Optimal Replacement Cycles for Highway Operations Equipment
Wednesday, August 15, 20181:00-2:30 PM ET
TRANSPORTATION RESEARCH BOARD
The Transportation Research Board has met the standards and
requirements of the Registered Continuing Education Providers Program.
Credit earned on completion of this program will be reported to RCEP. A
certificate of completion will be issued to participants that have registered
and attended the entire session. As such, it does not include content that
may be deemed or construed to be an approval or endorsement by RCEP.
Purpose Discuss research from the National Cooperative Highway Research Program (NCHRP)’s Research Report 879: Optimal Replacement Cycles of Highway Operations Equipment.
Learning ObjectivesAt the end of this webinar, you will be able to:• Describe the importance of and economic benefits of optimal
equipment replacement cycles• Understand replacement factors and how they are applied in a highway
operations environment• Understand how to implement a systematic replacement program,
prioritize equipment replacements, and make effective fleet replacement decisions
• Understand how to use the Excel-based analysis tool to perform life-cycle cost analysis in support of the replacement process
NCHRP Research Report 879: Optimal Replacement Cycles of Highway Operations Equipment
NCHRP Project 13-04
NCHRP is a State-Driven Program
– Suggest research of national interest
– Serve on oversight panels that guide the research.
• Administered by TRB in cooperation with the Federal Highway Administration.
• Sponsored by individual state DOTs who
Practical, ready-to-use results• Applied research aimed at
state DOT practitioners• Often become AASHTO
standards, specifications, guides, syntheses
• Can be applied in planning, design, construction, operations, maintenance, safety, environment
Today’s Speakers
• Jeff Holabaugh, Dye Management Group
• Moderated by Bill Dye, Dye Management Group
NCHRP Research Report 879
NCHRP Project 13-04
WebinarAugust 15, 2018
1:00pm to 2:30pm Eastern
Guide for Optimal Replacement of HighwayOperations Equipment
Outline
• Project Purpose and Importance of Effective Fleet Replacement
• Project Outputs• Life Cycle Cost Analysis• Replacement Decision Process• Replacement Factors• Excel-Based Tool Demonstration• Future Work
2NCHRP Project 13-04 Webinar
Project Purpose
3NCHRP Project 13-04 Webinar
Develop rational replacement processes based on optimal life cycles
Develop processes and tools to assist the replacement planning process
Assist equipment managers and administrators with the task of equipment replacement
Benefits of Effective Fleet Replacement
• Equipment is an asset vital to agency’s mission– Necessary to develop and implement a systematic
approach to support effective fleet replacement decisions
• Equipment replacement merits the attention of dedicated resources within the fleet management organization
• Optimal fleet replacement results in reduced costs of equipment ownership and operation
4NCHRP Project 13-04 Webinar
Benefits of Effective Fleet Replacement
Other benefits include:
5NCHRP Project 13-04 Webinar
Better equipment
leads to
Operational efficiencies
Cost savings
SafetyEmployee
morale
Public perception and image
Project Outputs
6
Guide Excel-Based Tool
Tool User Manual
Final Project Report
NCHRP Project 13-04 Webinar
Replacement Guide
• Provides a primer on replacement concepts and approaches• Describes:
– replacement factors– life-cycle cost analysis– Decision-making process
• Helps managers:– Determine replacement needs and funding– Develop a business case for securing funding
7NCHRP Project 13-04 Webinar
Tool User Manual
• Companion document to the User Guide• Provides instructions for:
– Installing the optimization tool– Customizing the tool to meet your agency’s needs– Importing your agency’s equipment data– Using the tool’s six main functions to support
equipment replacement
8NCHRP Project 13-04 Webinar
Life Cycle Cost Analysis
9NCHRP Project 13-04 Webinar
Life-Cycle Cost Analysis
Replacement Factors
10NCHRP Project 13-04 Webinar
Maintenance and repair
costsAge
Utilization
Depreciation
Fuel cost
Downtime Obsolescence
Replacement cost
Age
• Fundamental factor in two ways:– Used to express optimal replacement cycles in
years– Used as a planning value to identify potential
replacement candidates
• Replacement of individual equipment units decisions should not be made based solely on age
11NCHRP Project 13-04 Webinar
Utilization
• Similar to age, can be used as a replacement planning target
• Is used to identify optimal replacement cycle• Is used to determine depreciation• Operating costs are expressed in $ per mile or
hour• Can vary significantly between equipment
classes and from year-to-year for individual units
12NCHRP Project 13-04 Webinar
Depreciation
13NCHRP Project 13-04 Webinar
Not an accounting depreciation
Based on actual salvage value of
unit
Average salvage values from DOT
data
Tool depreciation curves based on
utilization –not age
Typical Depreciation Curve
• Example depreciation schedule, ½-ton pickups
14NCHRP Project 13-04 Webinar
Depreciation Schedule
Miles 10,000 20,000 30,000 40,000 50,000 60,000 80,000
Accumulated
Depreciation15% 24% 32% 40% 47% 53% 59%
Ownership Cost Component (Depreciation) of LCCA Example
15NCHRP Project 13-04 Webinar
Equipment Type 1/2-ton pickupLTD Utilization 45,500 miles
Replacement Cost $25,000Accumulated Depreciation
= (Accum. Depr. %) * Replacement Value
43.5% * $25,000 = $10,875The LCCA ownership cost component is based on LTD cost per mileLTD cost per mile = $10,875/45,500 miles = $0.24/mile
Maintenance and Repair Costs
16NCHRP Project 13-04 Webinar
Preventive Maintenance
Scheduled and unscheduled
repairs
Accident repairs and body work
Rebuilds and overhauls
Fuel Costs
17NCHRP Project 13-04 Webinar
Fuel prices vary year-to-year
Tool uses average annual fuel cost per mile
Downtime
• Is a real and significant equipment cost• Most DOTs are not tracking and recording
downtime• Cost is manifested in higher highway
maintenance and operations or lower service due to equipment downtime
• Tool allows for hourly downtime cost• Based on existing equipment rental rates
18NCHRP Project 13-04 Webinar
Condition and Mission Criticality
19NCHRP Project 13-04 Webinar
Engine
Body
Electrical
Transmission
Steering/Suspension
Overhead
• Historically, mechanic hourly rates have not fully recognized overhead
• Overhead for warehouse, non-chargeable mechanic time -- mechanic training, shop clean-up
• True operating costs are understated without fully-loaded mechanic hourly rates
• Tool has feature to include overhead• Guide provides examples of how to calculate
20NCHRP Project 13-04 Webinar
Obsolescence
• Considers equipment efficiency and dependability
• Tool measures obsolescence based on fuel utilization
• 2 percent rate, applied to vehicle’s fuel cost to calculate obsolescence
• Also includes equipment productivity and efficiency. Difficult to quantify.
21NCHRP Project 13-04 Webinar
Replacement Cost
• Utilized in two ways:– To calculate depreciation in LCCA– To project long-range replacement budget needs
• Should include the original price + cost of outfitting the unit prior to deployment
22NCHRP Project 13-04 Webinar
Making Replacement Decisions is a Process
23NCHRP Project 13-04 Webinar
Organizational Considerations
• Equipment replacement merits the attention of dedicated resources within the fleet management organization
24NCHRP Project 13-04 Webinar
Excel-Based Tool
25
Determine optimal life cycles for each equipment
class
Perform LCCA on individual equipment
units
Identify candidate replacement needs based on age, utilization or cost
Prioritize equipment replacement units based on cost, condition, and
mission criticality
Develop a 5-year replacement needs
budget
Analyze the cost consequences of various
replacement cycles
NCHRP Project 13-04 Webinar
Class-Level LCCA
• Looks at all units in a specific equipment class• LTD cost per mile calculated for each of the
cost components• Total cost per mile is obtained by totaling
maintenance, fuel, downtime, operating costs• Tool develops a trend line to model the total
cost curve
26NCHRP Project 13-04 Webinar
Identify Replacement Candidates
• Tool identifies potential replacements that:– Are past their replacement targets (miles or
hours) – Have high costs (>25 percent) compared to the
class average
• Only candidates for replacement• Each unit should be evaluated individually
27NCHRP Project 13-04 Webinar
Perform Condition Assessments
• Provides insight on individual units
28NCHRP Project 13-04 Webinar
Prioritize Replacement Units
• Tool determines priority ranking based on unit’s LTD cost and condition score
• Priority report will only show units with condition scores have been entered
• Default weighting of 40/60 percent to cost and condition
29NCHRP Project 13-04 Webinar
Unit-Level LCCA
• Analyzes cost performance of individual equipment units
• Requires annual data by unit• Recommend considering other factors
(beyond cost) such as condition and mission criticality
30NCHRP Project 13-04 Webinar
Determine Replacement Program
• Tool informs decision-makers• Guidelines for final decision making:
– Priority ranking as a starting point– Utilize condition assessments to identify units in
the best condition– Unit-level LCCA to identify trends of individual
units– Consider cost, condition, and other objective
factors in final decision31NCHRP Project 13-04 Webinar
Develop 5-Year Plan and Budget
• Planning tool to communicate future budget needs to upper management and budget decision-makers
• Tool determines replacement needs by comparing each unit’s current age with the target replacement age
• 5-Year Plan shows which year a unit is projected for replacement and calculates the total budget for each year
32NCHRP Project 13-04 Webinar
Analyze Cost Consequences
• Optional step• Helps fleet managers develop a business case
for funding levels• Tool analyzes annual cost of various
replacement cycle scenarios• Compares impacts of “optimal” versus “other”
replacement cycles
33NCHRP Project 13-04 Webinar
Tool Demonstration
34NCHRP Project 13-04 Webinar
Future Work and Enhancements
• Build tool in more robust software• Develop data validation feature• Link Condition Assessment Form to the tool• Commit resources to equipment management• Develop training for fleet managers
35NCHRP Project 13-04 Webinar
601 108th Avenue NE Suite 1900 Bellevue, WA 98004-5500T: (425) 637-8010 F: (425) 637-8020 www.dyemanagement.com
D Y E M A N A G E M E N T G R O U P , I N C .
Today’s Participants• Jeff Holabaugh, Dye Management Group,
• Bill Dye, Dye Management Group, [email protected]
Panelists Presentations
http://onlinepubs.trb.org/onlinepubs/webinars/180815.pdf
After the webinar, you will receive a follow-up email containing a link to the recording
Get Involved with TRB• Getting involved is free!• Join a Standing Committee (http://bit.ly/2jYRrF6)• Become a Friend of a Committee
(http://bit.ly/TRBcommittees)– Networking opportunities– May provide a path to become a Standing Committee
member• For more information: www.mytrb.org
– Create your account– Update your profile
Get involved with NCHRP
• Suggest NCHRP research topics • Volunteer to serve on NCHRP panels• Lead pilot projects and other
implementation efforts at your agency• For more information:
http://www.trb.org/nchrp/nchrp.aspx
Receiving PDH credits
• Must register as an individual to receive credits (no group credits)
• Credits will be reported two to three business days after the webinar
• You will be able to retrieve your certificate from RCEP within one week of the webinar