organization charteastcoastrail.indianrailways.gov.in/uploads/files/1360652666192-web site elect...

8
Electrical (General Services) ORGANIZATION CHART Sr.DEE(G)/KUR DEE(Chg)/PUI ADEE(G)/BBS ADEE(G)/HQ/CSP ADEE(G)/KUR

Upload: others

Post on 27-Mar-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ORGANIZATION CHARTeastcoastrail.indianrailways.gov.in/uploads/files/1360652666192-web site elect g-2013.pdfBBS coaching depot for which the Public complaint has been reduced from 34

Electrical (General Services)

ORGANIZATION CHART

Sr.DEE(G)/KUR

DEE(Chg)/PUI ADEE(G)/BBS ADEE(G)/HQ/CSP ADEE(G)/KUR

Page 2: ORGANIZATION CHARTeastcoastrail.indianrailways.gov.in/uploads/files/1360652666192-web site elect g-2013.pdfBBS coaching depot for which the Public complaint has been reduced from 34

Electrical (General) officers of Khurda Road Division:

Sl. No. Name Designation Phone No.

1. Sri S.C.Nayak Sr.DEE 8455887300

2. Sri S. Sahu DEE (Chg.) 8455887301

3. Sri T.K.Chandel ADEE (G)/BBS 8455887302 4 Sri S.K.Rout ADEE (G)/HQ/CSP 8455887314

5 Sri A.Ray ADEE (G)/KUR 8455887302

Staff Strength of The Division:

Sl.No Category Sanction

1. Group -C 524

2. Group-D 356

ELECTRICAL (GENERAL) MAINTENANCE SECTIONS OF THE DIVISION

Sl. No

Name Designation Section Phone No.

From To

1 Sk. Maskur Sr.SEE/BHC Bhadrak Dhanmandal 8455887324

2 P.K.Mahapatra Sr.SEE/KDJR Sukinda Road

Nayagarh 8455887343

3 A.Dam Sr.SEE/CTC Machhapur Paradeep via Cuttack

8455887325

4 N.C.Swain Sr.SEE/BBS Retang Rajathgarh 8455887322

5 N.Behera Sr.SEE/ANGL Joranda Road

Angul 8455889314

6 D.Das Sr.SEE/KUR : Khurda Road

Gangadharpur 8455887341

7 J.Mahapatra Sr.SEE/BAM Solari Brahmapur 8455887326

8 R.C.Rao JEE/PSA Golanthra Palasa 8978280302

9 S.Jena Sr.SEE/PUI Kanas Road Puri 8455887330

10 N.Behera Sr.SEE (Pump TL & AC)/KUR

: Khurda Road

Gangadharpur 8455889332

11 B.K.Saha Sr.SEE/BBS Rail Vihar 8455885343

12 B.Pradhan Sr.SEE/BBS Rail Kunj 8455885342

13 K.C.Mahapatra Sr.SEE/BBS Rail Sadan 8455885341

Page 3: ORGANIZATION CHARTeastcoastrail.indianrailways.gov.in/uploads/files/1360652666192-web site elect g-2013.pdfBBS coaching depot for which the Public complaint has been reduced from 34

Major Coaching Maintenance Depots: Puri Coaching Depot: Tthis depot is headed by DEE/Coaching/Puri with the following Sr.Section Engineers/Junior Engineers.

Sl. No. Name Designation Phone No.

1 J.K.Pani Sr.SEE 8455887336

2 A.K.Singh Sr.SEE/AC 8455887329

3 B.K.Thakur Sr.SEE/AC 845588

4 G.K.Roy Sr.SEE/TL 8455887321

5 B.B.Borde Sr.SEE/TL 8455887335

6 S.S.Sethy Sr.SEE/TL 8455887328

7 N.Mahanta Sr.SEE/TL 8455889318

8 B.Tripathy Sr.SEE/TL 8455889316

Bhubaneswar Coaching Depot: Tthis depot is headed by ADEE/G/BBSi with the following Sr.Section Engineers/Junior Engineers.

Sl. No. Name Designation Phone No.

1 KSRG Krishna Sr.SEE/EOG/BBS 8455887327

2 S.C.Bain Sr.SEE/AC/BBS 8455887323

3 P.Panigrahi Sr.SEE/AC&TL/BBS 8455889312

4 V.N. Kumar Sr.SEE/TL/BBS 8455889315

5 R.R.Das Sr.SEE/MCS 8455887338

Page 4: ORGANIZATION CHARTeastcoastrail.indianrailways.gov.in/uploads/files/1360652666192-web site elect g-2013.pdfBBS coaching depot for which the Public complaint has been reduced from 34

1 Functions 1.1 Power System:

a) Electrified station : 121 b) Connected load of Division : 25577 KW c) Average Unit consumed per month : 31.18 Lakh Unit d) 11/0.4 KVA Substation : 68 nos e) 33/11 KVA Substation : 03 nos f) Transformer : 115 nos. g) Electrical pump : 202 Nos h) Diesel Generator Set : 37 Nos i) Electrified Quarters : 10241 Nos. j) High mast : 61 Nos k) Electrified Manned LC Gate : 223 Nos

1.2 Stationary AC systems/Plants:

a) Window Model AC : 171 Nos. b) Split AC : 418 Nos. c) Package AC : 19 Nos. d) Multi – V AC : 46 Nos. e) Precission AC : 03 Nos. f) Mega Split AC : 08 Nos. g) Floor Mounted AC : 13 Nos. h) Cassate AC : 13 Nos. i) Refrigerator : 59 Nos. j) Water cooler : 70 Nos. k) Aquaguard : 50 Nos. l) Water cooler - cum - Purifier : 66 Nos.

1.3 TL & AC:

a) Primary Maintenance Depot : 02 Nos b) Primary Maintenance Mail/Express trains. : 34 Nos

c) Primary Maintenance Passenger trains : 05 Nos

d) Primary Maintenance rakes : 70 Nos

e) Secondary Maintenance rakes : 25 Nos f) TL passing point : 05 Nos

Page 5: ORGANIZATION CHARTeastcoastrail.indianrailways.gov.in/uploads/files/1360652666192-web site elect g-2013.pdfBBS coaching depot for which the Public complaint has been reduced from 34

2. Out sourcing of following maintenance activities: Comprehensive Maintenance of 156 Nos. 1.5 TR window AC etc. at

different stations in KUR Divn. Comprehensive operation & Maintenance of 2x20 TR Centralised AC

and 4x10 TR package AC in control Office/KUR Comprehensive operation & maintenance of package type AC unit 4 nos.

11 TR in PRS at BBS & CTC. Daily comprehensive operation and maintenance of package type Air

Conditioning units 2 Nos. of 11 TR in Booking Office at Bhubaneswar and 2 Nos. of 11 TR in Passenger Reservation System at Brahmapur in Khurda Road Division.

Daily operation and comprehensive maintenance of 16.5 TR Package type AC units in SCADA Building at Khurda Road station.

Comprehensive maintenance of Split AC of different capacity, Stabilizers and Power points over KUR division.

Comprehensive annual maintenance contract for Multi V Air Conditioners system in Zonal HQ building (ECoR Sadan) of south block.

Annual Maintenance Contract for Precision Air Conditioning Unit of Liebert make in Server Room of IT Centre of E.Co.Rly Zonal HQ Building (ECoR Sadan), Bhubaneswar.

Maintenance/repair of Air-Conditioners, Water Coolers and Refrigerators of East Coast Railway headquarters at Rail Vihar, ECoR Sadan, Railkunj at Bhubaneswar.

Comprehensive maintenance of Aquaguard, Water cooler-cum-purifier of KUR division.

Annual Maintenance Contract of Elevators of ESCON make provided at Rail Sadan, East Coast Railway, Bhubaneswar.

Miscellaneous Maintenance Contract for Electrical General Works of East Coast Railway Headquarters' & Staff Quarters at Rail Vihar, Rail kutir, Rail kunj and quarters near Kanchanjangha Apartment

Miscellaneous Maintenance Contract for Electrical General Works of Cuttack- Machhapur-Paradeep section under Sr.SEE/CTC in Khurda Road Division.

Misc. Maintenance contract for Electrical General Service works between SKND-DATR-Nayagarh section.

Miscellaneous Maintenance Contract for Electrical General Works of Brahmapur-Solari section under Sr.SEE/BAM and Palasa-Golanthra section under Sr.SEE/PSA in Khurda Road Division.

Miscellaneous Maintenance Contract for Electrical General Works of Bhadrak- Dhanmandal section under Sr.SEE/BHC and Talcher-Joranda-Angul section under Sr.SEE/ANGL in Khurda Road Division.

Miscellaneous Maintenance Contract for Electrical General Works of Khurda Road- Gangadharpur-Motari section under Sr.SEE/P/KUR, Bhubaneswar- Rajathagarh-Retang section under Sr.SEE/P/BBS and Puri- Kanas Road section under Sr.SEE/P/PUI in Khurda Road Division of East Coast Railway.

Annual Maintenance contract of Pump Sets its Motor, Starter & Control Panel and Operation of Pumps & DG sets in the specified Locations in Bhadrak-Bhubaneswar Including Angul & Paradeep Section.

Page 6: ORGANIZATION CHARTeastcoastrail.indianrailways.gov.in/uploads/files/1360652666192-web site elect g-2013.pdfBBS coaching depot for which the Public complaint has been reduced from 34

Comp. maint. Contract of pump sets it’s motor, stator, control panel & operation of pumps & DG sets in KUR-PSA including PUI section over KUR division.

Comprehensive maintenance of DG sets of Elect(G) ranging from 18.75 KVA to 500KVA at various locations between BHC-BBS including ANGL section,Rail Vihar & Rail Kunj .

Composite maintenance of DG sets of Elect(G) ranging from 12.5KVA to 350KVA at various locations between KUR-PSA including PUI section.

Annual Preventive Maintenance of 25 KVA Inverters of 25KVA Inverter (M/s Medha, Simens, Hind rectifier & Autometers Alliance make).

Annual Maintenance Contract of Roof Mounted Package units with control panels of AC coaches (RMPU type) of RDSO approved make for 249 Coaches at the Coaching Maintenance Depots & Carriage Repair Workshop, Mancheswar over East Coast Railway.

Bedroll service and other non-commercial services in AC coaches at PUI & BBS.

Bed roll service and other non-commercial services in AC coaches of train No. 12802/12801, 18452/18451, 18401/18402, 12843/12844, 18405/18406, 12882/12881, 18449/18450, 12895/12896, 12887/12888, 28835/28836, 18419/18420, 12746/12745, 12815/2816 & 12875/12876, 18409/18410, 18447/18448, 845/12846, 12880/12879, 18496/18495, 08471/08472, 12582/12581, 08465/08466, 18417/18418, 18463/18464 of train No.12281/12282at BBS & PUI depots.

Maintenance contract for non core activities of AC & TL coaches at BBS and PUI coaching.

Operation and Comprehensive Maintenance of 500 KVA Diesel Generator sets provided in the Power Cars at Puri and Bhubaneswar Coaching Depot.

Maintenance contract for pantry equipments in SG coaches of Trains other than Rajdhani Express (BBS-NDLS-BBS) & Duronto Exp. (PUI-HWH-PUI) at PUI & BBS coaching depot.

Maintenance of Pantry equipment of Rajdhani & Duronto Express. Proposed hiring of 02 nos truck (1 Ton loading capacity -01 no and 9Ton

loading Capacity-01 no) for carrying of Railway materials under of Elect(G) department of Khurda Road division.

Transportation of HSD Oil from KUR to PUI and fueling of Power Car of Train No.12277/12278 (Duronto Exp.) at PUI coaching depot.

Hiring of Road Vehicle along with driver for transporting the maintenance staff for attending Breakdown and Maintenance of Electrical Systems round the clock (24 Hrs) between SKND-DATR-KDJR-NYG section of East Coast Railway in KUR Division.

Page 7: ORGANIZATION CHARTeastcoastrail.indianrailways.gov.in/uploads/files/1360652666192-web site elect g-2013.pdfBBS coaching depot for which the Public complaint has been reduced from 34

3. IMPORTANT WORKS DURING 2012-2013: 3.1 TRAFFIC & TERMINAL FACILITY WORKS

1. Electrification of Yard (Route No 15,16,7,8,11 & 12) at PRDP has been done to facilitate welding of sick wagons.

2. 03 nos, of 22 Mtr High masts are commissioned at station and Goods shed at MCS.

3. To improve maintenance of the Coaching Trains during night time additional 50 nos. 36W FL fittings provided on pit lines in the Coaching Complex/BBS

4. To improve maintenance of the Coaching Trains during night time additional 50 nos. 36W FL fittings provided on pit lines in the Coaching Complex/BBS.

3.2 PASSENGER AMENITY WORKS 1. 1534 nos. Mobile charging points has been provided in AC coaches at PUI &

BBS coaching depot for which the Public complaint has been reduced from 34 nos. to 16 nos. during the period April to December- 2012 as compared to last year (2011).

2. 20 Nos. of refrigerator & deep freezers have been replaced in pantry cars at BBS & coaching depot for improvement of pantry services

3. Electrification of FOB has been done at JKPR, KRIH, HND, KAPG, HMA, GAM, GTA, SPT, MMS, RJGR, GNGD, HND & BUDR Station.

4. One 250 KVA DG set commissioned at KUR filter house for water supply & CTS service.

5. Electrification of PF No. 5 & 6 at KUR station has been done. 6. Electrification of new booking office near main gate No-1 of CTC Railway

station has been done.

3.3 ROAD SAFETY WORKS 1. 15 Nos. of new LC gates have been electrified. (CT-29, CT-56, CT- 71, JB-9,

JB-12, JB-18, CP-4, CP-41, 171,182, 192, 238. 242, 319 & 325). 2. LC gate No 242, JB-9 & JB-18 is electrified with provision of solar lights

3.5 OTHER IMPORTANT WORKS 1. Fuse Distribution Box cover of 818no.TL coaches modified with additional

screws with sealant for safety measure against fire hazard at Coaching depot/ PUI & BBS.

2. To avoid water leakage on electrical panel, Fabricated aluminum try has been provided in top of the panel in 37 coaches, this will also reduce short circuit in panel & avoid fire Hazard due to water leakage.

3. Modification of OVP in 4.5 KW RRU has been done in 6 nos RRU at coaching depot /PUI.

4. 01 no “V“belt grading machine has been provided at BBS coaching depot. 5. To improve reliability of charging of TL coaches 60 nos. corroded junction

boxes replaced in IPL-3A in Coaching complex/BBS. 6. One 2X250 KVA sub-station commissioned at MCS. 7. One 160 KVA DG set commissioned at ORH/PUI exclusively to feed to ORH.

Page 8: ORGANIZATION CHARTeastcoastrail.indianrailways.gov.in/uploads/files/1360652666192-web site elect g-2013.pdfBBS coaching depot for which the Public complaint has been reduced from 34

8. Electrification of new meeting hall near CDO office/PUI has been done. 9. As energy conservation measures 30% & 70% Platform lighting circuit has

been redistributed at KDJR, NKW. SGDP, BRAG, DNM, BYY, KIS & MCS stations.

<><><><><><>