Page 1: Optimization of MiG27 drone for long-range high-load flight week 9 Valentine Okonkwo Mohammad Shahid Jean-Paul Davet Tai Quach

Optimization of MiG27 drone forlong-range high-load flight

week 9

Valentine OkonkwoMohammad Shahid

Jean-Paul DavetTai Quach

Page 2: Optimization of MiG27 drone for long-range high-load flight week 9 Valentine Okonkwo Mohammad Shahid Jean-Paul Davet Tai Quach

Individual and team assignments from the previous

week meeting • MAX 712/713 (Jean-Paul and Tai)• Solar cells and Styrofoam (Valentine and Mohammad)• Finish the tail section with the elevator and servo lever

(Jean-Paul and Valentine)• Take actual measurement of the current draw with the

specific weight force of the servo (Jean-Paul, Valentine, Mohammad and Tai).

• Complete the simulation flight test for the force of the rudder, by using a car that is traveling at 65mph (Jean-Paul, Valentine, Mohammad and Tai).

• Team must decide what charge rate to use by the end of the week, and components must be ordered from mouser. (Jean-Paul and Tai)

• Start the installation of the landing gears (Jean-Paul and Valentine).

Page 3: Optimization of MiG27 drone for long-range high-load flight week 9 Valentine Okonkwo Mohammad Shahid Jean-Paul Davet Tai Quach

Obtained results and problems • Jean Paul: Front gear support wall for control servo,

Front gear assembled, main gear mount support, main gears assembled ( with valentine ), Control arms and cables routed for servo control and reinforced for support, Servo mounts built and reinforced  for three servos ( with Tai), Back tail glued, Rudder glued, Servo #1 mounted and connected with cable for rudder and Controllable front wheel, Servo # 2 mounted and connected with cable for Elevator, Servo # 3 mounted and connected to cable for Throttle, Both Ailerons for wing covered with aerokote measured experimental values for maximum current to be 250ma for the overall servo control system requirements at 65 mph & Max 712

• Mohammad: Solar cells and Styrofoam, Support wall is complete for front controllable wheel, Servo locations are considered and planned

Page 4: Optimization of MiG27 drone for long-range high-load flight week 9 Valentine Okonkwo Mohammad Shahid Jean-Paul Davet Tai Quach

Obtained results and problems

• Tai: Control arms and cables routed for servo control and reinforced for support, Servo mounts built and reinforced  for three servos (with Jean Paul)

• Valentine: Front gear support wall for control servo, Front gear assembled, main gear mount support, main gears assembled ( with Jean-Paul), Solar cells and Styrofoam.

Page 5: Optimization of MiG27 drone for long-range high-load flight week 9 Valentine Okonkwo Mohammad Shahid Jean-Paul Davet Tai Quach

Team’s assessment of previous week task

completion. Complete :

• 1)  Front gear support wall for control servo.

• 2) Front gear assembled.• 3) main gear mount support• 4) main gears assembled• 5) Control arms and cables routed for

servo control and reinforced for suppport• 6) Servo mounts built and reinforced  for

three servos• 7) Back tail glued• 8) Rudder glued• 9)  Servo #1 mounted and connected

with cable for rudder and Controllable front wheel

• 10) Servo # 2 mounted and connected with cable for Elevator

• 11) Servo # 3 mounted and connected to cable for Throttle

• 12) Both Ailerons for wing covered with aerokote

Page 6: Optimization of MiG27 drone for long-range high-load flight week 9 Valentine Okonkwo Mohammad Shahid Jean-Paul Davet Tai Quach

Table Overall Tasks

Week1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Discussion /Meeting X X

Turn in the paper about project X

Order parts X X

Sanding paper X

Work on the tail on rudder section X X X X

Install motor with blind nut X

Sufficiency of solar cells. X X X

Max 712 X X X

Installation of the landing gears X

Order parts for charger X X

Testing Subsystem X X X X

System Testing/Adjustment X X

Test Flight/Adjustment X X

Demonstrate of drone X

Page 7: Optimization of MiG27 drone for long-range high-load flight week 9 Valentine Okonkwo Mohammad Shahid Jean-Paul Davet Tai Quach

Team tasks for the next week

• 1) Ailerons need to be assembled with hinges to the main wing

 • 2) Implantation of the servo within the wing with

wood supports

• 3) Servo Arms and push rods assembled

• 4) Aerokote covering of the fuselage  

Page 8: Optimization of MiG27 drone for long-range high-load flight week 9 Valentine Okonkwo Mohammad Shahid Jean-Paul Davet Tai Quach

Time accounting Name Tasks Total

Hours

Jean-Paul •The task 1-12 (From slide 5)

•Max 712

13

Tai •Power point Slides

•Finish the tail section with the elevator and servo lever

•Task 5-6 (Slide 5)

7

Valentine • The minutes of the meeting

• Solar cells and Styrofoam

• Front gear support wall for control servo

• Front gear assembled

• Main gear mount support & main gears assembled

11.5

Mohammad •Send log book by email

•Solar cells and Styrofoam

•Servo locations are considered and planned

8

Total Hour 39.5