Page 1: Overview of ISGS™ Remediation TechnologyISGS Sealed Vertical Migration Pathways . 4.5% ISGS solution has specific gravity of 1.05 to 1.10 . Most visual evidence of reagent along

Overview of ISGS™ Remediation Technology

Jim Mueller, PhD FMC Corporation

[email protected]

Page 2: Overview of ISGS™ Remediation TechnologyISGS Sealed Vertical Migration Pathways . 4.5% ISGS solution has specific gravity of 1.05 to 1.10 . Most visual evidence of reagent along

The NAPL Challenge – “Secondary Sources”

Primary Sources - Excavation and Disposal $100 to $250/yd3

Secondary Sources – More Challenging >$250/yd3

Page 3: Overview of ISGS™ Remediation TechnologyISGS Sealed Vertical Migration Pathways . 4.5% ISGS solution has specific gravity of 1.05 to 1.10 . Most visual evidence of reagent along

.

In the presence of an organic compound (R), MnO4 reactions yield an oxidized intermediate (Rox) or CO2 ,… plus MnO2 R + MnO4- → MnO2 + CO2 or Rox

ISGS™ Chemistry ISGS solution is a proprietary blend of permanganate and mineral salts that form a stable mineral precipitate

Page 4: Overview of ISGS™ Remediation TechnologyISGS Sealed Vertical Migration Pathways . 4.5% ISGS solution has specific gravity of 1.05 to 1.10 . Most visual evidence of reagent along

Birnessite is an oxide of Mn and Mg along with Na, Ca and K with the composition:

(Na,Ca,K)(Mg,Mn)Mn6O14.5H2O

Page 5: Overview of ISGS™ Remediation TechnologyISGS Sealed Vertical Migration Pathways . 4.5% ISGS solution has specific gravity of 1.05 to 1.10 . Most visual evidence of reagent along

Non-Treated Soil ISGS Treated Soil

Page 6: Overview of ISGS™ Remediation TechnologyISGS Sealed Vertical Migration Pathways . 4.5% ISGS solution has specific gravity of 1.05 to 1.10 . Most visual evidence of reagent along

Treated Soil Core Close-up Showing ISGS “Crust” or Coating and NAPL Ganglia

Likely NAPL

ISGS coating

Soil Grain

Epoxy (open pore space)

Conclusion: Soil grains and NAPL blobs coated with ISGS crust

Page 7: Overview of ISGS™ Remediation TechnologyISGS Sealed Vertical Migration Pathways . 4.5% ISGS solution has specific gravity of 1.05 to 1.10 . Most visual evidence of reagent along

Contaminant flux = f (HS, DS) HS - hydrodynamic structure DS – DNAPL architecture

Most contaminated Least contaminated

Pre-Remediation:

Source Zone

Control Plane

B

A’

A Contaminant

Flux (Jc)

Control Plane Control Plane

B

A’

B’

Contaminant Flux (Jc)

Post-Remediation: A

Contaminant Flux Definition (Enfield, 2001)

Page 8: Overview of ISGS™ Remediation TechnologyISGS Sealed Vertical Migration Pathways . 4.5% ISGS solution has specific gravity of 1.05 to 1.10 . Most visual evidence of reagent along

ISGS Potential Advantages

Rapid reaction yields reduced aquifer permeability and COI flux in days

Applicable to wide range of organic and inorganic COIs

Simple systems depending on site conditions

Little waste disposal

Relatively low cost for localized source areas

Long term (est. >15 years)

Logical alternative to mass removal

Presenter
Presentation Notes
Applicable to bio-recalcitrant COIs/ yes
Page 9: Overview of ISGS™ Remediation TechnologyISGS Sealed Vertical Migration Pathways . 4.5% ISGS solution has specific gravity of 1.05 to 1.10 . Most visual evidence of reagent along

Field Pilot Tests Results Gainesville, FL

Page 10: Overview of ISGS™ Remediation TechnologyISGS Sealed Vertical Migration Pathways . 4.5% ISGS solution has specific gravity of 1.05 to 1.10 . Most visual evidence of reagent along

Cabot Carbon / Koppers Superfund Site, Gainesville, FL

• 90 acre site • Pump & treat in place • Secondary NAPL issues

Page 11: Overview of ISGS™ Remediation TechnologyISGS Sealed Vertical Migration Pathways . 4.5% ISGS solution has specific gravity of 1.05 to 1.10 . Most visual evidence of reagent along
Page 12: Overview of ISGS™ Remediation TechnologyISGS Sealed Vertical Migration Pathways . 4.5% ISGS solution has specific gravity of 1.05 to 1.10 . Most visual evidence of reagent along
Page 13: Overview of ISGS™ Remediation TechnologyISGS Sealed Vertical Migration Pathways . 4.5% ISGS solution has specific gravity of 1.05 to 1.10 . Most visual evidence of reagent along

DIP Parameter Value

Treatment area 2,000 ft2 Thickness of treatment interval (conservatively assumes 8 - 28 ft bgs)

20 ft

Soil density (estimated) 94.4 lbs/ft3 Soil mass within treatment area 3,778,000 lbs MnO4 to soil mass 3.2 g MnO4 / kg soil Mass NaMnO4 required for test plot 14,400 lbs Soil NOD 122 g MnO4 / Kg soil Application rate 10 % of soil pore vol Total volume 4.5% solution to inject 6,200 USG

Number of injection points 10 Volume 4.5% solution per point 620 USG Volume 4.5% NaMnO4 solution IP 155 USG

Page 14: Overview of ISGS™ Remediation TechnologyISGS Sealed Vertical Migration Pathways . 4.5% ISGS solution has specific gravity of 1.05 to 1.10 . Most visual evidence of reagent along

Direct Push Injections

Page 15: Overview of ISGS™ Remediation TechnologyISGS Sealed Vertical Migration Pathways . 4.5% ISGS solution has specific gravity of 1.05 to 1.10 . Most visual evidence of reagent along

ISGS Sealed Vertical Migration Pathways

4.5% ISGS solution has specific gravity of 1.05 to 1.10 Most visual evidence of reagent along clay “aquitard” at ca. 28 ft bgs However, ISGS reagents found its way through clay suggesting preferential pathway created by creosote

Presenter
Presentation Notes
But we also used 10% right? Just in wells May be following preferential? pathways created by creosote. Yes by design
Page 16: Overview of ISGS™ Remediation TechnologyISGS Sealed Vertical Migration Pathways . 4.5% ISGS solution has specific gravity of 1.05 to 1.10 . Most visual evidence of reagent along

RESULTS - NAPL Monitoring Wells

No measurable free-phase NAPL in any of the monitoring wells.

Monitoring Well Pre-Injection Post-Injection NISBS- 1 NAPL stain NISBS-2 NAPL stain TIP-3 ND ND TIP-4 ND ND UGH Recovery NAPL No NAPL

Page 17: Overview of ISGS™ Remediation TechnologyISGS Sealed Vertical Migration Pathways . 4.5% ISGS solution has specific gravity of 1.05 to 1.10 . Most visual evidence of reagent along

Total PAH Concentrations in Soil

6 cores (3 sections) before treatment

6 cores (2 depths) after treatment

DIP area: 11% reduction

TIP area: 50% reduction

Best matched cores: dropped from 7,250 mg/kg to 3,600 mg/kg

PAH concentrations in soil reduced by up to 50% within 3 months.

Page 18: Overview of ISGS™ Remediation TechnologyISGS Sealed Vertical Migration Pathways . 4.5% ISGS solution has specific gravity of 1.05 to 1.10 . Most visual evidence of reagent along

PAH Concentrations in Soil Leachate

6 cores (3 sections) before treatment

6 cores (2 depths) after treatment

DIP area: 71% reduction

TIP area: 98% reduction

Best matched cores: dropped from 11,700 mg/L to 560 mg/L

PAH leachate concentrations dropped by up to 98% reduction in within 3 months.

Page 19: Overview of ISGS™ Remediation TechnologyISGS Sealed Vertical Migration Pathways . 4.5% ISGS solution has specific gravity of 1.05 to 1.10 . Most visual evidence of reagent along

Field Pilot Tests Results Dolomite, AL

Page 20: Overview of ISGS™ Remediation TechnologyISGS Sealed Vertical Migration Pathways . 4.5% ISGS solution has specific gravity of 1.05 to 1.10 . Most visual evidence of reagent along

Woodward Coke Site Overview

Coal Tar Site

Traditional 5 point injection scheme

Fractured Bedrock / Karst Geology

Target interval 20 – 30 feet below grade

10,000 lbs ISGS @ 4.5% solution

4 Drums to 1,000 gallons of water for ~1% injection solution

Average 20 PSI injection pressure. Permitted up to 50 PSI.

Average 1,000 gallons in 1 hour 15 minutes (~13 gpm)

Page 21: Overview of ISGS™ Remediation TechnologyISGS Sealed Vertical Migration Pathways . 4.5% ISGS solution has specific gravity of 1.05 to 1.10 . Most visual evidence of reagent along

ISGS Injection – Dolomite, AL

Page 22: Overview of ISGS™ Remediation TechnologyISGS Sealed Vertical Migration Pathways . 4.5% ISGS solution has specific gravity of 1.05 to 1.10 . Most visual evidence of reagent along

ISGS Field Data – Decrease in K Values Woodward Coke Site – Dolomite, AL

•2 years post ISGS injection •1-2 log decrease in values •No NAPL in MW

Page 23: Overview of ISGS™ Remediation TechnologyISGS Sealed Vertical Migration Pathways . 4.5% ISGS solution has specific gravity of 1.05 to 1.10 . Most visual evidence of reagent along

ISGS Material Cost – Field Applications

Denver, CO Dolomite, AL Gainesville, FL TOD = 18 g/kg TOD = 1 g/kg TOD = 122 g/kg

Dense Alluvium Injection Wells

Fractured Karst Push-Pull

Sand/Silt Direct Push and Injection wells

1,273 m3 area 3% solutions 1,850 USG/IP 2-5 gpm (20 psi)

1,500 m3 soil area 1% solutions 20,000 USG 13 gpm (20-50 psi)

1,415 m3 soil 4.5 % solutions 620 USG/DIP 2-5 gpm (<50 psi)

Cost = $40 - 50/m3

$31 -38/yd3 Cost = $45 - 50/m3

$34 -38/yd3 Cost = $60 - 75/m3

$50 -60/yd3

Page 24: Overview of ISGS™ Remediation TechnologyISGS Sealed Vertical Migration Pathways . 4.5% ISGS solution has specific gravity of 1.05 to 1.10 . Most visual evidence of reagent along

ISGS Summary

Page 25: Overview of ISGS™ Remediation TechnologyISGS Sealed Vertical Migration Pathways . 4.5% ISGS solution has specific gravity of 1.05 to 1.10 . Most visual evidence of reagent along

• ISGS can help address DNAPL Challenges – Immobilizes DNAPL surface – Reduces near field permeability – Reduces flux of constituents into GW – Enhances natural attenuation potential of GW

ISGS - A Tool for the “NAPL Tool Box”

Page 26: Overview of ISGS™ Remediation TechnologyISGS Sealed Vertical Migration Pathways . 4.5% ISGS solution has specific gravity of 1.05 to 1.10 . Most visual evidence of reagent along

• Crust Longevity – Effect of change in Eh on crust weathering – Validate models – Mineralogy

• Performance Monitoring – What to monitor? – How to monitor? – In situ velocity flow sensors? – Flux reduction?

Regulatory Issues for Full-Scale Applications

Page 27: Overview of ISGS™ Remediation TechnologyISGS Sealed Vertical Migration Pathways . 4.5% ISGS solution has specific gravity of 1.05 to 1.10 . Most visual evidence of reagent along

• Crust longevity will be dependent on the pH and Eh at the site

• The theoretical maximum is 400 years, we have estimated crust lives of 20-40 years at sites

More soluble

Eh-pH diagram from Hem (1985)

Crust Longevity

Page 28: Overview of ISGS™ Remediation TechnologyISGS Sealed Vertical Migration Pathways . 4.5% ISGS solution has specific gravity of 1.05 to 1.10 . Most visual evidence of reagent along

Site COI / Environmental Setting ISGS Approach / Status Active Wood Treating Site Denver, CO Superfund Site

Phase separated creosote (PAHs) and pentachlorophenol (penta). Consolidated shallow alluvium.

KMnO4 (no catalysts; no buffer) successful bench and pilot studies completed; full-scale application completed 2004.

(Active) Wood Treating Site Gainesville Florida Superfund Site

Phase separated creosote (PAHs). Sand silt environment, 5 to 22 ft bgs.

NaMnO4 (catalyzed, buffered) completed bench-scale engineering optimization tests; Pilot-scale technology validation performed in January 2008. Full-scale application recommended as part of the final design.

Former Wood Treating Site Montgomery, AL

Phase separated creosote (PAHs) Field Scale application completed 2009. One to two orders of magnitude reduction in permeability.

Former Wood Treating Site Cape Fear, NC

Phase separated creosote (PAHs) Conceptual design completed.

Former American Creosote Works Winnfield, Louisiana

Phase separated creosote (PAHs) Engineering optimization bench work completed.

Former Wood Treating Site Sand Point, ID

Phase separated creosote (PAHs) Engineering optimization bench work completed; Field Pilot Completed Q3 2010; monitoring in progress

Former Wood Treating Site Netherlands

Phase separated creosote (PAHs) Engineering optimization bench work in progress; Field Pilot scheduled for Q2 2011

ISGS Experience

Page 29: Overview of ISGS™ Remediation TechnologyISGS Sealed Vertical Migration Pathways . 4.5% ISGS solution has specific gravity of 1.05 to 1.10 . Most visual evidence of reagent along

Site COI / Environmental Setting ISGS Approach / Status

Former Coke Manufacturing Site South Eastern USA

Phase separated creosote / tar (PAHs) in fractured limestone. 15,700 ft3 treated from 28 to 30 ft bgs.

NaMnO4 (catalyzed, buffered) completed bench-scale engineering optimization tests; Full-scale technology implementation completed spring 2007

Manufactured Gas Plant Dover, NJ

Phase separated coal tars; goal is to reduce COC flux and EPR.

Engineering optimization bench work completed

Manufactured Gas Plant, Indiana

Phase separated coal tars; goal is to reduce COC flux and facilitate EPR.

Engineering optimization bench work completed

Former Wood Treating Site Montgomery, AL

Phase separated creosote (PAHs)

Field Scale application completed 2009. One to two orders of magnitude reduction in permeability in Karst

Manufactured Gas Plant Ferndale Michigan

Phase separated coal tars Engineering optimization bench work completed; Pilot scheduled for Q1 2011

Fuel Terminal MASSPORT

Phase separated hydrocarbons Engineering optimization bench work completed; Field work pending

Fuel Terminals El Paso Energy

Phase separated hydrocarbons Field Pilot completed Q3 2010 – monitoring in progress

Manufactured Gas Plant New York

Phase separated coal tars Engineering optimization bench work completed; Field work pending

Manufactured Gas Plant Burlington, Iowa

Phase separated creosote (PAHs)

Engineering optimization bench work pending; Field pilot pending

ISGS Experience (continued)

Page 30: Overview of ISGS™ Remediation TechnologyISGS Sealed Vertical Migration Pathways . 4.5% ISGS solution has specific gravity of 1.05 to 1.10 . Most visual evidence of reagent along

Site COI / Environmental Setting ISGS Approach / Status

Former Wood Treating Site, Nashua, NH

Phase separated creosote (PAHs)

Engineering optimization bench work completed 2013. Field Pilot planned for Q1 2014

Manufactured Gas Plant New Jersey

Phase separated coal tars Full scale application completed Q3 2013; effective NAPL stabilization within 2 weeks

Fuel Terminal Philadelphia, PA

Phase separated hydrocarbons Engineering optimization bench work completed 2013. Field Pilot completed Q2 2013

Industrial Process Area, Europe

Creosote and PCBs Engineering optimization bench work planned for Q1 2014

ISGS Experience (continued)

Page 31: Overview of ISGS™ Remediation TechnologyISGS Sealed Vertical Migration Pathways . 4.5% ISGS solution has specific gravity of 1.05 to 1.10 . Most visual evidence of reagent along

FMC and ISGS are trademarks of FMC Corporation or its subsidiaries. © 2013 FMC Corporation.