PROJECT BOOKOver 65 years shaping pathways underground
RAILWAY
OSSA, founded in 1952, is a leading company in the underground construction sector specializing in four business areas:
Construction, Energy, Mining and Services.
Both in underground excavations by traditional method (NATM) and in tunneling with TBM, OSSA is a solid underground
works partner for important industrial and construction groups internationally. At OSSA we are highly commited to
Quality, Health and Safety, and Environment, and we invest in Research and Development Projects at an international
level. We promote a culture of respect and teamwork among our team.
OSSA has vast recent experience in high speed railway tunnels with over 75 km of high speed rail tunneling projects,
leading the Spanish market in this specialty, and also in underground power plants, having built over fifteen underground
plants with some of the largest underground caverns in the world. As a recent highlight, we have built more than 10 km
of tunnels for the Santiago de Chile Metro.
Internationally OSSA has executed works in Hong Kong, Taiwan, Chile, Peru, Colombia, Panama, Costa Rica, Brasil and
Guatemala and is recently focusing its tendering activity in North America, Central America, Asia and Great Britain.
After 65 years of success, our strategy is to continue expanding internationally, and to support large civil engineering and
mining industry clients at all levels, contributing our vast technical expertise and our equipment fleet, while prioritizing
health and safety and innovation in all our projects.
PRESENTATION
SAFETYSafety is OSSA’s main asset from the time when its operations began, demanded by the specialisation required for the works carried out underground.
The company’s staff have a high degree of professionalism and specialisation, which has been achieved after many years of training and the transfer of know how. Working in confined spaces with the presence of gas, dust, noise, low visibility and the use of explosives means that OSSA’s safety department is the most relevant in the company.
The use of cutting-edge, innovative techniques in the field of underground works requires the continuous training of the company’s human resources.
CONSTRUCTION DATA SHEET
Type:
Project photos:
Project:
Owner:
Start: Section:
End: Lenght:STATUS
STRUCTURE
COUNTRY
PROVINCE
PLACE
BUDGET(EXCLUDING VAT)
LOCATIONANDADITIONALINFORMATION
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNEL EQUIPMENT
GEOMETRY28 m²
Emergency exits. Variable
Drill and blast excavation and NATM
Variable
Drilling JumboBackhoe excavatorShotcrete machinesLoadersTrucks
Basque Country
Spain
Mondragón, Elorrio, Durango,Amorebieta, Lemoa, Galdakao and Basauri.
25.220.115 €
The works are located on the route of the Vitoria - Bilbao - San Sebastián axis of the high-speed train. The project covers 7 different sections of tunnel where, by the new regulation, it is necessary to build parallel emergency galleries so that there are no more than 1.000 m of tunnel without an emergency exit.
4.771 m. (Galleríes) + 183 m. (Connections)01/2022
10/2019
RAILWAY NEW EMERGENCY EXITS AT THE HIGH SPEED TRAIN LINEVITORIA-BILBAO-SAN SEBASTIÁN. VITORIA-BILBAO
ADIF
Project photos
Type Project
CONSTRUCTION DATA SHEET RAILWAY
STATUSStart: 04/2019
End: 12/2020
STRUCTURE Energency exits
PROVINCE Guipuzcoa
COUNTRY Spain
PLACE Bergara – Astigarraga
LOCATIONANDADDITIONALINFORMATION
The works are located on the Vitoria–Bilbao–San Sebastián axis of the high-speed train. The project in question consists of four different sections of tunnel where, by the new regulations, it is necessary to build new parallel emergency galleries so that there is no more than 1,000 m of tunnel without emergency exit. The work is undertaken with two excavation and support teams and two lining equipment.
GEOMETRYCross section: 20 m²
Lenght: 1,860 m
OVERBURDEN Variable
METHODOF TUNNELING Drill and blast
GEOLOGY ANDGEOTECHNICAL DATA Variable
TUNNEL EQUIPMENT
Drilling jumboLoadersBackhoesTrucksTelehandlersShotcrete machines
BUDGET(EXCLUDING VAT) 10,575,000 €
Owner: E.T.S.
NEW EMERGENCY EXITS AT THE HIGH SPEED TRAIN LINE VITORIA–BILBAO–SAN SEBASTIÁN. BERGARA–ASTIGARRAGA SECTION
Type Project
Project photos
Owner: Sociedad Estatal de Infraestructuras Terrestres
Start: 01/2010
End: 12/2019STATUS
TunnelsSTRUCTURE
ZamoraPROVINCE
SpainCOUNTRY
Pedralba de la Pradería, Requejo
PLACE
The works consist of the execution of the track bed for the High Speed Madrid-Galicia line, comprising 4.96 km of double track and 1.44 km of single track. The main works carried out were two viaducts: Requejo, with a length of 2.1 km; Los Pedregales, at 1.42 km. In addition the Pedralba de la Pradería Tunnel has been executed in the double-track section, with a length of 1,700 m including the false tunnels (1,580 m of bored tunnel) and an open cross-section of 86 m2. The Requejo Tunnel has also been executed, 2.4 km in length, for single track, with a cross-section of 75 m2, and including the construction of two false tunnels of 20 m each at the entrance and exit and another of 40 m in the middle. The excavation process for the tunnels follows the principles of the the New Austrian Method (NATM). Areas where the terrain is of high resistance have been excavated by drill and blast and those where it is of poorer quality with mechanical excavation.
GEOMETRY
MediumOVERBURDEN
NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation
METHODOF TUNNELING
Schists, slates with intercalations of quartzitesGEOLOGY ANDGEOTECHNICAL DATA
Type XL3C three-boom JumbosPutzmeister PM500 RobotManitou MRT 1650Backhoe loader with pick hammer
TUNNEL EQUIPMENT
132,775,860 €BUDGET(EXCLUDING VAT)
NORTH AND NORTHWEST CORRIDOR OF MADRID-GALICIA HIGH-SPEED LINE.LUBIÁN-ZAMORA SECTION. PEDRALBA PRADERÍA–PADORNELO TUNNEL SUBSECTION
Cross section: Tunnel de Pedralba de la Pradería 86 m2
Tunnel de Requejo 75 m2
Lenght: Tunnel de Pedralba de la Pradería 1,700 m. Tunnel de Requejo 2,400 m.
CONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Project photos
High Speed Train TunnelSTRUCTURE
OrensePROVINCE
SpainCOUNTRY
LazaPLACE
The works consist of the completion of the Cerdedelo tunnel, part of the Porticamba-Cerdedelo section of the Galician AVE.
The supports required are generally heavy, based on bolts, trusses, shotcrete and umbrellas. 487 m of tunnel in top heading and 1,028 m of tunnel in benching.
LOCATIONANDADDITIONALINFORMATION
100 mOVERBURDEN
Drilling and blasting / MechanicalMETHODOF TUNNELING
Below average quality slate and ampeliteGEOLOGY ANDGEOTECHNICAL DATA
1 Jumbo XL3C and 1 Jumbo L2C 2 Robot PM 500 1 Normet and 2 Manitous
TUNNEL EQUIPMENT
4,767,424 €BUDGET(EXCLUDING VAT)
Type Project
Owner: UTE LAZA (DRAGADOS-TECSA-COLLOSA-SOGEOSA)
CONSTRUCTION DATA SHEET
Start: 01/2018STATUS
End: 10/2018
TUNNEL COMPLETION, PORTOCAMBA - CERDEDELO SECTION OF MADRID-GALICIA AVE
Tunnel in top heading with 48 m2 section Tunnel in bench with 31 m2 section
GEOMETRY
RAILWAY
Type Project
PUEBLA DE SAN JULIÁN BYPASS
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Lugo
Spain
Puebla de San Julián
77,962,695 €
Medium
Hercinic granodiorite
NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation
Three-boom Jumbo Tamrock Axera. Wet - mix Robojet Putzmeister Wetkret η = 30 m³/h
Two railway tunnels of 520 and 1,450 m length. High speed railway design. 16 existing cross levels have been removed to improve the safety. Construction of “New Puebla de San Julian Station”. Steel reinforced shotcrete 45 Kg/m³, steel ribs TH - 29/HEB - 160, 4 m long bolts and 25 mm of diameter.
04/2007
07/2018
110 m²
1,970 m
Owner: Adif
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
Project photos
Owner: Administración de Infraestructuras Ferroviarias
TRACK BED FOR MADRID–EXTREMADURA–PORTUGUESE BORDER HIGH-SPEED LINE. TALAYUELA–CÁCERES. GRIMALDO–CASAS DE MILLÁN SECTION
Start: 06/2010
End: 07/2018STATUS
TunnelsSTRUCTURE
CáceresPROVINCE
SpainCOUNTRY
Cañaveral, Casas de MillánPLACE
The branch measures a little over 4 miles (6.6 km). The project comprises the construction of two viaducts. The first is over Boquerón Brook and measures 75 m in length, the second is over Campillo Brook and measures 90 m. There is also the construction of the 3,595 m long Santa Marina Tunnel, which includes two cut-and-cover tunnels measuring 215 m and 60 m each. This project also includes earth moving operations, 3 channels, drainage works and replacement of affected services.
Cross section: 100 m²
Length: 3,320 mGEOMETRY
MediumOVERBURDEN
NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation
METHODOF TUNNELING
Quartzite, slate, sandstone and conglomeratesGEOLOGY ANDGEOTECHNICAL DATA
Type XL3C three-boom JumbosPutzmeister PM500 RobotManitou MRT 1650Backhoe loader with hammer
TUNNEL EQUIPMENT
93,951,423 €BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
NEW BASQUE-COUNTRY RAIL NETWORK. TOLOSA SECTION
Project photos
Owner: Gobierno Vasco
Start: 12/2009
End: 11/2016STATUS
TunnelsSTRUCTURE
GuipúzcoaPROVINCE
SpainCOUNTRY
TolosaPLACE
Cross section: 85 m²
Lenght: 1,513 m + 1,453 mGEOMETRY
MediumOVERBURDEN
NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation
METHODOF TUNNELING
Marls, sandstones and limestonesGEOLOGY ANDGEOTECHNICAL DATA
Type XL3C three-boom JumbosPutzmeister PM500 RobotManitou MRT 1650Backhoe loader with pick hammer
TUNNEL EQUIPMENT
69,401,875 €BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
The above-mentioned works consist of the construction of the track bed for the Tolosa Section, between kilometre points 210+475 and 214+266, corresponding to a length of 3,791 m. The project includes construction of the following elements: two double-track tunnels, tunnel 1 with a length of 1,517 m and tunnel 2 measuring 1,455 m, and also two emergency galleries, gallery 1 being 60 m long and connecting with tunnel 1, and gallery 2, which connects with tunnel 2, being 401 m in length. It also includes 3 artificial tunnels, no. 1 being 507.6 m long and 100 m2 in cross-section and no. 2 and no. 3 measuring 23.9 m and 17.6 m in length respectively, both with a cross-section of 85 m2. In addition, there is a viaduct 108 m in length.Tunnels 1 and 2, with bored lengths of 1,512 m and 1,452 m respectively, have an open cross-section of 85 m2. The tunnels have been built by the conventional method, with blasting in areas of sound rock and a backhoe loader in those where the terrain is of poorer quality, using the construction principles of the New Austrian Method (NATM).The main support elements used both in the tunnels and in the evacuation galleries are: shotcrete, Mn-16 expansion rock bolts, type TH-29 and HEB-160 trusses and 150x150x6 mm steel mesh.
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
ESPIÑO TUNNEL. LEFT BRANCH
Owner: OHL - Sobrino - Asfaltos Elsan
Project photos
Start: 05/2013
End: 12/2015STATUS
TunnelsSTRUCTURE
OrensePROVINCE
SpainCOUNTRY
A Gudiña, Vilariño de ConsoPLACE
Excavation of the Espiño Tunnel (Left Branch), belonging to the works on the platform of the Madrid-Galicia high-speed north-northwest corridor. The tunnel is 3,500 m long with an excavation section of approximately 70 m2 and a final section of 52 m2. The following support elements have been used during excavation of the tunnel: sprayed concrete, TH-29 and HEB-160 type trusses, MN-16 type expansion bolts, 88.9 mm and 101.6 mm self-drilling and micro-pilot bolts.
Cross section: 52 m²
Lenght: 3,500 mGEOMETRY
Medium-HighOVERBURDEN
NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation
METHODOF TUNNELING
Siliceous shale, quartzite, Healthy and weathered sandsGEOLOGY ANDGEOTECHNICAL DATA
Three-booms Jumbo Atlas Copco XL3CPutzmesiter PM500 robotManitou MRT 1650Backhoe with pneumatic pick.
TUNNEL EQUIPMENT
9,421,331 €BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
Project photos
Owner: Ferrovial Agroman, S.A.
Start: 05/2013
End: 12/2015STATUS
TunnelsSTRUCTURE
OrensePROVINCE
SpainCOUNTRY
A Gudiña, Vilariño de ConsoPLACE
Excavation of the Espiño Tunnel (Right Branch), belonging to the works on the platform of the Madrid-Galicia high-speed north-northwest corridor. The tunnel is 3,500 m long with an excavation section of approximately 70 m2 and a final section of 52 m2. The following support elements have been used during excavation of the tunnel: sprayed concrete, TH-29 and HEB-160 type trusses, MN-16 type expansion bolts, 88.9 mm and 101.6 mm self-drilling and micro-pilot bolts.
Cross section: 52 m²
Lenght: 3,500 mGEOMETRY
Medium-HighOVERBURDEN
NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation
METHODOF TUNNELING
Siliceous shale, quartzite, Healthy and weathered sandsGEOLOGY ANDGEOTECHNICAL DATA
Three-booms Jumbo Atlas Copco XL3CPutzmesiter PM500 robotManitou MRT 1650Backhoe with pneumatic pick.
TUNNEL EQUIPMENT
10,500,115 €BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET ESPIÑO TUNNEL. RIGHT BRANCH
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Project photos
Start: 08/2008
End: 06/2015STATUS
TunnelsSTRUCTURE
PontevedraPROVINCE
SpainCOUNTRY
Vilagarcía de Arousa y CatoiraPLACE
Construction of the track bed of the Atlantic High-Speed Rail Axis. The length of the section is 8.35 km. The main works carried out are five tunnels: Quinteiro (1,776.5 m), Outeiro (233 m), Valicovas (1,287.75 m), Abalo (520.5 m) and Pedras Miúdas (56 m).
All the tunnels have been constructed using the New Austrian Method (NATM), by drill and blast in the areas where the material is of high geotechnical quality and with backhoe loaders with hammers in the poor-quality areas. The final cross-section of the tunnels is 85 m2. The Quinteiro tunnel has an emergency gallery with a length of 396 m and a cross-section of 32 m2.
The works also include remodelling the marshalling yard, a 82 m long overpass, five underpasses, thirteen drainage works, four walls and replacement of affected services, roads and rights of way.
Cross section: 85 m²
Lenght: 3,873.75 m. (total)GEOMETRY
MediumOVERBURDEN
NATM. Mechanical excavationMETHODOF TUNNELING
Granites with various degrees of alterationGEOLOGY ANDGEOTECHNICAL DATA
Three-boom jumboShotcrete robotBackhoe loaderTelehandler
TUNNEL EQUIPMENT
114,052,749 €BUDGET(EXCLUDING VAT)
Type Project
Owner: Ministerio de Fomento
CONSTRUCTION DATA SHEET ATLANTIC HIGH-SPEED RAIL AXIS.VILAGARCIA DE AROUSA - CATOIRA SECTION
LOCATIONANDADDITIONALINFORMATION
RAILWAY
C824 TUNNEL, HONG KONG
Owner: MTR (Mass Transit Rail Corporation)
Start: 08/2010
End: 12/2013
High speed tunnel
SAR Hong Kong
China
Yuen Long
149,445,693 €
Height
1 underground shaft of 250 m² and 90 m in depth1 underground shaft of 490 m² and 45 m in depthDouble tunnels of 67 m² with 345 m² cavern and bifurcation
Tuffs with quartz veins and sandstone
Shaft excavation with secant piles wall in the upper floor area and drill and blast in the inferior rock area
Atlas Copco XE3CJumbos, L2C, CAT 320 backhoes, PM 500 Robojets,Manitou platforms, GH cranes
Construction of high speed train tunnels. Double tunnels of 2.6 Km each, with a cavern for track changes and two tanks of 90 m and 45 m respectively at the end points of the section.
The tunnel section is of 70 m² per tube.
Excavation is carried out by alternating backhoes with hammers and jumbos. Some measurements: 21,000 m³ of shotcrete, 24,000 m of bolts, such as Swellex MN24, 115t of metallic trusses and 101,000 m³ of reinforced concrete.
Type Project
Project photos
STATUS
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
TUNNEL EQUIPMENT
GEOLOGY ANDGEOTECHNICAL DATA
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
URNIETA TUNNEL
Project photos
Owner: UTE Urumea: Dragados-Obras Subterráneas-Comsa-Leza
Start: 11/2012
End: 12/2013STATUS
TunnelsSTRUCTURE
GuipúzcoaPROVINCE
SpainCOUNTRY
UrnietaPLACE
The work involves constructing the Urnieta rail tunnel in the Urnieta-Hernani section of the Basque Country new rail network project. The tunnel is 2,587 m long and has a open cross-section of 85 m2, the excavation method is the New Austrian Method and the construction procedure has been of a conventional type using blast. Two galleries measuring 642.9 m and 417 m with an open cross-section of 41.5 m2 were also constructed. The support elements used in the tunnel and the galleries have been shotcrete, rock bolts and type TH and HEB trusses.
Cross section: 85 m²
Length: 2,157 mGEOMETRY
HighOVERBURDEN
NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation
METHODOF TUNNELING
Limestones, marls and sandstonesGEOLOGY ANDGEOTECHNICAL DATA
Type XL3C three-boom JumbosPutzmeister PM500 RobotManitou MRT 1650Backhoe loader with pick hammer
TUNNEL EQUIPMENT
17,983,414 €BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
Project photos
Owner: Gobierno Vasco
Start: 12/2010
End: 12/2013STATUS
TunnelsSTRUCTURE
GuipúzcoaPROVINCE
SpainCOUNTRY
UrnietaPLACE
Construction of the platform for the new Basque Country rail network; the section is 5.25 km long. The main work consists of constructing the railway tunnels known as the Urnieta and Hernani tunnels. The support elements employed in the tunnels are of sprayed concrete, Swellex rock bolts, mesh and trusses. Moreover the tunnels are lined with 30 cm of concrete. The budget also includes the construction of two false tunnels 483 m and 185 m long; a 57 m box under the Urumea dual carriageway; two viaducts, one of 163 m over the Uban irrigation channel and the other of 801 m over the river Urumea; and also two underpasses, an overpass and a total of eighteen walls.
LOCATIONANDADDITIONALINFORMATION
Cross section: Urnieta tunnel 85 m2 / Hernani tunnel 95 m2
Length: Urnieta tunnel 2,157 m / Hernani tunnel 769 mGEOMETRY
Medium-HighOVERBURDEN
NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation
METHODOF TUNNELING
Limestones, marls and sandstonesGEOLOGY ANDGEOTECHNICAL DATA
Type XL3C three-boom JumbosPutzmeister PM500 RobotManitou MRT 1650Backhoe loader with pick hammer
TUNNEL EQUIPMENT
115,547,766 €BUDGET(EXCLUDING VAT)
NEW BASQUE-COUNTRY RAIL NETWORK. URNIETA–HERNANI SECTIONCONSTRUCTION DATA SHEET RAILWAY
Type Project
Project photos
Owner: UTE Prado-Porto
Start: 10/2012
End: 11/2013STATUS
TunnelsSTRUCTURE
OurensePROVINCE
SpainCOUNTRY
Laza, Villar de BarrioPLACE
Excavation of the parallel tunnels at Corga de Vela, as part of the works for the Madrid-Galicia High-Speed line, each 1,100 m in length, with an excavation cross-section of approximately 70 m2 and a final cross-section of 52 m2. The main support elements used during execution of the tunnel were: sprayed concrete, type TH-29 and HEB-160 trusses, Mn-16 expansion rock bolts and micropiles with a diameter of 88.9 mm and a wall thickness of 7/8 mm.
Cross section: 52 m²
Length: 2 x 1.1 kmGEOMETRY
Medium-HighOVERBURDEN
NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation
METHODOF TUNNELING
Siliceous shales, quartzites, fresh and meteorite granitesGEOLOGY ANDGEOTECHNICAL DATA
Type XL3C three-boom JumbosPutzmeister PM500 RobotManitou MRT 1650Backhoe loader with pick hammer
TUNNEL EQUIPMENT
10.422.981 €BUDGET(EXCLUDING VAT)
CORGA DE VELA TUNNELSCONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
Project photos
Owner: UTE AVE Grimaldo – Casas de Millán
Start: 04/2011
End: 04/2013STATUS
TunnelsSTRUCTURE
CáceresPROVINCE
SpainCOUNTRY
Cañaveral, Casas de MillánPLACE
The main work consists of the excavation and support of the 3,320 m Santa Marina Tunnel with an excavation cross-section of 140 m2. The main support elements used are: shotcrete, carious types of rock bolts, lattice girders, 150 x 150 x 8 of lath and steel tube micro piles.
Cross section: 100 m²
Length: 3,320 mGEOMETRY
MediumOVERBURDEN
NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation
METHODOF TUNNELING
Quartzite, slate, sandstone and conglomeratesGEOLOGY ANDGEOTECHNICAL DATA
Type XL3C three-boom JumbosPutzmeister PM500 RobotManitou MRT 1650Backhoe loader with pick hammer
TUNNEL EQUIPMENT
34,365,887 €BUDGET(EXCLUDING VAT)
SANTA MARINA TUNNELCONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
Project photos
Owner: Administración de Infraestructuras Ferroviarias
Start: 06/2010
End: 03/2013STATUS
TunnelsSTRUCTURE
OurensePROVINCE
SpainCOUNTRY
Baños de MolgasPLACE
The branch measures over 4 miles (6.65 km) in length. The project includes the construction of the following structures: three viaducts, the 177 m Miamán viaduct, the 216 m Bouzas viaduct and a third over the River Arnoia measuring 799 m in length. In addition to construction work also includes earth moving operations, 2 pergolas to salvage the current rail line measuring 57.16 m and 176.9 m each, elevated crossings and subways, drainage works, replacement of affected services.
Cross section: 95 m²
Length: 852 mGEOMETRY
MediumOVERBURDEN
NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation
METHODOF TUNNELING
Quartzite, slate, sandstone and conglomeratesGEOLOGY ANDGEOTECHNICAL DATA
Type XL3C three-boom JumbosPutzmeister PM500 RobotManitou MRT 1650Backhoe loader with pick hammer
TUNNEL EQUIPMENT
64,300,715 €BUDGET(EXCLUDING VAT)
NORTH AND NORTHWEST CORRIDOR OF MADRID–GALICIA HIGH-SPEED LINE.MIAMÁN–PONTE AMBÍA SECTIONCONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
Project photos
Owner: Administración de Infraestructuras Ferroviarias
CONSTRUCTION OF MEDITERRANEAN HIGH SPEED CORRIDOR.MURCIA–ALMERÍA SECTION. BARRANCO DE GAFARILLOS–LOS AREJOS SUBSECTION
Start: 06/2009
End: 12/2012STATUS
TunnelsSTRUCTURE
AlmeríaPROVINCE
SpainCOUNTRY
SorbasPLACE
The branch measures a little over one mile (1.67 km) in length. The project includes the construction of a 434 m viaduct to salvage the double track Almendral Tunnel in Barranco de los Gafarillos, which measures 1,106 m in total, with 786 m underground and 100 m2 in height and width. The project also includes earth moving operations, drainage work, and the replacement of affected services.
Cross section: 100 m²
Length: 786 mGEOMETRY
MediumOVERBURDEN
NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation
METHODOF TUNNELING
Marl and marlaceous lime, calcarenites, calcareous holes; black shale with quartzite
GEOLOGY ANDGEOTECHNICAL DATA
Type XL3C three-boom JumbosPutzmeister PM500 RobotManitou MRT 1650Backhoe loader with pick hammer
TUNNEL EQUIPMENT
34,269,181 €BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Guipuzcoa, Vizcaya
Spain
Mondragón, Elorrio
90,537,027 €
Medium
Marl - limestones interbedded with limestones
Mechanical excavation and drill and blast
Three-boom JumboPutzmeister PM-500 gunning robot with max h. of 30 m3/h. Manitou MRT 1650
03/2009
12/2012
85 m²
3,622 m
Owner: Adif
Construction of the Vitoria-Bilbao-San Sebastian high speed platform.Section: Mondragón – Elorrio.The initial work involved the construction of 2 double-track rail lines, known as the Karraskain and Udalaitz tunnels, measuring 410 and 3,160 m respectively.Both tunnels with a gauge of 85 m².The following works were also carried out in the Project: the levelling of 337 m, two viaducts measuring 713 m in total, the false tunnels at the entrance and exit of the tunnels, and complementary works.The main support elements applied in the tunnels were: 8,235 m³ of fibre-free shotcrete, 12,951 m³ of fibre-reinforced shotcrete, 20,326 units of 4 mm-long bolts, 239 units of TH-29 trusses and 766 units of HEB-140 trusses.The tunnels have also been covered with HM-25 concrete with 40 cm of concrete, and have also been waterproofed by fitting 58,626 m² of 2 mm and 3mm PVC laminate.
BUDGET(EXCLUDING VAT)
VITORIA–BILBAO–SAN SEBASTIÁN HIGH-SPEED LINEMONDRAGÓN – ELORRIO SECTIONCONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
Project photos
Owner: UTE MIAMÁN: San Jose – Obras Subterráneas
Start: 07/2011
End: 07/2012STATUS
TunnelsSTRUCTURE
OurensePROVINCE
SpainCOUNTRY
Baños de MolgasPLACE
The main work consists of the excavation and support of Miamán Tunnel, measuring 852 m and with 95 m2 in height and width.The main support elements used are: shotcrete; rock bolts, TH and HEB type trusses, 150 x 150 x 6 lath and steel tube micro piles.
Cross section: 95 m²
Length: 852 mGEOMETRY
Medium OVERBURDEN
NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation
METHODOF TUNNELING
Quartzite, slate, sandstone and conglomeratesGEOLOGY ANDGEOTECHNICAL DATA
Type XL3C three-boom JumbosPutzmeister PM500 RobotManitou MRT 1650Backhoe loader with pick hammer
TUNNEL EQUIPMENT
5,863,261 €BUDGET(EXCLUDING VAT)
MIAMAN TUNNELCONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
TOLOSA TUNNEL
Project photos
Owner: UTE Tolosa
Start: 12/2010
End: 07/2012STATUS
TunnelsSTRUCTURE
GuipúzcoaPROVINCE
SpainCOUNTRY
TolosaPLACE
The main project consists of the excavation and support for two double-track tunnels, tunnel 1 with a length of 1,517.9 m (1,512.9 m bored) and tunnel 2 with a length of 1,455.2 m (1,452.7 m bored), both tunnels having an open cross-section of 85 m2. The tunnel has been built by the conventional method, with blasting in areas of sound rock and a backhoe loader in those where the terrain is of poorer quality, using the construction principles of the New Austrian Method (NATM).
To comply with safety standards two emergency galleries have been constructed. The first gallery is 60 m long and connects with tunnel 1, and the second connects with tunnel 2 and has a length of 401 m.
The main support elements used both in the tunnels and in the evacuation galleries are: shotcrete, Mn-16 expansion rock bolts, type TH-29 and HEB-160 trusses and 150x150x6 mm steel mesh.
Cross section: 85 m²
Lenght: 1,513 m + 1,453 mGEOMETRY
MediumOVERBURDEN
NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation
METHODOF TUNNELING
Marls, sandstones and limestonesGEOLOGY ANDGEOTECHNICAL DATA
Type XL3C three-boom JumbosPutzmeister PM500 RobotManitou MRT 1650Backhoe loader with pick hammer
TUNNEL EQUIPMENT
16,006,259 €BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
NEW BASQUE-COUNTRY RAIL NETWORK. EAST BEASAIN SECTION
Project photos
Owner: ETS (Euskal Trenbide Sarea)
Start: 11/2009
End: 07/2012STATUS
TunnelsSTRUCTURE
GuipúzcoaPROVINCE
SpainCOUNTRY
BeasainPLACE
The above-mentioned works involve constructing the track bed of the East Beasain Section, with a length of 2,158 m. The main tasks carried out are: a 1,955 m tunnel with a final cross-section of 85 m2, and two bridges, 70 m and 106 m long respectively, over the Usurbe and Mariarás rivers.
The tunnel has been built by the conventional method, with blasting in areas of sound rock and a backhoe loader in those where the terrain is of poorer quality, using the construction principles of the New Austrian Method (NATM). The main support elements used are: shotcrete, 25 mm diameter rock bolts, type HEB-180 trusses, 150x150x6 mm mesh, and steel tube micropiles.
Cross section: 85 m²
Lenght: 1,955 mGEOMETRY
MediumOVERBURDEN
NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation
METHODOF TUNNELING
Marls, sandstones and limestonesGEOLOGY ANDGEOTECHNICAL DATA
Type XL3C three-boom JumbosPutzmeister PM500 RobotManitou MRT 1650Backhoe loader with pick hammer
TUNNEL EQUIPMENT
46,778,437 €BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
LA TEMEROSA TUNNEL
Project photos
Owner: Vías y Construcciones
Start: 09/2011
End: 04/2012STATUS
TunnelsSTRUCTURE
AlicantePROVINCE
SpainCOUNTRY
AspePLACE
The above-mentioned works comprised the execution of excavation and supports for a 464 m tunnel with a cross-section of 70 m2, excavated with mechanical excavation and using explosives. The terrain was an alternating mixture of sandstones, marls and conglomerates and the supports used consisted of shotcrete with added metal fibres and metal trusses.
Cross section: 70 m²
Lenght: 464 mGEOMETRY
MediumOVERBURDEN
NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation
METHODOF TUNNELING
Sandstones, conglomerates and gypsumsGEOLOGY ANDGEOTECHNICAL DATA
Type XL3C three-boom JumbosPutzmeister PM500 RobotManitou MRT 1650Backhoe loader with pick hammer
TUNNEL EQUIPMENT
2,687,958 €BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
Project photos
Owner: UTE Gafarillos
Start: 03/2010
End: 06/2011STATUS
TunnelsSTRUCTURE
AlmeríaPROVINCE
SpainCOUNTRY
SorbasPLACE
The main work consists of the excavation and support of the double track Almedral Tunnel measuring 786 m and 100 m2 in height and width. The main support elements used are: shotcrete, 25 mm diameter rock bolts, TH-29, TH-36 and HEB-180 trusses, 150 x 150 x 6 of lath and steel tube micro piles.
Cross section: 100 m²
Length: 786 mGEOMETRY
MediumOVERBURDEN
NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation
METHODOF TUNNELING
Marl and marlaceous lime, calcarenites, calcareous holes; black shale with quartzite
GEOLOGY ANDGEOTECHNICAL DATA
Type XL3C three-boom JumbosPutzmeister PM500 RobotManitou MRT 1650Backhoe loader with pick hammer
TUNNEL EQUIPMENT
13,150,000 €BUDGET(EXCLUDING VAT)
EL ALMENDRAL TUNNELCONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
León
Spain
Cuadros, La Robla, La Pola de Gordón
104,201,195 €
Medium
Sandstones, lutites, slates and limestones
NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation
Jumbo has two booms and service plataform Copco BoomerRipper hammerPutzmeister PM-500 gunning robot with max h. of 30 m3/h.
06/2006
06/2011
120 m²
3,841 m
Owner: Adif
LEÓN–ASTURIAS HIGH-SPEED LINE. LA ROBLA–POLA DE LENA
BUDGET(EXCLUDING VAT)
The works consisted of constructing a track platform 9,440 m in length for the high-speed line in the section between La Robla and the Pajares Tunnels.
The project involved building 3 viaducts with a length of 817 m and 6 double-track tunnels with a total length of 4,204 m. The main part of the work was the tunnels, which are: Castro (493 m), Alba (1,057 m), Peredilla (723 m), Buen Suceso I (697 m), Buen Suceso II (251 m) and Nocedo de Gordón (620 m). The tunnels have cross-sections of 85 and 90 m2. The excavation was carried out using the New Austrian Method. Explosives were used in the geologically favourable areas and mechanical equipment in the more unfavourable areas.
CONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
LEÓN–ASTURIAS HIGH-SPEED LINE. PAJARES TUNNELS SECTION. PHASE 2
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
León
Spain
Pola de Gordón
407,790,294 €
High
Limestone of Lancara and Valdetoja Formations
Tunnel Boring Machine
TBM. 10 m diameter. Double shield
05/2004
04/2011
56 m²
7,720 m
Owner: Adif
Work involved the construction of a downhill entrance gallery with a 6.2% slope and 5,466 m in length. Besides the excavation of two parallel tunnels of 4,166 m and 3,189 m in length and 56 m² gauge, a cavern of 107 m in length and 426 m² gauge was undertaken. All these works belong to the León-Asturias high-speed line.Except for the tunnels that were excavated with TBM, the other galleries were drilled & blasted.To cover the parallel tunnels, 600 and 500 mm reinforced-concrete ring segments measuring 1.5 m in length were used, placed on 6+1 rings.Given the nature of the site and the size of the gallery, an in-depth pre-analysis of the site was undertaken.The main works were: 1,072,922 m3 of tunnel excavation, 39,945 m3 of cavern excavation, 79,512 m3 of varying-gauge gallery excavation, 14,365 m³ of steel fibre reinforced concrete, 122,216 ml of 32 mm-diameter bolts, 101,333 ml of 22 m fibreglass bolts, 124,027 ml of Swellex MN12 rockbolts, 3,500 ml of cable bolts, 1,032,700 kg of TH and HEB trusses and 69,115 ml of fibreglass-bolted covers.
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Madrid, Toledo
Spain
Aranjuez, Ontígola
126,460,869 €
Medium
Clays, glauberites and halites (Lower Miocene)
NATM (Top-Heading and Bench). Mechanical excavation
Ripper hammer. Wet - mix Robojet Putzmeister Wetkret η = 30 m³/hWIRTH T3.20 roadheader
11/2007
03/2011
100 m²
2,080 m
Owner: Adif
MADRID–VALENCIA HIGH-SPEED LINE.ARANJUEZ-ONTÍGOLA SECTION
Construction of the Madrid-Valencia high speed platform, the section length being 4.7 km The initial work involved the construction of the double-track rail tunnel known as the Tunnel del Regajal.Difficult construction from a geological and geotechnical point of view and because of the high environmental value of the area covered.Certain zones of the tunnel were built using micropile underpinning, double bolt covers and fitting of Gewi bolts.It was also necessary to undertake a water filtration test using epoxy and polyurethane-acrylic resins.The budget also included the following works: the false tunnels of the north and south entrance tunnels, measuring 23 m and 334 respectively.Also a 266 m-long viaduct and 2 overpasses.
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
BEASAIN TUNNEL
Project photos
Owner: UTE Beasain
Start: 06/2010
End: 02/2011STATUS
TunnelsSTRUCTURE
GuipúzcoaPROVINCE
SpainCOUNTRY
Beasain, OrdiziaPLACE
The main project consisted of the excavation and support for the double-track Beasain Tunnel, with a linear length of 1,916 m and an open cross-section of 85 m2. The tunnel has been built by the conventional method, with blasting in areas of sound rock and using a backhoe loader in those where the terrain is of poorer quality, using the construction principles of the New Austrian Method (NATM). The main support elements used were: shotcrete, 25 mm diameter rock bolts, type HEB-180 trusses, 150x150x6 mm mesh, and steel tube micropiles.
Cross section: 85 m²
Lenght: 1,916 mGEOMETRY
MediumOVERBURDEN
NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation
METHODOF TUNNELING
Marls, sandstones and limestonesGEOLOGY ANDGEOTECHNICAL DATA
Type XL3C three-boom JumbosPutzmeister PM500 RobotManitou MRT 1650Backhoe loader with pick hammer
TUNNEL EQUIPMENT
7,714,920 €BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
VEGA DE CIEGO TUNNEL
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Asturias
Spain
Pola de Lena
15,763,399 €
Medium
Lumolites, lutites and slates with sandstones and limestones
NATM. Top-Heading and Bench. Drill and blast
Jumbo: Atlas Copco Rocket and Atlas Copco XL3C (Two and three booms). Wet - mix Robojet Putzmeister Sika η = 30 m³/h
04/2008
09/2009
85 m²
2,460 m
Owner: Adif
The work involved the construction of the Vega de Ciego tunnel, part of the León-Asturias high speed line.Section: Campomanes - Pola de Lena
2,366 m of mine were excavated for the tunnel, which also has 94 m of false tunnel.
The initial works are: 7,145 m³ of shotcrete; 40,302 ml of Swellex rockbolts; 9,075 ml of 32 mm-diameter bolts; 789,834 ml of TH-29 and HEB-189 trusses and 3,892 ml of tubular micropile.
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
EL BOSQUE TUNNEL
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Cuenca
Spain
Olalla, Arcas del Villar
12,612,867 €
Medium
Carbonates with amount of limestones and marl - limestones
NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation
High speed Railway tunnel of “L.A.V. stretch: Olalla - Arcas del Villar”.
The design includes 10.6 Km with 184 m long viaduct (not included in budget). 2,912 m of tunnel and 216 m long cut and cover tunnel.
318,157 m³ tunnel excavation, 12,005 m³ shotcrete, 16,919 m steel ribs TH - 29/HEB - 180 and 114,432 m expansive bolts.
06/2007
06/2008
85 m²
3,128 m
Owner: Adif
Atlas Copco XL3CPutzmeister Sika η = 30 m³/hPutzmeister PM-500 gunning robot with max h. of 30 m3/h. Manitou MRT 1650BUDGET
(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
SIERRA DE ALTOMIRA TUNNEL
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Cuenca
Spain
Uclés
3,878,069 €
Medium
Limestones
NATM. Top-Heading and Bench. Drill and blast
Three-boom Jumbo Atlas Copco XL3C. Wet - mix Robojet Putzmeister Sika η = 30 m³/h
High speed railway tunnel. Stretch Uclés - Campos del Paraíso.
635.16 m long tunnel and 133.24 m long cut and cover. Construction problems due to the presence of 60 m long and 20 m height cavern.
102,938 m³ tunnel excavation, 5,244 m³ shotcrete, 292,865 Kg of steel ribs TH - 29/HEB - 180 and 24,448 m of expansive bolts.
08/2007
05/2008
147 m²
768 m
Owner: Adif
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
CONTRERAS TUNNELS
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Cuenca, Valencia
Spain
Villagordo del Cabriel, Minglanilla
20,633,171 €
Medium
Limestones, limestones with marls and clayly limestones
NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation
Jumbo: Atlas Copco Boomer, Atlas Copco Rocket and Atlas Copco XL3C (Two and three booms with service plataform). Wet - mix Robojets Aliva AL - 500 η = 23 m³/h and Putzmeister Sika η = 30 m³/h
High speed railway tunnels of “L.A.V. Madrid - Castilla la Mancha - Comunidad Valenciana - Region de Murcia. Subtramo: Embalse de Contreras - Villagordo del Cabriel”. Three tunnels: Hoya de la Roda (1,997 m long), Rabo de la Sarten (376 m), Umbría de los Molinos (1,522 m). Three viaducts are 1,640 m total long. The most important is Contreras Viaduct of 587 m long.
10/2006
12/2007
85 - 100 m²
3,890 m
Owner: Adif
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
ATLANTIC HIGH-SPEED RAIL AXIS. QUEIXAS BYPASS
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
La Coruña
Spain
Ordenes, Tardoia, Cerceda
38,121,954 €
Max. 79 m
Schists and quartz - schists
NATM (Top-Heading and Bench). Drill and blast. Mechanical excavation
Jumbo: Atlas Copco Boomer, Atlas Copco Rocket and Tamrock PARA (Two and Three booms and service plataform). Wet - mix Robojet Aliva AL - 500 η = 23 m³/h
The initial work consisted of the construction of the double-track tunnel belonging to the “Eje Atlántico de Alta Velocidad. Variante Queixas (La Coruña)”. Total length of 8,050 m, of which 120 m correspond to two viaducts. Concrete invert in bad geotechnical zones. 2,140 m long tunnel and 40 m long cut and cover construction. 10 - 25 cm thick steel reinforced shotcrete HP - 30 45 Kg/m³, Swelles MN bolts Ø = 24 mm L = 4 m, steel ribs THN - 29/HEB - 160 and 30 cm thick concrete lining HM - 25.
11/2003
11/2007
90 m²
2,180 m
Owner: Dirección General de Ferrocarriles
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
POUSADOIRO TUNNEL (PORTAS BYPASS II)
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Pontevedra
Spain
Portas
13,813,932 €
70 m
Biotite granodiorite
NATM. Top-Heading and Bench. Drill and blast. Mechanical excavation
Jumbos Atlas Copco Boomer y Atlas Copco Rocket (Two booms and service plataform). Ripper hammer. Wet - mix Robojets Putzmeister Wetkret η = 30 m³/h and Aliva AL - 500 η = 23 m³/h
High speed railway tunnel of “Eje Atlántico de Alta Velocidad”. 70 m long cut and cover in the north portal below 5 m of overburden. 159,003 m³ excavation tunnel, 15,948 m³ shotcrete and 17,447 m² of concrete lining. 11,769 m bolts, 865,921 Kg steel ribs and 3,151 m² of Bernold plate.
09/2004
09/2007
118 m²
2,430 m
Owner: Ministerio de Fomento
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
SAN PEDRO TUNNEL. WEST TUNNEL
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Madrid
Spain
Colmenar Viejo, Soto del Real
23,433,925 €
High
Coarse - grained orthogneiss
TBM and NATM. Drill and blast
TBM Herrenknecht, diameter 9.45 - 9.55 m Jumbo Atlas Copco Rocket and Atlas Copco XL3C
Twin tunnels of High Speed Railway Madrid - Segovia - Valladolid. The tunnel boring machine was blocked 470 m from the begining of excavation. The excavation continuated with explosives through a new adit tunnel. 726,325 m³ tunnel excavation. 29,931 m³ shotcrete, 548,692 Kg steel ribs TH - 29 y 50,932 ud. expansive bolts.
06/2005
03/2007
85 m²
8,545 m
Owner: Adif
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
SAN PEDRO TUNNEL. EAST TUNNEL
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Madrid
Spain
Colmenar Viejo, Soto del Real
23,927,382 €
High
Coarse - grained orthogneiss
TBM and NATM. Drill and blast
Jumbo: Atlas Copco Rocket and Atlas Copco XL3C (Two and three booms). Wet - mix Robojets Aliva AL - 500 η = 23 m³/h and Putzmeister Sika η = 30 m³/h
Twin tunnels of High Speed Railway Madrid - Segovia - Valladolid. The south entrance was carried out with a TBM and from the north with explosives, an 800 m long and 80 m2 gauge ramp was excavated and 5,500 m of the tunnel and 85 m² gauge. Connecting galleries between tunnels every 400 m. 74,691 m³ tunnel excavation, 5,343 ud. expansive bolts 4 m length, 153,642 Kg steel ribs TH - 29 and 3,530 m³ shotcrete.
06/2005
03/2007
85 m²
5,000 m
Owner: GIF
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
EL TENDERO TUNNEL
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Cuenca
Spain
Monteagudo de las Salinas
7,147,168 €
Medium
Limestones, dolomites and green clays (argillites)
NATM. Top-Heading and Bench. Drill and blast. Mechanical excavation
Two-booms Jumbo Atlas Copco Rocket. Wet - mixRobojets Aliva AL - 500 η = 20 m³/h and PutzmeisterSika η = 30 m³/h
High speed railway tunnel of “L.A.V. Madrid - Levante”. Mechanical excavation in tunnel portals, argillites and fault zones. 5 - 20 cm thick shotcrete HM - 30, 4 m long bolts, steel ribs TH - 29/HEB - 160 and 1.1 mm thick Bernold plate.
04/2005
12/2005
157 m²
890 m
Owner: Adif
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
MARTORELL TUNNELS
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Barcelona
Spain
Sant Esteve, Martorell
8,617,153 €
Low
Argillites, lutites and limolites
NATM. Top-Heading and Bench. Mechanical excavation. Drill and blast
Two-booms Jumbo Atlas Copco Rocket. Wet - mixRobojet Aliva AL - 500 η = 23 m³/h and PutzmeisterWetkret η = 30 m³/h
Four high speed rail tunnels to Madrid - Zaragoza - Barcelona - French Border. Tunnels of 152, 797, 120 and 423 m length with 120, 132, 108 and 109 m² cross section respectively. Mainly mechanical excavation with ripper hammer and sometimes with explosives. 10,989 m³ shotcrete, 31,651 ut. expansive bolts L = 4 m, 9,726 m steel ribs HEB - 160, 5,347 m corrugated steel Ø = 32 mm and 872 m² of Bernold plate.
06/2003
12/2004
120 m²
1,492 m
Owner: Adif
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
JÁTIVA TUNNELS
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Valencia
Spain
Játiva, Enova
4,316,347 €
Low
Limestones and marls
NATM. Top-Heading and Bench. Drill and blast. Mechanical excavation
Jumbo: Atlas Copco Rocket and Atlas Copco XL3C (Two and three booms and service plataform). Wet - mix Robojets Aliva AL-500 η = 23 m³/h and Putzmeister Wetkret η = 30 m³/h
High speed railway tunnel of “L.A.V. Madrid - Levante, stretch Játiva - Enova”.
625 and 600 m long tunnels with cross section variable beetwen 140 to 109 m².
Mainly drill and blast excavation, sometimes with ripper hammer. NATM support system.
12/2003
08/2004
109 - 140 m²
1,225 m
Owner: Adif
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Pontevedra
Spain
Barro, Portas
77,954,372 €
Medium
Biotite graniodorite
Drill and blast. Mechanical excavation
Jumbos Atlas Copco Boomer, Atlas Copco PARA and Tamrock Axera (Two and three booms and service plataform).WKM-103 Gunning Robot
12/2002
07/2007
80 m²
3,860 m
Owner: Ministerio de Fomento
ATLANTIC HIGH-SPEED RAIL AXIS. PORTAS BYPASS. SECTION I
The main works were carried out in the double track train tunnel called “Lantaño Tunnel” of 3.86 km in length and 80 m² gauge, belonging to the Atlantic Axis High Speed railway. Bypass at Portas (Pontevedra). Section 1; Portela-Portas Platform and track.
Work consisted of the construction of 7.70 km of high speed double track platform, plus an 805 m viaduct, an underpass, two overpasses, laying the track and the corresponding complementary works.
389,998 m³ of tunnel excavation, including 2 false tunnels at the entrance and exit. The tunnel also has an emergency gallery section.
163,535 m³ of H-250 reinforced concrete, with and without fibre, 45,524 m of bolts L= 4-8 m, 1.215,868kg of TH/HEB metallic trusses and 44,171 m² of Bernold metal sheet plating.
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Málaga
Spain
Alora, Pizarra, Cártama
53,311,038 €
250 m
Gneiss composed of angular fragments (breccias)
NATM. Top-Heading and Bench. Drill and blast. Mechanical excavation
Jumbos Atlas Copco Boomer and Tamrock PARA (Two and three booms and service plataform). Ripper hammer. Wet - mix Robojets Meyco and Putzmeister Wetkret η = 20 m³/h
06/2002
03/2005
85 - 110 m²
4,174 m
Owner: Adif
CÓRDOBA–MÁLAGA HIGH-SPEED LINE.ÁLORA–CÁRTAMA SECTION, TEVILLA AND GRIBALMORA TUNNELS
The works involved the execution of two train tunnels the Tevilla and Gibralmora tunnels of 975 m and 3,217 m and 110 and 85 m² respectively. The platform constructed is a 4.45 km in length. Apart from the tunnels, an underpass of 34.25 m was also built, 2 drainage works of 90.35 in total length and the repositioning of services and supplies. The principal support units placed in the tunnels were: 35, 643 m³ of reinforced concrete with fibres, 41,585 m of bolts of Ø = 25 mm and 4 m in length, 198 TH-29 trusses and 153 units of HEB-160, 31,404 m² of wire mesh 100x100x6 mm.
In the less favourable areas of the tunnels, these were excavated with a central buttress and inverted arch and sealed at the front.
Tunnel waterproofing consisted of 163,159 m² of geotextile laminate >300 g/m² of polypropylene fibre and 143,584 m² PVC laminate 1.5- 2 mm H – 250 concrete covering.
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
SAN SEBASTIÁN SOUTH RAIL BYPASS
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Guipuzcoa
Spain
San Sebastián
5,862,646 €
Medium
Limestones, sandy limestones, marls and sandstones
NATM. Mechanical excavation
Ripper hammer. Wet - mix Aliva AL - 285 η = 9 - 21 m³/h
Two railway tunnel of “Línea Bilbao - San Sebastián”. Reinforced diaphram walls are designed by the construction of underground station. 12,295 m³ tunnel excavation. Primary support: bolts, steel ribs and shotcrete.
04/1999
03/2005
50 m²
100 m
Owner: Euskotren
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Segovia
Spain
Tabladillo, Sta. Maria Real Nieva
45,718,770 €
Low
Dolomites and marls
NATM (Top-Heading and Bench). Drill and blast and mechanical excavation
Jumbos Atlas Copco Boomer and Atlas Copco H - 175 (Two and three booms and service plataform). Ripper hammer. Wet - mix Robojet Putzmeister Wetkret η = 20 m³/h and Aliva AL - 285 η = 9 - 21 m³/h
The main work carried out was the double track train tunnel known as the “Tabladillo Tunnel”, part of the “L.A.V Madrid-Segovia-Valladolid” route.
9,572 m³ steel fibres reinforced shotcrete, 21,758 m bolts, 1,402 m² Bernold plate and 534,723 Kg steel ribs TH29/HEB160. 71,717 m³ concrete lining 30 cm thickness.
Impermeabilization, all around the tunnel, with 29,617 m² polypropylene and 31,260 m² PVC sheet.
10/2001
09/2004
100 m²
2,514 m
Owner: GIF
HIGH-SPEED LINE: NEW RAIL ACCESSES TO NORTH AND NORTHWEST SPAIN.SEGOVIA–VALLADOLID SECTION
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
CASTEJÓN–MIRANDA DEL EBRO LINE. ELIMINATION OF LEVEL CROSSING
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
La Rioja
Spain
Logroño
11,147,046 €
Medium
Clays, limes and red sandstones
NATM. Mechanical excavation. Full face
Roadheader WESTFALIA. Wet - mix Robojet Putzmeister Wetkret η = 30 m³/h
12/1999
11/2003
32 m²
982 m
Owner: Dirección General de Ferrocarriles. Mº de Fomento
Removal of El Cortijo level crossing and diversion of the rail line.
The new route is 2.28 km long. The initial work involved the construction of the 982 metre long Cortijo tunnel.
46,201 m³ of full excavation, 25,942 m³ of shotcrete, 46,267 m³ of fibre-reinforced shotcrete.
1,300 m² of 2 mm-thick Bernold sheet, 1,685 units of bolts, 135 units of TH-21 trusses and 49,819 units of HEB-160 trusses.
The budget also includes the execution of the following works: the false tunnels at the entrance and exit of the tunnel with a length of 22 and 15.26 m, each with the same gauge as the Cortijo tunnel. A 38.56 m bridge. Laying of tracks, safety system, signalling, electrification, etc.
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
MADRID–BARCELONA HIGH-SPEED LINE. SUBSECTION VII-B
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Tarragona
Spain
La Nou de Gaiá, Roda de Bará
25,417,611 €
Medium
Marls, sands and sandstones
NATM. Drill and blast. Top-Heading and Bench
Jumbo has three booms Atlas Copco Boomer. Wet - mix Robojet Putzmeister Wetkret η = 30 m³/h
10/2001
09/2003
95 m²
401 m
Owner: GIF
The main work carried out was that of the double track train tunnel belonging to “L.A.V. Madrid-Barcelona”
Section: Lérida-Martorell. 331 m of tunnel excavated from the mine and 70 m of false tunnel.
The budget includes the execution of 2 overpasses, 3 drainage systems with shotcrete chamber, 2 drainage systems with shotcrete frames. Two underpasses were built with shotcrete chamber and a further two underpasses with shotcrete frames.
Circular tunnel section, 6.66 m interior radius and mass concrete covering. Slope treatment with bolts L=6-8 m, wire mesh and reinforced concrete.
Construction of micropile roof, tie beams and protective umbrella at the entrance. Excavation and tunnel support according to NATM.
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
VALENCIA–TARRAGONA LINE. VANDELLOS–TARRAGONA SECTION. SUBSECTION I.
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Tarragona
Spain
L´Hospitalet de L´Infant, Vandellos
48,104,934 €
15 m
Limestones and dolomites
NATM (Top-Heading and Bench). Drill and blast and mechanical excavation
Jumbos Atlas Copco H - 175 y Tamrock PARA (Three booms and service plataform). Wet - mix Robojet Meyco η = 20 m³/h
Valencia-Tarragona line. Section: Vandellos-Tarragona. Subsection I. Duplication of track and adjustment to 200/220 Km/h.
The initial work was the double track train tunnel known as Rojales Tunnel. This tunnel is 1,750 m long, plus 160 m of false tunnel with a section of 115 m². This section is 19.58 km in length, of which 1,360 m correspond to the execution of 9 viaducts.
During these works, 11 overpasses with a total length of 542 m were constructed plus 2 underpasses and 32 drainage works.
The main tunnel work units were: 8,496 m³ reinforced concrete with steel fibres 45 kg/m³, 29,412m bolts Ø = 25 mm, 388,000 Kg TH - 29/HEB - 160 trusses and 36,905 m³ H – 250 concrete lining.
05/2000
06/2003
115 m²
1,910 m
Owner: Dirección General de Ferrocarriles. Mº de Fomento
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
LA FUENTECILLA TUNNEL
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Segovia
Spain
Segovia
11,077,980 €
Low
Sands, limestones and sandstones
Top-Heading and Bench. Mechanical excavation and drill and blast
Jumbos Atlas Copco Boomer and Atlas Copco Rocket (Two and three booms). Ripper hammer. Wet - mix Robojets Putzmeister Wetkret η = 30 m³/h Aliva AL - 500 η = 23 m³/h
High speed railway tunnel of “L.A.V. Madrid - Segovia - Valladolid”.
12,158 m³ of shotcrete, 66,430 m of 6 m long bolts and 1,253,478 Kg steel ribs HEB. Excavation with alternative side benches.
9,022 m² Bernold plate and 2,053 m² wire mesh 150 x 150 x 6 in sections with bad geotechnical properties.
09/2002
05/2003
140 m²
1,100 m
Owner: GIF
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
EL VENDRELL TUNNELS
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Tarragona
Spain
El Vendrell
2,944,537 €
Low
Limestones, marls and sands
Drill and blast. Top-Heading and Bench
Jumbos Atlas Copco Boomer and Atlas Copco Rocket (Two booms and service plataform). Wet - mix Robojet Aliva AL - 500 η = 23 m³/h
High speed railway twin tunnels to Madrid - Zaragoza - Barcelona - French Border.
404 m length each one, in parallel and separated 24 m.
2,600 m³ of shotcrete, 5,707 m of bolts L = 4 m, 2,120 m steel ribs HEB - 160/TH-29 and 2,525.37 m² wire mesh 150 x 150 x 6 mm.
06/2002
09/2002
90 m²
808 m
Owner: GIF
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
ARRANOMENDI TUNNEL
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Guipuzcoa
Spain
Deba, Itziar
7,000,000 €
Medium
Limestones and clayly limestones
NATM. Drill and blast. Full face
Jumbo has two booms and service plataform Atlas Copco Boomer. Wet - mix Robojet Meyco η = 18 m³/h and Meyco GM - 090 η = 6 - 7m³/h
Construction of New Arranomendi Tunnel of Bilbao - San Sebastian Line. One railway tunnel.
The stretch is 1,756 m long with 1,199 m long tunnel and 21 m long cut and cover construction. 9,973 ud. Ø = 25 mm and 3 m long bolts, 310 ud. steel ribs TH - 21 and 3,946 m³ shotcrete 5 - 20 cm thickness.
09/1996
07/1998
25 m²
1,220 m
Owner: Euskotren S.A.
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
FUENTE LA HIGUERA TUNNEL
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Valencia
Spain
Fuente la Higuera
2,345,942 €
50 - 60 m
White marls. Red calcareous conglomerates with clayly matrix in the last 100 m
NATM. Top-Heading and Bench. Drill and blast. Mechanical excavation
Jumbo has two booms Atlas Copco Rocket. Wet - mix Robojets Aliva AL - 500 η = 20 m³/h and Putzmeister Sika η = 30 m³/h
Raiway tunnel of Madrid - Valencia Line.
The porpuse of the design was to ensure that decision makers consider the ensuing environmental impacts to decide wether to proceed with the project.
6,796 m³ shotcrete, 3,497 bolt units L = 4 m, 301 units steel ribs HEB - 160/TH21 and 324 m micropile umbrellaØ = 144 mm.
01/1993
12/1993
110 m²
800 m
Owner: Mº de Obras Públicas, Transportes y Medio Ambiente
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
Type Project
EL GOLOSO TUNNEL
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Madrid
Spain
Tres Cantos
14,601,071 €
20 - 30 m
Coarse grained arcosic sands with boulders and blocks
Premill method. Mechanical excavation
Ripper hammer. Wet - mix Aliva AL - 285 η = 9 - 21 m³/h
Railway tunnel of Madrid - Burgos Line. Construction in curve.
Premill method for tunnel excavation in cohesive soils. Replacement of affected service.
Primary support: shotcrete, bolt and steel ribs. Reinforced concrete piles of 1,000 mm of diameter.
04/1990
02/1992
100 m²
475 m
Owner: Renfe
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
LOCATIONANDADDITIONALINFORMATION
RAILWAY
OSSA, Obras Subterráneas
Calle Isla Graciosa 1, 2ª Planta - Puerta 428703 San Sebastián de los Reyes (Madrid)Spain
T. +34 91 782 34 00F. +34 91 562 42 98
www.ossaint.com