    SAP PP/QMConfiguration Pack

    Published by Team of SAPConsultants at SAPTOPJOBS

    Visit us at www.sap-topjobs.com

    Copyright 2005-06@SAPTOPJOBS

    All rights reserved. No part of this publication may be reproduced, stored in a

    retrieval system, or transmitted in any form, or by any means electronic or

    mechanical including photocopying, recording or any information storage and

    retrieval system without permission in writing from SAPTOPJOBS

    http://www.sap-topjobs.com/http://www.sap-topjobs.com/
  • 8/3/2019 Overview Doc

    2/73

    OVER VIEW INDEX

    1. Master Data Configuration............................................3

    1.1 Define Bill Of Materials (BOM) Usage...................................................31.2 Define BOM Status ....................................................................................71.3 Define Item Category ...............................................................................101.4 Define Application....................................................................................131.5 Define Work center Category ................................................................161.6 Define Parameters....................................................................................191.7 Define Standard Value............................................................................231.8 Define Shift Sequence .............................................................................251.9 Define Routing Selection Automatic ................................................30

    2. MRP Related configuration settings ............................. 332.1 Plant parameters ......................................................................................33

    2.2 Define MRP controller .............................................................................362.3 MRP Plant Parameter Float (Schedule Margin Key).....................392.4 MRP Plant Parameter Special Procurement Key...........................422.5 Activating MRP and Planning file entries...........................................462.6 MRP type ....................................................................................................482.7 MRP Plant Parameter Conversion.....................................................52

    3. PRODUCTION EXECUTION......................................... 543.1 Define Order Type ....................................................................................543.2 Define Number Range for Order type..................................................573.3 Define Scheduling Parameter for order type.....................................60

    3.4 Define confirmation parameters...........................................................643.5 Define Default Values .............................................................................70

  • 8/3/2019 Overview Doc

    3/73

    1.Master Data Configuration

    1.1 Define Bill Of Materials (BOM) Usage

    BACKGROUND

    This configuration setting enables one to define Bill OfMaterial (BOM) usage.

    BOM usage defines the usage of BOM in a specific applicationarea in SAP.

    Example, there can be a separate BOMs for

    Design,

    Production

    Costing.

    In this way, each area is dealing only with the specific data itrequires.

    Example:

    The design BOM includes all the components of theproduct and their technical data from the design point ofview. This BOM is generally not linked to any order.

    The production BOM contains all the items required fromthe production and assembly point of view. Only itemsrelevant to production, for which production data (suchas the issue storage location) can be entered, arerequired. A production BOM does not contain any

    packaging materials required in the shipping department.

  • 8/3/2019 Overview Doc

    4/73

    SCENARIO

    Create new BOM usage.

    Note:-

    Standard BOM usage available with SAP is sufficient. Howeverany new BOM usage can be created.

    INSTRUCTIONS

    Follow the Menu Path: IMG Production Basic data Bill

    of materials General data BOM Usage Define BOM

    Usage

    1. Click

    2. Click

    3. Enter usage value; it can be either numeric or alphabet.It is suggested to be numeric.

    4. Select +,- or . to indicate to which area this BOM ismeant for like Production, Engineering, Spare, PlantMaintenance, Sales or for costing relevancy.

  • 8/3/2019 Overview Doc

    5/73

    Note:-Based on this, during BOM explosion, entiredependent requirements are also planned,

    5. Enter Usage text

    6. Click Save

    Impact of this configuration in Master Data /Transaction

    When creating the BOM, key defined here will appear in theBOM Usage field.

    According to the requirement, BOM usage key has to beselected during BOM Creation.

    Click Match code or F4 in BOM usage field, to select thedesired BOM usage.

    Transaction code to create BOM is CS01

  • 8/3/2019 Overview Doc

    6/73

  • 8/3/2019 Overview Doc

    7/73

    1.2 Define BOM Status

    BACKGROUND

    This configuration setting enables to define BOM status.

    BOM status is used to define whether the BOM can be used byany application area or not.

    Example: -

    In the costing areas in a company, the BOM is explodedaccording to the application. While defining the BOMstatus, usage in costing area will be defined.

    In MRP, the following indicators are checked directly fromthe definition of the BOM status:

    - Explosion in MRP

    - Released for orders

    MRP only reads BOMs whose BOM status has at least one ofthese indicators.

    BOM status defines whether

    The BOM is active or inactive.

    SCENARIO

    BOM need to be created for certain for product whose BOMcan be finalized only after some trial and error.

  • 8/3/2019 Overview Doc

    8/73

    While it is in preparation it is required not to be used by anyapplication. Status In preparation has to be created.

    INSTRUCTIONS

    Follow the Menu Path: IMGProductionBasic dataBill ofmaterials General dataDefine BOM status

    1. Click

    ..continuation of the above screens right side balanceportion

    2. Click

    3. Enter usage value as 2.

  • 8/3/2019 Overview Doc

    9/73

    4. Leave all the check box EMPTY, i.e. do not tick any checkbox.

    5. Mention description as In preparation

    6. Click Save .

    Impact of this configuration in Master Data /Transaction

    BOM with status 2 can not be used for any application.

  • 8/3/2019 Overview Doc

    10/73

    1.3 Define Item Category

    BACKGROUND

    This configuration setting enables to define item category.

    The item category defines the attributes and functions of aBOM item. It controls field and screen selection for detailscreens in BOM maintenance.

    BOM can contain different type of items related to

    manufacture the finished product. There are

    Pipeline items i.e. items which are receivedthrough a pipeline from supplier not related toinventory

    Stock items i.e. materials are always issued fromstock which are relate to inventory

    Document item i.e. Documents are referred in theBOM as a item trough the Document ManagementSystem (DMS)

    Text item i.e. brief note about the material usagecan be maintained as a Text item. This will beuseful in a long BOM to indicate any specificassembly.

    The above different items are defined through item category inthe BOM.

    SCENARIO

    Define item category.

  • 8/3/2019 Overview Doc

    11/73

    Example:- An Item code may be defined as a normal item inthe material master. The same item code for one specific BOMhas to be treated as a phantom material.

    In such a situation, item category inside the item detail of theBOM will be mentioned as a phantom assembly. It is nowapplicable only to this BOM.

    Lets look at the standard setting for item category.

    Item categories defined by SAP will be sufficient in most of thecases. If required, any new item category can be created.

    INSTRUCTIONS

    Follow the Menu Path: IMGProductionBasic dataBill ofmaterials Item dataDefine item category

    1. Click

    2. click

    3. Update the following fields

    Field Name DescriptionItem category Desired item category to be

  • 8/3/2019 Overview Doc

    12/73

    mentioned in the BOMInv.Mgmt Relevant to Inventory

    managementTxtItem It is text item

    Vsl Variable size itemDocument Item To mention DocumentCls Item To mention as Class item,

    used in Variant configurationPM Str To mention as PM structure

    elementIntraM To mention Intra Material

    normally used in MasterRecipe-PPPI

    +/- sign Negative value allowed in the

    BOM or not? This is requiredto indicate the by product.

    SubI To indicate sub items aresupported.

    Item Ctrl Sequence of Item detailscreen.

    4. Select check boxes according to the businessrequirement

    5. Mention Item category Text

    6. Click Save .

    Impact of this configuration in Master Data /Transaction

    While creating the BOM, required item category can beselected.

  • 8/3/2019 Overview Doc

    13/73

    1.4 Define Application

    BACKGROUND

    This configuration setting enables to define BOM Application.

    BOM application controls use of BOM in a specific area.

    Example:- MRP run and cost estimate calculation will use theBOM of its own respective BOM application.

    SCENARIO

    BOM display at multiple levels (transaction code CS12) can bedone for different BOM application. It is required to displayonly the costing BOM to certain users. Separate BOMapplication to be created to display the BOM related only tocosting.

    Note: - BOM with usage for costing should be available. i.e.with the right usage for costing.

    INSTRUCTIONS

    Follow the Menu Path: IMGProductionBasic dataBill ofmaterials Alternative determinationDefine order of priorityfor BOM usage.

    1. Click

  • 8/3/2019 Overview Doc

    14/73

    2. Update the Following fieldsField DescriptionBOM Application Enter any four digit BOM

    application areaDescription Enter descriptionSelectin ID Selection ID through which

    BOM selectedAlternative Det.Multi.BOM To select for alternative BOM

    if multiple BOM is available.Tick this check box

    Production Version If there is a productionversion, that is used as a

    selection criteria.MRP explosion Leave BlankRel planned orders Leave BlankRelease costing Tick this check boxOther check boxes Leave Blank

  • 8/3/2019 Overview Doc

    15/73

    3. Click Save .

    Impact of this configuration in Master Data /

    Transaction

    When displaying the BOM through transaction code CS12,Right BOM usage will be displayed according to the settingsmaintained here. In this example, with BOM application, onlythe costing BOM will be displayed.

    Press F4 in BOM application, where all the available settingwill be displayed.

  • 8/3/2019 Overview Doc

    16/73

    1.5 Define Work center Category

    BACKGROUND

    This configuration setting enables to define work centercategory.

    Work center category is the major classification of work centerby SAP. E.g. Machine, processing unit, labor are defined as adifferent work center category.

    Work center category controls the field selection inside thework center.

    SCENARIO

    Create a work center category to mention skilled labor workcenter category.

    INSTRUCTIONS

    Follow the Menu Path: IMGProductionBasic dataWorkcenter General Data Define work center category.

    1. Click

  • 8/3/2019 Overview Doc

    17/73

    2. Click

    3. Update the Following fieldsField DescriptionCat Capacity category. Any new

    value may be entered. E.g.ZLAB

    Description Description of the desired

    capacity categoryField Selection Contains the fields required tothis capacity category. Enterstandard SAP value accordingto the capacity category

    Screen sequence Sequence of tab screen to beappeared in the work centermaster data. Enter thestandard SAP value.

    4. Click Enter

  • 8/3/2019 Overview Doc

    18/73

    5. Select Created capacity category

    6. Double Click

    7. Click

    8. Enter Application Area in SAP where this work centercategory can be used. E.g. P Routing; C - MasterRecipe; Q - Quality task list etc.

    9. Note:- If this work center category is to be applicable toall, maintain all the entry in this application field.

    10. Click .

    Impact of this configuration in Master Data /Transaction

    When creating the work center for skilled labor, work centercategory is to be mentioned as it is a mandatory entry.

  • 8/3/2019 Overview Doc

    19/73

    1.6 Define Parameters

    BACKGROUND

    This configuration setting enables to define Parameter(activities) for formula.

    Parameter is one of the required settings to calculate theconversion cost incurred in the Work center duringmanufacturing.

    Example for activities:-

    Work center while in use can consume

    Power

    Labour

    Setup time

    Depreciation

    Steam etc.

    The above costs incurred during conversion will be capturedthrough the activity. Parameter is the structure to capture thisactivity.

    Link to the Master data is established as below:-

    Parameter will be assigned to the standard valuekey.

    Standard value key will be assigned in the workcenter.

  • 8/3/2019 Overview Doc

    20/73

    Work center will be assigned to the task list(Routing or Master Recipe).

    Data of planned duration of these activities will bemaintained in the task list (Routing or Masterrecipe)

    SCENARIO

    Create a Parameter. Note: - Standard SAP setting is sufficient.Let us discuss the creation of new parameter.

    INSTRUCTIONS

    Follow the Menu Path: IMGProductionBasic dataWorkcenter General Data Standard ValueDefine Parameters.

    1. Click

    2. Click

    3. Update the Following fieldsField Description

  • 8/3/2019 Overview Doc

    21/73

    Parameter Parameter to hold the value.Any alphanumeric six digitmay be entered. E.g. LABOUR

    Origin Place where from the value is

    to be taken. E.g. To indicatevalue to be taken from tasklist maintain 2 in this field.

    Short key word Short descriptionKey work Key word to identifyDimension Dimension of the parameter.

    E.g. Any thing related toDuration may have TIME asdimension.

    Standard Value Unit Unit of this parameter. E.g.

    Time dimension may haveunit as MIN.

    Note: - If any parameter for which there is no unit, it may be

    mentioned as no unit.

    4. Click Save .

    Impact of this configuration in Master Data /Transaction

    Link between the parameter and the master data is as below.

    a. This parameter will be assigned to the standard valuekey.

    b. Standard value key will be attached with the work center.

    c. Work center will be attached in the task list. I.e. in therouting or in the master recipe.

    d. Standard value (i.e. duration of labour hours required)will be maintained in the task list as a master data.

  • 8/3/2019 Overview Doc

    22/73

  • 8/3/2019 Overview Doc

    23/73

    1.7 Define Standard Value

    BACKGROUND

    This configuration setting enables to define the standard valuekey.

    Standard value key is very essential to capture the costincurred in the work center.

    Standard value key will contain the activities. One standard

    value key can contain up to six activities. Each activity refersto the cost.

    Example:-

    Production cost

    Set up cost

    Labour cost

    Quality Cost

    Power cost

    Steam cost

    One work center can have only one standard value key.

    SCENARIO

    Create a standard value key to have the activities of setup,machine, labor, and over head.

  • 8/3/2019 Overview Doc

    24/73

    INSTRUCTIONS

    Follow the Menu Path: IMG

    Production

    Basic data

    Workcenter General Data Standard ValueDefine standardvalue key.

    1. Click

    2. Click

    3. Update the Following fieldsField DescriptionStandard value key Enter any alpha numeric to

    indicate standard value key.E.g. STD1

    Description Maintain standard value keydescription. E.g.setup/machine/labor/overhead

    Parameter Maintain the parameters. Up tosix parameters can bemaintained.

    4. Click Save .

    Impact of this configuration in Master Data /Transaction

    When creating the work center, standard value key will be

    assigned to the work center.

  • 8/3/2019 Overview Doc

    25/73

    1.8 Define Shift Sequence

    BACKGROUND

    This configuration setting enables to define shift sequence.

    Shift sequence is used to define the specific working pattern.I.e. weekly holidays, number of shift and working hours ofeach shift.

    Work center capacity is calculated from its working hours

    defined in the capacity header details of the work center.

    There are mainly three ways to define capacity for each workcenter.

    Normal capacity

    Available Interval capacity

    Interval and shifts

    Normal capacity is defined through the working hrs and breakin the capacity header

    Available interval capacity is the capacity available for anyspecific duration; it is defined at the capacity header detail

    Interval and shifts is defining the shifts in which the machine

    or industry works.

    SCENARIO

    Create a shift sequence with two shifts a day and Thursdayand Friday as weekly holiday.

  • 8/3/2019 Overview Doc

    26/73

    INSTRUCTIONS

    Follow the Menu Path: IMGProductionBasic dataWorkcenter Capacity Planning Available capacity Define shift

    sequence

    1. Click

    2. Click

    3. Update the Following fieldsField DescriptionGrouping Enter shifting grouping. E.g.

    SGDescription Enter description E.g. SpecialGrouping

    4. Click

    5. Select the Grouping

    6. Double Click

    7. Click

    8. Update the Following fieldsField DescriptionBreak Enter the Break name. E.g.

    IND6Break Number Enter the break number E.g. 1Description Description of break. E.g.

    First shift break

    Start Break start timeEnd Break end time

    9. Click

  • 8/3/2019 Overview Doc

    27/73

    10. Select Break 1 line

    11. Double click

    12. Click

    13. Update the Following fieldsField DescriptionShift Enter shift name. E.g.1SHFShift text Enter shift definition. E.g.

    First shiftStart date Starting date of the shiftEnd date End date of the shiftStart time Starting time of the shiftEnd Time End time of the shiftBreak Enter the Break schedule. E.g.

    IND6

    14. Click

  • 8/3/2019 Overview Doc

    28/73

    15. Select the 1SHT line

    16. Double click

    17. Click

    18. Update the Following fieldsField DescriptionSequence Enter the sequence No. E.g

    01Shift No. Shift number in the sequence.

    E.g. 1Description Description of the shift

    sequence. E.g. Two shift perday

    Day1 to Day 7 Maintain the desired shiftdefinition the day to follow.E.g. 1SHT and 2SHT in alldays except Thursday andFriday.

    19. Click

    20. Click Save .

    Impact of this configuration in Master Data /Transaction

  • 8/3/2019 Overview Doc

    29/73

    This shift sequence can be maintained as an interval ofavailable capacity.

    This can be maintained in the work center capacity header

    detail.

    Once this is assigned, working days and hours to this workcenter will be as per this shift sequence.

  • 8/3/2019 Overview Doc

    30/73

    1.9 Define Routing Select ion Automatic

    BACKGROUND

    This configuration setting enables to configure the automaticselection of routing (Task list).

    Task list has to be selected automatically during

    Production order creation (Routing)

    Process order creation (Master recipe)

    Cost estimate calculation

    MRP run

    Routing is essential to

    Calculate the conversion cost

    Calculate the capacity requirements

    Schedule the operation

    To schedule the material at right time in MRP

    SCENARIO

    Define Automatic routing selection.

    INSTRUCTIONS

    Follow the Menu Path: IMGProductionBasicdataRouting Routing selection Select automatically

  • 8/3/2019 Overview Doc

    31/73

    1. Click

    2. Click

    3. Update the Following fields

    Field DescriptionID Selection id. E.g. 01Selection Priority Priority of selection in this ID.

    E.g. enter from 1,2 Task List type Mention the task list type. E.g.

    N for routing, 2 for masterrecipe

    Usage Enter the Usage of this task

    list. E.g. 1Status Enter the status of this task

    list. E.g. 4

    Note: - Repeat the above with the same id as shown below.

    Impact of this configuration in Master Data /Transaction

    In the order type dependant parameter and MRP plantparameter configuration

    Selection id 01 will be mentioned.

  • 8/3/2019 Overview Doc

    32/73

    While performing the transaction (creation of process order orproduction order or MRP run), automatic selection of routingwill be performed in the following sequence:

    First system will search task list type routing as per thesequence 1

    System will search for routing with usage 1

    System will search for routing with status 4

    If the above search fails, system will go to the next sequence inthe same selection id. I.e. sequence no. 2 in our above shownscreen shot.

    system will search task list type routing as per thesequence 2

    System will search for routing with usage 1

    System will search for routing with status 2

  • 8/3/2019 Overview Doc

    33/73

    2.MRP Related configuration settings

    2.1 Plant parameters

    BACKGROUND

    This configuration setting enables to configure the plantparameter for Materials Requirement Planning (MRP).

    MRP will ensure

    Availability of right material at right time.

    Calculate the capacity requirements.

    Following MRP related parameters must be configured toperform MRP.

    Frequency of planning,

    How to explode the BOM,

    Order type to be used when converting planned order

    Planning horizon

    Scheduling

    Apart from above there are more parameters to be configured,which we shall discuss.

    When creating plant by copying from one plant, many plantparameters are copied, however it is required to maintainplant specific parameters.

  • 8/3/2019 Overview Doc

    34/73

    SCENARIO

    Maintain MRP plant parameter for the plant IND6.

    INSTRUCTIONS

    Follow the Menu Path: IMGProductionMaterialRequirement Planning Plant parameters carryout over allmaintenance of plant parameters

    Click

    Click

    Enter Plant IND6

    Click

  • 8/3/2019 Overview Doc

    35/73

    Status indicates that the values are maintained andthe status denotes that no value is maintained.

    Lets discuss the important tab screens one by one.

  • 8/3/2019 Overview Doc

    36/73

    2.2 Define MRP controller

    BACKGROUND

    This configuration setting enables to configure MRP controllerspecific to a plant.

    MRP controller will

    Material availability for production.

    Confirm the purchase request generated by MRP run.

    Schedule the production.

    Initiate action for shortage items and avoid shortages.

    SCENARIO

    Maintain MRP controller for the plant IND6.

    INSTRUCTIONS

    Follow the Menu Path: IMGProductionMaterialRequirement Planning Plant parameters carryout over allmaintenance of plant parameters

    Click

    Click

    Enter Plant IND6

    Click

  • 8/3/2019 Overview Doc

    37/73

    Click

    Click again in the next screen

    To create the new MRP controller,

    Click

    Update the Following fields

    Field DescriptionPlant Enter the plant number. E.g.

    IND6

    MRP controller Enter the MRP controller. E.g.RMP

    MRP controller Name Name of the MRP controller.E.g. RM planner

    Click Save .

    Impact of this configuration in Master Data /Transaction

  • 8/3/2019 Overview Doc

    38/73

    MRP controller has to be maintained in the material masterMRP1 view.

  • 8/3/2019 Overview Doc

    39/73

    2.3 MRP Plant Parameter Float (ScheduleMargin Key)

    BACKGROUND

    This configuration setting enables to define the float forproduction.

    It is used to schedule the production or process order. Float isthe cushioning durations in days before and after the actualproduction date. It is also called as schedule margin key.

    Cushioning period covers the days

    Before production

    After production

    In order to take care of any unforeseen situation duringmanufacturing and to make the committed date of production

    safer, the extra days are defined here.

    These extra days defined here will be added in the start date ofproduction and in the end date of production.

    SCENARIO

    Create schedule margin key for plant IND6

    INSTRUCTIONS

    Follow the Menu Path: IMGProductionMaterialRequirement Planning Plant parameters carryout over allmaintenance of plant parameters

  • 8/3/2019 Overview Doc

    40/73

    Click

    Click

    Enter Plant IND6

    Click

    Click

    Click

    Update the Following fields

    Field Description

    Plant Enter the plant number. E.g.IND6

    SMK Schedule Margin Key Key identify the float periods.E.g. 555

    Opening Period Number of working dayssubtracted from the orderstart date to find the creationdate.

    This is an extra time to MRPcontroller.It is used in backwardscheduling only.

    Float Before production Number of working daysbetween the order start dateand the scheduled start date;used as a float in productionScheduling.

    Float after production Number of working days usedas a float for schedulingbetween the order due date

    and the scheduled finish date.

    The safety margin afterproduction is used for

  • 8/3/2019 Overview Doc

    41/73

    compensating malfunctionswithin the order production.

    Click Save .

    Impact of this configuration in Master Data /Transaction

    Schedule Margin Key has to be maintained in the materialmaster MRP1 view.

  • 8/3/2019 Overview Doc

    42/73

    2.4 MRP Plant Parameter Special ProcurementKey

    BACKGROUND

    This configuration setting enables to define the specialprocurement key.

    Special procurement key used to

    Transfer requirements from one plant to another plant.

    Make material issue from another plant

    Create the direct process order in another plant or in ownplant

    Define the phantom item. I.e. item not exist physicallybut planning will be done.

    To calculate standard cost estimate in one plant referringthe BOM and Task list data from another plant.

    SCENARIO

    Define the special procurement key for plant IND6

    INSTRUCTIONS

    Follow the Menu Path: IMGProductionMaterialRequirement Planning Plant parameters carryout over allmaintenance of plant parameters

  • 8/3/2019 Overview Doc

    43/73

  • 8/3/2019 Overview Doc

    44/73

  • 8/3/2019 Overview Doc

    45/73

    at an alternative plant ifdependent requirements exist.

    Issuing Plant If the check box of with drawnfrom alternate plant is

    selected, it is mandatory tomention issuing plant.

    Click Save .

    Impact of this configuration in Master Data /Transaction

    When the material is to be stock transferred from anotherplant, maintain the special procurement key in MRP2 view ofthe material master.

    In this configuration example, if the special procurement key60 is maintained, stock transfer PR will be generatedindicating the supplying plant as 9100.

  • 8/3/2019 Overview Doc

    46/73

    2.5 Activating MRP and Planning file entries

    BACKGROUND

    This configuration setting enables to activate or deactivate theMRP single item multilevel.

    MRP single item multi level is used to run MRP for a specificmaterial at any given point of time.

    Single item multi level MRP run can be done to check the

    planning result of a specific material after changing the plan.

    Planning file is the internal file in SAP. Items which undergoany change will be maintained in the planning file internallyby the system automatically.

    Items maintained in the planning file will be considered in thenext net change MRP run.

    SCENARIO

    Activate MRP in the Plant IND6.

    INSTRUCTIONS

    Follow the Menu Path: IMGProductionMaterial

    Requirement Planning Planning file entries Activate MRPand setup planning file entries

    Click

    Click

  • 8/3/2019 Overview Doc

    47/73

    Update the Following fields

    Field Description

    Plant Select the Plant from thedisplay. E.g. IND6

    Activate RequirementPlanning Check box to be ticked toactivate single item multilevelMRP run. E.g. Ensure thecheck box is ticked.

    Click Save .

    Impact of this configuration in Master Data /Transaction

    Transaction codes MD01 and MD02 can be performed onlywith this configuration setting.

    Error message will be generated if this is not configured.

  • 8/3/2019 Overview Doc

    48/73

    2.6 MRP type

    BACKGROUND

    This configuration setting enables to define the MRP type.

    MRP type determines the type of planning to be employed to amaterial.

    Important types of Planning are

    Material Requirement Planning (MRP)

    Consumption Based Planning

    Forecast based planning

    Parameter which are defined in the MRP types are

    MRP procedure or MPS procedure

    Basis for planning Reorder point and consumption method

    Lot size procedure

    Forecast

    Not to plan the material at all

    Above types of planning are governed through the MRP type.

    SCENARIO

    Create a MRP type ZD with forecast and to plan regularly.

    INSTRUCTIONS

  • 8/3/2019 Overview Doc

    49/73

    Follow the Menu Path: IMGProductionMaterialRequirement Planning Master data check MRP type

    Click

    Click

    Update the Following fields

    Field Description

    MRP Type Key defining the MRP type.E.g. Enter ZD and maintain

  • 8/3/2019 Overview Doc

    50/73

    description.

    MRP Procedure SAP internally identified keyto do the planning accordingto the internal control. E.g.

    Enter D for MRPFirming type Confirming the orderproposal. Leave it blank here.

    Roll forward To delete or not the oldplanned orders. Leave it blank

    Plan Regularly (Check box) Planning takes place only ifany change happened to thematerial, other wise it is notplanned, if this check box isticked, material will beplanned in every MRPirrespective of any changeshappening to it.E.g. Tick this check box

    Forecast Indicator To consider the forecastrequirement. E.g. Enter * tomake it as optional forecast.Forecast requirementconsideration become

    optional.Consumption Indicatorforecast

    Defines, which consumptionare relevant for forecast. E.g.

    Enter G to indicate Totalconsumption

    MRP indicator forecast To define whether the forecastrequirements are to beconsidered in MRP. E.g. EnterG to consider total

    requirement in MRP run.Reduce forecast Indicates how the forecast

    requirements are to bereduced. E.g. Leave blank toreduce forecast value byconsumption

    Safety stock (Check box) To calculate safety stock

  • 8/3/2019 Overview Doc

    51/73

    automatically, tick this checkbox. E.g. Leave it blank

    Reorder Point To calculate Reorder pointautomatically, tick this check

    box. E.g. Leave it blank

    Click Save .

    Impact of this configuration in Master Data /Transaction

    Assign this MRP type ZD to the material master MRP1 view.

    This material will be planned regularly irrespective anychanges happening to this material.

    If is required Forecast can be run and those forecastrequirements will be considered in MRP.

  • 8/3/2019 Overview Doc

    52/73

    2.7 MRP Plant Parameter Conversion

    BACKGROUND

    This configuration setting enables to define the order types while converting the planned order in to process order orproduction order.

    Order type is a mandatory entry while creating the processorder or production order. Order type controls the creation oforder and responsible for entire production or process orderprocessing.

    MRP run will create the planned order for the net requiredquantity after considering the stocks and receipts. Plannedorder will be converted to process order if it is produced in-house or into the purchase request if it is procured from

    outside.

    SCENARIO

    Maintain the conversion parameter to convert planned orderinto the production order or into the process order.

    INSTRUCTIONS

    Follow the Menu Path: IMGProductionMaterial

    Requirement Planning Plant parameters carryout over allmaintenance of plant parameters

    Click

    Click

  • 8/3/2019 Overview Doc

    53/73

    Enter Plant IND6

    Click

    Click

    Click

    - Maintain the production order type to

    convert planned order into production order

    - Maintain process order type to convertplanned order into process order.

    Click Save .

    Impact of this configuration in Master Data /Transaction

    When converting the planned order into production order orprocess order, order will be determined automatically by thesystem.

  • 8/3/2019 Overview Doc

    54/73

  • 8/3/2019 Overview Doc

    55/73

  • 8/3/2019 Overview Doc

    56/73

    Resident time 1 and 2 Related to Archiving theobject. It indicates, thereshould be one month gapbetween deletion indicator

    setting and deletion flag. E.g.Enter 1 in Resident time 1and in resident time 2.

    Settlement profile Profile defining how the orderis to be settled. Related tocosting. E.g. enter 30

    Status profile Header User created status profileapplicable to this order type.

    Operation Status profile User created status profile foroperation applicable to this

    order type.

    Click Save .

    Impact of this configuration in Master Data /Transaction

    Order type is a mandatory entry while creating production orprocess order.

    Number range and controlling parameter (settlement rule) arepicked during creation of production or process orderaccording to the configuration setting defined in the ordertype.

  • 8/3/2019 Overview Doc

    57/73

  • 8/3/2019 Overview Doc

    58/73

  • 8/3/2019 Overview Doc

    59/73

    Click Save .

    Click

    Impact of this configuration in Master Data /Transaction

    While saving the production or process order, number will beassigned automatically to the order.

    If an order type does not have a number range assignment,

    abnormal termination of program will be displayed whilesaving the production or process order.

  • 8/3/2019 Overview Doc

    60/73

    3.3 Define Scheduling Parameter for order type

    BACKGROUND

    This configuration setting enables to define the schedulingparameter for production or process order type.

    Scheduling parameter is essential to schedule the productionorder according to the Task list data. I.e. to determine thestart date and end date for the order and to the eachoperation.

    Scheduling data for specific order type defines

    How to schedule production order

    Whether to generate capacity requirements

    How to adjust order dates while scheduling

    SCENARIO

    Define scheduling parameter for order type YP01 in plantIND6.

    INSTRUCTIONS

    Follow the Menu Path:- IMGProduction Shop floorcontrol Operation Scheduling Define schedulingparameters for production orders

    Click

  • 8/3/2019 Overview Doc

    61/73

    Click

    Update the Following fields

    Field Description

    Plant Plant to which this setting isto be applicable. E.g. IND6Order type Order type under the Plant

    IND6 to which this schedulingtype is to be applicable. E.g.Enter YP01

    Production scheduler Production scheduler to which

  • 8/3/2019 Overview Doc

    62/73

    this setting is applicable. E.g.* to indicate applicable to allproduction scheduler in theplant IND6.

    Production orders and processorders are scheduled at adetailed planning level usingthe routing or the masterrecipe. Therefore you cannotenter a selection ID. Also thescheduling indicator is setautomatically.

    Generate capacity reqs. To indicate the system tocalculate capacity

    requirement. Tick this checkbox.

    Adjust dates Indicating how to adjust thedates of production order ordependant requirement whenrescheduling. E.g. SelectAdjust basic date or dependdate to adjust order start date.

    Scheduling type Type of scheduling. E.g.

    Backward scheduling.Automatic Scheduling checkbox

    Tick this check box to indicatescheduling to be automatic.E.g. Tick this check box.

    Click Save .

    Impact of this configuration in Master Data /

    Transaction

    This setting determines the scheduling type while creating theproduction order.

  • 8/3/2019 Overview Doc

    63/73

    If it is backward scheduling, it is required to enter only orderfinish date while creating the production or process order.

  • 8/3/2019 Overview Doc

    64/73

    3.4 Define confirmation parameters

    BACKGROUND

    This configuration setting enables to define the confirmationparameter to the order type in specific plant.

    Through confirmation transaction, completion of productionwill be reported in the system. Confirmation parameter to eachorder type is essential to perform the confirmation.

    Confirmation parameter defines

    To propose partial confirmation, or full confirmation

    To propose value of activity

    To calculate the activity value according to the quantitychange

    Confirmation sequence is to be adhered to or not

    To display all component irrespective back-flushindicator

    SCENARIO

    Define confirmation parameter for order type YP01 in Plant

    IND6.

    INSTRUCTIONS

  • 8/3/2019 Overview Doc

    65/73

    Follow the Menu Path:- IMGProduction Shop floorcontrol Operation Confirmation Define Confirmationparameters

    Click

    Click

    Update the Following fields

    Field DescriptionPlant Enter plant name to which

    this setting is to be applicable.E.g. IND6

    Order type Enter the order type to whichthis setting is to be applicable.E.g. YP01

  • 8/3/2019 Overview Doc

    66/73

    Operation sequence While confirming, whetheroperation sequence is to befollowed as per routing or not.Select as shown above.

    Under delivery While confirming, if the yieldquantity is less than thetolerance limit maintained inthe work scheduling view ofmaterial master how thesystem to behave. Select asabove

    Over delivery While confirming, if the yieldquantity is more than thetolerance limit maintained in

    the work scheduling view ofmaterial master how thesystem to behave. Select asabove.

    QM Result rec. Operation contains the qualitycharacteristics and if thatoperation has to be confirmed,how the system to behavewhen that confirmation by QC

    is not done.E.g. Select as shown aboveLeave this blank if only theback-flush components are tobe proposed during theconfirmation. If this indicatoris set, system will propose allthe components assigned toan operation.

    Click tabscreen

  • 8/3/2019 Overview Doc

    67/73

    Field DescriptionConfirm type Type of confirmation to beproposed during confirmationtransaction. E.g. Select asshown above

    Goods Movements If this check box is ticked,system will give you a logmessage screen and requestyou to say yes or no to correctthe errors occurred in Goodsmovement duringconfirmation.

    Click tab screen

  • 8/3/2019 Overview Doc

    68/73

    Update the Following fields

    Field Description To propose the quantity

    during confirmationtransaction.When the yield quantity ischanged from the defaultdisplay, according to the new yield quantity, all otheractivity and quantities arecalculated with this tick inthis check box.

    Make other ticks in the check boxes as shown above, as theyare self explanatory.

    Click Save .

  • 8/3/2019 Overview Doc

    69/73

    Impact of this configuration in Master Data /Transaction

    While confirming the production order, system will performaccording to the setting maintained here.

    Example:-

    Production order quantity = 1000.

    Over delivery tolerance 25 % maintained in the workscheduling view of material master

    While confirming, the confirmation quantity entered as 1500(which is more than over delivery tolerance).

    As per the configuration setting here, system will allow tocontinue the transaction.

    If it is not to be allowed, change the over delivery tolerancechecking into an error message.

  • 8/3/2019 Overview Doc

    70/73

    3.5 Define Default Values

    BACKGROUND

    This configuration setting enables to define Default values fortask list.

    Default values are required to create the operation inside theproduction order or process order automatically if there is notask list.

    Default values are defined to a specific order type.

    SCENARIO

    Define default values to the order type YA70 in Plant IND6.

    INSTRUCTIONS

    Follow the Menu Path: IMGProductionShop floor control

    Operations Task list selection Define default values

    Click

    Enter Plant. E.g. IND6

  • 8/3/2019 Overview Doc

    71/73

    Click

    Note: - it is suggested to copy from the standard order type.

    Select PP01 by clicking the grey box in the left.

    Click

  • 8/3/2019 Overview Doc

    72/73

    Enter the order type as YP01

    Note: - values mentioned in each field can be left as it is. If

    required it can be changed.

    Click

    Click

    Impact of this configuration in Master Data /Transaction

    When creating the production order or process order, if thetask list is not found, system will create a dummy operationwith operation number 0010.

  • 8/3/2019 Overview Doc

    73/73

    The above is only a sample presented. To get hold of the fullSAP PP/QM pack with the entire configuration, end userdocuments and power point plus all the bonuses of PPQuestions and Answers, Resume Builder,Networking Audio

    and the very special CO Product Costing and Million DollarSAP PP-CO Integration report click on the below link

    http://www.sap-topjobs.com/SpecialPP/8431654645.html

    Your order will be shipped through FedEx and will reach youin 3 days time

    Prosperity and Happiness Be onto You.

    Take care and Have a Great Day.