p2 h

2
DAILY REPORT ON EQUIPMENT CHECK-LIST LAPORAN HARIAN PEMERIKSAAN PERALATAN JOB UNIT CODE: DATE/TANGGA OPERATION/DRIVER'S NAME SIGNATURED/ HOURS METER AWAL/STAR AKHIR/FINISH A.PEMERIKSAAN UMUM.GENERAL CHECK LIST 1 periksa oli mesin /check engine oil 2 periksa oli hidrolik / check hydraulic oil 3 periksa oli transmisi/check transmisi oil 4 periksa bahan bakar solar/ check the diesel fuel 5 periksa air radiator/ check the radiator water 6 accu / check the batteries 7 tangki udara/ check the air tank 8 9 10 11 12 13 14 15 16 17 18 19 20 pemeriksaan dilakukan s istirahat makan /ckeck ar shift & after meal hours

Upload: arip

Post on 09-Jul-2016

219 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: P2 H

DAILY REPORT ON EQUIPMENT CHECK-LISTLAPORAN HARIAN PEMERIKSAAN PERALATAN

JOB UNIT CODE: DATE/TANGGAL:OPERATION/DRIVER'S NAME SIGNATURED/TTD

HOURS METERAWAL/STAR

AKHIR/FINISHA.PEMERIKSAAN UMUM.GENERAL CHECK LIST

1 periksa oli mesin /check engine oil

2 periksa oli hidrolik / check hydraulic oil

3 periksa oli transmisi/check transmisi oil

4 periksa bahan bakar solar/ check the diesel fuel

5 periksa air radiator/ check the radiator water

6 accu / check the batteries

7 tangki udara/ check the air tank

89

1011121314151617181920

pemeriksaan dilakukan setelah pergantian shift atau istirahat makan /ckeck are conducted every change of shift & after meal hours

Page 2: P2 H

DAILY REPORT ON EQUIPMENT CHECK-LISTLAPORAN HARIAN PEMERIKSAAN PERALATAN

DATE/TANGGAL:SIGNATURED/TTD

pemeriksaan dilakukan setelah pergantian shift atau istirahat makan /ckeck are conducted every change of shift & after meal hours