Our GoalTo meaningfully advance the transition to sustainable
energy while creating jobs and cultivating economic
growth for communities around the world
Contact Information
Interested Suppliers
www. aurorasolarthermal.com.au/suppliers
Aurora Website
www.aurorasolarthermal.com.au
Proprietary and Confidential Copyright © 2018 SolarReserve, LLC All rights reserved | 2
SolarReserve Overview
Leading global integrated solar power business with a high quality development pipeline, differentiated
proprietary technology and a proven track record of success
Development pipeline of over 13 GW across
the world’s most attractive solar markets
includes CSP, PV and solar hybrid plants,
leverage proprietary CSP storage technology
with low-cost PV
Developed projects and secured long-term
power contracts for 775 MW representing
US$3.4 billion of project capital, with an
additional 2,000 MW of projects under award
Global presence with HQ in California and 7
international offices strategically located in
Africa, the Americas, the Asia-Pacific region,
the Middle East, and Europe
Experienced management team with over 27
GW and US$48 billion of combined transaction
experience in 25 countries
Development
Commercialized world’s most efficient and
lowest cost CSP with integrated storage that
solves the intermittency issues experienced
with other renewable energy sources
Unmatched proprietary CSP technology allows
solar to operate as baseload generation and
deliver power into peak demand periods, at a
fraction of other storage technologies
Portfolio of 108 U.S. and global patents and
patent applications, plus in-house ‘know how’
protects technology lead
Ownership of technology enables equipment
supply opportunities and development
advantage
ThermaVault™ Technology
More than US$1.8 billion of projects in
operation globally
Flagship 110 MW Crescent Dunes CSP
project in Tonopah, Nevada with 10 hours of
storage – in 2015 achieved commercial
operation under the Power Purchase
Agreement, a 25-year full offtake contract with
NV Energy
Company has been awarded 346 MW of
projects in South Africa, with 246 MW
currently operating
Full asset management capabilities,
includes supervision of operations,
environmental compliance, lender and
investor relations, and power offtake contract
management
Operations
Proprietary and Confidential Copyright © 2018 SolarReserve, LLC All rights reserved | 3
Global Reach Across Six Continents
Development portfolio of 13 gigawatts across the world’s most attractive, high growth renewable markets
KOTULO TSATSINorthern Cape, 150 MW +
1,800 MWh storage
KALKAARFree State, 150 MW +
1,800 MWh storage
ROOIPUNTNorthern Cape, 150 MW+
1,800 MWh storage
SOUTH AFRICA
JOHANNESBURG
REDSTONE
Northern Cape, 100 MW +
1,200 MWh storage
LESEDI
Free State, 75 MW
LETSATSI
Free State, 75 MW
DEVELOPMENT ACTIVITY
OPERATING
PPA AWARDED
ADVANCED DEVELOPMENT
USA
SANTA MONICA, CA (HQ)
CRESCENT DUNES
Tonopah, Nevada
110 MW +
1,100 MWh storage
SANDSTONE
Nevada
2,000 MW +
20,0000 MWh storage
CHILE
SANTIAGO
COPIAPÓ
Atacama Region
260 MW +
3,400 MWh storage
TAMARUGAL
Tarapaca Region
450 MW +
5,800 MWh storage
LIKANA
Antofagasta Region
390 MW +
5,100 MWh storageAUSTRALIA
ADELAIDE
AURORA
Port Augusta, SA
220 MW +
1100 MWh storage
CHINA
4,000 MW of
Preliminary Agreements
JASPER
Northern Cape, 96 MW
HERTZOGVILLE
Free State, 50 MW
ARRIESFONTEIN
SOLAR PARK
Northern Cape
75 MW - Wilger
75 MW - Arriesfontein
Office
Solar Thermal Projects
Photovoltaic (PV) Projects
Solar Thermal + PV Hybrid Projects
Proprietary and Confidential Copyright © 2018 SolarReserve, LLC All rights reserved | 4
Proprietary and Confidential Copyright © 2018 SolarReserve, LLC All rights reserved | 5
Power Block
PROVEN
TECHNOLOGY
Air Cooled Condenser
Hot Salt Tank
Concrete Tower
Cold Salt Tank
Receiver
Steam Turbine / Generator
Proprietary and Confidential Copyright © 2018 SolarReserve, LLC All rights reserved | 7
Dispatchable Generation Delivers Firm Output On Demand
Integrated energy storage provides the ability to shift electricity generation to meet different
profile needs and a deliver firm reliable power at high capacity value
Photovoltaic
Direct
Steam
SolarReserve’s ThermaVault™
Proprietary and Confidential Copyright © 2018 SolarReserve, LLC All rights reserved | 8
Operational Data: Demonstration of the Technology’s Dispatchability
Operational data from Crescent Dunes 110 MW facility in
Nevada, U.S. demonstrates the dispatchability and
baseload capabilities of SolarReserve’s technology
Energy capture in receiver proven at greater than 100% of
target
24-hour generation ability, although normal generation
requested by utility is peak 12-14 hours per day
Collection through intermittent solar resource and wind
conditions
24 Hour Generation
Stable generation during peak demand
Collection through intermittent solar
DNI (sunlight)
Net Generation (power delivery to the grid)
Receiver Output MW (energy collected in molten salt)
Proprietary and Confidential Copyright © 2018 SolarReserve, LLC All rights reserved | 9
Hybrid Solar Thermal + Solar Photovoltaic (PV) Power Plants
SolarReserve’s advanced hybrid technology comprises
− Solar thermal energy collection
− Integrated molten salt energy storage technology
− Conventional steam power generation
− Solar PV technology
Maximising the generation of electricity during peak demand periods, which extend into evening hours
Adding PV to our solar thermal facilities serves to add capacity as well as turbine flexibility
The solar PV component can
− Power the station’s electricity demand
− Enable the facility to supply more fully dispatchable
electricity to the grid
− Reduce the need to draw electricity from the grid for
station power when the facility is not operating
− Be utilized during daytime hours when electricity
demand and prices are lower – and while parasitic
station power requirements are higher
Rec Power (MWht)
Net Gen (MWhe)
Heliostat Available
Heliostat Tracking
DNI (W/m2)
Day
Month
Year
Actual Hours of Collection
Constrained Model Hours of Collection
Unconstrained Model Collection Hours
Constrained Hours
-
100
200
300
400
500
0
200
400
600
800
1,000
1,200
0 2 4 6 8 10 12 14 16 18 20 22
Elec
tric
al P
ow
er O
utp
ut
(MW
e)
DN
I (W
/m2)
& T
her
ma
l Ou
tpu
t (M
Wt)
)
DNI
Net Generation
Receiver Output MW
Modeled Receiver Output
0
5
10
15
20
25
30
35
40
0
200
400
600
800
1,000
1,200
0 2 4 6 8 10 12 14 16 18 20 22
Win
d S
pee
d (
m/s
) &
Vis
ibil
ity
(km
)
DN
I (W
/m2)
Time
09/27/2016 00:00 DNI Wind Cutoff Wind Speed DB Temp Visibility
Proprietary and Confidential Copyright © 2018 SolarReserve, LLC All rights reserved | 10
Introducing Aurora: South Australia’s Solar Thermal Energy Project
A 220 megawatt (MW) solar park consisting of 150 MW of fully dispatchable solar thermal with 8 hours
(1,100 MW-hours) of full load energy storage, plus the option for 70 MW of PV
70 MW PVPower Block
150 MW CSP with
1,100 MW-hours energy
storage
240 Meter Tower
1,100MW-HOURS
ENERGY STORAGE
(8 HOURS AT FULL
LOAD)
220MEGAWATTS
650GIGAWATT-
HOURS
ANNUALLY
4,300DIRECT, INDIRECT
AND INDUCED
JOBS CREATED
DURING
CONSTRUCTION
750FULL TIME
CONSTRUCTION
JOBS FOR A
DURATION OF
30 MONTHS
55FULL-TIME,
PERMANENT
JOBS FOR
OPERATIONS
AND
MAINTENANCE
60%SOUTH AUSTRALIA
CONTENT TARGETED
FOR CONSTRUCTION
PHASE
12,800 Heliostats
Proprietary and Confidential Copyright © 2018 SolarReserve, LLC All rights reserved | 11
Aurora Project Milestone Achievements
August 2017 November 2017 December 2017 January 2018 March 2018 July 2018
Generation
Agreement
signed with South
Australian
Government for
solar thermal
project with energy
storage to meet
Government’s
annual electricity
consumption
Heritage
Agreement
signed with the
native title holders
represented by the
Barngarla
Determination
Aboriginal
Corporation
Aurora project
secures
Development
Approval from
South Australian
Government
SolarReserve and
OZ Minerals enter
into agreement to
commission a new
high voltage power
line in South
Australia,
securing
transmission for
Aurora
SolarReserve
opens Australian
Headquarters in
Adelaide and Field
Office in Port
Augusta
Aurora project
secures PV
Development
Approval and
vegetation
clearing approval
from South
Australian
Government
Proprietary and Confidential Copyright © 2018 SolarReserve, LLC All rights reserved | 12
A New Transmission Backbone: Unlocking the Far North for Future Mining and Renewable Energy Projects
New line will support SolarReserve’s Aurora project
as well as OZ Minerals’ Prominent Hill mine and
Carrapateena project, all of which will create
thousands of jobs for the State
The high voltage power line will meet the
companies’ current operational requirements and
accommodate their growth strategy for the region
In total the line will be 270 km long with OZ
Minerals and SolarReserve equally sharing
operational costs for the first 35 km of the line
Bringing together two private companies to develop a
major piece of infrastructure for South Australia
Proprietary and Confidential Copyright © 2018 SolarReserve, LLC All rights reserved | 13
• Biological Monitoring
• Buildings
• Civil Works
• Commissioning
• Concrete Placement
• Crane Rental
• Earthwork
• Electrical
• Engineering
• Environmental
Protection
• Fencing
• Fire Protection
• Foundations
• General Contractor
• Geotechnical Works
• Heat Tracing
• Heliostat Assembly
• HVAC
• Instrumentation
• Insulation
• Mechanical
• Operating Services
• Reinforcing Steel
• Roadway
Improvements
• Salt Melting
• Scaffolding
• Security
• Steel Erection
• Surveying
• Tank Erection
• Testing
• Tower Erection
• Transmission
• Trucking
• Underground Utilities
Welding
www.aurorasolarthermal.com.au/suppliers
Solar thermal plants use a tremendous amount of local content, providing jobs to local suppliers