oracle scm cloud quality inspection management … · oracle scm cloud quality inspection...
TRANSCRIPT
Oracle SCM Cloud
Quality Inspection Management
Implementation
Activity Guide
Important!
You’ve been assigned a unique, two-digit student number for this
course. In the following pages, wherever you see “xx,” substitute
your student number.
Note: Your student number is only valid for the duration of the
course.
Practices for Lesson 2:
Overview of Quality
Inspection Management
Copyright © 2018, Oracle and/or its affiliates. All rights reserved.
2 Practices for Lesson 2: Overview of Quality Inspection Management
Practices for Lesson 2
Overview
In these practices, you navigate through the Quality Management work area.
Running Session Warmers
We recommend that you perform the following steps prior to starting any of the scripts to ensure
the best performance.
1. Log on using scm01.student (or your student log on).
2. Open a second browser tab and go to the main application page.
3. On the Main page, click Demo Tools and then, click Session Warmers.
4. Click SCM and then click Supply Management – Core and Supply Planning. Popups
launch and automatically close. If popups do not open, check that popup blocker is not
enabled in the browser.
5. When all popups close, go to the browser tab where you logged on to the application and
use that instance for running the scripts.
Copyright © 2018, Oracle and/or its affiliates. All rights reserved.
Practices for Lesson 2: Overview of Quality Inspection Management 3
Practice 2-1: Navigating through the Quality Management Work Area
Note to instructor: Demonstrate this practice to the students.
Overview
In this practice, you explore the Quality Management work area and navigate some basic
elements in the user interface.
Note: Only users with the Quality Analyst role are able to search for Issues and Actions. Users
with the Quality Engineer role are able to search for Inspection Plan, Inspection Characteristic,
Inspection Level, and Inspection. Users with both roles are able to search for all quality objects.
Prerequisites
None
User Login
scmXX.student (Replace XX with your student number)
Summary of Tasks
Navigate to the Quality Management work area
Explore the infolets on the Overview page
Review the available quality objects
Search for an existing quality object
Filter your search results
Create a new quality object
Steps:
Navigate to the Quality Management work area
1. From the Navigator, select Quality Management.
Explore the infolets on the Overview page
2. On the Overview page, explore the following infolets:
Receiving Inspections
WIP Inspections
Inspection Status
Review the available quality objects
3. Click the Search For list and review the quality objects (Inspection Plan, Inspection
Characteristic, Inspection Level, and Inspection) available.
Search for an existing quality object
4. In the Search For list, select Inspection Characteristics.
Copyright © 2018, Oracle and/or its affiliates. All rights reserved.
4 Practices for Lesson 2: Overview of Quality Inspection Management
5. In the Search field, enter: Charging.
Note: If you do not enter any text, the search results display all the Inspection
characteristics created so far.
6. Click the Search icon.
Filter your search results
7. Click the Show Filters link to filter your search results.
8. In the Source Object list, select Non-item.
9. Click Search. The search results display the quality objects (Inspection Characteristic)
matching the criteria you specified.
Create a new quality object from the Search page
10. On the Overview page, select Inspection Characteristics from the Search For list and
then, click the Search icon.
11. On the Search page, all existing inspection characteristics display.
12. Click the Create icon.
13. On the Create Inspection Characteristic page, review the various fields, such as Source
Object, Characteristic Group, Enabled, etc.
14. Click Cancel to return to the Overview page.
Note: Select Inspection Level from the Search For list and repeat steps 12-16 to
familiarize yourself with the steps to navigate to the Create Inspection Level page.
Practice Complete:
In this practice, you explored the Quality Management work area and navigated some basic
elements in the user interface.
Practices for Lesson 3:
Defining Quality Inspection
Requirements
Copyright © 2018, Oracle and/or its affiliates. All rights reserved.
2 Practices for Lesson 3: Defining Quality Inspection Requirements
Practices for Lesson 3
Overview
The practices in this lesson mainly focus on the set up required for performing quality
inspections. You create an item-based inspection characteristic and a non-item inspection
characteristic. In addition, you create a Receiving inspection plan as well as a Work-in-Process
inspection plan.
Copyright © 2018, Oracle and/or its affiliates. All rights reserved.
Practices for Lesson 3: Defining Quality Inspection Requirements 3
Demonstration 3-1: Creating an Item Inspection Characteristic
Overview
In this demonstration, you learn to create an item-based inspection characteristic of type -
number.
Prerequisites
None
User Login
scm00.instructor
Summary of Tasks
Navigate to the Create Inspection Characteristic page
Create an item-based inspection characteristic
Steps
Navigate to the Create Inspection Characteristic page
1. From the Navigator, select Quality Management.
2. On the Overview page, click the Create icon in the top-right corner and select
Inspection Characteristic from the list.
Create an item-based inspection characteristic
3. On the Create Inspection Characteristic page, enter or select values as follows:
Field Value
Name Resolution
Description (Optional) Display resolution
Source Object Item
Item Class VarioNIR
Target Attribute Reference Item-Display Resolution-Pixels Target
Note: You can do an Advanced search with the
key word ‘Pixels’ and by selecting ‘Contains’ in
the list of operators.
Minimum Attribute
Reference
Item-Display Resolution-Pixels MIN
Maximum Attribute
Reference
Item-Display Resolution-Pixels Max
Copyright © 2018, Oracle and/or its affiliates. All rights reserved.
4 Practices for Lesson 3: Defining Quality Inspection Requirements
4. Select the Enabled check box, if not previously defaulted.
5. In the UOM list, select px.
6. Click the Characteristic Group icon.
7. In the Associate Characteristic Group dialog box, click the Add Row icon.
8. In the Name list, select the Create link.
9. In the Create Group dialog box, in the Name field, enter: Item Dimensions.
Note: To search for an existing characteristic group, select Search, and to create a new
characteristic group, select Create from the list.
10. Click OK to close the dialog box.
11. (Optional) In the Attachments field, click the Manage Attachments icon to add or edit
an attachment.
12. Click Save and Create Another to create another characteristic, or Save and Close to
return to the Overview page.
Demonstration Complete:
In this demonstration, you learned to create an item-based inspection characteristic.
Copyright © 2018, Oracle and/or its affiliates. All rights reserved.
Practices for Lesson 3: Defining Quality Inspection Requirements 5
Demonstration 3-2 Creating a Receiving Inspection Plan
Overview
Receiving criteria can be defined to embed inline inspection as part of the receiving transaction
by document type or supplier, as examples. For example, a multi-sourced item could share the
same inspection plan across its suppliers.
In this demonstration, you learn to create a Receiving inspection plan.
Prerequisites
None
User Login
scm00.instructor
Summary of Tasks
Create an item
Navigate to the Create Inspection Plan page
Specify values in the Details section
Specify values in the Specification section
Specify values in the Inspection Criteria section
Approve and save the inspection plan
Steps
Create an Item
1. From the Navigator, under Product Management, select Product Information
Management.
2. Click the Tasks panel tab and then, select the Create Item link.
3. In the Create Item dialog box, enter or select values as follows:
Field Value
Organization 000
Create New Selected
Item Class Root Item Class
4. In the Templates region, in the Available List, select Purchased Item and then, click the
icon to move it to the Selected List.
5. Click OK. Click Yes to close the warning message.
6. On the Create Item page, enter or select values as follows:
Copyright © 2018, Oracle and/or its affiliates. All rights reserved.
6 Practices for Lesson 3: Defining Quality Inspection Requirements
Field Value
Item SCM.ABC.XX (replace XX with your initials)
Description Item for Receiving Inspection Plan
Item Status (Defaulted) Active
Lifecycle Phase (Defaulted) Production
7. Scroll down and click the Associations tab. Click the Select and Add icon.
8. In the Select and Add: Organization dialog box, in the Organization field, enter: 001 and
then, click the Search icon. Select the organization and then, click Apply.
9. In the Select and Add: Organization dialog box, in the Organization field, enter: 002 and
then, click the Search icon. Select the organization and then, click Apply. Click Done to
close the dialog box.
10. Click Save and Close on the Create Item page.
Navigate to the Create Inspection Plan page
11. From the Navigator, select Quality Management.
12. On the Overview page, click the Create icon in the top-right corner and select
Inspection Plan from the list.
Specify values in the Details section
13. On the Create Inspection Plan page, in the Details section, select or enter values as
follows:
Field Value
Name Incoming Memory Test_XX (Replace XX with
your initials)
Type Receiving
Organization 002
Details Item
Item SCM.ABC.XX (item you created)
Version Description
(Optional)
Inspection Plan for SCM.ABC.XX V1
Start Date Current Date and Time (Defaulted)
Status New (Defaulted)
Inspection Level Inspection Level 10
Specify values in the Specifications section
14. Select the Specifications infotile.
Copyright © 2018, Oracle and/or its affiliates. All rights reserved.
Practices for Lesson 3: Defining Quality Inspection Requirements 7
15. Click the New icon to add a new row, and then enter or select values as follows:
Field Value
Sequence 10 (Defaulted)
Characteristic Correct Part
Target Yes
16. Click the New icon again and then, in the Characteristic field, enter: Memory
Transfer Rate. Enter or select appropriate values in the Target, Minimum Value, and
Maximum Value fields for the characteristic. Note that the other fields (Target, Minimum
Value, and Maximum Value) are populated automatically if they are defined in the
Inspection Characteristic master for a non-item inspection characteristic. Similarly, these
fields are populated automatically if they are defined in the Item master for an item
inspection characteristic.
17. Click the New icon again, and then, in the Characteristic field, enter: Memory Clock.
Enter or select appropriate values in the Target, Minimum Value, and Maximum Value
fields.
Specify values in the Inspection Criteria section
18. Select the Inspection Criteria infotile.
19. Click the Add Row icon and enter or select values as follows:
Field Value
Document Type Purchase order
Supplier Midtown Computer Supplies
Supplier Site MCS US1
Approve and save the inspection plan
20. Click the Details infotile.
21. In the Status list, select Approved.
Click Save. Notice that the name of the screen changes to: Edit Inspection Plan:
Incoming - Item, 1 (002). Note that “Incoming Memory Test” is the name of the inspection
plan, “1” is the current version, and “002” is the organization.
Demonstration Complete:
In this demonstration, you learned to create a Receiving inspection plan.
Copyright © 2018, Oracle and/or its affiliates. All rights reserved.
8 Practices for Lesson 3: Defining Quality Inspection Requirements
Practice 3-1 Creating a Non-Item Characteristic
Overview
In the Quality Management Cloud application, you can define inspection characteristics that are
independent of item attributes and specifications. Non-item inspection characteristics can be
leveraged for both item and resource-related inspections.
In this practice, you create a non-item characteristic of type - Character.
Prerequisites
None
User Login
scmXX.student (Replace XX with your student number)
Summary of Tasks
Navigate to the Create Inspection Characteristic page
Create a non item inspection characteristic
Steps
Navigate to the Create Inspection Characteristic page
1. From the Navigator, select Quality Management.
2. On the Overview page, click the Create icon in the top-right corner and select
Inspection Characteristic from the list.
Create a non-item inspection characteristic
3. On the Create Inspection Characteristic page, select or enter values as follows:
Field Value
Name PartColorXX (replace XX with your student
number)
Description (Optional) Color of the component
Source Object Non-item
Data Type Character
4. Click the Value Set icon.
5. In the Create Value Set dialog box, click the Add Row icon.
6. In the Value field, enter: Black.
Copyright © 2018, Oracle and/or its affiliates. All rights reserved.
Practices for Lesson 3: Defining Quality Inspection Requirements 9
7. Click the Add Row icon again to add a new row.
8. In the Value field, enter: Gray.
9. Click OK to close the dialog box.
10. Select the Enabled check box, if not previously defaulted.
11. In the Target list, select Black.
12. (Optional) To associate a characteristic group, click the Characteristic Group icon.
13. Click Save and Close.
Practice Complete:
In this practice, you created a non-item inspection characteristic.
Copyright © 2018, Oracle and/or its affiliates. All rights reserved.
10 Practices for Lesson 3: Defining Quality Inspection Requirements
Practice 3-2 Creating a Work-in-Process Inspection Plan
Overview
Work in Process criteria can be set up to enforce inline inspection at a particular operation or
operation dispatch status.
In this practice, you create a Work-in-Process inspection plan.
Prerequisites
None
User Login
scmXX.student (Replace XX with your student number)
Summary of Tasks
Create an item
Navigate to the Create Inspection Plan page
Specify values in the Details section
Specify values in the Specification section
Specify values in the Inspection Criteria section
Approve and save the inspection plan
Steps
Create an item
1. From the Navigator, under Product Management, select Product Information
Management.
2. Click the Tasks panel tab and then, select the Create Item link.
3. In the Create Item dialog box, enter or select values as follows:
Field Value
Organization 000
Create New Selected
Item Class Root Item Class
4. In the Templates region, in the Available List, select Purchased Item and then, click the
icon to move it to the Selected List. Notice that there are the following two templates in
the Available List: Purchased Item and Finished Goods.
5. Click OK.
6. On the Create Item page, enter or select values as follows:
Copyright © 2018, Oracle and/or its affiliates. All rights reserved.
Practices for Lesson 3: Defining Quality Inspection Requirements 11
Field Value
Item QM.YY.XX (replace YY with your initials and
XX with your student number)
Description Item for WIP Inspection Plan
Item Status (Defaulted) Active
Lifecycle Phase (Defaulted) Production
7. Scroll down and click the Associations tab. Click the Select and Add icon.
8. In the Select and Add: Organization dialog box, in the Organization field, enter: 001 and
then, click the Search icon. Select the organization and then, click Apply.
9. In the Select and Add: Organization dialog box, in the Organization field, enter: 002 and
then, click the Search icon. Select the organization and then, click Apply. Click Done to
close the dialog box.
10. Click Save and Close on the Create Item page.
Navigate to the Create Inspection Plan page
11. From the Navigator, select Quality Management.
12. On the Overview page, click the Create icon in the top-right corner and select
Inspection Plan.
Specify values in the Details section
13. On the Create Inspection Plan page, in the Details section, select or enter values as
follows:
Field Value
Name WIP Tablet Technical Inspection-XX (replace
XX with your student number)
Type Work in process
Organization 002
Details Item
Item Item you created previously (Steps # 1-10)
Version Description Inspection Plan for item XXXXX (Replace
XXXXX with the item you created)
Start Date Current Date and Time (Defaulted)
End Date Note: Leave this field blank to keep your
inspection plan in an active state.
Status New (Defaulted)
Copyright © 2018, Oracle and/or its affiliates. All rights reserved.
12 Practices for Lesson 3: Defining Quality Inspection Requirements
14. In the Attachments field, click the Manage Attachments icon to add or edit a file.
Specify values in the Specifications section
15. Select the Specifications infotile.
16. Click the New icon to add a row, and then select or enter values given for Sequence 10
in the table below. Add two more rows in succession, and then enter the values for
Sequence 20 and 30 in the corresponding fields, respectively.
Sequence Characteristic UOM Target Minimum
Value
Maximum
Value
10 Screen Size mm 260 255 265
20 Memory
Transfer Rate MHz 667 660 675
Specify values in the Inspection Criteria section
17. Select the Inspection Criteria infotile.
18. Click the Add Row icon, and then select or enter values as follows:
Field Value
Operation Sequence 20
Operation Code TTST
Dispatch Status Ready
19. Click the Add Row icon again, and then select or enter values as follows:
Field Value
Operation Sequence 20
Operation Code TTST
Dispatch Status Reject
Approve and save the inspection plan
20. Select the Details infotile.
21. In the Status list, select Approved.
22. Click Save and Close to save the plan and return to the Overview page.
Practice Complete:
In this practice, you created a Work-in-Process inspection plan.
Practices for Lesson 4:
Performing Quality
Inspections
Copyright © 2018, Oracle and/or its affiliates. All rights reserved.
2 Practices for Lesson 4: Performing Quality Inspections
Practices for Lesson 4
Overview
The practices in this lesson focus on how to perform quality inspections. You learn to perform
an inline Receiving inspection as well as an inline Work-in-Process inspection. In addition, you
perform an ad-hoc Resource inspection.
Copyright © 2018, Oracle and/or its affiliates. All rights reserved.
Practices for Lesson 4: Performing Quality Inspections 3
Demonstration 4-3: Performing an Ad-Hoc Resource Inspection
Overview
In an ad-hoc inspection scenario, you can collect inspection results against a work order
operation, an item in inventory, or a resource.
In this demonstration, you perform an ad-hoc Resource inspection.
Prerequisites
None
User Login
scm00.instructor
Summary of Tasks
Navigate to the Create Inspection dialog box
Enter inspection details
Steps
Navigate to the Create Inspection dialog box
1. From the Navigator, select Quality Management.
2. On the Overview page, click the Create icon in the top-right corner and select
Inspection from the list.
3. In the Enter Inspection Details dialog box, select or enter values as follows:
Fields Values
Organization 002
Type Resource
Work Center Monogram Application WC
Resource Monogram Machine
Inspection Plan Monogram Machine Inspection Plan
4. Click OK to close the Enter Inspection Details dialog box.
Enter inspection details
5. On the Enter Inspection Details page, in the 00001: Inspection Results region, in the
Results field, enter values as follows:
Sequence Results
Copyright © 2018, Oracle and/or its affiliates. All rights reserved.
4 Practices for Lesson 4: Performing Quality Inspections
10 Yes
6. Click Save and Close.
Demonstration Complete:
In this demonstration, you performed an ad-hoc Resource inspection.
Copyright © 2018, Oracle and/or its affiliates. All rights reserved.
Practices for Lesson 4: Performing Quality Inspections 5
Practice 4-1: Performing an Inline Receiving Inspection
Note to instructor: Demonstrate this practice to the students.
Overview
In an inline Receiving inspection, results are entered as part of the Receiving transaction if a
matching inspection plan is found and an inspection is required, or if skip lots functionally does
not require an inspection but you choose to perform the inspection anyway.
In this practice, you perform an inline Receiving inspection.
Prerequisites
You have successfully completed Practice 3-2.
Set Receiving Parameters for Organization.
1. From the Navigator, select Setup and Maintenance.
2. On the Setup and Maintenance page, click the icon and then, select the Manufacturing and Supply Chain Materials Management offering from the list.
3. In the Functional Areas region, select the Receiving functional area.
4. Click the Manage Receiving Parameters task.
5. In the Select Organization dialog box, select 002 – Atlanta and then, click OK.
6. In the General region, in the Receipt Routing list, select Inspection required.
7. Select the Use Quality Inspection Plan check box.
8. Select the Allow Routing Override check box.
9. Click Save and Close.
User Login
Calvin.Roth
Summary of Tasks
Create receipts for inspection
Navigate to the Inspect Lines page
Enter quality inspection results
Submit quality inspection results
Steps
Navigate to the Inspect Lines page
1. Log on as Calvin.Roth.
2. From the Navigator, under Procurement, select Purchase Orders.
3. Click the Tasks panel tab and then, select Create Order.
4. In the Create Order dialog box, enter or select values as follows:
Fields Values
Copyright © 2018, Oracle and/or its affiliates. All rights reserved.
6 Practices for Lesson 4: Performing Quality Inspections
Style Purchase Order
Procurement BU US1 Business Unit
Requisitioning BU Defaulted on selecting the Procurement BU
Supplier Midtown Computer Supplies
Currency USD
Default Ship-to Location Atlanta
5. Click Create to close the Create Order dialog box. Note down the Purchase Order number
here: ____________________
6. On the Edit Document (Purchase Order): XXXXX page, in the General region, in the Bill-
to Location field, enter: Atlanta.
7. Scroll down and then, click the Lines tab. Click the Add Row icon. Enter or select values
as follows.
Fields Values
Item SB4751105
Quantity 20
Price 100
UOM Ea
8. Click the Schedules tab.
9. In the Request Delivery Date field, select three days later than the current date.
10. In the Receipt Routing field, select Inspection Required.
11. On the Edit Document (Purchase Order): XXXXX page, click the Submit button.
12. From the Navigator, under Warehouse Operations, select Inventory Management.
13. Click the Tasks panel tab and show tasks for Receipts.
14. Select Receive Expected Shipments.
15. Ensure that Organization 002 is selected in the top-right of the page. If not, click the
Change Organization button and select it.
16. In the Purchase Order field, enter the purchase order you created. Refer to step# 5. Then,
click Search.
17. In the Search Results region, select the record with your purchase order and then, click
the Receive button.
18. In the Quantity field, enter: 20.
19. Click the Create Receipt button.
20. On the Create Receipt page, click the Submit button.
Copyright © 2018, Oracle and/or its affiliates. All rights reserved.
Practices for Lesson 4: Performing Quality Inspections 7
21. A confirmation message that your receipt has been created appears. Note down the receipt
number here: _______________.
22. Click OK to close the confirmation message.
23. In the Navigator, under Warehouse Operations, select Inventory Management.
24. On the Overview page, click the Tasks panel tab, and show tasks for Receipts.
25. Select the Inspect Receipts link.
26. In the Advanced Search region, in the Receipt field, enter the receipt number generated
from Step 20.
27. Click Search.
28. On the Inspect Lines page, select the row for your receipt.
29. Click Inspect.
Enter quality inspection results
30. Select the item record and then, click the Enter Quality Results button.
31. In the Samples region, select the first sample (XXXXX – 1). Then, select or enter values as
follows:
Note: XXXXX is your receipt number.
Field Value
10 Yes
20 669
30 170
32. Notice a green tick appears next to the the first sample for which you entered quality results
above.
33. In the Samples region, select the second sample (XXXXX – 2). Then, select or enter
values as follows:
Note: XXXXX is your receipt number.
Field Value
10 Yes
20 670
30 169
34. Notice 2 under Accepted in the Disposition field. Click Save and Close.
Submit quality inspection results
35. Click Submit and then, click OK to confirm.
Copyright © 2018, Oracle and/or its affiliates. All rights reserved.
8 Practices for Lesson 4: Performing Quality Inspections
36. On the Inspect Receipts page, click Done to return to the Inventory Management
overview page.
Practice Complete:
In this practice, you performed an inline Receiving inspection.
Copyright © 2018, Oracle and/or its affiliates. All rights reserved.
Practices for Lesson 4: Performing Quality Inspections 9
Practice 4-2: Performing an Inline Work-in-Process Inspection
Note to instructor: Demonstrate this practice to the students.
Overview
In inline Work in Process inspection, the quantity being completed in an operation must be
inspected in order for the completion transaction to continue. Each individual unit is accepted or
rejected individually. Rejected units can then be reworked and inspected again or move to scrap
as appropriate.
In this practice, you perform an inline Work-in-Process inspection.
Prerequisites
None
User Login
scmXX.student (Replace XX with your student number)
Summary of Tasks
Create a Work Order
Navigate to the Review Dispatch List page
Enter quality inspection results
Steps
Create a Work Order for Inspection
1. From the Navigator, under Manufacturing, select Work Execution.
2. On the Overview page, in the top right, click Change Organization and select 002.
3. Click the Tasks panel tab and then, select Manage Work Orders.
4. On the Manage Work Orders page, in the Search Results region, click the Create icon
and then, select Create Standard Work Order.
5. In the Create Standard Work Order dialog box, enter or select values as follows:
Field Value
Item AS4751200
Quantity 10
Start Date Default Date
6. Click Save and Edit. Note the WO number here ________________________.
7. Click the Serial Number tab.
8. In the Generate and associate serial numbers field, enter: 2. Then, click Generate.
9. Click Save to save the changes you made to the work order.
10. Click the General Information tab and then, in the Status list, select Released.
Copyright © 2018, Oracle and/or its affiliates. All rights reserved.
10 Practices for Lesson 4: Performing Quality Inspections
11. Click Save and Close.
12. Click Done.
13. Click the Tasks panel tab and then, select Review Dispatch List.
14. On the Review Dispatch List page, in the Search region, click the Work Area list and
then, select Tablets.
15. Enter the work order number (WO-002-XXXX) you noted in Step# 6 in the Work Order field
and then, click Search.
16. Select the work order record and then, click the Expand icon next to it.
17. Select the Complete check box for both the serial numbers.
18. Click the Quick Complete button. A confirmation message that the quantity has been
completed at operation 10 and moved to operation 20 appears on the screen.
Navigate to the Review Dispatch List page
19. From the Navigator, under Manufacturing, select Work Execution.
20. On the Overview page, in the top right, click Change Organization.
21. In the Select Organization dialog box, in the Organization field, enter: 002.
22. Click OK.
23. On the Overview page, click the Tasks panel tab, and then select the Review Dispatch
List link.
24. On the Review Dispatch List page in the top-right, in the Saved Search list, select
Application Default.
25. On the Review Dispatch List page, in the Work Area list, select All.
26. In the Work Center list, select All.
27. Enter the work order number you created previously in the Work Order field.
28. Click Search.
29. In the search results, select the Work Order WO-002-XXXX and Operation 20 line with Item
AS4751200.
30. Click the Expand icon.
Enter quality inspection results
31. Select the Inspect and Complete check box for the two serial numbers.
32. Click Quick Complete.
33. In the AS475-XXXXX: Inspection Results region, in the Results field, enter values as
follows:
Sequence Results
10 260
20 667
34. In the Serials column on the left, select the second serial number.
Copyright © 2018, Oracle and/or its affiliates. All rights reserved.
Practices for Lesson 4: Performing Quality Inspections 11
35. In the Results field, enter values as follows:
Sequence Results
10 260
20 679
36. Click Save and Close.
37. In the Quick Complete WO-002-XXXX dialog box, click the Complete button.
Note: At this point, you can decide if you want the rejected units to be reworked and
inspected again, or move them to scrap as appropriate.
38. On the Review Dispatch List page, select the line with Work Order WO-002-XXXX - 30.
39. Click the Expand icon.
40. Select the Complete check box for Serial Number AS475-XXXXX.
41. Click Quick Complete.
42. On the Review Dispatch List page, click Done.
Practice Complete:
In this practice, you performed a Work-in-Process inspection.
Practices for Lesson 5:
Oracle Transactional
Business Intelligence for
Quality Inspection
Copyright © 2018, Oracle and/or its affiliates. All rights reserved.
2 Practices for Lesson 5: Oracle Transactional Business Intelligence for Quality Inspection
Practices for Lesson 5
Overview
In this practice, you define reports based on quality inspection results as well as related
inspection plan and item information.
Copyright © 2018, Oracle and/or its affiliates. All rights reserved.
Practices for Lesson 5: Oracle Transactional Business Intelligence for Quality Inspection 3
Demonstration 5-1: Building an OTBI Report on Inspection Results
Overview
Inspection results can be exported from OTBI into different formats used by other reporting tools
like for Statistical Control Chart analysis.
In this demonstration, you build an OTBI report on inspection results.
Prerequisites
None
User Login
scm00.instructor
Summary of Tasks:
Navigate to the Reports and Analytics page
Select a subject area
Edit view and layout of report
Enable the Sort and Filter, and apply conditional formatting
Save and review the report
Steps
Navigate to the Reports and Analytics page
1. From the Navigator, under More, select Report and Analytics.
2. On the top-left corner, in the Contents column, click the Create icon.
Select a subject area
3. In the Select Subject Area dialog box, select Quality Inspection Results Real Time.
4. On the Select Columns page, in the Subject Areas column, click the Expand icon next
to the Quality Inspection Results Real Time subject area.
5. Expand up to Inspection Event Details and select Accepted Quantity. Then, click the Add
icon to move it to the Selected Columns region.
6. Next, expand Inspection Event Details and select Rejected Quantity.
7. Click the Add icon to move it to the Selected Columns region.
8. Click Next.
Edit view and layout of report
9. On the Select Views train stop, in the Table list, select Table (recommended).
10. In the Graph list, select Line.
Copyright © 2018, Oracle and/or its affiliates. All rights reserved.
4 Practices for Lesson 5: Oracle Transactional Business Intelligence for Quality Inspection
11. In the Layout list, select Table above Graph.
12. (Optional) Select the Preview check box to preview the layout you selected.
13. Click Next.
14. On the Edit Table train stop, in the Table Layout section, you can select a column and
move it up or down.
15. Click Next.
16. On the Edit Graph train stop, you can customize the layout of the graph by using the Vary
Color By and Group By options.
17. Click Next.
Enable the Sort and Filter, and apply conditional formatting
18. On the Sort and Filter train stop, you can enable the Sort feature to sort analysis results by
columns. In addition, you can enable Filters to narrow down
19. On the Highlight train stop, click Add Column Format to apply conditional formatting. The
list has the following options: Result Quantity and Sample Quantity.
20. Click Next.
Save and review the report
21. In the Save train stop, the Analysis Name field, enter: OTBI_Test01.
22. In the Save In region, click the Expand icon next to My Folders.
23. Click the Expand icon next to the Drafts folder.
24. Click Submit. Click OK.
25. Review the report.
Demonstration Complete:
In this demonstration, you built an OTBI report on inspection results.