4 Managing the Wavelength Division Optical Power

Objective

This section introduces how to manage the optical power of the specified board optical interface on the wavelength trail.

Prerequisite

The NM user has the right of “system operator” or above.

The wavelength trail exists and is configured with a board with the optical power detection function.

Procedure

Step Action

1 Select [View/Trail View] from the main menu.

2 Select [Trail/Wavelength Management] in the trail view to enter the “Wavelength Management” interface.

3 Click <Filter> in the “Wavelength Management” interface. The “Set Trail Browse Filter Conditions” interface will pop up for you to select or enter the required parameters and trail filtering conditions.

Page 219: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-47

Step Action 4 Click <Full Filter>, and the trails that meet the conditions will be displayed

in the list.

Note:

“Full Filter” refreshes to display all the trails that meet the conditions. “Secondary Filter” serves to filter in the displayed trails according to the filtering conditions. “Incremental Filter” does not refresh the displayed trails, but only adds the results in respond to the new filtering to after the displayed trails.

5 Right-click a wavelength trail and select [Wavelength Division Optical Power Management], and then the “Wavelength Division Optical Power Management” will pop up.

6 Query/Set the optical power information. In doing so, please refer to 9.2 Optical Power Management.

9.9.5 Viewing the Relevant Alarms of a Wavelength Trail

Objective

This section introduces how to view the alarms related to a wavelength trail.

Prerequisite

The NM user has the right of “system operator” or above.

Internal fibers and external fibers of the optical NE have been correctly created.

Page 220: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-48

Procedure

Step Action 1 Select [View/Trail View] from the main menu.

2 Select [Trail/Wavelength Management] in the trail view to enter the “Wavelength Management” interface.

3 Click <Filter> in the “Wavelength Management” interface. The “Set Trail Browse Filter Conditions” interface will pop up for you to select or enter the required parameters and trail filtering conditions.

4 Click <Full Filter>, and the trails that meet the conditions will be displayed in the list.

Note:

“Full Filter” refreshes to display all the trails that meet the conditions. “Secondary Filter” serves to filter in the displayed trails according to the filtering conditions. “Incremental Filter” does not refresh the displayed trails, but only adds the results in respond to the new filtering to after the displayed trails.

5 Select a trail or several trails, and click <Alarm>. Select [Current Alarm].

Select [History Alarm] to view the history alarms.

Select [Alarm Suppression] to set alarm suppression.

Page 221: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-49

Step Action 6 The current alarms of all severities are listed.

7 Click <Query> to refresh the information.

8 Select an alarm, and the details about and the cause for the alarm will be given in the frame in the lower part.

9 After reading the information, click <Confirm>.

When the alarm ends, it will automatically become a history alarm.

10 Click <Save As> to save the result to the specified path on the client PC.

9.9.6 Viewing the Wavelength Trail Performance

Objective

This section introduces how to view the performance of a wavelength trail.

Prerequisite

The NM user has the right of “system operator” or above.

Internal fibers and external fibers of the optical NE have been correctly created.

Procedure

Step Action

1 Select [View/Trail View] from the main menu.

Page 222: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-50

Step Action 2 Select [Trail/Wavelength Management] in the trail view to enter the

“Wavelength Management” interface.

3 Click <Filter> in the “Wavelength Management” interface. The “Set Trail Browse Filter Conditions” interface will pop up for you to select or enter the required parameters and trail filtering conditions.

4 Click <Full Filter>, and the trails that meet the conditions will be displayed in the list.

Note:

“Full Filter” refreshes to display all the trails that meet the conditions. “Secondary Filter” serves to filter in the displayed trails according to the filtering conditions. “Incremental Filter” does not refresh the displayed trails, but only adds the results in respond to the new filtering to after the displayed trails.

5 Select a trail or several trails, and click <Performance>. Select [15-minute Current Performance].

Select [24-Hour Current Performance] to view the 24-hour current performance.

Select [15-Hour Current Performance] to view the 15-minute history performance.

Select [24-Hour Current Performance] to view the 24-hour history performance.

Select [Performance Threshold-Crossing Record] to view the performance threshold-crossing record.

Select [Performance Parameter] to view the performance parameter.

Page 223: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-51

Step Action 6 The 15-minute current performance information of the wavelength trail is

displayed.

7 Click <Query> to refresh the information.

8 Click <Save As> to save the result to the specified path on the client PC.

Page 224: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-52

9.10 Configuring OAMS

OAMS: Optical fiber line automatic monitoring system.

Through the OAMS, you can check fiber performance through the optical pulse injected in fibers, and get information about splicing points and connectors, such as attenuation, reflection, and location, as well as the performance of a whole fiber line or a certain fiber segment, such as total attenuation, optical return loss, and length.

The OptiX BWS 1600G products provide OAMS function to fibers, realizing preliminary fiber fault location and line fiber alarming. The OAMS function perfects the alarming performance of the OptiX BWS 1600G by monitoring fiber line and thus enhances the maintainability of optical transmission network. The OAMS, built in the 1600G products, is a relatively independent optional unit, which can be configured as required.

9.10.1 Starting OAMS through T2000

Purpose

Use this procedure to start OAMS through the T2000.

Prerequisites

The advanced menu has been started.

Supported by the OptiX BWS 1600G.

The optical NEs and related subrack NEs have been created.

The NM user with the authority of “system operator” or above.

Page 225: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-53

Procedure

Step Action 1 Install the FMU, MWA and MWF boards on the subrack NE. For details,

refer to “4.5 Creating Board”.

2 Add all NEs with OTDR function to OAMS users. For details, refer to “3.1 Creating NE User and Assign Authority”.

Note:

Here, the user name and the password of all NEs should be consistent.

3 Start the OAMS. Select [Alarm/ Start OAMS] from the main menu.

Page 226: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-54

9.10.2 Browsing Curve File

Purpose

According to location and usage, the curve files can be classified into local files, server files, reference curve, and test curve.

Local files are the curve files stored in the OAMS client.

Server files are the curve files stored in the OAMS server.

Reference curve refers to the curve stored at NE side for reference during test.

Test curve refers to the test result stored at NE side.

Local files and server files are history test curves. Reference curve is also history test curve. Since its performance is consistent with the actual fiber conditions, reference curve is used as reference during test.

Use this procedure to browse curve files.

Prerequisites

The OAMS has been started.

Applicable to the OptiX BWS 1600G.

The NM user with the authority of “system operator” or above.

Procedure

Step Action 1 Open a curve file.

Select [File/Open File/Local File] from the main menu of the OAMS, and the file browser is displayed. Select an appropriate local curve file and open it. Select [File/Open File/Server File] from the main menu of the OAMS, and the file list is displayed. Select an appropriate server curve file and open it. Select the tested unit, right-click it, and select [Browse Tested Curve] to open the tested curve. Select the tested unit, and then [Test/Query Reference Curve] from the main menu of OAMS to open the reference curve.

2 Browse the curve. Select [Browse] from the main menu of the OAMS or

click the toolbar buttons to adjust display proportion and location.

3 Close/Open the curve.

Right-click the curve file in the topology tree and select [Close Curve], the curve will be closed. After closing the curve, right-click to select [Open Curve] or double-click the curve file to display the curve in the curve area.

Page 227: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-55

Step Action 4 Close the curve file.

Right-click the curve file in the topology tree and select [Close File]. The curve will not be displayed and the curve file not displayed in the topology tree any more.

9.10.3 Modifying Curve File

Purpose

Use this procedure to modify the curve information of a curve file, such as:

Operator

Test date

Test equipment

Fiber identifier

Prerequisites

The OAMS has been started.

Applicable to the OptiX BWS 1600G.

The NM user with the authority of “system operator” or above.

Procedure

Step Action 1 Select an appropriate curve file in the topology tree. Select [Edit/Curve

Information] from the main menu of the OAMS, or right-click to select [Curve Information] to display the curve information dialog box.

2 Modify the curve information as required. Click <OK> to save the modification.

3 Repeat this procedure to modify as many curve files as necessary.

9.10.4 Setting Reference Curve

Purpose

If the test mode is set to test according to reference curve, it is required to set reference curve at the port to be tested. The test parameters will be obtained from the reference curve during test.

Use this procedure to set reference curve.

Page 228: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-56

Prerequisites

The OAMS has been started.

Applicable to OptiX BWS 1600G.

The NM user with the authority of “system operator” or above.

Procedure

Step Action 1 Open the server file and select one ideal curve for test.

2 Select [Test/ Set Start and End Points] from the main menu of the OAMS, and add start point and end point to the curve.

3 Adjust the location of start point and end point.

Note:

Do not place the start point and end point in the noise area, or near the events. The system will only process the data between the start point and end point and report alarms for the faults in this section.

4 Repeat this procedure to set as many reference curves as necessary.

Page 229: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-57

9.10.5 Test on-Demand

Purpose

Test on-demand is originated manually through the OAMS. In this case, an remote test unit (RTU) is selected and controlled to test a monitored fiber.

Use this procedure to complete test on-demand.

Prerequisites

The OAMS has been started.

Applicable to the OptiX BWS 1600G.

The NM user with the authority of “system operator” or above.

Procedure

Step Action 1 Select an appropriate test port in the topology tree.

2 Select an appropriate test mode and set parameters.

( Note:

In the case of “manual test”, it is required to select [Edit/Fiber Parameter Setting] from the main menu of the OAMS to set fiber parameters.

In the case of “test according to reference curve”, it is required to set reference curve. For details, refer to “9.10.4 Setting Reference Curve”.

In the case of “automatic test”, it is not necessary to set either fiber parameters or reference curve.

3 Select [Test/Start Test] from the main menu of the OAMS, or right-click the test port. Select [Start Test], and the test interface is displayed.

4 Click <Query> to query test parameters. Select “test on-demand”.and then an appropriate test mode, and set test parameters.

Page 230: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-58

Step Action 5 Click <OK> to start the test. The test progress bar is displayed.

6 After the test, the test result will be displayed on the interface. Observe whether it is normal. If not, abnormal event information will be generated (by observing the list of key events, faulty links and abnormal events). Handle the fault according to the abnormal event.

7 Select [Edit/Curve Information] from the main menu of the OAMS. Set curve information and then save it locally for easy view.

8 Repeat this procedure to complete as many tests on-demand as necessary.

9.10.6 Periodic Test

Purpose

It is also called conventional test. If the conditions are met (test cycle or test start time), the test can be started.

Use this procedure to complete periodic test.

Prerequisites

The OAMS has been started.

Page 231: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 9 Configuring Network Parameters

Huawei Technologies Proprietary

9-59

Applicable to the OptiX BWS 1600G.

The NM user with the authority of “system operator” or above.

Procedure

Step Action 1 Select an appropriate test port from the topology tree.

2 Select an appropriate test mode and set parameters.

Note:

1) In the case of “manual test”, it is required to select [Edit/Fiber Parameter Setting] from the main menu of the OAMS to set fiber parameters

2) In the case of “test according to reference curve”, it is required to set reference curve. For details, refer to 9.10.4 Setting Reference Curve.

In the case of “automatic test”, it is not necessary to set either fiber parameters or reference curve.

3 Select [Test/Start Test] from the main menu of the OAMS, or right-click the test port. Select [Start Test] and the test interface is displayed.

4 Click<Query> to query test parameters. Select “periodic test” and then an appropriate test mode, and set parameters like test time, test cycle, etc.

5 Click <OK> to send the test parameters.

6 If the conditions are met, the test will be started. After the test, an event will be reported to the NM. If abnormal, an abnormal event will be generated. It is necessary to handle the fault according to the abnormal event.

7 Select [Test/Query Test Curve] from the main menu of the OAMS to view the test result.

8 Select [Edit/Curve Information] from the main menu of the OAMS. Set curve information and save it locally for easy view.

Page 232: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 10 Configuring Protection

Huawei Technologies Proprietary

10-1

10 Configuring Protection

Configuring Protection includes: Configuring Optical Line Protection Configuring Wavelength Protection Group Configuring 1+1 Optical Channel Protection Configuring 1:N Optical Channel Protection Configuring Clock Transparent Transmission Protection

Page 233: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 10 Configuring Protection

Huawei Technologies Proprietary

10-2

10.1 Configuring Optical Line Protection

Purpose

The WDM system provides protection for the optical line by means of dual-fed and signal selection through the OLP board. Use this procedure to set the protection board and parameters for optical line protection.

Prerequisites

Super NM User: admin. The OLP board has been installed.

Procedure

Step Action 1 Select [Configuration/DWDM Configuration/Optical Line Protection]

from the Main Menu.

2 In the lower-left pane, select the appropriate terminal subrack NE and click the double-right-arrow button (red).

3 Click <Query> to query the current switching status of line protection from the NE.

4 Set protection related attributes: revertive mode, revertive time.

5 Click <Apply>. The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

Page 234: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 10 Configuring Protection

Huawei Technologies Proprietary

10-3

Step Action 6 Right-click the Switching Status item of selected NE to select

switching mode. The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

7 Repeat step 2 – step 6 to configure OLP path protection pair of the opposite subrack NE.

Page 235: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 10 Configuring Protection

Huawei Technologies Proprietary

10-4

10.2 Configuring Wavelength Protection Group

Purpose

The WDM system provides protection for optical transponder unit, supporting: Inter-board 1+1 protection, realized by the SCS board Intra-board protection, realized by the dual-fed and signal selection OTU

Use this procedure to set the parameters for wavelength protection group. Prerequisites

NM user with the authority of "system maintainer" or above. Active and standby boards have been installed or dual-fed and signal selection

OTU has been installed. Procedure

Step Action 1 Select [Configuration/DWDM Configuration/Wavelength Protection

Group] from the Main Menu.

2 In the lower-left pane, select the appropriate NE and click the double-right-arrow button (red).

3 Click <Query> to query the current protection information from the NE.

4 Click <Create>. “Create Wavelength Protection Group” dialog box is displayed.

Page 236: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 10 Configuring Protection

Huawei Technologies Proprietary

10-5

Step Action 5 Select Protection Type.

Three types can be selected: “Intra-Board Wavelength Protection” applies to dual-fed and signal selection OUT boards... “Inter-Board Wavelength Protection” applies to 1+1 backup OTU boards. “1+1 Wavelength Protection at Client” applies to client-end protection.

6 Set Working Path and Protection Path.

Note: In Inter-board wavelength protection mode, the OTU of the working path and that of the protection path must be two boards in one subrack. In Intra-board wavelength protection mode, adopt the OTU with dual-fed signal selection.

7 Set Revertive Mode and Revertive Time. “Non-Revertive” is recommended. If “Revertive” is selected, then the Revertive Time (s) is suggested to set to “600”. Revertive Mode and Revertive Time in the whole network should be same.

8 Set SD Trigger Flag and SD Trigger Conditions.

Page 237: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 10 Configuring Protection

Huawei Technologies Proprietary

10-6

Step Action 9 Click <OK>. The created wavelength protection group is displayed.

10 If you want to modify wavelength protection group, select a created wavelength group and click <Modify> to modify attribute value. If you want to delete wavelength protection group, select a created wavelength group and click <Delete> to delete a created protection group.

11 Repeat step 2 – step 10 to configure wavelength protection group of the opposite subrack NE.

Page 238: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 10 Configuring Protection

Huawei Technologies Proprietary

10-7

10.3 Configuring 1+1 Optical Channel Protection

Purpose

Use this procedure to set the parameters for wavelength protection group. Prerequisites

NM user with the authority of "system operator" or above. Supported by the OptiX Metro 6100. Two OTU boards of the same type have been created.

Procedure

Step Action 1 Select [Configuration/DWDM Configuration/1+1 Optical Channel

Protection] from the Main Menu.

2 In the lower-left pane, select the appropriate NE and click the double-right-arrow button (red).

3 Click <Query> to query the current protection information from the NE.

4 Click <Create>. “WDM Channel Protection Configuration-New” dialog box is displayed.

5 Select Active Board, Standby Board and Set Switching Status.

6 Set Revertive Mode.

Page 239: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 10 Configuring Protection

Huawei Technologies Proprietary

10-8

Step Action 7 Click <OK>. The created 1+1 optical channel protection group is

displayed.

8 If you want to modify protection group, select a created 1+1 optical channel protection group and click <Modify> to modify attribute value. If you want to delete protection group, select a created 1+1 optical channel protection group and click <Delete> to delete it.

9 Repeat step 2 – step 8 to configure 1+1 optical path protection of the opposite subrack NE.

Page 240: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 10 Configuring Protection

Huawei Technologies Proprietary

10-9

10.4 Configuring 1:N Optical Channel Protection

10.4.1 Creating 1:N Optical Channel Protection

Purpose

Use this procedure to set the parameters for 1:N optical channel protection. Prerequisites

NM user with the authority of "system operator" or above. An OCP board and two or more LWF/LWS boards have been created in the same

subrack NE. Fibers have been correctly created. Supported by the OptiX BWS 1600G. Supported by the LWF/LWFS/LWS board.

Procedure

Step Action 1 Select [Configuration/DWDM Configuration/1:N Optical Channel

Protection] from the Main Menu.

2 In the lower-left pane, select the appropriate NE and click the double-right-arrow button (red).

3 Click <Query> to query the current protection information from the NE.

4 Click <Add>. “Add” dialog box is displayed.

Page 241: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 10 Configuring Protection

Huawei Technologies Proprietary

10-10

Step Action 5 Set attribute values of 1:N optical channel protection and protection

path/working path.

Note:

1) Eight working OTUs (at most) and one protection OTU form a protection group. However, every board in this protection group and the OCP board must be inserted in the same subrack. 2) At present, the boards that support this kind of protection are LWF/LWFS/LWS. 3) “Number of Working Path”: The range is 1 to 8. 4) “SD Switching”: It indicates whether SD is a switching condition. It is “disabled” by default. 5) “Parameter Check Consistency Flag”: It should be set to check status, that is, ”Consistency Check of Physical Path and Logical Path” or “Path Priority Check”.

Page 242: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 10 Configuring Protection

Huawei Technologies Proprietary

10-11

Step Action 6 Click <OK>. The created 1:N optical channel protection group is

displayed.

7 If you want to delete protection group, select a created 1:N optical channel protection group and click <Delete> to delete a created protection group.

8 Repeat step 2 – step 6 to configure 1:N optical path protection of the opposite subrack NE.

10.4.2 Searching 1:N Optical Channel Protection Subnet

Purpose

Use this procedure to search 1:N optical channel protection subnet. You will find 1:N wavelength protection subnet after searching it and perform protection switching in protection subnet maintenance view.

Prerequisites

NM user with the authority of "system operator" or above. 1:N optical channel protection parameters have been configured. Fibers have been correctly created. Supported by the OptiX BWS 1600G. Supported by the LWF/LWFS/LWS board.

Procedure

Step Action 1 Select [View/Protection View] from the Main Menu.

Page 243: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 10 Configuring Protection

Huawei Technologies Proprietary

10-12

Step Action 2 Select [Protection Subnet/Protection Subnet Search] in the

“Protection View”.

3 Click <Next> at the bottom.

4 Click <Search> to search 1:N optical channel protection subnet.

5 Click <Next>.

6 Click <Finish>. Searched 1:N optical channel protection is displayed in graphic.

10.4.3 Switching 1:N Optical Channel Protection Status

Purpose

Use this procedure to: Modify parameters of 1:N optical channel protection Perform consistency check Query the switching status of 1:N optical channel protection Perform protection switching

Prerequisites

NM user with the authority of "system operator" or above.

Page 244: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 10 Configuring Protection

Huawei Technologies Proprietary

10-13

1:N optical channel protection parameters have been configured. Fibers have been correctly created. Supported by the OptiX BWS 1600G. Supported by the LWF/LWFS/LWS board.

Procedure

Step Action 1 Select [View/Protection View] from the Main Menu.

2 Select [Protection Subnet/Protection Subnet Maintenance] in the “Protection View”.

3 Select 1:N optical channel protection in the list on the left, and the corresponding maintenance information is displayed on the right.

4 Select “Resource Description” tab.

5 Query working link and protection link information.

Click <Query> to refresh the working link and protection link information of the 1:N optical channel protection.

6 Query the switching status of each node.

Select “Protection Subnet Maintenance” tab and check the information under the Protocol Controller, the “DPC_1 Switching Status” and the “DPC_2 Switching Status”.

Note: Only when the protection entity is in INACTIVE or ADDING status, it can be set or deleted. If you want to set or delete a protection entity in ACTIVE status, stop the corresponding protocol controller first.

Page 245: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 10 Configuring Protection

Huawei Technologies Proprietary

10-14

Step Action 7 Start/Stop protocol.

Click <Start/Stop protocol> to start or stop protection protocol.

8 Perform protection switching.

Right click the selected node, and select [DPC_1 Switching/Forced Switch/OTMA1-3-LWF-2(RX/TX)]. The “Operation Result” dialog appears, prompting the success of the switching. Query the protection status again to check.

9 Modify parameters of 1:N optical channel protection.

Select “Protection Subnet Parameters” tab in the “Protection Subnet Attributes” view to modify parameters of 1:N channel protection subnet. Click <Apply> to confirm the modification.

Note: The switching priority of both terminals in a 1:N optical path protection must be consistent, and the configuration of physical path and logical path must be consistent. Otherwise, the consistency check may fail.

Page 246: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 10 Configuring Protection

Huawei Technologies Proprietary

10-15

10.5 Configuring Clock Transparent Transmission Protection

Purpose

Use this procedure to set the parameters for clock transparent transmission protection.

Prerequisites

NM user with the authority of "system operator" or above. Two TC1/TC2 boards have been created.

Procedure

Step Action 1 Select [Configuration/DWDM Configuration/Clock Transparent

Transmission Protection] from the Main Menu.

2 In the lower-left pane, select the appropriate NE and click the double-right-arrow button (red).

3 Click <Query> to query the current protection information from the NE.

4 Click <Create>. “Create Clock Protection Group” dialog box is displayed.

5 Set attribute values of clock transparent transmission protection.

Note:

Generally the working board is in slot 6 and the protection board is in slot 8.

Page 247: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 10 Configuring Protection

Huawei Technologies Proprietary

10-16

Step Action 6 Click <OK>. The created clock transparent transmission protection is

displayed.

7 If you want to modify clock protection group, select a created clock transparent transmission protection and click <Modify> to modify its attribute value. If you want to delete clock protection group, select a clock transparent transmission protection and click <Delete> to delete it.

8 Repeat step 2 – step 6 to configure clock transparent transmission protection of the opposite subrack NE.

Page 248: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 11 Configuring Alarm and Performance Monitoring Parameters

Huawei Technologies Proprietary

11-1

11 Configuring Alarm and Performance Monitoring Parameters

This chapter introduces how to configuring alarm and performance monitoring parameters. The following tasks are described:

Synchronizing NE Time

Setting Network Wide Alarm Attributes

Setting NE Alarm Attributes

Setting Board/Port Alarm Attributes

Setting Performance Monitoring Parameters

Page 249: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 11 Configuring Alarm and Performance Monitoring Parameters

Huawei Technologies Proprietary

11-2

11.1 Synchronizing NE Time

Purpose

Use this procedure to synchronize NEs time with the T2000.

The occurring time of alarm and performance event is important for record and troubleshooting, so synchronizing NEs time with the T2000 is needed.

Prerequisite

NM user with the authority of “system administrator” or above.

Procedure

Step Action 1 Select [Configuration/Common Configuration/NE Time

Synchronization].

2 Select one or more NEs in the lower-left pane and click the double-right-arrow button.

3 Select one or more NE entries. Right-click and select [Synchronize with NM Time].

4 If you do not want to synchronize the NE time with the NM manually. You can enable the auto synchronization function. Select one or more NE entries, right-click and select [Enable Auto Synchronization]. Then set the “Synchronize Starting Time” and “Synchronization Period”, click <Apply> to confirm the settings.

Page 250: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 11 Configuring Alarm and Performance Monitoring Parameters

Huawei Technologies Proprietary

11-3

11.2 Setting Network Wide Alarm Attributes

11.2.1 Creating New Alarm Attribute Template

Purpose

Use this procedure to create alarm attribute template.

Setting Alarm Attributes NE by NE is very time-consuming. So the T2000 provides an easy way (creating alarm attribute template) to set alarm attributes for NEs.

Prerequisite

NM user with the authority of “system maintainer” or above.

Procedure

Step Action 1 Select [Alarm/Set Alarms/Customize Alarm Attribute Template].

2 Select a template from the “Template Name” drop-down list.

3 Modify the alarm attributes. Click <Save> to save the modification, or click <Save As> and enter a template name to save as a new template.

Page 251: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 11 Configuring Alarm and Performance Monitoring Parameters

Huawei Technologies Proprietary

11-4

11.2.2 Creating Alarm Correlation Rule

Purpose

Use this procedure to create alarm correlation rules to suppress the alarms which are induced by other alarms. Then troubleshooting will be easier.

Prerequisite

NM user with the authority of “system maintainer” or above.

Procedure

Step Action 1 Select [Alarm/Set Alarms/Set Alarm Correlation Rules].

2 Click <Create>, a new rule entry will be added. Select “Alarm 1” and “Alarm 2”, “Conditions” and “Action”.

3 Click <Apply> to confirm the creation.

4 Follow Step 2 and Step 3 to create more rules as you need.

11.2.3 Creating Fault Diagnosis Rule

Purpose

Use this procedure to help network maintenance engineers accumulate and share experience.

Page 252: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 11 Configuring Alarm and Performance Monitoring Parameters

Huawei Technologies Proprietary

11-5

Prerequisite

NM user with the authority of “system maintainer” or above.

Procedure

Step Action 1 Select [Alarm/Set Alarms/Set Fault Diagnosis Rules].

2 Right-click the “Fault Diagnosis Rules” folder and select [Add Rules]. A “Create Fault Diagnosis Rules” dialog box is displayed.

3 Select an alarm which you want to add diagnosis rule, click <OK> to confirm. A new rule entry is added.

4 Right-click the new rule entry and select [Add Steps]. A “Create Diagnosis Steps” dialog box is displayed.

5 Fill in the “Alarm Causes”, “Diagnosis Method” and “Processing Method” fields. Click <OK> to confirm. A step entry is added under the rule entry.

6 Follow Step 4 and Step 5 to add new step entries under the rule entry.

Page 253: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 11 Configuring Alarm and Performance Monitoring Parameters

Huawei Technologies Proprietary

11-6

Step Action 7 If you need, you can right-click a step entry and select [Modify] to

modify the original contents.

8 Click <Apply> to confirm the adding and modification.

11.2.4 Enabling the Switch of Alarm Function

Purpose

Use this procedure to enable the T2000 to automatically deal with alarms to reduce your workload.

Prerequisite

NM user with the authority of “system maintainer” or above.

Procedure

Step Action 1 Select [Alarm/Set Alarms/Set Alarm Function Switch].

Page 254: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 11 Configuring Alarm and Performance Monitoring Parameters

Huawei Technologies Proprietary

11-7

Step Action 2 In the upper-left corner, select “Auto Acknowledge Switch”, and set

alarm ending date.

Note:

For example: set the alarm ending date to 2, then the T2000 will automatically acknowledge the alarms, which ended two days before, at 3 a.m. every day.

3 In the lower-left corner, select one or more auto alarm synchronization trigger events according to actual condition.

Note:

For example: If “When Starting the NM” is selected, the alarm synchronization will be executed automatically when the NM is started up.

4 In the upper-right corner, select “Enable Alarm Correlation Analysis” to enable the alarm correlation analysis function. Refer to the note in the corner for details.

5 In the lower-right corner, select “Automatically Change End Alarm into History Alarm”. Refer to the note in the corner for details.

6 Click <Apply> to confirm the settings.

11.2.5 Enabling Alarm Notification to E-mail or Pager

Purpose

Use this procedure to facilitate maintenance engineers know the network running status momentarily. The T2000 provides the alarm notification function. If an alarm occurs, the T2000 will send a message to an appointed engineer’s email-box, pager or cell-phone.

Prerequisite

NM user with the authority of “system maintainer” or above.

Page 255: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 11 Configuring Alarm and Performance Monitoring Parameters

Huawei Technologies Proprietary

11-8

Procedure

Step Action 1 Select [Alarm/Set Alarms/Set Alarm SMS Notification].

2 Click <Create> to add a notification entry.

3 Fill in the user name. Set the communication mode. Fill in the communication number. And set Alarm Severity, Alarm Type, NE and Switch. Click <Apply> to confirm the settings.

Note:

There are three communication modes: Beep-Pager, mobile phone and email.

Select Alarm Severity, Alarm Type and NE. The T2000 will send messages only when alarms compliant with the settings occur. Thus you can focus on the important alarms.

Up to fifteen notification entries can be created.

4 If the communication mode is email, you need to click <Communication Settings> to set the SMTP address.

5 If the communication mode is Beep-Pager, you need to click <Communication Settings> to select the serial port connected with Modem.

Page 256: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 11 Configuring Alarm and Performance Monitoring Parameters

Huawei Technologies Proprietary

11-9

11.2.6 Enabling Alarm Box and Setting Parameter

Purpose

Use this procedure to set an alarm box. Then the T2000 can remind maintenance engineers by the alarm box when alarms occur.

Prerequisite

NM user with the authority of “system administrator” or above.

Procedure

Step Action 1 Select [Alarm/Set Alarm Box]. A “Warning” dialog box (it prompts the

alarm box is not enabled) is displayed. Click <OK>. An “Alarm Box” dialog box is displayed.

2 Select the “Alarm Box Settings” tab. Select the “Enable Alarm Box” and set the communication parameters of the alarm box with the T2000 Client computer.

3 Click <Apply>. A “prompt” dialog box (Please restart the client to make the settings effective) is displayed. Click <OK>.

4 Restart the T2000 Client program to enable the settings.

5 Re-enter the alarm box setting dialog box.

6 Select the “Alarm Box Operations” tab. You can turn off one or more indicators as you need. Or click <Mute Alarm Sound> to turn off the sound of the alarm box. If you click <Mute Alarm Sound> again, the sound will come back.

Page 257: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 11 Configuring Alarm and Performance Monitoring Parameters

Huawei Technologies Proprietary

11-10

11.2.7 Setting Alarm Dump Condition

Purpose

Use this procedure to set alarm dump condition.

To avoid the alarm data overflowing or being damaged, you need to dump alarm data in time.

You can dump the alarm data manually. Otherwise, you can set the alarm dump condition. The T2000 will dump the alarm data as you need.

There are two methods for auto dumping the alarm data: Dumping when Overflow, Dumping in schedule. You can select one method or both of them.

Prerequisite

NM user with the authority of “system maintainer” or above.

Procedure

Step Action 1 Select [Alarm/Alarm Dump].

Page 258: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 11 Configuring Alarm and Performance Monitoring Parameters

Huawei Technologies Proprietary

11-11

Step Action 2 Fill in the Maximum Storage Capacity, Dump number and Capacity

Alarm Threshold for the “Dumping when Overflow” method.

Set “Dump Periodically or not” to “Yes”. Set “Dump Interval” and “Time Limit” for the “Dumping in schedule” method.

Note:

The storage capacity refers to the maximum number of records that can be kept in the T2000 database.

The dump number refers to the number of alarm records to be dumped at a time.

The capacity alarm threshold refers to a number of records, when the records in the T2000 database exceed this number, an alarm occurs and the T2000 executes dumping operation.

The time limit refers to a period, when the T2000 executes dumping operation, only those records occurred earlier than this period will be dumped.

3 Click <OK> to confirm the settings.

Page 259: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 11 Configuring Alarm and Performance Monitoring Parameters

Huawei Technologies Proprietary

11-12

11.3 Setting NE Alarm Attributes

Purpose

Use this procedure to set alarm attributes for NEs, including: alarm saving mode, alarm reversion mode, alarm correlation suppression switch, delay switch, alarm delay, and alarm-stopping delay.

Prerequisite

NM user with the authority of “system maintainer” or above.

Procedure

Step Action 1 Select [Alarm/Set Alarms/Set NE Alarm Attribute].

2 Select one or more NEs in the lower-left pane and click the double-right-arrow button.

Page 260: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 11 Configuring Alarm and Performance Monitoring Parameters

Huawei Technologies Proprietary

11-13

Step Action 3 Select an NE entry and set attributes for it.

Note:

There are two saving modes: wrap, stop. If the saving mode is “wrap”, when the alarm register is full, the oldest alarms will be deleted for saving new alarms. If the saving mode is “stop”, when the alarm register is full, new alarms will be discarded.

There are three reversion modes: no reversion, auto-reversion and manual reversion. If the reversion mode is “no reversion”, all the alarms will be reported. If the reversion mode is “auto-reversion”, the configured but unloaded ports will not report alarms until the ports are loaded with service. If the reversion mode is “manual reversion”, all the ports of the NE will not report alarms and the reversion indicator will flash.

If the correlative suppressing switch is enabled, alarms induced by other alarms will not be reported.

If the delay switch is enabled, the following two attributes need to be set.

Alarm occurring delay time refers to a period of time. If an alarm is detected continuously for this period of time, the T2000 considers this alarm occurs.

Alarm ending delay time refers to a period of time. If an alarm is not detected continuously for this period of time, the T2000 considers this alarm is already ended.

4 Click <Apply> to confirm the settings.

Page 261: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 11 Configuring Alarm and Performance Monitoring Parameters

Huawei Technologies Proprietary

11-14

11.4 Setting Board/Port Alarm Attributes

11.4.1 Setting Alarm Severity and Auto-report status

Purpose

Use this procedure to set alarm severity and auto-report for units.

Up to five NEs can be set at the same time.

Prerequisite

NM user with the authority of “system operator” or above.

Procedure

Step Action 1 Select [Alarm/ Set Alarms/Set Alarm Severity and Auto-Report].

2 Select one or more units in the lower-left pane and click the double-right-arrow button.

3 Set alarm severity and auto-report status as you need.

4 Click <Apply> to confirm the settings.

Page 262: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 11 Configuring Alarm and Performance Monitoring Parameters

Huawei Technologies Proprietary

11-15

Step Action 5 If you have created an alarm template for the units, you can click

<Open Template> and select the desired template. And click <Open Template> to confirm the selection.

11.4.2 Setting Alarm Reversion

Purpose

Use this procedure to set alarm reversion for units.

Prerequisite

NM user with the authority of “system operator” or above.

Procedure

Step Action 1 Select [Alarm/Set Alarms/Set Alarm Reversion].

2 Select the board to be set alarm reversion in the lower-left pane and click the double-right-arrow button.

Page 263: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 11 Configuring Alarm and Performance Monitoring Parameters

Huawei Technologies Proprietary

11-16

Step Action 3 Select the ports to be set.Double-click the “Reversion State” field and

select “Enable” or “Disable”.

4 Click <Apply> to confirm the settings. The board displayed in the “Board List Reversed”.

11.4.3 Setting Alarm Suppression Status

Purpose

Use this procedure to set alarm suppression for units.

Up to five NEs can be set at the same time.

Prerequisite

NM user with the authority of “system operator” or above.

Procedure

Step Action 1 Select [Alarm/Set Alarms/Set Alarm Suppression].

Page 264: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 11 Configuring Alarm and Performance Monitoring Parameters

Huawei Technologies Proprietary

11-17

Step Action 2 Select one or more units in the lower-left pane and click the

double-right-arrow button.

3 Set alarm suppression status as you need.

4 Click <Apply> to confirm the settings.

5 If you have created an alarm template for the units, you can click <Open Template> and select the desired template. And click <Open Template> to confirm the selection.

Page 265: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 11 Configuring Alarm and Performance Monitoring Parameters

Huawei Technologies Proprietary

11-18

11.4.4 Setting Alarm Filter Status

Purpose

Use this procedure to set alarm filter status.

After NEs report alarms to the T2000, the T2000 will decide whether to display and save the alarm information according to the alarm filter status.

Prerequisite

NM user with the authority of “system administrator” or above.

Procedure

Step Action 1 Select [Alarm/Set Alarms/Set Alarm Filter].

2 Set alarm filter status.

3 Click <Apply> to confirm the settings.

Page 266: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 11 Configuring Alarm and Performance Monitoring Parameters

Huawei Technologies Proprietary

11-19

11.4.5 Setting Bit Error Alarm Threshold

Purpose

Use this procedure to set bit error alarm threshold of a specified port.

When bit error number exceeds the threshold, an alarm occurs.

Prerequisite

NM user with the authority of “system operator” or above.

Procedure

Step Action 1 Select [Alarm/Set QoS/Set Bit Error Alarm Threshold].

2 Double-click to select a unit in the lower-left pane.

3 Set threshold for B1, B2 and B3 bytes.

Note:

There are two thresholds for bit error: Threshold-crossing and Deterioration.

4 Click <Apply> to confirm the settings.

Page 267: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 11 Configuring Alarm and Performance Monitoring Parameters

Huawei Technologies Proprietary

11-20

11.4.6 Setting AIS Insertion Switch

Purpose

Use this procedure to set AIS insertion switch for a specified port.

For service that should be of good Quality of Service (QoS), when a specific QoS-affecting event (for example, TIM_P) is detected, the T2000 will insert AIS at the port immediately, thus triggering the related protection mechanism and switching the service at this port to a protection port to guarantee the QoS.

Prerequisite

NM user with the authority of “system operator” or above.

Procedure

Step Action 1 Select [Alarm/Set QoS/Set AIS Insert Switch] from the Main Menu.

2 Double-click to select a board in the lower-left pane.

3 Enable the AIS insertion switch.

4 Click <Apply> to confirm the settings.

Page 268: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 11 Configuring Alarm and Performance Monitoring Parameters

Huawei Technologies Proprietary

11-21

11.4.7 Setting UNEQ Insertion Switch

Purpose

Use this procedure to set the UNEQ insertion switch for a special port.

If the condition is met, UNEQ insertion will occur.

After UNEQ is inserted in a port, the service of this port will be interrupted, and none of the alarms of this port but TA_LOS will be detected. You can select whether to monitor the TA_LOS alarm of this port as required.

Prerequisite

NM user with the authority of “system operator” or above.

Procedure

Step Action 1 Select [Alarm/Set QoS/Set UNEQ Insertion Switch] from the Main

Menu.

2 Double-click to select a board in the lower-left pane.

Page 269: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 11 Configuring Alarm and Performance Monitoring Parameters

Huawei Technologies Proprietary

11-22

Step Action 3 Enable one or two switches as you need.

Note:

There are two switches for UNEQ insertion: “LOS” alarm and “path not used”.

4 Click <Apply> to confirm the settings.

Page 270: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 11 Configuring Alarm and Performance Monitoring Parameters

Huawei Technologies Proprietary

11-23

11.5 Setting Performance Monitoring Parameters

11.5.1 Creating Performance Threshold Template

Purpose

Use this procedure to create performance threshold template.

Setting performance thresholds NE by NE is very time-consuming. So the T2000 provides an easy way (creating performance threshold template) to set performance thresholds for NEs.

Prerequisite

NM user with the authority of “system maintainer” or above.

Procedure

Step Action 1 Select [Performance/Performance Setting/Customize Performance

Threshold Template].

2 Select a template from the “Template Name” drop-down list.

Page 271: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 11 Configuring Alarm and Performance Monitoring Parameters

Huawei Technologies Proprietary

11-24

Step Action 3 Modify the performance thresholds. Click <Save> to save the

modification, or click <Save As> and enter a template name to save as a new template.

4 Click <OK> to confirm the settings.

11.5.2 Setting Performance Threshold

Purpose

Use this procedure to set performance thresholds for boards.

One or more boards can be set at the same time.

Prerequisite

NM user with the authority of “system maintainer” or above.

Procedure

Step Action 1 Select [Performance/Performance Setting/Set Performance

Threshold] from Main Menu.

Page 272: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 11 Configuring Alarm and Performance Monitoring Parameters

Huawei Technologies Proprietary

11-25

Step Action 2 Select one or more boards in the lower-left pane and click the

double-right-arrow button.

3 Set performance thresholds as you need.

4 Click <Apply> to confirm the settings.

5 If you have created a performance threshold template for the boards. You can click <Open Template> and select the desired template. And click <Open Template> to confirm the selection.

11.5.3 Setting Board Temperature Threshold

Purpose

Use this procedure to set board temperature threshold.

One or more boards can be set at the same time.

Prerequisite

NM user with the authority of “system maintainer” or above.

Page 273: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 11 Configuring Alarm and Performance Monitoring Parameters

Huawei Technologies Proprietary

11-26

The advanced menu has been started.

Procedure

Step Action 1 Select [Maintenance/Board Temperature Threshold] from the Main

Menu.

2 Select one or more boards in the lower-left pane and click the double-right-arrow button (red).

3 Click <Query> to query the board temperature threshold.

4 Set temperature performance thresholds as you need.

5 Click <Apply> to confirm the settings.

11.5.4 Setting Performance Monitoring Object

Purpose

The T2000 monitors the performance of all units, and the auto-report is disabled by default.

Use this procedure to change the default settings as you need.

Prerequisite

NM user with the authority of “system maintainer” or above.

Page 274: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 11 Configuring Alarm and Performance Monitoring Parameters

Huawei Technologies Proprietary

11-27

Procedure

Step Action 1 Select [Performance/Performance Setting/Set Performance Monitoring

Object].

2 Select one or more units in the lower-left pane and click the double-right-arrow button.

3 Set the “monitor status”, “15 minute auto-report” and “24 hour auto-report” attributes as you need.

4 Click <Apply> to confirm the settings.

11.5.5 Setting Performance Monitoring Start/Stop Status

Purpose

Use this procedure to start or stop performance monitoring of NEs.

Prerequisite

NM user with the authority of “system maintainer” or above.

Page 275: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 11 Configuring Alarm and Performance Monitoring Parameters

Huawei Technologies Proprietary

11-28

Procedure

Step Action 1 Select [Performance/Performance Setting/Set Performance Monitoring

Start/Stop Status] from Main Menu.

2 Select one or more NEs in the lower-left pane and click the double-right-arrow button.

3 Select one or more NEs, set 15-minute and 24-hour performance monitor parameters as you need.

4 Click <Apply> to confirm the settings.

11.5.6 Setting Non-Periodic Automatic Report of Performance Event

Purpose

Use this procedure to set non-period automatic report switch for performance event.

Prerequisite

NM user with the authority of “system maintainer” or above.

Page 276: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 11 Configuring Alarm and Performance Monitoring Parameters

Huawei Technologies Proprietary

11-29

Procedure

Step Action 1 Select [Performance/Performance Setting/Set Non-Period Automatic

Report of Performance Event] from Main Menu.

2 Select one or more NEs in the lower-left pane and click the double-right-arrow button.

3 Set the “Auto Report Status” attributes as you need.

4 Click <Apply> to confirm the settings.

11.5.7 Resetting NE Performance Register

Purpose

Use this procedure to reset NE performance register.

After network test or fault recovery, you need to reset performance register to enter the new performance monitoring period.

Prerequisite

NM user with the authority of “system operator” or above.

Page 277: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 11 Configuring Alarm and Performance Monitoring Parameters

Huawei Technologies Proprietary

11-30

Procedure

Step Action 1 Select [Performance/Reset NE Performance Register].

2 Select one or more operation objects in the lower-left pane and click the double-right-arrow button.

3 Reset the registers as you need.

4 Click <OK> to confirm the settings.

11.5.8 Setting Performance Dump Conditions

Purpose

Use this procedure to set performance dump conditions.

To avoid the performance data overflowing or being damaged, you need to dump performance data in time.

You can dump the performance data manually. And you can set the performance dump condition. The T2000 will dump the performance data as you need.

There are two methods for auto dumping the performance data: Dumping when Overflow, Dumping in schedule. You can select one method or both of them.

The setting method is similar to that of alarm dump.

Prerequisite

NM user with the authority of “system maintainer” or above.

Page 278: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 11 Configuring Alarm and Performance Monitoring Parameters

Huawei Technologies Proprietary

11-31

Procedure

Step Action 1 Select [Performance/Performance Dump].

2 Fill in the “Maximum Storage Capacity”, “Dump Number” and “Capacity Alarm Threshold” for the “Dumping when Overflow” method.

Set “Dump Periodically or not” to “Yes”. Set “Dump Interval” and “Time Limit” for the “Dumping in schedule”.

Note:

The storage capacity refers to the maximum number of records that can be kept in the T2000 database.

The dump number refers to the number of performance records to be dumped at a time.

The capacity alarm threshold refers to a number of records, when the records in the T2000 database exceed this number, an alarm occurs and the T2000 executes dumping operation.

The time limit refers to a period, when the T2000 executes dumping operation, only those records occurred earlier than this period will be dumped.

There are several types of performance that can be set: 15-minute performance, 24-hour performance, performance value threshold-crossing, etc.

3 Click <OK> to confirm the settings.

Page 279: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 12 Synchronization and Data Management

Huawei Technologies Proprietary

12-1

12 Synchronization and Data Management

This chapter introduces the operations of synchronization and data management. The following tasks are described:

Synchronizing NE Time Synchronizing Current Alarms from NE Backing up and Restoring T2000 Database Managing NE Database

Page 280: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 12 Synchronization and Data Management

Huawei Technologies Proprietary

12-2

12.1 Synchronizing NE Time

Refer to11.1 Synchronizing NE Time.

12.2 Synchronizing Current Alarms from NE

Purpose

Use this procedure to synchronize the current alarm between the NE and the T2000. Alarm synchronization will verify the alarms in T2000 database and the alarms in NEs first, and then load the inconsistent alarm from NEs and overwrite the alarms in T2000 database so as to keep alarms consistent between T2000 database and NEs. Alarm synchronization can execute automatically under certain conditions and manually.

Prerequisite

NM user with the authority of "system operator" or above. Procedure

1. Synchronize alarms in multiple NEs Step Action 1 Select [Alarm/Synchronize Alarms] from the Main Menu.

2 Select one or more NEs to be synchronized.

3 Click <Synchronize Alarms>.

Page 281: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 12 Synchronization and Data Management

Huawei Technologies Proprietary

12-3

2. Synchronize alarms in a single NE Step Action 1 Select an NE in Main Topology view.

2 Right-click the NE and select [Synchronize Current Alarm].

Page 282: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 12 Synchronization and Data Management

Huawei Technologies Proprietary

12-4

12.3 Backing up and Restoring T2000 Database

12.3.1 Immediately Backing up T2000 Database

Purpose

Use this procedure to back up T2000 database immediately and manually. This task ensures T2000 NM system to recover safely and quickly when system faults occur, but it can not recover configuration data when updating system.

Prerequisites

Super NM user: admin. Switch over to single-user mode.

Procedure

Step Action 1 Select [System/Database Backup/Backup Immediately] from the Main

Menu.

2 The T2000 backs up the database immediately and displays the progress.

Note:

The database file is backed up in the default directory. For example, it is "/T2000/server/database/dbbackup/mo_20031024174342" on the Unix platform or "C:\T2000\server\database\dbbackup\mo_20031024174342" on the Windows platform.

12.3.2 Enabling Automatical T2000 Database Backup

Purpose

Use this procedure to set the backup period for the NM to perform automatic backup. During the operation, you need to back up the T2000 database from time to time. In this way, if the database fails, the loss can be minimized by restoring the saved database.

Prerequisites

Super NM user: admin.

Page 283: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 12 Synchronization and Data Management

Huawei Technologies Proprietary

12-5

Switch over to single-user mode. Procedure

1. Enable a single scheduled backup Step Action 1 Select [System/ Database Backup/Scheduled Backup] from the Main

Menu.

2 Set the date for a single backup and the start time as required. By default, the T2000 will back up the NM database at 1:00 a.m. of the set date.

Note:

The database file is backed up in the default directory. For example, it is "/T2000/server/database/dbbackup/mo_20031024174342" on the Unix platform or "C:\T2000\server\database\dbbackup\mo_20031024 174342" on the Windows platform.

3 Click <Apply> to enable the settings.

Page 284: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 12 Synchronization and Data Management

Huawei Technologies Proprietary

12-6

2. Enable the periodic scheduled backup Step Action 1 Select [System/ Database Backup/Scheduled Backup] from the Main

Menu.

2 Set the interval of periodic backup and the start time as required. By default, the T2000 will back up the NM database at 1:00 am of the set date.

Note:

The database file is backed up in the default directory. For example, it is "/T2000/server/database/dbbackup/mo_20031024174342" on the Unix platform or "C:\T2000\server\database\dbbackup\mo_20031024 174342" on the Windows platform.

3 Click <Apply> to enable the settings.

12.3.3 Restoring T2000 Database

Purpose

Use this procedure to restore T2000 database from the original T2000 database backup on the Unix platform or Windows platform respectively.

Prerequisites

Back up the T2000 Database completely. Shut down the T2000 server before restoring the database. On the Unix platform, the current user should have the Sybase database write

authority. On the Windows platform, the current user should have the system administrator

authority.

Page 285: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 12 Synchronization and Data Management

Huawei Technologies Proprietary

12-7

Procedure

1. On the Unix platform Step Action 1 Right-click on the CDE desktop and select [Tools/Terminal] to open a

terminal window.

2 In the "/T2000/server/database/mo" directory, delete all old files.

3 Copy the backup data file to be restored to the "/T2000/server/database /mo" directory.

Note: To restore the database, the T2000 takes data from the "/T2000/ server/database/mo" directory.

4 In the "/T2000/server/database" directory, run "restoremo.sh" to restore the T2000 database.

5 Press any key to continue the restoration.

2. On the Windows platform Step Action 1 Open the "Resource Browser" of the Windows 2000.

2 In the "C:\T2000\server\database\mo" directory, delete all old files.

3 Copy the backup data file to be restored to the "C:\T2000\server \database\mo" directory.

Note: To restore the database, the T2000 takes data from the "C:\T2000\ server\database\mo" directory.

4 In the "C:\T2000\server\database" directory, run "restoremo.bat" to restore the T2000 database.

5 Press any key to continue the restoration.

Page 286: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 12 Synchronization and Data Management

Huawei Technologies Proprietary

12-8

12.4 Managing NE Database

12.4.1 Checking the Consistency of NE Configuration Data

Purpose

Use this procedure to check whether the T2000 configuration data and the NE configuration are consistent. The configuration data in NEs and in the T2000 database is compared in this task and a report of consistency is created. According to the report and actual reliability of configuration data, uploading or downloading configuration data is selected to implement. This task will not change the configuration data in NEs and the T2000 database and it is recommended to run this function periodically to keep the consistency of configuration data in NEs and the T2000 server.

Prerequisite

NM user with the authority of "system maintainer" or above. Procedure

Step Action 1 Select [Configuration/Configuration Data Management/Configuration

Data Consistency Check]. Or, select [Maintenance/Configuration Data Management/NE Configuration Data Management] from the navigation tree of the Equipment Maintenance Console.

2 In the lower-left pane, select the appropriate NEs and click the double-right-arrow button (red).

3 Select one or more NEs to check in the NE Data List.

4 Right-click the NE and select [Consistency Check].

Page 287: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 12 Synchronization and Data Management

Huawei Technologies Proprietary

12-9

Step Action 5 Click <OK> to confirm the consistency check.

Note: If the check result shows the modules with the configuration data inconsistent, you should solve the problem by re-uploading or re-downloading the configuration data as required in practice.

12.4.2 Uploading/Downloading NE Configuration Data

Refer to Section 4.2.1 Uploading/Downloading NE Configuration Data. 12.4.3 Duplicating NE Configuration Data

Refer to Section 4.3 Duplicating NE Configuration Data. 12.4.4 Initializing NE Configuration Data

Purpose

Use this procedure to initialize the NE configuration data in the T2000 database or the NE. The NE initialized in the T2000 will be in unconfigured status.

Prerequisites

For initializing the configuration data in T2000 database, the NM user needs the authority of "system maintainer" or above.

For initializing the configuration data in NE, the NE user logged in the T2000 needs the authority of "system level".

Procedure

Step Action 1 Select [Configuration/Configuration Data Management/Configuration

Data Consistency Initialization].

2 In the lower-left pane, select the appropriate NEs and click the double-right-arrow button (red).

3 Select one or more NEs from the NE data list.

Page 288: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 12 Synchronization and Data Management

Huawei Technologies Proprietary

12-10

Step Action 4 For initializing the NE configuration data in T2000 database, right-click

the NE and select [Initialize NM Data].

For initializing the configuration data in NE, right-click the NE and select [Initialize NE Data].

5 Click <OK> to confirm the operation.

Page 289: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 12 Synchronization and Data Management

Huawei Technologies Proprietary

12-11

12.4.5 Exporting ROME Text Files Periodically

Purpose

Use this procedure to automatically export ROME text files periodically. The NE data in the T2000 are exported in ROME text files and stored in the specified directory on the T2000 server. The T2000 can export the ROME text files at a scheduled time, that is, it automatically exports data at a specific time without personal intervention. Only when you want to manage NE data in the ROME database, you need to export the NE data in the T2000. NE data include information about ports, boards, NEs, trails and Ethernet VLANs. Table 12-1lists ROME text files contained in the directory and their usage. Table 12-1 Files and usage

File name Usage

c_hua_1.txt Record board information.

ct_hua_1.txt Record trail information on SDH client layer.

cte_hua_1.txt Record trail end points information at SDH client layer.

ctr12_hua_1.txt Record VC12 trail routes information at SDH client layer.

ctr3_hua_1.txt Record VC3 trail routes information at SDH client layer.

ctr4_hua_1.txt Record VC4 trail routes information at SDH client layer.

eth_hua_1.txt Record Ethernet trail information.

ethe_hua_1.txt Record Ethernet trail end points information.

ethr_hua_1.txt Record Ethernet trail routes information.

extraction_done Identification document, generated by the interface module after all interface text files are generated, to identify the interface text files have been exported successfully.

ne_hua_1.txt Record NE information.

p_hua_1.txt Record port information.

st_hua_1.txt Record trail information at SDH service layer.

ste_hua_1.txt Record trail end points information at SDH service layer.

vlan_hua_1.txt Record Ethernet VLANs information.

tl_hua_1.txt Record Trunk Link trails information.

tle_hua_1.txt Record Trunk Link trail end points information.

tlr_hua_1.txt Record Trunk Link trail routes information.

vb_hua_1.txt Record Ethernet VBs information.

Page 290: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 12 Synchronization and Data Management

Huawei Technologies Proprietary

12-12

Prerequisites

NM user with the authority of "system operator" or above. Export NE data in the T2000 only NE data need to be managed through ROME

database. To enable this function, remove the "#" out of "# item= name(ROME Text Export)

OTID(4) OSTID(2) OID(1) CID(12560)" in the menu.ini file. On the Windows platform, this file is saved at C:\T2000\client\locale\C\imap12\common\profile (suppose the T2000 Client is installed in C:). On the UNIX platform, this file is save at /T2000/client/local/C/imap12/common /profile.

Procedure

Step Action 1 Select [System/ROME Text Export] from Main Menu.

2 Select to enable automatic export.

3 . Set the start time in the “Start Task Time”.

Page 291: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 12 Synchronization and Data Management

Huawei Technologies Proprietary

12-13

Step Action 4 Select an appropriate directory to store exported files. The default

directory is “rome/”, You can select a subdirectory from the “Operation Directory List” as the current directory for storing exported files.

If there is no appropriate subdirectory, you can create a new subdirectory. Click <Create File Directory>, the “Input” dialog box is displayed. Type a name for the directory.

Note:

You can delete a subdirectory here. Select a subdirectory from the “Operation Directory List” and click <Delete File Directory>. Deleting a directory will delete all files contained in that directory.

5 Click <Apply> to confirm the operation.

Note: You can query exported files. By default, these files are stored in: On the Windows platform, the path is “C:\T2000\server\rome”. (Suppose the T2000 server has been installed on the C:\) On the UNIX platform, the path is “/T2000/server/ script/rome”.

Page 292: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 13 Routine Maintenance

Huawei Technologies Proprietary

13-1

13 Routine Maintenance

This chapter includes the tasks in the routine maintenance work, which should be done regularly, may be daily, weekly or monthly.

The following tasks are described:

Browsing Alarm

Performance Monitoring

Browsing Operation Log

Checking Switching Status

Backing up and Restoring T2000 Database

Equipment Data Collection

Automatic Disabling of NE Function

Page 293: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 13 Routine Maintenance

Huawei Technologies Proprietary

13-2

13.1 Browsing Alarm

Before browsing alarm, the alarm parameters either can be the default values, or can be configured (refer to 11.2 Setting Network Wide Alarm Attributes).

13.1.1 Synchronizing Current Alarms from NE

Refer to 12.2 Synchronizing Current Alarms from NE.

13.1.2 Browsing Network-Wide Current Alarms

1. Browsing Network-Wide Current Alarms for Selected Severity

Purpose

Use this procedure to browse current alarms for just one particular severity network-wide.

Prerequisite

NM user with the authority of “System Monitor” or above.

Procedure

Step Action 1 Click one of the three alarm shortcut buttons: critical alarm, major

alarm or minor alarm .

All the current alarms for the selected severity are displayed.

2 Click <Query> to refresh the display.

3 Click to select one alarm, then the alarm details and the alarm causes are displayed in the panes below.

4 After reading it, click <Confirm>.

When the alarms are finished, it will automatically become the history alarm.

5 Click <Save as> to save the result into a file at selected path of the client computer.

Page 294: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 13 Routine Maintenance

Huawei Technologies Proprietary

13-3

2. Browsing Network-Wide Current Alarms for All Severities

Purpose

Use this procedure to browse NEs current alarms for all severities.

Prerequisite

NM user with the authority of “System Monitor” or above.

Procedure

Step Action 1 Select [Alarm/Browse Alarm] from the Main Menu.

2 In the lower-left pane, select the appropriate NEs and click the double-right-arrow button (red).

Then the current alarms of selected NEs for all severities are displayed.

3 Click to select the alarm display conditions:

If “Display Latest Reported Alarms” is selected, other conditions will be disabled.

Occurring Time: Click to select the date and time.

End Time: Click to select the date and time.

Select the Alarm Status: Acknowledged and Not Ended, Not Acknowledged and Ended, Not Acknowledged and Not Ended.

The display changes according to the choice of conditions.

4 Click <Save as> to save the result into a file at selected path of the client computer.

Page 295: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 13 Routine Maintenance

Huawei Technologies Proprietary

13-4

13.1.3 Browsing Current Alarms and Abnormal Event

1. Browsing Current Alarms

Purpose

Use this procedure to browse current alarms of the selected NE only.

Prerequisite

NM user with the authority of “System Monitor” or above.

Procedure

Step Action 1 Double-click the NE in the Main Topology.

The NE panel is displayed.

2 Click <Functions> and select [Browse Current Alarms].

The current alarms for all severities are displayed.

3 Click <Query> to refresh the display.

4 Click to select one alarm, then the alarm details and the alarm causes are displayed in the panes below.

5 After reading it, click <Confirm>.

When the alarms are ended, it will automatically become the history alarm.

6 Click <Save as> to save the result into a file at selected path of the client computer.

Page 296: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 13 Routine Maintenance

Huawei Technologies Proprietary

13-5

2. Browsing Abnormal Events

Purpose

Use this procedure to browse abnormal events of selected NEs within a selected period of time.

Prerequisite

NM user with the authority of “System Monitor” or above.

Procedure

Step Action 1 Select [Alarm/Browse Alarm] from the Main Menu.

2 Select “Browse Abnormal Events” tab.

3 In the lower-left pane, select the appropriate NEs and click the double-right-arrow button (red).

4 Click to select the occurring time. The display refreshes according to the choice.

5 Click <Save As> to save the result into a file at selected path of the client computer.

13.1.4 Browsing History Alarms

Purpose

Use this procedure to browse history alarms of selected NEs within a selected period of time.

Prerequisite

NM user with the authority of “System Monitor” or above.

Page 297: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 13 Routine Maintenance

Huawei Technologies Proprietary

13-6

Procedure

Step Action 1 Select [Alarm/Browse Alarm] from the Main Menu.

2 In the lower-left pane, select the appropriate NEs and click the double-right-arrow button (red).

Then the current alarms of selected NEs for all severities are displayed.

3 Click to select “History Alarms” and click <OK> in the prompt dialog box.

Then the history alarms of selected NEs for all severities are displayed.

4 Click <Query> to refresh the display.

5 Click to select the alarm display conditions:

Occurring Time: Click to select the date and time.

Ending Time: Click to select the date and time.

The display changes according to the choice of conditions.

6 Click <Save as> to save the result into a file at selected path of the client computer.

13.1.5 Browsing Alarm Statistics and Output Report

Purpose

Use this procedure to browse the number of alarms within a specific period of time, so that you can master the overall status of the entire network within this period of time.

Prerequisite

NM user with the authority of “System Monitor” or above.

Procedure

Step Action 1 Select [Alarm/Alarm Statistics] from the Main Menu.

Page 298: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 13 Routine Maintenance

Huawei Technologies Proprietary

13-7

Step Action 2 Select the occurring time and the result is displayed.

3 Click <Query> to update the result.

4 Click <Save as>.

5 Select the path to save the file and the file name. Click <OK>.

6 The alarm statistics report is saved in the directory.

13.1.6 Turning off Alarm Indicator on Alarm Box

Purpose

Use this procedure to turn off the alarm indicator on the alarm box for the selected severity, and turn off the alarm sound.

Prerequisite

Super NM user: admin.

The alarm box has been enabled.

Page 299: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 13 Routine Maintenance

Huawei Technologies Proprietary

13-8

Procedure

Step Action 1 Select [Alarm/Set Alarm Box] from the Main Menu.

2 Select the alarm severity that needs to be turned off the indicator.

3 Click <Apply>.

An information dialog box is displayed to remind you to restart the client.

4 Click <OK>.

5 Click <Mute Alarm Sound> to stop the alarm sound.

6 Exit the client and start the client again. Then the selected alarm indicators are turned off and the alarm sound is stopped.

13.1.7 Clearing Alarms

Purpose

Use this procedure to clear alarm indicator on the NE rack after getting the alarm notification, or to clear the alarm record in the T2000.

Prerequisite

NM user with the authority of "system operator" or above.

Page 300: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 13 Routine Maintenance

Huawei Technologies Proprietary

13-9

Procedure

Step Action 1 Select [Alarm/Clear Alarm] from the Main Menu.

2 Select the appropriate NEs.

3 Click <Clear Rack Alarm Indicator> to stop the sound and optical indicators on the NE racks.

4 Click <Clear Current NE Alarms> to clear the selected NEs alarms record in the T2000. If the alarms have not finished, they will be reported again.

Page 301: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 13 Routine Maintenance

Huawei Technologies Proprietary

13-10

13.2 Performance Monitoring

Before performance monitoring, the PM parameters should be set. Refer to 9.5 Setting Performance Monitoring Parameters.

13.2.1 Browsing Current Performance Data

Purpose

Use this procedure to browse current performance monitoring data of selected boards or ports. The current performance data include:

15-minute current performance

24-hour current performance

Prerequisite

NM user with the authority of “System Monitor” and above.

The service has been configured.

The performance monitoring parameters have been set.

Procedure

Step Action 1 Select [Performance/ Performance Browse/15-minute Current

Performance] from the Main Menu.

2 Click the “Current Performance Data” tab.

3 In the lower-left pane, select the appropriate NE, board, and port. Click the double-right-arrow button (red).

4 Select the Performance Event Type. The number of performance event types may be different with the type of selected board and port in the left pane.

The display of the data will change according to these selections.

5 Click <Query> to refresh the data from the NEs and the boards.

Page 302: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 13 Routine Maintenance

Huawei Technologies Proprietary

13-11

6 If you want to browse the 24-Hour current performance, you can just change the Monitor Period to 24-Hour and repeat steps 2-4 to select the display conditions.

13.2.2 Browsing PM Threshold-crossing Record

Purpose

Use this procedure to browse the PM threshold-crossing record. The record includes:

15-minute PM threshold-crossing record

24-hour PM threshold-crossing record

Prerequisite

NM user with the authority of “System Monitor” and above.

The service has been configured.

The performance monitoring parameters have been set.

Procedure

Step Action 1 Select [Performance/ Performance Browse/ Performance

Threshold-crossing Record] from the Main Menu.

The “Performance Threshold-crossing Record” tab is displayed.

2 In the lower-left pane, select the appropriate boards or ports. Click the double-right-arrow button (red).

3 Select the Monitor Period.

4 Select the Performance Event Type. The number of performance event types may be different with the type of selected board and port in the left pane.

5 Select the Time range.

6 Select the current status of the record.

7 Click <Query> to refresh the data from the T2000.

Page 303: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 13 Routine Maintenance

Huawei Technologies Proprietary

13-12

13.2.3 Browsing History Performance Data

Purpose

Use this procedure to browse history PM data of selected boards or ports. The history performance data include:

15-minute history performance

24-hour history performance

Prerequisite

NM user with the authority of “System Monitor” and above.

The service has been configured.

The performance monitoring parameters have been set.

Procedure

Step Action 1 Select [Performance/ Performance Browse/15-minute history

performance] from the Main Menu.

2 Click the “History Performance Data” tab.

3 In the lower-left pane, select the appropriate boards or ports. Click the double-right-arrow button (red).

4 Select the Time range.

5 Select the Performance Event Type. The number of performance event may be different with the type of selected board and port in the left pane.

6 Select the Display Mode. The “Analyze Graph” can be selected only when the object is just one port.

Page 304: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 13 Routine Maintenance

Huawei Technologies Proprietary

13-13

Step Action 7 Select “Query from the NE” or “Query from the NM”. Click <Query>.

The display of the data changes according to the selections above.

8 If you want to browse 24-hour history PM data, you can just change the Monitor Period to 24-Hour and repeat steps 2-6 to select the display conditions.

Page 305: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 13 Routine Maintenance

Huawei Technologies Proprietary

13-14

13.3 Browsing Operation Log

Purpose

Use this procedure to browse the operation log in which all types of operations on all clients, to all objects, by all users and in any period of time are recorded. It is a very important function to ensure the security of the T2000.

Prerequisite

NM user with the authority of “System Monitor” and above.

Procedure

Step Action 1 Select [System/Log Browse] from the Main Menu.

2 Click to select the browse conditions: Operation Use, Record Type, Danger Severity, and Range Selection.

3 Select the object choice at the upper right area.

If you select the “Select All Objects”, skip steps 4-5 and go to step 6 directly.

If you select the “Select From the Object Tree”, go to the next step.

Page 306: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 13 Routine Maintenance

Huawei Technologies Proprietary

13-15

Step Action 4 Click to select the appropriate objects in the “Select Object in Log

Browser” dialog box.

5 Click <Query> to obtain the data according to the browse data.

Page 307: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 13 Routine Maintenance

Huawei Technologies Proprietary

13-16

13.4 Checking Switching Status

13.4.1 Checking Line Protection Switching

Purpose

Use this procedure to check the switching status of optical line protection.

Prerequisite

A line protection has been created.

Procedure

Step Action 1 Select [Configuration/DWDM Configuration/Optical Line Protection]

from the Main Menu.

2 Select the object optical NE and subrack NE from the object tree and click the double-right-arrow button (red).

3 All OLP path protection pairs are listed in OLP path protection pair list.

4 Some parameters in the OLP path protection pair list can be modified. Click <Apply> to confirm the modification.

5 Click <Query> to query the switching status of subrack NE.

13.4.2 Checking Wavelength Protection Switching

Purpose

Use this procedure to check the switching status of wavelength protection.

Page 308: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 13 Routine Maintenance

Huawei Technologies Proprietary

13-17

Prerequisite

A wavelength protection group has been created.

Procedure

Step Action 1 Select [Configuration/DWDM Configuration/Wavelength Protection

Group] from the Main Menu.

2 Select the object optical NE and subrack NE from the object tree and click the double-right-arrow button (red). The created protection group and path status are listed on the right.

3 Click <Query> to query the switching status of subrack NE and the protection path status.

4 Click <Modify> to modify some parameters of the wavelength protection group.

13.4.3 Checking 1+1 Channel Protection Switching

Purpose

Use this procedure to check the switching status of 1+1 optical channel protection.

Prerequisite

1+1 optical channel protection has been created.

Page 309: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 13 Routine Maintenance

Huawei Technologies Proprietary

13-18

Procedure

Step Action 1 Select [Configuration/DWDM Configuration/1+1 Optical Channel

Protection] from the Main Menu.

2 Select the object optical NE and subrack NE from the object tree and click the double-right-arrow button (red). The created 1+1 optical channel protection information is listed on the right.

3 Click <Query> to query the switching status of 1+1 optical channel protection.

4 Click <Modify> to modify some parameters of 1+1 optical channel protection.

13.4.4 Checking 1:N Channel Protection Switching

Purpose

Use this procedure to check the switching status of 1:N optical channel protection.

Prerequisite

1:N optical channel protection has been created.

Procedure

Step Action 1 Select [View/Protection View] from the Main Menu.

2 Select [Protection Subnet/Protection Subnet Maintenance] in the “Protection View”.

3 Select 1:N optical channel protection in the list on the left, and the corresponding maintenance information is displayed on the right.

4 Select “Protection Subnet Maintenance” tab.

5 Click <Query> to refresh the maintenance information of the 1:N optical channel protection.

Page 310: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 13 Routine Maintenance

Huawei Technologies Proprietary

13-19

Step Action 6 Check the information under the Protocol Controller, the DPC_1

Switching Status and the DPC_2 Switching Status.

7 Select “Protection Subnet Parameters” tab in the “Protection Subnet Attributes” view to modify parameters of 1:N optical channel protection subnet. Click <Apply> to confirm the modification.

13.4.5 Checking Clock Transparent Transmission Protection Switching

Purpose

Use this procedure to check the switching status of clock transparent transmission protection.

Prerequisite

The clock transparent transmission protection has been created.

Page 311: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 13 Routine Maintenance

Huawei Technologies Proprietary

13-20

Procedure

Step Action 1 Select [Configuration/DWDM Configuration/Clock Transparent

Transmission Protection] from the Main Menu.

2 Select the object optical NE and subrack NE from the object tree and click the double-right-arrow button (red). The created clock transparent transmission protection information is listed on the right.

3 Click <Query> to check the switching status of clock transparent transmission protection group.

4 Click <Modify> to modify some parameters of the clock protection group.

Page 312: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 13 Routine Maintenance

Huawei Technologies Proprietary

13-21

13.5 Synchronization

Refer to the related section of Chapter 12 Synchronization and Data Management.

13.6 Backing up and Restoring T2000 Database

Refer to the related section of Chapter 12 Synchronization and Data Management.

13.7 Equipment Data Collection

Purpose

When the equipment fails, please collect the equipment data at once. So the situation of the equipment will be saved and it is useful for the fault analysis. The equipment data include:

Configuration data

Equipment protection

Equipment maintenance

Alarm

Performance

Security

Prerequisite

NM user with the authority of "system operator" or above.

Procedure

Step Action 1 Select [Maintenance/Equipment Data Collection] from the Main Menu.

Page 313: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 13 Routine Maintenance

Huawei Technologies Proprietary

13-22

Step Action 2 Click to select NE and functions to be collected.

3 Click <Start>.

The two bars will respectively display the progress of the current NE data collection and the entire data collection. And the results will be saved in "T2000\server\nemml\dcdatfiles".

Page 314: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 13 Routine Maintenance

Huawei Technologies Proprietary

13-23

13.8 Automatic Disabling of NE Function

Purpose

Loopback and laser shutdown are useful NE maintenance functions. But after loopback or when the optical line is recovered, the loopback and laser shutdown should be canceled just in time. Otherwise, the service can be interrupted.

Use this procedure to set automatically disable these NE functions in five minutes as default. The auto disabling time can be modified. These NE functions include:

Tributary loopback

Optical/Electrical port loopback

Cross connection loopback

Automatic laser shutdown

Manual laser shutdown

Prerequisites

The advanced menu has been started.

NM user with the authority of “system maintainer” or above.

Procedure

Step Action 1 Select [Maintenance/Automatic Disabling of NE Function] from the

Main Menu.

2 In the lower-left pane, select the appropriate NE and click the double-right-arrow button (red).

If loopback or laser shutdown are enabled, these functions will be displayed.

3 Keep the default status of Auto Disabling unchanged and modify the value of “Auto Disabling Time”.

4 Click <Apply>.

Page 315: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 14 Fault Maintenance

Huawei Technologies Proprietary

14-1

14 Fault Maintenance

This chapter introduces basic operations of fault maintenance.

The following tasks are described:

Checking Optical Power

Setting OTU Loopback

Performing Protection Switching

Page 316: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 14 Fault Maintenance

Huawei Technologies Proprietary

14-2

Fault Diagnosis Wizard

Hard Resetting and Soft Resetting Unit

Resetting NE Software

Remote Maintenance

Modifying Overhead Byte

Page 317: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 14 Fault Maintenance

Huawei Technologies Proprietary

14-3

14.1 Checking Optical Power

Refer to “9.2 Optical Power Management”.

14.2 Setting OTU Loopback

Purpose

Use this procedure to configure the loopback of optical transponder unit (OTU) during fault diagnosis.

OTU loopback includes outloop, inloop and cross loopback.

Outloop: Loop a received signal directly back to its corresponding output port without altering the signal structure. It can be used to test the fiber line and connectors.

OTU supports outloop function. Category Diagram

Outloop at client side of OTU

WDM sideClient side

OTUOutloop

Outloop at WDM side of OTU

WDM sideClient side

OTU Outloop

Inloop: Loop the processed signal to be output back to the input end. It can be used to test the flow direction of the signal in the system.

OTU supports inloop function. Category Diagram

Inloop at client side of OTU

WDM sideClient side

OTUInloop

Inloop at WDM side of OTU

WDM sideClient side

OTU Inloop

Cross loopback: Broadcast the optical signal received at client side to optical transmitting modules at both client side and WDM side, see “1” in Figure 14-1. Or

Page 318: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 14 Fault Maintenance

Huawei Technologies Proprietary

14-4

broadcast the optical signal received at WDM side to optical transmitting modules at both WDM side and client side, see“2” in Figure 14-1.

WDM sideClient side OTU

Opticaltransmitting

module

Opticalreceiving module

Opticaltransmitting

module

Opticalreceivingmodule

A

B

C

D

1

1

2

2

Figure 14-1 Cross loopback diagram

LWM and LWX boards support cross loopback.

Caution:

As loopback will interrupt service, it is only used for fault locating and must be cleared after the fault is removed.

Prerequisites

NM user with the authority of "system operator" or above.

Procedure

Step Action 1 Select [Maintenance/Loopback/OTU Loopback] from the Main Menu. Select

"By Function".

2 In the lower-left pane, select the appropriate OTU (for example, LWF) and click the double-right-arrow button (red).

3 Click <Query> to query the loopback status.

Page 319: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 14 Fault Maintenance

Huawei Technologies Proprietary

14-5

Step Action 4 Select one OTU. Double-click loopback parameter to select “Inloop” or

“Outloop”.

Note:

If you select the LWM or LWX board, the “Cross Loopback” can be select from the pull-down menu.

5 Click <Apply>. The “Operation Result” dialog box is displayed and indicates operation succeeded. Click <Close>.

Page 320: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 14 Fault Maintenance

Huawei Technologies Proprietary

14-6

14.3 Performing Protection Switching

14.3.1 Performing Line Protection Switching

Purpose

Use this procedure to perform line protection switching or lock the switching status manually during test and fault diagnosis.

Caution:

Forced switching may interrupt the service.

Prerequisites

The line protection has been created.

NM user with the authority of "system maintainer" or above.

Procedure

Step Action 1 Select [Configuration/DWDM Configuration/Optical Line Protection] from the

Main Menu.

2 Select the NE and subrack NE to be tested from the object tree and click double-right-arrow button (red).

Page 321: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 14 Fault Maintenance

Huawei Technologies Proprietary

14-7

Step Action 3 Select an OLP path protection pair, right click the “Switching Status” and

select [Forced Switching to Protection] or other switching operations. The “Operation Result” dialog box is displayed showing the switching is achieved.

4 Click <Query> to refresh the “OLP Path Protection Pair”, and then find that the “Active Channel” of the test object becomes “Standby Channel”, and its status changes from “Normal” to “Forced Switching”.

14.3.2 Performing Wavelength Protection Switching

Purpose

Use this procedure to perform wavelength protection switching or lock the switching status manually during test and fault diagnosis.

Caution:

Forced switching may interrupt the service.

Prerequisites

The wavelength protection group has been created.

NM user with the authority of "system maintainer" or above.

Page 322: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 14 Fault Maintenance

Huawei Technologies Proprietary

14-8

Procedure

Step Action 1 Select [Configuration/DWDM Configuration/Wavelength Protection Group]

from the Main Menu.

2 Select the NE and subrack NE to be tested from the object tree and click double-right-arrow button (red).

3 Select a wavelength protection group from the list.

4 Right click the wavelength protection group and select [Forced Switching to Protection Channel] or other switching operations. The “Confirm” dialog box is displayed. Click <OK> to confirm it. The dialog box “Operation Result” is displayed to show the switching is successful.

5 Click <Query> to check the switching status.

14.3.3 Performing 1+1 Channel Protection Switching

Purpose

Use this procedure to perform 1+1 optical channel protection switching or lock the switching status manually during test and fault diagnosis.

Caution:

Forced switching may interrupt the service.

Page 323: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 14 Fault Maintenance

Huawei Technologies Proprietary

14-9

Prerequisites

The 1+1 optical channel protection has been created.

NM user with the authority of "system maintainer" or above.

Supported by the OptiX Metro 6100.

Procedure

Step Action 1 Select [Configuration/DWDM Configuration/1+1 Optical Channel Protection]

from the Main Menu.

2 Select the NE and subrack NE to be tested from the object tree and click double-right-arrow button (red).

3 Select an optical channel protection group from the list.

4 Right click the protection group, select [Forced Switching] or other switching operations.

5 Click <Query> to refresh the channel protection group, and the switching status of the test object becomes “Forced Switching”.

14.3.4 Performing 1:N Channel Protection Switching

Refer to “10.4.3 Switching 1:N Optical Channel Protection Status”.

14.3.5 Performing Clock Transparent Transmission Protection Switching

Purpose

Use this procedure to perform clock transparent transmission protection switching during test and fault diagnosis.

Page 324: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 14 Fault Maintenance

Huawei Technologies Proprietary

14-10

Caution:

Forced switching may interrupt the service.

Prerequisites

The clock transparent transmission protection has been created.

NM user with the authority of "system maintainer" or above.

Supported by the OptiX BWS 1600G.

Procedure

Step Action 1 Select [Configuration/DWDM Configuration/Clock Transparent Transmission

Protection] from the Main Menu.

2 Select the NE and subrack NE to be tested from the object tree and click double-right-arrow button (red).

3 Select a clock protection group from the list.

4 Right click the protection group and select [Forced Switching to Working Channel] or other switching operations.

5 Click <Query> to refresh the clock protection group, and the switching status of the test object becomes “Forced Switching” and the active path is “Working Path”.

Page 325: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 14 Fault Maintenance

Huawei Technologies Proprietary

14-11

14.4 Fault Diagnosis Wizard

14.4.1 Set Fault Diagnosis Rules

Purpose

Use this procedure to set such information as alarm cause, diagnosis method and processing method.

This function helps the network maintenance engineer accumulate and share maintenance experiences to improve the troubleshooting efficiency. The system provides the common fault diagnosis rule.

Prerequisite

NM user with the authority of "system maintainer" or above.

Procedure

Step Action 1 Select [Alarm/Set Alarms/Set Fault Diagnosis Rules] from the Main Menu.

2 If you want to view the diagnosis rules, right-click “Fault Diagnosis Rules” and select “Refresh Rules”. Click the rule to view it.

3 If you want to add rules, right-click “Fault Diagnosis Rules” and select “Add Rules”. Select the alarm name of the rules in the “Create Fault Diagnosis Rules” dialog box and click <OK>.

Right-click the rule newly created and selects “Add Steps”. Enter contents of the rule in the “Create Diagnosis Steps” dialog box and click <OK>. Click <Apply>.

Page 326: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 14 Fault Maintenance

Huawei Technologies Proprietary

14-12

Step Action 4 If you want to add steps of one rule, right-click the rule and select “Add

Steps”. Enter contents of the rule in the “Create Diagnosis Steps” dialog box and click <OK>. Click <Apply>.

5 If you want to modify the steps of one rule, right-click the rule and select “Modify”. Modify the rule in the “Modify Diagnosis Steps” dialog box and click <OK>. Click <Apply>.

6 If you want to delete the rules, right-click the rule to be deleted and select “Delete Rules”. Click <Apply>.

7 If you want to delete the steps, right-click the step to be deleted and select “Delete”. Click <Apply>.

14.4.2 Fault Diagnosis Wizard

Purpose

The fault diagnosis function of the T2000 is in an open mode, and the system has preset the diagnosis rule for some common alarms, like R_LOS, TU_AIS, HP_TIM, and B1_EXC.

In routine maintenance, the network administrator selects a fault alarm that needs to be diagnosed, starts "Fault Diagnosis" wizard, locates and removes the fault by following the fault diagnosis rule step by step. If there is no fault diagnosis rule available for the selected alarm, a prompt that the wizard cannot be started is given. If the fault diagnosis wizard was used, the previous handling method is first prompted. You can click <Diagnose Again> to continue the search for fault cause.

Prerequisites

NM user with the authority of "system maintainer" or above.

Fault diagnosis rules have been created.

Procedure

Step Action 1 Select [Alarm/Browse Alarms] from the Main Menu.

2 Right-click the alarm from alarm list and select [Fault Diagnosis]. The “Fault Diagnosis” dialog box is displayed.

3 Select the most possible fault cause according to the actual situation. If you are not sure of the fault cause, it is recommended to select the first fault cause.

4 Click <Next>. The wizard gives the corresponding diagnosis method.

5 Follow the diagnosis method to locate the fault. If successful, click <Next> to remove the fault according to the suggestions in the handling method.

Page 327: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 14 Fault Maintenance

Huawei Technologies Proprietary

14-13

Step Action 6 If fault localization fails, click <Back> to reselect cause until you locate the

fault successfully or you have tried all the causes.

7 Click <Finish> or <Cancel> to exit the fault diagnosis wizard.

Page 328: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 14 Fault Maintenance

Huawei Technologies Proprietary

14-14

14.5 Hard Resetting and Soft Resetting Unit

Purpose

When a fault occurs to the unit, you can execute the hard resetting or soft resetting to reset the unit. After resetting, the data on the unit will not be lost. But resetting unit will probably interrupt the service on the unit. Hard resetting will take more time than soft resetting.

Prerequisite

NM user with the authority of "system maintainer" or above.

Procedure

Step Action 1 Select [Maintenance/Reset Board] from the Main Menu.

2 Select the unit from the unit list and click the double-right-arrow button (red).

3 Select the units and click <Hardware Reset> or <Software Reset>. The “Confirm” dialog box is displayed.

4 Click <OK> to reset the unit.

Page 329: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 14 Fault Maintenance

Huawei Technologies Proprietary

14-15

14.6 Resetting NE Software

Purpose

The NE software of OptiX NE is stored in the control & communication unit. You can reset the NE software by software/hardware resetting the control & communication unit.

Prerequisite

NM user with the authority of "system maintainer" or above.

Procedure

Step Action 1 Select [Maintenance/Reset Board] from the Main Menu.

2 Select the control & communication unit from unit list and click the double-right-arrow button (red).

3 Select the unit and click <Hardware Reset> or <Software Reset>. The “Confirm” dialog box is displayed.

4 Click <OK> to reset the unit.

Page 330: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 14 Fault Maintenance

Huawei Technologies Proprietary

14-16

14.7 Remote Maintenance

Purpose

Use RAS to realize the remote maintenance. RAS-based remote maintenance is shown in Figure 14-2. In this solution, the T2000 server and T2000 client implement transparent access of a gateway NE by means of agency forward software RAS.

T2000 client and server,Navigator (Remote)

PSTN orInternet

Modem Modem

RAS or NavigatorAgent (Local)

gateway NE

TCP/IP

Figure 14-2 RAS-based remote maintenance

Prerequisites

Super NM user: admin.

T2000 works normally.

Connection between remote maintenance terminal and T2000 server has been established.

Procedure

Step Action 1 Select [System/NM Security Management/Remote Maintenance User

Management] from the Main Menu.

2 Enable the remote maintenance and set the attributes of the remote user. Click <Set Password> to set the password of remote user.

3 On the remote computer, start the T2000 remote maintenance terminal. Execute the startup command of the program, for example, \T2000\cmdclient\t2000client.bat.

4 Enter the user name, password and the IP address of the server to log in the T2000 server.

Note:

Note that the port number 9801 cannot be changed or omitted.

Page 331: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM 14 Fault Maintenance

Huawei Technologies Proprietary

14-17

Step Action 5 After successful login, the object selection list box displays the NEs

managed by the T2000 server (the gateway NEs of all subnets are listed by default). Click the gateway NE to expand the subnet where it is located and double-click the NE you want to log in.

6 Enter the command in the input column (this tool supports all the host commands for the maintained equipment), and click <Send> to send the command to the NE.

7 After completing the remote maintenance, select [Remote Maintenance Report/Create] to create a remote maintenance report. The remote maintenance report is saved in the directory "T2000\server\nemml\rm" of the T2000 server.

14.8 Modifying Overhead Byte

Refer to “9.3 DWDM Overhead Byte Management”.

Page 332: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM Table A-1A Obtaining and Installing License

Huawei Technologies Proprietary

A-1

A Obtaining and Installing License

A.1 Obtaining License

Purpose

Use this procedure to apply for license for the computer of the T2000 server.

The license file is not sent to the user with the T2000 installation software. It is applied by the Huawei technical support engineer according to the MAC address of user’s computer and the contract number.

When users change computers of the T2000 server or add a new server computer of T2000, they need to feed back the related information to Huawei engineer to apply for the license file.

Prerequisite

Before browse the MAC address on the Unix platform, switch the Unix user to the super user: root.

Procedure

Step Action 1 Get the contract number in the documents of the project. The contract

number has 14 numbers with the same regulation, for example:

123456(the post code) 010811(the date) 10(number of the contract)

Page 333: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM Table A-1A Obtaining and Installing License

Huawei Technologies Proprietary

A-2

Step Action 2 Note:

If the computer of the T2000 server is on Windows 2000 platform, please refer to steps 2-4 to browse the MAC address of the computer.

If the computer of the T2000 server is on Unix platform, please refer to steps 5-8 to browse the MAC address of the computer.

In the Windows screen, click <Start>, and select [Programs\Accessories\Command Prompt].

3 In the “Command Prompt” window, enter: ipconfig /all.

The display is just like below:

4 Browse the MAC address in the display, for example:

The “00-50-BA-19-58-35” is the MAC address of the computer.

5 In the Unix platform, open a Terminal.

6 Enter: su –root

And enter the password of the root, for example: rootkit (the default is rootkit)

Page 334: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM Table A-1A Obtaining and Installing License

Huawei Technologies Proprietary

A-3

Step Action 7 Enter: ifconfig –a. The display is just like below:

8 Browse the MAC address in the display, for example:

The “8:0:20:a1:7:c7” is the MAC address of the computer.

9 Send the contract number and the MAC address to the engineer of Huawei technical support of local office.

The engineer will apply for the license file and send it to the user.

Page 335: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM Table A-1A Obtaining and Installing License

Huawei Technologies Proprietary

A-4

A.2 Installing License

Purpose

Use this procedure to install the license file on the computer of the T2000 server.

The License controls the management capability and functions of the T2000. Without a license file, the T2000 can be started, but the functions are limited.

As one step of the installation procedure, the installation of license file has been described in the OptiX iManager T2000 Installation Manual.

Note:

The License can take effect only when the Server program is restarted after the License installation.

Prerequisite

None.

Procedure

Step Action 1 Exit all the T2000 client software.

2 Exit the T2000 server software.

3 On the computer of the T2000 server, copy the authorized License file to the directory of /T2000/server/.

4 Restart the T2000 server software.

Then the license can take effect.

Page 336: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM Table A-1A Table A-1B Abbreviations

Huawei Technologies Proprietary

B-1

B Abbreviations

Abbreviation Explanation

AIS Alarm Indication Signal

ALC Automatic Level Control

APE Automatic Optical Power Equalization

ATM Asynchronous Transfer Mode

BIOS Basic Input/Output System

CDE Common Desktop Environment

DCC Data Communication Channel

DCN Data Communication Network

DWDM Dense Wavelength Division Multiplexing

ECC Embedded Control Channel

FEC Forward Error Correction

ID IDentification/IDentity

ITU-T International Telecommunication Union - Telecommunication Standardization Sector

OAMS Optical fiber line Automatic Monitoring System

ONE Optical Network Element

OSNR Optical Signal to Noise Ratio

OTDR Optical Time-Domain Reflectometer

RAS Remote Access Server

SDH Synchronous Digital Hierarchy

SMTP Simple Mail Transfer Protocol

SONET Synchronous Optical Network

Page 337: Operation Manual for WDM

OptiX iManager T2000 Operation Manual for WDM Table A-1A Table A-1B Abbreviations

Huawei Technologies Proprietary

B-2

Abbreviation Explanation

SSM Synchronization Status Message

TCP Transport Control Protocol

TU Tributary Unit

WAN Wide Area Network

WDM Wavelength Division Multiplexing