Value creation by interconnecting Norwegian hydropower and European markets in transition
German Norwegian Energy Forum - October 23th 2014
Øyvind Stakkeland, Director Regulatory Affairs
Agder EnergiMajor hydropower producer in Norway
Annual production: 7,800 GWh –6% of total Norwegian production
1,700 MW installed capacity
47 power stations
Experience in interconnector projects: NorGer and NorthConnect
Partner in CEDREN (Centre for Environmental Design of Renewable Energy)
The Agder Region
Power Stations
Tonstad – 960 MW
Skjerka – 110 MW
Brokke – 330 MW
Holen – 230 MW
Key points
1. The power markets
2. Value of interconnectors
3. Challenges to overcome
4. The way forward
Blåsjø 7.8TWh RESERVOIR
Total Norwegian reservoir 84TWh
0
10000
20000
30000
40000
50000
60000
70000
80000
900001 35 69 103
137
171
205
239
273
307
341
375
409
443
477
511
545
579
613
647
681
715
749
783
817
851
885
919
953
987
1021
1055
1089
1123
1157
1191
1225
1259
1293
1327
1361
1395
1429
1463
1497
1531
1565
1599
1633
1667
1701
1735
1769
1803
1837
1871
1905
1939
1973
2007
2041
2075
2109
2143
2177
Wind production in 2030 - North Sea region
Source: Cedren
7 x 24 h
7 x 24 h
7 x 24 h
-30 000 MW
+30
000
MW
5 TWh needed for balancing a low wind week
Intermittent energy in Germany in 2022- need for flexibility
Source: Agora
The spot markets
Key points
1. The power markets
2. Value of interconnectors
3. Challenges to overcome
4. The way forward
How to integrate renewables in the EU?
Source: Prognos
Indirectstorage
Generation
Batteries
Potentialsolutions
Loadmanagement
Networkextension
Energy trading across borders
Trading of RES commitments Energy trading based on interconnection
Lower risk of missing renewable energy targets
Lower cost delivery of renewable energy targets
Lower cost balancing services
Low-cost electricity imports
Lower CO2 emissions
Export market for European power
Improved security of supply
Interconnectors to Norway have high economic value
Source: Entso-E
DE-NO: Socio-economic welfare 370 Meur/Year
NO- UK: Socio-economic welfare 290 Meur/Year
Interconnectors NO-DE and NO-UK
Source: Entso-E, TyndP-Vision 4
Reduced CO2 emission
Increased renewable production
Key points
1. The power markets
2. Value of interconnectors
3. Challenges to overcome
4. The way forward
Market access
Challenge:Access to all markets through interconnectorsOptimize use of interconnector capasity across time frames.
Financing
• Legal framework – access for 3. party investors
• Business models attracting investors
Domestic grid bottlenecks
Grid planning for next generation grid
Key points
1. The power markets
2. Value of interconnectors
3. Challenges to overcome
4. The way forward
The way forward Market access PCI Projects
EU RES 2030Financing