LSTK-1 PACKAGE FOR “ETHYLENE GLYCOL” PROJECT OF M/S. INDIAN OIL CORPORATION LIMITED (IOCL) AT PARADIP REFINERY, ODISHA Doc. No. : IPEG-6389-MAZD(1)-8470-CA-061-0036 Title : FLEXIBILITY ANALYSIS REPORT - EGU : 061-001 Rev. No. : 02 Page : 1 of 3 OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON ENGINEERING LIMITED (LTHE) UNIT / UNIT NO : ERU / 060 (EGU / 061) PMC JOB NO. / NAME : 6389 / IPEG LTHE JOB NO. : IOCL-MEG 02 For Approval VS PP PP 01 For Approval VS PP PP 00 For Approval VS PP PP Rev. Description Prepared By Reviewed By Approved By Drawing/Document Category (Submission Purpose) Drawing/Document Review Status ( By OWNER / PMC ) For Approval For Review For Information Approval Code Status Action Required 1 Rejected Revise & resubmit 2 Commented as noted Work may proceed subject to acceptance & incorporation of comments 3 Acceptable with minor comments Incorporate comments, if any. Resubmit as certified final. Work may proceed. 4 Approved with No comments-FINAL Work may proceed. 5 Information Only Accepted for information only. Work may proceed. NAME DISCIPLINE SIGN. DATE This Approval does not absolve the CONTRACTOR from meeting their contractual obligations of delivering a complete safe and efficiently operating unit facilities meeting all requirements of the Contract.

Upload: others

Post on 27-Feb-2021

14 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

LSTK-1 PACKAGE FOR “ETHYLENE GLYCOL”

PROJECT OF M/S. INDIAN OIL CORPORATION

LIMITED (IOCL) AT PARADIP REFINERY, ODISHA

Doc. No. : IPEG-6389-MAZD(1)-8470-CA-061-0036 Title : FLEXIBILITY ANALYSIS

REPORT - EGU : 061-001

Rev. No. : 02

Page : 1 of 3

OWNER : INDIAN OIL CORPORATION LIMITED (IOCL)

PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL)

LSTK CONTRACTOR : L&T HYDROCARBON ENGINEERING LIMITED (LTHE)

UNIT / UNIT NO : ERU / 060 (EGU / 061)

PMC JOB NO. / NAME : 6389 / IPEG

LTHE JOB NO. : IOCL-MEG

02 For Approval VS PP PP

01 For Approval VS PP PP

00 For Approval VS PP PP

Rev. Description Prepared

By Reviewed

By Approved

By

Drawing/Document Category (Submission Purpose)

Drawing/Document Review Status ( By OWNER / PMC )

For Approval For Review For Information

Approval Code

Status Action Required

1 Rejected Revise & resubmit

2 Commented as noted Work may proceed subject to acceptance & incorporation of comments

3 Acceptable with minor comments

Incorporate comments, if any. Resubmit as certified final. Work may proceed.

4 Approved with No comments-FINAL

Work may proceed.

5 Information Only Accepted for information only. Work may proceed.

NAME

DISCIPLINE

SIGN.

DATE

This Approval does not absolve the CONTRACTOR from meeting their contractual obligations of delivering a complete safe and efficiently operating unit facilities meeting all requirements of the Contract.

Page 2: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

LSTK-1 PACKAGE FOR “ETHYLENE GLYCOL”

PROJECT OF M/S. INDIAN OIL CORPORATION

LIMITED (IOCL) AT PARADIP REFINERY, ODISHA

Doc. No. : IPEG-6389-MAZD(1)-8470-CA-061-0036 Title : FLEXIBILITY ANALYSIS

REPORT - EGU : 061-001

Rev. No. : 02

Page : 2 of 3

CHANGE LIST

SL. NO.

REV. NO.

PAGE NO.

CLAUSE /

LINE NO.

BRIEF DESCRIPTION / REASON OF REVISION

REMARKS

1 00 - - Issued for Review -

2 01 - - Issued for Review -

3 02 - - Issued for Review -

A Revision line in left side margin denotes revision

Page 3: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

LSTK-1 PACKAGE FOR “ETHYLENE GLYCOL”

PROJECT OF M/S. INDIAN OIL CORPORATION

LIMITED (IOCL) AT PARADIP REFINERY, ODISHA

Doc. No. : IPEG-6389-MAZD(1)-8470-CA-061-0036 Title : FLEXIBILITY ANALYSIS

REPORT - EGU : 061-001

Rev. No. : 02

Page : 3 of 3

TABLE OF CONTENT

Sr. No. Description Page No.

1. BASIS FOR STRESS ANALYSIS………………………………………. 04

2. P&ID MARK-UP…………………………………………………………… 06

3. STRESS MARK-UP ISOMETRICS & STRESS IMAGE…..…………. 08

- CAESAR-II model plot

- Stress Isometrics

4. STRESS ANALYSIS REPORT………………………………………….. 13

- Listing of Static Load Cases

- Input listing

- Stress summary

- Restraint summary extended

- Hanger report (if applicable)

- Displacement summary

5. NOZZLE LOAD EVALUATION REPORT………………………………. 130

6. PMS………………………………………………………………………… 142

7. VENDOR DATA…………………………………………………………… 152

8. CHECKLIST……………………………………………………………...... 158

Page 4: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

LSTK-1 PACKAGE FOR “ETHYLENE GLYCOL”

PROJECT OF M/S. INDIAN OIL CORPORATION

LIMITED (IOCL) AT PARADIP REFINERY, ODISHA

Doc. No. : IPEG-6389-MAZD(1)-8470-CA-061-0036 Title : FLEXIBILITY ANALYSIS

REPORT - EGU : 061-001

Rev. No. : 02

1. BASIS FOR STRESS ANALYSIS

Page 5: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

LSTK-1 PACKAGE FOR “ETHYLENE GLYCOL”

PROJECT OF M/S. INDIAN OIL CORPORATION

LIMITED (IOCL) AT PARADIP REFINERY, ODISHA

Doc. No. : IPEG-6389-MAZD(1)-8470-CA-061-0036 Title : FLEXIBILITY ANALYSIS

REPORT - EGU : 061-001

Rev. No. : 02

1.1 The stress analysis is performed according to the code ASME B31.3 - Process Piping (2016)

and Specification for Flexibility Analysis (Doc No. : IPEG-6389-8230-SP-060-0003_Rev-O2).

CAESAR II 2018 version 10.0 is used for Piping Flexibility analysis.

1.2 Reference coordinate system:

-X axis is towards North, +Y axis is vertical up and -Z axis is towards East. The gravity

direction used in the calculation is -Y.

1.3 Analysis conditions:

W = Weight.

WW = Water filled weight of piping

WNC = Weight no contents (empty pipe weight)

HP = Hydro test pressure

P1 = Design pressure

T1 = Design Temperature

T2 = Operating Temperature

WIN = Wind

U = Seismic

1.4 If equipment material mentioned in vendor drawing is not available in Caesar II database,

equivalent material is used for equipment modelling.

Page 6: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

LSTK-1 PACKAGE FOR “ETHYLENE GLYCOL”

PROJECT OF M/S. INDIAN OIL CORPORATION

LIMITED (IOCL) AT PARADIP REFINERY, ODISHA

Doc. No. : IPEG-6389-MAZD(1)-8470-CA-061-0036 Title : FLEXIBILITY ANALYSIS

REPORT - EGU : 061-001

Rev. No. : 02

2. P&ID MARK-UP

Page 7: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

--.1

50 NB215 KC/HR"

I

I

I

t50NBI 1]5 KGIHR.

I

| ?30*P.2"*

Ffi-f" 25 N8

25 NB

,4nw 1ST STAGE EJECTOR(x-EJECTOR)(TAc#061 -EJ-622-01 ) 50 NB Pd-E25lVM HG A.

Ps-400lvlM HG A.Pd

50NB T

,4nfTMT

/\

[,pic-o:es-Er r o-25-oo ' -ooel

fiA irso Ne\@iPs - 45MM Hc A

F1 luic - iiclunf ]AIR - I2OKG/HR

ql srs.voL. - 5rzu:

;l lEVA.rM[ - <r2oMrN.

!liFllfl|=t i

_l!>I

W

ALL TAIL PIPES VOLUME

JOO MIV

; ,6}. zNO STAGE EJECTOR

| ffit (Y-EJECToR)

; H (TAG#061 -EJ-622-02)

.'.*bF43kl f. TPS-200MM HG A.

HG A. C? L," _,._x9

@He

Pd - 400M1\,1

50

STAGE INTER CONDEN

- JlEl/AtY co{D!!:E_R) ,(TAG#061 -EJ-622-E01 )

a - 37.105.M.S0.

, INTIR STAGE CONDENSERS

(TAG No. # 061-EJ-622-Eo1 /Eo2/Eo3)TEMA TYPE : 8EM SHELL SIDE TUBE SIDE

DEScN pRE.(lslcm2(9)) 3.5/F''/ 8.0

DESICN IElvlP. (.C) 350 65

TRlt\,{ CLASS; C1P5 C1W0

INSULATIONTYPET PERSoNALPROTECTION

INSUIATI0N IHK./DENSTTY: 40 M[1 / 220 KG/M3

HEAT 0uly (kcol/hr) : 127628 (061-EJ-622-E01)

r00574 (061 -E--622 -t02)87J4J (0b1 -EJ-622-E03)

INTER STAGE EJECTORS

(TAc No. # 061-EJ-622-o1/o2/o3)MOTIVI SIDE BODY SIDE

0ES|GN PRE.(l9,rcm2(s)) 24-5/rv 3.5/rvDESIGN rEMP. ('C) 550 350

TRIM CLASS: BIAS E1PS

MOC: CS CS

INSULATIONTYPE: PERSoNALPROTECTIoN

INSULATIoN rHK./DENSII: 40 MM / 22O KC/M3

L&T'CHIY0DA urrnmf] REV]El,l CODE 1 ' REJECTEO

REIIST & RESUB|(I.

! RIVEW CODI 2 - CO|\IIIINTED AS NOTED, itORK IJAY PROCEEO SUBJIC] ]OACCEPTANCE AND INCORPORATION OF COMMENTS,

f] REVIE|I CODI J _ ACCEPTABLT |{IIH I(INOR CO|,I|IIENIS

INCORPORAIE COMMENTS, IF ANY. RESUBMITAS CERTIFIED FINAI. WORK IVAY PROCIED.

f] RtVItW CODT 4 - APPROVED |{ITH NO CO|JMTNIS - FINAL

WORK t\,iAY PROCEED.

f] RTVIE\Ii CODE 5 _ INFOR|IIATION ONIY

ACCTPTID FOR INFORI/AIION ONLY, I{ORK |,lAY PROCIED.

COMMENTED BY REVIEWED BY APPROVED BY DATE

THIS RTVEll / APPROVAL OOES NOI RELIEVE IHt VENDOR / MANUFACIURER

OF INT FULL RTSPONSIBILITY AS TO DESIGN CORRECTNISS OF DIIIENSIONS

& COMPLIANCE !|LTHALL APPLCABLE RECULATIONS ANO vl]TI] THE

REOIJREMENIS MADT IN PURCHASER SPECIFICAI1ONS.

|i\IISAS U013lil N[,\lnlo] 3lr1 uol 3N|MVU0 0l ry d

J(Ow nq/DocumentCotegory

(Submission Pupose)

Drawing/Document Review Stotus(BY OWNER/Pr\.4C)

Incorgorote comments,if ony. Resubmit osceriified finol.Work

Accepted foronly.Work moy proceed.

NOZZLES SCHEDUIT FOR EJECTORS & CONDENSERS

ETHYLENE GLYCOL PROJECTPARADIP REFINERY, ODISHA-INDIA.

s E

INDIAN OIL CORPORATION LIMITEDPARADIP REFINERY, ODISHA, INDIA

-1js D.awiig ;s trlqnP'ope4y or INDIAN OIL CORPORATION LTDo'd s ei! r,tloJl coniide'orion otler tnon the 8or.ow.r s oq'eenentthot it sholl not be reproduced, copied lent or disposed of directly orindir€ctly, nor used for ony purpose other thon thot for which it is

specificolly furnished. The opporotus shown in the drowing is covered bypotents informalion contoined in ihis drowing moy be proprietory

to Indion 0'l Cofpo.orior Ltd ono/o. icerso.s. ond is

PIVC

'Slc

ItlPt's Job woRK oRDER

6389 No. 25574423

LSTK-l Job

rn. -Mr r. woR( oRDfq

NO L JU JJIf /

=a

R:

9o69

NOTES:1 4L OIilENSIONS ffiE N frh UilLEss orHERwsE SHON2 4L NOZZLE UCES SHU BE AS PER ASME 4165-2OIJ,J 4L SNMP CORNERS NO €OC€S IO 3E ROINOED OFF IO A C€N€ROUS @IUS.4 4L OPENING ON NE €OUIPM€NTs TO BE PROIECEO ftR frN& INSPECION BY VIN, 6 IHK, SIEEL

CMR WIff 4 NOS AOLI BEFORE OISPATCH

5 STW REFORMER CL. JOO iBR CERNfl€D) WII 3€ LOOSE SUPPLIEO BY

CLIENT SCOPE OF SUPPLY

SCOPE OF SUPPLY

SYMBOL DESCRIPTION & LECEND OF P & ID

VENDoR PO NO. : MEGP LSTKI-STA ARP 0015 llATtD : 10.05.2019

NOZZLES SCHEDULE FOR CONNECTING PTPING CONNECTIONS TIILE UNT NO - 06I

P & ID DRAWING FOR MEG COLUMN EJECTOR SYSTEM

DWG. N0. : IPEG-6J89-8470-19-061-000J

CAD TILt RtF. CFR

Page 8: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

LSTK-1 PACKAGE FOR “ETHYLENE GLYCOL”

PROJECT OF M/S. INDIAN OIL CORPORATION

LIMITED (IOCL) AT PARADIP REFINERY, ODISHA

Doc. No. : IPEG-6389-MAZD(1)-8470-CA-061-0036 Title : FLEXIBILITY ANALYSIS

REPORT - EGU : 061-001

Rev. No. : 02

3. STRESS MARK-UP ISOMETRICS & STRESS IMAGE

Page 9: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

LSTK-1 PACKAGE FOR “ETHYLENE GLYCOL”

PROJECT OF M/S. INDIAN OIL CORPORATION

LIMITED (IOCL) AT PARADIP REFINERY, ODISHA

Doc. No. : IPEG-6389-MAZD(1)-8470-CA-061-0036 Title : FLEXIBILITY ANALYSIS

REPORT - EGU : 061-001

Rev. No. : 02

Page 10: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON
Page 11: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON
Page 12: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON
Page 13: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

LSTK-1 PACKAGE FOR “ETHYLENE GLYCOL”

PROJECT OF M/S. INDIAN OIL CORPORATION

LIMITED (IOCL) AT PARADIP REFINERY, ODISHA

Doc. No. : IPEG-6389-MAZD(1)-8470-CA-061-0036 Title : FLEXIBILITY ANALYSIS

REPORT - EGU : 061-001

Rev. No. : 02

4. STRESS ANALYSIS REPORT

Page 14: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612

1

Table of Contents

LISTING OF STATIC LOAD CASES FOR THIS ANALYSIS ................................................................................... 2 INPUT LISTING ............................................................................................................................................................. 3 CAESAR II LOAD CASE REPORT (DATE:JAN 20,2020) .......................................................................................... 25 Stress Summary : Multiple ............................................................................................................................... 30 Restraint Summary Extended : Multiple ..................................................................................................... 31 Displacement summary Report : Multiple ................................................................................................... 43

Page 15: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612

2

LISTING OF STATIC LOAD CASES FOR THIS ANALYSIS

1 (HYD) WW+HP

2 (OPE) W+T1+P1

3 (OPE) W+T2+P1

4 (SUS) W+P1

5 (OPE) W+T2+P1+U1

6 (OPE) W+T2+P1-U1

7 (OPE) W+T2+P1+U2

8 (OPE) W+T2+P1-U2

9 (OPE) W+T2+P1+U3

10 (OPE) W+T2+P1-U3

11 (OPE) W+T2+P1+WIN1

12 (OPE) W+T2+P1+WIN2

13 (OPE) W+T2+P1+WIN3

14 (OPE) W+T2+P1+WIN4

15 (OCC) L15=L5-L3

16 (OCC) L16=L6-L3

17 (OCC) L17=L7-L3

18 (OCC) L18=L8-L3

19 (OCC) L19=L9-L3

20 (OCC) L20=L10-L3

21 (OCC) L21=L11-L3

22 (OCC) L22=L12-L3

23 (OCC) L23=L13-L3

24 (OCC) L24=L14-L3

25 (OCC) L25=L4+L15

26 (OCC) L26=L4+L16

27 (OCC) L27=L4+L17

28 (OCC) L28=L4+L18

29 (OCC) L29=L4+L19

30 (OCC) L30=L4+L20

31 (OCC) L31=L4+L21

32 (OCC) L32=L4+L22

33 (OCC) L33=L4+L23

34 (OCC) L34=L4+L24

35 (EXP) L35=L2-L4

36 (EXP) L36=L3-L4

Page 16: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 INPUT LISTING

3

PIPE DATA ----------------------------------------------------------------------------- ----------------------------------------------------------------------------- From 10 To 20 DZ= -.375 m PIPE Dia= 323.850 mm Wall= 10.000 mm Cor= 3.0000 mm GENERAL T1= 65 C T2= 41 C P1= 8.0000 bar PHyd= 26.0000 bar Mat= (383)A516 70 E= 203,403 N/mm2 EH1= 200,335 N/mm2 EH2= 201,805 N/mm2 EH3= 203,403 N/mm2 EH4= 203,403 N/mm2 EH5= 203,403 N/mm2 EH6= 203,403 N/mm2 EH7= 203,403 N/mm2 EH8= 203,403 N/mm2 EH9= 203,403 N/mm2 v = .292 Pipe Den=7833.4399414 kg/m3 Fluid Den= 992.7000122 kg/m3 Insul Thk= 40.000 mm Insul Den= 220.0000000 kg/m3 RIGID Weight= .00 N UNIFORM LOAD Vector1 in G-s X1 Dir = .07 g's Y1 Dir = .00 g's Z1 Dir = .00 g's Vector2 in G-s X2 Dir = .00 g's Y2 Dir = .05 g's Z2 Dir = .00 g's Vector3 in G-s X3 Dir = .00 g's Y3 Dir = .00 g's Z3 Dir = .07 g's WIND Wind Shape= .650 ALLOWABLE STRESSES B31.3 (2016) Cycle Max Switch = --- Sc= 161 N/mm2 Sh1= 160 N/mm2 Sh2= 161 N/mm2 Sh3= 161 N/mm2 Sh4= 161 N/mm2 Sh5= 161 N/mm2 Sh6= 161 N/mm2 Sh7= 161 N/mm2 Sh8= 161 N/mm2 Sh9= 161 N/mm2 Sy= 262 N/mm2 ----------------------------------------------------------------------------- From 20 To 30 DZ= -.317 m RIGID Weight= .00 N ----------------------------------------------------------------------------- From 20 To 40 DY= .162 m RIGID Weight= .00 N ----------------------------------------------------------------------------- From 20 To 50 DY= -.162 m RIGID Weight= .00 N ----------------------------------------------------------------------------- From 50 To 60 DY= -.189 m PIPE Dia= 60.325 mm Wall= 8.738 mm Cor= 3.0000 mm Insul Thk= 40.000 mm ----------------------------------------------------------------------------- From 60 To 70 DY= -.064 m RIGID Weight= 36.00 N ----------------------------------------------------------------------------- From 70 To 80 DY= -.024 m RIGID Weight= 30.12 N ----------------------------------------------------------------------------- From 40 To 90 DY= .113 m PIPE Dia= 168.275 mm Wall= 10.973 mm Insul Thk= 40.000 mm SIF's & TEE's Node 90 Girth Butt Weld ----------------------------------------------------------------------------- From 90 To 100 DY= .111 m

Page 17: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 INPUT LISTING

4

----------------------------------------------------------------------------- From 100 To 110 DY= .089 m RIGID Weight= 147.74 N ----------------------------------------------------------------------------- From 90 To 120 DX= .186 m PIPE Dia= 60.325 mm Wall= 8.738 mm Insul Thk= 40.000 mm ----------------------------------------------------------------------------- From 120 To 130 DX= .064 m RIGID Weight= 12.02 N ----------------------------------------------------------------------------- From 130 To 140 DX= .024 m RIGID Weight= 12.02 N ----------------------------------------------------------------------------- From 30 To 150 DZ= -.263 m PIPE Dia= 323.850 mm Wall= 6.000 mm Cor= .0000 mm GENERAL T1= 350 C T2= 118 C P1= 3.5000 bar PHyd= 26.0000 bar Mat= (384)A240 304 E= 195,129 N/mm2 EH1= 172,308 N/mm2 EH2= 188,503 N/mm2 EH3= 195,129 N/mm2 EH4= 195,129 N/mm2 EH5= 195,129 N/mm2 EH6= 195,129 N/mm2 EH7= 195,129 N/mm2 EH8= 195,129 N/mm2 EH9= 195,129 N/mm2 v = .300 Pipe Den=8007.8237305 kg/m3 Fluid Den= 985.2000122 kg/m3 Insul Thk= 40.000 mm RIGID Weight= .00 N ALLOWABLE STRESSES B31.3 (2016) Cycle Max Switch = --- Sc= 138 N/mm2 Sh1= 111 N/mm2 Sh2= 138 N/mm2 Sh3= 138 N/mm2 Sh4= 138 N/mm2 Sh5= 138 N/mm2 Sh6= 138 N/mm2 Sh7= 138 N/mm2 Sh8= 138 N/mm2 Sh9= 138 N/mm2 ----------------------------------------------------------------------------- From 150 To 160 DY= .162 m RIGID Weight= .00 N ----------------------------------------------------------------------------- From 150 To 170 DZ= -.150 m RIGID Weight= .00 N ----------------------------------------------------------------------------- From 170 To 180 DY= -.162 m RIGID Weight= .00 N ----------------------------------------------------------------------------- From 170 To 190 DZ= -.725 m RIGID Weight= .00 N ----------------------------------------------------------------------------- From 190 To 200 DY= .162 m RIGID Weight= .00 N ----------------------------------------------------------------------------- From 190 To 210 DZ= -.693 m RIGID Weight= .00 N ----------------------------------------------------------------------------- From 210 To 220 DY= -.162 m RIGID Weight= .00 N ----------------------------------------------------------------------------- From 210 To 230 DZ= -.350 m RIGID Weight= .00 N -----------------------------------------------------------------------------

Page 18: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 INPUT LISTING

5

From 230 To 240 DY= .162 m RIGID Weight= .00 N ----------------------------------------------------------------------------- From 230 To 250 DY= -.162 m RIGID Weight= .00 N ----------------------------------------------------------------------------- From 230 To 260 DZ= -.213 m RIGID Weight= .00 N ----------------------------------------------------------------------------- From 160 To 270 DY= .111 m PIPE Dia= 114.300 mm Wall= 8.560 mm Insul Thk= 40.000 mm SIF's & TEE's Node 270 Girth Butt Weld ----------------------------------------------------------------------------- From 270 To 280 DY= .100 m ----------------------------------------------------------------------------- From 280 To 290 DY= .077 m GENERAL Fluid Den= 985.2000122 kg/m3 RIGID Weight= 90.06 N RESTRAINTS Node 290 ANC Cnode 291 EQUIPMENT LIMITS Nozzle Node = 290 Limiting Loads: A=pipe; B=ref; C=AxB; FA= 7,900.00 N FB= 5,600.00 N FC= 5,600.00 N MA= 2,100.00 N.m MB= 1,100.00 N.m MC= 1,100.00 N.m Equipment Major Direction Vector= .0000 .0000 1.0000 Interact. Mtd= Absolute ----------------------------------------------------------------------------- From 270 To 300 DX= .186 m PIPE Dia= 60.325 mm Wall= 5.537 mm Insul Thk= 40.000 mm ----------------------------------------------------------------------------- From 300 To 310 DX= .064 m RIGID Weight= 36.00 N ----------------------------------------------------------------------------- From 310 To 320 DX= .024 m RIGID Weight= 30.12 N ----------------------------------------------------------------------------- From 200 To 330 DY= .189 m PIPE Dia= 60.325 mm Wall= 5.537 mm Insul Thk= 40.000 mm ----------------------------------------------------------------------------- From 330 To 340 DY= .064 m RIGID Weight= 36.00 N ----------------------------------------------------------------------------- From 340 To 350 DY= .024 m RIGID Weight= 30.12 N ----------------------------------------------------------------------------- From 240 To 360 DY= .157 m PIPE Dia= 88.900 mm Wall= 7.620 mm Insul Thk= 40.000 mm

Page 19: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 INPUT LISTING

6

SIF's & TEE's Node 360 Girth Butt Weld ----------------------------------------------------------------------------- From 360 To 370 DY= .086 m ----------------------------------------------------------------------------- From 370 To 380 DY= .070 m RIGID Weight= 63.28 N ----------------------------------------------------------------------------- From 360 To 390 DX= .186 m PIPE Dia= 60.325 mm Wall= 5.537 mm Insul Thk= 40.000 mm ----------------------------------------------------------------------------- From 390 To 400 DX= .064 m RIGID Weight= 36.00 N ----------------------------------------------------------------------------- From 400 To 410 DX= .024 m RIGID Weight= 30.12 N ----------------------------------------------------------------------------- From 250 To 420 DY= -.189 m PIPE Dia= 60.325 mm Wall= 5.537 mm Insul Thk= 40.000 mm ----------------------------------------------------------------------------- From 420 To 430 DY= -.064 m RIGID Weight= 36.00 N ----------------------------------------------------------------------------- From 430 To 440 DY= -.024 m RIGID Weight= 30.12 N ----------------------------------------------------------------------------- From 260 To 450 DZ= -.317 m PIPE Dia= 323.850 mm Wall= 10.000 mm Cor= 3.0000 mm GENERAL T1= 65 C T2= 41 C P1= 8.0000 bar Mat= (383)A516 70 E= 203,403 N/mm2 EH1= 200,335 N/mm2 EH2= 201,805 N/mm2 EH3= 203,403 N/mm2 EH4= 203,403 N/mm2 EH5= 203,403 N/mm2 EH6= 203,403 N/mm2 EH7= 203,403 N/mm2 EH8= 203,403 N/mm2 EH9= 203,403 N/mm2 v = .292 Pipe Den=7833.4399414 kg/m3 Fluid Den= 992.7000122 kg/m3 Insul Thk= 40.000 mm RIGID Weight= .00 N ALLOWABLE STRESSES B31.3 (2016) Cycle Max Switch = --- Sc= 161 N/mm2 Sh1= 160 N/mm2 Sh2= 161 N/mm2 Sh3= 161 N/mm2 Sh4= 161 N/mm2 Sh5= 161 N/mm2 Sh6= 161 N/mm2 Sh7= 161 N/mm2 Sh8= 161 N/mm2 Sh9= 161 N/mm2 Sy= 262 N/mm2 ----------------------------------------------------------------------------- From 450 To 460 DZ= -.375 m RIGID Weight= .00 N ----------------------------------------------------------------------------- From 450 To 470 DY= .162 m RIGID Weight= .00 N ----------------------------------------------------------------------------- From 450 To 480 DY= -.162 m RIGID Weight= .00 N -----------------------------------------------------------------------------

Page 20: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 INPUT LISTING

7

From 480 To 485 DY= -.338 m PIPE Dia= 168.275 mm Wall= 10.973 mm Cor= 3.0000 mm Insul Thk= 40.000 mm BEND at "TO" end Radius= 228.600 mm (LONG) Bend Angle= 90.000 Angle/Node @1= 45.00 484 Angle/Node @2= .00 483 ----------------------------------------------------------------------------- From 485 To 490 DX= -.320 m SIF's & TEE's Node 490 Girth Butt Weld ----------------------------------------------------------------------------- From 490 To 500 DX= -.091 m ----------------------------------------------------------------------------- From 500 To 510 DX= -.091 m RIGID Weight= 147.74 N RESTRAINTS Node 510 ANC Cnode 511 EQUIPMENT LIMITS Nozzle Node = 510 Limiting Loads: A=pipe; B=ref; C=AxB; FA= 11,900.00 N FB= 8,400.00 N FC= 8,400.00 N MA= 4,600.00 N.m MB= 2,500.00 N.m MC= 2,500.00 N.m Equipment Major Direction Vector= .0000 .0000 1.0000 Interact. Mtd= Absolute ----------------------------------------------------------------------------- From 490 To 520 DZ= -.186 m PIPE Dia= 60.325 mm Wall= 8.738 mm Insul Thk= 40.000 mm ----------------------------------------------------------------------------- From 520 To 530 DZ= -.064 m RIGID Weight= 36.00 N ----------------------------------------------------------------------------- From 530 To 540 DZ= -.024 m RIGID Weight= 30.12 N ----------------------------------------------------------------------------- From 470 To 550 DY= .189 m PIPE Dia= 60.325 mm Wall= 8.738 mm Insul Thk= 40.000 mm SIF's & TEE's Node 550 Girth Butt Weld ----------------------------------------------------------------------------- From 550 To 560 DY= .064 m RIGID Weight= 36.00 N ----------------------------------------------------------------------------- From 560 To 570 DY= .024 m RIGID Weight= 30.12 N ----------------------------------------------------------------------------- From 180 To 580 DY= -.738 m PIPE Dia= 323.850 mm Wall= 6.000 mm Cor= .0000 mm GENERAL T1= 21 C T2= 21 C P1= 1.0130 bar PHyd= .0000 bar Mat= (106)A106 Grade B E= 203,403 N/mm2 EH1= 203,408 N/mm2 EH2= 203,408 N/mm2 EH3= 203,403 N/mm2 EH4= 203,403 N/mm2 EH5= 203,403 N/mm2 EH6= 203,403 N/mm2 EH7= 203,403 N/mm2

Page 21: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 INPUT LISTING

8

EH8= 203,403 N/mm2 EH9= 203,403 N/mm2 v = .292 Pipe Den=7833.4399414 kg/m3 Fluid Den= .0000000 kg/m3 Insul Thk= .000 mm RIGID Weight= .00 N RESTRAINTS Node 580 ANC ALLOWABLE STRESSES B31.3 (2016) Cycle Max Switch = --- Sc= 138 N/mm2 Sh1= 138 N/mm2 Sh2= 138 N/mm2 Sh3= 138 N/mm2 Sh4= 138 N/mm2 Sh5= 138 N/mm2 Sh6= 138 N/mm2 Sh7= 138 N/mm2 Sh8= 138 N/mm2 Sh9= 138 N/mm2 Sy= 241 N/mm2 ----------------------------------------------------------------------------- From 220 To 590 DY= -.738 m RIGID Weight= .00 N RESTRAINTS Node 590 +Y Mu = .30 Node 590 -Y Gap= 1.000 mm Node 590 X Gap= 3.000 mm Node 590 Z Gap= 15.000 mm ----------------------------------------------------------------------------- From 511 To 600 DX= -.091 m PIPE Dia= 168.275 mm Wall= 10.973 mm Cor= 3.0000 mm GENERAL T1= 65 C T2= 41 C P1= 8.0000 bar PHyd= 26.0000 bar Fluid Den=1000.0000000 kg/m3 Insul Thk= 40.000 mm RIGID Weight= 147.74 N ALLOWABLE STRESSES B31.3 (2016) Cycle Max Switch = --- Sc= 138 N/mm2 Sh1= 138 N/mm2 Sh2= 138 N/mm2 Sh3= 138 N/mm2 Sh4= 138 N/mm2 Sh5= 138 N/mm2 Sh6= 138 N/mm2 Sh7= 138 N/mm2 Sh8= 138 N/mm2 Sh9= 138 N/mm2 Sy= 241 N/mm2 ----------------------------------------------------------------------------- From 600 To 620 DX= -.427 m PIPE Dia= 168.275 mm Wall= 10.973 mm GENERAL T2= 40 C PHyd= 12.0000 bar Insul Thk= .000 mm BEND at "TO" end Radius= 228.600 mm (LONG) Bend Angle= 90.000 Angle/Node @1= 45.00 619 ALLOWABLE STRESSES B31.3 (2016) Cycle Max Switch = --- Sc= 138 N/mm2 Sh1= 138 N/mm2 Sh2= 138 N/mm2 Sh3= 138 N/mm2 Sh4= 138 N/mm2 Sh5= 138 N/mm2 Sh6= 138 N/mm2 Sh7= 138 N/mm2 Sh8= 138 N/mm2 Sh9= 138 N/mm2 Sy= 241 N/mm2 ----------------------------------------------------------------------------- From 620 To 630 DY= 1.372 m BEND at "TO" end Radius= 228.600 mm (LONG) Bend Angle= 90.000 Angle/Node @1= 45.00 629 Angle/Node @2= .00 628 ----------------------------------------------------------------------------- From 630 To 640 DX= -.600 m BEND at "TO" end Radius= 228.600 mm (LONG) Bend Angle= 90.000 Angle/Node @1= 45.00 639 Angle/Node @2= .00 638 ----------------------------------------------------------------------------- From 640 To 650 DY= -.229 m

Page 22: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 INPUT LISTING

9

----------------------------------------------------------------------------- From 650 To 661 DY= -.093 m RIGID Weight= 147.74 N ----------------------------------------------------------------------------- From 291 To 670 DY= .082 m PIPE Dia= 114.300 mm Wall= 8.560 mm Cor= .0000 mm GENERAL T1= 350 C T2= 180 C P1= 3.5000 bar PHyd= 7.0000 bar Mat= (155)A312 TP304 E= 195,129 N/mm2 EH1= 172,570 N/mm2 EH2= 184,235 N/mm2 EH3= 195,129 N/mm2 EH4= 195,129 N/mm2 EH5= 195,129 N/mm2 EH6= 195,129 N/mm2 EH7= 195,129 N/mm2 EH8= 195,129 N/mm2 EH9= 195,129 N/mm2 v = .292 Pipe Den=8027.1997070 kg/m3 Fluid Den= .6100000 kg/m3 Insul Thk= 40.000 mm RIGID Weight= 90.06 N ALLOWABLE STRESSES B31.3 (2016) Cycle Max Switch = --- Sc= 138 N/mm2 Sh1= 111 N/mm2 Sh2= 132 N/mm2 Sh3= 138 N/mm2 Sh4= 138 N/mm2 Sh5= 138 N/mm2 Sh6= 138 N/mm2 Sh7= 138 N/mm2 Sh8= 138 N/mm2 Sh9= 138 N/mm2 Sy= 207 N/mm2 ----------------------------------------------------------------------------- From 670 To 680 DY= .102 m PIPE Dia= 114.300 mm Wall= 8.560 mm Insul Thk= 40.000 mm REDUCER Diam2= 88.900 mm Wall2= 7.620 mm ----------------------------------------------------------------------------- From 680 To 690 DY= .116 m PIPE Dia= 88.900 mm Wall= 7.620 mm Insul Thk= 40.000 mm BEND at "TO" end Radius= 114.300 mm (LONG) Bend Angle= 90.000 Angle/Node @1= 45.00 689 Angle/Node @2= .00 688 ----------------------------------------------------------------------------- From 690 To 700 DX= -.790 m BEND at "TO" end Radius= 114.300 mm (LONG) Bend Angle= 90.000 Angle/Node @1= 45.00 699 Angle/Node @2= .00 698 ----------------------------------------------------------------------------- From 700 To 710 DY= -.750 m BEND at "TO" end Radius= 114.300 mm (LONG) Bend Angle= 90.000 Angle/Node @1= 45.00 709 Angle/Node @2= .00 708 ----------------------------------------------------------------------------- From 710 To 720 DZ= -1.004 m ----------------------------------------------------------------------------- From 720 To 730 DZ= -.075 m RIGID Weight= 63.28 N RESTRAINTS Node 730 ANC Cnode 731 EQUIPMENT LIMITS Nozzle Node = 730 Limiting Loads: A=pipe; B=ref; C=AxB; FA= 5,900.00 N FB= 4,200.00 N FC= 4,200.00 N MA= 1,200.00 N.m MB= 600.00 N.m

Page 23: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 INPUT LISTING

10

MC= 600.00 N.m Equipment Major Direction Vector= .0000 1.0000 .0000 Interact. Mtd= Absolute ----------------------------------------------------------------------------- From 740 To 750 DZ= .070 m PIPE Dia= 60.325 mm Wall= 8.738 mm Cor= 3.0000 mm GENERAL T1= 350 C T2= 213 C P1= 24.5000 bar PHyd= 62.0000 bar Mat= (155)A312 TP304 E= 195,129 N/mm2 EH1= 172,570 N/mm2 EH2= 181,976 N/mm2 EH3= 195,129 N/mm2 EH4= 195,129 N/mm2 EH5= 195,129 N/mm2 EH6= 195,129 N/mm2 EH7= 195,129 N/mm2 EH8= 195,129 N/mm2 EH9= 195,129 N/mm2 v = .292 Pipe Den=8027.1997070 kg/m3 Fluid Den= 9.8200006 kg/m3 Insul Thk= 40.000 mm Insul Den= 220.0000000 kg/m3 RIGID Weight= 36.00 N ALLOWABLE STRESSES B31.3 (2016) Cycle Max Switch = --- Sc= 138 N/mm2 Sh1= 111 N/mm2 Sh2= 127 N/mm2 Sh3= 138 N/mm2 Sh4= 138 N/mm2 Sh5= 138 N/mm2 Sh6= 138 N/mm2 Sh7= 138 N/mm2 Sh8= 138 N/mm2 Sh9= 138 N/mm2 Sy= 207 N/mm2 ----------------------------------------------------------------------------- From 750 To 760 DZ= .187 m PIPE Dia= 60.325 mm Wall= 8.738 mm Insul Thk= 40.000 mm ----------------------------------------------------------------------------- From 760 To 770 DZ= .253 m PIPE Dia= 323.850 mm Wall= 6.000 mm GENERAL Mat= (384)A240 304 E= 195,129 N/mm2 EH1= 172,308 N/mm2 EH2= 181,976 N/mm2 EH3= 195,129 N/mm2 EH4= 195,129 N/mm2 EH5= 195,129 N/mm2 EH6= 195,129 N/mm2 EH7= 195,129 N/mm2 EH8= 195,129 N/mm2 EH9= 195,129 N/mm2 v = .300 Pipe Den=8007.8237305 kg/m3 Insul Thk= 40.000 mm RIGID Weight= 848.57 N RESTRAINTS Node 770 +Y Mu = .30 ALLOWABLE STRESSES B31.3 (2016) Cycle Max Switch = --- Sc= 138 N/mm2 Sh1= 111 N/mm2 Sh2= 127 N/mm2 Sh3= 138 N/mm2 Sh4= 138 N/mm2 Sh5= 138 N/mm2 Sh6= 138 N/mm2 Sh7= 138 N/mm2 Sh8= 138 N/mm2 Sh9= 138 N/mm2 ----------------------------------------------------------------------------- From 770 To 780 DZ= .200 m GENERAL T2= 135 C P1= 3.5000 bar PHyd= 20.0000 bar Fluid Den= .6100000 kg/m3 RIGID Weight= 848.57 N ALLOWABLE STRESSES B31.3 (2016) Cycle Max Switch = --- Sc= 138 N/mm2 Sh1= 111 N/mm2 Sh2= 138 N/mm2 Sh3= 138 N/mm2 Sh4= 138 N/mm2 Sh5= 138 N/mm2 Sh6= 138 N/mm2 Sh7= 138 N/mm2 Sh8= 138 N/mm2 Sh9= 138 N/mm2 ----------------------------------------------------------------------------- From 780 To 810 DZ= .546 m PIPE Dia= 88.900 mm Wall= 6.600 mm GENERAL

Page 24: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 INPUT LISTING

11

T1= 350 C T2= 135 C P1= 3.5000 bar PHyd= 20.0000 bar Fluid Den= .6100000 kg/m3 Insul Thk= 40.000 mm ALLOWABLE STRESSES B31.3 (2016) Cycle Max Switch = --- Sc= 138 N/mm2 Sh1= 111 N/mm2 Sh2= 138 N/mm2 Sh3= 138 N/mm2 Sh4= 138 N/mm2 Sh5= 138 N/mm2 Sh6= 138 N/mm2 Sh7= 138 N/mm2 Sh8= 138 N/mm2 Sh9= 138 N/mm2 ----------------------------------------------------------------------------- From 810 To 731 DZ= .070 m RIGID Weight= 59.15 N ----------------------------------------------------------------------------- From 770 To 830 DY= .162 m PIPE Dia= 323.850 mm Wall= 6.000 mm GENERAL T1= 350 C T2= 135 C P1= 3.5000 bar PHyd= 20.0000 bar Fluid Den= .6100000 kg/m3 Insul Thk= 40.000 mm RIGID Weight= .00 N ALLOWABLE STRESSES B31.3 (2016) Cycle Max Switch = --- Sc= 138 N/mm2 Sh1= 111 N/mm2 Sh2= 138 N/mm2 Sh3= 138 N/mm2 Sh4= 138 N/mm2 Sh5= 138 N/mm2 Sh6= 138 N/mm2 Sh7= 138 N/mm2 Sh8= 138 N/mm2 Sh9= 138 N/mm2 ----------------------------------------------------------------------------- From 770 To 840 DX= -.162 m RIGID Weight= .00 N ----------------------------------------------------------------------------- From 840 To 850 DX= -.138 m PIPE Dia= 33.401 mm Wall= 6.350 mm Insul Thk= 40.000 mm BEND at "TO" end Radius= 38.100 mm (LONG) Bend Angle= 90.000 Angle/Node @1= 45.00 849 Angle/Node @2= .00 848 ----------------------------------------------------------------------------- From 850 To 860 DY= .144 m ----------------------------------------------------------------------------- From 860 To 870 DY= .056 m RIGID Weight= 17.07 N ----------------------------------------------------------------------------- From 870 To 880 DY= .019 m RIGID Weight= 13.73 N ----------------------------------------------------------------------------- From 830 To 890 DY= .193 m PIPE Dia= 88.900 mm Wall= 5.486 mm Insul Thk= 40.000 mm ----------------------------------------------------------------------------- From 890 To 900 DY= .070 m RIGID Weight= 56.90 N RESTRAINTS Node 900 ANC Cnode 901 EQUIPMENT LIMITS Nozzle Node = 900 Limiting Loads: A=pipe; B=ref; C=AxB; FA= 5,900.00 N FB= 4,200.00 N FC= 4,200.00 N MA= 1,200.00 N.m MB= 600.00 N.m MC= 600.00 N.m Equipment Major Direction Vector= .0000 .0000 1.0000 Interact. Mtd= Absolute -----------------------------------------------------------------------------

Page 25: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 INPUT LISTING

12

From 910 To 920 DZ= -.300 m PIPE Dia= 508.000 mm Wall= 10.000 mm Cor= 3.0000 mm GENERAL T1= 65 C T2= 38 C P1= 8.0000 bar PHyd= 26.0000 bar Mat= (383)A516 70 E= 203,403 N/mm2 EH1= 200,335 N/mm2 EH2= 202,039 N/mm2 EH3= 203,403 N/mm2 EH4= 203,403 N/mm2 EH5= 203,403 N/mm2 EH6= 203,403 N/mm2 EH7= 203,403 N/mm2 EH8= 203,403 N/mm2 EH9= 203,403 N/mm2 v = .292 Pipe Den=7833.4399414 kg/m3 Fluid Den= 994.5999756 kg/m3 Insul Thk= 40.000 mm Insul Den= 220.0000000 kg/m3 RIGID Weight= .00 N ALLOWABLE STRESSES B31.3 (2016) Cycle Max Switch = --- Sc= 161 N/mm2 Sh1= 160 N/mm2 Sh2= 161 N/mm2 Sh3= 161 N/mm2 Sh4= 161 N/mm2 Sh5= 161 N/mm2 Sh6= 161 N/mm2 Sh7= 161 N/mm2 Sh8= 161 N/mm2 Sh9= 161 N/mm2 Sy= 262 N/mm2 ----------------------------------------------------------------------------- From 920 To 930 DZ= -.192 m RIGID Weight= .00 N ----------------------------------------------------------------------------- From 920 To 940 DY= .254 m RIGID Weight= .00 N ----------------------------------------------------------------------------- From 920 To 950 DY= -.254 m RIGID Weight= .00 N ----------------------------------------------------------------------------- From 950 To 960 DY= -.182 m PIPE Dia= 60.325 mm Wall= 8.738 mm Cor= 3.0000 mm Insul Thk= 40.000 mm ----------------------------------------------------------------------------- From 960 To 970 DY= -.064 m RIGID Weight= 36.00 N ----------------------------------------------------------------------------- From 970 To 980 DY= -.024 m RIGID Weight= 30.12 N ----------------------------------------------------------------------------- From 940 To 990 DY= .182 m PIPE Dia= 60.325 mm Wall= 8.738 mm Insul Thk= 40.000 mm SIF's & TEE's Node 990 Girth Butt Weld ----------------------------------------------------------------------------- From 990 To 1000 DY= .064 m RIGID Weight= 63.28 N ----------------------------------------------------------------------------- From 1000 To 1010 DY= .024 m RIGID Weight= 48.07 N ----------------------------------------------------------------------------- From 930 To 1020 DZ= -.353 m PIPE Dia= 508.000 mm Wall= 8.000 mm Cor= .0000 mm GENERAL T1= 350 C T2= 111 C P1= 3.5000 bar PHyd= 26.0000 bar

Page 26: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 INPUT LISTING

13

Mat= (384)A240 304 E= 195,129 N/mm2 EH1= 172,308 N/mm2 EH2= 189,021 N/mm2 EH3= 195,129 N/mm2 EH4= 195,129 N/mm2 EH5= 195,129 N/mm2 EH6= 195,129 N/mm2 EH7= 195,129 N/mm2 EH8= 195,129 N/mm2 EH9= 195,129 N/mm2 v = .300 Pipe Den=8007.8237305 kg/m3 Fluid Den= 991.0999756 kg/m3 Insul Thk= 40.000 mm RIGID Weight= .00 N ALLOWABLE STRESSES B31.3 (2016) Cycle Max Switch = --- Sc= 138 N/mm2 Sh1= 111 N/mm2 Sh2= 138 N/mm2 Sh3= 138 N/mm2 Sh4= 138 N/mm2 Sh5= 138 N/mm2 Sh6= 138 N/mm2 Sh7= 138 N/mm2 Sh8= 138 N/mm2 Sh9= 138 N/mm2 ----------------------------------------------------------------------------- From 1020 To 1030 DY= .254 m RIGID Weight= .00 N ----------------------------------------------------------------------------- From 1020 To 1040 DZ= -.210 m RIGID Weight= .00 N ----------------------------------------------------------------------------- From 1040 To 1050 DY= -.228 m RIGID Weight= .00 N ----------------------------------------------------------------------------- From 1040 To 1060 DZ= -1.430 m RIGID Weight= .00 N ----------------------------------------------------------------------------- From 1060 To 1070 DY= .254 m RIGID Weight= .00 N ----------------------------------------------------------------------------- From 1060 To 1080 DZ= -1.238 m RIGID Weight= .00 N ----------------------------------------------------------------------------- From 1080 To 1090 DY= -.228 m RIGID Weight= .00 N ----------------------------------------------------------------------------- From 1080 To 1100 DZ= -.325 m RIGID Weight= .00 N ----------------------------------------------------------------------------- From 1100 To 1110 DY= .254 m RIGID Weight= .00 N ----------------------------------------------------------------------------- From 1100 To 1120 DY= -.254 m RIGID Weight= .00 N ----------------------------------------------------------------------------- From 1100 To 1130 DZ= -.238 m RIGID Weight= .00 N ----------------------------------------------------------------------------- From 1030 To 1140 DY= .101 m PIPE Dia= 219.075 mm Wall= 12.700 mm Insul Thk= 40.000 mm SIF's & TEE's Node 1140 Girth Butt Weld ----------------------------------------------------------------------------- From 1140 To 1150 DY= .093 m ----------------------------------------------------------------------------- From 1150 To 1160 DY= .102 m GENERAL

Page 27: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 INPUT LISTING

14

Fluid Den= 991.0999756 kg/m3 RIGID Weight= 230.63 N RESTRAINTS Node 1160 ANC Cnode 1161 EQUIPMENT LIMITS Nozzle Node = 1160 Limiting Loads: A=pipe; B=ref; C=AxB; FA= 15,800.00 N FB= 11,200.00 N FC= 11,200.00 N MA= 8,200.00 N.m MB= 4,500.00 N.m MC= 4,500.00 N.m Equipment Major Direction Vector= .0000 .0000 1.0000 Interact. Mtd= Absolute ----------------------------------------------------------------------------- From 1140 To 1170 DX= .186 m PIPE Dia= 60.325 mm Wall= 5.537 mm Insul Thk= 40.000 mm ----------------------------------------------------------------------------- From 1170 To 1180 DX= .064 m RIGID Weight= 36.00 N ----------------------------------------------------------------------------- From 1180 To 1190 DX= .024 m RIGID Weight= 30.12 N ----------------------------------------------------------------------------- From 1070 To 1200 DY= .182 m PIPE Dia= 60.325 mm Wall= 5.537 mm Insul Thk= 40.000 mm ----------------------------------------------------------------------------- From 1200 To 1210 DY= .064 m RIGID Weight= 36.00 N ----------------------------------------------------------------------------- From 1210 To 1220 DY= .024 m RIGID Weight= 30.12 N ----------------------------------------------------------------------------- From 1110 To 1230 DY= .101 m PIPE Dia= 114.300 mm Wall= 8.560 mm Insul Thk= 40.000 mm SIF's & TEE's Node 1230 Girth Butt Weld ----------------------------------------------------------------------------- From 1230 To 1240 DY= .068 m ----------------------------------------------------------------------------- From 1240 To 1250 DY= .077 m RIGID Weight= 90.25 N RESTRAINTS Node 1250 ANC Cnode 1251 EQUIPMENT LIMITS Nozzle Node = 1250 Limiting Loads: A=pipe; B=ref; C=AxB; FA= 7,900.00 N FB= 5,600.00 N FC= 5,600.00 N MA= 2,100.00 N.m MB= 1,100.00 N.m MC= 1,100.00 N.m Equipment Major Direction Vector= .0000 .0000 1.0000 Interact. Mtd= Absolute ----------------------------------------------------------------------------- From 1230 To 1260 DX= -.186 m PIPE Dia= 60.325 mm Wall= 5.537 mm Insul Thk= 40.000 mm

Page 28: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 INPUT LISTING

15

----------------------------------------------------------------------------- From 1260 To 1270 DX= -.064 m RIGID Weight= 36.00 N ----------------------------------------------------------------------------- From 1270 To 1280 DX= -.024 m RIGID Weight= 30.12 N ----------------------------------------------------------------------------- From 1120 To 1290 DY= -.182 m ----------------------------------------------------------------------------- From 1290 To 1300 DY= -.064 m RIGID Weight= 36.00 N ----------------------------------------------------------------------------- From 1300 To 1310 DY= -.024 m RIGID Weight= 30.12 N ----------------------------------------------------------------------------- From 1130 To 1320 DZ= -.317 m PIPE Dia= 508.000 mm Wall= 10.000 mm Cor= 3.0000 mm GENERAL T1= 65 C T2= 38 C P1= 8.0000 bar Mat= (383)A516 70 E= 203,403 N/mm2 EH1= 200,335 N/mm2 EH2= 202,039 N/mm2 EH3= 203,403 N/mm2 EH4= 203,403 N/mm2 EH5= 203,403 N/mm2 EH6= 203,403 N/mm2 EH7= 203,403 N/mm2 EH8= 203,403 N/mm2 EH9= 203,403 N/mm2 v = .292 Pipe Den=7833.4399414 kg/m3 Fluid Den= 994.5999756 kg/m3 Insul Thk= 40.000 mm RIGID Weight= .00 N ALLOWABLE STRESSES B31.3 (2016) Cycle Max Switch = --- Sc= 161 N/mm2 Sh1= 160 N/mm2 Sh2= 161 N/mm2 Sh3= 161 N/mm2 Sh4= 161 N/mm2 Sh5= 161 N/mm2 Sh6= 161 N/mm2 Sh7= 161 N/mm2 Sh8= 161 N/mm2 Sh9= 161 N/mm2 Sy= 262 N/mm2 ----------------------------------------------------------------------------- From 1320 To 1330 DZ= -.425 m RIGID Weight= .00 N ----------------------------------------------------------------------------- From 1320 To 1340 DY= .254 m RIGID Weight= .00 N ----------------------------------------------------------------------------- From 1320 To 1350 DY= -.150 m RIGID Weight= .00 N ----------------------------------------------------------------------------- From 1350 To 1355 DX= -.210 m PIPE Dia= 168.275 mm Wall= 10.973 mm Cor= 3.0000 mm Insul Thk= 40.000 mm RIGID Weight= .00 N ----------------------------------------------------------------------------- From 1355 To 1360 DX= -.146 m SIF's & TEE's Node 1360 Girth Butt Weld ----------------------------------------------------------------------------- From 1360 To 1370 DX= -.106 m ----------------------------------------------------------------------------- From 1370 To 1380 DX= -.087 m RIGID Weight= 147.74 N -----------------------------------------------------------------------------

Page 29: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 INPUT LISTING

16

From 1360 To 1390 DZ= -.186 m PIPE Dia= 60.325 mm Wall= 8.738 mm Insul Thk= 40.000 mm ----------------------------------------------------------------------------- From 1390 To 1400 DZ= -.064 m RIGID Weight= 36.00 N ----------------------------------------------------------------------------- From 1400 To 1410 DZ= -.024 m RIGID Weight= 30.12 N ----------------------------------------------------------------------------- From 1340 To 1420 DY= .101 m PIPE Dia= 168.275 mm Wall= 10.973 mm Insul Thk= 40.000 mm SIF's & TEE's Node 1420 Girth Butt Weld ----------------------------------------------------------------------------- From 1420 To 1430 DY= .106 m ----------------------------------------------------------------------------- From 1430 To 660 DY= .089 m RIGID Weight= 147.74 N RESTRAINTS Node 660 ANC Cnode 661 EQUIPMENT LIMITS Nozzle Node = 660 Limiting Loads: A=pipe; B=ref; C=AxB; FA= 11,900.00 N FB= 8,400.00 N FC= 8,400.00 N MA= 4,600.00 N.m MB= 2,500.00 N.m MC= 2,500.00 N.m Equipment Major Direction Vector= .0000 .0000 1.0000 Interact. Mtd= Absolute ----------------------------------------------------------------------------- From 1420 To 1450 DX= -.186 m PIPE Dia= 60.325 mm Wall= 8.738 mm Insul Thk= 40.000 mm ----------------------------------------------------------------------------- From 1450 To 1460 DX= -.064 m RIGID Weight= 36.00 N ----------------------------------------------------------------------------- From 1460 To 1470 DX= -.024 m RIGID Weight= 30.12 N ----------------------------------------------------------------------------- From 1050 To 1480 DY= -.646 m PIPE Dia= 141.300 mm Wall= 10.000 mm Cor= .0000 mm GENERAL T1= 21 C T2= 21 C P1= 1.0130 bar PHyd= .0000 bar Mat= (384)A240 304 E= 195,129 N/mm2 EH1= 195,135 N/mm2 EH2= 195,135 N/mm2 EH3= 195,129 N/mm2 EH4= 195,129 N/mm2 EH5= 195,129 N/mm2 EH6= 195,129 N/mm2 EH7= 195,129 N/mm2 EH8= 195,129 N/mm2 EH9= 195,129 N/mm2 v = .300 Pipe Den=8007.8237305 kg/m3 Fluid Den= .0000000 kg/m3 Insul Thk= .000 mm RIGID Weight= .00 N RESTRAINTS Node 1480 ANC ALLOWABLE STRESSES B31.3 (2016) Cycle Max Switch = --- Sc= 138 N/mm2 Sh1= 138 N/mm2

Page 30: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 INPUT LISTING

17

Sh2= 138 N/mm2 Sh3= 138 N/mm2 Sh4= 138 N/mm2 Sh5= 138 N/mm2 Sh6= 138 N/mm2 Sh7= 138 N/mm2 Sh8= 138 N/mm2 Sh9= 138 N/mm2 ----------------------------------------------------------------------------- From 1090 To 1490 DY= -.646 m RIGID Weight= .00 N RESTRAINTS Node 1490 +Y Mu = .30 Node 1490 -Y Gap= 1.000 mm Node 1490 X Gap= 3.000 mm Node 1490 Z Gap= 20.000 mm ----------------------------------------------------------------------------- From 1161 To 1500 DY= .106 m PIPE Dia= 219.075 mm Wall= 12.700 mm Cor= .0000 mm GENERAL T1= 350 C T2= 180 C P1= 3.5000 bar PHyd= 7.0000 bar Mat= (155)A312 TP304 E= 195,129 N/mm2 EH1= 172,570 N/mm2 EH2= 184,235 N/mm2 EH3= 195,129 N/mm2 EH4= 195,129 N/mm2 EH5= 195,129 N/mm2 EH6= 195,129 N/mm2 EH7= 195,129 N/mm2 EH8= 195,129 N/mm2 EH9= 195,129 N/mm2 v = .292 Pipe Den=8027.1997070 kg/m3 Fluid Den= .6100000 kg/m3 Insul Thk= 40.000 mm RIGID Weight= 230.63 N ALLOWABLE STRESSES B31.3 (2016) Cycle Max Switch = --- Sc= 138 N/mm2 Sh1= 111 N/mm2 Sh2= 132 N/mm2 Sh3= 138 N/mm2 Sh4= 138 N/mm2 Sh5= 138 N/mm2 Sh6= 138 N/mm2 Sh7= 138 N/mm2 Sh8= 138 N/mm2 Sh9= 138 N/mm2 Sy= 207 N/mm2 ----------------------------------------------------------------------------- From 1500 To 1510 DY= .152 m PIPE Dia= 219.075 mm Wall= 12.700 mm Insul Thk= 40.000 mm REDUCER Diam2= 168.275 mm Wall2= 10.973 mm ----------------------------------------------------------------------------- From 1510 To 1520 DY= .232 m PIPE Dia= 168.275 mm Wall= 10.973 mm Insul Thk= 40.000 mm BEND at "TO" end Radius= 228.600 mm (LONG) Bend Angle= 90.000 Angle/Node @1= 45.00 1519 Angle/Node @2= .00 1518 ----------------------------------------------------------------------------- From 1520 To 1530 DX= -.670 m BEND at "TO" end Radius= 228.600 mm (LONG) Bend Angle= 90.000 Angle/Node @1= 45.00 1529 Angle/Node @2= .00 1528 ----------------------------------------------------------------------------- From 1530 To 1540 DY= -1.040 m BEND at "TO" end Radius= 228.600 mm (LONG) Bend Angle= 90.000 Angle/Node @1= 45.00 1539 Angle/Node @2= .00 1538 ----------------------------------------------------------------------------- From 1540 To 1550 DZ= -.411 m -----------------------------------------------------------------------------

Page 31: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 INPUT LISTING

18

From 1550 To 1560 DZ= -.094 m RIGID Weight= 147.74 N RESTRAINTS Node 1560 ANC Cnode 1561 EQUIPMENT LIMITS Nozzle Node = 1560 Limiting Loads: A=pipe; B=ref; C=AxB; FA= 11,900.00 N FB= 8,400.00 N FC= 8,400.00 N MA= 4,600.00 N.m MB= 2,500.00 N.m MC= 2,500.00 N.m Equipment Major Direction Vector= .0000 1.0000 .0000 Interact. Mtd= Absolute ----------------------------------------------------------------------------- From 1251 To 1570 DY= .082 m PIPE Dia= 114.300 mm Wall= 8.560 mm Insul Thk= 40.000 mm RIGID Weight= 90.25 N ----------------------------------------------------------------------------- From 1570 To 1580 DY= .102 m PIPE Dia= 114.300 mm Wall= 8.560 mm Insul Thk= 40.000 mm REDUCER Diam2= 88.900 mm Wall2= 7.620 mm ----------------------------------------------------------------------------- From 1580 To 1590 DY= .116 m PIPE Dia= 88.900 mm Wall= 7.620 mm Insul Thk= 40.000 mm BEND at "TO" end Radius= 114.300 mm (LONG) Bend Angle= 90.000 Angle/Node @1= 45.00 1589 Angle/Node @2= .00 1588 ----------------------------------------------------------------------------- From 1590 To 1600 DX= .830 m PIPE Dia= 88.900 mm Wall= 7.620 mm Insul Thk= 40.000 mm BEND at "TO" end Radius= 114.300 mm (LONG) Bend Angle= 90.000 Angle/Node @1= 45.00 1599 Angle/Node @2= .00 1598 ----------------------------------------------------------------------------- From 1600 To 1610 DY= -.298 m ----------------------------------------------------------------------------- From 1610 To 901 DY= -.075 m PIPE Dia= 88.900 mm Wall= 7.620 mm Insul Thk= 40.000 mm RIGID Weight= 59.25 N ----------------------------------------------------------------------------- From 1630 To 1640 DZ= .069 m PIPE Dia= 48.260 mm Wall= 7.137 mm Cor= 3.0000 mm GENERAL T1= 350 C T2= 213 C P1= 24.5000 bar PHyd= 55.0000 bar Mat= (155)A312 TP304 E= 195,129 N/mm2 EH1= 172,570 N/mm2 EH2= 181,976 N/mm2 EH3= 195,129 N/mm2 EH4= 195,129 N/mm2 EH5= 195,129 N/mm2 EH6= 195,129 N/mm2 EH7= 195,129 N/mm2

Page 32: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 INPUT LISTING

19

EH8= 195,129 N/mm2 EH9= 195,129 N/mm2 v = .292 Pipe Den=8027.1997070 kg/m3 Fluid Den= 9.8200006 kg/m3 Insul Thk= 40.000 mm Insul Den= 220.0000000 kg/m3 RIGID Weight= 23.74 N ALLOWABLE STRESSES B31.3 (2016) Cycle Max Switch = --- Sc= 138 N/mm2 Sh1= 111 N/mm2 Sh2= 127 N/mm2 Sh3= 138 N/mm2 Sh4= 138 N/mm2 Sh5= 138 N/mm2 Sh6= 138 N/mm2 Sh7= 138 N/mm2 Sh8= 138 N/mm2 Sh9= 138 N/mm2 Sy= 207 N/mm2 ----------------------------------------------------------------------------- From 1640 To 1650 DZ= .184 m PIPE Dia= 48.260 mm Wall= 7.137 mm Insul Thk= 40.000 mm ----------------------------------------------------------------------------- From 1650 To 1660 DZ= .221 m PIPE Dia= 273.050 mm Wall= 9.271 mm GENERAL Mat= (155)A312 TP304 E= 195,129 N/mm2 EH1= 172,570 N/mm2 EH2= 181,976 N/mm2 EH3= 195,129 N/mm2 EH4= 195,129 N/mm2 EH5= 195,129 N/mm2 EH6= 195,129 N/mm2 EH7= 195,129 N/mm2 EH8= 195,129 N/mm2 EH9= 195,129 N/mm2 v = .292 Pipe Den=8027.1997070 kg/m3 Insul Thk= 40.000 mm RIGID Weight= 691.60 N ALLOWABLE STRESSES B31.3 (2016) Cycle Max Switch = --- Sc= 138 N/mm2 Sh1= 111 N/mm2 Sh2= 127 N/mm2 Sh3= 138 N/mm2 Sh4= 138 N/mm2 Sh5= 138 N/mm2 Sh6= 138 N/mm2 Sh7= 138 N/mm2 Sh8= 138 N/mm2 Sh9= 138 N/mm2 Sy= 207 N/mm2 ----------------------------------------------------------------------------- From 1660 To 1670 DZ= .090 m RIGID Weight= 691.60 N ----------------------------------------------------------------------------- From 1660 To 1680 DY= -.137 m RIGID Weight= .00 N ----------------------------------------------------------------------------- From 1660 To 1690 DY= .137 m RIGID Weight= .00 N ----------------------------------------------------------------------------- From 1690 To 1700 DY= .191 m PIPE Dia= 33.401 mm Wall= 6.350 mm Insul Thk= 40.000 mm ----------------------------------------------------------------------------- From 1700 To 1710 DY= .062 m RIGID Weight= 15.50 N ----------------------------------------------------------------------------- From 1710 To 1720 DY= .022 m RIGID Weight= 13.73 N ----------------------------------------------------------------------------- From 1680 To 1730 DY= -.191 m PIPE Dia= 33.401 mm Wall= 6.350 mm Insul Thk= 40.000 mm -----------------------------------------------------------------------------

Page 33: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 INPUT LISTING

20

From 1730 To 1740 DY= -.062 m RIGID Weight= 15.50 N ----------------------------------------------------------------------------- From 1740 To 1750 DY= -.022 m RIGID Weight= 13.73 N ----------------------------------------------------------------------------- From 1670 To 1760 DZ= .285 m PIPE Dia= 406.400 mm Wall= 8.000 mm GENERAL T2= 140 C P1= 3.5000 bar PHyd= 11.8000 bar Fluid Den= .2300000 kg/m3 Insul Thk= 40.000 mm RIGID Weight= 691.60 N RESTRAINTS Node 1760 +Y Mu = .30 ALLOWABLE STRESSES B31.3 (2016) Cycle Max Switch = --- Sc= 138 N/mm2 Sh1= 111 N/mm2 Sh2= 138 N/mm2 Sh3= 138 N/mm2 Sh4= 138 N/mm2 Sh5= 138 N/mm2 Sh6= 138 N/mm2 Sh7= 138 N/mm2 Sh8= 138 N/mm2 Sh9= 138 N/mm2 Sy= 207 N/mm2 ----------------------------------------------------------------------------- From 1760 To 1770 DZ= .232 m GENERAL T2= 140 C P1= 3.5000 bar PHyd= 11.8000 bar Fluid Den= .2300000 kg/m3 RIGID Weight= 691.60 N ALLOWABLE STRESSES B31.3 (2016) Cycle Max Switch = --- Sc= 138 N/mm2 Sh1= 111 N/mm2 Sh2= 138 N/mm2 Sh3= 138 N/mm2 Sh4= 138 N/mm2 Sh5= 138 N/mm2 Sh6= 138 N/mm2 Sh7= 138 N/mm2 Sh8= 138 N/mm2 Sh9= 138 N/mm2 Sy= 207 N/mm2 ----------------------------------------------------------------------------- From 1770 To 1780 DZ= .054 m PIPE Dia= 123.700 mm Wall= 5.000 mm Insul Thk= 40.000 mm REDUCER Diam2= 102.200 mm Wall2= 5.000 mm ----------------------------------------------------------------------------- From 1780 To 1790 DZ= .208 m PIPE Dia= 102.200 mm Wall= 5.000 mm GENERAL T1= 350 C Insul Thk= 40.000 mm ALLOWABLE STRESSES B31.3 (2016) Cycle Max Switch = --- Sc= 138 N/mm2 Sh1= 111 N/mm2 Sh2= 138 N/mm2 Sh3= 138 N/mm2 Sh4= 138 N/mm2 Sh5= 138 N/mm2 Sh6= 138 N/mm2 Sh7= 138 N/mm2 Sh8= 138 N/mm2 Sh9= 138 N/mm2 Sy= 207 N/mm2 REDUCER Diam2= 81.500 mm Wall2= 5.000 mm ----------------------------------------------------------------------------- From 1790 To 1800 DZ= .122 m PIPE Dia= 81.500 mm Wall= 5.000 mm Insul Thk= 40.000 mm -----------------------------------------------------------------------------

Page 34: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 INPUT LISTING

21

From 1800 To 1830 DZ= .519 m PIPE Dia= 81.500 mm Wall= 5.000 mm GENERAL T1= 350 C T2= 140 C P1= 3.5000 bar PHyd= 11.8000 bar Fluid Den= .2300000 kg/m3 Insul Thk= 40.000 mm ALLOWABLE STRESSES B31.3 (2016) Cycle Max Switch = --- Sc= 138 N/mm2 Sh1= 111 N/mm2 Sh2= 138 N/mm2 Sh3= 138 N/mm2 Sh4= 138 N/mm2 Sh5= 138 N/mm2 Sh6= 138 N/mm2 Sh7= 138 N/mm2 Sh8= 138 N/mm2 Sh9= 138 N/mm2 Sy= 207 N/mm2 REDUCER Diam2= 143.000 mm Wall2= 5.000 mm ----------------------------------------------------------------------------- From 1830 To 1840 DZ= .211 m PIPE Dia= 143.000 mm Wall= 5.000 mm Insul Thk= 40.000 mm REDUCER Diam2= 168.275 mm Wall2= 5.000 mm ----------------------------------------------------------------------------- From 1840 To 1561 DZ= .089 m PIPE Dia= 168.275 mm Wall= 5.000 mm Insul Thk= 40.000 mm RIGID Weight= 135.57 N ----------------------------------------------------------------------------- From 1760 To 1880 DY= .203 m PIPE Dia= 406.400 mm Wall= 8.000 mm GENERAL T1= 350 C T2= 140 C P1= 3.5000 bar PHyd= 11.8000 bar Fluid Den= .2300000 kg/m3 Insul Thk= 40.000 mm RIGID Weight= .00 N ALLOWABLE STRESSES B31.3 (2016) Cycle Max Switch = --- Sc= 138 N/mm2 Sh1= 111 N/mm2 Sh2= 138 N/mm2 Sh3= 138 N/mm2 Sh4= 138 N/mm2 Sh5= 138 N/mm2 Sh6= 138 N/mm2 Sh7= 138 N/mm2 Sh8= 138 N/mm2 Sh9= 138 N/mm2 Sy= 207 N/mm2 ----------------------------------------------------------------------------- From 1760 To 1890 DX= -.203 m RIGID Weight= .00 N ----------------------------------------------------------------------------- From 1890 To 1900 DX= -.147 m PIPE Dia= 33.401 mm Wall= 6.350 mm Insul Thk= 40.000 mm BEND at "TO" end Radius= 38.100 mm (LONG) Bend Angle= 90.000 Angle/Node @1= 45.00 1899 Angle/Node @2= .00 1898 ----------------------------------------------------------------------------- From 1900 To 1910 DY= .144 m ----------------------------------------------------------------------------- From 1910 To 1920 DY= .056 m RIGID Weight= 17.07 N -----------------------------------------------------------------------------

Page 35: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 INPUT LISTING

22

From 1920 To 1930 DY= .019 m RIGID Weight= 13.73 N ----------------------------------------------------------------------------- From 1880 To 1940 DY= .168 m PIPE Dia= 168.275 mm Wall= 7.112 mm Insul Thk= 40.000 mm ----------------------------------------------------------------------------- From 1940 To 1950 DY= .089 m RIGID Weight= 135.57 N CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) JAN 20,2020 18:10:22 INPUT UNITS USED... UNITS= SI-Bar NOM/SCH INPUT= ON LENGTH inches x 25.400 = mm FORCE pounds x 4.448 = N MASS(dynamics) pounds x 0.454 = kg MOMENTS(INPUT) inch-pounds x 0.113 = N.m MOMENTS(OUTPUT) inch-pounds x 0.113 = N.m STRESS lbs./sq.in. x 0.007 = N/mm2 TEMP. SCALE degrees F. x 0.556 = C PRESSURE psig x 0.069 = bar ELASTIC MODULUS lbs./sq.in. x 0.007 = N/mm2 PIPE DENSITY lbs./cu.in. x 27680.000 = kg/m3 INSULATION DENS. lbs./cu.in. x 27680.000 = kg/m3 FLUID DENSITY lbs./cu.in. x 27680.000 = kg/m3 TRANSL. STIF lbs./in. x 0.175 = N/mm ROTATIONAL STIF in.lb./deg. x 0.113 = N.m./deg UNIFORM LOAD lb./in. x 0.175 = N/mm G LOAD g's x 1.000 = g's WIND LOAD lbs./sq.in. x 6894.757 = N/m2 ELEVATION inches x 0.025 = m COMPOUND LENGTH inches x 0.025 = m DIAMETER inches x 25.400 = mm WALL THICKNESS inches x 25.400 = mm CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) JAN 20,2020 18:10:22 SETUP FILE PARAMETERS ------------------------------------------------------------------------------ CONNECT GEOMETRY THRU CNODES = YES MIN ALLOWED BEND ANGLE = 5.00000 MAX ALLOWED BEND ANGLE = 95.0000 BEND LENGTH ATTACHMENT PERCENT = 1.00000 MIN ANGLE TO ADJACENT BEND PT = 5.00000 LOOP CLOSURE TOLERANCE = 25.4000 mm THERMAL BOWING HORZ TOLERANCE = 0.100000E-03 AUTO NODE NUMBER INCREMENT= 10.0000 Z AXIS UP= NO USE PRESSURE STIFFENING = DEFAULT ALPHA TOLERANCE = 0.500000E-01 RESLD-FORCE = NO HGR DEF RESWGT STIF = 0.175120E+12 N/mm DECOMP SNG TOL = 0.100000E+11 BEND AXIAL SHAPE = YES FRICT STIF = 175120. N/mm

Page 36: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 INPUT LISTING

23

FRICT NORM FORCE VAR = 0.150000 FRICT ANGLE VAR = 15.0000 FRICT SLIDE MULT = 1.00000 ROD TOLERANCE = 1.00000 ROD INC = 2.00000 INCORE NUMERICAL CHECK = NO OUTCORE NUMERICAL CHECK = NO DEFAULT TRANS RESTRAINT STIFF= 0.175120E+12 N/mm DEFAULT ROT RESTRAINT STIFF= 0.112980E+12 N.m./deg IGNORE SPRING HANGER STIFFNESS = NO MISSING MASS ZPA = EXTRACTED MIN WALL MILL TOLERANCE = 12.5000 WRC-107 VERSION = MAR 79 1B1/2B1 WRC-107 INTERPOLATION = LAST VALUE DEFAULT AMBIENT TEMPERATURE= 21.1142 C BOURDON PRESSURE= TRANS COEFFICIENT OF FRICTION (MU) = 0.000000 INCLUDE SPRG STIF IN HGR OPE = NO INCLUDE INSULATION IN HYDROTEST = NO REDUCED INTERSECTION = B31.1(POST1980) USE WRC329 NO NO REDUCED SIF FOR RFT AND WLT NO B31.1 REDUCED Z FIX = YES CLASS 1 BRANCH FLEX NO ALL STRESS CASES CORRODED = NO ADD TORSION IN SL STRESS = DEFAULT ADD F/A IN STRESS = DEFAULT OCCASIONAL LOAD FACTOR = 0.000000 DEFAULT CODE = B31.3 B31.3 SUS CASE SIF FACTOR = 0.000000 ALLOW USERS BEND SIF = NO USE SCHNEIDER NO YIELD CRITERION STRESS = VON MISES USE PD/4T NO BASE HOOP STRESS ON ? = ID EN13480 USE IN OUTPLANE SIFS= NO LIBERAL EXPANSION ALLOWABLE= YES B31.3 SEC 319.2.3C SAXIAL= Default B31.3 WELDING/CONTOUR TEE ISB16.9 FALSE PRESSURE VARIATION IN EXP CASE= DEFAULT IMPLEMENT B313 APP-P NO IMPLEMENT B313 CODE CASE 178 YES IGNORE B31.1/B31.3 Wc FACTOR= YES USE FRP SIF = YES USE FRP FLEX = YES BS 7159 Pressure Stiffening= Design Strain FRP Property Data File= CAESAR.FRP FRP Emod (axial) = 22064.0 N/mm2 FRP Ratio Gmod/Emod (axial) = 0.250000 FRP Ea/Eh*Vh/a = 0.152730 FRP Laminate Type = THREE FRP Alpha = 21.5983 C FRP Density = 1660.80 kg/m3 EXCLUDE f2 FROM UKOOA BENDING = NO CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) JAN 20,2020 18:10:22

Page 37: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 INPUT LISTING

24

EXECUTION CONTROL PARAMETERS Rigid/ExpJt Print Flag ..... 1.000 Bourdon Option ............. 1.000 Loop Closure Flag .......... 2.000 Thermal Bowing Delta Temp .. .000 C Liberal Allowable Flag ..... 1.000 Uniform Load Option ........ .000 Ambient Temperature ........ 21.114 C Plastic (FRP) Alpha ........ 21.598 Plastic (FRP) GMOD/EMODa ... .250 Plastic (FRP) Laminate Type. 3.000 Eqn Optimizer .............. .000 Node Selection ............. .000 Eqn Ordering ............... .000 Collins .................... .000 Degree Determination ....... .000 User Eqn Control ........... .000 North Direction ............ -X CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date:JAN 20,2020 @18:10 Pg: 5

Page 38: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 CAESAR II LOAD CASE REPORT DATE:JAN 20,2020

25

CASE 1 (HYD) WW+HP HYDRO TEST CASE Keep/Discard: Keep Display: Disp/Force/Stress Elastic Modulus: EC Friction Mult.: 1.0000 Flg Analysis Temp: None CASE 2 (OPE) W+T1+P1 OPERATING CASE CONDITION 1 Keep/Discard: Keep Display: Disp/Force/Stress Elastic Modulus: EC Friction Mult.: 1.0000 Flg Analysis Temp: None CASE 3 (OPE) W+T2+P1 OPERATING CASE CONDITION 2 Keep/Discard: Keep Display: Disp/Force/Stress Elastic Modulus: EC Friction Mult.: 1.0000 Flg Analysis Temp: None CASE 4 (SUS) W+P1 SUSTAINED CASE CONDITION 1 Keep/Discard: Keep Display: Disp/Force/Stress Elastic Modulus: EC Friction Mult.: 1.0000 SUS/OCC case SH: SH_MIN Flg Analysis Temp: None CASE 5 (OPE) W+T2+P1+U1 Keep/Discard: Keep Display: Disp/Force/Stress Elastic Modulus: EC Friction Mult.: 1.0000 Flg Analysis Temp: None CASE 6 (OPE) W+T2+P1-U1 Keep/Discard: Keep Display: Disp/Force/Stress Elastic Modulus: EC Friction Mult.: 1.0000 Flg Analysis Temp: None CASE 7 (OPE) W+T2+P1+U2 Keep/Discard: Keep Display: Disp/Force/Stress Elastic Modulus: EC Friction Mult.: 1.0000 Flg Analysis Temp: None

Page 39: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 CAESAR II LOAD CASE REPORT DATE:JAN 20,2020

26

CASE 8 (OPE) W+T2+P1-U2 Keep/Discard: Keep Display: Disp/Force/Stress Elastic Modulus: EC Friction Mult.: 1.0000 Flg Analysis Temp: None CASE 9 (OPE) W+T2+P1+U3 Keep/Discard: Keep Display: Disp/Force/Stress Elastic Modulus: EC Friction Mult.: 1.0000 Flg Analysis Temp: None CASE 10 (OPE) W+T2+P1-U3 Keep/Discard: Keep Display: Disp/Force/Stress Elastic Modulus: EC Friction Mult.: 1.0000 Flg Analysis Temp: None CASE 11 (OPE) W+T2+P1+WIN1 Keep/Discard: Keep Display: Disp/Force/Stress Elastic Modulus: EC Friction Mult.: 1.0000 Flg Analysis Temp: None CASE 12 (OPE) W+T2+P1+WIN2 Keep/Discard: Keep Display: Disp/Force/Stress Elastic Modulus: EC Friction Mult.: 1.0000 Flg Analysis Temp: None CASE 13 (OPE) W+T2+P1+WIN3 Keep/Discard: Keep Display: Disp/Force/Stress Elastic Modulus: EC Friction Mult.: 1.0000 Flg Analysis Temp: None CASE 14 (OPE) W+T2+P1+WIN4 Keep/Discard: Keep Display: Disp/Force/Stress Elastic Modulus: EC Friction Mult.: 1.0000 Flg Analysis Temp: None CASE 15 (OCC) L15=L5-L3 Keep/Discard: Keep Display: Disp/Force/Stress Combination Method: ALG SUS/OCC case SH: SH_MIN OCC Load Factor: 0.0000

Page 40: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 CAESAR II LOAD CASE REPORT DATE:JAN 20,2020

27

CASE 16 (OCC) L16=L6-L3 Keep/Discard: Keep Display: Disp/Force/Stress Combination Method: ALG SUS/OCC case SH: SH_MIN OCC Load Factor: 0.0000 CASE 17 (OCC) L17=L7-L3 Keep/Discard: Keep Display: Disp/Force/Stress Combination Method: ALG SUS/OCC case SH: SH_MIN OCC Load Factor: 0.0000 CASE 18 (OCC) L18=L8-L3 Keep/Discard: Keep Display: Disp/Force/Stress Combination Method: ALG SUS/OCC case SH: SH_MIN OCC Load Factor: 0.0000 CASE 19 (OCC) L19=L9-L3 Keep/Discard: Keep Display: Disp/Force/Stress Combination Method: ALG SUS/OCC case SH: SH_MIN OCC Load Factor: 0.0000 CASE 20 (OCC) L20=L10-L3 Keep/Discard: Keep Display: Disp/Force/Stress Combination Method: ALG SUS/OCC case SH: SH_MIN OCC Load Factor: 0.0000 CASE 21 (OCC) L21=L11-L3 Keep/Discard: Keep Display: Disp/Force/Stress Combination Method: ALG SUS/OCC case SH: SH_MIN OCC Load Factor: 0.0000 CASE 22 (OCC) L22=L12-L3 Keep/Discard: Keep Display: Disp/Force/Stress Combination Method: ALG SUS/OCC case SH: SH_MIN OCC Load Factor: 0.0000 CASE 23 (OCC) L23=L13-L3 Keep/Discard: Keep Display: Disp/Force/Stress Combination Method: ALG SUS/OCC case SH: SH_MIN

Page 41: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 CAESAR II LOAD CASE REPORT DATE:JAN 20,2020

28

OCC Load Factor: 0.0000 CASE 24 (OCC) L24=L14-L3 Keep/Discard: Keep Display: Disp/Force/Stress Combination Method: ALG SUS/OCC case SH: SH_MIN OCC Load Factor: 0.0000 CASE 25 (OCC) L25=L4+L15 Keep/Discard: Keep Display: Disp/Force/Stress Combination Method: SCALAR SUS/OCC case SH: SH_MIN OCC Load Factor: 0.0000 CASE 26 (OCC) L26=L4+L16 Keep/Discard: Keep Display: Disp/Force/Stress Combination Method: SCALAR SUS/OCC case SH: SH_MIN OCC Load Factor: 0.0000 CASE 27 (OCC) L27=L4+L17 Keep/Discard: Keep Display: Disp/Force/Stress Combination Method: SCALAR SUS/OCC case SH: SH_MIN OCC Load Factor: 0.0000 CASE 28 (OCC) L28=L4+L18 Keep/Discard: Keep Display: Disp/Force/Stress Combination Method: SCALAR SUS/OCC case SH: SH_MIN OCC Load Factor: 0.0000 CASE 29 (OCC) L29=L4+L19 Keep/Discard: Keep Display: Disp/Force/Stress Combination Method: SCALAR SUS/OCC case SH: SH_MIN OCC Load Factor: 0.0000 CASE 30 (OCC) L30=L4+L20 Keep/Discard: Keep Display: Disp/Force/Stress Combination Method: SCALAR SUS/OCC case SH: SH_MIN OCC Load Factor: 0.0000 CASE 31 (OCC) L31=L4+L21 Keep/Discard: Keep Display: Disp/Force/Stress Combination Method: SCALAR

Page 42: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 CAESAR II LOAD CASE REPORT DATE:JAN 20,2020

29

SUS/OCC case SH: SH_MIN OCC Load Factor: 0.0000 CASE 32 (OCC) L32=L4+L22 Keep/Discard: Keep Display: Disp/Force/Stress Combination Method: SCALAR SUS/OCC case SH: SH_MIN OCC Load Factor: 0.0000 CASE 33 (OCC) L33=L4+L23 Keep/Discard: Keep Display: Disp/Force/Stress Combination Method: SCALAR SUS/OCC case SH: SH_MIN OCC Load Factor: 0.0000 CASE 34 (OCC) L34=L4+L24 Keep/Discard: Keep Display: Disp/Force/Stress Combination Method: SCALAR SUS/OCC case SH: SH_MIN OCC Load Factor: 0.0000 CASE 35 (EXP) L35=L2-L4 EXPANSION CASE CONDITION 1 Keep/Discard: Keep Display: Disp/Force/Stress Combination Method: ALG CASE 36 (EXP) L36=L3-L4 EXPANSION CASE CONDITION 2 Keep/Discard: Keep Display: Disp/Force/Stress Combination Method: ALG

Page 43: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 STRESS SUMMARY REPORT: Highest Stresses Mini Statement Various Load Cases

30

LOAD CASE DEFINITION KEY

CASE 1 (HYD) WW+HP

CASE 2 (OPE) W+T1+P1

CASE 35 (EXP) L35=L2-L4

CASE 36 (EXP) L36=L3-L4

Piping Code: B31.3 = B31.3 -2016, Jan 31, 2017

CODE STRESS CHECK PASSED : LOADCASE 1 (HYD) WW+HP

Highest Stresses: (N/mm2 ) LOADCASE 1 (HYD) WW+HP

Ratio (%): 9.1 @Node 1790

Code Stress: 18.9 Allowable Stress: 206.9

Axial Stress: 9.1 @Node 1150

Bending Stress: 15.3 @Node 1790

Torsion Stress: 1.0 @Node 890

Hoop Stress: 19.8 @Node 1140

OCTAHEDRAL Stress: 10.2 @Node 760

NO CODE STRESS CHECK PROCESSED: LOADCASE 2 (OPE) W+T1+P1

Highest Stresses: (N/mm2 ) LOADCASE 2 (OPE) W+T1+P1

Ratio (%): 0.0 @Node 485

OPE Stress: 56.3 Allowable Stress: 0.0

Axial Stress: 2.7 @Node 480

Bending Stress: 45.4 @Node 1590

Torsion Stress: 23.9 @Node 484

Hoop Stress: 6.0 @Node 760

OCTAHEDRAL Stress: 32.0 @Node 485

CODE STRESS CHECK PASSED : LOADCASE 35 (EXP) L35=L2-L4

Highest Stresses: (N/mm2 ) LOADCASE 35 (EXP) L35=L2-L4

Ratio (%): 15.9 @Node 485

Code Stress: 54.1 Allowable Stress: 340.7

Axial Stress: 0.8 @Node 1790

Bending Stress: 44.2 @Node 485

Torsion Stress: 23.9 @Node 484

Hoop Stress: 0.0 @Node 20

OCTAHEDRAL Stress: 31.9 @Node 485

CODE STRESS CHECK PASSED : LOADCASE 36 (EXP) L36=L3-L4

Highest Stresses: (N/mm2 ) LOADCASE 36 (EXP) L36=L3-L4

Ratio (%): 4.2 @Node 710

Code Stress: 14.0 Allowable Stress: 336.1

Axial Stress: 0.8 @Node 1790

Bending Stress: 13.2 @Node 710

Torsion Stress: 5.1 @Node 484

Hoop Stress: 0.0 @Node 20

OCTAHEDRAL Stress: 11.7 @Node 1800

Page 44: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 RESTRAINT SUMMARY EXTENDED REPORT: Loads On Restraints Various Load Cases

31

LOAD CASE DEFINITION KEY

CASE 1 (HYD) WW+HP

CASE 2 (OPE) W+T1+P1

CASE 3 (OPE) W+T2+P1

CASE 4 (SUS) W+P1

CASE 5 (OPE) W+T2+P1+U1

CASE 6 (OPE) W+T2+P1-U1

CASE 7 (OPE) W+T2+P1+U2

CASE 8 (OPE) W+T2+P1-U2

CASE 9 (OPE) W+T2+P1+U3

CASE 10 (OPE) W+T2+P1-U3

CASE 11 (OPE) W+T2+P1+WIN1

CASE 12 (OPE) W+T2+P1+WIN2

CASE 13 (OPE) W+T2+P1+WIN3

CASE 14 (OPE) W+T2+P1+WIN4

Node

Load Case

FX N FY N FZ N MX

N.m MY N.m MZ N.m DX mm DY mm DZ mm

290 TYPE=Rigi

d ANC;

1(HYD) 37 537 -13 -12 -23 -202 -0.011 0.004 0.003

2(OPE) -168 402 1067 -57 1065 -16 -0.004 3.609 0.867

3(OPE) -270 330 -603 0 -141 -52 0.000 0.958 0.244

4(SUS) 35 526 -8 -11 -20 -199 -0.011 0.000 0.002

5(OPE) -319 339 -587 -3 -126 -73 0.000 0.958 0.244

6(OPE) -217 291 -676 6 -190 -8 0.002 0.958 0.245

7(OPE) -272 314 -588 0 -132 -49 0.000 0.958 0.244

8(OPE) -264 315 -678 3 -187 -28 0.001 0.958 0.245

9(OPE) -267 284 -718 -1 -200 -20 0.002 0.958 0.246

10(OPE)

-272 376 -488 1 -83 -85 -0.002 0.958 0.242

11(OPE)

-503 337 -586 -6 -128 -57 0.005 0.958 0.245

12(OPE)

-34 294 -678 8 -188 -24 -0.003 0.958 0.245

13(OPE)

-264 286 -1001 -57 -298 -18 0.002 0.958 0.254

Page 45: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 RESTRAINT SUMMARY EXTENDED REPORT: Loads On Restraints Various Load Cases

32

Node

Load Case

FX N FY N FZ N MX

N.m MY N.m MZ N.m DX mm DY mm DZ mm

14(OPE)

-275 374 -205 58 16 -86 -0.002 0.958 0.234

MAX -503/L11 537/L1 1067/L2 58/L14 1065/L2 -202/L1 -

0.011/L1

3.609/L

2

0.867/L2

510 TYPE=Rigi

d ANC;

1(HYD) 98 308 13 4 8 94 -0.001 -0.043 -0.008

2(OPE) -1018 543 9269 6204 3915 739 -0.029 0.733 -12.695

3(OPE) -410 601 1981 1320 821 310 -0.054 0.098 -3.354

4(SUS) 104 313 0 -5 2 94 0.004 -0.040 0.002

5(OPE) -528 656 1969 1312 818 337 -0.044 0.094 -3.355

6(OPE) -291 544 1993 1328 825 283 -0.064 0.101 -3.352

7(OPE) -418 589 1980 1320 821 307 -0.054 0.099 -3.354

8(OPE) -397 608 1982 1321 822 312 -0.055 0.096 -3.353

9(OPE) -404 596 1939 1318 824 308 -0.056 0.098 -3.349

10(OPE)

-416 606 2022 1322 819 312 -0.052 0.098 -3.359

11(OPE)

-761 837 1943 1295 814 402 -0.025 0.087 -3.357

12(OPE)

-68 369 2017 1346 829 221 -0.083 0.108 -3.350

13(OPE)

-398 592 1899 1299 820 306 -0.057 0.098 -3.347

14(OPE)

-422 610 2063 1342 823 314 -0.051 0.097 -3.360

MAX -1018/L2

837/L11

9269/L2

6204/L2

3915/L2 739/L2 -

0.083/L12

0.733/L

2

-12.695/L

2

580 TYPE=Rigi

d ANC;

1(HYD) -112 -366 559 685 196 462 -0.000 -0.000 0.000

Page 46: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 RESTRAINT SUMMARY EXTENDED REPORT: Loads On Restraints Various Load Cases

33

Node

Load Case

FX N FY N FZ N MX

N.m MY N.m MZ N.m DX mm DY mm DZ mm

2(OPE) 1154 4172 -8120 -4553 -11901 -966 0.000 0.000 -0.000

3(OPE) 664 766 -182 451 -2554 -366 0.000 0.000 -0.000

4(SUS) -110 -755 -159 181 210 470 -0.000 -0.000 -0.000

5(OPE) 964 809 -159 472 -2964 -580 0.000 0.000 -0.000

6(OPE) 360 734 -147 473 -2108 -172 0.000 0.000 -0.000

7(OPE) 674 783 -223 407 -2581 -383 0.000 0.000 -0.000

8(OPE) 644 758 -82 538 -2479 -369 0.000 0.000 -0.000

9(OPE) 656 743 90 645 -2456 -393 0.000 0.000 0.000

10(OPE)

671 790 -454 256 -2652 -339 0.000 0.000 -0.000

11(OPE)

1940 974 -43 570 -3776 -1551 0.000 0.000 -0.000

12(OPE)

-608 576 -257 380 -1316 795 -0.000 0.000 -0.000

13(OPE)

649 296 1000 1295 -2351 -389 0.000 0.000 0.000

14(OPE)

678 1237 -1365 -394 -2756 -343 0.000 0.000 -0.000

MAX 1940/L11

4172/L2

-8120/L2

-4553/L

2

-11901/L

2

-1551/L1

1

0.000/L1

1

0.000/L

2

-0.000/L2

590

TYPE=Rigid +Y; Rigid

-Y w/gap; Rigid X w/gap; Rigid Z w/gap;

1(HYD) -23 -2244 -560 0 0 0 -0.000 -0.000 -0.003

2(OPE) 31 -7050 -2115 0 0 0 0.123 -0.000 -8.358

3(OPE) 15 -3630 -1089 0 0 0 0.030 -0.000 -2.215

4(SUS) -29 -2018 167 0 0 0 -0.000 -0.000 0.001

Page 47: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 RESTRAINT SUMMARY EXTENDED REPORT: Loads On Restraints Various Load Cases

34

Node

Load Case

FX N FY N FZ N MX

N.m MY N.m MZ N.m DX mm DY mm DZ mm

5(OPE) 18 -3737 -1121 0 0 0 0.035 -0.000 -2.214

6(OPE) 12 -3502 -1050 0 0 0 0.025 -0.000 -2.215

7(OPE) 14 -3529 -1059 0 0 0 0.030 -0.000 -2.215

8(OPE) 15 -3703 -1111 0 0 0 0.029 -0.000 -2.214

9(OPE) 14 -3556 -1067 0 0 0 0.029 -0.000 -2.214

10(OPE)

16 -3705 -1111 0 0 0 0.031 -0.000 -2.215

11(OPE)

24 -4080 -1224 0 0 0 0.044 -0.000 -2.214

12(OPE)

7 -3172 -952 0 0 0 0.017 -0.000 -2.216

13(OPE)

12 -3106 -932 0 0 0 0.028 -0.000 -2.214

14(OPE)

18 -4154 -1246 0 0 0 0.032 -0.000 -2.216

MAX 31/L2 -

7050/L2

-2115/L2

0.123/L2

-0.000/L

2

-8.358/L2

660 TYPE=Rigi

d ANC;

1(HYD) -98 1376 -13 10 7 353 0.002 0.003 -0.024

2(OPE) 1018 1149 -9269 3511 6448 624 0.116 1.632 -19.220

3(OPE) 410 1092 -1981 756 1393 351 -0.071 0.434 -4.741

4(SUS) -104 1380 -0 5 -2 350 0.003 -0.001 -0.004

5(OPE) 410 1037 -1969 751 1383 347 -0.041 0.434 -4.741

6(OPE) 409 1149 -1993 760 1403 356 -0.102 0.434 -4.741

7(OPE) 418 1026 -1980 755 1393 334 -0.071 0.434 -4.741

8(OPE) 397 1163 -1982 756 1394 369 -0.074 0.434 -4.741

9(OPE) 404 1097 -2058 754 1408 352 -0.075 0.434 -4.740

Page 48: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 RESTRAINT SUMMARY EXTENDED REPORT: Loads On Restraints Various Load Cases

35

Node

Load Case

FX N FY N FZ N MX

N.m MY N.m MZ N.m DX mm DY mm DZ mm

10(OPE)

416 1087 -1903 758 1378 350 -0.068 0.434 -4.742

11(OPE)

468 855 -1943 742 1359 318 0.036 0.434 -4.741

12(OPE)

361 1323 -2017 769 1426 385 -0.175 0.434 -4.741

13(OPE)

398 1101 -2280 711 1466 353 -0.078 0.434 -4.737

14(OPE)

422 1082 -1681 801 1320 349 -0.065 0.434 -4.745

MAX 1018/L2

1380/L4

-9269/L2

3511/L

2 6448/L2 624/L2

-0.175/L1

2

1.632/L

2

-19.220/L

2

730 TYPE=Rigi

d ANC;

1(HYD) 37 -141 -13 -33 27 39 0.067 -0.176 0.006

2(OPE) -168 -258 1067 536 41 214 -0.143 1.050 -8.525

3(OPE) -270 -330 -603 -81 44 167 -0.050 -0.312 -2.115

4(SUS) 35 -133 -8 -37 25 38 0.069 -0.178 0.000

5(OPE) -273 -321 -587 -87 32 160 0.136 -0.349 -2.169

6(OPE) -263 -369 -676 -67 71 173 -0.305 -0.247 -1.953

7(OPE) -272 -316 -588 -82 39 166 -0.034 -0.312 -2.143

8(OPE) -264 -375 -678 -71 65 169 -0.151 -0.281 -1.973

9(OPE) -267 -375 -672 -69 68 162 -0.125 -0.275 -1.940

10(OPE)

-272 -284 -534 -94 20 172 0.025 -0.350 -2.289

11(OPE)

-273 -323 -586 -86 38 178 0.221 -0.369 -2.179

12(OPE)

-263 -366 -678 -67 65 155 -0.384 -0.228 -1.944

13(OPE)

-264 -374 -644 -69 101 164 -0.181 -0.273 -1.768

Page 49: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 RESTRAINT SUMMARY EXTENDED REPORT: Loads On Restraints Various Load Cases

36

Node

Load Case

FX N FY N FZ N MX

N.m MY N.m MZ N.m DX mm DY mm DZ mm

14(OPE)

-275 -285 -562 -93 -12 171 0.078 -0.351 -2.462

MAX -275/L14 -

375/L9 1067/L2 536/L2 101/L13 214/L2

-0.384/L1

2

1.050/L

2

-8.525/L2

770 TYPE=Rigi

d +Y;

1(HYD) 113 -2719 -160 0 0 0 0.001 -0.000 -0.001

2(OPE) 141 -1836 -532 0 0 0 3.540 -0.000 -13.340

3(OPE) 343 -3018 -838 0 0 0 1.489 -0.000 -3.641

4(SUS) 115 -2458 -144 0 0 0 0.001 -0.000 -0.001

5(OPE) 362 -2893 -789 0 0 0 1.697 -0.000 -3.696

6(OPE) 320 -3206 -907 0 0 0 1.230 -0.000 -3.479

7(OPE) 329 -2887 -801 0 0 0 1.504 -0.000 -3.669

8(OPE) 360 -3224 -898 0 0 0 1.405 -0.000 -3.499

9(OPE) 358 -3085 -854 0 0 0 1.454 -0.000 -3.467

10(OPE)

328 -2951 -822 0 0 0 1.524 -0.000 -3.816

11(OPE)

376 -2904 -786 0 0 0 1.773 -0.000 -3.706

12(OPE)

304 -3191 -908 0 0 0 1.162 -0.000 -3.470

13(OPE)

371 -3094 -851 0 0 0 1.436 -0.000 -3.295

14(OPE)

318 -2945 -824 0 0 0 1.538 -0.000 -3.988

MAX 376/L11 -

3224/L8

-908/L12

3.540/L2

-0.000/L

8

-13.340/L

2

900 TYPE=Rigi

d ANC;

1(HYD) -76 188 147 56 57 19 -0.005 0.003 0.057

Page 50: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 RESTRAINT SUMMARY EXTENDED REPORT: Loads On Restraints Various Load Cases

37

Node

Load Case

FX N FY N FZ N MX

N.m MY N.m MZ N.m DX mm DY mm DZ mm

2(OPE) -323 -560 1651 86 -96 91 4.354 2.507 -14.179

3(OPE) -633 550 286 107 -176 -88 1.848 0.795 -3.534

4(SUS) -79 187 136 55 54 19 -0.005 0.000 0.061

5(OPE) -510 434 254 108 -188 -45 1.955 0.795 -3.566

6(OPE) -787 700 383 112 -146 -144 1.717 0.795 -3.421

7(OPE) -621 532 263 103 -183 -85 1.855 0.795 -3.558

8(OPE) -687 612 377 117 -151 -108 1.809 0.795 -3.424

9(OPE) -647 572 384 118 -149 -98 1.831 0.795 -3.395

10(OPE)

-620 529 188 96 -203 -77 1.864 0.795 -3.674

11(OPE)

-516 443 252 111 -185 -52 2.031 0.795 -3.566

12(OPE)

-777 687 383 109 -150 -136 1.647 0.795 -3.420

13(OPE)

-658 582 420 123 -106 -102 1.822 0.795 -3.224

14(OPE)

-611 521 152 91 -245 -74 1.872 0.795 -3.845

MAX -787/L6 700/L6 1651/L2

123/L13

-245/L14

-144/L6

4.354/L2

2.507/L

2

-14.179/L

2

1160

TYPE=Rigi

d ANC;

1(HYD) 3 1345 -396 -163 -271 -476 -0.004 0.006 0.006

2(OPE) -299 1076 -1292 334 -287 -526 -0.013 4.589 1.252

3(OPE) -242 821 -1324 -144 -417 -324 -0.006 1.126 0.313

4(SUS) -1 1089 -357 -155 -238 -371 -0.003 0.000 0.003

5(OPE) -403 806 -1377 -143 -314 -339 -0.004 1.126 0.313

6(OPE) -48 874 -1098 -164 -471 -316 -0.010 1.126 0.312

7(OPE) -236 780 -1264 -142 -389 -310 -0.006 1.126 0.312

Page 51: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 RESTRAINT SUMMARY EXTENDED REPORT: Loads On Restraints Various Load Cases

38

Node

Load Case

FX N FY N FZ N MX

N.m MY N.m MZ N.m DX mm DY mm DZ mm

8(OPE) -248 861 -1384 -145 -446 -338 -0.007 1.126 0.313

9(OPE) -263 764 -1679 -122 -590 -297 -0.006 1.126 0.314

10(OPE)

-221 878 -965 -166 -242 -351 -0.007 1.126 0.311

11(OPE)

-1161 845 -1094 -222 298 -507 0.005 1.126 0.312

12(OPE)

834 968 -776 -158 -918 -170 -0.020 1.126 0.311

13(OPE)

-300 750 -2343 -209 -861 -308 -0.005 1.125 0.318

14(OPE)

-184 897 -279 -81 41 -343 -0.008 1.126 0.307

MAX -1161/L11

1345/L1

-2343/L1

3 334/L2

-918/L12

-526/L2 -

0.020/L12

4.589/L

2

1.252/L2

1250

TYPE=Rigi

d ANC;

1(HYD) 76 219 -147 -46 65 -10 -0.004 0.004 -0.018

2(OPE) 323 958 -1651 36 1467 554 0.106 4.294 -17.631

3(OPE) 633 -151 -286 -86 413 -166 -0.075 1.053 -4.327

4(SUS) 79 212 -136 -45 59 -12 -0.003 -0.000 -0.000

5(OPE) 482 -35 -254 -89 399 -117 -0.047 1.053 -4.328

6(OPE) 815 -301 -383 -84 464 -226 -0.105 1.053 -4.327

7(OPE) 621 -152 -263 -84 401 -162 -0.074 1.053 -4.328

8(OPE) 687 -195 -377 -90 464 -186 -0.079 1.053 -4.326

9(OPE) 647 -173 -412 -94 478 -172 -0.078 1.053 -4.326

10(OPE)

620 -130 -160 -78 348 -160 -0.072 1.053 -4.329

11(OPE)

377 -44 -252 -92 394 -103 0.022 1.053 -4.328

Page 52: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 RESTRAINT SUMMARY EXTENDED REPORT: Loads On Restraints Various Load Cases

39

Node

Load Case

FX N FY N FZ N MX

N.m MY N.m MZ N.m DX mm DY mm DZ mm

12(OPE)

916 -288 -383 -81 468 -239 -0.170 1.053 -4.327

13(OPE)

658 -183 -709 -155 579 -176 -0.081 1.053 -4.319

14(OPE)

611 -123 137 -17 247 -157 -0.069 1.053 -4.336

MAX 916/L12 958/L2 -

1651/L2

-155/L1

3 1467/L2 554/L2

-0.170/L1

2

4.294/L

2

-17.631/L

2

1480

TYPE=Rigi

d ANC;

1(HYD) 27 -1621 1568 835 55 284 0.000 -0.000 0.000

2(OPE) -1044 -4448 12465 5037 -2983 1012 -0.000 -0.000 0.000

3(OPE) -795 -2205 4105 1839 1997 1443 -0.000 -0.000 0.000

4(SUS) 32 -1530 471 358 31 187 0.000 -0.000 0.000

5(OPE) -340 -2197 4128 1851 1234 817 -0.000 -0.000 0.000

6(OPE) -1314 -2225 3991 1782 2753 2176 -0.000 -0.000 0.000

7(OPE) -797 -2131 3984 1780 1971 1436 -0.000 -0.000 0.000

8(OPE) -829 -2310 4296 1924 2087 1515 -0.000 -0.000 0.000

9(OPE) -782 -2399 4729 2098 2128 1403 -0.000 -0.000 0.000

10(OPE)

-809 -2011 3478 1578 1866 1486 -0.000 -0.000 0.000

11(OPE)

1538 -2226 3778 1697 -739 -1298 0.000 -0.000 0.000

12(OPE)

-3318 -2129 3825 1708 4552 4497 -0.000 -0.000 0.000

13(OPE)

-755 -3249 6868 2980 2263 1372 -0.000 -0.000 0.000

14(OPE)

-841 -1159 1317 687 1728 1525 -0.000 -0.000 0.000

MAX -3318/L12 -

4448/L2

12465/L

2

5037/L

2

4552/L1

2

4497/L1

2

-0.000/L1

2

-0.000/L

2

0.000/L2

Page 53: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 RESTRAINT SUMMARY EXTENDED REPORT: Loads On Restraints Various Load Cases

40

Node

Load Case

FX N FY N FZ N MX

N.m MY N.m MZ N.m DX mm DY mm DZ mm

1490

TYPE=Rigid +Y; Rigid

-Y w/gap; Rigid X w/gap; Rigid Z w/gap;

1(HYD) -30 -3242 -972 0 0 0 -0.000 -0.000 -0.013

2(OPE) 1 -814 -244 0 0 0 0.082 -0.000 -15.723

3(OPE) -6 -1634 -490 0 0 0 -0.045 -0.000 -3.858

4(SUS) -7 -3228 23 0 0 0 -0.000 -0.000 0.000

5(OPE) -3 -1688 -507 0 0 0 -0.027 -0.000 -3.858

6(OPE) -8 -1575 -472 0 0 0 -0.063 -0.000 -3.858

7(OPE) -5 -1506 -452 0 0 0 -0.044 -0.000 -3.858

8(OPE) -6 -1693 -508 0 0 0 -0.047 -0.000 -3.858

9(OPE) -5 -1367 -410 0 0 0 -0.048 -0.000 -3.858

10(OPE)

-6 -1902 -570 0 0 0 -0.042 -0.000 -3.858

11(OPE)

2 -1508 -452 0 0 0 0.020 -0.000 -3.859

12(OPE)

-16 -1952 -585 0 0 0 -0.105 -0.000 -3.858

13(OPE)

-2 -498 -149 0 0 0 -0.050 -0.000 -3.856

14(OPE)

-8 -2775 -832 0 0 0 -0.039 -0.000 -3.860

MAX -30/L1 -

3242/L1

-972/L1 -

0.105/L12

-0.000/L

1

-15.723/L

2

1560

TYPE=Rigi

d ANC;

1(HYD) 3 -413 -396 -298 -4 -15 0.164 -0.032 0.011

2(OPE) -299 -411 -1292 -283 428 -17 -3.303 0.908 -1.235

Page 54: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 RESTRAINT SUMMARY EXTENDED REPORT: Loads On Restraints Various Load Cases

41

Node

Load Case

FX N FY N FZ N MX

N.m MY N.m MZ N.m DX mm DY mm DZ mm

3(OPE) -242 -666 -1324 -649 348 -17 -1.370 -0.416 -0.836

4(SUS) -1 -398 -357 -265 1 -17 0.131 -0.012 0.001

5(OPE) -299 -681 -1377 -671 450 -11 -1.210 -0.439 -0.860

6(OPE) -152 -613 -1098 -573 197 -23 -1.568 -0.372 -0.866

7(OPE) -236 -638 -1264 -624 339 -16 -1.380 -0.411 -0.851

8(OPE) -248 -694 -1384 -675 356 -18 -1.361 -0.421 -0.820

9(OPE) -263 -723 -1575 -737 376 -17 -1.387 -0.442 -0.719

10(OPE)

-221 -608 -1069 -561 319 -17 -1.353 -0.389 -0.955

11(OPE)

-573 -641 -1094 -614 703 37 -0.463 -0.528 -1.133

12(OPE)

246 -518 -776 -437 -234 -71 -2.458 -0.211 -0.781

13(OPE)

-300 -736 -1730 -805 403 -17 -1.390 -0.483 -0.586

14(OPE)

-184 -590 -892 -486 290 -17 -1.349 -0.346 -1.097

MAX -573/L11 -

736/L13

-1730/L1

3

-805/L1

3 703/L11 -71/L12

-3.303/L2

0.908/L

2

-1.235/L2

1760

TYPE=Rigi

d +Y;

1(HYD) 3 -4731 -396 0 0 0 0.000 -0.000 -0.002

2(OPE) -274 -4060 -1187 0 0 0 -2.240 -0.000 -9.697

3(OPE) -233 -4315 -1273 0 0 0 -0.667 -0.000 -3.646

4(SUS) -1 -4047 -357 0 0 0 -0.000 -0.000 -0.002

5(OPE) -41 -4330 -1298 0 0 0 -0.115 -0.000 -3.669

6(OPE) -444 -4261 -1199 0 0 0 -1.363 -0.000 -3.677

7(OPE) -227 -4119 -1215 0 0 0 -0.684 -0.000 -3.661

8(OPE) -239 -4510 -1332 0 0 0 -0.651 -0.000 -3.630

Page 55: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 RESTRAINT SUMMARY EXTENDED REPORT: Loads On Restraints Various Load Cases

42

Node

Load Case

FX N FY N FZ N MX

N.m MY N.m MZ N.m DX mm DY mm DZ mm

9(OPE) -256 -4372 -1286 0 0 0 -0.703 -0.000 -3.528

10(OPE)

-211 -4257 -1260 0 0 0 -0.629 -0.000 -3.765

11(OPE)

529 -4290 -1173 0 0 0 1.778 -0.000 -3.944

12(OPE)

-908 -4167 -859 0 0 0 -3.796 -0.000 -3.592

13(OPE)

-300 -4385 -1281 0 0 0 -0.796 -0.000 -3.394

14(OPE)

-172 -4239 -1260 0 0 0 -0.534 -0.000 -3.908

MAX -908/L12 -

4731/L1

-1332/L8

-

3.796/L12

-0.000/L

1

-9.697/L2

Page 56: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

43

LOAD CASE DEFINITION KEY

CASE 1 (HYD) WW+HP

CASE 2 (OPE) W+T1+P1

CASE 3 (OPE) W+T2+P1

CASE 4 (SUS) W+P1

CASE 5 (OPE) W+T2+P1+U1

CASE 6 (OPE) W+T2+P1-U1

CASE 7 (OPE) W+T2+P1+U2

CASE 8 (OPE) W+T2+P1-U2

CASE 9 (OPE) W+T2+P1+U3

CASE 10 (OPE) W+T2+P1-U3

CASE 11 (OPE) W+T2+P1+WIN1

CASE 12 (OPE) W+T2+P1+WIN2

CASE 13 (OPE) W+T2+P1+WIN3

CASE 14 (OPE) W+T2+P1+WIN4

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

10

1(HYD) 0.00 -0.00 0.01 0.00 0.00 0.00

2(OPE) -0.06 0.96 2.79 -0.00 -0.00 -0.00

3(OPE) -0.01 0.25 0.81 0.00 -0.00 -0.00

4(SUS) 0.00 -0.00 0.00 0.00 0.00 0.00

5(OPE) -0.01 0.25 0.81 0.00 -0.00 -0.00

6(OPE) -0.01 0.25 0.81 0.00 -0.00 -0.00

7(OPE) -0.01 0.25 0.81 0.00 -0.00 -0.00

8(OPE) -0.01 0.25 0.81 0.00 -0.00 -0.00

9(OPE) -0.01 0.25 0.81 0.00 -0.00 -0.00

10(OPE) -0.01 0.25 0.81 0.00 -0.00 -0.00

11(OPE) -0.02 0.25 0.81 0.00 -0.00 -0.00

12(OPE) -0.01 0.25 0.81 0.00 -0.00 0.00

13(OPE) -0.01 0.25 0.81 0.00 -0.00 -0.00

14(OPE) -0.01 0.25 0.81 0.00 -0.00 -0.00

MAX -0.06/L2 0.96/L2 2.79/L2 0.00/L13 -0.00/L2 -0.00/L11

20

1(HYD) -0.00 -0.00 0.00 0.00 0.00 0.00

2(OPE) -0.04 0.96 2.60 -0.00 -0.00 -0.00

3(OPE) -0.01 0.25 0.72 0.00 -0.00 -0.00

4(SUS) -0.00 -0.00 0.00 0.00 0.00 0.00

5(OPE) -0.01 0.25 0.72 0.00 -0.00 -0.00

6(OPE) -0.01 0.25 0.72 0.00 -0.00 -0.00

7(OPE) -0.01 0.25 0.72 0.00 -0.00 -0.00

8(OPE) -0.01 0.25 0.72 0.00 -0.00 -0.00

9(OPE) -0.01 0.25 0.72 0.00 -0.00 -0.00

10(OPE) -0.01 0.25 0.72 0.00 -0.00 -0.00

11(OPE) -0.01 0.25 0.72 0.00 -0.00 -0.00

12(OPE) -0.01 0.25 0.72 0.00 -0.00 0.00

13(OPE) -0.01 0.25 0.72 0.00 -0.00 -0.00

14(OPE) -0.01 0.25 0.72 0.00 -0.00 -0.00

MAX -0.04/L2 0.96/L2 2.60/L2 0.00/L13 -0.00/L2 -0.00/L11

Page 57: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

44

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

30

1(HYD) -0.00 0.00 0.00 0.00 0.00 0.00

2(OPE) -0.02 0.96 2.43 -0.00 -0.00 -0.00

3(OPE) -0.00 0.25 0.65 0.00 -0.00 -0.00

4(SUS) -0.00 -0.00 0.00 0.00 0.00 0.00

5(OPE) -0.00 0.25 0.65 0.00 -0.00 -0.00

6(OPE) -0.00 0.25 0.65 0.00 -0.00 -0.00

7(OPE) -0.00 0.25 0.65 0.00 -0.00 -0.00

8(OPE) -0.00 0.25 0.65 0.00 -0.00 -0.00

9(OPE) -0.00 0.25 0.65 0.00 -0.00 -0.00

10(OPE) -0.00 0.25 0.65 0.00 -0.00 -0.00

11(OPE) -0.00 0.25 0.65 0.00 -0.00 -0.00

12(OPE) -0.00 0.25 0.65 0.00 -0.00 0.00

13(OPE) -0.00 0.25 0.65 0.00 -0.00 -0.00

14(OPE) -0.00 0.25 0.65 0.00 -0.00 -0.00

MAX -0.02/L2 0.96/L2 2.43/L2 0.00/L13 -0.00/L2 -0.00/L11

40

1(HYD) -0.00 -0.00 0.00 0.00 0.00 0.00

2(OPE) -0.04 1.04 2.59 -0.00 -0.00 -0.00

3(OPE) -0.01 0.29 0.72 0.00 -0.00 -0.00

4(SUS) -0.00 -0.00 0.00 0.00 0.00 0.00

5(OPE) -0.01 0.29 0.72 0.00 -0.00 -0.00

6(OPE) -0.01 0.29 0.72 0.00 -0.00 -0.00

7(OPE) -0.01 0.29 0.72 0.00 -0.00 -0.00

8(OPE) -0.01 0.29 0.72 0.00 -0.00 -0.00

9(OPE) -0.01 0.29 0.72 0.00 -0.00 -0.00

10(OPE) -0.01 0.29 0.72 0.00 -0.00 -0.00

11(OPE) -0.01 0.29 0.72 0.00 -0.00 -0.00

12(OPE) -0.01 0.29 0.72 0.00 -0.00 0.00

13(OPE) -0.01 0.29 0.73 0.00 -0.00 -0.00

14(OPE) -0.01 0.29 0.72 0.00 -0.00 -0.00

MAX -0.04/L2 1.04/L2 2.59/L2 0.00/L13 -0.00/L2 -0.00/L11

50

1(HYD) 0.00 -0.00 0.00 0.00 0.00 0.00

2(OPE) -0.04 0.87 2.60 -0.00 -0.00 -0.00

3(OPE) -0.01 0.21 0.72 0.00 -0.00 -0.00

4(SUS) 0.00 -0.00 0.00 0.00 0.00 0.00

5(OPE) -0.01 0.21 0.72 0.00 -0.00 -0.00

6(OPE) -0.01 0.21 0.72 0.00 -0.00 -0.00

7(OPE) -0.01 0.21 0.72 0.00 -0.00 -0.00

8(OPE) -0.01 0.21 0.72 0.00 -0.00 -0.00

9(OPE) -0.01 0.21 0.72 0.00 -0.00 -0.00

10(OPE) -0.01 0.21 0.72 0.00 -0.00 -0.00

11(OPE) -0.01 0.21 0.72 0.00 -0.00 -0.00

12(OPE) -0.01 0.21 0.72 0.00 -0.00 0.00

13(OPE) -0.01 0.21 0.72 0.00 -0.00 -0.00

14(OPE) -0.01 0.21 0.72 0.00 -0.00 -0.00

MAX -0.04/L2 0.87/L2 2.60/L2 0.00/L13 -0.00/L2 -0.00/L11

Page 58: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

45

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

60

1(HYD) 0.00 -0.00 0.00 0.00 0.00 0.00

2(OPE) -0.04 0.77 2.60 -0.00 -0.00 -0.00

3(OPE) -0.01 0.17 0.72 0.00 -0.00 -0.00

4(SUS) 0.00 -0.00 0.00 0.00 0.00 0.00

5(OPE) -0.01 0.17 0.72 0.00 -0.00 0.00

6(OPE) -0.01 0.17 0.72 0.00 -0.00 -0.00

7(OPE) -0.01 0.17 0.72 0.00 -0.00 -0.00

8(OPE) -0.01 0.17 0.72 0.00 -0.00 -0.00

9(OPE) -0.01 0.17 0.72 0.00 -0.00 -0.00

10(OPE) -0.01 0.17 0.72 0.00 -0.00 -0.00

11(OPE) -0.01 0.17 0.72 0.00 -0.00 -0.00

12(OPE) -0.01 0.17 0.72 0.00 -0.00 0.00

13(OPE) -0.01 0.17 0.72 0.00 -0.00 -0.00

14(OPE) -0.01 0.17 0.72 0.00 -0.00 -0.00

MAX -0.04/L2 0.77/L2 2.60/L2 0.00/L13 -0.00/L2 -0.00/L11

70

1(HYD) 0.00 -0.00 0.00 0.00 0.00 0.00

2(OPE) -0.04 0.74 2.60 -0.00 -0.00 -0.00

3(OPE) -0.01 0.15 0.72 0.00 -0.00 -0.00

4(SUS) 0.00 -0.00 0.00 0.00 0.00 0.00

5(OPE) -0.01 0.15 0.72 0.00 -0.00 0.00

6(OPE) -0.01 0.15 0.72 0.00 -0.00 -0.00

7(OPE) -0.01 0.15 0.72 0.00 -0.00 -0.00

8(OPE) -0.01 0.15 0.72 0.00 -0.00 -0.00

9(OPE) -0.01 0.15 0.72 0.00 -0.00 -0.00

10(OPE) -0.01 0.15 0.72 0.00 -0.00 -0.00

11(OPE) -0.01 0.15 0.72 0.00 -0.00 -0.00

12(OPE) -0.00 0.15 0.72 0.00 -0.00 0.00

13(OPE) -0.01 0.15 0.72 0.00 -0.00 -0.00

14(OPE) -0.01 0.15 0.72 0.00 -0.00 -0.00

MAX -0.04/L2 0.74/L2 2.60/L2 0.00/L13 -0.00/L2 -0.00/L11

80

1(HYD) 0.00 -0.00 0.00 0.00 0.00 0.00

2(OPE) -0.04 0.73 2.60 -0.00 -0.00 -0.00

3(OPE) -0.01 0.15 0.72 0.00 -0.00 -0.00

4(SUS) 0.00 -0.00 0.00 0.00 0.00 0.00

5(OPE) -0.01 0.15 0.72 0.00 -0.00 0.00

6(OPE) -0.01 0.15 0.72 0.00 -0.00 -0.00

7(OPE) -0.01 0.15 0.72 0.00 -0.00 -0.00

8(OPE) -0.01 0.15 0.72 0.00 -0.00 -0.00

9(OPE) -0.01 0.15 0.72 0.00 -0.00 -0.00

10(OPE) -0.01 0.15 0.72 0.00 -0.00 -0.00

11(OPE) -0.01 0.15 0.72 0.00 -0.00 -0.00

12(OPE) -0.00 0.15 0.72 0.00 -0.00 0.00

13(OPE) -0.01 0.15 0.72 0.00 -0.00 -0.00

14(OPE) -0.01 0.15 0.72 0.00 -0.00 -0.00

MAX -0.04/L2 0.73/L2 2.60/L2 0.00/L13 -0.00/L2 -0.00/L11

Page 59: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

46

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

90

1(HYD) -0.00 0.00 0.00 0.00 0.00 0.00

2(OPE) -0.04 1.10 2.59 -0.00 -0.00 -0.00

3(OPE) -0.01 0.32 0.72 0.00 -0.00 -0.00

4(SUS) -0.00 -0.00 0.00 0.00 0.00 0.00

5(OPE) -0.01 0.32 0.72 0.00 -0.00 -0.00

6(OPE) -0.01 0.32 0.72 0.00 -0.00 -0.00

7(OPE) -0.01 0.32 0.72 0.00 -0.00 -0.00

8(OPE) -0.01 0.32 0.72 0.00 -0.00 -0.00

9(OPE) -0.01 0.32 0.72 0.00 -0.00 -0.00

10(OPE) -0.01 0.32 0.72 0.00 -0.00 -0.00

11(OPE) -0.01 0.32 0.72 0.00 -0.00 -0.00

12(OPE) -0.01 0.32 0.72 0.00 -0.00 0.00

13(OPE) -0.01 0.32 0.73 0.00 -0.00 -0.00

14(OPE) -0.01 0.32 0.72 0.00 -0.00 -0.00

MAX -0.04/L2 1.10/L2 2.59/L2 0.00/L13 -0.00/L2 -0.00/L11

100

1(HYD) -0.00 0.00 0.01 0.00 0.00 0.00

2(OPE) -0.04 1.16 2.59 -0.00 -0.00 -0.00

3(OPE) -0.01 0.34 0.72 0.00 -0.00 -0.00

4(SUS) -0.00 0.00 0.00 0.00 0.00 0.00

5(OPE) -0.01 0.34 0.72 0.00 -0.00 -0.00

6(OPE) -0.01 0.34 0.72 0.00 -0.00 -0.00

7(OPE) -0.01 0.34 0.72 0.00 -0.00 -0.00

8(OPE) -0.01 0.34 0.72 0.00 -0.00 -0.00

9(OPE) -0.01 0.34 0.72 0.00 -0.00 -0.00

10(OPE) -0.01 0.34 0.72 0.00 -0.00 -0.00

11(OPE) -0.01 0.34 0.72 0.00 -0.00 -0.00

12(OPE) -0.01 0.34 0.72 0.00 -0.00 0.00

13(OPE) -0.01 0.34 0.73 0.00 -0.00 -0.00

14(OPE) -0.01 0.34 0.72 0.00 -0.00 -0.00

MAX -0.04/L2 1.16/L2 2.59/L2 0.00/L13 -0.00/L2 -0.00/L11

110

1(HYD) -0.00 0.00 0.01 0.00 0.00 0.00

2(OPE) -0.04 1.21 2.59 -0.00 -0.00 -0.00

3(OPE) -0.01 0.36 0.72 0.00 -0.00 -0.00

4(SUS) -0.00 0.00 0.00 0.00 0.00 0.00

5(OPE) -0.01 0.36 0.72 0.00 -0.00 -0.00

6(OPE) -0.01 0.36 0.72 0.00 -0.00 -0.00

7(OPE) -0.01 0.36 0.72 0.00 -0.00 -0.00

8(OPE) -0.01 0.36 0.72 0.00 -0.00 -0.00

9(OPE) -0.01 0.36 0.72 0.00 -0.00 -0.00

10(OPE) -0.01 0.36 0.72 0.00 -0.00 -0.00

11(OPE) -0.01 0.36 0.72 0.00 -0.00 -0.00

12(OPE) -0.01 0.36 0.72 0.00 -0.00 0.00

13(OPE) -0.01 0.36 0.73 0.00 -0.00 -0.00

14(OPE) -0.01 0.37 0.72 0.00 -0.00 -0.00

MAX -0.04/L2 1.21/L2 2.59/L2 0.00/L13 -0.00/L2 -0.00/L11

Page 60: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

47

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

120

1(HYD) 0.00 0.00 0.00 0.00 0.00 -0.00

2(OPE) 0.06 1.10 2.60 -0.00 -0.00 -0.00

3(OPE) 0.04 0.32 0.73 0.00 -0.00 -0.00

4(SUS) -0.00 -0.00 0.00 0.00 0.00 -0.00

5(OPE) 0.04 0.32 0.73 0.00 -0.00 -0.00

6(OPE) 0.04 0.32 0.73 0.00 -0.00 -0.00

7(OPE) 0.04 0.32 0.73 0.00 -0.00 -0.00

8(OPE) 0.04 0.32 0.73 0.00 -0.00 -0.00

9(OPE) 0.04 0.32 0.73 0.00 -0.00 -0.00

10(OPE) 0.04 0.32 0.73 0.00 -0.00 -0.00

11(OPE) 0.03 0.31 0.73 0.00 -0.00 -0.00

12(OPE) 0.04 0.32 0.72 0.00 -0.00 -0.00

13(OPE) 0.04 0.31 0.73 0.00 -0.00 -0.00

14(OPE) 0.04 0.32 0.72 0.00 -0.00 -0.00

MAX 0.06/L2 1.10/L2 2.60/L2 0.00/L13 -0.00/L2 -0.00/L11

130

1(HYD) 0.00 0.00 0.00 0.00 0.00 -0.00

2(OPE) 0.09 1.10 2.61 -0.00 -0.00 -0.00

3(OPE) 0.05 0.31 0.73 0.00 -0.00 -0.00

4(SUS) -0.00 -0.00 0.00 0.00 0.00 -0.00

5(OPE) 0.05 0.31 0.73 0.00 -0.00 -0.00

6(OPE) 0.05 0.31 0.73 0.00 -0.00 -0.00

7(OPE) 0.05 0.31 0.73 0.00 -0.00 -0.00

8(OPE) 0.05 0.31 0.73 0.00 -0.00 -0.00

9(OPE) 0.05 0.31 0.73 0.00 -0.00 -0.00

10(OPE) 0.05 0.31 0.73 0.00 -0.00 -0.00

11(OPE) 0.05 0.31 0.73 0.00 -0.00 -0.00

12(OPE) 0.05 0.32 0.73 0.00 -0.00 -0.00

13(OPE) 0.05 0.31 0.73 0.00 -0.00 -0.00

14(OPE) 0.05 0.32 0.72 0.00 -0.00 -0.00

MAX 0.09/L2 1.10/L2 2.61/L2 0.00/L13 -0.00/L2 -0.00/L11

140

1(HYD) 0.00 0.00 0.00 0.00 0.00 -0.00

2(OPE) 0.10 1.10 2.61 -0.00 -0.00 -0.00

3(OPE) 0.06 0.31 0.73 0.00 -0.00 -0.00

4(SUS) -0.00 -0.00 0.00 0.00 0.00 -0.00

5(OPE) 0.06 0.31 0.73 0.00 -0.00 -0.00

6(OPE) 0.06 0.31 0.73 0.00 -0.00 -0.00

7(OPE) 0.06 0.31 0.73 0.00 -0.00 -0.00

8(OPE) 0.06 0.31 0.73 0.00 -0.00 -0.00

9(OPE) 0.06 0.31 0.73 0.00 -0.00 -0.00

10(OPE) 0.06 0.31 0.73 0.00 -0.00 -0.00

11(OPE) 0.06 0.31 0.73 0.00 -0.00 -0.00

12(OPE) 0.06 0.32 0.73 0.00 -0.00 -0.00

13(OPE) 0.06 0.31 0.73 0.00 -0.00 -0.00

14(OPE) 0.06 0.32 0.72 0.00 -0.00 -0.00

MAX 0.10/L2 1.10/L2 2.61/L2 0.00/L13 -0.00/L2 -0.00/L11

Page 61: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

48

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

150

1(HYD) -0.00 0.00 0.00 0.00 0.00 0.00

2(OPE) -0.01 0.96 0.88 -0.00 -0.00 -0.00

3(OPE) -0.00 0.25 0.24 0.00 -0.00 -0.00

4(SUS) -0.00 0.00 0.00 0.00 0.00 0.00

5(OPE) -0.00 0.25 0.24 0.00 -0.00 -0.00

6(OPE) -0.00 0.25 0.24 0.00 -0.00 -0.00

7(OPE) -0.00 0.25 0.24 0.00 -0.00 -0.00

8(OPE) -0.00 0.25 0.24 0.00 -0.00 -0.00

9(OPE) -0.00 0.25 0.24 0.00 -0.00 -0.00

10(OPE) -0.00 0.25 0.24 0.00 -0.00 -0.00

11(OPE) -0.00 0.25 0.24 0.00 -0.00 -0.00

12(OPE) -0.00 0.25 0.24 0.00 -0.00 0.00

13(OPE) -0.00 0.25 0.24 0.00 -0.00 -0.00

14(OPE) -0.00 0.25 0.23 0.00 -0.00 -0.00

MAX -0.01/L2 0.96/L2 0.88/L2 0.00/L13 -0.00/L2 -0.00/L11

160

1(HYD) -0.00 0.00 0.00 0.00 0.00 0.00

2(OPE) -0.01 1.91 0.88 -0.00 -0.00 -0.00

3(OPE) -0.00 0.51 0.24 0.00 -0.00 -0.00

4(SUS) -0.00 0.00 0.00 0.00 0.00 0.00

5(OPE) -0.00 0.51 0.24 0.00 -0.00 -0.00

6(OPE) -0.00 0.51 0.24 0.00 -0.00 -0.00

7(OPE) -0.00 0.51 0.24 0.00 -0.00 -0.00

8(OPE) -0.00 0.51 0.24 0.00 -0.00 -0.00

9(OPE) -0.00 0.51 0.24 0.00 -0.00 -0.00

10(OPE) -0.00 0.51 0.24 0.00 -0.00 -0.00

11(OPE) 0.00 0.51 0.24 0.00 -0.00 -0.00

12(OPE) -0.00 0.51 0.24 0.00 -0.00 0.00

13(OPE) -0.00 0.51 0.24 0.00 -0.00 -0.00

14(OPE) -0.00 0.51 0.23 0.00 -0.00 -0.00

MAX -0.01/L2 1.91/L2 0.88/L2 0.00/L13 -0.00/L2 -0.00/L11

170

1(HYD) -0.00 0.00 0.00 0.00 0.00 0.00

2(OPE) 0.00 0.95 -0.01 -0.00 -0.00 -0.00

3(OPE) 0.00 0.25 0.00 0.00 -0.00 -0.00

4(SUS) -0.00 0.00 0.00 0.00 0.00 0.00

5(OPE) 0.00 0.25 0.00 0.00 -0.00 -0.00

6(OPE) 0.00 0.25 0.00 0.00 -0.00 -0.00

7(OPE) 0.00 0.25 0.00 0.00 -0.00 -0.00

8(OPE) 0.00 0.25 0.00 0.00 -0.00 -0.00

9(OPE) 0.00 0.25 0.00 0.00 -0.00 -0.00

10(OPE) 0.00 0.25 0.00 0.00 -0.00 -0.00

11(OPE) 0.00 0.25 0.00 0.00 -0.00 -0.00

12(OPE) -0.00 0.25 0.00 0.00 -0.00 0.00

13(OPE) 0.00 0.25 0.00 0.00 -0.00 -0.00

14(OPE) 0.00 0.25 -0.00 0.00 -0.00 -0.00

MAX 0.00/L11 0.95/L2 -0.01/L2 -0.00/L2 -0.00/L2 -0.00/L11

Page 62: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

49

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

180

1(HYD) -0.00 -0.00 0.00 0.00 0.00 0.00

2(OPE) 0.00 -0.00 -0.00 -0.00 -0.00 -0.00

3(OPE) 0.00 -0.00 0.00 0.00 -0.00 -0.00

4(SUS) -0.00 0.00 0.00 0.00 0.00 0.00

5(OPE) 0.00 -0.00 0.00 0.00 -0.00 -0.00

6(OPE) 0.00 -0.00 0.00 0.00 -0.00 -0.00

7(OPE) 0.00 -0.00 0.00 0.00 -0.00 -0.00

8(OPE) 0.00 -0.00 0.00 0.00 -0.00 -0.00

9(OPE) 0.00 -0.00 0.00 0.00 -0.00 -0.00

10(OPE) 0.00 -0.00 0.00 0.00 -0.00 -0.00

11(OPE) 0.00 -0.00 0.00 0.00 -0.00 -0.00

12(OPE) -0.00 -0.00 0.00 0.00 -0.00 0.00

13(OPE) 0.00 -0.00 0.00 0.00 -0.00 -0.00

14(OPE) 0.00 -0.00 -0.00 0.00 -0.00 -0.00

MAX 0.00/L11 -0.00/L13 -0.00/L2 -0.00/L2 -0.00/L2 -0.00/L11

190

1(HYD) -0.00 0.00 -0.00 -0.00 0.00 0.00

2(OPE) 0.05 0.96 -4.28 -0.00 -0.00 -0.00

3(OPE) 0.01 0.25 -1.14 -0.00 -0.00 0.00

4(SUS) -0.00 0.00 -0.00 -0.00 0.00 0.00

5(OPE) 0.01 0.25 -1.14 -0.00 -0.00 0.00

6(OPE) 0.01 0.25 -1.14 -0.00 -0.00 0.00

7(OPE) 0.01 0.25 -1.14 -0.00 -0.00 0.00

8(OPE) 0.01 0.25 -1.14 -0.00 -0.00 0.00

9(OPE) 0.01 0.25 -1.14 -0.00 -0.00 0.00

10(OPE) 0.01 0.25 -1.14 -0.00 -0.00 0.00

11(OPE) 0.02 0.25 -1.14 -0.00 -0.00 -0.00

12(OPE) 0.00 0.25 -1.14 -0.00 -0.00 0.00

13(OPE) 0.01 0.25 -1.13 -0.00 -0.00 0.00

14(OPE) 0.01 0.25 -1.14 -0.00 -0.00 0.00

MAX 0.05/L2 0.96/L2 -4.28/L2 -0.00/L2 -0.00/L2 0.00/L12

200

1(HYD) -0.00 0.00 -0.00 -0.00 0.00 0.00

2(OPE) 0.05 1.91 -4.28 -0.00 -0.00 -0.00

3(OPE) 0.01 0.51 -1.14 -0.00 -0.00 0.00

4(SUS) -0.00 0.00 -0.00 -0.00 0.00 0.00

5(OPE) 0.01 0.51 -1.14 -0.00 -0.00 0.00

6(OPE) 0.01 0.51 -1.14 -0.00 -0.00 0.00

7(OPE) 0.01 0.51 -1.14 -0.00 -0.00 0.00

8(OPE) 0.01 0.51 -1.14 -0.00 -0.00 0.00

9(OPE) 0.01 0.51 -1.14 -0.00 -0.00 0.00

10(OPE) 0.01 0.51 -1.14 -0.00 -0.00 0.00

11(OPE) 0.02 0.51 -1.14 -0.00 -0.00 -0.00

12(OPE) 0.00 0.51 -1.14 -0.00 -0.00 0.00

13(OPE) 0.01 0.51 -1.13 -0.00 -0.00 0.00

14(OPE) 0.01 0.51 -1.14 -0.00 -0.00 0.00

MAX 0.05/L2 1.91/L2 -4.28/L2 -0.00/L2 -0.00/L2 0.00/L12

Page 63: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

50

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

210

1(HYD) -0.00 0.00 -0.01 -0.00 0.00 0.00

2(OPE) 0.12 0.95 -8.37 -0.00 -0.01 -0.00

3(OPE) 0.03 0.25 -2.22 -0.00 -0.00 0.00

4(SUS) -0.00 0.00 -0.00 -0.00 0.00 0.00

5(OPE) 0.03 0.25 -2.22 -0.00 -0.00 0.00

6(OPE) 0.02 0.25 -2.22 -0.00 -0.00 0.00

7(OPE) 0.03 0.25 -2.22 -0.00 -0.00 0.00

8(OPE) 0.03 0.25 -2.22 -0.00 -0.00 0.00

9(OPE) 0.03 0.25 -2.22 -0.00 -0.00 0.00

10(OPE) 0.03 0.25 -2.22 -0.00 -0.00 0.00

11(OPE) 0.04 0.25 -2.22 -0.00 -0.00 0.00

12(OPE) 0.01 0.25 -2.22 -0.00 -0.00 0.00

13(OPE) 0.03 0.25 -2.22 -0.00 -0.00 0.00

14(OPE) 0.03 0.25 -2.22 -0.00 -0.00 0.00

MAX 0.12/L2 0.95/L2 -8.37/L2 -0.00/L2 -0.01/L2 0.00/L12

220

1(HYD) -0.00 -0.00 -0.01 -0.00 0.00 0.00

2(OPE) 0.12 -0.00 -8.37 -0.00 -0.01 -0.00

3(OPE) 0.03 -0.00 -2.22 -0.00 -0.00 0.00

4(SUS) -0.00 0.00 -0.00 -0.00 0.00 0.00

5(OPE) 0.03 -0.00 -2.22 -0.00 -0.00 0.00

6(OPE) 0.02 -0.00 -2.22 -0.00 -0.00 0.00

7(OPE) 0.03 -0.00 -2.22 -0.00 -0.00 0.00

8(OPE) 0.03 -0.00 -2.22 -0.00 -0.00 0.00

9(OPE) 0.03 -0.00 -2.22 -0.00 -0.00 0.00

10(OPE) 0.03 -0.00 -2.22 -0.00 -0.00 0.00

11(OPE) 0.04 -0.00 -2.22 -0.00 -0.00 0.00

12(OPE) 0.01 -0.00 -2.22 -0.00 -0.00 0.00

13(OPE) 0.03 -0.00 -2.22 -0.00 -0.00 0.00

14(OPE) 0.03 -0.00 -2.22 -0.00 -0.00 0.00

MAX 0.12/L2 -0.00/L2 -8.37/L2 -0.00/L2 -0.01/L2 0.00/L12

230

1(HYD) -0.00 -0.00 -0.01 -0.00 0.00 0.00

2(OPE) 0.17 0.95 -10.43 -0.00 -0.01 -0.00

3(OPE) 0.04 0.25 -2.77 -0.00 -0.00 0.00

4(SUS) -0.00 -0.00 -0.00 -0.00 0.00 0.00

5(OPE) 0.04 0.25 -2.77 -0.00 -0.00 0.00

6(OPE) 0.03 0.25 -2.77 -0.00 -0.00 0.00

7(OPE) 0.04 0.25 -2.77 -0.00 -0.00 0.00

8(OPE) 0.04 0.25 -2.77 -0.00 -0.00 0.00

9(OPE) 0.04 0.25 -2.77 -0.00 -0.00 0.00

10(OPE) 0.04 0.25 -2.77 -0.00 -0.00 0.00

11(OPE) 0.06 0.25 -2.77 -0.00 -0.00 0.00

12(OPE) 0.02 0.25 -2.77 -0.00 -0.00 0.00

13(OPE) 0.04 0.25 -2.77 -0.00 -0.00 0.00

14(OPE) 0.04 0.25 -2.77 -0.00 -0.00 0.00

MAX 0.17/L2 0.95/L2 -10.43/L2 -0.00/L2 -0.01/L2 0.00/L12

Page 64: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

51

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

240

1(HYD) -0.00 0.00 -0.01 -0.00 0.00 0.00

2(OPE) 0.17 1.91 -10.44 -0.00 -0.01 -0.00

3(OPE) 0.04 0.50 -2.77 -0.00 -0.00 0.00

4(SUS) -0.00 -0.00 -0.00 -0.00 0.00 0.00

5(OPE) 0.04 0.50 -2.77 -0.00 -0.00 0.00

6(OPE) 0.03 0.50 -2.77 -0.00 -0.00 0.00

7(OPE) 0.04 0.50 -2.77 -0.00 -0.00 0.00

8(OPE) 0.04 0.50 -2.77 -0.00 -0.00 0.00

9(OPE) 0.04 0.50 -2.77 -0.00 -0.00 0.00

10(OPE) 0.04 0.50 -2.77 -0.00 -0.00 0.00

11(OPE) 0.06 0.50 -2.77 -0.00 -0.00 0.00

12(OPE) 0.02 0.50 -2.77 -0.00 -0.00 0.00

13(OPE) 0.04 0.50 -2.77 -0.00 -0.00 0.00

14(OPE) 0.04 0.50 -2.77 -0.00 -0.00 0.00

MAX 0.17/L2 1.91/L2 -10.44/L2 -0.00/L2 -0.01/L2 0.00/L12

250

1(HYD) -0.00 -0.00 -0.01 -0.00 0.00 0.00

2(OPE) 0.17 -0.01 -10.43 -0.00 -0.01 -0.00

3(OPE) 0.04 -0.00 -2.77 -0.00 -0.00 0.00

4(SUS) -0.00 -0.00 -0.00 -0.00 0.00 0.00

5(OPE) 0.04 -0.00 -2.77 -0.00 -0.00 0.00

6(OPE) 0.03 -0.00 -2.77 -0.00 -0.00 0.00

7(OPE) 0.04 -0.00 -2.77 -0.00 -0.00 0.00

8(OPE) 0.04 -0.00 -2.77 -0.00 -0.00 0.00

9(OPE) 0.04 -0.00 -2.77 -0.00 -0.00 0.00

10(OPE) 0.04 -0.00 -2.77 -0.00 -0.00 0.00

11(OPE) 0.06 -0.00 -2.77 -0.00 -0.00 0.00

12(OPE) 0.02 -0.00 -2.77 -0.00 -0.00 0.00

13(OPE) 0.04 -0.00 -2.77 -0.00 -0.00 0.00

14(OPE) 0.04 -0.00 -2.77 -0.00 -0.00 0.00

MAX 0.17/L2 -0.01/L2 -10.43/L2 -0.00/L2 -0.01/L2 0.00/L12

260

1(HYD) -0.00 -0.00 -0.01 -0.00 0.00 0.00

2(OPE) 0.19 0.95 -11.69 -0.00 -0.01 0.00

3(OPE) 0.04 0.25 -3.10 -0.00 -0.00 0.00

4(SUS) -0.00 -0.00 -0.00 -0.00 0.00 0.00

5(OPE) 0.05 0.25 -3.10 -0.00 -0.00 0.00

6(OPE) 0.04 0.25 -3.10 -0.00 -0.00 0.00

7(OPE) 0.04 0.25 -3.10 -0.00 -0.00 0.00

8(OPE) 0.04 0.25 -3.10 -0.00 -0.00 0.00

9(OPE) 0.04 0.25 -3.10 -0.00 -0.00 0.00

10(OPE) 0.05 0.25 -3.10 -0.00 -0.00 0.00

11(OPE) 0.07 0.25 -3.10 -0.00 -0.00 0.00

12(OPE) 0.02 0.25 -3.10 -0.00 -0.00 0.00

13(OPE) 0.04 0.25 -3.10 -0.00 -0.00 0.00

14(OPE) 0.05 0.25 -3.11 -0.00 -0.00 0.00

MAX 0.19/L2 0.95/L2 -11.69/L2 -0.00/L2 -0.01/L2 0.00/L12

Page 65: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

52

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

270

1(HYD) -0.00 0.00 0.00 0.00 0.00 0.00

2(OPE) -0.01 2.57 0.87 -0.00 -0.01 -0.00

3(OPE) -0.00 0.68 0.24 0.00 0.00 -0.00

4(SUS) -0.00 0.00 0.00 0.00 0.00 0.00

5(OPE) -0.00 0.68 0.24 0.00 0.00 -0.00

6(OPE) -0.00 0.68 0.24 0.00 0.00 -0.00

7(OPE) -0.00 0.68 0.24 0.00 0.00 -0.00

8(OPE) -0.00 0.68 0.24 0.00 0.00 -0.00

9(OPE) -0.00 0.68 0.24 0.00 0.00 -0.00

10(OPE) -0.00 0.68 0.24 0.00 0.00 0.00

11(OPE) 0.00 0.68 0.24 0.00 0.00 -0.00

12(OPE) -0.00 0.68 0.24 0.00 0.00 0.00

13(OPE) -0.00 0.68 0.24 0.00 0.00 -0.00

14(OPE) -0.00 0.68 0.23 -0.00 -0.00 0.00

MAX -0.01/L2 2.57/L2 0.87/L2 0.00/L13 -0.01/L2 0.00/L1

280

1(HYD) -0.01 0.00 0.00 0.00 0.00 0.00

2(OPE) -0.00 3.16 0.87 -0.00 -0.02 -0.00

3(OPE) 0.00 0.84 0.24 0.00 0.00 -0.00

4(SUS) -0.01 0.00 0.00 0.00 0.00 0.00

5(OPE) 0.00 0.84 0.24 0.00 0.00 0.00

6(OPE) 0.00 0.84 0.24 0.00 0.00 -0.00

7(OPE) 0.00 0.84 0.24 0.00 0.00 -0.00

8(OPE) 0.00 0.84 0.24 0.00 0.00 -0.00

9(OPE) 0.00 0.84 0.24 0.00 0.00 -0.00

10(OPE) -0.00 0.84 0.24 0.00 0.00 0.00

11(OPE) 0.00 0.84 0.24 0.00 0.00 -0.00

12(OPE) -0.00 0.84 0.24 0.00 0.00 0.00

13(OPE) 0.00 0.84 0.25 0.00 0.01 -0.00

14(OPE) -0.00 0.84 0.23 -0.00 -0.00 0.00

MAX -0.01/L1 3.16/L2 0.87/L2 0.00/L13 -0.02/L2 0.00/L1

290

1(HYD) -0.01 0.00 0.00 0.00 0.00 0.00

2(OPE) -0.00 3.61 0.87 -0.00 -0.02 -0.00

3(OPE) 0.00 0.96 0.24 0.00 0.00 -0.00

4(SUS) -0.01 0.00 0.00 0.00 0.00 0.00

5(OPE) 0.00 0.96 0.24 0.00 0.00 0.00

6(OPE) 0.00 0.96 0.24 0.00 0.00 -0.00

7(OPE) 0.00 0.96 0.24 0.00 0.00 -0.00

8(OPE) 0.00 0.96 0.25 0.00 0.00 -0.00

9(OPE) 0.00 0.96 0.25 0.00 0.00 -0.00

10(OPE) -0.00 0.96 0.24 0.00 0.00 0.00

11(OPE) 0.01 0.96 0.24 0.00 0.00 -0.00

12(OPE) -0.00 0.96 0.24 0.00 0.00 0.00

13(OPE) 0.00 0.96 0.25 0.00 0.01 -0.00

14(OPE) -0.00 0.96 0.23 -0.00 -0.00 0.00

MAX -0.01/L1 3.61/L2 0.87/L2 0.00/L13 -0.02/L2 0.00/L1

Page 66: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

53

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

291

1(HYD) -0.01 0.00 0.00 0.00 0.00 0.00

2(OPE) -0.00 3.61 0.87 -0.00 -0.02 -0.00

3(OPE) 0.00 0.96 0.24 0.00 0.00 -0.00

4(SUS) -0.01 0.00 0.00 0.00 0.00 0.00

5(OPE) 0.00 0.96 0.24 0.00 0.00 0.00

6(OPE) 0.00 0.96 0.24 0.00 0.00 -0.00

7(OPE) 0.00 0.96 0.24 0.00 0.00 -0.00

8(OPE) 0.00 0.96 0.25 0.00 0.00 -0.00

9(OPE) 0.00 0.96 0.25 0.00 0.00 -0.00

10(OPE) -0.00 0.96 0.24 0.00 0.00 0.00

11(OPE) 0.01 0.96 0.24 0.00 0.00 -0.00

12(OPE) -0.00 0.96 0.24 0.00 0.00 0.00

13(OPE) 0.00 0.96 0.25 0.00 0.01 -0.00

14(OPE) -0.00 0.96 0.23 -0.00 -0.00 0.00

MAX -0.01/L1 3.61/L2 0.87/L2 0.00/L13 -0.02/L2 0.00/L1

300

1(HYD) -0.00 0.00 0.00 0.00 0.00 0.00

2(OPE) 1.09 2.56 0.92 -0.00 -0.01 -0.00

3(OPE) 0.29 0.68 0.24 0.00 0.00 -0.00

4(SUS) -0.00 0.00 -0.00 0.00 0.00 -0.00

5(OPE) 0.29 0.68 0.24 0.00 0.00 -0.00

6(OPE) 0.29 0.68 0.23 0.00 0.00 -0.00

7(OPE) 0.29 0.68 0.24 0.00 0.00 -0.00

8(OPE) 0.29 0.68 0.23 0.00 0.00 -0.00

9(OPE) 0.29 0.68 0.23 0.00 0.00 -0.00

10(OPE) 0.29 0.68 0.24 0.00 0.00 -0.00

11(OPE) 0.29 0.67 0.24 0.00 0.00 -0.00

12(OPE) 0.29 0.68 0.23 0.00 0.00 -0.00

13(OPE) 0.29 0.67 0.23 0.00 0.00 -0.00

14(OPE) 0.29 0.68 0.24 -0.00 -0.00 -0.00

MAX 1.09/L2 2.56/L2 0.92/L2 0.00/L13 -0.01/L2 -0.00/L11

310

1(HYD) -0.00 0.00 0.00 0.00 0.00 0.00

2(OPE) 1.47 2.56 0.94 -0.00 -0.01 -0.00

3(OPE) 0.39 0.67 0.23 0.00 0.00 -0.00

4(SUS) -0.00 0.00 -0.00 0.00 0.00 -0.00

5(OPE) 0.39 0.67 0.24 0.00 0.00 -0.00

6(OPE) 0.39 0.67 0.23 0.00 0.00 -0.00

7(OPE) 0.39 0.67 0.24 0.00 0.00 -0.00

8(OPE) 0.39 0.67 0.23 0.00 0.00 -0.00

9(OPE) 0.39 0.67 0.23 0.00 0.00 -0.00

10(OPE) 0.39 0.68 0.24 0.00 0.00 -0.00

11(OPE) 0.39 0.67 0.24 0.00 0.00 -0.00

12(OPE) 0.39 0.68 0.23 0.00 0.00 -0.00

13(OPE) 0.39 0.67 0.23 0.00 0.00 -0.00

14(OPE) 0.39 0.68 0.24 -0.00 -0.00 -0.00

MAX 1.47/L2 2.56/L2 0.94/L2 0.00/L13 -0.01/L2 -0.00/L11

Page 67: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

54

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

320

1(HYD) -0.00 0.00 0.00 0.00 0.00 0.00

2(OPE) 1.61 2.56 0.94 -0.00 -0.01 -0.00

3(OPE) 0.43 0.67 0.23 0.00 0.00 -0.00

4(SUS) -0.00 0.00 -0.00 0.00 0.00 -0.00

5(OPE) 0.43 0.67 0.24 0.00 0.00 -0.00

6(OPE) 0.43 0.67 0.23 0.00 0.00 -0.00

7(OPE) 0.43 0.67 0.23 0.00 0.00 -0.00

8(OPE) 0.43 0.67 0.23 0.00 0.00 -0.00

9(OPE) 0.43 0.67 0.23 0.00 0.00 -0.00

10(OPE) 0.43 0.67 0.24 0.00 0.00 -0.00

11(OPE) 0.43 0.67 0.24 0.00 0.00 -0.00

12(OPE) 0.43 0.67 0.23 0.00 0.00 -0.00

13(OPE) 0.43 0.67 0.23 0.00 0.00 -0.00

14(OPE) 0.43 0.67 0.24 -0.00 -0.00 -0.00

MAX 1.61/L2 2.56/L2 0.94/L2 0.00/L13 -0.01/L2 -0.00/L11

330

1(HYD) -0.00 0.00 -0.00 -0.00 0.00 0.00

2(OPE) 0.05 3.03 -4.28 -0.00 -0.00 -0.00

3(OPE) 0.01 0.80 -1.14 -0.00 -0.00 0.00

4(SUS) -0.00 0.00 -0.00 -0.00 0.00 0.00

5(OPE) 0.01 0.80 -1.14 -0.00 -0.00 -0.00

6(OPE) 0.01 0.80 -1.14 -0.00 -0.00 0.00

7(OPE) 0.01 0.80 -1.14 -0.00 -0.00 0.00

8(OPE) 0.01 0.80 -1.14 -0.00 -0.00 0.00

9(OPE) 0.01 0.80 -1.14 0.00 -0.00 0.00

10(OPE) 0.01 0.80 -1.14 -0.00 -0.00 0.00

11(OPE) 0.02 0.80 -1.14 -0.00 -0.00 -0.00

12(OPE) 0.00 0.80 -1.14 -0.00 -0.00 0.00

13(OPE) 0.01 0.80 -1.13 0.00 -0.00 0.00

14(OPE) 0.01 0.80 -1.14 -0.00 -0.00 0.00

MAX 0.05/L2 3.03/L2 -4.28/L2 -0.00/L14 -0.00/L2 0.00/L12

340

1(HYD) -0.00 0.00 -0.00 -0.00 0.00 0.00

2(OPE) 0.05 3.40 -4.28 -0.00 -0.00 -0.00

3(OPE) 0.01 0.90 -1.14 -0.00 -0.00 0.00

4(SUS) -0.00 0.00 -0.00 -0.00 0.00 0.00

5(OPE) 0.01 0.90 -1.14 -0.00 -0.00 -0.00

6(OPE) 0.01 0.90 -1.14 -0.00 -0.00 0.00

7(OPE) 0.01 0.90 -1.14 -0.00 -0.00 0.00

8(OPE) 0.01 0.90 -1.14 -0.00 -0.00 0.00

9(OPE) 0.01 0.90 -1.14 0.00 -0.00 0.00

10(OPE) 0.01 0.90 -1.14 -0.00 -0.00 0.00

11(OPE) 0.02 0.91 -1.14 -0.00 -0.00 -0.00

12(OPE) 0.00 0.90 -1.14 -0.00 -0.00 0.00

13(OPE) 0.01 0.91 -1.13 0.00 -0.00 0.00

14(OPE) 0.01 0.90 -1.14 -0.00 -0.00 0.00

MAX 0.05/L2 3.40/L2 -4.28/L2 -0.00/L14 -0.00/L2 0.00/L12

Page 68: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

55

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

350

1(HYD) -0.00 0.00 -0.00 -0.00 0.00 0.00

2(OPE) 0.05 3.54 -4.28 -0.00 -0.00 -0.00

3(OPE) 0.01 0.94 -1.14 -0.00 -0.00 0.00

4(SUS) -0.00 0.00 -0.00 -0.00 0.00 0.00

5(OPE) 0.01 0.94 -1.14 -0.00 -0.00 -0.00

6(OPE) 0.01 0.94 -1.14 -0.00 -0.00 0.00

7(OPE) 0.01 0.94 -1.14 -0.00 -0.00 0.00

8(OPE) 0.01 0.94 -1.14 -0.00 -0.00 0.00

9(OPE) 0.01 0.94 -1.14 0.00 -0.00 0.00

10(OPE) 0.01 0.94 -1.14 -0.00 -0.00 0.00

11(OPE) 0.02 0.94 -1.14 -0.00 -0.00 -0.00

12(OPE) 0.00 0.94 -1.14 -0.00 -0.00 0.00

13(OPE) 0.01 0.94 -1.13 0.00 -0.00 0.00

14(OPE) 0.01 0.94 -1.14 -0.00 -0.00 0.00

MAX 0.05/L2 3.54/L2 -4.28/L2 -0.00/L14 -0.00/L2 0.00/L12

360

1(HYD) -0.00 0.00 -0.01 -0.00 0.00 -0.00

2(OPE) 0.17 2.83 -10.44 -0.00 -0.01 -0.00

3(OPE) 0.04 0.75 -2.77 -0.00 -0.00 -0.00

4(SUS) -0.00 -0.00 -0.00 -0.00 0.00 -0.00

5(OPE) 0.04 0.75 -2.77 -0.00 -0.00 -0.00

6(OPE) 0.03 0.75 -2.77 -0.00 -0.00 -0.00

7(OPE) 0.04 0.75 -2.77 -0.00 -0.00 -0.00

8(OPE) 0.04 0.75 -2.77 -0.00 -0.00 -0.00

9(OPE) 0.04 0.75 -2.77 -0.00 -0.00 -0.00

10(OPE) 0.04 0.75 -2.77 -0.00 -0.00 -0.00

11(OPE) 0.06 0.75 -2.77 -0.00 -0.00 -0.00

12(OPE) 0.02 0.75 -2.77 -0.00 -0.00 -0.00

13(OPE) 0.04 0.75 -2.77 -0.00 -0.00 -0.00

14(OPE) 0.04 0.75 -2.78 -0.00 -0.00 -0.00

MAX 0.17/L2 2.83/L2 -10.44/L2 -0.00/L14 -0.01/L2 -0.00/L11

370

1(HYD) -0.00 0.00 -0.01 -0.00 0.00 -0.00

2(OPE) 0.17 3.34 -10.44 -0.00 -0.01 -0.00

3(OPE) 0.04 0.88 -2.77 -0.00 -0.00 -0.00

4(SUS) -0.00 -0.00 -0.00 -0.00 0.00 -0.00

5(OPE) 0.04 0.88 -2.77 -0.00 -0.00 -0.00

6(OPE) 0.03 0.89 -2.77 -0.00 -0.00 -0.00

7(OPE) 0.04 0.89 -2.77 -0.00 -0.00 -0.00

8(OPE) 0.04 0.88 -2.77 -0.00 -0.00 -0.00

9(OPE) 0.04 0.88 -2.77 -0.00 -0.00 -0.00

10(OPE) 0.04 0.88 -2.77 -0.00 -0.00 -0.00

11(OPE) 0.06 0.88 -2.77 -0.00 -0.00 -0.00

12(OPE) 0.02 0.89 -2.77 -0.00 -0.00 -0.00

13(OPE) 0.04 0.89 -2.77 -0.00 -0.00 -0.00

14(OPE) 0.04 0.88 -2.78 -0.00 -0.00 -0.00

MAX 0.17/L2 3.34/L2 -10.44/L2 -0.00/L14 -0.01/L2 -0.00/L11

Page 69: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

56

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

380

1(HYD) -0.00 0.00 -0.01 -0.00 0.00 -0.00

2(OPE) 0.17 3.75 -10.44 -0.00 -0.01 -0.00

3(OPE) 0.04 0.99 -2.77 -0.00 -0.00 -0.00

4(SUS) -0.00 -0.00 -0.00 -0.00 0.00 -0.00

5(OPE) 0.04 0.99 -2.77 -0.00 -0.00 -0.00

6(OPE) 0.03 0.99 -2.77 -0.00 -0.00 -0.00

7(OPE) 0.04 0.99 -2.77 -0.00 -0.00 -0.00

8(OPE) 0.04 0.99 -2.77 -0.00 -0.00 -0.00

9(OPE) 0.04 0.99 -2.77 -0.00 -0.00 -0.00

10(OPE) 0.04 0.99 -2.77 -0.00 -0.00 -0.00

11(OPE) 0.06 0.99 -2.77 -0.00 -0.00 -0.00

12(OPE) 0.02 0.99 -2.77 -0.00 -0.00 -0.00

13(OPE) 0.04 0.99 -2.77 -0.00 -0.00 -0.00

14(OPE) 0.04 0.99 -2.78 -0.00 -0.00 -0.00

MAX 0.17/L2 3.75/L2 -10.44/L2 -0.00/L14 -0.01/L2 -0.00/L11

390

1(HYD) -0.00 -0.00 -0.01 -0.00 0.00 -0.00

2(OPE) 1.26 2.83 -10.41 -0.00 -0.01 -0.00

3(OPE) 0.33 0.75 -2.77 -0.00 -0.00 -0.00

4(SUS) -0.00 -0.01 -0.00 -0.00 0.00 -0.00

5(OPE) 0.34 0.74 -2.77 -0.00 -0.00 -0.00

6(OPE) 0.32 0.75 -2.77 -0.00 -0.00 -0.00

7(OPE) 0.33 0.75 -2.77 -0.00 -0.00 -0.00

8(OPE) 0.33 0.74 -2.77 -0.00 -0.00 -0.00

9(OPE) 0.33 0.75 -2.77 -0.00 -0.00 -0.00

10(OPE) 0.33 0.75 -2.77 -0.00 -0.00 -0.00

11(OPE) 0.35 0.74 -2.77 -0.00 -0.00 -0.00

12(OPE) 0.31 0.75 -2.77 -0.00 -0.00 -0.00

13(OPE) 0.33 0.75 -2.76 -0.00 -0.00 -0.00

14(OPE) 0.33 0.75 -2.77 -0.00 -0.00 -0.00

MAX 1.26/L2 2.83/L2 -10.41/L2 -0.00/L14 -0.01/L2 -0.00/L11

400

1(HYD) -0.00 -0.00 -0.01 -0.00 0.00 -0.00

2(OPE) 1.64 2.82 -10.41 -0.00 -0.01 -0.00

3(OPE) 0.43 0.74 -2.77 -0.00 -0.00 -0.00

4(SUS) -0.00 -0.01 -0.00 -0.00 0.00 -0.00

5(OPE) 0.44 0.74 -2.76 -0.00 -0.00 -0.00

6(OPE) 0.42 0.74 -2.77 -0.00 -0.00 -0.00

7(OPE) 0.43 0.74 -2.77 -0.00 -0.00 -0.00

8(OPE) 0.43 0.74 -2.77 -0.00 -0.00 -0.00

9(OPE) 0.43 0.74 -2.77 -0.00 -0.00 -0.00

10(OPE) 0.43 0.74 -2.77 -0.00 -0.00 -0.00

11(OPE) 0.45 0.74 -2.76 -0.00 -0.00 -0.00

12(OPE) 0.41 0.74 -2.77 -0.00 -0.00 -0.00

13(OPE) 0.43 0.74 -2.76 -0.00 -0.00 -0.00

14(OPE) 0.43 0.74 -2.77 -0.00 -0.00 -0.00

MAX 1.64/L2 2.82/L2 -10.41/L2 -0.00/L14 -0.01/L2 -0.00/L11

Page 70: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

57

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

410

1(HYD) -0.00 -0.01 -0.01 -0.00 0.00 -0.00

2(OPE) 1.78 2.82 -10.40 -0.00 -0.01 -0.00

3(OPE) 0.47 0.74 -2.77 -0.00 -0.00 -0.00

4(SUS) -0.00 -0.01 -0.00 -0.00 0.00 -0.00

5(OPE) 0.47 0.74 -2.76 -0.00 -0.00 -0.00

6(OPE) 0.46 0.74 -2.77 -0.00 -0.00 -0.00

7(OPE) 0.47 0.74 -2.77 -0.00 -0.00 -0.00

8(OPE) 0.47 0.74 -2.77 -0.00 -0.00 -0.00

9(OPE) 0.47 0.74 -2.76 -0.00 -0.00 -0.00

10(OPE) 0.47 0.74 -2.77 -0.00 -0.00 -0.00

11(OPE) 0.49 0.74 -2.76 -0.00 -0.00 -0.00

12(OPE) 0.45 0.74 -2.77 -0.00 -0.00 -0.00

13(OPE) 0.47 0.74 -2.76 -0.00 -0.00 -0.00

14(OPE) 0.47 0.74 -2.77 -0.00 -0.00 -0.00

MAX 1.78/L2 2.82/L2 -10.40/L2 -0.00/L14 -0.01/L2 -0.00/L11

420

1(HYD) -0.00 -0.00 -0.01 -0.00 0.00 0.00

2(OPE) 0.17 -1.12 -10.43 -0.00 -0.01 -0.00

3(OPE) 0.04 -0.30 -2.77 -0.00 -0.00 0.00

4(SUS) -0.00 -0.00 0.00 -0.00 0.00 0.00

5(OPE) 0.05 -0.30 -2.77 -0.00 -0.00 0.00

6(OPE) 0.03 -0.30 -2.77 -0.00 -0.00 0.00

7(OPE) 0.04 -0.30 -2.77 -0.00 -0.00 0.00

8(OPE) 0.04 -0.30 -2.77 -0.00 -0.00 0.00

9(OPE) 0.04 -0.30 -2.77 -0.00 -0.00 0.00

10(OPE) 0.04 -0.30 -2.77 -0.00 -0.00 0.00

11(OPE) 0.06 -0.30 -2.77 -0.00 -0.00 0.00

12(OPE) 0.02 -0.30 -2.77 -0.00 -0.00 0.00

13(OPE) 0.04 -0.30 -2.77 -0.00 -0.00 0.00

14(OPE) 0.04 -0.30 -2.77 -0.00 -0.00 0.00

MAX 0.17/L2 -1.12/L2 -10.43/L2 -0.00/L2 -0.01/L2 0.00/L5

430

1(HYD) -0.00 -0.00 -0.01 -0.00 0.00 0.00

2(OPE) 0.17 -1.50 -10.43 -0.00 -0.01 -0.00

3(OPE) 0.04 -0.40 -2.77 -0.00 -0.00 0.00

4(SUS) -0.00 -0.00 0.00 -0.00 0.00 0.00

5(OPE) 0.05 -0.40 -2.77 -0.00 -0.00 0.00

6(OPE) 0.03 -0.40 -2.77 -0.00 -0.00 0.00

7(OPE) 0.04 -0.40 -2.77 -0.00 -0.00 0.00

8(OPE) 0.04 -0.40 -2.77 -0.00 -0.00 0.00

9(OPE) 0.04 -0.40 -2.77 -0.00 -0.00 0.00

10(OPE) 0.04 -0.40 -2.77 -0.00 -0.00 0.00

11(OPE) 0.06 -0.40 -2.77 -0.00 -0.00 0.00

12(OPE) 0.02 -0.40 -2.77 -0.00 -0.00 0.00

13(OPE) 0.04 -0.40 -2.77 -0.00 -0.00 0.00

14(OPE) 0.04 -0.40 -2.77 -0.00 -0.00 0.00

MAX 0.17/L2 -1.50/L2 -10.43/L2 -0.00/L2 -0.01/L2 0.00/L5

Page 71: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

58

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

440

1(HYD) -0.00 -0.00 -0.01 -0.00 0.00 0.00

2(OPE) 0.17 -1.64 -10.43 -0.00 -0.01 -0.00

3(OPE) 0.04 -0.44 -2.77 -0.00 -0.00 0.00

4(SUS) -0.00 -0.00 0.00 -0.00 0.00 0.00

5(OPE) 0.05 -0.44 -2.77 -0.00 -0.00 0.00

6(OPE) 0.03 -0.44 -2.77 -0.00 -0.00 0.00

7(OPE) 0.04 -0.44 -2.77 -0.00 -0.00 0.00

8(OPE) 0.04 -0.44 -2.77 -0.00 -0.00 0.00

9(OPE) 0.04 -0.44 -2.77 -0.00 -0.00 0.00

10(OPE) 0.04 -0.44 -2.77 -0.00 -0.00 0.00

11(OPE) 0.06 -0.44 -2.77 -0.00 -0.00 0.00

12(OPE) 0.02 -0.44 -2.77 -0.00 -0.00 0.00

13(OPE) 0.04 -0.44 -2.77 -0.00 -0.00 0.00

14(OPE) 0.04 -0.44 -2.77 -0.00 -0.00 0.00

MAX 0.17/L2 -1.64/L2 -10.43/L2 -0.00/L2 -0.01/L2 0.00/L5

450

1(HYD) -0.00 -0.00 -0.01 -0.00 0.00 0.00

2(OPE) 0.24 0.94 -11.86 -0.00 -0.01 0.00

3(OPE) 0.05 0.25 -3.18 -0.00 -0.00 0.00

4(SUS) -0.00 -0.00 -0.00 -0.00 0.00 0.00

5(OPE) 0.06 0.24 -3.18 -0.00 -0.00 0.00

6(OPE) 0.05 0.25 -3.18 -0.00 -0.00 0.00

7(OPE) 0.05 0.25 -3.18 -0.00 -0.00 0.00

8(OPE) 0.05 0.24 -3.18 -0.00 -0.00 0.00

9(OPE) 0.05 0.24 -3.18 -0.00 -0.00 0.00

10(OPE) 0.06 0.25 -3.18 -0.00 -0.00 0.00

11(OPE) 0.08 0.24 -3.18 -0.00 -0.00 0.00

12(OPE) 0.03 0.25 -3.18 -0.00 -0.00 0.00

13(OPE) 0.05 0.25 -3.18 -0.00 -0.00 0.00

14(OPE) 0.06 0.24 -3.18 -0.00 -0.00 0.00

MAX 0.24/L2 0.94/L2 -11.86/L2 -0.00/L2 -0.01/L2 0.00/L5

460

1(HYD) -0.00 -0.01 -0.01 -0.00 0.00 0.00

2(OPE) 0.29 0.94 -12.05 -0.00 -0.01 0.00

3(OPE) 0.07 0.24 -3.27 -0.00 -0.00 0.00

4(SUS) -0.01 -0.00 -0.00 -0.00 0.00 0.00

5(OPE) 0.08 0.24 -3.27 -0.00 -0.00 0.00

6(OPE) 0.06 0.24 -3.27 -0.00 -0.00 0.00

7(OPE) 0.07 0.24 -3.27 -0.00 -0.00 0.00

8(OPE) 0.07 0.24 -3.27 -0.00 -0.00 0.00

9(OPE) 0.06 0.24 -3.27 -0.00 -0.00 0.00

10(OPE) 0.07 0.24 -3.27 -0.00 -0.00 0.00

11(OPE) 0.10 0.24 -3.27 -0.00 -0.00 0.00

12(OPE) 0.04 0.24 -3.27 -0.00 -0.00 0.00

13(OPE) 0.06 0.24 -3.27 -0.00 -0.00 0.00

14(OPE) 0.07 0.24 -3.27 -0.00 -0.00 0.00

MAX 0.29/L2 0.94/L2 -12.05/L2 -0.00/L2 -0.01/L2 0.00/L5

Page 72: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

59

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

470

1(HYD) -0.00 -0.00 -0.01 -0.00 0.00 0.00

2(OPE) 0.24 1.03 -11.86 -0.00 -0.01 0.00

3(OPE) 0.05 0.28 -3.18 -0.00 -0.00 0.00

4(SUS) -0.01 -0.00 -0.00 -0.00 0.00 0.00

5(OPE) 0.06 0.28 -3.18 -0.00 -0.00 0.00

6(OPE) 0.05 0.28 -3.18 -0.00 -0.00 0.00

7(OPE) 0.05 0.28 -3.18 -0.00 -0.00 0.00

8(OPE) 0.05 0.28 -3.18 -0.00 -0.00 0.00

9(OPE) 0.05 0.28 -3.18 -0.00 -0.00 0.00

10(OPE) 0.06 0.28 -3.18 -0.00 -0.00 0.00

11(OPE) 0.08 0.28 -3.18 -0.00 -0.00 0.00

12(OPE) 0.03 0.28 -3.18 -0.00 -0.00 0.00

13(OPE) 0.05 0.28 -3.18 -0.00 -0.00 0.00

14(OPE) 0.06 0.28 -3.18 -0.00 -0.00 0.00

MAX 0.24/L2 1.03/L2 -11.86/L2 -0.00/L2 -0.01/L2 0.00/L5

480

1(HYD) -0.00 -0.00 -0.01 -0.00 0.00 0.00

2(OPE) 0.24 0.86 -11.85 -0.00 -0.01 0.00

3(OPE) 0.05 0.21 -3.18 -0.00 -0.00 0.00

4(SUS) -0.00 -0.00 -0.00 -0.00 0.00 0.00

5(OPE) 0.06 0.21 -3.18 -0.00 -0.00 0.00

6(OPE) 0.05 0.21 -3.18 -0.00 -0.00 0.00

7(OPE) 0.06 0.21 -3.18 -0.00 -0.00 0.00

8(OPE) 0.05 0.21 -3.18 -0.00 -0.00 0.00

9(OPE) 0.05 0.21 -3.18 -0.00 -0.00 0.00

10(OPE) 0.06 0.21 -3.18 -0.00 -0.00 0.00

11(OPE) 0.08 0.21 -3.18 -0.00 -0.00 0.00

12(OPE) 0.03 0.21 -3.18 -0.00 -0.00 0.00

13(OPE) 0.05 0.21 -3.18 -0.00 -0.00 0.00

14(OPE) 0.06 0.21 -3.18 -0.00 -0.00 0.00

MAX 0.24/L2 0.86/L2 -11.85/L2 -0.00/L2 -0.01/L2 0.00/L5

483

1(HYD) -0.00 -0.01 -0.01 -0.00 0.00 0.00

2(OPE) 0.24 0.80 -11.85 -0.01 -0.03 0.00

3(OPE) 0.06 0.18 -3.18 -0.00 -0.01 0.00

4(SUS) -0.00 -0.00 -0.00 -0.00 0.00 0.00

5(OPE) 0.06 0.18 -3.18 -0.00 -0.01 0.00

6(OPE) 0.05 0.18 -3.18 -0.00 -0.01 0.00

7(OPE) 0.06 0.18 -3.18 -0.00 -0.01 0.00

8(OPE) 0.06 0.18 -3.18 -0.00 -0.01 0.00

9(OPE) 0.05 0.18 -3.18 -0.00 -0.01 0.00

10(OPE) 0.06 0.18 -3.18 -0.00 -0.01 0.00

11(OPE) 0.08 0.18 -3.18 -0.00 -0.01 0.00

12(OPE) 0.03 0.18 -3.18 -0.00 -0.01 0.00

13(OPE) 0.05 0.18 -3.18 -0.00 -0.01 0.00

14(OPE) 0.06 0.18 -3.18 -0.00 -0.01 0.00

MAX 0.24/L2 0.80/L2 -11.85/L2 -0.01/L2 -0.03/L2 0.00/L11

Page 73: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

60

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

484

1(HYD) 0.00 -0.01 -0.01 -0.00 0.00 0.00

2(OPE) 0.20 0.72 -11.84 -0.04 -0.06 -0.00

3(OPE) 0.05 0.14 -3.17 -0.01 -0.01 0.00

4(SUS) 0.00 -0.01 0.00 -0.00 0.00 0.00

5(OPE) 0.06 0.14 -3.17 -0.01 -0.01 0.00

6(OPE) 0.04 0.14 -3.17 -0.01 -0.01 0.00

7(OPE) 0.05 0.14 -3.17 -0.01 -0.01 0.00

8(OPE) 0.05 0.14 -3.17 -0.01 -0.01 0.00

9(OPE) 0.04 0.14 -3.17 -0.01 -0.01 0.00

10(OPE) 0.05 0.14 -3.18 -0.01 -0.01 0.00

11(OPE) 0.07 0.14 -3.17 -0.01 -0.01 0.00

12(OPE) 0.02 0.14 -3.17 -0.01 -0.01 0.00

13(OPE) 0.04 0.14 -3.17 -0.01 -0.01 0.00

14(OPE) 0.05 0.14 -3.18 -0.01 -0.01 0.00

MAX 0.20/L2 0.72/L2 -11.84/L2 -0.04/L2 -0.06/L2 0.00/L11

485

1(HYD) 0.00 -0.02 -0.01 -0.00 -0.00 0.00

2(OPE) 0.11 0.69 -12.05 -0.05 -0.12 -0.01

3(OPE) 0.01 0.11 -3.22 -0.01 -0.03 0.00

4(SUS) 0.00 -0.02 0.00 -0.00 0.00 0.00

5(OPE) 0.02 0.11 -3.22 -0.01 -0.03 0.00

6(OPE) 0.00 0.11 -3.22 -0.01 -0.03 0.00

7(OPE) 0.01 0.11 -3.22 -0.01 -0.03 0.00

8(OPE) 0.01 0.11 -3.22 -0.01 -0.03 0.00

9(OPE) 0.01 0.11 -3.22 -0.01 -0.03 0.00

10(OPE) 0.01 0.11 -3.22 -0.01 -0.03 0.00

11(OPE) 0.04 0.11 -3.22 -0.01 -0.03 0.00

12(OPE) -0.02 0.12 -3.22 -0.01 -0.03 0.00

13(OPE) 0.01 0.11 -3.21 -0.01 -0.02 0.00

14(OPE) 0.01 0.11 -3.22 -0.01 -0.03 0.00

MAX 0.11/L2 0.69/L2 -12.05/L2 -0.05/L2 -0.12/L2 -0.01/L2

490

1(HYD) 0.00 -0.03 -0.01 -0.00 -0.00 0.00

2(OPE) 0.07 0.71 -12.26 -0.06 -0.13 -0.01

3(OPE) -0.01 0.11 -3.26 -0.01 -0.03 0.00

4(SUS) 0.00 -0.03 0.00 -0.00 0.00 0.00

5(OPE) -0.00 0.10 -3.26 -0.01 -0.03 0.00

6(OPE) -0.02 0.11 -3.26 -0.01 -0.03 0.00

7(OPE) -0.01 0.11 -3.26 -0.01 -0.03 0.00

8(OPE) -0.01 0.11 -3.26 -0.01 -0.03 0.00

9(OPE) -0.01 0.11 -3.26 -0.01 -0.03 0.00

10(OPE) -0.01 0.11 -3.26 -0.01 -0.03 0.00

11(OPE) 0.02 0.10 -3.26 -0.01 -0.03 0.00

12(OPE) -0.04 0.11 -3.26 -0.01 -0.03 0.00

13(OPE) -0.01 0.11 -3.26 -0.01 -0.03 0.00

14(OPE) -0.01 0.11 -3.27 -0.01 -0.03 0.00

MAX 0.07/L2 0.71/L2 -12.26/L2 -0.06/L2 -0.13/L2 -0.01/L2

Page 74: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

61

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

500

1(HYD) -0.00 -0.04 -0.01 -0.00 -0.00 0.00

2(OPE) 0.02 0.72 -12.48 -0.07 -0.14 -0.01

3(OPE) -0.03 0.10 -3.31 -0.02 -0.03 0.00

4(SUS) 0.00 -0.03 0.00 -0.00 0.00 0.00

5(OPE) -0.02 0.10 -3.31 -0.02 -0.03 0.00

6(OPE) -0.04 0.10 -3.31 -0.02 -0.03 0.00

7(OPE) -0.03 0.10 -3.31 -0.02 -0.03 0.00

8(OPE) -0.03 0.10 -3.31 -0.02 -0.03 0.00

9(OPE) -0.03 0.10 -3.30 -0.02 -0.03 0.00

10(OPE) -0.03 0.10 -3.31 -0.02 -0.03 0.00

11(OPE) -0.00 0.09 -3.31 -0.02 -0.03 0.00

12(OPE) -0.06 0.11 -3.30 -0.02 -0.03 0.00

13(OPE) -0.04 0.10 -3.30 -0.02 -0.03 0.00

14(OPE) -0.03 0.10 -3.31 -0.02 -0.03 0.00

MAX -0.06/L12 0.72/L2 -12.48/L2 -0.07/L2 -0.14/L2 -0.01/L2

510

1(HYD) -0.00 -0.04 -0.01 -0.00 -0.00 0.00

2(OPE) -0.03 0.73 -12.69 -0.07 -0.14 -0.01

3(OPE) -0.05 0.10 -3.35 -0.02 -0.03 0.00

4(SUS) 0.00 -0.04 0.00 -0.00 0.00 0.00

5(OPE) -0.04 0.09 -3.35 -0.02 -0.03 0.00

6(OPE) -0.06 0.10 -3.35 -0.02 -0.03 0.00

7(OPE) -0.05 0.10 -3.35 -0.02 -0.03 0.00

8(OPE) -0.05 0.10 -3.35 -0.02 -0.03 0.00

9(OPE) -0.06 0.10 -3.35 -0.02 -0.03 0.00

10(OPE) -0.05 0.10 -3.36 -0.02 -0.03 0.00

11(OPE) -0.03 0.09 -3.36 -0.02 -0.03 0.00

12(OPE) -0.08 0.11 -3.35 -0.02 -0.03 0.00

13(OPE) -0.06 0.10 -3.35 -0.02 -0.03 0.00

14(OPE) -0.05 0.10 -3.36 -0.02 -0.03 0.00

MAX -0.08/L12 0.73/L2 -12.69/L2 -0.07/L2 -0.14/L2 -0.01/L2

511

1(HYD) -0.00 -0.04 -0.01 -0.00 -0.00 0.00

2(OPE) -0.03 0.73 -12.69 -0.07 -0.14 -0.01

3(OPE) -0.05 0.10 -3.35 -0.02 -0.03 0.00

4(SUS) 0.00 -0.04 0.00 -0.00 0.00 0.00

5(OPE) -0.04 0.09 -3.35 -0.02 -0.03 0.00

6(OPE) -0.06 0.10 -3.35 -0.02 -0.03 0.00

7(OPE) -0.05 0.10 -3.35 -0.02 -0.03 0.00

8(OPE) -0.05 0.10 -3.35 -0.02 -0.03 0.00

9(OPE) -0.06 0.10 -3.35 -0.02 -0.03 0.00

10(OPE) -0.05 0.10 -3.36 -0.02 -0.03 0.00

11(OPE) -0.03 0.09 -3.36 -0.02 -0.03 0.00

12(OPE) -0.08 0.11 -3.35 -0.02 -0.03 0.00

13(OPE) -0.06 0.10 -3.35 -0.02 -0.03 0.00

14(OPE) -0.05 0.10 -3.36 -0.02 -0.03 0.00

MAX -0.08/L12 0.73/L2 -12.69/L2 -0.07/L2 -0.14/L2 -0.01/L2

Page 75: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

62

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

520

1(HYD) 0.00 -0.03 -0.01 -0.00 -0.00 0.00

2(OPE) 0.49 0.50 -12.36 -0.06 -0.13 -0.01

3(OPE) 0.08 0.06 -3.31 -0.02 -0.03 0.00

4(SUS) 0.00 -0.03 0.00 -0.00 0.00 0.00

5(OPE) 0.09 0.06 -3.31 -0.02 -0.03 0.00

6(OPE) 0.07 0.06 -3.30 -0.02 -0.03 0.00

7(OPE) 0.08 0.06 -3.31 -0.02 -0.03 0.00

8(OPE) 0.08 0.06 -3.31 -0.02 -0.03 0.00

9(OPE) 0.08 0.06 -3.30 -0.02 -0.03 0.00

10(OPE) 0.08 0.06 -3.31 -0.01 -0.03 0.00

11(OPE) 0.11 0.05 -3.31 -0.01 -0.03 0.00

12(OPE) 0.05 0.07 -3.30 -0.02 -0.03 0.00

13(OPE) 0.07 0.06 -3.30 -0.02 -0.03 0.00

14(OPE) 0.08 0.06 -3.31 -0.02 -0.03 0.00

MAX 0.49/L2 0.50/L2 -12.36/L2 -0.06/L2 -0.13/L2 -0.01/L2

530

1(HYD) 0.00 -0.04 -0.01 -0.00 -0.00 0.00

2(OPE) 0.63 0.43 -12.39 -0.06 -0.13 -0.01

3(OPE) 0.11 0.04 -3.32 -0.02 -0.03 0.00

4(SUS) 0.00 -0.03 0.00 -0.00 0.00 0.00

5(OPE) 0.12 0.04 -3.32 -0.02 -0.03 0.00

6(OPE) 0.10 0.04 -3.32 -0.02 -0.03 0.00

7(OPE) 0.11 0.04 -3.32 -0.02 -0.03 0.00

8(OPE) 0.11 0.04 -3.32 -0.02 -0.03 0.00

9(OPE) 0.11 0.04 -3.32 -0.02 -0.03 0.00

10(OPE) 0.11 0.04 -3.32 -0.01 -0.03 0.00

11(OPE) 0.14 0.04 -3.32 -0.01 -0.03 0.00

12(OPE) 0.08 0.05 -3.32 -0.02 -0.03 0.00

13(OPE) 0.10 0.04 -3.32 -0.02 -0.03 0.00

14(OPE) 0.12 0.04 -3.32 -0.02 -0.03 0.00

MAX 0.63/L2 0.43/L2 -12.39/L2 -0.06/L2 -0.13/L2 -0.01/L2

540

1(HYD) 0.00 -0.04 -0.01 -0.00 -0.00 0.00

2(OPE) 0.69 0.40 -12.40 -0.06 -0.13 -0.01

3(OPE) 0.12 0.04 -3.33 -0.02 -0.03 0.00

4(SUS) 0.00 -0.03 0.00 -0.00 0.00 0.00

5(OPE) 0.13 0.03 -3.33 -0.02 -0.03 0.00

6(OPE) 0.11 0.04 -3.33 -0.02 -0.03 0.00

7(OPE) 0.12 0.04 -3.33 -0.02 -0.03 0.00

8(OPE) 0.12 0.03 -3.33 -0.02 -0.03 0.00

9(OPE) 0.12 0.03 -3.32 -0.02 -0.03 0.00

10(OPE) 0.12 0.04 -3.33 -0.01 -0.03 0.00

11(OPE) 0.15 0.03 -3.33 -0.01 -0.03 0.00

12(OPE) 0.09 0.04 -3.32 -0.02 -0.03 0.00

13(OPE) 0.11 0.04 -3.32 -0.02 -0.03 0.00

14(OPE) 0.13 0.03 -3.33 -0.02 -0.03 0.00

MAX 0.69/L2 0.40/L2 -12.40/L2 -0.06/L2 -0.13/L2 -0.01/L2

Page 76: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

63

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

550

1(HYD) -0.01 -0.00 -0.01 -0.00 0.00 0.00

2(OPE) 0.24 1.12 -11.86 -0.00 -0.01 0.00

3(OPE) 0.05 0.33 -3.18 -0.00 -0.00 0.00

4(SUS) -0.01 -0.00 -0.00 -0.00 0.00 0.00

5(OPE) 0.06 0.33 -3.18 -0.00 -0.00 0.00

6(OPE) 0.04 0.33 -3.18 -0.00 -0.00 0.00

7(OPE) 0.05 0.33 -3.18 -0.00 -0.00 0.00

8(OPE) 0.05 0.33 -3.18 -0.00 -0.00 0.00

9(OPE) 0.05 0.33 -3.18 -0.00 -0.00 0.00

10(OPE) 0.05 0.33 -3.18 -0.00 -0.00 0.00

11(OPE) 0.08 0.33 -3.18 -0.00 -0.00 -0.00

12(OPE) 0.03 0.33 -3.18 -0.00 -0.00 0.00

13(OPE) 0.05 0.33 -3.18 -0.00 -0.00 0.00

14(OPE) 0.06 0.33 -3.18 -0.00 -0.00 0.00

MAX 0.24/L2 1.12/L2 -11.86/L2 -0.00/L2 -0.01/L2 0.00/L12

560

1(HYD) -0.01 -0.00 -0.01 -0.00 0.00 0.00

2(OPE) 0.24 1.16 -11.86 -0.00 -0.01 0.00

3(OPE) 0.05 0.34 -3.18 -0.00 -0.00 0.00

4(SUS) -0.01 -0.00 -0.00 -0.00 0.00 0.00

5(OPE) 0.06 0.34 -3.18 -0.00 -0.00 0.00

6(OPE) 0.04 0.34 -3.18 -0.00 -0.00 0.00

7(OPE) 0.05 0.34 -3.18 -0.00 -0.00 0.00

8(OPE) 0.05 0.34 -3.18 -0.00 -0.00 0.00

9(OPE) 0.05 0.34 -3.18 -0.00 -0.00 0.00

10(OPE) 0.05 0.34 -3.18 -0.00 -0.00 0.00

11(OPE) 0.08 0.34 -3.18 -0.00 -0.00 -0.00

12(OPE) 0.03 0.34 -3.18 -0.00 -0.00 0.00

13(OPE) 0.05 0.34 -3.18 -0.00 -0.00 0.00

14(OPE) 0.06 0.34 -3.19 -0.00 -0.00 0.00

MAX 0.24/L2 1.16/L2 -11.86/L2 -0.00/L2 -0.01/L2 0.00/L12

570

1(HYD) -0.01 -0.00 -0.01 -0.00 0.00 0.00

2(OPE) 0.24 1.17 -11.86 -0.00 -0.01 0.00

3(OPE) 0.05 0.35 -3.18 -0.00 -0.00 0.00

4(SUS) -0.01 -0.00 -0.00 -0.00 0.00 0.00

5(OPE) 0.06 0.35 -3.18 -0.00 -0.00 0.00

6(OPE) 0.04 0.35 -3.18 -0.00 -0.00 0.00

7(OPE) 0.05 0.35 -3.18 -0.00 -0.00 0.00

8(OPE) 0.05 0.35 -3.18 -0.00 -0.00 0.00

9(OPE) 0.05 0.35 -3.18 -0.00 -0.00 0.00

10(OPE) 0.05 0.35 -3.18 -0.00 -0.00 0.00

11(OPE) 0.08 0.35 -3.18 -0.00 -0.00 -0.00

12(OPE) 0.03 0.35 -3.18 -0.00 -0.00 0.00

13(OPE) 0.05 0.35 -3.18 -0.00 -0.00 0.00

14(OPE) 0.06 0.35 -3.19 -0.00 -0.00 0.00

MAX 0.24/L2 1.17/L2 -11.86/L2 -0.00/L2 -0.01/L2 0.00/L12

Page 77: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

64

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

580

1(HYD) -0.00 -0.00 0.00 0.00 0.00 0.00

2(OPE) 0.00 0.00 -0.00 -0.00 -0.00 -0.00

3(OPE) 0.00 0.00 -0.00 0.00 -0.00 -0.00

4(SUS) -0.00 -0.00 -0.00 0.00 0.00 0.00

5(OPE) 0.00 0.00 -0.00 0.00 -0.00 -0.00

6(OPE) 0.00 0.00 -0.00 0.00 -0.00 -0.00

7(OPE) 0.00 0.00 -0.00 0.00 -0.00 -0.00

8(OPE) 0.00 0.00 -0.00 0.00 -0.00 -0.00

9(OPE) 0.00 0.00 0.00 0.00 -0.00 -0.00

10(OPE) 0.00 0.00 -0.00 0.00 -0.00 -0.00

11(OPE) 0.00 0.00 -0.00 0.00 -0.00 -0.00

12(OPE) -0.00 0.00 -0.00 0.00 -0.00 0.00

13(OPE) 0.00 0.00 0.00 0.00 -0.00 -0.00

14(OPE) 0.00 0.00 -0.00 -0.00 -0.00 -0.00

MAX 0.00/L11 0.00/L2 -0.00/L2 -0.00/L2 -0.00/L2 -0.00/L11

590

1(HYD) -0.00 -0.00 -0.00 -0.00 0.00 0.00

2(OPE) 0.12 -0.00 -8.36 -0.00 -0.01 -0.00

3(OPE) 0.03 -0.00 -2.21 -0.00 -0.00 0.00

4(SUS) -0.00 -0.00 0.00 -0.00 0.00 0.00

5(OPE) 0.03 -0.00 -2.21 -0.00 -0.00 0.00

6(OPE) 0.03 -0.00 -2.21 -0.00 -0.00 0.00

7(OPE) 0.03 -0.00 -2.21 -0.00 -0.00 0.00

8(OPE) 0.03 -0.00 -2.21 -0.00 -0.00 0.00

9(OPE) 0.03 -0.00 -2.21 -0.00 -0.00 0.00

10(OPE) 0.03 -0.00 -2.21 -0.00 -0.00 0.00

11(OPE) 0.04 -0.00 -2.21 -0.00 -0.00 0.00

12(OPE) 0.02 -0.00 -2.22 -0.00 -0.00 0.00

13(OPE) 0.03 -0.00 -2.21 -0.00 -0.00 0.00

14(OPE) 0.03 -0.00 -2.22 -0.00 -0.00 0.00

MAX 0.12/L2 -0.00/L2 -8.36/L2 -0.00/L2 -0.01/L2 0.00/L12

600

1(HYD) -0.00 -0.05 -0.01 -0.00 -0.00 0.00

2(OPE) -0.08 0.75 -12.91 -0.07 -0.14 -0.01

3(OPE) -0.08 0.09 -3.40 -0.02 -0.03 0.00

4(SUS) 0.00 -0.05 0.00 -0.00 0.00 0.00

5(OPE) -0.07 0.09 -3.40 -0.02 -0.03 0.00

6(OPE) -0.09 0.10 -3.40 -0.02 -0.03 0.00

7(OPE) -0.08 0.10 -3.40 -0.02 -0.03 0.00

8(OPE) -0.08 0.09 -3.40 -0.02 -0.03 0.00

9(OPE) -0.08 0.09 -3.39 -0.02 -0.03 0.00

10(OPE) -0.07 0.09 -3.41 -0.02 -0.03 0.00

11(OPE) -0.05 0.08 -3.40 -0.02 -0.03 0.00

12(OPE) -0.10 0.11 -3.40 -0.02 -0.03 0.00

13(OPE) -0.08 0.09 -3.39 -0.02 -0.03 0.00

14(OPE) -0.07 0.09 -3.41 -0.02 -0.03 0.00

MAX -0.10/L12 0.75/L2 -12.91/L2 -0.07/L2 -0.14/L2 -0.01/L2

Page 78: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

65

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

619

1(HYD) -0.01 -0.07 -0.01 -0.00 -0.00 0.00

2(OPE) -0.24 0.87 -14.00 -0.13 -0.17 -0.02

3(OPE) -0.15 0.11 -3.63 -0.03 -0.04 -0.00

4(SUS) -0.00 -0.07 0.00 -0.00 0.00 0.00

5(OPE) -0.14 0.10 -3.63 -0.03 -0.04 -0.00

6(OPE) -0.16 0.11 -3.63 -0.03 -0.03 -0.00

7(OPE) -0.15 0.11 -3.63 -0.03 -0.04 -0.00

8(OPE) -0.16 0.10 -3.63 -0.03 -0.03 -0.00

9(OPE) -0.16 0.11 -3.62 -0.03 -0.03 -0.00

10(OPE) -0.15 0.10 -3.64 -0.03 -0.04 -0.00

11(OPE) -0.12 0.09 -3.64 -0.03 -0.04 -0.01

12(OPE) -0.18 0.12 -3.63 -0.03 -0.03 -0.00

13(OPE) -0.16 0.11 -3.62 -0.03 -0.03 -0.00

14(OPE) -0.15 0.10 -3.64 -0.03 -0.04 -0.00

MAX -0.24/L2 0.87/L2 -14.00/L2 -0.13/L2 -0.17/L2 -0.02/L2

620

1(HYD) -0.01 -0.07 -0.01 -0.00 -0.00 0.00

2(OPE) -0.20 0.98 -14.66 -0.18 -0.18 -0.03

3(OPE) -0.15 0.15 -3.77 -0.04 -0.04 -0.01

4(SUS) -0.01 -0.07 0.00 -0.00 0.00 0.00

5(OPE) -0.14 0.15 -3.77 -0.04 -0.04 -0.01

6(OPE) -0.16 0.15 -3.77 -0.04 -0.04 -0.01

7(OPE) -0.15 0.15 -3.77 -0.04 -0.04 -0.01

8(OPE) -0.15 0.15 -3.77 -0.04 -0.04 -0.01

9(OPE) -0.15 0.15 -3.76 -0.04 -0.04 -0.01

10(OPE) -0.15 0.15 -3.78 -0.04 -0.04 -0.01

11(OPE) -0.11 0.14 -3.78 -0.04 -0.04 -0.01

12(OPE) -0.19 0.16 -3.77 -0.04 -0.04 -0.01

13(OPE) -0.15 0.15 -3.76 -0.04 -0.04 -0.01

14(OPE) -0.15 0.15 -3.79 -0.04 -0.04 -0.01

MAX -0.20/L2 0.98/L2 -14.66/L2 -0.18/L2 -0.18/L2 -0.03/L2

628

1(HYD) 0.01 -0.06 -0.02 -0.00 -0.00 -0.00

2(OPE) 0.34 1.46 -17.79 -0.18 -0.16 -0.03

3(OPE) 0.03 0.36 -4.45 -0.04 -0.03 -0.01

4(SUS) 0.01 -0.07 -0.00 -0.00 0.00 -0.00

5(OPE) 0.06 0.35 -4.44 -0.04 -0.03 -0.01

6(OPE) 0.00 0.36 -4.45 -0.04 -0.03 -0.01

7(OPE) 0.03 0.36 -4.45 -0.04 -0.03 -0.01

8(OPE) 0.03 0.35 -4.45 -0.04 -0.03 -0.01

9(OPE) 0.03 0.36 -4.44 -0.04 -0.03 -0.01

10(OPE) 0.04 0.36 -4.45 -0.04 -0.03 -0.01

11(OPE) 0.13 0.35 -4.44 -0.04 -0.03 -0.02

12(OPE) -0.07 0.37 -4.46 -0.04 -0.03 -0.01

13(OPE) 0.03 0.36 -4.43 -0.04 -0.03 -0.01

14(OPE) 0.04 0.36 -4.46 -0.04 -0.03 -0.01

MAX 0.34/L2 1.46/L2 -17.79/L2 -0.18/L2 -0.16/L2 -0.03/L2

Page 79: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

66

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

629

1(HYD) 0.02 -0.06 -0.02 -0.00 -0.00 -0.01

2(OPE) 0.40 1.58 -18.40 -0.12 -0.14 -0.03

3(OPE) 0.05 0.41 -4.58 -0.03 -0.03 -0.01

4(SUS) 0.02 -0.06 -0.01 -0.00 0.00 -0.01

5(OPE) 0.08 0.41 -4.58 -0.03 -0.03 -0.01

6(OPE) 0.02 0.41 -4.58 -0.03 -0.03 -0.01

7(OPE) 0.05 0.41 -4.58 -0.03 -0.03 -0.01

8(OPE) 0.05 0.41 -4.58 -0.03 -0.03 -0.01

9(OPE) 0.05 0.41 -4.58 -0.03 -0.03 -0.01

10(OPE) 0.06 0.41 -4.58 -0.03 -0.03 -0.01

11(OPE) 0.16 0.40 -4.57 -0.03 -0.03 -0.01

12(OPE) -0.05 0.42 -4.59 -0.03 -0.03 -0.01

13(OPE) 0.05 0.41 -4.56 -0.03 -0.03 -0.01

14(OPE) 0.06 0.41 -4.59 -0.03 -0.03 -0.01

MAX 0.40/L2 1.58/L2 -18.40/L2 -0.12/L2 -0.14/L2 -0.03/L2

630

1(HYD) 0.02 -0.04 -0.03 -0.00 -0.00 -0.01

2(OPE) 0.34 1.69 -18.87 -0.08 -0.10 -0.02

3(OPE) 0.03 0.46 -4.67 -0.02 -0.02 -0.01

4(SUS) 0.02 -0.04 -0.01 -0.00 0.00 -0.01

5(OPE) 0.06 0.45 -4.67 -0.02 -0.02 -0.01

6(OPE) -0.00 0.46 -4.68 -0.02 -0.02 -0.01

7(OPE) 0.03 0.46 -4.67 -0.02 -0.02 -0.01

8(OPE) 0.03 0.45 -4.67 -0.02 -0.02 -0.01

9(OPE) 0.03 0.46 -4.67 -0.02 -0.02 -0.01

10(OPE) 0.03 0.46 -4.68 -0.02 -0.02 -0.01

11(OPE) 0.14 0.45 -4.67 -0.02 -0.02 -0.01

12(OPE) -0.08 0.46 -4.68 -0.02 -0.02 -0.01

13(OPE) 0.02 0.46 -4.66 -0.02 -0.02 -0.01

14(OPE) 0.04 0.45 -4.69 -0.02 -0.02 -0.01

MAX 0.34/L2 1.69/L2 -18.87/L2 -0.08/L2 -0.10/L2 -0.02/L2

638

1(HYD) 0.02 -0.02 -0.03 -0.00 -0.00 -0.01

2(OPE) 0.27 1.75 -19.11 -0.06 -0.09 -0.02

3(OPE) -0.00 0.48 -4.72 -0.01 -0.02 -0.01

4(SUS) 0.02 -0.02 -0.01 -0.00 0.00 -0.01

5(OPE) 0.03 0.48 -4.72 -0.01 -0.02 -0.01

6(OPE) -0.03 0.48 -4.72 -0.01 -0.02 -0.01

7(OPE) -0.00 0.48 -4.72 -0.01 -0.02 -0.01

8(OPE) -0.01 0.48 -4.72 -0.01 -0.02 -0.01

9(OPE) -0.01 0.48 -4.72 -0.01 -0.02 -0.01

10(OPE) 0.00 0.48 -4.72 -0.01 -0.02 -0.01

11(OPE) 0.11 0.48 -4.72 -0.01 -0.02 -0.01

12(OPE) -0.11 0.48 -4.73 -0.01 -0.02 -0.01

13(OPE) -0.01 0.48 -4.71 -0.01 -0.02 -0.01

14(OPE) 0.00 0.48 -4.73 -0.01 -0.02 -0.01

MAX 0.27/L2 1.75/L2 -19.11/L2 -0.06/L2 -0.09/L2 -0.02/L2

Page 80: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

67

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

639

1(HYD) 0.01 -0.00 -0.03 -0.00 -0.00 -0.00

2(OPE) 0.17 1.76 -19.25 -0.04 -0.05 -0.01

3(OPE) -0.05 0.49 -4.75 -0.01 -0.01 -0.01

4(SUS) 0.01 -0.01 -0.01 -0.00 0.00 -0.00

5(OPE) -0.02 0.49 -4.75 -0.01 -0.01 -0.01

6(OPE) -0.08 0.49 -4.75 -0.01 -0.01 -0.01

7(OPE) -0.05 0.49 -4.75 -0.01 -0.01 -0.01

8(OPE) -0.05 0.49 -4.75 -0.01 -0.01 -0.01

9(OPE) -0.05 0.49 -4.75 -0.01 -0.01 -0.01

10(OPE) -0.04 0.49 -4.75 -0.01 -0.01 -0.01

11(OPE) 0.06 0.49 -4.75 -0.01 -0.01 -0.01

12(OPE) -0.15 0.49 -4.75 -0.01 -0.01 -0.00

13(OPE) -0.05 0.49 -4.74 -0.01 -0.01 -0.01

14(OPE) -0.04 0.49 -4.76 -0.01 -0.01 -0.01

MAX 0.17/L2 1.76/L2 -19.25/L2 -0.04/L2 -0.05/L2 -0.01/L2

640

1(HYD) 0.00 0.00 -0.02 -0.00 -0.00 -0.00

2(OPE) 0.12 1.68 -19.23 -0.01 -0.03 -0.00

3(OPE) -0.07 0.46 -4.74 -0.00 -0.01 -0.00

4(SUS) 0.01 -0.00 -0.00 -0.00 0.00 -0.00

5(OPE) -0.04 0.46 -4.74 -0.00 -0.01 -0.00

6(OPE) -0.10 0.46 -4.74 -0.00 -0.01 -0.00

7(OPE) -0.07 0.46 -4.74 -0.00 -0.01 -0.00

8(OPE) -0.07 0.46 -4.74 -0.00 -0.01 -0.00

9(OPE) -0.07 0.46 -4.74 -0.00 -0.01 -0.00

10(OPE) -0.07 0.46 -4.74 -0.00 -0.01 -0.00

11(OPE) 0.04 0.46 -4.74 -0.00 -0.01 -0.00

12(OPE) -0.18 0.46 -4.74 -0.00 -0.00 0.00

13(OPE) -0.08 0.46 -4.74 -0.00 -0.01 -0.00

14(OPE) -0.06 0.45 -4.75 -0.00 -0.01 -0.00

MAX -0.18/L12 1.68/L2 -19.23/L2 -0.01/L2 -0.03/L2 -0.00/L2

650

1(HYD) 0.00 0.00 -0.02 -0.00 -0.00 -0.00

2(OPE) 0.12 1.68 -19.23 -0.01 -0.03 -0.00

3(OPE) -0.07 0.45 -4.74 -0.00 -0.01 -0.00

4(SUS) 0.01 -0.00 -0.00 -0.00 0.00 -0.00

5(OPE) -0.04 0.45 -4.74 -0.00 -0.01 -0.00

6(OPE) -0.10 0.45 -4.74 -0.00 -0.01 -0.00

7(OPE) -0.07 0.45 -4.74 -0.00 -0.01 -0.00

8(OPE) -0.07 0.45 -4.74 -0.00 -0.01 -0.00

9(OPE) -0.07 0.45 -4.74 -0.00 -0.01 -0.00

10(OPE) -0.07 0.45 -4.74 -0.00 -0.01 -0.00

11(OPE) 0.04 0.46 -4.74 -0.00 -0.01 -0.00

12(OPE) -0.18 0.45 -4.74 -0.00 -0.00 0.00

13(OPE) -0.08 0.46 -4.74 -0.00 -0.01 -0.00

14(OPE) -0.06 0.45 -4.75 -0.00 -0.01 -0.00

MAX -0.18/L12 1.68/L2 -19.23/L2 -0.01/L2 -0.03/L2 -0.00/L2

Page 81: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

68

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

660

1(HYD) 0.00 0.00 -0.02 -0.00 -0.00 -0.00

2(OPE) 0.12 1.63 -19.22 -0.01 -0.03 -0.00

3(OPE) -0.07 0.43 -4.74 -0.00 -0.01 -0.00

4(SUS) 0.00 -0.00 -0.00 -0.00 0.00 -0.00

5(OPE) -0.04 0.43 -4.74 -0.00 -0.01 -0.00

6(OPE) -0.10 0.43 -4.74 -0.00 -0.00 -0.00

7(OPE) -0.07 0.43 -4.74 -0.00 -0.01 -0.00

8(OPE) -0.07 0.43 -4.74 -0.00 -0.01 -0.00

9(OPE) -0.07 0.43 -4.74 -0.00 -0.01 -0.00

10(OPE) -0.07 0.43 -4.74 -0.00 -0.01 -0.00

11(OPE) 0.04 0.43 -4.74 -0.00 -0.01 -0.00

12(OPE) -0.18 0.43 -4.74 -0.00 -0.00 0.00

13(OPE) -0.08 0.43 -4.74 -0.00 -0.01 -0.00

14(OPE) -0.06 0.43 -4.75 -0.00 -0.01 -0.00

MAX -0.18/L12 1.63/L2 -19.22/L2 -0.01/L2 -0.03/L2 -0.00/L2

661

1(HYD) 0.00 0.00 -0.02 -0.00 -0.00 -0.00

2(OPE) 0.12 1.63 -19.22 -0.01 -0.03 -0.00

3(OPE) -0.07 0.43 -4.74 -0.00 -0.01 -0.00

4(SUS) 0.00 -0.00 -0.00 -0.00 0.00 -0.00

5(OPE) -0.04 0.43 -4.74 -0.00 -0.01 -0.00

6(OPE) -0.10 0.43 -4.74 -0.00 -0.00 -0.00

7(OPE) -0.07 0.43 -4.74 -0.00 -0.01 -0.00

8(OPE) -0.07 0.43 -4.74 -0.00 -0.01 -0.00

9(OPE) -0.07 0.43 -4.74 -0.00 -0.01 -0.00

10(OPE) -0.07 0.43 -4.74 -0.00 -0.01 -0.00

11(OPE) 0.04 0.43 -4.74 -0.00 -0.01 -0.00

12(OPE) -0.18 0.43 -4.74 -0.00 -0.00 0.00

13(OPE) -0.08 0.43 -4.74 -0.00 -0.01 -0.00

14(OPE) -0.06 0.43 -4.75 -0.00 -0.01 -0.00

MAX -0.18/L12 1.63/L2 -19.22/L2 -0.01/L2 -0.03/L2 -0.00/L2

670

1(HYD) -0.02 0.00 0.00 0.00 0.00 0.00

2(OPE) -0.00 4.09 0.86 -0.00 -0.02 -0.00

3(OPE) 0.00 1.18 0.25 0.00 0.00 -0.00

4(SUS) -0.02 0.00 0.00 0.00 0.00 0.00

5(OPE) 0.00 1.18 0.25 0.00 0.00 0.00

6(OPE) 0.00 1.18 0.25 0.00 0.00 -0.00

7(OPE) 0.00 1.18 0.25 0.00 0.00 -0.00

8(OPE) 0.00 1.18 0.25 0.00 0.00 -0.00

9(OPE) 0.00 1.18 0.25 0.00 0.00 -0.00

10(OPE) -0.00 1.18 0.24 0.00 0.00 0.00

11(OPE) 0.01 1.18 0.25 0.00 0.00 -0.00

12(OPE) -0.00 1.18 0.25 0.00 0.00 0.00

13(OPE) 0.00 1.18 0.26 0.00 0.01 -0.00

14(OPE) -0.00 1.18 0.23 -0.00 -0.00 0.00

MAX -0.02/L1 4.09/L2 0.86/L2 0.00/L13 -0.02/L2 0.00/L1

Page 82: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

69

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

680

1(HYD) -0.02 0.00 0.00 0.00 0.00 0.01

2(OPE) -0.00 4.69 0.86 0.00 -0.04 0.00

3(OPE) 0.00 1.45 0.25 0.00 0.00 0.00

4(SUS) -0.02 0.00 0.00 0.00 0.00 0.01

5(OPE) -0.00 1.45 0.25 0.00 0.00 0.00

6(OPE) 0.00 1.45 0.25 0.00 0.01 -0.00

7(OPE) 0.00 1.45 0.25 0.00 0.00 0.00

8(OPE) 0.00 1.45 0.25 0.00 0.01 0.00

9(OPE) 0.00 1.45 0.25 0.00 0.01 0.00

10(OPE) -0.00 1.45 0.25 0.00 0.00 0.00

11(OPE) 0.01 1.45 0.25 0.00 0.00 0.00

12(OPE) -0.00 1.45 0.25 0.00 0.01 0.00

13(OPE) 0.00 1.45 0.27 0.00 0.01 0.00

14(OPE) -0.00 1.45 0.23 -0.00 -0.00 0.00

MAX -0.02/L1 4.69/L2 0.86/L2 0.00/L13 -0.04/L2 0.01/L1

688

1(HYD) -0.02 0.00 0.00 0.00 0.00 0.01

2(OPE) -0.00 4.70 0.86 0.00 -0.04 0.00

3(OPE) 0.00 1.46 0.25 0.00 0.00 0.00

4(SUS) -0.02 0.00 0.00 0.00 0.00 0.01

5(OPE) -0.00 1.46 0.25 0.00 0.00 0.00

6(OPE) 0.00 1.46 0.25 0.00 0.01 -0.00

7(OPE) 0.00 1.46 0.25 0.00 0.00 0.00

8(OPE) 0.00 1.46 0.25 0.00 0.01 0.00

9(OPE) 0.00 1.46 0.25 0.00 0.01 0.00

10(OPE) -0.00 1.46 0.25 0.00 0.00 0.00

11(OPE) 0.01 1.46 0.25 0.00 0.00 0.00

12(OPE) -0.00 1.46 0.25 0.00 0.01 0.00

13(OPE) 0.00 1.46 0.27 0.00 0.01 0.00

14(OPE) -0.00 1.46 0.23 -0.00 -0.00 0.00

MAX -0.02/L1 4.70/L2 0.86/L2 0.00/L13 -0.04/L2 0.01/L1

689

1(HYD) -0.04 -0.00 0.01 0.00 0.00 0.02

2(OPE) -0.20 5.18 0.83 0.00 -0.07 0.00

3(OPE) -0.09 1.67 0.25 -0.00 0.01 0.01

4(SUS) -0.04 -0.01 0.00 0.00 0.00 0.02

5(OPE) -0.10 1.67 0.25 -0.00 0.01 0.01

6(OPE) -0.09 1.67 0.25 -0.00 0.01 0.00

7(OPE) -0.09 1.67 0.25 -0.00 0.01 0.01

8(OPE) -0.09 1.67 0.25 -0.00 0.01 0.00

9(OPE) -0.09 1.67 0.26 -0.00 0.01 0.00

10(OPE) -0.10 1.67 0.25 -0.00 0.00 0.01

11(OPE) -0.09 1.67 0.25 -0.00 0.01 0.01

12(OPE) -0.10 1.67 0.25 -0.01 0.01 0.00

13(OPE) -0.09 1.67 0.28 -0.00 0.02 0.00

14(OPE) -0.10 1.67 0.23 -0.01 -0.00 0.01

MAX -0.20/L2 5.18/L2 0.83/L2 -0.01/L14 -0.07/L2 0.02/L1

Page 83: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

70

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

690

1(HYD) -0.05 -0.03 0.01 0.00 0.00 0.02

2(OPE) -0.68 5.37 0.71 0.00 -0.11 0.00

3(OPE) -0.32 1.75 0.26 -0.01 0.01 0.01

4(SUS) -0.05 -0.03 0.01 0.00 0.00 0.02

5(OPE) -0.32 1.74 0.26 -0.01 0.01 0.02

6(OPE) -0.31 1.75 0.27 -0.01 0.01 0.01

7(OPE) -0.32 1.75 0.26 -0.01 0.01 0.01

8(OPE) -0.31 1.75 0.27 -0.01 0.01 0.01

9(OPE) -0.31 1.75 0.27 -0.01 0.01 0.01

10(OPE) -0.32 1.74 0.25 -0.01 0.00 0.02

11(OPE) -0.31 1.74 0.26 -0.01 0.01 0.02

12(OPE) -0.32 1.76 0.27 -0.01 0.01 0.00

13(OPE) -0.31 1.75 0.31 -0.01 0.02 0.01

14(OPE) -0.32 1.74 0.22 -0.01 -0.01 0.02

MAX -0.68/L2 5.37/L2 0.71/L2 -0.01/L14 -0.11/L2 0.02/L1

698

1(HYD) -0.05 -0.30 0.05 0.00 0.00 0.03

2(OPE) -3.99 5.32 -0.73 0.05 -0.17 0.00

3(OPE) -1.82 1.58 0.34 -0.03 -0.00 0.02

4(SUS) -0.05 -0.30 0.04 0.00 0.00 0.03

5(OPE) -1.82 1.52 0.31 -0.03 -0.00 0.03

6(OPE) -1.81 1.68 0.40 -0.04 0.01 0.01

7(OPE) -1.82 1.58 0.32 -0.03 -0.00 0.02

8(OPE) -1.81 1.62 0.40 -0.04 0.01 0.02

9(OPE) -1.81 1.64 0.42 -0.04 0.01 0.01

10(OPE) -1.83 1.52 0.26 -0.03 -0.01 0.03

11(OPE) -1.82 1.49 0.32 -0.03 -0.00 0.03

12(OPE) -1.82 1.71 0.40 -0.04 0.01 0.00

13(OPE) -1.81 1.64 0.56 -0.04 0.02 0.01

14(OPE) -1.83 1.52 0.11 -0.03 -0.02 0.03

MAX -3.99/L2 5.32/L2 -0.73/L2 0.05/L2 -0.17/L2 0.03/L11

699

1(HYD) -0.04 -0.34 0.05 0.00 0.00 0.03

2(OPE) -4.47 5.13 -1.02 0.07 -0.19 -0.00

3(OPE) -2.02 1.46 0.35 -0.03 -0.01 0.02

4(SUS) -0.03 -0.34 0.04 0.00 0.00 0.03

5(OPE) -2.02 1.39 0.32 -0.03 -0.01 0.03

6(OPE) -2.02 1.58 0.43 -0.04 -0.01 0.01

7(OPE) -2.02 1.46 0.33 -0.03 -0.01 0.02

8(OPE) -2.02 1.51 0.42 -0.04 -0.01 0.02

9(OPE) -2.02 1.52 0.44 -0.04 -0.01 0.02

10(OPE) -2.03 1.40 0.26 -0.03 -0.02 0.03

11(OPE) -2.01 1.35 0.32 -0.03 -0.01 0.04

12(OPE) -2.03 1.62 0.42 -0.04 -0.01 0.00

13(OPE) -2.02 1.53 0.60 -0.04 0.01 0.02

14(OPE) -2.03 1.39 0.09 -0.03 -0.03 0.03

MAX -4.47/L2 5.13/L2 -1.02/L2 0.07/L2 -0.19/L2 0.04/L11

Page 84: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

71

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

700

1(HYD) -0.00 -0.36 0.05 0.00 0.01 0.02

2(OPE) -4.67 4.65 -1.24 0.08 -0.20 -0.01

3(OPE) -2.08 1.23 0.39 -0.04 -0.02 0.02

4(SUS) 0.00 -0.36 0.04 0.00 0.00 0.02

5(OPE) -2.07 1.16 0.36 -0.03 -0.02 0.03

6(OPE) -2.10 1.35 0.48 -0.04 -0.01 0.01

7(OPE) -2.08 1.23 0.37 -0.04 -0.02 0.02

8(OPE) -2.09 1.29 0.47 -0.04 -0.01 0.02

9(OPE) -2.09 1.30 0.49 -0.04 -0.01 0.02

10(OPE) -2.08 1.16 0.29 -0.03 -0.03 0.03

11(OPE) -2.05 1.11 0.36 -0.03 -0.02 0.04

12(OPE) -2.12 1.40 0.48 -0.04 -0.01 0.00

13(OPE) -2.09 1.30 0.66 -0.04 -0.00 0.02

14(OPE) -2.08 1.16 0.12 -0.03 -0.04 0.03

MAX -4.67/L2 4.65/L2 -1.24/L2 0.08/L2 -0.20/L2 0.04/L11

708

1(HYD) 0.18 -0.36 0.02 0.00 0.01 0.02

2(OPE) -4.79 1.58 -2.02 0.08 -0.23 -0.02

3(OPE) -1.89 -0.17 0.73 -0.03 -0.06 0.02

4(SUS) 0.18 -0.36 0.01 0.00 0.01 0.02

5(OPE) -1.79 -0.24 0.68 -0.03 -0.06 0.03

6(OPE) -2.05 -0.04 0.88 -0.04 -0.05 0.00

7(OPE) -1.89 -0.16 0.70 -0.03 -0.06 0.02

8(OPE) -1.95 -0.11 0.86 -0.04 -0.06 0.01

9(OPE) -1.95 -0.10 0.89 -0.04 -0.06 0.01

10(OPE) -1.84 -0.23 0.56 -0.03 -0.06 0.02

11(OPE) -1.69 -0.28 0.67 -0.03 -0.06 0.03

12(OPE) -2.14 0.00 0.89 -0.04 -0.06 -0.01

13(OPE) -1.96 -0.09 1.06 -0.04 -0.05 0.01

14(OPE) -1.83 -0.24 0.39 -0.03 -0.07 0.02

MAX -4.79/L2 1.58/L2 -2.02/L2 0.08/L2 -0.23/L2 0.03/L11

709

1(HYD) 0.20 -0.36 0.01 0.00 0.01 0.02

2(OPE) -4.69 1.14 -2.32 0.06 -0.23 -0.03

3(OPE) -1.84 -0.40 0.68 -0.02 -0.07 0.01

4(SUS) 0.20 -0.36 0.00 0.00 0.01 0.02

5(OPE) -1.71 -0.47 0.62 -0.02 -0.07 0.02

6(OPE) -2.01 -0.28 0.84 -0.03 -0.06 -0.00

7(OPE) -1.83 -0.39 0.65 -0.02 -0.07 0.01

8(OPE) -1.90 -0.35 0.82 -0.02 -0.06 0.01

9(OPE) -1.90 -0.33 0.85 -0.03 -0.06 0.01

10(OPE) -1.78 -0.46 0.50 -0.02 -0.07 0.02

11(OPE) -1.61 -0.51 0.61 -0.02 -0.07 0.03

12(OPE) -2.12 -0.23 0.84 -0.03 -0.06 -0.01

13(OPE) -1.91 -0.33 1.02 -0.03 -0.06 0.01

14(OPE) -1.76 -0.47 0.33 -0.02 -0.08 0.02

MAX -4.69/L2 1.14/L2 -2.32/L2 0.06/L2 -0.23/L2 0.03/L11

Page 85: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

72

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

710

1(HYD) 0.20 -0.35 0.01 0.01 0.01 0.01

2(OPE) -4.38 1.01 -2.83 0.04 -0.24 -0.03

3(OPE) -1.72 -0.51 0.47 -0.01 -0.08 0.01

4(SUS) 0.20 -0.35 0.00 0.01 0.01 0.01

5(OPE) -1.59 -0.57 0.42 -0.01 -0.08 0.02

6(OPE) -1.92 -0.39 0.63 -0.01 -0.08 -0.00

7(OPE) -1.72 -0.50 0.44 -0.01 -0.08 0.01

8(OPE) -1.80 -0.46 0.61 -0.01 -0.08 0.01

9(OPE) -1.79 -0.45 0.64 -0.01 -0.08 0.01

10(OPE) -1.66 -0.57 0.30 -0.00 -0.08 0.02

11(OPE) -1.48 -0.62 0.41 -0.00 -0.08 0.03

12(OPE) -2.02 -0.35 0.64 -0.01 -0.08 -0.01

13(OPE) -1.82 -0.44 0.82 -0.01 -0.07 0.01

14(OPE) -1.64 -0.57 0.12 -0.00 -0.09 0.02

MAX -4.38/L2 1.01/L2 -2.83/L2 0.04/L2 -0.24/L2 -0.03/L2

720

1(HYD) 0.08 -0.19 0.01 0.01 0.01 0.01

2(OPE) -0.48 1.09 -8.08 -0.03 -0.26 -0.08

3(OPE) -0.19 -0.34 -1.91 0.02 -0.11 -0.02

4(SUS) 0.08 -0.20 0.00 0.01 0.01 0.01

5(OPE) -0.01 -0.38 -1.97 0.03 -0.11 -0.01

6(OPE) -0.45 -0.27 -1.75 0.02 -0.11 -0.04

7(OPE) -0.18 -0.34 -1.94 0.02 -0.11 -0.02

8(OPE) -0.29 -0.31 -1.77 0.02 -0.11 -0.03

9(OPE) -0.27 -0.30 -1.74 0.02 -0.11 -0.03

10(OPE) -0.12 -0.38 -2.09 0.02 -0.11 -0.02

11(OPE) 0.07 -0.40 -1.98 0.03 -0.11 -0.01

12(OPE) -0.53 -0.25 -1.74 0.02 -0.11 -0.04

13(OPE) -0.33 -0.30 -1.57 0.02 -0.11 -0.03

14(OPE) -0.06 -0.38 -2.26 0.03 -0.11 -0.02

MAX -0.53/L12 1.09/L2 -8.08/L2 -0.03/L2 -0.26/L2 -0.08/L2

730

1(HYD) 0.07 -0.18 0.01 0.01 0.01 0.01

2(OPE) -0.14 1.05 -8.52 -0.03 -0.26 -0.08

3(OPE) -0.05 -0.31 -2.11 0.02 -0.11 -0.02

4(SUS) 0.07 -0.18 0.00 0.01 0.01 0.01

5(OPE) 0.14 -0.35 -2.17 0.03 -0.11 -0.01

6(OPE) -0.31 -0.25 -1.95 0.02 -0.11 -0.04

7(OPE) -0.03 -0.31 -2.14 0.02 -0.11 -0.02

8(OPE) -0.15 -0.28 -1.97 0.02 -0.11 -0.03

9(OPE) -0.13 -0.27 -1.94 0.02 -0.11 -0.03

10(OPE) 0.03 -0.35 -2.29 0.02 -0.11 -0.02

11(OPE) 0.22 -0.37 -2.18 0.03 -0.11 -0.01

12(OPE) -0.38 -0.23 -1.94 0.02 -0.11 -0.04

13(OPE) -0.18 -0.27 -1.77 0.02 -0.11 -0.03

14(OPE) 0.08 -0.35 -2.46 0.03 -0.11 -0.02

MAX -0.38/L12 1.05/L2 -8.52/L2 -0.03/L2 -0.26/L2 -0.08/L2

Page 86: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

73

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

731

1(HYD) 0.07 -0.18 0.01 0.01 0.01 0.01

2(OPE) -0.14 1.05 -8.52 -0.03 -0.26 -0.08

3(OPE) -0.05 -0.31 -2.11 0.02 -0.11 -0.02

4(SUS) 0.07 -0.18 0.00 0.01 0.01 0.01

5(OPE) 0.14 -0.35 -2.17 0.03 -0.11 -0.01

6(OPE) -0.31 -0.25 -1.95 0.02 -0.11 -0.04

7(OPE) -0.03 -0.31 -2.14 0.02 -0.11 -0.02

8(OPE) -0.15 -0.28 -1.97 0.02 -0.11 -0.03

9(OPE) -0.13 -0.27 -1.94 0.02 -0.11 -0.03

10(OPE) 0.03 -0.35 -2.29 0.02 -0.11 -0.02

11(OPE) 0.22 -0.37 -2.18 0.03 -0.11 -0.01

12(OPE) -0.38 -0.23 -1.94 0.02 -0.11 -0.04

13(OPE) -0.18 -0.27 -1.77 0.02 -0.11 -0.03

14(OPE) 0.08 -0.35 -2.46 0.03 -0.11 -0.02

MAX -0.38/L12 1.05/L2 -8.52/L2 -0.03/L2 -0.26/L2 -0.08/L2

740

1(HYD) -0.02 0.08 -0.01 0.01 0.00 0.00

2(OPE) 5.83 -0.94 -16.35 -0.11 -0.26 -0.11

3(OPE) 2.42 0.15 -5.32 0.02 -0.10 -0.05

4(SUS) -0.03 0.09 -0.00 0.01 0.00 0.00

5(OPE) 2.64 0.18 -5.38 0.02 -0.11 -0.03

6(OPE) 2.17 0.10 -5.16 0.01 -0.11 -0.07

7(OPE) 2.43 0.16 -5.35 0.02 -0.10 -0.05

8(OPE) 2.36 0.12 -5.18 0.01 -0.11 -0.05

9(OPE) 2.42 0.12 -5.15 0.01 -0.11 -0.05

10(OPE) 2.42 0.19 -5.50 0.02 -0.10 -0.04

11(OPE) 2.71 0.19 -5.39 0.02 -0.11 -0.03

12(OPE) 2.11 0.09 -5.15 0.01 -0.11 -0.06

13(OPE) 2.44 0.11 -4.98 0.01 -0.11 -0.05

14(OPE) 2.40 0.19 -5.67 0.02 -0.10 -0.04

MAX 5.83/L2 -0.94/L2 -16.35/L2 -0.11/L2 -0.26/L2 -0.11/L2

750

1(HYD) -0.02 0.07 -0.01 0.01 0.00 0.00

2(OPE) 5.51 -0.81 -15.94 -0.11 -0.26 -0.11

3(OPE) 2.29 0.13 -5.09 0.02 -0.10 -0.05

4(SUS) -0.02 0.07 -0.00 0.01 0.00 0.00

5(OPE) 2.51 0.16 -5.15 0.02 -0.11 -0.03

6(OPE) 2.04 0.09 -4.93 0.01 -0.11 -0.07

7(OPE) 2.31 0.13 -5.12 0.02 -0.10 -0.05

8(OPE) 2.23 0.10 -4.95 0.01 -0.11 -0.05

9(OPE) 2.29 0.10 -4.92 0.01 -0.11 -0.05

10(OPE) 2.30 0.16 -5.27 0.02 -0.10 -0.04

11(OPE) 2.58 0.17 -5.16 0.02 -0.11 -0.03

12(OPE) 1.98 0.08 -4.92 0.01 -0.11 -0.06

13(OPE) 2.30 0.10 -4.75 0.01 -0.11 -0.05

14(OPE) 2.28 0.16 -5.44 0.02 -0.10 -0.04

MAX 5.51/L2 -0.81/L2 -15.94/L2 -0.11/L2 -0.26/L2 -0.11/L2

Page 87: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

74

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

760

1(HYD) -0.01 0.04 -0.00 0.01 0.00 0.00

2(OPE) 4.67 -0.47 -14.83 -0.11 -0.26 -0.11

3(OPE) 1.95 0.08 -4.48 0.02 -0.10 -0.05

4(SUS) -0.01 0.04 -0.00 0.01 0.00 0.00

5(OPE) 2.16 0.09 -4.53 0.02 -0.11 -0.03

6(OPE) 1.70 0.05 -4.31 0.01 -0.11 -0.07

7(OPE) 1.97 0.08 -4.50 0.02 -0.10 -0.05

8(OPE) 1.88 0.06 -4.33 0.01 -0.11 -0.05

9(OPE) 1.93 0.06 -4.30 0.01 -0.11 -0.05

10(OPE) 1.97 0.09 -4.65 0.02 -0.10 -0.04

11(OPE) 2.24 0.10 -4.54 0.02 -0.11 -0.03

12(OPE) 1.63 0.04 -4.30 0.01 -0.11 -0.06

13(OPE) 1.93 0.06 -4.13 0.01 -0.11 -0.05

14(OPE) 1.96 0.10 -4.82 0.02 -0.10 -0.04

MAX 4.67/L2 -0.47/L2 -14.83/L2 -0.11/L2 -0.26/L2 -0.11/L2

770

1(HYD) 0.00 -0.00 -0.00 0.01 0.00 0.00

2(OPE) 3.54 -0.00 -13.34 -0.11 -0.26 -0.11

3(OPE) 1.49 -0.00 -3.64 0.02 -0.10 -0.05

4(SUS) 0.00 -0.00 -0.00 0.01 0.00 0.00

5(OPE) 1.70 -0.00 -3.70 0.02 -0.11 -0.03

6(OPE) 1.23 -0.00 -3.48 0.01 -0.11 -0.07

7(OPE) 1.50 -0.00 -3.67 0.02 -0.10 -0.05

8(OPE) 1.41 -0.00 -3.50 0.01 -0.11 -0.05

9(OPE) 1.45 -0.00 -3.47 0.01 -0.11 -0.05

10(OPE) 1.52 -0.00 -3.82 0.02 -0.10 -0.04

11(OPE) 1.77 -0.00 -3.71 0.02 -0.11 -0.03

12(OPE) 1.16 -0.00 -3.47 0.01 -0.11 -0.06

13(OPE) 1.44 -0.00 -3.29 0.01 -0.11 -0.05

14(OPE) 1.54 -0.00 -3.99 0.02 -0.10 -0.04

MAX 3.54/L2 -0.00/L8 -13.34/L2 -0.11/L2 -0.26/L2 -0.11/L2

780

1(HYD) 0.01 -0.03 -0.00 0.01 0.00 0.00

2(OPE) 2.64 0.37 -12.16 -0.11 -0.26 -0.11

3(OPE) 1.12 -0.06 -3.27 0.02 -0.10 -0.05

4(SUS) 0.01 -0.03 -0.00 0.01 0.00 0.00

5(OPE) 1.33 -0.07 -3.32 0.02 -0.11 -0.03

6(OPE) 0.86 -0.04 -3.11 0.01 -0.11 -0.07

7(OPE) 1.14 -0.06 -3.29 0.02 -0.10 -0.05

8(OPE) 1.03 -0.05 -3.13 0.01 -0.11 -0.05

9(OPE) 1.07 -0.05 -3.09 0.01 -0.11 -0.05

10(OPE) 1.17 -0.08 -3.44 0.02 -0.10 -0.04

11(OPE) 1.41 -0.08 -3.33 0.02 -0.11 -0.03

12(OPE) 0.79 -0.04 -3.10 0.01 -0.11 -0.06

13(OPE) 1.04 -0.05 -2.92 0.01 -0.11 -0.05

14(OPE) 1.20 -0.08 -3.61 0.02 -0.10 -0.04

MAX 2.64/L2 0.37/L2 -12.16/L2 -0.11/L2 -0.26/L2 -0.11/L2

Page 88: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

75

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

810

1(HYD) 0.06 -0.16 0.01 0.01 0.01 0.01

2(OPE) 0.17 1.01 -8.94 -0.03 -0.26 -0.08

3(OPE) 0.08 -0.28 -2.25 0.02 -0.11 -0.02

4(SUS) 0.06 -0.16 0.00 0.01 0.01 0.01

5(OPE) 0.27 -0.32 -2.30 0.03 -0.11 -0.01

6(OPE) -0.17 -0.22 -2.08 0.02 -0.11 -0.04

7(OPE) 0.10 -0.28 -2.27 0.02 -0.11 -0.02

8(OPE) -0.02 -0.25 -2.10 0.02 -0.11 -0.03

9(OPE) 0.01 -0.25 -2.07 0.02 -0.11 -0.03

10(OPE) 0.16 -0.32 -2.42 0.03 -0.11 -0.02

11(OPE) 0.36 -0.34 -2.31 0.03 -0.11 -0.01

12(OPE) -0.25 -0.20 -2.07 0.02 -0.11 -0.04

13(OPE) -0.04 -0.24 -1.90 0.02 -0.11 -0.03

14(OPE) 0.21 -0.32 -2.59 0.03 -0.11 -0.02

MAX 0.36/L11 1.01/L2 -8.94/L2 -0.03/L2 -0.26/L2 -0.08/L2

830

1(HYD) -0.00 0.00 0.03 0.01 0.00 0.00

2(OPE) 3.84 0.96 -13.64 -0.11 -0.26 -0.11

3(OPE) 1.62 0.30 -3.59 0.02 -0.10 -0.05

4(SUS) -0.00 0.00 0.03 0.01 0.00 0.00

5(OPE) 1.79 0.30 -3.64 0.02 -0.11 -0.03

6(OPE) 1.41 0.30 -3.45 0.01 -0.11 -0.07

7(OPE) 1.64 0.30 -3.62 0.02 -0.10 -0.05

8(OPE) 1.56 0.30 -3.46 0.01 -0.11 -0.05

9(OPE) 1.60 0.30 -3.43 0.01 -0.11 -0.05

10(OPE) 1.65 0.30 -3.75 0.02 -0.10 -0.04

11(OPE) 1.87 0.30 -3.64 0.02 -0.11 -0.03

12(OPE) 1.35 0.30 -3.44 0.01 -0.11 -0.06

13(OPE) 1.58 0.30 -3.26 0.01 -0.11 -0.05

14(OPE) 1.66 0.30 -3.93 0.02 -0.10 -0.04

MAX 3.84/L2 0.96/L2 -13.64/L2 -0.11/L2 -0.26/L2 -0.11/L2

840

1(HYD) -0.00 -0.00 0.01 0.01 0.00 0.00

2(OPE) 2.58 0.30 -14.07 -0.11 -0.26 -0.11

3(OPE) 1.19 0.13 -3.94 0.02 -0.10 -0.05

4(SUS) 0.00 -0.00 0.01 0.01 0.00 0.00

5(OPE) 1.39 0.10 -3.99 0.02 -0.11 -0.03

6(OPE) 0.93 0.18 -3.78 0.01 -0.11 -0.07

7(OPE) 1.20 0.13 -3.96 0.02 -0.10 -0.05

8(OPE) 1.10 0.15 -3.80 0.01 -0.11 -0.05

9(OPE) 1.15 0.14 -3.77 0.01 -0.11 -0.05

10(OPE) 1.22 0.13 -4.10 0.02 -0.10 -0.04

11(OPE) 1.47 0.10 -4.00 0.02 -0.11 -0.03

12(OPE) 0.86 0.18 -3.77 0.01 -0.11 -0.06

13(OPE) 1.13 0.15 -3.61 0.01 -0.11 -0.05

14(OPE) 1.23 0.12 -4.26 0.02 -0.10 -0.04

MAX 2.58/L2 0.30/L2 -14.07/L2 -0.11/L2 -0.26/L2 -0.11/L2

Page 89: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

76

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

848

1(HYD) -0.00 -0.01 0.01 0.01 0.00 0.00

2(OPE) 2.00 0.49 -14.51 -0.11 -0.26 -0.10

3(OPE) 1.00 0.21 -4.12 0.02 -0.10 -0.05

4(SUS) 0.00 -0.01 0.01 0.01 0.00 0.00

5(OPE) 1.21 0.15 -4.18 0.02 -0.11 -0.03

6(OPE) 0.74 0.30 -3.96 0.01 -0.11 -0.06

7(OPE) 1.01 0.21 -4.15 0.02 -0.10 -0.04

8(OPE) 0.92 0.24 -3.99 0.01 -0.11 -0.05

9(OPE) 0.96 0.23 -3.96 0.01 -0.11 -0.05

10(OPE) 1.03 0.20 -4.28 0.02 -0.10 -0.04

11(OPE) 1.28 0.15 -4.19 0.02 -0.11 -0.03

12(OPE) 0.67 0.29 -3.96 0.01 -0.11 -0.06

13(OPE) 0.95 0.23 -3.81 0.02 -0.11 -0.05

14(OPE) 1.05 0.20 -4.43 0.02 -0.10 -0.04

MAX 2.00/L2 0.49/L2 -14.51/L2 -0.11/L2 -0.26/L2 -0.10/L2

849

1(HYD) -0.00 -0.01 0.01 0.01 0.00 0.00

2(OPE) 1.86 0.60 -14.66 -0.11 -0.26 -0.10

3(OPE) 0.96 0.26 -4.17 0.02 -0.10 -0.05

4(SUS) -0.00 -0.01 0.02 0.01 0.00 0.00

5(OPE) 1.16 0.19 -4.23 0.02 -0.11 -0.03

6(OPE) 0.70 0.35 -4.01 0.01 -0.11 -0.06

7(OPE) 0.97 0.25 -4.19 0.02 -0.10 -0.04

8(OPE) 0.87 0.29 -4.04 0.01 -0.11 -0.05

9(OPE) 0.92 0.27 -4.01 0.01 -0.11 -0.05

10(OPE) 0.99 0.24 -4.32 0.02 -0.10 -0.04

11(OPE) 1.24 0.19 -4.23 0.02 -0.11 -0.03

12(OPE) 0.63 0.34 -4.00 0.01 -0.11 -0.06

13(OPE) 0.90 0.28 -3.86 0.02 -0.11 -0.05

14(OPE) 1.01 0.24 -4.47 0.02 -0.10 -0.04

MAX 1.86/L2 0.60/L2 -14.66/L2 -0.11/L2 -0.26/L2 -0.10/L2

850

1(HYD) -0.00 -0.01 0.02 0.01 0.00 0.00

2(OPE) 1.84 0.78 -14.76 -0.11 -0.26 -0.10

3(OPE) 0.96 0.32 -4.18 0.02 -0.10 -0.05

4(SUS) -0.00 -0.01 0.02 0.01 0.00 0.00

5(OPE) 1.16 0.24 -4.24 0.02 -0.11 -0.03

6(OPE) 0.71 0.41 -4.03 0.01 -0.11 -0.06

7(OPE) 0.97 0.31 -4.20 0.02 -0.10 -0.04

8(OPE) 0.88 0.35 -4.05 0.01 -0.11 -0.05

9(OPE) 0.92 0.33 -4.03 0.01 -0.11 -0.05

10(OPE) 0.99 0.30 -4.33 0.02 -0.10 -0.04

11(OPE) 1.23 0.25 -4.24 0.02 -0.11 -0.03

12(OPE) 0.64 0.40 -4.02 0.01 -0.11 -0.06

13(OPE) 0.91 0.34 -3.87 0.02 -0.11 -0.05

14(OPE) 1.00 0.30 -4.48 0.02 -0.10 -0.04

MAX 1.84/L2 0.78/L2 -14.76/L2 -0.11/L2 -0.26/L2 -0.10/L2

Page 90: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

77

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

860

1(HYD) -0.01 -0.01 0.04 0.01 0.00 0.00

2(OPE) 2.03 1.40 -14.95 -0.11 -0.26 -0.10

3(OPE) 1.04 0.51 -4.15 0.02 -0.10 -0.05

4(SUS) -0.01 -0.01 0.04 0.01 0.00 0.00

5(OPE) 1.22 0.44 -4.20 0.02 -0.11 -0.03

6(OPE) 0.83 0.61 -4.00 0.01 -0.11 -0.06

7(OPE) 1.05 0.51 -4.17 0.02 -0.10 -0.04

8(OPE) 0.97 0.55 -4.03 0.01 -0.11 -0.05

9(OPE) 1.01 0.53 -4.00 0.01 -0.11 -0.05

10(OPE) 1.07 0.50 -4.29 0.02 -0.10 -0.04

11(OPE) 1.30 0.44 -4.20 0.02 -0.11 -0.03

12(OPE) 0.75 0.60 -4.00 0.01 -0.11 -0.06

13(OPE) 1.00 0.53 -3.84 0.02 -0.11 -0.05

14(OPE) 1.08 0.50 -4.45 0.02 -0.10 -0.04

MAX 2.03/L2 1.40/L2 -14.95/L2 -0.11/L2 -0.26/L2 -0.10/L2

870

1(HYD) -0.01 -0.01 0.05 0.01 0.00 0.00

2(OPE) 2.13 1.73 -15.05 -0.11 -0.26 -0.10

3(OPE) 1.09 0.62 -4.13 0.02 -0.10 -0.05

4(SUS) -0.01 -0.01 0.05 0.01 0.00 0.00

5(OPE) 1.25 0.55 -4.18 0.02 -0.11 -0.03

6(OPE) 0.89 0.71 -3.99 0.01 -0.11 -0.06

7(OPE) 1.10 0.61 -4.15 0.02 -0.10 -0.04

8(OPE) 1.02 0.65 -4.01 0.01 -0.11 -0.05

9(OPE) 1.06 0.63 -3.99 0.01 -0.11 -0.05

10(OPE) 1.11 0.60 -4.27 0.02 -0.10 -0.04

11(OPE) 1.33 0.55 -4.18 0.02 -0.11 -0.03

12(OPE) 0.81 0.71 -3.99 0.01 -0.11 -0.06

13(OPE) 1.05 0.64 -3.82 0.02 -0.11 -0.05

14(OPE) 1.12 0.60 -4.43 0.02 -0.10 -0.04

MAX 2.13/L2 1.73/L2 -15.05/L2 -0.11/L2 -0.26/L2 -0.10/L2

880

1(HYD) -0.01 -0.01 0.05 0.01 0.00 0.00

2(OPE) 2.17 1.85 -15.09 -0.11 -0.26 -0.10

3(OPE) 1.10 0.65 -4.12 0.02 -0.10 -0.05

4(SUS) -0.01 -0.01 0.05 0.01 0.00 0.00

5(OPE) 1.26 0.58 -4.17 0.02 -0.11 -0.03

6(OPE) 0.91 0.75 -3.99 0.01 -0.11 -0.06

7(OPE) 1.11 0.65 -4.15 0.02 -0.10 -0.04

8(OPE) 1.04 0.69 -4.01 0.01 -0.11 -0.05

9(OPE) 1.07 0.67 -3.98 0.01 -0.11 -0.05

10(OPE) 1.12 0.64 -4.26 0.02 -0.10 -0.04

11(OPE) 1.34 0.59 -4.17 0.02 -0.11 -0.03

12(OPE) 0.83 0.74 -3.99 0.01 -0.11 -0.06

13(OPE) 1.06 0.67 -3.82 0.02 -0.11 -0.05

14(OPE) 1.14 0.64 -4.43 0.02 -0.10 -0.04

MAX 2.17/L2 1.85/L2 -15.09/L2 -0.11/L2 -0.26/L2 -0.10/L2

Page 91: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

78

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

890

1(HYD) -0.00 0.00 0.05 0.01 -0.00 -0.00

2(OPE) 4.21 2.09 -14.03 -0.12 -0.25 -0.11

3(OPE) 1.79 0.66 -3.55 0.01 -0.09 -0.05

4(SUS) -0.01 0.00 0.05 0.01 -0.00 -0.00

5(OPE) 1.91 0.66 -3.58 0.01 -0.09 -0.04

6(OPE) 1.64 0.66 -3.42 0.00 -0.10 -0.06

7(OPE) 1.80 0.66 -3.57 0.01 -0.09 -0.05

8(OPE) 1.74 0.66 -3.43 0.01 -0.10 -0.05

9(OPE) 1.77 0.66 -3.40 0.01 -0.10 -0.05

10(OPE) 1.81 0.66 -3.69 0.02 -0.09 -0.05

11(OPE) 1.99 0.66 -3.58 0.01 -0.09 -0.04

12(OPE) 1.57 0.66 -3.42 0.00 -0.10 -0.06

13(OPE) 1.76 0.66 -3.23 0.00 -0.11 -0.05

14(OPE) 1.82 0.66 -3.86 0.02 -0.08 -0.05

MAX 4.21/L2 2.09/L2 -14.03/L2 -0.12/L2 -0.25/L2 -0.11/L2

900

1(HYD) -0.00 0.00 0.06 0.01 -0.00 -0.00

2(OPE) 4.35 2.51 -14.18 -0.12 -0.25 -0.11

3(OPE) 1.85 0.80 -3.53 0.01 -0.09 -0.05

4(SUS) -0.01 0.00 0.06 0.01 -0.00 -0.00

5(OPE) 1.96 0.80 -3.57 0.01 -0.09 -0.04

6(OPE) 1.72 0.79 -3.42 0.00 -0.10 -0.06

7(OPE) 1.85 0.80 -3.56 0.01 -0.09 -0.05

8(OPE) 1.81 0.80 -3.42 0.01 -0.10 -0.05

9(OPE) 1.83 0.80 -3.39 0.01 -0.10 -0.05

10(OPE) 1.86 0.80 -3.67 0.02 -0.09 -0.05

11(OPE) 2.03 0.80 -3.57 0.01 -0.09 -0.04

12(OPE) 1.65 0.79 -3.42 0.00 -0.10 -0.06

13(OPE) 1.82 0.80 -3.22 0.00 -0.11 -0.05

14(OPE) 1.87 0.80 -3.84 0.02 -0.08 -0.05

MAX 4.35/L2 2.51/L2 -14.18/L2 -0.12/L2 -0.25/L2 -0.11/L2

901

1(HYD) -0.00 0.00 0.06 0.01 -0.00 -0.00

2(OPE) 4.35 2.51 -14.18 -0.12 -0.25 -0.11

3(OPE) 1.85 0.80 -3.53 0.01 -0.09 -0.05

4(SUS) -0.01 0.00 0.06 0.01 -0.00 -0.00

5(OPE) 1.96 0.80 -3.57 0.01 -0.09 -0.04

6(OPE) 1.72 0.79 -3.42 0.00 -0.10 -0.06

7(OPE) 1.85 0.80 -3.56 0.01 -0.09 -0.05

8(OPE) 1.81 0.80 -3.42 0.01 -0.10 -0.05

9(OPE) 1.83 0.80 -3.39 0.01 -0.10 -0.05

10(OPE) 1.86 0.80 -3.67 0.02 -0.09 -0.05

11(OPE) 2.03 0.80 -3.57 0.01 -0.09 -0.04

12(OPE) 1.65 0.79 -3.42 0.00 -0.10 -0.06

13(OPE) 1.82 0.80 -3.22 0.00 -0.11 -0.05

14(OPE) 1.87 0.80 -3.84 0.02 -0.08 -0.05

MAX 4.35/L2 2.51/L2 -14.18/L2 -0.12/L2 -0.25/L2 -0.11/L2

Page 92: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

79

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

910

1(HYD) -0.00 -0.00 0.01 0.00 0.00 0.00

2(OPE) -0.03 1.34 3.59 0.00 -0.00 0.00

3(OPE) 0.01 0.33 0.91 0.00 0.00 0.00

4(SUS) -0.00 -0.00 0.00 0.00 0.00 0.00

5(OPE) 0.01 0.33 0.91 0.00 0.00 0.00

6(OPE) 0.02 0.33 0.91 0.00 0.00 0.00

7(OPE) 0.01 0.33 0.91 0.00 0.00 0.00

8(OPE) 0.01 0.33 0.91 0.00 0.00 0.00

9(OPE) 0.02 0.33 0.92 0.00 0.00 0.00

10(OPE) 0.01 0.33 0.91 0.00 0.00 0.00

11(OPE) -0.00 0.33 0.91 0.00 -0.00 -0.00

12(OPE) 0.03 0.33 0.91 0.00 0.00 0.00

13(OPE) 0.02 0.32 0.92 0.00 0.00 0.00

14(OPE) 0.01 0.33 0.91 0.00 0.00 0.00

MAX -0.03/L2 1.34/L2 3.59/L2 0.00/L2 0.00/L12 0.00/L12

920

1(HYD) -0.00 -0.00 0.01 0.00 0.00 0.00

2(OPE) -0.02 1.34 3.43 0.00 -0.00 0.00

3(OPE) 0.01 0.33 0.86 0.00 0.00 0.00

4(SUS) -0.00 -0.00 0.00 0.00 0.00 0.00

5(OPE) 0.01 0.33 0.86 0.00 0.00 0.00

6(OPE) 0.01 0.33 0.86 0.00 0.00 0.00

7(OPE) 0.01 0.33 0.86 0.00 0.00 0.00

8(OPE) 0.01 0.33 0.86 0.00 0.00 0.00

9(OPE) 0.01 0.33 0.86 0.00 0.00 0.00

10(OPE) 0.01 0.33 0.86 0.00 0.00 0.00

11(OPE) -0.00 0.33 0.86 0.00 -0.00 -0.00

12(OPE) 0.02 0.33 0.86 0.00 0.00 0.00

13(OPE) 0.01 0.33 0.86 0.00 0.00 0.00

14(OPE) 0.01 0.33 0.85 0.00 0.00 0.00

MAX -0.02/L2 1.34/L2 3.43/L2 0.00/L2 0.00/L12 0.00/L12

930

1(HYD) -0.00 0.00 0.01 0.00 0.00 0.00

2(OPE) -0.02 1.34 3.33 0.00 -0.00 0.00

3(OPE) 0.01 0.33 0.82 0.00 0.00 0.00

4(SUS) -0.00 -0.00 0.00 0.00 0.00 0.00

5(OPE) 0.00 0.33 0.82 0.00 0.00 0.00

6(OPE) 0.01 0.33 0.82 0.00 0.00 0.00

7(OPE) 0.01 0.33 0.82 0.00 0.00 0.00

8(OPE) 0.01 0.33 0.82 0.00 0.00 0.00

9(OPE) 0.01 0.33 0.82 0.00 0.00 0.00

10(OPE) 0.00 0.33 0.82 0.00 0.00 0.00

11(OPE) 0.00 0.33 0.82 0.00 -0.00 -0.00

12(OPE) 0.01 0.33 0.82 0.00 0.00 0.00

13(OPE) 0.01 0.33 0.82 0.00 0.00 0.00

14(OPE) 0.00 0.33 0.82 0.00 0.00 0.00

MAX -0.02/L2 1.34/L2 3.33/L2 0.00/L2 0.00/L12 0.00/L12

Page 93: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

80

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

940

1(HYD) -0.00 0.00 0.01 0.00 0.00 0.00

2(OPE) -0.02 1.47 3.43 0.00 -0.00 0.00

3(OPE) 0.01 0.38 0.86 0.00 0.00 0.00

4(SUS) -0.00 -0.00 0.00 0.00 0.00 0.00

5(OPE) 0.00 0.38 0.86 0.00 0.00 0.00

6(OPE) 0.01 0.38 0.86 0.00 0.00 0.00

7(OPE) 0.01 0.38 0.86 0.00 0.00 0.00

8(OPE) 0.01 0.38 0.86 0.00 0.00 0.00

9(OPE) 0.01 0.38 0.86 0.00 0.00 0.00

10(OPE) 0.01 0.38 0.86 0.00 0.00 0.00

11(OPE) 0.00 0.38 0.86 0.00 -0.00 -0.00

12(OPE) 0.01 0.38 0.86 0.00 0.00 0.00

13(OPE) 0.01 0.38 0.86 0.00 0.00 0.00

14(OPE) 0.00 0.38 0.85 0.00 0.00 0.00

MAX -0.02/L2 1.47/L2 3.43/L2 0.00/L2 0.00/L12 0.00/L12

950

1(HYD) -0.00 -0.00 0.01 0.00 0.00 0.00

2(OPE) -0.02 1.21 3.43 0.00 -0.00 0.00

3(OPE) 0.01 0.28 0.86 0.00 0.00 0.00

4(SUS) -0.00 -0.00 0.00 0.00 0.00 0.00

5(OPE) 0.01 0.28 0.86 0.00 0.00 0.00

6(OPE) 0.01 0.28 0.86 0.00 0.00 0.00

7(OPE) 0.01 0.28 0.86 0.00 0.00 0.00

8(OPE) 0.01 0.28 0.86 0.00 0.00 0.00

9(OPE) 0.01 0.28 0.86 0.00 0.00 0.00

10(OPE) 0.01 0.28 0.86 0.00 0.00 0.00

11(OPE) -0.00 0.28 0.86 0.00 -0.00 -0.00

12(OPE) 0.02 0.28 0.86 0.00 0.00 0.00

13(OPE) 0.01 0.28 0.86 0.00 0.00 0.00

14(OPE) 0.01 0.28 0.85 0.00 0.00 0.00

MAX 0.02/L12 1.21/L2 3.43/L2 0.00/L2 0.00/L12 0.00/L12

960

1(HYD) 0.00 -0.00 0.01 0.00 0.00 0.00

2(OPE) -0.02 1.11 3.43 0.00 -0.00 0.00

3(OPE) 0.01 0.24 0.86 0.00 0.00 0.00

4(SUS) 0.00 -0.00 0.00 0.00 0.00 0.00

5(OPE) 0.01 0.24 0.86 0.00 0.00 0.00

6(OPE) 0.02 0.24 0.86 0.00 0.00 0.00

7(OPE) 0.01 0.24 0.86 0.00 0.00 0.00

8(OPE) 0.01 0.24 0.86 0.00 0.00 0.00

9(OPE) 0.01 0.24 0.86 0.00 0.00 0.00

10(OPE) 0.01 0.24 0.85 0.00 0.00 0.00

11(OPE) -0.00 0.24 0.85 0.00 -0.00 -0.00

12(OPE) 0.03 0.24 0.86 0.00 0.00 0.00

13(OPE) 0.01 0.24 0.86 0.00 0.00 0.00

14(OPE) 0.01 0.24 0.85 0.00 0.00 0.00

MAX 0.03/L12 1.11/L2 3.43/L2 0.00/L2 0.00/L12 0.00/L12

Page 94: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

81

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

970

1(HYD) 0.00 -0.00 0.01 0.00 0.00 0.00

2(OPE) -0.02 1.08 3.43 0.00 -0.00 0.00

3(OPE) 0.01 0.23 0.85 0.00 0.00 0.00

4(SUS) 0.00 -0.00 0.00 0.00 0.00 0.00

5(OPE) 0.01 0.23 0.85 0.00 0.00 0.00

6(OPE) 0.02 0.23 0.85 0.00 0.00 0.00

7(OPE) 0.01 0.23 0.85 0.00 0.00 0.00

8(OPE) 0.01 0.23 0.86 0.00 0.00 0.00

9(OPE) 0.01 0.23 0.86 0.00 0.00 0.00

10(OPE) 0.01 0.23 0.85 0.00 0.00 0.00

11(OPE) -0.00 0.23 0.85 0.00 -0.00 -0.00

12(OPE) 0.03 0.23 0.85 0.00 0.00 0.00

13(OPE) 0.01 0.23 0.86 0.00 0.00 0.00

14(OPE) 0.01 0.23 0.85 0.00 0.00 0.00

MAX 0.03/L12 1.08/L2 3.43/L2 0.00/L2 0.00/L12 0.00/L12

980

1(HYD) 0.00 -0.00 0.01 0.00 0.00 0.00

2(OPE) -0.02 1.07 3.43 0.00 -0.00 0.00

3(OPE) 0.01 0.23 0.85 0.00 0.00 0.00

4(SUS) 0.00 -0.00 0.00 0.00 0.00 0.00

5(OPE) 0.01 0.23 0.85 0.00 0.00 0.00

6(OPE) 0.02 0.23 0.85 0.00 0.00 0.00

7(OPE) 0.01 0.23 0.85 0.00 0.00 0.00

8(OPE) 0.01 0.23 0.85 0.00 0.00 0.00

9(OPE) 0.01 0.23 0.86 0.00 0.00 0.00

10(OPE) 0.01 0.23 0.85 0.00 0.00 0.00

11(OPE) -0.00 0.23 0.85 0.00 -0.00 -0.00

12(OPE) 0.03 0.23 0.85 0.00 0.00 0.00

13(OPE) 0.01 0.22 0.86 0.00 0.00 0.00

14(OPE) 0.01 0.23 0.85 0.00 0.00 0.00

MAX 0.03/L12 1.07/L2 3.43/L2 0.00/L2 0.00/L12 0.00/L12

990

1(HYD) -0.00 0.00 0.01 0.00 0.00 0.00

2(OPE) -0.02 1.57 3.43 0.00 -0.00 0.00

3(OPE) 0.01 0.41 0.86 0.00 0.00 0.00

4(SUS) -0.00 -0.00 0.00 0.00 0.00 0.00

5(OPE) 0.00 0.41 0.86 0.00 0.00 0.00

6(OPE) 0.01 0.41 0.86 0.00 0.00 0.00

7(OPE) 0.00 0.41 0.86 0.00 0.00 0.00

8(OPE) 0.01 0.41 0.86 0.00 0.00 0.00

9(OPE) 0.01 0.41 0.86 0.00 0.00 0.00

10(OPE) 0.00 0.41 0.86 0.00 0.00 0.00

11(OPE) 0.00 0.41 0.86 0.00 -0.00 -0.00

12(OPE) 0.01 0.41 0.86 0.00 0.00 0.00

13(OPE) 0.01 0.41 0.86 0.00 0.00 0.00

14(OPE) 0.00 0.41 0.85 -0.00 0.00 0.00

MAX -0.02/L2 1.57/L2 3.43/L2 0.00/L13 0.00/L12 0.00/L12

Page 95: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

82

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

1000

1(HYD) -0.00 0.00 0.01 0.00 0.00 0.00

2(OPE) -0.02 1.60 3.43 0.00 -0.00 0.00

3(OPE) 0.00 0.42 0.86 0.00 0.00 0.00

4(SUS) -0.00 -0.00 0.00 0.00 0.00 0.00

5(OPE) 0.00 0.42 0.86 0.00 0.00 0.00

6(OPE) 0.00 0.42 0.86 0.00 0.00 0.00

7(OPE) 0.00 0.42 0.86 0.00 0.00 0.00

8(OPE) 0.00 0.42 0.86 0.00 0.00 0.00

9(OPE) 0.01 0.42 0.86 0.00 0.00 0.00

10(OPE) 0.00 0.42 0.86 0.00 0.00 0.00

11(OPE) 0.00 0.42 0.86 0.00 -0.00 -0.00

12(OPE) 0.00 0.42 0.86 0.00 0.00 0.00

13(OPE) 0.01 0.42 0.86 0.00 0.00 0.00

14(OPE) 0.00 0.43 0.85 -0.00 0.00 0.00

MAX -0.02/L2 1.60/L2 3.43/L2 0.00/L13 0.00/L12 0.00/L12

1010

1(HYD) -0.00 0.00 0.01 0.00 0.00 0.00

2(OPE) -0.02 1.61 3.43 0.00 -0.00 0.00

3(OPE) 0.00 0.43 0.86 0.00 0.00 0.00

4(SUS) -0.00 -0.00 0.00 0.00 0.00 0.00

5(OPE) 0.00 0.43 0.86 0.00 0.00 0.00

6(OPE) 0.00 0.43 0.86 0.00 0.00 0.00

7(OPE) 0.00 0.43 0.86 0.00 0.00 0.00

8(OPE) 0.00 0.43 0.86 0.00 0.00 0.00

9(OPE) 0.01 0.43 0.86 0.00 0.00 0.00

10(OPE) 0.00 0.43 0.86 0.00 0.00 0.00

11(OPE) 0.00 0.43 0.86 0.00 -0.00 -0.00

12(OPE) 0.00 0.43 0.86 0.00 0.00 0.00

13(OPE) 0.01 0.43 0.86 0.00 0.00 0.00

14(OPE) 0.00 0.43 0.85 -0.00 0.00 0.00

MAX -0.02/L2 1.61/L2 3.43/L2 0.00/L13 0.00/L12 0.00/L12

1020

1(HYD) -0.00 0.00 0.00 0.00 0.00 0.00

2(OPE) -0.01 1.35 1.25 0.00 -0.00 0.00

3(OPE) -0.00 0.33 0.31 0.00 0.00 0.00

4(SUS) -0.00 -0.00 0.00 0.00 0.00 0.00

5(OPE) -0.00 0.33 0.31 0.00 0.00 0.00

6(OPE) -0.00 0.33 0.31 0.00 0.00 0.00

7(OPE) -0.00 0.33 0.31 0.00 0.00 0.00

8(OPE) -0.00 0.33 0.31 0.00 0.00 0.00

9(OPE) -0.00 0.33 0.31 0.00 0.00 0.00

10(OPE) -0.00 0.33 0.31 0.00 0.00 0.00

11(OPE) 0.00 0.33 0.31 0.00 -0.00 -0.00

12(OPE) -0.01 0.33 0.31 0.00 0.00 0.00

13(OPE) -0.00 0.33 0.31 0.00 0.00 0.00

14(OPE) -0.00 0.33 0.31 0.00 0.00 0.00

MAX -0.01/L2 1.35/L2 1.25/L2 0.00/L2 0.00/L12 0.00/L12

Page 96: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

83

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

1030

1(HYD) -0.00 0.00 0.00 0.00 0.00 0.00

2(OPE) -0.01 2.84 1.25 0.00 -0.00 0.00

3(OPE) -0.00 0.70 0.31 0.00 0.00 0.00

4(SUS) -0.00 0.00 0.00 0.00 0.00 0.00

5(OPE) -0.00 0.70 0.31 0.00 0.00 0.00

6(OPE) -0.00 0.70 0.31 0.00 0.00 0.00

7(OPE) -0.00 0.70 0.31 0.00 0.00 0.00

8(OPE) -0.00 0.70 0.31 0.00 0.00 0.00

9(OPE) -0.00 0.70 0.31 0.00 0.00 0.00

10(OPE) -0.00 0.70 0.31 0.00 0.00 0.00

11(OPE) 0.00 0.70 0.31 0.00 -0.00 -0.00

12(OPE) -0.01 0.70 0.31 0.00 0.00 0.00

13(OPE) -0.00 0.70 0.31 0.00 0.00 0.00

14(OPE) -0.00 0.70 0.31 0.00 0.00 0.00

MAX -0.01/L12 2.84/L2 1.25/L2 0.00/L2 0.00/L12 0.00/L12

1040

1(HYD) -0.00 0.00 0.00 0.00 0.00 0.00

2(OPE) -0.00 1.35 0.01 0.00 -0.00 0.00

3(OPE) -0.00 0.33 0.00 0.00 0.00 0.00

4(SUS) -0.00 0.00 0.00 0.00 0.00 0.00

5(OPE) -0.00 0.33 0.00 0.00 0.00 0.00

6(OPE) -0.01 0.33 0.00 0.00 0.00 0.00

7(OPE) -0.00 0.33 0.00 0.00 0.00 0.00

8(OPE) -0.00 0.33 0.00 0.00 0.00 0.00

9(OPE) -0.00 0.33 0.00 0.00 0.00 0.00

10(OPE) -0.00 0.33 0.00 0.00 0.00 0.00

11(OPE) 0.00 0.33 0.00 0.00 -0.00 -0.00

12(OPE) -0.01 0.33 0.00 0.00 0.00 0.00

13(OPE) -0.00 0.33 0.01 0.00 0.00 0.00

14(OPE) -0.00 0.33 0.00 0.00 0.00 0.00

MAX -0.01/L12 1.35/L2 0.01/L2 0.00/L2 0.00/L12 0.00/L12

1050

1(HYD) -0.00 -0.00 0.00 0.00 0.00 0.00

2(OPE) -0.00 -0.00 0.01 0.00 -0.00 0.00

3(OPE) -0.00 -0.00 0.00 0.00 0.00 0.00

4(SUS) -0.00 -0.00 0.00 0.00 0.00 0.00

5(OPE) -0.00 -0.00 0.00 0.00 0.00 0.00

6(OPE) -0.00 -0.00 0.00 0.00 0.00 0.00

7(OPE) -0.00 -0.00 0.00 0.00 0.00 0.00

8(OPE) -0.00 -0.00 0.00 0.00 0.00 0.00

9(OPE) -0.00 -0.00 0.00 0.00 0.00 0.00

10(OPE) -0.00 -0.00 0.00 0.00 0.00 0.00

11(OPE) 0.00 -0.00 0.00 0.00 -0.00 -0.00

12(OPE) -0.01 -0.00 0.00 0.00 0.00 0.00

13(OPE) -0.00 -0.00 0.00 0.00 0.00 0.00

14(OPE) -0.00 -0.00 0.00 0.00 0.00 0.00

MAX -0.01/L12 -0.00/L2 0.01/L2 0.00/L2 0.00/L12 0.00/L12

Page 97: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

84

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

1060

1(HYD) -0.00 0.00 -0.01 -0.00 0.00 0.00

2(OPE) 0.04 1.35 -8.42 -0.00 -0.00 0.00

3(OPE) -0.03 0.33 -2.07 -0.00 0.00 0.00

4(SUS) -0.00 0.00 -0.00 -0.00 0.00 0.00

5(OPE) -0.02 0.33 -2.07 -0.00 0.00 0.00

6(OPE) -0.04 0.33 -2.07 -0.00 0.00 0.00

7(OPE) -0.03 0.33 -2.07 -0.00 0.00 0.00

8(OPE) -0.03 0.33 -2.07 -0.00 0.00 0.00

9(OPE) -0.03 0.33 -2.07 -0.00 0.00 0.00

10(OPE) -0.03 0.33 -2.07 -0.00 0.00 0.00

11(OPE) 0.01 0.33 -2.07 -0.00 -0.00 -0.00

12(OPE) -0.07 0.33 -2.07 -0.00 0.00 0.00

13(OPE) -0.03 0.33 -2.07 -0.00 0.00 0.00

14(OPE) -0.03 0.33 -2.07 -0.00 0.00 0.00

MAX -0.07/L12 1.35/L2 -8.42/L2 -0.00/L2 0.00/L12 0.00/L12

1070

1(HYD) -0.00 0.00 -0.01 -0.00 0.00 0.00

2(OPE) 0.04 2.85 -8.42 -0.00 -0.00 0.00

3(OPE) -0.03 0.70 -2.07 -0.00 0.00 0.00

4(SUS) -0.00 0.00 -0.00 -0.00 0.00 0.00

5(OPE) -0.02 0.70 -2.07 -0.00 0.00 0.00

6(OPE) -0.05 0.70 -2.07 -0.00 0.00 0.00

7(OPE) -0.03 0.70 -2.07 -0.00 0.00 0.00

8(OPE) -0.03 0.70 -2.07 -0.00 0.00 0.00

9(OPE) -0.03 0.70 -2.07 -0.00 0.00 0.00

10(OPE) -0.03 0.70 -2.07 -0.00 0.00 0.00

11(OPE) 0.01 0.70 -2.07 -0.00 -0.00 -0.00

12(OPE) -0.08 0.70 -2.07 -0.00 0.00 0.00

13(OPE) -0.04 0.70 -2.07 -0.00 0.00 0.00

14(OPE) -0.03 0.70 -2.07 -0.00 0.00 0.00

MAX -0.08/L12 2.85/L2 -8.42/L2 -0.00/L2 0.00/L12 0.00/L12

1080

1(HYD) -0.00 0.00 -0.02 -0.00 0.00 0.00

2(OPE) 0.08 1.35 -15.72 -0.00 -0.00 0.00

3(OPE) -0.05 0.33 -3.86 -0.00 0.00 0.00

4(SUS) -0.00 0.00 -0.00 -0.00 -0.00 0.00

5(OPE) -0.03 0.33 -3.86 -0.00 0.00 0.00

6(OPE) -0.07 0.33 -3.86 -0.00 0.00 0.00

7(OPE) -0.05 0.33 -3.86 -0.00 0.00 0.00

8(OPE) -0.06 0.33 -3.86 -0.00 0.00 0.00

9(OPE) -0.06 0.33 -3.86 -0.00 0.00 0.00

10(OPE) -0.05 0.33 -3.86 -0.00 0.00 0.00

11(OPE) 0.02 0.33 -3.86 -0.00 -0.00 -0.00

12(OPE) -0.13 0.33 -3.86 -0.00 0.00 0.00

13(OPE) -0.06 0.33 -3.86 -0.00 0.00 0.00

14(OPE) -0.05 0.33 -3.86 -0.00 0.00 0.00

MAX -0.13/L12 1.35/L2 -15.72/L2 -0.00/L1 0.00/L12 0.00/L12

Page 98: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

85

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

1090

1(HYD) -0.00 -0.00 -0.02 -0.00 0.00 0.00

2(OPE) 0.08 -0.00 -15.72 -0.00 -0.00 0.00

3(OPE) -0.05 -0.00 -3.86 -0.00 0.00 0.00

4(SUS) -0.00 -0.00 -0.00 -0.00 -0.00 0.00

5(OPE) -0.03 -0.00 -3.86 -0.00 0.00 0.00

6(OPE) -0.07 -0.00 -3.86 -0.00 0.00 0.00

7(OPE) -0.05 -0.00 -3.86 -0.00 0.00 0.00

8(OPE) -0.05 -0.00 -3.86 -0.00 0.00 0.00

9(OPE) -0.05 -0.00 -3.86 -0.00 0.00 0.00

10(OPE) -0.05 -0.00 -3.86 -0.00 0.00 0.00

11(OPE) 0.02 -0.00 -3.86 -0.00 -0.00 -0.00

12(OPE) -0.12 -0.00 -3.86 -0.00 0.00 0.00

13(OPE) -0.06 -0.00 -3.86 -0.00 0.00 0.00

14(OPE) -0.05 -0.00 -3.86 -0.00 0.00 0.00

MAX -0.12/L12 -0.00/L14 -15.72/L2 -0.00/L1 0.00/L12 0.00/L12

1100

1(HYD) -0.00 0.00 -0.02 -0.00 0.00 0.00

2(OPE) 0.09 1.35 -17.64 -0.00 -0.00 0.00

3(OPE) -0.06 0.33 -4.33 -0.00 0.00 0.00

4(SUS) -0.00 -0.00 -0.00 -0.00 -0.00 0.00

5(OPE) -0.04 0.33 -4.33 -0.00 0.00 0.00

6(OPE) -0.08 0.33 -4.33 -0.00 0.00 0.00

7(OPE) -0.06 0.33 -4.33 -0.00 0.00 0.00

8(OPE) -0.06 0.33 -4.33 -0.00 0.00 0.00

9(OPE) -0.06 0.33 -4.33 -0.00 0.00 0.00

10(OPE) -0.06 0.33 -4.33 -0.00 0.00 0.00

11(OPE) 0.03 0.33 -4.33 -0.00 -0.00 -0.00

12(OPE) -0.14 0.33 -4.33 -0.00 0.00 0.00

13(OPE) -0.06 0.33 -4.33 -0.00 0.00 0.00

14(OPE) -0.05 0.33 -4.33 -0.00 0.00 0.00

MAX -0.14/L12 1.35/L2 -17.64/L2 -0.00/L1 0.00/L12 0.00/L12

1110

1(HYD) -0.00 0.00 -0.02 -0.00 0.00 0.00

2(OPE) 0.09 2.84 -17.64 -0.00 -0.00 0.00

3(OPE) -0.06 0.70 -4.33 -0.00 0.00 0.00

4(SUS) -0.00 -0.00 -0.00 -0.00 -0.00 0.00

5(OPE) -0.04 0.70 -4.33 -0.00 0.00 0.00

6(OPE) -0.09 0.70 -4.33 -0.00 0.00 0.00

7(OPE) -0.06 0.70 -4.33 -0.00 0.00 0.00

8(OPE) -0.06 0.70 -4.33 -0.00 0.00 0.00

9(OPE) -0.06 0.70 -4.33 -0.00 0.00 0.00

10(OPE) -0.06 0.70 -4.33 -0.00 0.00 0.00

11(OPE) 0.03 0.70 -4.33 -0.00 -0.00 -0.00

12(OPE) -0.15 0.70 -4.33 -0.00 0.00 0.00

13(OPE) -0.07 0.70 -4.33 -0.00 0.00 0.00

14(OPE) -0.06 0.70 -4.33 -0.00 0.00 0.00

MAX -0.15/L12 2.84/L2 -17.64/L2 -0.00/L1 0.00/L12 0.00/L12

Page 99: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

86

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

1120

1(HYD) -0.00 -0.00 -0.02 -0.00 0.00 0.00

2(OPE) 0.09 -0.15 -17.64 -0.00 -0.00 0.00

3(OPE) -0.06 -0.04 -4.33 -0.00 0.00 0.00

4(SUS) -0.00 -0.00 -0.00 -0.00 -0.00 0.00

5(OPE) -0.03 -0.04 -4.33 -0.00 0.00 0.00

6(OPE) -0.08 -0.04 -4.33 -0.00 0.00 0.00

7(OPE) -0.06 -0.04 -4.33 -0.00 0.00 0.00

8(OPE) -0.06 -0.04 -4.33 -0.00 0.00 0.00

9(OPE) -0.06 -0.04 -4.33 -0.00 0.00 0.00

10(OPE) -0.05 -0.04 -4.33 -0.00 0.00 0.00

11(OPE) 0.03 -0.04 -4.33 -0.00 -0.00 -0.00

12(OPE) -0.13 -0.04 -4.33 -0.00 0.00 0.00

13(OPE) -0.06 -0.04 -4.33 -0.00 0.00 0.00

14(OPE) -0.05 -0.04 -4.33 -0.00 0.00 0.00

MAX -0.13/L12 -0.15/L2 -17.64/L2 -0.00/L1 0.00/L12 0.00/L12

1130

1(HYD) -0.00 -0.00 -0.02 -0.00 0.00 0.00

2(OPE) 0.10 1.35 -19.05 -0.00 -0.00 0.00

3(OPE) -0.06 0.33 -4.68 -0.00 0.00 0.00

4(SUS) -0.00 -0.00 -0.00 -0.00 -0.00 0.00

5(OPE) -0.04 0.33 -4.68 -0.00 0.00 0.00

6(OPE) -0.09 0.33 -4.68 -0.00 0.00 0.00

7(OPE) -0.06 0.33 -4.68 -0.00 0.00 0.00

8(OPE) -0.07 0.33 -4.68 -0.00 0.00 0.00

9(OPE) -0.07 0.33 -4.68 -0.00 0.00 0.00

10(OPE) -0.06 0.33 -4.68 -0.00 0.00 0.00

11(OPE) 0.03 0.33 -4.68 -0.00 -0.00 -0.00

12(OPE) -0.15 0.33 -4.68 -0.00 0.00 0.00

13(OPE) -0.07 0.33 -4.67 -0.00 0.00 0.00

14(OPE) -0.06 0.33 -4.68 -0.00 0.00 0.00

MAX -0.15/L12 1.35/L2 -19.05/L2 -0.00/L1 0.00/L12 0.00/L12

1140

1(HYD) -0.00 0.00 0.00 0.00 0.00 0.00

2(OPE) -0.01 3.44 1.25 0.00 -0.00 0.00

3(OPE) -0.00 0.84 0.31 0.00 0.00 0.00

4(SUS) -0.00 0.00 0.00 0.00 0.00 0.00

5(OPE) -0.00 0.84 0.31 0.00 0.00 0.00

6(OPE) -0.01 0.84 0.31 0.00 0.00 0.00

7(OPE) -0.00 0.84 0.31 0.00 0.00 0.00

8(OPE) -0.00 0.84 0.31 0.00 0.00 0.00

9(OPE) -0.00 0.84 0.31 0.00 0.00 0.00

10(OPE) -0.00 0.84 0.31 0.00 0.00 0.00

11(OPE) 0.00 0.84 0.31 0.00 -0.00 -0.00

12(OPE) -0.01 0.84 0.31 0.00 0.00 0.00

13(OPE) -0.00 0.84 0.31 0.00 0.00 0.00

14(OPE) -0.00 0.84 0.31 0.00 0.00 0.00

MAX -0.01/L12 3.44/L2 1.25/L2 0.00/L13 0.00/L12 0.00/L12

Page 100: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

87

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

1150

1(HYD) -0.00 0.01 0.01 0.00 0.00 0.00

2(OPE) -0.01 3.99 1.25 0.00 -0.00 0.00

3(OPE) -0.00 0.98 0.31 0.00 0.00 0.00

4(SUS) -0.00 0.00 0.00 0.00 0.00 0.00

5(OPE) -0.00 0.98 0.31 0.00 0.00 0.00

6(OPE) -0.01 0.98 0.31 0.00 0.00 0.00

7(OPE) -0.00 0.98 0.31 0.00 0.00 0.00

8(OPE) -0.01 0.98 0.31 0.00 0.00 0.00

9(OPE) -0.00 0.98 0.31 0.00 0.00 0.00

10(OPE) -0.01 0.98 0.31 0.00 0.00 0.00

11(OPE) 0.01 0.98 0.31 0.00 -0.00 0.00

12(OPE) -0.02 0.98 0.31 0.00 0.00 0.00

13(OPE) -0.00 0.98 0.32 0.00 0.00 0.00

14(OPE) -0.01 0.98 0.31 0.00 0.00 0.00

MAX -0.02/L12 3.99/L2 1.25/L2 0.00/L13 0.00/L12 0.00/L12

1160

1(HYD) -0.00 0.01 0.01 0.00 0.00 0.00

2(OPE) -0.01 4.59 1.25 0.00 -0.00 0.00

3(OPE) -0.01 1.13 0.31 0.00 0.00 0.00

4(SUS) -0.00 0.00 0.00 0.00 0.00 0.00

5(OPE) -0.00 1.13 0.31 0.00 0.00 0.00

6(OPE) -0.01 1.13 0.31 0.00 0.00 0.00

7(OPE) -0.01 1.13 0.31 0.00 0.00 0.00

8(OPE) -0.01 1.13 0.31 0.00 0.00 0.00

9(OPE) -0.01 1.13 0.31 0.00 0.00 0.00

10(OPE) -0.01 1.13 0.31 0.00 0.00 0.00

11(OPE) 0.01 1.13 0.31 0.00 -0.00 0.00

12(OPE) -0.02 1.13 0.31 0.00 0.00 0.00

13(OPE) -0.01 1.13 0.32 0.00 0.00 0.00

14(OPE) -0.01 1.13 0.31 0.00 0.00 0.00

MAX -0.02/L12 4.59/L2 1.25/L2 0.00/L13 0.00/L12 0.00/L12

1161

1(HYD) -0.00 0.01 0.01 0.00 0.00 0.00

2(OPE) -0.01 4.59 1.25 0.00 -0.00 0.00

3(OPE) -0.01 1.13 0.31 0.00 0.00 0.00

4(SUS) -0.00 0.00 0.00 0.00 0.00 0.00

5(OPE) -0.00 1.13 0.31 0.00 0.00 0.00

6(OPE) -0.01 1.13 0.31 0.00 0.00 0.00

7(OPE) -0.01 1.13 0.31 0.00 0.00 0.00

8(OPE) -0.01 1.13 0.31 0.00 0.00 0.00

9(OPE) -0.01 1.13 0.31 0.00 0.00 0.00

10(OPE) -0.01 1.13 0.31 0.00 0.00 0.00

11(OPE) 0.01 1.13 0.31 0.00 -0.00 0.00

12(OPE) -0.02 1.13 0.31 0.00 0.00 0.00

13(OPE) -0.01 1.13 0.32 0.00 0.00 0.00

14(OPE) -0.01 1.13 0.31 0.00 0.00 0.00

MAX -0.02/L12 4.59/L2 1.25/L2 0.00/L13 0.00/L12 0.00/L12

Page 101: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

88

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

1170

1(HYD) 0.00 0.00 0.00 0.00 0.00 -0.00

2(OPE) 1.09 3.44 1.25 0.00 -0.00 -0.00

3(OPE) 0.27 0.84 0.31 0.00 0.00 -0.00

4(SUS) -0.00 -0.00 0.00 0.00 0.00 -0.00

5(OPE) 0.27 0.84 0.31 0.00 0.00 -0.00

6(OPE) 0.26 0.84 0.30 0.00 0.00 -0.00

7(OPE) 0.27 0.84 0.31 0.00 0.00 -0.00

8(OPE) 0.27 0.84 0.31 0.00 0.00 -0.00

9(OPE) 0.27 0.84 0.31 0.00 0.00 -0.00

10(OPE) 0.27 0.84 0.31 0.00 0.00 -0.00

11(OPE) 0.27 0.84 0.31 0.00 -0.00 -0.00

12(OPE) 0.26 0.84 0.30 0.00 0.00 -0.00

13(OPE) 0.27 0.84 0.31 0.00 0.00 -0.00

14(OPE) 0.26 0.84 0.30 0.00 0.00 -0.00

MAX 1.09/L2 3.44/L2 1.25/L2 0.00/L13 0.00/L12 -0.00/L11

1180

1(HYD) 0.00 0.00 0.00 0.00 0.00 -0.00

2(OPE) 1.46 3.44 1.26 0.00 -0.00 -0.00

3(OPE) 0.36 0.84 0.30 0.00 0.00 -0.00

4(SUS) -0.00 -0.00 0.00 0.00 0.00 -0.00

5(OPE) 0.36 0.84 0.31 0.00 0.00 -0.00

6(OPE) 0.36 0.84 0.30 0.00 0.00 -0.00

7(OPE) 0.36 0.84 0.30 0.00 0.00 -0.00

8(OPE) 0.36 0.84 0.30 0.00 0.00 -0.00

9(OPE) 0.36 0.84 0.30 0.00 0.00 -0.00

10(OPE) 0.36 0.84 0.30 0.00 0.00 -0.00

11(OPE) 0.37 0.84 0.31 0.00 -0.00 -0.00

12(OPE) 0.35 0.84 0.30 0.00 0.00 -0.00

13(OPE) 0.36 0.84 0.31 0.00 0.00 -0.00

14(OPE) 0.36 0.84 0.30 0.00 0.00 -0.00

MAX 1.46/L2 3.44/L2 1.26/L2 0.00/L13 0.00/L12 -0.00/L11

1190

1(HYD) 0.00 0.00 0.00 0.00 0.00 -0.00

2(OPE) 1.61 3.44 1.26 0.00 -0.00 -0.00

3(OPE) 0.39 0.84 0.30 0.00 0.00 -0.00

4(SUS) -0.00 -0.00 0.00 0.00 0.00 -0.00

5(OPE) 0.39 0.84 0.31 0.00 0.00 -0.00

6(OPE) 0.39 0.84 0.30 0.00 0.00 -0.00

7(OPE) 0.39 0.84 0.30 0.00 0.00 -0.00

8(OPE) 0.39 0.84 0.30 0.00 0.00 -0.00

9(OPE) 0.39 0.84 0.30 0.00 0.00 -0.00

10(OPE) 0.39 0.84 0.30 0.00 0.00 -0.00

11(OPE) 0.40 0.84 0.31 0.00 -0.00 -0.00

12(OPE) 0.38 0.84 0.29 0.00 0.00 -0.00

13(OPE) 0.39 0.84 0.31 0.00 0.00 -0.00

14(OPE) 0.39 0.84 0.30 0.00 0.00 -0.00

MAX 1.61/L2 3.44/L2 1.26/L2 0.00/L13 0.00/L12 -0.00/L11

Page 102: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

89

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

1200

1(HYD) -0.00 0.01 -0.01 -0.00 0.00 0.00

2(OPE) 0.04 3.92 -8.42 -0.00 -0.00 0.00

3(OPE) -0.03 0.96 -2.07 -0.00 0.00 0.00

4(SUS) -0.00 0.00 -0.00 -0.00 0.00 0.00

5(OPE) -0.02 0.96 -2.07 -0.00 0.00 0.00

6(OPE) -0.05 0.96 -2.07 -0.00 0.00 0.00

7(OPE) -0.03 0.96 -2.07 -0.00 0.00 0.00

8(OPE) -0.04 0.96 -2.07 -0.00 0.00 0.00

9(OPE) -0.04 0.96 -2.07 0.00 0.00 0.00

10(OPE) -0.03 0.96 -2.07 -0.00 0.00 0.00

11(OPE) 0.02 0.96 -2.07 -0.00 -0.00 -0.00

12(OPE) -0.08 0.96 -2.07 -0.00 0.00 0.00

13(OPE) -0.04 0.96 -2.06 0.00 0.00 0.00

14(OPE) -0.03 0.96 -2.07 -0.00 0.00 0.00

MAX -0.08/L12 3.92/L2 -8.42/L2 -0.00/L14 0.00/L12 0.00/L12

1210

1(HYD) -0.00 0.01 -0.01 -0.00 0.00 0.00

2(OPE) 0.04 4.30 -8.42 -0.00 -0.00 0.00

3(OPE) -0.03 1.06 -2.07 -0.00 0.00 0.00

4(SUS) -0.00 0.00 -0.00 -0.00 0.00 0.00

5(OPE) -0.02 1.06 -2.07 -0.00 0.00 0.00

6(OPE) -0.05 1.06 -2.07 -0.00 0.00 0.00

7(OPE) -0.03 1.06 -2.07 -0.00 0.00 0.00

8(OPE) -0.04 1.06 -2.07 -0.00 0.00 0.00

9(OPE) -0.04 1.06 -2.07 0.00 0.00 0.00

10(OPE) -0.03 1.06 -2.07 -0.00 0.00 0.00

11(OPE) 0.02 1.06 -2.07 -0.00 -0.00 -0.00

12(OPE) -0.09 1.06 -2.07 -0.00 0.00 0.00

13(OPE) -0.04 1.06 -2.06 0.00 0.00 0.00

14(OPE) -0.03 1.06 -2.07 -0.00 0.00 0.00

MAX -0.09/L12 4.30/L2 -8.42/L2 -0.00/L14 0.00/L12 0.00/L12

1220

1(HYD) -0.00 0.01 -0.01 -0.00 0.00 0.00

2(OPE) 0.04 4.44 -8.42 -0.00 -0.00 0.00

3(OPE) -0.04 1.09 -2.07 -0.00 0.00 0.00

4(SUS) -0.00 0.00 -0.00 -0.00 0.00 0.00

5(OPE) -0.02 1.09 -2.07 -0.00 0.00 0.00

6(OPE) -0.05 1.09 -2.07 -0.00 0.00 0.00

7(OPE) -0.03 1.09 -2.07 -0.00 0.00 0.00

8(OPE) -0.04 1.09 -2.07 -0.00 0.00 0.00

9(OPE) -0.04 1.09 -2.07 0.00 0.00 0.00

10(OPE) -0.03 1.09 -2.07 -0.00 0.00 0.00

11(OPE) 0.02 1.09 -2.07 -0.00 -0.00 -0.00

12(OPE) -0.09 1.09 -2.07 -0.00 0.00 0.00

13(OPE) -0.04 1.09 -2.06 0.00 0.00 0.00

14(OPE) -0.03 1.09 -2.07 -0.00 0.00 0.00

MAX -0.09/L12 4.44/L2 -8.42/L2 -0.00/L14 0.00/L12 0.00/L12

Page 103: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

90

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

1230

1(HYD) -0.00 0.00 -0.02 0.00 -0.00 0.00

2(OPE) 0.09 3.44 -17.64 0.00 -0.02 -0.00

3(OPE) -0.06 0.84 -4.33 0.00 -0.00 0.00

4(SUS) -0.00 -0.00 -0.00 0.00 -0.00 0.00

5(OPE) -0.04 0.84 -4.33 0.00 -0.00 0.00

6(OPE) -0.09 0.84 -4.33 0.00 -0.00 0.00

7(OPE) -0.06 0.84 -4.33 0.00 -0.00 0.00

8(OPE) -0.07 0.84 -4.33 0.00 -0.00 0.00

9(OPE) -0.07 0.84 -4.33 0.00 -0.00 0.00

10(OPE) -0.06 0.84 -4.33 0.00 -0.00 0.00

11(OPE) 0.03 0.84 -4.33 0.00 -0.00 0.00

12(OPE) -0.15 0.84 -4.33 0.00 -0.00 0.00

13(OPE) -0.07 0.84 -4.33 0.00 -0.00 0.00

14(OPE) -0.06 0.84 -4.34 -0.00 -0.00 0.00

MAX -0.15/L12 3.44/L2 -17.64/L2 0.00/L13 -0.02/L2 0.00/L12

1240

1(HYD) -0.00 0.00 -0.02 0.00 -0.00 0.00

2(OPE) 0.10 3.84 -17.63 0.00 -0.03 -0.01

3(OPE) -0.07 0.94 -4.33 0.00 -0.01 0.00

4(SUS) -0.00 -0.00 -0.00 0.00 -0.00 0.00

5(OPE) -0.04 0.94 -4.33 0.00 -0.01 0.00

6(OPE) -0.10 0.94 -4.33 0.00 -0.01 0.01

7(OPE) -0.07 0.94 -4.33 0.00 -0.01 0.00

8(OPE) -0.07 0.94 -4.33 0.00 -0.01 0.00

9(OPE) -0.07 0.94 -4.33 0.00 -0.01 0.00

10(OPE) -0.07 0.94 -4.33 0.00 -0.00 0.00

11(OPE) 0.02 0.94 -4.33 0.00 -0.01 0.00

12(OPE) -0.16 0.94 -4.33 0.00 -0.01 0.01

13(OPE) -0.08 0.94 -4.32 0.00 -0.01 0.00

14(OPE) -0.06 0.94 -4.34 -0.00 -0.00 0.00

MAX -0.16/L12 3.84/L2 -17.63/L2 0.00/L13 -0.03/L2 0.01/L12

1250

1(HYD) -0.00 0.00 -0.02 0.00 -0.00 0.00

2(OPE) 0.11 4.29 -17.63 0.00 -0.03 -0.01

3(OPE) -0.07 1.05 -4.33 0.00 -0.01 0.00

4(SUS) -0.00 -0.00 -0.00 0.00 -0.00 0.00

5(OPE) -0.05 1.05 -4.33 0.00 -0.01 0.00

6(OPE) -0.10 1.05 -4.33 0.00 -0.01 0.01

7(OPE) -0.07 1.05 -4.33 0.00 -0.01 0.00

8(OPE) -0.08 1.05 -4.33 0.00 -0.01 0.00

9(OPE) -0.08 1.05 -4.33 0.00 -0.01 0.00

10(OPE) -0.07 1.05 -4.33 0.00 -0.00 0.00

11(OPE) 0.02 1.05 -4.33 0.00 -0.01 0.00

12(OPE) -0.17 1.05 -4.33 0.00 -0.01 0.01

13(OPE) -0.08 1.05 -4.32 0.00 -0.01 0.00

14(OPE) -0.07 1.05 -4.34 -0.00 -0.00 0.00

MAX -0.17/L12 4.29/L2 -17.63/L2 0.00/L13 -0.03/L2 0.01/L12

Page 104: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

91

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

1251

1(HYD) -0.00 0.00 -0.02 0.00 -0.00 0.00

2(OPE) 0.11 4.29 -17.63 0.00 -0.03 -0.01

3(OPE) -0.07 1.05 -4.33 0.00 -0.01 0.00

4(SUS) -0.00 -0.00 -0.00 0.00 -0.00 0.00

5(OPE) -0.05 1.05 -4.33 0.00 -0.01 0.00

6(OPE) -0.10 1.05 -4.33 0.00 -0.01 0.01

7(OPE) -0.07 1.05 -4.33 0.00 -0.01 0.00

8(OPE) -0.08 1.05 -4.33 0.00 -0.01 0.00

9(OPE) -0.08 1.05 -4.33 0.00 -0.01 0.00

10(OPE) -0.07 1.05 -4.33 0.00 -0.00 0.00

11(OPE) 0.02 1.05 -4.33 0.00 -0.01 0.00

12(OPE) -0.17 1.05 -4.33 0.00 -0.01 0.01

13(OPE) -0.08 1.05 -4.32 0.00 -0.01 0.00

14(OPE) -0.07 1.05 -4.34 -0.00 -0.00 0.00

MAX -0.17/L12 4.29/L2 -17.63/L2 0.00/L13 -0.03/L2 0.01/L12

1260

1(HYD) -0.00 -0.00 -0.02 0.00 -0.00 0.00

2(OPE) -1.00 3.45 -17.69 0.00 -0.02 -0.00

3(OPE) -0.33 0.83 -4.34 0.00 -0.00 0.00

4(SUS) -0.00 -0.01 -0.00 0.00 -0.00 0.00

5(OPE) -0.31 0.83 -4.34 0.00 -0.00 0.00

6(OPE) -0.36 0.83 -4.34 0.00 -0.00 0.01

7(OPE) -0.33 0.83 -4.34 0.00 -0.00 0.00

8(OPE) -0.34 0.83 -4.34 0.00 -0.00 0.00

9(OPE) -0.34 0.83 -4.34 0.00 -0.00 0.00

10(OPE) -0.33 0.83 -4.34 0.00 -0.00 0.00

11(OPE) -0.24 0.84 -4.35 0.00 -0.00 0.00

12(OPE) -0.42 0.82 -4.34 0.00 -0.00 0.01

13(OPE) -0.34 0.83 -4.34 0.00 -0.00 0.00

14(OPE) -0.33 0.83 -4.34 -0.00 -0.00 0.00

MAX -1.00/L2 3.45/L2 -17.69/L2 0.00/L13 -0.02/L2 0.01/L12

1270

1(HYD) -0.00 -0.00 -0.02 0.00 -0.00 0.00

2(OPE) -1.38 3.45 -17.71 0.00 -0.02 -0.00

3(OPE) -0.43 0.83 -4.34 0.00 -0.00 0.00

4(SUS) -0.00 -0.01 -0.00 0.00 -0.00 0.00

5(OPE) -0.40 0.83 -4.35 0.00 -0.00 0.00

6(OPE) -0.45 0.82 -4.34 0.00 -0.00 0.01

7(OPE) -0.43 0.83 -4.34 0.00 -0.00 0.00

8(OPE) -0.43 0.82 -4.35 0.00 -0.00 0.00

9(OPE) -0.43 0.82 -4.35 0.00 -0.00 0.00

10(OPE) -0.42 0.83 -4.34 0.00 -0.00 0.00

11(OPE) -0.34 0.83 -4.35 0.00 -0.00 0.00

12(OPE) -0.52 0.82 -4.34 0.00 -0.00 0.01

13(OPE) -0.43 0.82 -4.34 0.00 -0.00 0.00

14(OPE) -0.42 0.83 -4.34 -0.00 -0.00 0.00

MAX -1.38/L2 3.45/L2 -17.71/L2 0.00/L13 -0.02/L2 0.01/L12

Page 105: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

92

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

1280

1(HYD) -0.00 -0.00 -0.02 0.00 -0.00 0.00

2(OPE) -1.52 3.45 -17.72 0.00 -0.02 -0.00

3(OPE) -0.46 0.82 -4.35 0.00 -0.00 0.00

4(SUS) -0.00 -0.01 -0.00 0.00 -0.00 0.00

5(OPE) -0.44 0.83 -4.35 0.00 -0.00 0.00

6(OPE) -0.49 0.82 -4.35 0.00 -0.00 0.01

7(OPE) -0.46 0.82 -4.35 0.00 -0.00 0.00

8(OPE) -0.47 0.82 -4.35 0.00 -0.00 0.00

9(OPE) -0.46 0.82 -4.35 0.00 -0.00 0.00

10(OPE) -0.46 0.82 -4.34 0.00 -0.00 0.00

11(OPE) -0.37 0.83 -4.35 0.00 -0.00 0.00

12(OPE) -0.55 0.81 -4.34 0.00 -0.00 0.01

13(OPE) -0.47 0.82 -4.35 0.00 -0.00 0.00

14(OPE) -0.46 0.82 -4.34 -0.00 -0.00 0.00

MAX -1.52/L2 3.45/L2 -17.72/L2 0.00/L13 -0.02/L2 0.01/L12

1290

1(HYD) -0.00 -0.00 -0.02 -0.00 0.00 0.00

2(OPE) 0.09 -1.23 -17.64 -0.00 -0.00 0.00

3(OPE) -0.05 -0.30 -4.33 -0.00 0.00 0.00

4(SUS) -0.00 -0.00 -0.00 -0.00 -0.00 0.00

5(OPE) -0.03 -0.30 -4.33 -0.00 0.00 0.00

6(OPE) -0.08 -0.30 -4.33 -0.00 0.00 0.00

7(OPE) -0.05 -0.30 -4.33 -0.00 0.00 0.00

8(OPE) -0.06 -0.30 -4.33 -0.00 0.00 0.00

9(OPE) -0.06 -0.30 -4.33 -0.00 0.00 0.00

10(OPE) -0.05 -0.30 -4.33 -0.00 0.00 0.00

11(OPE) 0.02 -0.30 -4.33 -0.00 -0.00 -0.00

12(OPE) -0.13 -0.30 -4.33 -0.00 0.00 0.00

13(OPE) -0.06 -0.30 -4.33 -0.00 0.00 0.00

14(OPE) -0.05 -0.30 -4.33 -0.00 0.00 0.00

MAX -0.13/L12 -1.23/L2 -17.64/L2 -0.00/L9 0.00/L12 0.00/L12

1300

1(HYD) -0.00 -0.00 -0.02 -0.00 0.00 0.00

2(OPE) 0.09 -1.60 -17.64 -0.00 -0.00 0.00

3(OPE) -0.05 -0.40 -4.33 -0.00 0.00 0.00

4(SUS) -0.00 -0.00 -0.00 -0.00 -0.00 0.00

5(OPE) -0.03 -0.40 -4.33 -0.00 0.00 0.00

6(OPE) -0.08 -0.40 -4.33 -0.00 0.00 0.00

7(OPE) -0.05 -0.40 -4.33 -0.00 0.00 0.00

8(OPE) -0.06 -0.40 -4.33 -0.00 0.00 0.00

9(OPE) -0.06 -0.40 -4.33 -0.00 0.00 0.00

10(OPE) -0.05 -0.40 -4.33 -0.00 0.00 0.00

11(OPE) 0.02 -0.40 -4.33 -0.00 -0.00 -0.00

12(OPE) -0.13 -0.40 -4.33 -0.00 0.00 0.00

13(OPE) -0.06 -0.40 -4.33 -0.00 0.00 0.00

14(OPE) -0.05 -0.40 -4.33 -0.00 0.00 0.00

MAX -0.13/L12 -1.60/L2 -17.64/L2 -0.00/L9 0.00/L12 0.00/L12

Page 106: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

93

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

1310

1(HYD) -0.00 -0.00 -0.02 -0.00 0.00 0.00

2(OPE) 0.09 -1.74 -17.64 -0.00 -0.00 0.00

3(OPE) -0.05 -0.43 -4.33 -0.00 0.00 0.00

4(SUS) -0.00 -0.00 -0.00 -0.00 -0.00 0.00

5(OPE) -0.03 -0.43 -4.33 -0.00 0.00 0.00

6(OPE) -0.08 -0.43 -4.33 -0.00 0.00 0.00

7(OPE) -0.05 -0.43 -4.33 -0.00 0.00 0.00

8(OPE) -0.06 -0.43 -4.33 -0.00 0.00 0.00

9(OPE) -0.06 -0.43 -4.33 -0.00 0.00 0.00

10(OPE) -0.05 -0.43 -4.33 -0.00 0.00 0.00

11(OPE) 0.02 -0.43 -4.33 -0.00 -0.00 -0.00

12(OPE) -0.13 -0.43 -4.33 -0.00 0.00 0.00

13(OPE) -0.06 -0.43 -4.33 -0.00 0.00 0.00

14(OPE) -0.05 -0.43 -4.33 -0.00 0.00 0.00

MAX -0.13/L12 -1.74/L2 -17.64/L2 -0.00/L9 0.00/L12 0.00/L12

1320

1(HYD) -0.00 -0.00 -0.02 -0.00 0.00 0.00

2(OPE) 0.11 1.34 -19.21 -0.00 -0.00 0.00

3(OPE) -0.07 0.33 -4.74 -0.00 0.00 0.00

4(SUS) -0.00 -0.00 -0.00 -0.00 -0.00 0.00

5(OPE) -0.04 0.33 -4.74 -0.00 0.00 0.00

6(OPE) -0.10 0.33 -4.74 -0.00 0.00 0.00

7(OPE) -0.07 0.33 -4.74 -0.00 0.00 0.00

8(OPE) -0.07 0.33 -4.74 -0.00 0.00 0.00

9(OPE) -0.07 0.33 -4.74 -0.00 0.00 0.00

10(OPE) -0.06 0.33 -4.74 -0.00 0.00 0.00

11(OPE) 0.03 0.33 -4.74 -0.00 -0.00 -0.00

12(OPE) -0.16 0.33 -4.74 -0.00 0.00 0.00

13(OPE) -0.08 0.33 -4.74 -0.00 0.00 0.00

14(OPE) -0.06 0.33 -4.74 -0.00 0.00 0.00

MAX -0.16/L12 1.34/L2 -19.21/L2 -0.00/L1 -0.00/L2 0.00/L12

1330

1(HYD) -0.00 -0.00 -0.02 -0.00 0.00 0.00

2(OPE) 0.13 1.34 -19.43 -0.00 -0.00 0.00

3(OPE) -0.08 0.33 -4.82 -0.00 0.00 0.00

4(SUS) -0.00 -0.00 -0.00 -0.00 -0.00 0.00

5(OPE) -0.04 0.33 -4.82 -0.00 0.00 0.00

6(OPE) -0.11 0.33 -4.82 -0.00 0.00 0.00

7(OPE) -0.07 0.33 -4.82 -0.00 0.00 0.00

8(OPE) -0.08 0.33 -4.82 -0.00 0.00 0.00

9(OPE) -0.08 0.33 -4.82 -0.00 0.00 0.00

10(OPE) -0.07 0.33 -4.82 -0.00 0.00 0.00

11(OPE) 0.04 0.33 -4.82 -0.00 -0.00 -0.00

12(OPE) -0.18 0.33 -4.82 -0.00 0.00 0.00

13(OPE) -0.08 0.33 -4.82 -0.00 0.00 0.00

14(OPE) -0.07 0.33 -4.82 -0.00 0.00 0.00

MAX -0.18/L12 1.34/L2 -19.43/L2 -0.00/L1 -0.00/L2 0.00/L12

Page 107: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

94

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

1340

1(HYD) -0.00 -0.00 -0.02 -0.00 0.00 0.00

2(OPE) 0.11 1.48 -19.21 -0.00 -0.00 0.00

3(OPE) -0.07 0.38 -4.74 -0.00 0.00 0.00

4(SUS) -0.00 -0.00 -0.00 -0.00 -0.00 0.00

5(OPE) -0.04 0.38 -4.74 -0.00 0.00 0.00

6(OPE) -0.10 0.38 -4.74 -0.00 0.00 0.00

7(OPE) -0.07 0.38 -4.74 -0.00 0.00 0.00

8(OPE) -0.07 0.38 -4.74 -0.00 0.00 0.00

9(OPE) -0.07 0.38 -4.74 -0.00 0.00 0.00

10(OPE) -0.07 0.38 -4.74 -0.00 0.00 0.00

11(OPE) 0.03 0.38 -4.74 -0.00 -0.00 -0.00

12(OPE) -0.17 0.38 -4.74 -0.00 0.00 0.00

13(OPE) -0.08 0.38 -4.74 -0.00 0.00 0.00

14(OPE) -0.06 0.38 -4.74 -0.00 0.00 0.00

MAX -0.17/L12 1.48/L2 -19.21/L2 -0.00/L1 -0.00/L2 0.00/L12

1350

1(HYD) -0.00 -0.00 -0.02 -0.00 0.00 0.00

2(OPE) 0.11 1.27 -19.21 -0.00 -0.00 0.00

3(OPE) -0.07 0.30 -4.74 -0.00 0.00 0.00

4(SUS) -0.00 -0.00 -0.00 -0.00 -0.00 0.00

5(OPE) -0.04 0.30 -4.74 -0.00 0.00 0.00

6(OPE) -0.09 0.30 -4.74 -0.00 0.00 0.00

7(OPE) -0.07 0.30 -4.74 -0.00 0.00 0.00

8(OPE) -0.07 0.30 -4.74 -0.00 0.00 0.00

9(OPE) -0.07 0.30 -4.74 -0.00 0.00 0.00

10(OPE) -0.06 0.30 -4.74 -0.00 0.00 0.00

11(OPE) 0.03 0.30 -4.74 -0.00 -0.00 -0.00

12(OPE) -0.16 0.30 -4.74 -0.00 0.00 0.00

13(OPE) -0.07 0.30 -4.73 -0.00 0.00 0.00

14(OPE) -0.06 0.30 -4.74 -0.00 0.00 0.00

MAX -0.16/L12 1.27/L2 -19.21/L2 -0.00/L1 -0.00/L2 0.00/L12

1355

1(HYD) -0.00 -0.00 -0.02 -0.00 0.00 0.00

2(OPE) 0.01 1.27 -19.22 -0.00 -0.00 0.00

3(OPE) -0.11 0.30 -4.73 -0.00 0.00 0.00

4(SUS) -0.00 -0.00 -0.00 -0.00 -0.00 0.00

5(OPE) -0.08 0.30 -4.74 -0.00 0.00 0.00

6(OPE) -0.13 0.30 -4.73 -0.00 0.00 0.00

7(OPE) -0.11 0.30 -4.73 -0.00 0.00 0.00

8(OPE) -0.11 0.30 -4.73 -0.00 0.00 0.00

9(OPE) -0.11 0.30 -4.73 -0.00 0.00 0.00

10(OPE) -0.10 0.30 -4.73 -0.00 0.00 0.00

11(OPE) -0.01 0.30 -4.74 -0.00 -0.00 -0.00

12(OPE) -0.20 0.29 -4.73 -0.00 0.00 0.00

13(OPE) -0.11 0.30 -4.73 -0.00 0.00 0.00

14(OPE) -0.10 0.30 -4.74 -0.00 0.00 0.00

MAX -0.20/L12 1.27/L2 -19.22/L2 -0.00/L1 -0.00/L2 0.00/L12

Page 108: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

95

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

1360

1(HYD) -0.00 -0.00 -0.02 -0.00 0.00 0.00

2(OPE) -0.07 1.26 -19.23 -0.00 -0.00 0.00

3(OPE) -0.14 0.29 -4.73 -0.00 0.00 0.00

4(SUS) -0.00 -0.00 -0.00 -0.00 -0.00 0.00

5(OPE) -0.11 0.30 -4.73 -0.00 0.00 0.00

6(OPE) -0.16 0.29 -4.73 -0.00 0.00 0.00

7(OPE) -0.14 0.29 -4.73 -0.00 0.00 0.00

8(OPE) -0.14 0.29 -4.73 -0.00 0.00 0.00

9(OPE) -0.14 0.29 -4.73 -0.00 0.00 0.00

10(OPE) -0.13 0.29 -4.73 -0.00 0.00 0.00

11(OPE) -0.04 0.30 -4.74 -0.00 -0.00 -0.00

12(OPE) -0.23 0.29 -4.72 -0.00 0.00 0.00

13(OPE) -0.14 0.29 -4.73 -0.00 0.00 0.00

14(OPE) -0.13 0.29 -4.73 -0.00 0.00 0.00

MAX -0.23/L12 1.26/L2 -19.23/L2 -0.00/L1 -0.00/L2 0.00/L12

1370

1(HYD) -0.01 -0.00 -0.02 -0.00 0.00 0.00

2(OPE) -0.13 1.26 -19.23 -0.00 -0.00 0.00

3(OPE) -0.16 0.29 -4.73 -0.00 0.00 0.00

4(SUS) -0.00 -0.00 -0.00 -0.00 -0.00 0.00

5(OPE) -0.13 0.29 -4.73 -0.00 0.00 0.00

6(OPE) -0.18 0.29 -4.73 -0.00 0.00 0.00

7(OPE) -0.16 0.29 -4.73 -0.00 0.00 0.00

8(OPE) -0.16 0.29 -4.73 -0.00 0.00 0.00

9(OPE) -0.16 0.29 -4.73 -0.00 0.00 0.00

10(OPE) -0.15 0.29 -4.73 -0.00 0.00 0.00

11(OPE) -0.06 0.30 -4.74 -0.00 -0.00 -0.00

12(OPE) -0.25 0.29 -4.72 -0.00 0.00 0.00

13(OPE) -0.16 0.29 -4.73 -0.00 0.00 0.00

14(OPE) -0.15 0.29 -4.73 -0.00 0.00 0.00

MAX -0.25/L12 1.26/L2 -19.23/L2 -0.00/L1 -0.00/L2 0.00/L12

1380

1(HYD) -0.01 -0.00 -0.02 -0.00 0.00 0.00

2(OPE) -0.17 1.26 -19.23 -0.00 -0.00 0.00

3(OPE) -0.17 0.29 -4.73 -0.00 0.00 0.00

4(SUS) -0.00 -0.00 -0.00 -0.00 -0.00 0.00

5(OPE) -0.15 0.29 -4.73 -0.00 0.00 0.00

6(OPE) -0.20 0.29 -4.72 -0.00 0.00 0.00

7(OPE) -0.17 0.29 -4.73 -0.00 0.00 0.00

8(OPE) -0.18 0.29 -4.73 -0.00 0.00 0.00

9(OPE) -0.18 0.29 -4.73 -0.00 0.00 0.00

10(OPE) -0.17 0.29 -4.73 -0.00 0.00 0.00

11(OPE) -0.08 0.30 -4.74 -0.00 -0.00 -0.00

12(OPE) -0.27 0.28 -4.71 -0.00 0.00 0.00

13(OPE) -0.18 0.29 -4.72 -0.00 0.00 0.00

14(OPE) -0.17 0.29 -4.73 -0.00 0.00 0.00

MAX -0.27/L12 1.26/L2 -19.23/L2 -0.00/L1 -0.00/L2 0.00/L12

Page 109: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

96

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

1390

1(HYD) -0.00 -0.01 -0.02 -0.00 0.00 0.00

2(OPE) -0.06 1.26 -19.32 -0.00 -0.00 0.00

3(OPE) -0.14 0.29 -4.77 -0.00 0.00 0.00

4(SUS) -0.00 -0.01 -0.00 -0.00 -0.00 0.00

5(OPE) -0.11 0.29 -4.77 -0.00 0.00 0.00

6(OPE) -0.17 0.29 -4.76 -0.00 0.00 0.00

7(OPE) -0.14 0.29 -4.77 -0.00 0.00 0.00

8(OPE) -0.14 0.29 -4.77 -0.00 0.00 0.00

9(OPE) -0.14 0.29 -4.77 -0.00 0.00 0.00

10(OPE) -0.14 0.29 -4.77 -0.00 0.00 0.00

11(OPE) -0.04 0.30 -4.78 -0.00 -0.00 -0.00

12(OPE) -0.24 0.29 -4.76 -0.00 0.00 0.00

13(OPE) -0.15 0.29 -4.76 -0.00 0.00 0.00

14(OPE) -0.13 0.29 -4.77 -0.00 0.00 0.00

MAX -0.24/L12 1.26/L2 -19.32/L2 -0.00/L8 -0.00/L2 0.00/L12

1400

1(HYD) -0.00 -0.01 -0.02 -0.00 0.00 0.00

2(OPE) -0.06 1.26 -19.36 -0.00 -0.00 0.00

3(OPE) -0.14 0.29 -4.78 -0.00 0.00 0.00

4(SUS) -0.00 -0.01 -0.00 -0.00 -0.00 0.00

5(OPE) -0.11 0.29 -4.78 -0.00 0.00 0.00

6(OPE) -0.17 0.29 -4.78 -0.00 0.00 0.00

7(OPE) -0.14 0.29 -4.78 -0.00 0.00 0.00

8(OPE) -0.14 0.29 -4.78 -0.00 0.00 0.00

9(OPE) -0.14 0.29 -4.78 -0.00 0.00 0.00

10(OPE) -0.14 0.29 -4.78 -0.00 0.00 0.00

11(OPE) -0.04 0.29 -4.79 -0.00 -0.00 -0.00

12(OPE) -0.24 0.28 -4.77 -0.00 0.00 0.00

13(OPE) -0.15 0.29 -4.78 -0.00 0.00 0.00

14(OPE) -0.13 0.29 -4.78 -0.00 0.00 0.00

MAX -0.24/L12 1.26/L2 -19.36/L2 -0.00/L8 -0.00/L2 0.00/L12

1410

1(HYD) -0.00 -0.01 -0.02 -0.00 0.00 0.00

2(OPE) -0.06 1.26 -19.37 -0.00 -0.00 0.00

3(OPE) -0.14 0.29 -4.78 -0.00 0.00 0.00

4(SUS) -0.00 -0.01 -0.00 -0.00 -0.00 0.00

5(OPE) -0.11 0.29 -4.79 -0.00 0.00 0.00

6(OPE) -0.17 0.29 -4.78 -0.00 0.00 0.00

7(OPE) -0.14 0.29 -4.78 -0.00 0.00 0.00

8(OPE) -0.14 0.29 -4.78 -0.00 0.00 0.00

9(OPE) -0.14 0.29 -4.78 -0.00 0.00 0.00

10(OPE) -0.14 0.29 -4.79 -0.00 0.00 0.00

11(OPE) -0.03 0.29 -4.79 -0.00 -0.00 -0.00

12(OPE) -0.24 0.28 -4.78 -0.00 0.00 0.00

13(OPE) -0.15 0.29 -4.78 -0.00 0.00 0.00

14(OPE) -0.13 0.29 -4.79 -0.00 0.00 0.00

MAX -0.24/L12 1.26/L2 -19.37/L2 -0.00/L8 -0.00/L2 0.00/L12

Page 110: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

97

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

1420

1(HYD) -0.00 0.00 -0.02 -0.00 -0.00 -0.00

2(OPE) 0.11 1.53 -19.21 -0.00 -0.02 -0.00

3(OPE) -0.07 0.40 -4.74 -0.00 -0.00 0.00

4(SUS) -0.00 -0.00 -0.00 -0.00 -0.00 -0.00

5(OPE) -0.04 0.40 -4.74 -0.00 -0.00 -0.00

6(OPE) -0.10 0.40 -4.74 -0.00 -0.00 0.00

7(OPE) -0.07 0.40 -4.74 -0.00 -0.00 0.00

8(OPE) -0.07 0.40 -4.74 -0.00 -0.00 0.00

9(OPE) -0.08 0.40 -4.74 -0.00 -0.00 0.00

10(OPE) -0.07 0.40 -4.74 -0.00 -0.00 0.00

11(OPE) 0.03 0.40 -4.74 -0.00 -0.00 -0.00

12(OPE) -0.17 0.40 -4.74 -0.00 -0.00 0.00

13(OPE) -0.08 0.40 -4.73 -0.00 -0.00 0.00

14(OPE) -0.06 0.40 -4.74 -0.00 -0.00 0.00

MAX -0.17/L12 1.53/L2 -19.21/L2 -0.00/L2 -0.02/L2 0.00/L12

1430

1(HYD) 0.00 0.00 -0.02 -0.00 -0.00 -0.00

2(OPE) 0.11 1.59 -19.21 -0.01 -0.03 -0.00

3(OPE) -0.07 0.42 -4.74 -0.00 -0.01 -0.00

4(SUS) 0.00 -0.00 -0.00 -0.00 0.00 -0.00

5(OPE) -0.04 0.42 -4.74 -0.00 -0.01 -0.00

6(OPE) -0.10 0.42 -4.74 -0.00 -0.00 -0.00

7(OPE) -0.07 0.42 -4.74 -0.00 -0.01 -0.00

8(OPE) -0.07 0.42 -4.74 -0.00 -0.01 -0.00

9(OPE) -0.08 0.42 -4.74 -0.00 -0.01 -0.00

10(OPE) -0.07 0.42 -4.74 -0.00 -0.01 -0.00

11(OPE) 0.03 0.42 -4.74 -0.00 -0.01 -0.00

12(OPE) -0.17 0.42 -4.74 -0.00 -0.00 0.00

13(OPE) -0.08 0.42 -4.74 -0.00 -0.01 -0.00

14(OPE) -0.07 0.42 -4.74 -0.00 -0.01 -0.00

MAX -0.17/L12 1.59/L2 -19.21/L2 -0.01/L2 -0.03/L2 -0.00/L2

1450

1(HYD) -0.00 0.00 -0.02 -0.00 -0.00 0.00

2(OPE) 0.02 1.53 -19.26 -0.00 -0.02 0.00

3(OPE) -0.11 0.39 -4.74 -0.00 -0.00 0.00

4(SUS) -0.00 -0.00 -0.00 -0.00 -0.00 0.00

5(OPE) -0.08 0.39 -4.75 -0.00 -0.00 0.00

6(OPE) -0.14 0.39 -4.74 -0.00 -0.00 0.00

7(OPE) -0.11 0.39 -4.74 -0.00 -0.00 0.00

8(OPE) -0.11 0.39 -4.74 -0.00 -0.00 0.00

9(OPE) -0.11 0.39 -4.74 -0.00 -0.00 0.00

10(OPE) -0.10 0.39 -4.75 -0.00 -0.00 0.00

11(OPE) -0.00 0.40 -4.75 -0.00 -0.00 0.00

12(OPE) -0.21 0.39 -4.74 -0.00 -0.00 0.00

13(OPE) -0.11 0.39 -4.74 -0.00 -0.00 0.00

14(OPE) -0.10 0.39 -4.75 -0.00 -0.00 0.00

MAX -0.21/L12 1.53/L2 -19.26/L2 -0.00/L2 -0.02/L2 0.00/L12

Page 111: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

98

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

1460

1(HYD) -0.00 -0.00 -0.02 -0.00 -0.00 0.00

2(OPE) -0.02 1.53 -19.28 -0.00 -0.02 0.00

3(OPE) -0.12 0.39 -4.75 -0.00 -0.00 0.00

4(SUS) -0.00 -0.00 -0.00 -0.00 -0.00 0.00

5(OPE) -0.09 0.39 -4.75 -0.00 -0.00 0.00

6(OPE) -0.15 0.39 -4.75 -0.00 -0.00 0.00

7(OPE) -0.12 0.39 -4.75 -0.00 -0.00 0.00

8(OPE) -0.12 0.39 -4.75 -0.00 -0.00 0.00

9(OPE) -0.12 0.39 -4.75 -0.00 -0.00 0.00

10(OPE) -0.12 0.39 -4.75 -0.00 -0.00 0.00

11(OPE) -0.01 0.39 -4.75 -0.00 -0.00 0.00

12(OPE) -0.22 0.39 -4.74 -0.00 -0.00 0.00

13(OPE) -0.13 0.39 -4.74 -0.00 -0.00 0.00

14(OPE) -0.11 0.39 -4.75 -0.00 -0.00 0.00

MAX -0.22/L12 1.53/L2 -19.28/L2 -0.00/L2 -0.02/L2 0.00/L12

1470

1(HYD) -0.00 -0.00 -0.02 -0.00 -0.00 0.00

2(OPE) -0.03 1.53 -19.29 -0.00 -0.02 0.00

3(OPE) -0.12 0.39 -4.75 -0.00 -0.00 0.00

4(SUS) -0.00 -0.00 -0.00 -0.00 -0.00 0.00

5(OPE) -0.10 0.39 -4.75 -0.00 -0.00 0.00

6(OPE) -0.15 0.39 -4.75 -0.00 -0.00 0.00

7(OPE) -0.12 0.39 -4.75 -0.00 -0.00 0.00

8(OPE) -0.13 0.39 -4.75 -0.00 -0.00 0.00

9(OPE) -0.13 0.39 -4.75 -0.00 -0.00 0.00

10(OPE) -0.12 0.39 -4.75 -0.00 -0.00 0.00

11(OPE) -0.02 0.39 -4.76 -0.00 -0.00 0.00

12(OPE) -0.23 0.39 -4.74 -0.00 -0.00 0.00

13(OPE) -0.13 0.39 -4.74 -0.00 -0.00 0.00

14(OPE) -0.12 0.39 -4.75 -0.00 -0.00 0.00

MAX -0.23/L12 1.53/L2 -19.29/L2 -0.00/L2 -0.02/L2 0.00/L12

1480

1(HYD) 0.00 -0.00 0.00 0.00 0.00 0.00

2(OPE) -0.00 -0.00 0.00 0.00 -0.00 0.00

3(OPE) -0.00 -0.00 0.00 0.00 0.00 0.00

4(SUS) 0.00 -0.00 0.00 0.00 0.00 0.00

5(OPE) -0.00 -0.00 0.00 0.00 0.00 0.00

6(OPE) -0.00 -0.00 0.00 0.00 0.00 0.00

7(OPE) -0.00 -0.00 0.00 0.00 0.00 0.00

8(OPE) -0.00 -0.00 0.00 0.00 0.00 0.00

9(OPE) -0.00 -0.00 0.00 0.00 0.00 0.00

10(OPE) -0.00 -0.00 0.00 0.00 0.00 0.00

11(OPE) 0.00 -0.00 0.00 0.00 -0.00 -0.00

12(OPE) -0.00 -0.00 0.00 0.00 0.00 0.00

13(OPE) -0.00 -0.00 0.00 0.00 0.00 0.00

14(OPE) -0.00 -0.00 0.00 0.00 0.00 0.00

MAX -0.00/L12 -0.00/L2 0.00/L2 0.00/L2 0.00/L12 0.00/L12

Page 112: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

99

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

1490

1(HYD) -0.00 -0.00 -0.01 -0.00 0.00 0.00

2(OPE) 0.08 -0.00 -15.72 -0.00 -0.00 0.00

3(OPE) -0.04 -0.00 -3.86 -0.00 0.00 0.00

4(SUS) -0.00 -0.00 0.00 -0.00 -0.00 0.00

5(OPE) -0.03 -0.00 -3.86 -0.00 0.00 0.00

6(OPE) -0.06 -0.00 -3.86 -0.00 0.00 0.00

7(OPE) -0.04 -0.00 -3.86 -0.00 0.00 0.00

8(OPE) -0.05 -0.00 -3.86 -0.00 0.00 0.00

9(OPE) -0.05 -0.00 -3.86 -0.00 0.00 0.00

10(OPE) -0.04 -0.00 -3.86 -0.00 0.00 0.00

11(OPE) 0.02 -0.00 -3.86 -0.00 -0.00 -0.00

12(OPE) -0.10 -0.00 -3.86 -0.00 0.00 0.00

13(OPE) -0.05 -0.00 -3.86 -0.00 0.00 0.00

14(OPE) -0.04 -0.00 -3.86 -0.00 0.00 0.00

MAX -0.10/L12 -0.00/L1 -15.72/L2 -0.00/L1 0.00/L12 0.00/L12

1500

1(HYD) -0.01 0.01 0.01 0.00 0.00 0.00

2(OPE) -0.01 5.22 1.25 0.00 -0.00 0.00

3(OPE) -0.01 1.41 0.31 0.00 0.00 0.00

4(SUS) -0.00 0.00 0.00 0.00 0.00 0.00

5(OPE) -0.00 1.41 0.31 0.00 0.00 0.00

6(OPE) -0.01 1.41 0.31 0.00 0.00 0.00

7(OPE) -0.01 1.41 0.31 0.00 0.00 0.00

8(OPE) -0.01 1.41 0.31 0.00 0.00 0.00

9(OPE) -0.01 1.41 0.32 0.00 0.00 0.00

10(OPE) -0.01 1.41 0.31 0.00 0.00 0.00

11(OPE) 0.00 1.41 0.31 0.00 -0.00 0.00

12(OPE) -0.02 1.41 0.31 0.00 0.00 0.00

13(OPE) -0.01 1.41 0.32 0.00 0.00 0.00

14(OPE) -0.01 1.41 0.31 0.00 0.00 0.00

MAX -0.02/L12 5.22/L2 1.25/L2 0.00/L13 0.00/L12 0.00/L12

1510

1(HYD) -0.01 0.01 0.01 0.00 0.00 0.00

2(OPE) -0.02 6.11 1.25 -0.00 -0.00 0.00

3(OPE) -0.01 1.82 0.32 0.00 0.00 0.00

4(SUS) -0.01 0.00 0.01 0.00 0.00 0.00

5(OPE) -0.01 1.82 0.32 0.00 0.00 0.00

6(OPE) -0.02 1.82 0.32 0.00 0.00 0.00

7(OPE) -0.01 1.82 0.32 0.00 0.00 0.00

8(OPE) -0.01 1.82 0.32 0.00 0.00 0.00

9(OPE) -0.01 1.82 0.32 0.00 0.00 0.00

10(OPE) -0.01 1.82 0.31 0.00 0.00 0.00

11(OPE) 0.00 1.82 0.32 0.00 -0.00 0.00

12(OPE) -0.03 1.82 0.31 0.00 0.01 0.00

13(OPE) -0.01 1.82 0.32 0.00 0.00 0.00

14(OPE) -0.01 1.82 0.31 0.00 0.00 0.00

MAX -0.03/L12 6.11/L2 1.25/L2 0.00/L13 0.01/L12 0.00/L2

Page 113: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

100

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

1518

1(HYD) -0.01 0.01 0.01 0.00 0.00 0.00

2(OPE) -0.02 6.13 1.25 -0.00 -0.00 0.00

3(OPE) -0.01 1.83 0.32 0.00 0.00 0.00

4(SUS) -0.01 0.00 0.01 0.00 0.00 0.00

5(OPE) -0.01 1.83 0.32 0.00 0.00 0.00

6(OPE) -0.02 1.83 0.32 0.00 0.00 0.00

7(OPE) -0.01 1.83 0.32 0.00 0.00 0.00

8(OPE) -0.01 1.83 0.32 0.00 0.00 0.00

9(OPE) -0.01 1.83 0.32 0.00 0.00 0.00

10(OPE) -0.01 1.83 0.32 0.00 0.00 0.00

11(OPE) 0.00 1.83 0.32 0.00 -0.00 0.00

12(OPE) -0.03 1.83 0.31 0.00 0.01 0.00

13(OPE) -0.01 1.83 0.32 0.00 0.00 0.00

14(OPE) -0.01 1.83 0.31 0.00 0.00 0.00

MAX -0.03/L12 6.13/L2 1.25/L2 -0.00/L2 0.01/L12 0.00/L2

1519

1(HYD) -0.02 0.00 0.01 0.00 0.00 0.01

2(OPE) -0.43 7.08 1.24 -0.01 -0.00 0.01

3(OPE) -0.20 2.26 0.32 -0.00 0.00 0.01

4(SUS) -0.02 -0.00 0.01 0.00 0.00 0.01

5(OPE) -0.20 2.26 0.32 -0.00 0.00 0.01

6(OPE) -0.20 2.26 0.32 -0.00 0.01 0.01

7(OPE) -0.20 2.26 0.32 -0.00 0.00 0.01

8(OPE) -0.20 2.26 0.32 -0.00 0.00 0.01

9(OPE) -0.20 2.26 0.32 -0.00 0.01 0.01

10(OPE) -0.20 2.26 0.32 -0.00 0.00 0.01

11(OPE) -0.19 2.25 0.31 -0.00 -0.00 0.01

12(OPE) -0.21 2.26 0.33 0.00 0.01 0.00

13(OPE) -0.20 2.26 0.33 -0.00 0.01 0.01

14(OPE) -0.20 2.26 0.31 -0.00 0.00 0.01

MAX -0.43/L2 7.08/L2 1.24/L2 -0.01/L2 0.01/L12 0.01/L11

1520

1(HYD) -0.03 -0.03 0.03 0.00 0.00 0.01

2(OPE) -1.40 7.44 1.22 -0.01 -0.00 0.02

3(OPE) -0.64 2.41 0.33 -0.00 0.01 0.01

4(SUS) -0.02 -0.03 0.02 0.00 0.00 0.01

5(OPE) -0.64 2.41 0.32 -0.00 0.00 0.01

6(OPE) -0.65 2.41 0.34 -0.00 0.01 0.01

7(OPE) -0.64 2.41 0.33 -0.00 0.00 0.01

8(OPE) -0.65 2.41 0.33 -0.00 0.01 0.01

9(OPE) -0.64 2.41 0.34 -0.01 0.01 0.01

10(OPE) -0.65 2.41 0.33 -0.00 0.00 0.01

11(OPE) -0.65 2.38 0.29 -0.00 -0.01 0.02

12(OPE) -0.65 2.44 0.37 0.00 0.02 -0.00

13(OPE) -0.64 2.41 0.35 -0.01 0.01 0.01

14(OPE) -0.65 2.41 0.31 -0.00 -0.00 0.01

MAX -1.40/L2 7.44/L2 1.22/L2 -0.01/L2 0.02/L12 0.02/L11

Page 114: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

101

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

1528

1(HYD) -0.03 -0.07 0.05 0.00 0.01 0.01

2(OPE) -2.65 7.37 1.21 -0.02 -0.00 0.02

3(OPE) -1.21 2.36 0.35 -0.01 0.00 0.01

4(SUS) -0.03 -0.06 0.04 0.00 0.00 0.01

5(OPE) -1.21 2.35 0.33 -0.01 0.00 0.01

6(OPE) -1.22 2.38 0.37 -0.00 0.01 0.01

7(OPE) -1.21 2.37 0.35 -0.01 0.00 0.01

8(OPE) -1.22 2.36 0.35 -0.01 0.01 0.01

9(OPE) -1.21 2.37 0.36 -0.01 0.01 0.01

10(OPE) -1.22 2.36 0.34 -0.00 0.00 0.01

11(OPE) -1.22 2.28 0.25 -0.01 -0.01 0.03

12(OPE) -1.22 2.46 0.45 0.00 0.02 -0.00

13(OPE) -1.21 2.36 0.40 -0.01 0.01 0.01

14(OPE) -1.22 2.37 0.30 -0.00 -0.00 0.01

MAX -2.65/L2 7.37/L2 1.21/L2 -0.02/L2 0.02/L12 0.03/L11

1529

1(HYD) -0.02 -0.11 0.06 0.00 0.01 0.01

2(OPE) -3.58 6.91 1.23 -0.02 -0.00 0.02

3(OPE) -1.63 2.14 0.37 -0.01 0.00 0.02

4(SUS) -0.01 -0.09 0.05 0.00 0.01 0.01

5(OPE) -1.63 2.13 0.34 -0.01 -0.00 0.02

6(OPE) -1.64 2.17 0.40 -0.00 0.01 0.01

7(OPE) -1.63 2.15 0.37 -0.01 0.00 0.02

8(OPE) -1.63 2.14 0.38 -0.01 0.00 0.02

9(OPE) -1.63 2.15 0.40 -0.01 0.01 0.02

10(OPE) -1.63 2.14 0.35 -0.00 0.00 0.02

11(OPE) -1.61 2.01 0.21 -0.01 -0.02 0.04

12(OPE) -1.66 2.30 0.52 -0.00 0.03 -0.01

13(OPE) -1.63 2.14 0.45 -0.01 0.01 0.02

14(OPE) -1.63 2.15 0.30 -0.00 -0.00 0.02

MAX -3.58/L2 6.91/L2 1.23/L2 -0.02/L2 0.03/L12 0.04/L11

1530

1(HYD) 0.02 -0.13 0.06 0.00 0.01 0.01

2(OPE) -3.90 5.93 1.29 -0.03 -0.01 0.03

3(OPE) -1.76 1.69 0.40 -0.01 0.00 0.02

4(SUS) 0.02 -0.11 0.05 0.00 0.01 0.01

5(OPE) -1.74 1.67 0.37 -0.01 -0.00 0.02

6(OPE) -1.78 1.72 0.42 -0.01 0.01 0.01

7(OPE) -1.76 1.70 0.40 -0.01 0.00 0.02

8(OPE) -1.76 1.69 0.41 -0.01 0.00 0.02

9(OPE) -1.76 1.70 0.44 -0.02 0.00 0.02

10(OPE) -1.76 1.69 0.36 -0.01 -0.00 0.02

11(OPE) -1.66 1.52 0.20 -0.00 -0.03 0.05

12(OPE) -1.87 1.88 0.56 -0.00 0.03 -0.01

13(OPE) -1.75 1.69 0.51 -0.02 0.01 0.02

14(OPE) -1.77 1.70 0.29 -0.00 -0.01 0.02

MAX -3.90/L2 5.93/L2 1.29/L2 -0.03/L2 0.03/L12 0.05/L11

Page 115: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

102

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

1538

1(HYD) 0.16 -0.13 0.04 0.00 0.01 0.01

2(OPE) -3.61 2.49 1.62 -0.03 -0.01 0.03

3(OPE) -1.56 0.13 0.51 -0.01 -0.00 0.02

4(SUS) 0.13 -0.11 0.03 0.00 0.01 0.01

5(OPE) -1.49 0.11 0.48 -0.01 -0.01 0.03

6(OPE) -1.63 0.15 0.49 -0.00 0.00 0.01

7(OPE) -1.56 0.13 0.49 -0.01 -0.00 0.02

8(OPE) -1.55 0.12 0.52 -0.01 -0.00 0.02

9(OPE) -1.55 0.13 0.61 -0.01 -0.00 0.02

10(OPE) -1.56 0.12 0.41 -0.00 -0.01 0.02

11(OPE) -1.15 -0.04 0.24 -0.00 -0.04 0.05

12(OPE) -2.03 0.31 0.59 -0.00 0.04 -0.02

13(OPE) -1.53 0.12 0.72 -0.02 0.00 0.02

14(OPE) -1.58 0.13 0.29 0.00 -0.01 0.02

MAX -3.61/L2 2.49/L2 1.62/L2 -0.03/L2 -0.04/L11 0.05/L11

1539

1(HYD) 0.20 -0.12 0.02 0.01 0.01 0.01

2(OPE) -3.51 1.50 1.31 -0.03 -0.02 0.03

3(OPE) -1.49 -0.31 0.34 0.00 -0.01 0.02

4(SUS) 0.16 -0.10 0.01 0.01 0.01 0.01

5(OPE) -1.40 -0.33 0.32 -0.00 -0.02 0.03

6(OPE) -1.59 -0.28 0.31 0.00 0.00 0.02

7(OPE) -1.50 -0.30 0.33 0.00 -0.01 0.02

8(OPE) -1.48 -0.31 0.36 -0.00 -0.01 0.02

9(OPE) -1.49 -0.31 0.45 -0.00 -0.00 0.02

10(OPE) -1.49 -0.31 0.23 0.00 -0.01 0.02

11(OPE) -0.95 -0.47 0.05 0.01 -0.05 0.06

12(OPE) -2.12 -0.12 0.40 0.00 0.04 -0.02

13(OPE) -1.46 -0.33 0.58 -0.01 -0.00 0.02

14(OPE) -1.51 -0.29 0.09 0.01 -0.01 0.02

MAX -3.51/L2 1.50/L2 1.31/L2 -0.03/L2 -0.05/L11 0.06/L11

1540

1(HYD) 0.19 -0.10 0.01 0.01 0.01 0.01

2(OPE) -3.42 1.03 0.40 -0.03 -0.02 0.03

3(OPE) -1.43 -0.47 -0.10 0.01 -0.01 0.02

4(SUS) 0.16 -0.07 0.00 0.01 0.01 0.01

5(OPE) -1.32 -0.50 -0.12 0.01 -0.02 0.03

6(OPE) -1.57 -0.44 -0.13 0.01 -0.00 0.02

7(OPE) -1.44 -0.47 -0.11 0.01 -0.01 0.02

8(OPE) -1.42 -0.48 -0.08 0.01 -0.01 0.02

9(OPE) -1.44 -0.49 0.02 0.01 -0.01 0.02

10(OPE) -1.43 -0.46 -0.21 0.01 -0.01 0.02

11(OPE) -0.74 -0.61 -0.39 0.02 -0.06 0.06

12(OPE) -2.25 -0.27 -0.04 0.01 0.04 -0.02

13(OPE) -1.42 -0.51 0.15 0.00 -0.01 0.03

14(OPE) -1.44 -0.43 -0.36 0.02 -0.02 0.02

MAX -3.42/L2 1.03/L2 0.40/L2 -0.03/L2 -0.06/L11 0.06/L11

Page 116: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

103

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

1550

1(HYD) 0.17 -0.05 0.01 0.01 0.01 0.01

2(OPE) -3.34 0.95 -0.68 -0.02 -0.02 0.03

3(OPE) -1.39 -0.44 -0.58 0.01 -0.01 0.02

4(SUS) 0.14 -0.03 0.00 0.01 0.01 0.01

5(OPE) -1.25 -0.46 -0.61 0.01 -0.02 0.03

6(OPE) -1.57 -0.40 -0.61 0.01 -0.00 0.02

7(OPE) -1.40 -0.43 -0.60 0.01 -0.01 0.02

8(OPE) -1.38 -0.44 -0.57 0.01 -0.01 0.02

9(OPE) -1.41 -0.46 -0.47 0.01 -0.01 0.02

10(OPE) -1.38 -0.41 -0.70 0.02 -0.02 0.02

11(OPE) -0.56 -0.56 -0.88 0.02 -0.06 0.06

12(OPE) -2.39 -0.23 -0.53 0.01 0.04 -0.02

13(OPE) -1.40 -0.49 -0.33 0.01 -0.01 0.03

14(OPE) -1.38 -0.38 -0.84 0.02 -0.02 0.02

MAX -3.34/L2 0.95/L2 -0.88/L11 -0.02/L2 -0.06/L11 0.06/L11

1560

1(HYD) 0.16 -0.03 0.01 0.01 0.01 0.01

2(OPE) -3.30 0.91 -1.24 -0.02 -0.02 0.03

3(OPE) -1.37 -0.42 -0.84 0.01 -0.01 0.02

4(SUS) 0.13 -0.01 0.00 0.01 0.01 0.01

5(OPE) -1.21 -0.44 -0.86 0.01 -0.02 0.03

6(OPE) -1.57 -0.37 -0.87 0.01 -0.00 0.02

7(OPE) -1.38 -0.41 -0.85 0.01 -0.01 0.02

8(OPE) -1.36 -0.42 -0.82 0.01 -0.01 0.02

9(OPE) -1.39 -0.44 -0.72 0.01 -0.01 0.02

10(OPE) -1.35 -0.39 -0.95 0.02 -0.02 0.02

11(OPE) -0.46 -0.53 -1.13 0.02 -0.06 0.06

12(OPE) -2.46 -0.21 -0.78 0.01 0.04 -0.02

13(OPE) -1.39 -0.48 -0.59 0.01 -0.01 0.03

14(OPE) -1.35 -0.35 -1.10 0.02 -0.02 0.02

MAX -3.30/L2 0.91/L2 -1.24/L2 -0.02/L2 -0.06/L11 0.06/L11

1561

1(HYD) 0.16 -0.03 0.01 0.01 0.01 0.01

2(OPE) -3.30 0.91 -1.24 -0.02 -0.02 0.03

3(OPE) -1.37 -0.42 -0.84 0.01 -0.01 0.02

4(SUS) 0.13 -0.01 0.00 0.01 0.01 0.01

5(OPE) -1.21 -0.44 -0.86 0.01 -0.02 0.03

6(OPE) -1.57 -0.37 -0.87 0.01 -0.00 0.02

7(OPE) -1.38 -0.41 -0.85 0.01 -0.01 0.02

8(OPE) -1.36 -0.42 -0.82 0.01 -0.01 0.02

9(OPE) -1.39 -0.44 -0.72 0.01 -0.01 0.02

10(OPE) -1.35 -0.39 -0.95 0.02 -0.02 0.02

11(OPE) -0.46 -0.53 -1.13 0.02 -0.06 0.06

12(OPE) -2.46 -0.21 -0.78 0.01 0.04 -0.02

13(OPE) -1.39 -0.48 -0.59 0.01 -0.01 0.03

14(OPE) -1.35 -0.35 -1.10 0.02 -0.02 0.02

MAX -3.30/L2 0.91/L2 -1.24/L2 -0.02/L2 -0.06/L11 0.06/L11

Page 117: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

104

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

1570

1(HYD) -0.00 0.00 -0.02 0.00 -0.00 0.00

2(OPE) 0.11 4.77 -17.63 0.00 -0.03 -0.01

3(OPE) -0.08 1.27 -4.33 0.00 -0.01 0.00

4(SUS) -0.00 -0.00 0.00 0.00 -0.00 0.00

5(OPE) -0.05 1.27 -4.33 0.00 -0.01 0.00

6(OPE) -0.11 1.27 -4.32 0.00 -0.01 0.01

7(OPE) -0.08 1.27 -4.33 0.00 -0.01 0.00

8(OPE) -0.09 1.27 -4.32 0.00 -0.01 0.00

9(OPE) -0.08 1.27 -4.32 0.00 -0.01 0.00

10(OPE) -0.08 1.27 -4.33 0.00 -0.00 0.00

11(OPE) 0.02 1.27 -4.33 0.00 -0.01 0.00

12(OPE) -0.18 1.27 -4.32 0.00 -0.01 0.01

13(OPE) -0.09 1.27 -4.31 0.00 -0.01 0.00

14(OPE) -0.07 1.27 -4.34 -0.00 -0.00 0.00

MAX -0.18/L12 4.77/L2 -17.63/L2 0.00/L13 -0.03/L2 0.01/L12

1580

1(HYD) -0.01 0.00 -0.02 0.00 -0.00 0.00

2(OPE) 0.13 5.38 -17.62 -0.00 -0.05 -0.01

3(OPE) -0.09 1.55 -4.32 0.00 -0.01 0.00

4(SUS) -0.00 -0.00 0.00 0.00 -0.00 0.00

5(OPE) -0.06 1.54 -4.32 0.00 -0.01 0.00

6(OPE) -0.12 1.55 -4.32 0.00 -0.01 0.01

7(OPE) -0.09 1.55 -4.32 0.00 -0.01 0.00

8(OPE) -0.10 1.55 -4.32 0.00 -0.01 0.01

9(OPE) -0.09 1.55 -4.32 0.00 -0.01 0.01

10(OPE) -0.09 1.55 -4.32 0.00 -0.01 0.00

11(OPE) 0.01 1.55 -4.32 0.00 -0.01 0.00

12(OPE) -0.19 1.55 -4.32 0.00 -0.01 0.01

13(OPE) -0.10 1.55 -4.31 0.00 -0.02 0.01

14(OPE) -0.08 1.54 -4.34 0.00 -0.01 0.00

MAX -0.19/L12 5.38/L2 -17.62/L2 0.00/L13 -0.05/L2 -0.01/L2

1588

1(HYD) -0.01 0.00 -0.02 0.00 -0.00 0.00

2(OPE) 0.13 5.39 -17.62 -0.00 -0.05 -0.01

3(OPE) -0.09 1.55 -4.32 0.00 -0.01 0.01

4(SUS) -0.00 -0.00 0.00 0.00 -0.00 0.00

5(OPE) -0.06 1.55 -4.32 0.00 -0.01 0.00

6(OPE) -0.12 1.55 -4.32 0.00 -0.01 0.01

7(OPE) -0.09 1.55 -4.32 0.00 -0.01 0.00

8(OPE) -0.10 1.55 -4.32 0.00 -0.01 0.01

9(OPE) -0.09 1.55 -4.32 0.00 -0.01 0.01

10(OPE) -0.09 1.55 -4.32 0.00 -0.01 0.00

11(OPE) 0.01 1.55 -4.32 0.00 -0.01 0.00

12(OPE) -0.19 1.55 -4.32 0.00 -0.01 0.01

13(OPE) -0.10 1.55 -4.31 0.00 -0.02 0.01

14(OPE) -0.08 1.55 -4.34 0.00 -0.01 0.00

MAX -0.19/L12 5.39/L2 -17.62/L2 0.00/L13 -0.05/L2 -0.01/L2

Page 118: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

105

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

1589

1(HYD) -0.01 0.01 -0.01 0.00 -0.00 0.00

2(OPE) 0.37 5.84 -17.59 -0.01 -0.08 -0.04

3(OPE) -0.01 1.77 -4.30 0.01 -0.02 0.01

4(SUS) -0.01 0.00 0.01 0.00 -0.00 0.00

5(OPE) 0.03 1.77 -4.30 0.01 -0.02 0.00

6(OPE) -0.05 1.77 -4.30 0.01 -0.03 0.01

7(OPE) -0.01 1.77 -4.31 0.01 -0.02 0.01

8(OPE) -0.02 1.77 -4.30 0.01 -0.03 0.01

9(OPE) -0.01 1.77 -4.30 0.01 -0.03 0.01

10(OPE) -0.00 1.77 -4.31 0.01 -0.02 0.01

11(OPE) 0.10 1.77 -4.30 0.01 -0.02 0.00

12(OPE) -0.12 1.77 -4.30 0.01 -0.02 0.01

13(OPE) -0.02 1.77 -4.28 0.01 -0.03 0.01

14(OPE) -0.00 1.77 -4.33 0.00 -0.01 0.01

MAX 0.37/L2 5.84/L2 -17.59/L2 0.01/L13 -0.08/L2 -0.04/L2

1590

1(HYD) -0.01 0.01 -0.00 0.00 -0.01 -0.00

2(OPE) 0.88 5.95 -17.43 -0.01 -0.14 -0.07

3(OPE) 0.20 1.87 -4.25 0.01 -0.04 0.00

4(SUS) -0.00 0.00 0.01 0.00 -0.01 -0.00

5(OPE) 0.24 1.86 -4.25 0.01 -0.04 0.00

6(OPE) 0.16 1.87 -4.25 0.01 -0.05 0.01

7(OPE) 0.21 1.87 -4.26 0.01 -0.04 0.00

8(OPE) 0.20 1.87 -4.25 0.01 -0.05 0.00

9(OPE) 0.20 1.87 -4.24 0.01 -0.05 0.00

10(OPE) 0.21 1.87 -4.27 0.01 -0.04 0.00

11(OPE) 0.31 1.86 -4.25 0.01 -0.04 0.00

12(OPE) 0.09 1.87 -4.25 0.01 -0.04 0.01

13(OPE) 0.20 1.87 -4.21 0.01 -0.06 0.00

14(OPE) 0.21 1.87 -4.30 0.01 -0.03 0.00

MAX 0.88/L2 5.95/L2 -17.43/L2 0.01/L13 -0.14/L2 -0.07/L2

1598

1(HYD) -0.00 0.00 0.08 0.00 -0.01 0.00

2(OPE) 4.42 4.93 -15.40 -0.08 -0.23 -0.11

3(OPE) 1.82 1.84 -3.63 0.01 -0.07 -0.01

4(SUS) -0.00 0.00 0.09 0.00 -0.01 0.00

5(OPE) 1.85 1.83 -3.64 0.01 -0.07 -0.01

6(OPE) 1.78 1.86 -3.57 0.01 -0.08 -0.02

7(OPE) 1.82 1.84 -3.65 0.01 -0.07 -0.01

8(OPE) 1.81 1.85 -3.56 0.01 -0.08 -0.01

9(OPE) 1.81 1.84 -3.54 0.01 -0.08 -0.01

10(OPE) 1.82 1.84 -3.73 0.01 -0.07 -0.01

11(OPE) 1.93 1.83 -3.64 0.01 -0.07 -0.01

12(OPE) 1.70 1.86 -3.58 0.00 -0.08 -0.02

13(OPE) 1.81 1.84 -3.40 0.01 -0.09 -0.01

14(OPE) 1.82 1.84 -3.87 0.01 -0.05 -0.01

MAX 4.42/L2 4.93/L2 -15.40/L2 -0.08/L2 -0.23/L2 -0.11/L2

Page 119: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

106

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

1599

1(HYD) -0.00 0.00 0.08 0.00 -0.00 -0.00

2(OPE) 4.83 4.58 -15.02 -0.10 -0.24 -0.11

3(OPE) 2.02 1.72 -3.53 0.01 -0.08 -0.03

4(SUS) -0.00 0.00 0.09 0.00 -0.00 -0.00

5(OPE) 2.06 1.72 -3.54 0.01 -0.08 -0.02

6(OPE) 1.97 1.73 -3.46 0.00 -0.09 -0.04

7(OPE) 2.02 1.72 -3.55 0.01 -0.08 -0.03

8(OPE) 2.01 1.73 -3.45 0.00 -0.09 -0.03

9(OPE) 2.01 1.72 -3.43 0.00 -0.09 -0.03

10(OPE) 2.02 1.72 -3.63 0.01 -0.07 -0.03

11(OPE) 2.13 1.72 -3.54 0.01 -0.08 -0.02

12(OPE) 1.90 1.73 -3.46 0.00 -0.09 -0.04

13(OPE) 2.01 1.73 -3.26 0.00 -0.10 -0.03

14(OPE) 2.03 1.72 -3.80 0.01 -0.07 -0.03

MAX 4.83/L2 4.58/L2 -15.02/L2 -0.10/L2 -0.24/L2 -0.11/L2

1600

1(HYD) -0.00 0.00 0.08 0.00 -0.00 -0.00

2(OPE) 4.87 4.03 -14.73 -0.12 -0.25 -0.11

3(OPE) 2.06 1.49 -3.49 0.01 -0.09 -0.04

4(SUS) -0.00 0.00 0.09 0.01 -0.00 -0.00

5(OPE) 2.11 1.49 -3.51 0.01 -0.09 -0.03

6(OPE) 2.00 1.49 -3.41 0.00 -0.09 -0.06

7(OPE) 2.06 1.49 -3.51 0.01 -0.09 -0.04

8(OPE) 2.04 1.49 -3.40 0.00 -0.09 -0.05

9(OPE) 2.05 1.49 -3.38 0.00 -0.09 -0.04

10(OPE) 2.06 1.49 -3.61 0.01 -0.08 -0.04

11(OPE) 2.18 1.49 -3.50 0.01 -0.09 -0.03

12(OPE) 1.93 1.49 -3.41 0.00 -0.09 -0.06

13(OPE) 2.05 1.49 -3.21 0.00 -0.10 -0.04

14(OPE) 2.07 1.49 -3.78 0.01 -0.07 -0.04

MAX 4.87/L2 4.03/L2 -14.73/L2 -0.12/L2 -0.25/L2 -0.11/L2

1610

1(HYD) -0.00 0.00 0.06 0.01 -0.00 -0.00

2(OPE) 4.50 2.95 -14.34 -0.12 -0.25 -0.11

3(OPE) 1.91 1.00 -3.52 0.01 -0.09 -0.05

4(SUS) -0.01 0.00 0.07 0.01 -0.00 -0.00

5(OPE) 2.00 1.00 -3.55 0.01 -0.09 -0.04

6(OPE) 1.80 1.00 -3.42 0.00 -0.10 -0.06

7(OPE) 1.92 1.00 -3.54 0.01 -0.09 -0.05

8(OPE) 1.88 1.00 -3.42 0.01 -0.10 -0.05

9(OPE) 1.90 1.00 -3.39 0.01 -0.10 -0.05

10(OPE) 1.92 1.00 -3.65 0.02 -0.09 -0.05

11(OPE) 2.08 1.00 -3.55 0.01 -0.09 -0.04

12(OPE) 1.73 1.00 -3.42 0.00 -0.10 -0.06

13(OPE) 1.89 1.00 -3.22 0.00 -0.11 -0.05

14(OPE) 1.93 1.00 -3.82 0.02 -0.08 -0.05

MAX 4.50/L2 2.95/L2 -14.34/L2 -0.12/L2 -0.25/L2 -0.11/L2

Page 120: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

107

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

1630

1(HYD) -0.10 -0.41 -0.01 -0.03 0.01 0.02

2(OPE) -1.36 -0.94 -14.71 -0.06 -0.06 0.04

3(OPE) -0.05 0.06 -6.06 0.00 -0.04 0.03

4(SUS) -0.08 -0.41 -0.00 -0.03 0.01 0.02

5(OPE) 0.84 0.08 -6.09 0.00 -0.06 0.03

6(OPE) -1.17 -0.01 -6.10 -0.00 -0.01 0.02

7(OPE) -0.07 0.06 -6.08 0.00 -0.04 0.03

8(OPE) -0.02 0.05 -6.05 0.00 -0.04 0.03

9(OPE) -0.08 0.13 -5.95 0.01 -0.04 0.03

10(OPE) -0.01 -0.02 -6.18 -0.00 -0.04 0.03

11(OPE) 3.57 0.10 -6.36 0.01 -0.12 0.05

12(OPE) -4.78 -0.19 -6.01 -0.01 0.07 -0.00

13(OPE) -0.23 0.24 -5.81 0.02 -0.04 0.03

14(OPE) 0.14 -0.13 -6.33 -0.01 -0.05 0.03

MAX -4.78/L12 -0.94/L2 -14.71/L2 -0.06/L2 -0.12/L11 0.05/L11

1640

1(HYD) -0.09 -0.38 -0.01 -0.03 0.01 0.02

2(OPE) -1.43 -0.86 -14.30 -0.06 -0.06 0.04

3(OPE) -0.10 0.05 -5.84 0.00 -0.04 0.03

4(SUS) -0.07 -0.37 -0.00 -0.03 0.01 0.02

5(OPE) 0.76 0.08 -5.86 0.00 -0.06 0.03

6(OPE) -1.18 -0.01 -5.87 -0.00 -0.01 0.02

7(OPE) -0.12 0.06 -5.85 0.00 -0.04 0.03

8(OPE) -0.07 0.05 -5.82 0.00 -0.04 0.03

9(OPE) -0.13 0.12 -5.72 0.01 -0.04 0.03

10(OPE) -0.06 -0.01 -5.96 -0.00 -0.04 0.03

11(OPE) 3.42 0.10 -6.14 0.01 -0.12 0.05

12(OPE) -4.70 -0.17 -5.78 -0.01 0.07 -0.00

13(OPE) -0.28 0.22 -5.59 0.02 -0.04 0.03

14(OPE) 0.09 -0.12 -6.10 -0.01 -0.05 0.03

MAX -4.70/L12 -0.86/L2 -14.30/L2 -0.06/L2 -0.12/L11 0.05/L11

1650

1(HYD) -0.07 -0.29 -0.00 -0.03 0.01 0.02

2(OPE) -1.62 -0.66 -13.22 -0.06 -0.06 0.04

3(OPE) -0.23 0.04 -5.23 0.00 -0.04 0.03

4(SUS) -0.05 -0.28 -0.00 -0.03 0.01 0.02

5(OPE) 0.55 0.06 -5.25 0.01 -0.06 0.03

6(OPE) -1.23 -0.01 -5.26 -0.00 -0.01 0.02

7(OPE) -0.26 0.05 -5.25 0.00 -0.04 0.03

8(OPE) -0.21 0.04 -5.21 0.00 -0.04 0.03

9(OPE) -0.27 0.09 -5.11 0.01 -0.04 0.03

10(OPE) -0.20 -0.01 -5.35 -0.00 -0.04 0.03

11(OPE) 3.03 0.07 -5.53 0.01 -0.12 0.05

12(OPE) -4.48 -0.13 -5.18 -0.01 0.07 -0.00

13(OPE) -0.40 0.17 -4.98 0.02 -0.04 0.03

14(OPE) -0.06 -0.09 -5.49 -0.01 -0.05 0.03

MAX -4.48/L12 -0.66/L2 -13.22/L2 -0.06/L2 -0.12/L11 0.05/L11

Page 121: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

108

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

1660

1(HYD) -0.04 -0.18 -0.00 -0.03 0.01 0.02

2(OPE) -1.85 -0.41 -11.91 -0.06 -0.06 0.04

3(OPE) -0.39 0.03 -4.50 0.00 -0.04 0.03

4(SUS) -0.03 -0.18 -0.00 -0.03 0.01 0.02

5(OPE) 0.30 0.04 -4.52 0.01 -0.06 0.03

6(OPE) -1.28 -0.00 -4.53 -0.00 -0.01 0.02

7(OPE) -0.41 0.03 -4.52 0.00 -0.04 0.03

8(OPE) -0.37 0.02 -4.48 0.00 -0.04 0.03

9(OPE) -0.43 0.06 -4.38 0.01 -0.04 0.03

10(OPE) -0.36 -0.01 -4.62 -0.00 -0.04 0.03

11(OPE) 2.57 0.05 -4.80 0.01 -0.12 0.05

12(OPE) -4.23 -0.08 -4.45 -0.01 0.07 -0.00

13(OPE) -0.55 0.11 -4.25 0.02 -0.04 0.03

14(OPE) -0.23 -0.06 -4.76 -0.01 -0.05 0.03

MAX -4.23/L12 -0.41/L2 -11.91/L2 -0.06/L2 -0.12/L11 0.05/L11

1670

1(HYD) -0.03 -0.14 -0.00 -0.03 0.01 0.02

2(OPE) -1.94 -0.32 -11.38 -0.06 -0.06 0.04

3(OPE) -0.46 0.02 -4.21 0.00 -0.04 0.03

4(SUS) -0.03 -0.14 -0.00 -0.03 0.01 0.02

5(OPE) 0.20 0.03 -4.23 0.01 -0.06 0.03

6(OPE) -1.30 -0.00 -4.24 -0.00 -0.01 0.02

7(OPE) -0.48 0.02 -4.22 0.00 -0.04 0.03

8(OPE) -0.44 0.02 -4.19 0.00 -0.04 0.03

9(OPE) -0.49 0.04 -4.09 0.01 -0.04 0.03

10(OPE) -0.42 -0.00 -4.32 -0.00 -0.04 0.03

11(OPE) 2.38 0.04 -4.50 0.01 -0.12 0.05

12(OPE) -4.12 -0.06 -4.15 -0.01 0.07 -0.00

13(OPE) -0.61 0.08 -3.95 0.02 -0.04 0.03

14(OPE) -0.31 -0.04 -4.47 -0.01 -0.05 0.03

MAX -4.12/L12 -0.32/L2 -11.38/L2 -0.06/L2 -0.12/L11 0.05/L11

1680

1(HYD) -0.00 -0.18 0.06 -0.03 0.01 0.02

2(OPE) -1.76 -1.22 -11.76 -0.06 -0.06 0.04

3(OPE) -0.33 -0.42 -4.51 0.00 -0.04 0.03

4(SUS) 0.00 -0.18 0.06 -0.03 0.01 0.02

5(OPE) 0.38 -0.41 -4.54 0.01 -0.06 0.03

6(OPE) -1.22 -0.45 -4.53 -0.00 -0.01 0.02

7(OPE) -0.35 -0.42 -4.53 0.00 -0.04 0.03

8(OPE) -0.30 -0.43 -4.49 0.00 -0.04 0.03

9(OPE) -0.36 -0.39 -4.40 0.01 -0.04 0.03

10(OPE) -0.29 -0.46 -4.62 -0.00 -0.04 0.03

11(OPE) 2.68 -0.40 -4.81 0.01 -0.12 0.05

12(OPE) -4.23 -0.53 -4.42 -0.01 0.07 -0.00

13(OPE) -0.48 -0.34 -4.29 0.02 -0.04 0.03

14(OPE) -0.17 -0.51 -4.74 -0.01 -0.05 0.03

MAX -4.23/L12 -1.22/L2 -11.76/L2 -0.06/L2 -0.12/L11 0.05/L11

Page 122: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

109

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

1690

1(HYD) -0.09 -0.18 -0.07 -0.03 0.01 0.02

2(OPE) -1.94 0.39 -12.06 -0.06 -0.06 0.04

3(OPE) -0.46 0.48 -4.49 0.00 -0.04 0.03

4(SUS) -0.07 -0.18 -0.07 -0.03 0.01 0.02

5(OPE) 0.23 0.49 -4.51 0.01 -0.06 0.03

6(OPE) -1.33 0.45 -4.53 -0.00 -0.01 0.02

7(OPE) -0.48 0.48 -4.50 0.00 -0.04 0.03

8(OPE) -0.44 0.47 -4.48 0.00 -0.04 0.03

9(OPE) -0.50 0.51 -4.36 0.01 -0.04 0.03

10(OPE) -0.42 0.44 -4.62 -0.00 -0.04 0.03

11(OPE) 2.45 0.50 -4.78 0.01 -0.12 0.05

12(OPE) -4.23 0.37 -4.48 -0.01 0.07 -0.00

13(OPE) -0.62 0.56 -4.21 0.02 -0.04 0.03

14(OPE) -0.30 0.39 -4.78 -0.01 -0.05 0.03

MAX -4.23/L12 0.56/L13 -12.06/L2 -0.06/L2 -0.12/L11 0.05/L11

1700

1(HYD) -0.15 -0.18 -0.16 -0.03 0.01 0.02

2(OPE) -2.06 1.52 -12.27 -0.06 -0.06 0.04

3(OPE) -0.55 1.11 -4.48 0.00 -0.04 0.03

4(SUS) -0.12 -0.18 -0.16 -0.03 0.01 0.02

5(OPE) 0.12 1.12 -4.49 0.01 -0.06 0.03

6(OPE) -1.41 1.08 -4.53 -0.00 -0.01 0.02

7(OPE) -0.57 1.11 -4.49 0.00 -0.04 0.03

8(OPE) -0.54 1.10 -4.46 0.00 -0.04 0.03

9(OPE) -0.59 1.14 -4.33 0.01 -0.04 0.03

10(OPE) -0.52 1.07 -4.63 -0.00 -0.04 0.03

11(OPE) 2.30 1.13 -4.76 0.01 -0.12 0.05

12(OPE) -4.23 1.00 -4.52 -0.01 0.07 0.00

13(OPE) -0.72 1.19 -4.15 0.02 -0.04 0.03

14(OPE) -0.38 1.02 -4.82 -0.01 -0.05 0.03

MAX -4.23/L12 1.52/L2 -12.27/L2 -0.06/L2 -0.12/L11 0.05/L11

1710

1(HYD) -0.17 -0.18 -0.19 -0.03 0.01 0.02

2(OPE) -2.10 1.89 -12.34 -0.06 -0.06 0.04

3(OPE) -0.58 1.31 -4.47 0.00 -0.04 0.03

4(SUS) -0.14 -0.18 -0.19 -0.03 0.01 0.02

5(OPE) 0.09 1.32 -4.48 0.01 -0.06 0.03

6(OPE) -1.43 1.28 -4.54 -0.00 -0.01 0.02

7(OPE) -0.60 1.31 -4.48 0.00 -0.04 0.03

8(OPE) -0.57 1.31 -4.46 0.00 -0.04 0.03

9(OPE) -0.62 1.34 -4.32 0.01 -0.04 0.03

10(OPE) -0.55 1.28 -4.63 -0.00 -0.04 0.03

11(OPE) 2.25 1.33 -4.75 0.01 -0.12 0.05

12(OPE) -4.23 1.20 -4.53 -0.01 0.07 0.00

13(OPE) -0.75 1.39 -4.13 0.02 -0.04 0.03

14(OPE) -0.41 1.23 -4.83 -0.01 -0.05 0.03

MAX -4.23/L12 1.89/L2 -12.34/L2 -0.06/L2 -0.12/L11 0.05/L11

Page 123: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

110

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

1720

1(HYD) -0.17 -0.18 -0.20 -0.03 0.01 0.02

2(OPE) -2.12 2.02 -12.36 -0.06 -0.06 0.04

3(OPE) -0.59 1.38 -4.47 0.00 -0.04 0.03

4(SUS) -0.15 -0.18 -0.20 -0.03 0.01 0.02

5(OPE) 0.08 1.40 -4.48 0.01 -0.06 0.03

6(OPE) -1.44 1.35 -4.54 -0.00 -0.01 0.02

7(OPE) -0.61 1.39 -4.48 0.00 -0.04 0.03

8(OPE) -0.58 1.38 -4.46 0.00 -0.04 0.03

9(OPE) -0.63 1.42 -4.32 0.01 -0.04 0.03

10(OPE) -0.56 1.35 -4.63 -0.00 -0.04 0.03

11(OPE) 2.23 1.41 -4.75 0.01 -0.12 0.05

12(OPE) -4.23 1.28 -4.54 -0.01 0.07 0.00

13(OPE) -0.77 1.46 -4.12 0.02 -0.04 0.03

14(OPE) -0.42 1.30 -4.83 -0.01 -0.05 0.03

MAX -4.23/L12 2.02/L2 -12.36/L2 -0.06/L2 -0.12/L11 0.05/L11

1730

1(HYD) 0.06 -0.18 0.15 -0.03 0.01 0.02

2(OPE) -1.64 -2.35 -11.55 -0.06 -0.06 0.04

3(OPE) -0.23 -1.05 -4.52 0.00 -0.04 0.03

4(SUS) 0.06 -0.18 0.15 -0.03 0.01 0.02

5(OPE) 0.49 -1.04 -4.56 0.01 -0.06 0.03

6(OPE) -1.15 -1.09 -4.53 -0.00 -0.01 0.02

7(OPE) -0.26 -1.05 -4.54 0.00 -0.04 0.03

8(OPE) -0.21 -1.06 -4.50 0.00 -0.04 0.03

9(OPE) -0.27 -1.02 -4.43 0.01 -0.04 0.03

10(OPE) -0.20 -1.09 -4.62 -0.00 -0.04 0.03

11(OPE) 2.85 -1.03 -4.84 0.01 -0.12 0.05

12(OPE) -4.23 -1.16 -4.38 -0.01 0.07 -0.00

13(OPE) -0.37 -0.97 -4.34 0.02 -0.04 0.03

14(OPE) -0.09 -1.14 -4.71 -0.01 -0.05 0.03

MAX -4.23/L12 -2.35/L2 -11.55/L2 -0.06/L2 -0.12/L11 0.05/L11

1740

1(HYD) 0.08 -0.18 0.18 -0.03 0.01 0.02

2(OPE) -1.60 -2.71 -11.48 -0.06 -0.06 0.04

3(OPE) -0.20 -1.26 -4.53 0.00 -0.04 0.03

4(SUS) 0.07 -0.18 0.18 -0.03 0.01 0.02

5(OPE) 0.52 -1.25 -4.56 0.01 -0.06 0.03

6(OPE) -1.13 -1.29 -4.53 -0.00 -0.01 0.02

7(OPE) -0.23 -1.25 -4.55 0.00 -0.04 0.03

8(OPE) -0.18 -1.26 -4.51 0.00 -0.04 0.03

9(OPE) -0.24 -1.23 -4.44 0.01 -0.04 0.03

10(OPE) -0.17 -1.29 -4.61 -0.00 -0.04 0.03

11(OPE) 2.90 -1.24 -4.85 0.01 -0.12 0.05

12(OPE) -4.23 -1.37 -4.36 -0.01 0.07 -0.00

13(OPE) -0.34 -1.18 -4.36 0.02 -0.04 0.03

14(OPE) -0.06 -1.34 -4.70 -0.01 -0.05 0.03

MAX -4.23/L12 -2.71/L2 -11.48/L2 -0.06/L2 -0.12/L11 0.05/L11

Page 124: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

111

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

1750

1(HYD) 0.08 -0.18 0.20 -0.03 0.01 0.02

2(OPE) -1.59 -2.85 -11.45 -0.06 -0.06 0.04

3(OPE) -0.19 -1.33 -4.53 0.00 -0.04 0.03

4(SUS) 0.08 -0.18 0.19 -0.03 0.01 0.02

5(OPE) 0.54 -1.32 -4.57 0.01 -0.06 0.03

6(OPE) -1.12 -1.36 -4.53 -0.00 -0.01 0.02

7(OPE) -0.22 -1.33 -4.55 0.00 -0.04 0.03

8(OPE) -0.17 -1.34 -4.51 0.00 -0.04 0.03

9(OPE) -0.22 -1.30 -4.44 0.01 -0.04 0.03

10(OPE) -0.16 -1.36 -4.61 -0.00 -0.04 0.03

11(OPE) 2.92 -1.31 -4.85 0.01 -0.12 0.05

12(OPE) -4.23 -1.44 -4.36 -0.01 0.07 -0.00

13(OPE) -0.33 -1.25 -4.37 0.02 -0.04 0.03

14(OPE) -0.05 -1.41 -4.70 -0.01 -0.05 0.03

MAX -4.23/L12 -2.85/L2 -11.45/L2 -0.06/L2 -0.12/L11 0.05/L11

1760

1(HYD) 0.00 -0.00 -0.00 -0.03 0.01 0.02

2(OPE) -2.24 -0.00 -9.70 -0.06 -0.06 0.04

3(OPE) -0.67 -0.00 -3.65 0.00 -0.04 0.03

4(SUS) -0.00 -0.00 -0.00 -0.03 0.01 0.02

5(OPE) -0.12 -0.00 -3.67 0.01 -0.06 0.03

6(OPE) -1.36 -0.00 -3.68 -0.00 -0.01 0.02

7(OPE) -0.68 -0.00 -3.66 0.00 -0.04 0.03

8(OPE) -0.65 -0.00 -3.63 0.00 -0.04 0.03

9(OPE) -0.70 -0.00 -3.53 0.01 -0.04 0.03

10(OPE) -0.63 -0.00 -3.77 -0.00 -0.04 0.03

11(OPE) 1.78 -0.00 -3.94 0.01 -0.12 0.05

12(OPE) -3.80 -0.00 -3.59 -0.01 0.07 -0.00

13(OPE) -0.80 -0.00 -3.39 0.02 -0.04 0.03

14(OPE) -0.53 -0.00 -3.91 -0.01 -0.05 0.03

MAX -3.80/L12 -0.00/L1 -9.70/L2 -0.06/L2 -0.12/L11 0.05/L11

1770

1(HYD) 0.03 0.11 -0.00 -0.03 0.01 0.02

2(OPE) -2.48 0.26 -8.33 -0.06 -0.06 0.04

3(OPE) -0.84 -0.02 -3.19 0.00 -0.04 0.03

4(SUS) 0.02 0.11 -0.00 -0.03 0.01 0.02

5(OPE) -0.38 -0.02 -3.21 0.01 -0.06 0.03

6(OPE) -1.42 0.00 -3.22 -0.00 -0.01 0.02

7(OPE) -0.85 -0.02 -3.21 0.00 -0.04 0.03

8(OPE) -0.82 -0.01 -3.18 0.00 -0.04 0.03

9(OPE) -0.87 -0.04 -3.07 0.01 -0.04 0.03

10(OPE) -0.80 0.00 -3.31 -0.00 -0.04 0.03

11(OPE) 1.29 -0.03 -3.49 0.01 -0.12 0.05

12(OPE) -3.53 0.05 -3.14 -0.01 0.07 -0.00

13(OPE) -0.95 -0.07 -2.94 0.02 -0.04 0.03

14(OPE) -0.72 0.03 -3.45 -0.01 -0.05 0.03

MAX -3.53/L12 0.26/L2 -8.33/L2 -0.06/L2 -0.12/L11 0.05/L11

Page 125: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

112

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

1780

1(HYD) 0.03 0.14 -0.00 -0.02 0.01 0.02

2(OPE) -2.54 0.31 -8.01 -0.06 -0.06 0.04

3(OPE) -0.88 -0.02 -3.09 0.01 -0.04 0.03

4(SUS) 0.03 0.13 -0.00 -0.02 0.01 0.02

5(OPE) -0.44 -0.03 -3.11 0.01 -0.06 0.03

6(OPE) -1.43 0.00 -3.12 0.00 -0.01 0.02

7(OPE) -0.89 -0.03 -3.10 0.01 -0.04 0.03

8(OPE) -0.86 -0.02 -3.07 0.01 -0.04 0.03

9(OPE) -0.91 -0.05 -2.97 0.01 -0.04 0.03

10(OPE) -0.84 0.00 -3.20 0.00 -0.04 0.03

11(OPE) 1.18 -0.04 -3.38 0.01 -0.12 0.05

12(OPE) -3.47 0.06 -3.03 -0.01 0.07 -0.00

13(OPE) -0.99 -0.08 -2.83 0.02 -0.04 0.03

14(OPE) -0.76 0.04 -3.35 -0.01 -0.05 0.03

MAX -3.47/L12 0.31/L2 -8.01/L2 -0.06/L2 -0.12/L11 0.05/L11

1790

1(HYD) 0.06 0.19 0.00 -0.00 0.01 0.02

2(OPE) -2.74 0.50 -6.78 -0.04 -0.05 0.04

3(OPE) -1.02 -0.07 -2.68 0.02 -0.04 0.03

4(SUS) 0.04 0.19 -0.00 -0.01 0.01 0.01

5(OPE) -0.66 -0.09 -2.70 0.02 -0.06 0.03

6(OPE) -1.48 -0.04 -2.71 0.02 -0.01 0.02

7(OPE) -1.03 -0.08 -2.69 0.02 -0.04 0.03

8(OPE) -1.01 -0.07 -2.66 0.02 -0.04 0.03

9(OPE) -1.06 -0.11 -2.56 0.02 -0.04 0.03

10(OPE) -0.98 -0.03 -2.80 0.02 -0.04 0.03

11(OPE) 0.76 -0.10 -2.98 0.02 -0.11 0.05

12(OPE) -3.24 0.06 -2.62 0.01 0.06 -0.01

13(OPE) -1.12 -0.17 -2.43 0.03 -0.03 0.03

14(OPE) -0.92 0.03 -2.94 0.01 -0.04 0.02

MAX -3.24/L12 0.50/L2 -6.78/L2 -0.04/L2 -0.11/L11 0.05/L11

1800

1(HYD) 0.07 0.18 0.00 0.01 0.01 0.02

2(OPE) -2.85 0.57 -6.07 -0.03 -0.05 0.03

3(OPE) -1.09 -0.13 -2.44 0.03 -0.03 0.03

4(SUS) 0.06 0.18 -0.00 0.01 0.01 0.01

5(OPE) -0.77 -0.14 -2.46 0.03 -0.05 0.03

6(OPE) -1.50 -0.08 -2.47 0.02 -0.01 0.02

7(OPE) -1.10 -0.13 -2.46 0.02 -0.03 0.02

8(OPE) -1.08 -0.12 -2.42 0.03 -0.03 0.03

9(OPE) -1.13 -0.17 -2.32 0.03 -0.03 0.03

10(OPE) -1.05 -0.08 -2.56 0.02 -0.03 0.03

11(OPE) 0.55 -0.16 -2.74 0.03 -0.09 0.05

12(OPE) -3.12 0.04 -2.39 0.02 0.05 -0.01

13(OPE) -1.18 -0.24 -2.19 0.03 -0.03 0.03

14(OPE) -1.00 -0.01 -2.70 0.02 -0.04 0.02

MAX -3.12/L12 0.57/L2 -6.07/L2 -0.03/L2 -0.09/L11 0.05/L11

Page 126: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

113

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

1830

1(HYD) 0.13 0.04 0.01 0.02 0.01 0.01

2(OPE) -3.17 0.78 -3.00 -0.02 -0.03 0.03

3(OPE) -1.29 -0.34 -1.42 0.02 -0.02 0.02

4(SUS) 0.10 0.06 0.00 0.01 0.01 0.01

5(OPE) -1.08 -0.36 -1.45 0.02 -0.03 0.03

6(OPE) -1.56 -0.29 -1.45 0.02 -0.00 0.02

7(OPE) -1.30 -0.34 -1.44 0.02 -0.02 0.02

8(OPE) -1.29 -0.34 -1.41 0.02 -0.02 0.02

9(OPE) -1.32 -0.38 -1.31 0.02 -0.01 0.02

10(OPE) -1.27 -0.30 -1.54 0.02 -0.02 0.02

11(OPE) -0.15 -0.42 -1.72 0.02 -0.06 0.06

12(OPE) -2.68 -0.13 -1.37 0.02 0.04 -0.02

13(OPE) -1.34 -0.44 -1.17 0.01 -0.01 0.03

14(OPE) -1.24 -0.24 -1.68 0.02 -0.02 0.02

MAX -3.17/L2 0.78/L2 -3.00/L2 -0.02/L2 -0.06/L11 0.06/L11

1840

1(HYD) 0.15 -0.01 0.01 0.01 0.01 0.01

2(OPE) -3.27 0.87 -1.76 -0.02 -0.02 0.03

3(OPE) -1.35 -0.40 -1.01 0.01 -0.01 0.02

4(SUS) 0.12 0.01 0.00 0.01 0.01 0.01

5(OPE) -1.17 -0.42 -1.03 0.01 -0.02 0.03

6(OPE) -1.57 -0.35 -1.04 0.01 -0.00 0.02

7(OPE) -1.36 -0.39 -1.03 0.01 -0.01 0.02

8(OPE) -1.34 -0.40 -0.99 0.01 -0.01 0.02

9(OPE) -1.37 -0.43 -0.89 0.01 -0.01 0.02

10(OPE) -1.33 -0.36 -1.13 0.02 -0.02 0.02

11(OPE) -0.37 -0.50 -1.31 0.02 -0.06 0.06

12(OPE) -2.52 -0.19 -0.95 0.01 0.04 -0.02

13(OPE) -1.38 -0.47 -0.76 0.01 -0.01 0.03

14(OPE) -1.32 -0.32 -1.27 0.02 -0.02 0.02

MAX -3.27/L2 0.87/L2 -1.76/L2 -0.02/L2 -0.06/L11 0.06/L11

1880

1(HYD) -0.06 0.00 -0.10 -0.03 0.01 0.02

2(OPE) -2.37 1.20 -9.92 -0.06 -0.06 0.04

3(OPE) -0.77 0.40 -3.63 0.00 -0.04 0.03

4(SUS) -0.06 0.00 -0.10 -0.03 0.01 0.02

5(OPE) -0.23 0.40 -3.65 0.01 -0.06 0.03

6(OPE) -1.44 0.40 -3.68 -0.00 -0.01 0.02

7(OPE) -0.78 0.40 -3.64 0.00 -0.04 0.03

8(OPE) -0.75 0.40 -3.62 0.00 -0.04 0.03

9(OPE) -0.80 0.40 -3.50 0.01 -0.04 0.03

10(OPE) -0.73 0.40 -3.77 -0.00 -0.04 0.03

11(OPE) 1.61 0.40 -3.92 0.01 -0.12 0.05

12(OPE) -3.79 0.40 -3.64 -0.01 0.07 -0.00

13(OPE) -0.90 0.40 -3.34 0.02 -0.04 0.03

14(OPE) -0.62 0.40 -3.94 -0.01 -0.05 0.03

MAX -3.79/L12 1.20/L2 -9.92/L2 -0.06/L2 -0.12/L11 0.05/L11

Page 127: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

114

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

1890

1(HYD) -0.00 -0.06 0.02 -0.03 0.01 0.02

2(OPE) -3.44 -0.13 -9.91 -0.06 -0.06 0.04

3(OPE) -1.06 -0.10 -3.79 0.00 -0.04 0.03

4(SUS) -0.00 -0.06 0.02 -0.03 0.01 0.02

5(OPE) -0.51 -0.11 -3.90 0.01 -0.06 0.03

6(OPE) -1.76 -0.08 -3.72 -0.00 -0.01 0.02

7(OPE) -1.08 -0.10 -3.81 0.00 -0.04 0.03

8(OPE) -1.05 -0.10 -3.78 0.00 -0.04 0.03

9(OPE) -1.10 -0.10 -3.68 0.01 -0.04 0.03

10(OPE) -1.03 -0.10 -3.91 -0.00 -0.04 0.03

11(OPE) 1.38 -0.17 -4.37 0.01 -0.12 0.05

12(OPE) -4.19 0.00 -3.36 -0.01 0.07 -0.00

13(OPE) -1.19 -0.11 -3.53 0.02 -0.04 0.03

14(OPE) -0.93 -0.09 -4.07 -0.01 -0.05 0.03

MAX -4.19/L12 -0.17/L11 -9.91/L2 -0.06/L2 -0.12/L11 0.05/L11

1898

1(HYD) -0.00 -0.10 0.03 -0.03 0.01 0.02

2(OPE) -4.08 -0.20 -10.02 -0.06 -0.06 0.04

3(OPE) -1.28 -0.16 -3.87 0.00 -0.04 0.03

4(SUS) -0.00 -0.09 0.03 -0.03 0.01 0.02

5(OPE) -0.73 -0.18 -4.02 0.01 -0.06 0.03

6(OPE) -1.97 -0.12 -3.75 -0.00 -0.01 0.03

7(OPE) -1.30 -0.15 -3.89 0.00 -0.04 0.03

8(OPE) -1.26 -0.16 -3.86 0.00 -0.04 0.03

9(OPE) -1.31 -0.16 -3.76 0.01 -0.04 0.03

10(OPE) -1.24 -0.15 -3.99 -0.00 -0.04 0.03

11(OPE) 1.17 -0.27 -4.60 0.01 -0.12 0.05

12(OPE) -4.41 -0.00 -3.23 -0.01 0.07 0.00

13(OPE) -1.41 -0.17 -3.60 0.02 -0.04 0.03

14(OPE) -1.14 -0.14 -4.16 -0.01 -0.05 0.03

MAX -4.41/L12 -0.27/L11 -10.02/L2 -0.06/L2 -0.12/L11 0.05/L11

1899

1(HYD) -0.00 -0.11 0.03 -0.03 0.01 0.02

2(OPE) -4.25 -0.16 -10.06 -0.06 -0.06 0.04

3(OPE) -1.34 -0.15 -3.89 0.00 -0.04 0.03

4(SUS) -0.00 -0.10 0.02 -0.03 0.01 0.02

5(OPE) -0.79 -0.17 -4.05 0.01 -0.06 0.03

6(OPE) -2.03 -0.12 -3.76 -0.00 -0.01 0.03

7(OPE) -1.35 -0.14 -3.90 0.00 -0.04 0.03

8(OPE) -1.32 -0.15 -3.88 0.00 -0.04 0.03

9(OPE) -1.37 -0.15 -3.77 0.01 -0.04 0.03

10(OPE) -1.30 -0.15 -4.01 -0.00 -0.04 0.03

11(OPE) 1.11 -0.27 -4.66 0.01 -0.12 0.05

12(OPE) -4.46 0.02 -3.20 -0.01 0.07 0.00

13(OPE) -1.47 -0.16 -3.61 0.02 -0.04 0.03

14(OPE) -1.20 -0.13 -4.18 -0.01 -0.05 0.03

MAX -4.46/L12 -0.27/L11 -10.06/L2 -0.06/L2 -0.12/L11 0.05/L11

Page 128: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

115

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

1900

1(HYD) -0.01 -0.11 0.02 -0.03 0.01 0.02

2(OPE) -4.33 -0.01 -10.10 -0.06 -0.06 0.04

3(OPE) -1.37 -0.10 -3.90 0.00 -0.04 0.03

4(SUS) -0.01 -0.10 0.01 -0.03 0.01 0.02

5(OPE) -0.82 -0.12 -4.06 0.01 -0.06 0.03

6(OPE) -2.07 -0.07 -3.76 -0.00 -0.01 0.03

7(OPE) -1.39 -0.09 -3.91 0.00 -0.04 0.03

8(OPE) -1.36 -0.11 -3.89 0.00 -0.04 0.03

9(OPE) -1.41 -0.10 -3.78 0.01 -0.04 0.03

10(OPE) -1.34 -0.10 -4.02 -0.00 -0.04 0.03

11(OPE) 1.06 -0.22 -4.68 0.01 -0.12 0.05

12(OPE) -4.48 0.07 -3.20 -0.01 0.07 0.01

13(OPE) -1.50 -0.12 -3.61 0.02 -0.04 0.03

14(OPE) -1.24 -0.09 -4.20 -0.01 -0.05 0.03

MAX -4.48/L12 -0.22/L11 -10.10/L2 -0.06/L2 -0.12/L11 0.05/L11

1910

1(HYD) -0.05 -0.11 -0.03 -0.03 0.01 0.02

2(OPE) -4.40 0.62 -10.22 -0.06 -0.06 0.04

3(OPE) -1.43 0.11 -3.89 0.00 -0.04 0.03

4(SUS) -0.05 -0.10 -0.04 -0.03 0.01 0.02

5(OPE) -0.89 0.08 -4.05 0.01 -0.06 0.03

6(OPE) -2.11 0.14 -3.76 -0.00 -0.01 0.03

7(OPE) -1.44 0.11 -3.90 0.00 -0.04 0.03

8(OPE) -1.42 0.10 -3.88 0.00 -0.04 0.03

9(OPE) -1.47 0.10 -3.76 0.01 -0.04 0.03

10(OPE) -1.39 0.11 -4.02 -0.00 -0.04 0.03

11(OPE) 0.97 -0.02 -4.66 0.01 -0.12 0.05

12(OPE) -4.50 0.28 -3.22 -0.01 0.07 0.01

13(OPE) -1.56 0.09 -3.57 0.02 -0.04 0.03

14(OPE) -1.29 0.12 -4.22 -0.01 -0.05 0.03

MAX -4.50/L12 0.62/L2 -10.22/L2 -0.06/L2 -0.12/L11 0.05/L11

1920

1(HYD) -0.07 -0.11 -0.06 -0.03 0.01 0.02

2(OPE) -4.44 0.95 -10.28 -0.06 -0.06 0.04

3(OPE) -1.46 0.22 -3.89 0.00 -0.04 0.03

4(SUS) -0.06 -0.10 -0.07 -0.03 0.01 0.02

5(OPE) -0.92 0.19 -4.04 0.01 -0.06 0.03

6(OPE) -2.14 0.25 -3.76 -0.00 -0.01 0.03

7(OPE) -1.47 0.22 -3.90 0.00 -0.04 0.03

8(OPE) -1.45 0.21 -3.88 0.00 -0.04 0.03

9(OPE) -1.50 0.21 -3.75 0.01 -0.04 0.03

10(OPE) -1.42 0.22 -4.02 -0.00 -0.04 0.03

11(OPE) 0.93 0.09 -4.66 0.01 -0.12 0.05

12(OPE) -4.50 0.39 -3.23 -0.01 0.07 0.01

13(OPE) -1.60 0.20 -3.55 0.02 -0.04 0.03

14(OPE) -1.32 0.23 -4.24 -0.01 -0.05 0.03

MAX -4.50/L12 0.95/L2 -10.28/L2 -0.06/L2 -0.12/L11 0.05/L11

Page 129: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 DISPLACEMENT SUMMARY REPORT REPORT: Nodal Movements Various Load Cases

116

Node Load Case DX mm DY mm DZ mm RX deg. RY deg. RZ deg.

1930

1(HYD) -0.08 -0.11 -0.07 -0.03 0.01 0.02

2(OPE) -4.46 1.06 -10.30 -0.06 -0.06 0.04

3(OPE) -1.47 0.25 -3.89 0.00 -0.04 0.03

4(SUS) -0.07 -0.10 -0.07 -0.03 0.01 0.02

5(OPE) -0.93 0.23 -4.04 0.01 -0.06 0.03

6(OPE) -2.15 0.29 -3.76 -0.00 -0.01 0.03

7(OPE) -1.48 0.26 -3.90 0.00 -0.04 0.03

8(OPE) -1.46 0.25 -3.88 0.00 -0.04 0.03

9(OPE) -1.51 0.25 -3.75 0.01 -0.04 0.03

10(OPE) -1.43 0.26 -4.03 -0.00 -0.04 0.03

11(OPE) 0.91 0.13 -4.65 0.01 -0.12 0.05

12(OPE) -4.50 0.42 -3.24 -0.01 0.07 0.01

13(OPE) -1.61 0.24 -3.54 0.02 -0.04 0.03

14(OPE) -1.33 0.27 -4.24 -0.01 -0.05 0.03

MAX -4.50/L12 1.06/L2 -10.30/L2 -0.06/L2 -0.12/L11 0.05/L11

1940

1(HYD) -0.12 0.00 -0.18 -0.03 0.01 0.02

2(OPE) -2.48 2.19 -10.11 -0.06 -0.06 0.04

3(OPE) -0.85 0.73 -3.62 0.00 -0.04 0.03

4(SUS) -0.10 0.00 -0.18 -0.03 0.01 0.02

5(OPE) -0.32 0.73 -3.63 0.01 -0.06 0.03

6(OPE) -1.51 0.73 -3.68 -0.00 -0.01 0.02

7(OPE) -0.86 0.73 -3.63 0.00 -0.04 0.03

8(OPE) -0.84 0.73 -3.61 0.00 -0.04 0.03

9(OPE) -0.89 0.73 -3.47 0.01 -0.04 0.03

10(OPE) -0.81 0.73 -3.77 -0.00 -0.04 0.03

11(OPE) 1.46 0.73 -3.90 0.01 -0.12 0.05

12(OPE) -3.79 0.73 -3.67 -0.01 0.07 -0.00

13(OPE) -0.99 0.73 -3.29 0.02 -0.04 0.03

14(OPE) -0.70 0.73 -3.96 -0.01 -0.05 0.03

MAX -3.79/L12 2.19/L2 -10.11/L2 -0.06/L2 -0.12/L11 0.05/L11

1950

1(HYD) -0.14 0.00 -0.22 -0.03 0.01 0.02

2(OPE) -2.54 2.71 -10.20 -0.06 -0.06 0.04

3(OPE) -0.89 0.90 -3.61 0.00 -0.04 0.03

4(SUS) -0.13 0.00 -0.22 -0.03 0.01 0.02

5(OPE) -0.37 0.90 -3.62 0.01 -0.06 0.03

6(OPE) -1.54 0.90 -3.68 -0.00 -0.01 0.02

7(OPE) -0.90 0.90 -3.62 0.00 -0.04 0.03

8(OPE) -0.88 0.90 -3.60 0.00 -0.04 0.03

9(OPE) -0.93 0.90 -3.46 0.01 -0.04 0.03

10(OPE) -0.85 0.90 -3.77 -0.00 -0.04 0.03

11(OPE) 1.39 0.90 -3.89 0.01 -0.12 0.05

12(OPE) -3.79 0.90 -3.69 -0.01 0.07 -0.00

13(OPE) -1.04 0.90 -3.26 0.02 -0.04 0.03

14(OPE) -0.74 0.90 -3.98 -0.01 -0.05 0.03

MAX -3.79/L12 2.71/L2 -10.20/L2 -0.06/L2 -0.12/L11 0.05/L11

Page 130: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

LSTK-1 PACKAGE FOR “ETHYLENE GLYCOL”

PROJECT OF M/S. INDIAN OIL CORPORATION

LIMITED (IOCL) AT PARADIP REFINERY, ODISHA

Doc. No. : IPEG-6389-MAZD(1)-8470-CA-061-0036 Title : FLEXIBILITY ANALYSIS

REPORT - EGU : 061-001

Rev. No. : 02

5. NOZZLE LOAD EVALUATION REPORT

Page 131: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612

1

Table of Contents

LISTING OF STATIC LOAD CASES FOR THIS ANALYSIS ................................................................................... 2 Nozzle Check : Multiple ..................................................................................................................................... 3

Page 132: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612

2

LISTING OF STATIC LOAD CASES FOR THIS ANALYSIS

1 (HYD) WW+HP

2 (OPE) W+T1+P1

3 (OPE) W+T2+P1

4 (SUS) W+P1

5 (OPE) W+T2+P1+U1

6 (OPE) W+T2+P1-U1

7 (OPE) W+T2+P1+U2

8 (OPE) W+T2+P1-U2

9 (OPE) W+T2+P1+U3

10 (OPE) W+T2+P1-U3

11 (OPE) W+T2+P1+WIN1

12 (OPE) W+T2+P1+WIN2

13 (OPE) W+T2+P1+WIN3

14 (OPE) W+T2+P1+WIN4

15 (OCC) L15=L5-L3

16 (OCC) L16=L6-L3

17 (OCC) L17=L7-L3

18 (OCC) L18=L8-L3

19 (OCC) L19=L9-L3

20 (OCC) L20=L10-L3

21 (OCC) L21=L11-L3

22 (OCC) L22=L12-L3

23 (OCC) L23=L13-L3

24 (OCC) L24=L14-L3

25 (OCC) L25=L4+L15

26 (OCC) L26=L4+L16

27 (OCC) L27=L4+L17

28 (OCC) L28=L4+L18

29 (OCC) L29=L4+L19

30 (OCC) L30=L4+L20

31 (OCC) L31=L4+L21

32 (OCC) L32=L4+L22

33 (OCC) L33=L4+L23

34 (OCC) L34=L4+L24

35 (EXP) L35=L2-L4

36 (EXP) L36=L3-L4

Page 133: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 NOZZLE CHECK REPORT: Nozzle Loads Screening Various Load Cases

3

LOAD CASE DEFINITION KEY

CASE 3 (OPE) W+T2+P1

CASE 4 (SUS) W+P1

CASE 5 (OPE) W+T2+P1+U1

CASE 6 (OPE) W+T2+P1-U1

CASE 7 (OPE) W+T2+P1+U2

CASE 8 (OPE) W+T2+P1-U2

CASE 9 (OPE) W+T2+P1+U3

CASE 10 (OPE) W+T2+P1-U3

CASE 11 (OPE) W+T2+P1+WIN1

CASE 12 (OPE) W+T2+P1+WIN2

CASE 13 (OPE) W+T2+P1+WIN3

CASE 14 (OPE) W+T2+P1+WIN4

Node fa N fb N fc N Forces Check

ma N.m

mb N.m

mc N.m Moments

Check

290 Absolute Method

Limits 7900 5600 5600 2100 1100 1100

3(OPE) 330 -603 -270 0.108 -141 -52 0 0.067

4(SUS) 526 -8 35 0.067 -20 -199 -11 0.181

5(OPE) 339 -587 -319 0.105 -126 -73 -3 0.066

6(OPE) 291 -676 -217 0.121 -190 -8 6 0.091

7(OPE) 314 -588 -272 0.105 -132 -49 0 0.063

8(OPE) 315 -678 -264 0.121 -187 -28 3 0.089

9(OPE) 284 -718 -267 0.128 -200 -20 -1 0.095

10(OPE) 376 -488 -272 0.087 -83 -85 1 0.077

11(OPE) 337 -586 -503 0.105 -128 -57 -6 0.061

12(OPE) 294 -678 -34 0.121 -188 -24 8 0.090

13(OPE) 286 -1001 -264 0.179 -298 -18 -57 0.142

14(OPE) 374 -205 -275 0.049 16 -86 58 0.078

510 Absolute Method

Limits 11900 8400 8400 4600 2500 2500

3(OPE) 410 1981 601 0.236 -1320 310 821 0.329

4(SUS) -104 0 313 0.037 5 94 2 0.038

5(OPE) 528 1969 656 0.234 -1312 337 818 0.327

6(OPE) 291 1993 544 0.237 -1328 283 825 0.330

7(OPE) 418 1980 589 0.236 -1320 307 821 0.329

8(OPE) 397 1982 608 0.236 -1321 312 822 0.329

9(OPE) 404 1939 596 0.231 -1318 308 824 0.329

10(OPE) 416 2022 606 0.241 -1322 312 819 0.328

Page 134: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 NOZZLE CHECK REPORT: Nozzle Loads Screening Various Load Cases

4

Node fa N fb N fc N Forces Check

ma N.m

mb N.m

mc N.m Moments

Check

11(OPE) 761 1943 837 0.231 -1295 402 814 0.326

12(OPE) 68 2017 369 0.240 -1346 221 829 0.332

13(OPE) 398 1899 592 0.226 -1299 306 820 0.328

14(OPE) 422 2063 610 0.246 -1342 314 823 0.329

730 Absolute Method

Limits 5900 4200 4200 1200 600 600

3(OPE) 603 -330 -270 0.102 -167 44 -81 0.139

4(SUS) 8 -133 35 0.032 -38 25 -37 0.061

5(OPE) 587 -321 -273 0.100 -160 32 -87 0.145

6(OPE) 676 -369 -263 0.115 -173 71 -67 0.144

7(OPE) 588 -316 -272 0.100 -166 39 -82 0.138

8(OPE) 678 -375 -264 0.115 -169 65 -71 0.141

9(OPE) 672 -375 -267 0.114 -162 68 -69 0.135

10(OPE) 534 -284 -272 0.091 -172 20 -94 0.156

11(OPE) 586 -323 -273 0.099 -178 38 -86 0.148

12(OPE) 678 -366 -263 0.115 -155 65 -67 0.129

13(OPE) 644 -374 -264 0.109 -164 101 -69 0.168

14(OPE) 562 -285 -275 0.095 -171 -12 -93 0.155

900 Absolute Method

Limits 5900 4200 4200 1200 600 600

3(OPE) 550 286 -633 0.151 -176 -88 107 0.178

4(SUS) 187 136 -79 0.032 54 19 55 0.092

5(OPE) 434 254 -510 0.121 -188 -45 108 0.180

6(OPE) 700 383 -787 0.187 -146 -144 112 0.240

7(OPE) 532 263 -621 0.148 -183 -85 103 0.171

8(OPE) 612 377 -687 0.164 -151 -108 117 0.196

9(OPE) 572 384 -647 0.154 -149 -98 118 0.197

10(OPE) 529 188 -620 0.148 -203 -77 96 0.169

11(OPE) 443 252 -516 0.123 -185 -52 111 0.185

12(OPE) 687 383 -777 0.185 -150 -136 109 0.226

13(OPE) 582 420 -658 0.157 -106 -102 123 0.205

Page 135: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 NOZZLE CHECK REPORT: Nozzle Loads Screening Various Load Cases

5

Node fa N fb N fc N Forces Check

ma N.m

mb N.m

mc N.m Moments

Check

14(OPE) 521 152 -611 0.146 -245 -74 91 0.204

1160 Absolute Method

Limits 15800 11200 11200 8200 4500 4500

3(OPE) 821 -1324 -242 0.118 -417 -324 -144 0.072

4(SUS) 1089 -357 -1 0.069 -238 -371 -155 0.082

5(OPE) 806 -1377 -403 0.123 -314 -339 -143 0.075

6(OPE) 874 -1098 -48 0.098 -471 -316 -164 0.070

7(OPE) 780 -1264 -236 0.113 -389 -310 -142 0.069

8(OPE) 861 -1384 -248 0.124 -446 -338 -145 0.075

9(OPE) 764 -1679 -263 0.150 -590 -297 -122 0.072

10(OPE) 878 -965 -221 0.086 -242 -351 -166 0.078

11(OPE) 845 -1094 -1161 0.104 298 -507 -222 0.113

12(OPE) 968 -776 834 0.074 -918 -170 -158 0.112

13(OPE) 750 -2343 -300 0.209 -861 -308 -209 0.105

14(OPE) 897 -279 -184 0.057 41 -343 -81 0.076

1250 Absolute Method

Limits 7900 5600 5600 2100 1100 1100

3(OPE) -151 -286 633 0.113 413 -166 -86 0.197

4(SUS) 212 -136 79 0.027 59 -12 -45 0.041

5(OPE) -35 -254 482 0.086 399 -117 -89 0.190

6(OPE) -301 -383 815 0.146 464 -226 -84 0.221

7(OPE) -152 -263 621 0.111 401 -162 -84 0.191

8(OPE) -195 -377 687 0.123 464 -186 -90 0.221

9(OPE) -173 -412 647 0.116 478 -172 -94 0.228

10(OPE) -130 -160 620 0.111 348 -160 -78 0.166

11(OPE) -44 -252 377 0.067 394 -103 -92 0.188

12(OPE) -288 -383 916 0.164 468 -239 -81 0.223

13(OPE) -183 -709 658 0.127 579 -176 -155 0.276

14(OPE) -123 137 611 0.109 247 -157 -17 0.142

660 Absolute Method

Page 136: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CAESAR II 2018 Ver.10.00.00.7700, (Build 170726) Date: JAN 20, 2020 Time: 18:10 Job:: 061-EJ-612 NOZZLE CHECK REPORT: Nozzle Loads Screening Various Load Cases

6

Node fa N fb N fc N Forces Check

ma N.m

mb N.m

mc N.m Moments

Check

Limits 11900 8400 8400 4600 2500 2500

3(OPE) 1092 -1981 410 0.236 1393 351 756 0.303

4(SUS) 1380 -0 -104 0.116 -2 350 5 0.140

5(OPE) 1037 -1969 410 0.234 1383 347 751 0.301

6(OPE) 1149 -1993 409 0.237 1403 356 760 0.305

7(OPE) 1026 -1980 418 0.236 1393 334 755 0.303

8(OPE) 1163 -1982 397 0.236 1394 369 756 0.303

9(OPE) 1097 -2058 404 0.245 1408 352 754 0.306

10(OPE) 1087 -1903 416 0.227 1378 350 758 0.303

11(OPE) 855 -1943 468 0.231 1359 318 742 0.297

12(OPE) 1323 -2017 361 0.240 1426 385 769 0.310

13(OPE) 1101 -2280 398 0.271 1466 353 711 0.319

14(OPE) 1082 -1681 422 0.200 1320 349 801 0.320

1560 Absolute Method

Limits 11900 8400 8400 4600 2500 2500

3(OPE) 1324 -666 -242 0.111 17 348 -649 0.260

4(SUS) 357 -398 -1 0.047 17 1 -265 0.106

5(OPE) 1377 -681 -299 0.116 11 450 -671 0.268

6(OPE) 1098 -613 -152 0.092 23 197 -573 0.229

7(OPE) 1264 -638 -236 0.106 16 339 -624 0.249

8(OPE) 1384 -694 -248 0.116 18 356 -675 0.270

9(OPE) 1575 -723 -263 0.132 17 376 -737 0.295

10(OPE) 1069 -608 -221 0.090 17 319 -561 0.224

11(OPE) 1094 -641 -573 0.092 -37 703 -614 0.281

12(OPE) 776 -518 246 0.065 71 -234 -437 0.175

13(OPE) 1730 -736 -300 0.145 17 403 -805 0.322

14(OPE) 892 -590 -184 0.075 17 290 -486 0.194

Page 137: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

DX(mm) DY(mm) DZ(mm) RX deg. RY deg. RZ deg.

Operating at Design Temp. -1.36 -0.94 -14.71 -0.06 -0.06 0.04

Operating at Working Temp. -0.05 0.06 -6.06 0 -0.04 0.03

Sustain -0.08 -0.41 0 -0.03 0.01 0.02

Operating at Design Temp. -2.54 2.71 -10.2 -0.06 -0.06 0.04

Operating at Working Temp. -0.89 0.9 -3.61 0 -0.04 0.03

Sustain -0.13 0 -0.22 -0.03 0.01 0.02

Operating at Design Temp. -3.3 0.91 -1.24 -0.02 -0.02 0.03

Operating at Working Temp. -1.37 -0.42 -0.84 0.01 -0.01 0.02

Sustain 0.13 -0.01 0 0.01 0.01 0.01

Operating at Design Temp. -4.46 1.06 -10.3 -0.06 -0.06 0.04

Operating at Working Temp. -1.47 0.25 -3.89 0 -0.04 0.03

Sustain -0.07 -0.1 -0.07 -0.03 0.01 0.02

Operating at Design Temp. -2.12 2.02 -12.36 -0.06 -0.06 0.04

Operating at Working Temp. -0.59 1.38 -4.47 0 -0.04 0.03

Sustain -0.15 -0.18 -0.2 -0.03 0.01 0.02

Operating at Design Temp. -1.59 -2.85 -11.45 -0.06 -0.06 0.04

Operating at Working Temp. -0.19 -1.33 -4.53 0 -0.04 0.03

Sustain 0.08 -0.18 0.19 -0.03 0.01 0.02

Operating at Design Temp. -0.17 1.26 -19.23 0 0 0

Operating at Working Temp. -0.17 0.29 -4.73 0 0 0

Sustain 0 0 0 0 0 0

Operating at Design Temp. 0.12 1.63 -19.22 -0.01 -0.03 0

Operating at Working Temp. -0.07 0.43 -4.74 0 -0.01 0

Sustain 0 0 0 0 0 0

FIR

ST S

TAG

E E

JEC

TOR

FIR

ST S

TAG

E IN

TER

CO

ND

ENSE

R

6608

Y3 1561

Y6 1750

4 Y4 1930

7

5

6

Y5 1720

IC1

3

STEAM JET AIR EJECTOR SYSTEM

Max Displacement Value in different Cases

Eqp Nozzle Node No. Load CaseDisplacement

Sl. No.

1 Y1 1630

2 Y2 1950

1380

IC2

Page 138: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

DX(mm) DY(mm) DZ(mm) RX deg. RY deg. RZ deg.

FIR

ST S

TAG

E E

JEC

TOR

STEAM JET AIR EJECTOR SYSTEM

Max Displacement Value in different Cases

Eqp Nozzle Node No. Load CaseDisplacement

Sl. No.

1 Y1 1630

Operating at Design Temp. -0.01 4.59 1.25 0 0 0

Operating at Working Temp. -0.01 1.13 0.31 0 0 0

Sustain 0 0 0 0 0 0

Operating at Design Temp. 0.11 4.29 -17.63 0 -0.03 -0.01

Operating at Working Temp. -0.07 1.05 -4.33 0 -0.01 0

Sustain 0 0 0 0 0 0

Operating at Design Temp. 0.09 -1.74 -17.64 0 0 0

Operating at Working Temp. -0.05 -0.43 -4.33 0 0 0

Sustain 0 0 0 0 0 0

Operating at Design Temp. 0.04 4.44 -8.42 0 0 0

Operating at Working Temp. -0.04 1.09 -2.07 0 0 0

Sustain 0 0 0 0 0 0

Operating at Design Temp. -0.02 1.61 3.43 0 0 0

Operating at Working Temp. 0 0.43 0.86 0 0 0

Sustain 0 0 0 0 0 0

Operating at Design Temp. -0.02 1.07 3.43 0 0 0

Operating at Working Temp. 0.01 0.23 0.85 0 0 0

Sustain 0 0 0 0 0 0

Operating at Design Temp. -0.06 1.26 -19.37 0 0 0

Operating at Working Temp. -0.14 0.29 -4.78 0 0 0

Sustain 0 -0.01 0 0 0 0

Operating at Design Temp. -0.03 1.53 -19.29 0 -0.02 0

Operating at Working Temp. -0.12 0.39 -4.75 0 0 0

Sustain 0 0 0 0 0 0

1410

1470

1160

1010IC7

16 IC10

14

15

11

12

13

IC9

9

10

IC3

IC4

IC8

IC6

980

1310

1220

1250

FIR

ST S

TAG

E IN

TER

CO

ND

ENSE

R

IC5

Page 139: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

DX(mm) DY(mm) DZ(mm) RX deg. RY deg. RZ deg.

FIR

ST S

TAG

E E

JEC

TOR

STEAM JET AIR EJECTOR SYSTEM

Max Displacement Value in different Cases

Eqp Nozzle Node No. Load CaseDisplacement

Sl. No.

1 Y1 1630

Operating at Design Temp. 1.61 3.44 1.26 0 0 0

Operating at Working Temp. 0.39 0.84 0.3 0 0 0

Sustain 0 0 0 0 0 0

Operating at Design Temp. -1.52 3.45 -17.72 0 -0.02 0

Operating at Working Temp. -0.46 0.82 -4.35 0 0 0

Sustain 0 -0.01 0 0 0 0

Operating at Design Temp. 5.83 -0.94 -16.35 -0.11 -0.26 -0.11

Operating at Working Temp. 2.42 0.15 -5.32 0.02 -0.1 -0.05

Sustain -0.03 0.09 0 0.01 0 0

Operating at Design Temp. 4.35 2.51 -14.18 -0.12 -0.25 -0.11

Operating at Working Temp. 1.85 0.8 -3.53 0.01 -0.09 -0.05

Sustain -0.01 0 0.06 0.01 0 0

Operating at Design Temp. -0.14 1.05 -8.52 -0.03 -0.26 -0.08

Operating at Working Temp. -0.05 -0.31 -2.11 0.02 -0.11 -0.02

Sustain 0.07 -0.18 0 0.01 0.01 0.01

Operating at Design Temp. 2.17 1.85 -15.09 -0.11 -0.26 -0.1

Operating at Working Temp. 1.1 0.65 -4.12 0.02 -0.1 -0.05

Sustain -0.01 -0.01 0.05 0.01 0 0

Operating at Design Temp. -0.03 0.73 -12.69 -0.07 -0.14 -0.01

Operating at Working Temp. -0.05 0.1 -3.35 -0.02 -0.03 0

Sustain 0 -0.04 0 0 0 0

Operating at Design Temp. -0.04 1.21 2.59 0 0 0

Operating at Working Temp. -0.01 0.36 0.72 0 0 0

Sustain 0 0 0 0 0 0

24 AC2 110

22 Z4 880

23 AC1 510

SEC

ON

D S

TAG

E E

JEC

TOR

20 Z2 900

21 Z3 731

19 Z1 740

17 IC11 1190

IC12 128018

FIR

ST S

TAG

E IN

TER

CO

ND

ENSE

RA

FTER

CO

ND

ENSE

R

Page 140: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

DX(mm) DY(mm) DZ(mm) RX deg. RY deg. RZ deg.

FIR

ST S

TAG

E E

JEC

TOR

STEAM JET AIR EJECTOR SYSTEM

Max Displacement Value in different Cases

Eqp Nozzle Node No. Load CaseDisplacement

Sl. No.

1 Y1 1630

Operating at Design Temp. 0 3.61 0.87 0 -0.02 0

Operating at Working Temp. 0 0.96 0.24 0 0 0

Sustain -0.01 0 0 0 0 0

Operating at Design Temp. 0.17 3.75 -10.44 0 -0.01 0

Operating at Working Temp. 0.04 0.99 -2.77 0 0 0

Sustain 0 0 0 0 0 0

Operating at Design Temp. 0.17 -1.64 -10.43 0 -0.01 0

Operating at Working Temp. 0.04 -0.44 -2.77 0 0 0

Sustain 0 0 0 0 0 0

Operating at Design Temp. 0.05 3.54 -4.28 0 0 0

Operating at Working Temp. 0.01 0.94 -1.14 0 0 0

Sustain 0 0 0 0 0 0

Operating at Design Temp. 0.24 1.17 -11.86 0 -0.01 0

Operating at Working Temp. 0.05 0.35 -3.18 0 0 0

Sustain -0.01 0 0 0 0 0

Operating at Design Temp. -0.04 0.73 2.6 0 0 0

Operating at Working Temp. -0.01 0.15 0.72 0 0 0

Sustain 0 0 0 0 0 0

Operating at Design Temp. 0.69 0.4 -12.4 -0.06 -0.13 -0.01

Operating at Working Temp. 0.12 0.04 -3.33 -0.02 -0.03 0

Sustain 0 -0.03 0 0 0 0

Operating at Design Temp. 0.1 1.1 2.61 0 0 0

Operating at Working Temp. 0.06 0.31 0.73 0 0 0

Sustain 0 0 0 0 0 0

32 AC10 140

30 AC8 80

31 AC9 540

28 AC6 350

29 AC7 570

26 AC4 380

27 AC5 440

25 AC3 290

AFT

ER C

ON

DEN

SER

Page 141: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

DX(mm) DY(mm) DZ(mm) RX deg. RY deg. RZ deg.

FIR

ST S

TAG

E E

JEC

TOR

STEAM JET AIR EJECTOR SYSTEM

Max Displacement Value in different Cases

Eqp Nozzle Node No. Load CaseDisplacement

Sl. No.

1 Y1 1630

Operating at Design Temp. 1.61 2.56 0.94 0 -0.01 0

Operating at Working Temp. 0.43 0.67 0.23 0 0 0

Sustain 0 0 0 0 0 0

Operating at Design Temp. 1.78 2.82 -10.4 0 -0.01 0

Operating at Working Temp. 0.47 0.74 -2.77 0 0 0

Sustain 0 -0.01 0 0 0 0

33 AC11 320

34 AC12 410

AFT

ER C

ON

DEN

SER

Page 142: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

LSTK-1 PACKAGE FOR “ETHYLENE GLYCOL”

PROJECT OF M/S. INDIAN OIL CORPORATION

LIMITED (IOCL) AT PARADIP REFINERY, ODISHA

Doc. No. : IPEG-6389-MAZD(1)-8470-CA-061-0036 Title : FLEXIBILITY ANALYSIS

REPORT - EGU : 061-001

Rev. No. : 02

6. PMS

Page 143: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

ATTACHMENT- 3

635110

C1P50

1 OF 421-NOV-17

ASME B31.3

1.27 93 149 19538

NO Kgf/cm2 20/FV 18.2/FV 16.6/FV 14.4/FV

1.00 : dsp_GrpLine1

2.00 S/C

3.00 : dsp_GrpLine2

PIPE

1/2

1

2

3

16

36

64

NIPPLE

1/2

HALF NIPPLE

3/4

ELBOW/TEE/REDUCER/CAP

1/2

2

16

64

SWAGE NIPPLE(CON)1/2

SWAGE NIPPLE(ECC)1/2

SOCKET OUTLET1/2

SCREWED CAP3/4

FULL COUPLING11/2

31.00 : dsp_GrpLine1

CLASS 32.00 THICKNOM.SIZE(NPS) MATERIAL S/C REVNOTEREF. TO

33.00 : dsp_GrpLine2

FLANGE

1/2

2

36

11/2

BLIND FLANGE1/2

8-FIG FLANGE1/2

SPACER & BLIND10

BOLT/NUT1/2

GASKET1/2

50.00 : dsp_GrpLine1

TYPE 51.00 VALVE NO.BODY/TRIM ENDCLASS S/C REVNOTENOM.SIZE(NPS) REF. TO

52.00 : dsp_GrpLine2

GATE VALVE1/2

DOC. NO.

PIPING MATERIALS CLASSIFICATION WORK NO.

><

REV. MARK

ISSUE DATE PAGE:

DESIGN CODEBASE MATERIAL

P-T TEMP. (C)C.A.(inch)

PWHT RATING PRESS.

SERVICE

Carbon Steel

GENERAL PROCESS - NON CORROSIVE, VACUUM SERVICE

PRODUCT WALL THICKENDMATERIAL REVNOTENOM.SIZE(NPS) REF. TO

- ASME B36.10MSCH 160PESMLSA106GR.B3/4 P

- ASME B36.10MXSPESMLSA106GR.B11/2 P

- ASME B36.10MXSBESMLSA106GR.B2 P

- ASME B36.10MSTDBESMLSA106GR.B14 P

- ASME B36.10MSTDBEEFWA672GR.B60CL.1224 P

- ASME B36.10MXSBEEFWA672GR.B60CL.1238 P

- ASME B36.10M19.05BEEFWA672GR.B60CL.1266 P

- ASME B36.10MSCH 160PBESMLSA106GR.B11/2 NF

- ASME B36.10MSCH 160PBESMLSA106GR.B3/4 NH

S/C ( E : 90 EL, EA : 45 EL, ES : SHORT EL, T : TEE, RC : CON RED, RE : ECC RED, CA : CAP )

- ASME B16.11CL.6000SW-A10511/2

- ASME B16.9BWSMLSA234GR.WPB14

- ASME B16.9BWWELDA234GR.WPB48

- BY MFRBWWELDA234GR.WPB66

- MSS SP-95PBE-A1053 NS

- MSS SP-95PBE-A1053 NE

- ASME B16.11CL.6000SW-A10511/2 T

- ASME B16.11CL.3000SCRD-A1053/4 CAT

- ASME B16.11CL.6000SW-A10511/2 OF

TYPE-FACE

- ASME B16.5SW-RF150A10511/2 F

- ASME B16.5WN-RF150A10524 F

- ASME B16.47 SR.BWN-RF150A10536 F

- (B)ASME B16.5SW-RF300A10511/2 F3

- ASME B16.5RF150A10524 FB

- ASME B16.48FF150A1058 ZFS

- ASME B16.48FF150A10524 ZFS

- ASME B18.2.1/18.2.2S.BOLT/HEX.NUT150A193GR.B7/A194GR.2H36 B

- ASME B16.204.5TRF150SPIRAL WOUND GASKET36 G

- SS304 IR + CS OR G

(A)API 602VAS418ZBB,OS&YSW 80011/2 A105/#8 VA-

ANNEXURE - A

Page 144: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

ATTACHMENT- 3

635110

C1P50

2 OF 421-NOV-17

ASME B31.3

1.27 93 149 19538

NO Kgf/cm2 20/FV 18.2/FV 16.6/FV 14.4/FV

1.00 : dsp_GrpLine1

TYPE 2.00 VALVE NO.BODY/TRIM ENDCLASS S/C REVNOTENOM.SIZE(NPS) REF. TO

3.00 : dsp_GrpLine2

2

GLOBE VALVE1/2

2

CHECK VALVE

1/2

DUAL PLATE CHECK VALVE

2

BALL VALVE

1/2

PLUG VALVE

1/2

NEEDLE VALVE

1/2

[251]NOTES :

DOC. NO.

PIPING MATERIALS CLASSIFICATION WORK NO.

><

REV. MARK

ISSUE DATE PAGE:

DESIGN CODEBASE MATERIAL

P-T TEMP. (C)C.A.(inch)

PWHT RATING PRESS.

SERVICE

Carbon Steel

GENERAL PROCESS - NON CORROSIVE, VACUUM SERVICE

(A)API 600VAF218ZBB,OS&YRF 15024 A216GR.WCB/#8 VA-

(A)API 602VBS418ZBB,OS&YSW 80011/2 A105/#8 VB-

(A)BS 1873VBF218ZBB,OS&YRF 15024 A216GR.WCB/#8 VB-

API 602VCS418BC,LIFTSW 80011/2 A105/#8 VC-

API 594VNA218-WAFER 15024 A216GR.WCB/#8 VN-

(A)API 608VJFA1PZREGULARRF 15024 A216GR.WCB/316+PTFE VJ-

(A)API 599VHFA1ZZNON-LUBRICATEDRF 15010 A216GR.WCB/DI+CR/PTFE VH-

(A)API 602VFS418ZBB,OS&YSW 8001/2 A105/#8 VF-

(A) VALVE SHALL BE SUITABLE FOR VACUUM SERVICE.(B) HIGHER RATING FLANGE SHALL BE USED AS PER PID REQUIREMENT.

ANNEXURE - A

Page 145: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

ATTACHMENT- 3

635110

C1P50

3 OF 421-NOV-17

ASME B31.3

1.27 93 149 19538

NO Kgf/cm2 20/FV 18.2/FV 16.6/FV 14.4/FV

Line ControlLine control PIPING CLASS TABLE NOLine controlLine controlLine controlLine controlLine controlLine control H : HALF COUPLING 0 : LONG BOSS W : WELDING OUTLETLine control T : THREADED JOINT P : PIPE WELD (NOZZLE ON or IN) R : PIPE WELD WITH REINFORCE PADLine control 1 : SOCKET OUTLET 2 : THREAD OUTLET 3 : SWEEP OUTLETLine control 4 : NIPPLE OUTLET 5 : INSERT WELDING OUTLET 6 : REDUCED TEE + REDUCERLine controlLine control

RevMAIN SIZE

1/2 S3/4 S S1 S SS

11/2 S SS S2 1 11 B B3 1 11 1 B B4 1 11 1 B B B6 1 11 1 P B B B8 1 11 1 P P B B B10 1 11 1 P P P B B B12 1 11 1 P P P P B B B14 1 11 1 P P P P P BB B16 1 11 1 P P P P P BBP B18 1 11 1 P P P P P BBBP P20 1 11 1 P P P P P BBBPP P24 1 11 1 R R R R R BBBRRR R26 1 11 1 R R R R R BBBRRRR R28 1 11 1 R R R R R BBBRRRRR R30 1 11 1 R R R R R BBBRRRRRR R32 1 11 1 R R R R R BBBRRRRRRR R34 1 11 1 R R R R R BBBRRRRRRRR R36 1 11 1 R R R R R BBBRRRRRRRRR R38 1 11 1 R R R R R BBBBBBBBBRRRR R40 1 11 1 R R R R R BBBRRRRRRRRRRR R42 1 11 1 R R R R R BBBRRRRRRRRRRRR R44 1 11 1 R R R R R BBBRRRRRRRRRRRRR R46 1 11 1 R R R R R BBBRRRRRRRRRRRRRR R48 1 11 1 R R R R R BBBRRRRRRRRRRRRRRR R64 1 11 1 R R R R R RRRRRRRRRRRRRRRRRR R66 1 11 1 R R R R R RRRRRRRRRRRRRRRRRR R

MAIN 1 2 4 6 8 1 1 1 1 2 2 2 2 3 3 3 3 3 4 4 4 4 433 11 1 */ 1 0 2 4 6 8 0 4 6 8 0 2 6 8 4 6 8 4 0 2/ *4 / 2 BRANCH 2

BRANCH SIZE

DOC. NO.

PIPING MATERIALS CLASSIFICATION WORK NO.

><

REV. MARK

ISSUE DATE PAGE:

DESIGN CODEBASE MATERIAL

P-T TEMP. (C)C.A.(inch)

PWHT RATING PRESS.

SERVICE

Carbon Steel

GENERAL PROCESS - NON CORROSIVE, VACUUM SERVICE

T-10

C1P5

S : SOCKET WELD B : WELDING TEE(COMMERCIAL TYPE) F : FABRICATED TEE or FLANGED TEE

ANNEXURE - A

Page 146: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

ATTACHMENT- 3

635113

C1W00

1 OF 421-NOV-17

ASME B31.3

1.27 65

NO Kgf/cm2 20.03

1.00 : dsp_GrpLine1

2.00 S/C

3.00 : dsp_GrpLine2

PIPE

1/2

1

2

3

8

10

24

NIPPLE

1/2

HALF NIPPLE

1/2

ELBOW/TEE/REDUCER/CAP

1/2

2

10

SWAGE NIPPLE(CON)

1/2

SWAGE NIPPLE(ECC)

1/2

SOCKET OUTLET

1/2

SCREWED CAP

1/2

FULL COUPLING

3/4

PLUG

3/4

32.00 : dsp_GrpLine1

CLASS 33.00 THICKNOM.SIZE(NPS) MATERIAL S/C REVNOTEREF. TO

34.00 : dsp_GrpLine2

FLANGE1/2

2

28

3/4

BLIND FLANGE

1/2

8-FIG FLANGE

1/2

SPACER & BLIND

10

BOLT/NUT

1/2

GASKET

1/2

51.00 : dsp_GrpLine1

TYPE 52.00 VALVE NO.BODY/TRIM ENDCLASS S/C REVNOTENOM.SIZE(NPS) REF. TO

53.00 : dsp_GrpLine2

DOC. NO.

PIPING MATERIALS CLASSIFICATION WORK NO.

><

REV. MARK

ISSUE DATE PAGE:

DESIGN CODEBASE MATERIAL

P-T TEMP. (C)C.A.(inch)

PWHT RATING PRESS.

SERVICE

Carbon Steel

COOLING WATER SUPPLY/RETURN (AG), BEARING COOLING WATER SUPPLY/RETURN

PRODUCT WALL THICKENDMATERIAL REVNOTENOM.SIZE(NPS) REF. TO

- ASME B36.10MSCH 160PESMLSA106GR.B3/4 P

- ASME B36.10MXSPESMLSA106GR.B11/2 P

- ASME B36.10MXSBESMLSA106GR.B2 P

- ASME B36.10MSTDBESMLSA106GR.B6 P

- ASME B36.10MSCH 20BESMLSA106GR.B8 P

- ASME B36.10MSCH 10BEWELDAPI5LGR.B PSL.120 P

- ASME B36.10MSTDBEWELDAPI5LGR.B PSL.128 P

- ASME B36.10MSCH 160PBESMLSA106GR.B11/2 NF

- ASME B36.10MSCH 160PBESMLSA106GR.B1 NH

S/C ( E : 90 EL, EA : 45 EL, ES : SHORT EL, T : TEE, RC : CON RED, RE : ECC RED, CA : CAP )

- ASME B16.11CL.6000SW-A10511/2

- ASME B16.9BWSMLSA234GR.WPB8

- ASME B16.9BWWELDA234GR.WPB28

- MSS SP-95PBE-A1053 NS

- MSS SP-95PBE-A1053 NE

- ASME B16.11CL.6000SW-A10511/2 T

- ASME B16.11CL.3000SCRD-A1051 CAT

- ASME B16.11CL.6000SW-A10511/2 OF

- ASME B16.11CL.3000SCRD-A1053/4 CP

TYPE-FACE

- ASME B16.5SW-RF150A10511/2 F

- ASME B16.5SO-RF150A10524 F

- AWWA C207 CL.DSO-RF150A10528 F

- (A)ASME B16.5SW-RF300A1053/4 F3

- ASME B16.5RF150A10524 FB

- ASME B16.48FF150A1058 ZFS

- ASME B16.48FF150A10524 ZFS

- ASME B18.2.1/18.2.2S.BOLT/HEX.NUT150A193GR.B7/A194GR.2H28 B

- ASME B16.212.0TRF150FLAT RING, SINTHETIC FIBRE28 G

WITH

- SBR BINDER G

ANNEXURE - A

Page 147: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

ATTACHMENT- 3

635113

C1W00

2 OF 421-NOV-17

ASME B31.3

1.27 65

NO Kgf/cm2 20.03

BALL VALVE8

1.00 : dsp_GrpLine1

TYPE 2.00 VALVE NO.BODY/TRIM ENDCLASS S/C REVNOTENOM.SIZE(NPS) REF. TO

3.00 : dsp_GrpLine2

NEEDLE VALVE

3/4

GLOBE VALVE

1/2

2

CHECK VALVE1/2

DUAL PLATE CHECK VALVE2

BUTTERFLY VALVE2

[251]NOTES :

DOC. NO.

PIPING MATERIALS CLASSIFICATION WORK NO.

><

REV. MARK

ISSUE DATE PAGE:

DESIGN CODEBASE MATERIAL

P-T TEMP. (C)C.A.(inch)

PWHT RATING PRESS.

SERVICE

Carbon Steel

COOLING WATER SUPPLY/RETURN (AG), BEARING COOLING WATER SUPPLY/RETURN

TOP ENTRYAPI 608VJF214REGULARRF 1508 A216GR.WCB/304+PTFE VJ-

API 602VFS418BB,OS&YSW 8003/4 A105/#8 VF-

API 602VBS418BB,OS&YSW 80011/2 A105/#8 VB-

BS 1873VBF218BB,OS&YRF 15024 A216GR.WCB/#8 VB-

API 602VCS418BC,LIFTSW 80011/2 A105/#8 VC-

API 594VNA218-WAFER 15024 A216GR.WCB/#8 VN-

API 609 CAT.BVKA211TRIPLEWAFER 15024 A216GR.WCB/13CR+METAL VK-

ECCENTRIC

(A) HIGHER RATING FLANGE SHALL BE USED AS PER PID REQUIREMENT.

ANNEXURE - A

Page 148: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

ATTACHMENT- 3

635113

C1W00

3 OF 421-NOV-17

ASME B31.3

1.27 65

NO Kgf/cm2 20.03

Line ControlLine control PIPING CLASS TABLE NOLine controlLine controlLine controlLine controlLine controlLine control H : HALF COUPLING 0 : LONG BOSS W : WELDING OUTLETLine control T : THREADED JOINT P : PIPE WELD (NOZZLE ON or IN) R : PIPE WELD WITH REINFORCE PADLine control 1 : SOCKET OUTLET 2 : THREAD OUTLET 3 : SWEEP OUTLETLine control 4 : NIPPLE OUTLET 5 : INSERT WELDING OUTLET 6 : REDUCED TEE + REDUCERLine controlLine control

RevMAIN SIZE

1/2 S3/4 S S1 S SS

11/2 S SS S2 1 11 B B3 1 11 1 B B4 1 11 1 B B B6 1 11 1 P B B B8 1 11 1 P P B B B10 1 11 1 P P P B B B12 1 11 1 P P P P B B B14 1 11 1 P P P P P BB B16 1 11 1 P P P P P BBP B18 1 11 1 P P P P P BBBP P20 1 11 1 P P P P P BBBPP P24 1 11 1 P P P P P BBBPPP P26 1 11 1 P P P P P BBBPPPP P28 1 11 1 P P P P P BBBPPRPP P

MAIN 1 2 4 6 8 1 1 1 1 2 2 2 233 11 1 */ 1 0 2 4 6 8 0 4 6 8 / *4 / 2 BRANCH 2

BRANCH SIZE

DOC. NO.

PIPING MATERIALS CLASSIFICATION WORK NO.

><

REV. MARK

ISSUE DATE PAGE:

DESIGN CODEBASE MATERIAL

P-T TEMP. (C)C.A.(inch)

PWHT RATING PRESS.

SERVICE

Carbon Steel

COOLING WATER SUPPLY/RETURN (AG), BEARING COOLING WATER SUPPLY/RETURN

T-12

C1W0

S : SOCKET WELD B : WELDING TEE(COMMERCIAL TYPE) F : FABRICATED TEE or FLANGED TEE

ANNEXURE - A

Page 149: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

ATTACHMENT- 3

635131

B1AS(I)0

1 OF 214-FEB-18

ASME B31.3

1.5 93 149 204 260 35038

NO Kgf/cm2 52.03 47.81 46.05 44.64 42.54 18/FV

1.00 : dsp_GrpLine1

2.00 S/C

3.00 : dsp_GrpLine2

1/2

1

2

3

12

16

26

1/2

1/2

1

2

26

1/2

1

1/2

1/2

1

1/2

31.00 : dsp_GrpLine1

CLASS 32.00 THICKNOM.SIZE(NPS) MATERIAL S/C REVNOTEREF. TO

33.00 : dsp_GrpLine2

1/2

2

26

20

2

1/2

26

1/2

10

1/2

1/2

26

52.00 : dsp_GrpLine1

TYPE 53.00 VALVE NO.BODY/TRIM ENDCLASS S/C REVNOTENOM.SIZE(NPS) REF. TO

DOC. NO.

PIPING MATERIALS CLASSIFICATION WORK NO.

><

REV. MARK

ISSUE DATE PAGE:

BASE MATERIAL DESIGN CODE

P-T TEMP. (C)C.A.(mm)

PWHT RATING PRESS.

SERVICE

Killed Carbon Steel

MEDUIM PRESSURE STEAM, IBR

PRODUCT WALL THICKENDMATERIAL REVNOTENOM.SIZE(NPS) REF. TO

- (I)

PIPE- PASME B36.10SCH 160PESMLS3/4 A106GR.B

- PASME B36.10XSPESMLS11/2 A106GR.B

- PASME B36.10XSBESMLS2 A106GR.B

- PASME B36.10STDBESMLS10 A106GR.B

- PASME B36.10SCH 40BESMLS14 A106GR.B

- PASME B36.10SCH 40BEEFW24 A672GR.B60CL.22

- PASME B36.1014.27BEEFW28 A672GR.B60CL.22

NIPPLE- NFASME B36.10XXS-SMLS11/2 A106GR.B

ELBOW/TEE/REDUCER/CAP S/C ( E : 90 EL, EA : 45 EL, ES : SHORT EL, T : TEE, RC : CON RED, RE : ECC RED, CA : CAP )

- ASME B16.11CL.6000SWFORG3/4 A105N

- ASME B16.11CL.3000SWFORG11/2 A105N

- ASME B16.9BWSMLS24 A234GR.WPB

- ASME B16.9BWWELD36 A234GR.WPB

SOCKET OUTLET

- TMSS SP-97CL.6000SWFORG3/4 A105N

- TMSS SP-97CL.3000SWFORG11/2 A105N

THREADED CAP- (A) (I) CATASME B16.11CL.3000THRDFORG11/2 A105N

FULL COUPLING- OFASME B16.11CL.6000SWFORG3/4 A105N

- OFASME B16.11CL.3000SWFORG11/2 A105N

SWAGE NIPPLE S/C ( NS : SWAGE NIPPLE(CON), NE : SWAGE NIPPLE(ECC) )

- NS NEMSS SP-95BE/PESMLS4 A105N

TYPE-FACE

FLANGE- FASME B16.5SW-RF30011/2 A105N

- FASME B16.5WN-RF30024 A105N

- FASME B16.47 SR.BWN-RF30036 A105N

- F9ASME B16.5WN-RF90020 A105N

- F6ASME B16.5WN-RF60024 A105N

BLIND FLANGE- FBASME B16.5RF30024 A105N

- FBASME B16.47 SR.BRF30026 A105N

FIG-8 BLANKS

- ZFSASME B16.48FF3008 A515GR.70

SPACER & BLANKS

- ZFSASME B16.48FF30036 A515GR.70

BOLT/NUT

- BASME B18.2.1/18.2.2S.BOLT/HEX.NUT30036 A193GR.B7/A194GR.2H

GASKET

- GASME B16.204.5TRF30024 SPIRAL WOUND SS316+CS

GRAPHITE FILLER

- GASME B16.204.5TRF30036 SPIRAL WOUND SS316+CS

GRAPHITE FILLER

ANNEXURE - B

Page 150: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

ATTACHMENT- 3

635131

B1AS(I)0

2 OF 214-FEB-18

ASME B31.3

1.5 93 149 204 260 35038

NO Kgf/cm2 52.03 47.81 46.05 44.64 42.54 18/FV

54.00 : dsp_GrpLine2

1/2

1.00 : dsp_GrpLine1

TYPE 2.00 VALVE NO.BODY/TRIM ENDCLASS S/C REVNOTENOM.SIZE(NPS) REF. TO

3.00 : dsp_GrpLine2

2

1/2

2

20

1/2

12

2

[251]NOTES :

DOC. NO.

PIPING MATERIALS CLASSIFICATION WORK NO.

><

REV. MARK

ISSUE DATE PAGE:

BASE MATERIAL DESIGN CODE

P-T TEMP. (C)C.A.(mm)

PWHT RATING PRESS.

SERVICE

Killed Carbon Steel

MEDUIM PRESSURE STEAM, IBR

GATE VALVE

- (L) VAAPI 602VSGD11A01UBB,OS&YSW 800A105N/#511/2

- (L) VAAPI 600VLGB44A01UBB,OS&YRF 300A216GR.WCB/#526

GLOBE VALVE

- (L) VBBS EN ISO 15761VGSD11A01UBB,OS&YSW 800A105N/#511/2

- (L) VBBS 1873VGLB44A01UBB,OS&YRF 300A216GR.WCB/#512

- (L) VBBS 1873VGLB44A01UBB,OS&YRF 300A216GR.WCB/#520

CHECK VALVE

- (L),(B) VCBS EN ISO 15761VPCD11A01UBC,PISTONSW 800A105N/#511/2

DUAL PLATE CHECK VALVE

- (L),(D) VNAPI 594VDFB44A01UDOUBLERF 300A216GR.WCB/#524

FLANGED

CHECK VALVE- (L),(C),(E) VCBS 1868VSCB44A01UBC,SWINGRF 300A216GR.WCB/#524

(A) THREADED JOINTS ARE PERMITTED ONLY AT THE OUTLET OF VENT AND DRAIN VALVES.(B) THESE CHECK VALVES SHALL BE INSTALLED IN HORIZONTAL POSITION ONLY WITH COVER UP.(C) THESE CHECK VALVES SHALL BE INSTALLED IN HORIZONTAL POSITION WITH COVER UP OR IN VERTICAL POSITION WITH UPWARD FLOW.(D) THESE CHECK VALVES SHALL BE INSTALLED IN HORIZONTAL POSITION WITH HINGE PIN VERTICAL OR IN VERTICAL WITH UPWARD FLOW.(E) DUAL PLATE CHECK VALVE IS PREFERRED OPTION.(I) ALL PIPES, FITTINGS, VALVES, FLANGES, TRAPS, STRAINERS AND OTHER SPECIAL PARTS SHALL BE TESTED AND TEST CERTIFICATE IN FORM IIIA FOR PIPE AND FORM IIIC FOR OTHERS SHALL BE REQUIRED DULY COUNTERSIGNED BY IBR AUTHORITY OR ITS APPROVED REPRESENTATIVE.(L) VALVE INSTALLED IN VACCUM SERVICE LINE & SHALL BE SUITABLE FOR TEMPORARY FULL VACUUM CONDITION.

ANNEXURE - B

Page 151: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

ATTACHMENT- 3

635131

B1AS(I)0

3 OF 214-FEB-18

ASME B31.3

1.5 93 149 204 260 35038

NO Kgf/cm2 52.03 47.81 46.05 44.64 42.54 18/FV

Line ControlLine control PIPING CLASS TABLE NOLine controlLine controlLine controlLine controlLine controlLine control H : HALF COUPLING 0 : LONG BOSS W : WELDING OUTLETLine control T : THREADED JOINT P : PIPE WELD (NOZZLE ON or IN) R : PIPE WELD WITH REINFORCE PADLine control 1 : SOCKET OUTLET 2 : THREAD OUTLET 3 : SWEEP OUTLETLine control 4 : NIPPLE OUTLET 5 : INSERT WELDING OUTLET 6 : REDUCED TEE + REDUCERLine controlLine control

RevMAIN SIZE

1/2 S3/4 S S1 S SS11/2 S SS S2 1 11 B B3 1 11 1 P B4 1 11 1 R R B6 1 11 1 R R R B8 1 11 1 R R R R B10 1 11 1 R R R R R B12 1 11 1 R R R R B B B14 1 11 1 R R R R R BB B16 1 11 1 R R R R R BBR B18 1 11 1 R R R R R BBBR R20 1 11 1 R R R R R BBBRR R24 1 11 1 R R R R R BBBRRR R26 1 11 1 R R R R R BBBRRRR R28 1 11 1 R R R R R BBBRRRRR R30 1 11 1 R R R R R BBBRRRRRR R32 1 11 1 R R R R R BBBRRRRRRR R34 1 11 1 R R R R R BBBRRRRRRRR R36 1 11 1 R R R R R BBBRRRRRRRRR R

MAIN 1 2 4 6 8 1 1 1 1 2 2 2 2 3 3 3 333 11 1 */ 1 0 2 4 6 8 0 4 6 8 0 2 6 4/ *4 / 2 BRANCH 2

BRANCH SIZE

DOC. NO.

PIPING MATERIALS CLASSIFICATION WORK NO.

><

REV. MARK

ISSUE DATE PAGE:

BASE MATERIAL DESIGN CODE

P-T TEMP. (C)C.A.(mm)

PWHT RATING PRESS.

SERVICE

Killed Carbon Steel

MEDUIM PRESSURE STEAM, IBR

T-11

B1AS

S : SOCKET WELD B : WELDING TEE(COMMERCIAL TYPE) F : FABRICATED TEE or FLANGED TEE

ANNEXURE - B

Page 152: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

LSTK-1 PACKAGE FOR “ETHYLENE GLYCOL”

PROJECT OF M/S. INDIAN OIL CORPORATION

LIMITED (IOCL) AT PARADIP REFINERY, ODISHA

Doc. No. : IPEG-6389-MAZD(1)-8470-CA-061-0036 Title : FLEXIBILITY ANALYSIS

REPORT - EGU : 061-001

Rev. No. : 02

7. VENDOR DATA

Page 153: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

Mumbai, India

INDIAN OIL CORPORATION LIMITED

PARADIP REFINERY, ODISHA, INDIA

ETHYLENE GLYCOL PROJECT

INDIAN OIL CORPORATION LTD

PARADIP REFINERY, ODISHA-INDIA.

Page 154: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

INDIAN OIL CORPORATION LIMITED

PARADIP REFINERY, ODISHA, INDIA

ETHYLENE GLYCOL PROJECT

INDIAN OIL CORPORATION LTD

PARADIP REFINERY, ODISHA-INDIA.

Page 155: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON
Page 156: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

INDIAN OIL CORPORATION LIMITED

PARADIP REFINERY, ODISHA, INDIA

ETHYLENE GLYCOL PROJECT

INDIAN OIL CORPORATION LTD

PARADIP REFINERY, ODISHA-INDIA.

Page 157: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

INDIAN OIL CORPORATION LIMITED

PARADIP REFINERY, ODISHA, INDIA

ETHYLENE GLYCOL PROJECT

INDIAN OIL CORPORATION LTD

PARADIP REFINERY, ODISHA-INDIA.

Page 158: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

LSTK-1 PACKAGE FOR “ETHYLENE GLYCOL”

PROJECT OF M/S. INDIAN OIL CORPORATION

LIMITED (IOCL) AT PARADIP REFINERY, ODISHA

Doc. No. : IPEG-6389-MAZD(1)-8470-CA-061-0036 Title : FLEXIBILITY ANALYSIS

REPORT - EGU : 061-001

Rev. No. : 02

8. CHECKLIST

Page 159: OWNER : INDIAN OIL CORPORATION LIMITED (IOCL) PMC : TOYO ENGINEERING … · 2020. 5. 12. · PMC : TOYO ENGINEERING INDIA PRIVATE LIMITED (TEIPL) LSTK CONTRACTOR : L&T HYDROCARBON

CHECK ITEMS GENERAL NOTES

Revision Status No. Item BY PREPARED CHECKED APPROVED PREPARED CHECKED APPROVED PREPARED CHECKED APPROVED

INPUT PARAMETERS

All lines included as per critical line list -

Configuration / Unit file - - -

Pipe Diameter/Wall Thk - - -

Corrosion - - -

Insulation, Internal Lining ( Refractory etc.) - - -

Fluid density - - -

Temperature - - -

Pressure - - -

Rigid Weight - - -

Flange check input NA NA - - -

SIF / Branch type (also check D/T ratio >100) - - -

Bend type (Single / Double flange) - - -

Bourdon Effect - - -

PSV's Reaction force NA NA - - -

Two Phase Flow / Slug Flow NA NA - - -

Pulsation study in case of reciprocating compressor / pump NA NA - - -

Nozzle Movements, Imposed displacements, Equipment Model NA NA - - -

Nozzle Flexibility NA NA - - -

Tank settlement & bulging / Vessel sway NA NA - - -

Wind - Shape factor , Co-ordinates, Profile - - -

Earthquake - g'factor / Spectrum - - -

Expansion joint (Model / Stiffness / Weight ) NA NA - - -

Special execution parameters - - -

Use of Liberal stress (Y/N) NA NA - - -

Min. Ambient Temp. / Environmental Temp. - - -

Uniform load in g's - - -

Stress system isolation / Boundary Condition

Piping / Equipment Material check

RESTRAINT DATA

Springs NA NA - - -

Guides / Stops/ Hold-Down/ Restraint Gap - - -

PTFE / Graphite Slide Plates - - -

Snubber / Strut / Rigid hanger NA NA - - -

NA NA

CASES ANALYSED

Hot / Cold cases (Pump / PSV etc. as applicable) NA NA

NA NA

Full stress range evaluation in case of negative temperature NA NA

Wind

Earthquake

Steam out / Steam tracing / Jacketing NA NA

Two Phase Flow / Slug Force NA NA

PSV Reaction force NA NA

OUTPUT

Nozzle / Tie-in loads

Stresses

Hot sustain / Lift off check

WNC case check when spring supports used NA NA

Displacements / Pipe Sagging

Support loads

Nozzle alignment check for rotating equipment

Flange leakage check NA NA

Two-phase / pulsation frequency NA NA

Spring / Snubber angulation within 4° NA NA

Load variation within 25% for variable spring support NA NA

Weld strength check in case of Jacket piping NA NA

Support/Trunnion strength check NA NA

PMC / CLIENT comment resolution

`REPORT

Basis for Flexibility analysis

Support markup in isometric drawings - - - REV APPROVED /DATE

Displacements greater than 75 mm marked on isometric drawing - - - 00 VS 10-Oct-19 PP 10-Oct-19 PP 10-Oct-19 STRESS SYSTEM IPEG-6389-MAZD(1)-8470-CA-061-0036

Report with all necessary documents - - - 01 VS 03-Jan-20 PP 03-Jan-20 PP 03-Jan-20 PROJECT ETHYLENE GLYCOL PROJECT PARADIP REFINERY, ODISHA, INDIA

02 VS 20-Jan-20 PP 20-Jan-20 PP 20-Jan-20 PROJECT CODE 4026

HOLDS IDENTIFIED ( Yes/ None) NA NA

(GENERAL NOTES NO.):All the general notes to be followed.

CHECK LIST FOR PIPING STRESS ANALYSIS

CHECKED/DATE

All possible relevant cases such as start-up, shut-down, upset, stand

by, regeneration,Cyclic service, chemical-cleaning, solar radiation

etc.

Instructions

PREPARED/DATE

01 02 03