Agenda

ORWG October 2021 2

Item Description Who Time

1. Welcome and introduction RWA 10:00–10:15

2. MOSL updates & TP discussion• CMOS Maintenance schedule 2021• CMOS Disaster Recovery• Release Schedule 2022• Release 11.0• Settlement• G readings• General information/discussion – including:

• Service Desk feedback, Non-Code Changes, Bilaterals

RWA 10:15-10:45

3. Forthcoming changes update AR 10:45–11:00

4. Data issues/improvements• CMOS/Remedy users / number of transactions

RWA 11:00–11:15

5. AOB and wrap up All 11:15–11:30

Page 3: Operations and Release Working Group

Welcome and Introduction

Participants

Dynamics of web conference

Alex Crosbie (IT Support Analyst) will state your name, please tell us your company name and he will also take the minutes

Feel free to switch your camera on

3ORWG October 2021

Page 4: Operations and Release Working Group

MOSL Updates

Page 5: Operations and Release Working Group

Maintenance Schedule 2021 & Disaster Recovery

5

Published on MOSL websiteCMOS > CMOS – Next ReleaseLast updated 17/09/2021

October

Monday 11/10/2021 Tuesday 12/10/2021 Wednesday 13/10/2021

MPS2Outage between 10am and

4pm

MPSOutage between 10am and

4pm+ 30 min outage from 6pm for

both MPS and MPS2

Mop Up

Saturday 16/10/2021

PRODOutage between 11pm on

Saturday and 6am on Sunday

Friday 22/10/2021

PRODOutage between 6pm on

Friday and 5pm on SaturdayDisaster Recovery test

ORWG October 2021

Page 6: Operations and Release Working Group

Maintenance Schedule 2021

6

Published on MOSL websiteCMOS > CMOS – Next ReleaseLast updated 17/09/2021

November

Monday 22/11/2021 Tuesday 23/11/2021 Wednesday 24/11/2021

MPS2Outage between 10am

and 4pm

MPSOutage between 10am and 4pm

+ 30 min outage from 6pm for both MPS and MPS2

Mop Up

Saturday 27/11/2021

PRODOutage between 11pm

on Saturday and 6am on Sunday

ORWG October 2021

Page 7: Operations and Release Working Group

Release Schedule 2022

7

Published on MOSL website CMOS > CMOS – Current Release

Release Deployment date Time Environment Content confirmed

12.0 15.04.2022 10am-8am MPS2 17.11.2021

29.04.2022 10am-5pm Patch drop MPS2

13.05.2022 6pm-2pm PROD

17.05.2022 10am-5pm MPS

12.5 29.07.2022 10am-8am MPS2 02.03.2022

12.08.2022 10am-5pm Patch drop MPS2

26.08.2022 6pm-2pm PROD

30.08.2022 10am-5pm MPS

13.0 28.10.2022 10am-8am MPS2 01.06.2022

11.11.2022 10am-5pm Patch drop MPS2

02.12.2022 6pm-2pm PROD

06.12.2022 10am-5pm MPS

ORWG October 2021

Page 8: Operations and Release Working Group

NCC024 – SMR Project 3: Meter read rejections

NCC025 – Open Transactions Export

Improvement – Meter shortcut in Market Information

Defect fixes – see CMOS 11 Release Note

8

CMOS Release R11.0

ORWG October 2021

Page 9: Operations and Release Working Group

NCC024 – SMR Project 3: Meter read rejections

Removal of case sensitivity on meter manufacturer (D3013) and manufacturer serial number (D3014) that applies to VR.291 (Meter does not exist in the central system) and VR.291-2 (Meter does not exist in the central system with initial meter reading date).

The notification (.M) will return the matched meter details in CMOS and could be a different value than the details submitted in the transaction.

9

CMOS Release R11.0

ORWG October 2021

Page 10: Operations and Release Working Group

Example:

T114.W submitted Manufacturer: ACTARIS and Serial Number: 20LU012345

CMOS finds a match that in the DB is Manufacturer: Actaris and Serial Number: 20lu012345

The T114.M notification will send Manufacturer: Actaris and Serial Number: 20lu012345

10

CMOS Release R11.0 NCC024 – SMR Project 3: Meter read rejections

ORWG October 2021

Page 11: Operations and Release Working Group

Transactions TCORR173.W (Amend I or F Meter Read), TCORR174.W (Erase Meter) and TCORR180.W (Amend Meter Identification) will not change:

These transactions will continue to be case sensitive

11

CMOS Release R11.0 NCC024 – SMR Project 3: Meter read rejections

ORWG October 2021

Page 12: Operations and Release Working Group

NCC025 – Open Transactions Export

To enable users to download a report (csv) in relation to their open transactions

12

CMOS Release R11.0

ORWG October 2021

Page 13: Operations and Release Working Group

NCC025 – Open Transactions Export

13

CMOS Release R11.0

ORWG October 2021

Page 14: Operations and Release Working Group

Improvement – Meter shortcut in Market Information

To enable to show the Meter shortcut in the search results when searching for a SPID that only has inactive meter(s)

14

CMOS Release R11.0

ORWG October 2021

Page 15: Operations and Release Working Group

Potential changes to be implemented:

CPW123 – Improved Remote Read Type Codes

NCC026 – Collapse functionality in CMOS

CPW118 – Minimum Meter Read Frequency – Recommendation from Panel to reject but final decision from Ofwat

CPW110 – Sharing Non-household Emergency Contact Details –Recommendation from Panel to reject but final decision from Ofwat

15

CMOS Release R12.0

ORWG October 2021

Page 16: Operations and Release Working Group

System Code versions

16

System Version as of date

PROD 10.0.2 (8181) 12/10/2021

MPS 10.0.2 (8181) 12/10/2021

MPS2 10.0.2 (8181) 12/10/2021

ORWG October 2021

Page 17: Operations and Release Working Group

Settlement

Page 18: Operations and Release Working Group

Settlement timetable 2021/23

18

Published on MOSL website Services > Market Operations > Settlement > Settlement Runs

ORWG October 2021

Page 19: Operations and Release Working Group

Estimated Readings Process – G Readings

19

Doing well - 16% decrease in the last 6 months

Processing on average in 3 hours

ORWG October 2021

Page 20: Operations and Release Working Group

Service Desk feedback

Please respond to “Satisfaction Survey Request” from the Service Desk whenever you receive an email ([email protected])

Please communicate this to your colleagues that raise tickets with the Service Desk

It’s important to get feedback to resolve any issues, improve the service or praise for the good service received.

20

General information / discussion

ORWG October 2021

Page 21: Operations and Release Working Group

Non-Code Change Process

21

Guidance and template: CMOS > MOSL Guidance > Non-Code Change (NCC) Request Guidance and NCC Change Request Template

Simplified process

Allows changes to CMOS or MOSL systems to be requested and considered

Fill in the template and email [email protected]

ORWG October 2021

Page 22: Operations and Release Working Group

NCC on MOSL website (Market Codes > Change > Non-Code Change Requests)

22ORWG August 2021

Page 23: Operations and Release Working Group

Always use the latest Proforma available on our website (CMOS > Administration)

Make sure you only fill in the required fields as per instructions in the Proforma, for example:

If you only want to add a new certificate to a specific environment as the previous one is going to expire, do not add previous IP addresses to be whitelisted or existing certificates

Make sure you summarise in the email to [email protected] what you would like

Authorised users: we sent a communication to all Contract Managers to provide a list of authorised users that can submit Proformas – we will continue to do it on a regular basis – minimum yearly.

23

Proformas

ORWG October 2021

Page 24: Operations and Release Working Group

Phase 2:

TP feedback continues to be positive (any feedback? email [email protected])

System performing well with low number of defects

>1,300 C1 requests raised by 31 TPs

Moving C1 to BAU 18th of October

Targeting delivery of B5 (meter repair/replace) end of January 2022

Phase 3:

Have explored lessons from Phase 2 to take into next phase

Recognition that C1 is significantly richer than a MVP

We need to be stricter about functionality levels (protect budget and timescale)

Delivering first 8 processes to MVP remains key

24

Bilaterals Update

ORWG October 2021

Page 25: Operations and Release Working Group

A couple of TPs to connect to Production

Contact:

[email protected] for connectivity issues (LVI, HVI), user access and logins

[email protected] general queries, support with the process, defects.

Are you receiving the relevant communications? Any questions, issues or suggestions?

25

Bilaterals Update

ORWG October 2021

Page 26: Operations and Release Working Group

Contract Managers – any information that must reach the trading party, e.g., plans, proposals, key meetings, user requirements, testing, system performance, outages, defects.

Pathfinder Group – attendees support early testing and provide sounding board to consider MOSL proposals and help guide programme

Bilateral Transactions Programme – high level only, general interest

OAG (Operational Advisory Group) – all meeting inputs and outputs relating to process reviews, user requirements, etc.

CAG (Code Advisory Group) – all meeting inputs and outputs relating to code change drafting and process

TAG (Technical Advisory Group) – bilateral issues that have strategic IT implications for trading parties

26

Bilaterals Update

ORWG October 2021

Page 27: Operations and Release Working Group

Forthcoming Changes Update

Abu Rashid, Senior Market Design Analyst

Page 28: Operations and Release Working Group

In-flight Changes

28ORWG October 2021

Page 29: Operations and Release Working Group

Change Proposals in Design (1/2)

Reference CPM046 CPW085

Title Approved Codes of Practice Premise Vacant transaction link to DPID

CMOS Impact N Y

Group Sub-group MOSL

Update • Raised by United Utilities• Nominations window open

for sub-group• First sub-group meeting

expected in January 2022

• MOSL is working to develop the solution with the Proposer and an informal sub-group of the MPC

• Re-consultation planned for November• A guidance note to incorporate into a wider

vacancy guidance document is being developed

Panel Recommendation

31 May 2022 29 Mar 2022

Implementation 26 Aug 2022 2 Dec 2022

ORWG October 2021

Page 30: Operations and Release Working Group

Change Proposals in Design (2/2)

30

Area Interim Supply New Connections Building Supply

Potential Change(s) • Wholesale charges

• Transfer reads

Revamp Changes to temporary building supply

Area Metering Credit Tariffs

Potential Change(s) • Read rejections• Transfer reads

Protections for credit support security

Tariff simplification

ORWG October 2021

Page 31: Operations and Release Working Group

Change Proposals in Consultation

31

Reference CPW120 CPW122

Title Final read when no visual read is available

Introducing Direct Debit as a Payment Method

CMOS Impact Y N

Group MOSL MOSL

Update • Adopted by MOSL after it was withdrawn

• Relates to meter reading processes upon meter removal

Returned by Panel in August 2021 for further assessment on impacts, benefits and potential uptake of direct debit

Consultation 23 Sep – 14 Oct 2021 11 Oct – 29 Oct 2021

Panel Recommendation

22 Feb 2022 30 Nov 2021

Implementation 2 Dec 2022 28 Feb 2022

ORWG October 2021

Page 32: Operations and Release Working Group

32

Reminder

ORWG October 2021

Page 33: Operations and Release Working Group

Change Proposals for Panel Recommendation in Oct 2021

33

Reference Title CMOS Impact

Group Implementation (if approved)

CPM044 Management of the Ofwat Innovation Fund

N MOSL

17 Nov 2021

CPM045 Extending the right of the Market Operator to raise Change Proposals

14 Jan 2022

ORWG October 2021

Page 34: Operations and Release Working Group

Awaiting Ofwat Decision (1/2)

Reference Title CMOS Impact

Panel Recommendation

Implementation (if approved)

CPM015 & CPW071

Panel Self-Governance

N Approve

On holdCPW080 Simplification of the Default and Termination Process

CPM035 Panel Election Streamlining

CPW106 Management of long-term vacant SPIDs

31 Mar 2022

CPW117 Shortening the late payment default timeline for a credit support reduction

5 Nov 2021

ORWG October 2021

Page 35: Operations and Release Working Group

Awaiting Ofwat Decision (2/2)

35

Reference Title CMOS Impact

Panel Recommendation

Implementation (if approved)

CPW110 & CPM041

Sharing Non-Household Emergency Contact Details

Y

Reject

13 May 2022CPW118 Minimum Meter Read

Frequency Reject

CPW123 Improved remote read type codes

Approve

ORWG October 2021

Page 36: Operations and Release Working Group

Awaiting Implementation

36

Reference Title CMOS Impact

Implementation

CPW119 & CPM042

Dormant Trading Party Provisions

N

5 Nov 2021

CPM039 Revisions to Panel Composition

28 Feb 2022 (latest)

ORWG October 2021

Page 37: Operations and Release Working Group

Change Proposals Implemented on 22 Sep 2021

37

Reference Title CMOS Impact

CPW070a-1 Phase 2 - Bilateral Transactions -Supplementary

N

ORWG October 2021

Page 38: Operations and Release Working Group

Data issues / Improvements

Page 39: Operations and Release Working Group

CMOS e-Learning

MOSL website updated with new CMOS e-learning videos for Wholesalers and Retailers

It’s in CMOS > Training Videos:

CMOS General Training – Wholesaler

CMOS General Training – Retailer

You’ll be redirected to MOSL’s training platform

39ORWG October 2021

Page 40: Operations and Release Working Group

Topics covered

CMOS Administration

Maintaining SPID Data

Registering Supply Points

Trade Effluent

Disconnections, Reconnections and Deregistrations

Corrections

Registering Transfers

40ORWG October 2021

Page 41: Operations and Release Working Group

Ongoing developments

Additional subjects such as Settlement, Trade Effluent, Tariffs and Administration duties to be added

Review of current e-learning courses to upgrade and improve where necessary

Any further suggestions for e-learning courses? (email us [email protected])

41ORWG October 2021

Page 42: Operations and Release Working Group

Data issues – CMOS users

CMOS users – August we had 5,478 active users. Today 5,461

August: 2,815 users are active but blocked. Today 2,547 – it’s likely they do not need access – please action (We sent a list of these users to CMs)

CSD006 – Trading Party Administration and Notification Process (Market Codes > Codes)

Trading Parties are responsible for maintaining user accounts on the Market Operator Systems, including the termination of accounts as part of the exit process for leavers, but always within one (1) week of the user having left the Trading Party.

If you would like a list of your active users in CMOS to review, request it via email to [email protected] (Needs Contract Manager/Authorised user approval)

42ORWG October 2021

Page 43: Operations and Release Working Group

Data issues – Remedy users

Remedy users – maximum 10 users per Trading Party – on track

If you would like a list of your Remedy users to review, request it via email to [email protected] (Needs Contract Manager/Authorised user approval)

43ORWG October 2021

Page 44: Operations and Release Working Group

HVI Transactions

Maximum number of transactions to be submitted: 3,600/hour/TP (since the end of March 2020 increased to 4,000/hour/TP from 8am to 6pm and, 6,000/hour between 6pm and 12am and 3:30am to 8am). No transactions to be submitted between 12am and 3:30am.

MVI Transactions

5,000 transactions/TP/month

We have increased this since the end of March 2020 for specific situations, but larger volumes need to be communicated in advance for acceptance and planning. (email [email protected])

In any case, only submit one batch at a time. Once that batch is completed, then another one can be submitted – never submit several batches at once

44

Data issues – Transactions’ submission

ORWG October 2021

Page 45: Operations and Release Working Group

AOB and wrap up

Slides will be published on the website this afternoon

Meeting minutes to be published on the website in 2 days (Groups and Forums > Industry Groups and Forums > Operations and Release Working Group)

Date of next meeting: 14 December 2021 – virtual meeting

February meeting: 15 February 2022 – virtual meeting

Everyone subscribed to the mailing list on our website? “CMOS outages, updates and release notes” and “Operations and Release Working Group (ORWG)”

45ORWG October 2021