Based from the Hamburg head oce and working as part of project management team, the InterFace supplied HSE Manager, was engaged to manage all safety matters during the installation, mechanical completion and commissioning phases of the Ormonde Oshore Wind farm near Barrow-in-Furness (30 x 5MW turbines). This included overseeing German load out ports (Brunsbüttel, Cuxhaven and Bremerhaven) and managing HSE resources in Belfast and Barrow. Tasks included: - HSE systems development (as the oshore department was new for Repower, no safety management structure existed) Realising Risk Assessments/Method Statements for all planned and unplanned activities Development and delivery of safety related training including project/site inductions and toolbox talks Ensuring sites were set up and run safely Facilitating incident management, including issue of flash reports, safety alerts and subsequent incident investigation Competence assessment of project resources prior to issue of oshore passes Facilitation of lessons learned reviews Management reporting and task monitoring (for on and oshore activities) Checking compliance to all project HSE requirements including PPE, permits to work, emergency response plans, working at height, lifting and manual handling. ORMONDE OFFSHORE WIND FARM, BARROW, UK Project Duration Nov 2010 - Dec 2011 www.InterFaceSafety.com

Upload: voxuyen

Post on 06-Sep-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Based from the Hamburg head office and working as part of project management team, the InterFace supplied HSE Manager, was engaged to manage all safety matters during the installation, mechanical completion and commissioning phases of the Ormonde Offshore Wind farm near Barrow-in-Furness (30 x 5MW turbines). This included overseeing German load out ports (Brunsbüttel, Cuxhaven and Bremerhaven) and managing HSE resources in Belfast and Barrow. Tasks included: - • HSE systems development (as the offshore department was new for Repower, no safety

management structure existed) • Realising Risk Assessments/Method Statements for all planned and unplanned activities • Development and delivery of safety related training including project/site inductions and

toolbox talks • Ensuring sites were set up and run safely • Facilitating incident management, including issue of flash reports, safety alerts and

subsequent incident investigation• Competence assessment of project resources prior to issue of offshore passes• Facilitation of lessons learned reviews• Management reporting and task monitoring (for on and offshore activities)• Checking compliance to all project HSE requirements including PPE, permits to work,

emergency response plans, working at height, lifting and manual handling.

ORMONDE OFFSHORE WIND FARM, BARROW, UK

Project Duration

Nov 2010 - Dec 2011