outcomes reporting guideline document...outcomes table in mmo for projects from 2013‐2017. to...
TRANSCRIPT
OUTCOMES REPORTING GUIDELINE DOCUMENT
Federal Gas Tax Fund
Manitoba Strategic Infrastructure Secretariat [email protected]
Abstract Background, reference material and step‐by‐step instructions for reporting on
beneficial Outcomes of municipal 2013‐2017 federal Gas Tax Fund projects
FEDERAL GAS TAX FUND OUTCOMES REPORTING – GUIDELINE DOCUMENT
1
TABLE OF CONTENTS
BACKGROUND ................................................................................................................................. 2
GENERAL INSTRUCTIONS ................................................................................................................ 2
STEP‐BY‐STEP INSTRUCTIONS ......................................................................................................... 3
APPENDIX A: 2013‐2017 Municipal GTF Outcomes Report ............................................................ 6
APPENDIX B: Project Indicators & Project Outcomes by Eligible Category .................................... 7
FEDERAL GAS TAX FUND OUTCOMES REPORTING – GUIDELINE DOCUMENT
2
BACKGROUND
The federal Gas Tax Fund (GTF) is a permanent source of funding provided up front to municipalities to support local infrastructure priorities. Municipalities can pool, bank and borrow against this funding, providing significant financial flexibility. Reporting federal Gas Tax Fund (GTF) project Outcomes is a requirement of the Municipal Gas Tax Agreement. Manitoba must provide to Canada and make publicly available, an Outcomes Report that will report, in aggregate, on the degree to which investments are supporting the progress towards achieving the following three program benefits:
1. Beneficial impacts on communities of completed Eligible Projects; 2. Enhanced impact of GTF as a predictable source of funding including incrementality; and 3. Progress made on improving Local Government planning and asset management.
GTF project details previously submitted in Manitoba Municipalities Online (MMO) did not meet the level of detail required to report on measurable beneficial impacts (Outcomes) required by Canada. In order to summarize and report on completed projects, a set of measurable GTF Project Indicators and Project Outcomes have been established for each of the 18 eligible GTF investment categories. As a result, MMO has been further developed to provide municipalities an avenue to easily report appropriate Indicator and Outcomes along with applicable baselines and results for GTF projects. This data is required for GTF projects with expenditures in the years 2013 to 2017 (inclusive). To demonstrate the enhanced impact of GTF as a predictable source of funding, municipalities are being the following two questions.
Has your municipality ever used its predictable sources of federal Gas Tax Funds to plan for an eligible GTF infrastructure project in a long‐term capital plan? Has your municipality ever, or planned to ever, establish a borrowing by‐law using its federal Gas Tax Funds to finance an eligible GTF project?
The Municipal Asset Management Status Reports, which municipalities complete on an annual basis (started December 2017), provide documentation of progress made by municipalities to build their own capacity for long‐term infrastructure planning and develop and implement formalized asset management plans into their governance and operations.
GENERAL INSTRUCTIONS
After reviewing the following instructions and reference material, municipalities will need to complete the “Outcomes” Table in MMO to identify Project Indicators and Outcomes for each of their GTF projects from 2013‐2017 (inclusive). Once completed, municipalities will submit their 2013‐2017 Municipal GTF Outcomes Report through MMO (see Appendix A –Sample Report).
The deadline to complete GTF Outcomes Reporting is August 31, 2018. Staff from the Manitoba Strategic Infrastructure Secretariat are available to provide additional guidance as needed. For assistance, call toll free 1‐800‐268‐4883, local 204‐945‐4074 or email [email protected].
FEDERAL GAS TAX FUND OUTCOMES REPORTING – GUIDELINE DOCUMENT
3
STEP‐BY‐STEP INSTRUCTIONS
Project data should be sourced from the most accurate information available at the time of reporting. In some cases, estimating future Outcome results will be necessary. Each GTF project is only required to report on one Project Indicator and one Project Outcome. A complete list of Indicators and Outcomes by eligible GTF category are outlined in Appendix B. The following two generic Outcomes “Years of useful life have been extended” and “Physical condition rating has increased” should only be used when other more specific Outcomes are not applicable. Follow these step‐by‐step instructions to complete the required Outcomes reporting on all applicable GTF projects by the August 31, 2018 deadline. STEP 1: Log in to MMO to begin reporting federal Gas Tax Fund Project INDICATORS and OUTCOMES STEP 2: Follow the link to “Municipal Grants” from the main page in MMO STEP 3: In the horizontal menu at the top of Municipal Grants, select “GTF Outcomes”
On the GTF Outcomes screen (sample below), projects that involved the use of federal Gas Tax Funds
between the years 2013 to 2017 (inclusive) will be displayed in order of their project number with the
most recent appearing at the top of the list. The Project # is linked to the Project Details page where
additional project information can be reviewed to assist in Outcomes reporting.
FEDERAL GAS TAX FUND OUTCOMES REPORTING – GUIDELINE DOCUMENT
4
STEP‐BY‐STEP INSTRUCTIONS ‐ Continued
REQUIRED DATA
The following information is required for each project in the Outcomes Table.
Project Indicator: A set of applicable and measurable Project Indicators are available in the drop down
box under this heading. See Appendix B for a full listing of Indicators broken down
by eligible category.
Indicator Result: This is an open numerical field, with up to two decimal places, for the affiliated result
of the project indicator selected. The number recorded should represent the
applicable value stated in the Indicators (KMs or quantity (# of) etc.).
Project Outcome: A set of applicable measurable Project Outcomes are available in the drop down box
under this heading. See Appendix B for a full listing of Outcomes broken down by
eligible category.
Outcome Baseline: This is an open numerical field with up to two decimal places. Where applicable,
baseline data used to measure the resulting Outcome is required. The number
recorded should represent the Baseline value stated in the Outcome Baseline/Results
column of Appendix B.
Outcome Result: This is an open numerical field with up to two decimal places. The number recorded
should represent the Result stated in the Outcome Baseline/Results column of
Appendix B.
Construction
Completion Date: This is a data field. This date will be used to confirm the project has been fully
constructed and can be used for the purposes intended. In the case of a project
under the capacity‐building category, project completion date is applicable for this
field.
NOTE: The “Construction Completion Date” is being confirmed in this report because
the “Project End Date” recorded on the “Project Detail” page in MMO is not always
accurately updated when a forecasted date is used for projects recorded before
constructed.
FEDERAL GAS TAX FUND OUTCOMES REPORTING – GUIDELINE DOCUMENT
5
STEP‐BY‐STEP INSTRUCTIONS ‐ Continued
STEP 4: Begin completing the GTF Outcomes table. Reference Appendix B and select the most
appropriate Project Indicators and Outcomes. Record applicable baselines and results for each of the projects in the table; only one Indicator and Outcome is required per project.
Finally, record the Construction Completion Date. Approximate dates are acceptable provided
they are within the correct quarter of the correct calendar year (i.e. Jan to March, April to June, July to Sept, Oct to Dec). Note: the Construction Completion Date may be before or after the last year that GTF was expended on the project, depending on how the project was funded.
TIP: To ensure data is not lost while completing the report, click the word “Apply” at any time
to save what has been selected or entered. Changes can be made as the form is being completed.
If an applicable Indicator and/or Outcome cannot be determine from the available choices,
contact Manitoba Strategic Infrastructure Secretariat for additional guidance (toll free 1‐800‐
268‐4883, local 204‐945‐4074 or email [email protected]).
Once all projects in the GTF Outcomes table have been fully reported on, save the data by clicking the word “Apply” and proceed to STEP 5.
STEP 5: Complete the 2013‐2017 Municipal GTF Outcomes Report (template was emailed to your
municipality on August 10, 2018) ensuring both questions that address the “Enhanced impact of GTF as a predictable source of funding” are answered prior to submitting the completed report in MMO by the August 31, 2018 deadline.
APPENDIX A FEDERAL GAS TAX FUND OUTCOMES REPORTING – GUIDELINE DOCUMENT
2013‐2017 Municipal Gas Tax Fund Outcomes Report
Municipality:
Contact Name:
Title:
Phone:
Email:
Municipalities are responsible for reporting on the use of their federal Gas Tax Funds (GTF) on eligible projects and the resulting beneficial impacts of those projects on their communities. Project details and Outcomes data collected through Manitoba Municipalities Online (MMO) will support one of three parts of the Outcomes reporting requirements under the Canada‐Manitoba Administrative Agreement on the Federal Gas Tax Fund.
I confirm that Project Indicators (and Results), Project Outcomes (and Baseline / Results) as well as Construction Completion Dates have been recorded for all GTF projects displayed in the Outcomes Table in MMO for projects from 2013‐2017.
To demonstrate enhanced impact of GTF as a predictable source of funding, municipalities are being asked to respond to the following two questions. 1. Has your municipality ever used its predictable sources of federal Gas Tax Funds to plan for an eligible GTF
infrastructure project in a long‐term capital plan?
Yes No
2. Has your municipality ever, or planned to ever, establish a borrowing by‐law using its federal Gas Tax Funds to finance an eligible GTF project?
Yes No
The Municipal Asset Management Status Reports, which municipalities complete on an annual basis (started December 2017), will be used to provide evidence of progress made by municipalities to develop their own capacity for long‐term infrastructure planning and develop and implement formalized asset management plans into their governance and operations. If your municipality did not complete this Status Report, it must be completed before submitting this 2013‐2017 Municipal GTF Outcomes Report.
Attestation: I warrant that, to the best of my knowledge, all information provided in this Report and in the Outcomes Table in MMO has been prepared using the most accurate information available to the Municipality at the time of submission. I further warrant that, I am authorized to submit this Report, and the information contained within, on behalf of the Municipality.
Attested By (Name, Title): Date:
APPENDIX B FEDERAL GAS TAX FUND OUTCOMES REPORTING – GUIDELINE DOCUMENT
1
Project Indicators and Project Outcomes by eligible GTF Category
In order to demonstrate greatest “Beneficial impacts on communities of completed Eligible Projects” review all Indicators and Outcomes by category and select the most specific choices for which results are available. The following two generic Outcomes “Years of useful life have been extended” and “Physical condition rating has increased” should only be used when other more specific Outcomes are not applicable.
Expected useful life of an asset refers to the service life or the productive life of the asset at the time of its acquisition regardless of their lives reported for income tax purposes.
Physical Condition Rating Scale
1 = Very Poor The asset is unfit for sustained service. Near or beyond expected service life, widespread signs of advanced deterioration, some assets may be unusable.
2 = Poor Increasing potential of affecting service. The asset is approaching end of service life; condition below standard and a large portion of system exhibits significant deterioration.
3 = Fair The asset requires attention. The assets show signs of deterioration and some elements exhibit deficiencies.
4 = Good The asset is adequate. Acceptable, generally within mid stage of expected service life.
5 = Very Good Asset is fit for the future. Well maintained, good condition, new or recently rehabilitated.
Category Project Indicators Project Outcomes Outcomes Baseline/Result
Daily vehicle usage has increased
(not applicable to AT projects)
Baseline: vehicle usage per day before investment.
Result: vehicle usage per day after investment.
Travel distance (in KMs) from
point A to B has decreased
Baseline: KMs from point A to B before investment.
Result: KMs from point A to B after investment.
Average travel time (in minutes) from
point A to B has decreased
Baseline: average travel time in minutes before investment.
Result: average travel time in minutes after investment.
Years of useful life have been extendedBaseline: years of useful life before investment.
Result: years of useful life after investment.
Physical condition rating has increasedBaseline: average physical condition of asset(s) before investment
Result: average physical condition of asset(s) after investment.
Average # of monthly users has increased
(AT projects only)
Baseline: average # of monthly users before investment.
Result: average # of monthly users after investment.
Local Roads
and Bridges
# of KMs of existing local roads received investment
or
# of existing local road assets received investment
or
# of KMs of new local roads constructed
or
# of new local road assets constructed and/or aquired
or
# of meters of existing bridges received investment
or
# of existing bridges received investment
or
# of meters of new bridges constructed
or
# of new bridge assets constructed and/or aquired
or
# of KMs of existing active transporation assets received investment
or
# of existing active transporation assets received investment
or
# of KMs of new active transporation assets constructed
or
# of new active transporation assets constructed and/or aquired
APPENDIX B FEDERAL GAS TAX FUND OUTCOMES REPORTING – GUIDELINE DOCUMENT
2
Category Project Indicators Project Outcomes Outcomes Baseline/Result
Daily vehicle usage has increasedBaseline: vehicle usage per day before investment.
Result: vehicle usage per day after investment.
Travel distance (in KMs) from
point A to B has decreased
Baseline: KMs from point A to B before investment.
Result: KMs from point A to B after investment.
Average travel time (in minutes) from
point A to B has decreased
Baseline: average travel time in minutes before investment.
Result: average travel time in minutes after investment.
Years of useful life have been extendedBaseline: years of useful life before investment.
Result: years of useful life after investment.
Physical condition rating has increasedBaseline: average physical condition of asset(s) before investment
Result: average physical condition of asset(s) after investment.
Highways
# of KMs of highways received investment
or
# of highways received investment
Fleet capacity has increasedBaseline: Fleet capacity before investment.
Result: Fleet capacity after investment.
Cargo capacity has increasedBaseline: Cargo capacity before investment.
Result: Cargo capacity after investment.
Passenger capacity has increasedBaseline: Passenger capacity before investment.
Result: Passenger capacity after investment.
Years of useful life have been extendedBaseline: years of useful life before investment.
Result: years of useful life after investment.
Physical condition rating has increasedBaseline: average physical condition of asset(s) before investment
Result: average physical condition of asset(s) after investment.
Short‐sea
Shipping
# of new short‐sea shipping assets constructed and/or acquired
or
# of existing short‐sea shipping assets received investment
Fleet capacity has increasedBaseline: Fleet capacity before investment.
Result: Fleet capacity after investment.
Cargo capacity has increasedBaseline: Cargo capacity before investment.
Result: Cargo capacity after investment.
Passenger capacity has increasedBaseline: Passenger capacity before investment.
Result: Passenger capacity after investment.
Years of useful life have been extendedBaseline: years of useful life before investment.
Result: years of useful life after investment.
Physical condition rating has increasedBaseline: average physical condition of asset(s) before investment
Result: average physical condition of asset(s) after investment.
Short‐line Rail
# of new short‐line rail assets constructed and/or acquired
or
# of existing short‐line rail assets received investment
APPENDIX B FEDERAL GAS TAX FUND OUTCOMES REPORTING – GUIDELINE DOCUMENT
3
Category Project Indicators Project Outcomes Outcomes Baseline/Result
Annual # of takeoffs/landings has increasedBaseline: annual takeoffs/landings before investment.
Result: annual takeoffs/landings after investment.
Annual # of passengers has increasedBaseline: annual passengers before investment.
Result: annual passengers after investment.
New permanent jobs created
as a result of investment
Baseline: permanent jobs before investment.
Result: permanent jobs after investment.
Businesses are growing as a result of investmentBaseline: NOT APPLICABLE
Result: # of new businesses in operation after investment.
Additional business investment
as a result of investment
Baseline: business investment before investment.
Result: business investment after investment.
Years of useful life have been extendedBaseline: years of useful life before investment.
Result: years of useful life after investment.
Physical condition rating has increasedBaseline: average physical condition of asset(s) before investment
Result: average physical condition of asset(s) after investment.
Regional and
Local Airports
# of new regional and local airport assets constructed and/or
acquired
or
# of existing regional and local airport assets received investment
Households with access to high speed internet
(1.5 MBPS or higher) have increased
Baseline: households with access to high speed internet before investment.
Result: households with access to high speed internet after investment.
Businesses with access to high speed internet
(1.5 MBPS or higher) have increased
Baseline: businesses with access to high speed internet before investment.
Result: businesses with access to high speed internet after investment.
Years of useful life have been extendedBaseline: years of useful life before investment.
Result: years of useful life after investment.
Physical condition rating has increasedBaseline: average physical condition of asset(s) before investment
Result: average physical condition of asset(s) after investment.
Broadband
Connectivity
# of meters of cable/fibre optic lines installed
or
# of towers/repeaters installed
or
# of broadband infrastructure assets received investment
or
# of broadband infrastructure assets acquired
Transport capacity has increasedBaseline: transport capacity before investment.
Result: transport capacity after investment.
Annual ridership has increasedBaseline: annual ridership before investment.
Result: annual ridership after investment.
Average age (in years) of fleet has decreased
(rolling stock only)
Baseline: average age of fleet before investment.
Result: average age of fleet after investment.
Fleet vehicles with safety features have increasedBaseline: fleet with related safety features before investment.
Result: fleet with related safety features after investment.
Years of useful life have been extendedBaseline: years of useful life before investment.
Result: years of useful life after investment.
Physical condition rating has increasedBaseline: average physical condition of asset(s) before investment
Result: average physical condition of asset(s) after investment.
Public Transit
# of public transit buses acquired
or
# of handi‐transit vehicles acquired
or
# of new public transit infrastructure assets constructed and/or
acquired
or
# of new handi‐transit infrastructure assets constructed and/or
acquired
or
# of existing pubic transit infrastructure assets received investment
or
APPENDIX B FEDERAL GAS TAX FUND OUTCOMES REPORTING – GUIDELINE DOCUMENT
4
Category Project Indicators Project Outcomes Outcomes Baseline/Result
Cubic metres of water treated
per day has increased
Baseline: cubic metres of water treated before investment.
Result: cubic metres of water treated after investment.
Litres of chemicals used to
treat water has decreased
Baseline: litres of chemical used per day before investment.
Result: litres of chemical used per day after investment.
Fewer drinking water advisoriesBaseline: drinking water advisories before investment.
Result: drinking water advisories after investment.
Households with improved water qualityBaseline: NOT APPLICABLE
Result: # of households with improved water quality after investment.
Households with protected
water supply has increased
Baseline: households with protected water supply before investment.
Result: households with protected water supply after investment.
Households with drinking water
meeting new standards
Baseline: NOT APPLICABLE
Result: # of households with drinking water meeting new standards after investment.
Additional households that can be
connected to drinking water system
Baseline: households that could be connected before investment.
Result: households that can be connected after investment.
Average annual water main breaks have decreasedBaseline: average annual water main breaks before investment.
Result: average annual water main breaks after investment.
Cubic metres of average daily water
consumption has decreased
Baseline: cubic metres of average daily water consumption before investment.
Result: cubic metres of average daily water consumption after investment.
Average age (in years) of waterlines
has been reduced
Baseline: average age of waterlines before investment.
Result: average age of waterlines after investment.
Kilowatt hours in energy consumption
per year has been reduced
Baseline: kilowatt hours per year of energy consumption before investment.
Result: kilowatt hours per year of energy consumption after investment.
Cubic meters of water storage capacity
has increased
Baseline: cubic metres of water storage capacity before investment.
Result: cubic metres of water storage capacity after investment.
Households served has increasedBaseline: households served before investment.
Result: households served after investment.
Years of useful life have been extendedBaseline: years of useful life before investment.
Result: years of useful life after investment.
Physical condition rating has increasedBaseline: average physical condition of asset(s) before investment
Result: average physical condition of asset(s) after investment.
Drinking Water
# of new water treatment plant/filtration systems assets constructed
and/or acquired
or
# of existing water treatment plant/filtration systems assets
received investment
# of distribution waterlines renewed or installed
or
# of metres of distribution waterlines renewed or installed
or
# of water meters installed
or
# of new water distribution assets acquired
or
# of existing water distribution assets received investment
# of water storage infrastructure assets received investment
ANY PROJECT INDICATORS (OUTPUTS) FROM ABOVE
APPENDIX B FEDERAL GAS TAX FUND OUTCOMES REPORTING – GUIDELINE DOCUMENT
5
Households with access to sanitary wastewater
system has increased
Baseline: households served before investment.
Result: households served after investment.
Cubic metres of daily wastewater collection
capacity has increased
Baseline: cubic metres per day before investment.
Result: cubic metres per day after investment.
Average age (in years) of wastewater pipes
has been reduced
Baseline: average age before investment.
Result: average age after investment.
Cubic metres of daily wastewater treatment
capacity has increased
Baseline: cubic metres per day before investment.
Result: cubic metres per day after investment.
Fewer non‐compliance incidentsBaseline: non‐compliance incidents before investment.
Result: non‐compliance incidents after investment.
Kilowatt‐hours in energy usage
per year has been reduced
Baseline: Kilowatt‐hours in energy usage per year before investment.
Result: Kilowatt‐hours in energy usage per year after investment.
Cubic metres in untreated water has been reducedBaseline: Cubic metres in untreated water before investment.
Result: Cubic metres in untreated water after investment.
Cubic metres of capacity to manage storm water
has increased
Baseline: capacity before investment.
Result: capacity after investment.
Square meters of land area with increased
protection/ reduced risk
Baseline: NOT APPLICABLE
Result: Square meters of land area with increased protection/reduced risk after
related investment.
Households with access to storm water
infrastructure has been increased
Baseline: households with access before investment.
Result: households with access after investment.
Years of useful life have been extendedBaseline: years of useful life before investment.
Result: years of useful life after investment.
Physical condition rating has increasedBaseline: average physical condition of asset(s) before investment
Result: average physical condition of asset(s) after investment.
Wastewater
# of metres of wastewater pipes received investment
or
# of new wastewater collection infrastructure (other than pipes)
constructed and/or acquired
or
# of existing wastewater collection infrastructure (other than pipes)
received investment
or
# of lagoons received investment
or
# of cubic metres of lagoons received investment
or
# of new wastewater treatment infrastructure assets (other than
lagoons) constructed and/or acquired
or
# of existing wastewater treatment infrastructure assets received
investment
# of storm water management assets received investment
ANY PROJECT INDICATORS (OUTPUTS) FROM ABOVE
Metric tonnes of landfill capacity
has been increased
Baseline: metric tonnes capacity before investment.
Result: metric tonnes capacity after investment.
Fewer non‐compliance incidentsBaseline: non‐compliance incidents before investment.
Result: non‐compliance incidents after investment.
Premises participating in recycling has increasedBaseline: participating premises before investment.
Result: participating premises after investment.
Metric tonnes of solid waste diverted from
disposal per year has increased
Baseline: metric tonnes per year diverted before investment.
Result: metric tonnes per year diverted after investment.
Years of useful life have been extendedBaseline: years of useful life before investment.
Result: years of useful life after investment.
Physical condition rating has increasedBaseline: average physical condition of asset(s) before investment
Result: average physical condition of asset(s) after investment.
Solid Waste
# of solid waste equipment assets acquired
or
# of solid waste infrastructure assets received investment
or
# of square meters of solid waste assets received investment
# of recycling equipment assets acquired
or
# of recycling infrastructure assets received investment
or
# of square meters of recycling assets received investment
ANY PROJECT INDICATORS (OUTPUTS) FROM ABOVE
APPENDIX B FEDERAL GAS TAX FUND OUTCOMES REPORTING – GUIDELINE DOCUMENT
6
Litres of energy usage (propane, heating fuel)
has decreased
Baseline: litres per year before investment.
Result: litres per year after investment.
Cubic metres of energy usage (natural gas)
has decreased
Baseline: cubic metres per year before investment.
Result: cubic metres per year after investment.
Kilowatt‐hours of energy usage (electricity)
has decreased
Baseline: kilowatt‐hours per year before investment.
Result: kilowatt‐hours per year after investment.
Metric tonnes of GHG emissions has decreasedBaseline: GHG emissions per year before investment.
Result: GHG emissions per year after investment.
Annual related operational costs, due to energy
conservation, have decreased
Baseline: operating cost per year of related energy use before investment.
Result: operating cost per year of related energy use after investment.
Kilowatt hours generated off grid has increasedBaseline: kilowatt hours/year generated before investment.
Result: kilowatt hours/year generated after investment.
Metric tonnes of GHG emissions has increasedBaseline: GHG emission per year before investment.
Result: GHG emission per year after investment.
Annual related operational costs, due to energy
conservation, have decreased
Baseline: operating cost per year of related energy use before investment.
Result: operating cost per year of related energy use after investment.
Community
Energy Systems
# of energy conservation infrastructure assets received investment
# of energy generation infrastructure assets received investment
Contaminants removed or reduced to
safe exposure level
Baseline: NOT APPLICABLE
Result: Contaminants removed or reduced to safe exposure level after investment.
Taxable assessed value of property has increasedBaseline: taxable assessed value of property before investment.
Result: taxable assessed value of property after investment.
Annual users benefiting from
developed park/playground
Baseline: NOT APPLICABLE
Result: Annual users benefiting from developed park/playground after investment.
Residence benefiting from social housingBaseline: NOT APPLICABLE
Result: Residence benefiting from social housing after investment.
Brownfield
Redevelopment
# of square metres of land remediated
or
# of cubic metres of contaminates removed
or
# of square metres of public parks/playgrounds developed
or
# of social housing units constructed
Annual users have increasedBaseline: annual users before investment.
Result: annual users after investment.
Annual users benefiting from investmentBaseline: NOT APPLICABLE
Result: Annual users benefiting from investment.
Years of useful life have been extendedBaseline: years of useful life before investment.
Result: years of useful life after investment.
Physical condition rating has increasedBaseline: average physical condition of asset(s) before investment
Result: average physical condition of asset(s) after investment.
Sport
Infrastructure
# of new sport infrastructure assets constructed and/or acquired
or
# of existing sport infrastructure assets received investment
Annual users have increasedBaseline: annual users before investment.
Result: annual users after investment.
Annual users benefiting from investmentBaseline: NOT APPLICABLE
Result: Annual users benefiting from investment.
Years of useful life have been extendedBaseline: years of useful life before investment.
Result: years of useful life after investment.
Physical condition rating has increasedBaseline: average physical condition of asset(s) before investment
Result: average physical condition of asset(s) after investment.
Recreational
Infrastructure
# of new recreational infrastructure assets constructed and/or
acquired
or
# of existing recreational infrastructure assets received investment
APPENDIX B FEDERAL GAS TAX FUND OUTCOMES REPORTING – GUIDELINE DOCUMENT
7
Annual users have increasedBaseline: annual users before investment.
Result: annual users after investment.
Annual users benefiting from investmentBaseline: NOT APPLICABLE
Result: Annual users benefiting from investment.
Years of useful life have been extendedBaseline: years of useful life before investment.
Result: years of useful life after investment.
Physical condition rating has increasedBaseline: average physical condition of asset(s) before investment
Result: average physical condition of asset(s) after investment.
Cultural
Infrastructure
# of new cultural infrastructure assets constructed and/or acquired
or
# of existing cultural infrastructure assets received investment
Annual users have increasedBaseline: annual users before investment.
Result: annual users after investment.
Annual users benefiting from investmentBaseline: NOT APPLICABLE
Result: Annual users benefiting from investment.
Annual visitors to the community have increasedBaseline: annual visitor per year before investment.
Result: annual visitor per year after investment.
Years of useful life have been extendedBaseline: years of useful life before investment.
Result: years of useful life after investment.
Physical condition rating has increasedBaseline: average physical condition of asset(s) before investment
Result: average physical condition of asset(s) after investment.
Tourism
Infrastructure
# of new tourism infrastructure assets constructed and/or acquired
or
# of existing tourism infrastructure assets received investment
Properties with increased protection/reduced riskBaseline: NOT APPLICABLE
Result: Properties with increased protection/reduced risk after related investment.
Square meters of land area with increased
protection/ reduced risk
Baseline: NOT APPLICABLE
Result: Square meters of land area with increased protection/reduced risk after
related investment.
Disaster
Mitigation# of disaster mitigation infrastructure assets received investment
# of individuals completed training related to asset management or
municipal long‐term infrastructure planning
Municipalities' or municipal departments'
capacity to develop long‐term infrastructure
planning practices has improved
Baseline: NOT APPLICABLE
Result: # of municipalities or municipal departments with improved capacity to
develop long‐term infrastructure planning practices.
# of long‐term infrastructure studies and/or strategic assessments
conducted
or
# of software/systems acquired and implemented which directly
support asset management planning
Asset Management Plan components further
developed or completed
Baseline: NOT APPLICABLE
Result: # of components of Asset Management Plan further developed or completed.
Capacity
Building