p. - university of hawaii...they aay voluntarily submit out.tanding 188ue(s) to bindina o~...

33
p. # '),.0 CHECKLIST CONSTRUCTION PERMIT PUMP INSTALLATION PERMIT -- WELL NAME or LOCATION: ISLAND: 67A5/-0'1-/ ,5"(,61 -()!} . WELL NUMBER: 6(,6/-015' Tax Map Key: j, -- f-eN: OWNER/OPERATOR: Firm In(;. Contact Person Nel! O)KetA;:: Address ,P",. 8/¥ - Hc,1I( z. Phone Ws- LANDOWNER: Firm Name Contact Person, __ __________ __ Address Phone, ________ __________ _ Date application received ....................... /1- - 9l:> Date acknowledged receipt/request more info ••••• ________________ _ Date application accepted ••••••••••••••••••••••• ________________ _ Suspense date (90 days) •••• •••••• ••••••••• •• Date filing fee deposited ••• ................. __ ____ Application sent to following: Date sent Comments received li " Date agenda due ..•..••..••••.••••••••••••••••••• ________________ _ Date submittal due ••••••••••••••••••.•••••••••••• _______________ _ Date submittal sent to applicant •••••••••••••••• ________________ _ Date application __ approved or __ disapproved ••• ----------------- Date applicant notified of decision ••••••••••••• ________________ _ REMARKS: __________________ -"7,,,- let; tr«. cQf<6:{ ky-

Upload: others

Post on 19-Mar-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: p. - University of Hawaii...they aay voluntarily submit out.tanding 188ue(s) to bindina O~ nonbinding a~bitration pursuant to t.~ .. ~.ed to by the parties. Korth Kohala Pipeline The

p.

~~ ~,'~.kI. # '),.0

CHECKLIST

~ELL CONSTRUCTION PERMIT PUMP INSTALLATION PERMIT -- (~rwd~ N~II$. ~~Y./3~¢)--WELL NAME or LOCATION: IJIR/;!;t~ ~I'h ·/l~$ort:.;t;,e,.. ISLAND: ~N';:';~'

67A5/-0'1-/ ,5"(,61 -()!} .

WELL NUMBER: 5~1-()4., 6(,6/-015' Tax Map Key: j, -- f-eN: ,~

OWNER/OPERATOR: Firm Name/J1Ald/~ u"I'If~f)rl- In(;. Contact Person Nel! O)KetA;:: Address ,P",. 8/¥ ~':Sj' -Hc,1I( z. K~ CA:1~t: ~(/ ~1.t,l-"

Phone Ws- '~77

LANDOWNER: Firm Name ~~ffl<'/ Contact Person, __ ~fl __________ __

Address ~

Phone, ________ ~~~~~m~u~ __________ _

Date application received....................... /1- I~ - 9l:> Date acknowledged receipt/request more info ••••• ________________ _ Date application accepted ••••••••••••••••••••••• ________________ _ Suspense date (90 days) •••• ~ •••••• ~ ••••••••• ~ •• ----------~--~-Date filing fee deposited ••• !~ ................. __ ~ ____ ~-------Application sent to following:

Date sent Comments received

li "

Date agenda due ..•..••..••••.••••••••••••••••••• ________________ _ Date submittal due ••••••••••••••••••.•••••••••••• _______________ _ Date submittal sent to applicant •••••••••••••••• ________________ _

Date application __ approved or __ disapproved ••• -----------------Date applicant notified of decision ••••••••••••• ________________ _

REMARKS: __________________ ~---------------------------------------12/t~11,1 -"7,,,-~~ ~ ~ let; tr«. cQf<6:{ ky-

Page 2: p. - University of Hawaii...they aay voluntarily submit out.tanding 188ue(s) to bindina O~ nonbinding a~bitration pursuant to t.~ .. ~.ed to by the parties. Korth Kohala Pipeline The

1'1 !' .

• • \"., '41 ••

, . ~AII 31 'DO 12:33'· FRtlI:THWRE

I ! ,." !I"! 'i" I " " .

Tom Nance Wau::r a.IIiI ........ Resource EngineerinS

, t"'-

TO:~ ___ ~_:--=o~~--=~~-~C~W~lZJA~ ____ _ Otiaiul 0 ~11 til wiJlIIDl be rnai1e41D yoIL

From: ____ r.n_om_-9{j-=ana ______ ~ __

T-766 P.Ol/0S F~350 .....,& ........... -~---

Facsimile Header

Fu No.: ---:::::::--_, ______ ---

DaII!: ~. 4 1, 'Uoo No. of Paps; ~ fmcludina ~)

Subjeet;_~~=_::~~Ko:..LP'bki~:A..__.s.W.;.;I,;:..a.;~~:........:~:..;;;....:::..!:=_~~~-------~-_

Page 3: p. - University of Hawaii...they aay voluntarily submit out.tanding 188ue(s) to bindina O~ nonbinding a~bitration pursuant to t.~ .. ~.ed to by the parties. Korth Kohala Pipeline The

·. ~

. ~AN 31 'DO 12:33 FROM:TNWRE .' nov. I.. 1 ~~J lU: ll .... O'1Uft III UJUISJ ~44-HJ!t!j

+808-538-1157

.0 T-7&& P.Ol/OS F-350

110. ~4U'1 1'. UY

MEMOllANDUM OF tnlDEI.STAHDIHG BETWED MAUU KIA PllOpnT~tS. INC.. MAUNA LAllJ: USOllT, XBC ••

BANSAY HAWAII, nrc. AND WAnOLOA LAlfJ) COHPAlIY ON COOPERATIVE REGIONAL WATER DEVILOPHEII

Mission Statement

To work Jointly and cooperatively in developing and implementing a resional water plan which beat serves the collective water needa of the parties and others within the

"- --- - --- -- -- ··relion- 1na Ilanner-- a«eptahle---to--relevant-gove:rnaent;al- - -----.--------autbo2:'lt1es.

Qbjectiye.s

The parties to this HemD~andqa of Uod.r.tandins (collectively referred to a. "South Kohal. Wa.ter Study Group" or "Croup") acknowled.ae and agree tha.t it ia in their lona-te~ best interalts to achieve the Mission set forth abG~a in the £ollowina .. nn.~:

o

CII

o

Roeaem .&~eaeAt Oil .. J'e.:ion&l pl&ft fo~ the developaant of sourceS and distribution 87Bt~ for potable. non-potable wate~ and effluent reuStl,

Porta azul •• tabliah. a8 equity participuta. a pz-i. ..... '-.. ~S1oQal _t:e!~ ccnapa07' O'J:' c~mde. fot' ~ba clevelopDl8nt. production, distribution and •• 1- of pot.blc, non·potabl. and .fflq.nt reuse reSOUTceB servius the part i.. and others within the Tegioni

Reach bilateral and multilateral aar .... nt. achi.evinl the atasec! 11Aplementati.OA of the r •• ion.l water p1an;

PUblicly $UPPQ~ an4 consider tba e~taent to the co~t1on.l, partial fuudin& of the County of Hawaii Depar~nt gf Water·Supply'. (DWS) c1.v.lo~t of its planned Worth ~Dhala 1'1peline;

Develop a Water Commitment Poliey. whiCh 1. incorporated herein by reference. containing l~ideliDe8 and requirements for eaCh Group Kember aecurina a sufficient .upply of water for actual use in accordance with • realistic timetable;

Page 4: p. - University of Hawaii...they aay voluntarily submit out.tanding 188ue(s) to bindina O~ nonbinding a~bitration pursuant to t.~ .. ~.ed to by the parties. Korth Kohala Pipeline The

, JAN 31 '00 12:33 FROM:TNWRE

o

o

+808-538-1757 T-766 P.03/0S F-350 o .'IV" '" ·,0 rcu. "ItUI r. J/:J

Coordinate the activities of the Water Study Group with all relevant State of Hawail autho~iti ••• including but not limited to its Wate~ commission. in a manner which promote. and preserves the Group's ability to deal with regional water iSlue. Oft a collective basis,

Communicate. where appropriate. wi.th other interested partial within the reeion;

.. -- _. -_. -- -- ...... - ........ _ ..... -'g---- E"ntei'-"iiito--uUbsequelif--j"cfint-astee1aeiitS-l.nT"&naea---- _._--to implement the objectives adopted h.rein.

Governance

The activities of the Group shall be loverned and coo~inate4 throush an Executive Co~ittee coapriGed of a d •• ianated ~eprft •• nt.t1ve of e.ch signator,J to thi. Meao~~ua of Understanding-

The Group Eaecu~!ve Coaaitt •• sball:

• ..

a

o

Approve all pol!~ie •••• ~.emcn~& and expenditure. made aD behalf of the Group; provided. tha~ It the r.p~ •• ent.~tv~ of anr Group member specifically di.approv.. of any such azpend:l.tur.. that Group .... b.X' sball be eXCQaecl !l"011 its pro rata ahare of suab expenditure;

Approve the inclusion of additional members to and approve, except member in quelt1.on, fol" the exclusion of ex~stinl members fX'01I th~ Water Study Group; .

Approve public state.eute and t •• tt.oay rela~dinl Wate~ StudJ Group acti~ti •• ;

Develop and approve an annual operating budset, p~oj.et budaata and the indi~dual par~7'8 ob118at1oDI to fuDd. the operatioD& and the development of the •• planned proje~t8l

B. k.pt info~ed Df &11 aareements .n~arad into between Water Stud, Croup ~berl affectins the G~ou,'. H1Daion and Objec~tve.;

Coo~i~te &11 contact rega~ns the .ctt~1t~es of the Water Study Group with gove~antal agenelea;

-2-

Page 5: p. - University of Hawaii...they aay voluntarily submit out.tanding 188ue(s) to bindina O~ nonbinding a~bitration pursuant to t.~ .. ~.ed to by the parties. Korth Kohala Pipeline The

, ' JAN 31 'DO 12:33 FROM:TlIrRE • h'OY. t.. l~~J , lU: IJAJI "Qua III ,lOUOJ :)n-OJ~:I,.

+80.8-5~8 .. -.TT.~ ._.. T-766 P. 04/09 F-350 _ ~ r,.J - r !to. l4U I ...... ( ..... Ill L~ ... ~

~, ~

o

D

Direct and approve the activitia& of all consultants reca1ned by the Water Study Group relatina to its stated Kission and Objective ••

All deei.iona of the Group Ihall be by the maJor1cl of Cha aember. of the Executive Committee ex:cept for: "key decisions" which requIre unaniaous approval. ~e1 dec18ioft include approval of the annual op~rating bu4set and individual member. obllaatioQ to fund

.. - operations 01" make- ·contr:l.butionl-to-the-- -- ---.-------­devalopaent of planned projetl. expenditures which are outside of the appravea budget in e~ces& of $5,000 in any single cas. or $25,000 in the aggregate and the addition of any RaW -' member to the Executive Committee.

Dispute ~esolution

It il ecmowledaed that froa time to tilla, disputes and di ... reements aay ariae between the parties to this Memorandum Qf UndaratandiDc resardina raajonal water issues and thac it 11 in their loua-te~ collective be.t interests that suCh dispute5 be resolved without resort to lovernmantal o~ judicial involv ... nt.

The parties agr.. that they shall USe tbei~ individual and collective beat efforts to reaolv. any and all outataudina: issues covered by this ...,~... '!be partie. further aar.e that in the event ~8otlatioftS fail to r •• ult ~ acceptable •• re ••• n~ or r •• olut~aD. they aay voluntarily submit out.tanding 188ue(s) to bindina O~ nonbinding a~bitration pursuant to t.~ .. ~.ed to by the parties.

Korth Kohala Pipeline

The partie. _aree to support the coneept of a North Xobal& pipeline t~anapo~iaa potaple wa~er to South Kobal. being pursued b7 the Depart.ent of Water Supply, Count1 of Ho.veii.

In the event that the parties are reasonably 8atiafied that the North Kobala pipeline will be bUilt, buc no later than the ata.:t't of c:onatl='UQti.on. individual lisnato~1e8 to thi$ aarcemant shall coamit, au a fa1~ and eq~it&ble b4Sis~ to tha pa~tial fun41ns of &ald p1pe11ne under acceptable teras and condicions to b~ negotiated.

-3-

Page 6: p. - University of Hawaii...they aay voluntarily submit out.tanding 188ue(s) to bindina O~ nonbinding a~bitration pursuant to t.~ .. ~.ed to by the parties. Korth Kohala Pipeline The

, . . ' ~Aft 31 'DO 12:3~ FRt*:TNWRE ,';.lHI. , .. 'W"" jU. j.l~ Q IV!' 14' \UUUI \I,. U,",;';'

+808-538-1(;) T-166 P.OS/OS F-350 au. nu I r. 'J/::f

Termination/Withdrawal

A .ajority of the members af the Group ma~ te~1nate the Group and joint obligations contained in this Hemoraodua of Understanding. Individual Group members aaJ withd.aw f~om the South KQhala Watc~ Study G~oup upon written notice to other members; provided, that members shall reaaln liable tor ~h.lr 0% lta pro-rat~ share of cos~s of operation. per the approved budget or aaeudmant. thereto. incurr.d dUring their membership or p~ior to Withdrawal, as the caBe .. ,. ba.

flIL. This Meaara»!pa of Underst=anciina is antered into th1a ,~ clay of ~aNLt • 199fJ. , MAUNA EBA P10PERTlES. IIC.

By tMJJ.~._ :I~t-'~~~~~~------------

!1AIJlI4 LANX llESOI..T. 'IlIJc.

-4-

N.AllSAY HAWAII, nlC.

.; IJJ=tka4J tV

-y ~lts r-f'---+fiII~~;..-.-.-~~':::::

Page 7: p. - University of Hawaii...they aay voluntarily submit out.tanding 188ue(s) to bindina O~ nonbinding a~bitration pursuant to t.~ .. ~.ed to by the parties. Korth Kohala Pipeline The

" .. JAIl 31 '00 12:34 FROM:TJlWRE +808-538-7757

.... 0 ~ .. T-766 P.06/0S F-350

• n'v ,. I..' .,.h' , U . '.Ina \uUUI ,,,,, ,,'tv I I. VI ~ ... , It. , .• ' .. I

". - .... ~. -- ---,.. ,...,--.

DRAFT Water CnmmitJDeat Pol1cl. aad Pnx:ecIUreI

aim. So.th JCahQIa W ... r Users' Group

BcYiscct: (feblU • ., ",1"3) March 9, 1993

-- _ .. - -- - -- - -- --- - - .. -- ---- -- --------- --. -- -- --.- ------ .. --- --------------------- . -- ------ -----

The South Kohal. WAW U'Cl"S Croup ('Group',) r~e5 the nHd to develop a coherent set of policies and pIoced\.Ue5 for the development of groundwater to ensure maximum beneficial use of this limited rssoUl'C'e, avoid conflicts among users, and facilitate the tjn,ely development of water tied to actual use. The parties to this doc:wnent agree to abide by the policies and procedures it contains and encourage the State Coollnission on Water Resource Managen\ent C'Commission-) to evaluate all drilling and pump installation permits received fraul othet wl\l@r users in the basilt by the same aiteria.

POUCIES

1.

-1.

3.

TIl@ lJ'9Yl'recQ&11izes that aD parties need assurance of t4e,avaiJabillty of water for their developments- The ,roup turk recO£11im that such il5SU@J)W san occur only if. ie.ped to u,u pug. .

~tJA'I All drilling, well nlodification, and punlp installation ptl1lljt$ will be fOnllulated to conform to the intent of the then ~n'ent version of the Group's approved South Kobala Water [Master] ResouIc~ Plan.

All drilling. wellll'\odification, and pump installation Petlnits will be submitted to the Group for iES approval prior to SUbmittal to the Commission- The Croup's approval ,haD be based on the applicant's conformance with tllese polides, and the pro<:ed\1tes listed below. The Group's approval shall not be unreasonably withheld if sueb confo111'\ance is demons trated.

To mlninlize excessive 1.1H of groundwater, all eifb.lcnt from sewage b:eatn,ent plants shall be reused for inigation unless it can be conclusively demonstrated to be physically and/ or economically impractical for the d.valoper of the il'risation Iupply or the ultimate user of the water.

Page 8: p. - University of Hawaii...they aay voluntarily submit out.tanding 188ue(s) to bindina O~ nonbinding a~bitration pursuant to t.~ .. ~.ed to by the parties. Korth Kohala Pipeline The

· . JAIl 31 'DO 12:34 FROIot:TNWRE +808-538-7157 T-766 P.07/09 F-350 'I .... '. .... 'oJv~ 4.V ' .'1." ~ IV ......

......,. 1:1

\UUUI

, . . .'0

4. All new landscaping, including golf COU1'Se turfgrass, wiD be designed and bnplemented to %l.'\inimize irrigation use. EHotts tawant this eM shall include choosing appropda te plant ma terials, use of proper soil types and thickness, and avoiditag excessive tvrtgrass areas. Any new 18 -hole golf COUl'Se ,hall not use more tllan 0.15 MGO on year-round average nor more than 1.00 MCO over any seven-day period.

S. Alll\ew hotel, residential, commercial, and industrial develop,ment shall be designed to mhUmize water use IIld shall include appropriate water saving devices.

-6~ ---- WPm, permits should be supported if consistent with·tbe-WateJ--- -- ----.----.­Resource Plan as they provide mucb needed information about this resion's asmiler. ~ . . .

7. (Drilling anel] Punlp in5tallation perDlits shall not be sought mOrt than two yean in advance of actual need [to avoid aeating false Shortages of 5upply and inappropriate positioning for the resource, potentially denying othel'S their lair and equitable use].

8. Members of the Croup agree to devise water use standards for consumption of potable and inigation water use in order to implement iliele polities.

9. It is recognized that agreenlents between two ()( more patties may be y ~ ~ ne.cess.ary-to facilhate respective water developmenl [Such apeements .~, shall be consistent with these poUcies and proceduteS.] ~

PROCEDURES

1. All applications for drilling, weD nlodification, and pump instilBation pennits, including extension5 of these pemuts, will be submitted for review and approval by the Group to ensure contonnance with rho lntent of the Group's policies cmd [ulaster] water resOurce plan prior to submittal to the COJIUIlission.

2. . To initiate the Gl'OUp'S tMew, application will be submitted with the following supporting iniornlation:

a. Quantity [and timing] of potable and I or non-potable liupply • l-eqllirelllenb, indudil1g the basis for these projectiona (unit c~nts, acreage, et'.).

Page 9: p. - University of Hawaii...they aay voluntarily submit out.tanding 188ue(s) to bindina O~ nonbinding a~bitration pursuant to t.~ .. ~.ed to by the parties. Korth Kohala Pipeline The

, .JAfI 31 '00 12:35 FROM:TNIRE ," • .:,;"', C.,l;':lJ lU,l,*l\. O.·,vnu, \UUO} J'l'lUJ:l:l

+808-53B-7~ T-7BB P.D8/DS F-350

b.

c.

d.

M", nu,

Measures taken to avoid excessive potable and/ or non-potabll! w.tcrU$e. Exact location of the water uses, mcluding land use plans, TMKs, etc. Approved State Iud use designation; COUllty General Plan designation; County zoning; use pemlit for district use; and the prospectiVe land use approvals, lndudtng 5ubdivision, needed to achieve thl! desired land use.

e. The project's site specific water master plan for potable and not potable w.w shall be submitted.

- --- -- . - ------ - _f, ____ ~~~ 1_~~C?J1' dimensions, and pump capacity of the weD (01 t wells) to be-developid to meeTthesisupplfrecjUiremenas-:-- -- ---- ----

[g. A developtnent schedule indicating the date of aC:Nal wa.ter use.] to .

3. The Group's review and response to the ~ppliQtic:m shldl b. completed within 45 days. The response shall judge the application's conIonnance with .these poliCies ... and with the South Kohala Water [Master] R t

Plan, [the appropriateness of the timing of the application,] and the •• [Unless there are compelling reasonS otherwise, the timing of ~ application shan be deemed Inappropriate unle~5 all land use ilppTOVali tbrough and including County zoning have bee11l'ectived and the actual use of water, based 011 a finn schedule, is to begin within two years.) Listed beloW' ate spedfic; criteriA of the Group" review 01 applications.

~.--- If c;onfonnance with these polides and~pI'O(e.dure$_is demonstrated [and tNt tinling of the appUcatiol\ is appropriate,] the GtoUp's approval shall not be unreasonably withheld.

b. If the application falls (0 nleet the standard5 fOf acceptability set out herein, no submittal of tbe application to the Commission shaD be made untill'evisions satisfactol'Y to the Group are made.

[c. The Group·s approval for _ p~mp installation permit shall be given only after tentative subdivision appl'Oval tor the project to be served has been given.)

[d. JJ a proven water ~ource is a cOlldition of County zoning or ~ perDlit llpprovals, the Group's approval 01 a weU construction pemllt shall be given only if evidence of the aC:Na) w&ter use within two yeaxs is provided.]

Page 10: p. - University of Hawaii...they aay voluntarily submit out.tanding 188ue(s) to bindina O~ nonbinding a~bitration pursuant to t.~ .. ~.ed to by the parties. Korth Kohala Pipeline The

'--.. JAN 31 'DO 12:35 FROM:TNWRE

• tr·~ .. "I ... AU.,,, "W •• " ..... I'

'0 .V..... \UUU/ " .... II"""

+8D8-538-TT57

'0 T-766 P.DS/D9 F-350

ltV. L'tU t 1. iJl iJ

Thele Wa~r Commitment Policies and Procedures are entered into this day pf .I 1993 .

. Mauna Kca Pmpel'tl.I, htc.

By: ______ --~-_ "It.

Br-~.----------______ ----It.

~una Lani atsort, Inc. Waikoloa t..and Compimy By: ____________________ _

By Its

Page 11: p. - University of Hawaii...they aay voluntarily submit out.tanding 188ue(s) to bindina O~ nonbinding a~bitration pursuant to t.~ .. ~.ed to by the parties. Korth Kohala Pipeline The

,-', ' ... . .... ~:. .

",:. :. o . -,\ .' : ....

,,;,L(

" ,,~ . . . .,.,

State of Hawaii COMMISSION ON WATER RESOURCE MANAGEMENT

Department of Land and Natural Resources Division of Water Resource Management

APPLICATION FOR

X WELL CONSTRUCTION PERMIT

PUMP INSTALLATION PERMIT

INSTRUCTIONS: Pt .... pnnt or type and .. nd compl.t.d application with attachm.nt. to (h. b1V{llon or waler and Land D.v.lopm.nt. P.O. Box 313. Honolulu. HawaU .saO., Application mUlt b. accompanied by I non-refundlbl. rlllnC r .. nr $25,00 pAyabl. to th. D,plrtm.nt or Land and Natural a.lOurc... ("Un, r .. _alved ror fovarnm.nt a,.ncl ... ) Ir n.c .... ry. phone 548-1543. HYdroloD"CeoIO()' S.ctlon ror ... I.tanc ••

1. WELL LOCATION

Island Hawa i i Tax Map Key 6-8-01 :33 Address To be located in Lot 33; Saltwater Well No. 2

(Attach a USGS map (scale 1"-2000') and property tax map referenced to established property boundaries.)

showing well location

2. WELL OWNER LANDOWNER

Firm Name Mauna Lani Resort, Inc. Firm Name Mauna Lani Resort, Inc.

Contact Person Neil O'Keeffe Contact Person Neil 0' Keeffe

Address P.O. Box 4959 - HCR 2 Address P.O. Box 4959 - HCR 2

Kohala Coast, Hawaii 96743 Kohala Coast, Hawaii 96743 Phone 885-6677 Phone 885-6677

3. PROPOSED CONTRACTOR rOR: .Well Drilling OPump Installation Name Will Be Competitively Bid Phone -------Address Contractor's License No.

---------------------------------

4. PROPOSED WORK

5.

6.

7.

• Drill New Well c::J Alter o Install New Pump

o Deepen CJ Seal o Replace Pump

o Redrill c::J Abandon D Modify Pump

(Briefly describe the proposed work and fill in the diagram on the back of this form.)

PROPOSED USE OMunicipal (including hotels, stores, etc.) ODomestic (individual, noncommercial water systems) o Irrigation (specify) ______ _

o MiUtary o Industrial Source Supply _Other (specify) for Sal twater

Lagoon PROPOSED AMOUNT OF WITHDRAWAL

PROPOSED PUMP INFORMATION

2,000,000 gallons per day

Pump Type: .Vertical Turbine • Submersible 0 Centrifugal Motor: ODiesel DOas .Electric: _4_0 ____ Rated Horsepower Rated Pump Capacity 1700' gallons per minute (gpm)

• • • • • * * * * * * * * * * * • • • • • • • • • • • • • * * • • • • • • • • * • * • * • • • • • • *

Well Owner (print) MAUNA LANI RESORT, INC. Landowner (print) MAUNA LANI RESORT, INC.

~I!t"~e.~ - Signature ~ Date/kt" •

For OfficiaL Use onLy: Fie Zd Checked By ______ _ La titude _____ __ Hydrotogic Unit _____ _

State WeH No. Sf.,SI- 0.3 Cate ------------------------Longi tude _______ _

{)«Ad Nr !WJ, I.>

Page 12: p. - University of Hawaii...they aay voluntarily submit out.tanding 188ue(s) to bindina O~ nonbinding a~bitration pursuant to t.~ .. ~.ed to by the parties. Korth Kohala Pipeline The

..

.. ' . -'0 •

' . .' " •. ..,.,it, :~

. ' .. ",. ' "

Briefly describe the proposed work:

The work will consist of drilling, casing, and pump testing the proposed'

well. This would be used to supply saltwater to a proposed saltwater

lagoon system.

'·1 ::: " Cement :. ,.

Grout 150 ft. ---t-~IIP".I - , .. .... . . .. , Hole Dia. 20 in. ---t-.....

Total Depth ~ ft.-..-...t

Rock Packing N/ A ft.

PROPOSED SECTION OF WELL

_...;G;;;.;r:;.;:o;.;;;u;,;;n;.;d~El;;.;;e;.;.v..;.. __ 3_5 __ ft., msl·

SoUd.· Casing: Material PVC 1120, ASTM 1784

Length 150 ft .

Diameter 15" (SDR 21) in.

Wall thickness 0.729 in.

vCasing: I I Perforated I IScreen

I Material N/A • Length ft.

I Diameter in . • Wall thickness in.

Openings

~openHOle: sq. in./L.F.

Length 50 feet

Diameter 12" in.

• Approximate elevation at time of fUing application. Final elevation (msl) by a surveyor licensed by the State must be submitted at start of construction.

c

Page 13: p. - University of Hawaii...they aay voluntarily submit out.tanding 188ue(s) to bindina O~ nonbinding a~bitration pursuant to t.~ .. ~.ed to by the parties. Korth Kohala Pipeline The

o "-"

J, .1 •..• f .. · •.

" , .

• ...... '1.

.;: ;;\;;J';~,/;'(: . ~:: :~~~\.c"~lL:;,,· ;.,·1" .'

. ;

KArotlD

."LAC

ISLAND OF HAWAII ~~ I' 'AAU A t4+.9'i

• ... i:.

\>

" ... .... ....t.. .. " ..

'''. • i! .... '''. ~ .. , .. ~·· ....... t.

.,/'

,/"'/" "

-.Joo-; __

\> ./ ~ I .. /,/'

-........ ........ .-.. ".

Lani-Salt Water Wells #1-#4

~

/

... I f f ~ (J"

1'"-1 ! C., .;'() t/-t v ........... :::::.,

I l; \ ... )

Page 14: p. - University of Hawaii...they aay voluntarily submit out.tanding 188ue(s) to bindina O~ nonbinding a~bitration pursuant to t.~ .. ~.ed to by the parties. Korth Kohala Pipeline The

-~ . .

, ..... P ••

KALAE

__ J{ ~ f~

c ..

~o

... ~ --,C"'" e .. _= __ , ,. "'U

..

~ .t1 (

~

(:::-:-:::".. --)

rj' () t / .f (t I .. \ r

v ....... ..

.... ..."- . ~,,~~ ,,/ . . ..... ,~ /' .....; ,.., .. '

~ ~"" t" /' ~ . . -.. . .' I ~ .":'>~' .... -

\.

Page 15: p. - University of Hawaii...they aay voluntarily submit out.tanding 188ue(s) to bindina O~ nonbinding a~bitration pursuant to t.~ .. ~.ed to by the parties. Korth Kohala Pipeline The

/

JOHNWAIHEE GOVERNOR OF HAWAH

~rT r--

..,I";'···~· .. , I ... · '..: __

o ~' or • ., I ...; 3.J i.1i '':''i

VI~

KEITH W. AHUE CHAlAPEASOH

JOHN C. LEWIN. M.D. ROBERT S. NAKATA

STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT

J. DOUGLAS lNG, ESC. RICHARD H. COX, P.E.

GUY K. FWIMURA

P.O. BOX 621

HONOLULU, HAWAII 96809

RAE M. LOUI, P.E.

REF:WRM-KY

MAR 3 a 1994

TO: ~orable Hoaliku L. Drake, Director Department of Hawaiian Home Lands

Mr. Clayton H.W. Hee, Chamnan & Trustee At Large Office of Hawaiian Affairs .

FROM:

SUBJECf:

tith w. Ahue, ChaiIperso~ Well Construction & Pump )ns~al~tion Pennit Applications

Please review the following permit applications and submit your comments to us by APR 2 I 1994 .

Island Well Name Well No. Application Type

Hawaii Mauna Lani Salt Water Well 1 5651-02 Pump Installation Hawaii Mauna Lani Salt Water Well 2 5651-03 Pump Installation Hawaii Kaupulehu Irrigation Well 1 4757-01 Pump Installation Hawaii Kaupulehu Irrigation Well 2 4757-02 Pump Installation Oahu Kaluanui III 3554-06 Well Construction Kauai Kilauea-KPG III 1225-03 Well Construction

Should you have any questions, please contact the Commission on VV~re~ Res01liCe Management staff at 587-0225. '. ; ° . ..::-

~::j Ene.

Response: (X) We have no objections ( ) Not subject to our regulatory authority & pennit ( ) Comments attached ( ) Additional infonnation requested ( ) Extended review period requested

Darrell

;;:;,:: :;;1'" .. .;

.~_.. ,"T'

.,

Phone: 586-3836

=s

Date: _~,,-+-!~2 1-1---'/9"-+-1-' _

DEPUTY

'-....

Page 16: p. - University of Hawaii...they aay voluntarily submit out.tanding 188ue(s) to bindina O~ nonbinding a~bitration pursuant to t.~ .. ~.ed to by the parties. Korth Kohala Pipeline The

JOHNWAIHEE GOVERNOR OF HAWAII

o o

STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT

P.O. BOX 621

HONOLULU, HAWA1I 96809

PUMP INSTALLATION PERMIT

for

Mauna Lani Salt Water Well 2 Well No. 5651-03

South Kohala. Hawaii

, /i /,Q,! I~ l'Z,/ ,I "'; ;,... l.f'" /',j /

KEITH W. AHUE CHAIRPERSON

JOHN C. LEWIN, M.D. ROBERT S. NAKATA

J. DOUGLAS lNG, ESQ. RICHARD H. COX, P.E.

ROBERT G. GIRALD

RAE M. LOUI, P.E. DEPUTY

TO: Mauna Lani Resort, Inc. P.O. Box 4959-HCR 2 Kohala Coast, HI 96743

In accordance with the Department of Land and Natural Resources Administrative Rules, Section 13-168, entitled 'Water Use, Wells, and Stream Diversion Works", your application to install a 3000 gallons per minute pump in Mauna Lani Salt Water Well 2 (Well No. 5651-03), is approved subject to the following conditions:

1. The Commission on Water Resource Management (Commission), P.O. Box 621, Honolulu, HI 96809, shall be notified, in writing, before any work covered by this permit commences.

2. The permit shall be for installation of a 3000 gpm capacity, or less, pump in the well. A means to accurately measure water levels, acceptable to the Commission, shall be provided.

3. The proposed use shall not adversely affect existing or future legal uses of water in the area, including any surface water or established instream flow standards. This permit or the authorization to pump water from the well shall not constitute a determination of correlative water rights. The permittee is notified and by this provision understands that the quantity of water taken from the well could be reduced by the Commission in the future. This permit is not a commitment that the pump capacity permitted here or even some lesser amount is guaranteed in the future.

4. The applicant shall comply with all applicable laws, rules, and ordinances.

5. The applicant shall provide and maintain an approved meter or other appropriate device or means for measuring and reporting total water usage. Water usage shall be measured on a monthly basis and reported to the Commission.

----~-- -------

Page 17: p. - University of Hawaii...they aay voluntarily submit out.tanding 188ue(s) to bindina O~ nonbinding a~bitration pursuant to t.~ .. ~.ed to by the parties. Korth Kohala Pipeline The

o o PUMP INSTALLATION PERMIT Well No. 5651-03

Page 2

6. This permit may be revoked if work is not started within six (6) months of the date of issuance or if work is suspended or abandoned for six months. The work proposed in the permit application shall be completed within two years from the date of permit approval.

7. An as-built sectional drawing of the pump installation shall be submitted to the Commission within thirty (30) days after completion of work.

8. The permit application and staff submittal approved by the Commission at its meeting on May 18, 1994 shall be incorporated herein by reference.

If

IT . AHUE, Cha

C.j 9t1 Date of Issuance

I have read the conditions and terms of this permit and understand them. I accept -and agree to meet these conditions as a prerequisite and underlying condition of my ability to proceed.

Applicant's Signature: ~~ ~/~ Date: ~ - /..1 -l~ Printed Name: Me> ~. \c UN i Sf'S' po. \c:' v ~ Po

Firm or Title: _-'-P ..... g._t-'-~-'--'-t p'---'e_1\l_1-=---_ __.:H--'-'-'-A-u..:=...:...N....:..~=____~....:.!_IV_;_R;.....:,..~_S'O__.:P_'___I.!_'_N_<!._. __

Please sign and return one copy of this permit to the Commission and retain a copy for your record.

cc: USGS Department of Health

::::\"":" ", c,':,' ''I':

" ';, " ""I: ." ... i ;

Safe Drinking Water Branch Ground Water Protection Program Wastewater Branch

f:~i :.::0 .,0, "'1;;, .... :q

Hawaii Department of Water Supply

i f',') J c:::::::! i' ·t

" ",1-

:.rJ~ ::.:;. .,,' '" , ," 23 ~. ;' I~ '; J " ". .:.:,rJ' . " :,:w ;1 .•. ,./'

" W ;'1

c::::;

Page 18: p. - University of Hawaii...they aay voluntarily submit out.tanding 188ue(s) to bindina O~ nonbinding a~bitration pursuant to t.~ .. ~.ed to by the parties. Korth Kohala Pipeline The

JOHNWAIHEE GOVERNOR OF HAWAII

STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT

P.O. BOX 621

HONOLULU. HAWAII 06809

PUMP INSTALLATION PERMIT

for

Mauna Lani Salt Water Well 2 Well No. 5651-03

South Kohala, Hawaii

KEITH W. AHUE CHAIRPERSON

JOHN C. LEWIN. M.D. ROBERT S. NAKATA

J. DOUGLAS ING. ESC. RICHARD H. COX. P.E.

ROBERT G. GIRALD

RAE M. LOUI. P.E. DEPUTY

TO: Mauna Lani Resort, Inc. P.O. Box 4959-HCR 2 Kohala Coast, HI 96743

In accordance with the Department of Land and Natural Resources Administrative Rules, Section 13-168, entitled 'Water Use, Wells, and Stream Diversion Works", your application to install a 3000 gallons per minute pump in Mauna Lani Salt Water Well 2 (Well No. 5651-03), is approved subject to the following conditions:

I

1. The Commission on Water Resource Management (Commission), P.O. Box 621, Honolulu, HI 96809, shall be notified, in writing, before any work covered by this pennit commences.

2. The pennit shall be for installation of a 3000 gpm capacity, or less, pump in the well. A means to accurately measure water levels, acceptable to the Commission, shall be provided.

3. The proposed use shall not adversely affect existing or future legal uses of water in the area, including any surface water or established instream flow standards. This permit or the authorization to pump water from the well shall not constitute a determination of correlative water rights. The permittee is notified and by this provision understands that the quantity of water taken from the well could be reduced by the Commission in the future. This permit is not a commitment that the pump capacity permitted here or even some lesser amount is guaranteed in the future.

4. The applicant shall comply with all applicable laws, rules, and ordinances.

5. The applicant shall provide and maintain an approved meter or other appropriate device or means for measuring and reporting total water usage. Water usage shall be measured on a monthly basis and reported to the Commission.

Page 19: p. - University of Hawaii...they aay voluntarily submit out.tanding 188ue(s) to bindina O~ nonbinding a~bitration pursuant to t.~ .. ~.ed to by the parties. Korth Kohala Pipeline The

o PUMP INSTALLA'fION PERMIT Well No. 5651-03

o Page 2

6. This permit may be revoked if work is not started within six (6) months of the date of issuance or if work is suspended or abandoned for six months. The work proposed in the permit application shall be completed within two years from the date of permit approval.

7. An as-built sectional drawing of the pump installation shall be submitted to the Commission within thirty (30) days after completion of work.

8. The permit application and staff submittal approved by the Commission at its meeting on May 18, 1994 shall be incorporated herein by reference.

II

IT . AHUE, Cha

{, .J 9v Date of Issuance

I have read the conditions and terms of this permit and understand them. I accept and agree to meet these conditions as a prerequisite and underlying corldition of my ability to proceed.

Applicant's Signature: ___________ _ Date: _____ _

Printed Name: _______________________ __

Firm or Title: _______________________ _

Please sign and return one copy of this permit to the Commission and retain a copy for your record.

cc: USGS Department of Health

Safe Drinking Water Branch Ground Water Protection Program Wastewater Branch

Hawaii Department of Water Supply

Page 20: p. - University of Hawaii...they aay voluntarily submit out.tanding 188ue(s) to bindina O~ nonbinding a~bitration pursuant to t.~ .. ~.ed to by the parties. Korth Kohala Pipeline The

9ate of HawaII q COMMISSION ON WATER RESOURCE MANAGEMENT Department of Land and Natural Resources

APPLICATION FOR PERMIT o Well Construction or • Pump Installation

1-31-94 94-08

Instructions: Please print In Ink or type and send completed appllcallon with attachments to the Commission on Waler Resource Management P.O. Box 621, Honolulu, Hawaii 96809. Application must be accompanied by a non-fefundable filing fll of $25.00 payable to the Dept. of Land and' Natural Resources. The Commission may not accept incomplete applications. For aSSistance, call the Regulation Branch at 587-0225.

1. APPLICANT: (may be a, b, or c, but.al! must be filled In) (a) WELL OWNER (b) LANDOWNER FIrm/Name Mauna Lan; Resort, Inc. FIrm/Name Mauna Lani Resort, Inc. Contact Person Nel I 0' Keeffe ,0885-6677 Contact Person Nel I 0' Keeffe Ph' 885-6677 Addre.. P.O. Box 4959 - CR 2 Address P. 0. Box 4959 - HCR 2

Kohala Coast, Hawaii 96743 Kobala Coast. Hawaij 96741---

(c) CONTR~CTOR Flrm/Name ____________ -.JP~h:t:..·_____ Contractor's C-57 Ucense 1'40 _______ _ Address _____________________________________ _

2. WEU LOCATION/NAME: -5~i}3-·-I·s-}aftds··-Makat Island _....:..:.Ha::.,:w:.:.:a::..,:i:...,:i __ _ Address Mauna Lani Resort, South Kohala. Hawaii Island Tax Map Key _..;;...6-....,;8_-...:,.0;;;,..1 :;..,::5:..:,2 __

(Attach a USGS map, scale 1"·2OOO',and a property tax map showing well location referenced to established property boundaries.)

3. (a) PROPOSED WORK: 0 Drill New Well 0 • Alter Location

4.

5.

6.

7.

8.

o Modify existing Well 0 Redrlll 0 Deepen 0 • Abandon/Seal

o Install New Pump • Replace Pump 0 Modify Pump

• Be sure to complete and lubmlt well abandonment report upon completion 01 work.

(b) WELL TYPE: o Dug 0 Bored 0 Driven • Drilled D Radial

Isthilwellapartofabatteryofwelll? .VII 01'40 (Two wells 1200 feet apart) (Brielly desalbe and 1111 In tht diagram on the back 01 this form.)

PROPOSED PUMP INFORMATION: Rated Pump capaclty: ____ 3..;;...,0_0_0 ___ gallons per minute

Pump Type:

D Detp Wen Turbine - D Rotary D Submerllbl. D Rotary-DIsplacement • Centrifugal D Rotary-Gear

D Propeller

D ReclprocaUng

D Impulse

PROPOSED USE: D Municipal Qncludlng hoteta, storel, etc.)

D Domeatlc Qndlvldual, noncomm.rclal wattr lya.)

o irrigation (crop)

Motor:

D OIt .. 1

DGas • Eltctrlc, rattd horsepower of_----::5;...;;;0 __ _

D Military

D industrial

• Other (explain)

o Rural D Conservation State land U .. OIstrlct: • Urban D Agriculture County Zoning (deaalbt) ___ ..:..R::::e:.:::s..:::,o.:.,r..::,t ________________ _

(H more !pace Is needed, conUnue below under remar1<s, explanaUons.)

(Refer to Remarks gallons per day Be 1 ow) (a) PROPOSED AMOUNT OF WITHDRAWAL: __ 4..:..., 3_0_0~, 0_0_0_

(b) METHOD OF FLOW MEASUREMENT: • Flow-meter DOpen-plpe D Oriftce Plate DWeir

PENDING ACTIONS: DCOUA DSMA DEIS DEA • NONE D Other(explain)

R~AA~,~P~N~OOS: ___ ~_(E_x~p_la_n_a_t_io_n_o_n_B_a_ck_) __________ _

NOll!: SIQf1I"9 below indicates thIIt the applicant understands thIIt. "the pe~mn requ .. "d I, granted by U .. COIf1mlsslun (11'1 Wa'er Resource Ma:\;Qemer:" .. the propcsed work IS to be complel' Mlhln two (2) yeer. ot thl appro"" ct.tl. In addition, the contractor shan .ubmft '0 the Commission a wei completion report. wen abandonment report. or both. within JO deys alter a completion ct.te 01 the permitted worll. The applicant also understands that monthly water use ct.1a .ha" be submitted to the Commission. The appncent further underslends thaI approvel ,he proposed permit shan not conllltute • determination 01 correlaUve water rlQht.lfICIshll not QUlfanteethe pump capacity or Mure use up to the permitted pump capacity.

W~IOwner_~ _________ __

Slgnalur.~/0h Oate ___ ~.-;.. ____ r--l. ____ _

For Official U,. Only: Oa'e Received ______ _ Ol'e Accep'ed ______ _ Field Checked By _____ _

Ol'e

landowner _________ _

Signature ____________ _ Dat9 ___________ _

longitude _____ _ udtude ______ _

Contractor---------

Signature --------------­Oat9----------

Aquiler System Name _______ _ State Wei No. _______ _

Page 21: p. - University of Hawaii...they aay voluntarily submit out.tanding 188ue(s) to bindina O~ nonbinding a~bitration pursuant to t.~ .. ~.ed to by the parties. Korth Kohala Pipeline The

8. REMARKS, EXPLANATIONS (cont'd): The two Islands saltwater wells (Nos. 5846-02 and -03) provide circulation water for a large water feature with marine life. The design-build contractor originally installed a recirculating system with the wells only providing make-up supply at relatively low flowrates. The system will now be converted to single-pass circulation which will require a larger flowrate. One well would operate continuously and the other would provjde standby capacity.

9. PROPOSED WELL SECTION

Elev6110n at top of casing

~ft .• rmI.

-~

25 Ground Elevation: ___ It .• ms/*

Cement Grout: 125 n. .. III'

= .

II .... ~ Rock Packing None n. .. Solid Casing: Schedul e 80 PVC

Material ~_----,....,....,.---_______ _ Length ___ .::..;I2z..:5~ _______ ft.

Diameter 18 In.

Wall thickness 0.876 In.

,... 24 Hole Diameter: ___ In.

I L .. I I'"'

.... \ I .... 188 Total Depth ___ ft.

Casing: o Perforated o Screen None Material Length ft. Diameter In.

Wall thickness In. '-- ,..-- Openings sq.ln.lLF.

~ ~ Open Hole:

Length _____ 6;,.:3;,--______ ft. Diameter 16 in.

"Approximate elevation at time of nllng application. Ground elevation above mean sea level (msl) by a surveyor licensed by the Stale musl be submlned al start 01 construction. Final elevations 01 well components shall be submlned In the well completion/well abandonment reports.

I

Q

Page 22: p. - University of Hawaii...they aay voluntarily submit out.tanding 188ue(s) to bindina O~ nonbinding a~bitration pursuant to t.~ .. ~.ed to by the parties. Korth Kohala Pipeline The

c Q 'State 01' Hawaii :""'" f'\ 1MISSION ON WATER RESOURCE r.l~EMWr Department of Land and Natural Resources

Division of Water Resource Management

WELL COMPLETION REPORT

/ I

10-22-91 154-03

iNSTRUCTIONS: Please print or type and submit completed report within 30 days of well completion to the Division of Water • Land Development. P.O. Box 373. Honolulu. HI 96809. An as-built drawing of the well and chemical analysis. if available.'. should also be submitted. If necessary. phone 548-7543. Hydrology. Geology Section for assistance.

A. STATE WELL NO. 5651-03 WELL NAME Is1 ands ~~e1l No.2 ISLAND Hawa i i

B. LOCATION M.akai Side of Islands Site TAX MAP KEY 6-8-01:52 -----------------c. WELL OWNER Mauna Lani Resort, Inc.

D. DRILLING OR PUMP INSTALLATION CONTRACTOR _----:R.:.:o~s~c:.::o;",;:e;",.":,,.;M~o.::.s.::.s;::o:I~~a:;.:w~a:;,..i;.,;i~,~I.,;,.;nT_c..:...-------E. TYPE OF RIG Cab 1 e Too 1 DRILLER Rodney couch

F. DATE OF WELL COMPLETION_~9_-_9_-_9_1 ___ DATE OF PUMP INSTAI,LATION ________ _

G. GROUND ELEVATION (msl) 28 ft. Top of Drilling Platform (msl) ft. Height of drill1ng platform above ground surface ft. Bench mark and method used to dete~mine groun~d~el'""e~va".,t,...lo--n:: ___ 2_8 ___ !t.

H. TOTAL DEPTH OF WELL BELOW GROUND 188 • ----------------------HOLE SIZE: 24 inch dia. from 0 ft. to 125 ft. below ground 1 6 inch dia. from 1 25ft. to --~1;';;;8~8--ft. below ground

inch dia. from ft. to ft. below ground ------- -------l.

J. CASING INSTALLED: PVC

K.

L.

M. N.

18 in. l.D. x 693 in. wall solid section to 125 12 in. 1.0. x 250 in. wall perforated section to TYPe"Of perforation Stalnless steel saw cut over

ANNULUS:

ft. below ground 175 ft. below ground

lapped 30'

Grouted from 0 ft. to 125 ft. below ground Gravel packed from 25ft r.-. -rto~-65 ft. below ground for sounding tube

PERMANENT PUMP INSTALLATION: Pump type. make. serial No. ______ ---------------------Motor type. H.P .• voltage. r.p.m. Depth of pump intake setting tt. below Depth of bottom of airline ft. below -------

Capacity _____ gpm

which elevation is ____ It. which elevation is ft.

PROPOSED USE Source of Supply for Saltwater Ponds

INITIAL WATER LEVEL 26.5 ft. below ground. Date and time of measurement 5-13-91

O. INITIAL CHLORIDE ppm. Date and time of sampling _________ _

P. PUMPIN9TESTS~Rele~ (R.P.) used: which elevation is ft.

Date ... ~ ..... "' ........ ~_ .... --.... ,.,;.:;:... Date ........................................................... . Start water level ................................... ft. below R. P. Start water level ........................................... ft. below R. P. End water level ..................................... ft. below R. P. End water level ............................................. ft. below R. P. Depth of well ......................................... ft. below R. P. Depth of well ................................................. ft. below R. P.

Elapsed Rate Draw- CI- Temp. Elapsed Rate Draw- CI- Temp. Time (hours) (gpm) down (ft.) (ppm)"F Time (hours) (gpm) down (ft.) (ppm) OF

.............. to .............. .............. .............. .............. .............. .. ............ to. .............. "2'12'0" '''f:'ifi' .............. .. .......... ..

....... Q ..... to ...... 2.4 .... ·~·~~·~r·. "test" (~r4':·j .. ·Pp·i" .. Sa·{i ni ty) .. ·~·~·8~ .. to .............. "2'00'5" '''r:'2~'' ........................... .

.............. to ..................................................................................... to .................................................................... ..

.............. to .............. .............. .............. .............. .............. ...$..;J~ .. to .............. ..f.~.Q.Q.. .. .... t.9..~.. .............. .. .......... ..

.............. to .............. .............. .............. .............. .............. ...8.:.18.. to .............. ..1.58.Q.. .. ...... ~.8.. .............. .. ........... .

.............. to .............. .............. .............. .............. .............. .. ............ to ......... S.tep .. .Ie.st .............. .............. .. .......... ..

Q. DRILLER I S r.cx;: Depth, ft.

. ............. to ............ ..

Water Level Rock Description & Remarks ft.

Water Level Depth, ft. Rock Description & Remarks ft.

......... 0 ... to ......... ~... S.r.9.~~n ... ~~.y.~......................... .. ........... .

......... S ... to ....... 2.R... S.r.9~m .. 1.~.~R-.... ~.Hx:~ ......... :..... .. .......... .. .. ............ to ............ ..

....... 25 ... to ...... ~.9. ... G.t9:y. .. J,..9:y.9: ... w/....OJ.i.\!d.~~... ...?9.~ .. ? .. .. ............ to ............ .. ... .... 3~ ... to ....... 5.Q... G.r.gy ... l"g.v.iLH.~.r.9.................. ...g.9..~.?'. . ............. to ............ .. ....... 50 ... to ...... 9.8 ... G.r.ay .. & . .JnA~.~ ... ~.H.y.H ... ~x:9k.~!J ..... .'.' .. .. ............ to ............ ..

.. ............ to ....... .

.............. to ...... ..

. ............. to ....... .

.. ............ to ...... .

o I ~II Latitude 19 56· 35 () I II

Longitude 155 51 56

....... 68 ... to ...... s.~... G.r.ay .. J:ta.r.9 .. .l.~~.~.................. . ........... ..

....... 85 ... to .... 1.l.3 ... CJJJ.d~.r.~ ... & ... CltlJk.~r.$ .... c.~ vJrJ,g.: .. ..

.... 1.13 ... to .... 1.18 ... B.r.o.k~.n ... Gr.Q.Y .. .l.~y~............. .. .......... ..

... .1.18. .. to ... .1.33 ... G.ray .. .La.v.a .. .H.ar.d ............................. .. . ............. to ...... . ............ to ............ ..

We~1 No. 5651-~03 .... 133 .. to .... 1.88 ... B.r.o.ke.n .. Lav.a .. & ... CJnde.rs ............ .. .............. to ............................................................................... .

REMARKS: ............................................................................................................................................................................................ .

Submitted by (print) Tom Nance Water Resources Engineerin9ritle -------------------President

Signature _____ ~ ____ ~ ______ . _____ _ Date ------------------------------October 22, 1991

Page 23: p. - University of Hawaii...they aay voluntarily submit out.tanding 188ue(s) to bindina O~ nonbinding a~bitration pursuant to t.~ .. ~.ed to by the parties. Korth Kohala Pipeline The

"

00 \ ..

p

1 c I F I

0 d E A N

58

57

56

r

\>

~

/'

oj "

~

/'

~

"././ .. /

\

\>

, ,~

/'~

/<' " \\

\\

" \\

./

r I

Page 24: p. - University of Hawaii...they aay voluntarily submit out.tanding 188ue(s) to bindina O~ nonbinding a~bitration pursuant to t.~ .. ~.ed to by the parties. Korth Kohala Pipeline The

- , --_.-

jjt fl~: 40'

1 •

70'

1 'lY;O'

~o'

roo'

I ~

-/T~

V' ~t20<4"' ~

W/.: sz yt/ (+1--=

• t'-6.~

r--

• r-6t~

~ '24-"

1e,,1

~ Vf\IC, USI

IG" v~

,~

j .~ J ~

2.cg' I" t-~ 1- '\T of- W~~ - 1I~ ft· Vl'I

(Os' I-V'~~a

L r--- I~II~ ('2-,' ~ V ~v'll

~l,lc..

12:6' I" I'-- Ct tet«X"

~'l4"

~ l(; It

.t'/~

£~~~R. ~LL& ~~ ~l.P-,.\1)s. f~or

AS-p'/t.U L1 'P/McMSlO-,.(.s

~----___ = 1~ ... , ___ ~"'1""'~ ..... , _________ '_1." _.,," "

Page 25: p. - University of Hawaii...they aay voluntarily submit out.tanding 188ue(s) to bindina O~ nonbinding a~bitration pursuant to t.~ .. ~.ed to by the parties. Korth Kohala Pipeline The

c o

trm um '367JO 4ftiv fLoW~ Cc:r.M ')

<JS/....-W\)S' :;,M:f~tf?r2- 'Nat.-) fU.Jv'f ~1 ~-s-w.urs

-----_. __ . __ ._---------

Page 26: p. - University of Hawaii...they aay voluntarily submit out.tanding 188ue(s) to bindina O~ nonbinding a~bitration pursuant to t.~ .. ~.ed to by the parties. Korth Kohala Pipeline The

(0 ~ M~UNA LAN) RES()RT

April 8, 199191 APR '_0 A 8: 35

State of Hawaii Division of Water Resource Management P. O. Box 373 Honolulu, Hawaii 96809

RE: MAUNA LANI SALT WATER WEllS The Islands at Mauna Lani Notification of Construction

Gentlemen, I

Be advised that in accordance with your WELL CONS1RUCfION/pUMP INSTAllATION PERMIT, we hereby provide notice that we intend to begin construction of the following wells:

* * * *

Mauna Lani Salt Water Well #1, Well No. 5651-02 Mauna Lani Salt Water Well #2, Well No. 5651-03 Mauna Lani Salt Water Well #3, Well No. 5651-04 Mauna Lani Salt Water Well #4, Well No. 5651-05

Feel free to contact our office should you have any questions regarding this matter.

Very truly yours,

MAUNA LAN! RESORT,' INC.

Mk--Neil O'Keeffe Construction Manager

NOK/cst

cc: Tom Nance, Belt Collins & Associates Loran Runnells, Roscoe Moss Hawaii, Inc. Fritz Harris-Glade, Mauna Lani Resort

P.O. Box 4959, HCR 2 • Kohala Coast • Island of Hawaii 96743-4959 Telephone: (~08) 885-6677 • TELEX: 752449 • FAX: (808) 885-6375

Page 27: p. - University of Hawaii...they aay voluntarily submit out.tanding 188ue(s) to bindina O~ nonbinding a~bitration pursuant to t.~ .. ~.ed to by the parties. Korth Kohala Pipeline The

1. o JOHN WAIHEE

GOVERNOR OF HAWAII

WILLIAM W. PATY

C HAl RPERSON

STATE OF HAWAII DEPARTMENT DF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT

P. O. BOX 621

HONOLULU, HAWAII 96809

WELL CONSTRUCTION/PUMP INSfALLATION PERMIT

for

Mauna Lani Salt Water Well 2 Well No. 5651-03

TO: Mauna Lani Resort, Inc. P.O. Box 4959-HCR 2 Kohala Coast, HI 96743

South Kohala. Hawaii

t111-'1~ ,

JOHN C. LEWIN, M.D. MICHAEL J. CHUN, Ph.D.

ROBERT S. NAKATA RICHARD H. COX

GUY K. FUJIMURA

MANABU TAGOMORI

DEPUTY

In accordance with the Department of Land and Natural Resources Administrative Rules, Section 13-168, entided 'Water Use, Wells, and Stream Diversion Works", your application to construct, test, and install a pump in Mauna Lani Salt Water Well 2 (Well No. 5651-03) within Tax Map Key: 6-8-01:33, to supply water for a proposed salt water lagoon system, is approved subject to the following conditions:

1. The Division of Water Resource Management (DWRM), P.O. Box 373, Honolulu, HI 96809, shall be notified, in writing, before any work covered by this permit commences.

2. The permit shall be for construction, testing, and installation of a 1,700 gallons per minute capacity, or less, pump in the well, as determined by the pumping test results. The applicant shall submit to DWRM the test results and proposed permanent pump information, based on the test, for approval by the Chairperson. No permanent pump may be installed and no water used from the well without the Chairperson's approval.

3. The proposed use shall not adversely affect existing or future legal uses of water in the area, including any surface water or established instream flow standards. This permit or the authorization to construct and pump water from a well shall not constitute a determination of correlative water rights. The permittee is notified and by this provision understands that the quantity of water taken from the well could be reduced by the Commission in the future. This permit is not a commitment that the pump capacity permitted here or even some lesser amount is guaranteed in the future.

Page 28: p. - University of Hawaii...they aay voluntarily submit out.tanding 188ue(s) to bindina O~ nonbinding a~bitration pursuant to t.~ .. ~.ed to by the parties. Korth Kohala Pipeline The

, .. o

WELL CONSTRUCTION AND PUMP INSTALLAITON PERMIT Well No. 5651-03

o Page 2

4. The following shall be submitted to DWRM within 30 days after completion of the work:

a. Well Completion Report.

b. As-built sectional drawing of the well.

c. Plot plan and map showing the exact location of the well.

d. Complete pumping test record, including time, pumping rate, drawdown, chloride content, and water quality data.

5. The applicant shall provide and maintain an approved meter or other appropriate device or means for measuring and reporting total water usage on a monthly basis.

6. The applicant shall comply with all applicable laws, rules, and ordinances.

7. This permit may be revoked if work is not started within six months of the date of issuance or if work is suspended or abandoned for six months. The work proposed in the permit application shall be completed within 24 months from the date of permit issuance.

8. The applicant shall provide the State Historic Preservation Division with documentation that the project area has undergone an archaeological survey. The permit shall be issued after the State Historic Preservation Division has reviewed and accepted the appr p . ate documentation and QIl~urs that the project will have "no effect" or I 0 adverse effect" toric sites:-",

APR 2 1991 Date of Issuance

cc: USGS Department of Health

Drinking Water Branch Ground Water Protection Program

Hawaii Department of Water Supply Tom Nance, Water Resources Engineering

"

Page 29: p. - University of Hawaii...they aay voluntarily submit out.tanding 188ue(s) to bindina O~ nonbinding a~bitration pursuant to t.~ .. ~.ed to by the parties. Korth Kohala Pipeline The

Mr. Manabu Tagomori Commission on Water Resource Management Department of land & Natural Resources State of Hawaii P. O. Box 373 Honolulu, Hawaii 96809

Dear Manabu:

~:,

HECEIVED

OlV. OF ViATER & LAND DEVi:LOPf¥iENT

.'

Well Construction Permit Application for Mauna Lanl Resort. South Kohala. Hawaii

Hovemben:15, 1990 90TN-037 (054-42)

We are pleased to submit the . enclosed permit applications and $100 filing fee on behalf of Mauna. Lan! Resort. Mauna Lan! intends to drill, case, and pump test the wells to supply saltwater for a proposed lagoon to b8 constructed within> the Resort. "

If you have questions or require additional information, please call either Neil O'Keeffe at Mauna Lan! Resort (885-6677) or me. Thank you for your attention to this matter.

TN:lt

cc: Nell O'Keeffe

Enclosures

Sincerely,

Tom Nance

II

'"

680 Ala Moana Boulevard, Suite 200 • Honolulu, Hawaii 96813 • Phone: (808) 521-5361 • Fax: (808) 538-7819

A Belt Collins & Associates Company

Page 30: p. - University of Hawaii...they aay voluntarily submit out.tanding 188ue(s) to bindina O~ nonbinding a~bitration pursuant to t.~ .. ~.ed to by the parties. Korth Kohala Pipeline The

o o

Page 31: p. - University of Hawaii...they aay voluntarily submit out.tanding 188ue(s) to bindina O~ nonbinding a~bitration pursuant to t.~ .. ~.ed to by the parties. Korth Kohala Pipeline The

o o State of Hawaii

COMMISSION ON WATER RESOURCE MANAGEMENT Department of Land and Natural Resources

Division of Water Resource Management

APPLICATION FOR

X WELL CONSTRUCTION PERMIT

PUMP INST ALLA TION PERMIT

INSTRUcTIONS: pleue pMnt or type and .end completed application with anachmente to the D1Vi.lon or Water and Land Development, P ,0, Box 313, Honolulu, Hawaii UIO', Appllcetlon muet be accompanied by a non-refundable riling tee or $25.00 pAyable to the Department or Land and Natural RellOurc... (Fl11nr (ee waived (or rovernment agencies.) It neceuary, phone 548-1543. Hydrolou/Oeolo(y Section (or ualatance.

1. WELL LOeA TION

Island Hawaii Tax Map Key 6-8-01:33 Address To be 1 oca ted in Lot 33; Sa l twa ter We 11 No.2

(Attach a USGS map (scale 1"=2000') and property tax map showing well location referenced to established property boundaries.)

2. WELL OWNER LANDOWNER

Firm Name Mauna Lani Resort, Inc. Firm Name Mauna Lani Resort, Inc.

Contact Person Neil O'Keeffe Contact Person Neil 0 I Keeffe

Address P. O. Box 4959 - HCR 2 Address P.O. Box 4959 - HCR 2

Kohala Coast, Hawaii 96743 Kohala Coast, Hawaii 96743 Phone 885-6677 Phone 885-6677

3, PROPOSED CONTRACTOR FOR: .Well Drilling OPump Installation Name Will Be Competitively Bid Phone -------Address Contractor's License No.

4. PROPOSED WORK

5.

6.

7.

• Drill New Well o Alter o Install New Pump

o Deepen c:; Seal o Replace Pump

o Redrill c:; Abandon o Modify Pump

(Briefly describe the proposed work and fill in the diagram on the back of this form.)

PROPOSED USE

OMunicipal (including hotels, stores. etc.) ODomestic (individUal, noncommercial water systems) Olrrigation (speci!y) ______ _

o Military o Industrial Source Supply _Other (specify) for Saltwater

Lagoon PROPOSED AMOUNT OF WITHDRAWAL 2,000,000 gallons per day

PROPOSED PUMP INFORMATION

Pump Type: .Vertical Turbine • Submersible o Centrifugal Motor: ODiesel OGas .Electric: _4_0 ____ Rated Horsepower Rated Pump Capacity 1700' gallons per minute (gpm)

• • • • • • * * * * * * * * * * * * * • • • • • • • • • * • • • • * • * * * • • * * • • • • • • • * *

Well Owner (print) MAUNA LANI RESORT, INC. Landowner (print) MAUNA LANI RESORT, INC.

~i!t"Jke.~ - Signature d?~ Date;;;:k.t ) 9,

Fer Officia~ Use On~y:

Fie ~d Checked By ______ _ Latitude ----- HydroLogic Unit --------Longitude ----- State We LL No. St.,.,!:; 1- 0.3 rate ----------------

(;j~ Ur ~. IS-

Page 32: p. - University of Hawaii...they aay voluntarily submit out.tanding 188ue(s) to bindina O~ nonbinding a~bitration pursuant to t.~ .. ~.ed to by the parties. Korth Kohala Pipeline The

Briefly describe the proposed work:

The work will consist of drilling, casing, and pump testing the proposed I

well. This would be used to supply saltwater to a proposed saltwater

lagoon system.

"I : .. • .. Cement ". ,

" Grout 150 ft. ' ,

Hole Dia. 20 in.

Total Depth 22.9... ft.-.....

Rock Packing N/A ft.

PROPOSED SECTION OF WELL

Ground Elev. 35 ft" msl·

Solid Casing: Material PVC 1120, ASTM 1784

Length 150 ft.

Diameter 15" (SDR 21) in.

Wall thickness 0.729 in,

I Material N/ A / /Screen

VCaSing: / /Perforated

------------------. Length ______________ _

I Diameter ft.

I Wall thickness

Openings

~openHOle:

in.

in,

sq. in.fL.F.

Length 50 feet 12" Diameter __________ in,

• Approximate elevation at time of filing application. Final elevation (msl) by a surveyor licensed by the State must be submitted at start of construction.

c ;

Page 33: p. - University of Hawaii...they aay voluntarily submit out.tanding 188ue(s) to bindina O~ nonbinding a~bitration pursuant to t.~ .. ~.ed to by the parties. Korth Kohala Pipeline The

, I, \ o

"58"·

I~~~~-r--~/// ~--- ~ ,/' .. /'"

" U Q

k k

" " It

r

52

\> ,/' ,/'

""

.,/'

,/'~ ,/'"

""~~ ,/'

o

51 50

" h ~

" ./ " It , . -"0( A .. •

: (. 0

{ ~'-£:]02