CHALLENGE Confirm integrity of coated IPC test stands while ensuring safety by applying ID pressure in tubing-conveyed perforating (TCP) shoot- and-pull string without removing muticycle tester and circulating valves. SOLUTION Deploy the ultrahigh-pressure-rated IRDV* intelligent remote dual valve, which combines nitrogen-free, hydrostatically powered testing and circulating valves in a single tool. RESULTS Successfully tested the coated pipe in the TCP shoot-and-pull run after perforating, saving a flex-trip run and associated rig costs. Extreme reservoir requires ensured string integrity Finding and efficiently developing new hydrocarbon reserves involves operating in increasingly hostile downhole conditions. In the Lower Tertiary play of the Gulf of Mexico, operators face ultrahigh absolute bottomhole pressures that push the limits of conventional downhole test tools. When operating in this environment, the operator wanted to run a TCP shoot-and-pull string, perforate the well and reverse tubing fluid to ensure well control, and then pull out of hole before beginning gravel- pack operations. However, since the operator wanted to test two types of IPC stands with different thicknesses, the coating’s integrity needed to be tested prior to the gravel-pack operation. Conventionally, testing the coated pipe would require an extra run, or “flex trip,” prior to perforating. During such a test, only single-shot tubing tests and reversing tools could be used due to the absolute- pressure limitations of conventional multicycle dual valves. Because of this, the operator analyzed an alternative option that would eliminate the need for a flex trip and test the coated pipe during the perforating run, while keeping the main multicycle tester and circulating valves in the string. This option would provide greater flexibility, address safety concerns, and control the well after perforating. CASE STUDY Perforating Operator Saves Rig Time During High-Pressure GOM Perforating Run by Using Remote Dual Valve IRDV dual valve allows downhole tube flexing after perforating, saving a flex-trip run in costly ultradeepwater environment The industry defines HPHT reservoirs as 300 degF and 10,000 psi. The IRDV dual valve comes in HPHT-rated versions that can accommodate hostile reservoirs of 30,000 psi and up to 410 degF. Global HPHT Conditions Reservoir pressure, psi Reservoir temperature, degF 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 650 550 450 350 250 150 CONVENTIONAL High pressure High temperature

Upload: truongdung

Post on 19-Jul-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Operator Saves Rig Time During High-Pressure GOM ... · CHALLENGE Confirm integrity of coated IPC test stands while ensuring safety by applying ID pressure in tubing-conveyed perforating

CHALLENGEConfirm integrity of coated IPC test stands while ensuring safety by applying ID pressure in tubing-conveyed perforating (TCP) shoot-and-pull string without removing muticycle tester and circulating valves.

SOLUTIONDeploy the ultrahigh-pressure-rated IRDV* intelligent remote dual valve, which combines nitrogen-free, hydrostatically powered testing and circulating valves in a single tool.

RESULTSSuccessfully tested the coated pipe in the TCP shoot-and-pull run after perforating, saving a flex-trip run and associated rig costs.

Extreme reservoir requires ensured string integrity Finding and efficiently developing new hydrocarbon reserves involves operating in increasingly hostile downhole conditions. In the Lower Tertiary play of the Gulf of Mexico, operators face ultrahigh absolute bottomhole pressures that push the limits of conventional downhole test tools.

When operating in this environment, the operator wanted to run a TCP shoot-and-pull string, perforate the well and reverse tubing fluid to ensure well control, and then pull out of hole before beginning gravel-pack operations. However, since the operator wanted to test two types of IPC stands with different thicknesses, the coating’s integrity needed to be tested prior to the gravel-pack operation.

Conventionally, testing the coated pipe would require an extra run, or “flex trip,” prior to perforating. During such a test, only single-shot tubing tests and reversing tools could be used due to the absolute-pressure limitations of conventional multicycle dual valves. Because of this, the operator analyzed an alternative option that would eliminate the need for a flex trip and test the coated pipe during the perforating run, while keeping the main multicycle tester and circulating valves in the string. This option would provide greater flexibility, address safety concerns, and control the well after perforating.

CASE STUDY

Perforating

Operator Saves Rig Time During High-Pressure GOM Perforating Run by Using Remote Dual Valve IRDV dual valve allows downhole tube flexing after perforating, saving a flex-trip run in costly ultradeepwater environment

The industry defines HPHT reservoirs as 300 degF and 10,000 psi. The IRDV dual valve comes in HPHT-rated versions that can accommodate hostile reservoirs of 30,000 psi and up to 410 degF.

Global HPHT Conditions

Reservoir pressure, psi

Rese

rvoi

r tem

pera

ture

, deg

F

0 5,000 10,000 15,000 20,000 25,000 30,000 35,000

650

550

450

350

250

150

CONVENTIONAL

High pressure

High temperature

Page 2: Operator Saves Rig Time During High-Pressure GOM ... · CHALLENGE Confirm integrity of coated IPC test stands while ensuring safety by applying ID pressure in tubing-conveyed perforating

slb.com/IRDV

*Mark of SchlumbergerCopyright © 2015 Schlumberger. All rights reserved. 14-TS-0015

The IRDV dual valve features nitrogen-free, hydrostatically powered testing and circulating valves in one tool.

Innovative dual-valve technology provides solution Schlumberger proposed using the IRDV intelligent remote dual valve that is rated to 30,000-psi absolute ID and OD pressure. The IRDV dual valve combines two fullbore multicycle valves—a tester valve and a circulating valve—that can be cycled independently or sequentially for increased flexibility. This feature met the operator’s requirement that both valves remain downhole to ensure well control. The dual valve also enhances safety with lower-pressure, nitrogen-free operation and minimizes operating time by using automatic valve sequence commands.

Met all test objectives within outlined parameters The reservoir was perforated using both a 25,000-psi HSD* high shot density perforating gun system and 25,000-psi eFire* electronic firing heads. Then, the IRDV dual valve was used to successfully pressure test the string up to absolute pressure of 28,400 psi at depth. This enabled evaluating the coated pipe condition prior to gravel-pack operations in a single run, thereby eliminating the need to perform a flex trip, saving costly rig time in the extreme ultradeepwater environment. The circulating valve reversed out the workstring volume at 1.11 m3/min [7 bbl/min]. With these results, the operator met all of its test objectives within outlined parameters.

CASE STUDY: IRDV dual valve eliminates need for extra run during high-pressure perforating, GOM

IRDV dual valve provides multicycle, independent command and control for reliable reservoir interaction.