Organization 5.2 BRAIDWOOD — UNITS 1 & 2 5.2 — 2 Amendment 157 5.2 Organization 5.2.2 Facility Staff The facility staff organization shall include the following: a. A total of three non-licensed operators for the two units is required in all conditions. At least one of the required non-licensed operators shall be assigned to each unit. b. Shift crew composition may be less than the minimum requirement of 10 CFR 50.54(m)(2)(i) and 5.2.2.a and 5.2.2.f for a period of time not to exceed 2 hours in order to accommodate unexpected absence of on-duty shift crew members provided immediate action is taken to restore the shift crew composition to within the minimum requirements. c. A radiation protection technician shall be on site when fuel is in the reactor. The position may be vacant for not more than 2 hours, in order to provide for unexpected absence, provided immediate action is taken to fill the required position. d. Deleted. e. The operations manager or the supervisor in charge of the operations shift crews shall hold an SRO license. f. The Shift Technical Advisor (STA) shall provide advisory technical support to the Shift Manager in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to the safe operation of the facility. In addition, the STA shall meet the qualifications specified by the Commission Policy Statement on Engineering Expertise on Shift. Page 1 of 30

Upload: others

Post on 11-Jul-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Organization 5.2 5.2 Organization requirement of 10 CFR 50 ... · 5.2 BRAIDWOOD — UNITS 1 & 2 5.2 — 2 Amendment 157 5.2 Organization 5.2.2 Facility Staff The facility staff organization

Organization 5.2

BRAIDWOOD — UNITS 1 & 2 5.2 — 2 Amendment 157

5.2 Organization 5.2.2 Facility Staff

The facility staff organization shall include the following:

a. A total of three non-licensed operators for the two units is required in all conditions. At least one of the required non-licensed operators shall be assigned to each unit.

b. Shift crew composition may be less than the minimum

requirement of 10 CFR 50.54(m)(2)(i) and 5.2.2.a and 5.2.2.f for a period of time not to exceed 2 hours in order to accommodate unexpected absence of on-duty shift crew members provided immediate action is taken to restore the shift crew composition to within the minimum requirements.

c. A radiation protection technician shall be on site when fuel

is in the reactor. The position may be vacant for not more than 2 hours, in order to provide for unexpected absence, provided immediate action is taken to fill the required position.

d. Deleted. e. The operations manager or the supervisor in charge of the

operations shift crews shall hold an SRO license. f. The Shift Technical Advisor (STA) shall provide advisory

technical support to the Shift Manager in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to the safe operation of the facility. In addition, the STA shall meet the qualifications specified by the Commission Policy Statement on Engineering Expertise on Shift.

Page 1 of 30

u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Callout
one of the operations middle managers
u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Callout
unit
u004dr0
Callout
unit operations shift crew
Page 2: Organization 5.2 5.2 Organization requirement of 10 CFR 50 ... · 5.2 BRAIDWOOD — UNITS 1 & 2 5.2 — 2 Amendment 157 5.2 Organization 5.2.2 Facility Staff The facility staff organization

Facility Staff Qualifications5.3

BRAIDWOOD — UNITS 1 & 2 5.3 — 1 Amendment 173

5.0 ADMINISTRATIVE CONTROLS

5.3 Facility Staff Qualifications

5.3.1 Each member of the facility staff shall meet or exceed the minimum qualifications of ANSI N18.1-1971, with the following exceptions: 1) either the senior health physics supervisor or lead health physicist, shall meet or exceed the qualifications for "Radiation Protection Manager" in Regulatory Guide 1.8, September 1975, and 2) the licensed operators who shall comply only with the requirements of 10 CFR 55.

Page 2 of 30

u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Callout
ANSI/ANS-3.1-2014, except: - Those who were actively in role prior to implementation of the standard. - Non-Licensed Operators who shall meet or exceed the minimum requirements of ANS-3.1/N18.1-1971.
u004dr0
Cross-Out
Page 3: Organization 5.2 5.2 Organization requirement of 10 CFR 50 ... · 5.2 BRAIDWOOD — UNITS 1 & 2 5.2 — 2 Amendment 157 5.2 Organization 5.2.2 Facility Staff The facility staff organization

Organization 5.2

BYRON — UNITS 1 & 2 5.2 — 2 Amendment 162

5.2 Organization 5.2.2 Facility Staff

The facility staff organization shall include the following:

a. A total of three non-licensed operators for the two units is required in all conditions. At least one of the required non-licensed operators shall be assigned to each unit.

b. Shift crew composition may be less than the minimum

requirement of 10 CFR 50.54(m)(2)(i) and 5.2.2.a and 5.2.2.f for a period of time not to exceed 2 hours in order to accommodate unexpected absence of on-duty shift crew members provided immediate action is taken to restore the shift crew composition to within the minimum requirements.

c. A radiation protection technician shall be on site when fuel

is in the reactor. The position may be vacant for not more than 2 hours, in order to provide for unexpected absence, provided immediate action is taken to fill the required position.

d. Deleted. e. The operations manager or the supervisor in charge of the

operations shift crews shall hold an SRO license. f. The Shift Technical Advisor (STA) shall provide advisory

technical support to the Shift Manager in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to the safe operation of the facility. In addition, the STA shall meet the qualifications specified by the Commission Policy Statement on Engineering Expertise on Shift.

Page 3 of 30

u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Callout
unit operations shift crew
u004dr0
Callout
unit
u004dr0
Cross-Out
u004dr0
Callout
one of the operations middle managers
Page 4: Organization 5.2 5.2 Organization requirement of 10 CFR 50 ... · 5.2 BRAIDWOOD — UNITS 1 & 2 5.2 — 2 Amendment 157 5.2 Organization 5.2.2 Facility Staff The facility staff organization

Facility Staff Qualifications5.3

BYRON — UNITS 1 & 2 5.3 — 1 Amendment 180

5.0 ADMINISTRATIVE CONTROLS

5.3 Facility Staff Qualifications

5.3.1 Each member of the facility staff shall meet or exceed the minimum qualifications of ANSI N18.1-1971, with the following exceptions: 1) either the senior health physics supervisor or lead health physicist, shall meet or exceed the qualifications for "Radiation Protection Manager" in Regulatory Guide 1.8, September 1975, and 2) the licensed operators who shall comply only with the requirements of 10 CFR 55.

Page 4 of 30

u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Callout
ANSI/ANS-3.1-2014, except: - Those who were actively in role prior to implementation of the standard. - Non-Licensed Operators who shall meet or exceed the minimum requirements of ANS-3.1/N18.1-1971.
Page 5: Organization 5.2 5.2 Organization requirement of 10 CFR 50 ... · 5.2 BRAIDWOOD — UNITS 1 & 2 5.2 — 2 Amendment 157 5.2 Organization 5.2.2 Facility Staff The facility staff organization

Organization 5.2

5.2 Organization

CALVERT CLIFFS - UNIT 1 5.2-2 Amendment No. 296 CALVERT CLIFFS - UNIT 2 Amendment No. 272

5.2.2 Unit Staff The unit staff organization shall include the following:

a. A total of three non-licensed operators shall be assigned to the Units 1 and 2 shift crews.

b. Those licensed operators counted toward minimum shift crew

composition required by 10 CFR 50.54(m)(2)(i) shall be licensed for both units.

c. Shift crew composition may be less than the minimum

requirement of 10 CFR 50.54(m)(2)(i), 5.2.2.a, and 5.2.2.g for a period of time not to exceed 2 hours in order to accommodate unexpected absence of on-duty shift crew members provided immediate action is taken to restore the shift crew composition to within the minimum requirements.

d. A radiation protection technician shall be onsite when fuel

is in the reactor. The position may be vacant for not more than 2 hours, in order to provide for unexpected absence, provided immediate action is taken to fill the required position.

e. Deleted. f. The operations manager or assistant operations manager shall

hold an SRO license. g. One Shift Technical Advisor (STA) shall be assigned to the

shift crew when either unit is in MODE 1, 2, 3, or 4, and shall be filled as follows:

1. By the Shift Supervisor (SS) or an on-shift SRO license

holder, provided the individual meets the Commission Policy Statement on Engineering Expertise on Shift; or

Page 5 of 30

u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Callout
The Shift Technical Advisor (STA) shall provide advisory technical support to the unit operations shift crew in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to safe operation of the unit.
u004dr0
Callout
one of the operations middle managers
Page 6: Organization 5.2 5.2 Organization requirement of 10 CFR 50 ... · 5.2 BRAIDWOOD — UNITS 1 & 2 5.2 — 2 Amendment 157 5.2 Organization 5.2.2 Facility Staff The facility staff organization

Organization 5.2

5.2 Organization

CALVERT CLIFFS - UNIT 1 5.2-3 Amendment No. 292 CALVERT CLIFFS - UNIT 2 Amendment No. 268

2. By an individual with a Bachelors Degree or equivalent in a scientific or engineering discipline with specific training in plant design, and response and analysis of the plant transient and accidents; or

3. By an SRO license holder previously approved by the

Nuclear Regulatory Commission as an exception to the minimum STA education requirements of Specification 5.2.2.g.2, provided the following conditions are met:

i. With both units in MODE 1, 2, 3, or 4, the STA

shall be an SRO license holder in addition to the two SRO license holders required,

ii. With one unit in MODE 1, 2, 3, or 4, and the other

unit in MODE 5 or 6, the STA shall be an SRO license holder other than the SS, and

iii. With one unit in MODE 1, 2, 3, or 4, and the other

unit defueled, the STA shall be an SRO license holder in addition to the one SRO license holder required.

Page 6 of 30

u004dr0
Cross-Out
u004dr0
Text Box
INFORMATION ON THIS PAGE HAS BEEN DELETED
Page 7: Organization 5.2 5.2 Organization requirement of 10 CFR 50 ... · 5.2 BRAIDWOOD — UNITS 1 & 2 5.2 — 2 Amendment 157 5.2 Organization 5.2.2 Facility Staff The facility staff organization

Unit Staff Qualifications5.3

5.0 ADMINISTRATIVE CONTROLS

5.3 Unit Staff Qualifications

5.3.1 Each member of the unit staff shall meet or exceed the minimumqualifications of ANSI N18.1-1971, for comparable positions,except for the Radiation Protection Manager, who shall meet orexceed the requirements of Regulatory Guide 1.8, September 1975,and the Shift Technical Advisor, who shall meet the requirementsof Specification 5.2.2.g.

CALVERT CLIFFS - UNIT 1CALVERT CLIFFS - UNIT 2

5.3-1 Amendment No. 2.59Amendment No. 236

Page 7 of 30

u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Callout
ANSI/ANS-3.1-2014, except: - Those who were actively in role prior to implementation of the standard. - Non-Licensed Operators who shall meet or exceed the minimum requirements of ANS-3.1/N18.1-1971.
Page 8: Organization 5.2 5.2 Organization requirement of 10 CFR 50 ... · 5.2 BRAIDWOOD — UNITS 1 & 2 5.2 — 2 Amendment 157 5.2 Organization 5.2.2 Facility Staff The facility staff organization

Organization5.2

CLINTON 5.0-3 Amendment No. 185

5.2 Organization______________________________________________________________________________

5.2.2 Unit Staff (continued)

b. At least one licensed RO shall be present in the controlroom when fuel is in the reactor. In addition, while theunit is in MODE 1, 2, or 3, at least one licensed SRO shallbe present in the control room.

c. Shift crew composition may be one less than the minimumrequirements of 10 CFR 50.54(m)(2)(i) and Specifications5.2.2.a and 5.2.2.g for a period of time not to exceed 2hours to accommodate unexpected absence of on-duty shiftcrew members, provided immediate action is taken to restorethe shift crew composition within the minimum requirements.

d. A radiation protection technician shall be on site when fuelis in the reactor. The position may be vacant for not morethan 2 hours, in order to provide for unexpected absence,provided immediate action is taken to fill the requiredposition.

e. Deleted.

f. The operations manager or at least one operations middle manager shall hold an SRO license. for Clinton Power Station.

g. The Shift Technical Advisor (STA) shall provide advisorytechnical support to the SS in the areas of thermalhydraulics, reactor engineering, and plant analysis withregard to the safe operation of the unit. In addition, theSTA shall meet the qualifications specified by theCommission Policy Statement on Engineering Expertise onShift.

______________________________________________________________________________

Page 8 of 30

u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Callout
unit operations shift crew
u004dr0
Callout
one of the operations middle managers
Page 9: Organization 5.2 5.2 Organization requirement of 10 CFR 50 ... · 5.2 BRAIDWOOD — UNITS 1 & 2 5.2 — 2 Amendment 157 5.2 Organization 5.2.2 Facility Staff The facility staff organization

CLINTON 5.0-5 Amendment No. 200

Unit Staff Qualifications5.3

5.0 ADMINISTRATIVE CONTROLS

5.3 Unit Staff Qualifications______________________________________________________________________________

5.3.1 Each member of the unit staff shall meet or exceed the minimum qualifications of ANSI/ANS 3.1!1978, with the following exception: the licensed operators who shall comply only with the requirements of 10 CFR 55.

______________________________________________________________________________

Page 9 of 30

u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Callout
ANSI/ANS-3.1-2014, except: - Those who were actively in role prior to implementation of the standard. - Non-Licensed Operators who shall meet or exceed the minimum requirements of ANSI/ANS-3.1-1978.
Page 10: Organization 5.2 5.2 Organization requirement of 10 CFR 50 ... · 5.2 BRAIDWOOD — UNITS 1 & 2 5.2 — 2 Amendment 157 5.2 Organization 5.2.2 Facility Staff The facility staff organization

Organization5.2

Dresden 2 and 3 5.2-2 Amendment No. 231/224

5.2 Organization

5.2.2 Unit Staff (continued)

a. A total of three non-licensed operators for the two units is required in all conditions. At least one of the required non-licensed operators shall be assigned to each unit.

b. Shift crew composition may be less than the minimum requirement of 10 CFR 50.54(m)(2)(i) and Specifications 5.2.2.a and 5.2.2.f for a period of time not to exceed 2 hours in order to accommodate unexpected absence of on-duty shift crew members provided immediate action is taken to restore the shift crew composition to within the minimum requirements.

c. A radiation protection technician shall be on site when fuel is in the reactor. The position may be vacant for not more than 2 hours, in order to provide for unexpected absence, provided immediate action is taken to fill the required position.

d. Deleted.

e. The operations manager or shift operations supervisor shall hold an SRO license.

f. The Shift Technical Advisor (STA) shall provide advisory technical support to the shift manager in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to the safe operation of the unit. In addition, the STA shall meet the qualifications specified by the Commission Policy Statement on Engineering Expertise on Shift.

Page 10 of 30

u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Callout
unit operations shift crew
u004dr0
Cross-Out
u004dr0
Callout
one of the operations middle managers
Page 11: Organization 5.2 5.2 Organization requirement of 10 CFR 50 ... · 5.2 BRAIDWOOD — UNITS 1 & 2 5.2 — 2 Amendment 157 5.2 Organization 5.2.2 Facility Staff The facility staff organization

Unit Staff Qualifications5.3

Dresden 2 and 3 5.3-1 Amendment No. 240/233

5.0 ADMINISTRATIVE CONTROLS

5.3 Unit Staff Qualifications

5.3.1 Each member of the unit staff shall meet or exceed the minimum qualifications of ANSI N18.1-1971, with the following exceptions: 1) the radiation protection manager shall meet or exceed the qualifications for "Radiation Protection Manager" in Regulatory Guide 1.8, September 1975, and 2) the licensed operators who shall comply only with the requirements of 10 CFR 55.

Page 11 of 30

u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Callout
ANSI/ANS-3.1-2014, except: - Those who were actively in role prior to implementation of the standard. - Non-Licensed Operators who shall meet or exceed the minimum requirements of ANS-3.1/N18.1-1971.
Page 12: Organization 5.2 5.2 Organization requirement of 10 CFR 50 ... · 5.2 BRAIDWOOD — UNITS 1 & 2 5.2 — 2 Amendment 157 5.2 Organization 5.2.2 Facility Staff The facility staff organization

Organization5.2

LaSalle 1 and 2 5.2-2 Amendment No. 192/179

5.2 Organization

5.2.2 Unit Staff (continued)

non-licensed operators shall be assigned to each unit.

b. Shift crew composition may be less than the minimumrequirement of 10 CFR 50.54(m)(2)(i) and Specifications 5.2.2.a and 5.2.2.e for a period of time not to exceed 2 hours in order to accommodate unexpected absence of on-duty shift crew members provided immediate action is taken to restore the shift crew composition to within the minimum requirements.

c. A radiation protection technician shall be on site when fuel is in the reactor. The position may be vacant for not more than 2 hours, in order to provide for unexpected absence, provided immediate action is taken to fill the required position.

d. The operations manager or shift operations supervisor shall hold an SRO license.

e. The Shift Technical Advisor (STA) shall provide advisory technical support to the shift manager in the areas of thermal hydraulics, reactor engineering, and plant analysiswith regard to the safe operation of the unit. In addition, the STA shall meet the qualifications specified by the Commission Policy Statement on Engineering Expertise on Shift.

Page 12 of 30

u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Callout
unit operations shift crew
u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Callout
one of the operations middle managers
Page 13: Organization 5.2 5.2 Organization requirement of 10 CFR 50 ... · 5.2 BRAIDWOOD — UNITS 1 & 2 5.2 — 2 Amendment 157 5.2 Organization 5.2.2 Facility Staff The facility staff organization

Unit Staff Qualifications5.3

LaSalle 1 and 2 5.3-1 Amendment No. 206/193

5.0 ADMINISTRATIVE CONTROLS

5.3 Unit Staff Qualifications

5.3.1 Each member of the unit staff shall meet or exceed the minimum qualifications of ANSI N18.1-1971, with the following exceptions: 1) the radiation protection manager shall meet the requirements of"radiation protection manager" in Regulatory Guide 1.8, September 1975, and 2) the licensed operators who shall comply only with the requirements of 10 CFR 55. Also, the ANSI N18.1-1971 qualification requirements for "radiation protection technician"may be met by either of the following alternatives:

a. Individuals who have completed the radiation protection technician training program and have accrued one year of working experience in the specialty; or

b. Individuals who have completed the radiation protection technician training program, but have not yet accrued one year of working experience in the specialty, who are supervised by on-shift radiation protection supervision who meet the requirements of ANSI N18.1-1971, Section 4.3.2 or Section 4.4.4.

Page 13 of 30

u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Callout
ANSI/ANS-3.1-2014, except: - Those who were actively in role prior to implementation of the standard. - Non-Licensed Operators who shall meet or exceed the minimum requirements of ANS-3.1/N18.1-1971.
Page 14: Organization 5.2 5.2 Organization requirement of 10 CFR 50 ... · 5.2 BRAIDWOOD — UNITS 1 & 2 5.2 — 2 Amendment 157 5.2 Organization 5.2.2 Facility Staff The facility staff organization

ADMINISTRATIVE CONTROLS UNIT STAFF (Continued)

g. The individual filling the position of Operations Manager as defined

by ANSI/ANS-3.1-1978 or another Manager in Operations shall hold a Senior Reactor Operator License.

LIMERICK - UNIT 1 6-3 Amendment No. 10,35,63,80,96, 162, 198

Page 14 of 30

u004dr0
Cross-Out
u004dr0
Callout
The operations manager or one of the operations middle managers shall hold an SRO license.
u004dr0
Cross-Out
Page 15: Organization 5.2 5.2 Organization requirement of 10 CFR 50 ... · 5.2 BRAIDWOOD — UNITS 1 & 2 5.2 — 2 Amendment 157 5.2 Organization 5.2.2 Facility Staff The facility staff organization

ADMINISTRATIVE CONTROLS _ 6.2.3 DELETED. The information from this section is located in the UFSAR. 6.2.4 SHIFT TECHNICAL ADVISOR 6.2.4.1 The Shift Technical Advisor shall provide advisory technical support to Shift Supervision in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to safe operation of the unit. The Shift Technical Advisor shall meet the qualifications specified by the 1985 NRC Policy Statement on Engineering Expertise on Shift. 6.3 UNIT STAFF QUALIFICATIONS 6.3.1 Each member of the unit staff shall meet or exceed the minimum qualifications of ANSI/ANS 3.1-1978 for comparable positions, except for the Manager - Radiation Protection who shall meet or exceed the qualifications of Regulatory Guide 1.8, September 1975, and the licensed operators who shall comply only with the requirements of 10CFR55. LIMERICK - UNIT 1 6-6 Amendment No. 10, 35, 55, 64, 96, 210 .

Corrected by Letter dated October 17, 1995

Page 15 of 30

u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Callout
unit operations shift crew
u004dr0
Callout
ANSI/ANS-3.1-2014, except: - Those who were actively in role prior to implementation of the standard. - Non-Licensed Operators who shall meet or exceed the minimum requirements of ANSI/ANS-3.1-1978.
Page 16: Organization 5.2 5.2 Organization requirement of 10 CFR 50 ... · 5.2 BRAIDWOOD — UNITS 1 & 2 5.2 — 2 Amendment 157 5.2 Organization 5.2.2 Facility Staff The facility staff organization

ADMINISTRATIVE CONTROLS __

6.2.2 UNIT STAFF (Continued)

g. The individual filling the position of Operations Manager as defined byANSI/ANS-3.1-1978 or another Manager in Operations shall hold a SeniorReactor Operator License.

LIMERICK - UNIT 2 6-3 Amendment No. 2,28,41,60,124, 159

Page 16 of 30

u004dr0
Cross-Out
u004dr0
Callout
The operations manager or one of the operations middle managers shall hold an SRO license.
u004dr0
Cross-Out
Page 17: Organization 5.2 5.2 Organization requirement of 10 CFR 50 ... · 5.2 BRAIDWOOD — UNITS 1 & 2 5.2 — 2 Amendment 157 5.2 Organization 5.2.2 Facility Staff The facility staff organization

ADMINISTRATIVE CONTROLS _ 6.2.3 DELETED. The information from this section is located in the UFSAR. 6.2.4 SHIFT TECHNICAL ADVISOR 6.2.4.1 The Shift Technical Advisor shall provide advisory technical support to Shift Supervision in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to safe operation of the unit. The Shift Technical Advisor shall meet the qualifications specified by the 1985 NRC Policy Statement on Engineering Expertise on Shift. 6.3 UNIT STAFF QUALIFICATIONS 6.3.1 Each member of unit staff shall meet or exceed the minimum qualifications of ANSI/ANS 3.1-1978 for comparable positions, except for the Manager - Radiation Protection who shall meet or exceed the qualifications of Regulatory Guide 1.8, September 1975, and the licensed operators who shall comply only with the requirements of 10CFR55. LIMERICK - UNIT 2 6-6 Amendment No. 2, 20, 29, 60, 171 .

Corrected by Letter dated October 17, 1995

Page 17 of 30

u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Callout
unit operations shift crew
u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Callout
ANSI/ANS-3.1-2014, except: - Those who were actively in role prior to implementation of the standard. - Non-Licensed Operators who shall meet or exceed the minimum requirements of ANSI/ANS-3.1-1978.
Page 18: Organization 5.2 5.2 Organization requirement of 10 CFR 50 ... · 5.2 BRAIDWOOD — UNITS 1 & 2 5.2 — 2 Amendment 157 5.2 Organization 5.2.2 Facility Staff The facility staff organization

e. As a minimum, either the Manager Operations or the General Supervisor Operations shall hold an SRO license.

f. The Shift Technical Advisor (STA) shall provide advisory technical support to the shift supervision in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to the safe operation of the unit. In addition, the STA shall meet the qualifications specified by the Commission Policy Statement on Engineering Expertise on Shift.

6.3 Unit Staff Qualifications

6.3.1 Each member of the unit staff, with the exception of the operator license applicants and the radiation protection manager, shall meet or exceed the minimum qualifications of ANSI N18.1-1971 for comparable positions. The radiation protection manager shall meet or exceed the qualifications of Regulatory Guide 1.8, September 1975. The licensed operators shall comply only with the requirements of 10 CFR 55.

6.3.2 For the purpose of 10 CFR 55.4, a licensed Senior Reactor Operator (SRO) and a licensed Reactor Operator (RO) are those individuals who, in addition to meeting the requirements of Specification 6.3.1, perform the functions described in 10 CFR 50.54(m).

6.4 Procedures

6.4.1 Written procedures and administrative policies shall be established, implemented and maintained that meet or exceed the requirements and recommendations of Sections 5.1 and 5.3 of ANSI N18.7-1972 and cover the following activities:

a. The applicable procedures recommended in Regulatory Guide 1.33, Appendix A, November 3, 1972;

AMENDMENT NO. 142, 157, 158, 160, 162, 181, 198, 203, 218 349

Page 18 of 30

u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Text Box
NMP U1
u004dr0
Callout
ANSI/ANS-3.1-2014, except: - Those who were actively in role prior to implementation of the standard. - Non-Licensed Operators who shall meet or exceed the minimum requirements of ANS-3.1/N18.1-1971.
u004dr0
Callout
unit operations shift crew
u004dr0
Callout
The operations manager or one of the operations middle managers
u004dr0
Cross-Out
u004dr0
Cross-Out
Page 19: Organization 5.2 5.2 Organization requirement of 10 CFR 50 ... · 5.2 BRAIDWOOD — UNITS 1 & 2 5.2 — 2 Amendment 157 5.2 Organization 5.2.2 Facility Staff The facility staff organization

Organization5.2

NMP2 5.2-3 Amendment 91, 131

5.2 Organization

5.2.2 Unit Staff (continued)

f. The operations supervisors shall hold an SRO license.

g. The Shift Technical Advisor (STA) shall provide advisory technical support to the shift supervision in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to the safe operation of the unit. In addition, the STA shall meet the qualifications specified by the Commission Policy Statement on Engineering Expertise on Shift.

Page 19 of 30

u004dr0
Cross-Out
u004dr0
Callout
The operations manager or one of the operations middle managers
u004dr0
Callout
unit operations shift crew
u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Cross-Out
Page 20: Organization 5.2 5.2 Organization requirement of 10 CFR 50 ... · 5.2 BRAIDWOOD — UNITS 1 & 2 5.2 — 2 Amendment 157 5.2 Organization 5.2.2 Facility Staff The facility staff organization

Unit Staff Qualifications5.3

NMP2 5.3-1 Amendment 91, 127, 148

5.0 ADMINISTRATIVE CONTROLS

5.3 Unit Staff Qualifications

5.3.1 Each member of the unit staff, with the exception of the operator license applicants and the radiation protection manager, shall meet or exceed the minimum qualifications of ANSI/ANS 3.1-1978 for comparable positions. The radiation protection manager shall meet or exceed the qualifications of Regulatory Guide 1.8, September 1975. The licensed operators shall comply only with the requirements of 10 CFR 55.

Page 20 of 30

u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Callout
ANSI/ANS-3.1-2014, except: - Those who were actively in role prior to implementation of the standard. - Non-Licensed Operators who shall meet or exceed the minimum requirements of ANSI/ANS-3.1-1978.
u004dr0
Cross-Out
Page 21: Organization 5.2 5.2 Organization requirement of 10 CFR 50 ... · 5.2 BRAIDWOOD — UNITS 1 & 2 5.2 — 2 Amendment 157 5.2 Organization 5.2.2 Facility Staff The facility staff organization

Organization5.2

5.2 Organization

5.2.2 Unit Staff (continued)

e. The senior operations manager or an operations manager shall hold an SRO license.

f. An individual shall provide advisory technical support to the unit operations shift crew in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to the safe operation of the unit. This individual shall meet the qualifications specified by the Commission Policy Statement on Engineering Expertise on Shift.

PBAPS UNIT 2 5.0-4 Amendment No. 271Page 21 of 30

u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Callout
one of the operations middle managers
u004dr0
Callout
The Shift Technical Advisor (STA)
u004dr0
Cross-Out
Page 22: Organization 5.2 5.2 Organization requirement of 10 CFR 50 ... · 5.2 BRAIDWOOD — UNITS 1 & 2 5.2 — 2 Amendment 157 5.2 Organization 5.2.2 Facility Staff The facility staff organization

Unit Staff Qualifications 5.3 5.0 ADMINISTRATIVE CONTROLS 5.3 Unit Staff Qualifications 5.3.1 Each member of the unit staff shall meet or exceed the minimum

qualifications of ANSI N18.1-1971 for comparable positions described in the UFSAR, with the following exceptions: 1) the Manager-Radiation Protection shall meet or exceed the qualifications of Regulatory Guide 1.8, September 1975, and 2) the licensed operators who shall comply only with the requirements of 10 CFR 55.

5.3.2 For the purpose of 10 CFR 55.4, a licensed Senior Reactor Operator

(SRO) and a licensed Reactor Operator (RO) are those individuals who, in addition to meeting the requirements of TS 5.3.1, perform the functions described in 10 CFR 50.54(m).

PBAPS UNIT 2 5.0-5 Amendment No. 2897

Page 22 of 30

u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Callout
ANSI/ANS-3.1-2014, except: - Those who were actively in role prior to implementation of the standard. - Non-Licensed Operators who shall meet or exceed the minimum requirements of ANS-3.1/N18.1-1971.
Page 23: Organization 5.2 5.2 Organization requirement of 10 CFR 50 ... · 5.2 BRAIDWOOD — UNITS 1 & 2 5.2 — 2 Amendment 157 5.2 Organization 5.2.2 Facility Staff The facility staff organization

Organization5.2

5.2 Organization

5.2.2 Unit Staff (continued)

e. The senior operations manager or an operations manager shall hold an SRO license.

f. An individual shall provide advisory technical support to the unit operations shift crew in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to the safe operation of the unit. This individual shall meet the qualifications specified by the Commission Policy Statement on Engineering Expertise on Shift.

PBAPS UNIT 3 5.0-4 Amendment No. 275

Page 23 of 30

u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Callout
one of the operations middle managers
u004dr0
Cross-Out
u004dr0
Callout
The Shift Technical Advisor (STA)
Page 24: Organization 5.2 5.2 Organization requirement of 10 CFR 50 ... · 5.2 BRAIDWOOD — UNITS 1 & 2 5.2 — 2 Amendment 157 5.2 Organization 5.2.2 Facility Staff The facility staff organization

Unit Staff Qualifications 5.3 5.0 ADMINISTRATIVE CONTROLS 5.3 Unit Staff Qualifications 5.3.1 Each member of the unit staff shall meet or exceed the minimum

qualifications of ANSI N18.1-1971 for comparable positions described in the UFSAR, with the following exceptions: 1) the Manager-Radiation Protection shall meet or exceed the qualifications of Regulatory Guide 1.8, September 1975, and 2) the licensed operators who shall comply only with the requirements of 10 CFR 55.

5.3.2 For the purpose of 10 CFR 55.4, a licensed Senior Reactor Operator

(SRO) and a licensed Reactor Operator (RO) are those individuals who, in addition to meeting the requirements of TS 5.3.1, perform the functions described in 10 CFR 50.54(m).

PBAPS UNIT 3 5.0-5 Amendment No. 2921

Page 24 of 30

u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Callout
ANSI/ANS-3.1-2014, except: - Those who were actively in role prior to implementation of the standard. - Non-Licensed Operators who shall meet or exceed the minimum requirements of ANS-3.1/N18.1-1971.
Page 25: Organization 5.2 5.2 Organization requirement of 10 CFR 50 ... · 5.2 BRAIDWOOD — UNITS 1 & 2 5.2 — 2 Amendment 157 5.2 Organization 5.2.2 Facility Staff The facility staff organization

Organization5.2

Quad Cities 1 and 2 5.2-2 Amendment No. 243/238

5.2 Organization

5.2.2 Unit Staff (continued)

a. A total of three non-licensed operators for the two units is required in all conditions. At least one of the required non-licensed operators shall be assigned to each unit.

b. Shift crew composition may be less than the minimum requirement of 10 CFR 50.54(m)(2)(i) and Specifications 5.2.2.a and 5.2.2.f for a period of time not to exceed 2 hours in order to accommodate unexpected absence of on-duty shift crew members provided immediate action is taken to restore the shift crew composition to within the minimum requirements.

c. A radiation protection technician shall be on site when fuel is in the reactor. The position may be vacant for not more than 2 hours, in order to provide for unexpected absence, provided immediate action is taken to fill the required position.

d. Deleted.

e. The operations manager or shift operations supervisor shall hold an SRO license.

f. The Shift Technical Advisor (STA) shall provide advisory technical support to the shift manager in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to the safe operation of the unit. In addition, the STA shall meet the qualifications specified by the Commission Policy Statement on Engineering Expertise on Shift.

Page 25 of 30

u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Callout
unit operations shift crew
u004dr0
Callout
one of the operations middle managers
u004dr0
Cross-Out
Page 26: Organization 5.2 5.2 Organization requirement of 10 CFR 50 ... · 5.2 BRAIDWOOD — UNITS 1 & 2 5.2 — 2 Amendment 157 5.2 Organization 5.2.2 Facility Staff The facility staff organization

Unit Staff Qualifications5.3

Quad Cities 1 and 2 5.3-1 Amendment No. 251/246

5.0 ADMINISTRATIVE CONTROLS

5.3 Unit Staff Qualifications

5.3.1 Each member of the unit staff shall meet or exceed the minimum qualifications of ANSI N18.1-1971, with the following exceptions: 1) the radiation protection manager or lead radiation protection technician who shall meet or exceed the qualifications for "Radiation Protection Manager" in Regulatory Guide 1.8, September 1975, and 2) the licensed operators who shall comply only with therequirements of 10 CFR 55.

Page 26 of 30

u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Callout
ANSI/ANS-3.1-2014, except: - Those who were actively in role prior to implementation of the standard. - Non-Licensed Operators who shall meet or exceed the minimum requirements of ANS-3.1/N18.1-1971.
Page 27: Organization 5.2 5.2 Organization requirement of 10 CFR 50 ... · 5.2 BRAIDWOOD — UNITS 1 & 2 5.2 — 2 Amendment 157 5.2 Organization 5.2.2 Facility Staff The facility staff organization

Organization5.2

R.E. Ginna Nuclear Power Plant 5.2-2 Amendment 108

5.2.2 Plant Staff

The plant staff organization shall include the following:

a. An auxiliary operator shall be assigned to the shift crew with fuel inthe reactor. An additional auxiliary operator shall be assigned tothe shift crew while the plant is in MODE 1, 2, 3 or 4.

b. Shift crew composition may be one less than the minimumrequirement of 10 CFR 50.54(m)(2)(i) and Specifications 5.2.2.aand 5.2.2.f for a period of time not to exceed 2 hours in order toaccommodate unexpected absence of on-duty shift crew membersprovided immediate action is taken to restore the shift crewcomposition to within the minimum requirements.

c. An individual qualified in radiation protection procedures shall be onsite when fuel is in the reactor. The position may be vacant for notmore than 2 hours, in order to provide for unexpected absence,provided immediate action is taken to fill the required position.

d. Deleted.

e. The operations manager or operations middle manager shall hold aSRO license.

f. The Shift Technical Advisor (STA) shall provide advisory technical support to the Shift Supervisor (SS) in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to the safe operation of the plant. The STA shall be assigned to the shift crew while the plant is in MODE 1, 2, 3 or 4. and shall meet the qualifications contained in the STA training program specified in UFSAR Section 13.2.

Page 27 of 30

u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Callout
unit
u004dr0
Cross-Out
u004dr0
Callout
unit operations shift crew
u004dr0
Callout
one of the operations middle managers
Page 28: Organization 5.2 5.2 Organization requirement of 10 CFR 50 ... · 5.2 BRAIDWOOD — UNITS 1 & 2 5.2 — 2 Amendment 157 5.2 Organization 5.2.2 Facility Staff The facility staff organization

Plant Staff Qualifications5.3

R.E. Ginna Nuclear Power Plant 5.3-1 Amendment 80

5.0 ADMINISTRATIVE CONTROLS

5.3 Plant Staff Qualifications

5.3.1 Each member of the plant staff shall meet or exceed the minimum qualifications of ANSI Standard N18.1-1971, as supplemented by Regulatory Guide 1.8, Revision 1, September 1975, for comparable positions.

Page 28 of 30

u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Callout
ANSI/ANS-3.1-2014, except: - Those who were actively in role prior to implementation of the standard. - Non-Licensed Operators who shall meet or exceed the minimum requirements of ANS-3.1/N18.1-1971.
Page 29: Organization 5.2 5.2 Organization requirement of 10 CFR 50 ... · 5.2 BRAIDWOOD — UNITS 1 & 2 5.2 — 2 Amendment 157 5.2 Organization 5.2.2 Facility Staff The facility staff organization

c. At least two licensed Reactor Operators shall be present in the control room during

reactor startup, scheduled reactor shutdown and during recovery from reactor trips.

d. The Shift Manager or Control Room Supervisor # shall be in the control room at all times other than cold shutdown conditions (T ave < 200°F) when he shall be onsite.

e. An individual ## qualified pursuant to 6.3.2 in radiation protection procedures shall be

on site when fuel is in the reactor.

f. All REFUELING OPERATIONS shall be observed and directly supervised by either a licensed Senior Reactor Operator or Senior Reactor Operator Limited to Fuel Handling who has no other concurrent responsibilities during this operation.

g. A Site Fire Brigade ## of at least 5 members shall be maintained onsite at all times. The Site Fire Brigade shall not include members of the minimum shift crew necessary for safe shutdown of the unit and any personnel required for other essential functions during a fire emergency.

h. The Shift Technical Advisor shall serve in an advisory capacity to the Shift Manager on matters pertaining to the engineering aspects assuring safe operation of the unit.

6.2.2.3 Individuals who train the operating staff and those who carry out the health physics and quality

assurance function shall have sufficient organizational freedom to be independent from operating pressures, however they may report to the appropriate manager on site.

# If not SRO licensed, he shall have completed the SRO Training program. ## The individual of item 6.2.2.2e and the Fire Brigade composition may be less than the minimum requirements for a period of time not to exceed 2 hours in order to accommodate unexpected absence provided immediate action is taken to fill the required positions.

6-1a Amendment 11, 32, 77, 139, 169, 219

Page 29 of 30

u004dr0
Cross-Out
u004dr0
Sticky Note
Accepted set by u004dr0
u004dr0
Sticky Note
None set by u004dr0
u004dr0
Cross-Out
u004dr0
Text Box
TMI
u004dr0
Cross-Out
u004dr0
Callout
h. The operations manager or one of the operations middle managers shall hold an SRO license. .... i. The Shift Technical Advisor (STA) shall provide advisory technical support to the unit operations shift crew in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to the safe operation of the unit.
Page 30: Organization 5.2 5.2 Organization requirement of 10 CFR 50 ... · 5.2 BRAIDWOOD — UNITS 1 & 2 5.2 — 2 Amendment 157 5.2 Organization 5.2.2 Facility Staff The facility staff organization

6.3 UNIT STAFF QUALIFICATIONS

6.3.1 Each member of the unit staff shall meet or exceed the minimum qualifications of ANSI/ANS 3.1of 1978 for comparable positions unless otherwise noted in the Technical Specifications, with thefollowing exceptions: 1) the licensed operators who shall comply only with the requirements of 10 CFR 55, and 2) individuals who do not meet ANSI/ANS 3.1 of 1978, Section 4.5, are not considered technicians or maintenance personnel for purposes of determining qualifications but are permitted to perform work for which qualification has been demonstrated.

6.3.2 The management position responsible for radiological controls shall meet or exceed the qualifications of Regulatory Guide 1.8 of 1977. Each radiological controls technician/supervisor shall meet or exceed the qualifications of ANSI-N 18.1-1971, paragraph 4.5.2/4.3.2, or be formally qualified through an NRC approved TMI-l Radiation Controls training program. All radiological controls technicians will be qualified through training and examination in each area or specific task related to their radiological controls functions prior to their performance of those tasks.

6.3.3 The Shift Technical Advisors shall have a bachelor's degree or equivalent in a scientific or engineering discipline with specific training in unit design, response and analysis of transientsand accidents.

6.4 TRAINING

6.4.1 A training program for the Fire Brigade shall be maintained and shall meet or exceed the requirements of Section 600 of the NFPA Code.

6.5 DELETED

6-3(Pages 6-4 through 6-8 deleted)

Amendment Nos. 11,22,32,55,77,84,92,99,128,129,131,132,139,141,149,159,171,179,195,198, 207,212,218,239,241,252, 265, 269, 280

Page 30 of 30

u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Cross-Out
u004dr0
Callout
(Deleted)
u004dr0
Callout
(Deleted)
u004dr0
Cross-Out
u004dr0
Text Box
TMI
u004dr0
Callout
ANSI/ANS-3.1-2014, except: - Those who were actively in role prior to implementation of the standard. - Non-Licensed Operators who shall meet or exceed the minimum requirements of ANSI/ANS-3.1-1978.