p15453 11/24/14 meeting. what we did well ●depth and thoroughness of work ●documentation of work...

11
P15453 11/24/14 Meeting

Upload: loren-carr

Post on 06-Jan-2018

221 views

Category:

Documents


3 download

DESCRIPTION

What we need to improve on ●Last minute work ●Team brainstorming critical design features ●Documenting work ●Others?

TRANSCRIPT

Page 1: P15453 11/24/14 Meeting. What we did well ●Depth and thoroughness of work ●Documentation of work ●Team Work ●Others?

P1545311/24/14 Meeting

Page 2: P15453 11/24/14 Meeting. What we did well ●Depth and thoroughness of work ●Documentation of work ●Team Work ●Others?

What we did well● Depth and thoroughness of work● Documentation of work● Team Work● Others?

Page 3: P15453 11/24/14 Meeting. What we did well ●Depth and thoroughness of work ●Documentation of work ●Team Work ●Others?

What we need to improve on● Last minute work● Team brainstorming critical design features● Documenting work● Others?

Page 4: P15453 11/24/14 Meeting. What we did well ●Depth and thoroughness of work ●Documentation of work ●Team Work ●Others?

What’s NextDetailed Design/Gate Review1. EMA Detailed Design2. Secondary Requirement Design3. Test Plans4. Finalize Risks & Bill of Materials5. Make Edge Pretty6. Test Transducer

Page 5: P15453 11/24/14 Meeting. What we did well ●Depth and thoroughness of work ●Documentation of work ●Team Work ●Others?

EMA Detailed Design● Analyze each component

o Screw calculatoro Ansys of mounting fixturingo Locating pins?o Load cell connection

● Team brainstorm critical components ● Select critical component design with justification ● Consult subject matter experts on designs● Finalize 3D models & 2D drawings● Identify long lead items● Expand controls flow diagram if needed

Page 6: P15453 11/24/14 Meeting. What we did well ●Depth and thoroughness of work ●Documentation of work ●Team Work ●Others?

Secondary Requirements● Identify secondary requirements● Consult morph for possible solutions● Explore options strengths and weaknesses(pugh)● Create 3D/2D designs for implementation● How will information be displayed?

o Excitation voltage required?o Signal conditioning?o Sampling rate?

● Bill of materials*● Risk assessment*

*these will be added to the main document later

Page 7: P15453 11/24/14 Meeting. What we did well ●Depth and thoroughness of work ●Documentation of work ●Team Work ●Others?

Test PlansEMA to have extensive test plans

● Receive parts● Install software and get operational● Communicate with EMA through controller

○ Simple movement○ Force test

● ImplementSecondary requirements are simpler but still thorough

● Bench top testingo Example: Thermocouples in hot water, compare TC readings with thermometer

Keys:Estimated times for each process helps ganttThoroughness here will lead to easier MSDII

Page 8: P15453 11/24/14 Meeting. What we did well ●Depth and thoroughness of work ●Documentation of work ●Team Work ●Others?

EDGE● Make sure there isn’t anything left from the template● Update roles● Update gantt charts● Add risk assessment ● Add project plans

Page 9: P15453 11/24/14 Meeting. What we did well ●Depth and thoroughness of work ●Documentation of work ●Team Work ●Others?

Test Transducer● Theoretical Analysis

o How much displacement and force will x amount of volts produce?

o Call supplier and get quote on partso Based on forces iterate fixture designo Update B.O.M.o Test plan o Risk assessment

Page 10: P15453 11/24/14 Meeting. What we did well ●Depth and thoroughness of work ●Documentation of work ●Team Work ●Others?

Addition of Physical Calendar• Show

progress

• Keeps DDR in sights

Page 11: P15453 11/24/14 Meeting. What we did well ●Depth and thoroughness of work ●Documentation of work ●Team Work ●Others?

Addition of Physical Action Items• Allows us to see who’s

doing what

• Allows us to see our status of completion

• If your looking for more tasks you can see who to ask