KEY Rev Date Description Chk'd Made App'd 0 14/11/2017 PEIR KC ZF SG FIGURE 7.1 LVIA STUDY AREAS CHAPTER 7: LANDSCAPE AND VISUAL Drawn: KC Date: Approved: Checked: ZF SG 14/11/2017 Document Type: Scale: Rev: Sheet Size: Sheet: FIGURE 0 1 OF 1 A3 (420 mm x 297 mm) 1:80,000 PREFERRED LINE ROUTE (OF THE 132 kV OVERHEAD LINE) 200m STUDY AREA 1km STUDY AREA 5km STUDY AREA Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_7.1.mxd Scheme Name: ° Chapter: Document Title: REINFORCEMENT TO NORTH SHROPSHIRE ELECTRICITY DISTRIBUTION NETWORK: 132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated. The study areas extend from the 25m Construction and Operations Corridor (Draft Order Limits), but only taking into account the Preferred Line Route (i.e. the proposed overhead line). BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE. CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017. Notes: 0 1 2 0.5 Kilometres

Upload: others

Post on 23-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: OSWESTRY - SPEnergyNetworks...ELECTRICITY DISTRIBUTION NETWORK: 132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM The Draft Order Limits comprises the construction and operations corridor,

KEYRev Date Description Chk'dMade App'd

0 14/11/2017 PEIR KC ZF SG

FIGURE 7.1 LVIA STUDY AREAS

CHAPTER 7: LANDSCAPE AND VISUAL

Drawn:

KCDate:Approved:Checked:

ZF SG 14/11/2017

Document Type: Scale:

Rev:

Sheet Size:

Sheet:

FIGURE

01 OF 1

A3 (420 mm x 297 mm)1:80,000

PREFERRED LINE ROUTE (OF THE 132 kV OVERHEAD LINE)

200m STUDY AREA

1km STUDY AREA

5km STUDY AREA

Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_7.1.mxd

Scheme Name:

°

Chapter:

Document Title:

REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:

132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM

The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.

The study areas extend from the 25m Construction and Operations Corridor (Draft Order Limits), but only taking into account the Preferred Line Route (i.e. the proposed overhead line).

BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY

PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.

CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.

Notes:

0 1 20.5

Kilometres

Page 2: OSWESTRY - SPEnergyNetworks...ELECTRICITY DISTRIBUTION NETWORK: 132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM The Draft Order Limits comprises the construction and operations corridor,

KEYRev Date Description Chk'dMade App'd

0 14/11/2017 PEIR KC ZF SG

FIGURE 7.2 SHROPSHIRE LANDSCAPE TYPOLOGIES

CHAPTER 7: LANDSCAPE AND VISUAL

Drawn:

KCDate:Approved:Checked:

ZF SG 14/11/2017

Document Type: Scale:

Rev:

Sheet Size:

Sheet:

FIGURE

01 OF 1

A3 (420 mm x 297 mm)1:75,000

PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)

CONSTRUCTION ANDOPERATIONS CORRIDOR

40m CONSULTATION BOUNDARY

1km STUDY AREA

5km STUDY AREA

PROPOSED 132 kVUNDERGROUND CABLE

PROPOSED TEMPORARY ACCESS

PROPOSED TEMPORARYLAYDOWN AREAS

PROPOSED UNDERGROUNDROUTE OF EXISTING LOWERVOLTAGE OVERHEAD LINE BEINGREMOVED

Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_7.2.mxd

Scheme Name:

°

Settled pastoralfarmlands

Urban

Lowlandmoors Estate

farmlands

Timbered plateaufarmlands

Sandstonehills

Enclosed lowlandheaths

Principal settledfarmlands

Lowlandmoors

Settled pastoralfarmlands

Principal timberedfarmlands

Urban

OSWESTRY

WEM

REDNAL

COCKSHUTT Principal settledfarmlands

HIGH ENCLOSED PLATEAU

UPLAND SMALLHOLDINGS

PASTURE HILLS

WOODED RIVER GORGE

WOODED HILLS FARMLANDS

SANDSTONE HILLS

TIMBERED PLATEAU FARMLANDS

PRINCIPAL TIMBERED FARMLANDS

WOODED ESTATELANDS

ESTATE FARMLANDS

SETTLED PASTORAL FARMLANDS

PRINCIPAL SETTLED FARMLANDS

ENCLOSED LOWLAND HEATHS

LOWLAND MOORS

RIVERSIDE MEADOWS

LOWLAND MOSS

URBAN

LANDSCAPE TYPE DESCRIPTIVE UNITS (EXTRACTED FROM THE SHROPSHIRE LANDSCAPE TYPOLOGY, SEPTEMBER 2006)

Chapter:

Document Title:

REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:

132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM

The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.

BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY

PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.

CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.

Notes:

0 1 20.5

Kilometres

The study areas extend from the 25m Construction and Operations Corridor (Draft Order Limits), but only taking into account the Preferred Line Route (i.e. the proposed overhead line).

Page 3: OSWESTRY - SPEnergyNetworks...ELECTRICITY DISTRIBUTION NETWORK: 132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM The Draft Order Limits comprises the construction and operations corridor,

1110

9

9

9

8

876

5

4

3

2

1

KEYRev Date Description Chk'dMade App'd

0 14/11/2017 PEIR KC ZF SG

FIGURE 7.3 LANDSCAPE CHARACTER AREAS

CHAPTER 7: LANDSCAPE AND VISUAL

Drawn:

KCDate:Approved:Checked:

ZF SG 14/11/2017

Document Type: Scale:

Rev:

Sheet Size:

Sheet:

FIGURE

01 OF 1

A3 (420 mm x 297 mm)1:75,000

PREFERRED LINE ROUTE (OF THE 132 kVOVERHEAD LINE)

CONSTRUCTION AND OPERATIONSCORRIDOR

40m CONSULTATION BOUNDARY

1km STUDY AREA

5km STUDY AREA

PROPOSED 132 kV UNDERGROUND CABLE

PROPOSED TEMPORARY ACCESS

PROPOSED TEMPORARY LAYDOWNAREAS

PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED

Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_7.3.mxd

Scheme Name:

°

Settled pastoralfarmlands

Urban

Lowlandmoors Estate

farmlands

Timbered plateaufarmlands

Sandstonehills

Enclosed lowlandheaths

Principal settledfarmlands

Lowlandmoors

Settled pastoralfarmlands

Principal timberedfarmlands

Urban

OSWESTRY

WEM

REDNAL

COCKSHUTT Principal settledfarmlands

PROPOSED TEMPORARY ACCESS

1. URBAN: OSWESTRY

2. SETTLED PASTORAL FARMLANDS: OPEN

3. PRINCIPAL TIMBERED FARMLANDS:HALSTON HALL

4. ESTATE FARMLANDS: WOODHOUSEESTATE

5. LOWLAND MOORS: RIVER PERRY

6. ESTATE FARMLANDS: SEMI-INDUSTRIAL

7. ESTATE FARMLANDS: ELEVATED RIDGE

8. LOWLAND MOORS: WACKLEY BROOK &RIVER RODEN

9. PRINCIPAL SETTLED FARMLANDS:COCKSHUTT TO RUEWOOD

10. SETTLED PASTORAL FARMLANDS:WEM FRINGE

11. URBAN: WEM

PROPOSED TEMPORARY ACCESS

PROPOSED TEMPORARY ACCESS

PROPOSED TEMPORARY ACCESS

HIGH ENCLOSED PLATEAU

UPLAND SMALLHOLDINGS

PASTURE HILLS

WOODED RIVER GORGE

WOODED HILLS FARMLANDS

SANDSTONE HILLS

TIMBERED PLATEAU FARMLANDS

PRINCIPAL TIMBERED FARMLANDS

WOODED ESTATELANDS

ESTATE FARMLANDS

SETTLED PASTORAL FARMLANDS

PRINCIPAL SETTLED FARMLANDS

ENCLOSED LOWLAND HEATHS

LOWLAND MOORS

RIVERSIDE MEADOWS

LOWLAND MOSS

URBAN

LANDSCAPE TYPE DESCRIPTIVE UNITS (EXTRACTED FROM THE SHROPSHIRE LANDSCAPE TYPOLOGY, SEPTEMBER 2006)

LANDSCAPE CHARACTER AREAS

Chapter:

Document Title:

REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:

132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM

The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.

BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY

PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.

CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.

Notes:

0 1 20.5

Kilometres

The study areas extend from the 25m Construction and Operations Corridor (Draft Order Limits), but only taking into account the Preferred Line Route (i.e. the proposed overhead line).

Page 4: OSWESTRY - SPEnergyNetworks...ELECTRICITY DISTRIBUTION NETWORK: 132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM The Draft Order Limits comprises the construction and operations corridor,

WALESRev Date Description Chk'dMade App'd

0 14/11/2017 PEIR KC ZF SG

Drawn:

KCDate:Approved:Checked:

ZF SG 14/11/2017

Document Type: Scale:

Rev:

Sheet Size:

Sheet:

FIGURE

01 OF 1

A3 (420 mm x 297 mm)1:75,000

°

Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_7.4_OV.mxd

Scheme Name:

PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)

CONSTRUCTION AND OPERATIONSCORRIDOR

40m CONSULTATION BOUNDARY

200m STUDY AREA

1km STUDY AREA

5km STUDY AREA

PROPOSED 132 kV UNDERGROUNDCABLE

PROPOSED TEMPORARY ACCESS

PROPOSED TEMPORARY LAYDOWNAREAS

PROPOSED UNDERGROUND ROUTEOF EXISTING LOWER VOLTAGEOVERHEAD LINE BEING REMOVED

COUNTRYSIDE STEWARDSHIP

REGISTERED PARK AND GARDENS

OPEN ACCESS LAND

ANCIENT WOODLAND INVENTORY

DECIDUOUS WOODLAND

NATIONAL FORESTRY INVENTORY

LANDFILL SITE (AUTHORISED &HISTORIC)

BURLTON SOLAR FARM

P!APPROX. LOCATION OF WINDTURBINES

## LISTED BUILDING (GRADE I, II*)

SCHEDULED MONUMENT

SSSI

RAMSAR

SHROPSHIRE NORTH CONSERVATIONAREAS

CHAPTER 7: LANDSCAPE AND VISUAL

FIGURE 7.4 LANDSCAPE DESIGNATIONSOVERVIEW

KEY

Chapter:

Document Title:

REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:

132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM

The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.

BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY

PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.

CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.

Notes:

0 1 20.5

Kilometres

The study areas extend from the 25m Construction and Operations Corridor (Draft Order Limits), but only taking into account the Preferred Line Route (i.e. the proposed overhead line).

Page 5: OSWESTRY - SPEnergyNetworks...ELECTRICITY DISTRIBUTION NETWORK: 132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM The Draft Order Limits comprises the construction and operations corridor,

CON

TIN

UES

ON

PAG

E 2

OF

5

OSWESTRY /CROESOSWALLT

Gobowen

St Martin's

Whittington

WestonRhyn

Trefonen

Treflach

Morda

Porth-y-waen

Llynclys

Morton

Hengoed

Middleton

MaesburyMarsh

Selattyn

Ball

Woolston

2 3 4 51

KEY

Rev Date Description Chk'dMade App'd

0 14/11/2017 PEIR KC ZF SG

FIGURE 7.4 LANDSCAPE DESIGNATIONS

CHAPTER 7: LANDSCAPE AND VISUAL

Drawn:

KCDate:Approved:Checked:

ZF SG 14/11/2017

Document Type: Scale:

Rev:

Sheet Size:

Sheet:

FIGURE

01 OF 5

A3 (420 mm x 297 mm)1:30,000

°

Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_7.4.mxd

Scheme Name:

PAGE 1 OF 5

PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)

CONSTRUCTION AND OPERATIONSCORRIDOR

40m CONSULTATION BOUNDARY

200m STUDY AREA

1km STUDY AREA

5km STUDY AREA

PROPOSED 132 kV UNDERGROUNDCABLE

PROPOSED TEMPORARY ACCESS

PROPOSED TEMPORARY LAYDOWNAREAS

PROPOSED UNDERGROUND ROUTEOF EXISTING LOWER VOLTAGEOVERHEAD LINE BEING REMOVED

COUNTRYSIDE STEWARDSHIP

REGISTERED PARK AND GARDENS

OPEN ACCESS

ANCIENT WOODLAND INVENTORY

DECIDUOUS WOODLAND

NATIONAL FORESTRY INVENTORY

LANDFILL SITE (AUTHORISED &HISTORIC)

BURLTON SOLAR FARM

P!APPROX. LOCATION OF WINDTURBINES

## LISTED BUILDING (GRADE I, II*)

SCHEDULED MONUMENT

SSSI

RAMSAR

SHROPSHIRE NORTH CONSERVATIONAREAS

Chapter:

Document Title:

REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:

132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM

The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.

The study areas extend from the 25m Construction and Operations Corridor (Draft Order Limits), but only taking into account the Preferred Line Route (i.e. the proposed overhead line).

BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.

CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.

Notes:

0 0.5 10.25

Kilometres

Page 6: OSWESTRY - SPEnergyNetworks...ELECTRICITY DISTRIBUTION NETWORK: 132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM The Draft Order Limits comprises the construction and operations corridor,

CON

TIN

UES

ON

PAG

E 1

OF

5

CON

TIN

UES

ON

PAG

E 3

OF

5

Whittington

Perthy

Grimpo

WestFelton

LowerFrankton

Hindford

Middleton

Eardiston

NewMarton

Woolston

Haughton

Queen'sHead

Weirbrook

Hordley

Rednal

Babbinswood

13 4 52

KEY

Rev Date Description Chk'dMade App'd

0 14/11/2017 PEIR KC ZF SG

FIGURE 7.4 LANDSCAPE DESIGNATIONS

CHAPTER 7: LANDSCAPE AND VISUAL

Drawn:

KCDate:Approved:Checked:

ZF SG 14/11/2017

Document Type: Scale:

Rev:

Sheet Size:

Sheet:

FIGURE

02 OF 5

A3 (420 mm x 297 mm)1:30,000

°

Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_7.4.mxd

Scheme Name:

PAGE 2 OF 5

PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)

CONSTRUCTION AND OPERATIONSCORRIDOR

40m CONSULTATION BOUNDARY

200m STUDY AREA

1km STUDY AREA

5km STUDY AREA

PROPOSED 132 kV UNDERGROUNDCABLE

PROPOSED TEMPORARY ACCESS

PROPOSED TEMPORARY LAYDOWNAREAS

PROPOSED UNDERGROUND ROUTEOF EXISTING LOWER VOLTAGEOVERHEAD LINE BEING REMOVED

COUNTRYSIDE STEWARDSHIP

REGISTERED PARK AND GARDENS

OPEN ACCESS

ANCIENT WOODLAND INVENTORY

DECIDUOUS WOODLAND

NATIONAL FORESTRY INVENTORY

LANDFILL SITE (AUTHORISED &HISTORIC)

BURLTON SOLAR FARM

P!APPROX. LOCATION OF WINDTURBINES

## LISTED BUILDING (GRADE I, II*)

SCHEDULED MONUMENT

SSSI

RAMSAR

SHROPSHIRE NORTH CONSERVATIONAREAS

Chapter:

Document Title:

REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:

132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM

The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.

The study areas extend from the 25m Construction and Operations Corridor (Draft Order Limits), but only taking into account the Preferred Line Route (i.e. the proposed overhead line).

BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.

CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.

Notes:

0 0.5 10.25

Kilometres

Page 7: OSWESTRY - SPEnergyNetworks...ELECTRICITY DISTRIBUTION NETWORK: 132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM The Draft Order Limits comprises the construction and operations corridor,

CON

TIN

UES

ON

PAG

E 2

OF

5

CON

TIN

UES

ON

PAG

E 4

OF

5

Ellesmere

Ruyton-XI-Towns

Welshampton

Cockshutt

ColemereTetchill

Bagley

WestonLullingfields

Stanwardinein the Fields

LowerHordley

Lee

Petton

Haughton

Hordley

Wykey

Kenwick

1 24 53

KEY

Rev Date Description Chk'dMade App'd

0 14/11/2017 PEIR KC ZF SG

FIGURE 7.4 LANDSCAPE DESIGNATIONS

CHAPTER 7: LANDSCAPE AND VISUAL

Drawn:

KCDate:Approved:Checked:

ZF SG 14/11/2017

Document Type: Scale:

Rev:

Sheet Size:

Sheet:

FIGURE

03 OF 5

A3 (420 mm x 297 mm)1:30,000

°

Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_7.4.mxd

Scheme Name:

PAGE 3 OF 5

PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)

CONSTRUCTION AND OPERATIONSCORRIDOR

40m CONSULTATION BOUNDARY

200m STUDY AREA

1km STUDY AREA

5km STUDY AREA

PROPOSED 132 kV UNDERGROUNDCABLE

PROPOSED TEMPORARY ACCESS

PROPOSED TEMPORARY LAYDOWNAREAS

PROPOSED UNDERGROUND ROUTEOF EXISTING LOWER VOLTAGEOVERHEAD LINE BEING REMOVED

COUNTRYSIDE STEWARDSHIP

REGISTERED PARK AND GARDENS

OPEN ACCESS

ANCIENT WOODLAND INVENTORY

DECIDUOUS WOODLAND

NATIONAL FORESTRY INVENTORY

LANDFILL SITE (AUTHORISED &HISTORIC)

BURLTON SOLAR FARM

P!APPROX. LOCATION OF WINDTURBINES

## LISTED BUILDING (GRADE I, II*)

SCHEDULED MONUMENT

SSSI

RAMSAR

SHROPSHIRE NORTH CONSERVATIONAREAS

Chapter:

Document Title:

REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:

132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM

The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.

The study areas extend from the 25m Construction and Operations Corridor (Draft Order Limits), but only taking into account the Preferred Line Route (i.e. the proposed overhead line).

BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.

CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.

Notes:

0 0.5 10.25

Kilometres

Page 8: OSWESTRY - SPEnergyNetworks...ELECTRICITY DISTRIBUTION NETWORK: 132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM The Draft Order Limits comprises the construction and operations corridor,

CON

TIN

UES

ON

PAG

E 3

OF

5

CON

TIN

UES

ON

PAG

E 5

OF

5

Cockshutt

HarmerHill

Myddle

Northwood

Colemere

Loppington

Alderton

Lyneal

Petton

EnglishFrankton

Wolverley

Newtown

Burlton

Noneley

Sleap

KEY

Rev Date Description Chk'dMade App'd

0 14/11/2017 PEIR KC ZF SG

FIGURE 7.4 LANDSCAPE DESIGNATIONS

CHAPTER 7: LANDSCAPE AND VISUAL

Drawn:

KCDate:Approved:Checked:

ZF SG 14/11/2017

Document Type: Scale:

Rev:

Sheet Size:

Sheet:

FIGURE

04 OF 5

A3 (420 mm x 297 mm)1:30,000

°

Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_7.4.mxd

Scheme Name:

PAGE 4 OF 5

PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)

CONSTRUCTION AND OPERATIONSCORRIDOR

40m CONSULTATION BOUNDARY

200m STUDY AREA

1km STUDY AREA

5km STUDY AREA

PROPOSED 132 kV UNDERGROUNDCABLE

PROPOSED TEMPORARY ACCESS

PROPOSED TEMPORARY LAYDOWNAREAS

PROPOSED UNDERGROUND ROUTEOF EXISTING LOWER VOLTAGEOVERHEAD LINE BEING REMOVED

COUNTRYSIDE STEWARDSHIP

REGISTERED PARK AND GARDENS

OPEN ACCESS

ANCIENT WOODLAND INVENTORY

DECIDUOUS WOODLAND

NATIONAL FORESTRY INVENTORY

LANDFILL SITE (AUTHORISED &HISTORIC)

BURLTON SOLAR FARM

P!APPROX. LOCATION OF WINDTURBINES

## LISTED BUILDING (GRADE I, II*)

SCHEDULED MONUMENT

SSSI

RAMSAR

SHROPSHIRE NORTH CONSERVATIONAREAS

Chapter:

Document Title:

REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:

132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM

The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.

The study areas extend from the 25m Construction and Operations Corridor (Draft Order Limits), but only taking into account the Preferred Line Route (i.e. the proposed overhead line).

BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.

CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.

Notes:

0 0.5 10.25

Kilometres

Page 9: OSWESTRY - SPEnergyNetworks...ELECTRICITY DISTRIBUTION NETWORK: 132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM The Draft Order Limits comprises the construction and operations corridor,

CON

TIN

UES

ON

PAG

E 4

OF

5

Wem

Prees

Clive

PreesGreen

Grinshill

HarmerHill

LeeBrockhurst

Edstaston

Alderton

Whixall

Paddolgreen

PrestonBrockhurst

QuinaBrook

Besford

Yorton

1 2 3 4 5

KEY

Rev Date Description Chk'dMade App'd

0 14/11/2017 PEIR KC ZF SG

FIGURE 7.4 LANDSCAPE DESIGNATIONS

CHAPTER 7: LANDSCAPE AND VISUAL

Drawn:

KCDate:Approved:Checked:

ZF SG 14/11/2017

Document Type: Scale:

Rev:

Sheet Size:

Sheet:

FIGURE

05 OF 5

A3 (420 mm x 297 mm)1:30,000

°

Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_7.4.mxd

Scheme Name:

PAGE 5 OF 5

PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)

CONSTRUCTION AND OPERATIONSCORRIDOR

40m CONSULTATION BOUNDARY

200m STUDY AREA

1km STUDY AREA

5km STUDY AREA

PROPOSED 132 kV UNDERGROUNDCABLE

PROPOSED TEMPORARY ACCESS

PROPOSED TEMPORARY LAYDOWNAREAS

PROPOSED UNDERGROUND ROUTEOF EXISTING LOWER VOLTAGEOVERHEAD LINE BEING REMOVED

COUNTRYSIDE STEWARDSHIP

REGISTERED PARK AND GARDENS

OPEN ACCESS

ANCIENT WOODLAND INVENTORY

DECIDUOUS WOODLAND

NATIONAL FORESTRY INVENTORY

LANDFILL SITE (AUTHORISED &HISTORIC)

BURLTON SOLAR FARM

P!APPROX. LOCATION OF WINDTURBINES

## LISTED BUILDING (GRADE I, II*)

SCHEDULED MONUMENT

SSSI

RAMSAR

SHROPSHIRE NORTH CONSERVATIONAREAS

Chapter:

Document Title:

REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:

132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM

The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.

The study areas extend from the 25m Construction and Operations Corridor (Draft Order Limits), but only taking into account the Preferred Line Route (i.e. the proposed overhead line).

BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.

CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.

Notes:

0 0.5 10.25

Kilometres

Page 10: OSWESTRY - SPEnergyNetworks...ELECTRICITY DISTRIBUTION NETWORK: 132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM The Draft Order Limits comprises the construction and operations corridor,

P! P!

P!P!

P!P!

P!P!

P! P!P!

P!

P!P!

P!

P!

P!

P!P!

P!

P!

P!

P!

P! P!

P!P!

P!

P!

P!P!P!

P!

P!

P!

P!

P!

P!

P!

P!

P!

P!

P!

P!

P!

P!P!

P!

P!P!

P!

P!

P!

P!

P!

P!

P!

P!

P!

P!P!

P!

P!

P!

P!

P!

P!P!

P!

P!

P!

P!

P!

P!

P!P!VP1 VP10

VP 11

VP12

VP13VP14

VP15VP16

VP17 VP18VP19

VP2

VP20VP21

VP22

VP23

VP24

VP25

VP26

VP27

VP28

VP29

VP3

VP30VP31

VP32

VP33

VP34

VP35

VP36VP37VP38

VP39

VP4

VP40

VP41

VP42

VP43

VP44

VP45

VP46

VP47

VP48

VP49

VP5

VP50

VP51

VP52

VP53

VP54

VP55

VP56

VP57

VP58

VP59

VP6

VP60

VP61

VP62

VP63

VP64

VP65

VP66

VP67

VP68

VP69

VP7

VP70

VP71

VP72

VP73

VP74

VP75

VP76

VP8

VP9

KEYRev Date Description Chk'dMade App'd

0 14/11/2017 PEIR KC ZF SG

FIGURE 7.5 TOPOGRAPHY - ELEVATION (AOD) FOR STUDY AREA

CHAPTER 7: LANDSCAPE AND VISUAL

Drawn:

KCDate:Approved:Checked:

ZF SG 14/11/2017

Document Type: Scale:

Rev:

Sheet Size:

Sheet:

FIGURE

01 OF 1

A3 (420 mm x 297 mm)1:75,000

PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)

CONSTRUCTION AND OPERATIONSCORRIDOR

40m CONSULTATION BOUNDARY

1km STUDY AREA

5km STUDY AREA

PROPOSED 132 kV UNDERGROUNDCABLE

PROPOSED TEMPORARY ACCESS

PROPOSED TEMPORARY LAYDOWNAREAS

PROPOSED UNDERGROUND ROUTEOF EXISTING LOWER VOLTAGEOVERHEAD LINE BEING REMOVED

VIEWPOINTS:

P! SIGNIFICANT

P! NON-SIGNIFICANT

P! NO VIEW

P! NO ACCESS

Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_7.5.mxd

Scheme Name:

°

OSWESTRY

WEM

REDNAL

COCKSHUTT

Elevation (AOD)

62 - 74

74.1 - 76

76.1 - 78

78.1 - 80

80.1 - 82

82.1 - 84

84.1 - 86

86.1 - 88

88.1 - 90

90.1 - 92

92.1 - 94

94.1 - 96

96.1 - 98

98.1 - 100

100.1 - 102

102.1 - 104

104.1 - 106

106.1 - 108

108.1 - 110

110.1 - 112

112.1 - 114

114.1 - 116

116.1 - 118

118.1 - 120

120.1 - 122

122.1 - 124

124.1 - 126

126.1 - 128

128.1 - 379

ELEVATION (AOD)

Chapter:

Document Title:

REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:

132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM

The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.

BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY

PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.

CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.

Notes:

0 1 20.5

Kilometres

The study areas extend from the 25m Construction and Operations Corridor (Draft Order Limits), but only taking into account the Preferred Line Route (i.e. the proposed overhead line).