OUTCOMES REPORTING GUIDELINE DOCUMENT 

Federal Gas Tax Fund

Manitoba Strategic Infrastructure Secretariat [email protected] 

Abstract Background, reference material and step‐by‐step instructions for reporting on  

beneficial Outcomes of municipal 2013‐2017 federal Gas Tax Fund projects  

Page 2: OUTCOMES REPORTING GUIDELINE DOCUMENT...Outcomes Table in MMO for projects from 2013‐2017. To demonstrate enhanced impact of GTF as a predictable source of funding, municipalities

FEDERAL GAS TAX FUND OUTCOMES REPORTING – GUIDELINE DOCUMENT 

TABLE OF CONTENTS 

 

BACKGROUND ................................................................................................................................. 2 

 GENERAL INSTRUCTIONS ................................................................................................................ 2 

 STEP‐BY‐STEP INSTRUCTIONS ......................................................................................................... 3 

 

APPENDIX A: 2013‐2017 Municipal GTF Outcomes Report ............................................................ 6 

 

APPENDIX B: Project Indicators & Project Outcomes by Eligible Category .................................... 7 

 

 

   

Page 3: OUTCOMES REPORTING GUIDELINE DOCUMENT...Outcomes Table in MMO for projects from 2013‐2017. To demonstrate enhanced impact of GTF as a predictable source of funding, municipalities

FEDERAL GAS TAX FUND OUTCOMES REPORTING – GUIDELINE DOCUMENT 

BACKGROUND  

The federal Gas Tax Fund (GTF) is a permanent source of funding provided up front to municipalities to support  local  infrastructure priorities. Municipalities  can pool, bank  and borrow  against  this  funding, providing significant financial flexibility.   Reporting  federal Gas  Tax  Fund  (GTF)  project Outcomes  is  a  requirement  of  the Municipal Gas  Tax Agreement.  Manitoba must provide to Canada and make publicly available, an Outcomes Report that will report, in aggregate, on the degree to which investments are supporting the progress towards achieving the following three program benefits:   

1. Beneficial impacts on communities of completed Eligible Projects;  2. Enhanced impact of GTF as a predictable source of funding including incrementality; and 3. Progress made on improving Local Government planning and asset management. 

 GTF project details previously submitted in Manitoba Municipalities Online (MMO) did not meet the level of detail required to report on measurable beneficial impacts (Outcomes) required by Canada.  In order to summarize and report on completed projects, a set of measurable GTF Project Indicators and Project Outcomes have been established for each of the 18 eligible GTF investment categories. As a result, MMO has been further developed to provide municipalities an avenue to easily report appropriate Indicator and Outcomes along with applicable baselines and  results  for GTF projects.   This data  is  required  for GTF projects with expenditures in the years 2013 to 2017 (inclusive).  To demonstrate the enhanced impact of GTF as a predictable source of funding, municipalities are being the following two questions.  

Has your municipality ever used its predictable sources of federal Gas Tax Funds to plan for an eligible GTF infrastructure project in a long‐term capital plan?  Has your municipality ever, or planned to ever, establish a borrowing by‐law using its federal Gas Tax Funds to finance an eligible GTF project? 

 The Municipal Asset Management  Status Reports, which municipalities  complete  on  an  annual  basis (started December 2017), provide documentation of progress made by municipalities to build their own capacity for long‐term infrastructure planning and develop and implement formalized asset management plans into their governance and operations.  

GENERAL INSTRUCTIONS  

After reviewing the following  instructions and reference material, municipalities will need to complete the “Outcomes” Table in MMO to identify Project Indicators and Outcomes for each of their GTF projects from 2013‐2017 (inclusive).  Once completed, municipalities will submit their 2013‐2017 Municipal GTF Outcomes Report through MMO (see Appendix A –Sample Report).   

The deadline to complete GTF Outcomes Reporting is August 31, 2018.  Staff from the Manitoba Strategic Infrastructure Secretariat are available to provide additional guidance as needed.  For assistance, call toll free 1‐800‐268‐4883, local 204‐945‐4074 or email [email protected].

Page 4: OUTCOMES REPORTING GUIDELINE DOCUMENT...Outcomes Table in MMO for projects from 2013‐2017. To demonstrate enhanced impact of GTF as a predictable source of funding, municipalities

FEDERAL GAS TAX FUND OUTCOMES REPORTING – GUIDELINE DOCUMENT 

STEP‐BY‐STEP INSTRUCTIONS 

 Project data should be sourced from the most accurate information available at the time of reporting.  In some cases, estimating future Outcome results will be necessary.    Each GTF project is only required to report on one Project Indicator and one Project Outcome. A complete list of  Indicators and Outcomes by eligible GTF category are outlined  in Appendix B. The following two generic Outcomes “Years of useful life have been extended” and “Physical condition rating has increased” should only be used when other more specific Outcomes are not applicable.   Follow these step‐by‐step instructions to complete the required Outcomes reporting on all applicable GTF projects by the August 31, 2018 deadline.   STEP 1:  Log in to MMO to begin reporting federal Gas Tax Fund Project INDICATORS and OUTCOMES  STEP 2:  Follow the link to “Municipal Grants” from the main page in MMO  STEP 3:  In the horizontal menu at the top of Municipal Grants, select “GTF Outcomes” 

 

 

          

 On the GTF Outcomes screen  (sample below), projects that  involved the use of  federal Gas Tax Funds 

between the years 2013 to 2017 (inclusive) will be displayed  in order of their project number with the 

most recent appearing at  the top of the  list. The Project #  is  linked  to the Project Details page where 

additional project information can be reviewed to assist in Outcomes reporting.  

Page 5: OUTCOMES REPORTING GUIDELINE DOCUMENT...Outcomes Table in MMO for projects from 2013‐2017. To demonstrate enhanced impact of GTF as a predictable source of funding, municipalities

FEDERAL GAS TAX FUND OUTCOMES REPORTING – GUIDELINE DOCUMENT 

STEP‐BY‐STEP INSTRUCTIONS ‐ Continued 

REQUIRED DATA 

The following information is required for each project in the Outcomes Table. 

Project Indicator:   A set of applicable and measurable Project Indicators are available in the drop down 

box under this heading.  See Appendix B for a full listing of Indicators broken down 

by eligible category. 

 

Indicator Result:  This is an open numerical field, with up to two decimal places, for the affiliated result 

of  the  project  indicator  selected.    The  number  recorded  should  represent  the 

applicable value stated in the Indicators (KMs or quantity (# of) etc.). 

 

Project Outcome:  A set of applicable measurable Project Outcomes are available in the drop down box 

under this heading.   See Appendix B for a full  listing of Outcomes broken down by 

eligible category. 

 

Outcome Baseline:  This  is an open numerical  field with up  to  two decimal places. Where applicable, 

baseline  data  used  to measure  the  resulting  Outcome  is  required.  The  number 

recorded should represent the Baseline value stated in the Outcome Baseline/Results 

column of Appendix B. 

 

Outcome Result:  This is an open numerical field with up to two decimal places. The number recorded 

should  represent  the  Result  stated  in  the  Outcome  Baseline/Results  column  of 

Appendix B. 

 

Construction  

Completion Date:   This  is  a  data  field.  This  date will  be  used  to  confirm  the  project  has  been  fully 

constructed and can be used  for  the purposes  intended.    In  the case of a project 

under the capacity‐building category, project completion date is applicable for this 

field.  

   

  NOTE: The “Construction Completion Date” is being confirmed in this report because 

the “Project End Date” recorded on the “Project Detail” page in MMO is not always 

accurately updated when  a  forecasted date  is used  for projects  recorded before 

constructed.   

Page 6: OUTCOMES REPORTING GUIDELINE DOCUMENT...Outcomes Table in MMO for projects from 2013‐2017. To demonstrate enhanced impact of GTF as a predictable source of funding, municipalities

FEDERAL GAS TAX FUND OUTCOMES REPORTING – GUIDELINE DOCUMENT 

STEP‐BY‐STEP INSTRUCTIONS ‐ Continued 

 STEP 4:  Begin  completing  the  GTF  Outcomes  table.    Reference  Appendix  B  and  select  the  most 

appropriate Project Indicators and Outcomes.  Record applicable baselines and results for each of the projects in the table; only one Indicator and Outcome is required per project.   

   Finally, record the Construction Completion Date.  Approximate dates are acceptable provided 

they are within the correct quarter of the correct calendar year (i.e. Jan to March, April to June, July to Sept, Oct to Dec).  Note: the Construction Completion Date may be before or after the last year that GTF was expended on the project, depending on how the project was funded. 

   TIP: To ensure data is not lost while completing the report, click the word “Apply” at any time 

to  save what  has  been  selected  or  entered.    Changes  can  be made  as  the  form  is  being completed. 

 

  

If  an  applicable  Indicator  and/or Outcome  cannot be determine  from  the  available  choices, 

contact Manitoba Strategic Infrastructure Secretariat for additional guidance (toll free 1‐800‐

268‐4883, local 204‐945‐4074 or email [email protected]). 

Once all projects  in  the GTF Outcomes  table have been  fully  reported on,  save  the data by clicking the word “Apply” and proceed to STEP 5.  

  STEP 5:  Complete  the  2013‐2017 Municipal  GTF  Outcomes  Report  (template was  emailed  to  your 

municipality on August 10, 2018) ensuring both questions that address the “Enhanced impact of GTF as a predictable source of funding” are answered prior to submitting the completed report in MMO by the August 31, 2018 deadline. 

Page 7: OUTCOMES REPORTING GUIDELINE DOCUMENT...Outcomes Table in MMO for projects from 2013‐2017. To demonstrate enhanced impact of GTF as a predictable source of funding, municipalities

APPENDIX A               FEDERAL GAS TAX FUND OUTCOMES REPORTING – GUIDELINE DOCUMENT 

 

  

2013‐2017 Municipal Gas Tax Fund Outcomes Report  

Municipality:  

Contact Name:  

Title:  

Phone:  

Email:    

Municipalities are responsible for reporting on the use of their federal Gas Tax Funds (GTF) on eligible projects and the resulting beneficial impacts of those projects on their communities.  Project details and Outcomes data collected through Manitoba Municipalities Online (MMO) will support one of three parts of the Outcomes reporting requirements under the Canada‐Manitoba Administrative Agreement on the Federal Gas Tax Fund.   

I confirm that Project Indicators (and Results), Project Outcomes (and Baseline / Results) as well as  Construction  Completion  Dates  have  been  recorded  for  all  GTF  projects  displayed  in  the Outcomes Table in MMO for projects from 2013‐2017. 

   

To demonstrate enhanced impact of GTF as a predictable source of funding, municipalities are being asked to respond to the following two questions. 1. Has your municipality ever used its predictable sources of federal Gas Tax Funds to plan for an eligible GTF 

infrastructure project in a long‐term capital plan? 

 Yes        No  

2. Has your municipality ever, or planned to ever, establish a borrowing by‐law using its federal Gas Tax Funds to finance an eligible GTF project?  

Yes     No   

   

The Municipal Asset Management  Status Reports, which municipalities  complete  on  an  annual  basis (started December 2017), will be used to provide evidence of progress made by municipalities to develop their own capacity  for  long‐term  infrastructure planning and develop and  implement  formalized asset management plans into their governance and operations.  If your municipality did not complete this Status Report, it must be completed before submitting this 2013‐2017 Municipal GTF Outcomes Report.  

 

Attestation: I warrant that, to the best of my knowledge, all information provided in this Report and in the Outcomes Table in MMO has been prepared using the most accurate information available to the Municipality at the time of submission.  I further warrant that, I am authorized to submit this Report, and the information contained within, on behalf of the Municipality.    

Attested By (Name, Title):            Date:  

Page 8: OUTCOMES REPORTING GUIDELINE DOCUMENT...Outcomes Table in MMO for projects from 2013‐2017. To demonstrate enhanced impact of GTF as a predictable source of funding, municipalities

APPENDIX B                             FEDERAL GAS TAX FUND OUTCOMES REPORTING – GUIDELINE DOCUMENT 

Project Indicators and Project Outcomes by eligible GTF Category  

In order to demonstrate greatest “Beneficial impacts on communities of completed Eligible Projects” review all Indicators and Outcomes by category and select the most specific choices for which results are available.  The following two generic Outcomes “Years of useful life have been extended” and “Physical condition rating has increased” should only be used when other more specific Outcomes are not applicable.   

Expected useful life of an asset refers to the service life or the productive life of the asset at the time of its acquisition regardless of their lives reported for income tax purposes.  

Physical Condition Rating Scale 

1 = Very Poor  The asset is unfit for sustained service. Near or beyond expected service life, widespread signs of advanced deterioration, some assets may be unusable. 

2 = Poor  Increasing potential of affecting service. The asset is approaching end of service life; condition below standard and a large portion of system exhibits significant deterioration. 

3 = Fair  The asset requires attention. The assets show signs of deterioration and some elements exhibit deficiencies. 

4 = Good  The asset is adequate. Acceptable, generally within mid stage of expected service life. 

5 = Very Good  Asset is fit for the future. Well maintained, good condition, new or recently rehabilitated.   

  

    

Category Project Indicators Project Outcomes Outcomes Baseline/Result

Daily vehicle usage has increased 

(not applicable to AT projects)

Baseline: vehicle usage per day before investment.

Result: vehicle usage per day after investment.

Travel distance (in KMs) from 

point A to B has decreased

Baseline: KMs from point A to B before investment.

Result: KMs from point A to B after investment.

Average travel time (in minutes) from 

point A to B has decreased

Baseline: average travel time in minutes before investment.

Result:  average travel time in minutes after investment.

Years of useful life have been extendedBaseline: years of useful life before investment.

Result: years of useful life after investment.

Physical condition rating has increasedBaseline: average physical condition of asset(s) before investment 

Result: average physical condition of asset(s) after investment. 

Average # of monthly users has increased 

(AT projects only)

Baseline: average # of monthly users before investment.

Result: average # of monthly users after investment.

Local Roads 

and Bridges

# of KMs of existing local roads received investment

     or

# of existing local road assets received investment 

     or

# of KMs of new local roads constructed

     or

# of new local road assets constructed and/or aquired

     or

# of meters of existing bridges received investment

     or

# of existing bridges received investment

     or

# of meters of new bridges constructed             

     or

# of new bridge assets constructed and/or aquired

     or

# of KMs of existing active transporation assets received investment

     or

# of existing active transporation assets received investment 

     or

# of KMs of new active transporation assets constructed

     or

# of new active transporation assets constructed and/or aquired

Page 9: OUTCOMES REPORTING GUIDELINE DOCUMENT...Outcomes Table in MMO for projects from 2013‐2017. To demonstrate enhanced impact of GTF as a predictable source of funding, municipalities

APPENDIX B                             FEDERAL GAS TAX FUND OUTCOMES REPORTING – GUIDELINE DOCUMENT 

 

  

  

  

         

Category Project Indicators Project Outcomes Outcomes Baseline/Result

Daily vehicle usage has increasedBaseline: vehicle usage per day before investment.

Result: vehicle usage per day after investment.

Travel distance (in KMs) from 

point A to B has decreased

Baseline: KMs from point A to B before investment.

Result: KMs from point A to B after investment.

Average travel time (in minutes) from 

point A to B has decreased

Baseline: average travel time in minutes before investment.

Result:  average travel time in minutes after investment.

Years of useful life have been extendedBaseline: years of useful life before investment.

Result: years of useful life after investment.

Physical condition rating has increasedBaseline: average physical condition of asset(s) before investment 

Result: average physical condition of asset(s) after investment. 

Highways

# of KMs of highways received investment

     or

# of highways received investment

Fleet capacity has increasedBaseline: Fleet capacity before investment.

Result: Fleet capacity after investment.

Cargo capacity has increasedBaseline: Cargo capacity before investment.

Result: Cargo capacity after investment.

Passenger capacity has increasedBaseline: Passenger capacity before investment.

Result: Passenger capacity after investment.

Years of useful life have been extendedBaseline: years of useful life before investment.

Result: years of useful life after investment.

Physical condition rating has increasedBaseline: average physical condition of asset(s) before investment 

Result: average physical condition of asset(s) after investment. 

Short‐sea 

Shipping

# of new short‐sea shipping assets constructed and/or acquired

     or

# of existing short‐sea shipping assets received investment

Fleet capacity has increasedBaseline: Fleet capacity before investment.

Result: Fleet capacity after investment.

Cargo capacity has increasedBaseline: Cargo capacity before investment.

Result: Cargo capacity after investment.

Passenger capacity has increasedBaseline: Passenger capacity before investment.

Result: Passenger capacity after investment.

Years of useful life have been extendedBaseline: years of useful life before investment.

Result: years of useful life after investment.

Physical condition rating has increasedBaseline: average physical condition of asset(s) before investment 

Result: average physical condition of asset(s) after investment. 

Short‐line Rail

# of new short‐line rail assets constructed and/or acquired

     or

# of existing short‐line rail assets received investment

Page 10: OUTCOMES REPORTING GUIDELINE DOCUMENT...Outcomes Table in MMO for projects from 2013‐2017. To demonstrate enhanced impact of GTF as a predictable source of funding, municipalities

APPENDIX B                             FEDERAL GAS TAX FUND OUTCOMES REPORTING – GUIDELINE DOCUMENT 

 

  

  

  

      

Category Project Indicators Project Outcomes Outcomes Baseline/Result

Annual # of takeoffs/landings has increasedBaseline:  annual takeoffs/landings before investment.

Result: annual takeoffs/landings after investment.

Annual # of passengers has increasedBaseline:  annual passengers before investment.

Result: annual passengers after investment.

New permanent jobs created 

as a result of investment

Baseline:  permanent jobs before investment.

Result: permanent jobs after investment.

Businesses are growing as a result of investmentBaseline:  NOT APPLICABLE

Result: # of new businesses in operation after investment.

Additional business investment 

as a result of investment

Baseline:  business investment before investment.

Result: business investment after investment.

Years of useful life have been extendedBaseline: years of useful life before investment.

Result: years of useful life after investment.

Physical condition rating has increasedBaseline: average physical condition of asset(s) before investment 

Result: average physical condition of asset(s) after investment. 

Regional and 

Local Airports

# of new regional and local airport assets constructed and/or 

acquired

     or

# of existing regional and local airport assets received investment

Households with access to high speed internet 

(1.5 MBPS or higher) have increased

Baseline:  households with access to high speed internet before investment.

Result: households with access to high speed internet after investment.

Businesses with access to high speed internet 

(1.5 MBPS or higher) have increased

Baseline:  businesses with access to high speed internet before investment.

Result: businesses with access to high speed internet after investment.

Years of useful life have been extendedBaseline: years of useful life before investment.

Result: years of useful life after investment.

Physical condition rating has increasedBaseline: average physical condition of asset(s) before investment 

Result: average physical condition of asset(s) after investment. 

Broadband 

Connectivity

# of meters of cable/fibre optic lines installed

     or

# of towers/repeaters installed

     or

# of broadband infrastructure assets received investment

     or

# of broadband infrastructure assets acquired

Transport capacity has increasedBaseline: transport capacity before investment.

Result: transport capacity after investment.

Annual ridership has increasedBaseline: annual ridership before investment.

Result: annual ridership after investment.

Average age (in years) of fleet has decreased 

(rolling stock only)

Baseline: average age of fleet before investment.

Result: average age of fleet after investment.

Fleet vehicles with safety features have increasedBaseline: fleet with related safety features before investment.

Result: fleet with related safety features after investment.

Years of useful life have been extendedBaseline: years of useful life before investment.

Result: years of useful life after investment.

Physical condition rating has increasedBaseline: average physical condition of asset(s) before investment 

Result: average physical condition of asset(s) after investment. 

Public Transit

# of public transit buses acquired

     or

# of handi‐transit vehicles acquired

     or

# of new public transit infrastructure assets constructed and/or 

acquired

     or

# of new handi‐transit infrastructure assets constructed and/or 

acquired

     or

# of existing pubic transit infrastructure assets received investment

     or

Page 11: OUTCOMES REPORTING GUIDELINE DOCUMENT...Outcomes Table in MMO for projects from 2013‐2017. To demonstrate enhanced impact of GTF as a predictable source of funding, municipalities

APPENDIX B                             FEDERAL GAS TAX FUND OUTCOMES REPORTING – GUIDELINE DOCUMENT 

 

  

           

Category Project Indicators Project Outcomes Outcomes Baseline/Result

Cubic metres of water treated 

per day has increased

Baseline: cubic metres of water treated before investment.

Result: cubic metres of water treated after investment.

Litres of chemicals used to 

treat water has decreased

Baseline: litres of chemical used per day before investment.

Result: litres of chemical used per day after investment.

Fewer drinking water advisoriesBaseline: drinking water advisories before investment.

Result: drinking water advisories after investment.

Households with improved water qualityBaseline: NOT APPLICABLE

Result: # of households with improved water quality after investment.

Households with protected 

water supply has increased

Baseline: households with protected water supply before investment.

Result: households with protected water supply after investment.

Households with drinking water 

meeting new standards

Baseline: NOT APPLICABLE

Result: # of households with drinking water meeting new standards after investment.

Additional households that can be 

connected to drinking water system

Baseline: households that could be connected before investment.

Result: households that can be connected after investment.

Average annual water main breaks have decreasedBaseline: average annual water main breaks before investment.

Result: average annual water main breaks after investment.

Cubic metres of average daily water 

consumption has decreased

Baseline: cubic metres of average daily water consumption before investment.

Result: cubic metres of average daily water consumption after investment.

Average age (in years) of waterlines 

has been reduced

Baseline: average age of waterlines before investment.

Result: average age of waterlines after investment.

Kilowatt hours in energy consumption 

per year has been reduced

Baseline: kilowatt hours per year of energy consumption before investment.

Result: kilowatt hours per year of energy consumption after investment.

Cubic meters of water storage capacity 

has increased

Baseline: cubic metres of water storage capacity before investment.

Result: cubic metres of water storage capacity after investment.

Households served has increasedBaseline: households served before investment.

Result: households served after investment.

Years of useful life have been extendedBaseline: years of useful life before investment.

Result: years of useful life after investment.

Physical condition rating has increasedBaseline: average physical condition of asset(s) before investment 

Result: average physical condition of asset(s) after investment. 

Drinking Water

# of new water treatment plant/filtration systems assets constructed 

and/or acquired

     or

# of existing water treatment plant/filtration systems  assets 

received investment

# of distribution waterlines renewed or installed

     or

# of metres of distribution waterlines renewed or installed

     or

# of water meters installed

     or

# of new water distribution assets acquired

     or

# of existing water distribution assets received investment

# of water storage infrastructure assets received investment

ANY PROJECT INDICATORS (OUTPUTS) FROM ABOVE

Page 12: OUTCOMES REPORTING GUIDELINE DOCUMENT...Outcomes Table in MMO for projects from 2013‐2017. To demonstrate enhanced impact of GTF as a predictable source of funding, municipalities

APPENDIX B                             FEDERAL GAS TAX FUND OUTCOMES REPORTING – GUIDELINE DOCUMENT 

 

  

  

  

Households with access to sanitary wastewater 

system has increased

Baseline: households served before investment.

Result: households served after investment.

Cubic metres of daily wastewater collection 

capacity has increased

Baseline: cubic metres per day before investment.

Result: cubic metres per day after investment.

Average age (in years) of wastewater pipes 

has been reduced

Baseline: average age before investment.

Result: average age after investment.

Cubic metres of daily wastewater treatment 

capacity has increased

Baseline: cubic metres per day before investment.

Result: cubic metres per day after investment.

Fewer non‐compliance incidentsBaseline: non‐compliance incidents before investment.

Result: non‐compliance incidents after investment.

Kilowatt‐hours in energy usage 

per year has been reduced

Baseline: Kilowatt‐hours in energy usage per year before investment.

Result: Kilowatt‐hours in energy usage per year after investment.

Cubic metres in untreated water has been reducedBaseline: Cubic metres in untreated water before investment.

Result: Cubic metres in untreated water after investment.

Cubic metres of capacity to manage storm water 

has increased

Baseline: capacity before investment.

Result: capacity after investment.

Square meters of land area with increased 

protection/ reduced risk

Baseline: NOT APPLICABLE

Result: Square meters of land area with increased protection/reduced risk after 

related investment.

Households with access to storm water 

infrastructure has been increased

Baseline: households with access before investment.

Result: households with access after investment.

Years of useful life have been extendedBaseline: years of useful life before investment.

Result: years of useful life after investment.

Physical condition rating has increasedBaseline: average physical condition of asset(s) before investment 

Result: average physical condition of asset(s) after investment. 

Wastewater

# of metres of wastewater pipes received investment

     or

# of new wastewater collection infrastructure (other than pipes) 

constructed and/or acquired

     or

# of existing wastewater collection infrastructure (other than pipes) 

received investment

     or

# of lagoons received investment

     or

# of cubic metres of lagoons received investment

     or

# of new wastewater treatment infrastructure assets (other than 

lagoons) constructed and/or acquired

     or

# of existing wastewater treatment infrastructure assets received 

investment

# of storm water management assets received investment

ANY PROJECT INDICATORS (OUTPUTS) FROM ABOVE

Metric tonnes of landfill capacity 

has been increased

Baseline: metric tonnes capacity before investment.

Result: metric tonnes capacity after investment.

Fewer non‐compliance incidentsBaseline: non‐compliance incidents before investment.

Result: non‐compliance incidents after investment.

Premises participating in recycling has increasedBaseline:  participating premises before investment.

Result:  participating premises after investment.

Metric tonnes of solid waste diverted from 

disposal per year has increased

Baseline: metric tonnes per year diverted before investment.

Result: metric tonnes per year diverted after investment.

Years of useful life have been extendedBaseline: years of useful life before investment.

Result: years of useful life after investment.

Physical condition rating has increasedBaseline: average physical condition of asset(s) before investment 

Result: average physical condition of asset(s) after investment. 

Solid Waste

# of solid waste equipment assets acquired

     or

# of solid waste infrastructure assets received investment

     or

# of square meters of solid waste assets received investment

# of recycling equipment assets acquired

     or

# of recycling infrastructure assets received investment

     or

# of square meters of recycling assets received investment

ANY PROJECT INDICATORS (OUTPUTS) FROM ABOVE

Page 13: OUTCOMES REPORTING GUIDELINE DOCUMENT...Outcomes Table in MMO for projects from 2013‐2017. To demonstrate enhanced impact of GTF as a predictable source of funding, municipalities

APPENDIX B                             FEDERAL GAS TAX FUND OUTCOMES REPORTING – GUIDELINE DOCUMENT 

  

  

  

  

    

Litres of energy usage (propane, heating fuel) 

has decreased

Baseline: litres per year before investment.

Result: litres per year after investment.

Cubic metres of energy usage (natural gas) 

has decreased

Baseline: cubic metres per year before investment.

Result: cubic metres per year after investment.

Kilowatt‐hours of energy usage (electricity) 

has decreased

Baseline: kilowatt‐hours per year before investment.

Result: kilowatt‐hours per year after investment.

Metric tonnes of GHG emissions has decreasedBaseline: GHG emissions per year before investment.

Result: GHG emissions per year after investment.

Annual related operational costs, due to energy 

conservation, have decreased

Baseline: operating cost per year of related energy use before investment.

Result: operating cost per year of related energy use after investment.

Kilowatt hours generated off grid has increasedBaseline: kilowatt hours/year generated before investment.

Result: kilowatt hours/year generated after investment.

Metric tonnes of GHG emissions has increasedBaseline: GHG emission per year before investment.

Result: GHG emission per year after investment.

Annual related operational costs, due to energy 

conservation, have decreased

Baseline: operating cost per year of related energy use before investment.

Result: operating cost per year of related energy use after investment.

Community 

Energy Systems

# of energy conservation infrastructure assets received investment

# of energy generation infrastructure assets received investment

Contaminants removed or reduced to 

safe exposure level

Baseline: NOT APPLICABLE

Result: Contaminants removed or reduced to safe exposure level after investment.

Taxable assessed value of property has increasedBaseline: taxable assessed value of property before investment.

Result: taxable assessed value of property after investment.

Annual users benefiting from 

developed park/playground

Baseline: NOT APPLICABLE

Result: Annual users benefiting from developed park/playground after investment.

Residence benefiting from social housingBaseline: NOT APPLICABLE

Result: Residence benefiting from social housing after investment.

Brownfield 

Redevelopment

# of square metres of land remediated

     or 

# of cubic metres of contaminates removed

     or

# of square metres of public parks/playgrounds developed

     or

# of social housing units constructed

Annual users have increasedBaseline:  annual users before investment.

Result:  annual users after investment.

Annual users benefiting from investmentBaseline: NOT APPLICABLE

Result: Annual users benefiting from investment.

Years of useful life have been extendedBaseline: years of useful life before investment.

Result: years of useful life after investment.

Physical condition rating has increasedBaseline: average physical condition of asset(s) before investment 

Result: average physical condition of asset(s) after investment. 

Sport 

Infrastructure

# of new sport infrastructure assets constructed and/or acquired

     or

# of existing sport infrastructure assets received investment

Annual users have increasedBaseline:  annual users before investment.

Result:  annual users after investment.

Annual users benefiting from investmentBaseline: NOT APPLICABLE

Result: Annual users benefiting from investment.

Years of useful life have been extendedBaseline: years of useful life before investment.

Result: years of useful life after investment.

Physical condition rating has increasedBaseline: average physical condition of asset(s) before investment 

Result: average physical condition of asset(s) after investment. 

Recreational 

Infrastructure

# of new recreational infrastructure assets constructed and/or 

acquired

     or

# of existing recreational infrastructure assets received investment

Page 14: OUTCOMES REPORTING GUIDELINE DOCUMENT...Outcomes Table in MMO for projects from 2013‐2017. To demonstrate enhanced impact of GTF as a predictable source of funding, municipalities

APPENDIX B                             FEDERAL GAS TAX FUND OUTCOMES REPORTING – GUIDELINE DOCUMENT 

 

  

  

  

  

  

Annual users have increasedBaseline:  annual users before investment.

Result:  annual users after investment.

Annual users benefiting from investmentBaseline: NOT APPLICABLE

Result: Annual users benefiting from investment.

Years of useful life have been extendedBaseline: years of useful life before investment.

Result: years of useful life after investment.

Physical condition rating has increasedBaseline: average physical condition of asset(s) before investment 

Result: average physical condition of asset(s) after investment. 

Cultural 

Infrastructure

# of new cultural infrastructure assets constructed and/or acquired

     or

# of existing cultural infrastructure assets received investment

Annual users have increasedBaseline:  annual users before investment.

Result:  annual users after investment.

Annual users benefiting from investmentBaseline: NOT APPLICABLE

Result: Annual users benefiting from investment.

Annual visitors to the community have increasedBaseline:  annual visitor per year before investment.

Result:  annual visitor per year after investment.

Years of useful life have been extendedBaseline: years of useful life before investment.

Result: years of useful life after investment.

Physical condition rating has increasedBaseline: average physical condition of asset(s) before investment 

Result: average physical condition of asset(s) after investment. 

Tourism 

Infrastructure

# of new tourism infrastructure assets constructed and/or acquired

     or

# of existing tourism infrastructure assets received investment

Properties with increased protection/reduced riskBaseline: NOT APPLICABLE

Result: Properties with increased protection/reduced risk after related investment.

Square meters of land area with increased 

protection/ reduced risk

Baseline: NOT APPLICABLE

Result: Square meters of land area with increased protection/reduced risk after 

related investment.

Disaster 

Mitigation# of disaster mitigation infrastructure assets received investment

# of individuals completed training related to asset management or 

municipal long‐term infrastructure planning

Municipalities' or municipal departments' 

capacity to develop long‐term infrastructure 

planning practices has improved

Baseline: NOT APPLICABLE

Result: # of municipalities or municipal departments with improved capacity to 

develop long‐term infrastructure planning practices.

# of long‐term infrastructure studies and/or strategic assessments 

conducted

     or

# of software/systems acquired and implemented which directly 

support asset management planning

Asset Management Plan components further 

developed or completed

Baseline: NOT APPLICABLE

Result: # of components of Asset Management Plan further developed or completed.

Capacity 

Building