out_in_ b.braun correspondence (08-nov)
DESCRIPTION
Correspondence (08-Nov)TRANSCRIPT
Approval for Material Sample 1
OUTGOING Rev.Date Issued
Title AttachmentStatus
14/02/28 14/03/10 Tung
14/03/03Certificates for Pesticide
Mr. Tung C14/03/04
14/03/14 14/03/21 Tung
14/03/17 C14/03/17
14/03/18 Tung
14/03/27 B14/03/28
14/03/05 14/03/10 Tung14/03/11
14/03/10 B
Additional document Profile in English + 8 contractsTung
14/05/02 14/05/08 14/05/07
Re-submit sample
Tung A/B
14/03/07 Mrs. Lan14/03/10
14/03/10 C
14/03/131 A3 paper
Mrs. Lan
14/03/13 A14/03/13
14/03/17 Hoang
14/03/19 B14/03/19
14/04/15 14/04/18
Marubeni Itochu Steel
Hoang
14/04/16Marubeni Itochu Steel
A
14/03/17 Hoang
14/03/24Purlin
C14/03/24
Date Required Reply
INCOMINGDate Issued
Author/Copy Delivered to
Date delivered
BBVN-FIVE-S2-SC-AMASA-0001-14
Anti Termite Treatment Product - LENFOS 50EC [Pesticide (Hop Tri company)]LENFOS leaflet, Certificate for Pesticide registration (official), Certificate of quality control for import pesticide (official), certificates of analysis (4 pages)
Anti-Termite Product LENFOS - 50EC
BBVN-FIVE-S2-SC-AMASA-0001-14/R1
Anti Termite Treatment: Termimesh Rev.1 Certificate of Quality, Certificate of Origin, Ocean Bill of Lading, Company Profile, Catalogue, Sample
Anti Termite Treatment Termimesh Rev.1
BBVN-FIVE-S2-SC-AMASA-0001/R2
Anti Termite Treatment: Termimesh. Rev.2 Certificate of Analysis, Certificate of Quality Control for Import Pesticide, Certificate for Pesticide registration (official)
Anti Termite Treatment: Termimesh. Rev.2
BBVN-FIVE-S2-SC-AMASA-0002-14
Geotextile ARITEX ART20 Specification of Non-Woven Geotextile, Result of Geotextile official, Sample
Teinco Company Profile (in English) + 8 contracts as reference experience
BBVN-FIVE-S2-SC-AMASA-0002-14/R2
Geotextile ARITEX ART20
BBVN-FIVE-S2-SC-AMASA-0003-14
Concrete grade & Slump
Concrete grade & Slump
BBVN-FIVE-S2-SC-AMASA-0003-14/R1
Concrete grade & Slump (Rev.1)
Concrete Grade & Slump Rev.1
BBVN-FIVE-S2-SC-AMASA-0004
Steel (Kyoei Steel Vietnam Co., Ltd) Company profile, Brochure, Inspection certificate of raw material, Transportation capacity of company in Vietnamese
Steel (Kyoei Steel Vietnam Co., LtdO
BBVN-FIVE-S2-SC-AMASA-0004 (ADD)
Letter of Guaranty for Transportation of Dbar to B.Braun Project; Letter of Guaranty for Quality of Billets Using for Production of Steel Dbar Supplied to B. Braun Project
BBVN-FIVE-S2-SC-AMASA-0005
Purlin Sample, Mill Test certificate, Inspection certificate, 1 A3 size drawing
Approval for Material Sample 2
OUTGOING Rev.Date Issued
Title AttachmentStatus
Date Required Reply
INCOMINGDate Issued
Author/Copy Delivered to
Date delivered
14/04/07 14/04/10Sample
Hoang
14/04/21Purlin_rev1
B
14/03/24 14/03/25 Hoang
14/03/24Sample for Material Sticker
A14/03/24
14/03/24 14/03/25 Hoang
14/03/28 C
14/04/03 14/04/07Sand for Backfill Rev.1
Hoang
10-Apr-14 A
14/03/24 14/03/25 Hoang
14/03/28 C
14/04/03 14/04/07
14/04/05 C
14/04/14 14/04/17
14/04/17 A
14/03/25 14/03/28 Tung
14/03/29 C
14/04/25 14/04/25 Tung
14/04/25List of EM Approval material _ Rev1
B
14/04/02 14/04/05 Hoang
14/04/05 B
14/05/17 14/05/20Test Result
Hoang QC
14/04/02 14/04/05Color Paint Catalogue for Steel structure
Hoang
14/04/17Color Paint Catalogue for Steel structure
C
14/05/19 14/05/13 14/05/15Color Paint Catalogue for Steel structure_Rev.1
Hoang QC C
BBVN-FIVE-S2-SC-AMASA-0005/R1
Purlin Rev1 (revised based on comments in AMASA-0005 dated 24-Mar-2014)
BBVN-FIVE-S2-SC-AMASA-0006
Sample for Material Sticker
BBVN-FIVE-S2-SC-AMASA-0007
Sand for Backfill
Sand for Backfill
BBVN-FIVE-S2-SC-AMASA-0007/R1
Test report by VIBM (Vietnam Institute for Building Materials)
Sand for Backfill Rev.1
BBVN-FIVE-S2-SC-AMASA-0008
Crush rock range 2-10mm, less than 10% passing the 2.36mm sieve for Backfill
Crush rock range 2-10mm, less than 10% passing the 2.36mm sieve for Backfill
BBVN-FIVE-S2-SC-AMASA-0008/R1
Crush rock range 2-10mm, less than 10% passing the 2.36mm sieve for Backfill Rev.1Test result by VIBM (Vietnam Institute for Building Materials)
Crush rock range 2-10mm, less than 10% passing the 2.36mm sieve for Backfill Rev.2
BBVN-FIVE-S2-SC-AMASA-0008/R2
Crush rock range 2-10mm, less than 10% passing the 2.36mm sieve for Backfill Rev.2
Crush rock range 2-10mm, less than 10% passing the 2.36mm sieve for Backfill Rev.2
BBVN-FIVE-S2-SC-AMASA-0009
List of FM Approval Materials
List of FM Approval Materials
BBVN-FIVE-S2-SC-AMASA-0009/R1
List of FM Approval Materials_Rev.1 (Revised based on comments in AMASA_0009 dated 11-Apr-2014)
BBVN-FIVE-S2-SC-AMASA-0010
Steel plate for steel structure (Thickness 6mm, 8mm, 10mm, 12mm, 16mm, 20mm, 30mm, 40mm)
Steel plate for steel structure (Thickness 6mm, 8mm, 10mm, 12mm, 16mm, 20mm, 30mm, 40mm)
BBVN-FIVE-S2-SC-AMASA-0010 (ADD.01)
Steel plate for steel structure (Thickness 6mm, 8mm, 10mm, 12mm, 16mm, 20mm, 30mm, 40mm)_Additional Documents for AMASA-0010 dated 2-Apr-201
BBVN-FIVE-S2-SC-AMASA-0011
BBVN-FIVE-S2-SC-AMASA-0011/R1
Approval for Material Sample 3
OUTGOING Rev.Date Issued
Title AttachmentStatus
Date Required Reply
INCOMINGDate Issued
Author/Copy Delivered to
Date delivered
14/05/12 14/05/15 14/05/15ISO 12944 for lifetime of paint
Hoang QC
14/05/23 14/05/28 14/05/29Sample (INTERLAC-645)
Hoang QC C
14/05/29 14/06/5 14/05/31Sample (INTERLAC-645)
Hoang QC A
14/04/03 14/04/07
XYPEX (Crystalline Waterproof Coating system)
Tung
12-Apr-14 B
14/04/17 14/04/21C/O & C/Q
Tung
Tung B+C
14/05/13 14/05/16 14/05/14XYPEX (Crystalline Waterproof Coating system)_Sample
B
14/04/07 14/04/10Hight intension Bolts (D16, D20, D24) hot dip galvanized
Hoang
14/04/14Hight intension Bolts (D16, D20, D24) hot dip galvanized
C
14/04/24 14/04/28 14/06/17 Hoang A
10-Apr-14 14-Apr-1401 Sample
Tung
14/04/14Wall Tile for Wet area (Toilet & Changing room)
C
14/04/18 14/04/23 Tung
14/04/24 C
BBVN-FIVE-S2-SC-AMASA-0011/R1 (ADD.01)
Color Paint Catalogue for Steel Structure_Rev.1_Additional Documents
BBVN-FIVE-S2-SC-AMASA-0011/R2
Color Paint for Steel structure_Rev.2 revised based on comments in AMASA-0011_Rev.1 dated 15-May-2014
BBVN-FIVE-S2-SC-AMASA-0011/R3
Color Paint for Steel structure_Rev.3 revised based on comments in AMASA-0011_Rev.2 dated 28-May-2014
BBVN-FIVE-S2-SC-AMASA-0012
Introduction, Spec Data, Xypex Concentrate, Vietnam Projects references, Vinh Hiep Hung-Xypex-Method Statement, Material safety data sheet, Selected Projects & SAMPLE (powder&plate)
XYPEX (Crystalline Waterproof Coating system)
BBVN-FIVE-S2-SC-AMASA-0012 (ADD)
XYPEX (Crystalline Waterproof Coating system)_Additional Documents
BBVN-FIVE-S2-SC-AMASA-0012 (ADD.02)/R1
BBVN-FIVE-S2-SC-AMASA-0013
Certificate of Origin (C/O), Certificate of Qualtiy (C/Q)
BBVN-FIVE-S2-SC-AMASA-0013/R1
High Tension Bolts (D16, D20, D24) hot dip galvanized_Rev.1 (Revised based on comments in AMASA_0013 dated 14-Apr-2014)
BBVN-FIVE-S2-SC-AMASA-0014
Wall Tile for Wet area (Toilet & Changing room)
BBVN-FIVE-S2-SC-AMASA-0014/R1
Ceramic Tile for Black Corridor (CR1), Wet Areas (CR2), Exterior Terrace (CR3), Toilet Wall (CR4) supplied by Viet Ceramic & Bach Ma Ceramic
2 company catalogues, Test report, Techinical Specifications, Samples
Ceramic Tile for Black Corridor (CR1), Wet Areas (CR2), Exterior Terrace (CR3), Toilet Wall (CR4) supplied by Viet Ceramic & Bach Ma Ceramic
Approval for Mechanical, Electrical Plumbing 4
OUTGOIING Rev. Date Delivered Title Attachment Author/Delivered to Status
14/04/16 C
14/04/07 MV Cable & MV Terminal kit A
14/04/04 Steel conduit (Smartube) C
14/03/26 C 14/03/26
14/03/24 C 14/03/24
14/03/17 C 14/03/17
14/03/17 C 14/03/17
11-Apr-14B
12-Apr-14
12-Apr-14Plumbing system-PPR pipe & fitting B
12-Apr-14B
12-Apr-14B
11-Apr-14B
12-Apr-14
08-Apr-14 B 08-Apr-14
04-Apr-14 C 04-Apr-14
08-Apr-14 B 08-Apr-14
14/03/17 14/03/22 Trung
14/03/31 14/04/05 Trung
14/03/17 14/03/22 Trung
14/03/24 14/03/31
14/04/01 14/04/08
14/03/17 14/03/22 Specification, VRV brochure, Quang
14/03/29 14/04/04 VRV III Air Conditioning Rev.1
14/03/31 14/04/04 LV Busway Production Mr. Quang
14/03/31 14/04/03 MV Cable & MV Terminal kit Mr. Quang
14/08/08 14/08/13 14/08/12 MV Cable & MV Terminal kit 36kV Technical Description Details Quang/Ujiie B/A
14/03/31 14/04/08 Transformer & LV busduct (feeder) Mr. Quang
14/04/01 14/04/05 Plumbing System u.PVC Pipe&Fitting
14/04/02 14/04/06 Plumbing system-PPR pipe & fitting Mr. Quang
14/04/02 14/04/06 Mr. Quang
10-Apr-14 14-Apr-14
14/04/11 Plumbing system-HDPE pipe & fitting_Rev.1 C
14/04/19 14/04/23 Plumbing system-HDPE pipe & fitting_Rev.2 Mr. Quang
14/04/24 Plumging system - HDPE pipe & Fittings _ Rev.2 A/B
10-Apr-14 14-Apr-14 Mr.Ujiie
14/04/23 HVAC system/ u.PVC pipe & Fitting (Condensate Drain Pipe) B
14/04/28 14/05/02 14/05/07 Diesel Generating Sets Mr. Quang N/A
14/03/31 14/04/04 PVC conduit and fitting (SP) Brochure & Certificate Mr. Quang
14/04/04 PVC conduit and fitting (SP) C
14/04/14 14/04/19 PVC conduit and fitting (SP)_Rev.1 Certificate & Brochure Mr. Quang/Mr.Diem
14/04/17 PVC conduit and fitting (SP)_Rev.1 C
14/03/31 14/04/04 Steel conduit (Smartube) Brochure & Certificate Mr. Quang
14/04/14 14/04/19 Steel conduit (Smartube).Rev1 Company Profile & Brochure Mr. Quang/Mr. Diem
14/04/17 Steel conduit (Smartube).Rev1 C
14/05/06 14/05/10 14/05/28 Steel Conduit and Fittings_Rev2 Catalogue & Supplier Profile Mr. Quang/Diem B/B/A
14/07/14 14/07/19 14/07/18 Steel Conduit & Fittings _Rev.2 (Additional Document) Catalogue B/A
14/03/31 14/04/04 Flexible conduit for underground (Baan) Brochure & Certificate Mr. Quang
14/04/04 Flexible conduit for underground (BAAN) C
14/04/14 14/04/19 Flexible conduit for underground (Baan)_Rev.1 Mr. Quang/Mr. Diem
14/04/23 Flexible conduit for Underground (BAAN)_Rev.1 B/A
14/06/02 B
12-Apr-14 19-Apr-14 Mr.Quang
14/04/16 LV Cable C
14/04/25 14/05/02 14/05/09 Mr. Quang C
14/05/23 14/06/3 14/06/09 Mr. Quang B
12-Apr-14 16-Apr-14 Mr.Quang
14/04/28 14/05/2 14/06/05 Quang/Diem B
14/04/15 14/04/18 VAV for Circulation Corridor Mr. Quang
14/04/24 VAV for Circulation Corridor A/B
14/05/06 14/05/13 14/05/28 Process Chilled Water Insulation Mr. Quang B
14/04/15 14/014/18 14/04/17 RO Water System (Pipe & Fitting and Valve) Mr. Quang C
14/05/24 14/06/06 Randy/Quang
14/04/22 14/04/28 14/05/07 Fire Alarm System Quang, Diem C
14/05/15 14/05/22 14/05/31 Catalogue & Supplier Profile Quang/ Trung B
14/04/23 14/04/26 Flexible Thermelly Insulation Duct Connection Catalogue Mr. Quang
14/05/05 Flexible Thermelly Insulation Duct Connection B
14/04/23 14/04/26 14/05/14 Glasswool Insulation for Cleanroom Ducts Mr. Quang B/B/A
14/04/24 14/04/26 Galvanized Pipe Medium Grade SCHED 40 for Fire Fighting Tabulation & Catalogue Mr. Quang
14/04/25 Galvanized Pipe Medium Grade SCHED 40 for Fire Fighting C
14/05/10 14/05/15 14/05/29 Quang/Trung A
14/05/10 14/05/15 14/05/28 Tabulation & Catalogue Quang/Trung A/B
14/05/10 14/05/15 14/05/15 Tabulation & Catalogue Quang/Trung C
14/05/31 14/06/12 14/06/03 Quang/Trung B
14/04/28 14/05/2 14/05/19 FM 200 C/W Control Panel and Accessories Quang/Trung C
14/06/02 14/06/13 14/06/25 Quang/Trung B
Date Required Reply
INCOMING Date Received
Date Delivered to Author
Lighting Protection
AHU-2units Rev.1
Air Conditioning
Air Cooled Chiller
AHU-2units
Plumbing System u.PVC Pipe&Fitting
Air Cooled Chiller Rev.1 based on comments AMEP-0001 dated 17Mar2014
AHU-2units Rev.2
VRV III Air Conditioning Rev.1
Transformer & LV busduct (feeder)
Plumbing system-HDPE pipe & fitting
LV Busway Production
BBVN-FIVE-S2-SC-AMEP-0001
Air Cooled Chiller Specification, chiller selection software, 2 A4 size drawings
BBVN-FIVE-S2-SC-AMEP-0001/R1
Air Cooled Chiller Rev.1 based on comments AMEP-0001 dated 17Mar2014
BBVN-FIVE-S2-SC-AMEP-0002
AHU (AIR HANDLING UNIT w/VSD) - 2 units Specification, 2 A4size drawings, AL-KO AHU AT6 brochure, Form Material & Equipment Approval record signed by Sub-contractor dated 10-Mar-2014
BBVN-FIVE-S2-SC-AMEP-0002/R1
AHU - 2 units Rev.1
BBVN-FIVE-S2-SC-AMEP-0002/R2
AHU-2units Rev.2 AHU No.3&4 Data sheet, AHU AT6 Catalogue, Supply fan curve diagram, Exhaust fan curve diagram, fan motor catalogue, damper actuator catalogues, heat wheel catalogues
BBVN-FIVE-S2-SC-AMEP-0003
VRVIII Air Conditioning
BBVN-FIVE-S2-SC-AMEP-0003/R1
VRV Tabulation list, 15 catalogues of CDU 1 to 5 and Indoor Cooling/Heating
BBVN-FIVE-S2-SC-AMEP-0004
Canalis KSC, 630A Canalis, 630A End Feed-end cover, Plug in
BBVN-FIVE-S2-SC-AMEP-0005
BBVN-FIVE-S2-SC-AMEP-0005 (A)
BBVN-FIVE-S2-SC-AMEP-0006
Relays, Thermo meter, Feeder busway copper contact, Flexible LinkEdgewise
BBVN-FIVE-S2-SC-AMEP-0007
BBVN-FIVE-S2-SC-AMEP-0008
BBVN-FIVE-S2-SC-AMEP-0009
Plumbing system-HDPE pipe & fitting
BBVN-FIVE-S2-SC-AMEP-0009/R1
Plumbing system-HDPE pipe & fitting_Rev.1
BBVN-FIVE-S2-SC-AMEP-0009/R2
BBVN-FIVE-S2-SC-AMEP-0010
HVAC system/ u.PVC pipe & Fitting (Condensate Drain Pipe)
BBVN-FIVE-S2-SC-AMEP-0011
Technical Detail Desciption, Drawing, Catalogue
BBVN-FIVE-S2-SC-AMEP-0012
BBVN-FIVE-S2-SC-AMEP-0012/R1
BBVN-FIVE-S2-SC-AMEP-0013
BBVN-FIVE-S2-SC-AMEP-0013/R1
BBVN-FIVE-S2-SC-AMEP-0013/R2
BBVN-FIVE-S2-SC-AMEP-0013/R2 (ADD.01)
BBVN-FIVE-S2-SC-AMEP-0014
BBVN-FIVE-S2-SC-AMEP-0014/R1
Cerfiticate, Capacity & Experience Report
BBVN-FIVE-S2-SC-AMEP-0014/R2
BBVN-FIVE-S2-SC-AMEP-0015
LV Cable
BBVN-FIVE-S2-SC-AMEP-0015/R1
LV Cable_Rev.1 (Revised based on comments in AMEP_0015 dated 16/J64-Apr-2014)
BBVN-FIVE-S2-SC-AMEP-0015/R1
LV Cable_Rev.1 (Revised based on comments in AMEP_0015 dated 16/J64-Apr-2014)
BBVN-FIVE-S2-SC-AMEP-0016
Lighting Protection
BBVN-FIVE-S2-SC-AMEP-0016/R1
Lighting Protection_Rev.1 Revised based on comments AMEP_0016 dated 16-APR-2014
BBVN-FIVE-S2-SC-AMEP-0017
VariTrane VAV Terminal Catalogue
BBVN-FIVE-S2-SC-AMEP-0018
Technical Detail Description, Catalogue
BBVN-FIVE-S2-SC-AMEP-0019
Pipe & Fitting for RO Catalogue, Valve for RO Catalogue
BBVN-FIVE-S2-SC-AMEP-0019/R1
RO Water System (Pipe & Fitting and Valve)_Rev.1 Revised based on comments in AMEP-0019 dated 17-April-2014
Tabulation, Technical Detail Description. Catalogue
BBVN-FIVE-S2-SC-AMEP-0020
Intelligent Fire Control Panel, smoke detector, heat detector, alarm bell, manual call point, deam detector, duct smoke detector, laser smoke detector, telephone jack, relay control module, monitor module, control module, fault isolator, horn trobe, phone communication module, lamp driver module (for renovation of MIMIC panel)
BBVN-FIVE-S2-SC-AMEP-0020/R1
(15 items) Fire Alarm System [FM Approval] Intelligent Fire Control Panel IFC 302(E), smoke detector 2951J, heat detector 5951J, alarm bell SSM24-6, manual call point JBG-12LX, beam detector FSB-200/FSB-200s, duct smoke detector D4240, laser smoke detector 7351J, telephone jack FPJ, relay control module M300RJ, monitor module M301MJ, fault isolator M500XJ, horn trobe CHSR, phone communication module M500FPJ, lamp driver module LDM-32
BBVN-FIVE-S2-SC-AMEP-0021
BBVN-FIVE-S2-SC-AMEP-0022
Certificate of Compliance FM Approval Class 4924, Catalogue
BBVN-FIVE-S2-SC-AMEP-0023
BBVN-FIVE-S2-SC-AMEP-0023/R1 (A)
Galvanized Pipe Medium Grade SCHED 40 for Fire Fighting (FM 200 System)_Rev.1 Revised based on comments in AMEP_0023 dated 25-Apr-2014
FM 200 Piping, Tabulation & Catalogue
BBVN-FIVE-S2-SC-AMEP-0023/R1 (B)
Galvanized Pipe Medium Grade SCHED 40 for Fire Fighting (above Ground Floor) _Rev.1 Revised based on comments in AMEP_0023 dated 25-Apr-2014
BBVN-FIVE-S2-SC-AMEP-0023/R1 (C)
Galvanized Pipe Medium Grade SCHED 40 for Fire Fighting (Underground)_Rev.1 Revised based on comments in AMEP_0023 dated 25-Apr-2014
BBVN-FIVE-S2-SC-AMEP-0023/R2 (C)
Galvanized Pipe Medium Grade SCHED 40 for Fire Fighting (Underground)_Rev.2 Revised based on comments in AMEP_0023/R1 (C) dated 15-May-2014Denso TapePipe Fittings (JIS)
Tabulation, Technical Detail Description & Catalogue
BBVN-FIVE-S2-SC-AMEP-0024
FIKE Technical detail description, drawing and catalogue
BBVN-FIVE-S2-SC-AMEP-0024/R1
FM 200 C/W Control Panel and Accessories_Rev.1 Revised upon AMEP 0024 dated 19-May-2014
Tabulation, Calculation, Catalogue
Approval for Mechanical, Electrical Plumbing 5
OUTGOIING Rev. Date Delivered Title Attachment Author/Delivered to StatusDate Required Reply
INCOMING Date Received
Date Delivered to Author
14/09/17 14/09/22 14/09/22 Technical Data Sheet Quang/Trung B
14/04/28 14/05/02 14/05/21 Sprinkler Head System Quang C
14/06/02 14/06/12 14/07/03 Tabulation, Catalogue Quang B
14/10/02 14/10/06 14/10/07 Technical Data Sheet Quang A
14/04/29 14/05/05 HVAC_Hepa Filter (AAF)_Size 1060x460x69mm Quang/Trung
14/04/29 14/05/05 14/05/28 HVAC_Hepa Filter (AAF)_Size 1060x1060x69mm Quang/Trung B/B/A
14/05/14 14/05/17 Drawings Quang/Vuong
14/05/14 14/05/17 14/05/20 Catalogue Quang B/A
14/05/14 14/05/17 14/05/20 Catalogue Quang A
14/05/14 14/05/17 14/05/22 HVAC System_VRV Indoor and Refrigerant Pipe Support Quang C
14/04/29 14/05/05 14/05/07 Galvanized Ducts and Fittings for Low Pressure (SSSC) Catalogue Quang/Vuong C
14/05/23 14/06/02 14/05/28 Tabulation, Technical Data Quang A/B
14/04/29 14/05/05 14/05/07 Galvanized Duct and Fittings for Medium Pressure Catalogue Quang/Vuong C
14/05/19 14/06/02 14/05/28 Galvanized Duct and Fittings for Medium Pressure_Rev.1 A
14/04/29 14/05/05 14/05/07 Spiral Duct and Fittings Catalogue Quang/Vuong C
14/05/19 14/06/02 14/05/28 Spiral Duct and Fittings_Rev.1 A/B
14/05/02 14/05/08 14/05/09 Butterfly valve and OS&Y gate valves for fire fighting Catalogue Trung C
14/05/21 14/06/03 14/05/26 Tabulation, Catalogue Randy B/B/A
14/06/05 14/06/11 14/06/11 Tabulation, Catalogue Trung A
14/06/03 14/06/09 14/06/27 Tabulation, Catalogue Mr. Quang B
14/10/14 14/10/18 14/10/18 Motorized Valve for AHU (Johnson Control) Catalogue, Technical Data Quang/Ujiie C
14/10/31 14/11/06 Motorized Valve for AHU (Johnson Control) Quang/Ujiie
14/05/02 14/05/08 14/05/22 Alarm valve and Pre-action valve for fire fighting system Catalogue Trung A/B/B
14/07/28 14/08/02 14/08/04 Quang B
14/05/02 14/05/08 14/05/09 Lighting system Catalogue Quang/Diem C
14/05/14 14/05/21 14/05/29 B/B/A
14/06/05 14/06/09 14/06/25 Catalogue B/A+C
14/06/26 14/07/01 14/06/27 Tabulation, Catalogue B
14/05/02 14/05/08 14/05/28 BMS system Catalogue Diem B
14/07/09 BMS system B
14/05/03 14/05/09 14/05/28 Copper pipe & Fitting Catalogue Quang B/B/A
14/05/14 14/05/17 14/05/20 Water Supply System_Water Heater (ARISTON) Quang B/A
14/05/06 14/05/13 14/05/28 Chiller Pipe Insulation Mr. Quang B/B/A
14/05/06 14/05/13 14/05/28 VRV Insulation (Refrigirant Pipe and Condensate Drain) Mr. Quang B/B/A
14/05/06 14/05/13 14/05/14 Flexible Joint Model Z-3000 & Flexible Joint Model Z-9000 Mr. Quang C
14/05/31 14/06/13 14/06/02 Quang/Ujiie A
14/05/07 14/05/10 14/05/23 Air Compressor Mr. Quang B
14/05/09 14/05/15 14/05/15 Sanitary Wares Quang/ Khoa C/A+B+C
14/06/03 14/06/10 14/06/10 Quang/ Khoa A
14/05/10 14/05/15 14/05/28 Supply Fan Quang/Diem C
14/06/03 14/06/09 14/06/05 Mr. Quang B
14/05/10 14/05/15 14/05/28 Smoke Exhaust Fan C
14/06/02 14/06/09 14/06/13 Quang/Ujiie C/C/B
14/06/26 14/07/01 14/07/05 B
BBVN-FIVE-S2-SC-AMEP-0024/R2
FM 200 C/W Accessories_Rev.2 (Superseded the approved FM 200 c/w Accessories_Rev.1 in AMEP24/R1 dated 25-June-2014)
BBVN-FIVE-S2-SC-AMEP-0025
Preaction Sprinkers (Quick Response Upright), Quick Response Sprinkler heads, Standard Sprinkler Heads VIKING Technical Detail desciption, Catalogue
BBVN-FIVE-S2-SC-AMEP-0025/R1
Sprinkler Head System (Preaction Sprinkers (Quick Response Upright and Pendant), Quick Response, Sprinkler heads, Standard Sprinkler Heads, Sprinkler Guard )_Rev.1 Revised upon AMEP-0025 dated 21-May-2014
BBVN-FIVE-S2-SC-AMEP-0025/R1(ADD.01)
ESPR Upright Sprinkler for Warehouse Under Duct- VIKING VK520 K14.0 (Additional Material for approved in AMEP_0025 dated 03-July-2014)
BBVN-FIVE-S2-SC-AMEP-0026
Technical Detail Description, Drawing, Catalogue
BBVN-FIVE-S2-SC-AMEP-0027
Technical Detail Description, Drawing, Catalogue
BBVN-FIVE-S2-SC-AMEP-0028 Hepa Filter Box (INOCHI)_Top Open&Dimension 1145x1145x400mm;
Top Open&Dimension 11145x1145x400; Bottom Open&Dimension 1145x545x400mm; Bottom Open&Dimension 1145x1145x400mm
BBVN-FIVE-S2-SC-AMEP-0029
HVAC_ Chilled Water Pipe (Tread Seal for Screw type) for Compressor Chilled Water and Instrument on Piping
BBVN-FIVE-S2-SC-AMEP-0030
Compressor System_Compressor Pipe Tread Seal for Screw type piping tread seal
BBVN-FIVE-S2-SC-AMEP-0031
Technical Detail Description & Catalogue
BBVN-FIVE-S2-SC-AMEP-0032
BBVN-FIVE-S2-SC-AMEP-0032/R1
HVAC System_Galvanized Ducts and Fittings for Low Pressure _Rev.1 Revised based on comments in AMEP-0032 dated 7-May-2014
BBVN-FIVE-S2-SC-AMEP-0033
BBVN-FIVE-S2-SC-AMEP-0033/R1
BBVN-FIVE-S2-SC-AMEP-0034
BBVN-FIVE-S2-SC-AMEP-0034/R1
BBVN-FIVE-S2-SC-AMEP-0035
BBVN-FIVE-S2-SC-AMEP-0035/R1
Fire fighting system_OS&Y Gate valves for FF System Hose reel -18 gate valve, tamper switch (supervisory switch) - OSYSU-1, Automatic air vent - AV-0100, Butterfly valve - HPW Series
BBVN-FIVE-S2-SC-AMEP-0035/R1 (ADD.01)
Fire fighting system_OS&Y Gate valves for FF System _ Rev.1 (ADD.01) _ Revised based on comments in AMEP-0035/R1 dated 26-May-2014
BBVN-FIVE-S2-SC-AMEP-0036
Balancing Valve (PCW, AHU and Compressor) and Motorized Valve for Chiller and AHU
BBVN-FIVE-S2-SC-AMEP-0036 A
BBVN-FIVE-S2-SC-AMEP-0036 A/R1
Catalogue, Technical Data, BBVN-S2-SC-LTR-0087
BBVN-FIVE-S2-SC-AMEP-0037
BBVN-FIVE-S2-SC-AMEP-0037 A
Pre-action valve double interlock type (Superseded the pre-action valve single interlock in AMEP-37 dated 19-May-2014 following designer comments)
Catalogue, Technical detail description
BBVN-FIVE-S2-SC-AMEP-0038
BBVN-FIVE-S2-SC-AMEP-0038/R1
Lighting system_Rev.1 Revised based on comments in AMEP-0038 dated 9-May-2014
Tabulation, Lighting -1x18W, 2x13W, Exits, High bay 150W, Road pole lamp, 3x36W, 2x28W (Weatherproof), 2x28W, 3x14W, Road Pole Lamp, 3x14W
BBVN-FIVE-S2-SC-AMEP-0038/R1 (ADD.01)
Lighting system_Rev.1 (Add.01)_ Revised based on comments in AMEP-0038/R1 dated 29-May-2014
BBVN-FIVE-S2-SC-AMEP-0038 (A)
Lighting System_(Additional) Exit Light for exit road (revised based on comments in AMEP-38/R1 (ADD) dated 25-June-2014
BBVN-FIVE-S2-SC-AMEP-0039
BBVN-FIVE-S2-SC-AMEP-0039 (ADD)
BBVN-FIVE-S2-SC-AMEP-0040
BBVN-FIVE-S2-SC-AMEP-0041
Techinical detail description & Catalogue
BBVN-FIVE-S2-SC-AMEP-0042
Technical Detail Description, Catalogue, FM Certificate
BBVN-FIVE-S2-SC-AMEP-0043
Catalogue, Technical Detail Description, FM certificate
BBVN-FIVE-S2-SC-AMEP-0044
Technical Detail Description, Catalogue
BBVN-FIVE-S2-SC-AMEP-0044/R1
HVAC&CDA_Flexible Joint for Chiller Piping and CDA Piping - SF-600_Rev.1 (Revised based on comments in AMEP-0044 dated 14-May-2014)
Technical Detail Description, Catalogue
BBVN-FIVE-S2-SC-AMEP-0045
Technical Detail Description, Catalogue
BBVN-FIVE-S2-SC-AMEP-0046
Sanitary Ware Tabulation, Under Counter Top Basin, Wall Hung Basin, Auto Sensor Basin Tap, Water Closet, Wall Hung Urinal w Automatic Flush Valve, Automatic Flush Valve, Shower Mixer Complete, Pantry Sink, Faucet for Pantry Sink, Accessories
BBVN-FIVE-S2-SC-AMEP-0046/R1
Sanitary Wares_Rev.1 Revised based on comments in AMEP-0046 dated 15-May-2015
Tabulation, faucet automatic, shower
BBVN-FIVE-S2-SC-AMEP-0047
Catalogues of Ventilation Fan Equipment No. OAF-PII-01
BBVN-FIVE-S2-SC-AMEP-0047/R1
Supply Fan_Rev.1 (revised based on comments in AMEP-0047 dated 28-May-2014)
Catalogue of Supply Fan Equipment No. OAF-PII-01
BBVN-FIVE-S2-SC-AMEP-0048
Catalogues of Smoke Exhaust Equipment No. FSFE-PII-01; PAEF-PII-01
BBVN-FIVE-S2-SC-AMEP-0048/R1
Smoke Exhaust Fan_Rev.1 Revised based on comments in AMEP-0048 dated 28-May-2014 (RFC submitted paralelly for this AMEP)
Catalogue of smoke exhaust fan Equipment No.FSFE-PII-01; PAEF-PII-01
BBVN-FIVE-S2-SC-AMEP-0048/R2
Approval for Mechanical, Electrical Plumbing 6
OUTGOIING Rev. Date Delivered Title Attachment Author/Delivered to StatusDate Required Reply
INCOMING Date Received
Date Delivered to Author
14/05/10 14/05/15 14/05/28 Exhaust Fan C
14/06/03 14/06/09 14/06/05 Mr. Quang B
14/05/10 14/05/17 14/05/31 C
14/06/13 C
14/06/18 14/06/23 14/06/25 Diem B
14/05/10 14/05/17 14/05/19 HVAC System: Black carbon steel pipe SCHED 40 for chilled water Quang/Ujiie C
14/05/31 14/06/14 14/06/02 Quang/Ujiie B
14/05/10 14/05/15 14/05/19 HVAC System: Black carbon steel pipe fittings for chilled water C
14/05/31 14/06/14 14/06/02 B
14/05/16 14/05/20 14/05/22 HVAC System_Chilled Water Pipe Support Catalogue Quang C
14/05/15 14/05/19 14/06/05 Quang B/B+C
14/11/05 14/11/12 Technical Data Sheet Quang/Ujiie
14/05/14 14/05/17 14/05/20 Catalogue Quang A
14/05/14 14/05/17 14/05/21 Catalogue Quang C
14/06/18 14/06/23 14/07/04 Quang/Ujiie B/A+B+C
14/05/14 14/05/17 14/05/21 Quang C
…… …….. 14/06/02 B
14/05/14 14/05/17 14/05/20 Quang B
14/05/15 14/05/17 14/05/21 Catalogue Quang C
14/05/31 14/06/13 14/06/23 Quang A
14/05/15 14/05/19 14/05/21 Catalogue Quang C
14/05/30 14/06/13 14/06/03 Quang/Randy/Ujiie A
14/05/15 14/05/29 14/06/13 Catalogue, Tabulation Quang/Randy B
14/07/14 14/07/19 14/07/18 catalogue Quang/Randy B
14/05/16 14/05/30 14/06/05 HVAC System _ Non-Clean room Duct Sealant (APOLLO A100) Catalogue Quang B
14/05/16 14/05/30 14/06/05 HVAC System_Cleanroom Duct Sealant (Terostat MS930) Catalogue Quang B
14/05/16 14/05/30 14/06/05 Tabulation. Catalogue Quang A/B
14/05/16 14/05/30 14/05/21 Compressed Air System_GI Black Steel Pipe Fittings (DN50, DN80) Tabulation, Catalogue Quang C
14/05/31 14/06/12 14/06/03 Tabulation, Catalogue Quang B
14/05/16 14/05/30 14/06/05 Water Supply System_Water Pump & Water Pump Control Panel Quang B
14/06/14 14/06/20 14/06/20 Quang/Khoa B
14/05/16 14/05/30 14/06/05 Quang B/B/A
14/05/16 14/05/30 14/06/06 Quang B
14/05/19 14/06/02 Randy/Quang
14/06/14 14/06/21 14/06/25 Quang B/B+C
14/10/31 14/11/06 14/11/03 Technical Detail Quang/Ujiie B
14/06/27 14/07/03 14/07/09 Quang/Diem A (SUPERSEDED)
14/08/09 14/08/14 14/08/15 Fiber Optic Cable Quang B
14/08/18 14/08/23 14/08/22 Quang B
14/08/23 14/08/27 14/08/28 Manufacturer Letter, Catalog Quang/Ujiie B
14/05/19 14/06/02 14/05/28 Bare Copper Wire - 70mm2 Quang/Ujiie B/A
BBVN-FIVE-S2-SC-AMEP-0049
Catalogues of Ventilation Fan Equipment No. EAFG-PII-01, EAFG-PII-02; EAF1-PII-01, EAF1-PII-02
BBVN-FIVE-S2-SC-AMEP-0049/R1
Exhaust Fan_Rev.1 revised based on comments in AMEP-0049 dated 28-May-2014) RFC submitted paralelly for this AMEP
Catalogue of Supply Fan Equpment No. EAFG-PII-01; EAFG-PII-02; EAF1-PII-01; EAF1-PII-02
BBVN-FIVE-S2-SC-AMEP-0050
CCTV System (Indoor PTZ IP dome camera, outdoor PTZ IP dome camera, Indoor fixed camera, FOC (fiber optic converter)
BBVN-FIVE-S2-SC-AMEP-0050/R1
BBVN-FIVE-S2-SC-AMEP-0050/R2
CCTV System_Indoor PTZ dome camera, Outdoor PTZ IP dome Camera, IP indoor fixed dome camera, FOC (fiber optic converter)_Rev.2 Revised based on comments in AMEP-0050/R1 dated 13-June-2014
Tabulation, technical detail desciption, catalogue
BBVN-FIVE-S2-SC-AMEP-0051
Technical detail description, Catalogue
BBVN-FIVE-S2-SC-AMEP-0051/R1
HVAC System: Black carbon steel pipe SCHED 40 for chilled water_Rev.1 Revised based on comments in AMEP-0051 dated 16-May-2014
Technical detail description, Catalogue
BBVN-FIVE-S2-SC-AMEP-0052
Technical detail description, Catalogue
BBVN-FIVE-S2-SC-AMEP-0052/R1
HVAC System: Black carbon steel pipe fittings for chilled water_Rev.1 Revised based on comments in AMEP-0052 dated 19-May-2014
Technical detail description, Catalogue
BBVN-FIVE-S2-SC-AMEP-0053
BBVN-FIVE-S2-SC-AMEP-0054
HVAC_Buffer Tank & Buffer Tank Insulation Location of installation AHU room (Buffer tank capacity 5m3) (NAM AN)
Technical detail description, Catalogue
BBVN-FIVE-S2-SC-AMEP-0054 A
Buffer Tank Insulation - BASF Elastopor MH 2149 (Superseded the approved buffer tank insulation in AMEP-54 dated 5-June-2014
BBVN-FIVE-S2-SC-AMEP-0055
Fire Fighting System_Fire Fighting Tread Seal for Screw type Piping Tread Seal (TOMBO)
BBVN-FIVE-S2-SC-AMEP-0056
Fire Fighting System (Fire Extinguisher CO2&ABC, Fire Hydrant Pillar, Hosereel cabinet (indoor type), Fire Hose reel (Indoor with Accessories), Fire Hydrant cabinet outdoor & Fire hydrant (outdoor with accessories))
BBVN-FIVE-S2-SC-AMEP-0056/R1
Fire Hose Reel & Extinguisher; Drum Hose Reel for Clean Room, Circulation Corridor, Office Ground Floor, Warehouse, above Ceiling Clean Room, Office 1st Floor, External and Transformer Room 1,2,3, Stage 1_Rev.1 Revised based on comments in AMEP-0056 dated 21-May-2014
Tabulation, Catalogue, Drawings
BBVN-FIVE-S2-SC-AMEP-0057
Process Cooling Water System_SUS 304 Pipe Use for Process Cooling Water
Tabulation, Technical Detail Description & Catalogue
BBVN-FIVE-S2-SC-AMEP-0057/R1
Process Cooling Water System_SUS 304 Pipe Use for Process Cooling Water_Rev.1
BBVN-FIVE-S2-SC-AMEP-0058
Process Cooling Water System_SUS 304 Pipe Fittings Use for Process Cooling Water & Fittings
Tabulation, Technical Detail Description & Catalogue
BBVN-FIVE-S2-SC-AMEP-0059
Compressed Air System_Copper Pipe Fittings for Compressed Air (Use for Compressor air Piping inside production area and above walkable ceiling connected on GI pipe)
BBVN-FIVE-S2-SC-AMEP-0059/R1
Compressed Air System_Copper Pipe Fittings for Compressed Air (Use for Compressor air Piping inside production area and above walkable ceiling connected on GI pipe)_Rev.1 Revised based on comments in AMEP-0059 dated 21-May-2014
Technical Detail Description, Catalogue
BBVN-FIVE-S2-SC-AMEP-060
Compressed Air System_Copper Pipe for Compressed Air (Use for Compressor air Piping inside production area and above walkable ceiling connected on GI pipe)
BBVN-FIVE-S2-SC-AMEP-060/R1
Compressed Air System_Copper Pipe for Compressed Air (Use for Compressor air Piping inside production area and above walkable ceiling connected on GI pipe)_Rev.1 Revised based on comment in AMEP-60 dated 21-May-2014
Technical Detail Description, Catalogue
BBVN-FIVE-S2-SC-AMEP-061
(1) Network Video Recorder; (2) Reader Controller & Card Reader Interface Module-Lenel LNL-1320 Series, LNL-2220; (3) nput Control Module-Lenel LNL1100 Series 2; (4) Door Contact-Position Sensor 1078C-N; (5)Door Holder-YLI YD-602; (6) Door Alarm - AV Gad Eye spy II pro; (7) Card Reader & Card Reader w/Time Tracking - HID R10; (8) Pir Sensor - AV Gad Eye spy II pro; (9) Emergency Door Release Break Glass - YLI ABK-900A, Fire Proofl (10) Exit Push Button - YLI ABK-802
BBVN-FIVE-S2-SC-AMEP-061/R1
Card Reader & Card Reader with Time Tracking_Rev.1 - HID-R10-900N (Superseded the Card Reader & Card Reader with time tracking- HID-R10-6100B, 6108B, 6109B in AMEP-61 dated 13-June-2014)
BBVN-FIVE-S2-SC-AMEP-062
BBVN-FIVE-S2-SC-AMEP-063
BBVN-FIVE-S2-SC-AMEP-064
Compressed Air System_GI Black Steel Pipe Medium Grade Schedule 40
BBVN-FIVE-S2-SC-AMEP-065
BBVN-FIVE-S2-SC-AMEP-065/R1
Compressed Air System_GI Black Steel Pipe Fittings (DN50, DN80)_Rev.1 Revised based on Comments in AMEP-0065 dated 21-May-2014
BBVN-FIVE-S2-SC-AMEP-066
Catalogue, Manufacturer Letter, Technical Data & Drawing
SUPERSEEDED booster pump Grund Fos Hydro Multi - B/E 2CME 25-41
BBVN-FIVE-S2-SC-AMEP-066/R1
Water Supply System_Water Pump & Water Pump Control Panel_Rev.1 Revised based on Approval RFC-023 dated 6-June-2014 (SMZ-140606/D147)
Catalogue, Manufacturer Letter, Technical Data & Drawing
BBVN-FIVE-S2-SC-AMEP-067
Sewage Pump_SP-01 to SP-02 Pump pit, SP-03 to SP-04 Pump pit (external)
Catalogue, Manufacturer Letter
BBVN-FIVE-S2-SC-AMEP-068
MVAC System_Primary Chilled Water Pump CHWP 03(200x150CNHA), Secondary Chilled Water Pump SCHWP-01-03 150x125 FS4KA5 37
Manufacturer Letter, Technical Data
BBVN-FIVE-S2-SC-AMEP-069
Electrical Cable & Accessories for Control System: (1) 12C MM Fiber Optic Cable (Indoor) - B9B042, (2) 4C Multimode Outside Plant Fiber Optic Cable - B9A171, (3) 14AWG Twisted Pair Cable - 5120UL, (4) Shielded 6-core AWG22 Cable - 5504FE, (5) Shield 2-core AWG18 Cable - 5300FE, (6) Shield 4-core AWG22 Cable - 5502FE, (7) UTP Category 6 Network Cable - 2413, (8) Faceplate Kit Shutter - 2111036-1, (9) Category 6 SL Series Jacks -1375055-1
Tabulation, Technical Detail Description, Catalogue
BBVN-FIVE-S2-SC-AMEP-069/R1
Electrical Cable & Accessories for Control System: (1) 12C MM Fiber Optic Cable (Indoor) - B9B042, (2) 4C Multimode Outside Plant Fiber Optic Cable - B9A171, (3) 14AWG Twisted Pair Cable - 5120UL, (4) Shielded 6-core AWG22 Cable - 5504FE, (5) Shield 2-cor_Rev.1
Tabulation, Technical Detail Description, Catalogue
BBVN-FIVE-S2-SC-AMEP-069/R2
Faceplate Kit Shutter - AMP (Model: 2-1427030-1, 2-1427030-2), Suppersed the approved faceplate kit shutter in AMEP-69/R1 dated 25-June-2014
BBVN-FIVE-S2-SC-AMEP-069 (A)
Electrical Cable & Accessories for Control System: 14AWG pair cable; 14AWG Twisted pair cable; TCVN 5738:2001
Technical Detail Description, Catalogue
BBVN-FIVE-S2-SC-AMEP-069 [B]
Technical Detail Description, Catalogue
BBVN-FIVE-S2-SC-AMEP-069 [C]
Fire Alarm Cable 14AWG Twisted Pair Cable-5100FZE & 14AWG Pair Cable-5100UZE (Superseded AMEP-69 [A] dated 9-July-2014)
Manufacturer Letter, Technical Data Sheet
BBVN-FIVE-S2-SC-AMEP-069 [D]
Catelogy 6 UTP Cable Cut Sheet - AMP (Superseded the UTP Catelogy 6 inn approved AMEP_069/R1 dated 25 June 2014)
BBVN-FIVE-S2-SC-AMEP-070
Approval for Mechanical, Electrical Plumbing 7
OUTGOIING Rev. Date Delivered Title Attachment Author/Delivered to StatusDate Required Reply
INCOMING Date Received
Date Delivered to Author
14/05/19 14/05/30 14/05/29 Randy, Ujiie, Quang C
14/06/11 14/06/18 14/06/27 Ujiie, Quang, Diem B
14/05/23 14/06/05 14/06/27 Quang/Ujiie B/B+C
14/05/23 14/06/05 14/06/02 Cable Ladder & Trunking for Power, Data & BMS - E.Nhat Quang/ Ujiie B
14/05/23 14/05/30 14/06/02 Compressor Valve System Trung/Quang B
14/08/28 14/08/30 14/09/02 Data sheet Trung / Quang C
14/05/24 14/06/06 14/06/27 Quang/Ujiie A
14/05/24 14/05/28 14/06/27 Damper for Air Duct Quang/Ujiie B/B/A
14/05/29 14/06/05 14/06/27 HVAC_BACnet Interface for VRV III Quang/Ujiie B/B/A
14/05/31 14/06/13 14/06/10 Quang/Randy/Ujiie B/A+B+C
14/06/25 14/06/30 14/07/04 Technical Detail Description Quang/Randy/Ujiie B/A+B+C
14/05/30 14/06/11 14/06/02 HVAC_VRV Refrigerant Piping (REFNET PIPING) Quang/Ujiie A
14/05/31 14/06/13 14/06/27 Production Exhaust, Production exhaust filter and Housing Catalogue Quang/Ujiie B/B/A
14/06/03 14/06/09 14/06/10 Catalogue, Tabulation Quang/Ujiie C
14/06/16 14/06/20 14/06/20 Water Supply System_Gate Valve PPR Technical Detail Description Quang/Ujiie B/A+C
14/06/16 14/06/20 14/06/20 Drainage System_Ball Valve (SUS), Check Valve (SUS) Technical Detail Description Quang/Ujiie B/B
14/07/05 14/07/11 14/07/08 Technical Detail Description Quang/Ujiie B/A+C
14/08/07 14/08/13 14/08/18 Catalogue Quang/Ujiie B/A
14/08/01 14/08/07 14/08/26 Technical Detail Description Quang/Ujiie/Khoa B
14/08/01 14/08/07 14/08/26 Technical Detail Description Quang/Ujiie/Khoa B
14/08/01 14/08/07 14/08/26 Technical Detail Description Quang/Ujiie/Khoa B
14/06/05 14/06/09 14/06/10 Tabulation, Catalogue Quang/Ujiie B
14/08/23 14/08/27 14/08/28 Catalog, Manufacturers Letter B
14/06/05 14/06/09 14/06/10 Tabulation, Catalogue Quang/Ujiie B/A+B+C
14/07/17 14/07/22 14/07/21 Technical Detail Description Quang/Ujiie/Diem B
14/08/23 14/08/27 14/08/28 Catalog, Manufacturers Letter Quang/Ujiie B
14/10/31 14/11/06 14/11/03 Quang/Ujiie B
14/06/06 14/06/09 14/06/27 Fire fighting System_Vane Type Waterflow Alarm Switch with Retard Catalogue Quang/Ujiie A/B/A
14/06/06 14/06/09 14/06/27 Fire fighting System_Pressure relief Valve Catalogue Quang/Ujiie A/B/A
14/06/06 14/06/09 14/06/10 Fire fighting System_Denso Tape for Underground Catalogue Quang/Ujiie C
14/06/14 14/06/18 14/06/20 Catalogue Quang/Ujiie A
14/06/06 14/06/10 14/06/18 Fire Stop Mortar Technical Detail Description Quang/Ujiie A
14/06/06 14/06/10 14/06/18 Fire Stop Sealant Technical Detail Description Quang/Ujiie A
14/06/07 14/06/16 14/06/27 Tabulation, Catalogue Quang/Ujiie B/B/A
14/06/12 14/06/16 14/06/12 Safety Valve Catalogue Quang/Ujiie/Khoa C
14/06/12 14/06/16 14/06/12 Welding Rod Catalogue Quang/Ujiie/Trung C
14/06/18 14/06/24 14/06/23 Product Data Sheet Quang/Ujiie/Trung C
14/06/26 14/06/30 14/07/04 Catalogue Quang/Ujiie/Trung B
14/06/12 14/06/16 14/06/12 Sub Welding Rod Catalogue Quang/Ujiie/Trung C
14/06/18 14/06/24 14/06/25 Product Data Sheet Quang/Ujiie / ung C
14/06/26 14/06/30 14/07/04 Quang/Ujiie / ung C
14/07/08 A
14/06/12 14/06/16 14/06/12 Hot Water Pipe Insulation Catalogue Quang/Ujiie/Khoa B
14/06/12 14/06/16 14/06/12 Copper Pipe for Hot Water Catalogue Quang/Ujiie/Khoa B/A
14/06/12 14/06/16 14/06/12 Copper Pipe Fittings for Hot Water Piping Catalogue Quang/Ujiie/Khoa A
14/06/16 14/06/20 14/06/20 Quang/ Ujiie A/B
BBVN-FIVE-S2-SC-AMEP-071
(A) LV Panel & LCP: (1,2,3) DB-1A-1, 2,3; (4) DB-CDU2, (5,6) DB-MCC2,3; (7) DB-SCHWP; (8,9) DB-M/C-1,2; (10) DB-IT2; (11) LCP-TK-01-04-TC, LCP-TK-04-04-MC, LCP-ASS-03&04, LCP-MD-05-22; (12) LCP-ASS-01,02,05,06,07; (13) LCP-P2-F-1&2; (14) LCP-P2-F-3&4; (15) LCP-P2-F-MD-1,2,3,4,5,6; (16,17,18) LCP-P2-G-1&2,3,4; (19) LCP-P2-G-MD-1; (20) PCHWP; (21) DB-CH-03; (22) VSD-RF; (23) 02 New MCCB in MSB-A Bus-2 (for DB-MCC3-1); (24) DB-CW; (25,26,27) DB-1C,1D,1E Modification; (28) DB-CDA Modification; (29) DB-GC-Modification; (30) ATS Panel; (31) DB-M/C-3 Modification; (32) CLP-EXT-03
Tabulation, Technical Data, Drawing, catalogue
BBVN-FIVE-S2-SC-AMEP-071/R1
LV Panel: (1,2,3) DB-1A-1, 2,3; (4) DB-CDU2, (5,6) DB-MCC2,3; (7) DB-SCHWP; (8,9) DB-M/C-1,2; (10) DB-IT2; (11) Local Panel LCP: LCP-TK-01~04-TC, LCP-TK-01~04-MC, LCP-ASS-03&04, LCP-MD-05~22; (12) Local Panel: LCP-ASS-01,02,05,06,07; (13) Local Panel LCP: LCP-P2-F-1&2 (new); (14) Local Panel LCP: LCP-P2-F-3&4 (new); (15) Local Panel LCP: LCP-P2-F-MD-1,2,3,4,5,6; (16,17,18) Local Panel LCP: LCP-P2-G-1&2,3,4; (19) Local Panel LCP: LCP-P2-G-MD-1; (20) PCHWP; (21) DB-CH-03; (22) 02 New MCCB in MSB-A Bus-No.2; MSB-ABUS 2 for DB-MCC3-1&2; (23, 24, 25) DB-1C,1D,1E Modification; (26) DB-CDA Modification; (27) DB-GC-Modification; (28) ATS Panel; (29) DB-M/C-3 Modification; (30) CLP-EXT-03 New; (31) DB-CW
Tabulation, Technical Data, Drawing, catalogue
BBVN-FIVE-S2-SC-AMEP-072
HVAC_Volume Control Damper (Rectangular Type), Volume Control Damper (Round Type), Access Door for Duct
Tabulation, Technical Detail description, Catalogue
BBVN-FIVE-S2-SC-AMEP-073
Tabulation, Technical Detail Description, Catalogue
BBVN-FIVE-S2-SC-AMEP-074
Ball Valve, Check Valve, Auto drain, Relief Valve
BBVN-FIVE-S2-SC-AMEP-074 (FINAL)
Compressor Valve System (SUS Ball Valve _ Flange Type) TOYO, Model: 3011L
BBVN-FIVE-S2-SC-AMEP-075
HVAC_Exhaust and Return Air Grille, Air Grille for Production Cleanroom Plenum
Tabulation, Technical Detail Description, Catalogue
BBVN-FIVE-S2-SC-AMEP-076
Tabulation, Volume Control Damper, Motorized Damper, Smoke Fire Damper, Non-Return Damper Model BDD-A-R & BDD-A3-R
BBVN-FIVE-S2-SC-AMEP-077
BBVN-FIVE-S2-SC-AMEP-078
HVAC_Wafer Check Valve, Butterfly Valve size up to DN200 lever, Butterfly Valve Gear Type, Y Strainer for DN65 and Above (Flange end type), Y strainer for CDA chilled water supply piping, Thermometer, Pressure Guage, Ball valve for Pressure gauge and temperature gauge, Flow switch for chiller return pipe
Technical Detail Description, Catalogue
BBVN-FIVE-S2-SC-AMEP-078 (A)
HVAC_Butterfly Valve Gear Type, Butterfly valve Lener Type, Lug Type, Wafer Cheeck valve, Y Strainer, Ball balce for Y-Strainer Drain
BBVN-FIVE-S2-SC-AMEP-079
Technical Detail Description, Catalogue
BBVN-FIVE-S2-SC-AMEP-0080
BBVN-FIVE-S2-SC-AMEP-0081
Drainage and Water Supply Valve (PPR Shut Off Valve, Check valve Flange Type, Check Valve Swing Brass Type, Ball Valve Flange Type, Ball Valve Screw Type, Gate Valve Flange Type)
BBVN-FIVE-S2-SC-AMEP-0081 (A)
BBVN-FIVE-S2-SC-AMEP-0081 (B)
BBVN-FIVE-S2-SC-AMEP-0081 ( C )
Gate Valve (Flange Type)_(For Water Supply Pipe in Pump Room), Gate Valve PPR, Gate Valve
BBVN-FIVE-S2-SC-AMEP-0081/R1 ( C )
Brass Gate Valve for Hot Water Supply_Rev.1 Revised based on comments in AMEP-81 (C ) dated 8-July-2014) Refer to RFC-85
BBVN-FIVE-S2-SC-AMEP-0081 (D)
PVC Ball Check Valve (Manufacturer: FIP)_Model: SXENV (Superseded AMEP-81 (B) refer to RFC-71 subjected "Submersible Pump Pit 1 & 2" dated 17-July -2014 Rejected)
BBVN-FIVE-S2-SC-AMEP-0081 (E)
PVC Ball Check Valve (Manufacturer: FIP)_Model: VEENV (Superseded AMEP-81 (B) refer to RFC-71 subjected "Submersible Pump Pit 1 & 2" dated 17-July -2014 Rejected)
BBVN-FIVE-S2-SC-AMEP-0081 (F)
PVC Ball Check Valve (Manufacturer: FIP)_Model: VXENV (Superseded AMEP-81 (B) refer to RFC-71 subjected "Submersible Pump Pit 1 & 2" dated 17-July -2014 Rejected)
BBVN-FIVE-S2-SC-AMEP-0082
Lighting Switch (1way, 2way, 4way) & Plate (1gang-1divice, 1gang-2divices, 1gang-3divices)
BBVN-FIVE-S2-SC-AMEP-0082(A)
Lighting Switch 1way & 2way (Superseded the lighting swich 1 way & 2 way in approved AMEP_082 dated 10 June 2014)
BBVN-FIVE-S2-SC-AMEP-0083
Socket Outlet_Single Socket, Double Socket, Divice Plate, Weatherproof Socket, Industrial Socket & Plug, 1gang 16A 1Pole/N/E Switch Socket Outlet, Floor Box 2x16A Double Socket Outlet w/ 2 Data, Isolators for VRV, Camera, Heater
BBVN-FIVE-S2-SC-AMEP-0083 (A)
Weatherproof Socket - MK Masterseal Compact 86893 GRY IP66, 15A 3Pin (Superseded the weatherproof socket in AMEP-83 dated 10-June-2014)
BBVN-FIVE-S2-SC-AMEP-0083 (B)
Socket Outlet_Single Outlet, Double Socket & Plates (Superseded the single socket, double docket & plate in approved AMEP_083 dated 10 June 2014)
BBVN-FIVE-S2-SC-AMEP-0083 (C )
Raised Floor Box w/ 2x16A Double Socket Outlet & 2 data Revised based on comments in AMEP-83 dated 10-June-2014
Sample Material Picture, MK Catalogue
BBVN-FIVE-S2-SC-AMEP-0084
BBVN-FIVE-S2-SC-AMEP-0085
BBVN-FIVE-S2-SC-AMEP-0086
BBVN-FIVE-S2-SC-AMEP-0086/R1
Fire fighting System_Denso Tape for Underground_Rev.1 Revised based on comments in AMEP-0086 dated 10-June-2014
BBVN-FIVE-S2-SC-AMEP-0087
BBVN-FIVE-S2-SC-AMEP-0088
BBVN-FIVE-S2-SC-AMEP-0089
Fire Fighting System_Flexible Hose for Sprinkler Head (K5.6 & K14.0)
BBVN-FIVE-S2-SC-AMEP-0090
BBVN-FIVE-S2-SC-AMEP-0091
BBVN-FIVE-S2-SC-AMEP-0091/R1
Welding Rod_Rev.1 Revised based on comments in AMEP-91 dated 12-June-2014
BBVN-FIVE-S2-SC-AMEP-0091/R2
Welding Rod_Rev.2 Revised based on comments in AMEP-91/R1 dated 23-June-2014
BBVN-FIVE-S2-SC-AMEP-0092
BBVN-FIVE-S2-SC-AMEP-0092/R1
SUS Welding Rod_Rev.1 Revised based on comments in AMEP-0092 dated 12-June-2014
BBVN-FIVE-S2-SC-AMEP-0092/R2
GAS Metal Arc Welding (KIM TIN)_Rev.2 Revised based on comments in AMEP-92/R1 dated 25-June-2014
Catalogue, Techinical Detail Description
BBVN-FIVE-S2-SC-AMEP-0092/R3
GAS Metal Arc Welding (KIM TIN)_Rev.3 Revised based on comments in AMEP-92/R2 dated 4-July-2014
BBVN-FIVE-S2-SC-AMEP-0093
BBVN-FIVE-S2-SC-AMEP-0094
BBVN-FIVE-S2-SC-AMEP-0095
BBVN-FIVE-S2-SC-AMEP-0096
Pipe Fittings_Flange Slip on Type (For Valve Flange Connection)_Refer to comments in AMEP-0078 dated 10-June-2014
Technical Detail Description, Catalogue
Approval for Mechanical, Electrical Plumbing 8
OUTGOIING Rev. Date Delivered Title Attachment Author/Delivered to StatusDate Required Reply
INCOMING Date Received
Date Delivered to Author
14/06/17 14/06/21 14/06/20 Quang/ Ujiie A
14/06/17 14/06/21 14/06/20 Exposed Chiller Pipe Insulation Cladding Quang/ Ujiie C
14/06/25 14/07/01 14/06/27 Technical detail description A
14/06/18 14/06/25 14/06/23 Catalogue Quang./Ujiie C
14/06/18 14/06/24 14/06/23 Support Materials (Tisco) Catalogue Quang/Ujiie B
14/06/18 14/06/25 14/06/23 Treaded Rod, Bolt, Nuts, Washer, Pipe Clamp (Tanco/Zhapu) Quang/Ujiie C
14/07/09 14/07/14 14/07/11 Technical Detail Description Quang/Ujiie B/A+B+C
14/08/06 14/08/13 14/08/18 Catalogue Quang/Ujiie B/A+B+C
14/06/18 14/06/25 14/06/23 Buffer Tank (NAM AN) 1A3size drawing Quang/Ujiie B
14/06/21 14/06/25 14/06/25 Galvanized Anchor Bolt (HILTI) Technical Detail Description Quang/Ujiie B
14/06/21 14/06/25 14/06/25 U Bolt (For Support above ground) Technical Detail Description Quang/Ujiie B
14/06/21 14/06/25 14/06/25 SUS Anchor Bolt (HILTI) Technical Detail Description Quang/Ujiie B
14/06/21 14/06/25 14/06/25 Spring Isolator Quang/Ujiie B/A+C
14/07/21 SPRING ISOLATOR_Rev.1 C
14/08/04 14/08/09 14/08/25 Quang/Ujiie B/A+C
14/10/07 14/10/14 14/10/18 Catalogue Quang/Ujiie C
14/10/31 14/11/06 14/11/08 Catalogue Quang/Ujiie C
14/11/06 14/11/13 14/11/08 Catalogue, Shop Drawing Quang/Ujiie B
14/06/23 14/06/28 14/06/26 VAV for Circulation Corridor Communication Controller - DVC-V304 Catalogue Quang/Ujiie B
14/06/25 14/07/01 14/06/27 Galvanized Repair Compound Technical Detail Description Quang/Ujiie B/A
14/06/25 14/07/01 14/06/27 Fire Fighting Paint (Vinilex Primer) Technical Detail Description Quang/Ujiie C
14/07/09 14/07/14 Technical Detail Description Quang/Ujiie
14/06/25 14/07/01 14/06/27 Fire Fighting Paint (Primer for Welded Location) Technical Detail Description Quang/Ujiie C
14/07/05 14/07/11 14/07/08 Technical Detail Description Quang/Ujiie C
14/06/25 14/07/01 14/06/27 Fire Fighting Paint (Sprinkler, Hydrant and Hose Reel top Coat paint) Technical Detail Description Quang/Ujiie C
14/07/09 14/07/14 Technical Detail Description Quang/Ujiie
14/06/26 14/07/03 14/07/29 Access Control System_Passive Infrared Sensor Tabulation, Catalogue Quang/Ujiie B
14/06/26 14/07/02 14/07/09 Tabulation, Catalogue Quang/ Ujiie B
14/08/27 14/09/01 14/09/04 Quang/Ujiie/Khoa B
14/07/01 14/07/05 14/07/07 Process Chilled Water Valve Tabulation, Catalogue Quang/Ujiie B/A+B+C
14/07/15 14/07/21 14/07/25 Quang/Ujiie/Trung B/A
14/08/28 14/08/30 14/09/06 Process Chilled Water Valve_Rev.1 (Additional Document) Quang/Ujiie/Trung C
14/07/04 14/07/09 14/07/08 Aluminum Insulation Pin (Al Pin) Technical Detail Description Quang/Ujiie A
14/07/05 14/07/11 14/07/08 Technical Detail Description Quang/Ujiie A
14/07/05 14/07/11 14/07/08 Technical Detail Description Quang/Ujiie B
14/07/05 14/07/11 14/07/08 Technical Detail Description Quang/Ujiie B
14/07/07 14/07/12 14/07/10 Technical Detail Description Quang/Ujiie A
14/07/07 14/07/12 14/07/10 Technical Detail Description Quang/Ujiie A
14/07/09 14/07/14 14/07/11 HVAC System_ Aluminum Insulation Tape (Bond Tape) Technical Detail Description Quang/Ujiie B
14/07/09 14/07/14 14/07/21 Duct Silencer for AO Fan Duct (Tan Hung) Technical Detail Description Quang/Ujiie C
14/07/09 14/07/14 14/07/21 Technical Detail Description Quang/Ujiie C
14/07/09 14/07/14 14/07/21 Technical Detail Description Quang/Ujiie C
14/07/09 14/07/14 14/07/11 Technical Detail Description Quang/Ujiie B/A+B+C
14/07/09 14/07/14 14/07/11 Technical Detail Description Quang/Ujiie A
14/07/14 14/07/19 14/07/18 Ybsguekded 2-Core AWG18 Cable Technical Detail Description Quang/Randy B/A
BBVN-FIVE-S2-SC-AMEP-0097
Copper Pipe for AHU connection (Use for AHU coil connection) & Copper Pipe Fittings for AHU connection (Use for AHU coil connection)
Technical Detail Description, Catalogue
BBVN-FIVE-S2-SC-AMEP-0098
Technical detail description, Catalogue
BBVN-FIVE-S2-SC-AMEP-0098/R1
Exposed Chiller Pipe Insulation Cladding_Rev.1 Revised based on comments in AMEP-98 dated 20-June-2014
BBVN-FIVE-S2-SC-AMEP-0099
Anchor Bolt (SANKO) for Pipe Support on Trench Pit and Underground Toilet
BBVN-FIVE-S2-SC-AMEP-100
BBVN-FIVE-S2-SC-AMEP-101
Certificate/Test of Quality and Quantity, Product Data Sheet
BBVN-FIVE-S2-SC-AMEP-101/R1
Treaded Rod, Bolt, Nuts, Washer, Pipe Clamp (Tanco/Zhapu)_Rev.1 Revised based on comments in AMEP-101 dated 23-June-2014
BBVN-FIVE-S2-SC-AMEP-101 (A)
Treaded Rod for Indoor Support - TANCO Class 4.8 DIN975 Submitted based on comments in AMEP-101/R1 dated 11-July-2014
BBVN-FIVE-S2-SC-AMEP-102
BBVN-FIVE-S2-SC-AMEP-103
BBVN-FIVE-S2-SC-AMEP-104
BBVN-FIVE-S2-SC-AMEP-105
BBVN-FIVE-S2-SC-AMEP-106
For 7 items, Technical Detail Description
BBVN-FIVE-S2-SC-AMEP-106/R1
BBVN-FIVE-S2-SC-AMEP-106/R2
Spring Isolator (Floor Mounted)_Manufacturer: MASON_Model" SLFH_Rev.2 Revised based on comments in AMEP-106/R1 dated 21-July-2014
Technical Detail Description (for 8 items)
BBVN-FIVE-S2-SC-AMEP-106 (A)
Spring Isolator (Floor Mounted) for Primary & Secondary Pump - MASON SLFH1350 & SLFH1750 (Revised based on comment in AMEP-106/R2 dated 25-August-2014)
BBVN-FIVE-S2-SC-AMEP-106 (A)/R1
Spring Isolator (Floor Mounted) for Primary & Secondary Pump - MASON SLFH1350 & SLFH1750 (Revised based on comment in AMEP-106(A) dated 18-Oct-2014)
BBVN-FIVE-S2-SC-AMEP-106 (A)/R2
Spring Isolator (Floor Mounted) for Primary & Secondary Pump - MASON SLFH1350 & SLFH1750_Rev.2 (Revised based on comment in AMEP-106(A) dated 18-Oct-2014)
BBVN-FIVE-S2-SC-AMEP-107
BBVN-FIVE-S2-SC-AMEP-108
BBVN-FIVE-S2-SC-AMEP-109
BBVN-FIVE-S2-SC-AMEP-109/R1
Fire Fighting Paint (Vinilex Primer)_Nippon Paint (Model: VINILEX 120 ACTIVE Primier)_rev.1 Revised based on comments in AMEP-109 dated 27-June-2014
BBVN-FIVE-S2-SC-AMEP-110
BBVN-FIVE-S2-SC-AMEP-110/R1
Fire Fighting Paint (Primer for Welded Location)_Rev.1 (Revised based on comments in AMEP_110 dated 27-June-2014
BBVN-FIVE-S2-SC-AMEP-111
BBVN-FIVE-S2-SC-AMEP-111/R1
Fire Fighting Paint (Sprinkler, Hydrant and Hose Reel top Coat paint)_Nippon Paint (Model: Bilac B9004 Vermillion)_Rev.1 Revised based on comments in AMEP-111 dated 27-June-2014
BBVN-FIVE-S2-SC-AMEP-112
BBVN-FIVE-S2-SC-AMEP-113
DDC for Compressor Chiller Water Valve, Motorized Valve for compressor chilled water pipe, temperature sensor for compressor chilled water pipe, Solenoid valve for compressor
BBVN-FIVE-S2-SC-AMEP-113 (A)
Solenoid valve for compressor (ASCA) for Compressor Chilled Water Pipe_Model: SCXE238A005-24017 (Supperseded Solenoid valve for compressor in AMEP-113 dated 26-June-2014) Based on comments in AMEP-113
Technical Description and Catalogue
BBVN-FIVE-S2-SC-AMEP-114
BBVN-FIVE-S2-SC-AMEP-114 (A)
Process Chilled Water Valve_Rev.1 Revised based on comments in AMEP-114 dated 7-July-2014
Tabulation, Technical detailed description
BBVN-FIVE-S2-SC-AMEP-114 (A) (FINAL)
Gate Valve (TOYO)_DN80 for water supply Tie-in works; Ball valve (TOYO) for Compressor room Tie-in
BBVN-FIVE-S2-SC-AMEP-115
BBVN-FIVE-S2-SC-AMEP-116
Gavanized Black Carbon steel Pipe Medium Grade Schedule 40 (Use for Water Supply on Pump Room)
BBVN-FIVE-S2-SC-AMEP-117
Gavanized Black Carbon steel Pipe BS-M (Use for Water Supply DN 100mm and Below)
BBVN-FIVE-S2-SC-AMEP-118
Gavanized Black Carbon steel Pipe Fittings (Use for Water Supply in Pump Room)
BBVN-FIVE-S2-SC-AMEP-119
Auto Drain (for Compressor Auto Drain in Compressor Room) (ADCA)_Model FA20
BBVN-FIVE-S2-SC-AMEP-120
Y Strainer (for compressor Chilled Water Supply Piping) (ARITA)_Model Brass-Y-Strainer-Screwed End BSPT
BBVN-FIVE-S2-SC-AMEP-121
BBVN-FIVE-S2-SC-AMEP-122
BBVN-FIVE-S2-SC-AMEP-123
Duct Silencer for AHU Supply Duct (Tan Hung)W4200xH2000mmxL3100mm
BBVN-FIVE-S2-SC-AMEP-124
Duct Silencer for AHU Supply Duct (Tan Hung)W4300xH2000mmxL2800mm
BBVN-FIVE-S2-SC-AMEP-125
Fire Fighting Paint Fire Fighting Paint (Vinilex Primer)_Nippon Paint (Model: VINILEX 120 ACTIVE Primier)_rev.1 Revised based on comments in AMEP-109 dated 27-June-2014Fire Fighting Paint (Primer for Welded Location)_Rev.1 (Revised based on comments in AMEP_110 dated 27-June-2014)Fire Fighting Paint (Sprinkler, Hydrant and Hose Reel top Coat paint)_Nippon Paint (Model: Bilac B9004 Vermillion)_Rev.1 Revised based on comments in AMEP-111 dated 27-June-2014
BBVN-FIVE-S2-SC-AMEP-126
HVAC_Aluminum Insulation Pin Adhesive (TITEBOND)_Model: Titebond Heavy Duty Construction Adhesive
BBVN-FIVE-S2-SC-AMEP-127
Approval for Mechanical, Electrical Plumbing 9
OUTGOIING Rev. Date Delivered Title Attachment Author/Delivered to StatusDate Required Reply
INCOMING Date Received
Date Delivered to Author
14/07/14 14/07/19 14/07/18 Cable Terminal for LV Cable (Big type & Small Type) Tabulation, Catalogue Quang/Randy B/A
14/07/15 14/07/21 14/07/17 Floor Clean Out (1st Floor Toilet)_Model: COB Technical Detail Description Quang/Ujiie C
14/08/01 14/08/06 14/08/12 Technical Detail Description Quang/Ujiie/Khoa C
14/10/27 14/11/01 14/11/04 Catalogue Quang/Ujiie/Khoa B
14/07/15 14/07/21 14/07/17 Floor Clean Out (Ground Floor)_Model: COA Technical Detail Description Quang/Ujiie C
14/07/18 14/07/23 14/07/21 Bitumen For Pipe Protection (Shell Bitumen)_Model: Shell Flintkote 3 Technical Detail Desciption Quang/Ujiie/Trung C
14/08/01 14/08/08 14/08/15 Catalogue Quang/Ujiie/Trung C
14/08/01 14/08/08 14/08/15 Catalogue Quang/Ujiie/Trung C
14/07/18 14/07/23 14/07/21 Technical Detail Desciption Quang/Ujiie/Trung C
14/07/25 B/A
14/07/18 14/07/23 14/07/21 Technical Detail Desciption Quang/Ujiie/Trung C
14/07/25 B
14/07/21 14/07/25 14/07/24 Technical Detail Desciption Quang/Ujiie/Trung B
14/07/22 14/04/24 14/07/28 Quang/Ujiie C
14/08/08 14/08/13 Quang/Ujiie
14/07/25 14/07/31 14/08/04 Bolt, Nuts, Washer for Flange DIN 931, Class 8.8 Technical Detail Desciption Quang/Ujiie C
14/08/06 14/08/13 14/08/18 catalogue Quang B
14/07/30 14/08/06 14/08/18 Hose Rack Assembly (Manufacturer: Croker) Technical Detail Desciption Quang/Ujiie B
14/09/03 14/09/05 14/10/20 Quang/Ujiie C
14/10/31 14/11/06 Quang/Ujiie
14/07/30 14/08/06 PVC Ball Valve (Manufacturer: FIP)_Model: VXEAV Technical Detail Desciption Quang/Ujiie
14/08/06 14/08/13 14/08/11 Catalogue Quang/ujiie B
14/08/09 14/08/14 14/08/29 Flexible Canvas for Mechanical Equipment_Prodetech Tabulation, Catalogue Quang/ujiie B
14/09/22 B
14/10/16 B
14/08/14 14/08/19 14/10/06 Technical Detail Description Quang/Ujiie B
14/08/18 14/08/23 14/08/22 Quang/Ujiie C
14/08/25 14/08/29 14/08/28 Drawing Quang/Ujiie B
14/08/20 14/08/25 MS-24.1: HV Connection for Transformer TX-2 Quang/Ujiie/Diem
14/08/21 14/08/25 14/08/29 Catalogue Quang/Ujiie B/A
14/08/21 14/08/25 14/08/28 Nickel Coated Brass Cable Gland & Nylon Cable Gland (w/Locknut) Quang/Ujiie B
14/08/21 14/08/25 14/08/28 Drawings Quang/Ujiie/Randy C
14/08/23 14/08/27
14/08/28 14/09/02 Sprinkler Pipe Support and Process Exhaust Duct DN250 and Below Sample
14/08/30 14/09/05 14/09/06 Product Data Sheet Quang/Ujiie C
14/08/30 14/09/01 14/09/04 Drawing & Photos Quang/Ujiie C
14/09/30 14/10/07 14/10/08 Technical Data Quang/Ujiie C
14/10/10 14/10/16 14/10/13 Quang/Ujiie B
14/09/01 14/09/04 Quang/Ujiie
14/09/02 14/09/05 14/09/15 Technical Data Quang/Ujiie B
14/09/03 14/09/05 14/09/17 Fire Hydrant Hose & Fire Hydrant Nozzle (Supplier: PCCC Hanoi) Quang/Ujiie C
14/09/05 14/09/10 14/09/18 Quang/Ujiie C
14/09/09 14/09/11 14/09/22 Catalogue Quang/Ujiie/Trung C
14/10/13 14/10/18 14/10/20 Catalogue, Technical Data Quang/Ujiie/Trung B/A
14/09/10 14/09/17 Quang/Ujiie
14/09/10 14/09/17 14/09/27 Quang/Ujiie C
14/09/11 14/09/13 14/09/18 Denso Primer D for Underground Firefighting Technical Data Sheet Quang/Ujiie B
BBVN-FIVE-S2-SC-AMEP-128
BBVN-FIVE-S2-SC-AMEP-129
BBVN-FIVE-S2-SC-AMEP-129/R1
Floor Clean Out (1st Floor Toilet)_Model: COB(Ground Floor Toilet)_Model: COA_Rev.1 (Revised based on comments in AMEP_129 dated 17-July-2014)
BBVN-FIVE-S2-SC-AMEP-129/R2
Cleanout for First Floor Office - K Product CO 810W Type: CW-43 and CW-25_rev.2 Revised based on comment in AMEP-129/R1 dated 12-August-2014
BBVN-FIVE-S2-SC-AMEP-130
BBVN-FIVE-S2-SC-AMEP-131
BBVN-FIVE-S2-SC-AMEP-131/R1
Bitumen For Pipe Protection (Shell Bitumen)_Model: Shell Flintkote 3_Rev.1 Revised based on comments in AMEP-131 dated 21-July-2014
BBVN-FIVE-S2-SC-AMEP-131 (ADD.01)
Bitumen For Pipe Protection (Shell Bitumen)_Model: Shell Flintkote PF-4_ADD (Additional Document based on EMEP-131 dated 21--July-2014
BBVN-FIVE-S2-SC-AMEP-132
Copper Pipe Welding Rod (Brazing)_Harris [Model: AWS A5.8, BCuP 2]
BBVN-FIVE-S2-SC-AMEP-132/R1
Copper Pipe Welding Rod (Brazing)_Harris [Model: AWS A5.8, BCuP 2]_Rev.1
BBVN-FIVE-S2-SC-AMEP-133
GTAW Welding Rod for Pipe 50mm and Below (Huyndai)_Model: ST-50G
BBVN-FIVE-S2-SC-AMEP-133/R1
GTAW Welding Rod for Pipe 50mm and Below (Huyndai)_Model: ST-50G_Rev.1
BBVN-FIVE-S2-SC-AMEP-134
SMAW Welding Rod for Pipe (Chosun Welding Co.,Ltd)_Model: LC-300
BBVN-FIVE-S2-SC-AMEP-135
Master Tie-in List, Method Statement List, Material and Tool List, Organization Chart for Stage 1
5A3size pages Master Tie-in List, Method Statement List of Tie-in 1A3size page, 8A3size pages Material and Tool List + 26A3size drawings, 2A3size pages Organization Chart for Stage 1 + 2A3pages contact details
Superseed (Replaced by APD-69)
BBVN-FIVE-S2-SC-AMEP-135/R1
Master Tie-in List, Method Statement List, Material and Tool List, Organization Chart for Stage 1_Rev.1 Revised based on comments in AMEP_135 dated 28-Jul-2014
Tie-in Comments List (2A3sizepages), Master Tie-in List for Stage 1 (9S3size pages + 1 A0size colored page), Method Statement List of Tie-in (1A3size page), Organizational Chart, Manpower list (2A3size pages)
BBVN-FIVE-S2-SC-AMEP-136
BBVN-FIVE-S2-SC-AMEP-136/R1
Bolt, Nuts, Washer for Flange -TANCO DIN931 Class 8.8 _Rev.1 Revised based on comments in AMEP-136 dated 4-Aug-2014
BBVN-FIVE-S2-SC-AMEP-137
BBVN-FIVE-S2-SC-AMEP-137/R1
Hose Rack Assembly (Manufacturer: Croker)_Rev.1 Revised based on comments in AMEP-137 dated 18-August-2014
Manufacturer Letter, Catalogue
BBVN-FIVE-S2-SC-AMEP-137/R2
Hose Rack Assembly (Manufacturer: Croker)_Rev.2 Revised based on comments in AMEP-137/R1 dated 20-October-2014
Manufacturer Letter, Catalogue
BBVN-FIVE-S2-SC-AMEP-138
BBVN-FIVE-S2-SC-AMEP-139
Fire Resistance Cable for Fire Alarm Stage 1 Tie-in Connection - Wilson FR-100
BBVN-FIVE-S2-SC-AMEP-140
BBVN-FIVE-S2-SC-AMEP-140/R1
Flexible Canvas for Mechanical Equipment_Prodetech _Rev.1 Revised based on comments in AMEP-140 dated 29-August-2014
BBVN-FIVE-S2-SC-AMEP-140/R2
flexible Canvas for Mechanical Equipment_Prodetech _Rev.2 Revised based on comments in AMEP-140/R1 dated 22-September-2014
BBVN-FIVE-S2-SC-AMEP-141
Sikagrout GP (Sika)_Model: Sikagrout GP& SikaFlex-Construction (AP)_Model: SikaFlex-Construction (AP) for Toilet Sleeve Sealing
BBVN-FIVE-S2-SC-AMEP-142
Access Control Panel Enclosure W560xH700xD250 & W540xH560xD250
Drawing, Picture of Existing Panel for Panel Color
BBVN-FIVE-S2-SC-AMEP-142/R1
Access Control Panel Enclosure W560xH700xD250 & W540xH560xD250_Rev.1 Revised based on comments in AMEP-142 dated 22-August-2014
BBVN-FIVE-S2-SC-AMEP-143
BBVN-FIVE-S2-SC-AMEP-144
Copper Busbar for Modification of LV Panel & Earth Copper Bar- Oriental Copper
BBVN-FIVE-S2-SC-AMEP-145
Tabulation, 1A4size photo, data sheet
BBVN-FIVE-S2-SC-AMEP-146
PV Control Panel for Pre-Action Valve & Schematic Diagram for Operation (Additional Document for AMEP-37A Pre-Action Valve for Fire fighting system double interlock)
BBVN-FIVE-S2-SC-AMEP-147
Hermeseal S-2 for fire fighitng pipe to fittings thear connection (pipe size DN25, DN32, DN40, DN50)
Catalog, Method Application, Shop drawing Location
BBVN-FIVE-S2-SC-AMEP-148
BBVN-FIVE-S2-SC-AMEP-149
Drop in Anchor (SANKO)_Model: CT-1040; CT1250 Use for Concrete Slab Anchoring
BBVN-FIVE-S2-SC-AMEP-150
Duct Silencer for AHU Supply Duct (W4200xH2000xL3540 & W4300xH2000xL3540) & Duct Silencer for OA Fan Duct (W800xH600xL1200)_TAN HUNG
BBVN-FIVE-S2-SC-AMEP-150/R1
Duct Silencer for AHU Supply Duct (W4200xH2000xL3540 & W4300xH2000xL3540) & Duct Silencer for OA Fan Duct (W800xH600xL1200)_TAN HUNG_Rev.1Revised based on comments in AMEP_150 dated 04-September-2014
BBVN-FIVE-S2-SC-AMEP-150/R2
Duct Silencer for AHU 3 & 4 Supply Duct & OA Duct _ Rev.2 Revised based on comments in AMEP-150/R1 dated 8-Oct-2014
Catalogue, Noise Analysis calculation, Drawing
BBVN-FIVE-S2-SC-AMEP-151
SUS Ball valve Flange type (for process chilled water piping Tie-in 6 worker, Insolation to Stage 2)
BBVN-FIVE-S2-SC-AMEP-152
HILTI Plastic Anchor for Brick- HRD 10x70mm (Use for anchoring on Brick only)
BBVN-FIVE-S2-SC-AMEP-153
Manufacturer Letter, Catalogue
BBVN-FIVE-S2-SC-AMEP-154
Chiller Water and PCW Pipe Insulation Support (AEROFLEX) for supply and return_Model: AEROFIT
Technical detail description (Product Data Sheet)
BBVN-FIVE-S2-SC-AMEP-155
Pressure Reducing Valve for Fire Hydrant System - Malgorani EUROBRASS 143
BBVN-FIVE-S2-SC-AMEP-155/R1
Pressure Reducing Valve for Fire Hydrant System_Rev.1 GOETZE Series 681 (revised based on comment in AMEP-155 dated 22-September-2014)
BBVN-FIVE-S2-SC-AMEP-156
Gate Valve DN80 - TOYO 420E (For Water Supply Tie-in Works only) (Superseded the gate valve DN80 in approved ANEP-81C dated 8-July-2014) Tie-in No.20
Teechnical Data, Drawing for Reference
BBVN-FIVE-S2-SC-AMEP-157
Ball Valve DN25 - TOYO 5026 (for Compressor Tie-in Works only) Tie-in No.8
Teechnical Data, Drawing for Reference
BBVN-FIVE-S2-SC-AMEP-158
Approval for Mechanical, Electrical Plumbing 10
OUTGOIING Rev. Date Delivered Title Attachment Author/Delivered to StatusDate Required Reply
INCOMING Date Received
Date Delivered to Author
14/09/11 14/09/13 14/09/18 Densoclad 40 HT tape for Underground Firefighting Protection Cover Technical Data Sheet Quang/Ujiie B
14/09/12 14/09/17 14/09/18 Floor Drain for Clean Room Area - FUKUNISHI T-5SBGS-50 Technical Data Sheet Quang/Ujiie B
14/09/18 14/09/23 14/09/22 Quang/Ujiie B
14/09/19 14/09/26 14/09/22 Catalogue Quang/Ujiie B
14/09/22 14/09/25 14/09/27 Technical data Quang/Ujiie B
14/09/22 14/09/25 14/09/27 Technical data sheet Quang/Ujiie B
14/09/26 14/10/03 14/10/01 Electromagnetic Lock_ ALGATECH UL275- SMC Catalogue Quang/ Ujiie C
14/10/18 14/10/22 14/10/24 Catalogue Quang/Ujiie B/A
14/09/26 14/10/03 14/10/06 Isolators Quang/Ujiie B
14/10/31 14/11/06 Catalog Quang/Ujiie
14/10/31 14/11/07 Catalogue Quang/Ujiie
14/09/29 14/10/04 14/10/06 Catalog Quang/Ujiie C
14/10/09 C
14/10/28 B
14/09/30 14/10/07 14/10/08 Fire Stop Foam- HILTI CP660 Technical Data Quang/Ujiie C
14/10/20 14/10/27 14/10/24 Catalogue, Test report Quang/Ujiie B
14/09/30 14/10/07 14/10/08 Fire Stop Pipe Wrap- HILTI CP648-E Technical Data Quang/Ujiie B
14/09/30 14/10/07 14/10/08 Fire Stop Collar- HILTI CP643N Technical Data Quang/Ujiie B
14/10/02 14/10/04 AHU Sealant - SIKAFLEX 221 Technical Data Sheet Quang/Ujiie
14/10/06 14/10/13 14/10/16 Quang/Ujiie B
14/10/07 14/10/14 14/10/09 Quang/Ujiie C
14/10/17 14/10/20 14/10/23 Quang/Ujiie B+C/B+C
14/10/07 14/10/14 14/10/09 FS-ONE Fire Stop Sealant for Busduct Penetration - HILTI Catalogue, Technical Data Quang/Ujiie B
14/10/07 14/10/14 14/10/13 Technical Data Sheet Quang/Ujiie C
14/10/07 14/10/14 14/10/20 PVC Butterfly Valve for Drain Office Pit - FIP FEOV/LM Catalogue Quang/Ujiie B/A
14/10/07 14/10/14 14/10/09 Badge Printer - Fargo HDP5000 & Accessories Catalogue, Installation Guide Quang/Ujiie C
14/11/04 14/11/11 14/11/07 Quang/Ujiie C
14/11/08 14/11/13 Catalog Quang/Ujiie
14/10/07 14/10/14 14/10/09 Software for Access Control - Lenel S00090 Picture Quang/Ujiie C
14/10/10 14/10/17 14/10/20 Catalogue, Letter, Certificate Quang/Ujiie C
14/11/05 14/11/12 Catalogue, Letter Quang/Ujiie
14/10/14 14/10/21 14/10/17 Catalogue Quang/Ujiie C
14/11/07 14/11/10 Catalogue, Technical Data Quang/Ujiie
14/10/17 14/10/20 14/10/21 FM 200 Low Pressure Swich and Discharge Pressure Swich- FIKE Catalogue, Data Sheet Quang/ Ujiie A
14/10/18 14/10/22 14/10/24 Control cable for Mechanical Equipment- LS Vina CVV-A Catalogue, Test Report Quang/ Ujiie C
14/10/31 14/11/06 14/11/03 Control cable for Mechanical Equipment- LS Vina CVV-A_Rev.1 Catalogue, Test Report Quang/ Ujiie C
14/10/22 14/10/27 14/10/28 ACP Battery Back-up - Phoenix TS1272 (12V-7.2Ah) Picture Quang/Ujiie C
14/10/31 14/11/06 14/11/03 Technical Data Quang/Ujiie C
14/11/08 14/11/14 Quang/Ujiie
14/10/22 14/10/27 14/11/03 EPDM Gasket - Tan Thai Binh G-ST-Flange Gasket Catalogue Quang/Ujiie C
14/10/25 14/11/01 14/10/30 MCCB 630AF/630AT 4P 50kA (by Schneider)_Model: NSX630N Quang/Ujiie B+C/B+C
14/10/31 14/11/01 14/11/03 MCCB 630AF/630AT 4P 50kA- Schneider NSX630N_Rev.1 Catalog Quang/Ujiie B
14/10/25 14/11/01 14/10/31 Quang/Ujiie C
14/10/27 14/11/01 14/11/04 Catalogue, Performance Data Quang/Ujiie C
14/11/08 14/11/10 Catalog, Technical Data Quang/Ujiie
14/10/31 14/11/06 14/11/03 Office Power Supply Battery-Altronix OLS120 Technical Data Quang/Ujiie C
14/10/31 14/11/07 14/11/03 Pilot Light Unibody Type- IDEC YW1P- 1BUQ3(2) Catalog Quang/Ujiie B
14/11/07 14/11/14 Quang/Ujiie/Diem
BBVN-FIVE-S2-SC-AMEP-159
BBVN-FIVE-S2-SC-AMEP-160
BBVN-FIVE-S2-SC-AMEP-161
Flexible Canvas for Mechanical Equipment - YEEDAH (Superseded the approved Flexible canvas in AMEP-140 dated 29-August-2014)
Tabulation, Catalogue, Test report
(refer to 140/R1)
BBVN-FIVE-S2-SC-AMEP-162
Female Anchor for Suspended Slab, Office and Clean Room Area - HILTI HKV
BBVN-FIVE-S2-SC-AMEP-163
Quick Response Pendent Sprinkler for Component Production - VIKING VK352 L=8.0 (Additional material for approval in approved AMEP-25/R1 dated 3-July-2014)
BBVN-FIVE-S2-SC-AMEP-164
Flexible Hose for Sprinkler Head - TRONFLEX TCR25BR for Component Production Sprinkler Head K=8.0 (Superseded the approved flexible hose for component production sprinkler head K=14 3/4'' commection in AMEP-89 dated 27-June-2014)
BBVN-FIVE-S2-SC-AMEP-165
BBVN-FIVE-S2-SC-AMEP-165/R1
Electromagnetic Lock_ ALGATECH UL275- SMC_Rev.1Revised based on comments in AMEP_165 dated 01-Oct-2014
BBVN-FIVE-S2-SC-AMEP-166
Technical detail description/ Catalogue
BBVN-FIVE-S2-SC-AMEP-166/R1
Isolators- Schneider Clipdsal WHT35: 3P 35A for RF-P2-01, 02 & Legrand 0 226 27: 4P 100A for SCHWP-01, 02, 03 (Revised and superseded the approval isolator for SCWP in AMEP-166 dated 06-Oct-2014)
BBVN-FIVE-S2-SC-AMEP-166(A)
Isolators for VRV Outdoor Unit- Schneider/ Clipsal WHT35 3P 35A&WHT20 3P 20A
BBVN-FIVE-S2-SC-AMEP-167
OS&Y Gate Valve for Fire Fighting System (Double Interlock Pre-Action)- FIREKING OF200F-400F (Superseded the approved butterfly valve DN100 in AMEP_0035/R1 based on RFC_0024 & RFI_159)
BBVN-FIVE-S2-SC-AMEP-167/R1
OS&Y Gate Valve for Fire Fighting System (Double Interlock Pre-Action)-
BBVN-FIVE-S2-SC-AMEP-167/R2
OS&Y Gate Valve for Fire Fighting System (Double Interlock Pre-Action)_Rev.2
BBVN-FIVE-S2-SC-AMEP-168
BBVN-FIVE-S2-SC-AMEP-168/R1
Fire Stop Foam- HILTI CP660_Rev.1 Revised based on comments in AMEP-168 dated 8-October-2014
BBVN-FIVE-S2-SC-AMEP-169
BBVN-FIVE-S2-SC-AMEP-170
BBVN-FIVE-S2-SC-AMEP-171
BBVN-FIVE-S2-SC-AMEP-172
Pipe and Duct Labelling (Brady) for chilled water and process chilled water pipe (Supply and Return)_Model: B6606 digitally printed plastic
BBVN-FIVE-S2-SC-AMEP-173
Highbay Lighting Emergency Lamp for Warehouse (OSRAM Halostar 50W 12V GY6.35); Lamp for Downlight in Office & Canopy (OSRAM Deluxe D/E); Lamp for Flood Light (Exterior) (OSRAM Powerstar HQI-TS Excellence 150W/NDL); Lamp for Highbay Light (Warehouse) (OSRAM Powerstar HQI-E 150W/NDL/Clear); 14W Flourescent Lamp for Office - Phillips TL5 Essential 14W/840; 28W Flourescent Lamp for Buffer Areas VRV - Phillips TL5 Essential 28W/840; 36W Flourescent Lamp for Cleanroom - Phillips TL-D 36W/840; Ballast 36W for Clean Room-TRIDONIC PC T8 Pro IP; Ballast 28W for Buffer Areas & VRV - THorn Electronic Ballast for Linear T5 FL Lamp; Ballast 14W for Office - TRIDONIC PC T5 Top IP 3x14W
Catalogue; Technical Data sheet
BBVN-FIVE-S2-SC-AMEP-173/R1
Highbay Lighting Emergency Lamp for Warehouse (OSRAM Halostar 50W 12V GY6.35); Lamp for Downlight in Office & Canopy (OSRAM Deluxe D/E); Lamp for Flood Light (Exterior) (OSRAM Powerstar HQI-TS Excellence 150W/NDL); Lamp for Highbay Light (Warehouse) (OSRA
Catalogue, Techinical Data Sheet
BBVN-FIVE-S2-SC-AMEP-174
BBVN-FIVE-S2-SC-AMEP-175
Fire Smoke Supply Air Fan FSFS0PII-01,02 - Drugger TDA-V900-14AA-7-7/22 (Additional Fan - Refer to RFC26)
BBVN-FIVE-S2-SC-AMEP-176
BBVN-FIVE-S2-SC-AMEP-177
BBVN-FIVE-S2-SC-AMEP-177/R1
Badge Printer - Fargo HDP5000 & Accessories_Rev.1 Revised based on comments in AMEP-177 dated 9-October-2014
Technical Detail Description; Catalogue
BBVN-FIVE-S2-SC-AMEP-177/R2
Badge Printer - Fargo HDP5000 & Accessories_Rev.2 Revised based on comments in AMEP-177/R1 dated 07-Nov-2014
BBVN-FIVE-S2-SC-AMEP-178
BBVN-FIVE-S2-SC-AMEP-179
Water Pump Tank - GRUNDFOS GT-H-100 PN10 G1V (Superseded the approved water pump tank in AMEP-66/R1 dated 20-June-2014)
BBVN-FIVE-S2-SC-AMEP-179/R1
Water Pump Tank - GRUNDFOS GT-H-100 PN10 G1V _Rev.1 Revised based on comments in AMEP-179 dated 20-October-2014
BBVN-FIVE-S2-SC-AMEP-180
BTU Meter - ONICON System-10-BAC BTU Meter (Refer to RFC Additional BTU Meter for Chilled Water)
BBVN-FIVE-S2-SC-AMEP-180/r1
BTU Meter - ONICON System-10-BAC BTU Meter_Rev.1 Revised based on comments in AMEP-180 dated 17-October-2014
BBVN-FIVE-S2-SC-AMEP-181
BBVN-FIVE-S2-SC-AMEP-182
BBVN-FIVE-S2-SC-AMEP-182/R1
BBVN-FIVE-S2-SC-AMEP-183
BBVN-FIVE-S2-SC-AMEP-183/R1
ACP Battery Back-up - Phoenix TS1272 (12V-7.2Ah)_Rev.1Revised based on comments in AMEP_182 dated 28-Oct-2014
BBVN-FIVE-S2-SC-AMEP-183/R2
ACP Battery Back-up - Phoenix TS1272 (12V-7.2Ah)_Rev.2Revised based on comments in AMEP_182/R1 dated 03-Nov-2014
Technical detail description, Catalogue
BBVN-FIVE-S2-SC-AMEP-184
BBVN-FIVE-S2-SC-AMEP-185
Product Data Sheet, IN_AMEP-15/R2 dated 9-June-2014; IN_AMEP-128 dated 18-July-2014; IN_AMEP-144 dated 29-August-2014
BBVN-FIVE-S2-SC-AMEP-185/R1
BBVN-FIVE-S2-SC-AMEP-186
Variable Speed Drive (VSD)_by Hai Nam (Recycling Fan RF-PII-01, 02) & New DB by Hai Nam Sub-Panel in AHU Room for Smoke Fan
Drawings; Catalogue/Product Data Sheet
BBVN-FIVE-S2-SC-AMEP-187
PVC Fume Exhaust Fan for Production Tool IMM2-5 and IMM2-6-Krugger CCD-9-7 245W 3SY
BBVN-FIVE-S2-SC-AMEP-187/R1
PVC Fume Exhaust Fan for Production Tool IMM2-5 and IMM2-6-Krugger CAC 200-4_ Rev.1Revised based on comment in AMEP_187 dated 04-Nov-2014
BBVN-FIVE-S2-SC-AMEP-188
BBVN-FIVE-S2-SC-AMEP-189
BBVN-FIVE-S2-SC-AMEP-190
Trunking, Data, Powepoint for Toolshop 2; for IPQC Lab and for White Office
Technical Detail Description; Catalogue
BBVN-FIVE-S2-SC-AMEP-191
BBVN-FIVE-S2-SC-AMEP-192
BBVN-FIVE-S2-SC-AMEP-193
BBVN-FIVE-S2-SC-AMEP-194
Approval for Mechanical, Electrical Plumbing 11
OUTGOIING Rev. Date Delivered Title Attachment Author/Delivered to StatusDate Required Reply
INCOMING Date Received
Date Delivered to Author
BBVN-FIVE-S2-SC-AMEP-195
BBVN-FIVE-S2-SC-AMEP-196
BBVN-FIVE-S2-SC-AMEP-197
BBVN-FIVE-S2-SC-AMEP-198
BBVN-FIVE-S2-SC-AMEP-199
Approval for Mechanical, Electrical Plumbing 12
OUTGOIING Rev. Date Delivered Title Attachment Author/Delivered to StatusDate Required Reply
INCOMING Date Received
Date Delivered to Author
Approval for Mechanical, Electrical Plumbing 13
OUTGOIING Rev. Date Delivered Title Attachment Author/Delivered to StatusDate Required Reply
INCOMING Date Received
Date Delivered to Author
Approval for Mechanical, Electrical Plumbing 14
OUTGOIING Rev. Date Delivered Title Attachment Author/Delivered to StatusDate Required Reply
INCOMING Date Received
Date Delivered to Author
Approval for Mechanical, Electrical Plumbing 15
OUTGOIING Rev. Date Delivered Title Attachment Author/Delivered to StatusDate Required Reply
INCOMING Date Received
Date Delivered to Author
Approval for Mechanical, Electrical Plumbing 16
OUTGOIING Rev. Date Delivered Title Attachment Author/Delivered to StatusDate Required Reply
INCOMING Date Received
Date Delivered to Author
Approval for Mechanical, Electrical Plumbing 17
OUTGOIING Rev. Date Delivered Title Attachment Author/Delivered to StatusDate Required Reply
INCOMING Date Received
Date Delivered to Author
Approval for Mechanical, Electrical Plumbing 18
OUTGOIING Rev. Date Delivered Title Attachment Author/Delivered to StatusDate Required Reply
INCOMING Date Received
Date Delivered to Author
45.00
Approval for Method Statement 19OUTGOING Rev. Title Attachment Prepared by Status
BBVN-FIVE-S2-SC-AMS-0001-14 Pre-condition survey method PhucC
14/03/05 Nguyen
BBVN-FIVE-S2-SC-AMS-0002-14 Nguyen14/02/28 C
14/03/03 14/03/03 Cuong/Toan
14/03/05 B
Temporary site office method statement (Rev.2) Nguyen
14/03/06 C
14/03/06 14/03/06 Nguyen
14/03/06 B
BBVN-FIVE-S2-SC-AMS-0003-14 14/03/04 14/03/04 Dam Minh Quang
14/03/06 C
14/03/14 9 A3 drawings Trung
14/03/17 C
14/03/18 7 A3size drawings Diem
14/03/20 C
14/03/21 1 A3 size schedule, 9 A3 size drawings Diem
14/03/21 A
BBVN-FIVE-S2-SC-AMS-0004-14 14/03/04 14/03/04 Dam Minh Quang
14/03/05 C
14/03/21 14/03/28 Ujiie/D.T . Trung
14/03/24 C
14/03/27 14/04/03 Mr. Trung
BBVN-FIVE-S2-SC-AMS-0005-14 14/03/03 14/03/04 Dam Minh Quang
Date Issued
Date Required
Reply
INCOMING Date Received
Pre-condition survey method
BBVN-FIVE-S2-SC-AMS-0001-14/R1
Pre-condition survey method
Temporary site office method statementTemporary site office method statement
BBVN-FIVE-S2-SC-AMS-0002-14/R1
Temporary site office method statement (Rev.1)
Temporary site office method statement (Rev.1)
BBVN-FIVE-S2-SC-AMS-0002-14/R2
Temporary site office method statement (Rev.2)
BBVN-FIVE-S2-SC-AMS-0002-14/R3
Temporary site office method statement (Rev.3)
Temporary site office method statement (Rev.3)
Temporary Electric Method Statement Risk Assessment (2 A4 pages), 4 A3 size drawings: E-01, E-02, E-03, E-04
Temporary Electric Method Statement
BBVN-FIVE-S2-SC-AMS-0003-14/R1
Temporary Electric Method Statement (Rev.1)
Temporary Electric Method Statement (Rev.1)
BBVN-FIVE-S2-SC-AMS-0003/R2
Temporary Electric Method Statement (Rev.2)
Temporary Electric Method Statement (Rev.2)
BBVN-FIVE-S2-SC-AMS-0003/R3
Temporary Electric Method Statement (Rev.3)
Temporary Electric Method Statement (Rev.3)
Relocation Fire fighting Method Statement Risk Assessment (2 A4 pages), 1 A3 size drawings: MF-02
Relocation Fire fighting Method Statement
BBVN-FIVE-S2-SC-AMS-0004/R1
MS-21. Fire Fighting System_Remove and Modification Existing Hydrant Pipe Rev.1Remove and Modification Existing Hydrant Pipe, Details schedule for the remove & modification existing hydrant pipe, JSA form1 A3 size drawing
MS-21. Fire Fighting System_Remove and Modification Existing Hydrant Pipe Rev.1
BBVN-FIVE-S2-SC-AMS-0004/R2
MS-21. Fire Fighting System_Remove and Modification Existing Hydrant Pipe Rev.2Remove and Modification Existing Hydrant Pipe, Details schedule for the remove & modification existing hydrant pipe
Temporary Water Supply Method Statement Risk Assessment (2 A4 pages), A3 size drawings: Option 1: 3 pages, Option 2: 2 pages
Approval for Method Statement 20OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
14/03/06 C
14/03/12 1 A3 size schedule, 2 A3 size drawings Trung
14/03/14 B
BBVN-FIVE-S2-SC-AMS-0006-14 14/03/03 14/03/04 Dam Minh Quang
14/03/06 C
14/03/14 1 A3 size schedule, 2 A3 size drawings Trung B
BBVN-FIVE-S2-SC-AMS-0007-14 14/03/11 17 A3 size drawings, JSA form Cuong14/03/14 C
14/03/18 Cuong
14/03/26 B
BBVN-FIVE-S2-SC-AMS-0008-14 14/03/11 Thanh14/03/12 C/A
14/03/18 Tu
14/03/21 B
BBVN-FIVE-S2-SC-AMS-0009 14/03/18 Nguyen/Tu
14/03/25 C/B
14/03/29 14/04/02
14/04/03 B
14/04/05 14/04/08
12-Apr-14 B
Temporary Water Supply Method Statement
BBVN-FIVE-S2-SC-AMS-0005-14/R1
Water Supply Temporary System Rev.1
Water Supply Temporary System Rev.2
Temporary Sewage water Method Statement Risk Assessment (2 A4 pages), 5 A3 size drawings: Option 1 (M-03, M-04, underground Combined), Option 2 (M-03, M-04)
Temporary Sewage water Method Statement
BBVN-FIVE-S2-SC-AMS-0006-14/R1
Water Drain Temporary System Rev.1
Water Drain Temporary System Rev1
Existing pile rectificationExisting pile rectification
BBVN-FIVE-S2-SC-AMS-0007/R1
Existing pile rectification Rev.1 Work Monitoring, HILTI Specification, QPTL-D6:1978, 17 A3 size drawings, JSA form
Existing pile rectification Rev.1
List of Method StatementList of Method Statement
BBVN-FIVE-S2-SC-AMS-0008/R1
List of Method Statement Rev.1
List of Method Statement Rev.1
MS-BLD.04 Earthwork Schedule of Elevation, Site organization Chart, Location & Access, Schedule & Manpower, JSA form
MS-BLD.04 Earthwork
BBVN-FIVE-S2-SC-AMS-0009/R1
MS-BLD.04 Earthwork Rev.1 Schedule of Elevation, Site organization Chart, Location & Access, Schedule & Manpower, Existing Ground Level, JSA form
MS-BLD.04 Earthwork Rev.1
BBVN-FIVE-S2-SC-AMS-0009/R1 (ADD)
Report & Proposal on consulting for soil treatment method (Based on comment SL.16 in General Note Sheet 2 - For Construciton Drawings (Structural Drawings) Nov 2013)
Approval for Method Statement 21OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
BBVN-FIVE-S2-SC-AMS-0010 14/03/18 14/03/19 Toan
14/03/20 C
14/03/21 14/03/22 Toan
14/03/28 MS-11 Sub-con Temporary Site Office _ Rev.1 Toan B
BBVN-FIVE-S2-SC-AMS-0011 14/03/24 14/03/28 Thanh
14/03/26 C
14/04/03 14/04/05 Tuan Anh
12-Apr-14 B
BBVN-FIVE-S2-SC-AMS-0012 14/03/27 14/03/31 R.C Work Equipment List, Schedule & Manpower, JSA Tuan Anh
08-Apr-14 C
14/04/1614/04/19 Tuan Anh
14/04/23 RC Work_Rev.1 Tuan Anh B
BBVN-FIVE-S2-SC-AMS-0013 14/04/04 14/04/09
08-Apr-14C
14/04/28 14/05/05
BBVN-FIVE-S2-SC-AMS-0014 14/04/14 14/04/21
14/04/18 C
MS-11 Subcon Temporary Site Office Schedule of Elevation, Site Organisation Chart, A3 size Drawings Vinaconex 2 4 pages&North Star 17 pages, JSA form
MS-11 Subcon Temporary Site Office
BBVN-FIVE-S2-SC-AMS-0010/R1
MS-11 Subcon Temporary Site Office Rev.1 Site Organisation Chart, Schedule of Works - Vinaconex 2 & North Star, 1 A3 size Drawings Master Plan of site office building, 4 A3 size drawings of Vinaconex 2 & 13 pages North Star, JSA form
MS.BLD-01/Anti-Termite Work Schedule of elevation, Site Organisation Chart, JSA form, 6 A3size drawings
MS.BLD-01/Anti-Termite Work
BBVN-FIVE-S2-SC-AMS-0011/R1
MS.BLD-01/Anti-Termite Work Rev.1 based on comments AMS-0011 dated 26-Mar-2014Schedule of elevation, Site Organisation Chart, JSA form, 5 A3size drawings, Material Safety Data Sheet
MS.BLD-01/Anti-Termite Work Rev.1 based on comments AMS-0011 dated 26-Mar-2014
R.C Work
BBVN-FIVE-S2-SC-AMS-0012/R1 R.C Work Rev.1
Method Statement for Concrete work, Equipment list, JSA
MS-29: Earthing System and Underground System Work Cabling and Piping
Details Schedule/Main Power Requirement, Survey Method, Installation Underground pipe, Method installation earth rod in earth pit, Detail of grounding rod in earth pit, detail of earth pit, connection from test link box to earth rod, details of HDPE conduit installation
Mr. Quang/Mr. Diem
MS-29: Earthing System and Underground System Work Cabling and Piping
BBVN-FIVE-S2-SC-AMS-0013/R1
MS-19 [C]: Air Conditioning & Mechanical Ventilation System[C] Condensation Drain Pipe Underground System Work
Excavation Work, Installaiton pipe work, testing commissioning, Sleeve, Location of the activity, Details Schedule/Manpower requirement
Mr. Quang/Mr. Trung
MS-19: Air Conditioning & Mechanical Ventilation System[C] Condensation Drain Pipe Underground System Work
Approval for Method Statement 22OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
14/04/26 14/04/29 14/05/19 Quang/Trung C
14/05/27 14/05/29 14/06/02 Quang/Trung B
BBVN-FIVE-S2-SC-AMS-0015 14/04/14 14/04/21 MS-20: Water Supply and Drainage Underground System Work
14/04/18 MS-20: Water Supply and Drainage Underground System Work C
14/04/26 14/04/29 14/05/09 Mr. Quang/Trung B
BBVN-FIVE-S2-SC-AMS-0016 14/04/14 14/04/21 MS-21: Fire Fighting Underground System Work
14/04/18 MS-21: Fire Fighting Underground System Work C
14/04/26 14/04/29 14/05/09 Quang/Trung B
BBVN-FIVE-S2-SC-AMS-0017 14/04/22 14/04/24 MS-44 Protection Method for Door & Window at Grid Line 12 Method Statement, JSA/Risk Analysis, Schedule Tuan Anh
14/04/23 MS-44 Protection Method for Door & Window at Grid Line 12 B/C
14/04/24 14/04/25 Method Statement, JSA/Risk Analysis, Schedule
14/04/25 MS-44 Protectin Method for Door & Window at Grid Line 12_Rev.1 Tuan Anh A/B
BBVN-FIVE-S2-SC-AMS-0018 14/04/28 14/05/05 Quang/Diem C
14/05/07 C
BBVN-FIVE-S2-SC-AMS-0014/R1
MS-19: Air Conditioning & Mechanical Ventilation System [C] Condensation Drain Pipe Underground System Work_Rev.1 Revised based on comments in AMS_0014 dated 18-Apr-2014
BBVN-FIVE-S2-SC-AMS-0014/R2
MS-19: Air Conditioning & Mechanical Ventilation System [C] Condensation Drain Pipe Underground System Work_Rev.1 Revised based on comments in AMS_0014 dated 18-Apr-2014
Excavation Work, Installaiton pipe work, testing commissioning, Sleeve, Location of the activity, Details Schedule/Manpower requirement
Mr. Quang/Mr. Trung
BBVN-FIVE-S2-SC-AMS-0015/R1
MS-20: Water Supply and Drainage Underground System Work_Rev.1 Revised based on comments in AMS_0015 dated 18-Apr-2014
Excavation Work, Installaiton pipe work, testing commissioning, Sleeve, Location of the activity, Details Schedule/Manpower requirement
Mr. Quang/Mr. Trung
BBVN-FIVE-S2-SC-AMS-0016/R1
MS-21: Fire Fighting Underground System Work_Rev.1 Revised based on comments in AMS_0016 dated 18-Apr-2014
BBVN-FIVE-S2-SC-AMS-0017
MS-44 Protection Method for Door & Window at Grid Line 12_Rev1 (Revised based on comment in AMS_0017 dated 23-Apr-2014)
MS-28: External Lighting-Underground Work for Foundation Cabling & Piping
Survey Method, Installation underground pipe, installation underground crossing road, concrete foundation method, JSA, schedule, plan of activity
MS-28: External Lighting-Underground Work for Foundation Cabling & Piping
Approval for Method Statement 23OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
14/05/12 14/05/16 14/05/19 Quang/Diem B
BBVN-FIVE-S2-SC-AMS-0019 14/04/29 14/05/05 14/05/09 MS-25: Underground Piping & Cabling for Pumpit Quang/Diem C
14/05/28 14/05/28 14/06/04 Quang/Diem C
14/11/08 14/11/12 Quang/Diem
BBVN-FIVE-S2-SC-AMS-0020 14/04/29 14/05/05 14/05/09 MS-35: CCTV system-Underground system work cabling and piping Quang/Diem C
14/05/24 14/05/28 14/05/28 Quang/Diem B
BBVN-FIVE-S2-SC-AMS-0021 14/04/29 14/05/3 14/05/07 MS-BLD.05 Method Statement for Temporary Steel Stage Tuan Anh
B
BBVN-FIVE-S2-SC-AMS-0022 14/04/29 14/05/05 MS-30 Lightning System - Underground Work Cabling and Piping Quang/Diem
BBVN-FIVE-S2-SC-AMS-0018/R1
MS-28: External Lighting-Underground Work for Foundation Cabling & Piping_Rev.1 Revised based on comments in AMS-0018 dated 7-May-14
Details schedule/Menpower Requirements, MSE.1: Survey Method, MSE.2: Installation underground pipe, MSE.3: Details of HDPE conduit installation, MSE.4: Method Installation underground pipe across rain water pipe at crossroad, MSE.5: Fabrication of pipe cast foundation, MSE.6: Make concrete foundation method
Survey Method, Installation underground pipe, detail of installation of HDPE conduit, Connect to panel, sleeve for pum pit, JSA, schedule, plan of activity
BBVN-FIVE-S2-SC-AMS-0019/R1
MS-25: Underground Piping & Cabling for Pumpit_Rev.1 Revised based on comments in AMS-19 dated 9-May-2014
Detailed schedule/Manpower Requirement, MSE.1: Survey Method; MSE.2: Installation Underground Pipe (HDPE); MSE.3: Details of HDPE conduit installationl; MSE.4: Connect to electric panel
BBVN-FIVE-S2-SC-AMS-0019/R2
MS-25: Underground Piping & Cabling for Pumpit_Rev.2 Revised based on comments in AMS-19/R1 dated 4-June-2014
Detailed schedule/Manpower Requirement, MSE.1: Survey Method; MSE.2: Installation Underground Pipe (HDPE); MSE.3: Details of HDPE conduit installationl; MSE.4: Connect to electric panel
Survey Method, Installation underground pipe, detail of installation of HDPE conduit, JSA, schedule, plan of activity
BBVN-FIVE-S2-SC-AMS-0020/R1
MS-35: CCTV system-Underground system work cabling and piping_Rev.1 Revised based on comments in AMS-20 dated 9-May-2014
Detailed schedule/Manpower Requirement, MSE.1: Survey Method; MSE.2: Installation Underground Pipe (FEP); MSE.3: Details of HDPE conduit installation; MSE.4: Method installation underground pipe across rain water pipe at crossroad
1.Working Procedure, 2.Material Spec., 3.Platform Installation, 4.Schedule & Manpower, 5.Drawing, 6.JSA/Risk Analysis, 7.Crane Spec., 8.Calculation Sheet
Approval for Method Statement 24OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
14/05/09 MS-30 Lightning System - Underground Work Cabing and Piping Mr. Quang C
14/05/12 14/05/15 14/05/19 Quang/Diem B
BBVN-FIVE-S2-SC-AMS-0023 14/05/2 14/05/06 14/05/07 MS-BLD.18 Method Statement for Road & Stormwater works Tuan Anh
C
14/05/21 14/05/24 Tuan Anh
BBVN-FIVE-S2-SC-AMS-0024 14/05/05 14/05/07 14/05/07 MS-45: Staircase Demolition at Gridline 12 Tuan AnhB
14/05/21 14/05/24 14/06/03B
BBVN-FIVE-S2-SC-AMS-0025 14/06/05 14/06/10 14/06/11 MS-BLD.03 - Scaffolding Installation & Dismantling Works Tuan AnhA
BBVN-FIVE-S2-SC-AMS-0026 14/05/07 14/05/10 14/05/13 MS-BLD.06-A: Reinforcement Concrete - Trench Pit Tuan Anh C
14/05/14 14/05/16 14/05/16 Tuan Anh B/A
BBVN-FIVE-S2-SC-AMS-0022/R1
MS-30 Lightning System - Underground Work Cabing and Piping _Rev.1 Revised based on comments in AMS_0022 dated 05-May-2014
Details schedule/Manpower requirements, MSE.1: Survey Method, MSE.2: Installation underground pipe, MSE.3: details of HDPE conduit installation, MSE.4.1&4.2: Method installation earth rod in earth pit, MSE.5: Detail of grounding rod in earth pit, MSE.6: detail of earth pit, MSE.7&7.1: Connection from test link box to earth rod, MSE.8&8.1&8.2&8.3: Sleeve for lightning cable, MSE.7: Connection from test link box to earth rod
1.General, 2.Reference standards & documents 3. Equipment list, 4.Preparation works, 5.Construction for road work, 6.Construction for storm works, 7.Quality managemant., 8.Safety management
BBVN-FIVE-S2-SC-AMS-0023/R1
MS-BLD.18 Method Statement for Road & Stormwater works_Rev.1 Revised based on comments in AMS-0023 dated 7-May-2014
Drawings for road construction, Drawings for storm water construction, Schedule & Manpower, JSA/Risk Assessment
Method Statement, JSA/Risk Assessment, Schedule
BBVN-FIVE-S2-SC-AMS-0024/R1
MS-45: Staircase Demolition at Gridline 12_Rev.1 Revised based on comments in AMEP-24 dated 7-May-2014
Scaffolding Layout, Section&Details; Schedule; Data Sheet/Catalogue; JSA/RA; Calculation Sheet
Method Statement, JSA/Risk Assessment
BBVN-FIVE-S2-SC-AMS-0026/R1
MS-BLD.06-A: Reinforcement Concrete - Trench Pit_Rev.1 Revised based on comments in AMS-0026 dated 13-May-2014
Method Statement, Equipment List, Schedule&Manpower, JSK/Risk Assessment
Approval for Method Statement 25OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
BBVN-FIVE-S2-SC-AMS-0027 14/06/11 14/06/16 MS-BLD.10-Roofing & Waterproofing for Roof Tuan Anh
BBVN-FIVE-S2-SC-AMS-0028 14/05/09 14/05/13 14/05/15 MS-BLD.09_XYPEX Waterproofing for Under Slab Tuan Anh B
BBVN-FIVE-S2-SC-AMS-0029 (A) 14/05/28 MS-34 [A]: Fire Detection and Alarm System for Stage 1 Quang/Diem C
14/07/31 14/08/07 14/08/11 Quang/Diem C
14/08/22 14/08/25 14/08/28 Quang/Diem B
Waterproofing Guarantee; RA & JSA; Introduction Letter from SIKA Ltd Vietnam; Worker Certification/License; SIKA Products Data Sheet; Machinery Catalogue; Drawings for Waterproofing Works; Material Safety Data Sheet - MSDS; Report for Mock-up Application REP-MU-01
Drawings, Specification/Data Sheet, Material Safety Data Sheet, JSA/Risk Assessment
Details Schedule/Manpower Requirement, MSE.1: Scaffolding setup for existing generator and MVSG room, MSE.2: Scaffolding setup for AHU area, MSE.3: Method of installation detector exposed, MSE.4: Installation for BMS room
BBVN-FIVE-S2-SC-AMS-0029 (A)/R1
MS-34 [A]: Fire Detection and Alarm System for Stage 1_Rev.1 Revised based on comments in AMS-29 (A) dated 28-May-2014
Details Schedule/Manpower Requirement, Appendix 1: Location of Activity, Appendix 2: Detail of installation - MV Switchgear room, Appendix 3: Detail of installation - Generator room, Appendix 4: AHU room, Appendix 5: Detail of installation-BMS room, Appendix 6: Detail of installation - SFACP panels, JSA, Risk Assessment and management for change system, RCR services pre-work/task observation sheet, Pre-task planning worksheet
BBVN-FIVE-S2-SC-AMS-0029 (A)/R2
MS-34 [A]: Fire Detection and Alarm System for Stage 1_Rev.2 Revised based on comments in AMS-29 (A)/R1 dated 11-August-2014 (Tie-in No. 31)
Comments response table; Details Schedule/Manpower Requirement, Works detail table; Appendix 1: Location of Activity, Appendix 2: Detail of installation - MV Switchgear room, Appendix 3: Detail of installation - Generator room, Appendix 4: AHU room, Appendix 5: Detail of installation-BMS room, Appendix 6: Connection for BB262B-IFC-320-Z04&BB262-IFC-320-Z05 panel;Appendix 7: Detail of new modules connection to FA system, JSA, Risk Assessment and management for change system, RCR services pre-work/task observation sheet, Pre-task planning worksheet
Approval for Method Statement 26OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
BBVN-FIVE-S2-SC-AMS-0029 (B) 14/05/28 MS-34 [B]: Fire Detection and Alarm System for Stage 2 Quang/Diem B
14/08/22 14/08/25 Quang/Diem
14/10/29 14/11/03 14/11/07 Quang/Diem C
BBVN-FIVE-S2-SC-AMS-0030 14/05/15 14/05/17 14/05/22 MS-46: Fence Relocation Tuan Anh C
14/05/29 14/06/04 14/06/02 B
14/06/12 14/06/13 14/06/13 MS-46: Fence Relocation_Rev.1 (Additional Document) Ba Hoa/Nguyen B
BBVN-FIVE-S2-SC-AMS-0031 14/05/16 14/05/20 14/05/23 MS-21 [A]: Fire Fighting System_Stage 1 Quang/Trung C
Details Schedule/Manpower Requirement, MSE.1: Scaffolding setup for existing generator and MVSG room, MSE.2: Scaffolding setup for AHU area, MSE.3: Method of installation detector exposed, MSE.4: Installation for BMS room
BBVN-FIVE-S2-SC-AMS-0029 (B)/R1
MS-34 [B]: Fire Detection and Alarm System for Stage 2_Rev.1 Revised based on comments in AMS-29 (B) dated 25-May-2014
Comments response table; Details Schedule/Manpower Requirement, Work Detail table; Location of activity; Detail of Installation - MV Switchgear room/Generator room/AHU room/BMS Room; Connection for BB262B-IFC-320-Z04&BB262-IFC-320-Z05 panel; Detail of new modules connection to FA system; JSA; Risk assessment and management for change system; RCR servicers Pre-work/Task observation sheet; Pre-task planning worksheet
BBVN-FIVE-S2-SC-AMS-0029 (B)/R2
MS-34 [B]: Fire Detection and Alarm System for Stage 2_Rev.2 Revised based on comments in AMS-29 (B) /R1
Details Schedule/Manpower Requirement, MSE.1: Method Installation Concealed EMC conduit on the wall; MSE.2: Method of Installation for expose conduit; MSE.3: Method of Installation conduit under sub-beam; MSE.4: Method of Installation detector on ceiling; MSE.5: Method of Installation detector for office, corridor and changing room; MSE.6: Method of Installation equipment for office, corridor and changing room; MSE.7: Method of Installation detector for cleaning room; MSE.8: Method of Installation equipment for cleaning room; MSE.9: Method of Installation beam detector for warehouse; MSE.10: Method of Installation beam detector for warehouse; MSE.11: Cable test form
Method Statement, JSK/Risk Assessment, Schedule
BBVN-FIVE-S2-SC-AMS-0030/R1
MS-46: Fence Relocation_Rev.1 Revised based on comments in AMS-0030 dated 22-May -2014
Method Statement, JSK/Risk Assessment, Schedule
Tuan Anh/Ba Hoa
BBVN-FIVE-S2-SC-AMS-0030/R1 (ADD.01)
Methodology, Location, Site Orgnization Chart, Tool&Equipment List, Detail Schedule/Manpower, Safety Management, Quality Control, Appendices
Approval for Method Statement 27OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
BBVN-FIVE-S2-SC-AMS-0032 14/05/16 14/05/20 14/05/23 MS-21 [B]: Fire Fighting System_Stage 2 C
14/07/16 14/07/21 14/07/25 Quang/Trung C
14/08/01 14/08/07 14/08/16 Quang/Trung C
14/08/22 14/08/27 14/09/04 Quang/Trung B
BBVN-FIVE-S2-SC-AMS-0033 14/05/19 14/05/24 14/05/28 MS-20 [A]: Water Supply and Drainage System for Stage 1 Quang/Khoa C
14/06/26 14/07/03 14/07/01 Quang/Khoa C
14/07/09 14/07/16 14/07/11 Quang/Khoa C
14/07/30 14/08/06 14/08/12 Quang/Khoa C
14/08/15 14/08/22 14/08/26 Quang/Khoa B
Methodology, Location, Site Orgnization Chart, Tool&Equipment List, Detail Schedule/Manpower, Safety Management, Quality Control, Appendices
BBVN-FIVE-S2-SC-AMS-0032/R1
MS-21 [B]: Fire Fighting System_Stage 2_Rev.1 Revised based on comments in AMS-32 dated 23-May-2014
Installation Equipment, Installation FM200, Installation support & pipe, Inspection Document, Procedure firestop, location of the activity, details schedule/Manpower requirement, JSA
BBVN-FIVE-S2-SC-AMS-0032/R2
MS-21 [B]: Fire Fighting System_Stage 2_Rev.2 Revised based on comments in AMS-32/R1 dated 25-July-2014
Installation Equipment, Installation FM200, Installation support & pipe, Inspection Document, Procedure firestop, location of the activity, details schedule/Manpower requirement, JSA
BBVN-FIVE-S2-SC-AMS-0032/R3
MS-21 [B]: Fire Fighting System_Stage 2_Rev.3 Revised based on comments in AMS-32/R2 dated 16-August-2014
Comments response table; Installation Equipment, Installation support & pipe, Inspection Document, Procedure firestop, location of the activity, details schedule/Manpower requirement, JSA
BBVN-FIVE-S2-SC-AMS-0033/R1
MS-20 [A]: Water Supply and Drainage System for Stage 1_Rev.1 Revised based on comments in AMS-33 dated 28-May-2014
Pump &Pipe install works, location of the activity, Procedure fire stop, Details schedule/Manpower requirement, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet, hot work permit, document reference, risk assessment & management for change system
BBVN-FIVE-S2-SC-AMS-0033/R2
MS-20 [A]: Water Supply and Drainage System for Stage 1_Rev.2 Revised based on comments in AMS-33 dated 1-July-2014
Pump &Pipe install works, location of the activity, Procedure fire stop, Welding Procedure, Details schedule/Manpower requirement, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet, hot work permit, document reference, risk assessment & management for change system
BBVN-FIVE-S2-SC-AMS-0033/R3 (A)
MS-20-A-1: Water Supply System for Stage 1_Rev.3 Revised based on comments in AMS-33/R2 dated 11-July-2014
Pump &Pipe install works, location of the activity, Procedure fire stop, Welding Procedure, Details schedule/Manpower requirement & Tie-in List, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet, hot work permit, document referenced, risk assessment & management for change system
BBVN-FIVE-S2-SC-AMS-0033/R4 (A)
MS-20-A-1: Water Supply System for Stage 1_Rev.4 Revised based on comments in AMS-33/R3 (A) dated 12-August-2014
Pump &Pipe install works, Location of the activity, Procedure fire stop, Welding Procedure, Details schedule/Manpower requirement & Tie-in List, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet, hot work permit, document referenced, risk assessment & management for change system
Approval for Method Statement 28OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
14/07/30 14/08/06 14/08/12 Quang/Khoa C
14/08/15 14/08/22 14/08/27 Quang/Khoa B
BBVN-FIVE-S2-SC-AMS-0034 14/05/19 14/05/24 14/05/28 MS-20 [B]: Water Supply and Drainage System for Stage 2 Quang/Khoa C
14/06/26 14/07/03 14/07/04 Quang/Khoa B/B+C
BBVN-FIVE-S2-SC-AMS-0035 14/05/21 14/05/26 14/05/28 MS-23: Equipment for Stage 1 Quang/Diem C
14/08/09 14/08/14 14/08/15 Quang/Diem B
BBVN-FIVE-S2-SC-AMS-0036 14/06/16 14/06/20 14/06/23 Quang/Diem C
14/07/23 14/07/26 14/08/01 Quang/Diem C
BBVN-FIVE-S2-SC-AMS-0033/R3 (B)
MS-20-A-1: Drainage System for Stage 1_Rev.3 Revised based on comments in AMS-33/R2 dated 11-July-2014
Installation works, location of the activity, Details schedule/Manpower requirement, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet, document referenced, JSA
BBVN-FIVE-S2-SC-AMS-0033/R4 (B)
MS-20-A-2: Drainage System for Stage 1_Rev.4 Revised based on comments in AMS-33/R3 (B) dated 12-August-2014
Installation works, location of the activity, Details schedule/Manpower requirement, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet, document referenced, JSA
BBVN-FIVE-S2-SC-AMS-0034/R1
MS-20 [B]: Water Supply and Drainage System for Stage 2_Rev.1 Revised based on comments in AMS-34 dated 28-May-2014
Installation Pipe, Procedure firestop, Location of the activity, Document referenced
Detailed Schedule/Manpower Requirement, MSE.1: Method Take out louver of transformer, MSE.2: Method make temporary unloading area, MSE.3: Method unloading transformer and fix transformer, MSE.4: Method reinstallation of louvers for transformer
BBVN-FIVE-S2-SC-AMS-0035/R1
MS-23: Equipment for Stage 1_Rev.1 Revised based on comments in AMS_0035 dated 28-May-2014
Details schedule/Manpower Requirements, MSE.1: Take out louver menthod, MSE.2: Make temporary uploading area, MSE.3: Uploading transformer and fix transformer, MSE.4: Move transformer to foundation, MSE.5: Fix Transformer to concrete base, MSE.6: Re-install louver and finish work
MS-24 [A]: Main Feeder, Cable Rack, Busway and Panel System for Stage 1
Detailed Schedule/Manpower Requirements, MSE.1: Method of unloading busway and cable rack, MSE.2: Method of installation support for cable rack/busway under sub-beam; MSE.3: Method of installation cable rack
BBVN-FIVE-S2-SC-AMS-0036/R1
MS-24 [A]: Main Feeder, Cable Rack, Busway and Panel System for Stage 1_Rev.1 Revised based on comments in AMS-36 dated 23-June-2014
Detailed Schedule/Manpower Requirements, MSE.1: Method of unloading cable rack and panels, MSE.2: Method of Making wall opening holes; MSE.3: Method of making floor opening holes, MSE.4: Method of installation cable rack at AHU room, MSE.5: Method of installing cable rack above walkable ceilingl MSE.6L Method of installing cable rack at utility area, MSE.7: Method of installing LV panels; JSA, RA and Management for change system
Approval for Method Statement 29OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
14/08/07 14/08/12 14/08/15 Quang/Diem B
BBVN-FIVE-S2-SC-AMS-0037 14/05/22 14/05/29 Quang/Diem
BBVN-FIVE-S2-SC-AMS-0038 14/05/22 14/05/29 14/05/28 MS-25 [A]: Cable and Trunking for Stage 1 Quang/Diem C
14/07/28 14/08/04 14/08/07 C
14/08/19 14/08/22 14/08/23 B
BBVN-FIVE-S2-SC-AMS-0036/R2
MS-24 [A]: Main Feeder, Cable Rack, Busway and Panel System for Stage 1_Rev.2 Revised based on comments in AMS-36/R1 dated 01-August-2014
Detailed Schedule/Manpower Requirements, MSE.1: Method of unloading cable rack, scaffoldings; MSE.2: Method of Making wall opening holes; MSE.3: Method of making floor opening holes, MSE.4: Method of installation cable rack at AHU room, MSE.5: Method of installing cable rack above walkable ceiling; MSE.6: Method of installing cable racks at utility area; RCR services pre-work/task observation sheet; Pre-task planning sheet; Hot work permit; JSA and Management for change system
MS-24 [B]: Main Feeder, Cable Rack, Busway and Panel System for Stage 2
Detailed Schedule/Manpower Requirements, MSE.1: Method of unloading busway and cable rack, MSE.2: Method of installation support for cable rack/busway under concrete ceiling; MSE.3: Method of installation support for cable rack/busway under sub-beam; MSE.4: Method of installation cable rack; MSE.5: Method of installation LV Busway for production machine; MSE.6: Method of installation panel
Detailed Schedule/Manpower Requirements, MSE.1: Method of unloading cable drum to AHU room; MSE.2: Mehtod of installation pulling cable; MSE.3: Mehtod of installation for termination connection
BBVN-FIVE-S2-SC-AMS-0038/R1
MS-25 [A]: Cable and Trunking for Stage 1_Rev.1 Revised based on comments in AMS-38 dated 28-May-2014
Detailed Schedule/Manpower Requirements, MSE.1: Method of unloading cable drum to AHU room; MSE.2: Mehtod of installation pulling cable; MSE.3: Mehtod of installation for termination connection
BBVN-FIVE-S2-SC-AMS-0038/R2
MS-25 [A]: Cable and Trunking for Stage 1_Rev.2 Revised based on comments in AMS-38/R1 dated 7-August-2014
MSE.1: Method of unloading cables; MSE.2: Mehtod of unloading trunkings; MSE.3: Method of installation trunkings above walkable ceiling; MSE.4: Mehtod of installing trunking at AHU room; MSE.5: Method of cabling works; JSA; Risk Assessment and Managerment for Change system
Quang/Diem/Ujiie
Approval for Method Statement 30OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
BBVN-FIVE-S2-SC-AMS-0039 14/05/22 14/05/29 14/05/28 MS-25 [B]: Cable and Trunking for Stage 2 Quang/Diem C
14/07/28 14/08/04 Quang/Diem
BBVN-FIVE-S2-SC-AMS-0039 ( C ) 14/07/12 14/07/14 14/07/18 B
BBVN-FIVE-S2-SC-AMS-0040 14/05/22 14/05/29 14/05/28 MS-26: Lighting System Quang/Diem C
BBVN-FIVE-S2-SC-AMS-0041 14/05/23 14/05/28 14/06/02 MS-BLD.07 - Structure Steel Erection Works Tuan Anh B
14/08/04 14/08/05 14/08/11 MS-BLD.07 - Structure Steel Erection Works_Additional Drawing 1A3size drawing C
Detailed Schedule/Manpower Requirements, MSE.1: Method of unloading cable and trunking; MSE.2: Method of installation trunking under sub-beam for walkway area; MSE.3: Method of installation trunking under concrete ceiling for office area; MSE.4: Method of installation trunking under purlin for office area: MSE.5: Method of installation cable pulling: MSE.6: Method of installation cable pulling for warehouse and common walkway area: MSE.7: Method of installation for termination connection
BBVN-FIVE-S2-SC-AMS-0039/R1
MS-25 [B]: Cable and Trunking for Stage 1_Rev. 1 Revised based on comments in AMS-39 dated 28-May-2014
Detailed Schedule/Manpower Requirements, MSE.1: Method of unloading cable; MSE.2: Method of installation trunkings ; MSE.3: Method of installation trunkings above walkable ceiling; MSE.4: Method of installation trunkings at AHU Room; MSE.5: Method of cabling works; MSE.6: Method of termination works; JSA; Risk Assessment and Management for change system
MS-39 ( C ): Electrical System Work for Stage 1 Remove Lighting and Trunking
Quang/Ujiie/Diem
Detailed Schedule/Manpower Requirements, MSE.1: Method installation concealed EMC conduit on the wall; MSE.2: Method of installation for expose conduit: MSE.3: Method of installation conduit under sub-beam; MSE.4: Method of installation lighting fixture on ceiling: MSE.5: Method of installation for cleaning room area: MSE.6: Method of installation lighting fixture for warehouse: MSE.7: Method of installation lighting fixture for common area: MSE.8: Method of installation lighting fixture for walkway and outdoor area
Sequence for Steel Structure Erection; Organization Chart; Equipment List; JSA/Risk Assessment
BBVN-FIVE-S2-SC-AMS-0041 (ADD.01)
Tuan Anh/Ngueyn/Phuc
Approval for Method Statement 31OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
BBVN-FIVE-S2-SC-AMS-0042 14/06/16 14/06/20 MS-27: Emergency and Exit Lighting System Diem/Quang
BBVN-FIVE-S2-SC-AMS-0043 14/05/24 14/05/30 MS-30: Lightning System Quang/Diem
BBVN-FIVE-S2-SC-AMS-0044 14/06/16 14/06/20 14/06/23 MS-31: Socket Outlet System B
Details schedule/Man Power Requirements; MSE.1 : Method installation concealed EMC conduit on the wall; MSE.2 : Method of installation for expose conduit; MSE.3 : Method of installation conduit under sub-beam; MSE.4 : Method of installation emergency lighting fixture on ceiling; MSE.5 : Method of installation emergency lighting fixture for cleaning room area; MSE.6 : Method of installation emergency lighting fixture for ware house; MSE.7 : Method of installation emergency lighting fixture for common area; MSE.8 : Method of installation emergency lighting fixture for walkway and outdoor area; MSE.9 : Method of installation exit lighting for common area; JSA for emergency and exit lighting system stage 2
Details Schedule/Manpower requirement; MSE.1: connection from testing link box to lightning bar on roof; MSE.2: connection from testing link box to lightning bar on roof; MSE.3: connection from testing link box to lightning bar on roof; MSE.4: installation detail of air terminal; MSE.5: installation detail of connection earthing cable to tape; JSA analysis for lightning system
Details schedule/Man Power Requirements; MSE.1: Method installation concealed EMC conduit on the wall; MSE.2: Method of installation trunking under sub-beam; MSE.3: Method of installation cable and outlet for walkway area; MSE.4 : M Method of installation socket outlet on the floor; MSE.5: Method of installation socket outlet on the wall for cleaning room and office area; MSE.6 : Method of installation isolator at walkway area; MSE.7 : Installation socket and isolator on the wall; MSE.8 : Installation socket and isolator on the wall; Job safety analysis for socket outlet
Approval for Method Statement 32OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
BBVN-FIVE-S2-SC-AMS-0045 14/05/24 14/05/30 MS-28: External Lighting System Quang/Diem
BBVN-FIVE-S2-SC-AMS-0046 14/06/16 14/06/20 14/06/23 MS-32 [A]: BMS System Quang/Diem C
14/09/08 14/09/13 14/09/15 Quang/Diem C
14/09/23 14/09/30 14/10/01 Quang/Diem B
Details schedule/ManPower Requirements; MSE.1 : Method installation plate fix the lighting fixture on the wall; MSE.2 : Method of installation bracket the lighting fixture on the wall; MSE.3: Method of installation support for flood lighting fixture on the wall; MSE.4: Method of installation flood lighting fixture on the wall; MSE.5: Method of installation fix the lighting pole to precast foundation; MSE.6: Method of installation lighting fixture to pole and connection; Job safety analysis for external lighting
Details schedule/ManPower Requirements; MSE.1 : Method installation water temperature sensor; MSE.2: Method of installation air temperature sensor; MSE.3: method of installation modulating dumper; MSE.4: method of installation level switch for tank and temperature humidity sensor; JSA for building management system stage 1
BBVN-FIVE-S2-SC-AMS-0046/R1
MS-32 [A]: BMS System_Rev.1 Revised based on comments in AMS-46 dated 23-June-2014
Details schedule/ManPower Requirements; Appendix 1: Move in path & location of activity plan; Appendix 2: Installation cable; Appendix 3: Installation of devices and panels; Appendix 4: Cable Termination; JSA for BMS stage 1; Risk assessment and Management for change system, RCR services Pre-work/Task observation sheet, Pre-task planning worksheet
BBVN-FIVE-S2-SC-AMS-0046/R2
MS-32 [A]: BMS System_Rev.2 Revised based on comments in AMS-46/R1 dated 15-September-2014
Comments response table; Details schedule/ManPower Requirements; Appendix 1: Move in path & location of activity plan; Appendix 2: Installation cable; Appendix 3: Installation of devices and panels; Appendix 4: Cable Termination; JSA for BMS stage 1; Risk assessment and Management for change system, RCR services Pre-work/Task observation sheet, Pre-task planning worksheet
Approval for Method Statement 33OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
BBVN-FIVE-S2-SC-AMS-0047 14/06/16 14/06/20 14/06/23 MS-32 [B]: BMS System Quang/Diem B
BBVN-FIVE-S2-SC-AMS-0048 14/05/31 14/06/05 14/06/05 C
14/06/27 14/07/03 14/07/04 Quang C
14/08/04 14/08/09 14/09/06 Quang C
14/09/23 14/09/30 14/10/03 Quang/Vuong B+C/B+C
14/06/05 14/07/04 Duct Vuong C
14/07/14 14/07/19 14/07/21 C
14/09/09 14/09/16 14/09/19 B
Details schedule/ManPower Requirements; MSE.1 : Method installation of trunking for walkway ceiling area; MSE.2: Installation of trunking for office area; MSE.3: installation sensor for panel and control FCU; MSE.4: installation temperature, pressure and humidity sensor; MSE.5: installation damper, humidity and pressure sensor; JSA
MS-19 [A]: Air Conditioning & Mechanical Ventilation System Stage 1
General , Methodology, Location, Site Organization Chart, Tools & Equipments list, Detail schedule/manpower, safety management, quality control, appendices, JSA, Schedule
Quang/Ujiie, Randy
BBVN-FIVE-S2-SC-AMS-0048/R1 (A)
MS-19 [A]: Air Conditioning & Mechanical Ventilation System _Rev.1MS-19-A-1: Chiller Area Works_ Revised based on comments in AMS-48 dated 5-June-2014
Unload Chiller, Location of the activity, details schedule/Manpower requirement, RCR service pre-work/task observation sheet, Pre-task planning work sheet (requirement form RCR), Hot work permit, RA and management for change system
BBVN-FIVE-S2-SC-AMS-0048/R2 (A)
MS-19-A-1: Chiller Area Works_Rev.2 Revised based on comments in AMS-48/R1 dated 4-July-2014
Comments response table, Unload Chiller, Location of the activity, details schedule/Manpower requirement, RCR service pre-work/task observation sheet, Pre-task planning work sheet (requirement form RCR), Hot work permit, RA and management for change system
BBVN-FIVE-S2-SC-AMS-0048/R3 (A)
MS-19-A-1: Chiller Area Works_Rev.3 Revised based on omments in AMS-48/R2 dated 6-September-2014
Comments response table, Unload Chiller, Location of the activity, details schedule/Manpower requirement, RCR service pre-work/task observation sheet, Pre-task planning work sheet (requirement form RCR), Hot work permit, RA and management for change system
BBVN-FIVE-S2-SC-AMS-0048/R1 (B)
BBVN-FIVE-S2-SC-AMS-0048/R2 (B)
MS-19 [A]-2: Duct Stage 1 Work on the Ceiling Clean Room Area_Rev.2 Revised based on comments in AMS-0048/R1 (B) dated 4-July-2014
Preparation works, installation platform/Duct, Locaiton of the activity, Details schedule/manpower requirement, RCR servicer pre-work/task observation shet, Pre-task planning work sheet (requirement from RCR), Document reference, RA and management for change system
Quang/Ujiie/Vuong
BBVN-FIVE-S2-SC-AMS-0048/R3 (B)
MS-19 [A]-2: Duct Stage 1 Work on the Ceiling Clean Room Area_Rev.3 Revised based on comments in AMS-0048/R2 (B) dated 21-July-2014
Comments response table; Preparation works, installation Duct, Locaiton of the activity, Details schedule/manpower requirement &Tie-in list, RCR servicer pre-work/task observation shet, Pre-task planning work sheet (requirement from RCR), Document referenced, RA and management for change system
Quang/Ujiie/Vuong
Approval for Method Statement 34OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
14/07/02 14/07/07
14/09/15 14/09/20 14/09/19 C
14/09/18 14/09/20 14/09/19 C
14/09/24 14/10/01 14/10/07 MS-19-A-3.1: Assembly AHU Work Quang/Vuong B
BBVN-FIVE-S2-SC-AMS-0049 14/06/24 14/06/28 14/06/26 MS-48: Temporary Concrete Road Method Statement; JSA/RS, Schedule B
BBVN-FIVE-S2-SC-AMS-0050 14/06/26 14/07/02 MS-49: Aluminum Panel Removal at Gridline 12 Method Statement, JSA/RA, Schedule Tuan Anh
BBVN-FIVE-S2-SC-AMS-0051 14/06/26 14/07/03 14/07/01 MS-22-A-1: Air Compressor System C
14/07/14 14/07/17 14/07/21 C
BBVN-FIVE-S2-SC-AMS-0048/R1 (C )
MS-19 [A]: Air Conditioning & Mechanical Ventilation System _Rev.1MS-19-A-3: AHU Area Works
Unload AHU, PUMP, BUFFER Tank, details schedule/Manpower requirement, Location of the activity, Procedure Firestop, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet (requirement form RCR), Hot work permit, Document Referenced, RA and management for change system
Quang/Ujiie/Vuong
BBVN-FIVE-S2-SC-AMS-0048/R2 (C )
MS-19 [A]: Air Conditioning & Mechanical Ventilation SystemMS-19-A-3: AHU Work Area_Rev.2 _ Revised based on comments in AMS-48/R1 (C ) dated 4-June-2014
Comments response table; Unload AHU, Details schedule/Manpower requirement, Location of the activity, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet (requirement form RCR), RA and management for change system
Quang/Ujiie/Vuong
BBVN-FIVE-S2-SC-AMS-0048/R2 (C ) (ADD.01)
MS-19-A-3: AHU Work Area_Rev.2 _ Revised based on comments in AMS-48/R1 (C ) dated 4-June-2014_Additional Document
Guidance the transportation and installation AHU (13A4pages_VNese), sketch/drawings (10A4size)
Quang/Ujiie/Vuong
BBVN-FIVE-S2-SC-AMS-0048 (D)
Drawing AHU assebly work; AHU assembly instruction manual; List part by part assembly AHU; Factory issue final QC check; Unload AHU; Detail crane AVC 1 ton; Location of the activity; Detail schedule/Manpower requirement; RCR servicer pre-work/task observation sheet; Pre-task planning work sheet (requirement from RCR); Risk assessment and management for change system
Tuan Anh/Ba Hoa
Installation Works, Procedure Fire Stop, Location of the activity, Details shcedule/Manpower Requirement, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet, document referenced, RA and maangement for change system
Quang/Ujiie/Trung
BBVN-FIVE-S2-SC-AMS-0051/R1
MS-22-A-1: Air Compressor System_Rev.1 Revised based on comments in AMS-51 dated 1-July-2014
Installation Works, Procedure Fire Stop, Welding Procedure G.I Pipe, Location of the activity, Details shcedule/Manpower Requirement, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet, document referenced, RA and maangement for change system
Approval for Method Statement 35OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
14/07/30 14/08/06 14/08/12 Quang B
BBVN-FIVE-S2-SC-AMS-0052 14/06/27 14/07/03 14/07/03 MS-23: Installation Assembly Area Quang/Ujiie B
BBVN-FIVE-S2-SC-AMS-0053 14/06/30 14/07/04 14/07/03 MS-19-A-5: Installation Platform Quang/Ujiie B
BBVN-FIVE-S2-SC-AMS-0054 14/06/30 14/07/04 14/07/02 C
14/07/07 14/07/18 14/07/10 C
14/08/07 14/08/11 14/08/18 C
BBVN-FIVE-S2-SC-AMS-0051/R2
MS-22-A-1: Air Compressor System_Rev.2Revised based on comments in AMS-51/R1 dated 21-July-2014
CommentIns table, Installation Works, Procedure FireStop, Function test of Air Compressor, Welding Procedure G.I Pipe & Copper pipe, Location of the activity, Details shcedule/Manpower Requirement, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet, document referenced, RA and maangement for change system
Install Assembly Area, Location of the activity, details schedule/manpower requirement, RCR pre-work/task observation sheet, Pre-task planning work sheet (requirement from RCR)
Install Platform, Install temporary floor, lovation of the activit, Detail schedule/manpower requirement, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet (Requirement from RCR) & JSA
MS-22-A-2: Installation of RO, Process Cooling Water Pipe above Ceiling Clean Room
Detail installaiton works, Welding procedure PP-H pipe, Welding procedure SUS pipe, Procedure Firestop, Location of the activity, Details scheudle/Manpower reuirement, RCR servicer pre-work/task observation sheet, Pretask planning work sheet, JSA
Quang/Ujiie/Khoa
BBVN-FIVE-S2-SC-AMS-0054/R1 [A]
MS-22-A-2: Installation of Process Cooling water pipe above ceiling clean room _ Rev.1
Quang/Ujiie/Khoa
BBVN-FIVE-S2-SC-AMS-0054/R2 [A]_1
MS-22-A-2.1: Installation of Process Cooling water pipe above ceiling clean room _ Rev.2_STAGE 1 Revised based on comments in AMS-54/R1 [A] dated 10-July-2014
Comments response table, Detail installaiton works, Welding procedure SUS pipe, Procedure Firestop, Location of the activity, Details schedule/Manpower reuirement, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet, Risk Assessment and Management for change system
Quang/Ujiie/Khoa
Approval for Method Statement 36OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
14/09/25 14/10/02 14/10/03 B
14/08/07 14/08/11 14/08/18 C
14/09/25 14/10/02 14/10/03 B
14/07/07 14/07/18 14/07/14 C
14/07/30 14/08/06
BBVN-FIVE-S2-SC-AMS-0055 14/07/01 14/07/05 14/07/08 MS-BLD.06-B: Reinforcement Concrete Septic Tank Tuan Anh B
BBVN-FIVE-S2-SC-AMS-0056 14/07/07 14/07/12 14/07/09 MS-39: Electrical System - Temporary Work for Stage 1 C
14/07/10 14/07/12 14/07/15 B
BBVN-FIVE-S2-SC-AMS-0054/R3 [A]_1
MS-22-A-2.1: Installation of Process Cooling water pipe above ceiling clean room _ Rev.3_STAGE 1 (Close Loop) Revised based on comments in AMS-54/R2 [A] _1 dated 18-August-2014
Detail installaiton works, Welding procedure SUS pipe, Procedure Firestop, Location of the activity, Details schedule/Manpower reuirement, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet, Document referenced; Risk Assessment and Management for change system
Quang/Ujiie/Khoa
BBVN-FIVE-S2-SC-AMS-0054/R2 [A]_2
MS-22-A-2.2: Installation of Process Cooling water (Open Loop) pipe above ceiling clean room _ Rev.2_STAGE 1 Revised based on comments in AMS-57/R1 [A] dated 10-July-2014
Comments response table, Detail installaiton works, Welding procedure SUS pipe, Procedure Firestop, Location of the activity, Details schedule/Manpower reuirement, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet, Hot work permit, Document Referenced, Risk Assessment and Management for change system
Quang/Ujiie/Khoa
BBVN-FIVE-S2-SC-AMS-0054/R3 [A]_2
MS-22-A-2.2: Installation of Process Cooling water (Open Loop) pipe above ceiling clean room _ Rev.3_STAGE 1 Revised based on comments in AMS-57/R2 [A] dated 18-August-2014
Comments response table, Detail installaiton works, Welding procedure SUS pipe, Procedure Firestop, Location of the activity, Details schedule/Manpower reuirement, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet, Hot work permit, Document Referenced, Risk Assessment and Management for change system
Quang/Ujiie/Khoa
BBVN-FIVE-S2-SC-AMS-0054/R1 [B]
MS-22-A-3: Installation of RO Water Pipe above ceiling Clean Room _ Rev.1
Quang/Ujiie/Khoa
BBVN-FIVE-S2-SC-AMS-0054/R2 [B]
MS-22-A-3: Installation of RO Water Pipe above ceiling Clean Room _ Rev.2 Revised based on comments in AMS-54/R1 (B) dated 14-July-2014 (STAGE 1)
Detail installaiton works, Welding procedure PP-H pipe, Procedure Firestop, Location of the activity, Details scheudle/Manpower reuirement, RCR servicer pre-work/task observation sheet, Pretask planning work sheet, Hot work permit, Document reference, JSA
Quang/Ujiie/Khoa
Method Statement for Septic tank, Equipment List, Schedule, JSA/Risk Assessent
Electrical Method, Equipment list, RCR services pre-work/task observation sheet, Pre-task planning worksheet
Quang/Ujiie/Diem
BBVN-FIVE-S2-SC-AMS-0056/R1
MS-39: Electrical System - Temporary Work for Stage 1_Rev.1 Revised based on comments in AMS-56 dated 9-July-2014
Electrical Method, Equipment list, Details schedule/Manpower requirement, JSA for electrical system temporary for stage 1, RCR services pre-work/task observation sheet, Pre-task planning worksheet, Drawings for installation
Approval for Method Statement 37OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
14/07/25 14/07/30 14/07/31 6A3size drawings B/A
BBVN-FIVE-S2-SC-AMS-0057 14/07/09 14/07/14 14/07/22 MS-BLD.02 - Demolition Works at Grid Line 12 Tuan Anh C
14/08/04 14/08/06 14/08/15 Tuan Anh B
14/08/11 14/08/15 Tuan Anh
BBVN-FIVE-S2-SC-AMS-0058 14/07/10 14/07/17 14/07/15 MS-39B: Lighting System Temporary Work for Stage 1 Quang/Diem B/B+C
14/07/25 14/07/30 14/07/31 3A3size drawings Quang/Diem B
BBVN-FIVE-S2-SC-AMS-0059 14/07/10 14/07/15 14/07/19 MS-BLD.11 - Masonry & Plastering Works Method Statement, RA/JSA, Schedule Phuc C14/07/22 14/07/24 14/07/24 Method Statement, RA/JSA, Schedule Phuc C/B
14/07/25 14/07/30 14/07/28 Method Statement, RA/JSA, Schedule Phuc B
14/08/06 14/08/09 14/08/18 Phuc/Nguyen C
BBVN-FIVE-S2-SC-AMS-0060 14/07/15 14/07/21 14/07/21 Method Statement for Welding Procedure Plan Quang/Ujiie C
14/08/07 14/08/12 14/08/18 Quang/Ujiie B
BBVN-FIVE-S2-SC-AMS-0061 14/07/16 14/07/21 14/07/25 MS-22-B-1: Air Compressor System C
BBVN-FIVE-S2-SC-AMS-0056/R1 (ADD)
MS-39: Electrical System - Temporary Work for Stage 1_Rev.1 (Supplimental Shop Drawing) Based on comments in AMS-56 dated 15-July-2014
Quang/Diem/Ujiie
Method Statement, RA/JSA, Internal, External Scaffolding Calculation & Drawings, Clean Panel Protection, Wall & Column Demolition
BBVN-FIVE-S2-SC-AMS-0057/R1
MS-BLD.02 - Demolition Works at Grid Line 12_Rev.1 Revised based on commnets in AMS-57 dated 22-July-2014
Comments response table, Method Statement, RA/JSA, Internal/ External Scaffolding Calculation & Drawings, Clean Panel Protection, Wall & Column Demolition
BBVN-FIVE-S2-SC-AMS-0057/R1 (ADD.01)
MS-BLD.02 - Demolition Works at Grid Line 12_Rev.1 (Additional document) Revised based on commnets in AMS-57 dated 22-July-2014
Hanging Cable Data Sheet & Method for Column Hanging
Lighting System Method, MSE-01:Terminal wire connection, MSE-02: Insulation testing, Equipment List, JSA
BBVN-FIVE-S2-SC-AMS-0058 (ADD)
MS-39B: Lighting System Temporary Work for Stage 1 (Supplimental Shop Drawing) Based on comments in AMS-58 dated 15-July-2014
BBVN-FIVE-S2-SC-AMS-0059/R1
MS-BLD.11 - Masonry & Plastering Works_Rev.1 Revised based on comments in AMS-59 dated 19-July-2014
BBVN-FIVE-S2-SC-AMS-0059/R2
MS-BLD.11 - Masonry & Plastering Works_Rev.2 Revised based on comments in AMS-59/R1 dated 24-July-2014
BBVN-FIVE-S2-SC-AMS-0059/R2 (ADD.01)
MS-BLD.11 - Masonry & Plastering Works_Rev.2 (Additional Drawing) Revised based on comments in AMS-59/R1 dated 24-July-2014
1A3size drawing (Execution Method for Brick Wall)
Welding Procedure Specification (WPS), Welder list & Certificates, Welding Report, JSA
BBVN-FIVE-S2-SC-AMS-0060/R1
Method Statement for Welding Procedure Plan_Rev.1 Revised based on comments in AMS-60 dated 21-July-2014
Welding Procedure Specification (WPS), Welder list & Certificates, Welding Report, JSA
Installation works, Welding Procedure G.I pipe, Location of the activity, Details schedule/Manpower requirement, Document referenced, JSA
Quang/Ujiie/Trung
Approval for Method Statement 38OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
14/08/22 14/08/25 14/08/27 B
BBVN-FIVE-S2-SC-AMS-0062 14/07/17 14/07/21 14/07/25 quang/ujiie C
14/08/27 14/09/01 quang/ujiie
BBVN-FIVE-S2-SC-AMS-0063 14/07/17 14/07/21 14/07/28 C
14/09/15 14/09/21 14/09/22 B
BBVN-FIVE-S2-SC-AMS-0064 14/07/18 14/07/23 14/08/18 MS-50: Honeycomb Treatment Product Datasheet Tuan Anh B
BBVN-FIVE-S2-SC-AMS-0065 14/07/25 14/07/30 14/08/07 MS-BLD.51- Demolition Work for Office Area & Column A12 Tuan Anh C
14/09/09 14/09/15 14/09/19 T. Anh C
14/09/25 14/10/02 14/10/09 T. Anh B
BBVN-FIVE-S2-SC-AMS-0066 14/07/30 14/08/06 14/08/04 MS-19-C: Remove Equipment No Used inside AHU Room Ujiie, Quang B
BBVN-FIVE-S2-SC-AMS-0061/R1
MS-22-B-1: Air Compressor System_Rev.1 Revised based on comments in AMS-61 dated 25-July-2014
Comments response table; Installation works, Welding Procedure, Location of the activity, Details schedule/Manpower requirement, Document referenced, JSA
Quang/Ujiie/Trung
MS-22-B-2: Installation of Process Cooling Water Pipe above Ceiling Clean Room (Stage 2)
Detail installation works, welding procedure SUS pipe, Location of the activity, details schedule/Manpower requirement, document reference, JSA
BBVN-FIVE-S2-SC-AMS-0062/R1
MS-22-B-2: Installation of Process Cooling Water Pipe above Ceiling Clean Room (Stage 2)_Rev.1 Revised based on comments in AMS-62 dated 25-July-2014
Comments response table; Detail installation works, welding procedure SUS pipe (GTAW), ITP, Location of the activity, details schedule/Manpower requirement, document reference, JSA
MS-22-B-3: Installation of R.O Water Pipe above Ceiling Clean Room_Stage 2
Detail installation works, welding procedure PP-H pipe, Location of the activity, details schedule/Manpower requirement, document reference, JSA
Quang/Ujiie/Khoa
BBVN-FIVE-S2-SC-AMS-0063/R1
MS-22-B-3: Installation of R.O Water Pipe above Ceiling Clean Room_Stage 2_Rev.1 Revised based on comments in AMS_0063 dated 28-Jul-2014
Detail installation works, welding procedure PP-H pipe, Location of the activity, details schedule/Manpower requirement, document reference, JSA
Quang/Ujiie/Khoa
Method Statement for Demolition Works; Method Statement for Temporary Panel; Risk Assessment and JSA, , Drawings
BBVN-FIVE-S2-SC-AMS-0065/R1
MS-BLD.51- Demolition Work for Office Area & Column A12_Rev.1 Revised based on comments in AMS-65 dated 7-August-2014
Method Statement for Demolition Works; Method Statement for Temporary Panel; Risk Assessment and JSA, Organizational Chart, Schedule
BBVN-FIVE-S2-SC-AMS-0065/R2
MS-BLD.51- Demolition Work for Office Area & Column A12_Rev.2 Revised based on comments in AMS-65/R1 dated 19-September-2014
Appendix 1: Method Statement for Demolition Works; Appendix 2: Method Statement for Temporary Panel; Appendix 3: Risk Assessment and JSA; Appendix 4: Organization Chart, Appendix 5: Schedule
Remove Works, Location of the Activity, Details schedule/Manpower requirement, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet (requirement from RCR), Hot work permit
Approval for Method Statement 39OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
BBVN-FIVE-S2-SC-AMS-0067 14/07/30 14/08/06 14/07/31 MS-19-A-6: Method Statement for Tie-in No.: 2.1, 2.2, 2.3 Quang C
14/08/05 14/08/09 14/08/07 Quang B
14/08/09 Additional document (refer to TS 179 dated 12-Aug-2014)
BBVN-FIVE-S2-SC-AMS-0068 14/07/30 14/08/06 14/08/06 MS-19-A-7: Method Statement for Tie-in No.: 3.1, 3.2, 3.3 Quang C
14/08/08 14/08/13 14/08/11 Quang B
BBVN-FIVE-S2-SC-AMS-0069 14/08/06 14/08/09 14/08/14 MS-BLD.53_Wall Penetration on Grid 3 B
BBVN-FIVE-S2-SC-AMS-0070 14/08/08 14/08/13 14/08/14 Quang B
Schedule Material List, Tie-in List, Drawing, RCR servicer pre-work/ task observation sheet, pre-task planning work sheet (requirement from RCR), Document referenced, Risk assessment and management for change system
BBVN-FIVE-S2-SC-AMS-0067/R1
MS-19-A-6: Method Statement for Tie-in No.: 2.1, 2.2, 2.3_Rev.1 Revised based on comments in AMS-67 dated 31-July-2014
Comments response table, Schedule Material List, Tie-in List, Drawing, RCR servicer pre-work/ task observation sheet, pre-task planning work sheet (requirement from RCR), Document referenced, Risk assessment and management for change system
BBVN-FIVE-S2-SC-AMS-0067/R1 (ADD01)
Schedule Material List, Tie-in List, Drawing, RCR servicer pre-work/ task observation sheet, pre-task planning work sheet (requirement from RCR), Document referenced, Risk assessment and management for change system
BBVN-FIVE-S2-SC-AMS-0068/R1
MS-19-A-7: Method Statement for Tie-in No.: 3.1, 3.2, 3.3_Rev.1 Revised based on comments in AMS-68 dated 6-Aug-2014
Comments response table, Schedule Material List, Tie-in List, Drawing, RCR servicer pre-work/ task observation sheet, Pre-task planning work sheet (requirement from RCR), Document Referenced, Risk assessment and management for change system
MS for Scaffolding; MS for Wall Penetration on Grid 3; Risk Assessment and JSA
Nguyen/Tuan Anh
MS-21-A-2: Method Statement for Tie-in No.: 15.1, 15.2, 15.3, 15.4, 15.5
Schedule Material List, Tie-in List, Drawing, Installation Work, Fire Stop mortar, RCR servicer pre-work/ task observation sheet, Pre-task planning work sheet (requirement from RCR), Hot work permit, Red tag permit, Risk assessment and management for change system
Approval for Method Statement 40OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
BBVN-FIVE-S2-SC-AMS-0071 14/08/07 14/08/13 14/08/18 MS-19-D: Relocation Duct Inside Electric Room (Tie-In 22) Quang/Diem B
BBVN-FIVE-S2-SC-AMS-0072 14/08/07 14/08/13 14/08/12 MS-19-A-8: Method Statement for Tie-in No.: 1.1, 1.2 Quang/Trung B
BBVN-FIVE-S2-SC-AMS-0073 14/08/08 14/08/13 14/08/14 MS-19-A-9: Method Statement for Tie-in No.: 9.1, 9.2, 9.3 Quang/Ujiie B
BBVN-FIVE-S2-SC-AMS-0074 14/08/09 14/08/14 14/08/14 MS-19-A-11: Method Statement for Tie-in No: 11.1, 11.2 Quang/Ujiie B
BBVN-FIVE-S2-SC-AMS-0075 14/08/09 14/08/14 MS-24.1 HV Connection for transformer TX-2 Quang/Ujiie
BBVN-FIVE-S2-SC-AMS-0076 14/08/09 14/08/14 14/08/14 MS-21-A-3: Method Statement for Tie-in No: 16.1, 16.2 Quang/Ujiie B
Relocation Works; Location of the activity; Details schedule/Manpower requirement; RCR servicer pre-work/task observation sheet; Pre-task planning work sheet (requirement from RCR), JSA
Schedule Material List, Tie-in List, Drawing, RCR servicer pre-work/ task observation sheet, Pre-task planning work sheet (requirement from RCR), Document Referenced, Risk assessment and management for change system
Schedule Material List, Tie-in List, Drawing, RCR servicer pre-work/ task observation sheet, Pre-task planning work sheet (requirement from RCR), Document Referenced, Risk assessment and management for change system
Schedule Material List, Tie-in List, Drawing, RCR servicer pre-work/ task observation sheet, Pre-task planning work sheet (requirement from RCR), Document Referenced, Risk assessment and management for change system
Detail schedule/ Main Power Requirements, MSE.1: Marking location at site, MSE.2: Method of cutting-off the main power, MSE.3: Method of re-opening the existing holes, MSE.4: Method of cabling works, MSE.5: Method of cable and termination works, Job safety analysis, Risk Assessment and Management for Change System
Schedule Material List, Tie-in List, Drawing, Installation work, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet (Requirement from RCR), Hot work permit, Red tag permit, Risk assessment and management for change system
Approval for Method Statement 41OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
BBVN-FIVE-S2-SC-AMS-0077 14/08/11 14/08/16 14/08/23 MS-19-B-2: Duct Works_Stage 2 Quang/Vuong C
14/08/29 14/09/05 14/09/16 Quang/Vuong C
BBVN-FIVE-S2-SC-AMS-0078 14/08/12 14/08/16 14/08/20 MS-21-A-4: Method Statement for Tie-in No.: 17.1, 17.2 C
14/08/21 14/08/23 14/08/21 B/A
BBVN-FIVE-S2-SC-AMS-0079 14/08/12 14/08/16 14/08/19 MS-31: Tie-in List of Fire Detection and Alarm System Quang/Ujiie B
BBVN-FIVE-S2-SC-AMS-0080 14/08/14 14/08/16 14/08/21 MS-BLD.54: Plinth Construction Nguyen B
BBVN-FIVE-S2-SC-AMS-0081 14/08/15 14/08/22 14/08/28 MS-19-A-10: Method Statement for Tie-in No.: 4.1, 4.2, 4.3 Quang/Khoa B
Method Duct Works; Installation Works; Location of the activity; Details schedule/Manpower requirement; Document referencedl JSA
BBVN-FIVE-S2-SC-AMS-0077/R1
MS-19-B-2: Duct Works_Stage 2_Rev.1 Revised based on comments in AMS-77 dated 23-August-2014
Comments response table; Method Duct Works; Installation Works; Location of the activity; Details schedule/Manpower requirement; Document referenced; JSA
Schedule Material List, Tie-in List, Drawing, Installation work, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet (Requirement from RCR), Risk assessment and management for change system
Quang/Tuan/Trung
BBVN-FIVE-S2-SC-AMS-0078/R1
MS-21-A-4: Method Statement for Tie-in No.: 17.1, 17.2_Rev.1 Revised based on comments in AMS-78 dated 20-August-2014
Appendix4. Plug Sprinkler Head for roof above clean room, JSA
Quang/Tuan/Trung
Details Schedule/Manpower Requirements; Tie-in works detail table; Plan of Tie-in List; Detail of installation for tie-in list; detail of cable termination; JSA; Risk assessment and management for change system; RCR services pre-work/task observation sheet; pre-task planning worksheet; Red tag permit
MS for Temporary Canvas protection; MS for Installing rebar and formwork; MS for casting concrete; JSA and Risk Assessment
Schedule Material List, Tie-in List, Drawing, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet (Requirement from RCR), Document Referenced, Risk assessment and management for change system
Approval for Method Statement 42OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
BBVN-FIVE-S2-SC-AMS-0082 14/08/18 14/08/22 14/08/26 MS-20-A-3: Method Statement for Tie-in No. 20.1, 20.2, 20.3 Quang/Ujiie B
BBVN-FIVE-S2-SC-AMS-0083 14/08/18 14/08/19 14/08/26 Quang/Ujiie B
BBVN-FIVE-S2-SC-AMS-0084 14/08/18 14/08/19 14/09/02 Quang/Ujiie N/A
BBVN-FIVE-S2-SC-AMS-0085 14/08/18 14/08/23 MS-22-A-4: Method Statement for Tie-in No.: 7.1, 7.2 Quang/Ujiie
BBVN-FIVE-S2-SC-AMS-0086 14/08/18 14/08/20 14/08/19 MS-21-A-5: Method Statement for Tie-in No.: 18.1, 18.2 Quang/Ujiie B
14/08/21 14/08/23 Quang/Ujiie
Schedule Material List, Tie-in List, Drawing, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet (Requirement from RCR), Hot work permit, Document Referenced, Risk assessment and management for change system
MS-19-A-13:Method Statement for Tie-in No.: 5.1, 5.2, 5.3, 5.4, 5.5, 5.6
Schedule Material List, Tie-in List/Details schedule, Drawing, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet (Requirement from RCR), Document Referenced, Risk assessment and management for change system, Hot Work Permit, Red Tag permit
MS-19-A-13: Method Statement for Tie-in No.: 21.1 (R.O Water System)
Tie-in List/Detaila Schedule; Schedule Material List, Drawing, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet, Hot work permit, Document Referenced, Risk assessment and management for change system
Tie-in List/Details Schedule; Schedule Material List, Drawing, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet, Document Referenced, Risk assessment and management for change system
Schedule Material List, Tie-in List, Drawing, Installation work; RCR servicer pre-work/task observation sheet, Pre-task planning work sheet (Requirement from RCR), Hot Work Permit, Red Tag permit; Risk assessment and management for change system
BBVN-FIVE-S2-SC-AMS-0086 (FINAL)
MS-21-A-5: Method Statement for Tie-in No.: 18.1, 18.2 (FINAL Document)
Comments Response table; Schedule Material List, Tie-in List, Drawing, Installation work; RCR servicer pre-work/task observation sheet, Pre-task planning work sheet (Requirement from RCR), Hot Work Permit, Red Tag permit; Risk assessment and management for change system
Approval for Method Statement 43OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
BBVN-FIVE-S2-SC-AMS-0087 14/08/18 14/08/20 14/08/29 MS-22-A-5: Method Statement for Tie-in No.: 6.1, 6.2 Quang/Ujiie B
BBVN-FIVE-S2-SC-AMS-0088 14/08/19 14/08/22 14/08/22 MS-36-2: LV Busway 3200A Installation B
BBVN-FIVE-S2-SC-AMS-0089 14/08/19 14/08/22 14/08/23 C
14/08/26 14/08/30 14/08/28 B
BBVN-FIVE-S2-SC-AMS-0090 14/08/20 14/08/27 14/09/04 MS-BLD.20: Clean Room - Finishing Works Ceiling & Partition Wall Tuan Anh C
14/09/11 14/09/17 14/09/26 Tuan Anh B
Tie-in List/Details Schedule; Schedule Material List, Welding Procedure SUS Pipe; Drawing, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet, Hot work permit; Document Referenced, Risk assessment and management for change system
MSE.1: Method of unloading LV Busway; MSE.2: Mehtod of making wall opening hole; MSE.3: Method of busway installation; JSA; Risk Assessment and management for change system
Quang/Diem/Ujiie
MS-24.2: LV Busway 3200A Connection from Transformer TX-2 to MSB-A/BUS_2
Site organization chart; Detailed schedule/Manpower requirement; Material list; MSE.1: Location plan of work; MSE.2: Method of cutting-off the main power; MSE.3: Method of installing the flanged-end units; MSE.4: Detail of busway connection; JSA; Risk Assessment and Management for Change system
Quang/Ujiie/Diem
BBVN-FIVE-S2-SC-AMS-0089/R1
MS-24.2: LV Busway 3200A Connection from Transformer TX-2 to MSB-A/BUS_2_Rev.1 Revised based on comments in AMS-89 dated 23-August-2014
Comments response table; Site organization chart; Detailed schedule/Manpower requirement; Material list; MSE.1: Location plan of work; MSE.2: Method of cutting-off the main power; MSE.3: Method of installing the flanged-end units; MSE.4: Detail of busway connection; JSA; Risk Assessment and Management for Change system
Quang/Ujiie/Diem
Drawing for ceiling & Partition Wall; Products Data sheet; Risk Assessment and JSA
BBVN-FIVE-S2-SC-AMS-0090/R1
MS-BLD.20: Clean Room - Finishing Works Ceiling & Partition Wall_Rev.1 Revised based on comments in AMS-90 dated 4-September-2014
Appendix 1: Drawing for Ceiling & Partition Wall; Appendix 2: Products Data Sheet; Appendix 3: Risk Assessment and JSA
Approval for Method Statement 44OUTGOING Rev. Title Attachment Prepared by StatusDate Issued
Date Required
Reply
INCOMING Date Received
BBVN-FIVE-S2-SC-AMS-0091 14/08/20 14/08/25 14/08/26 MS-19-A-12: Method Statement for Tie-in No.: 8.1,8.2,8.3 B
BBVN-FIVE-S2-SC-AMS-0092 14/08/20 14/08/25 14/08/26 MS-24.1: HV Connection for Transformer TX-2 (Tie-in 24.1) B
BBVN-FIVE-S2-SC-AMS-0093 14/08/20 14/08/25 14/08/26 MS-21-B-2: Welding Procedure Plan (GTAW) B
BBVN-FIVE-S2-SC-AMS-0094 14/08/21 14/08/25 MS-21-A-6: Method Statement for Tie-in No.: 19.1, 19.2 Quang/Ujiie/khoa
BBVN-FIVE-S2-SC-AMS-0095 14/08/22 14/08/25 14/08/29 MS-BLD.52: Warehouse Wall Demolition for Roller Shutter T.Anh B
Tie-in List/Details Schedule; Schedule Material List, Drawing, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet, Document Referenced, Hot work permit, Risk assessment and management for change system
Quang/Ujiie/Khoa
Site organization chart; Detailed schedule/Manpower requirement; Material list; MSE.1: Working Location at site; MSE.2: Method of cutting-off the main power; MSE.3: Method of re-opening the existing holes; MSE.4: Method of cabling works; MSE.5: Method of cable and termination works; JSA; Risk Assessment and Management for Change system
Quang/Ujiie/Diem
Welding Procedure Specification (WPS); Welder list & Certificates; Welding Report
Quang/Ujiie/Khoa
Schedule Material List, Tie-in List, Drawing, Installation work, RCR servicer pre-work/task observation sheet, Pre-task planning work sheet,Hot work permit, Red tag permit, Risk assessment and management for change system
Drawing for Demolition works, Organization Chart, Risk Assessment and JSA; FRI No.183
Approval for Project Document 45
OUTGOING Rev. Date Issued Title Attachments StatusDate Required Reply
INCOMING Date Issued
Author/Delivered to
Date Delivered to Author
BBVN-FIVE-S2-SC-APD-0013 14/03/18 Mr. Tung
14/03/20 List of Mock-up C
14/03/26 14/04/01 List of Mock-up_rev.1
14/04/02 List of Mock-up_rev.1 B
14/09/19 14/09/26 14/10/04 List of Mock-up_Rev.1 Updated based on actual condition 3A4size pages Tung C
14/10/11 14/10/18 14/10/28 4A4size pages Tung B
BBVN-FIVE-S2-SC-APD-0014 14/03/20 Mr. Mark
14/03/25 C
14/05/02 14/05/06 14/05/07 Tung C
14/05/15 14/05/19 14/05/21 Tung B
BBVN-FIVE-S2-SC-APD-0015 14/03/24 14/03/26 Ms. Hau
A
BBVN-FIVE-S2-SC-APD-0016 14/03/19 Mr. Tung
14/03/25 B
BBVN-FIVE-S2-SC-APD-0017 14/03/24 14/03/25 Mr. Le/Mr. Thanh
BBVN-FIVE-S2-SC-APD-0018 14/03/25 Mrs. Lan
14/03/31 C
14/04/02 14/04/07
11-Apr-14 C 12-Apr-14
14/04/03 14/04/07 QCP for Fabrication Structural Steel in SEICO Factory Mrs. Lan
11-Apr-14 C 12-Apr-14
List of Mock-up
BBVN-FIVE-S2-SC-APD-0013/R1
BBVN-FIVE-S2-SC-APD-0013/R1 (Revised)
BBVN-FIVE-S2-SC-APD-0013/R2 (Revised)
List of Mock-up_Rev.2 Revised based on comments in APD-13/R1 (Revised) dated 4-October-2014
Procurement Plan
Procurement Plan
BBVN-FIVE-S2-SC-APD-0014/R1
Procurement Plan_Rev.1 Revised based on comments in APD-0014 dated 25-Mar-2014
BBVN-FIVE-S2-SC-APD-0014/R2
Procurement Plan_Rev.2 Revised based on comments in APD-0014/R1 dated 07-May-2014
Signature Flowchart
Signature Flowchart
Company profile for Space Frame and Paint (TOA)
Company profile for Space Frame and Paint (TOA)
Road & Drainage System Level based on Pre-condition Survey Result 4A3 drawings for road, 4A3 drawings for drainage system
(Superseded)
QCP for Steel Strutural Work (QCP-3) Quality Control Documents of Seico (Steel Structural Manufacture)
QCP for Steel Strutural Work (QCP-3)
BBVN-FIVE-S2-SC-APD-0018/R1
Profile of Authority Unit for NDT inspector for steel structural works_Rev.1 (based on
Profile of Authority Unit for NDT inspector for steel structural works_Rev.1 (based on
BBVN-FIVE-S2-SC-APD-0018/R1 (II)
Welding Procedure Specification, Welder List & Certificatess
QCP for Fabrication Structural Steel in SEICO Factory
Approval for Project Document 46
OUTGOING Rev. Date Issued Title Attachments StatusDate Required Reply
INCOMING Date Issued
Author/Delivered to
Date Delivered to Author
14/04/19 14/04/25
14/04/28 QCP-3 (full) Mrs. Lan B
BBVN-FIVE-S2-SC-APD-0019 14/03/27
14/03/29 New Gridline based on Survey Existing Factory C
14/03/31 14/04/01 New Gridline 7 A3 size drawings Mr. Nguyen
14/04/02 New Gridline B
BBVN-FIVE-S2-SC-APD-0020 14/03/27 14/03/31 Master Schedule & Manpower 12 A3 size pages Mr. Tu
14/04/15 Master Schedule & Manpower 11A3size pages C
14/04/29 14/05/02 14/05/08 11A3size pages Mr. Tu/Cuong C
14/05/12 14/05/15 14/05/15 11A3size pages Mr. Tu/Cuong B
BBVN-FIVE-S2-SC-APD-0021 14/03/31 14/04/01 Cash Flow 1A3 size page Tung/Mr. Nguyen
14/04/03 Cash Flow 1A3 size page
BBVN-FIVE-S2-SC-APD-0022 14/03/31 Additional Documents required in APD-0011 dated 14/03/24 Tung
14/04/03 Additional Documents required in APD-0011 dated 14/03/24 B
BBVN-FIVE-S2-SC-APD-0023 14/04/01 14/04/04 List of Materials 25 A4 pages Mr. Tung
14/04/25 List of Materials B
BBVN-FIVE-S2-SC-APD-0024 14/04/04 14/04/08 Package List of the Project 1A3 size pages Mr. Tung
11-Apr-14 C 12-Apr-14
14/04/28 14/05/05 14/05/07 1A3 size pages Tung A/B
BBVN-FIVE-S2-SC-APD-0025 14/04/08 14/04/18 Clean Construction Protocol for Clean Room 1A3size page Mrs. Lan
11-Apr-14 C 12-Apr-14
BBVN-FIVE-S2-SC-APD-0018/R2
QCP-3(1): Quality Control Plan for Fabrication structural steel in Seico factory_Rev.2QCP-3(2): Quality Control Plan for Assembly and Erection Structural steel on site_Rev.1NDT Laboratory: THT Technology and Services Engineering JSC (English Version)
New Gridline based on Survey Existing Factory 1 A4 photo, 1 A3 drawing, 1A3 page benchmark layout, 2 A3 size pages of cordinates, 6 A3size drawings
Mr. Nguyen/Mr. Chien
BBVN-FIVE-S2-SC-APD-0019/R1
BBVN-FIVE-S2-SC-APD-0020/R1
Master Schedule & Manpower_Rev.1 Revised based on comments in APD_0021 dated 15-APR-2014
BBVN-FIVE-S2-SC-APD-0020/R2
Master Schedule & Manpower_Rev.2 Revised based on comments in APD_0020/R1 dated 8-May-2014
dated 24-Mar-2014: 2 business certificates(Luong Thanh Dong & Kinh Viet), 2 companies profiles (Vinh Hiep Hung & Doan Thanh)
Package List of the Project
BBVN-FIVE-S2-SC-APD-0024/R1
Package List of the Project_Rev.1 Reivsed based on comments in APD-0024 dated 11-Apr-2014
Clean Construction Protocol for Clean Room
Approval for Project Document 47
OUTGOING Rev. Date Issued Title Attachments StatusDate Required Reply
INCOMING Date Issued
Author/Delivered to
Date Delivered to Author
14/04/29 14/05/05 14/05/09 Access Layout 4A3size drawings Mrs. Lan B/C
BBVN-FIVE-S2-SC-APD-0026 14/04/08 14/04/10 (2 + 2 + 4 + 2 + 2 + 2 + 2) A4size Pages Hoang safety
14/04/14
B
14/04/25 14/05/02 14/04/26 Hoang safety B/A
BBVN-FIVE-S2-SC-APD-0027 08-Apr-14 11-Apr-14 Mr. Tu
11-Apr-14 B 12-Apr-14
14/04/15 Mr. Tu
BBVN-FIVE-S2-SC-APD-0028 11-Apr-14 12-Apr-14 Mr. Tung
14/04/15 19A3 size drawings C
14/04/28 14/05/02 14/05/14 Mr. Tung B
BBVN-FIVE-S2-SC-APD-0029 14/04/15 14/04/17 Inspection Form for Earthwork & RC Work (7 forms) Mr. Hoang
14/04/21 Inspection Form for Earthwork & RC Work (7 forms) B
14/04/23 14/04/26 Tuan Anh
14/04/29 Tuan Anh A
BBVN-FIVE-S2-SC-APD-0030 14/04/15 14/04/17 Clashing Point Check
BBVN-FIVE-S2-SC-APD-0025/R1
Clean Construction Protocol for Clean Room_Rev.1 Revised based on comments in APD-0025 dated 14-Apr-2014
Work permit forms:Forms including (i) Parent Work Permit, (ii) Hot Work Permit, (iii) Work At Height Permit, (iv) Confined Space Permit, (v) Lifting Permit, (vi) Excavation Permit, (vii) Demolition Permit
Work permit forms:Forms including (i) Parent Work Permit, (ii) Hot Work Permit, (iii) Work At Height Permit, (iv) Confined Space Permit, (v) Lifting Permit, (vi) Excavation Permit, (vii) Demolition Permit
BBVN-FIVE-S2-SC-APD-0026 (ADD)
Work permit forms: Additional 2 Forms (Based on comments in APD-0026 dated 14-Apr-2014)
Chemical Registration, Checmical Use Declaration & Work at Height Permit
Report of Taking Photograph and Surveying actual quality of B. Braun Five AP Construction Site Stage No.2
Report of Taking Photograph and Surveying actual quality of B. Braun Five AP Construction Site Stage No.2
BBVN-FIVE-S2-SC-APD-0027 (ADD)
Report of Taking Photograph and Surveying actual quality of B. Braun Five AP Construction Site Stage No.2
Roofing System for FM Global Approval. Roof Nav Assembly No. 237498-0-0
Roofing System for FM Global Approval. Roof Nav Assembly No. 237498-0-0
BBVN-FIVE-S2-SC-APD-0028/R1
Roofing System for FM Global Approval. Roof Nav Assembly No. 237498-0-0_Rev1 revised based on comments in APD-0028 dated 15-APR-2014
Hard rock 80 for roof insulation, Sika Membrance, Fastener (Catalogue & Datasheet), V125 Decking + 11A3size drawings
Pre-Concrete Inspection, RC Inspection, Formwork Inspection, Puring Concrete on Site, Inspection, Final Concrete Inspection, Backfill Inpection Record, Excavation Inspection Record
BBVN-FIVE-S2-SC-APD-0029 (ADD)
Inspection Form for Earthwork & RC Work (9 forms)_Additional & Revised based on comments in APD_0029 dated 24-Apr-2014
Pre-Concrete Inspection, RC Inspection, Formwork Inspection, Puring Concrete on Site, Inspection, Final Concrete Inspection, Backfill Inpection Record, Excavation Inspection Record, Lean Concrete Inspection, Minutes for Material/Equipment Inspection & Acceptance Reports
Inspection Form for Earthwork & RC Work (9 forms)_Additional & Revised based on comments in APD_0029 dated 24-Apr-2014
Duct vs Steel Structure (11 items), Duct vs Fire Fighting (10 items), Cable Ladder/tray vs Structure (8 items)
Mr. Giang/Mr. Thanh
Approval for Project Document 48
OUTGOING Rev. Date Issued Title Attachments StatusDate Required Reply
INCOMING Date Issued
Author/Delivered to
Date Delivered to Author
14/04/17 Clashing Point Check C
14/04/29 14/05/06 Mr. Giang/An
BBVN-FIVE-S2-SC-APD-0031 14/04/18 14/04/22 LAS298 profile for Geotextile Test LAS 298 Profile Mrs. Lan/Hoang
14/04/25 LAS298 profile for Geotextile Test B
BBVN-FIVE-S2-SC-APD-0032 14/04/18 14/04/22 LAS201 profile for Testing thickness of zinc coat for purlin LAS 201 Profile Mrs. Lan/Hoang
14/04/25 LAS201 profile for Testing thickness of zinc coat for purlin B
BBVN-FIVE-S2-SC-APD-0033 14/04/21 14/04/23 Temporary Road for Construction Work A3 size drawing Mr. Ba Hoa
14/04/23 Temporary Road for Construction Work C/B
14/04/24 14/05/02 Mr. Ba Hoa
14/04/25 B
BBVN-FIVE-S2-SC-APD-0034 14/04/21 14/04/26 General JSA & Risk Assessment Shimizu 31 items of work Mr. Hoang Safety
14/04/23 General JSA & Risk Assessment Shimizu C
14/05/14 14/05/16 14/05/19 61 Activities Hoang Safety C
14/05/28 14/06/02. 14/06/02 Hoang Safety B
BBVN-FIVE-S2-SC-APD-0035 14/04/24 14/04/25 Hoang
14/04/28 A
BBVN-FIVE-S2-SC-APD-0030/R1
Clashing Point Check_Rev.1 Revised based on comments in APD-0030 dated 14-Apr-2014
BBVN-FIVE-S2-SC-APD-0033/R1
Temporary Road for Construction Work_Rev.1 (Revised based on comments in APD-0033 dated 23/04/2014
Temporary Road for Construction Work_Rev.1 (Revised based on comments in APD-0033 dated 23/04/2014
BBVN-FIVE-S2-SC-APD-0034/R1
General JSA & Risk Assessment Shimizu_Rev.1 Revised based on comments in APD-0034 dated 23-Apr-2014
BBVN-FIVE-S2-SC-APD-0034/R2
General JSA & Risk Assessment Shimizu_Rev.2 Revised based on comments in APD-0034 dated 19-May-2014
Additional Document required (9 activities + Fire extinguisher point location on site - 4A3size drawings)
Proportion Mix Concrete for Construction (M20 10±2, M30 10±2, M30 14±2, M40 10±2, M40 14±2)
Concrete Testing report, Cement testing report, Fine aggregate testing report, Coarse aggregate testing report, Water aggregate testing, Admixture specification for trial mix
Proportion Mix Concrete for Construction (M20 10±2, M30 10±2, M30 14±2, M40 10±2, M40 14±2)
Approval for Shop Drawing 49
OUTGOING Rev. Date Issued Title Attachment Author/Delivered to StatusRequired Replied Date
INCOMING Issued Date
Date Delivered to Author
BBVN-FIVE-S2-SC-ASD-173(ADD.01) 14/10/14 14/10/15 14/10/20 5A3size drawings Thanh C
BBVN-FIVE-S2-SC-ASD-173(ADD.02) 14/10/18 14/10/21 14/10/20 6A3 size drawings Thanh B
BBVN-FIVE-S2-SC-ASD-174 14/10/07 14/10/14 14/10/22 Piping Schedule & Underground Schedule Drawing List, 10A1size drawings Quang/Trung/Ujiie C RCR
BBVN-FIVE-S2-SC-ASD-175 14/10/08 14/10/15 14/10/17 AC Control System Plan Quang/Ujiie/Diem C
BBVN-FIVE-S2-SC-ASD-175/R1 14/11/07 14/11/10 Drawing list, 5A1size drawings Quang/Ujiie/Diem
BBVN-FIVE-S2-SC-ASD-176
BBVN-FIVE-S2-SC-ASD-177 14/10/08 14/10/15 14/10/20 Pass Tray Details 1A3size drawing Cuong CBBVN-FIVE-S2-SC-ASD-177/R1 14/10/28 14/11/03 1A3size drawing Cuong
PentHouse Drawings (Additional Drawings No.01) Revised based on comments in ASD -173
PentHouse Drawings .Revised base on BBVN on ASD.173. Replace the relative details and drawings in ASD-13R1:ASD-124R1:ASD-173(ADD.01)
Drawing list, 4A1size drawings (Office Ground Floor; Clean Room; First Floor; Outdoor Area)
AC Control System Plan_Rev.1Revised based on comments in ASD_175 dated 17-Oct-2014
Pass Tray Details_Rev.1 Revised based on comments in ASD-177 dated 20-October-2014
Approval for Shop Drawing 50
Previous Title Drawing NAME Drawing CODE Size Author/Delivered to To/ReceiversREFERENCE (ASD_FOR APPROVAL)
Ref. Date Issued
14/07/01 Bar Bending for Ground Slab Zone 2, Zone 3 Phuc/Nguyen
14/07/07 Phuc/Nguyen
14/07/10 Phuc/Nguyen
14/07/18 Phuc/Nguyen
14/07/21 Phuc/Nguyen
BBVN-FIVE-S2-SC-ASD-102
Bar Bending for Ground Slab Zone 2, Zone 3_Rev.1 Revised based on comments in ASD-102 dated 7-July-2014
Bar Bending for Ground Slab Zone 2, Zone 3_Rev.2 Revised based on comments in ASD-102/R1 dated 9-July-2014
Bar Bending for Ground Slab Zone 2, Zone 3_Rev.3_Part 1 (Zone 2) Revised based on comments in ASD-102/R2 dated 14-July-2014
Bar Bending for Ground Slab Zone 2, Zone 3_Rev.3_Part 2 (Zone 3) Revised based on comments in ASD-102/R2 dated 14-July-2014
Approval for Shop Drawing 51
Drawing NAME Drawing CODE Size Author/Delivered to To/Receivers
Phuc/Nguyen
Phuc/Nguyen
Phuc/Nguyen
Phuc/Nguyen
Phuc/Nguyen
Request for Information
OUT-GOING Rev Date Issued INCOMING Rev Date Issued Title Attachment
14/02/29 14/03/07 Tung
14/03/03
14/02/28 14/02/28 Cuong
14/03/03 Steel Structure Comment
14/03/07 Steel Structure Comment. Designer Reply
14/02/28 14/02/28 5 pages A3 size drawings Cuong
14/03/03 Steel Structure Comment
14/03/07 Steel Structure Comment. Designer Reply.
14/03/04 14/03/05 Cuong
14/03/010 Gridline Survey
14/03/12 Gridline Survey
Cuong
14/03/10 Pile Location & Pile Top Level Survey
14/03/12 Pile Location & Pile Top Level Survey
14/03/04 14/03/07 7 drawing pages A4 size Thanh/Cuong
14/03/10
14/02/13
14/03/28 14/03/ 2 Additional Drawings for Structure/Architecture/Drain Pipe/
14/04/02
14/03/04 14/03/07 Mr. Giang/Thanh
14/03/10 Design Queries: hard Copy - Issued for Construction documents
Date Required
Reply
Author/Delivered to
BBVN-FIVE-S2-SC-RFI-0001-14
Architectual/Roof Insulation 2 As-built drawings:BB/SEC/G1/00/AARCH/006, BB/SEC/G1/00/AARCH/007 (A3 size)
BV-137206/6011/SMZ-140228/D001
BBVN-FIVE-S2-SC-RFI-0002-14
Structural/Steel structural Comment 8 items of drawings (12 pages A3 size drawings)
BV-137206/6011/SMZ-140303/D002
BV-137206/6011/SMZ-140306/D004
BBVN-FIVE-S2-SC-RFI-0003-14
Structural/Ground Beam level confirm
BV-137206/6011/SMZ-140303/D003
BV-137206/6011/SMZ-140306/D005
BBVN-FIVE-S2-SC-RFI-0004-14
Architectual/ Grid Line Survey 1 A3 size drawing No.141-HBP-A-CD-MB-001b, 4 A4 sized photos
BV-137206/6011/SMZ-140308/D007
BV-137206/6011/SMZ-140312/D013
BBVN-FIVE-S2-SC-RFI-0005-14
Structural/ Pile Location & Pile Top Level Survey 2 A4 size pages Starter bar survey level, 9 A3 size drawings
BV-137206/6011/SMZ-140308/D008
BV-137206/6011/SMZ-140312/D012
BBVN-FIVE-S2-SC-RFI-0006-14
Structure, Ardhitecture / Design Queries (maintenance/Floor finishing/drain pipe/cadding/pile shaft)
BV-137206/6011/SMZ-140308/D009
Design Queries: Maintenance/Floor Finishing/Drain Pipes/Cladding/Pipe Shaft
BV-137206/6011/SMZ-140312/D014
Design Queries: Maintenance/Floor Finishing/Drain Pipes/Cladding/Pipe Shaft
BBVN-FIVE-S2-SC-RFI-0006/R1
BV-137206/6011/SMZ-140402/D037
Design Queries: Maintenance/Floor Finishing/Drain Pipes/Cladding/Pipe Shaft
BBVN-FIVE-S2-SC-RFI-0007-14
Struture, Architecture/ Design Queries (require 1 hard copy A1 size with stamp)
BV-137206/6011/SMZ-140310/D010
Request for Information
OUT-GOING Rev Date Issued INCOMING Rev Date Issued Title AttachmentDate Required
Reply
Author/Delivered to
14/03/07 5 A3 size drawings Mr. An/Mr.Giang
14/03/10Bracing Steel Structure Clashing Points
14/03/13Bracing Steel Structure Clashing Points
14/03/12 14/03/12 5 A4 size drawings Mr. Giang/An
14/03/13 Toilet Drain and Structure Beam
14/03/13 14/03/14 Mr. Tu/Nguyen
14/03/17 Pile Test Result All pipe test result report
14/03/17 1 A3 size drawing. Mr. Cuong/Giang
14/03/21 Rain Water Pipe - Gridline A
14/03/26 Rain Water Pipe - Gridline A
14/04/02 Rain Water Pipe - Gridline A
14/03/28 Rain Water Pipe - Gridline A
14/03/17 14/03/18 Mr. Hoang
14/03/21 Backfill Material & Compaction
14/03/26 Backfill Material & Compaction
14/03/24 14/03/25 Mr. Le/Mr. Thanh
00/01/2514/04/02 RFI-013 Road & Drainage System Level
14/03/24 14/03/26 1 A3 drawing Mr. Le/Mr. Thanh
14/04/02 (RFI_014) Interfacing Ground Floor Level
14/03/24 14/03/27 Brick for Masonry Hoang
BBVN-FIVE-S2-SC-RFI-0008-14 M&E/ Bracing steel structure Clashings points
BV-137206/6011/SMZ-140310/D011
BV-137206/6011/SMZ-140313/D015
BBVN-FIVE-S2-SC-RFI-0009-14
Structure/Architecture/M&E_Design Queries_Toilet
BV-137206/6011/SMZ-140313/D016
BBVN-FIVE-S2-SC-RFI-0010-14
Pile testing result (Intergrity test, Bearing test)
BV-137206/6011/SMZ-140317/D019
BBVN-FIVE-S2-SC-RFI-0011
Rain Water Pipe (RWP) grid line A
BV-137206/6011/SMZ-140318/D021
BV-137206/6011/SMZ-140326/D023
BV-137206/6011/SMZ-140402/D038
BBVN-FIVE-S2-SC-RFI-0011/R1
BBVN-FIVE-S2-SC-RFI-0012
Backfill Layer Material & Compaction
BV-137206/6011/SMZ-140318/D022
BV-137206/6011/SMZ-140326/D024
BBVN-FIVE-S2-SC-RFI-0013
Road & Drainage System Level 4 A3 size drawings (road), 4A3 size drawings (drainage system)
BV-137206/6011/SMZ-140403/D033
BBVN-FIVE-S2-SC-RFI-0014
Survey Report with Different level between design and existing of interfacing ground floor
BV-137206/6011/SMZ-140402/D035
BBVN-FIVE-S2-SC-RFI-0015
Request for Information
OUT-GOING Rev Date Issued INCOMING Rev Date Issued Title AttachmentDate Required
Reply
Author/Delivered to
14/03/29 Brick for Masonry
14/04/04 14/04/09 Brick for Masonry Rev.1
14/03/26 14/03/26 6 A3 size drawings Thanh
BV-137206/6011/SMZ-14
14/03/27 14/03/31 Conflict between beeam and Sewage Pipe 4 A3 size drawings
14/04/02 (RFI_017)_Toilet & Structure Beam
14/03/27 14/04/02 Mr. Nguyen/Tu
14/03/29 RFI-18 Ground Compaction
14/04/02 RFI-018 Ground Compaction
14/03/29 14/04/02 Electrical/ Lighting cable specification Specification, 2A3 size drawings Mr. Quang
14/04/01 Electrical/ Lighting cable specification
14/04/04 Electrical/ Lighting cable specification
14/04/01 14/04/04 Design/Internal - Location of floor drain at ground and first floor 12 A3size drawings Mr. Quang
14/04/03 Design/Internal - Location of floor drain at ground and first floor 12 A3size drawings
14/04/08
14/04/04 14/04/07 Purlin Connection Details 4 A3size drawings
14/04/04 Purlin Connection Details
14/04/07 (RFI-021) Purlin Connection Details (reply by Designer)
14/04/14 14/04/17 Paint for Steel Structure Mr. Giang/Hoang
14/04/17 Paint for Steel Structure
BV-137206/6011/SMZ-140329/D029
BBVN-FIVE-S2-SC-RFI-0016
RFI_0016_toilet & Structure Beam
BBVN-FIVE-S2-SC-RFI-0017
Mr. Giang/Mr. Thanh, Mr. Le/Quang
BV-137206/6011/SMZ-140402/D036
BBVN-FIVE-S2-SC-RFI-0018
Civil / Ground Compaction Photos of Soil Trial Test, Testing Resultfor compacting at the construction site
BV-137206/6011/SMZ-140329/D031
BV-137206/6011/SMZ-140402/D034
BBVN-FIVE-S2-SC-RFI-0019
BV-137206/6011/SMZ-140401/D032
BV-137206/6011/SMZ-140404/D041
BBVN-FIVE-S2-SC-RFI-0020
BV-137206/6011/SMZ-140403/D039
BV-137206/6011/SMZ-140408/D043
Design/Internal - Location of floor drain at ground and first floor (Designer Comments)
BBVN-FIVE-S2-SC-RFI-0021
Mr. Giang/Mr. Thanh
BV-137206/6011/SMZ-140404/D040
BV-137206/6011/SMZ-140404/D042
Mr. Giang/Mr. Thanh
BBVN-FIVE-S2-SC-RFI-0022
BV-137206/6011/SMZ-140417/D044
Request for Information
OUT-GOING Rev Date Issued INCOMING Rev Date Issued Title AttachmentDate Required
Reply
Author/Delivered to
14/04/21 14/04/24 Dehumidifier in Granulation Room's Specification
14/04/23 Dehumidifier Specification
14/04/21 14/04/24 Lightning Protection System
14/05/06 Lightning Protection System
14/04/22 14/04/25 Vent Pipe for Sanaitation Facilities
14/04/23 Vent Pipe for Sanaitation Facilities
14/04/22 14/04/25 Specification Clarification (Pile Cap)
14/04/25 RFI-026_ Specification Clarification. Foundation Notes.
14/04/22 14/04/25 M&E Outlet Location Mr. Ujiie
14/04/25 RFI-027_ M&E Outlet Location
14/04/25 14/04/29 UPS at Panel DB-IT2 Mr. Ujiie
14/06/06 UPS at Panel DB-IT2
BBVN-FIVE-S2-SC-RFI-0023
Mr. Ujiie/Mr. Quang
BV-137206/6011/SMZ-140423/D045
BBVN-FIVE-S2-SC-RFI-0024
Mr. Ujiie/Mr. Quang, Mr. Trung
BV-137206/6011/SMZ-140506/D046
BBVN-FIVE-S2-SC-RFI-0025
Mr. Ujiie/Mr. Quang, Mr. Trung
BV-137206/6011/SMZ-140423/D047
BBVN-FIVE-S2-SC-RFI-0026
Mr. Tuan Anh/Mr. Mike-Hoa
BV-137206/6011/SMZ-140424/D056
BBVN-FIVE-S2-SC-RFI-0027
BV-137206/6011/SMZ-140424/D055
BBVN-FIVE-S2-SC-RFI-0028
BV-137206/6011/SMZ-140606/D145
Request for Information
OUT-GOING Rev Date Issued INCOMING Rev Date Issued Title AttachmentDate Required
Reply
Author/Delivered to
14/04/25 14/04/29 Production Panel Relocation Mr. Ujiie
14/06/03 Production Panel Relocation Ujiie/Quang
14/04/25 14/05/02 Door Hardware Tung
14/05/22 Door Hardware
14/06/03 Door Hardware
14/04/25 14/05/02 Chair at Laboratory Room Tung
14/04/29 RFI-031_Chair at White Area
14/04/25 14/04/26 Lightning Protection Quang
14/05/06 Lightning Protection Quang/Diem
14/04/28 14/05/03 Smoke Exhaust Fan Randy
14/05/06 Smoke Exhaust Fan Randy
14/04/29 14/05/02 Moterrise Damper Randy
14/05/16 Moterrise Damper Randy
BBVN-FIVE-S2-SC-RFI-0029
BV-137206/6011/SMZ-140602/D126
BBVN-FIVE-S2-SC-RFI-0030
BV-137206/6011/SMZ-140522/D113
BV-137206/6011/SMZ-140603/D122
BBVN-FIVE-S2-SC-RFI-0031
BV-137206/6011/SMZ-140429/D058
BBVN-FIVE-S2-SC-RFI-0032
BV-137206/6011/SMZ-140506/D062
BBVN-FIVE-S2-SC-RFI-0033
BV-137206/6011/SMZ-140506/D061
BBVN-FIVE-S2-SC-RFI-0034
BV-137206/6011/SMZ-140516/D072
Request for Information
OUT-GOING Rev Date Issued INCOMING Rev Date Issued Title AttachmentDate Required
Reply
Author/Delivered to
14/04/28 14/05/03 Process Exhaust Fan Randy
14/05/16 Process Exhaust Fan 2A3size drawings
14/04/28 14/05/03 Exhaust Fan Capacity Randy
14/05/06 Exhaust Fan Capacity Randy
14/04/28 14/05/03 Ele. Room Sprinkler Randy
14/05/16 Ele. Room Sprinkler 1A3size drawing
14/04/28 14/05/03 Switch Box Level Randy
14/05/07 Switch Box Level
14/04/28 14/05/02 Warehouse Lighting Randy
14/04/29 RFI-039_Warehouse Lighting
BBVN-FIVE-S2-SC-RFI-0035
BV-137206/6011/SMZ-140516/D073
BBVN-FIVE-S2-SC-RFI-0036
BV-137206/6011/SMZ-140506/D060
BBVN-FIVE-S2-SC-RFI-0037
BV-137206/6011/SMZ-140516/D074
BBVN-FIVE-S2-SC-RFI-0038
BV-137206/6011/SMZ-140507/D063
BBVN-FIVE-S2-SC-RFI-0039
BV-137206/6011/SMZ-140429/D059
Request for Information
OUT-GOING Rev Date Issued INCOMING Rev Date Issued Title AttachmentDate Required
Reply
Author/Delivered to
14/04/28 14/05/02 Sprinkler inside Air Shaft Randy
14/05/16 Sprinkler inside Air Shaft 2A3size drawings
14/04/29 14/05/02 Spinkler Head under Duct Randy
14/05/16 Spinkler Head under Duct 1A3size drawing + 1A4size photo
14/05/02 14/05/03 Conductor for Lightning System Randy
14/05/16 Conductor for Lightning System 1A3size drawing
14/05/02 14/05/03 Urinal Sensor Socket Randy
14/05/16 Urinal Sensor Socket 2A3size drawings
14/05/20 14/05/23 Water Chiller Valve Randy
14/06/05 Water Chiller Valve
14/05/02 14/05/03 RO Gasket & O ring Type Randy
14/05/07 RO Gasket & O ring Type Randy
14/05/02 14/05/03 Existing Panel Modification Randy
14/05/16 Existing Panel Modification
14/05/02 14/05/03 Manhole for AC Drain & Compressor Drain Randy
BBVN-FIVE-S2-SC-RFI-0040
BV-137206/6011/SMZ-140516/D075
BBVN-FIVE-S2-SC-RFI-0041
BV-137206/6011/SMZ-140516/D076
BBVN-FIVE-S2-SC-RFI-0042
BV-137206/6011/SMZ-140516/D077
BBVN-FIVE-S2-SC-RFI-0043
BV-137206/6011/SMZ-140516/D078
BBVN-FIVE-S2-SC-RFI-0044
BV-137206/6011/SMZ-140605/D140
BBVN-FIVE-S2-SC-RFI-0045
BV-137206/6011/SMZ-140507/D064
BBVN-FIVE-S2-SC-RFI-0046
BV-137206/6011/SMZ-140516/D079
1A3size drawing & 1A4size Photo
BBVN-FIVE-S2-SC-RFI-0047
Request for Information
OUT-GOING Rev Date Issued INCOMING Rev Date Issued Title AttachmentDate Required
Reply
Author/Delivered to
14/05/16 Manhole for AC Drain & Compressor Drain 3A3size drawings
14/05/02 14/05/03 Cable ladder & trinking color code Randy
14/05/16 Cable ladder & trinking color code
14/05/02 14/05/03 Earthing System Randy
14/05/16 Earthing System 2A3size drawings
14/05/02 14/05/03 Earth Pit Dimension Randy
14/05/16 Earth Pit Dimension 1A3size drawing
14/05/02 14/05/03 Earth Ring Conductor Randy
14/05/19 Earth Ring Conductor Randy
14/05/02 14/05/03 Single line diagram Randy
14/05/16 Single line diagram 2A3zise drawings
14/05/14 14/05/16 Chiller Control Randy
14/06/05 Chiller Control
BV-137206/6011/SMZ-140516/D080
BBVN-FIVE-S2-SC-RFI-0048
BV-137206/6011/SMZ-140516/D081
BBVN-FIVE-S2-SC-RFI-0049
BV-137206/6011/SMZ-140516/D082
BBVN-FIVE-S2-SC-RFI-0050
BV-137206/6011/SMZ-140516/D083
BBVN-FIVE-S2-SC-RFI-0051
BV-137206/6011/SMZ-140516/D084
BBVN-FIVE-S2-SC-RFI-0052
BV-137206/6011/SMZ-140516/D101
BBVN-FIVE-S2-SC-RFI-0053
BV-137206/6011/SMZ-140605/D139
Request for Information
OUT-GOING Rev Date Issued INCOMING Rev Date Issued Title AttachmentDate Required
Reply
Author/Delivered to
14/05/02 14/05/06 Warehouse Exhaust Air Fan and Smoke Exhaust Damper Randy
14/05/16 Warehouse Exhaust Air Fan and Smoke Exhaust Damper 1A3size drawing
14/05/02 14/05/06 Water Supply System Route Randy
14/05/16 Water Supply System Route 2A3size drawings
14/05/02 14/05/05 Louver Air Velocity Randy
14/05/16 Louver Air Velocity 1A3size drawing
14/05/02 14/05/06 Exhaust fan RF-PII-01 & 02 Operation Control Randy
14/05/16 Exhaust fan RF-PII-01 & 02 Operation Control 1A3size drawing
14/05/02 14/05/06 Randy
14/05/16 1A3size drawing
14/05/02 14/05/06 CCTV Monitor at Guard House and BMS Room Randy
14/05/16 CCTV Monitor at Guard House and BMS Room 1A3size drawing
14/05/02 14/05/06 Access Control System Randy
14/05/16 Access Control System 2A3size drwings
BBVN-FIVE-S2-SC-RFI-0054
BV-137206/6011/SMZ-140516/D085
BBVN-FIVE-S2-SC-RFI-0055
BV-137206/6011/SMZ-140516/D086
BBVN-FIVE-S2-SC-RFI-0056
BV-137206/6011/SMZ-140516/D087
BBVN-FIVE-S2-SC-RFI-0057
BV-137206/6011/SMZ-140516/D088
BBVN-FIVE-S2-SC-RFI-0058
Humidity and Temperature Control on Component Production & Storage
BV-137206/6011/SMZ-1405/16/D089
Humidity and Temperature Control on Component Production & Storage
BBVN-FIVE-S2-SC-RFI-0059
BV-137206/6011/SMZ-140516/D090
BBVN-FIVE-S2-SC-RFI-0060
BV-137206/6011/SMZ-140516/D091
Request for Information
OUT-GOING Rev Date Issued INCOMING Rev Date Issued Title AttachmentDate Required
Reply
Author/Delivered to
14/05/02 14/05/05 AHU Plenum Randy
14/05/16 AHU Plenum 2A3zise drawings
14/05/16 14/05/19 MV&LV Cable Color Code Randy
14/06/05 MV&LV Cable Color Code
14/05/08 14/05/11 14/05/12 Push Putton Switch Randy
14/05/02 14/05/06 AHU Supply Air Duct Silencer Randy
14/05/16 AHU Supply Air Duct Silencer 1A3zise drawing
14/05/05 14/05/08 Fire Hose Cabinet Randy
14/05/16 Fire Hose Cabinet 1A3zise drawing
14/05/05 14/05/08 Pre Filter for Ventillation System Randy
14/05/16 Pre Filter for Ventillation System 3A3zise drawings
14/05/05 14/05/08 VentillationSystem for Toilet: Air Grill W/O Duct Randy
14/05/16 VentillationSystem for Toilet: Air Grill W/O Duct 1A3zise drawing
BBVN-FIVE-S2-SC-RFI-0061
BV-137206/6011/SMZ-140516/D092
BBVN-FIVE-S2-SC-RFI-0062
BV-137206/6011/SMZ-140605/D138
BBVN-FIVE-S2-SC-RFI-0063
BV-137206/6011/SMZ-140509/D069
BBVN-FIVE-S2-SC-RFI-0064
BV-137206/6011/SMZ-140516/D093
BBVN-FIVE-S2-SC-RFI-0065
BV-137206/6011/SMZ-140516/D094
BBVN-FIVE-S2-SC-RFI-0066
BV-137206/6011/SMZ-140516/D095
BBVN-FIVE-S2-SC-RFI-0067
BV-137206/6011/SMZ-140516/D096
Request for Information
OUT-GOING Rev Date Issued INCOMING Rev Date Issued Title AttachmentDate Required
Reply
Author/Delivered to
14/05/05 14/05/08 Provisional Sum Items Information Randy
14/05/09 Provisional Sum Items Information
14/05/05 14/05/08 Stage 1 Clean Room Plenum Randy
14/05/16 Stage 1 Clean Room Plenum 2A3zise drawings
14/05/05 14/05/08 Stage 1 Busbar BB4 400A Relocation Randy
14/06/03 Stage 1 Busbar BB4 400A Relocation
14/05/05 14/05/08 Drain Pipe in IPQC Lab Randy
14/05/16 Drain Pipe in IPQC Lab 1A3zise drawing
14/05/06 14/05/09 Beam & Stair Confliction Thanh/Duong-An
14/05/16 Beam & Stair Confliction 1A3zise drawings
14/05/14 14/05/16 Beam & Stair Confliction 1A3size drawing Thanh
14/05/07 14/05/09 CR4-Wall Type Thanh
BV-137206/6011/SMZ-140 CR4-Wall Type
14/05/13 14/05/16 CR4-Wall Type Thanh
BBVN-FIVE-S2-SC-RFI-0068
BV-137206/6011/SMZ-140507/D065
BBVN-FIVE-S2-SC-RFI-0069
BV-137206/6011/SMZ-140516/D097
BBVN-FIVE-S2-SC-RFI-0070
BV-137206/6011/SMZ-140602/D125
BBVN-FIVE-S2-SC-RFI-0071
BV-137206/6011/SMZ-140516/D098
BBVN-FIVE-S2-SC-RFI-0072
BV-137206/6011/SMZ-140516/D103
BBVN-FIVE-S2-SC-RFI-0072 (ADD.01)
BBVN-FIVE-S2-SC-RFI-0073
BBVN-FIVE-S2-SC-RFI-0073/R1
Request for Information
OUT-GOING Rev Date Issued INCOMING Rev Date Issued Title AttachmentDate Required
Reply
Author/Delivered to
14/05/07 14/05/10 Balancing Valve for Chiller Randy
14/05/16 Balancing Valve for Chiller 2A3zise drawings
14/05/07 14/05/10 AHU Chiller Pipe Connection Randy
14/05/22 AHU Chiller Pipe Connection
14/05/08 14/05/10 C5-1 & Anchor Steel Plate Thanh
14/05/16 C5-1 & Anchor Steel Plate 3A3zise drawings
14/05/08 14/05/11 14/05/12 Accesss Control Module Randy
BV-137206/6011/SMZ-140
14/05/09 14/05/12 SB1 Steel Beam Connection Thanh
14/05/16 SB1 Steel Beam Connection 1A3zise drawing
14/05/12 14/05/15 Smoke Exhaust Static Pressure Calculation Quang
14/05/22 Smoke Exhaust Static Pressure Calculation
BBVN-FIVE-S2-SC-RFI-0074
BV-137206/6011/SMZ-140516/D102
BBVN-FIVE-S2-SC-RFI-0075
BV-137206/6011/SMZ-140522/D116
BBVN-FIVE-S2-SC-RFI-0076
BV-137206/6011/SMZ-140516/D099
BBVN-FIVE-S2-SC-RFI-0077
BV-137206/6011/SMZ-140509
BBVN-FIVE-S2-SC-RFI-0078
BV-137206/6011/SMZ-140516/D100
BBVN-FIVE-S2-SC-RFI-0079
D61, 2A3size drawings, tabulation
BV-137206/6011/SMZ-140522/D114
Request for Information
OUT-GOING Rev Date Issued INCOMING Rev Date Issued Title AttachmentDate Required
Reply
Author/Delivered to
14/05/12 14/05/15 Water Tank Outlet and Gate Valve Randy
14/06/06 Water Tank Outlet and Gate Valve
14/05/13 14/05/16 LV Panel DB-1A-2 Modification Randy
14/05/15 M&E Proposed Change
14/05/13 14/05/16 LV Panel DB-1A-3 Modification Load Power Schedule + Drawings Randy
14/05/15 LV Panel DB-1A-3 Modification Load Power Schedule
14/05/13 14/05/16 LV Panel DB-MCC2 Modification Schedule + Drawings Randy
14/05/15 LV Panel DB-MCC2 Modification Schedule + 2A3size Drawings
14/05/13 14/05/16 LV Panel DB-SCHWP-02, 03 Modification Schedule, 2A3size drawings Randy
14/05/15 LV Panel DB-SCHWP-02, 03 Modification Schedule, 2A3size drawings
14/05/13 14/05/16 LV Panel DB-MCC3-1&DB-MCC3-2 Modification Schedule & 2A3size drawings Randy
14/05/15 Lv Panel DB-MCC3-1&DB-MCC3-2 Modification Schedule & 2A3size drawings
BBVN-FIVE-S2-SC-RFI-0080
1A4size photo & 2A3size drawings
BV-137206/6011/SMZ-140606/D143
BBVN-FIVE-S2-SC-RFI-0081
Load Power Schedule& 2A3size drawings
BV-137206/6011/SMZ-140515/D071
Load Power Schedule& 4A3size drawings
BBVN-FIVE-S2-SC-RFI-0082
BV-137206/6011/SMZ-140515/D071
BBVN-FIVE-S2-SC-RFI-0083
BV-137206/6011/SMZ-140515/D071
BBVN-FIVE-S2-SC-RFI-0084
BV-137206/6011/SMZ-140515/D071
BBVN-FIVE-S2-SC-RFI-0085
BV-137206/6011/SMZ-140515/D071
Request for Information
OUT-GOING Rev Date Issued INCOMING Rev Date Issued Title AttachmentDate Required
Reply
Author/Delivered to
14/05/13 14/05/16 LV Panel Modification: Analog Type Meter to Digital Multimeter Randy
14/05/15 LV Panel Modification: Analog Type Meter to Digital Multimeter
14/05/13 14/05/16 Main Switchboard A&B Modification 2A3size drawings Randy
14/05/15 Main Switchboard A&B Modification 2A3size drawings
14/05/13 14/05/16 LV Panel DB-M/C-1&2, DB-CH-03 Modification 5A3size drawings Randy
14/05/15 LV Panel DB-M/C-1&2, DB-CH-03 Modification 5A3size drawings
14/05/22 14/05/24 MSB-A New MCCB for AHU-04 Supply & Return Fans Randy
14/07/04 MSB-A New MCCB for AHU-04 Supply & Return Fans
15/05/13 14/05/17 Beam B12 size 2A3size drawings Thanh
14/05/16 Beam B12 size 2A3size drawings
14/05/15 14/05/16 Duct Pressure (Low & Medium) Schedule Randy
14/06/06 Duct Pressure (Low & Medium)
14/05/16 14/05/21 Generator Delivery 1A3size drawing Randy
BBVN-FIVE-S2-SC-RFI-0086
BV-137206/6011/SMZ-140515/D071
BBVN-FIVE-S2-SC-RFI-0087
BV-137206/6011/SMZ-140515/D071
BBVN-FIVE-S2-SC-RFI-0088
BV-137206/6011/SMZ-140515/D071
BBVN-FIVE-S2-SC-RFI-0089
2A4size photos&data sheet, 1A3size drawing
BV-137206/6011/SMZ-140704/D233
BBVN-FIVE-S2-SC-RFI-0090
BV-137206/6011/SMZ-140515/D104
BBVN-FIVE-S2-SC-RFI-0091
BV-137206/6011/SMZ-140606/D144
BBVN-FIVE-S2-SC-RFI-0092
Request for Information
OUT-GOING Rev Date Issued INCOMING Rev Date Issued Title AttachmentDate Required
Reply
Author/Delivered to
14/06/03 Generator Delivery
14/05/17 14/05/19 AHU Opening 2A3size drawings Randy
14/06/10 AHU Opening
14/05/17 14/0521 CCTV Connection Module Randy
14/05/22 CCTV Connection Module
14/05/22 14/05/24 Return Air Grille 1A3sze drawing Randy
14/06/11 Return Air Grille
14/07/09 Return Air Grille
14/05/22 14/0525 Water Chiller Valve Size 2A3 size drawings Randy
14/06/25 Water Chiller Valve Size
14/07/09 Water Chiller Valve Size
14/05/22 14/05/25 Motorized Valve for Chiller - 03 Data sheet + Specification Randy
14/07/04 Motorized Valve for Chiller - 03
14/05/22 14/05/24 Fusible Link Temperature Requirement for Smoke Duct Fire Damper 1A3size drawing Randy
14/05/23
BV-137206/6011/SMZ-140602/D127
BBVN-FIVE-S2-SC-RFI-0093
BV-137206/6011/SMZ-140610/D161
BBVN-FIVE-S2-SC-RFI-0094
Technical Specification & 1A3size drawing
BV-137206/6011/SMZ-140522/D115
BBVN-FIVE-S2-SC-RFI-0095
BV-137206/6011/SMZ-140610/D168
BV-137206/6011/SMZ-140709/D242
BBVN-FIVE-S2-SC-RFI-0096
BV-137206/6011/SMZ-140624/D195
BV-137206/6011/SMZ-140709/D243
BBVN-FIVE-S2-SC-RFI-0097
BV-137206/6011/SMZ-140704/D234
BBVN-FIVE-S2-SC-RFI-0098
BV-137206/6011/SMZ-140523/D117
Request for Information
OUT-GOING Rev Date Issued INCOMING Rev Date Issued Title AttachmentDate Required
Reply
Author/Delivered to
14/05/22 14/05/25 The Brick Jamb at Door Locations Thanh
14/06/16 The Brick Jamb at Door Locations
14/05/22 14/05/26 Septic Tank 4A3size drawings Thanh
14/07/09 Septic Tank
14/05/23 14/05/25 Ceiling Frame Connection Detail 6A3size drawings Thanh / Duong
14/06/05 Ceiling Frame Connection Detail
14/05/23 14/05/24 Fastener Securement Deck Lap Tung
14/05/23
Sanitary Fixture Randy
14/06/03 Sanitary Fixture
14/05/27 14/05/30 New Production Machine Layout 1A3size drawing Randy
14/06/06 New Production Machine Layout
14/06/10 New Production Machine Layout
BBVN-FIVE-S2-SC-RFI-0099
1A4Aize photo & 13A3size drawings
BV-137206/6011/SMZ-140616/D176
BBVN-FIVE-S2-SC-RFI-0100
BV-137206/6011/SMZ-140709/D244
BBVN-FIVE-S2-SC-RFI-0101
BV-137206/6011/SMZ-140604/D129
BBVN-FIVE-S2-SC-RFI-0102
BV-137206/6011/SMZ-140523/D118
BBVN-FIVE-S2-SC-RFI-0103
BV-137206/6011/SMZ-140602/D128
BBVN-FIVE-S2-SC-RFI-0104
BV-137206/6011/SMZ-140606/D146
BV-137206/6011/SMZ-140610/D162
Request for Information
OUT-GOING Rev Date Issued INCOMING Rev Date Issued Title AttachmentDate Required
Reply
Author/Delivered to
14/05/28 14/05/31 Master Key Schedule Mr. Thanh
14/06/25 Master Key Schedule
14/05/28 14/05/31 Structure & Finishing 1Fl Toilet 1A3size drawing Duong
14/06/07 Structure & Finishing 1Fl Toilet
14/05/30 14/06/03 LCP-P2-G-1 Relocation to Stage 1 Staircase 1A3size drawing Randy
14/06/03 LCP-P2-G-1 Relocation to Stage 1 Staircase
14/05/30 14/06/05 Relocation of utilities from under to above of secondary support 2A3size drawings Randy
14/06/05 Relocation of utilities from under to above of secondary support
14/05/30 14/06/04 C8 Column along GL-E size 4A3size drawings Thanh
14/06/07 C8 Column along GL-E size
14/05/31 14/06/07 2A3size drawings Randy
14/06/25
BBVN-FIVE-S2-SC-RFI-0105
BV-137206/6011/SMZ-140625/D198
BBVN-FIVE-S2-SC-RFI-0106
BV-137206/6011/SMZ-140607/D148
BBVN-FIVE-S2-SC-RFI-0107
BV-137206/6011/SMZ-140602/D123
BBVN-FIVE-S2-SC-RFI-0108
BV-137206/6011/SMZ-140604/D130
BBVN-FIVE-S2-SC-RFI-0109
BV-137206/6011/SMZ-140607/S153
BBVN-FIVE-S2-SC-RFI-0110
Relocation of Existing Pole Light, CCTV, Fire Hydrant Pillar & Cabinet
BV-137206/6011/SMZ-140625/D199
Relocation of Existing Pole Light, CCTV, Fire Hydrant Pillar & Cabinet
Request for Information
OUT-GOING Rev Date Issued INCOMING Rev Date Issued Title AttachmentDate Required
Reply
Author/Delivered to
14/06/2 14/06/05 Aluminum Cover Details @ GL A&Z Thanh
14/06/05 Aluminum Cover Details @ GL A&Z
14/06/19 14/06/24 Aluminum Cover Details @ GL A&Z_Rev.1 Thanh
14/06/26 Aluminum Cover Details @ GL A&Z_Rev.1 Thanh
14/06/02 14/06/07 Steel Lintel for Alu door & window 1A3size drawing Thanh
14/06/07 Steel Lintel for Alu door & window
14/06/02 14/06/05 Top Beam @ Gridline 21 6A3size drawings Thanh
14/06/07 Top Beam @ Gridline 21
14/06/09 14/06/14 Top Beam @ Gridline 21 Thanh
14/06/02 14/06/05 Wall Type 1b Detail 6A3size drawings Thanh
14/06/07 Wall Type 1b Detail
14/06/02 14/06/07 Double Glass Specification 1A3size drawing Thanh
14/06/07 Double Glass Specification
14/06/09 14/06/14 Double Glass Specification Description of Work Thanh
14/06/14 Double Glass Specification Description of Work Thanh
14/06/05 14/06/12 Concrete Apron to the Curb for Asphalt Road 1A4size photo, 2A3size drawings Le, Thanh
BBVN-FIVE-S2-SC-RFI-0111
6A3size drawings & 1 A3size drawing for REFERENCE
BV-137206/6011/SMZ-140605/D137
BBVN-FIVE-S2-SC-RFI-0111/R1
SMZ_140605/D137(RFI_111)7A3size drawings
BV-137206/6011/SMZ-140626/D207
SMZ_140605/D137(RFI_111)7A3size drawings
BBVN-FIVE-S2-SC-RFI-0112
BV-137206/6011/SMZ-140607/D149
BBVN-FIVE-S2-SC-RFI-0113
BV-137206/6011/SMZ-140607/D152
BBVN-FIVE-S2-SC-RFI-0113/R1
11A3size drawings included in IN_ASD-0020 dated28-May-2014
BBVN-FIVE-S2-SC-RFI-0114
BV-137206/6011/SMZ-140607/D150
BBVN-FIVE-S2-SC-RFI-0115
BV-137206/6011/SMZ-140607/D151
BBVN-FIVE-S2-SC-RFI-0115/R1
BV-137206/6011/SMZ-140614/D175
BBVN-FIVE-S2-SC-RFI-0116
Request for Information
OUT-GOING CODE Date Issued INCOMING Date Issued Title Attachment Status
BV-137206/6011/SMZ-140314/D017 14/03/14 Bus duct from Aluminum to Copper Mr. Ujiie
BV-137206/6011/SMZ-140327/D025 14/03/27 Bus duct from Aluminum to Copper. Approval
BV-137206/6011/SMZ-140318/D020 14/03/18 Trench and Backfilling under Ground Slab Mr. Hoa
BV-137206/6011/SMZ-140522/D109 14/05/22 Trench and Backfilling under Ground Slab_Approval
14/04/12 BV-137206/6011/SMZ-140314/D018 14/03/14 Fire Fighting Pipe Location
14/06/03 Fire Fighting Pipe Cost Estimation Tung
BV-137206/6011/SMZ-140627/D217 14/06/27 Fire Fighting Pipe_Approval
14/04/12 Mr. Ujiie
BV-137206/6011/SMZ-140423/D053 14/04/23
BV-137206/6011/SMZ-
14/04/29 14/04/29 Conduit from PVC to GI Mr. Ujiie
BV-137206/6011/SMZ-140519/D105 14/05/19 Conduit from PVC to GI
BV-137206/6011/SMZ-
BV-137206/6011/SMZ-140423/D048 14/04/23 Galvanized Fire Fighting Pipe BBVN - FIVE-S2-RFC-0006 Mr. Mike
14/06/03 Galvanized Fire Fighting Pipe_V.O 2 options Mr. Quang
BV-137206/6011/SMZ-140627/D218 14/06/27 Galvanized Fire Fighting Pipe_Approval
BV-137206/6011/SMZ-140
BV-137206/6011/SMZ-140423/D049 14/04/23 Lighting Poles BBVN - FIVE-S2-RFC-07 Mr. Mike
14/05/25 Lighting Poles BBVN - FIVE-S2-RFC-07
BV-137206/6011/SMZ-140619/D185 14/06/19 Lighting Poles
14/06/30 Lighting Poles Arrangment_V.O Estimation
BV-137206/6011/SMZ-140423/D050 14/04/23Lighting System at Warehouse
Mr. Mike
14/05/25Lighting System at Warehouse
Estimation, Variation
BV-137206/6011/SMZ-140715/D259 14/07/15Lighting System at Warehouse_Approval
Author/Delivered to Date Deliverd to Author
BBVN-FIVE-S2-RFC-001
RFC form BBVN -FIVE-S2-RFC-0001
RFC form BBVN -FIVE-S2-RFC-0001 and Estimsation (VO)
BBVN-FIVE-S2-RFC-002
BBVN-FIVE-S2-RFC-0002, 2 drawings A3
BBVN-FIVE-S2-RFC-0002, 4 drawings A3
BBVN-FIVE-S2-RFC-003
BBVN-FIVE-S2-RFC-0003,2 A3size drawings, 1 sketch
BBVN-FIVE-S2-RFC-003
BBVN-FIVE-S2-RFC-004
Design Change: (M&E) Addition Floor drain (FD) at ground and first floor
BBVN - FIVE-S2-RFC-0004, 1A3 size drawing
Design Change: (M&E) Addition Floor drain (FD) at ground and first floor. Rejected.
BBVN - FIVE-S2-RFC-0004, 1A3 size drawing
BBVN-FIVE-S2-RFC-005
BBVN - FIVE-S2-RFC-0005, 1A4size page, Comparison Sheet
BBVN-FIVE-S2-RFC-0006
BBVN-FIVE-S2-RFC-0006
BBVN-FIVE-S2-RFC-0007
BBVN-FIVE-S2-RFC-0007
BBVN-FIVE-S2-RFC-0007
BBVN-FIVE-S2-RFC-0008
BBVN - FIVE-S2-RFC-0008, 1A4size drawing
BBVN-FIVE-S2-RFC-0008
Request for Information
OUT-GOING CODE Date Issued INCOMING Date Issued Title Attachment StatusAuthor/Delivered to Date Deliverd to Author
BV-137206/6011/SMZ-140423/D051 14/04/23Roof Insulation Material
BBVN - FIVE-S2-RFC-0009 Mike, Tung
BV-137206/6011/SMZ-140
BV-137206/6011/SMZ-140
BV-137206/6011/SMZ-140423/D052 14/04/23 Clean Room Floor Material Mike, Tung
BV-137206/6011/SMZ-140428/D057 14/04/28 2A3size drawings
14/05/19 Static Conductive Vinyl Floor Tung
BV-137206/6011/SMZ-140528/D121 14/05/28 Static Conductive Vinyl Floor Tung
Ladder inside Septic Tank & Pump Pit No.1 & No.2 BBVN - FIVE-S2-RFC-010 Mr. Le
BV-137206/6011/SMZ-140627/D214 14/06/27 Ladder inside Septic Tank & Pump Pit No.1 & No.2
BV-137206/6011/SMZ-140BV-137206/6011/SMZ-140BV-137206/6011/SMZ-140BV-137206/6011/SMZ-140
14/05/13 Road, Ground slab & Natural Soil BBVN - FIVE-S2-RFC-012 Mr. Ba Hoa
BV-137206/6011/SMZ-140605/D131 14/06/05 Road, Ground slab & Natural Soil_Approval
BV-137206/6011/SMZ-140
BV-137206/6011/SMZ-140 Biometric Access Control BBVN - FIVE-S2-RFC- a Thanh/Mike
BV-137206/6011/SMZ-140627/D216 14/06/27 Biometric Access Control
BV-137206/6011/SMZ-140
14/05/13 Moisture barrier at clean room Mr. Tung
BV-137206/6011/SMZ-140521/D110 14/05/21 Moisture barrier at clean room_Rejected
14/05/16 Lighting Control Swich Randy/Ujiie
BV-137206/6011/SMZ-140627/D219 14/06/27 Lighting Control Swich_Approval
BBVN-FIVE-S2-RFC-0009
BBVN-FIVE-S2-RFC-0010
BBVN - FIVE-S2-RFC-0010, A-CD-SC-01 Finishing & Material Schedule
RFC-10_ Clean Room Floor Material. Additional Details for Static Conductive Vinyl
BBVN-FIVE-S2-RFC-0010
Form RFC-010 by SMZ; Estimation & 1A3size drawing
BBVN-FIVE-S2-RFC-0011
BBVN-FIVE-S2-RFC-0012
BBVN-FIVE-S2-RFC-0013
BBVN-FIVE-S2-RFC-0014
BBVN - FIVE-S2-RFC-014, Product Data Sheet
BBVN-FIVE-S2-RFC-0015
BBVN - FIVE-S2-AC-RFI-73, BV-137206/6011/SMZ-140509/D069, 2A3size drawings
Request for Information
OUT-GOING CODE Date Issued INCOMING Date Issued Title Attachment StatusAuthor/Delivered to Date Deliverd to Author
BV-137206/6011/SMZ-140
'14/05/16 Control Module for Access System Randy/Ujiie
BV-137206/6011/SMZ-140BV-137206/6011/SMZ-140BV-137206/6011/SMZ-
14/05/15 Fire Hose Reel Supply Connection BBVN - FIVE-S2-RFC- Randy
BV-137206/6011/SMZ-140619/D180 14/06/19 Fire Hose Reel Supply Connection_Approval
BV-137206/6011/SMZ-140BV-137206/6011/SMZ-
BV-137206/6011/SMZ-140520/D106 14/05/20 Archive door relocation BBVN - FIVE-S2-RFC- BV
14/05/25 Archive door relocation 1A3size drawing
BV-137206/6011/SMZ-140603/D124 14/06/04 Archive Door Relocation_Approval BV
BV-137206/6011/SMZ-140620/D193 14/06/20 Ante-chamber to toilet-Carpet Tiles_Approval
BV-137206/6011/SMZ-140520/D107 14/05/20 IT Shop and server room - Floor Vinyl tiles BBVN - FIVE-S2-RFC-19 BV
14/05/25 IT Shop and server room - Floor Vinyl tiles SMZ
BV-137206/6011/SMZ-140605/D132 14/06/05 IT Shop and server room - Floor Vinyl tiles_Approval
BV-137206/6011/SMZ-BV-137206/6011/SMZ-
BV-137206/6011/SMZ-140520/D108 14/05/20 Ante Chamber to toilet - Carpet Tiles BV
14/05/25 Ante Chamber to toilet - Carpet Tiles Estimation, 2A3size drawings SMZ
BV-137206/6011/SMZ-140605/D136 14/06/05 Ante Chamber to toilet - Carpet Tiles
14/06/10 RFC-020 form (signature)
BV-137206/6011/SMZ-
BBVN-FIVE-S2-RFC-0016
BBVN - FIVE-S2-SC-RFI-77, BV-137206/6011/SMZ-140509/D070 dated 9May2014, 1A3soze drawing
BBVN-FIVE-S2-RFC-0017
BBVN-FIVE-S2-RFC-0018
BBVN-FIVE-S2-RFC-0018
BBVN - FIVE-S2-RFC-018; 2A3size drawings
BBVN-FIVE-S2-RFC-0019
BBVN-FIVE-S2-RFC-0019
BBVN - FIVE-S2-RFC-19, 2A4size drawing
BBVN-FIVE-S2-RFC-0020
BBVN - FIVE-S2-RFC-20; 1A3size drawing
BBVN-FIVE-S2-RFC-0020
BBVN-FIVE-S2-RFC-0020
Request for Information
OUT-GOING CODE Date Issued INCOMING Date Issued Title Attachment StatusAuthor/Delivered to Date Deliverd to Author
BV-137206/6011/SMZ-140522/D111 14/05/22 Temporary Backfilling of Stage 2 area_Approval BBVN - FIVE-S2-RFC- BV
BV-137206/6011/SMZ-140BV-137206/6011/SMZ-140BV-137206/6011/SMZ-140BV-137206/6011/SMZ-140BV-137206/6011/SMZ-140
BV-137206/6011/SMZ-140522/D112 14/05/22 3D Model_Approval BBVN - FIVE-S2-RFC-22 BV
BV-137206/6011/SMZ-140BV-137206/6011/SMZ-140
BBVN - FIVE-S2-RFC-Ujiie/Randy/Quang
BV-137206/6011/SMZ-140606/D147 14/06/06 Water Supply System _ Approval
BV-137206/6011/SMZ-140
14/05/21 Ujiie
BV-137206/6011/SMZ-140609/D156 14/06/09 Ujiie
BV-137206/6011/SMZ-140
BBVN - FIVE-S2-RFC-BV-137206/6011/SMZ-140
14/05/21 Socket and Data Location at Clean Room Ujiie
BV-137206/6011/SMZ-140627/D215 14/06/27 Socket and Data Location at Clean Room
BBVN-FIVE-S2-RFC-0021
BBVN-FIVE-S2-RFC-0022
BBVN-FIVE-S2-RFC-0023
Water Supply System _ Change the Pipe size & Pipe route, chang pump capacity
Form RFC-023, SMZ-140516/D086 dated 26-May-2014 (for RFI-055), data sheet&4A3size drawings
Form RFC-023; SMZ-140516/S086 dated 16-May-2014; Water Supply Calculation; 4A3size drawings; 1A3size drawings list
BBVN-FIVE-S2-RFC-0024
Fire Fighting System _ Change model & physical data of OS&Y valve from OF200 to OF200F & from cast iron to ductile iron
BBVN - FIVE-S2-RFC-0024, Viking letter, catalogue, data sheet
Fire Fighting System _ Change model & physical data of OS&Y valve from OF200 to OF200F & from cast iron to ductile iron_Approved
BBVN-FIVE-S2-RFC-0025
Request for Information
OUT-GOING CODE Date Issued INCOMING Date Issued Title Attachment StatusAuthor/Delivered to Date Deliverd to Author
BV-137206/6011/SMZ-14070//D123 Fire Smoke Supply Air Fans BBVN - FIVE-S2-RFC- BB
14/08/02 Fire Smoke Supply Air Fans Ujiie
BV-137206/6011/SMZ-140
14/10/01 Fire Smoke Supply Air Fans Cost estimation, 1A3size drawing Ujiie
14/10/06 Fire Smoke Supply Air Fans Cost estimation Tung
BV-137206/6011/SMZ-141010//D391 14/10/10 Fire Smoke Supply Air Fans_APPROVED
Septic Tank Ladder Casting into Concrete BBVN - FIVE-S2-RFC-
BV-137206/6011/SMZ-140605/D133 14/06/05 Septic Tank Ladder Casting into Concrete_Rejected
BV-137206/6011/SMZ-140
14/05/25 Grafting Filter for rubish
BV-137206/6011/SMZ-140619/D189 14/06/19 Grafting Filter for rubish
BV-137206/6011/SMZ-140
14/05/29 Change of Ground Beam Profile_Warehouse GL Z and 21 BBVN - FIVE-S2-RFC- Thanh
BV-137206/6011/SMZ-140605/D134 14/06/05 Change of Ground Beam Profile_Warehouse GL Z and 21
BV-137206/6011/SMZ-140626/D203 14/06/26 Change of Ground Beam Profile_Warehouse GL Z and 21_Approval
BV-137206/6011/SMZ-140529/D120 14/05/29 Pharmaceutical Pipe & Sleeve BBVN - FIVE-S2-RFC-
BV-137206/6011/SMZ-140530/D122 14/05/31 Pharmaceutical Pipe & Sleeve_Approval
14/06/02 Additional Drain for IPQC Room BBVN - FIVE-S2-RFC-
BV-137206/6011/SMZ-140607/D154 14/06/07 Additional Drain for IPQC Room_Rejected
BV-137206/6011/SMZ-140
14/05/31 Compressor Pipe Fittings Brand Name BBVN - FIVE-S2-RFC-32 Ujiie
BBVN-FIVE-S2-RFC-0026
BBVN-FIVE-S2-RFC-0026
Cost estimation, D223 (RFC-26), 3A3size drawings
BBVN-FIVE-S2-RFC-0026
BBVN-FIVE-S2-RFC-0026
BBVN-FIVE-S2-RFC-0026
BBVN-FIVE-S2-RFC-0027
BBVN-FIVE-S2-RFC-0028
BBVN - FIVE-S2-RFC-028; Estimation, 2A3size drawings
BBVN-FIVE-S2-RFC-0029
BBVN-FIVE-S2-RFC-0030
BBVN-FIVE-S2-RFC-0031
BBVN-FIVE-S2-RFC-0032
Request for Information
OUT-GOING CODE Date Issued INCOMING Date Issued Title Attachment StatusAuthor/Delivered to Date Deliverd to Author
BV-137206/6011/SMZ-140605/D135 14/06/05 Compressor Pipe Fittings Brand Name
BV-137206/6011/SMZ-140605/D141 14/06/06 Compressor Pipe Fittings Brand Name_Approved
14/06/09 Compressor Pipe Fittings Brand Name
14/06/02 Ventilation Fan Brand (From Fantech replaced by Krugger) BBVN - FIVE-S2-RFC- Ujiie
BV-137206/6011/SMZ-140605/D142 14/06/06 Ventilation Fan Brand (From Fantech replaced by Krugger)_Approval Ujiie
BV-137206/6011/SMZ-140
14/06/03 Painting on Brick Wall at Air Shaft BBVN - FIVE-S2-RFC- Tung
BV-137206/6011/SMZ-140607/D155 14/06/07 Painting on Brick Wall at Air Shaft
BV-137206/6011/SMZ-140627/D220 14/06/27 Painting on Brick Wall at Air Shaft_Approval
14/06/09 AC Drain and Compressor Drain 4A43sizedrawings Ujiie/Randy
BV-137206/6011/SMZ-140612/D171 14/06/12 AC Drain and Compressor Drain_Approved
BV-137206/6011/SMZ-140
14/06/09 Ball Valve for Handspray Randy
BV-137206/6011/SMZ-140619/D181 14/06/19 Ball Valve for Handspray_Approval
BV-137206/6011/SMZ-140609/D158 14/06/09 Copper Pipe for Water Heater BV
BV-137206/6011/SMZ-140620/D194 14/06/20 Copper Pipe for Water Heater_Approval
BBVN-FIVE-S2-RFC-0032
BBVN-FIVE-S2-RFC-0033
Form RFC-33, Main Equipment List, Technical Specification
BBVN-FIVE-S2-RFC-0034
BBVN-FIVE-S2-RFC-0035
BBVN-FIVE-S2-RFC-0036
BBVN - FIVE-S2-RFC-0034; Cost Estimation; SMZ-140602/D128 dated 2nd June 2014; RFI-103_Sanitary Fixtures dated 23-May -2014; IN_AMEP-0046 cover page dated 15-May-2014
BBVN-FIVE-S2-RFC-0037
Request for Information
OUT-GOING CODE Date Issued INCOMING Date Issued Title Attachment StatusAuthor/Delivered to Date Deliverd to Author
BV-137206/6011/SMZ-140609/D159 14/06/09 Steel Structure Color BV
BV-137206/6011/SMZ-140619/D184 14/06/19 Steel Structure Color_Rejected
Flood Lights BV
BV-137206/6011/SMZ-140609/D160 14/06/09 Flood Lights
BV-137206/6011/SMZ-140619/D186 14/06/19 Flood Lights
BV-137206/6011/SMZ-140609/D157 14/06/09 Chilled water system bypass BV
14/06/27 Chilled water system bypass_V.O Estimation, drawing
BV-137206/6011/SMZ-140702/D226 14/07/02 Chilled water system bypass
14/06/10 Tung
BV-137206/6011/SMZ-140626/D205 14/06/26
14/06/10 Waterproofing between brick wall and concrete column Estimation, 4A3size drawings Tung
BV-137206/6011/SMZ-140612/D172 14/06/12 Waterproofing between brick wall and concrete column_Rejected
Moisture Barrier at Clean Room Tung
BV-137206/6011/SMZ-140626/D204 14/06/26 Moisture Barrier at Clean Room_Approval
Earth Pit Dimension Duong
BV-137206/6011/SMZ-140804/D294 14/08/04 Earth Pit Dimension_Approval
BBVN-FIVE-S2-RFC-0038
BBVN-FIVE-S2-RFC-0039
BBVN-FIVE-S2-RFC-0040
BBVN-FIVE-S2-RFC-0040
BBVN-FIVE-S2-RFC-0041
High Speed Door 2.G.D.42 & 2.G.D.46 change from Horman Door to Dynaco Door
Horman Confirmation Letter, Dynaco Catalogue, Reference Projects
High Speed Door 2.G.D.42 & 2.G.D.46 change from Horman Door to Dynaco Door_Approval
BBVN-FIVE-S2-RFC-0042
BBVN-FIVE-S2-RFC-0043
Sikafloor 81 Epocem 3mmthick to Flowcem 2mm thick
BBVN-FIVE-S2-RFC-0044
Request for Information
OUT-GOING CODE Date Issued INCOMING Date Issued Title Attachment StatusAuthor/Delivered to Date Deliverd to Author
Raised Floor Outlet Box Ujiie/Quang
BV-137206/6011/SMZ-140619/D187 14/06/19 Raised Floor Outlet Box
Drainage System Submersible Pump Ujiie/Quang
BV-137206/6011/SMZ-140619/D182 14/06/19 Drainage System Submersible Pump_Approval
14/06/13 Chiller CH-03 Additional Valve Ujiie/ Quang
BV-137206/6011/SMZ-140619/D188 14/06/19 Chiller CH-03 Additional Valve
14/07/10 Chiller CH-03 Additional Valve_Rev.1
BV-137206/6011/SMZ-140804/D295 14/08/04 Chiller CH-03 Additional Valve_Rev.1 _Approval
BV-137206/6011/SMZ-140731/D286 14/07/31 IT Adjustment BB
BV-137206/6011/SMZ-140822/D331 14/08/22 IT Adjustment SMZ
BV-137206/6011/SMZ-140917/D371 14/09/18 IT Adjustment_APPROVAL
14/06/17 Construction Joint on Ground Floor Slab Le/Thanh/nguyen
BV-137206/6011/SMZ-140626/D202 14/06/26 Construction Joint on Ground Floor Slab_Approval
14/07/17 Construction Joint on Ground Floor Slab Form, 3A3size drawings Phuc. Thanh
BV-137206/6011/SMZ-140722/D280 14/07/22 Construction Joint on Ground Floor Slab _Approved
14/06/17 Water Heater Safety Walve Drain Pipe 4A3size drawings Ujiie/Quang
BV-137206/6011/SMZ-140619/D183 14/06/19 Water Heater Safety Walve Drain Pipe_Approved
BBVN-FIVE-S2-RFC-0045
BBVN-FIVE-S2-RFC-0046
BBVN-FIVE-S2-RFC-0047
Estimation; SMZ-140602/D127 dated 3-Jun-2014; Product Data Sheet
BBVN-FIVE-S2-RFC-0047/R1
BBVN-FIVE-S2-RFC-0048
BBVN-FIVE-S2-RFC-0048/R1
BBVN-FIVE-S2-RFC-0049
1A3size drawings, 1 A3 drawing 141-HBPE-S-CD-MB-214
BBVN-FIVE-S2-RFC-0049/R1
BBVN-FIVE-S2-RFC-0050
Request for Information
OUT-GOING CODE Date Issued INCOMING Date Issued Title Attachment StatusAuthor/Delivered to Date Deliverd to Author
14/06/17 VRV Room Steel Work Member 3A3size drawings Giang
14/06/25 VRV Room Steel Work Member_Additional Document Giang/Duong
BV-137206/6011/SMZ-140630/D122 14/07/01 VRV Room Steel Work Member
14/07/02 VRV Room Steel work member_Rev.1 Tung/Giang
BV-137206/6011/SMZ-140723/D282 14/07/23 VRV Room Steel work member_Rev.1 _ Approval
14/06/20 Priority Power Supply for DB-SP Connection Point 3A3size drawings Quang/Ujiie
BV-137206/6011/SMZ-140627/D221 14/06/27 Priority Power Supply for DB-SP Connection Point
14/06/24 Pit Support Meterial Change from GI to SUS304 4A3size drawings Quang/Ujiie
BV-137206/6011/SMZ-140711/D251 14/07/11 Pit Support Meterial Change from GI to SUS304_Rejected Estimation, 4A3size drawings
14/07/10 Concrete Apron to the kerbt for the asphalt road 3A3size drawings Thanh
BV-137206/6011/SMZ-140804/D297 14/08/04 Concrete Apron to the kerbt for the asphalt road_Approval
14/07/10 Asphalt road extension 3A3size drawings Thanh
BV-137206/6011/SMZ-140731/D290 14/07/31 Asphalt road extension_Approved Thanh
14/06/24 LV Panel Load Technical Data Meter (from analog to digital) Quang/Ujiie
BV-137206/6011/SMZ-140626/D206 14/06/26
BBVN-FIVE-S2-RFC-0051
BBVN-FIVE-S2-RFC-0051 (ADD.01)
Comparison for geometric properties of sections, 3A3size drawings
BBVN-FIVE-S2-RFC-0051/R1
Geometric Properties, 1A3size drawing
Tung/Giang/Thanh/Quang
BBVN-FIVE-S2-RFC-0052
BBVN-FIVE-S2-RFC-0053
BBVN-FIVE-S2-RFC-0054
BBVN-FIVE-S2-RFC-0055
BBVN-FIVE-S2-RFC-0056
Estimation, SMZ-140515/D71 dated 15-May-2014, RFI-86 dated 13-May-2014, Panel List for Multimeter, Technical Specification
LV Panel Load Technical Data Meter (from analog to digital)_Rejected
Request for Information
OUT-GOING CODE Date Issued INCOMING Date Issued Title Attachment StatusAuthor/Delivered to Date Deliverd to Author
14/06/24 VAV Communication Control Quang/Ujiie
BV-137206/6011/SMZ-140805/D299 14/08/06 VAV Communication Control_Approval
14/07/15 Ramp Adjustments BB
BV-137206/6011/SMZ-140731/D287 14/07/31 Ramp Adjustments 4A3size drawings BV
14/08/22 Ramp Adjustments SMZ/Tung
BV-137206/6011/SMZ-140829/D349 14/08/29 Ramp Adjustments_Approval
14/06/30 Raised Floor Outlet Box (From 4 nos. to 2 nos.)
BV-137206/6011/SMZ-140918/D375 14/09/19 Raised Floor Outlet Box (From 4 nos. to 2 nos.) Ujiie
14/10/04 Clinic House Terrace Renovation SMZ (BB)
14/07/01 LV Panel Modification - DB-SCHWP-02,03 Estimation, 6A3size drawings Ujiie
BV-137206/6011/SMZ-140
14/07/04 Dike Wall and Water Proofing at the Wet Area 9A3size drawings Thanh
BV-137206/6011/SMZ-140710/D247 14/07/10 Dike Wall and Water Proofing at the Wet Area
14/07/04 Hoang QC
BV-137206/6011/SMZ-140722/D278 14/07/22
BBVN-FIVE-S2-RFC-0057
Product Data Sheet, AMEP 17 dated 24-Apr-2014, VAV Terminal Unit Catalogue
BBVN-FIVE-S2-RFC-0058
BBVN-FIVE-S2-RFC-0058
Estimation, 4A3size drawings, 2A3size photos, 1A3size sketch
BBVN-FIVE-S2-RFC-0059
form + ASD 60, ASD-60/R1 dated 30-June-2014
BBVN-FIVE-S2-RFC-0059
Cost estimation, 2A3size drawings
BBVN-FIVE-S2-RFC-0060
BBVN-FIVE-S2-RFC-0061
BBVN-FIVE-S2-RFC-0062
Waterproofing for Construction Joint (Casting Concrete for Ground Slab)
Waterproofing for Construction Joint (Casting Concrete for Ground Slab)_Approved
Request for Information
OUT-GOING CODE Date Issued INCOMING Date Issued Title Attachment StatusAuthor/Delivered to Date Deliverd to Author
14/07/07 Pressure gauge on the chilled water pipe for compressor diagram, photo A4size Ujiie
BV-137206/6011/SMZ-140730/D288 14/07/31 Pressure gauge on the chilled water pipe for compressor_Approved Ujiie
RC for brickwalls at door/window/louver/opening locations Thanh
BV-137206/6011/SMZ-140731/D291 14/07/31 Thanh
14/07/10 Reinforced Concrete post for intersecting brick wall 14A3size drawings Thanh
BV-137206/6011/SMZ-140718/D271 14/07/18 Reinforced Concrete post for intersecting brick wall _ Rejected
14/07/10 Water Proofing for Septic Tank 3A3size drawings Thanh
BBVN-FIVE-S2-RFC-0063
BBVN-FIVE-S2-RFC-0064
Estimation, D176 (RFI-099), 14A4size drawings, 4A3size drawings
RC for brickwalls at door/window/louver/opening locations_Approved
BBVN-FIVE-S2-RFC-0065
BBVN-FIVE-S2-RFC-0066
Correspondence submission to PCI 81
No. To CC: Issued Title Attachment Authored by
BV BB 14/08/08 Confirmation of Pre-Action System Control Panel 2A3size drawings Mr. Ujiie
BV BB 08/11/08 ASD-0076/R2 - Fire Sprinkler FM Approvals Mr. Ujiie
BV BB 14/08/08 Shop Drawing Approvals Mr. Ujiie
BV BB 14/08/08 EVN Confirmation for Shutdown Schedule Ujiie
BV BB 14/08/08 MOM Item 8.5.46 Pipe Connection to Buffer Tank 2A3size drawings Ujiie
BV BB 14/08/09 Ujiie
BV BB 14/08/11 Support Fabrication Supporting Finishing table Ujiie
BV BB 14/08/08 Factory Visit/Inspection (Hainam Factory) Ujiie
BV BB 14/08/12 MOM-26 Item 9.42 FM-200 Refilling Ujiie
BV BB 14/08/12 BV-137206/6011/SMZ-140811/D308 RFC-088 Comment D308 Ujiie
BV BB 14/08/12 ASD-130 Timber door and glass partition Mike
BV BB 14/08/14 BBVN-FIVE-S2-SC-AMEP-005A Comment Ujiie
BV BB 14/08/14 Ujiie
BV BB 14/08/14 Ujiie
BV BB 14/08/14 Ujiie
BV BB 14/08/14 Ujiie
BBVN-FIVE-S2-SC-LTR-ENG-0030
BBVN-FIVE-S2-SC-LTR-ENG-0031
BBVN-FIVE-S2-SC-LTR-ENG-0032
BBVN-FIVE-S2-SC-LTR-ENG-0033
BBVN-FIVE-S2-SC-LTR-ENG-0034
BBVN-FIVE-S2-SC-LTR-ENG-0035
BV-137206/609/140804/SI044 Pharma Proposed Floor Drain Provision at Warehouse
2A4size drawings, BV-137206/609/140804/SI-44 dated 5-August-2014
BBVN-FIVE-S2-SC-LTR-ENG-0036
BBVN-FIVE-S2-SC-LTR-ENG-0037
BBVN-FIVE-S2-SC-LTR-ENG-0038
E-mail from FIKE Aisa Pacific (Clean Agent FM-200 Refilling for Fike's System)&MOM-26 page 9 of 22
BBVN-FIVE-S2-SC-LTR-ENG-0039
BBVN-FIVE-S2-SC-LTR-ENG-0040
BBVN-FIVE-S2-SC-LTR-ENG-0041
BBVN-FIVE-S2-SC-AMEP-005A
BBVN-FIVE-S2-SC-LTR-ENG-0042
AMEP Comment Clarification BBVN-FIVE-S2-SC-AMEP-002/R2 Air Handing Unit 3&4
BBVN-FIVE-S2-SC-AMEP-002/R2 Air Handing Unit 3&4
BBVN-FIVE-S2-SC-LTR-ENG-0043
AMEP Comment Clarification BBVN-FIVE-S2-SC-AMEP-0045 Air Compressor
BBVN-FIVE-S2-SC-AMEP-0045 Air Compressor
BBVN-FIVE-S2-SC-LTR-ENG-0044
AMEP Comment Clarification BBVN-FIVE-S2-SC-AMEP-001/R1 Air Cooled Chiller
BBVN-FIVE-S2-SC-AMEP-001/R1 Air Cooled Chiller
BBVN-FIVE-S2-SC-LTR-ENG-0045
AMEP Comment Clarification BBVN-FIVE-S2-SC-AMEP-0015/R2 LV Cable
BBVN-FIVE-S2-SC-AMEP-0015/R2 LV Cable
Correspondence submission to PCI 82
No. To CC: Issued Title Attachment Authored by
BV BB 14/08/14 MOM Item 11.12.11 AHU Coil Ujiie
BV BB 14/08/15 Tu
BV BB 14/08/15 Inspection Schedule for Transformer Delivery & Power On Quang
NS 14/08/15 Quang
BV BB 14/08/19 Transformer Factory Test Schedule Quang/Ujiie
NS 14/08/21 BB-FIVE-AP-S2-Ref: Re-Organization of Site Staff Sasaki Toru
BB BV 14/08/21 Smoke Exhaust Duct Ujiie
BB BV 14/08/21 Transformer Inspection Ujiie
NS 14/08/22 Working Time Ujiie
BV 14/08/23 Remaining Works at Substation Area Ujiie
Nhat Hoa 14/08/23 Clean Room Vinyl Flooring Installation 1A3szie schedule Tung QS
Dai Vu 14/08/23 Clean Room Moisture Resistant Membrane Contract Award 1A3szie schedule Tung QS
BB BV 14/08/29 1A3size drawing Tu
BB BV 14/08/29 EVN Checking 2A4size photos Ujiie
BB BV 14/08/30 3A4size colored photos
BBVN-FIVE-S2-SC-LTR-ENG-0046
MOM-26 page 11/22l Alko letter (Capacity of Cooling Coil in AHU of Bbraun Phase 2 Project), sketch, 2A3size draiwng
BBVN-FIVE-S2-SC-LTR-ENG-0047
BB-FIVE AP-S2 – Ref: BV-137206/609/140805/SI049 Zone 2 M&E Installation Works
BBVN-FIVE-S2-SC-LTR-ENG-0048
BBVN-FIVE-S2-SC-LTR-ENG-0049
BB-FIVE AP-S2 – Ref: Non Compliance with Approved Documentation
BBVN-FIVE-S2-SC-LTR-ENG-0050
Factory Acceptance Test procedure for Transformer; Test report of Transformer
BBVN-FIVE-S2-SC-LTR-ENG-0051
BBVN-FIVE-S2-SC-LTR-ENG-0052
Duct & Fitting Schedule; 1A3size drawing
BBVN-FIVE-S2-SC-LTR-ENG-0053
BBVN-FIVE-S2-SC-LTR-ENG-0054
BBVN-FIVE-S2-SC-LTR-ENG-0055
BBVN-FIVE-S2-SC-LTR-ENG-0056
BBVN-FIVE-S2-SC-LTR-ENG-0057
BBVN-FIVE-S2-SC-LTR-ENG-0058
Contractors Scope of Work & Responsibilities prior to Transformer Installation
BBVN-FIVE-S2-SC-LTR-ENG-0059
BBVN-FIVE-S2-SC-LTR-ENG-0060
BBVN - FIVE-AP-S2-RFI 180 Response - BV-137206/6011/SMZ-140821/D324
Tuan Anh / Mike
Correspondence submission to PCI 83
No. To CC: Issued Title Attachment Authored by
BB BV 14/09/02 HILTI Female Type Anchor (Drop in Anchor) Ujiie
VNC2 14/09/05 Site works progress and Outstanding Schedule of Works Tu
BB BV 14/09/08 Stage 1 Remaining Works (Interlocking Function Test) Ujiie
VNC2 14/09/08 Site Works Progress and Outstanding Schedule of Works Tu
LS BB, BV 14/09/10 Provisional Sum Item 10.114 Installation of Loose Furniture Fixtures Hoa
NS 14/09/10 Stage 1 Underground Firefighting Works Hoa
BB, BV 14/09/10 Chiller Equipment Delivery Schedule Ujiie
NS 14/09/11 Quality of Welding Work NCR-06 dated 12-June-2014 Ujiie
BB BV 14/09/12 Stage 1 Remaining Works (Interlocking Function Test) (ADD.01) Ujiie/Tu
BB BV 14/09/13 MOM Item 11.20.18 Cable Spacer Ujiie/Tu
LTR/VIE-001 BB 14/09/16 muon 02 khoa (1 khoa co, 1 khoa dien) Toan
BB BV 14/09/18 MOM Item 11.17.6 Pre-Action System Ujiie
BBVN-FIVE-S2-SC-LTR-ENG-0061
BBVN-FIVE-S2-SC-LTR-ENG-0062
BBVN-FIVE-S2-SC-LTR-ENG-0063
ETF-01 sheet (LV Room test items_2 sheets)
BBVN-FIVE-S2-SC-LTR-ENG-0064
BBVN-FIVE-S2-SC-LTR-ENG-0065
BBVN-FIVE-S2-SC-LTR-ENG-0066
BBVN-FIVE-S2-SC-LTR-ENG-0067
BBVN-FIVE-S2-SC-LTR-ENG-0068
BBVN-FIVE-S2-SC-LTR-ENG-0069
MSB Panel Module Control for … Operation 1A3size drawing
BBVN-FIVE-S2-SC-LTR-ENG-0070
MOM No.30 page 21 of 31, Product data sheet, 2A3size drawings
BBVN-FIVE-S2-SC-LTR-ENG-0071
Confirmation letter from Ban Mai System JSC, Certificates, 1A3size drawings
Correspondence submission to PCI 84
No. To CC: Issued Title Attachment Authored by
BB BV 14/09/19 Material & Installation Flow Chart Ujiie
BB BV 14/09/19 Update Existing DB-1C, DB-1S; DB-1E 1A3size drawing Ujiie
NS 14/09/20 Air Compressor Delivery Ujiie
BB BV 14/09/26 Site Management Ujiie
BB BV 14/10/06 AHU Sealant - Sikaflex 221 Ujiie
BB BV 14/10/09 FM 200 Re-Filling Tu
BB BV 14/10/09 Electrical Cable Color Tu
BB BV 14/10/13 Grundfos Pump Certificate of Origin Tu
LTR/VIE-002 BB 14/10/02 muon 02 khoa (1 khoa co, 1 khoa dien)_3/10 den 17/10 Toan14/10/13 Issue for Construction Drawing Tu
BB BV 14/10/13 Stage 1 Clean Room Thanh
BB BV 14/10/16 AMEP-173 Ballast & Lamp for Lighting Ujiie
BBVN-FIVE-S2-SC-LTR-ENG-0072
BBVN-FIVE-S2-SC-LTR-ENG-0073
BBVN-FIVE-S2-SC-LTR-ENG-0074
Internal Minutes for material/Equipment Inspection & Acceptance, AMEP-45, C/O&C/Q
BBVN-FIVE-S2-SC-LTR-ENG-0075
BBVN-FIVE-S2-SC-LTR-ENG-0076
Confirmation letter from manufacturer (AL-KO), Product Data sheet for One-component adhesive sealant; Certificate Hygiene conformity test
BBVN-FIVE-S2-SC-LTR-ENG-0077
Letter FM 200 Filling time; FIKE FIRE Suppression System Distribution IN VIETNAM
BBVN-FIVE-S2-SC-LTR-ENG-0078
BBVN-FIVE-S2-SC-LTR-ENG-0079
Confirmation letter from Grundfos; Certificate of Origin/Processing; Certificate of Quality & Quantity; IN-AMEP-66/R1 dated 20-Jun-2014
BBVN-FIVE-S2-SC-LTR-ENG-0080
NORTH STAR
BBVN-FIVE-S2-SC-LTR-ENG-0081
BBVN-FIVE-S2-SC-LTR-ENG-0082
Confirmation letter by THORN, IN_AMEP-173 dated 9-October-2014
Correspondence submission to PCI 85
No. To CC: Issued Title Attachment Authored by
BB BV 14/10/17 AMEP-173 Ballast & Lamp for Lighting Ujiie
BB BV 14/10/17 AMEP-173 Ballast & Lamp for Lighting
BB BV 14/10/20 Badge Printer & Card Sample Ujiie
BB BV 14/10/20 RFC-105 Response - AMS-140910/D361 Hoa
BB BV 14/10/20 AMEP-179 Water Pump Tank Ujiie
BB BV 14/10/22 Motorized Valve for AHU Ujiie
BB BV 14/10/28 Door Fan Test Ujiie
NS 14/10/27 Clean Room Ceiling Installation Ujiie/Tu
BB BV 14/10/30 Mr. Hoa
BB BV 14/10/30 FM 200 Refilling Tu
BB BV 14/10/31 Viet Kim Company - VRV Air Conditioning Tu
BB BV 14/11/04 MOM Item 8.5.71 RFC-26 Fire Smoke Supply Air Fans Tu
BB BV 14/11/04 MOM Item 8.5.71 RFC-26 Fire Smoke Supply Air Fans Tu
BBVN-FIVE-S2-SC-LTR-ENG-0082/R1
Confirmation letter by THORN, IN_AMEP-173 dated 9-October-2014, Comparison table Lighting Specification, Technical Specification, Product Data Sheet
BBVN-FIVE-S2-SC-LTR-ENG-0083
BBVN-FIVE-S2-SC-LTR-ENG-0084
BBVN-FIVE-S2-SC-LTR-ENG-0085
BBVN-FIVE-S2-SC-LTR-ENG-0086
Confirmation letter from A&M technical equipment; Certificate authorised distributorship, IN_AMEP 179 dated 20-October-2014,
BBVN-FIVE-S2-SC-LTR-ENG-0087
IN-AMEP-0036(A) dated 18-Oct-2014, AMEP-0036 dated 03-Jun-2014
BBVN-FIVE-S2-SC-LTR-ENG-0088
BBVN-FIVE-S2-SC-LTR-ENG-0089
BBVN-FIVE-S2-SC-LTR-ENG-0090
BV-137206/6011/SMZ-141027/D417 (RFC-123) Change of Location for Louver Opening
BBVN-FIVE-S2-SC-LTR-ENG-0091
Confirmation Letter from European Tech., JSC
BBVN-FIVE-S2-SC-LTR-ENG-0092
BBVN-FIVE-S2-SC-LTR-ENG-0093
RFC-26 Additional OA Supply Fan for Smoke Exhaust,2A3size drawings; List of Pending documents for Resubmission
BBVN-FIVE-S2-SC-LTR-ENG-0093A
Correspondence submission to PCI 86
No. To CC: Issued Title Attachment Authored by
BB BV 14/11/10 IN-AMEP-157 UjiieBBVN-FIVE-S2-SC-LTR-ENG-0094
BBVN-FIVE-S2-SC-AMEP_157: Ball Valve for Compressor Tie-in Work
BBVN-FIVE-S2-SC-LTR-ENG-0095
BBVN-FIVE-S2-SC-LTR-ENG-0096
BBVN-FIVE-S2-SC-LTR-ENG-0097
No. Issued Title
BV-140218-01 14/02/18 Standards form for reference ThuBV-140219-01 14/02/19 Thu
BBVN-FIVE-S2-SC-TS-0001-14 14/02/26 Lan
BBVN-FIVE-S2-SC-TS-0002-14 14/02/27 Pile Survey Report (by Shimizu)BBVN-FIVE-S2-SC-TS-0003-14 14/02/28
BBVN-FIVE-S2-SC-TS-0004-14 14/03/03 Return borrowed documentsBBVN-FIVE-S2-SC-TS-0005-14 14/03/03
BBVN-FIVE-S2-SC-TS-0006-14 14/04/03 2 RFI 0005 & 0006, APD-0008 (ITPs)BBVN-FIVE-S2-SC-TS-0007-14 14/03/04 Return borrowed documentsBBVN-FIVE-S2-SC-TS-0008-14 14/03/05
BBVN-FIVE-S2-SC-TS-0009-14 14/03/06 ASD Site office _0.002/R3BBVN-FIVE-S2-SC-TS-00010-14 14/03/07
BBVN-FIVE-S2-SC-TS-00011-14 14/03/10 APD-0001/R1_Project Management Plan (Rev.1)BBVN-FIVE-S2-SC-TS-00012-14 14/03/11 AMS_0007 (Pile rectification), AMS_0008 (AMS list)BBVN-FIVE-S2-SC-TS-00013-14 14/03/12
BBVN-FIVE-S2-SC-TS-00014-14 14/03/14
BBVN-FIVE-S2-SC-TS-00015-14 14/03/28
BBVN-FIVE-S2-SC-TS-00016 14/03/26 Official Electric Meter Number showing dated 19 Feb 2014BBVN-FIVE-S2-SC-TS-00017 14/04/01 Cerfiticate basic scaffolding course (Tubular)_Vu Viet Anh
Quatity (Copies)
BV/SMZ FOR CON Chop
Benchmark Handover (Minutes of handover btw TONE, ACC & BBVN)
CVs & Project Organizational Chart; Quality Management Plan ; Project Execution Plan
1. BBVN-FIVE-S2-SC-AMS-0002-14 Method statement for temporary office, 2. BBVN-FIVE-S2-SC-LET-ENG-0001-14 Pile survey report, 3. BBVN-FIVE-S2-SC-4. BBVN-FIVE-S2-SC-ASD-0003-14 Approval for temporary site office shop drawingASD-0003-14 Approval for signboard shop drawing, RFI_0002, RFI_0003, Project Safety Plan, AME_001, AME_0002
4 Method statements AMS-003-006 (water supply, sewage water, temporary electricity, relocation of fire fighting) ,AMS-0001 (Pesticide), ADP-0006 (QCP-1), APD-0007 (QCP-2), RFI-0004 (Grid line survey)
AMASA_0002 (geotextile), AMS-0001/R1 Pre-condition survey method, RFI_0007 (hard copy of drawing with stamp)
AMASA_0003 (Concrete grade & Slump), APD_0009 Prj Environmental Plan; RFI_0008_Brace steel structure
AMASA_0003/R1 (concrete grade&slump), RFI_0009 (Design Queries_M&E/Toilet), ASD_0002/R1 (Signboard Rev.1),
Geotextile additional document (Company profile) + 8 contracts for reference of experience from TEINCO
Giay Chung nhan kiem dinh Dong ho nuoc Zenner- Comma/ Verification Certificate for Water Meter
BBVN-FIVE-S2-SC-TS-00018 14/04/02
BBVN-FIVE-S2-SC-TS-00019 14/04/04
BBVN-FIVE-S2-SC-TS-00020 14/04/05
BBVN-FIVE-S2-SC-TS-00021 14/04/14 RFC-0003 (M&E) Addition FD at ground and first floorBBVN-FIVE-S2-SC-TS/M&E-00022 14/04/15 Document, Drawing regarding ceiling, wall (Soft file)BBVN-FIVE-S2-SC-TS/M&E-00023 14/04/18
BBVN-FIVE-S2-SC-TS/M&E-00024 14/04/18 CD_AMEP (full)BBVN-FIVE-S2-SC-TS-00025 14/04/22 RFI Progress statusBBVN-FIVE-S2-SC-TS-00026 14/04/23 IN_AMEP (0013, 0013/R1, 0014, 0014/R1, 0016, 0019)BBVN-FIVE-S2-SC-TS-00027 14/04/24 IR FORMS for Earth Work & RC Works (9 Forms in total)BBVN-FIVE-S2-SC-TS-00028 14/04/26
BBVN-FIVE-S2-SC-TS-00029 14/04/28
BBVN-FIVE-S2-SC-TS-00030 14/04/29
BBVN-FIVE-S2-SC-TS-00031 14/04/29
BBVN-FIVE-S2-SC-TS-00032 14/05/05 MOM_12BBVN-FIVE-S2-SC-TS-00033 14/05/05
BBVN-FIVE-S2-SC-TS-00034 14/05/05
BBVN-FIVE-S2-SC-TS-00035 14/05/05 M&E Sample Board No. 3 _ HVAC SystemBBVN-FIVE-S2-SC-TS-00036 14/05/05 M&E Sample Board No. 4 _ Lightning SystemBBVN-FIVE-S2-SC-TS-00037 14/05/05
BBVN-FIVE-S2-SC-TS-00038 14/05/05 M&E Sample _ Sleeve
Certificate for Pesticide Registration, Material Safety Data Sheet (for AMASA_0002_R1)
Giay chung nhan dang ky thue (Certificate of tax registration) (Notarized copy)
19 A3 size drawings REFERENCE for Space Management (Steel structure, M&E combine)
IN (ASD: 0008_00, AMEP: 0001/R1, 0002/R2, 0003/R1, 0004-00, 0005-00, 0006-00, 0007-00, 0008-00; AMS: 0003//R3, 0004/R1, 0005/R1, 0006/R1, 0007/R1, 0008/R1, 0009/R1, 0013-00); OUT (AMS: 0014, 0015, 0016)_ CD (Soft Files)
ASD_0005/R3 copy Pile cap Rev.3 (Revised based on comments in ASD-0005/R2 dated 03-Apr-2014) dated 12-Apr-2014
IN _ ASD_0006/R1 dated 15-Apr-2014 titled: Steel Structure_Rev.1 revised based on ASD_0006 dated 31-Mar-2014
Report of Taking Photograph and Surveying Actual Quality of B.Braun FIVE AP Construction Site Stage No.2
Report of Taking Photograph and Surveying Actual Quality of B.Braun FIVE AP Construction Site Stage No.2 (4 copies)
M&E Sample Board No.1 _ PPR for Cold Water System, GI Pipe for FF and Air Compressor, BS pipe for Chiller system
M&E Sample Board No. 2 _ u. PVC pipe&fittings for Condensate drain plumbing & Sanitary system, HDPE flexible for electric system, HDPE pipe for drainage system (compacted area)
M&E Sample Board No. 5 _ Steel Pipe & Fittings and Support of M&E Systems
BBVN-FIVE-S2-SC-TS-00039 14/05/05 RFC-0009BBVN-FIVE-S2-SC-TS-00040 14/05/12
BBVN-FIVE-S2-SC-TS-00041 14/05/12 XYPEX sampleBBVN-FIVE-S2-SC-TS-00042 14/05/12 MOM_13 to North StarBBVN-FIVE-S2-SC-TS-00043 14/05/12 IN_ASD_0014/R1 Ground Floor Slab, Beam_Rev.1BBVN-FIVE-S2-SC-TS-00044 14/05/12 IN_ASD_0005/R5_ Trench Pit (For Con. Chopped) 2A3pagesBBVN-FIVE-S2-SC-TS-00045 14/05/14 M&EBBVN-FIVE-S2-SC-TS-00046 14/05/15 Sample Board_Duct Equipments for HVAC SystemBBVN-FIVE-S2-SC-TS-00047 14/05/20 Official Contract DocumentsBBVN-FIVE-S2-SC-TS-00048 14/05/19 MOM_13 & 14BBVN-FIVE-S2-SC-TS-00049 14/05/20 Sample Board_Air Grille for HVAC systemBBVN-FIVE-S2-SC-TS-00050 14/05/21 Sample Board_GI Conduit & SupportsBBVN-FIVE-S2-SC-TS-00051 14/05/21 Sample Board_MV & LV CableBBVN-FIVE-S2-SC-TS-00052 14/05/22
BBVN-FIVE-S2-SC-TS-00053 14/05/22 IN_BBVN-FIVE-S2-SC-ASD-0014/R1BBVN-FIVE-S2-SC-TS-00054 14/05/22 IN_ASD-22/R1 & IN - ASD-23/R1 dated 22-May-2014BBVN-FIVE-S2-SC-TS-00055 14/05/22 IN_ASD-22/R1 & IN - ASD-23/R1 dated 22-May-2015BBVN-FIVE-S2-SC-TS-00056 14/05/23 MOM_15BBVN-FIVE-S2-SC-TS-00057 14/05/24
BBVN-FIVE-S2-SC-TS-00058 14/05/26 IN_ SI_05 Schedule Recovery PlanBBVN-FIVE-S2-SC-TS-00059 Tuan Anh
BBVN-FIVE-S2-SC-TS-00060 14/05/27 IN - ASD-0033 Ground Floor Wall Type LayoutBBVN-FIVE-S2-SC-TS-00061 14/05/28
BBVN-FIVE-S2-SC-TS-00062 14/05/29
BBVN-FIVE-S2-SC-TS-00063 14/05/29
BBVN-FIVE-S2-SC-TS-00064 14/05/29 Interim Payment No.2 (Draft)BBVN-FIVE-S2-SC-TS-00065 14/05/29
APD-0006/R2, APD-0007/R1, APD-00008/R3 (Tuan Anh to Vinaconex2)
IN_ASD-0015/R2 dated 19-May-2014 & ASD-0026/R1 dated 19-May-2014, IN_ASD-0038 dated 19-May-2014
IN_ASD-0008/R2 (A) M&E Underground Drawings_Rev.2 Sleeve for pipe underground Revised based on comments in ASD-0008/R1 dated 13-May-2013
IN_ASD-0035 Crane Beam Layout Plan & Section; IN - ASD-0020 CBP for Mezzanine Floor
IN- ASD-0021/R3 (A) _ M&E Ground Floor Ceiling Combination for Clean Room Detail Section _ Rev. 3 (A)
IN_ ASD-0028 M&E Ground Floor Combination Look down(Clean room) & 1st Floor Ceiling Combination (office) & IN - ASD-0029 M&E Ground Floor Combination Look up(Clean room)
IN_ ASD-0025/R2 Ground Beam for Zone 2_Rev.2 dated 28-May-2014
BBVN-FIVE-S2-SC-TS-00066 14/05/30
BBVN-FIVE-S2-SC-TS-00067 14/05/30
BBVN-FIVE-S2-SC-TS-00068 14/05/31
BBVN-FIVE-S2-SC-TS-00069 14/06/02
BBVN-FIVE-S2-SC-TS-00070 14/06/02 IN - AMS-0030/R1 _ Fence Relocation _ Rev.1 dated 2-June -2014 For con Chop
BBVN-FIVE-S2-SC-TS-00071 14/06/03 For Con Chop
BBVN-FIVE-S2-SC-TS-00072 14/06/04 CCTV SytemBBVN-FIVE-S2-SC-TS-00073 14/06/04
BBVN-FIVE-S2-SC-TS-00074 14/06/05 IN_ASD-0036 dated 3-June-2014 Dock Level Plan & Section For con ChopBBVN-FIVE-S2-SC-TS-00075 14/06/05 CD
BBVN-FIVE-S2-SC-TS-00076 14/06/06
BBVN-FIVE-S2-SC-TS-00077 14/06/06
BBVN-FIVE-S2-SC-TS-00078 14/06/07 IN_MOM_017BBVN-FIVE-S2-SC-TS-00079 14/06/10 Main Contract BBVN-FIVE-S2-SC-TS-00080 14/06/10
BBVN-FIVE-S2-SC-TS-00081 14/06/10
IN_ASD-0013/R1 Roof & Gutter water proofing _Rev.1 dated 29-May-2014 (For Con chop)
IN_Transmittal Sheet (BV)_List of Items to be Dismantled at Vacuum Pump & AHU area
IN_ASD-0020 dated 28-May-2014 CBP for Mezzanine Floor & IN_ASD-0026/R1 dated 19-May-2014 Concrete Body Plan for First Floor_Rev.1
IN_ASD-0051 dated 29-May-2014 Gridline A Downspout (Sifon) & VRV Room & Gridline Z Downspout (Sifon)
BV/SMZ For Con Chop
IN_AMS-0041 dated 2-June-2014 MS-BLD.07 - Structure Steel Erection Works dated 2-June-2014
IN_AMS-0024/R1 dated 3-June-2014 MS-BLD.18 Method Statement for Road & Stormwater works_Rev.1
IN_AMEP (50,20/R1,57/R1, 73,51/R1,19/R1, 74,52/R1, 79, 44, 60/R1, 65/R1, 13/R1, 13/R2, 32/R1, 33/R1, 70, 34/R1, 23/R1_B, 49, 48, 47, 18, 42, 27, 40, 43, 71, 39, 38/R1) , AMS (14/R2, 40, 29, 20/R1, 29_A, 35, 39, 38, 34, 33), ASD (50, 58, 62, 21/R3_A, 28, 29)
Additional Document for AMASA-11 (Based on comments in AMASA-0011/R3 dated 31-May-2014)_Specification_Interlac 645
Foundation Pit & Concrete Body Plan (CBP).Rev2( Revised based on RFI-072)Drawing Ground Floor Beam Layout Plan (1 of 6)
Tender Submission documents for B. Braun Project from QS Hanoi to Tùng QS filing in construction site (Commercial Part_Original, Rev.1 & Rev.2)
Refer to AMASA-0025 dated 28-May-2014 regarding: Wire Mesh Sl52, SL82_Supplemental documents: (1) Song Hop Luc Weldmesh Co., Ltd - HLC Catalogue; (2) Song Hop Luc Weldmesh Co., Ltd - Certification & (3) Song Hop Luc Weldmesh Co., Ltd - List of Reference Projects
BBVN-FIVE-S2-SC-TS-00082 14/06/10
BBVN-FIVE-S2-SC-TS-00083 14/06/11 IN_ASD-0043/R1 & ASD-0044/R1BBVN-FIVE-S2-SC-TS-00084 14/06/11 List of FM Approved Materials (M&E and Building)BBVN-FIVE-S2-SC-TS-00085 14/06/11 Loose Furniture Quotation (PC sum) [2A3size pages]BBVN-FIVE-S2-SC-TS-00086 14/06/12 IN_ASD_0054/R1 dated 11-Jun-2014 Internal Staircase_Rev.1 For con red chop
BBVN-FIVE-S2-SC-TS-00087 14/06/12 For con red chop
BBVN-FIVE-S2-SC-TS-00088 14/06/12 Shop Drawing for Steel Door Installation (90A3size drawings)
BBVN-FIVE-S2-SC-TS-00089 14/06/12
BBVN-FIVE-S2-SC-TS-00090 14/06/13
BBVN-FIVE-S2-SC-TS-00091 14/06/13 FM Approval Materials (Building Material)_R1BBVN-FIVE-S2-SC-TS-00092 14/06/13 For con red chop
BBVN-FIVE-S2-SC-TS-00093 14/06/13 For con red chop
BBVN-FIVE-S2-SC-TS-00094 14/06/13 For con red chop
BBVN-FIVE-S2-SC-TS-00095 14/06/14 FM Approval Materials (M&E Materials)_Rev.1BBVN-FIVE-S2-SC-TS-00096 14/06/14 IN_MOM_18BBVN-FIVE-S2-SC-TS-00097 14/06/14 IN_ASD (76, 10/R1, 75, 28); IN_AMEP (93,94,95,90,91,92,48/R1)
BBVN-FIVE-S2-SC-TS-00098 14/06/16
BBVN-FIVE-S2-SC-TS-00099 14/06/16 Interim Payment No.2
IN_AMEP (10, 54, 62, 63, 64, 66, 67, 68, 69, 15/R2, 16/R1, 47/R1, 49/R1); IN_AMS (39, 48); IN_ASD (60, 63, 64)
IN_ASD-0062/R1 dated 11-Jun-2014 HVAC-Water Chiller Pipe Layout 1st Floor _ Stage 1_Rev.1
IN_AMEP (35, 46, 78, 81,82,83,86); IN_ASD (49, 62/R1, 69, 76)_CD
SANITEC System - Product Data Sheet (Refer to RFC-0034: Painting on Brick Wall at Air Shaft)
IN_APD-44/R1 dated 28-May-2014: Quality Control Plan for Masonry & Plastering Works (QCP-6)_Rev.1 ; IN_AMS-30/R1 dated 2-Jun-2014; IN_AMS-30/R1 (ADD.01) dated MS-46: Fence Relocation_Rev.1 (Additional Document) dated 13-Jun-2014; IN_AMS-0025 dated 11-Jun-2014: MS-BLD.03 - Scaffolding Installation & Dismantling Works
IN_ASD_0047/R1 dated 12-Jun-2014: Office Toilet Drawings_Rev.1; IN_ASD-0030/R2 dated 12-Jun-2014: Ground Floor and First Floor Ceiling_Rev.2; IN_ASD-0053/R1 dated 12-Jun-2014: External Staircases_Rev.1; IN_ASD-0031/R1 dated 12-Jun-2014: Male&Female ground floor toilet&changing room_rev.1
IN_ASD-0032/R2 dated 11-Jun-2014: General Floor Finish Layout_Rev3; IN_ASD-0056/R1 dated 11-Jun-2014: General First Floor Finish Floor Layou_Rev.1
IN_ASD-0070/R1 dated 14-Jun-2014 1st Floor Beam Rebar Arrangement_Part 2_Rev.1
BBVN-FIVE-S2-SC-TS-00100 14/06/17 For con red chop
BBVN-FIVE-S2-SC-TS-00101 14/06/17 Monthly Statement No.2_Interim Payment BBVN-FIVE-S2-SC-TS-00102 14/06/18 For con red chop
BBVN-FIVE-S2-SC-TS-00103 14/06/18 For con red chop
BBVN-FIVE-S2-SC-TS-00104 14/06/19
BBVN-FIVE-S2-SC-TS-00105 14/06/19 For con red chop
BBVN-FIVE-S2-SC-TS-00106 14/06/20 IN_ASD-57/R2 dated 20-June-2014 First Floor Wall Type_Rev.2 For con red chop
BBVN-FIVE-S2-SC-TS-00107 14/06/21 MOM_19BBVN-FIVE-S2-SC-TS-00108 14/06/23 For con red chop
BBVN-FIVE-S2-SC-TS-00109 14/06/24 For con red chop
BBVN-FIVE-S2-SC-TS-00110 14/06/25 For con red chop
BBVN-FIVE-S2-SC-TS-00111 14/06/25 For con red chop
BBVN-FIVE-S2-SC-TS-00112 14/06/26
BBVN-FIVE-S2-SC-TS-00113 14/06/30 For con red chop
BBVN-FIVE-S2-SC-TS-00114 14/06/30 IN_MOM_20BBVN-FIVE-S2-SC-TS-00115 14/07/01 Monthly Statement Interim No.3 -Interim Payment BBVN-FIVE-S2-SC-TS-00116 14/07/02
BBVN-FIVE-S2-SC-TS-00117 14/07/02
BBVN-FIVE-S2-SC-TS-00118 14/07/02 RFC-0026 Fire Smoke Supply Air FansBBVN-FIVE-S2-SC-TS-00119 14/07/03 Vinaconex 2 Group Accident Insurance Contract _ Copy
IN_ASD-0035 Crane Beam Layout Plan & Section dated 28-May-2014
IN_ASD-0077/R1 dated 17-June-2014 1st floor slab rebar arrangement Rev.1
IN_ASD-0068/R1 dated 16-Jun-2014 1st floor beam rebar arrangement
Additional Document for TS_91 dated 13/June/2014 regarding FM Approval Materials for Building (refer to Item No. 13 - Fire Resistant Door _ 120 minutes)_ English translation
IN_ASD-0059/R2 dated 19-June-2014 regarding Ground Beam for Zone 3 _ Rev.2
IN_ASD-20 (Replaced 1 drawing, A3size) MEZZ Floor Beam Layour Plan (4 of 6)
IN_ASD-15/R2 dated 19-May-2014 Ground Floor Column layout_rev.2
IN_ASD-15/R2 dated 19-May-2014 Ground Floor Column layout_Rev.2 (2A3size drawings)
IN_ASD-83 dated 25-Jun-2014 Rebar Arrangement for Stormwater System (A, B, D), IN_ASD-85 dated 25-Jun-2014 Rebar Arrangement for Stormwater System ( C )
2 Minutes of Hand-over Material of Owner (Pole Lighting, Lighting Fixture, Pole Camera, Dome Camera)_6 items
IN_ASD-26/R1 dated 19-May-2014 revised 2 A3size drawings following comments
Refer to AMASA-46 dated 12-June-2014; Clean Room Window - Tempered Glass Cerfiticate _ Purchase Order (Stage 1) from Channel Systems
Refer to MOM 20 (item 11.18.2)_ Factory Acceptance for Compress Air
BBVN-FIVE-S2-SC-TS-00120 14/07/03
BBVN-FIVE-S2-SC-TS-00121 14/07/03 For con chop
BBVN-FIVE-S2-SC-TS-00122 14/07/04
BBVN-FIVE-S2-SC-TS-00123 14/07/05
BBVN-FIVE-S2-SC-TS-00124 14/07/05
BBVN-FIVE-S2-SC-TS-00125 14/07/05
BBVN-FIVE-S2-SC-TS-00126 14/07/07 IN_MOM_21BBVN-FIVE-S2-SC-TS-00127 14/07/07 Quotation and Furniture LayoutBBVN-FIVE-S2-SC-TS-00128 14/07/08
BBVN-FIVE-S2-SC-TS-00129 14/07/08
BBVN-FIVE-S2-SC-TS-00130 14/07/08 2CVs (Randy & Quyen)BBVN-FIVE-S2-SC-TS-00131 14/07/09 JSA (Refer to AMS-34/R1 dated 4-July-2014)
BV-137206/6011/SMZ-140702/D226 dated 02-7-2014Chilled water system bypass
IN_ASD-81/R1 dated 03-July -2014 Mezzanine Floor Beam Rebar Arrangement _Rev.1 & IN_ASD-82 (A) dated 3-July -2014 Entrance Mat & Louver
Welding Procedure Specification (WPS) and Welding Certificate 6G Refer to AMS-54 dated 2-July -2014IN- ASD-0026R1FIRST FLOOR BEAM LAYOUT PLAN (1 OF 6) -(R.3) SD-Beam -1FL-141-HBPE-S-CD-MB-261-1/6FIRST FLOOR BEAM LAYOUT PLAN (1 OF 6) -(R.3) SD-Beam -1FL-141-HBPE-S-CD-MB-261-1/6IN-ASD-00771FL SLAB TOP X REINFORCEMENT (R.2) SD-BBS-1FL-141-HBPE-S-CD-MB-217 - TOP X1FL SLAB TOP Y REINFORCEMENT (R.2) SD-BBS-1FL-141-HBPE-S-CD-MB-217 - TOP Y1FL SLAB TOP X REINFORCEMENT(R.2) SD-BBS-1FL-141-HBPE-S-CD-MB-218 - BOT X1FL SLAB TOP Y REINFORCEMENT(R.2) SD-BBS-1FL-141-HBPE-S-CD-MB-218 - BOT Y1FL SLAB SECTION AND DETAIL (R.2) SD-BBS-1FL-141-HBPE-S-CD-MB-217-Detail
Brick wall Typical detailBrick wall ground floor planBrick wall layout 1st floor & mezzanine
Refer to Letter BBVN-FIVE-S2-SC-LTR-0016 FM Approval Materials_Rev.2 based on Letter BB-137206/6011/SMZ-140703/D228 List of EM Approved Materials_Rev.2; Catalogue: Automatic air vent c/w gate valve for Pre-action, Heat Detector, Smoke sampling detection system fire alarm; Flow switch, Pressure switch
IN_AMS-28 MS.BLD-09_dated 15-May-2014: XYPEX Waterproofing for Under Slab
IN-APD-37 dated 7-july-2014 Quality Control Plan for Road & Stormwater Works (QCP-9)
BBVN-FIVE-S2-SC-TS-00132 14/07/14
BBVN-FIVE-S2-SC-TS-00133 14/07/12 IN_MOM No.22BBVN-FIVE-S2-SC-TS-00134 14/07/12 IN_AMS-55 dated 8-July-2014 MS-BLD 06-B: RC Septic TankBBVN-FIVE-S2-SC-TS-00135 14/07/12
BBVN-FIVE-S2-SC-TS-00136 14/07/14
BBVN-FIVE-S2-SC-TS-00137 14/07/14
BBVN-FIVE-S2-SC-TS-00138 14/07/14 AS 4100-1998 & Amendment No.1 to AS 4100-1998: Steel Structure
BBVN-FIVE-S2-SC-TS-00139 14/07/15
BBVN-FIVE-S2-SC-TS-00140 14/07/16 Ground Floor Column Layout (2A4size drawings)BBVN-FIVE-S2-SC-TS-00141 14/07/16
BBVN-FIVE-S2-SC-TS-00142 14/07/16
BBVN-FIVE-S2-SC-TS-00143 14/07/16
BBVN-FIVE-S2-SC-TS-00144 14/07/17 Monthly Statement No.3_Interim Payment BBVN-FIVE-S2-SC-TS-00145 14/07/17 For con red chop
BBVN-FIVE-S2-SC-TS-00146 14/07/18
BBVN-FIVE-S2-SC-TS-00147 14/07/18
BBVN-FIVE-S2-SC-TS-00148 14/07/21 IN_MOM 23BBVN-FIVE-S2-SC-TS-00149 14/07/21
Red bill (VAT) for completed amount No.2 for BB Project dated 22-May-2014
IN_NCR-05, 06 dated 11-July-2014: GI Piping Procedure & Welding Procedure
IN_D258 dated 14-July-2014: (RFC-069) Relocation of By-pass valve from Walkable ceiling to inside Toolshop room and additional ball valve (Process Chilled water system)
IN-APD-0008/R3 dated 22-Apr-2014 Inspection and Testing Plan (ITP)_Rev.3
Embeded Plate (PL8, PL12 Q345B) Test Result & Steel Bar (D12, D16) Test Result
Letter to Ministry of Industry & Trade (Goods and products to be imported), Ist of goods and products to be imported, Investment lisence of B. B dated 31-Aug-2011
BBVN-FIVE-S2-RFC-0073Modification of Data and Voice System Schematic Diagram
IN-APD-25/R1 dated 9-May-2014 Clean Construction Protocol for Clean Room& IN-APD-53 dated 19-June-2014 Access Control Layout for Clean Room Revised based on comments in APD-0025/R1 dated 9-May-2014
IN_ASD-96/R2 dated 17-July-2014 Rebar arrangement for Septic tank rev.2 and IN_ASD-117/R1 dated 17-July-2014 Rebar arrangement for Pump Pit No.1
IN_D253 dated 11-July-2014 (RFC-67) IT System Wifi Relocation & IN_D254 dated 11-July-2014 (RFC-68) Process Exhaust System for Toolshop Room
IN_SMZ-140716/D265 dated 16-July-2014 (RFI-159) Pre-action System
IN_AMS-27 dated 20-June-2014 MS-BLD-10 Roofing & Waterproofing for roof
BBVN-FIVE-S2-SC-TS-00150 14/07/21
BBVN-FIVE-S2-SC-TS-00151 14/07/21 IN_ASD-109 dated 21-July-2014 Main Building Phase 2.1 Elevation Red For Conchop
BBVN-FIVE-S2-SC-TS-00152 14/07/22
BBVN-FIVE-S2-SC-TS-00153 14/07/23 IN_ASD-107/R1 dated 22-July-2014 Crane _ Rev.1 For con red chop
BBVN-FIVE-S2-SC-TS-00154 14/07/23 HSE_Incident_Report (EHS F14 4.13)BBVN-FIVE-S2-SC-TS-00155 14/07/24 Architecture Drawings Pending ListBBVN-FIVE-S2-SC-TS-00156 14/07/24 Incident Investigation Report No.1BBVN-FIVE-S2-SC-TS-00157 14/07/25
BBVN-FIVE-S2-SC-TS-00158 14/07/28 IN_MOM_24BBVN-FIVE-S2-SC-TS-00159 14/07/30 CD_EVN Document (Soft files)BBVN-FIVE-S2-SC-TS-00160 14/07/31 For con red chop
BBVN-FIVE-S2-SC-TS-00161 14/07/31
BBVN-FIVE-S2-SC-TS-00162 14/07/31 For con red chop
BBVN-FIVE-S2-SC-TS-00163 14/07/31 Incident Investigation Report No.1BBVN-FIVE-S2-SC-TS-00164 14/08/01 IN_MOM 25BBVN-FIVE-S2-SC-TS-00165 14/08/01 Pending/Remaining Material for Approval BBVN-FIVE-S2-SC-TS-00166 14/08/02 Purlin Test Result (Zinc coating, Tension strength)BBVN-FIVE-S2-SC-TS-00167 14/08/02
BBVN-FIVE-S2-SC-TS-00168 14/08/04 Cash Flow (end of July) (1A3page)BBVN-FIVE-S2-SC-TS-00169 14/08/04
BBVN-FIVE-S2-SC-TS-00170 14/08/04
IN_SI-34 dated 21-July-2014 Submission of Holiday Tester for FF System (Underground Pipe)
IN_BV-137206/6011/SMZ-140722/D276 dated 22-July-2014 Minutes Project walkthrough Stage 1 on 18th & 21st July 2014
Test Result of Purlin Strength, Decking Strength, Anchor Bolts (M20, M24) Strength
IN_ASD-102/R3_ 1& 2 dated 30-July-2014 Bar Bending for Ground Slab Zone 2, Zone 3_Rev.3_Part 1 &@ (Zone 2 & Zone 3) Revised based on comments in ASD-102/R2 dated 14-July-2014
IN_AMS-59/R2 dated 25-Jul-2014 MS-BLD.11 Masonry & Plastering Works_Rev.2
IN_ASD-110/R1 dated 31-Jul-2014 Ground Floor & 1st Floor Brick Wall Plans and Typical Details (Refer to ASD-90)_Rev.1
BV-137206/609/140802/SC/SI-43 dated 2-Aug-2014 "Submission of Holiday Tester for FF System (Underground Pipe)"
Surface water test result (1A4page) & Location of sample (1A3 photo drawing)
IN_SI-42 dated 2-Aug-2014 Protection and Proper Covering of Sewer and rian manhole and stormline and sealing of HDPE pipe sleeve
BBVN-FIVE-S2-SC-TS-00171 14/08/05
BBVN-FIVE-S2-SC-TS-00172 14/08/05 Monthly Statement No.4_Interim PaymentBBVN-FIVE-S2-SC-TS-00173 14/08/07 For con red chop
BBVN-FIVE-S2-SC-TS-00174 14/08/08 Official (red chop) Payment Certificates No.2 (4A4 pages)BBVN-FIVE-S2-SC-TS-00175 14/08/11 PV Control Panel for Pre-Action ValveBBVN-FIVE-S2-SC-TS-00176 14/08/12
BBVN-FIVE-S2-SC-TS-00177 14/08/12
BBVN-FIVE-S2-SC-TS-00178 14/08/12 Tie-inBBVN-FIVE-S2-SC-TS-00179 14/08/12 OUT-AMS-67/R1 (ADD.01) dated 09-Aug-2014BBVN-FIVE-S2-SC-TS-00180 14/08/12 Tie-in PermitBBVN-FIVE-S2-SC-TS-00181 14/08/13 BBVN - FIVE-S2-SC/IR/M&E-0246 (3 copies)BBVN-FIVE-S2-SC-TS-00182 14/08/14 Tie-in PermitBBVN-FIVE-S2-SC-TS-00183 14/08/14 Tie-in Permit 1BBVN-FIVE-S2-SC-TS-00184 14/08/14
BBVN-FIVE-S2-SC-TS-00185 14/08/14
BBVN-FIVE-S2-SC-TS-00186 14/08/15
BBVN-FIVE-S2-SC-TS-00187 14/08/15 IN-ASD-110/R1 (39A3size drawings)BBVN-FIVE-S2-SC-TS-00188 14/08/15BBVN-FIVE-S2-SC-TS-00189 14/08/15 OUT - AMS-64 Dated 18 July 2014 MS-50: Honeycomb treatment
BBVN-FIVE-S2-SC-TS-00190 14/08/16 2 copies/each
BBVN-FIVE-S2-SC-TS-00191 14/08/18 Acceptance Order & Acceptance Board Establishment Decision
BBVN-FIVE-S2-SC-TS-00192 14/08/18
BBVN-FIVE-S2-SC-TS-00193 14/08/18 IN_MOM-26&27BBVN-FIVE-S2-SC-TS-00194 14/08/18 FM Approval Materials (Additional item for FM Approval)BBVN-FIVE-S2-SC-TS-00195 14/08/18 QC Site Check (16 & 18 August 2014)_9pages
IN_SI-46 dated 5-Aug-2014 Pharma Proposed Floor Drain Provision at Warehouse (2A4size photos)
IN_ASD-14 (Replaced 4 drawing, A3size) Ground floor beam layout layout (3&6), 3D model, layout section
IN_SMZ-140811/D308 dated 11-Aug-2014 (RFC-88) Duct Reinforcement Angle Bar_Approval
OUT_RFC-76 dated 19-July-2014 Change in Roof connection detail GL-12_Additional Drawing (1A3size drawing)
Confirmation Letter from INOCHI Technology SDN BHD (2 HEPA BOX samples on 1st August 2014 finished imder Powder Coated Painting) dated 13 Aug 2014
IN_ASD-109 dated 21-July-2014 Main Building Phase 2.1 Elevation & IN_ASD-110/R1 Brick wall
OUT_ASD-052 (ADD.01) GL Z Downspout Combine w/MEZZ CBP dated 14-August-2014 (1A3size drawing)
Dang ky vao thi cong (MS-23: Equipment for stage 1; MS-24A-1: Main Feeder, Cable rack for stage 1; MS-24-A-1: Air Compressor system)
IN_ASD-20 MEZZ Floor Beam Layout Plan & IN_ASD-26/R1 First Floor Beam
BBVN-FIVE-S2-SC-TS-00196 14/08/18 QC Site Check (18 August 2014)_32pagesBBVN-FIVE-S2-SC-TS-00197 14/08/18
BBVN-FIVE-S2-SC-TS-00198 14/08/18 Tie-in Work No.17 & Tie-in Work No. 18BBVN-FIVE-S2-SC-TS-00199 14/08/19
BBVN-FIVE-S2-SC-TS-00200 14/08/19 For con red chop
BBVN-FIVE-S2-SC-TS-00201 14/08/19 For con red chop
BBVN-FIVE-S2-SC-TS-00202 14/08/19 2 sets
BBVN-FIVE-S2-SC-TS-00203 14/08/19 Cable Gland Material Sample (Tabulation for Cable Gland Sample) 1 copy
BBVN-FIVE-S2-SC-TS-00204 14/08/19 1 copy
BBVN-FIVE-S2-SC-TS-00205 14/08/20 1 copy
BBVN-FIVE-S2-SC-TS-00206 14/08/20 1 copy
BBVN-FIVE-S2-SC-TS-00207 14/08/21 IN_ASD-119 dated BBVN-FIVE-S2-SC-TS-00208 14/08/21 1 For con red chop
BBVN-FIVE-S2-SC-TS-00209 14/08/21 1 copy + CD
BBVN-FIVE-S2-SC-TS-00210 14/08/21 IR-275, 276, 277 2
BBVN-FIVE-S2-SC-TS-00211 14/08/22 INOCHI Technology SDN BHD Confirmation letter 1 copyBBVN-FIVE-S2-SC-TS-00212 14/08/22 Mock-up inspection report 1 copyBBVN-FIVE-S2-SC-TS-00213 14/08/22 QC Site Check on 22nd August 2014 (21 pages photos) 1 copyBBVN-FIVE-S2-SC-TS-00214 14/08/23 1 copy
HAND-OVER Sample (Magnetic Holder)_Model: YD602_Full set in 1 box (including door contact)
Tie-in Work No.22 & Extending the Temporary storage for the assembly AHU
IN_ASD-127 dated 16-AUG-2014 Pantry Details; IN_ASD-16A dated 16-AUG-2014 Drainage System; IN_ASD-119/R3 dated 14-AUG-2014 Ramp Enlarge CBP&Finishing Details_Rev.3; .IN_ASD-124/R1 dated 18-AUG-2014 Aluminum Composite Cladding SD_Rev.1
IN_ASD-132/R1 dated 19-AUG-2014 Chiller Plinth; IN_ASD-128/R1 dated 19-AUG-2014 AHU CBP Extension_Stage 1_Rev.1
Application for Work Permit (MS-36-2) LV Busway 3200A Installation
AMEP-37A _ Shop drawing of PV Control panel for Pre-action valve, Pre-action system operation & instruciton manual
BBVN-FIVE-S2-SC-AMEP-0039 Designers' Comment (Attachment: Tabulation of UPS for Building Managerment System; IN_AMEP-39 dated 29-May-2014)
Honeycomb Treatment (IN_BBVN - FIVE-S2-SC-AMS-64 dated 18-Aug-2014)
IN_ASD-140 dated 21-Aug-2014 Framing Elevation; IN_ASD-006/R2(ADD.02) dated 21-Aug-2014 Steel Structure rev.2
IN_SMZ-140820/D321 dated 20-Aug-2014 (RFI-173) Fire pump room and clinic drawing
Copies (signed+ Stamped)
AMEP-147 Hermeseal Material Submission (Clear Soft Copy) for FM Approval
BBVN-FIVE-S2-SC-TS-00215 14/08/25 1 copy (Vnese)
BBVN-FIVE-S2-SC-TS-00216 14/08/25 6
BBVN-FIVE-S2-SC-TS-00217 14/08/25 1 Copy
BBVN-FIVE-S2-SC-TS-00218 14/08/25 1 Copy
BBVN-FIVE-S2-SC-TS-00219 14/08/25 QC Site Patrol dated 25-August-2014 by Mr. Duong (07 pages) 1 Copy
BBVN-FIVE-S2-SC-TS-00220 14/08/26 IR-268, 279, 291 & 292 2
BBVN-FIVE-S2-SC-TS-00221 14/08/26 1
BBVN-FIVE-S2-SC-TS-00222 14/08/26 1 For con red chop
BBVN-FIVE-S2-SC-TS-00223 14/08/27 IR-250 & 287 with signature 2 with signatureBBVN-FIVE-S2-SC-TS-00224 14/08/27 1 For con red chop
BBVN-FIVE-S2-SC-TS-00225 14/08/27 06; 06; 02; 02 Original (red chop)
BBVN-FIVE-S2-SC-TS-00226 14/08/28 1
BBVN-FIVE-S2-SC-TS-00227 14/08/28 1 COPPY
Contract on Compensation Insurance for Labor (HUNG TRANG); (ii) Certificate for Construction Machines and Equipment Insurance & Certificate for Personal Accident Insurance (HUNG TRANG); (iii) Construction Machines and Equipment Insurance (SEICO); (iv) Certificate for Personal Accident 24/24 Insurance (VIEN DONG); (v) Contract on Compensation Insurance for Labor (North Star)
Bien ban nghiem thu giai doan hoan thanh (Minutes of Inspection & Acceptance of Stage Completion: Preliminary inspection for substation & MV)
Official Original (Red chop)
Package of Main Contractor (Monthly Statement No.4)_Interim payment
Loose Furniture Quotation (PC sum) [2A3size pages] (Refer to AMASA_0028); Labor Insurance for Dang Minh (SEICO)
Copy (with signature)
FM Approval Materials (Additional item for FM Approval)_FM plan review No. 191722
IN_ASD-129/R1 dated 26-August-2014 AHU Plenum Extension_Stage 1_Rev.1 (1A3size drawing)
IN_ASD-127 dated 16-AUG-2014 Pantry Details revised (1A3size drawing)
IN_Minutes of Inspection & Acceptance of Tie-in Works: Sub-station & MV Inspection record (cable 35kV)Transformer 2000kVA 35(22)/0.4 kVPanel, cable LV, out going (dated 25/08/2014); Minutes of Inspection & Acceptance of Completion and Put into Use (dated 27/08/2014): Correspondence No.01/140826 pertaining Signing of Electrical Contract (dated 25/08/2014); EVN Contract (14/190002)
IN_ASD-144/R1 dated 28-August-2014 Brick Wall Details - Rebar Details_Rev.1 (1A3size drawing)
copy (for con red chop)
IN-ASD-128 AHU Concrete Body Plan Extension _ Stage 1_Rev.1 Revised based on comments in ASD-128 dated 7-Aug-2014
BBVN-FIVE-S2-SC-TS-00228 14/08/29 Comments on Site Instructions (28-August-2014)_2A1size photos 1 Color copy
BBVN-FIVE-S2-SC-TS-00229 14/08/30 Result of Checking Slab Level (2A3size pages) 1 CopyBBVN-FIVE-S2-SC-TS-00230 14/09/01 Bảo lãnh thực hiện hợp đồng số 709BG01400357 1 Original (red chop)
BBVN-FIVE-S2-SC-TS-00231 14/09/02 1 Copy
BBVN-FIVE-S2-SC-TS-00232 14/09/03 Monthly Statement No.4_Interim Payment (OFFICIAL) 4
BBVN-FIVE-S2-SC-TS-00233 14/09/03
BBVN-FIVE-S2-SC-TS-00234 14/09/03
BBVN-FIVE-S2-SC-TS-00235 14/09/04 1 copy
BBVN-FIVE-S2-SC-TS-00236 14/09/04 1
BBVN-FIVE-S2-SC-TS-00237 14/09/05
BBVN-FIVE-S2-SC-TS-00238 14/09/05 1 copy
BBVN-FIVE-S2-SC-TS-00239 14/09/05 1 copy
BBVN-FIVE-S2-SC-TS-00240 14/09/05 1 copy
BBVN-FIVE-S2-SC-TS-00241 14/09/08 1 ORG (set)
IN_SMZ-140829/D343 dated 29-AUG (RFC-72) IT Adjustments - Additional Data Points; IN_SMZ-140829/D344 dated 29-AUG (RFC-75) New DB Panel for Smoke Extraction Fan; IN_SMZ-140829/D346 dated 29-AUG (RFC-99) C-Channel Support for Duct 2401 and above_Approval; IN_SMZ-14829 dated 29-AUG (RFC-100) DB-1D Panel Modification_Approval; IN_SMZ-140829/D348 dated 29-AUG (RFC-103) DB-1E Panel Modification_Approval
Original Copy (red chop)
IN_AMS-100 dated 2-SEP-2014 MS-BLD.12-A: Aluminum Door & Window
Minutes of Acceptance and Hand-Over after 72 hours electricity connection (6 Original copies); 2 Electricity Contract (14/190002)
IN_AMS90 dated 4-September-2014 MS-BLD.20: Clean Room - Finishing Works Ceiling & Partition Wall
IN_ASD-110/R1 (ADD) dated 4-September-2014 Brick wall elevation axis U (3A3size drawings)
copy (for con red chop)
Contract Implementation Bank Guarantee (Deutsche Bank for Electricity Sale/Consumption), 2 copies of Electricity Sale/Consumption Contract & 2 original official copies; Minutes of Meeting Checking the electricity sale rate determination
IN_SMZ-140905/D352 dated 5-September-2014 (TS-221) Clarification Required
IN_SI-59 dated 5-September-2014 M&E Items at Stage 1 area / Preparation for Saturday 6th power off
IN_SMZ-140905/D353 dated 5-September-2014 (RFI-190) Weight Capacity Suspended on Purlin
6 Original Minutes of handover after 72hour Power on dated 3-Sep-/2014; 2 original EVN Contract (14/190002) dated 5-Sep-2014; 2 original of Electrical Selling Rate (dated 5-Sep-2014)
BBVN-FIVE-S2-SC-TS-00242 14/09/09 1 copy
BBVN-FIVE-S2-SC-TS-00243 14/09/09 As-Built Roof Decking Level (1A4page) 1 copyBBVN-FIVE-S2-SC-TS-00244 14/09/09 1 copy
BBVN-FIVE-S2-SC-TS-00245 14/09/09 1 copy
BBVN-FIVE-S2-SC-TS-00246 14/09/09 Incident Investigation Report No.2a, 2b & 2c 1 copyBBVN-FIVE-S2-SC-TS-00247 14/09/10 Monthly Statement No.5 (Interim Payment) 1 copyBBVN-FIVE-S2-SC-TS-00248 14/09/10 1 copy
BBVN-FIVE-S2-SC-TS-00249 14/09/11 1 Original
BBVN-FIVE-S2-SC-TS-00250 14/09/11 Monthly Statement No.4 (Interim Payment) 4 OriginalBBVN-FIVE-S2-SC-TS-00251 14/09/11 Cable Arrangement (1A3size drawing) 1 copyBBVN-FIVE-S2-SC-TS-00252 14/09/13 1 copy
BBVN-FIVE-S2-SC-TS-00253 14/09/13 1
BBVN-FIVE-S2-SC-TS-00254 14/09/13 1 copy
BBVN-FIVE-S2-SC-TS-00255 14/09/15 1 copy
BBVN-FIVE-S2-SC-TS-00256 14/09/16 1 copy
BBVN-FIVE-S2-SC-TS-00257 14/09/16 Quality Control Document (Buffer/Chiller Tank) 1 copyBBVN-FIVE-S2-SC-TS-00258 14/09/16 Monthly Statement No.4 (Interim Payment) 4 ORG (set)
BBVN-FIVE-S2-SC-TS-00259 14/09/16 1 copy
BBVN-FIVE-S2-SC-TS-00260 14/09/16 1 copy
IN_ASD_0030 dated 19-August-2014 Ground floor and 1st floor ceiling_Rev.3
IN_AMS-95 dated 29-August -2014 MS-BLD.52: Warehouse Wall Demolition for Roller Shutter ; IN_APD-58/R1 dated 9-September-2014 Quality Control Plan for Waterproofing Work (QCP-5)_Rev.1
IN_AMS-104 dated 9-September-2014 MS-BLD.06-C: Reinforcement Concrete Ramp Extension;
25A3size As-Built Drawings (prepared by Hoang Ky CTCP TV Xay lap dien luc), checked by North Star
Red bill (VAT) for completed amount No.3 for BB Project dated 19-August-2014
IN_ASD-160 dated 13-September-2014 Clean room ceiling shop drawings
MOM Item No. 11.32.4Flushing method for Ro, PCW Open loop & Close Loop Tie-in Work
Brick wall elevation axis U (opening locations_design)_1A3size drawing
Integrity Report BBVN-FIVE-S2-SC-New Building Project. Warehouse Area- Water Leakage 20140813- Occurrence, Suspected cause of occurrence, Rectification Procedure, Integrity Checking, Appendix
MOM No.31 Item No.11.30.8 (Production Area Illumination_Calculation)
HEPA Box confirmation letter from INOCHI Technology SDN BHD; Document hand-over for construction finalization
HAFELE lock document (23A4 pages); OUT_ASD-80/R4 dated 6-September-2014 Shop Drawing for Steel Door Installation with Mr. Hoa's signature
BBVN-FIVE-S2-SC-TS-00261 14/09/16 1 copy
BBVN-FIVE-S2-SC-TS-00262 14/09/16 1 colored copy
BBVN-FIVE-S2-SC-TS-00263 14/09/18 1 copy
BBVN-FIVE-S2-SC-TS-00264 14/09/22 CSA- Internal Quality Issues (18-September-2014)_3A3size pages 1 color copy
BBVN-FIVE-S2-SC-TS-00265 14/09/22 As-built drawing list (Steel structure; As-built list; sub-con) 1 copyBBVN-FIVE-S2-SC-TS-00266 14/09/22 1 copy
BBVN-FIVE-S2-SC-TS-00267 14/09/23 IN_ASD-162 dated 23-September-2014 Racking for Warehouse 1 copy red chop
BBVN-FIVE-S2-SC-TS-00268 14/09/25 (MOM Item 16.32)_HILTI load test report 1 copyBBVN-FIVE-S2-SC-TS-00269 14/09/25 1 copy
BBVN-FIVE-S2-SC-TS-00270 14/09/25 Brick Wall Detail at Axis 19 from E to G Axis (1A3size drawing) 1 copy
BBVN-FIVE-S2-SC-TS-00271 14/09/25 Brick Wall Detail at Axis 19 from E to G Axis (1A3size drawing) 1 copy
BBVN-FIVE-S2-SC-TS-00272 14/09/25 IR/M&E-383 & IR/M&E-385 (signature)_2 copies 2 copyBBVN-FIVE-S2-SC-TS-00273 14/09/26 As- built lever for decking 1 copyBBVN-FIVE-S2-SC-TS-00274 14/09/26 Clean Room -Finishing Works Ceiling & Parition Wall 1 copy
BBVN-FIVE-S2-SC-TS-00275 14/09/27 Red Invoice For IPC NO.4 1 ORG (set)BBVN-FIVE-S2-SC-TS-00276 14/09/29 As-built drawing for DB-1E, 1C, ID, GC 1 copyBBVN-FIVE-S2-SC-TS-00277 14/09/29 1 copy
BBVN-FIVE-S2-SC-TS-00278 14/09/29 Brick wall elevation axis Z 1 copyBBVN-FIVE-S2-SC-TS-00279 14/09/29 Clean Room Doors 1 copyBBVN-FIVE-S2-SC-TS-00280 14/09/30 FM-200 System (for FM submission) 1 copyBBVN-FIVE-S2-SC-TS-00281 14/09/30 Magnetic Lock 1 sampleBBVN-FIVE-S2-SC-TS-00282 14/10/01
IN_ASD-110/R1 dated 31-Jul-2014 Ground Floor & 1st Floor Brick Wall Plans and Typical Details (Refer to ASD-90)_Rev.1; IN_ASD-145 dated 11-September-2014 Brick Wall Elevation Axis 21
QC Patrol_Site Inspection Comments (16-September-2014)-4A3size pages with 22 items
OUT_ASD-110/R1 (revised) Brick wall ground floor plan 1, 2 & 3 (3A3size drawings)
SMZ-140919/D377 dated 22-SEP-2014 (RFC-111) Fume Exhaust Fan (RFC-111 form, 1A3size drawing)
IN_ASD-74/R3 dated 22-September-2014 Dock leveller, dock shelter_Rev.3
IN_ASD_0058/R1 dated 05-September-2014 Quality control Plan for Waterproofing Work (QCP-5)_Rev.1 (Approval)
Monthly Statement No.6 Interim Payment (Summary & Building)M&E 1St Interim Payment (M&E IPC No.6)
11
Book File c
BBVN-FIVE-S2-SC-TS-00283 14/10/01 Monthly Statemant No.5 Interim Payment 1 OriginalBBVN-FIVE-S2-SC-TS-00284 14/10/01 Underground Fire Fighting Plan Schedule 1 copyBBVN-FIVE-S2-SC-TS-00285 14/10/01 Clean Room Sprinklers 1 copy
BBVN-FIVE-S2-SC-TS-00286 14/10/01 Atlas Copco Letter ragarding Air Compressor 1 copyBBVN-FIVE-S2-SC-TS-00287 14/10/01 1 copy
BBVN-FIVE-S2-SC-TS-00288 14/10/02 1 copy (Vietnamese)
BBVN-FIVE-S2-SC-TS-00289 14/10/03 Monthly Statement No.5 (Interim Payment) 4 Original copy
BBVN-FIVE-S2-SC-TS-00290 14/10/03 1 copy
BBVN-FIVE-S2-SC-TS-00291 14/10/06 1 copy
BBVN-FIVE-S2-SC-TS-00292 14/10/07 Monthly Payment No.5 4 OriginalBBVN-FIVE-S2-SC-TS-00293 14/10/09 1 Copy
BBVN-FIVE-S2-SC-TS-00294 14/10/09 Monthly Payment No.5 OriginalBBVN-FIVE-S2-SC-TS-00295 14/10/09 1 Copy
BBVN-FIVE-S2-SC-TS-00296 14/10/09 1 Copy
BBVN-FIVE-S2-SC-TS-00297 14/10/10 Drawings: 1 CopyClean Room Key Plan
FIKE Design Information - Ckean Agent System W/Impulse Technology HFC-227EA Agent
Ho so hoan cong: Nang cong suat tram bien ap (As-Built document: Improve the transformer capacity) 2000kVA-35(22)/0.4kV
NCR-23 dated 1-October-2014 Unsatisfactory welding quality on sarnafil layer gridline (L-N&20-21) and CSA3-OCT-2014
IN_APD-0008/R3 dated 22-April-2014 ITP rev.3 and IN_APD-68/R1 dated 22-September-2014 Quality Control Plan for Floor Finishing Works_QCP-8 (1)_Rev.1
DKE comments on drawings for PCCC Resubmission (7A3size drawings) (refer to DT119 dated 8-Oct-2014 from BB); DIA Lux Thorn 96 535 724 DUOPRF 3x36W T26 HF IP65 L840 [STD] Luminaire Data Sheet
IN-AMS-65/R1 dated 19-September-2014: MS-BLD.51- Demolition Work for Office Area & Column A12_Rev.1 Revised based on comments in AMS-65 dated 7-August-2014
IN-AMS-110(A)/R1 datd 9-Oct-2014 MS-BLD.14-C-1: Finishing Works- (Flooring Epoxy Floor)Revised based on comments in AMS_110 dated 18- Sep- 2014 and IN-AMS-110 (C )/R1 dated 9-Oct-2014 MS-BLD.14-C-3: Finishing Works- (Moisture Barrier)Revised based on comments in AMS_110 dated 18- Sep- 2014
14/10/10
CLEAN ROOM SECTION DETAIL - SHEET 1CLEAN ROOM SECTION DETAIL - SHEET 2CLEAN ROOM SECTION DETAIL - SHEET 3CLEAN ROOM TYPICAL DETAILS - SHEET 1CLEAN ROOM TYPICAL DETAILS - SHEET 2HANGER WITH OFFSET 65MMCEILING LAYOUT H=4000MMHANGER POINT PLANWALL LAYOUTWALL ELEVATION (1 OF 3)WALL ELEVATION (2 OF 3)WALL ELEVATION (3 OF 3)
BBVN-FIVE-S2-SC-TS-00298 14/10/10 1 copy
BBVN-FIVE-S2-SC-TS-00299 14/10/13 Toilet Perspective (8A3size drawings) 1 copyBBVN-FIVE-S2-SC-TS-00300 14/10/13 CLEAN ROOM SECTION KEY PLAN 1 copy
CLEAN ROOM SECTION DETAIL - SHEET 1CLEAN ROOM SECTION DETAIL - SHEET 2CLEAN ROOM SECTION DETAIL - SHEET 3CLEAN ROOM SECTION DETAIL - SHEET 4
BBVN-FIVE-S2-SC-TS-00301BBVN-FIVE-S2-SC-TS-00302 14/10/14 IN-ASD-159 date 13-Oct-2014 1 copyBBVN-FIVE-S2-SC-TS-00303 14/10/14 1 copy
BBVN-FIVE-S2-SC-TS-00304 14/10/14 1 copy
BBVN-FIVE-S2-SC-TS-00305 14/10/15 1 copy
Calculation and Report for PCCC re-submission: Fire services report - PCCC; Report-Heating, ventilation & cooling system; Report-Fire fighting system; Hydraulic calculation (Production) CD
IN-ASD_0031/R1 dated 12-June-2014 Male & Female Ground Floor Toilet & Changing Room. IN-ASD_0047/R1 dated 12-June-2014 Office Toilet Drawings
IN-AASD-124/R1 dated 18-Aug-2014 Aluminum Composite Cladding Shop Drawings
IN_AMS-120 dated 14-October-2014 MS-55 Waterproofing for bathrooms & Others Wet Areas
BBVN-FIVE-S2-SC-TS-00306 14/10/15 1 copy
BBVN-FIVE-S2-SC-TS-00307 14/10/15 1 copy
BBVN-FIVE-S2-SC-TS-00308 14/10/15 1 copy
BBVN-FIVE-S2-SC-TS-00309 14/10/15 1 copy
BBVN-FIVE-S2-SC-TS-00310 14/10/15 1 copy
BBVN-FIVE-S2-SC-TS-00311 14/10/17 1 copy
BBVN-FIVE-S2-SC-TS-00312 14/10/17 1 copy
BBVN-FIVE-S2-SC-TS-00313 14/10/20 1 copy
BBVN-FIVE-S2-SC-TS-00314 14/10/21 Clean Room Ceiling Mock-up List 1 copyBBVN-FIVE-S2-SC-TS-00315 14/10/21 Equipment Delivery Schedule for RFC-26 1 copyBBVN-FIVE-S2-SC-TS-00316 14/10/21 Production Exhaust Filter c/w Housing 1 copyBBVN-FIVE-S2-SC-TS-00317 14/10/21 Panel Status 1 copyBBVN-FIVE-S2-SC-TS-00318 14/10/21 NDT Test Report 1 copyBBVN-FIVE-S2-SC-TS-00319 14/10/21 As-built Roof Level/Elevation (1A3size drawing) 1 copyBBVN-FIVE-S2-SC-TS-00320 14/10/22 1 copy
BBVN-FIVE-S2-SC-TS-00321 14/10/22 1 copyBBVN-FIVE-S2-SC-TS-00322 14/10/23 IN-ASD-150 -Ground Floor and 1st Floor Ceiling Details 1 copyBBVN-FIVE-S2-SC-TS-00323 14/10/25BBVN-FIVE-S2-SC-TS-00324 14/10/25 NDT Test Schedule 1 copyBBVN-FIVE-S2-SC-TS-00325 14/10/25 1 copy
IN_AMS-120 dated 14-October-2014 MS-55 Waterproofing for bathrooms & Others Wet Areas; IN_APD-77/R1 dated 14-October-2014 Quality Control Plan for Finishing Work_Painting for Wall & Ceiling (QCP-8 (2))_Rev.1; IN_APD-83 dated 14-October-2014 Quality Control Plan for Ceiling Work (QCP-8 (3))
IN_APD-77/R1 dated 14-October-2014 Quality Control Plan for Finishing Work_Painting for Wall & Ceiling (QCP-8 (2))_Rev.1
IN_APD-77/R1 dated 14-October-2014 Quality Control Plan for Finishing Work_Painting for Wall & Ceiling (QCP-8 (2))_Rev.1
IN_APD-77/R1 dated 14-October-2014 Quality Control Plan for Finishing Work_Painting for Wall & Ceiling (QCP-8 (2))_Rev.1; IN_APD-83 dated 14-October-2014 Quality Control Plan for Ceiling Work (QCP-8 (3))
IN_APD-83 dated 14-October-2014 Quality Control Plan for Ceiling Work (QCP-8 (3))
Updated List of Mock-up, Remaining Material List, Main Equipment List (M&E)
IN_APD-85 dated 17-October-2014 Quality Control Plan for Partition Work (QCP-8 (4))
BV-137206/6011/SMZ-141016/D397 (RFC-128 dated 17-OCT-2014) Power Distribution System Modification
(MOM Item 9.42) FM 200 Refilling Station at Hochiminh city, Vietnam
Sprinkler Head Inspection (3A3size photos, checklist/check sheet, 1A3size drawing)
BBVN-FIVE-S2-SC-TS-00326 14/10/27 IN_AMS-100 (B)/R2 dated 25-October-2014 1 copyBBVN-FIVE-S2-SC-TS-00327 14/10/27 Lighting calculation for cleanroom 1 copyBBVN-FIVE-S2-SC-TS-00328 14/10/29 1 copy
BBVN-FIVE-S2-SC-TS-00329 14/10/31 Monthly Statement No.6_Interim Payment 4 ORIGINALBBVN-FIVE-S2-SC-TS-00330 14/11/04 1 Copy
BBVN-FIVE-S2-SC-TS-00331 14/11/04 6 Original
BBVN-FIVE-S2-SC-TS-00332 14/11/05 1 Copy
BBVN-FIVE-S2-SC-TS-00333 14/11/07 VAT Red Bill For IPC No.06 1 Original BBVN-FIVE-S2-SC-TS-00334 14/11/07 Monitoring Panel Table for Power On Schedule 1 copyBBVN-FIVE-S2-SC-TS-00335BBVN-FIVE-S2-SC-TS-00336BBVN-FIVE-S2-SC-TS-00337BBVN-FIVE-S2-SC-TS-00338BBVN-FIVE-S2-SC-TS-00339BBVN-FIVE-S2-SC-TS-00340BBVN-FIVE-S2-SC-TS-00341BBVN-FIVE-S2-SC-TS-00342BBVN-FIVE-S2-SC-TS-00343BBVN-FIVE-S2-SC-TS-00344BBVN-FIVE-S2-SC-TS-00345BBVN-FIVE-S2-SC-TS-00346BBVN-FIVE-S2-SC-TS-00347BBVN-FIVE-S2-SC-TS-00348BBVN-FIVE-S2-SC-TS-00349BBVN-FIVE-S2-SC-TS-00350BBVN-FIVE-S2-SC-TS-00351BBVN-FIVE-S2-SC-TS-00352BBVN-FIVE-S2-SC-TS-00353BBVN-FIVE-S2-SC-TS-00354BBVN-FIVE-S2-SC-TS-00355BBVN-FIVE-S2-SC-TS-00356BBVN-FIVE-S2-SC-TS-00357
M&E Interim Payment (M&E IPC No.7) [A4size bookfile] and Monthly Statement No.7 Interim Payment [A3size bookfile]
V/O No.30 Asphalt Road Increase Area IN_D290 (RFC-55) dated 31-July-2014; V/O No. 45 Ramp Adjustment IN_D349dated 29-August-2014
As-built Foundation, CBP for First Floor and Trench Pit (26A3size drawings)
Slab Level before Moisture Barrier Application (3A3size page)_1st Time
BBVN-FIVE-S2-SC-TS-00358BBVN-FIVE-S2-SC-TS-00359BBVN-FIVE-S2-SC-TS-00360BBVN-FIVE-S2-SC-TS-00361BBVN-FIVE-S2-SC-TS-00362BBVN-FIVE-S2-SC-TS-00363BBVN-FIVE-S2-SC-TS-00364BBVN-FIVE-S2-SC-TS-00365BBVN-FIVE-S2-SC-TS-00366BBVN-FIVE-S2-SC-TS-00367BBVN-FIVE-S2-SC-TS-00368BBVN-FIVE-S2-SC-TS-00369BBVN-FIVE-S2-SC-TS-00370BBVN-FIVE-S2-SC-TS-00371BBVN-FIVE-S2-SC-TS-00372BBVN-FIVE-S2-SC-TS-00373BBVN-FIVE-S2-SC-TS-00374BBVN-FIVE-S2-SC-TS-00375BBVN-FIVE-S2-SC-TS-00376BBVN-FIVE-S2-SC-TS-00377BBVN-FIVE-S2-SC-TS-00378BBVN-FIVE-S2-SC-TS-00379BBVN-FIVE-S2-SC-TS-00380BBVN-FIVE-S2-SC-TS-00381BBVN-FIVE-S2-SC-TS-00382BBVN-FIVE-S2-SC-TS-00383BBVN-FIVE-S2-SC-TS-00384BBVN-FIVE-S2-SC-TS-00385BBVN-FIVE-S2-SC-TS-00386BBVN-FIVE-S2-SC-TS-00387BBVN-FIVE-S2-SC-TS-00388BBVN-FIVE-S2-SC-TS-00389BBVN-FIVE-S2-SC-TS-00390BBVN-FIVE-S2-SC-TS-00391BBVN-FIVE-S2-SC-TS-00392BBVN-FIVE-S2-SC-TS-00393BBVN-FIVE-S2-SC-TS-00394BBVN-FIVE-S2-SC-TS-00395
BBVN-FIVE-S2-SC-TS-00396BBVN-FIVE-S2-SC-TS-00397BBVN-FIVE-S2-SC-TS-00398BBVN-FIVE-S2-SC-TS-00399BBVN-FIVE-S2-SC-TS-00400BBVN-FIVE-S2-SC-TS-00401BBVN-FIVE-S2-SC-TS-00402BBVN-FIVE-S2-SC-TS-00403BBVN-FIVE-S2-SC-TS-00404BBVN-FIVE-S2-SC-TS-00405BBVN-FIVE-S2-SC-TS-00406BBVN-FIVE-S2-SC-TS-00407BBVN-FIVE-S2-SC-TS-00408BBVN-FIVE-S2-SC-TS-00409BBVN-FIVE-S2-SC-TS-00410BBVN-FIVE-S2-SC-TS-00411BBVN-FIVE-S2-SC-TS-00412BBVN-FIVE-S2-SC-TS-00413BBVN-FIVE-S2-SC-TS-00414BBVN-FIVE-S2-SC-TS-00415BBVN-FIVE-S2-SC-TS-00416BBVN-FIVE-S2-SC-TS-00417BBVN-FIVE-S2-SC-TS-00418
Send to/Receiver Author/Remarks File Code Volume
Vol 01Vol 01
Hard & Soft
Hard
Soft
Mrs. Nguyet BBMs. Thu
Mr. Oscar
ThuThu
BB, BV
Ngo Duy Ngoc (North Star)Tam (North Star)
Tam (North Star)Ms. Hiep, Ms. ThuTam (North Star)a Kien Northstara Quang VINACONEX2
a Giang/a Lam Seico
Mr. Ho Tuong Long LS
Ms. Hiep
Ms. TamMs. Hiep
Ms. Hiep
Ms. HiepMs. HiepMs. Hiep
Ms. Hiep
Ms. HiepMr. Binh
Ms. HiepMs. TamMr. NhamMr. Nguyen/Mr. NhamMr Quang/Ms. TamMs. HiepMs. ThuMs. TamMs. HiepMs. HiepMS. HiepMs. Tam
Ms. TamMs. TamMr. BìnhMs. TamMs. Tam
Ms. Tam
North StarMs. Tam
Ms. Tam
Ms. Tam
BB, BV, LSMs. Tam
Vinaconex_2 (Mr. Bach Quoc Binh)
Ms. Tam
Ms. Tam
Mr. Binh
Mr. Binh & Ms. Tam
Mr. Nham
Mr. Lam SEICO
BB, BVMr. Binh VINACONEX2
Ms. TamMs. Tam
BB, BV
Ms. TamMr. Long_LSTung QS
BB, BV
Vinaconex_2 (Mr. Bach Quoc Binh)
Ms. Tam
Ms. Tam, Mr. BinhBB, BVBB, BVMr. Binh
Mr. Lam SEICO
Ms. Tam
Ms. Tam
BB, BV
BBMr. Binh
NS, Vinaconex2
NS, Vinaconex3
BB, BVNSNS
NS, VNC2
LS
HACXO - SEICO
BVNS, VNC2
NS, VNC2
BB, BV
Vinaconex2, North Star
Vinaconex2, North Star
NSVinaconex2, North Star
Vinaconex2, North Star
Vinaconex2, North Star
Vinaconex2
BB, BV
BB, BV, NS, VNC2
NSLS, BB, BVBB, BV
BV
NSBB, BV
BB
NSNS, VNC2NS
NS
NS
SEICO
BB, BV
BVBB
NS
Langdon SeahNS, VNC2
NS
NS
NSSEICO
NS, VNC2, Hung Trang, Vien Dong, Nhat Hoa ICT, Dai Vu
NS
NS, VNC2
NS
NS, VNC2
BB, BVBB, BVBB, BVBB (red stamp), BV
NSNSVNC2
VNC2
NS, VNC2
BB, BVNSBB., BVBB., BVNS
BB, BVBB, BV
NS
NS
BB, BV, LSNS, VNC2
BVBB, BVNS
BB, BV
RCRBB, BVRCR (Mr. Thang)BVRCR (Mr. Thang)NSBB, BV
NS, VNC2
BB, BV, NS, VNC2
BBNSVNC2
RCR (Mr. Thang)
BB. BV
VNC2, NS
NSBB, BVSEICO
VNC2VINASANWA (mr. Hung)
RCRRCR (full set)
NS+ VNC2
NS+ VNC2
RCR (Diem)
BB, BV
BB, BV
BB, BV
VNC2 Tuan Anh
VNC2, NS
NS
BV
BB, BVNSVNC2BB
BB, BV, LS
NS Incoming from BB 23/08/2014
BB, BV, LS Tung QS
VNC2 Tuan Anh
BV Trung ME
BB, BV
NS, VNC2
BV Trung ME
BB, Bv, VNC2, NS Cuong
NS
NS, VNC2
NS
Langdon Seah (MR. Long - Associate)
NS
BB, BVVNC2, NS
VNC2
BB, BVBB, BV, LSBB
BB
BVBB (Mr. Thanhf)C-Chanel (Mr. Yoong)
BB
Vinaconex2, NS
BB/BV
BB/BV
BB/BV
BB/BV
BB (Mr. Thanhf)
Langdon Seah (MR. Long - Associate)
NS, VNC2
SEICO, VNC2
VNC2, NS
VNC2, SEICO
BB, BVNS
C-Chanel (Mr. Yoong)
BB, BVNS
BB, BV
VNC2
BVBV, BB
BB(Bernd Plocher)BB As-built drawing
Hung Trang
Vinaconex(Mr.Phuc)C-Chanel (Mr. Yoong)BVVINASANWA( Mr.Hung)BB,BV,Langdon Seah(Mr.Long)
C-Chanel (Mr. Yoong)Nhat Hoa ITC
BV,Langdon SeahBV, BBBV, BB , Langdon Seah(Mr.Long)
BV, BBBV,BB
BV,BB
Hung Trang (Le Xuan Muoi)
BBNorth Star
BB(Bernd Plocher)VNC2, Vien Dong
Dai Vu
Chanel System (Yong)SD-BBVN2-SUB-CHA-CLN-CLG-LAY-01A A3
Langdon Seah (MR. Long - Associate)
1. Đại Vũ ITC2. Nhật Hoa ITC3. Vien Dong4. Vinaconex 2
Chanel System (Yong)
SD-BBVN2-SUB-CHA-CLN-CLG-SEC-01 A3SD-BBVN2-SUB-CHA-CLN-CLG-SEC-02 A3SD-BBVN2-SUB-CHA-CLN-CLG-SEC-03 A3SD-BBVN2-SUB-CHA-CLN-CLG-TYP-01A A3SD-BBVN2-SUB-CHA-CLN-CLG-TYP-01B A3SD-BBVN2-SUB-CHA-CLN-CLG-TYP-32 A3SD-BBVN2-SUB-CHA-CLN-CLG-LAY-01A A1SD-BBVN2-SUB-CHA-CLN-CLG-LAY-02 A1SD-BBVN2-SUB-CHA-CLN-PRT-LAY-01 A1SD-BBVN2-SUB-CHA-CLN-PRT-ELE-01 A1SD-BBVN2-SUB-CHA-CLN-PRT-ELE-02 A1SD-BBVN2-SUB-CHA-CLN-PRT-ELE-03 A1
North Star 14/10/25
North StarVINACONEX2, VIEN DONG SD-BBVN2-SUB-CHA-CLN-CLG-LAY-01A
SD-BBVN2-SUB-CHA-CLN-CLG-LAY-SEC-01
SD-BBVN2-SUB-CHA-CLN-CLG-LAY-SEC-02
SD-BBVN2-SUB-CHA-CLN-CLG-LAY-SEC-03
SD-BBVN2-SUB-CHA-CLN-CLG-LAY-SEC-04
Vinaconex2North Star
North Star
Hung Trang
North Star return document & CD
Vinaconex2
Dai Vu
Doan Thanh
Vien Dong, Nhat Hoa ITC
Channel System
BB, BV APD
Vien Dong (mr. Long)
North Star
BB, BVBB, BVBB, BVBB, BVBB, BVBB, BVBB, BV
BB, BVVien Dong(Mr.Long)
BB, BVBB, BV
Correspondence submission to PCI 243
Code/Ref. Issued Date Title Attachment Delivered to
BV-137206-1009-140312/HSI01 14/03/12 10A4 photos Toan Safety
BV-137206-1009-140313/HSI02 14/03/13 1A4size photo Toan Safety
BV-137206-1009-140321/HSI03 14/03/21 Hoang Safety
BV-137206-1009-140418/HSI04 14/04/18 Hoang Safety
BV-137206-1009-140428/HSI05 14/04/28 Water Discharge on adjacent Properties Nguyen, Hoang safetyBV-137206-1009-140428/HSI06 14/04/28 Installation for Lightning system (SMZ & Vinaconex Office) Nguyen, Hoang safetyBV-137206-1009-140505/HSI07 14/05/05 Request for Cleaning Up Public road and Drain Stagnant water 4A4size photos Nguyen, Hoang safety
BV-137206-1009-140514/HSI08 14/05/14 Sadety ImprovementBV-137206-1009-140519/HSI09 14/05/19 Request Safety Issue 7A4size photos Nguyen, Hoang safety, QuangBV-137206-1009-140521/HSI10 14/05/22 Incompliance of minimum HSE Equipments 1A4size photo Nguyen, Hoang safetyBV-137206-1009-142305/HSI11 14/05/23 Improvement of Security entrance post Nguyen, Hoang safetyBV-137206-1009-142405/HSI12 14/05/24 Cable isolation and arrangement 3A4size photos Nguyen, Hoang safety, Quang M&EBV-137206-1009-143005/HSI13 14/05/30 Control Speed of Heavy Trucks on Site 1A4size photo Nguyen, Hoang safety, Quang M&EBV-137206-1009-140623/HSI14 14/06/23 Unsafe Access of Ramp 1A4size photo Nguyen, Hoang Safety, TuBV-137206-1009-140623/HSI15 14/06/23 Wearing Safety Glass on Site Nguyen, Hoang Safety, TuBV-137206-1009-140630/HSI16 14/06/30 Set up life line system for working at height 1A4size photo Nguyen, Hoang Safety, TuBV-137206-1009-140702/HSI17 14/07/02 Set up Stable Access for Heavy Crane 2A4size photos Nguyen, Hoang Safety, TuBV-137206-1009-140701/HSI18 14/07/03 Working platform for rebar and transfering material 3A4size photos Nguyen, Hoang Safety, TuBV-137206-1009-140708/HSI19 14/07/08 Protect web sling 2A4size photos Nguyen, Hoang Safety, TuBV-137206-1009-140711/HSI20 14/07/11 Housekeeping at Stage 1 4A4size photos Nguyen, Hoang Safety, TuBV-137206-1009-140711/HSI21 14/07/11 Set up safety net system 1A4size photo Nguyen, Hoang Safety, TuBV-137206-1009-140717/HSI22 14/07/17 Covering all openings of gridline 12 2A4size photos Nguyen, Hoang Safety, TuBV-137206-1009-140718/HSI23 14/07/18 No Smoking at roof of main building 1A4size photo Nguyen, Hoang Safety, TuBV-137206-1009-140723/HSI24 14/07/23 Pumping Stagant Water 2A4size photos Nguyen, Hoang Safety, TuBV-137206-1009-140723/HSI25 14/07/23 Covering the gap for the cladding of column GL 12-A 1A4size photo Nguyen, Hoang Safety, TuBV-137206-1009-140731/HSI26 14/07/31 Sprinkler pipe system protection 1A4size photo Nguyen, Hoang Safety, Tu, QuangBV-137206-1009-140805/HSI27 14/08/05 Missing PPE 2A4size photos Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-140805/HSI28 14/08/05 Housekeeping Materials and tools 2A4size photos Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-140811/HSI29 14/08/11 Washing Bay Improvements 2A4size photos Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-140806/HSI30 14/08/06 Protection the Floor at Storage area 2A4size photos Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-140812/HSI31 14/08/12 HSE Supervisor at night shift Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-140822/HSI32 14/08/22 Damage Road at Stage 1 1A4size photo Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-140909/HSI33 14/09/09 Housekeeping on site 3A4size photos Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-140910/HSI34 14/09/10 Hard Barricade a visitor balcony area 2A4size photos Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-140910/HSI35 14/09/11 Working with scissor lift 1A4size photo Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-140918/HSI36 14/09/18 Concrete beam is impacting the scaffolding 1A4size photo Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-140918/HSI37 14/09/18 Housekeeping on site 2A4size photos Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-140918/HSI38 14/09/18 Unsafe Working Conditions 3A4size photos Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-140922/HSI39 14/09/22 Unsafe Working Condition 1A4size photo Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-140922/HSI40 14/09/22 Unsafe Working Condition 6A4size photos Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-140922/HSI41 Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-140930/HSI42 14/09/30 Unsafe Conditioin at 12 Gridline Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-141003/HSI43 14/10/03 Lifeline System 2A4size photos Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-141009/HSI44 14/10/09 Lighting Condition 1A4size photo Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-141011/HSI45 14/10/11 Personal Protective Equipment 3A4size photos Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-141011/HSI46 14/10/11 Housekeeping at AHU area 4A4size photos Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-141003/HSI47 14/10/20 Working at height 2A4size photos Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-141103/HSI48 14/11/03 Unsafe Scaffolding at Gridline Z 5A4size photos Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-141103/HSI49 14/11/03 Concrete on the Top of Column at Gridline 12 2A4size photos Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-141103/HSI50 14/11/03 Dust on Walkable Ceiling 8A4size photos Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-141105/HSI51 14/11/05 Unsafe Activities at Stage 1 10A4 photos Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-141106/HSI52 14/11/06 Training Protocol 1at Clean Stage at Clean Room Area 3A4size photos Nguyen, Hoang Safety, Tu, MikeBV-137206-1009-141003/HSI53
Request for Installation electric cabinet and warning sign at live cable, stop pumping water at site
Request for installation hard barricade for deep hole, provide rubbish bin and toilet temporary at site
Request for installation drainage system and cover electric wire at washing bay
Request for checking during night time at project area and bilingual permit to work
Correspondence submission to PCI 310
Code/Ref. Issued Date Title Attachment Delivered to
BV-137206/609/130826/SC/SI-01 14/03/12 Mr. Tu, Nguyen, Hoang Safety
BV-137206/609/130826/SC/SI-01 14/07/27 Earthworks. Backfilling of Stage 2 area Mr. Tu, Nguyen, Hoang SafetyBV-137206/609/140516/SC/SI-02 14/05/16 Foundation Works. Improvement for next stages 5A4 photos Mr. Tu, Nguyen, Hoang SafetyBV-137206/609/140521/SC/SI-03 14/05/21 Foundation Works. Waiting bar for ground slad 1A4size photo Mr. Tu, Nguyen, Hoang SafetyBV-137206/609/140526/SC/SI-04 14/05/26 Improvement of Concrete Quality Tu, Nguyen, Tuan Anh/Hoang QCBV-137206/609/140526/SC/SI-05 14/05/26 Schedule Recovery Plan 1A3size page
BV-137206/609/140529/SC/SI-06 14/05/29 Report after Inspection at SEICO (Steel Structure Supplier) Factory All SMZ members (email)
BV-137206/609/140530/SC/SI-07 14/05/31 Ground Beam SleeveBV-137206/609/140609/SC/SI-08 14/06/09 Tu, Nguyen, Tuan Anh
BV-137206/609/140609/SC/SI-09 14/06/09 Concrete Curing Progress Tu. Nguyen, Tuan AnhBV-137206/609/140610/SC/SI-10 14/06/10 Backfilling Method 1A4size photo Tu. Nguyen, Tuan AnhBV-137206/609/140610/SC/SI-11 14/06/10 Backfilling Material 1A4size photo Tu. Nguyen, Tuan AnhBV-137206/609/140618/SC/SI-12 14/06/18 Welding Issue on Factory 1A4size photo Tu, Tuan Anh BV-137206/609/140618/SC/SI-13 14/06/18 Concrete for Footing 1A4size photo Tu, Tuan Anh BV-137206/609/140619/SC/SI-14 14/06/19 Rain Water pipe position Tu. Nguyen, Tuan AnhBV-137206/609/140619/SC/SI-15 14/06/19 Embeded steel plate 1A4size photo Tu. Nguyen, Tuan AnhBV-137206/609/140627/SC/SI-16 14/06/27 Scratch positions during transportation and unloading steel structure 2A4size photos Tu. Nguyen, Tuan Anh
BV-137206/609/140630/SC/SI-17 14/06/30 4A4size photos Tu, Nguyen, Quang
BV-137206/609/140702/SC/SI-18 14/07/02 Submittal of Shop Drawing for M&E opening and embeded item Tu, Quang, Cuong
BV-137206/609/140703/SC/SI-19 14/07/03 3A4size photos Tu. Nguyen, Tuan Anh
BV-137206/609/140703/SC/SI-20 14/07/03 Steel Structure Schedule Tu, Tuan Anh BV-137206/609/140711/SC/SI-21 14/07/11 Removal of Underground GI piping works at warehouse area 2A4size photos Tu, Nguyen, Quang
BV-137206/609/140703/SC/SI-22 14/07/14 Verticalityof concrete column Tu, Nguyen, Tuan AnhBV-137206/609/140717/SC/SI-23 14/07/17 Honeycomb of Column GL21Y 2A4size photos Tu, Nguyen, Tuan AnhBV-137206/609/140703/SC/SI-24 14/07/14 Surface of concrete column 3A4size photos Tu, Nguyen, Tuan AnhBV-137206/609/140717/SC/SI-25 14/07/17 Shop Drawing for bar bending for ground slab Zone 2, Xone 3 Tu, Phuc, Nguyen
BV-137206/609/140703/SC/SI-26 14/07/17 Warning of sub-concrete column along axis 21 1A4size photo Tu, Nguyen, Tuan Anh BV-137206/609/140703/SC/SI-27 14/07/17 Protection for mezzanine floor 1A4size photo Tu, Nguyen, Tuan Anh BV-137206/609/140703/SC/SI-28 14/07/17 Quality of Painting for roof bracing 3A4size photos Tu, Nguyen, Tuan Anh BV-137206/609/140703/SC/SI-29 14/07/17 Lean Concrete surface before applying Xypec 2A4size photos Tu, Nguyen, Tuan Anh BV-137206/609/140703/SC/SI-30 14/07/19 Notice during loading and unloading progress 1A4size photo Tu, Nguyen, Tuan Anh BV-137206/609/140703/SC/SI-31 14/07/19 Aluminum Cladding Material Tu, Nguyen, Tuan Anh BV-137206/609/140703/SC/SI-32 14/07/19 Testing Results Submission Tu, Nguyen, Tuan Anh BV-137206/609/140719/SC/SI-33 14/07/19 Technical document of torque wrench Tu, Nguyen, Tuan Anh BV-137206/609/140721/SC/SI-34 14/07/21 Submission of Holiday Tester for FF System (Underground Pipe) Tu, Nguyen, Quang, (T. Anh), Mike
BV-137206/609/140724/SC/SI-35 14/07/24 5A4 photos Tu, Nguyen, T. Anh, Mike
BV-137206/609/140724/SC/SI-36 14/07/24 Quality Document Control Tu, Nguyen, T. Anh, MikeBV-137206/609/140728/SC/SI-37 14/07/28 Brickwork issues 1A4size photo Tu, Nguyen, T. Anh, MikeBV-137206/609/140731/SC/SI-38 14/07/31 Brickwork issues 2nd time 3A4size photos Tu, Nguyen, T. Anh, MikeBV-137206/609/140731/SC/SI-39 14/07/31 Heavy Rain during Casting Concrete 3A4size photos Tu, Nguyen, T. Anh, MikeBV-137206/609/140731/SC/SI-40 14/07/31 Preventive action for Casting Concrete at Ground Slab Tu, Nguyen, T. Anh, MikeBV-137206/609/140731/SC/SI-41 14/07/31 Correct Damage Rebar at Ground Beam 1A4size photo Tu, Nguyen, T. Anh, MikeBV-137206/609/140802/SC/SI-42 14/08/02 2A4size photos Tu, Nguyen, Mike, Quang
BV-137206/609/140802/SC/SI-43 14/08/02 Submission of Holiday Tester for FF System (Underground Pipe) Tu, Nguyen, Mike, Quang
BV-137206/609/140802/SC/SI-44 14/08/02
Request for Installation electric cabinet and warning sign at live cable, stop pumping water at site
Tu, Nguyen, Tuan Anh, Quang, Thanh, Tung QS
Report after Inspection at SEICO (Steel Structure Supplier) Factory 2nd time
21A4 size page photos (4 photos)
Rainwater pipe joining fusion welding Works for underground rainwater pipe of Stage 2 area
1A4size drawing, 1 A4size schedule
Scratch positions during transportation and unloading steel structure 2nd time)
Protection and Caring of Installed Rain Water Pipe along GL a and GL Z
Protection and Proper Covering of Sewer and rian manhole and stormline and sealing of HDPE pipe sleeve
Correspondence submission to PCI 311
Code/Ref. Issued Date Title Attachment Delivered to
BV-137206/609/140802/SC/SI-45 14/08/02 Road & Stormwater Drainage Issue 2A4size photos Tu, Nguyen, MikeBV-137206/609/140805/SC/SI-46 14/08/05 Pharma Proposed Floor Drain Provision at Warehouse 2A4size photos Tu, Nguyen, Mike, Quang
BV-137206/609/140805/SC/SI-47 14/08/05 Concrete Beam B3-axis 14A(E-G) bending 1A4size photo Tu, Nguyen, MikeBV-137206/609/140805/SC/SI-48 14/08/05 Existing roof issues 4A4size photos Tu, Nguyen, MikeBV-137206/609/140805/SC/SI-49 14/08/05 Zone 2 M&E Installation Works Tu, Nguyen, Mike, QuangBV-137206/609/140805/SC/SI-50 14/08/05 Backfilling Issue axis G-E 1A4size photo Tu, Nguyen, MikeBV-137206/609/140805/SC/SI-51 14/08/05 Roof Installation issue 4A4size photos Tu, Nguyen, MikeBV-137206/609/140807/SC/SI-52 14/08/07 Flatness of ground slab 1A4size photo Tu, Nguyen, MikeBV-137206/609/140807/SC/SI-53 14/08/07 Delivered and Accepted Rain Water Pipe Material (HDPE) 1A4size photo Tu, Nguyen, Mike, QuangBV-137206/609/140807/SC/SI-54 14/08/07 Prevent Rain Water Coming to Phase 1-Roof Area 3A4size photos Tu, Nguyen, Mike, QuangBV-137206/609/140809/SC/SI-55 14/08/11 Installation of Exposed rain water pipe along GL Z at warehouse area 2A4size photos Tu, Nguyen, Mike, Quang
BV-137206/609/140812/SC/SI-56 14/08/13 Quality Document Preparation Before Inspection From Authority
BV-137206/609/140822/SC/SI-57 14/08/22 Delivered AHU at Material Assembly Area at Stage 1 (Parking Area) 1A4size photo Tu, Nguyen/Phuc, Mike, Quang, T.Anh
BV-137206/609/140829/SC/SI-58 14/08/29 Store Material Properly 2A4size photos Tu, Nguyen, T.Anh, MikeBV-137206/609/140905/SC/SI-59 14/09/05 M&E Items at Stage 1 area / Preparation for Saturday 6th power off Tu, Nguyen, T.Anh, Mike, Quang NS
BV-137206/609/140922/SC/SI-60 14/09/22 Brickwork Defect 3A4size photos Tu, Nguyen, T.Anh, MikeBV-137206/609/140922/SC/SI-61 14/09/22 Repair water leak on roof before applying insulation layers Tu, Nguyen, T.Anh, MikeBV-137206/609/140923/SC/SI-62 14/09/23 Stainless Steel Piping Work 1A4size photo Tu, Nguyen, Quang, MikeBV-137206/609/140924/SC/SI-63 14/09/24 Stage 1 main air duct installation (Handling & moving) 1A4size page Tu, Nguyen, T.Anh, MikeBV-137206/609/140925/SC/SI-64 14/09/25 Storage material on Site 1A4size photo Tu, Nguyen, T.Anh, MikeBV-137206/609/140926/SC/SI-65 14/09/26 Air Particle Counting inside Stage 1 Clean Room 6A4size photoBV-137206/609/140926/SC/SI-66 14/09/26 Damage of underground sevices at Ramp Extension area 5A4 photosBV-137206/609/141002/SC/SI-67 14/10/02 Underground pipe at technical building stage 1 1A4size photo Tu, Nguyen, Quang, MikeBV-137206/609/141003/SC/SI-68 14/10/03 Unsatisfactory Frame for Dry Wall at gridline E 1A4size photo Tu, Nguyen, T.Anh, MikeBV-137206/609/141008/SC/SI-69 14/10/08 Inadequate Protection of AHU Parts and Other Material 1A4size photo Tu, Nguyen, T.Anh, Mike, QuangBV-137206/609/141104/SC/SI-70 14/11/04 Welding Process Approved Parameters (External Fire Fighting Pipe) Tu, Nguyen, Mike, Quang
BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140
NS, Tung, Ujiie (To raise RFC)
1A4size photo & 1A3size Weld Log/Weld Inspection Report
Correspondence submission to PCI 312
Code/Ref. Issued Date Title Attachment Delivered to
BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140BV-137206/609/140
Correspondence submission to PCI 383
Code/Ref. Issued Date Title Attachment Delivered to
BV-13720/802/140520/NCR-01 14/05/20 Ground Beam Rebar: Tie Bar Shape 1A4size photo Tu, Nguyen, Tuan AnhReply 14/05/21 Ground Beam Rebar: Tie Bar ShapeBV-13720/802/140520/NCR-01 14/06/03 1A4size photo (2 photos) Tu, Nguyen, Tuan Anh
BV-13720/802/140521/NCR-02 14/05/21 Ground Beam Rebar: Waiting Tie Bar 1A4size photo Tu, Nguyen, Tuan AnhReply 14/05/21 Ground Beam Rebar: Waiting Tie Bar 2 photos, 1A3size drawing Tuan AnhBV-13720/802/140521/NCR-02 14/07/08
BV-13720/802/140609/NCR-03 14/06/09 Column Footing 1A4size photo Tu, Nguyen, Tuan AnhReply 14/06/17 Column Footing Tuan AnhBV-13720/802/140609/NCR-03 14/06/23 Column Footing_FINALBV-13720/802/140621/NCR-04 14/06/21 Column Honeycomb 1A4size photoReply 14/07/09 Column Honeycomb
BV-13720/802/140621/NCR-04 14/07/14 Column Honeycomb_FINAL
BV-13720/802/140711/NCR-05 14/07/11 GI Piping Welding Procedure 7A4size photosReply
BV-13720/802/140712/NCR-06 14/07/12 Welding ProcedureReply
BV-13720/802/140712/NCR-07 14/07/12 Bolts Finishing Length (Steel Structure)Reply 14/07/21 Bolts Finishing Length (Steel Structure)
BV-13720/802/140621/NCR-08 14/07/14 Main Rebar Deformation 2A4size photosReply 14/09/26 Main Rebar Deformation 5A4size photos
BV-13720/802/140621/SC/NCR-09 14/07/16 Column Honeycomb (Axis 21-Y) 1A4size photo Tu, Nguyen, Tuan AnhReply 14/08/08 Column Honeycomb (Axis 21-Y)_Solution Tu, Nguyen, Tuan Anh
BV-13720/802/140621/SC/NCR-09 14/08/11 Column Honeycomb (Axis 21-Y)_FINAL Tu, Nguyen, Tuan Anh
BV-13720/802/140721/SC/NCR-10 14/07/21 Damaged Main Rebar & Tie Bar (GL-16 &Q-R) 1A4size photo Tu, Nguyen, Tuan AnhReply 14/10/01 Damaged Main Rebar & Tie Bar (GL-16 &Q-R) 1A4size photo Tu, Nguyen, Tuan Anh
BV-13720/802/140721/SC/NCR-11 14/07/21 Unapproved Roof Bracing 1A4size photo Tu, Nguyen, Tuan AnhReply 14/07/21 Unapproved Roof Bracing
BV-13720/802/140728/SC/NCR-12 14/07/28 Thickness of masonry motar layer 1A4size photo Tu, Nguyen, Tuan Anh, Mike
Reply
OUTGOINGING
(Reply) (FINAL)
Ground Beam Rebar: Tie Bar Shape_FINAL_(Confirm Accept for Payment)
Ground Beam Rebar: Waiting Tie Bar_FINAL (Confirm Accept for Payment)
2A4size photos, Sikagrout 214-11 product specification/data sheet
1A4size photo, SikaGrout 212-11/214-11 data sheet/Specification (4A4 pages) 2A4size photos
1A4size photo, SikaGrout 212-11/214-11 data sheet/Specification (4A4 pages) 2A4size photos
Correspondence submission to PCI 384
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
BV-13720/802/140731/SC/NCR-13 14/07/31 2A2aize photos
BV-13720/802/140812/SC/NCR-14 14/08/13 Deformed Anchor Bolt at top of Column (A, E-13A, A-E-14A) 2A4size photos Tu, Nguyen, Tuan Anh, Mike
BV-13720/802/140829/SC/NCR-15 14/08/29 Crack on top of column coordinate E-13A 1A4size photo Tu, Nguyen, Tuan Anh, Mike
BV-13720/802/140915/SC/NCR-16 14/09/15 Electrical Earth Wire Insulation Color Tu, Nguyen, Tuan Anh, Mike
BV-13720/802/140922/SC/NCR-17 14/09/22 Wrong Technic in brick work 1A4size photo Tu, Nguyen, Tuan Anh, Mike
14/09/22 Wrong Technic in brick work Tuan AnhBV-13720/802/140922/SC/NCR-17 14/11/07 wrong Technic in brick work_FINAL (APPROVED) 1A4size photo Mrs. Lan QC
BV-13720/802/140922/SC/NCR-17 (/R1) 14/09/24 Wrong Technic in brick work (not acceptable_Resubmit) Tu, Nguyen, Tuan Anh, Mike
BV-13720/802/140924/SC-NCR-18 14/09/26 Septic tank & Pump pit work 1A4size photoBV-13720/802/140924/SC-NCR-18 14/10/14 Septic tank & Pump pit work_Repair work 1A4size photo Ba HoaBV-13720/802/140924/SC-NCR-18 14/11/05 Septic tank & Pump pit work_Repair work_Rejected 1A4size photo
BV-13720/802/140929/SC-NCR19 14/09/30 Sealant for AHU Cleanroom Grade 7A4size photo
BV-13720/802/140930/SC-NCR-20 14/09/30 Supply Air Duct Method of Fabrication Stage 1 4A4size photo
BV-13720/802/140930/SC/NCR-21 14/09/30 Air Duct Method of Fabrication Stage 2 4A4size photo
BV-13720/802/140930/SC/NCR-22 14/09/30 Air Duct Hanger Support Method 3A4size photo
BV-13720/802/141001/SC/NCR-2314/10/01
3A4size photo
BV-13720/802/140
BV-13720/802/141010/SC/NCR-25 14/10/10 Brickwork defect at gridline 15A (E-G) 1A4size photo Tuan Anh
14/11/07 Brickwork defect at gridline 15A (E-G)_REPLY 2A4size photos Mrs. Lan QC
BV-13720/802/141010/SC/NCR-25 14/11/07 Brickwork defect at gridline 15A (E-G)_FINAL APPROVED 2A4size photos Mrs. Lan QC
Wrong Position of Concrete Beam at Mezzanine Floor Axis E (16A-19A)
Unsatisfactory welding quality on Sarnafil layer gridline (L-N&20-21)
BV-13720/802/141010/SC/NCR-25 (REPLY)
Correspondence submission to PCI 385
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
BV-13720/802/141020/SC/NCR-26 14/10/20 Smoke Extraction Equipment Delivery Inspection 1A4 size photo BVReply Method 14/10/22 Smoke Extraction Equipment Delivery Inspection M&E Team
BV-13720/802/141020/SC/NCR-26 14/10/23 Smoke Extraction Equipment Delivery Inspection_Rejected BV
BV-13720/802/140
BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140
BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140
Correspondence submission to PCI 386
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140BV-13720/802/140
Correspondence submission to PCI 387
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 388
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 389
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 390
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 391
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 392
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 393
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 394
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 395
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 396
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 397
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 398
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 399
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 400
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 401
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 402
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 403
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 404
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 405
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 406
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 407
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 408
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 409
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 410
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 411
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 412
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 413
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 414
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 415
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 416
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 417
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 418
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 419
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 420
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 421
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 422
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 423
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 424
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 425
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 426
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 427
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 428
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 429
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 430
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 431
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 432
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 433
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 434
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 435
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 436
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 437
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 438
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 439
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 440
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 441
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 442
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 443
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 444
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 445
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 446
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 447
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 448
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 449
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 450
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 451
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 452
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 453
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 454
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 455
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 456
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 457
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 458
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 459
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 460
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 461
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 462
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 463
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 464
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 465
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 466
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 467
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 468
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 469
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 470
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 471
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 472
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
Correspondence submission to PCI 473
Code/Ref. Issued Date Title Attachment Delivered toOUTGOINGING
(Reply) (FINAL)
+
Correspondence submission to PCI 508
CODE Issued DateTo
Title/Subject Attachment Author
BBVN-FIVE-S2-SC-SUB-NCR-001 14/08/20 VNC2 Concrete Curve after Removing Formwork for Mezzanine Floor Tuan Anh
BBVN-FIVE-S2-SC-SUB-NCR-002 14/08/20VNC2
Wrong Position of Concrete Beam at 1st Floor Offcie Area Tuan Anh
BBVN-FIVE-S2-SC-SUB-NCR-003 14/08/19 SEICO Quan Damaged Anchor Bolts at Office Area 6A4size photos Tuan Anh
BBVN-FIVE-S2-SC-SUB-NCR-004 14/08/29VNC2 Nham
Crack on top of Column Axis E-16A at Office Area Tuan Anh
BBVN-FIVE-S2-SC-SUB-NCR-005 14/08/29 C-Channel Yyong Damaged Clean Room Components 3A4size photos Tuan Anh
BBVN-FIVE-S2-SC-SUB-NCR-006 14/09/11 SEICO Quan Finishing length of bolts-anchor bolts 2A4size photos Tuan Anh
BBVN-FIVE-S2-SC-SUB-NCR-007 14/09/17VNC2 Nham
Concrete Curve at Drainage Tuan Anh
BBVN-FIVE-S2-SC-SUB-NCR-008 14/09/17
VNC2 Nham
Honeycomb at Concrete Post Axis Z - Warehous Tuan Anh
BBVN-FIVE-S2-SC-SUB-NCR-009 14/09/23 VNC2 Nham Plaster Cracking at Column 13-U 2A4size photos Tuan Anh
BBVN-FIVE-S2-SC-SUB-NCR-010 14/10/04 VNC2 Nham Water Leak & Wrong Installation Sequence of Septic Tank 3A4size photos Tuan anh
BBVN-FIVE-S2-SC-SUB-NCR-011 14/10/06 4A4size photos Tuan Anh
BBVN-FIVE-S2-SC-SUB-NCR-012 14/10/23Vien Dong Long/Duy
Tuan Anh
BBVN-FIVE-S2-SC-SUB-NCR-013 14/10/23Hung Trang
Water Penetrated Rockwool at Axis 20A-21/D-E 3A4size photos Tuan Anh
BBVN-FIVE-S2-SC-SUB-NCR-014
Name received
INCOMING (Reply&
FINAL)
1A4size drawing, 2A4size photos
1A4size drawing, 3A4size photos
2A4size photos; 1A3size drawing
1A4size drawing, 2A4size photos
1A4size drawing, Transmittal sheet 206 dated 20-August-2014 (Honeycomb treatment), 2A4size ptotos
Nhat Hoa ITC
Wrong Method of Handling and Storage ceiling panel for Clean Room
Wrong Frame Installation for Alu. Composite Cladding at Axis 21/H-Q
2A4size drawings, 2A4size photos
Le Xuan Muoi
Correspondence submission to PCI 509
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
BBVN-FIVE-S2-SC-SUB-NCR-015
BBVN-FIVE-S2-SC-SUB-NCR-016
BBVN-FIVE-S2-SC-SUB-NCR-017
BBVN-FIVE-S2-SC-SUB-NCR-018
BBVN-FIVE-S2-SC-SUB-NCR-019
Correspondence submission to PCI 510
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 511
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 512
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 513
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 514
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 515
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 516
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 517
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 518
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 519
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 520
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 521
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 522
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 523
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 524
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 525
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 526
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 527
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 528
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 529
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 530
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 531
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 532
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 533
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 534
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 535
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 536
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 537
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 538
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 539
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 540
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 541
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 542
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 543
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 544
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 545
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 546
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 547
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 548
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 549
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 550
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 551
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 552
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 553
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 554
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 555
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 556
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 557
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 558
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 559
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 560
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 561
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 562
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 563
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 564
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 565
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 566
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 567
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 568
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 569
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 570
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 571
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 572
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 573
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 574
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 575
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 576
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 577
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 578
CODE Issued DateTo
Title/Subject Attachment AuthorName
received
INCOMING (Reply&
FINAL)
Correspondence submission to PCI 612
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
BV-137206-1009-140312/HSI01 14/03/12 10A4 photos Toan Safety
BV-137206-1009-140313/HSI02 14/03/13 1A4size photo Toan Safety
BV-137206-1009-140321/HSI03 14/03/21 Hoang Safety
BV-137206-1009-140418/HSI04 14/04/18 Hoang Safety
BV-137206-1009-140428/HSI05 14/04/28 Water Discharge on adjacent Properties Nguyen, Hoang safetyBV-137206-1009-140428/HSI06 14/04/28 Installation for Lightning system (SMZ & Vinaconex Office) Nguyen, Hoang safetyBV-137206-1009-140505/HSI07 14/05/05 Request for Cleaning Up Public road and Drain Stagnant water 4A4size photos Nguyen, Hoang safety
BV-137206-1009-140514/HSI08 14/05/14 Sadety ImprovementBV-137206-1009-140519/HSI09 14/05/19 Request Safety Issue 7A4size photos Nguyen, Hoang safety, QuangBV-137206-1009-140521/HSI10 14/05/22 Incompliance of minimum HSE Equipments 1A4size photo Nguyen, Hoang safetyBV-137206-1009-142305/HSI11 14/05/23 Improvement of Security entrance post Nguyen, Hoang safetyBV-137206-1009-142405/HSI12 14/05/24 Cable isolation and arrangement 3A4size photos Nguyen, Hoang safety, Quang M&EBV-137206-1009-143005/HSI13 14/05/30 Control Speed of Heavy Trucks on Site 1A4size photo Nguyen, Hoang safety, Quang M&EBV-137206-1009-140623/HSI14 14/06/23 Unsafe Access of Ramp 1A4size photo Nguyen, Hoang Safety, TuBV-137206-1009-140623/HSI15 14/06/23 Wearing Safety Glass on Site Nguyen, Hoang Safety, Tu
No.001 Set up life line system for working at height 1A4size photoNo.002No.003No.004No.005 14/10/02 Dust on walkable ceiling 14/09/15 2A4size photos Hoang Tuan Anh Site EngineerNo.006 14/10/20 (Packing Area)_Drop steel pipe from the handrail gap at Stage 1 14/10/18 2A4size photos Vuong
No.007No.008No.009No.010No.011No.012No.013No.014
Request for Installation electric cabinet and warning sign at live cable, stop pumping water at site
Request for installation hard barricade for deep hole, provide rubbish bin and toilet temporary at site
Request for installation drainage system and cover electric wire at washing bay
Request for checking during night time at project area and bilingual permit to work
INCIDENT INVESTIGATION REPORT
Correspondence submission to PCI 613
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 614
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 615
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 616
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 617
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 618
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 619
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 620
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 621
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 622
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 623
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 624
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 625
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 626
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 627
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 628
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 629
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 630
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 631
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 632
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 633
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 634
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 635
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 636
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 637
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 638
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 639
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 640
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 641
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 642
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 643
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 644
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 645
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
Correspondence submission to PCI 646
Code/Ref. Issued Date Title Incident Date Attachment Prepared by Position
+
Correspondence submission to PCI 682
No. Rev. To CC: Issued Title Attachment Prepared by DateReplied Delivered to Volume
Bao Minh insurance 14/03/14 Questionnaire Answer
Date delivered
Bao Minh/Mr. Thang
(Contact No. 0977455105) E-mail address: [email protected]
Correspondence submission to PCI 683
No. Rev. To CC: Issued Title Attachment Prepared by DateReplied Delivered to VolumeDate delivered
Correspondence submission to PCI 684
No. Rev. To CC: Issued Title Attachment Prepared by DateReplied Delivered to VolumeDate delivered
Correspondence submission to PCI 685
No. Rev. To CC: Issued Title Attachment Prepared by DateReplied Delivered to VolumeDate delivered
Correspondence submission to PCI 686
No. Rev. To CC: Issued Title Attachment Prepared by DateReplied Delivered to VolumeDate delivered
Correspondence submission to PCI 687
No. Rev. To CC: Issued Title Attachment Prepared by DateReplied Delivered to VolumeDate delivered
Correspondence submission to PCI 688
No. Rev. To CC: Issued Title Attachment Prepared by DateReplied Delivered to VolumeDate delivered
Correspondence submission to PCI 689
No. Rev. To CC: Issued Title Attachment Prepared by DateReplied Delivered to VolumeDate delivered
Correspondence submission to PCI 690
No. Rev. To CC: Issued Title Attachment Prepared by DateReplied Delivered to VolumeDate delivered
Correspondence submission to PCI 691
No. Rev. To CC: Issued Title Attachment Prepared by DateReplied Delivered to VolumeDate delivered
Correspondence submission to PCI 692
No. Rev. To CC: Issued Title Attachment Prepared by DateReplied Delivered to VolumeDate delivered
Correspondence submission to PCI 693
No. Rev. To CC: Issued Title Attachment Prepared by DateReplied Delivered to VolumeDate delivered
Correspondence submission to PCI 694
No. Rev. To CC: Issued Title Attachment Prepared by DateReplied Delivered to VolumeDate delivered
Correspondence submission to PCI 695
No. Rev. To CC: Issued Title Attachment Prepared by DateReplied Delivered to VolumeDate delivered
Correspondence submission to PCI 696
No. Rev. To CC: Issued Title Attachment Prepared by DateReplied Delivered to VolumeDate delivered
Correspondence submission to PCI 697
No. Rev. To CC: Issued Title Attachment Prepared by DateReplied Delivered to VolumeDate delivered
Correspondence submission to PCI 698
No. Rev. To CC: Issued Title Attachment Prepared by DateReplied Delivered to VolumeDate delivered
Correspondence submission to PCI 699
No. Rev. To CC: Issued Title Attachment Prepared by DateReplied Delivered to VolumeDate delivered
Correspondence submission to PCI 700
No. Rev. To CC: Issued Title Attachment Prepared by DateReplied Delivered to VolumeDate delivered
Correspondence submission to PCI 701
No. Rev. To CC: Issued Title Attachment Prepared by DateReplied Delivered to VolumeDate delivered
Correspondence submission to PCI 702
No. Rev. To CC: Issued Title Attachment Prepared by DateReplied Delivered to VolumeDate delivered
Correspondence submission to PCI 703
No. Rev. To CC: Issued Title Attachment Prepared by DateReplied Delivered to VolumeDate delivered
45.00
Correspondence submission to PCI 704
No. Rev. To CC: Issued Title Attachment Prepared by DateReplied Delivered to VolumeDate delivered
Correspondence submission to PCI 705
No. Rev. To CC: Issued Title Attachment Prepared by DateReplied Delivered to VolumeDate delivered
Correspondence submission to PCI 706
No. Rev. To CC: Issued Title Attachment Prepared by DateReplied Delivered to VolumeDate delivered
Correspondence submission to PCI 707
No. Rev. To CC: Issued Title Attachment Prepared by DateReplied Delivered to VolumeDate delivered
Correspondence submission to PCI 708
No. Rev. To CC: Issued Title Attachment Prepared by DateReplied Delivered to VolumeDate delivered
Correspondence submission to PCI 709
No. Rev. To CC: Issued Title Attachment Prepared by DateReplied Delivered to VolumeDate delivered
Correspondence submission to PCI 710
No. Rev. To CC: Issued Title Attachment Prepared by DateReplied Delivered to VolumeDate delivered
Correspondence submission to PCI 711
No. Rev. To CC: Issued Title Attachment Prepared by DateReplied Delivered to VolumeDate delivered
Correspondence submission to PCI 712
No. Rev. To CC: Issued Title Attachment Prepared by DateReplied Delivered to VolumeDate delivered
1,244,000
Correspondence submission to PCI 713
No. Rev. To CC: Issued Title Attachment Prepared by DateReplied Delivered to VolumeDate delivered
Correspondence submission to PCI 714
No. Rev. To CC: Issued Title Attachment Prepared by DateReplied Delivered to VolumeDate delivered
Correspondence submission to PCI 715
No. Rev. To CC: Issued Title Attachment Prepared by DateReplied Delivered to VolumeDate delivered
+
Correspondence submission to PCI 749
REV. Received From Date Issued Title Attachment Status
DT-77 BB 14/03/25 PCCC documents (CD)
TS-04 14/08/22 Mock up Inspection ReportDT-107 BB 14/09/18
DT-109 BB 14/09/22
DT-110 BB 14/09/22
DT-116 BB 14/10/08 Approved IPC No.05 for SMZ 01 ORIGINAL TungDT-119 BB 14/10/08 01 Copy
PCCC 14/10/10 01 ORIGINAL a Nguyen
DT-122 BB 14/10/10 1 copy M&E
DT-123 BB 14/10/23 List of Imported Products (2nd batch)
DT-124 BB 14/10/24
DT-125 BB 14/10/28 3 original
DT-126 BB 14/10/30 3 original Quyen keeps
DT-128 BB 14/11/06 Approved IPC No.06 for SMZ 1 Original
Author/Delivered to
Author
Date Delivered to Author
Minutes No.1: Completion of Foundation Work for Main Building
Minutes No.1 (official)_Red signed
PCCC, Hydraulic calculation for roof and warehouse (with sketch); FF system design report; smoke exhaust calculation; approved PCCC documents; drawings, certificate & technical report, CD
BBVN comments on incident investigation report No.3 - Clean room wall
DKE comments on drawings for PCCC Resubmission (7A3size drawings)
M&E teamTransmit to NS in TS-293 dated 9-OCT
Minutes of Meeting/Inspection in 9-October-2014
Calculation and Report for PCCC Re-submission: (i) Fire service report - PCCC; (ii) Report-Heating, ventilation & cooling system; (iii) Report-Fire fighting system; (iv) Hydraulic calculation (Production)
North Star on 10-OCT (TS-298)
Letter to DOC (Request for Inspection of Foundation Completion)
Power of Attorney_from BBVN to SMZ to work with PCCC
given to Ms. Hau
Letter to EVN Thanh Oai pertaining Power Shutdown (1st & 2nd NOV) for S1 Power Supply Modification
Tung/Sent to Mrs. Hieu
Correspondence submission to PCI 750
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 751
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 752
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 753
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 754
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 755
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 756
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 757
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 758
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 759
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 760
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 761
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 762
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 763
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 764
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 765
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 766
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 767
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 768
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 769
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 770
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 771
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 772
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 773
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 774
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 775
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 776
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 777
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 778
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 779
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 780
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 781
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 782
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 783
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 784
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 785
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 786
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 787
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 788
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 789
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 790
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 791
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 792
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 793
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 794
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 795
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 796
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 797
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 798
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 799
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 800
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 801
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 802
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 803
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 804
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 805
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
45.00
Correspondence submission to PCI 806
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 807
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 808
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 809
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 810
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 811
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 812
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 813
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 814
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 815
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 816
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 817
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 818
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
1,244,000
Correspondence submission to PCI 819
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 820
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 821
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 822
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 823
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 824
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 825
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 826
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 827
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 828
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 829
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 830
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 831
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 832
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 833
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 834
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 835
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 836
REV. Received From Date Issued Title Attachment StatusAuthor/Delivered to
Author
Date Delivered to Author
+
Correspondence submission to PCI 871
OUTGOIING Section No. Section Date Issued Title Attachment Status
BBVN-FIVE-S2-SC-IR0001
14/03/04 ….. Hoang QC
000214/03/11 Testing Concrete (7 day)_ M30, M40, Slump 14 ±2 Hoang QC
000314/03/13 Concrete Mixing trial Hoang QC
000414/03/17 Concrete Mixing trial Hoang QC
000514/03/21 Concrete Mixing trial Hoang QC
000614/03/24 Trial Mixing Concrete Test (AQH) (7 days) Hoang QC
000714/03/26 Inspection within the new construction boundary
0008Trial Mixing Concrete Test (MHDI9)
000914/04/02 Nguyen
001014/04/04 Trial Mixing Concrete Test (AQH) 14 days Hoang
001114/04/04 Trial Mixing Concrete Test (MHDI9) 14 days Hoang
001214/04/07 Anchor Bolts Testing Hoang
001314/04/07 Rebar Testing for Construction Hoang
001414/04/11 Actual soil level Check Nguyen
001514/04/14 Trung
001614/04/15 Trial Mixing Concrete Test (AQH) 28 days Hoang
001714/04/15 Soft Soil Treatment Ba Hoa
001814/04/16 Compact Sand K90-layer1 Ba Hoa
001914/04/18 Compact Sand K90_layer 2 Ba Hoa
002014/04/18 Concrete Spacer Mixing Grade 30MPa Hoang
0021
BBVN-FIVE-S2-SC-IR/ CON0022
14/04/23 Phuc
BBVN-FIVE-S2-SC-IR/ QC/MA0023
14/04/23 Hoang
BBVN-FIVE-S2-SC-IR/ CON
0024
14/04/24 Phuc
BBVN-FIVE-S2-SC-IR/
0025
14/04/26 Toan
BBVN-FIVE-S2-SC-IR/
0026
14/04/26 Toan
BBVN-FIVE-S2-SC-IR/
0027
14/04/28 Toan
BBVN-FIVE-S2-SC-IR/ 0028BBVN-FIVE-S2-SC-IR/ 0029BBVN-FIVE-S2-SC-IR/ 0030BBVN-FIVE-S2-SC-IR/ 0031BBVN-FIVE-S2-SC-IR/ 0032BBVN-FIVE-S2-SC-IR/ 0033BBVN-FIVE-S2-SC-IR/ 0034BBVN-FIVE-S2-SC-IR/ 0035
Author/Delivered to
Date Delivered to Author
Concrete Mixing trial (7 day - 28 days)_ M30, M40, Slump 14 ±2
BBVN-FIVE-S2-SC-IR-0002-14BBVN-FIVE-S2-SC-IR-0003
BBVN-FIVE-S2-SC-IR-0004
BBVN-FIVE-S2-SC-IR-0005
BBVN-FIVE-S2-SC-IR-0006
BBVN-FIVE-S2-SC-IR-0007
Chu Binh Nguyen
BBVN-FIVE-S2-SC-IR-0008
BBVN-FIVE-S2-SC-IR-0009
Inspection the existing soil level at construction site (from 9Am-10AM) dated 3-Apr-2014
BBVN-FIVE-S2-SC-IR-0010
BBVN-FIVE-S2-SC-IR-0011
BBVN-FIVE-S2-SC-IR-0012
BBVN-FIVE-S2-SC-IR-0013
BBVN-FIVE-S2-SC-IR-0014
BBVN-FIVE-S2-SC-IR/M&E-Site-0015
Inspection of Remove and Modification existing fire hydrant pipe before & after at construction site
BBVN-FIVE-S2-SC-IR/QC-MA-0016
BBVN-FIVE-S2-SC-IR/CON-0017
BBVN-FIVE-S2-SC-IR/CON-0018
BBVN-FIVE-S2-SC-IR/CON-0019
BBVN-FIVE-S2-SC-IR/CON-0020
BBVN-FIVE-S2-SC-IR/QC-MA-0021
Lean Concrete for Pile Cap (PC 8, PC10, PC11, PC13, PC16, PC18, PC31, PC33, PC36, PC40, PC41, C48, C50, C53, C56, C58, C71, C73, C76, C79, C94, C96, C99, C102, C104, )
Sampling Steel Plate for Steel Structure thickness 6mm, 8mm, 10mm, 12mm, 16mm, 20mm& 40mm
Lean Concrete for Foundation PC1C(PC13), PC1C(PC36), PC1B(C53), PC1B(C76), PC1B(C99), PC1C(PC15), PC1C(PC34), PC1B(C51), PC1B(C55), PC1B(C74), PC1B(C78), PC1B(C97), PC2(PC41), PC1C(PC09), PC1C(PC32), PC1(PC08), PC1(PC31), PC1A(C58), PC1A(C81), PC1A(C104), PC2(PC40), PC1A(C104), PC1A(PC40), PC1A(C48), PC1A(C71), PC1A(C94) (24Nos.)
Lean Concrete for Foundation PC1( PC17 ), PC1A ( C49 ), PC1A ( C72 ), PC1A ( C95 ),PC1 ( PC7 ),PC1 ( PC30 ),PC1A ( C59 ),PC1A ( C82 ),PC1A ( C105 ),PC1 ( PC06 ),PC1 ( PC29 ),PC1A ( C60 ),PC1A ( C83 ),PC1A ( C106 ),PC2 ( PC39 )
Formwork, Rebar, Casting concrete for PC1B(C56), PC1B(C79) ,PC1B(C102), PC1A(C73) , PC1A(C96), PC1A(C57), PC1A(C80), PC1A(C103), PC1A(C72), PC1A(C95)
Formwork, Rebar, Casting concrete for PC1C(PC11), PC1C(PC10), PC1C(PC16), PC1B(C56), PC1B(C79), PC1A(C80), PC1B(C97), PC1A(C96), PC1B(C101), PC1A(C103)
Correspondence submission to PCI 872
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
0035 (B) 14/05/04 Inspection Pile Treatment (higti) ToanBBVN-FIVE-S2-SC-IR/ 0036BBVN-FIVE-S2-SC-IR/ 0037BBVN-FIVE-S2-SC-IR/ 0038BBVN-FIVE-S2-SC-IR/ 0039BBVN-FIVE-S2-SC-IR/ 0040BBVN-FIVE-S2-SC-IR/ 0041BBVN-FIVE-S2-SC-IR/ 0042BBVN-FIVE-S2-SC-IR/ 0043BBVN-FIVE-S2-SC-IR/ 0044BBVN-FIVE-S2-SC-IR/ 0045BBVN-FIVE-S2-SC-IR/ 0046BBVN-FIVE-S2-SC-IR/ 0047BBVN-FIVE-S2-SC-IR/ 0048BBVN-FIVE-S2-SC-IR/ 0049BBVN-FIVE-S2-SC-IR/ 0050BBVN-FIVE-S2-SC-IR/
0051
BBVN-FIVE-S2-SC-IR/ 0052BBVN-FIVE-S2-SC-IR/ 0053BBVN-FIVE-S2-SC-IR/ 0054BBVN-FIVE-S2-SC-IR/ 0055BBVN-FIVE-S2-SC-IR/ 0056BBVN-FIVE-S2-SC-IR/ 0057BBVN-FIVE-S2-SC-IR/ 0058BBVN-FIVE-S2-SC-IR/ 0059BBVN-FIVE-S2-SC-IR/ 0060BBVN-FIVE-S2-SC-IR/
006114/05/22 Inspection Installation sleeves on trench pit wall at construction site Trung
BBVN-FIVE-S2-SC-IR/ 0062 14/05/22 Inspection of Project Sign Board NguyenBBVN-FIVE-S2-SC-IR/ 0063
00640065006600670068006900700071
007214/05/28 Phuc
00730074007500760077
CON 0078 14/05/31 Lean concrete for external drainage system Toan007900800081008200830084008500860087
Rebar, Formwork, Casting Concrete for Ground Beam Axis K - E & 18 - 21
Correspondence submission to PCI 873
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 874
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 875
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 876
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 877
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 878
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 879
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 880
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 881
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 882
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 883
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 884
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 885
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 886
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 887
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 888
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 889
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 890
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 891
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 892
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 893
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 894
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 895
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 896
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 897
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 898
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 899
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 900
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 901
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 902
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 903
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 904
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 905
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 906
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 907
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 908
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 909
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 910
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 911
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 912
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 913
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 914
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 915
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 916
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 917
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 918
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 919
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 920
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 921
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 922
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 923
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 924
OUTGOIING Section No. Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 955
OUTGOIING Section Date Issued Title Attachment Status
BBVN-FIVE-S2-SC-ACPT0001
QC-MA-Concrete 14/04/23 Concrete for Construction Proportions Mix Design Result Hoang QC
BBVN-FIVE-S2-SC-ACPT0002
14/04/23
BBVN-FIVE-S2-SC-ACPT 0003BBVN-FIVE-S2-SC-ACPT 0004BBVN-FIVE-S2-SC-ACPT 0005BBVN-FIVE-S2-SC-ACPT 0006BBVN-FIVE-S2-SC-ACPT 0007BBVN-FIVE-S2-SC-ACPT 0008BBVN-FIVE-S2-SC-ACPT 0009BBVN-FIVE-S2-SC-ACPT 0010BBVN-FIVE-S2-SC-ACPT 0011BBVN-FIVE-S2-SC-ACPT 0012BBVN-FIVE-S2-SC-ACPT 0013BBVN-FIVE-S2-SC-ACPT 0014BBVN-FIVE-S2-SC-ACPT 0015BBVN-FIVE-S2-SC-ACPT 0016BBVN-FIVE-S2-SC-ACPT 0017BBVN-FIVE-S2-SC-ACPT 0018BBVN-FIVE-S2-SC-ACPT 0019BBVN-FIVE-S2-SC-ACPT 0020BBVN-FIVE-S2-SC-ACPT 0021BBVN-FIVE-S2-SC-ACPT 0022BBVN-FIVE-S2-SC-ACPT 0023BBVN-FIVE-S2-SC-ACPT 0024BBVN-FIVE-S2-SC-ACPT 0025BBVN-FIVE-S2-SC-ACPT 0026BBVN-FIVE-S2-SC-ACPT 0027BBVN-FIVE-S2-SC-ACPT 0028BBVN-FIVE-S2-SC-ACPT 0029BBVN-FIVE-S2-SC-ACPT 0030BBVN-FIVE-S2-SC-ACPT 0031BBVN-FIVE-S2-SC-ACPT 0032BBVN-FIVE-S2-SC-ACPT 0033BBVN-FIVE-S2-SC-ACPT 0034BBVN-FIVE-S2-SC-ACPT 0035BBVN-FIVE-S2-SC-ACPT 0036
00370038003900400041004200430044004500460047004800490050
0051
0052005300540055005600570058005900600061006200630064006500660067
Author/Delivered to
Date Delivered to Author
MINUTES FOR MATERIAL/EQUIPMENT INSPECTION & ACCEPTANCE
Correspondence submission to PCI 956
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 957
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 958
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 959
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 960
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 961
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 962
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 963
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 964
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 965
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 966
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 967
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 968
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 969
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 970
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 971
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 972
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 973
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 974
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 975
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 976
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 977
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 978
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 979
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 980
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 981
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 982
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 983
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 984
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 985
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 986
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 987
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 988
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 989
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 990
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 991
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 992
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 993
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 994
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 995
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 996
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 997
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 998
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 999
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 1000
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 1001
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 1002
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 1003
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 1004
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 1005
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 1006
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 1007
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 1008
OUTGOIING Section Date Issued Title Attachment StatusAuthor/Delivered to
Date Delivered to Author
Correspondence submission to PCI 1040
No. Rev. Date Issued Rev Title Attachment Status
14/03/20 17-23 Mar 2014
14/03/21 24-30 Mar 2014 Toan
14/03/24 24-30 Mar 2014 (Rev.1) Toan
14/04/04 7-13 Apr 2014 Toan
Date Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
BBVN-FIVE-S2-SC-LMS-0001
BBVN-FIVE-S2-SC-LMS-0002
BBVN-FIVE-S2-SC-LMS-0002/R1
BBVN-FIVE-S2-SC-LMS-0003
Correspondence submission to PCI 1041
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1042
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1043
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1044
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1045
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1046
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1047
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1048
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1049
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1050
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1051
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1052
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1053
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1054
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1055
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1056
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1057
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1058
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1059
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1060
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1061
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1062
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1063
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1064
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1065
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1066
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1067
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1068
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1069
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1070
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1071
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1072
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1073
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1074
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1075
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1076
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1077
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1078
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1079
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1080
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1081
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1082
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1083
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1084
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1085
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1086
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1087
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1088
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1089
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1090
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1091
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1092
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1093
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1094
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1095
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1096
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1097
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1098
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1099
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1100
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1101
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1102
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1103
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1104
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1105
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1106
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1107
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1108
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1109
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1110
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1111
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1112
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1113
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1114
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1115
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1116
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1117
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1118
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1119
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1120
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1121
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1122
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1123
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1124
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1125
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
Correspondence submission to PCI 1126
No. Rev. Date Issued Rev Title Attachment StatusDate Delivered
Date Required
Reply
INCOMING
Date Issued
Date Received
Author/Delivered to
Author
Date Delivered to Author
+
WEEKLY MEETINGFile Issued Title File Code
M-01-001 06/11/23 Weekly MOM at PCI office. No1 -23 November-2006 MOM-03-01M-01-002 06/11/30 Weekly MOM at PCI office. No1 -30 November-2006 MOM-03-01M-01-003 06/12/07 Weekly MOM at PCI office. No3 -7 December-2006 MOM-03-01M-01-004 06/12/15 Weekly MOM at PCI office. No4 -15 December-2006 MOM-03-01M-01-005 06/12/21 Weekly MOM at PCI office. No 5 -21 December-2006 MOM-03-01M-01-006 06/12/29 Weekly MOM at PCI office. No 6 -28 December-2006 MOM-03-01M-01-007 07/01/04 Weekly MOM at PCI office. No 7 -04 January-2007 MOM-03-01M-01-008 07/01/15 Weekly MOM at PCI office. No 8 -11 January-2007 MOM-03-01M-01-009 07/01/20 Weekly MOM at PCI office. No 9 -18 January-2007 MOM-03-01M-01-010 07/01/25 Weekly MOM at PCI office. No 10 -25 January-2007 MOM-03-01M-01-011 07/02/01 Weekly MOM at PCI office. No 11 -01 February-2007 MOM-03-01M-01-012 07/02/08 Weekly MOM at PCI office. No 12 -08 February-2007 MOM-03-01M-01-013 07/02/14 Weekly MOM at PCI office. No 13 -14 February-2007 MOM-03-01M-01-014 07/03/01 Weekly MOM at PCI office. No 14 -1 March -2007 MOM-03-01M-01-015 07/03/09 Weekly MOM at PCI office. No 15 -8 March -2007 MOM-03-01M-01-016 07/03/15 Weekly MOM at PCI office. No 16 -15 March -2007 MOM-03-01M-01-017 07/03/22 Weekly MOM at PCI office. No 17 -22 March -2007 MOM-03-01M-01-018 07/03/30 Weekly MOM at PCI office. No 18 -30 March -2007 MOM-03-01M-01-019 07/04/05 Weekly MOM at PCI office. No 19 -05 April -2007 MOM-03-01M-01-020 07/04/12 Weekly MOM at PCI office. No 20 -12 April -2007 MOM-03-01M-01-021 07/04/19 Weekly MOM at PCI office. No 21 -19 April -2007 MOM-03-01M-01-022 07/05/02 Weekly MOM at PCI office. No 22 -03 May-2007 MOM-03-01M-01-023 07/05/10 Weekly MOM at PCI office. No 23 -10 May-2007 MOM-03-01M-01-024 07/05/17 Weekly MOM at PCI office. No 24 -17 May-2007 MOM-03-01M-01-025 07/05/24 Weekly MOM at PCI office. No 25 -24 May-2007 MOM-03-01M-01-026 07/05/31 Weekly MOM at PCI office. No 26 -31 May-2007 MOM-03-01M-01-027 07/06/07 Weekly MOM at PCI office. No 27 -7 June-2007 MOM-03-01M-01-028 07/06/21 Weekly MOM at PCI office. No 28 -21 June-2007 MOM-03-01M-01-029 07/06/28 Weekly MOM at PCI office. No 29 -28 June-2007 MOM-03-01M-01-030 07/07/05 Weekly MOM at PCI office. No 30 -05 July-2007 MOM-03-01M-01-031 07/07/12 Weekly MOM at PCI office. No 31 -12 July-2007 MOM-03-01M-01-032 07/07/19 Weekly MOM at PCI office. No 32 -19 July-2007 MOM-03-01M-01-033 07/07/28 Weekly MOM at PCI office. No 33 -26 July-2007 MOM-03-01M-01-034 07/08/02 Weekly MOM at PCI office. No 34 -02 August-2007 MOM-03-01M-01-035 07/08/08 Weekly MOM at PCI office. No 35 -08 August-2007 MOM-03-01M-01-036 07/08/16 Weekly MOM at PCI office. No 36 -16 August-2007 MOM-03-01M-01-037 07/08/23 Weekly MOM at PCI office. No 37 -23 August-2007 MOM-03-01M-01-038 07/08/30 Weekly MOM at PCI office. No 38 -30 August-2007 MOM-03-01M-01-039 07/09/06 Weekly MOM at PCI office. No 39 -06 Sep-2007 MOM-03-01M-01-040 07/09/13 Weekly MOM at PCI office. No 40 -13 Sep-2007 MOM-03-01M-01-041 07/09/20 Weekly MOM at PCI office. No 41 -20 Sep-2007 MOM-03-01M-01-042 07/09/28 Weekly MOM at PCI office. No 42 -28 Sep-2007 MOM-03-01M-01-043 07/10/04 Weekly MOM at PCI office. No 43 -04 October-2007 MOM-03-01M-01-044 07/10/11 Weekly MOM at PCI office. No 44 -11 October-2007 MOM-03-01M-01-045 07/10/18 Weekly MOM at PCI office. No 45 -18 October-2007 MOM-03-01M-01-046 07/10/25 Weekly MOM at PCI office. No 46 -25 October-2007 MOM-03-01M-01-047 07/11/01 Weekly MOM at PCI office. No 47 -01 November-2007 MOM-03-01M-01-048 07/11/08 Weekly MOM at PCI office. No 48 -08 November-2007 MOM-03-01M-01-049 07/11/15 Weekly MOM at PCI office. No 49 -15 November-2007 MOM-03-01M-01-050 07/11/22 Weekly MOM at PCI office. No 50 -22 November-2007 MOM-03-01M-01-052 07/12/08 Weekly MOM at PCI office. No 52 -06 December-2007 MOM-03-01M-01-053 07/12/13 Weekly MOM at PCI office. No 53 -13 December-2007 MOM-03-01
M-01-054 07/12/20 Weekly MOM at PCI office. No 54 -20 December-2007 MOM-03-01M-01-055 07/12/26 Weekly MOM at PCI office. No 55 -26 December-2007 MOM-03-01M-01-056 08/01/10 Weekly MOM at PCI office. No 56 -10 January -2008 MOM-03-01M-01-057 08/01/23 Weekly MOM at PCI office. No 57 -23 January -2008 MOM-03-01M-01-058 08/01/30 Weekly MOM at PCI office. No 58 -30 January -2008 MOM-03-01M-01-059 08/02/20 Weekly MOM at PCI office. No 59 -20 February -2008 MOM-03-01M-01-060 08/02/27 Weekly MOM at PCI office. No 60 -27 February -2008 MOM-03-01M-01-061 08/03/12 Weekly MOM at PCI office. No 61 -12 March -2008 MOM-03-01M-01-062 08/03/19 Weekly MOM at PCI office. No 62 -19 March -2008 MOM-03-01M-01-063 08/03/26 Weekly MOM at PCI office. No 63 -26 March -2008 MOM-03-01M-01-064 08/04/02 Weekly MOM at PCI office. No 64-02 April 2008 MOM-03-01M-01-065 08/04/23 Weekly MOM at PCI office. No 65-22 April 2008 MOM-03-01M-01-066 08/05/07 Weekly MOM at PCI office. No 66-7 May 2008 MOM-03-01M-01-067 08/05/14 Weekly MOM at PCI office. No 67-14 May 2008 MOM-03-01M-01-068 08/05/21 Weekly MOM at PCI office. No 68-21May 2008 MOM-03-01M-01-069 08/06/18 Weekly MOM at PCI office. No 69-18 June 2008 MOM-03-01M-01-070 08/06/25 Weekly MOM at PCI office. No 70-25 June 2008 MOM-03-01M-01-071 08/07/02 Weekly MOM at PCI office. No 71-02 July 2008 MOM-03-01M-01-072 08/07/16 Weekly MOM at PCI office. No 72-16 July 2008 MOM-03-01M-01-074 08/08/06 Weekly MOM at PCI office. No 74-06 August 2008 MOM-03-01M-01-075 08/08/13 Weekly MOM at PCI office. No 75-13 August 2008 MOM-03-01M-01-076 08/08/20 Weekly MOM at PCI office. No 76-20 August 2008 MOM-03-01M-01-077 08/09/03 Weekly MOM at PCI office. No 77-03 Sep 2008 MOM-03-01M-01-078 08/09/10 Weekly MOM at PCI office. No 78-10 Sep 2008 MOM-03-01M-01-079 08/09/17 Weekly MOM at PCI office. No 79-17 Sep 2008 MOM-03-01M-01-080 08/09/24 Weekly MOM at PCI office. No 80-24 Sep 2008 MOM-03-01M-01-082 08/10/08 Weekly MOM at PCI office. No 82- 8 Oct 2008 MOM-03-01M-01-083 08/10/15 Weekly MOM at PCI office. No 83-15 Oct 2008 ( No meeting) MOM-03-01
M-01-084 08/10/22 Weekly MOM at PCI office. No 84-22 Oct 2008 ( no meeting) MOM-03-01
M-01-085 08/10/29 Weekly MOM at PMU office. No 85- 29 Oct 2008 MOM-03-01M-01-086 08/11/19 Weekly MOM at PCI office. No 86-19 Nov 2008 MOM-03-01M-01-087 09/01/14 Weekly MOM at PMU office. No 87-14 Jan 2009 MOM-03-01M-01-088 09/04/06 Weekly MOM at PMU office. No 88-06 Apr 2009 MOM-03-01
WEEKLY MEETING BI-WEEKLY MEETINGVolume File Issued TitleVol 01 MB-01-001 06/12/11 Bi-weekly MOM at PMU office on 12/11/06Vol 01 MB-01-002 06/12/25 Bi-weekly MOM at PMU office on 25/12/06Vol 01 MB-01-003 07/01/08 Bi-weekly MOM at PMU office on 8 Jan 2007Vol 01 MB-01-004 07/01/22 Bi-weekly MOM at PMU office on 22 Jan 2007Vol 01 MB-01-005 07/03/06 Bi-weekly MOM at PMU office on 06/03/07Vol 01 MB-01-006 07/03/19 Bi-weekly MOM at PMU office on 19/03/07Vol 01 MB-01-007 07/04/01 Bi-weekly MOM at PMU office on 01/04/07Vol 01 MB-01-008 07/04/16 Bi-weekly MOM at PMU office on 16/04/07Vol 01 MB-01-009 07/05/07 Bi-weekly MOM at PMU office on 07/05/07Vol 01 MB-01-010 07/06/04 Bi-weekly MOM at PMU office on 04 June 2007Vol 01 MB-01-011 07/07/10 Bi-weekly MOM at PMU office on 10/07/07Vol 01 MB-01-012 07/07/23 Bi-weekly MOM at PMU office on 23 July 2007Vol 01 MB-01-013 07/08/13 Bi-weekly MOM at PMU office on 13 August 2007Vol 01 MB-01-014 07/09/10 Bi-weekly MOM at PMU office on 10 September 2007Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 01Vol 02 MB-01-015 07/10/01 Bi-weekly MOM at PMU office on 01 October 2007Vol 02 MB-01-016 07/10/22 Bi-weekly MOM at PMU office on 22 October 2007Vol 02 MB-01-016 07/11/12 Bi-weekly MOM at PMU office on 12 November 2007Vol 02 MB-01-017 07/11/26 Bi-weekly MOM at PMU office on 26 November 2007Vol 02 MB-01-018 07/12/24 Bi-weekly MOM at PMU office on 24 December 2007Vol 02 MB-01-019 08/01/14 Bi-weekly MOM at PMU office on 14 January 2008Vol 02 MB-01-020 08/03/03 Bi-weekly MOM at PMU office on 03 March 2008Vol 02Vol 02Vol 02Vol 02
Vol 02Vol 02Vol 02Vol 02Vol 02Vol 02Vol 02Vol 02Vol 02Vol 03 MB-01-021 08/03/31 Bi-weekly MOM at PMU office on 31 March 2008Vol 03 MB-01-022 08/06/02 Bi-weekly MOM at PMU office on 02 June 2008Vol 03 MB-01-023 08/07/07 Bi-weekly MOM at PMU office on 07 July 2008Vol 03 MB-01-024 08/08/25 Bi-weekly MOM at PMU office on 25 August 2008Vol 03Vol 03Vol 03Vol 03Vol 03Vol 03Vol 03Vol 03Vol 03Vol 03Vol 03Vol 03Vol 03Vol 03Vol 03
Vol 03
Vol 03Vol 03Vol 03Vol 03
BI-WEEKLY MEETINGFile Code Volume
MOM-03-01 Vol 01MOM-03-01 Vol 01MOM-03-01 Vol 01MOM-03-01 Vol 01MOM-03-01 Vol 01MOM-03-01 Vol 01MOM-03-01 Vol 01MOM-03-01 Vol 01MOM-03-01 Vol 01MOM-03-01 Vol 01MOM-03-01 Vol 01MOM-03-01 Vol 01MOM-03-01 Vol 01MOM-03-01 Vol 01
MOM-03-01 Vol 02MOM-03-01 Vol 02MOM-03-01 Vol 02MOM-03-01 Vol 02MOM-03-01 Vol 02MOM-03-01 Vol 02MOM-03-01 Vol 02