orbit al-7103 m & t - print

124
COMMUNICATION WITHOUT BOUNDARIES Orbit Communication Systems Ltd. P.O.B. 42504, Israel, Tel: +(972) 9 892 2777, Fax: +(972) 9 885 5944 www.orbit-cs.com TM AL-7103 MKII 1.15m (45”) Ku-Band/X-Band Antenna Maritime Stabilized VSAT System Maintenance and Troubleshooting Manual Document: MAN31-0046, Revision A

Upload: karl-linder

Post on 02-Oct-2014

1.961 views

Category:

Documents


105 download

TRANSCRIPT

Page 1: Orbit AL-7103 M & T - Print

COMMUNICATION WITHOUT BOUNDARIES Orbit Communication Systems Ltd. P.O.B. 42504, Israel, Tel: +(972) 9 892 2777, Fax: +(972) 9 885 5944 www.orbit-cs.com

TM

AL-7103 MKII 1.15m (45”) Ku-Band/X-Band Antenna

Maritime Stabilized VSAT System

Maintenance and Troubleshooting Manual

Document: MAN31-0046, Revision A

Page 2: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual ii

Copyright

© 2011 Orbit Communication Ltd. All rights reserved.

All product names are trademarks of Orbit Communication Ltd.

Other names are the property of the respective owners.

No part of this publication may be reproduced, transmitted, transcribed, stored in a retrieval system, or translated into any language or computer language, in any form or by any means, electronic or otherwise, without the prior written permission of Orbit Communication Ltd.

Disclaimer of Warranty

Orbit Communication Ltd has made every effort to ensure the accuracy and relevancy of the material in this document. It is expected that all sections of this document will be read thoroughly and that all information and procedures should be fully understood.

However, Orbit Communication Ltd assumes no responsibility for any errors that may appear in this document, and reserves the right to make changes to the document without notice.

Orbit Communication Ltd makes no warranty of any kind in regard to this document, including, but not limited to, the implied warranties of merchantability and fitness for a particular purpose.

Orbit Communication Ltd disclaims any responsibility for incidental or consequential damages in connection with the furnishing, performance or use of this document.

Parts of this document may be based on hardware or software developed by third-party vendors. Orbit Communication Ltd disclaims any responsibility for the accuracy of this document with respect to such hardware and software, and assumes no responsibility for incidental or consequential damages arising due to discrepancies between this document and such hardware or software.

Page 3: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual iii

Certifications

Orbit Communication Technologies Ltd. is an ISO 9001 registered company. Registration License No. 27870, issued May 1st, 2005.

ORBIT AL-7103 Stabilized Marine Satellite Communication System is in conformity with the appropriate standards: ISO 12100-2:2003, EN 60204-1:1997, EN 614-1:1995, IEC 60945:2002, ETSI EN 302340.

The AL-7103 System is granted EUTELSAT Type Approval as standard earth station. Type Approval Certificate Registration Number: EA-A033.

The AL-7103 System is granted INTELSAT Type Approval, as GVF earth station. Type Approval Certificate Registration Number: GVF/IA 200FLT, standards K2 & G.

The AL-7103 System is granted ANATEL Certificate of Homologation No. 2012-08-4778.

Page 4: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual iv

Revision History and Control

Revision History

Rev # Date Comments

Rev: A June 2011 Initial version

List of Effective Pages

Total number of pages in this publication is 119, consisting of the following:

Page No. Content Change No.

i-ii Title Page and Copyright

iii Certifications

iv Revision History and Control

v About this Manual

vii Safety Precautions

ix Table of Contents

xiii List of Figures

1 Overview

2-52 Replacing System Components

71-76 Updating the System Software

78-100 Troubleshooting

107-111 Preventive Maintenance

Page 5: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual v

About this Manual

This manual is designed to guide you through the initialization and operational procedures for the OrSat-G (AL-7103-Ku Mk II) Marine Satellite Communication System, and provide a troubleshooting guide for handling technical problems that may arise. It is recommended that you familiarize yourself with the information and procedures contained in this manual, to facilitate smooth implementation of the system.

Text Conventions Style Indicates Example

Text Normal descriptive text Contents

Text Words or figures that appear on the screen or that should be typed; the name of a file or directory

System Status

<Text> A key to be pressed <ESC>

TEXT The name of a software or hardware component

ANTENNA

The description of a procedure To configure…

Notations

Indicates important information that should be noted

Indicates a potential hazard

Indicates the safest method of installation or operation that must be adhered to.

Page 6: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual vi

Acronyms & Abbreviations

ADE

ADMx

BDE

BDMx

BUC

B/W

CCU

IMU

KB

LNA

LNB

M&C

Mk

MMI

MUX

PSU

RJ

SBC

SDM

SR

Above Deck Equipment

Above Deck MUX

Below Deck Equipment

Below Deck MUX

Block Up Converter

Band Width

Central Control Unit

Inertial Measurement Unit

Keyboard

Low Noise Amplifier

Low Noise Block

Monitor & Control

Mark

Man-Machine Interface

Multiplexer

Power Supply Unit

Rotary Joint

Single Board Controller

Servo Drive Module

Slip Ring

Page 7: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual vii

Safety Precautions

The following general precautions apply to the installation, operation and servicing of the system. Specific warnings appear throughout the manual where they apply, and may not appear in this summary.

♦ Only qualified and trained personnel should perform installation, operation, and maintenance of this equipment.

♦ Before entering the RADOME for maintenance purposes, shut off the main power to the system from the ship’s electrical panel. Upon entry, switch off the ADE POWER BOX.

♦ Take extra care when handling the ADE POWER BOX, SLIP RING, and POWER SUPPLY UNIT – which are all connected to 110/220 VAC – and when handling the SERVO DRIVE MODULES – which are connected to 51 VDC.

♦ The system conducts potentially harmful voltages when connected to the designated power sources. Never remove equipment covers except for maintenance or internal adjustments.

♦ Keep clear of the moving ANTENNA at all times. The POSITIONER is equipped with high-torque motors that generate considerable force.

♦ When units are connected to the chassis’s ground (to prevent shock and similar hazards), the chassis’s ground conductor must not be removed.

♦ Although the RADOME is not heavy, care should be taken when lifting it as it acts as a sail under windy conditions. At least two people should handle the RADOME during installation.

♦ To prevent shock or fire hazard when sub-units are open or cables are disconnected, do not expose the equipment to rain or moisture.

♦ Avoid making unauthorized modifications to the circuitry. Any such changes to the system will void the warranty.

♦ Do not disconnect cables from the equipment while the system is running.

Page 8: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual viii

♦ System interfaces require high-quality connectors and cables.

♦ Use only Orbit-authorized parts for repair.

Radiation Safety

The following figure illustrates the safety distances for an OrSatTM AL-7103 MKII system equipped with 8W BUC.

For systems equipped with a 16W BUC, safety distances should be multiplied by approximately 1.5.

The values illustrated in this diagram are driven by ACGIH and ICNIRP guidelines, for occupational use.

Page 9: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual ix

Table of Contents

1 Overview ......................................................................................................................... 1

2 Replacing System Components ...................................................................................... 2

2.1 Before you begin ...................................................................................................... 2

2.2 List of Tools for LRU Replacement Procedures ........................................................ 3

2.3 Removing/Replacing the Radome ............................................................................ 4

2.4 Replacing the IMU .................................................................................................... 4

2.4.1 Removing the IMU ........................................................................................... 4

2.4.2 Reinstalling the IMU ......................................................................................... 6

2.4.3 Configuring the IMU ......................................................................................... 6

2.4.4 Inspecting the IMU-Slip Ring Cable .................................................................. 7

2.4.5 Rerouting the IMU-Slip Ring Cable ................................................................... 7

2.5 Replacing the SBC ................................................................................................... 9

2.5.1 Preliminary Procedures .................................................................................... 9

2.5.2 Removing the SBC ..........................................................................................10

2.5.3 Reinstalling the SBC .......................................................................................11

2.5.4 Resetting the SBC IP address .........................................................................12

2.5.5 Reconfiguring the System ...............................................................................12

2.6 Replacing the PSU ................................................................................................. 13

2.6.1 Removing the PSU ..........................................................................................13

2.6.2 Reinstalling the PSU .......................................................................................14

2.6.3 Post-Assembly System Verification .................................................................15

2.7 Replacing the GPS Antenna ................................................................................... 16

2.7.1 Removing the GPS Antenna ...........................................................................16

2.7.2 Reinstalling the GPS Antenna .........................................................................17

Page 10: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual x

2.7.3 Post-Installation System Verification ...............................................................17

2.8 Replacing the ADMx............................................................................................... 18

2.8.1 Removing the ADMx .......................................................................................18

2.8.2 Reinstalling the ADMx .....................................................................................20

2.8.3 Post-Installation System Verification ...............................................................21

2.9 Replacing the DC Inserter ...................................................................................... 22

2.9.1 Removing the DC Inserter ...............................................................................22

2.9.2 Reinstalling the DC Inserter.............................................................................23

2.9.3 Post-Installation System Verification ...............................................................24

2.10 Replacing the Splitter ............................................................................................. 25

2.10.1 Removing the Splitter ......................................................................................25

2.10.2 Reinstalling the Splitter ....................................................................................26

2.10.3 Post-Installation System Verification ...............................................................26

2.11 Replacing the X-Axis SDM ..................................................................................... 27

2.11.1 Removing the X-Axis SDM ..............................................................................28

2.11.2 Reinstalling the X-Axis SDM............................................................................30

2.11.3 Axis Alignment Verification ..............................................................................32

2.12 Replacing the Y-Axis SDM ..................................................................................... 38

2.12.1 Removing the Y-Axis SDM ..............................................................................39

2.12.2 Reinstalling the Y-Axis SDM............................................................................41

2.12.3 Axis Alignment Verification ..............................................................................43

2.13 Replacing the Z-Axis SDM ..................................................................................... 44

2.13.1 Removing the Z-Axis SDM ..............................................................................45

2.13.2 Reinstalling the Z-Axis SDM ............................................................................48

2.13.3 Axis Alignment Verification ..............................................................................51

2.14 Replacing RF Package Components ...................................................................... 52

Page 11: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual xi

2.14.1 Replacing the LNB ..........................................................................................52

2.14.2 Replacing the RF Chain ..................................................................................54

2.14.3 Replacing the 4W BUC ...................................................................................56

2.14.4 Replacing the 8W BUC ...................................................................................59

2.14.5 Replacing the 16W BUC .................................................................................63

3 Updating the System Software ...................................................................................... 71

3.1 Updating the CCU MtsLink Application ................................................................... 71

3.2 Updating the SBC VxWorks Application ................................................................. 72

3.3 Updating the IMU Calibration File ........................................................................... 74

3.4 Reconfiguring the SBC ........................................................................................... 76

4 Troubleshooting ............................................................................................................ 78

4.1 Tracking Error Exceeds Limit ................................................................................. 79

4.2 Tracking Instability ................................................................................................. 80

4.3 Pointing to Satellite Issues ..................................................................................... 81

4.4 No Communication Between ADE and BDE ........................................................... 82

4.5 The SBC Does Not Boot ........................................................................................ 83

4.6 Wrong IP Address for SBC ..................................................................................... 84

4.7 Blank CCU Screen ................................................................................................. 85

4.8 The CCU Does Not Boot ........................................................................................ 85

4.9 No GPS Output from the CCU ................................................................................ 86

4.10 No GPS Position Update ........................................................................................ 87

4.11 GPS Communication Failed ................................................................................... 88

4.12 Compass Communication Failed ............................................................................ 89

4.13 Axis Jamming Errors .............................................................................................. 90

4.14 Polarization Axis Jamming Error............................................................................. 92

4.15 Axis Encoder Errors ............................................................................................... 94

Page 12: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual xii

4.16 No Rx Lock ............................................................................................................ 96

4.17 No Tx Lock ............................................................................................................. 97

4.18 Missing System Files .............................................................................................. 99

4.19 ADE / BDE Software Mismatch .............................................................................. 99

4.20 Using the Status Dump Function for Troubleshooting ........................................... 100

4.20.1 Downloading the Status Dump Report .......................................................... 100

4.20.2 Status Dump File Example ............................................................................ 100

5 Preventive Maintenance .............................................................................................. 107

5.1 Introduction .......................................................................................................... 107

5.2 Health Check........................................................................................................ 107

5.2.1 Visual inspection ........................................................................................... 107

5.2.2 System Software ........................................................................................... 107

5.2.3 Mechanical Test ............................................................................................ 108

5.2.4 RF System Performance Test ....................................................................... 111

5.2.5 System Documentation ................................................................................. 111

Page 13: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual xiii

List of Figures Figure 2-1: Correct Routing .................................................................................................... 7

Figure 2-2: Incorrect Routing .................................................................................................. 7

Figure 2-3: Correct IMU-Slip Ring Cable Routing ................................................................... 8

Figure 2-4: CCU-Laptop Connection ...................................................................................... 9

Figure 2-5: Location of Screws on the X-Axis SDM .............................................................. 27

Figure 2-6: Cable Connections on the X-Axis SDM .............................................................. 27

Figure 2-7: Antenna after Enc Init Sequence ........................................................................ 33

Figure 2-8: Manual Axis Control ........................................................................................... 33

Figure 2-9: X-Axis Reference Points ..................................................................................... 34

Figure 2-10: X-Axis Alignment .............................................................................................. 34

Figure 2-11: Y-Axis Reference Points ................................................................................... 35

Figure 2-12: Y-Axis Alignment .............................................................................................. 35

Figure 2-13: Z-Axis Reference Points ................................................................................... 36

Figure 2-14: Pedestal X Window .......................................................................................... 36

Figure 2-15: Axes Parameters Dialog Box ............................................................................ 37

Figure 2-16: Location of Screws on the Y-Axis SDM ............................................................ 38

Figure 2-17: Cable Connections on the Y-Axis SDM ............................................................ 38

Figure 2-18: Location of Screws on the Z-Axis SDM ............................................................ 44

Figure 2-19: Cable Connections on the Z-Axis SDM ............................................................ 44

Figure 3-1: MtsDock ThisHost Menu .................................................................................... 71

Figure 3-2: Host Communication Dialog Box ........................................................................ 72

Figure 3-3: Connect to ACU Dialog Box ............................................................................... 73

Figure 3-4: Connect ACU Message Box ............................................................................... 73

Figure 3-5: Put Executable Command .................................................................................. 74

Figure 3-6: Connect to ACU Dialog Box ............................................................................... 75

Figure 3-7: Get IMU Calibration Command ........................................................................... 75

Figure 3-8: Connect to ACU Dialog Box ............................................................................... 76

Figure 3-9: Get Configuration Command .............................................................................. 77

Figure 4-1: Select Status Dump File Dialog Box ................................................................. 100

Figure 5-1: Pedestal-X Dialog Box ..................................................................................... 108

Figure 5-2: Azimuth Trajectory results ................................................................................ 109

Page 14: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 1

1 Overview

This manual contains instructions for post-installation maintenance of the OrSatTM AL-7103 MKII Maritime Stabilized VSAT System. It includes the following chapters:

• Replacing System Components – illustrated instructions for removing and reinstalling the Line Replaceable Units (LRUs) that comprise the OrSatTM AL-7103 MKII system

• Updating the System Software – procedures for updating the CCU and SBC operating software, IMU calibration file and SBC configuration file

• Troubleshooting – a series of flowcharts illustrating the chain of operations to perform when solving a variety of common problems encountered during system operation

• Preventive Maintenance – a program of procedures to be performed at regular intervals in order to ensure that the OrSatTM AL-7103 MKII system continues to function smoothly with maximum performance over time

Page 15: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 2

2 Replacing System Components

This section contains illustrated instructions for replacing the various Line Replaceable Units (LRUs) comprising the OrSatTM AL-7103 system.

2.1 Before you begin

• Perform System Shut-Down (via the CCU). • Open the RADOME hatch. • POWER DOWN THE ANTENNA. • Manually rotate the PEDESTAL AXES to gain convenient access to the serviced unit. • If access to the serviced unit is limited or restricted, remove the RADOME.

• In the following procedures, be very careful when tightening and loosening the screws with which the parts are assembled and attached to the system. Some of these screws are delicate and can be damaged by excess force. When using an Allen key, make sure to insert the key all the way into the screw head, to avoid stripping, and do not exceed the torque specified for each type of screw.

• Apply Loctite Threadlocker when inserting screws during the replacement process: Blue #241 for screws below 5mm in width, Red #270 for screws over 5mm.

• In order to loosen the screws when removing a part (with the exception of RF and SDM components), you may need to heat the screw with a blower in order to melt the Loctite.

WARNING!

The Utility Outlet is connected directly to the vessel’s AC voltage input terminals (125 VAC / 250 VAC). Therefore, there still exists live voltage at the Utility Outlet after disconnecting the power supply to the ADE using the Mains Power On/Off Switch.

Only qualified and authorized personnel are allowed to carry out system service/maintenance procedures.

Page 16: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 3

2.2 List of Tools for LRU Replacement Procedures

LRU Replacement Procedures Required Tools

Replacing the IMU 3/16” Allen key

Replacing the SBC 5/32” Allen key

8mm + 11mm Open wrench

Replacing the PSU 5/32” Allen key

Tie-wraps

Tie Cutter

Replacing the GPS Antenna 8mm open wrench

Tie Cutter

Tie-wraps

Replacing the ADMx 3mm Allen key

5/32” Allen key

8mm + 11mm Open wrench

Replacing the DC Inserter 5/32” Allen key

Phillips screwdriver

Replacing the Splitter

7/64” Allen key

11mm Open wrench

Phillips screwdriver

Loctite 241

Replacing the X-Axis SDM Replacing the Y-Axis SDM and Replacing the Z-

Axis SDMs

3/16” Allen key

5/32” Allen key

3/16” open wrench

Torque Meter

Tie-wraps

Pliers & Tie Cutter

Replacing the LNB 8mm + 11mm Open wrench

3mm Allen key

Replacing the 8mm + 11mm Open wrench

3mm Allen key

Page 17: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 4

Replacing the 4W BUC

6mm open wrench

7/16” open wrench

3/16” Allen key

Tie-wraps

Tie Cutter

Replacing the 8W BUC

13mm open wrench

3mm Allen key

Tie-wraps

Tie Cutter

Replacing the 16W BUC

8mm + 13 mm open wrench

6 mm Allen key

Tie-wraps

Tie Cutter

2.3 Removing/Replacing the Radome

See the OrSatTM AL-7103 Installation and Operation Manual.

2.4 Replacing the IMU

2.4.1 Removing the IMU

Step 1

Disconnect the IMU cable from the IMU connector.

Page 18: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 5

Step 2

Remove the four screws securing the IMU to the RADOME BASE, using a 3/16” Allen key.

Attention: In order to access the left-hand back screw, you will need to rotate the Z Axis.

Step 3

Remove the IMU from the RADOME BASE.

Page 19: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 6

2.4.2 Reinstalling the IMU

Step 1

Mount the new IMU in its place on the ADE.BASE.

Apply Loctite 270 to the four screws, and tighten them using a 3/16” Allen key with 11N/M torque.

Attention: In order to access the left-hand back screw hole, you will need to rotate the Z Axis.

Step 2

Connect the IMU cable to the IMU connector.

2.4.3 Configuring the IMU

After replacing the IMU, it is necessary to update the IMU calibration file, in accordance with the specific IMU installed on the system. See Updating the IMU Calibration File on page 74 for instructions.

Page 20: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 7

2.4.4 Inspecting the IMU-Slip Ring Cable

1. Power off both the ADE and BDE and disconnect them from their power source.

2. Activate Stow and Shutdown modes (see the AL-7103 MKII Installation and Operation Manual for instructions).

3. Remove the RADOME.

4. Inspect the routing of the IMU cable. Verify that the cable is not routed along the side of the ADE BASE.

Figure 2-1: Correct Routing

Figure 2-2: Incorrect Routing

5. Incorrect routing between the IMU and the ADE BASE can result in damage to the cable, due to system vibrations. To correct the cable routing, perform the following procedure.

2.4.5 Rerouting the IMU-Slip Ring Cable

1. Disconnect the cable from the IMU.

2. Cut all the tie-wraps securing the cable to the ADE BASE.

3. Inspect the cable for any damage. Repair the cable or replace the SLIP RING, as needed.

4. Route the cable properly, as depicted in the following figures. Use tie-wraps where applicable.

Page 21: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 8

Figure 2-3: Correct IMU-Slip Ring Cable Routing

5. Connect the cable to the IMU connector.

6. Power up the system and activate Test Traj Mode for five minutes. Verify that the cable is not squeezed or pinched at any point in the system’s movement.

Page 22: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 9

2.5 Replacing the SBC

2.5.1 Preliminary Procedures

1. Connect a laptop computer running the MTSDOCK application to the CCU’s BDMx LAN connector (using a cross-over cable).

Figure 2-4: CCU-Laptop Connection

2. Open MTSDOCK and download the SBC configuration file (see Reconfiguring the SBC [Steps 1-5] on page 76 for instructions).

3. Download the IMU calibration file (see Updating the IMU Calibration File [Steps 1-4] on page 74 for instructions).

4. Shut down the system and power off.

Page 23: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 10

2.5.2 Removing the SBC

Step 1

Cut the tie-wraps securing the SBC harnesses.

Step 2

Disconnect all cables from the SBC connector panel using an 8mm Open wrench.

Step 3

Loosen the four screws securing the SBC to the BASE PLATE, using a 5/32” Allen key.

Note: The screws remain attached to the SBC (captives).

Step 4

Remove the SBC.

Page 24: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 11

2.5.3 Reinstalling the SBC

Step 1

Mount the new SBC in its place on the ADE BASE.

Step 2

Tighten the four screws securing the SBC to the BASE PLATE, using a 5/32” Allen key.

Step 3

Connect the cables to the SBC connector panel.

Page 25: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 12

Step 4

Bind the SBC harnesses with tie-wraps.

2.5.4 Resetting the SBC IP address

The original SBC is factory configured to the IP address 192.9.200.10. To set a different address for the new SBC, perform the following procedure:

1. Connect a laptop computer running the MTSDOCK application to the CCU’s BDMx LAN connector (using a cross-over cable).

2. Open MTSDOCK and select Edit Network Parameters > Connected ACU from the ACU menu. The Connected ACU dialog box appears.

3. Enter the new IP address and click OK (Enter).

4. Reboot the system.

2.5.5 Reconfiguring the System

1. Open MTSDOCK and upload the SBC configuration file (see Reconfiguring the SBC [Steps 6-7] on page 77 for instructions).

2. Upload the IMU calibration file (see Updating the IMU Calibration File [Steps 5-6] on page 76 for instructions).

Page 26: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 13

2.6 Replacing the PSU

2.6.1 Removing the PSU

Step 1

Remove the GPS ANTENNA from the PSU.

Step 2

Disconnect the cables from the PSU connectors.

Page 27: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 14

Step 3

Loosen the three screws securing the PSU to the BASE PLATE, using a 5/32” Allen key.

Note: The screws remain attached to the PSU (Captives).

Step 4

Remove the PSU.

2.6.2 Reinstalling the PSU

Step 1

Mount the new PSU in its place on the ADE BASE.

Page 28: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 15

Step 2

Tighten the three screws securing the PSU to the ADE BASE, using a 5/32” Allen key.

Step 3

Connect the cables to the PSU connectors.

Step 4

Mount the GPS ANTENNA in its place on the PSU and secure it with a tie-wrap.

2.6.3 Post-Assembly System Verification

After replacing the PSU, power up the system and activate Enc Init Mode several seconds after startup (see the AL-7103 MKII Installation and Operation Manual for instructions). Verify that the system functions properly.

Page 29: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 16

2.7 Replacing the GPS Antenna

2.7.1 Removing the GPS Antenna

Step 1

Cut the tie-wraps securing the SBC harnesses.

Step 2

Disconnect the GPS ANTENNA cable from the SBC connector, using an 8mm Open wrench.

Step 3

Remove the GPS ANTENNA.

GPS Antenna Cable

GPS Antenna

Page 30: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 17

2.7.2 Reinstalling the GPS Antenna

Step 1

Put the new GPS ANTENNA in its place on the PSU.

Step 2

Connect the GPS ANTENNA cable to the SBC connector, using an 8mm Open wrench.

Step 3

Bind the SBC harnesses with tie-wraps.

2.7.3 Post-Installation System Verification After replacing the GPS ANTENNA, power up the system and open MTSLINK. Open the Maintenance Screen and verify that the system functions properly and satellites are available.

GPS Antenna Cable

Page 31: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 18

2.8 Replacing the ADMx

2.8.1 Removing the ADMx

Step 1

Remove the cables from the ADMX connectors, using a 7/16” or 8mm open wrench.

Attention: If the RF cable includes a 22KHz filter, you need to remove it separately and use it when installing the new ADMX.

Step 2

Cut the tie-wraps securing the cables to the ADMX mounting plate.

Page 32: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 19

Step 3

Remove the four screws securing the ADMX mounting plate to the assembly, using a 5/32” Allen key.

Step 4

Remove the four screws securing the ADMX to its mounting plate, using a 3mm Allen key.

Page 33: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 20

2.8.2 Reinstalling the ADMx

Step 1

Use a 3mm Allen key to secure the new ADMX to the mounting plate.

Step 2

Use a 5/32” Allen key to secure the ADMX mounting plate to the assembly,

Step 3

Replace the cable harness on the ADMX mounting plate and secure it with tie-wraps.

Page 34: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 21

Step 4

Connect the cables to the ADMX connectors, using a 7/16” or 8mm open wrench.

Attention: If the RF cable includes a 22KHz filter, replace the filter before connecting the cable.

2.8.3 Post-Installation System Verification

After replacing the ADMX, power up the system and verify that the CCU functions properly and that there is communication between the CCU and the SBC.

Page 35: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 22

2.9 Replacing the DC Inserter

2.9.1 Removing the DC Inserter

Step 1

Disconnect the cables from the DC INSERTER connectors.

Step 2

Remove the two screws securing the DC INSERTER mount to the assembly, using a 5/32” Allen key.

Step 3

Use a Phillips screwdriver to remove the four screws holding the DC INSERTER to its mounting plate.

Page 36: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 23

2.9.2 Reinstalling the DC Inserter

Step 1

Use a Phillips screwdriver to secure the new DC INSERTER to its mounting plate.

Step 2

Use a 5/32” Allen key to secure the DC INSERTER mounting plate to the assembly.

Step 3

Connect the cables to the DC INSERTER connectors.

Page 37: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 24

2.9.3 Post-Installation System Verification

After replacing the DC INSERTER, power up the system and verify that the BUC functions properly:

• For a BUC with M&C, open the MAINTENANCE SCREEN and check the BUC status. • For a BUC without M&C, verify that the LED on the BUC is lit and that the modem

transmits.

Page 38: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 25

2.10 Replacing the Splitter

2.10.1 Removing the Splitter

Step 1

Disconnect the cables from the SPLITTER connectors, using a 7/16” or 11mm open wrench.

Step 2

Remove the two screws securing the SPLITTER to the assembly, using a 7/64” Allen key.

Step 3

Remove the SPLITTER.

Page 39: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 26

2.10.2 Reinstalling the Splitter

Step 1

Apply Loctite 241 to the two screws, and secure the SPLITTER to the assembly using a 7/64” Allen key.

Step 2

Connect the cables to the SPLITTER connectors, using a 7/16” or 11mm open wrench.

2.10.3 Post-Installation System Verification

After replacing the SPLITTER, power up the system and verify that the modem’s AGC and EB/N0 have not changed and are exactly as defined in the link budget.

Page 40: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 27

2.11 Replacing the X-Axis SDM

Figure 2-5: Location of Screws on the X-Axis SDM

Figure 2-6: Cable Connections on the X-Axis SDM

Page 41: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 28

2.11.1 Removing the X-Axis SDM

Step 1

Cut the tie-wraps binding the cables connected to the SDM.

Step 2

Disconnect the SDM cables using a 3/16” open wrench.

Page 42: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 29

Step 3

Remove the six screws securing the SDM to the assembly, using a 3/16” Allen key.

Step 4

Remove the X-Axis SDM.

Page 43: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 30

2.11.2 Reinstalling the X-Axis SDM

Step 1

Mount the new SDM in its place and secure it to the assembly.

Tighten the six screws using a 3/16” Allen key with 11N/M torque.

Page 44: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 31

Step 2

Connect the SDM cables using a 3/16” open wrench.

Step 3

Bind the SDM cables with tie-wraps.

Page 45: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 32

2.11.3 Axis Alignment Verification

After replacing the SDM, perform the following procedure to verify that the physical zero is properly aligned.

1. Power up the system and activate Enc Init Mode several seconds after startup (see the AL-7103 MKII Installation and Operation Manual for instructions). When the sequence is complete the antenna should be positioned as displayed in the following image.

Page 46: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 33

Figure 2-7: Antenna after Enc Init Sequence

2. Enter the MTSLINK Maintenance Screen and move each axis manually until its position corresponds to that displayed in the relevant image:

Figure 2-8: Manual Axis Control

Page 47: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 34

X-Axis Alignment

Figure 2-9: X-Axis Reference Points

Figure 2-10: X-Axis Alignment

Page 48: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 35

Y-Axis Alignment

Figure 2-11: Y-Axis Reference Points

Figure 2-12: Y-Axis Alignment

Page 49: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 36

Z-Axis Alignment

Figure 2-13: Z-Axis Reference Points

The distance between points A and B to the BASE PLATE should be equal.

3. Note the value of each axis movement. In the below figure, the X AXIS has been moved 1.5° in order to reach the correct physical alignment.

Figure 2-14: Pedestal X Window

Page 50: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 37

4. Enter the MTSLINK Operation Screen and click Axes Parameters on the InConfig menu. The Axes Parameters dialog box appears.

Figure 2-15: Axes Parameters Dialog Box

5. Add the value recorded for each axis to the Encoder Offsets values, using the opposite sign. For example, the current Pedestal-X value is 0.000. For a movement of 1.5°, add -1.5 to the value, for a new value of -1.5.

Page 51: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 38

2.12 Replacing the Y-Axis SDM

Figure 2-16: Location of Screws on the Y-Axis SDM

Figure 2-17: Cable Connections on the Y-Axis SDM

Page 52: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 39

2.12.1 Removing the Y-Axis SDM

Step 1

Disconnect the SDM cables using a 3/16” open wrench.

Page 53: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 40

Step 2

Remove the six screws securing the SDM to the assembly using a 3/16” Allen key, and remove the SDM from the assembly.

Step 3

Page 54: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 41

Remove the Y-Axis SDM.

2.12.2 Reinstalling the Y-Axis SDM

Step 1

Put the new SDM in its place and secure it to the assembly.

Tighten the six screws using a 3/16” Allen key with 11N/M torque.

Page 55: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 42

Step 2

Connect the SDM cables using a 3/16” open wrench.

Page 56: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 43

2.12.3 Axis Alignment Verification

After replacing the SDM, perform the axis alignment procedure on page 32 to verify that the physical zero is properly aligned.

Page 57: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 44

2.13 Replacing the Z-Axis SDM

Figure 2-18: Location of Screws on the Z-Axis SDM

Figure 2-19: Cable Connections on the Z-Axis SDM

Page 58: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 45

2.13.1 Removing the Z-Axis SDM

Step 1

Cut the tie-wraps binding the cables connected to the SDM.

Page 59: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 46

Step 2

Disconnect the power cable and the three cables that pass though the SLIP-RING (ADMX, SBC, and PSU).

Attention: Be very careful not to bend the RF cable. A bent cable could damage the SLIP-RING when the system is functional.

Step 3

Remove the KEY CARRIER from the Z-AXIS SDM, using a 3/16” Allen key.

Page 60: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 47

Step 4

Use a 5/32” Allen key to remove the two screws holding the T-shaped bar to the KEY CARRIER and pull out the cables.

Step 5

Remove the six screws securing the SDM to the assembly using a 3/16” Allen key.

Attention: Be careful not to damage the cables.

Page 61: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 48

Step 6

Remove the Z-Axis SDM.

2.13.2 Reinstalling the Z-Axis SDM

Step 1

Put the new SDM in its place and secure it to the assembly.

Tighten the six screws using a 3/16” Allen key with 11N/M torque.

Page 62: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 49

Step 2

Thread the cables through the KEY CARRIER and secure the T-shaped bar. Apply Loctite 270 to the two screws and tighten them using a 5/32” Allen key with 4N/M torque.

Attention: The blue LMR cable should run to the right of the T-shaped bar, and the IMU and power cables to the left.

Page 63: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 50

Step 3

Secure the KEY CARRIER to the SDM, using a 3/16” Allen key with 11N/M torque.

Step 4

Connect the power cable and the three cables that pass though the SLIP-RING (ADMX, SBC, and PSU).

Attention: Be very careful not to bend the RF cable. A bent cable could damage the SLIP-RING when the system is functional.

Page 64: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 51

Step 5

Bind the SDM cables with tie-wraps.

2.13.3 Axis Alignment Verification

After replacing the SDM, perform the axis alignment procedure on page 32 to verify that the physical zero is properly aligned.

Page 65: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 52

2.14 Replacing RF Package Components

When performing the following procedures, be careful not to bend or damage the highly sensitive RF cables.

2.14.1 Replacing the LNB

To remove the LNB:

Step 1

Disconnect the cable from the LNB connector, using a 7/16” or 7mm open wrench.

Step 2

Remove the four screws securing the LNB to the RF ASSEMBLY, using a 3mm Allen key.

Step 3

Remove the LNB.

Page 66: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 53

To reinstall the LNB:

Step 1

Use a 3mm Allen key to secure the LNB to the RF ASSEMBLY.

Attention: Make sure to replace the rubber O-Ring that seals the LNB to the WAVEGUIDE.

Step 2

Connect the cable to the LNB connector, using a 7/16” or 7mm open wrench.

Post-Installation System Verification

After replacing the LNB, power up the system and drive the BUC to 1dB compression (see the AL-7103 MKII Installation and Operation Manual for instructions). Verify that the EB/N0 is exactly as defined in the link budget.

Page 67: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 54

2.14.2 Replacing the RF Chain

To remove the RF Chain:

Step 1

Disconnect the cable from the RF CHAIN connector, using a 5/16” open wrench.

Step 2

Remove the four screws securing the RF CHAIN to the RF ASSEMBLY, using a 3mm Allen key.

Step 3

Remove the RF CHAIN. Note: If the LNB is functioning, remove the LNB and replace it on the new RF Chain (see Replacing the LNB above).

Page 68: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 55

To reinstall the RF Chain:

Step 1

Use a 3mm Allen key to secure the new RF CHAIN to the RF ASSEMBLY.

Attention: If necessary, replace the LNB on the new RF CHAIN. Make sure to replace the rubber O-Ring that seals the RF CHAIN to the RF ASSEMBLY.

Step 2

Connect the cable to the RF CHAIN connector, using a 5/16” open wrench.

Step 3

Reconnect the cable from the RF CHAIN to the LNB.

Post-Installation System Verification

After replacing the RF CHAIN, power up the system and drive the BUC to 1dB compression (see the AL-7103 MKII Installation and Operation Manual for instructions). Verify that the EB/N0 is exactly as defined in the link budget.

Page 69: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 56

2.14.3 Replacing the 4W BUC

To remove the BUC:

Step 1

Disconnect the cables from the BUC connectors.

Step 2

Remove the four screws securing the BUC WAVEGUIDE, using a 6mm open wrench for the SMA connector.

Page 70: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 57

Step 3

Loosen the nuts securing the four screws on the mounted brackets using a 7/16” open wrench.

Remove the screws using a 3/16” Allen key.

Step 4

Remove the BUC.

To reinstall the BUC:

Step 1

Mount the new BUC in its place and secure it to the mounted brackets using a 3/16” Allen key and a 7/16” open wrench.

Page 71: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 58

Step 2

Replace the BUC WAVEGUIDE, and secure its four screws, using a 6mm open wrench for the SMA connector.

Attention: Make sure to replace the rubber O-Ring that seals the WAVEGUIDE to the BUC.

Step 3

Connect the cables to the BUC connectors.

Post-Installation System Verification

After replacing the BUC, power up the system and drive the BUC to 1dB compression (see the AL-7103 MKII Installation and Operation Manual for instructions). Verify that the EB/N0 is exactly as defined in the link budget.

Page 72: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 59

2.14.4 Replacing the 8W BUC

To remove the BUC:

Step 1

Disconnect the cables from the BUC connectors.

Step 2

Remove the two screws securing the BUC to the RF ASSEMBLY, using a 13mm open wrench and 3mm Allen key.

Page 73: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 60

Step 3

Remove the 4 screws securing the BUC WAVEGUIDE, using a 3mm Allen key.

Step 4

Loosen the securing screws using a 13mm open wrench.

Step 5

Remove the BUC.

Page 74: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 61

To reinstall the BUC:

Step 1

Mount the new BUC in its place and use a 13mm open wrench to tighten the securing screws.

Step 2

Use a 3mm Allen key to secure the BUC WAVEGUIDE.

Attention: Make sure to replace the rubber O-Ring that seals the WAVEGUIDE to the BUC.

Step 3

Use a 13mm open wrench and 3mm Allen key to secure the BUC to the RF ASSEMBLY.

Page 75: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 62

Step 4

Connect the cables to the BUC connectors.

Post-Installation System Verification

After replacing the BUC, power up the system and drive the BUC to 1dB compression (see the AL-7103 MKII Installation and Operation Manual for instructions). Verify that the EB/N0 is exactly as defined in the link budget.

Page 76: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 63

2.14.5 Replacing the 16W BUC

To remove the BUC:

Step 1

Cut the tie-wraps binding the cables and remove them from the DISH ASSEMBLY.

Page 77: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 64

Step 2

Disconnect the cables from the BUC connectors.

Page 78: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 65

Step 3

Release the inner and outer nuts and remove the screws and washers.

Attach the nuts and washers to their screws and save them for the reinstallation procedure.

Page 79: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 66

Step 4

Remove the BUC from the RF ASSEMBLY.

To reinstall the BUC:

Step 1

Connect the Waveguide-to-SMA adapter to the BUC with M4 fasteners and an EMI O-Ring.

Use a 3mm Allen key and a 7mm open wrench.

Page 80: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 67

Step 2

Use a 2.5mm Allen key to remove the screws holding the safety caps in place. Remove the caps and replace the screws.

Page 81: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 68

Step 3

Use a 6mm Allen key and a 13mm open wrench to loosely attach the BUC to the DISH ASSEMBLY with M8 fasteners.

Attention: Make sure the spring washers and flat washers are correctly positioned.

Page 82: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 69

Step 4

Tighten the nuts and screws.

Attention: The distance between the BUC and the DISH ASSEMBLY should not exceed 3mm.

Step 5

Connect the cables to the BUC connectors.

Use an SMA torque wrench for the SMA connectors.

Page 83: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 70

Step 6

Bind the cables to the DISH ASSEMBLY with tie-wraps.

Post-Installation System Verification

After replacing the BUC, power up the system and drive the BUC to 1dB compression (see the AL-7103 MKII Installation and Operation Manual for instructions). Verify that the EB/N0 is exactly as defined in the link budget.

Page 84: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 71

3 Updating the System Software

This chapter describes the following procedures:

• Updating the CCU MtsLink Application • Updating the SBC VxWorks Application • Updating the IMU Calibration File • Reconfiguring the SBC

3.1 Updating the CCU MtsLink Application

1. Request the updated MTSLINK executable file (MtsLinkCE.zip) from Orbit. In order to receive the correct file, you need to provide the CPU Kind used by your CCU. To determine the CPU Kind, reboot the CCU and press the Break button on your keyboard while the CCU is booting. The CPU Kind is displayed on the screen.

2. Transfer the zipped executable file to a USB memory stick.

3. Connect the memory stick to the USB port in the CCU front panel.

4. Minimize the MTSLINK window and activate the MTSDOCK program.

5. Open the This Host menu on the MtsDock Menu Bar and select Put MtsLink.

Figure 3-1: MtsDock ThisHost Menu

Page 85: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 72

6. Load the new MTSLINK file from the memory stick.

7. When the file is fully loaded, reboot the CCU, either by activating the Reboot command from the ThisHost menu, or by powering off.

3.2 Updating the SBC VxWorks Application

1. Request the updated VXWORKS executable file (VxWorks.zip) from Orbit. In order to receive the correct file, you need to provide the CPU Kind used by your SBC.

Follow steps 4-9 below and read the CPU Kind from the Connect ACU message box.

2. When you receive the zipped executable file, transfer it to a USB memory stick.

3. Connect the memory stick to the USB port in the CCU front panel.

4. In the MtsLink window, open the Host menu and select Communication. The Host Communication dialog box opens.

Figure 3-2: Host Communication Dialog Box

5. Click the TCP/IP tab. The SBC IP address appears in the Remote Address field. Make a note of the address.

6. Minimize the MtsLink window and activate the MTSDOCK program.

Page 86: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 73

7. Open the ACU menu on the MtsDock Menu Bar and select Connect. The Connect to ACU dialog box appears.

Figure 3-3: Connect to ACU Dialog Box

8. Verify that the IP address in the Network Address field matches the IP address that you noted from the MTSLINK application. If necessary, correct the address accordingly.

9. Click OK (Enter). When the connection is established between the CCU and the SBC, a message box appears confirming the connection, and displaying the CPU Kind.

Figure 3-4: Connect ACU Message Box

10. Open the ACU menu and select Put Executable.

Page 87: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 74

Figure 3-5: Put Executable Command

11. Load the new VXWORKS file from the memory stick.

12. When the file is fully loaded, reboot the SBC by selecting Reboot from the ACU menu.

13. When communication is reestablished between the SBC and the CCU, close the MTSDOCK application, and maximize MTSLINK.

14. Click the Version command on the MtsLink Menu Bar and verify that the new version was successfully installed and matches the software version used by the CCU.

If the CCU software version does not match the new SBC version, see Updating the CCU MtsLink Application on page 71.

3.3 Updating the IMU Calibration File

After replacing the IMU, it is necessary to update the IMU calibration file, in accordance with the specific IMU installed on the system.

If you are replacing the SBC, you can download the IMU calibration file from the SBC, prior to its removal, and then upload it to the new SBC.

Page 88: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 75

To update the IMU calibration file:

1. Activate the MTSDOCK application.

2. Open the ACU menu and select Connect. The Connect to ACU dialog box appears.

Figure 3-6: Connect to ACU Dialog Box

3. Verify that the correct SBC IP address appears in the Network Address field and click OK (Enter). When the connection is established between the CCU and the SBC, a message box appears confirming the connection.

4. Do one of the following:

♦ If you are replacing the SBC, open the ACU menu, select Calibration, then Get IMU Calibration and save the IMU calibration file. Replace the SBC (see Replacing the SBC on page 9).

Figure 3-7: Get IMU Calibration Command

Page 89: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 76

♦ If you are replacing the IMU, insert the Orbit memory stick with the calibration file into the front panel of the CCU.

5. Open the ACU menu and select Calibration, then Put IMU Calibration.

6. Reboot the SBC by selecting Reboot from the ACU menu.

3.4 Reconfiguring the SBC

When you replace the SBC, you need to configure it with the parameters previously defined in the system (e.g. compass offsets, blockage zones). In certain cases, when the system was not properly configured, it is advisable to load a new file and reconfigure the system.

To reconfigure the SBC:

1. Do one of the following:

♦ If you wish to keep the existing system configuration, perform the following steps to download the configuration file from the current SBC before removal.

♦ If you wish to load a new configuration file, replace the SBC and proceed to Step 6 (see Replacing the SBC on page 9).

2. Activate the MTSDOCK application.

3. Open the ACU menu and select Connect. The Connect to ACU dialog box appears.

Figure 3-8: Connect to ACU Dialog Box

4. Verify that the correct SBC IP address appears in the Network Address field and click OK (Enter). When the connection is established between the CCU and the SBC, a message box appears confirming the connection.

5. Open the ACU menu and select Get Configuration and save the configuration file.

Page 90: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 77

Figure 3-9: Get Configuration Command

Replace the SBC (see Replacing the SBC on page 9).

6. Open the ACU menu and select Put Configuration.

7. Reboot the SBC by selecting Reboot from the ACU menu.

Page 91: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 78

4 Troubleshooting

The following chapter contains flow charts illustrating the chain of operations to perform when solving a variety of common problems encountered during system operation. The following troubleshooting procedures are described: • Tracking Error Exceeds Limit • Tracking Instability • Pointing to Satellite Issues • No Communication Between ADE and BDE • The SBC Does Not Boot • Wrong IP Address for SBC • Blank CCU Screen • The CCU Does Not Boot • No GPS Output from the CCU • No GPS Position Update • GPS Communication Failed • Compass Communication Failed • Axis Jamming Errors • Polarization Axis Jamming Error • Axis Encoder Errors • No Rx Lock • No Tx Lock • Missing System Files • ADE / BDE Software Mismatch

An additional section describes the System Status Dump command, which generates an ASCII file containing the system parameters defined during the commissioning process as well as system status indications.

Footnotes provide the MTSLINK path to commands required during the various troubleshooting procedures.

Page 92: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 79

4.1 Tracking Error Exceeds Limit

* InConfig > Step-Track > Ku-Band ** InConfig > Receiver ** InConfig > Compass NMEA

Page 93: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 80

4.2 Tracking Instability

* InConfig > Step-Track > Ku-Band ** InConfig > Receiver ** InConfig > Compass NMEA

Page 94: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 81

4.3 Pointing to Satellite Issues

** InConfig > Compass NMEA

Page 95: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 82

4.4 No Communication Between ADE and BDE

* Host > Communication

Page 96: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 83

4.5 The SBC Does Not Boot

Page 97: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 84

4.6 Wrong IP Address for SBC

Page 98: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 85

4.7 Blank CCU Screen

* As a temporary measure, connect an external monitor to the VGA port

4.8 The CCU Does Not Boot

Page 99: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 86

4.9 No GPS Output from the CCU

* Host > Hardware Interface ** InConfig > External Hardware IP

Page 100: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 87

4.10 No GPS Position Update

* Commands > Clear GPS

Page 101: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 88

4.11 GPS Communication Failed

* InConfig > COM Ports > Configuration

Page 102: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 89

4.12 Compass Communication Failed

* Host > Hardware Interface ** InConfig > External Hardware IP

Page 103: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 90

4.13 Axis Jamming Errors

Continued on next page

* InConfig > Axes Parameters

Page 104: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 91

Page 105: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 92

4.14 Polarization Axis Jamming Error

Continued on next page

Page 106: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 93

Page 107: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 94

4.15 Axis Encoder Errors

Continued on next page

* InConfig > Axes Parameters

Page 108: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 95

Page 109: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 96

4.16 No Rx Lock

* InConfig > Receiver ** If the tracking and download frequencies are not the same, skip to the next step (modem settings).

Page 110: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 97

4.17 No Tx Lock

Continued on next page

Page 111: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 98

* Maintenance Screen > BUC Status window

** Maintenance Screen > Tx Chain window

*** 4W BUC – 36dBm; 8W BUC – 39dBm; 16W BUC – 42dBm

Page 112: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 99

4.18 Missing System Files

4.19 ADE / BDE Software Mismatch

Page 113: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 100

4.20 Using the Status Dump Function for Troubleshooting

The Status Dump command generates the Status Dump Report an ASCII file containing the system parameters defined during the commissioning process and well as system status indications. These parameters and indications can be used to analyze system performance and determine the possible source of system faults.

4.20.1 Downloading the Status Dump Report

From the Operation Screen, open the Host menu and select Status Dump. A browser window opens, in which you can indicate where to save the file using the Save As command. You can save the report to the CCU desktop or directly to a disk-on-key.

Figure 4-1: Select Status Dump File Dialog Box

4.20.2 Status Dump File Example

The following is an example of a typical Status Dump Report.

Page 114: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 101

Orbit Marine Status Dump Report at 07-Apr-2011 08:46:33

********************************************************************

Controller's Information

************************

CPU Kind: SOM4055

VxWorks Software Version: 4.6 6.08.2009

Work Time: 1 days 6 hours

SBC IP address: 203.88.94.2

SBC Subnet Mask: 255.255.255.240

SBC Default Gateway: 203.88.94.1

External Hardware Host IP Address: 203.88.94.1;203.88.94.3

System ID: AL-7103

Hardware ID

***********

---TYPE----

Receiver: 29_0001

I/O: 29-0001

IMU: SLDSTATE

BUC: 8W Ku KoSpace M&C

---EPLD Version---

Receiver: DE12

I/0: DE12

I/0: DE12

---Serial Number---

SBC: 1067

BUC: 0068

---Calibration Files ID---

imusave: 1301

nbrsave: 4209093

nbralcsv: 4209093

bucltab: REV D

Page 115: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 102

System Status

*************

Operating Mode: StepTrack

IMU status: Locked

IRD: Locked

PolSw: 90 deg

Polariz: A:VL-RC

Ship Coordinates

****************

Latitude: 35.052 deg

Longitude: 129.001 deg

Compass: 171.860 deg

Axes Offsets

************

--Encoder--

Pedestal-X: -171.510 deg

Pedestal-Y: 38.950 deg

Pedestal-Z: 8.960 deg

--Alignment--

PolSkew: 0.000 deg

Elevation: -0.800 deg

Antenna Status Target Position

************** ********************************

Azimuth: 121.600 deg 122.823 deg

Elevation: 29.206 deg 29.121 deg

PolSkew: -44.190 deg 91.432 deg

Current System Messages

***********************

WRN 003: GPS Communication Failed

Page 116: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 103

WRN 019: System not initialized

Tracking Signal

***************

AGC: -68.24 dBm 3.42 Volts

Thresh: -80.00 dBm

Tracking Frequency: 1250.725

NBR Selected IF Filter: 50KHz

Compass Setup

*************

On Host: YES

Compass Type: NMEA_0183

Compass Offset: -100.400 deg

Power State Readout

*******************

Parameter CPU SBC IMU SDU NBR

--------- -------------------------------------------------------

+5V: 5.029 4.992 5.732

2.5V: 2.485

3.3V: 3.319

+12V: 11.782

-12V: -11.780

+30V: 15.779

LNBV: 13.813 22.667 0.230

T(degC): 50.500 22.310 36.712

Local Angles

************

Azimuth: 310.990 deg

Elevation: 29.590 deg

Page 117: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 104

Antenna Blockage

****************

Angle From To

----------------- -----------------------

Zone 0 Azimuth: 240.000 deg 260.000 deg

Zone 0 Elevation: 0.000 deg 40.000 deg

Zone 1 Azimuth: 260.000 deg 360.000 deg

Zone 1 Elevation: 0.000 deg 10.000 deg

Zone 2 Azimuth: 0.000 deg 10.000 deg

Zone 2 Elevation: 0.000 deg 5.000 deg

Zone 3 Azimuth: 0.000 deg 0.000 deg

Zone 3 Elevation: 0.000 deg 0.000 deg

CCU's Information

*****************

Version: 4.6 6.08.2009

Work Time: 1 minutes 39 seconds

Communication Type: TCP/IP

Remote Address: 203.88.94.2

Hardware Interface Enable: NO

Compass Interface Setup

***********************

Input Enable: NO

COM Port Number: 1

Baudrate: 9600

Format: 8_NON_1

GPS Interface Setup

*******************

Output Enable: NO

COM Port Number: 1

Baudrate: 4800

Format: 8_NON_1

Page 118: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 105

NMEA Device: GP

NMEA Sentence: GLL

Interval: 1.000

IRD Interface Setup

*******************

Interface Enable: NO

COM Port Number: 1

System Massage Log

******************

Time Type ID Text Transition

-------- ------- --- ------------------------

01-Jan-01 00:23:49 Warning 002 Compass Communication Failed On\Off

01-Jan-01 00:23:48 Warning 002 Compass Communication Failed Off/On

01-Jan-01 00:23:24 Warning 180 No Noise Floor Table On\Off

01-Jan-01 00:18:54 Warning 180 No Noise Floor Table Off/On

01-Jan-01 00:18:28 Warning 002 Compass Communication Failed On\Off

01-Jan-01 00:18:27 Warning 002 Compass Communication Failed Off/On

01-Jan-01 00:18:03 Warning 180 No Noise Floor Table On\Off

01-Jan-01 00:13:08 Warning 002 Compass Communication Failed On\Off

01-Jan-01 00:13:07 Warning 002 Compass Communication Failed Off/On

01-Jan-01 00:11:58 Warning 180 No Noise Floor Table Off/On

01-Jan-01 00:11:39 Message 018 Acquiring a Satellite On\Off

01-Jan-01 00:11:37 Message 018 Acquiring a Satellite Off/On

Page 119: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 106

01-Jan-01 00:10:47 Message 018 Acquiring a Satellite On\Off

01-Jan-01 00:10:45 Message 018 Acquiring a Satellite Off/On

01-Jan-01 00:09:55 Message 018 Acquiring a Satellite On\Off

01-Jan-01 00:09:53 Message 018 Acquiring a Satellite

********************************************

Contact Detail (Manually)

**************

* Vessel Name: ________________________________

* Service Location: ________________________________

* Contact Name (On Board): ________________________________

* Contact Number: ________________________________

* E-Mail Address: ________________________________

* Other Notes:

___________________________________________________

___________________________________________________

___________________________________________________

___________________________________________________

********************************************************************

Page 120: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 107

5 Preventive Maintenance

5.1 Introduction

The preventive maintenance program is designed to ensure that the OrSatTM AL-7103 system continues to function smoothly with maximum performance over time.

The preventive maintenance program consists of a general health check to be performed once every year. This procedure should require one day to complete.

The health check should only be performed by a certified Orbit technician, who was trained on the OrSatTM AL-7103 system, and is familiar with the system and its utilities (e.g. Logger, Spectrum Analyzer, MTSDOCK).

5.2 Health Check

The health check procedure comprises the following tasks:

5.2.1 Visual inspection

Check the system for all of the following:

• Mechanical damage • Water leakage • Oil leakage • Loose cable connections • System warning messages that have not been addressed

5.2.2 System Software

• Check that the IMU calibration file is the correct one for the serial number located on the IMU chassis. If not, request the correct file from Orbit.

• Check the serial number on the SBC chassis and compare it with the number that appears in the Hardware ID dialog box (InConfig menu).

Page 121: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 108

• Check the serial number of the BUC, located on the BUC chassis, and compare it with the number that appears in the Hardware ID dialog box.

5.2.3 Mechanical Test

Use the Graphic Data Logger to perform the following tests (for detailed instructions, see the OrSatTM AL-7103 Installation and Operation Manual):

1. Open the Graphic Data Logger from the Maintenance Screen and add the following parameters:

♦ Pedestal X Position Feedback ♦ Pedestal X Position Error ♦ Pedestal X Velocity Feedback ♦ Pedestal X Velocity Output

2. In the Logger Configuration dialog box, set the sampling time to 6 ticks (60 seconds).

3. Return to the Maintenance Screen and select the Pedestal-X window.

4. Click the Open button and select Axis Config. The Pedestal-X dialog box appears.

Figure 5-1: Pedestal-X Dialog Box

5. Verify that the Test Trajectory parameters are assigned the following values:

♦ Amplitude: 15.0 ♦ Period: 60.0 ♦ Phase: 0.0 ♦ Offset: 0.0

Page 122: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 109

6. Close the Pedestal-X dialog box and click the Mode button.

7. Select Test Traj and wait for 10 seconds.

8. Enter the Logger screen and begin recording. Results should appear after 60 seconds.

Figure 5-2: Azimuth Trajectory results

The above results have been scaled to emphasize the errors.

9. Analyze the results as follows:

♦ Position/Feedback: The green wave shows the position of the selected axis in degrees. Data is usually sampled between -60° and +60°, and should appear as a smooth sine wave. The velocity (blue wave) should be 0 at the limit of movement, as the dish halts and changes direction.

♦ Position/Error: The red wave shows the backlash error of the gearbox. This line should be level on the 0 position of the graph, should be repeatable at maximum velocity, and should not show any extremely high or sharp peaks, which would indicate obstruction of movement.

Page 123: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 110

♦ Velocity/Feedback: The blue wave shows the velocity of the selected axis in degrees per second. This data should appear as a smooth sign wave, with the highest velocity when Position/Feedback is in the 0 position. Velocity should be at 0 when the position feedback is at its highest or lowest position, according to the following formula:

TAAV ××=×= πω 2 deg/sec

♦ Velocity/Output: The purple wave shows the current draw as a percentage for the motor. The higher the current draw, the more force is necessary to move the axis. Consequently, the lower the output value, the better for the system. Output should not exceed 40% in most cases; otherwise, power consumption is too high, and presents a definite pattern loosely following the Velocity/Feedback wave.

10. Save all results to a file named PX1 in the Mesr7200 sub-directory of the backup folder.

11. Return to the Pedestal-X window in the Maintenance Screen, click the Mode button and select Halt to stop the axis.

12. Repeat the above process for Period values of 60 and 10, saving the results in files named PX2 and PX3, respectively.

13. Repeat the entire process for the Pedestal-Y and Pedestal-Z axes, naming the files PY1-3 and PZ1-3, respectively.

14. After you have completed the entire trajectory test, verify that both axes are in Halt position, and reset their Test Trajectory parameters to the following values:

♦ Amplitude: 15.0 ♦ Period: 60.0 ♦ Phase: 0.0 ♦ Offset: 0.0

If any of the above tests do not pass, please contact the Orbit SatCom Service Center at [email protected].

Page 124: Orbit AL-7103 M & T - Print

OrSatTM AL-7103 MKII Maintenance and Troubleshooting Manual 111

5.2.4 RF System Performance Test

1. Receive the link budget from the NOC.

2. Set the modem to drive the BUC to 1dB compression (see the OrSatTM AL-7103 Installation and Operation Manual).

3. Check the system’s transmission and reception data against the provided link budget.

5.2.5 System Documentation

Download the following files:

• Status Dump Report (see Downloading the Status Dump Report on page 100) • SBC configuration file (see Reconfiguring the SBC on page 76) • Messages log file (see the OrSatTM AL-7103 Installation and Operation Manual)