Page 1: Overview of NEDO's Offshore Wind Power …CDTI‐NEDO Joint Workshop on Offshore Wind Kitakyushu, th8 of July 2019 Overview of NEDO's Offshore Wind Power Technology Development Masaharu

1CDTI‐NEDO Joint Workshop on Offshore Wind

CDTI‐NEDO Joint Workshop on Offshore Wind

Kitakyushu, 8th of July 2019

Overview of NEDO's Offshore Wind Power Technology Development

Masaharu ITOHSenior Researcher

New Energy Technology Dept., NEDO

Page 2: Overview of NEDO's Offshore Wind Power …CDTI‐NEDO Joint Workshop on Offshore Wind Kitakyushu, th8 of July 2019 Overview of NEDO's Offshore Wind Power Technology Development Masaharu

2CDTI‐NEDO Joint Workshop on Offshore Wind

About NEDOFormal Name New Energy and Industrial Technology 

Development Organization

Management Agency One of the largest management agencies in 

Japan Playing a role as public R&D management 

organizations in Japan’s economic and industrial policies

Budget FY2019 1.43 billion US$ (1571億円)

Sunwater~jawiki, (July 14th, 2015). ミューザ川崎 [Picture file]. Retrieved May 14th, 2019 from following URL:https://upload.wikimedia.org/wikipedia/commons/2/2e/Muza_Kawasaki_201507.JPG

System provision Energy storage (e.g. batteries) Hydrogen production, storage, transport and

utilization Renewable energy

Energy Systems (0.5 billion US$, 550億円)

*$1 = ¥110

Page 3: Overview of NEDO's Offshore Wind Power …CDTI‐NEDO Joint Workshop on Offshore Wind Kitakyushu, th8 of July 2019 Overview of NEDO's Offshore Wind Power Technology Development Masaharu

3CDTI‐NEDO Joint Workshop on Offshore Wind

About NEDO

IndustryAcademia ResearchInstitutes

Coordination withpolicymaking authorities

Budget

Finance / Fund

Copyright ©METI

Page 4: Overview of NEDO's Offshore Wind Power …CDTI‐NEDO Joint Workshop on Offshore Wind Kitakyushu, th8 of July 2019 Overview of NEDO's Offshore Wind Power Technology Development Masaharu

4CDTI‐NEDO Joint Workshop on Offshore Wind

NEDO’s Offshore Wind Development Projects2008 2009 2010〜2014 2015 2016 2017 2018 2019〜

FixedBottom

PJ

CommonTopic

FloatingPJ

Demonstration:Offshore Wind Measurement

Demonstration:Fixed-Bottom Offshore Wind Turbine

Demonstration:FOWT

Development:NEDO Offshore Wind Information System

(NeoWins)

Development:Low-Cost

Installation technology

FSDemonstration:

Low-CostInstallation technology

FS

Supporting offshore WF development(2013〜)

Page 5: Overview of NEDO's Offshore Wind Power …CDTI‐NEDO Joint Workshop on Offshore Wind Kitakyushu, th8 of July 2019 Overview of NEDO's Offshore Wind Power Technology Development Masaharu

5CDTI‐NEDO Joint Workshop on Offshore Wind

NEDO Offshore Wind Information System(NeoWins)

Objective: To support developer’s planning for 

offshore wind farm development 

Project period : 2015FY〜2017FY Achievement: First Integrated Information necessary for 

planning offshore wind farm

High Accuracy: within 5% relative error ratio between simulation and Met‐Mast

Wind Speed

Month

‐Met‐Mast‐Simulation

NeoWins: http://app10.infoc.nedo.go.jp/Nedo_Webgis/index.htmlFreely available

Page 6: Overview of NEDO's Offshore Wind Power …CDTI‐NEDO Joint Workshop on Offshore Wind Kitakyushu, th8 of July 2019 Overview of NEDO's Offshore Wind Power Technology Development Masaharu

6CDTI‐NEDO Joint Workshop on Offshore Wind

Offshore Wind Potential in Japan / Area

Fixed BottomWater depth: 0‐50m

Approx. 21,000km2

Barge  

※ Excluding social constraintsDistance to shore within 30kmAnnual average wind speed: more than 7m/s

FloatingWater depth: 50‐100mApprox. 42,000km2

FloatingWater depth: 100‐200mApprox. 56,000km2

TLP Semi‐Sub SparJacketMono‐Pile 

Gravity 

50m 100m

Page 7: Overview of NEDO's Offshore Wind Power …CDTI‐NEDO Joint Workshop on Offshore Wind Kitakyushu, th8 of July 2019 Overview of NEDO's Offshore Wind Power Technology Development Masaharu

7CDTI‐NEDO Joint Workshop on Offshore Wind

Floating offshore wind turbine: Hibiki

Objectives:• Suitable for Japanese wind & sea conditions• To comply with the Japanese technical standards and guidelines

• System that can be installed in the depth of 50m

• Cost reduction by light weight system• Technical evaluation & Economic evaluation Characteristics:• Steel barge floater 

(Size: 51m×51m×10m, Draft: 7.5m)• 9 steel chain and drag anchor moorings• 2‐Blade, Upwind, 3MW wind turbine

Demonstrator: Hibiki Installing site

2014 2015 2016 2017 2018 2019 2020 2021

Feasibility StudyFeasibility Study Demonstration OperationDemonstration OperationDesign/Construction/InstallationDesign/Construction/Installation

Page 8: Overview of NEDO's Offshore Wind Power …CDTI‐NEDO Joint Workshop on Offshore Wind Kitakyushu, th8 of July 2019 Overview of NEDO's Offshore Wind Power Technology Development Masaharu

8CDTI‐NEDO Joint Workshop on Offshore Wind

Hibiki Project member

NEDO

Marubeni Corporation

Hitachi Zosen Corporation

GLOCAL INC.

Cosmo Eco Power Co., Ltd.

The University of Tokyo

Kyuden Mirai Energy Company, Incorporated

・Cost Analysis・Relation with Stakeholders

・Design & Manufacturing Floater・Installing the Demonstrator

・Wind Turbine & Mooring system Procurement

・Environmental Impact Assessment

・Evaluation of the System

・Grid Connection Discussion・Electric power quality evaluation

Page 9: Overview of NEDO's Offshore Wind Power …CDTI‐NEDO Joint Workshop on Offshore Wind Kitakyushu, th8 of July 2019 Overview of NEDO's Offshore Wind Power Technology Development Masaharu

9CDTI‐NEDO Joint Workshop on Offshore Wind

Hibiki Project PR video

YouTube – NEDO ChannelA record of the construction of Hibiki, a Next-Generation Floating Offshore Wind Turbine System

Page 10: Overview of NEDO's Offshore Wind Power …CDTI‐NEDO Joint Workshop on Offshore Wind Kitakyushu, th8 of July 2019 Overview of NEDO's Offshore Wind Power Technology Development Masaharu

10CDTI‐NEDO Joint Workshop on Offshore Wind

Overview of the New Act for Marine Renewable Energy

Design “Basic Policy”by the Government

Designation of promotion zones for offshore windby the Ministers(METI, MLIT)

Drawing up “Tender Guidelines”by the Ministers(METI, MLIT)

Submitting  “Occupancy Plan”by Developers

Selection of developer & Approval of “Occupancy Plan”by the Ministers(METI, MLIT)

Feed‐in Tariff(FIT) approval  in accordance with the approved “Occupancy Plan” by METI under FIT law 

Approval of Maximum of 30 years occupancy in accordance with the approved “Occupancy Plan” by MLIT

1. Investigation of the zone candidates by METI and MLIT

2. Discussing with the MAFF & the MOE

3. Identification of issues official and national concern in “the Council” ,which includes relevant stakeholders

4. Public announcement of the draft of designated zones※ the Stakeholders posses the right of expressing opinion

METI:MLIT:MAFF:MOE:

Ministry of Economics, Trade and IndustryMinistry of Land, Infrastructure, Transport and TourismMinistry of Agriculture, Forestry and FisheryMinistry of Environment