OSFM and a Manufacturing Execution System: Compatible Partners. Training Day January 17, 2007. Objectives. Outline the mechanics of PI’s interface project Communicate the challenges encountered Discuss the solution components employed Share some tips and pitfalls. Agenda. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: OSFM and a Manufacturing Execution System: Compatible Partners

OAC

OSFM and aManufacturing Execution System:

Compatible Partners

Training DayJanuary 17, 2007

Page 2: OSFM and a Manufacturing Execution System: Compatible Partners

Date: January 17, 2007Slide: Slide: 22NorCal OAUG Training DayNorCal OAUG Training Day

Objectives

Outline the mechanics of PI’s interface project Communicate the challenges encountered Discuss the solution components employed Share some tips and pitfalls

Page 3: OSFM and a Manufacturing Execution System: Compatible Partners

Date: January 17, 2007Slide: Slide: 33NorCal OAUG Training DayNorCal OAUG Training Day

Agenda

Introduction - Power Integrations Background on the Project Overview of PI Supply Chain Overview of OSFM Integration Challenges and Considerations Interface Components Lessons Learned Questions and Answers

Page 4: OSFM and a Manufacturing Execution System: Compatible Partners

Date: January 17, 2007Slide: Slide: 44NorCal OAUG Training DayNorCal OAUG Training Day

Power Integrations

Innovation in Power Conversion Fabless Semiconductor Manufacturer Headquartered in San Jose Founded in 1988 Leading supplier of high-voltage analog integrated circuits

(ICs) used in power conversion.– Enable compact, lightweight power supplies that are simpler to

design and manufacture, more reliable, and more energy-efficient than those made with competing technologies.

– Power a vast range of consumer and industrial electronics—computers, DVD players, TV set-top boxes, cell phone chargers, home appliances, telecom networking equipment, and many others.

Page 5: OSFM and a Manufacturing Execution System: Compatible Partners

Date: January 17, 2007Slide: Slide: 55NorCal OAUG Training DayNorCal OAUG Training Day

Project Background – Business Considerations

Issues: Camstar MESA used for tracking production only WIP/Inv Cost – done on massive spreadsheets Extraordinarily long and painful month end close

Solution: Implement OSFM & Inventory to manage WIP

valuation– In process Sort, Assembly, Test, Tape & Reel, etc– Wafer Bank, Die Bank, Untested, etc

Page 6: OSFM and a Manufacturing Execution System: Compatible Partners

Date: January 17, 2007Slide: Slide: 66NorCal OAUG Training DayNorCal OAUG Training Day

Replace Spreadsheet CostAccounting with OSFM

Install interface engine,develop and test interfaces

Project Background - Timetable

2006 2007

Upgrade to 11.5.10from 11.0.3

• Order Management• Inventory• Purchasing• Financials (GL/AP/AR/CM/FA)• Human Resources

Develop interfaceengine (eFabless)

• Receiving• Inventory• OSFM

Page 7: OSFM and a Manufacturing Execution System: Compatible Partners

Date: January 17, 2007Slide: Slide: 77NorCal OAUG Training DayNorCal OAUG Training Day

Overview – Supply Chain

DIEBANK

UNTESTED

WFRBANK

WFRBANK ASSY UN

TESTED

SORT DIEBANK

FG

TEST

Wafer Dlvd from Fab

SAN JOSE

OFFSHORESUBCONTRACTORS

TEST + LF

UNBAKED

BAKE + BAG

BAKE + T&R

HONG KONGDISTRIBUTION

TEST (& VA) FG FG

Page 8: OSFM and a Manufacturing Execution System: Compatible Partners

Date: January 17, 2007Slide: Slide: 88NorCal OAUG Training DayNorCal OAUG Training Day

OSFM Integration

Assets @ Standard Cost

I nventoryI tems,UOM,

QOH

Shop Floor Management

Lot- based J obs

Cost Management

PurchasingBills of Material

Cost Rolls

OSPRequisitions

Wafer POsOSP Blanket OrdersOSP Blanket Releases

WaferReceipts

GeneralLedger

WaferDieUntestedUnbakedFinished Goods

BOMsRoutings

DepartmentsResources

Expected YieldsAbsorption Rates

OSPReceipts

Assets(WI P Value)

Variances

Variances (PPV)

Standard Costs

MESA

Mesa-toOSFM

I nterf ace

Page 9: OSFM and a Manufacturing Execution System: Compatible Partners

Date: January 17, 2007Slide: Slide: 99NorCal OAUG Training DayNorCal OAUG Training Day

Challenges and Considerations

MESA uses single item number for multiple operations:– Wafer number for Wafer Bank, Sort, and Die Bank– FG number for Assembly, Test, and Finished Goods

Multiple Organizations with changes in inventory asset ownership

Not every transaction in MESA is necessary for Cost Accounting

Must avoid prematurely processing a “downstream” transaction for a given lot before “upstream” transaction is successfully played

Page 10: OSFM and a Manufacturing Execution System: Compatible Partners

Date: January 17, 2007Slide: Slide: 1010NorCal OAUG Training DayNorCal OAUG Training Day

Components – Getting Started - Tables

The necessary tables for each transaction were identifie

d

Page 11: OSFM and a Manufacturing Execution System: Compatible Partners

Date: January 17, 2007Slide: Slide: 1111NorCal OAUG Training DayNorCal OAUG Training Day

Components – Getting Started - Columns

•Every required column for each table was planned.

•eFabless rules were created for each (see Appendix for examples)

Page 12: OSFM and a Manufacturing Execution System: Compatible Partners

Date: January 17, 2007Slide: Slide: 1212NorCal OAUG Training DayNorCal OAUG Training Day

Components – Simplified OverviewAS400 eFabless Engine Oracle

MESA Transactions

Get Data from MESA Selected

Transactions

Write Data to Oracle

Read Results from Oracle

Rules and Lookups

Metered by Lot & Control Number

Success or Failure

ReceivingOSFM

Inventory

Page 13: OSFM and a Manufacturing Execution System: Compatible Partners

Date: January 17, 2007Slide: Slide: 1313NorCal OAUG Training DayNorCal OAUG Training Day

Components – Example of Transactions

4Job StartMode 2

UM = DIE

SORTDIE BANK

UM = DIE

YIELD %

LBR+OH

WAFERBANK

UM = WFR

7Lot Move

andCompletn

MESA

Wafer Dlvd from Fab

STRT

1P.O. Rcpt / Deliver

2000WAFERRECVG

MOVE2100

WAFERACCPT

16InterorgTransfer

WAFERBANK

UM = WFR

2200QC

2300WAFER

QUEMOVE

2400WAFERSORT

MOVE, SPLIT, CONV NOT INTERFACED to OSFM

Physicallyarrives in San Jose

MOVE,NOTINTFCD to OSFM

OR

AC

LEO

FFS

HO

RE

OR

GA

NIZ

ATI

ON

2450WS

STAGE

2900DIE

BANK

2475QC

STAGE

2500WSQC

MOVE

OR

AC

LES

AN

JO

SE

OR

GA

NIZ

ATI

ON

Page 14: OSFM and a Manufacturing Execution System: Compatible Partners

Date: January 17, 2007Slide: Slide: 1414NorCal OAUG Training DayNorCal OAUG Training Day

Components – Example of Transactions

7Lot Move

andCompletn

4Job StartMode 2

UM = EA

ASSEMBLY

YIELD %

DIE BANK

UM = DIE

OSPReqOSP

Blanket PO

OSPRelease

Receipt / Deliver OSP

OSPStd’s

UNTESTED

UM = EA

2900DIE

BANKMESA

2950DIE

STAGE

MOVE,SHIP NOTINTFCD to OSFM

16InterorgTransfer

DIE BANK

UM = DIE

Ownership retained in the

U.S. until receipt offshore

17P.O. Rcpt /

Deliver

3000ASSY

(POWR)

3000ASSY(PIC2)

16InterorgTransfer

UNTESTED

UM = EA

Ownership transferred at time of shipment to the

U.S.

INTRNST

RECV, MOVE NOTINTFCD to OSFM

3500ASSYRECV

4000UN

TESTDSHIPIN

TRNST RECV

Qty = Outs

OR

AC

LEO

FFS

HO

RE

OR

GA

NIZ

ATI

ON

OR

AC

LES

AN

JO

SE

OR

G

Page 15: OSFM and a Manufacturing Execution System: Compatible Partners

Date: January 17, 2007Slide: Slide: 1515NorCal OAUG Training DayNorCal OAUG Training Day

Lessons Learned

API user guides are not always clearfor example…– Initially used rcv_lots_interface for Receiving Deliver– Learned via TAR should be mtl_transaction_lots_interface

TRM Column descriptions are not always clearfor example…– Column Name = PRODUCT_CODE – TRM description = Stores the product name to identify the

source transaction for the record– Mandatory = No– Discovered it is required for Receiving Delivery (RCV)

Page 16: OSFM and a Manufacturing Execution System: Compatible Partners

Date: January 17, 2007Slide: Slide: 1616NorCal OAUG Training DayNorCal OAUG Training Day

Lessons Learned

Error messages are not always accuratefor example…– RCV_TP_ACCT_PERIOD_CLOSED error caused by

values unrelated to accounting periods.– Transactions set to ERROR status with no error message

Mapping the right rules and data values took longer than expected.

Need to be on the latest patchset Recognize the need to properly staff for on-going

monitoring of the transactions

Page 17: OSFM and a Manufacturing Execution System: Compatible Partners

Date: January 17, 2007Slide: Slide: 1717NorCal OAUG Training DayNorCal OAUG Training Day

Questions and Answers

Presenter Contact Information

Clark Stockard(408) 414-8879

[email protected]

Travis Cox(925) 786-1230

[email protected]

Page 18: OSFM and a Manufacturing Execution System: Compatible Partners

Date: January 17, 2007Slide: Slide: 1818NorCal OAUG Training DayNorCal OAUG Training Day

Appendix – Example of eFabless Rule

Page 19: OSFM and a Manufacturing Execution System: Compatible Partners

Date: January 17, 2007Slide: Slide: 1919NorCal OAUG Training DayNorCal OAUG Training Day

Appendix – Example of eFabless Rule

Page 20: OSFM and a Manufacturing Execution System: Compatible Partners

Date: January 17, 2007Slide: Slide: 2020NorCal OAUG Training DayNorCal OAUG Training Day

Appendix – Example of eFabless Rule

Page 21: OSFM and a Manufacturing Execution System: Compatible Partners

Date: January 17, 2007Slide: Slide: 2121NorCal OAUG Training DayNorCal OAUG Training Day

Appendix – Example of eFabless Rule

Page 22: OSFM and a Manufacturing Execution System: Compatible Partners

Date: January 17, 2007Slide: Slide: 2222NorCal OAUG Training DayNorCal OAUG Training Day

Appendix – Example of eFabless Rule